CAREER OBJECTIVE:
A CHALLENGING ROLE IN AUTOMOBILE/AUTO ANCILLARY/TIRE INDUSTRY WHERE MY EXPERTISE IN MAINTENANCE /AFTER SALES SERVICE WOULD BE NEEDED ,WITH AMPLE ROOM FOR PROFESSIONAL AND PERSONAL GROWTH
WORK EXPERIENCE
SAUD BAHWAN AUTOMOTIVE LLC Muscat
Deputy Manager Customer service,Jul2012–
Handling aftersales service for brand Yokohama,Goodyear,,Continental,Maxxis,Techking ,Kumho,GT,TVS,Ceat,Westlake tyres at M/S Saudbahwan Automotive LLC,Oman.
Check to ensure that appropriate changes were made to resolve customers' problems.
Keep records of customer interactions or transactions,recording details of inquiries,complaints, or comments,as well as actions taken.
Contact customers to respond to inquiries or to notify them of claim investigation results or any planned adjustments.
Review claims adjustments with dealers,examining tires claimed to be defective ,and approving or disapproving dealers' claims.
Imparting technical training to major fleet customers,technicians and otherstaff regarding the selection,application of tires and the basics of tyre technology.
Communication and coordination with principals for all technical service activities.
APOLLO TYRES LTD Cochin Kerala
Associate Manager -Maintenance March 2008 - June 2012 Maintenance of Banbury mixers,Engine Generator sets,68 " Calendaring Machine,84" Mills and 60" ,36"
david bridge rolling mills,AHL Tyre building ,machinery,Bias cutters in a bias tyre manufacturing plant Indigenisation of spares and Maintain cost with in the budget,Training to different stake holders.
Successfully completed one project in green belt in six sigma for the reduction of breakdown in curing
and Has won accolades for the same from the Unit head.
Introduced reciprocating membrane sludge pumps in Banbury mill pit and calendar mill pit instead of
centrifugal pump for better house keeping.
Mill guide base and studs modified for reducing breakdown due to compound lumps in mill gap and
achieved 0.25% reduction in compound scrap due to cured compound between mill gaps. Ensured 100 % adherence to PM in Banbury mixer.
Banbury mixer mill blade assembly modified with new pneumatic cylinder assembly for better cutting of
the compounded sheets. Achieved better lubrication efficiency in the mills due to reducing the time of mill grease injection via
plc(suggestion by self with coordination with electrical department). Introduced conveyor trip mechanism for cooling conveyor of dual extruder tread l ine to reduce
production loss and cost of poly amide rods and achieved 0.5 % reduction in extruder l ine loss due to breakage of polyamide rods due to tread loop in cooling coveyor l ine,
Modified mill knife assembly in dual extruder base mill for varying base strip as per specifications.
Modified the dual extruder clamping cylinder base and alignment of the clamping cylinders to ensure
improved clamping and loss of production due to seal leakage in the clamping cylinders and the compound leak from the extruder head
Indigenised PTFE seals of dual locking cylinders of krupp dual extruder for better cost effectiveness.
Indigenised cooling conveyor Teflon rollers and roller locks for better cost effecteviness.
Modified the extruder skiver blade water nozzles for better cooling the blade and hence better l ife. Introduced lechler water spray nozzles in the sidewall cooling conveyor to prevent blisters in the
sidewall. Modified sidewall l ine dancing conveyor to reduce sidewall stretch.
Modified head clamping bolts and die holder for better seating of the die thereby reducing compound
leak through sidewall extruder head Modified bead winding wire roll let off brake for enhancing operator ease.
Modified ply let off in passenger tyre building machine to reduce fabric scrap in tyre building and
achieved 0.03 % reduction in fabric scrap from tyre building Modified triaxial tyre building machine to support the production of OTR tyres and completed and
successfully commissioned 4 of 10 machines.
ROLLS ROYCE ENERGY SYSTEMS INDIA PVT LTD ThanjavurTamilnadu
Senior Engineer Operation and maintenance June 2006 - March 2008 Monitor power plant equipment and indicators to detect evidence of operating problems.
Control power generating equipment, including boilers, turbines, generators, or reactors, using control
boards or semi-automatic equipment. Operation and maintenance of 2*3.25 MW Rolls Royce Bergen KVGS 18G1 gas engine generator based
power plant in Nallur ,Mannargudi,Customer Name : M/S MMS steel and power ltd Generation of Operation data record and planning for spare parts for major/minor overhauls
Acheived 98.2% uptime of the machines against a contracted uptime of 96 % through out the tenure. Acheived 100 % compliance to preventive maintenance activities through proper spares planning and
manpower mobilisation. Represented The O and M team in the major maintenance at M/S Saheli power exports in Mayavaram
and supported the customer to run in the engine much before planned time. Supported customer by proactively planning maintenance aligned with gas station shutdowns and hence
reduced the unwanted breakdowns by 0.45 %. WARTSILA INDIA LTD Tuticorin Tamilnadu
Operation and Maintenance engineer August 2002 - June 2006 Operation and maintenance of Wartsila 3*W18V32 and 4*Vaasa 18V32 LN HFO engine generators based
52 MW powerplant in M/S Sterlite Industries ltd,Tuticorin Monitor power plant equipment and indicators to detect evidence of operating problems.
Clean, lubricate, or maintain equipment, such as generators, turbines, pumps, or compressors, to
prevent failure or deterioration. Examine and test electrical power distribution machinery and equipment, using testing devices.
Planning of spare parts for overhauls,Training of in house staff,Maintain budget.
Acheived 8440 hrs of engine operation against a contracted operation of 8400 hrs.
Completed major maintenance of 4* W18V32 engines with minimal support from the service
department and progressively reduced the maintenance duration for all the engines.
Won accolades from the customer and the South India operations head for the active participation and
successful completion of major maintenance of engines at M/S Loyal textile mills,Kovilpatti and M/S Vikrant cements ,Nayagaun,MP
EDUCATION
SCT College of engineeringThiruvananthapuramKerala
B Tech Mechanical-Automobile Engg, Apr 2001 with 70.2 % aggregate
EXTRA CURRICULAR ACTIVITIES
Active member of Association of Automobile engineering students Kerala and was the executive member for the conduction of first ever automobile expo in Trivandrum in the year 1998-1999
Won several prizes in painting,pencil drawing and acting
ADDITIONAL SKILLS
Green belt in six sigma from M/s Apollo Laureate academy
Internal Auditor for ISO/TS 16949/OHSAS 18001/ISO 14001 ,Training from M/S Omnex international
Training in 5s