ASIAN STAR PROJECT SALES HANDBOOKASIAN STAR PROJECT SALES HANDBOOK
-
1. Steel Industry 3
2. Scrap Industry 9
3. Magnet Machine 21
4. Material Handling Machine 37
5. High mount Cab 53
6. Base Machine for Mobile Shear 65
7. Mobile Shear (Maker:GENESIS) 73
8. Electric Material Handling Machines 91
9. Recycling Equipments 101
10. Mining & Quarry Equipment 131
11. Forestry Machines 155
12. Brochures List 161
- Contents -
1
-
2
-
1. Steel Industry
3
-
1-1. Basic Steel Production Methods
SlagSlagBy-product
ScrapIron oreCoalLimestone + scrap
RawMaterial
Variety
High efficiency
Volume
Large Facility
Electric ArcPure oxygenHeatsource
HITACHI
Product
Electric Arc FurnaceElectric Arc FurnaceBlast FurnaceBlastFurnace
BOSFurnace
ZXZX ZWZWZRZR ZXZXZWZW
Producti-
on
Process
4
-
Port handling
Stock yard Maintenance
Recycling
Variety of HITACHI products working in
steel works
1-2. Blast Furnace
5
-
Port handling
Maintenance
Stock yard
Recycling
Variety of HITACHI products working in
steel works
1-3. Electric Arc Furnace
6
-
SteelManufacture
Scrap Dealer
Port handling
Manufacture
ImportScrap
Domestic market
Products
ExportScrap
1-4. Supply of Raw Materials for Electric Arc Furnace
7
-
8
-
2. Scrap Industry
9
-
2-1. Dividing and Sizing
ShreddingPressing
Gus Cutting Shearing
Steel materialsusing in construction
Demolish
Retirement
SteelManufacturer
All materials will be Treated
10
-
Magnet Mobile Shear Grapple
Shredder Scrap Loader Shearing
Scrap Yard
2-2. Outline of Scrap Yard
11
-
2-3. Scrap Grade (1)
-
Galvanized Sheet, Electric Household Appliance, Motorcycles, Bicycles etc.
B
Shredder
SteelScrap
Charging box cast, unstripped auto blocs B
Machinery parts, Clean Auto Blocks etc. ACast IronPigIron
ScrapIron boring of mild castingAIron
Boring
Cans for food/drink, Cans in general( expect for paint, chemicals or oil )
CS**
Galvanized Sheet, Pressed Turing of mild steel, Electric Household Appliance, motorcycles, Bicycles etc.
B
Auto Body, Fender, Galvanized SheetAPress
Auto Body, Fender, Steel Furniture etc.A
Auto Body, Fender, Clipping etc. especially not contaminated with non-ferrous dusts.
AS
Mixed cans of various types, including 18-liter cans
C*
Hot or Cold Sheet with some rust, incl. Coated Sheet without harm for steel making
B ( Bundle of Steel Sheet)
Hot or Cold Sheet with no rustA ( Bundle of Steel Sheet)SteelSheet
Clipping
Tin Plated Sheet, Mixed cans etc.C
Turing of mild steel with no rust, in fine formsATurning
Hot or Cold Sheet with some rust, incl. Coated Sheet without harm for steel making
B ( Busheling , Steel Sheet Clipping etc )
Hot or Cold Sheet with no rustA ( Busheling , Steel Sheet Clipping etc )
Heavy*
Variety
Rail, Punching, Small Clipping, Wheels, Nuts & Bolts, Pipes
H1
Steel plate, Wide Flange Beam, Angle, Channel, Hot rolled Bars, Rail, Punching, Small Clipping, Scrap of Heavy Machinery ( other than Concrete Reinforcing Bars, sheet piles ) etc.
HS
Steel Sheet, Wire, Wire rope, Steel Furniture, Door Shutter, Bicycle etc.
H4
Light Gavage, Steel Sheet, Steel Band, Auto Wheel, Spring Plate etc.
H3
Steel plate, Angel, Channel, Scrap of Heavy Machinery etc.
H2
Iron boring of mild casting with some rustB
Press grade added for new marketPress
Turning of mild steel with some rust, in various forms
B
Remarks (Examples)GradeClassification
2-3. Scrap Grade (2)
13
-
2-4. Scrap Processing Facility
ShredingShredingShearingShearingPressingPressing
Our products
Reduce volume(Factorybindle/Can/Car)
Sizing(Hbeam/Pipe/Ship/etc)
Dividing &Sizing(Ferrous/Aluminum/Copper/etc)
Our products Our products
14
-
2-5. Scrap Handling Machine Equipment
Undercarriage
CabinFront
Attachment
1 Grouser * 2 Flat3 Rubber pad 4 Wheel5 Stationary ( high post)
1 Standard cabin2 Fixed high cabin3 Linkage high cabin
1 Standard2 High boss3 Straight4 Long
1 Fork grapple2 Magnet3 Orange grapple4 Shear
ZX330ZX330--33
Engine
1 Diesel2 Electric
15
-
2-6. How to Select Attachment
Magnet
OrangeGrapple
Fork Grapple
Shear
Scrap handling
Excavator
+ attachment
Light weight scrap handling
Popularhandlingattachment
Over size
Easy to loading and unloading from lorry.
Separate
ferrous Non ferrous mixture
Popularmachine size 20ton-30ton
On site
Easy to picking up from ground.
function
Volume
function
Process
function
Usefullyand
Simple
16
-
Hanging
High boss
Tilt Type
1.Wide working radius2.Reduce front damage
Weakness1.Separating operation2.pushing operation
1.Separating operation2.pushing operation
Weakness1.Front damage
1.High working radius/low cost
Weakness1.Shallow working radius
Value
Value
Value
2-7. Characteristic Structure of Front
17
-
2-8. Characteristic Structure of Characteristic Structure of High Cab
Fixed
1.0 m1.5 m2.0 m
Linkage
1.Low initial cost2.High stability3.Low maintenance cost
Weakness1.Transportation with reduction
high cab unit 2.unadjustment height
1.Higher eye point level2.easy transportation3.adjustment height
Weakness
1.High initial cost2.less stability3.Need Maintenance for Rink unit
Value
Value
18
-
Stationary
Wheel
1.Reasonable initial cost2.Off road travel ability
Weakness
Value
1.Slow traveling speed2.Damage for Concrete Yard 3.High undercarriage Operation cost
1.Large size yard2.High traveling Speed 3.Low undercarriage maintenance cost
Weakness
Value
1.High initial cost2.low off road travel ability
1.low operation cost 2.Saving space3.wide operation reach
Weakness
Value
1.Fixed operation2.high initial cost
1 Grouser *1 Grouser *2 Flat2 Flat3 Rubber 3 Rubber pad pad
Crawler
2-9. Characteristic Structure of Characteristic Structure of Undercarriage
19
-
Diesel Engine
Electric Motor
1.Low initial cost2.Generale machine3.Location free
Weakness1.High operation cost2.High CO2 discharge3.Dirty exhaust guss
1.Low operation cost2.Clean operation3.Low noise
Weakness
1.High initial cost2.limited location
Value
Value
2-10. Characteristic Structure of Characteristic Structure of Power Source
20
-
3. Magnet Machine
21
-
3-1. Whats a Magnet Machine
GeneratorPowersupply
box
Powertransmission
Motive power Electromagnet
Iron scrap
Absorption & Absorption & ReleaseRelease
IIt is a machine that t is a machine that absorbs, loads the absorbs, loads the iron scrap with the iron scrap with the electromagnet.electromagnet.
22
-
Insulation
Yoke
Coil
Coil supportOuter pole ring
(non-magnetic, stainless steel)
Iron core
Inner pole ring
Bracket
1 stainless steel welding
Check the wear on the magnet bottom plate. Repair or replace the inner and outer poles according to the wear limits shown in the table below.
Magnet
LECHX11F6
LECHX13F6
LECHX15F6
Wear limit (portion H)
10
15
15
3-2. Structure of Magnet
Use the magnet within the adsorption time ratio and the continuous adsorption time.For the magnet of 60% ED, the adsorption time to attract scraps is 60% or less in one cycle, and the continuous attraction time is 6 minutes or less.
In case the appearance of the magnet is excessively deformed or the wear on the bottom surface becomes remarkable, repair the magnet or replace the bottom plate.
