Hitachi is the leading manufacturer of hydroelectric equipment inJapan and ranks among the top corporations worldwide. Moreover,Hitachi is a fully integrated company with all the R&D, design, andmanufacturing resources needed to undertake any project in anypart of the world.
Hitachi first entered the hydroelectric equipment field in 1911with the production of a 300 HP output Pelton turbine and a 250 kVAgenerator. This was followed by long years of both theoretical andpractical experience in the research, design, manufacturing,installation and operation of hydroelectric equipment, enablingHitachi to produce the highest quality equipment. Since 1911 we havebuilt and installed over 1,400 turbines (64,000 MW) and over 1,300generators (46,000 MVA). This means our engineers have extensivedesign experience in every type of turbine (e.g., Pelton, Francis,Diagonal Flow, Kaplan, and Tubular) and generator used inconventional and pumped-storage plants. It also means our know-how covers all other aspects of hydroelectric plants, includinggovernors, inlet valves, excitation systems, and other types ofancillary and control equipment. Our accumulated experience as amanufacturer is an invaluable asset. Hitachi can design any systemor piece of equipment using the latest model test, quality control,and system engineering techniques.
This brochure has been prepared to provide a briefintroduction to Hitachi’s hydroelectric power generating equipment.
Preface
Hitachi Hydroelectric Equipment
Hitachi Assures High Reliability throughSpecial Testing Equipment and Advanced AnalysisHitachi Assures High Reliability throughSpecial Testing Equipment and Advanced Analysis
Model test stands for hydraulic turbines
Flow analysis of pump- turbine
Flow analysis of runner
Actual head test equipment
Thrust bearing test facility
Hitachi Hydraulic Laboratory
2
Hitachi Hydroelectric Equipment
Hitachi Supplies All Kinds of Hydroelectric EquipmentHitachi Supplies All Kinds of Hydroelectric Equipment
Control room for Okutataragi Power Station, Japan
2.3 m dia. spherical type turbine inlet valvefor Okuyahagi No.2 Power Station, Japan
Thyristor starting freqency controlfor Kannagawa Power Station, Japan
280 MVA/280 MW 16.5 kV 375 min-1 Generator-motor for Okukiyotsu Power Station, Japan
Actuator Digital speedgovemor
475 MVA/438 MW 18 kV 500 min-1 Pump-turbine andGenerator-motor 3D-CADfor Kazunogawa Power Station, Japan
3
Hitachi Hydroelectric Equipment
Runner of 414,000 kW pump-turbinefor Helms Power Station, U.S.A.
Machining of head cover of 414,000 kW pump-turbinefor Helms Power Station, U.S.A.
Runner of 318,000 kW pump-turbinefor Nabara Power Station, Japan
Half of split runner of 176,000 kW pump-turbinefor Srisailam Power Station, India
Hitachi Francis Type Pump-TurbinesHitachi Francis Type Pump-Turbines
Record of Francis Type Pump Turbines
4
Name of Power Plant Country Max.Output(kW)
Max.Head(m)
Speed(min-1)
No. ofUnits
YearSpeed(min-1)
Max.Head(m)
Max.Discharge
(m3/s)
Turbine Operation Pump Operation
Helms
Kazunogawa
Samrangjin
Ludington
Okawachi
Bear Swamp
Rocky Mt.
Nabara
Omarugawa
U.S.A.
Japan
Korea
U.S.A.
Japan
U.S.A.
U.S.A.
Japan
Japan
414,000
412,000
370,000
343,000
331,000
320,000
320,000
318,000
310,000
531.6
728.0
345.0
107.7
415.6
228.6
210.3
317.5
671.8
360
500
300
113
330-390
225
225
257
576-624
517.0
778.0
355.0
113.6
432.0
240.8
218.5
340.5
720.4
73.6
50.3
103.3
314.0
81.7
125.4
146.4
110
44.1
360
500
300
113
330-390
225
225
257
576-624
3
1
2
6
2
2
3
2
2
1984
1999
1985
1973
1993
1974
19872001 (Unit 1)2003 (Unit 2)*
* Runner Replace
2007 (Unit 4)2010 (Unit 1)
Shop assembly of spiral case and stay ringof 343,000 kW pump-turbine for Ludington Power Station, U.S.A.
