HOME INSPECTION REPORT
PREPARED FOR:
KENNETH PRIVETT & ROSIMER PRIVETT
PROPERTY AT: 2800 SW 154 AVE
DAVIE, FLORIDA
PREPARED BY:
KBC BUILDING INSPECTIONS, INC. ENGINEERING, CONSTRUCTION MANAGEMENT & REAL ESTATE INSPECTION SERVICES
8724 SUNSET DRIVE #427, MIAMI, FL. 33173-3512 TELEPHONE: (305662-5073 / FAX: (305) 553-3735
Page 1 of 20
KBC BUILDING INSPECTIONS, INC. ENGINEERING, CONSTRUCTION MANAGEMENT & INSPECTION SERVICES
INSPECTION REPORT
CLIENT INFORMATION:
Client Name: Kenneth Privett &
Rosimer Privett
Telephone no.:
INSPECTION INFORMATION:
Date of Inspection: 08-12-19
Location: 2800 SW 154 Ave
Inspector: G. Fagundo
G. Fagundo, jr
(HI-4019)
A. Fernandez
Building Use: Residential Commercial Other
Type of Inspection:
Comprehensive Package Appliances
Roof Pool/Hot Tub/Spa
Structural Sprinkler System
Plumbing Water Quality
Electrical Townhouse Package
A/C & Heating System Termite
Present at Inspection:
Client Selling Agent
Seller Listing Agent
GENERAL INFORMATION:
KBC Building Inspections, Inc. has performed the inspection(s) in accordance with the conditions
established in the Service Agreement with the Client. The inspection did not involve destructive
testing; therefore, surface materials were not removed during the inspection. When there were
numerous similar items to be checked (i.e., windows, doors, electrical switches/receptacles, etc.),
a spot check of a representative number was performed. KBC Building Inspections, Inc. does not
check gas lines, appliances, etc. for leaks; therefore, if the property is serviced with gas, the Client
should obtain a satisfactory gas utility safety inspection. Repair work should not be performed
based solely upon this Inspection Report. Prior to the closing date, an appropriate licensed
contractor specializing in the specific area of expertise should further evaluate the system or item
to offer a recommendation for repair. Changes can occur to this property between the time of this
inspection and the closing date of the sale. The Client should personally inspect the property prior
to the closing date to confirm that nothing has been changed, altered or damaged.
KBC BUILDING INSPECTIONS, INC. INSPECTION REPORT
Page 2 of 20
DEFINITION OF EVALUATION TERMS:
N/A Not applicable and/or not inspected.
Normal Item is in normal condition for its age, in the opinion of the inspector.
N/R Item needs repair or replacement. Item is not functioning, is in an unsafe condition,
or has deteriorated in the opinion of the inspector.
W.D.O. Item shows indication of deterioration, possibly due to wood destroying organisms;
consult pest infestation expert.
R/C Please refer to comments provided.
Note: When the terms N/R and/or W.D.O. are used throughout this report, we recommend that
an appropriate licensed contractor or professional specializing in the specific area of expertise be
called in to further evaluate the system.
All cost estimates included in this report are only approximate. If a more detailed estimate
is required, it is recommended that the Client obtain a cost estimate from a Licensed
Contractor or Technician who specializes in the specific area of expertise. Cost estimates for
cosmetic repairs are not included in this report.
KBC BUILDING INSPECTIONS, INC. INSPECTION REPORT
Page 3 of 20
ROOF:
Main Roof: Asphalt Shingles Attic: Yes No
Sloping Flat Accessible
Inaccessible
Roof No. 2 Surface: N/A Limited Access
Sloping Flat Storage/Obstructions
Attic Insulation:
Roof No. 3 Surface: N/A Batt Other
Sloping Flat Loose N/A
Component: N/A Normal N/R W.D.O. R/C
Flashing
Fascias
Soffits
Ridge
Gutters
Downspouts
Vent Piping Penetration
Ventilators Penetration
Chimney Penetration
Wood Trusses
Wood Rafters
Wood Joists
Roof Sheathing
Attic Ventilation
Visible Water Penetration No Yes, refer to comments.