23
-
3-3. Engine: Magnet Machine
Generator is work with Engine - Generator unit
Generator is work with Excavators engine
Engine Generator
unit
One Engine Type
Two Engine Type
Reasonable Price Easy Maintenance Better Rear VisibilityGood
No Good
Much Fuel Consumption =>High idling drive for engine Heavy Engine Load
Less Engine Load
Good
No Good
High Price Poor Rear Visibility More Maintenance
Required(for Two engines)
ExcavatorsEngine
ExcavatorsEngine
24
-
3-4. Power Transmission
Hydraulic Pump & Motor Drive(HITACHI Genuine Magnet)
V-Belt Drive (Local Magnet)
Generator
Engine HYD.Motor
HYD. Pump
Engine
Generator
V-Belt
The Layout position is free.
Good
Cheap in Price(but cheap in quality)
Good
No Good
Layout Space is Limited.Frequent change of V-belt is necessary.Life time of bearing is short.
Better weight balanceBetter performance by using hydsystem (Good heat balance).Good stability (better than transmission).
Weight balance is bad
25
-
current
Fixed Current Control
Over excite Current Control!Over excite Current Control!
Local magnet
HITACHI magnet
Production is Different between HITACHI and Local Production is Different between HITACHI and Local made.made.
MagnetismCurve
current
200V
AbsorptionReleasing time:
Approx.6 sec
3-5. Advantage of Control System
Absorption point Releasing point
Slow Absorption
Slow release
Slowresponse
Quick Absorption
Quick release
AbsorptionReleasing time:
Approx.1 sec
QuickQuickresponse!!response!!
ReverseExcitation
Releasing point
26
-
Base machine
HeavyCounterweight
Magnet
PowerSupply
Box
3-phase AC power generator
Bracket, Cover for Power supply box
& Generator
Parts for Generator drive
InstrumentBox
(ControlSwitch Box)
Electric CableBoom slow return vale
3-6. HITACHI Magnet Machine
Engine 1 Engine typePower Transmission Hydraulic Pump & Motor DriveGenerator 3-phase A.C GeneratorPower Supply Box Over excitement & Reverse
excitation control type
Grip Switch (adsorption)
GripSwitch
(release)
27
-
Generator
Hydraulic motor
Control Panel(Power Supply Box)
Large sized air filter
3-7. ZAXIS-3 Model Magnet Machine
Control switch box
Magnet switch
Additionalhydraulic
pump
Magnet
28
-
Cable layout is between the upper side of the arm and the magnet.
Reduction of broken cable accidents.
3-8. Characteristics
Engine speed when a magnet is used.When the magnet main switch turns on, the engine speed switches to its rated speed.
When magnet is not adsorbing and the machine is not operating any other operation, the engine speed decreases to a specified speed.
Engine Controls
Improvement of fuel consumption.By comparison with ZX-1, about 15% less.
Improvement of operability.
Auto Idle Control
However fuel consumption vary by working conditions.
1.30.7
990-1 130 kg630-760 kg1 570 mmZX330LC
815-920 kg515-605 kg1 370 mmZX200LC/ZX240LC
Gravity
Scrap Absorption
MAGNETMODEL
ZX200LCZX330LC Magnet Comparison
29
-
3-9. ZX200LC-3 Specification
Working Range
A
B
C
1 370Magnet outside diameter(arm rolled-in)
3 370C Magnet height
7 930B Max. working height
8 680A Max. working reach
ZX200LC-3Model
Unit : mm
30
-
Working Range
A
B
C
1 370Magnet outside diameter
(arm rolled-in)3 640C Magnet height
8 050B Max. working height
8 960A Max. working reach
ZX240LC-3Model
Unit : mm
3-10. ZX240LC-3 Specification
31
-
Working Range
A
B
C
1 570Magnet outside diameter
(arm rolled-in)3 600C Magnet height
8 220B Max. working height
9 730A Max. working reach
ZX330LC-3Model
Unit : mm
3-11. ZX330LC-3 Specification
32
-
KOMASTUKOBELCO
LocalModification
USER
NOWARRANTY
MachineTrouble
Standard Machine
3-12. Vs. Local Magnet : Warranty
UnstableCounterweightEngine Overheat
HCM Magnet Machine with WARRANTY
*Selling Points
33
-
Volume of Magnet absorption
1 150 / 940 kg
1 990 / 1 570 kg
3 000 kg60%ED
1 500mm
Localmagnet
1 250 / 1 120 kg
1 900 / 1 710 kg
3 120 kg60%ED
1 570mm
HITACHI Magnet
HS1 Scrap Steel /
Iron Chips
Pig Iron / Crop Ends
Absorption volume
WeightDutyratioOutside
Diameter
23sec(cycle23sec(cycletime)time)
=185=185t/hrt/hr
3600sec3600sec11.185t.185tHITACHIHITACHI
magnetmagnet 23+5sec(cycle time)
=134t/hr
3600sec1.045tLocal
magnet
HS1 scrap steel 99--19 %19 % More absorptionPig iron 9 %9 % More absorption
Loading volumeLoading volume
38%38% up!!up!!
Add. 5 sec for local magnet.10% bigger volume against ZX-1 model.due to bigger diameter.
Shorter turning radius (130mm) by 5%.
3-13. Vs. Local Magnet : Productivity
34
-
Good Stability
Cut out counterweight
1.71.72.96m STD2.96m STD1 3701 370ZX240LCZX240LC--33
2.22.23.2m STD3.2m STD1 5701 570ZX330LCZX330LC--33
1.51.52.9m STD2.9m STD1 3701 370ZX200LCZX200LC--33
Heavy C/W (STD + ? Ton)ARMMagnet sizeBase machine
C/W : counter weight
Bad Stability
HITACHI genuine magnet Machine
Local Magnet Machine
HeavierCounterweight
Include
Heavier CounterweightNot Include
Unbalanced
*Many trouble cases
3-14. Vs. Local Magnet : Selling Point
35
-
36
-
4. Material Handling Machine
37
-
DOUBLE HANDLING WORKS.
Good
No Good
HITACHI Material Handling Machine WORKS.(EX.ZX240LC-3)
5 750 mm
8 000mm
13 750 mm
13 710 mm
Change!!Change!!
Double!!Double!!MaintenanceMaintenance
FuelFuelLabor FeeLabor Fee
OneOne--Half!!Half!!MaintenanceMaintenance
FuelFuelLabor FeeLabor Fee
4-1. Suggestion of Elimination
Can workwith One machine
38
-
4-2. Equipment
Front lightFront light ::Boom x 1Boom x 1Arm x 2Arm x 2
End of piping End of piping point with stop point with stop
valvevalve
PipingPipingguardguardplateplate
Cab :Cab :StandardStandard CabCabHighHigh--Mount Cab Mount Cab
(Option)(Option)Fixed TFixed TypeypeLinkage TypeLinkage Type
Counterweight :Counterweight :heavier typeheavier type
(reinforced main (reinforced main frame)frame)
Arm Cyl. Arm Cyl. Installed both Installed both
sides.sides.
