Hitachi is a fully integrated company with all the R&D ... · PDF fileHitachi is a fully...

16

Transcript of Hitachi is a fully integrated company with all the R&D ... · PDF fileHitachi is a fully...

Page 1: Hitachi is a fully integrated company with all the R&D ... · PDF fileHitachi is a fully integrated company with all the R&D, design, and ... 492,000 kW Francis turbine runner being
Page 2: Hitachi is a fully integrated company with all the R&D ... · PDF fileHitachi is a fully integrated company with all the R&D, design, and ... 492,000 kW Francis turbine runner being
Page 3: Hitachi is a fully integrated company with all the R&D ... · PDF fileHitachi is a fully integrated company with all the R&D, design, and ... 492,000 kW Francis turbine runner being

Hitachi is the leading manufacturer of hydroelectric equipment inJapan and ranks among the top corporations worldwide. Moreover,Hitachi is a fully integrated company with all the R&D, design, andmanufacturing resources needed to undertake any project in anypart of the world.

Hitachi first entered the hydroelectric equipment field in 1911with the production of a 300 HP output Pelton turbine and a 250 kVAgenerator. This was followed by long years of both theoretical andpractical experience in the research, design, manufacturing,installation and operation of hydroelectric equipment, enablingHitachi to produce the highest quality equipment. Since 1911 we havebuilt and installed over 1,400 turbines (64,000 MW) and over 1,300generators (46,000 MVA). This means our engineers have extensivedesign experience in every type of turbine (e.g., Pelton, Francis,Diagonal Flow, Kaplan, and Tubular) and generator used inconventional and pumped-storage plants. It also means our know-how covers all other aspects of hydroelectric plants, includinggovernors, inlet valves, excitation systems, and other types ofancillary and control equipment. Our accumulated experience as amanufacturer is an invaluable asset. Hitachi can design any systemor piece of equipment using the latest model test, quality control,and system engineering techniques.

This brochure has been prepared to provide a briefintroduction to Hitachi’s hydroelectric power generating equipment.

Preface

Page 4: Hitachi is a fully integrated company with all the R&D ... · PDF fileHitachi is a fully integrated company with all the R&D, design, and ... 492,000 kW Francis turbine runner being

Hitachi Hydroelectric Equipment

Hitachi Assures High Reliability throughSpecial Testing Equipment and Advanced AnalysisHitachi Assures High Reliability throughSpecial Testing Equipment and Advanced Analysis

Model test stands for hydraulic turbines

Flow analysis of pump- turbine

Flow analysis of runner

Actual head test equipment

Thrust bearing test facility

Hitachi Hydraulic Laboratory

2

Page 5: Hitachi is a fully integrated company with all the R&D ... · PDF fileHitachi is a fully integrated company with all the R&D, design, and ... 492,000 kW Francis turbine runner being

Hitachi Hydroelectric Equipment

Hitachi Supplies All Kinds of Hydroelectric EquipmentHitachi Supplies All Kinds of Hydroelectric Equipment

Control room for Okutataragi Power Station, Japan

2.3 m dia. spherical type turbine inlet valvefor Okuyahagi No.2 Power Station, Japan

Thyristor starting freqency controlfor Kannagawa Power Station, Japan

280 MVA/280 MW 16.5 kV 375 min-1 Generator-motor for Okukiyotsu Power Station, Japan

Actuator Digital speedgovemor

475 MVA/438 MW 18 kV 500 min-1 Pump-turbine andGenerator-motor 3D-CADfor Kazunogawa Power Station, Japan

3

Page 6: Hitachi is a fully integrated company with all the R&D ... · PDF fileHitachi is a fully integrated company with all the R&D, design, and ... 492,000 kW Francis turbine runner being

Hitachi Hydroelectric Equipment

Runner of 414,000 kW pump-turbinefor Helms Power Station, U.S.A.

Machining of head cover of 414,000 kW pump-turbinefor Helms Power Station, U.S.A.