Runner of 412,000 kW pump-turbinefor Kazunogawa Power Station, Japan
Shop assembly of 412,000 kW pump-turbinefor Kazunogawa Power Station, Japan
Runner of 120,000 kW pump-turbinefor Nagarjunasagar Power Station, India
5
Shop assembly of 310,000 kW pump-turbinefor Omarugawa Power Station, Japan
Hitachi Hydroelectric Equipment
Hitachi Francis TurbinesHitachi Francis Turbines
Runner of 265,000 kW Francis turbinefor Brownlee Power Station, U.S.A.
Shop assembly of 89,500 kW Francis turbinefor Temengor Power Station, Malaysia
Shop assembly of 492,000 kW Francis turbine main bodyfor Mica Power Station, Canada
492,000 kW Francis turbine runner being transported to MicaPower Station, Canada
Record of Francis Turbines
6
Name of Power Plant
Guri II
Mica
Foz Do Areia
Brownlee
Tarbela
Macagua II
Country
Venezuela
Canada
Brazil
U.S.A.
Pakistan
Venezuela
Max.Output(kW)
730,000
492,000
430,300
265,000
216,000
216,000
Max.Head(m)
146
182.9
135
81
136.5
50.5
Speed(min-1)
No. ofUnits Year
112.5
129
129
100
136
81.8
10
2
4
1
4
12
1984
1975
1980
1980
1972
1996
Runner of 216,000 kW Francis turbine for Macagua ll Power Station, Venezuela
Shop assembly of 216,000 kW Francis turbine for Macagua llPower Station, Venezuela
Splitter-blade Runner of 23,800 kW Francis turbine for OntakePower Station, Japan
7
Hitachi Hydroelectric Equipment
Hitachi Kaplan TurbinesHitachi Kaplan Turbines
Shop assembly of runner of 89,500 kW Kaplanturbine for Otori No.2 Power Station, Japan
Shop assembly of runner of 92,000 kW Kaplan turbinefor Nipawin Power Station, Canada
Shop assembly of spiral case and stay ring of 59,500 kW Kaplan turbinefor Takisato Power Station, Japan
Shop assembly of runner of 235,000 kW Kaplanturbine for Shuikou Power Station, China
Record of Kaplan Turbines
8
Name of Power Plant
Shuikou
Otori
Nipawin
Otori No.2
Macagua II
Takisato
Country
China
Japan
U.S.A.
Japan
Venezuela
Japan
Max.Output(kW)
235,000
100,000
92,000
89,500
88,200
59,500
Max.Head(m)
57.8
51.0
34.5
48.2
23.0
47.0
Speed(min-1)
No. ofUnits Year
107
125
113
167
94.7
187.5
2
1
3
1
2
1
1993
1963
1985
2003
1995
1999
Hitachi Hydroelectric Equipment
Hitachi Impulse TurbinesHitachi Impulse Turbines
Shop assembly of 18,000 kW Impulse turbinefor Shin-Shimodaira Power Station, Japan
Shop assembly of 19,500 kW Impulse turbinefor Akaishizawa Power Station, Japan
Shop assembly of 95,000 kW Impulse turbinefor Kurobegawa No.4 Power Station, Japan
Runner for Karasugawa No.3 Power Station, Japan
Record of Inpulse Turbines
9
Name of Power Plant
Kurobegawa No. 4
Loon Lake
Akaishizawa
Shin-Shimodaira
Karasugawa No.3
Yutaka
Country
Japan
U.S.A.
Japan
Japan
Japan
Japan
Max.Output(kW)
95,000
85,800
19,500
18,000
16,700
14,500
Max.Head(m)
580
345.3
323.8
221.5
485.35
304.26
Speed(min-1)
No. ofUnits Year
360
200
514
333
720
514
1
1
1
1
1
1
1973
1968
1994
2002
1985
2006
Hitachi Hydroelectric Equipment
Hitachi Tubular TurbinesHitachi Tubular Turbines
Runner of 48,190 kW Bulb turbinefor Hong Jiang Power Station, China
Shop assembly of 30,930 kW Bulb turbinefor Ling Jintan Power Station, China
Shop assembly of 65,800 kW Bulb turbinefor Tadami Power Station, Japan
Model of Bulb turbine for Tadami Power Station, Japan
Record of Tubular Turbines
10
Name of Power Plant
Tadami
Hong Jiang
Kangyang
Ling Jintan
Friant-Kern No. 1
Country
Japan
China
China
China
U.S.A.