Clamping pipe :Clamping pipe :Fixes with two bolts.Fixes with two bolts.((PreventPrevent loosing bolts) loosing bolts)
39
-
4-3. Working Range (Arm Point)
Material Handling Machine
Excavator(STD front)
Comparison
40
-
23 000(kg)Operating weight
3 270 H Overall height of boom
6 770 G Length from swing center to front end
9 520 F Overall length6 150 E Max. arm point depth reach
5 680 D Max. arm point depth3 190 C Min. swing radius
12 280 B Max. arm point height11 000 A Max. arm point reach
ZX200LC-3ModelUnit : mm
Working Range & Dimension
4-cycle water-cooled, intercooled
Type
655Nm(67kgfm)At 1 500min-1(rpm)
Maximumtorque
122kW(164HP)At 2 000min-1(rpm)
Ratedpower
Isuzu AI-4HK1XModel
ZX200LC-3 ENGINE
4-4. ZX200LC-3 Specification
41
-
26 100(kg)Operating weight
3 400 H Overall height of boom
7 400 G Length from swing center to front end
10 400 F Overall length
6 680 E Max. arm point depth reach
6 700 D Max. arm point depth
3 770 C Min. swing radius
13 710 B Max. arm point height
12 500 A Max. arm point reach
ZX240LC-3Model
Unit : mm
Working Range & Dimension
4-cycle water-cooled, intercooled
Type
673Nm(69kgfm)At 1 500min-1(rpm)
Maximumtorque
132kW(177HP)At 2 000min-1(rpm)
Ratedpower
Isuzu AI-4HK1XModel
ZX240LC-3 ENGINE
4-5. ZX240LC-3 Specification
42
-
35 600(kg)Operating weight
2 690 H Overall height of boom
8 800 G Length from swing center to front end
12 340 F Overall length
8 420 E Max. arm point depth reach
6 150 D Max. arm point depth3 850 C Min. swing radius15 660B Max. arm point height14 200 A Max. arm point reach
ZX330LC-3Model
Unit : mm
Working Range & Dimension
4-cycle water-cooled, intercooled
Type
1 080Nm(110kgfm)At 1 500min-1(rpm)
Maximumtorque
202kW(271HP)At 1 900min-1(rpm)
Ratedpower
Isuzu AI-6HK1XModel
ZX330LC-3 ENGINE
4-6. ZX330LC-3 Specification
43
-
Working Range & Dimension
50 700(kg)Operating weight
3 370 Overall height of boom
9 900 Length from swing center to front end
13 420 Overall length9 370 Max. arm point depth reach7 210 Max. arm point depth5 300 Min. swing radius
17 500 Max. arm point height16 200 Max. arm point reach
ZX450LC-3ModelUnit :mm
4-cycle water-cooled,direct injection
Type
1 580Nm(161kgfm)At 1 500min-1(rpm)
Maximumtorque
260kW(349HP)At 1 800min-1(rpm)
Ratedpower
Isuzu AH-6WG1XYSA-01
Model
ZX450LC-3 ENGINE
4-7. ZX450LC-3 Specification
44
-
4-8. Outline of Lifting Capacity
Lifting capacity
Load radius
Lifting capacity Total weight of attachment and material
3.23.2
14.214.2
ZX330LCZX330LC--33
4.14.12.12.12.32.3ttonon
LiftingLiftingcapacitycapacity(at Max. (at Max. reach)reach)
16.216.212.512.511.011.0mmMax. Load Max. Load radiusradius
ZX450LCZX450LC--33ZX240LCZX240LC--33ZX200LCZX200LC--33
When selecting the attachments, refer to Lifting Capacities in Specification. Take care to the weight of the attachment and select the attachment.
Prevent the front from contacting the attachment.When the front is raised, it is possible that the attachment may come in contact with the arm. Operate the machine carefully when the front is raised.
45
-
LIFTING CAPACITY( Unit :1000kg) & Load radius ( Rating over-front)EX) Load point height 2m
MAX Working range 11000mm
MAX Working range 12500mm
MAX Working range 14200mm
Loading radius
Lifting capacity
202kW(1900min-1)35600kg4940mm8500mm6200mmZX330LC-3
260kW(1900min-1)50700kg5470mm9500mm7300mmZX450LC-3
26100kg
23000kg
Operatingweight
4640mm
4470mm
Undercarriagelength
132kW(2000min-1)7000mm6000mmZX240LC-3
122kW (2000min-1)6500mm4950mmZX200LC-3
Engine rated power Boom lengthArmlength
MODEL
ZX200LCZX450LC Main Spec Comparison
MAX Working range 16200mm
4-9. ZAXIS-3 Specifications
46
-
4-10. ZX200LC-3 Lifting Capacity
47
-
4-11. ZX240LC-3 Lifting Capacity
48
-
4-12. ZX330LC-3 Lifting Capacity
49
-
ZX45
0LC
-34-13. ZX450LC-3 Lifting Capacity
50
-
4-14. Comparison Data
2.9t(12.45m)
13.6m
12.45m
4.0m
6.8mLC
25.0t
PC210LC-8
-t(-m)3.2t(12.4m)3.3t
(12m)3.4t
(12m)2.9t
(10.5m)2.7t
(11m)Lifting capacity
11.8m13.7m13.8m13.7m12.8m12.28mMax. Height
11.5m12.4m12.7m12.5m11.5m11.0mMax. Reach
5.0m5.8m6.0m6.0m5.0m4.95mArm
7.2m6.5m6.8m7.0m6.6m6.5mBoomLCLCHD-SLLCHD-SLLCTrack
27.4t25.5t27t26.1t22.2t23.0tWeight
PC220LC-7320C MHR924B
ZX240LC-3R904CZX200LC-3Model
KOMATSUCATLIEBHERRHITACHILIEBHERRHITACHIManufacturer
233020t23WeightClass
3.7t(16.5m)
18.3m
16.5m
7.3m9.5m
EW46.1t
R944C
LIEBHERR
4.0t(16m)-t(-m)
4.35t(14.1m)
4.1t(13.4m)
4.6t(14m)
Lifting capacity
17.5m16.2m14.4m15.1m15.6mMax. Height
16.2m16.1m14.1m13.5m14.2mMax. Reach
7.3m6.8m6.0m6.0m6.2mArm9.5m10.5m9.1m7.6m8.5mBoom
LCLCHDHWHD-SLLCTrack50.7t38.4t38.4t35.7t35.6tWeight
ZX450LC-3PC330LC-7330C MHR934C(3A)ZX330LC-3Model
HITACHIKOMATSUCATLIEBHERRHITACHIManufacturer
40t50t30t40tWeight Class
HITACHI material handling machines are comparable to competitors machines.
51
-
52
-
5. High mount CabFixed CabLinkage Cab
53
-
Normal cabin is BAD VISIBILITY.
No Good
Difficult to Operate- Low Productivity
Difficult to Operate- Low Productivity
Operator cannot see loads from truck.
Wider Working Range & Better Visibility for High Productivity
Wider Working Range & Better Visibility for High Productivity
HIGH cabin is GOOD VISIBILITY.
Good
5-1. Fixed Type High Cab
54
-
5-1-1. Operators Eye Point of Fixed Cab
4 73
0
Eye point of Fixed cab
Eye point of Std cab
Advantages of Fixed highAdvantages of Fixed high--mount cabinmount cabin Higher visibility allows Operators to see truck loading
position.
Lower capital maintenance cost
Example: ZX330LC-3 with 2.0m Fixed High-mount cabin
Truck HeightTruck Height
55
-
5-1-2. Kind of Extention Stand
Options of fixed highOptions of fixed high--mount cabinmount cabin
Sidewalk stair typeSide ladder type
2.0 m2.0 m1.5 m1.5 m1.0 m1.0 m
Better Visibility = Better Operation !!Better Visibility = Better Operation !!
56
-
2 790 2 790 2 290 2 660 2 660 2 160 2 5702 5902 090E Step height
530 530640420420530370370480D Operator's view between swing center
3 520 3 020 2 520 3 360 2 860 2 360 3 3302 8302 330C Floor height
4 730 4 230 3 730 4 600 4 100 3 600 4 5304 0303 530B Operator's view
5 160 4 660 4 160 5 010 4 510 4 010 4 9904 4903 990A Overall height of cab
2.0m
1.5m
1.0m
2.0m
1.5m
1.0m
2.0m
1.5m
1.0mExtension stand
ZX330LC-3ZX240LC-3ZX210LC-3
5-1-3. Dimensions
DimensionsDimensions
57
-
5-2. Linkage Type High Cab
Better Visibility = More Safety & Efficient Operation
Cab Height Operators Eye
Picture : ZX200-3 Magnet machine
AboutAbout35sec35sec
58
-
5-2-1. Feature
Linkage cab has two cylinders.Lock pin
Holding valve on lift cylinder is equipped
Enhancement of safety device
Emergency lowering switch is located both inside and outside the cab.
Push
59
-
Eye point of Linkage cab
Eye point of Std cab
5 18
0
Advantages of 1 Link cabinAdvantages of 1 Link cabin Higher visibility allows Operators to see the truck
loading position. Cab height can be adjustable according to working
conditions. Easier transportation.
Truck HeightTruck Height
Example ZX330LC-3
5-2-2. Operators Eye Point of LinkageCab
60
-
5-2-3. Dimensions
1 430 to 1 4901 320 to 1 3801 270 to 1 330D Operator's view between swing center
1 490 to 3 9901 360 to 3 8601 300 to 3 800C Floor height
2 700 to 5 1802 570 to 5 0702 500 to 5 000B Operator's view
3 160 to 5 6603 010 to 5 5102 950 to 5 450A Overall height of cab
ZX330LC-3ZX240LC-3ZX200LC-3
Unit: mm
DimensionsDimensions
61
-
5-2-4. Selling Point (1)
Customer (Malaysia): Purchased 1 Linkage Cab
Before purchasing Before purchasing ZX240LCZX240LC--3 1 3 1 link high cabinlink high cabinMModelodel : EX 220: EX 220
40 ft / 16 40 ft / 16 wwheelsheels ttruckruck ttakesakes 22 hrshrs lloading 30 tons oading 30 tons mmetaletal sscrap.crap.