Runner of 318,000 kW pump-turbinefor Nabara Power Station, Japan

Half of split runner of 176,000 kW pump-turbinefor Srisailam Power Station, India

Hitachi Francis Type Pump-TurbinesHitachi Francis Type Pump-Turbines

Record of Francis Type Pump Turbines

4

Name of Power Plant Country Max.Output(kW)

Max.Head(m)

Speed(min-1)

No. ofUnits

YearSpeed(min-1)

Max.Head(m)

Max.Discharge

(m3/s)

Turbine Operation Pump Operation

Helms

Kazunogawa

Samrangjin

Ludington

Okawachi

Bear Swamp

Rocky Mt.

Nabara

Omarugawa

U.S.A.

Japan

Korea

U.S.A.

Japan

U.S.A.

U.S.A.

Japan

Japan

414,000

412,000

370,000

343,000

331,000

320,000

320,000

318,000

310,000

531.6

728.0

345.0

107.7

415.6

228.6

210.3

317.5

671.8

360

500

300

113

330-390

225

225

257

576-624

517.0

778.0

355.0

113.6

432.0

240.8

218.5

340.5

720.4

73.6

50.3

103.3

314.0

81.7

125.4

146.4

110

44.1

360

500

300

113

330-390

225

225

257

576-624

3

1

2

6

2

2

3

2

2

1984

1999

1985

1973

1993

1974

19872001 (Unit 1)2003 (Unit 2)*

* Runner Replace

2007 (Unit 4)2010 (Unit 1)

Page 7: Hitachi is a fully integrated company with all the R&D ... · PDF fileHitachi is a fully integrated company with all the R&D, design, and ... 492,000 kW Francis turbine runner being

Shop assembly of spiral case and stay ringof 343,000 kW pump-turbine for Ludington Power Station, U.S.A.

Runner of 412,000 kW pump-turbinefor Kazunogawa Power Station, Japan

Shop assembly of 412,000 kW pump-turbinefor Kazunogawa Power Station, Japan

Runner of 120,000 kW pump-turbinefor Nagarjunasagar Power Station, India

5

Shop assembly of 310,000 kW pump-turbinefor Omarugawa Power Station, Japan

Page 8: Hitachi is a fully integrated company with all the R&D ... · PDF fileHitachi is a fully integrated company with all the R&D, design, and ... 492,000 kW Francis turbine runner being

Hitachi Hydroelectric Equipment

Hitachi Francis TurbinesHitachi Francis Turbines

Runner of 265,000 kW Francis turbinefor Brownlee Power Station, U.S.A.

Shop assembly of 89,500 kW Francis turbinefor Temengor Power Station, Malaysia

Shop assembly of 492,000 kW Francis turbine main bodyfor Mica Power Station, Canada

492,000 kW Francis turbine runner being transported to MicaPower Station, Canada

Record of Francis Turbines

6

Name of Power Plant

Guri II

Mica

Foz Do Areia

Brownlee

Tarbela

Macagua II

Country

Venezuela

Canada

Brazil

U.S.A.

Pakistan

Venezuela

Max.Output(kW)

730,000

492,000

430,300

265,000

216,000

216,000

Max.Head(m)

146

182.9

135

81

136.5

50.5

Speed(min-1)

No. ofUnits Year

112.5

129

129

100

136

81.8

10

2

4

1

4

12

1984

1975

1980

1980

1972

1996

Page 9: Hitachi is a fully integrated company with all the R&D ... · PDF fileHitachi is a fully integrated company with all the R&D, design, and ... 492,000 kW Francis turbine runner being

Runner of 216,000 kW Francis turbine for Macagua ll Power Station, Venezuela

Shop assembly of 216,000 kW Francis turbine for Macagua llPower Station, Venezuela

Splitter-blade Runner of 23,800 kW Francis turbine for OntakePower Station, Japan

7

Page 10: Hitachi is a fully integrated company with all the R&D ... · PDF fileHitachi is a fully integrated company with all the R&D, design, and ... 492,000 kW Francis turbine runner being

Hitachi Hydroelectric Equipment

Hitachi Kaplan TurbinesHitachi Kaplan Turbines

Shop assembly of runner of 89,500 kW Kaplanturbine for Otori No.2 Power Station, Japan

Shop assembly of runner of 92,000 kW Kaplan turbinefor Nipawin Power Station, Canada

Shop assembly of spiral case and stay ring of 59,500 kW Kaplan turbinefor Takisato Power Station, Japan

Shop assembly of runner of 235,000 kW Kaplanturbine for Shuikou Power Station, China

Record of Kaplan Turbines

8

Name of Power Plant

Shuikou

Otori

Nipawin

Otori No.2

Macagua II

Takisato

Country

China

Japan

U.S.A.