Comments:
1. Evaluation of all components is based on visible roof surface and not on the life expectancy
of the roof system. No thermal or material content evaluation of insulation was performed.
2. Roof is in poor condition, improper shingles used on ridge. It appears that roof was not
professionally installed. It is recommended that roof be replaced. Approx. $16,000. (see
fig. 1)
3. SE corner of roof is damaged and improperly repaired. Area is currently being held up
by temporary lally columns. Approx. $2,500 to reinforce and repair area. (see fig. 2)
4. Underside of rear porch roof needs to be redone. Approx. $500. (see fig. 3)
5. No roof insulation noted. Approx. $2,000 to install.
KBC BUILDING INSPECTIONS, INC. INSPECTION REPORT
Page 4 of 20
EXTERIOR:
Component: N/A Normal N/R W.D.O. R/C
Exterior Siding
Stairways/Landings/Railings
Balconies/Railings
Decks/Railings
Patios/Porches
Window Trim
Exterior Doors
Door Frame & Trim
Sliding Doors
Garage Doors
Walkways/Driveways
Grading & Drainage
Retaining Walls
Comments:
1. Due to rust and generally poor condition, front door needs to be replaced. Approx. $700.
2. Rear exterior door needs to be replaced. Approx. $500. (see fig. 4)
3. South exterior (grarge) door is improperly installed. It is recommended that door and
frame be replaced. Approx. $500. (see fig. 5)
4. South exterior overhead doors and tracks need to be replaced. Approx. $4,800.
5. Rear sliding glass doors at living room have been removed. Approx. $3,000 to install.
(see fig. 6)
6. Front porch columns appear to have been removed. It is strongly recommended that
columns be reinstalled. Approx. $1,500. (see fig. 7)
7. It should be noted that north area of yard is very wet and muddy. Multiple puddles of
water observed and soil is very loose. There appears to be no water piping in the area,
but it is strongly recommended that area be monitored for further signs of water.
KBC BUILDING INSPECTIONS, INC. INSPECTION REPORT
Page 5 of 20
FLOOR:
Type: Concrete Slab Wood Frame
Crawl Space: None Inspected No Access
Crawl Space Walls: N/A Block/Brick Concrete
Component: N/A Normal N/R W.D.O. R/C
Concrete Slab
Crawl Space
Joist/Girders
Ventilation
Floors
Tiles
Other:
Comments:
1. Landing at rear exterior door needs to be replaced with a concrete slab. Approx. $150. (see
fig. 8)
KBC BUILDING INSPECTIONS, INC. INSPECTION REPORT
Page 6 of 20
INTERIOR:
Component: N/A Normal N/R W.D.O. R/C
Walls
Ceilings
Doors
Windows
Stairway/Railings
Balconies/Railings
Fireplace
Cabinets/Countertops
Comments:
1. Surfacing materials and/or obstructions such as wall coverings, furniture, etc. were not
removed during the visual inspection; therefore, the condition of the wall, floor or ceiling
behind or under such item was not evaluated.
2. Master bathroom window has a damaged glass pane. Approx. $100 to replace. (see fig.
8)
3. Two damaged glass panes noted at NW bedroom. Approx. $200 to replace.
4. Front porch window frames are damaged. Approx. $200 to repair. (see fig. 9)
5. It should be noted that windows throughout house are in fair-to-poor condition and are
not protected by any impact-resistant materials.
6. Water stains noted at NE bedroom south wall. This appears to be from a previous water
leak at adjacent bathroom. (see fig. 10)
7. Ceiling at NW corner of garage is damaged. Approx. $75 to repair. (see fig. 11)
8. Kitchen cabinets and countertops are water-damaged throughout. Approx. $9,000 to redo
kitchen cabinets and countertops.