OOnene dayday :: 22 truck loading onlytruck loading only..
USED
EXCAV
ATOR F
ORLO
ADING
62
-
Model : ZX240LC-3 1 link high cabin
Less than 1 hr1 hr to load 30 tons scrap metal.One day : 4 - 5 truck loading.
NEWEXC
AVATOR
FOR LO
ADING
5-2-5. Selling Point (2)
63
-
64
-
6. Base Machine for Mobile Shear
65
-
Long crawler
Cab front guard
Weight-addedcounterweight
Reinforced boom
Item
Long crawler
Cab front guard (Lower & Upper)
Weight-added counterweight
Reinforced boom
Piping for Large flow volume exclusive use
2-Speed selector (auxiliary flow combining)
GENESIS shear
Piping for large flowVolume Exclusive use
GENESIS shear
6-1. Equipment
2-Speed selector
66
-
*R=Rotation
GXP1000
GXP700R
GXP700
GXP500R
GXP500
GXP400R
ShearModel
at throat 34.3(MPa)
965
889
889
813
813
737
Jawdepth(mm)
1 7509657.2
1 4608897.79.2+2.5ZX470LCH-3
1 4608896.3
1 3058136.28.2ZX350LCK-3
1 3058135.8
9807115.46.5ZX250LCK-3
Shearforce
(t)
Jawopening
(mm)
shear weight
(t)
Counterweight
(t)
Base Machine(Boom
mounted)
6-2. Recommended Base Machine List
67
-
6-3. ZAXIS-3 Demolition Version :K-Series
Standard Equipment(Difference with standard machine)Example ZX350K-3
Lunched ModelZX210K(LC)-3ZX250K(LC)-3ZX350K(LC)-3
Attachment basic piping
K-reinforced
bucket
Front glass lower guard
Front screen of fuel cooler and air condenser
8200kgCounterweight
K-cab (CRES with overhead window & guard)
6.0mm thickness undercover
600mm reinforced triple grouser shoe
Reinforcedlower flangeReinforced idler bracket
Damage prevention plate
Reinforcedlink B
Twin wiper
Track undercover
68
-
6-4. K-Cab Specification
Roof wiper
Head guard (ISO level 1)
Twin wiper
Overhead window
Roof wiper , washer switch
Twin wiperswitch
Wipe area
69
-
6.0mm Thickness undercover
Track center frame lower flange thickness increase
9.0 mm Thickness track undercover
28 mm19 mm19 mmK-Series
22 mm14 mm14 mmSTD
330240200Class
Front screen of fuel cooler
6-5. K-series Standard Equipment
Air condenser
70
-
6-6. ZAXIS-3 Heavy Duty Version : H Series
Reinforced boom and arm 4.5 mm thickness undercover 600 mm triple grouser shoes
H/R CabH/R cab utilizes Reinforced front
window and FOPS at rooffor protection against falling
objects.
Full track guard
Protect track links and lower rollersfrom damage and deformation.
ZX470(LC)H-3 Standard Equipment
*Heavy/Rock
Front glass window,made of straight-laminated,
is fixed to shut out dirt and debris
71
-
72
-
7. Mobile Shear
Maker : GENESIS
73
-
7-1. Out Line of XP (GXP) Series
74
-
7-1-1. XP Series Performance GuidePerformance Guide
75
-
7-2. Machanical Pulverizer (GMP)
76
-
7-3. Linkage Shear (GLS)
77
-
7-4. Rebar Shear (GRS)
78
-
7-5. Concrete Cracker (GCC)
79
-
7-6. Severe-Duty Grapple (GSD)
80
-
7-7. Image of Hydraulic Flow
81
-
7-8. Hydraulic Flows and Pressures
82
-
7-9. Genesis Shear Capability (1)
Base MachineZX450-1Genesis ShearGPX700RCuttable Object: Construction debris at demolition site
Approx: 10mmApprox: 9mm
Blade position is the Key for efficient cutting
83
-
7-10. Genesis Shear Capability (2)
84
-
7-11. Genesis Shear Capability (3)
85
-
7-12. Genesis Shear Capability (4)
86
-
7-13. Genesis Shear Capability (5)
87
-
Looks reinforced, but Difficult to Remove it, after using long time.
Much trouble reported.
G
L
More Reinforcement.Easy to replace for Pin.Little trouble reported.
GGENESISVS
LLabounty
7-14. Comparison : Side Guard for Boss
88
-
GL
7-15. Comparison : Blade Edge
Not Invertible usage,But, More reinforcement,
Can be used for Long time
Invertible usage,But, Less reinforcement,
Cant be used for Long time
GGENESISVS
LLabounty
89
-
90
-
8. Electric Material Handling Machines
Japanese electricity charge & diesel fuel charge in 2008. Japanese electricity charge & diesel fuel charge in 2008. Figures are different for your country & situation. Figures are different for your country & situation.
91
-
8-1. Market Needs
Coal (yen/ton)
All Mater
ial Costs
Rapidly
Increasi
ng
All Mater
ial Costs
Rapidly
Increasi
ng
LNG (yen/ton) Crude oil (dollar/barrel) uranium (dollar/pound)
CoalLNG(yen/ton)
Crude oil (dollar/barrel)
uranium (dollar/pound)Change of MaterialChange of Material CCostostss
Total Machine Running CostTotal Machine Running CostTotal Machine Running CostLeaseLease
Labor FeeLabor Fee
MaintenanceMaintenance
Maximum: Approx 70% of Total costMaximum: Approx 70% of Total cost
Instead of Fuel (Diesel), Instead of Fuel (Diesel),
Another Power Source Required Another Power Source Required ==>==> ElectricityElectricity
Fuel CostFuel Cost
92
-
8-2. Introduce
Fixed high post : 360Swing
Collector RingSwitchboard
Way of Power Supply Way of Power Supply Way of Power Supply
Fixed TypeFixed Type
No Need to No Need to TravelTravel
PowerPowerSupplySupply
Scrap SlotScrap Slot
GrabbedGrabbedPositionPosition
SwingSwingApprox360Approx360
Switch Switch BoardBoard
93
-
8-3. Feature
Good
Cheap in Cost20-35% Less than Engine Type
*Diesel 1L=150Yen
Cheap in CostCheap in Cost2020--35% Less than Engine Type35% Less than Engine Type
**Diesel 1L=150YenDiesel 1L=150Yen
Better for Environment No Emission material => CO2, Nox, etc Better for Environment Better for Environment No Emission material => CO2, No Emission material => CO2, NoxNox, etc, etc
Lower Noise4-6dB Less than Engine Type Lower NoiseLower Noise
44--6dB Less than Engine Type6dB Less than Engine Type
A Little Slower OperationApprox 15-20% Less) =>Full Mode A Little Slower OperationApprox 15-20% Less) =>Full Mode
Travel Area Limited*Some Customers dont require travel function
Travel Area Limited*Some Customers dont require travel function
No Good
94
-
8-4. Cost Performance
%QORCTKUQP4WPPKPI%QUV
--5 485 920Yen5 485 920Yen/Year/Year
12
10
8
6
4
2
1 2 3 4 5
14
Engine Running Cost
Terms of Cost ComparisonNormal Operation8hours/ day25days/month
Engine Maintenance(4times/year) 240 000Yen
Include in Engine Running Cost
Year
M
Modification Cost Modification Cost For Electricity For Electricity 8 000k8 000k
Recover within 1 year and halfRecover within 1 year and half
Ex.) ZX200-3 Case in JapanEx.)Ex.) ZX200ZX200--33 Case in JapanCase in Japan
Engine Type Electric Type
Electric Running Cost
Initial Cost (Approx):
Electric Driving Modification
95
-
Unitsyear
UnitYear
2002 2003 2004 2005 2006 2007
Category Breakdown
Scrap 11unitsRental 9unitsSteel 6unitsIndustrial waste 5units Others 4units
Approx 50% of DemandScarp & Steel Category
8-5. Sales Record: in Japan
Total 35 units!!Total 35 units!!