Japan

Venezuela

Japan

Max.Output(kW)

235,000

100,000

92,000

89,500

88,200

59,500

Max.Head(m)

57.8

51.0

34.5

48.2

23.0

47.0

Speed(min-1)

No. ofUnits Year

107

125

113

167

94.7

187.5

2

1

3

1

2

1

1993

1963

1985

2003

1995

1999

Page 11: Hitachi is a fully integrated company with all the R&D ... · PDF fileHitachi is a fully integrated company with all the R&D, design, and ... 492,000 kW Francis turbine runner being

Hitachi Hydroelectric Equipment

Hitachi Impulse TurbinesHitachi Impulse Turbines

Shop assembly of 18,000 kW Impulse turbinefor Shin-Shimodaira Power Station, Japan

Shop assembly of 19,500 kW Impulse turbinefor Akaishizawa Power Station, Japan

Shop assembly of 95,000 kW Impulse turbinefor Kurobegawa No.4 Power Station, Japan

Runner for Karasugawa No.3 Power Station, Japan

Record of Inpulse Turbines

9

Name of Power Plant

Kurobegawa No. 4

Loon Lake

Akaishizawa

Shin-Shimodaira

Karasugawa No.3

Yutaka

Country

Japan

U.S.A.

Japan

Japan

Japan

Japan

Max.Output(kW)

95,000

85,800

19,500

18,000

16,700

14,500

Max.Head(m)

580

345.3

323.8

221.5

485.35

304.26

Speed(min-1)

No. ofUnits Year

360

200

514

333

720

514

1

1

1

1

1

1

1973

1968

1994

2002

1985

2006

Page 12: Hitachi is a fully integrated company with all the R&D ... · PDF fileHitachi is a fully integrated company with all the R&D, design, and ... 492,000 kW Francis turbine runner being

Hitachi Hydroelectric Equipment

Hitachi Tubular TurbinesHitachi Tubular Turbines

Runner of 48,190 kW Bulb turbinefor Hong Jiang Power Station, China

Shop assembly of 30,930 kW Bulb turbinefor Ling Jintan Power Station, China

Shop assembly of 65,800 kW Bulb turbinefor Tadami Power Station, Japan

Model of Bulb turbine for Tadami Power Station, Japan

Record of Tubular Turbines

10

Name of Power Plant

Tadami

Hong Jiang

Kangyang

Ling Jintan

Friant-Kern No. 1

Country

Japan

China

China

China

U.S.A.

Max.Output(kW)

65,800

48,190

42,700

30,930

19,620

Max.Head(m)

20.7

27.3

22.5

10.5

36.4

Speed(min-1)

No. ofUnits Year

100

136.4

125

79.8

180

1

2

7

6

1

1989

2003

2005

1998

1985

Remarks

Bulb

Bulb

Bulb

Bulb

S-type

Page 13: Hitachi is a fully integrated company with all the R&D ... · PDF fileHitachi is a fully integrated company with all the R&D, design, and ... 492,000 kW Francis turbine runner being

Hitachi Hydroelectric Equipment

Hitachi Diagonal Flow Turbines andPump-TurbinesHitachi Diagonal Flow Turbines andPump-Turbines

Shop assembly of 7,200 kW Diagonalflow turbine for Kumanogawa PowerStation, Japan

Shop assembly of 88,000 kW Diagonalflow pump-turbine for Takane No.1Power Station, Japan

Installation of 149,000 kW Diagonal flowturbine for Masegawa No.1 PowerStation, Japan

Record of Diagonal Flow Turbine and Pump Turbines

Turbines

Pump Turbines

11

Name of Power Plant

Sameura

Shin-Nikkogawa

Ashiogawa No.2

Kumanogawa

Country

Japan

Japan

Japan

Japan

Max.Output(kW)

44,000

15,500

14,700

7,200

Max.Head(m)