KBC BUILDING INSPECTIONS, INC. INSPECTION REPORT
Page 7 of 20
ELECTRICAL:
Service Type: Overhead Underground
Service Line: Copper Aluminum Unknown
Household Circuits: Copper Aluminum Unknown
Type: Circuit Breaker Fuses
Component: N/A Normal N/R R/C
Exterior Wiring
Main Electrical Service
Main Panel
Interior Wiring
Switches
Receptacles
Light Fixtures
Ceiling Fans:
GFI Receptacles/Breakers: No Yes
Comments:
1. The electrical system evaluation is limited to visual observations of the components.
2. Electrical system is not properly grounded. Approx. $375 to properly ground. (see fig.
12)
3. Uncapped wiring at main panel needs to be properly capped. Approx. $20. (see fig. 13)
4. 220-volt outlet has been installed directly to main panel bus. This needs to be removed.
(see fig. 14)
5. Current main shutoff is a fuse.
6. Due to age and condition of main panel, it is strongly recommended that main panel be
replaced with a larger-capacity panel and that main shutoff be integrated into panel.
Approx. $4,000.
7. Kitchen outlets need to be replaced with GFI outlets. Approx. $225.
8. Hall bathroom outlet needs to be replaced with a GFI outlet. Approx. $75.
9. Master bathroom outlet needs to be replaced with a GFI outlet. Approx. $75.
10. Exterior outlets need to be replaced with GFI outlets. Approx. $200.
11. Kitchen light fixture needs to be replaced. Approx. $100.
12. Shutoff fuse used to power exterior well pump needs to be replaced. Approx. $300.
KBC BUILDING INSPECTIONS, INC. INSPECTION REPORT
Page 8 of 20
HEATING & AIR CONDITIONING:
Component: N/A Normal N/R R/C
Air Conditioning
Air Handler
Condenser Unit
Heat
Ductwork
Filter
Other
Comments:
1. Heat recovery, solar systems or other supplementary systems for the heating system are
not included in this inspection.
2. There is currently no A/C installed. Approx. $5,000 to install.
3. A/C ductwork needs to be re-insulated. Approx. $2,000. (see fig. 15)
KBC BUILDING INSPECTIONS, INC. INSPECTION REPORT
Page 9 of 20
PLUMBING:
Service for water supply system appears to be:
Municipal Water Private On-Site Water (Not Inspected)
Unknown
Water Supply Lines:
Copper PVC Cast Iron Galvanized
Polybutelene
Service for sanitary sewer system appears to be:
Municipal Water Private On-Site Water (Not Inspected) Unknown
Sanitary Sewer Lines:
PVC Cast Iron Galvanized Unknown
Component: N/A Normal N/R R/C
Water Pressure
Water Piping
Waste & Drain Piping
Kitchen Sink & Faucet
Bar Sink & Faucet
Bathroom Sink & Faucet
Bathtub & Faucet
Stall Shower & Faucet
Toilets
Bathroom Ventilation
Laundry Tub & Faucets
Comments:
1. No water analysis was performed; water softener systems and filters were not inspected.
2. Evaluation of piping was limited to visible inspection only; in-wall/under-floor piping and
other hidden plumbing components, which may exist, were not inspected.
3. Cast iron plumbing noted. All remaining cast iron piping needs to be replaced with PVC.
Approx. $20,000. (see fig. 16)
4. Master bathroom bathtub piping needs to be redone. Approx. $400. (see fig. 17)
5. Hall bathroom bathtub piping needs to be redone. Approx. $400. (see fig. 18)
6. Leak noted at hall bathroom toilet supply. Approx. $175 to repair. (see fig. 19)
7. Galvanized steel supply lines noted at well pumps. Garage well pump is improperly
installed. All galvanized supply lines, pressure tank, and both well pumps need to be
replaced. Approx. $16,000.
KBC BUILDING INSPECTIONS, INC. INSPECTION REPORT
Page 10 of 20
WATER HEATER:
Fuel: Electric Gas Solar Heat Recovery Other
Component: N/A Normal N/R R/C
Water Heater
Piping
Pressure Release Valve
Insulated Jacket
Other:
Comments:
1. Heat recovery, solar systems or other supplementary systems for the water heater are not
included in this inspection. 2. Water heater needs to be replaced. Approx. $750. (see fig. 20)
KITCHEN & APPLIANCES:
Exhaust Fan: Vented Ductless
Component: N/A Normal N/R R/C
Refrigerator
Range Top
Oven
Exhaust Fan
Microwave
Dishwasher
Garbage Disposal
Trash Compactor
Washer (Clothes)
Dryer (Clothes)
Other:
Comments:
1. The following items are not included as part of this inspection: icemakers, cosmetic
appearances, self-cleaning oven cycle, oven temperature calibration, water filter units, water
pressure and water levels of dishwasher, and washer (clothes), thermostatic controls,
complete operating cycles, and appliance accessories.