96
-
8-6. Job Site Study : ZX200-3
ZX200-3 ForkZX200-3 Fork
200V-55KWMechanical ForkFixed Cabin
Cost Comparison-482 000/M
(versus Engine)
Prior Machine
Wall blackenedby Engine
Fuel Cost8h/d 25days = 570 000/m (110/L)
Electricity Cost8h/d 25days = 88 000/m
Hitachi
Scrap Handling (Guillotine Operation )*Prior owned machine - Komatsu( Engine type)Currently, new inquiry
- interchange from Komatsu 78UCustomer satisfy with cheaper running cost
Protection:for Original Source Cable
(Customer need to purchase Original cable
Swing 220(Base machine)
97
-
8-7. Job Site Study : High Post Type
ZX450-3 High PostZX450-3 High Post
ZX330 High PostZX330 High Post
AC400V177KW/1 900min-1Fork (Rotation type)Total Weight31.0t
AC400V 60Hv160kWGrapple (Hanging type)7m High Post
98
-
8-8. Check Point with Customer
Power Supply VoltagePower Supply VoltageShould beShould be(400/440V)(400/440V)
Operation AreaOperation AreaFix or TravelFix or TravelPower supply Cable Power supply Cable
Travel area is LimitedTravel area is Limited
**Need to Check Need to Check -- Installation LocationInstallation LocationTravel Area & Operation AreaTravel Area & Operation Area
Fetch Position: Electric Cable Fetch Position: Electric Cable Original power supply Original power supply
--Customer need to set upCustomer need to set upFetch position (Cabinet panel) Fetch position (Cabinet panel) --Need to Decide with CustomerNeed to Decide with Customer
99
-
100
-
9. Recycling Equipments
101
-
Wood grinder
9-1. Product line
Screen
Soil recycler
Shredder
Crusher
5 main recycling equipment product lines.
102
-
9-2. Position of Recycle Equipment
Material Products Money
*And the most important thing to sell or select the machine is
to know what the material is
and what the customer wants to make.
*For customer, recycle equipment is a facility for making money.
And money becomes an origin when the customer buy the next machine.
So, recycle equipment is also important for customer site.
Recycle equipments
103
-
9-3. Track Mounted Crusher
Crusher
Civil engineering(Dam)
Landfill or Illegal dumping
Quarry
Demolition
Recycle Steel Slaggy
Highversatility
Mining
ZR950JC
104
-
9-3-1. Feature : ZR950JC
29 8003 2002 90012 400
Weight(kg)
Height(mm)
With(mm)
Length (mm)
High performance Jaw crusher
featuring overload protection system.
High performance Jaw crusher
featuring overload protection system.
Applicable material
Stone, Concrete
Applicable material
Stone, Concrete
Over load protection cylinder
Engine complies withTier 3 gas emission
regulation
Engine complies withTier 3 gas emission
regulation
e-Service is available
Easy operation : 7 inch wide display
e-Service is available
Easy operation : 7 inch wide display
Dimension
More detail, please see product information.More detail, please see product information.
105
-
Rough crushing with multi-purposeboom
Remove steal by Magnet machine
Feed material into crusher
Crushing by ZR950JC
Screen by VR408 (vibration screen)
Feed back over size material
Recycle as road foundation material
Discharge material
Product(0-40mm)
Rough crushing by breaker
Feed material into crusher
ZR950JC VR408
Crushing Screening
Zaxis
Application reference at demolition site in Japan
9-3-2. Job Site Study : ZR950JC (1)
For more information,
please see application bulletin
106
-
Material :Concrete debris
Target size :0-40mm
Loading machine :ZX270HCA Demo fleet)
Crusher followed by :N/A
Material :Basalt
Target size :0-40mm
Loading machine :ZX270 (HCA demo fleet)
Crusher followed by :HITACHI VR408
9-3-3. Job Site Study : ZR950JC (2)
Application reference at quarry site in Australia
107
-
9-3-4. Competitors of Crushure
Hitachi ZR950JC
KOMATSU BR380JG
More detail, please see product information.More detail, please see product information.
ZR950JC and Competitors
TEREX-PEGSON
M-Trak
Hartl
PC1055J
Metso
LT95
Sandvik EXTEC
C-10+
108
-
9-4. Track Mounted Screen
Screen
Civilengineering
Landfill or Illegal dumping
Quarry
Demolition
Recycle
Steel Slaggy
High versatility
Mining
VR516FS
VR408
109
-
27 5005 0307 37016 030
Weight(kg)
Height(mm)
With(mm)
Length (mm)
Finger screen is superior to screen
sticky material than mesh screen
Finger screen is superior to screen
sticky material than mesh screen
Engine complies withTier 3 gas emission
regulation
Engine complies withTier 3 gas emission
regulation
Dimension
9-4-1. Feature : VR516FS
Hydraulically adjustable
screen box angle
810121416
Hydraulically adjustable Hydraulically adjustable
screen box anglescreen box angle
810121416
e-Service is availablee-Service is available
Selectablescreeningmode Itspossible to select 2or 3 wayseparation.
Selectablescreeningmode Itspossible to select 2or 3 wayseparation.
Applicable material
Concrete debris, Top soil, Demolition debris
Industrial waste, Contaminated soil etc.
Applicable materialApplicable material
Concrete debris, Top soil, Demolition debrisConcrete debris, Top soil, Demolition debris
Industrial waste, Contaminated soil etc. Industrial waste, Contaminated soil etc.
More detail, please see product information.More detail, please see product information.
110
-
Adjustablescreen boxAdjustablescreen box
Equip single deck vibration screen and
2 discharge conveyor with compact body
Realize superior utility
Equip single deck vibration screen and Equip single deck vibration screen and
2 discharge conveyor with compact body2 discharge conveyor with compact body
Realize superior utilityRealize superior utility
Superiortransportability
Both ways rotationBoth ways
rotation
High discharge height
9 0003 5005 8009 250
Weight(kg)
Height(mm)
With(mm)
Length (mm)
Dimension
Applicable material
Crushed concrete, aggregate,
soil including piece of wood,etc
Applicable material
Crushed concrete, aggregate,
soil including piece of wood,etc
More detail, please see product information.More detail, please see product information.
9-4-2. Feature : VR408
111
-
*Shearing dust screening
Shearing Dust
40mm over Fines: under 40mm
In this Case,About 10% of Shearing dust was valuable material such as metals, steels.So, using Hitachi VR408, 10% of such valuable material was screened completely, and disposal cost was reduced.
Screening!Screening!
Dumping / Recycling
Resalable / Reusable
10% 90%
9-4-3. Job Site Study : VR408
112
-
VR516FS ZR900TS
Reference 1 : for mixed waste
ZR950JCVR516FSSR2000G
Reference 2: for debris with topsoil
Reference 3: for soil improving
SR2000G
ZR950JC
VR408
VR408
Reference 4: for Aggregate crushing
Application reference :material
More information, please see application bulletin
9-4-4. Job Site Study : VR516FS/VR408
113
-
Product map of Mobile Screen Product map of Mobile Screen 1 or 2way 3ways (Finger type) 3ways
HITACHI
PowerScreenTEREX
SANDVIC
SANDVIC
MetsoMinerals
3ways3ways(Finger)
9-4-5. Competitors Crusher
VR408 COMPETITORS VR516FS COMPETITORS
1or2way
HITACHI VR408
TEREX-POWERSCREENPOWERTRAK 600
TEREX-FINLAY694SUPERTRAK
TEREX-FINLAY883
HITACHI VR516FS
CompetitorsCompetitors
SANDVIK-EXTEC S-5
114
-
Wood grinder
Forestry
Landfill / Illegal dumping
Wastemanagement
RecycleAgriculture
9-5. Track Mounted Wood Grinder
ZR260HC
Wood path
Deforestation
115
-
9-5-1. Feature : ZR260HC
High grinding performanceHigh grinding performance
24 0003 2002 98011 200
Weight(kg)
Height(mm)
With(mm)
Length (mm)
Dimension
e-Service is availablee-Service is available
Easy material feeding
The horizontal feeding hopper excels at processing of long materials.
Easy material feeding
The horizontal feeding hopper excels at processing of long materials.
Auto feeder
The auto feeder can adjust the amount of feedingmaterials.
Auto feeder
The auto feeder can adjust the amount of feedingmaterials.
Easy maintenance
Replace screeneasily
Easy maintenance
Replace screeneasily
Applicable material
C&D waste, green waste,
cut wood, bamboo, etc.
Applicable material Applicable material
C&D waste, green waste,C&D waste, green waste,
cut wood, bamboo, etc.cut wood, bamboo, etc.
More detail, please see product information.More detail, please see product information.