87.5

113.4

94

140

Speed(min-1)

No. ofUnits Year

257

600

450

720

1

1

1

1

1970

1963

1987

1987

Name of Power Plant Country Max.Output(kW)

Max.Head(m)

Speed(min-1)

No. ofUnits

YearSpeed(min-1)

Max.Head(m)

Max.Discharge

(m3/s)

Turbine Operation Pump Operation

Masegawa No. 1

Takane No. 1

Japan

Japan149,000

88,000

104.9

136.2180

277

109.7

137.4

167

75

180

277

2

21976

1969

Page 14: Hitachi is a fully integrated company with all the R&D ... · PDF fileHitachi is a fully integrated company with all the R&D, design, and ... 492,000 kW Francis turbine runner being

12

Hitachi Hydroelectric Equipment

Hitachi Generator-MotorsHitachi Generator-Motors

220 MVA generator-motor assembly for Sriragarind Power Station, Thailand Rotor of 316 MVA generator-motorfor Tenzan Power Station, Japan

Rotor of 475 MVA generator-motorfor Kazunogawa No.1 Power Station, Japan

Rotor of 395 MVA adjustable speed generator-motor for Okawachi Power Station, Japan

Record of Generator Motors

Name of Power Plant Country Speed(min-1)

No. ofUnits

YearSpeed(min-1)

Output(kW)

Voltage(kV)

Turbine Operation Pump Operation

Kannagawa

Kazunogawa

Okawachi

Rocky Mt.

Omarugawa

Srinagarind

Japan

Japan

Japan

U.S.A.

Japan

Thailand

525,000

475,000

395,000

361,000

345,000

220,000

500

500

330–390

225

576-624

150

50

50

60

60

60

50

464,000

438,000

388,000

366,500

330,000

210,000

18.0

18.0

18.0

19.0

16.5

13.8

500

500

330-390

225

576-624

150

2

1

2

3

2

2

1999

1993

19952007 (Unit 4)2010 (Unit 1)

Freq.(Hz)

Freq.(Hz)

Capacity(kVA)

Voltage(kV)

50

50

60

60

60

50

18.0

18.0

18.0

20.0

16.5

13.8 19851991

2005 (Unit 1)2013 (Unit 2)

Page 15: Hitachi is a fully integrated company with all the R&D ... · PDF fileHitachi is a fully integrated company with all the R&D, design, and ... 492,000 kW Francis turbine runner being

Hitachi Hydroelectric Equipment

Stator frame of 805,000 kVA generatorfor Guri II Power Station, Venezuela

Rotor of 288,000 kVA generatorfor Brownlee Power Station, U.S.A.

67,200 kVA bulb turbine generatorfor Tadami Power Station, Japan

18,400 kVA Tubular turbine generatorfor Friant-Kern No.1 Power Station, U.S.A.

Hitachi Hydraulic TurbineDriven A.C. GeneratorsHitachi Hydraulic TurbineDriven A.C. Generators

Record of A.C. Generators

13

Name of Power Plant

Guri ll

Brownlee

Macagua ll

Shuikou

Arimine No.2

Tadami

Friant-Kern No.1

Country

Venezuela

U.S.A.

Venezuela

China

Japan

Japan

U.S.A.

Voltage(kV)

805,000

288,000

250,000

242,100

130,000

67,200

18,400

Freq.(Hz)

Speed(min-1)

No. ofUnits

Year

60

60

60

50

60

50

60

1

1

4

2

1

1

1

1984

1980

1993

1993

1982

1989

1985

TurbineType

Capacity(kVA)

18.0

13.8

13.8

13.8

16.5

11

6.6

113

100

81.8

107

277

100

180

Francis

Francis

Francis

Kaplan

Francis

Bulb

S-Tube

Page 16: Hitachi is a fully integrated company with all the R&D ... · PDF fileHitachi is a fully integrated company with all the R&D, design, and ... 492,000 kW Francis turbine runner being

Printed in Japan (H) WG-E019 0606

Hitachi, Ltd.Akihabara Daibiru Building, 18-13,Soto-Kanda 1-chome, Chiyoda-ku, Tokyo, 101-8608 JapanTel: +81-3-3258-1111