2. Dishwasher needs to be replaced. Approx. $800.
KBC BUILDING INSPECTIONS, INC. INSPECTION REPORT
Page 11 of 20
PAINT:
Lead Test Performed: 3M Lead Check Swabs, LOT #AAMBB20
Test Method: One swab per area tested
Areas Tested:
South Exterior Wall
West Exterior Wall
East Exterior Wall
North Exterior Wall
Water Heater Closet
Master Bedroom Window
Garage doorframes
Kitchen Pantry
Kitchen Window
SE bedroom
Results:
No trace of lead was found at any swab location.
Areas are clear of lead, there are no recommendations at this time.
KBC BUILDING INSPECTIONS, INC. INSPECTION REPORT
Page 12 of 20
TOTAL ESTIMATED REPAIR COSTS BY SECTION
1. Roof: $ 21,000.00
2. Exterior: $ 11,000.00
3. Floor: $ 150.00
4. Interior: $ 9,575.00
5. Electrical: $ 5,370.00
6. Heating & Air Conditioning: $ 7,000.00
7. Plumbing: $ 36,975.00
8. Water Heater: $ 750.00
9. Kitchen & Appliances: $ 800.00
10. Pool/Hot Tub/Spa $ 0
Grand Total: $ 92,620.00
All cost estimates included in this report are only approximate. If a more
detailed estimate is required, it is recommended that the Client obtain a cost
estimate from a Licensed Contractor or Technician who specializes in the
specific area of expertise. Cost estimates for cosmetic repairs are not included
in this report.
KBC BUILDING INSPECTIONS, INC. INSPECTION REPORT
Page 13 of 20
Fig. 1 – Roof is in poor condition.
Fig. 2 – SE corner of roof is damaged and improperly repaired.
KBC BUILDING INSPECTIONS, INC. INSPECTION REPORT
Page 14 of 20
Fig. 3 – Underside of rear porch roof needs to be redone.
Fig. 4 – Rear exterior door needs to be replaced.
Fig. 5 – South exterior (garage) door is improperly installed.
KBC BUILDING INSPECTIONS, INC. INSPECTION REPORT
Page 15 of 20
Fig. 5 – Rear sliding glass doors at living room have been removed.
Fig. 6 – Front porch columns appear to have been removed.
Fig. 7 – Landing at rear exterior door needs to be replaced with a concrete slab.
KBC BUILDING INSPECTIONS, INC. INSPECTION REPORT
Page 16 of 20
Fig. 8 – Master bathroom window has a damaged glass pane.
Fig. 9 – Front porch window frames are damaged.
Fig. 10 – Water stains noted at NE bedroom south wall.
KBC BUILDING INSPECTIONS, INC. INSPECTION REPORT
Page 17 of 20
Fig. 11 – Ceiling at NW corner of garage is damaged.
Fig. 12 – Electrical system is not properly grounded.
Fig. 13 – Uncapped wiring at main panel needs to be properly capped.
KBC BUILDING INSPECTIONS, INC. INSPECTION REPORT
Page 18 of 20
Fig. 14 – 220-volt outlet has been installed directly to main panel bus.
Fig. 15 – A/C ductwork needs to be reinsulated.
Fig. 16 – Cast iron plumbing noted.
KBC BUILDING INSPECTIONS, INC. INSPECTION REPORT
Page 19 of 20
Fig. 17 – Master bathroom bathtub piping needs to be redone.
Fig. 18 – Hall bathroom bathtub piping needs to be redone.
Fig. 19 – Leak noted at hall bathroom toilet supply.
KBC BUILDING INSPECTIONS, INC. INSPECTION REPORT
Page 20 of 20
Fig. 20 – Water heater needs to be replaced.