116
-
9-5-2. Job Site Study : ZR260HC
At deforestation site
Material :Bamboo
Production :Primary grinding
Loading by :EX60-1 with grapple
At recycle site At recycle site
At forestry site
Material :Log/Stump
Production :Primary grinding
Loading by :ZX120 with Grapple
Material :Green waste
Production :Compost
Loading by :CAT+ Grapple
Material :Log/C&D waste etc
Production :Chip for fuel/compost
Loading by :ZX225USR
with grapple
More information, please see application bulletin
117
-
HITACHI ZR260HC
KOMATSU BR200T-2
MORBARK 950TUB
Vermeer HG365E
WILLIBALD MZA2400
Precision Husky
PROGRIND1000
(*Include upper size/class)
9-5-3. Competitors of Wood Grinder
118
-
WasteWastemanagementmanagement
Landfill or Illegal Landfill or Illegal dumpingdumping
Recycle (General )Recycle (General )
High versatility
DisposalDisposalstationstation
Auto salvageAuto salvage
ZR900TS
IncineratorIncinerator
Metal scrapMetal scrap(Thin material)(Thin material)
9-6. Track Mounted Shredder
*Suitable for disposal of
plastics, tires, vinyl, thin metal, and so on.
*Not suitable for solid materials
such as metals, slag, rocks etc.
119
-
RubberhoseTire
Conveyor belt
Rubber
PalletC&Dwaste
Wooden/ Fiber
Pallet
Hard waste
Soft waste
Electricbase
Plastic
Urethan
SheetWastepipeHardwaste
Vinyl
Bumper
Bowling ball
Refrigerator
Tatamimat
Wastetextile
Thin metalContainer
ZR900TS is the machine that
shred these kind of materials.
ZR900TS
9-6-1. Applicable Materials
120
-
*Realize minimized cost.
-one-man operation by remote control can minimize labor cost.
-ZR900TS is all-in-one design. There is no need to prepare additional control
equipment.
-self clean up function can minimize machine downtime.
-maximum discharge height in 20t class can reduce the time of
carry-out material and use less fuel.
9-6-2. Feature : ZR900TS
Feature
More detail, please see product information.More detail, please see product information.
*Realize reducing maintenance cost.
-adopting mono-cutter can reduce maintenance cost.
(Cutters are reproduced about 3 times*.)*Realize more efficiency shredding.
-adopting two axis shaft realize cutting sharpness.
-variable cutter and the spacer makes various size of cutting.
-easy layout change realize flexible placement.
18 9003 9303 6109 510
Weight (kg)Height (mm)With (mm)Length (mm)
Specification
121
-
In this case,
HITACHI ZR900TS could reduce 70% of disposal cost
and made 70% of valuable / resalable materials.
9-6-3. Job Site Study : ZR900TS
Example of Tire shredding
-Condition *Material weight :About 8Kg/Tire*Number of tires: tires/Automobile*Shredded automobile per day: 841.Estimated capacity=8Kg5tires84auto/day3.36t/day
2.Distribution2.Distribution
**70%70%(2.36t) was fine (under 50mm)(2.36t) was fine (under 50mm)= Resalable= Resalable
**30%30%(1t) was over (over 50mm) (1t) was over (over 50mm) =Waste=Waste
Estimated Capacity & Distribution Estimated Capacity & Distribution
Fines
70
over
30
About 1min/piece
122
-
9-6-4. Competitors Shredders
Competitor 1:Fixed type
*Fixed type of shredder is made by many companies.
and sometimes, ZR900TS is preprocessor for Fixed type.
Competitor 2:Tack mounted & Stationary type
(*Include upper size/class)
HITACHI ZR900TS KOMATSU BR300S
CAT MC220-S
Forus
BZ171
Doppstadt DW2060 HAMMEL VB650 KOMPTECH
TERMINATOR
123
-
9-7. Track Mounted Soil Recycler
Soil Recycler
Roadconstruction
Dredging
Recycle
Erosioncontrol
High versatility
Disaster-relief
Contaminated treatment
Order recieved from
Australian customer
SR2000G
124
-
Additive feederAdditive feederSwingGate
SwingGate
Additive
FeedingFeedingmaterialmaterial
Additivehopper
Additivehopper
Dischargeconveyor
Dischargeconveyor
MixingchamberMixing
chamberFeederFeederHopperHopper
Mixing
9-7-1. Feature : SR2000G
-Structure--Structure-
-Flow-
Note
19 6004 5002 99012 500
Weight(kg)
Height(mm)
With(mm)
Length (mm)
Dimension
Improved/
Treatmented
Soil
*Apply to higher moisturized material by Horizontal and wide feed hopper
*Realize stable material feeding without bridging by Swing Gate
*Continuous and direct measurement of feed material by Level roller
*Apply to various additive by Screw feeder
*Feed additive precisely by Precise additive feed control
*Realize higher mixing performance by Two shafts paddle mixer
More detail, please see product information.More detail, please see product information.
125
-
9-7-2. Job Site Study (1)
Aim to :Banking reinforcement
Material :Levee soil
Additive :Cement
Aim to :Prevent mud flow
Material : Soil with volcanic ash l
Additive :Cement
Aim to : Recycle for road base
Material :Turned Soil
Additive :Cement
Aim to : Remediation
Material : Contaminated soil
Additive : Unknown
More information, please see application bulletin
At disaster-relief site At erosion control site
At Highway construction site At VOCs contaminated site
126
-
9-7-3. Job Site Study (2)
Reference1:Dredged soil improvement
Digging by
Dredging ship
Feeddredged soil
to VR408
Prescreening
Separate stone
from soil
Improve
by Soil recycler
Products
(Improvedsoil)
Reference2:Soil Recycle
Material
Digging by backhoe
Pre screening by VR408
Separate fine(0-20mm) from over(20-100mm) Products(0-20mm)
Improve by soil recycler
Backhoe VR408 Soil recycler Recycle products
Application referenceApplication reference
127
-
9-7-4. Competitors Soil Recycler
HITACHI SR2000G
KOMATSU
BZ210-1
3,500
128
-
Note This information just shows estimated capacity.
HCM doesn't warrant any information on this sheet. Estimated capacity depends much on feeding material, condition and so on.
9-7-5. Appendix : Estimated Productivity
129
-
130
-
10. Mining & QuarryEquipment
131
-
10-1. Process of Mine Development
Four components of Development of mineRock ( Blasted rocks )Water (balancing reservoir / detritus tank )Burden ( Stock yard ( capacity ) Equipment ( Machines & Plants
Examination by literature
Elastic wave explorationBoring exploration
Finish of diggingtreatment
Blasting workFormation of Bench
Backhoe & Dump & Bulldozer
Plant trees
Application of vacant lot
Examination
Treatment
Development
ProductSelect of mountain
Closeinvestigation
licenseapplication
Wood grindingclearing
Land cleaning
Introducedeach furnishing
Introducedmachines
Digging of raw stone
Processingproduction
Custody control
Acceptance of order &
Shipment
Examination of land surface
Creation of Stock yard
IntroducedMachines/Plants
Crusher/ScreenConveyer/Mining machines
Blasting face/ road/ stock yard / balancing reservoir / detritus tank
Product by productcustody
132
-
10-2. Products Line Up Aggregate
For roadMaterial for concrete Ballast Broken stone
Products are classified into size and/or grain by purpose and/or uses.
Aggregate is classifiedinto four products.
For road Material for concreteBallastBroken stone
Aggregate products
For road
Materialfor concrete
For railroad stone
Other
For paving material
Coarseaggregate
Fineaggregate
Ballast
For surface &Groundsill
For upper or lowerFor Base coursematerial
For sub grade material
For lower stone
Dust & others
Broken stone
133
-
10-3. Specification Table of General Rock
Various rare metals are included in many kinds of rocks. Loading capacity estimation is based on the chart below. Refer to the chart below for silica level
1.83.0lowserpentinite
1.83.0mediumgabbro
1.72.9mediumdiorite
1.62.7highgranite
1.83.0mediumdiabase
1.72.8mediumporphyrite
1.83.0mediumbasalt
1.52.6mediumandesite
igneous
rock
1.83.0lowmarble
1.83.0mediumamphibolite
1.62.7highgneiss
metamorphicrock
1.11.9lowcoal
1.62.6highchert
1.62.6lowlimestone
1.72.8highschalstein
1.62.6lowslate
1.62.7highgraywacke
1.52.5highsandstone
sedimentary
rock
1.6lowsoil (overburden)
Looset/m3Bankt/m3
Average densitysilicaname
134
-
10-4. Development of Mine in Japan (1)
Finished wall(rehabilitation)
Stock yard floor
bench
Bench-cut(mountain top cutting)
verticalshaft
Related with TOP6 companies
1.Initial investment is huge.
mainly, construction costs of vertical shaft & hauling tunnel.