Max.Output(kW)
65,800
48,190
42,700
30,930
19,620
Max.Head(m)
20.7
27.3
22.5
10.5
36.4
Speed(min-1)
No. ofUnits Year
100
136.4
125
79.8
180
1
2
7
6
1
1989
2003
2005
1998
1985
Remarks
Bulb
Bulb
Bulb
Bulb
S-type
Hitachi Hydroelectric Equipment
Hitachi Diagonal Flow Turbines andPump-TurbinesHitachi Diagonal Flow Turbines andPump-Turbines
Shop assembly of 7,200 kW Diagonalflow turbine for Kumanogawa PowerStation, Japan
Shop assembly of 88,000 kW Diagonalflow pump-turbine for Takane No.1Power Station, Japan
Installation of 149,000 kW Diagonal flowturbine for Masegawa No.1 PowerStation, Japan
Record of Diagonal Flow Turbine and Pump Turbines
Turbines
Pump Turbines
11
Name of Power Plant
Sameura
Shin-Nikkogawa
Ashiogawa No.2
Kumanogawa
Country
Japan
Japan
Japan
Japan
Max.Output(kW)
44,000
15,500
14,700
7,200
Max.Head(m)
87.5
113.4
94
140
Speed(min-1)
No. ofUnits Year
257
600
450
720
1
1
1
1
1970
1963
1987
1987
Name of Power Plant Country Max.Output(kW)
Max.Head(m)
Speed(min-1)
No. ofUnits
YearSpeed(min-1)
Max.Head(m)
Max.Discharge
(m3/s)
Turbine Operation Pump Operation
Masegawa No. 1
Takane No. 1
Japan
Japan149,000
88,000
104.9
136.2180
277
109.7
137.4
167
75
180
277
2
21976
1969
12
Hitachi Hydroelectric Equipment
Hitachi Generator-MotorsHitachi Generator-Motors
220 MVA generator-motor assembly for Sriragarind Power Station, Thailand Rotor of 316 MVA generator-motorfor Tenzan Power Station, Japan
Rotor of 475 MVA generator-motorfor Kazunogawa No.1 Power Station, Japan
Rotor of 395 MVA adjustable speed generator-motor for Okawachi Power Station, Japan
Record of Generator Motors
Name of Power Plant Country Speed(min-1)
No. ofUnits
YearSpeed(min-1)
Output(kW)
Voltage(kV)
Turbine Operation Pump Operation
Kannagawa
Kazunogawa
Okawachi
Rocky Mt.
Omarugawa
Srinagarind
Japan
Japan
Japan
U.S.A.
Japan
Thailand
525,000
475,000
395,000
361,000
345,000
220,000
500
500
330–390
225
576-624
150
50
50
60
60
60
50
464,000
438,000
388,000
366,500
330,000
210,000
18.0
18.0
18.0
19.0
16.5
13.8
500
500
330-390
225
576-624
150
2
1
2
3
2
2
1999
1993
19952007 (Unit 4)2010 (Unit 1)
Freq.(Hz)
Freq.(Hz)
Capacity(kVA)
Voltage(kV)
50
50
60
60
60
50
18.0
18.0
18.0
20.0
16.5
13.8 19851991
2005 (Unit 1)2013 (Unit 2)
Hitachi Hydroelectric Equipment
Stator frame of 805,000 kVA generatorfor Guri II Power Station, Venezuela
Rotor of 288,000 kVA generatorfor Brownlee Power Station, U.S.A.
67,200 kVA bulb turbine generatorfor Tadami Power Station, Japan
18,400 kVA Tubular turbine generatorfor Friant-Kern No.1 Power Station, U.S.A.
Hitachi Hydraulic TurbineDriven A.C. GeneratorsHitachi Hydraulic TurbineDriven A.C. Generators
Record of A.C. Generators
13
Name of Power Plant
Guri ll
Brownlee
Macagua ll
Shuikou
Arimine No.2
Tadami
Friant-Kern No.1
Country
Venezuela
U.S.A.
Venezuela
China
Japan
Japan
U.S.A.
Voltage(kV)
805,000
288,000
250,000
242,100
130,000
67,200
18,400
Freq.(Hz)
Speed(min-1)
No. ofUnits
Year
60
60
60
50
60
50
60
1
1
4
2
1
1
1
1984
1980
1993
1993
1982
1989
1985
TurbineType
Capacity(kVA)
18.0
13.8
13.8
13.8
16.5
11
6.6
113
100
81.8
107
277
100
180
Francis
Francis
Francis
Kaplan
Francis
Bulb
S-Tube
Printed in Japan (H) WG-E019 0606
Hitachi, Ltd.Akihabara Daibiru Building, 18-13,Soto-Kanda 1-chome, Chiyoda-ku, Tokyo, 101-8608 JapanTel: +81-3-3258-1111