2.Production cost isrelatively stable,because carrying distance will not be so extended in future.
There is crusher and/or feeder at bottom of the shaft
Plant1st,2nd,3rd,
floor
Stock yard
Bench-cut
(mountain side cutting)
bench
Down road carrying
1.Initial investment is small.
2.Production cost will be increased in future because carrying distance will be extended in process.Need to check Periodical review of carrying volume is required, especially combination of machines
Expandingarea
carrying distance is extended in future
135
-
Indonesia coal mine (KPC) Chili copper mine
Russia diamond mine
Bench-cut (down the hall)
1.Initial investment is huge.
2.Production cost will be increased in future 0by increasing carrying distance in process. Need to check Periodical review.
(boring examination, digging up an overburden)
3.In comparison with other methods, fuel cost 0is at a disadvantage by uphill carrying of load
10-4. Development of Mine in Japan (2)
136
-
0200
400
600
800
1 000
1 200
71 73 75 77 79 81 83 85 87 89 91 93 95 97 99 01 03 05
10-5. Marketing : Production of Aggregate
Total Products
Limestone
Quarry & gravel
year
Mt
Main Target
Cement For steel Quarry For chemical Others
Quarry Sand & gravel (sea/river) OthersSand & gravel (land/mountain)
137
-
More than 1 000kt / year
5001 000kt / year
100500kt / year
Less than 100kt / year
2008 Limestone
mines quarry sites 1.369
Supposed loading machineSupposed loading machine6.5hr/day 22days/month12months/yearBucket Efficiency 90Loading Efficiency 65
EX550029.0 4 290 2 500
EX3600 EX550022.029.03 432 2 000
EX250015.0 2 574 1 500
EX190012.0 1 716 1 000
EX1200BE EX19005.612.01 373 800
EX12005.0 1 030 600
ZX350H1.41.5343200
ZX240H1.0 172100
MODELm3Kt/yeart/hr
10-6. Marketing : Produce of Scale (1)
138
-
ZX450 over Excavator sale records
2328 31 29
32 29 32 30
4436
13
26
3635
31
40
2931
27
30
35
32
11
15 14
7
11
11
19
13
1414
8
1
2 3
2
1
3
44
4
4
4
4
4
5
0
20
40
60
80
100
'03/F '03/S '04/F '04/S '05/F '05/S '06/F '06/S '07/F '07/S '08/F
NOT FOUNDOTHERSCAT JAPAN
HITACHI
KOMATSU
(units)
10-6. Marketing : Produce of Scale (2)
139
-
10-7. Strategy Making in Japan
LT160EX19001 716 1 000
LT160EX1200BEEX19001 373 800
LT140EX12001 030 600
LT125 LT140LX4506.0ZX870HZX870BEH858500
LT125ZW310LX3004.05.0
ZX670HZX870H686400
ZR950JCZR950JCLT105
ZW220ZW220ZW250ZW250
3.23.5
ZX470HZX470HZX520LCHZX520LCH515300
ZR950JCZW2203.2ZX350HZX400ZX400343200
ZR950JCZW2203.2ZX240H172100
MODELMODELm3MODELKt/yeart/hr
CRUSHERWLIN PLANTEXCAVATOR
Selection of Selection of main promotion Modelmain promotion Model
MainMarket
Developed quarry-modelSelecting customers & Demo
Application range of our products
Demo at customers site. Attending to the Hi-OSS demo site
Developed Quarry-modelSelecting customers & Demo
140
-
10-8. Production Process & Machinesin Japan (1)
ZX850HEX800H
Rough Crushing & Digging up Rough Crushing & Digging up (with breaker)(with breaker)
Digging up Digging up (after blasting)(after blasting)
Back break of blasting ZX520H Back break of blasting ZX870H
The edge of blasting pit EX800H The bottom of blasting face EX1200
by bulldozer
by backhoe
pit
After blasting operation need to crush rocks by hydraulic breaker.
Above crushing operation is quite heavily-loaded, HD spec is most suitable.
On dangerous job site, Excavator is more suitable than Bulldozer considered with safety issue.
141
-
Blasted rock EX850H
Overburden EX1200
Overburden ZX450H
Blasted rock ZW310
Shovel & Dump Shovel & Dump
Load & Carry Load & Carry
L&C ZW310
In SH&DP Work, blasted rocks are Loaded & Carried to Dump truck by big excavator & big WL.
In L & C work, WL directly carries rocks or gravel to hopper.
10-8. Production Process & Machinesin Japan (2)
142
-
ZR950JC&VR408(screen)Producing Recycle Crusher-run
ZX450&CrusherPrimary crusher Dump-less system
Crushing & Screening Crushing & Screening (Mobile Crusher & MCP ~Mobile Crushing Plant~)(Mobile Crusher & MCP ~Mobile Crushing Plant~)
After first crushing next two steps crushing operation done.
After that above, by Screen the rocks separated by each size.
10-8. Production Process & Machinesin Japan (3)
143
-
10-9. Information of ZAXIS R-Model
ZX870LCH (Rough Crushing)2007/3 delivery 800hr
ZX520LCH (Back break of blasting)2006/11 delivery 1 800hr
144
-
transmission Hydraulically operated cooling fan with Heat-Sensing system
Comfort-designed suspension seat
Adjustable steering column
system
Bushings
All round visibility panoramic cab
ZW Selling pointThree works modes TT (Total Torque-control) system
Three driving modes L/N/H/M
Selectable Clutch Cutoff timing
Three work modes are selectable according to job needs and operators preference .In eachWork mode, TT system controls the total torque of the engine and pump for well matchedPenetration force and implement speed according to job needs. The three work modes can beOptimally selected to suit materials to be handled for higher production.
The three driving modes can be selected according to job needs and operators preference.
Voluntarily
Slow
Early
Shift timing
AllnothingM(manual mode)
HCore working is diggingSloping road
NLong distance and/or flat terrainL
Recommend siteAutomatic shift transmissionDriving modes
Clutch cutoff timing can be selected from three position to suit various job condition, includingRapid operation on level ground , and surefooted operation on gradient.
10-10. Wheel Loader Information (ZW series)
P mode : Heavy-duty excavation N mode: Loading L mode : Light-duty operation
ZW220~ZW330ZW220~ZW330
145
-
Type- Loading methodCross Loading method
Material
Type-V Loading method
Weld edge
BOC
Bucket Specification
Bolt-on Cutting edge (BOC)
Bolt-on cutting edge isnt compatible with bolt on teeth.
(Weld edge is different.)
Teeth cant be attached to BOC bucket.
Weld edge
Bolt-on Teeth (BOT)
Material
10-11. Loading Method of Wheel Loader (ZW series)
146
-
Selectable for custom
Extinguisher With or Without of Gumball machine
BOC or Tooth
Main work of WL by ZW310 class is loading to dump truck and feeding into hoppers by bucket.
In case of carrying products, the bucket is not necessary to be reinforced. But in case of loading to dump truck& throwing into hoppers, it needs to be reinforced.
Side, inner and bottom plates, and side edges are usually reinforced depending on customers request.
EX.)
9mm
25mm9mm
10-12. Feature of Wheel Loader (ZW series)
147
-
Bridgestone Bias tires pattern
Michelin radial tires pattern
Michelin treat only radial tire.
Cost
Bias tire is configured to nylon codes that it is piled up carcass.
Radial tire has several strong steel belts, carcass. Steel belt be for tread faces stability and guard. Carcass is steel code of one ply
that it is arranged radial pattern.
Feature
Decaydurability
Side wall and Tread face are bow. Contact area is fickleness.
Side wall is only bow, Tread face isnt bowContact area is stabilized to load.Deflection
Low
Radial
HighContactpressure
Bias
Usually Europe and America use radial tire.
Tire for WLBias tire
Radial tireTire size pattern L3/L4/L5
Bias tire
Radial tireWidth of Tire ( inch)
Diameter of rim ( inch)
Ply
Width of Tire ( inch)Diameter of rim ( inch)
Dia
met
er
of ri
m
Out
side
D
iam
eter
of
tire
Hei
ght
of
tire
Section
10-13. Tire
148
-
Carrying distance and Cost ( Polar example)Carrying distance and Cost ( Polar example)
10-14. Matching of Dump & Excavator Information (1)
Carrying methods of minerals are as followings. Dump-Truck method Dump-less method
In Japan, Dump method is usually went on to Shovel-Dump method that it combines Hydraulic Excavator and Dump.
Advantages of Dump-Truck method
1.High general versatility. Applicable tovarious sites
2.Damage would be smaller when troublehappens
3.Managable by adjusting no. of units fordistance and/or amount of production change
4.High ability to handle various objects5.Easier operation, less tiredness for operator6.Easier maintenance7.Lower cost for long distance carry comparing
with Bulldozer method & L & C method.
Bulldozer method
L & C method( Load & Carry )
Shovel & Dump method
BulldozerDump
Carrying distance
High
Low
Cost
Wheel loader
149
-
Dimensions of Excavator, Size of Dump and Matching numbers of Unit should be considered.
Matching numbers of Loading machine & Dumping machineDumping clearance of Loading machine & Bessels Height of DumpDumping reach & Bessels Length of DumpBucket width & Bessel width
Excavator (Bucket capacityISOunitmm)
Model code Bucket capacity A B C D E
ZX380HH 1.5 m3 3 320 2 680 3 650 11 020 1 470ZX470H-3 1.9 3 645 2 990 3 410 12 060 1 500ZX520LCH-3 1.9 3 645 3 070 3 410 12 000 1 500ZX650H ZX670LCH-3 2.9 3 850 3 240 4 310 13 280 1 680
ZX650H(BE) ZX670LCH-3(BE) 3.3 3 850 3 200 4 520 11 800 1 700
ZX870LCH-3 3.5 4 600 4 000 4 590 14 100 1 890ZX870LCH-3(BE) 4.3 4 600 3 770 4 620 12 340 2 110EX1200-5C 5.0 4 850 3 220 7 000 15 340 2 100EX1900-5 12.0 6 010 4 050 6 430 15 250 3 050EX2500-5 15.0 6 290 4 250 7 580 17 050 3 180EX3600-5 22.0 6 780 4 990 7 470 18 190 3 790
A :Rear-end swing radiusB : Dumping heightC : Dumping reachD : MAX. digging reachE : Bucket widthF : Bessel lengthG : Inner Bessel widthH : Bessel height
(Standard Specification)
10-14. Matching of Dump & Excavator Information (2)
150
-
Model codeBucket capacity (m3)
Cycle tine (sec)
11t(7m3)
20t(14m3)
32t(24m3)
46t(34m3)
55t(40m3)
64t(42m3)
90t(60m3)
136t(78m3)
ZX450H 1.9 22 348278162
1213278
ZX650H 2.8 24 236056120
89206
ZX650BE 3.3 24 25245102
78174
1011248
1213290
ZX850H 3.4 25 235245102
78176
1011250
1112294
ZX850BE 4.3 25 12403482
56140
78198
910232
EX1200-5 5.0 26 237245124
67176
78192
89218
EX1900-5 12.0 28 23562380
3494
3498
56140
67182
EX2500-5 15.0 29 23662378
2382
34116
56150
EX3600-5 22.0 30 12501258
2362
2388
34114
EX5500-5 29.0 32 12441246
2366
2386
Appropriate units of Dump per 1 lording machine is calculated by the following formula.
Cm1Cm2
Required units unit
Necessary time at 1 cycle of Dump ( second )
Necessary time at loading to Dump ( second )
(Standard Specification)
10-14. Matching of Dump & Excavator Information (3)
151
-
10-15. Mobile System in Mine
VR516FS(Finger screen)Screening out usable material from stockpile of wastes in the stockyard
ZR260HC(Wood grinder)Woods & stubs are recycled by wood grinder. (used as recycle fuel or compost.)
SR2000G(Soil recycler)Improving overburden for recycle. (used as bank of road construction.)
152
-
???????
??????
10-16. Hearing seat to customer
3rd
2ndCone crusher
1stJoe crusherXinch
Plant/Equipment
others
DP HD2052 10tDP5
WL WA400 ZW310 966G
SH ZX470R PC450 ZX210H
Ownership machines
SH&DP one way 800m L&C one way 60mMethod of carrying
Bench cut Open shootMethod of quarrying
Development of forest land by September,2009Rock extraction April,2010per 5 years
Update term of Operation license
6.0hr/day 22day/month 12month/year1 584hr/yearCondition of blast
Monthly output 0000/month Annual output84000/yearAmount of production
Coal ironstonelimestone etc.Rock quality
Booklet Y N URL Y NBooklet/URL
business placeBusiness place/Job site
mining companyCustomers name
Format of acquisition of information
153
-
154
-
11. Forestry Machines
155
-
Operating weight 13 700 kgBucket capacity(PCSA heaped) 0.5 m
3
Traction force 130 kNGradeability 35(70%)Ground pressure 41 kPaRated power P moed : 63/1950 kW/min-1
HP moed : 66/2150 kW/min-1
Dimensions/Working Range DiagramDimensions/Working Range Diagram
11-1. Dimensions : ZX130L
156
-
ZX130L Forestry EQUIPMENTZX130L Forestry EQUIPMENT
Air cleanerdouble filters
High performance filter
Reinforcedunder
carriage
Tropical cover
Upperstructurereinforced under cover(4.5mm)
Std cabArm with damage prevention plate
(Upper,Lower,Side)
Reinforced under carriageReinforced under carriage
Two roller guard
Traction force 15%UP
LkNSTD102kN
Reinforced stepReinforcedunder cover
Distance between tumblesL2990mm
STD2880mm
11-2. Equipment (1)
157
-
Min.ground clearanceMin.ground clearance
(Std
:440
mm
)
(Std
:890
mm
)
Component comparisonComponent comparison
Track link assembly ZX110MTravel motor ZX110MUpper rollers ZX200Lower rollers ZX200Idler assembly ZX200Spring track assembly ZX110M
It is the same as std modelZX120.Hydraulic circuit
It is the same as std modelZX120.Electric circuit
OtherOther
11-3. Equipment (2)
158
-
11-4. Attachments (1)
ProcessorProcessor
Attachment for specializing in lopping branches off and cross cutting(cut same size).
Composed of grapple(handling wood), blade cutter(lopping branches), feed controlling device, and chainsaw(cross cutting).
Human operation(lopping branches): 10minutes
Processor operation(lopping branches & cross cutting): 2minutes
Shotens operation time and reduces manpower
Grapple Chain saw
Measure device
Transfer device for Hanging wood
Device for Branch cutting off
159
-
11-5. Attachments (2)
HarvesterHarvesterCut off device for Branch
Transfer device for Hanging wood
Measure device
Grapple Chain saw
Attachment for felling trees, cutting branches off, cross cutting,
Different point(from Processor): Equipped with Tilt system(for easy cutting down trees)
FellerFeller BuncherBuncher
Attachment for felling trees for easy collection.
Lighter attachment weight than processor & harvester. Can be fitted to Long front machine.
160
-
KS-EN075ZX650LC-3 F Type SeriesKS-EN059ZX850-3 Series (850-3/850LC-3/870H-3/870LCH-3)
KS-EN074ZX500-3 F Type SeriesKS-EN031ZX650LC-3 Series (650LC-3/670LCH-3)
KS-EN076ZX850-3 F Type Series
KS-EN073ZX450-3 F Type SeriesKS-EN030ZX500LC-3 Series (500LC-3/520LCH-3)
EX8000-6
EX5500-6
EX3600-6
EX2500-6
EX1900-6
EX1200-6
For Mining Machines BrochureFor Mining Machines Brochure
Recycling Equipments BrochureRecycling Equipments Brochure
KS-EN105Spec.KS-EN056PBrochure
KS-EN104Spec.KS-EN122Brochure
KS-EN044ZX400LCH-3KS-EN060ZX450-3 Series (450-3/450LC-3/470H-3/470LCH-3)
KS-EN047ZX-R Series (400R-3/470R-3/520R-3/670R-3/870R-3)KS-EN077ZX-R F Type SeriesKS-EN109Brochure
KS-EN125Brochure
KS-EN051QSpec.KS-EN057PBrochureKS-EN052QSpec.KS-EN058Brochure
KA-EN044ZR260HC
KA-EN078Material Handling Machines BrochureKA-EN077Scrap Metal Recycling Brochure
KA-EN082VR408KA-EN061PVR516FSKA-EN043ZR125HC
KA-EN074SR2000GKA-EN020ZR950JC
KS-EN103Spec.
KS-EN112Spec.
For Metal Recycling Machines BrochureFor Metal Recycling Machines Brochure
12. Brochures List
This information is the present in February, 2009.
161