ESCO Capacity Building Seminar
Hitachi Energy Solution
Dec 18th 2008
Hitachi , Ltd.
Energy Solution Div.
Kenichi Kuwabara, Department Manager
Content
Industrial Sector
1. ESCO Example in Thailand
2. ESCO Example in Philippine
3. ESCO Example in Singapore
4. ESCO Example for Shopping Center
5. ESCO Example for City Government Office
Commercial Sector
1
1-1. Overview of customer
Country : Thailand
Production : Hard Disk Drive
Established : Feb , 1997
Production : Dec , 1997
2
1-2. Example in Thailand (Before ESCO)
Through flow
Boilers
3
S : SteamD : Drain H : Hot waterCD : Cooling water
Dry air
Cleaning machines
Laundry ( Drying
Machine )
Steam Header
(50℃)HX
S
S
S
D
D
H
UDI water(30℃)
Air compressor
Cooling Tower
H
HX
P
CDCD
HLow temp
high temp
Focus-1OIL
Waste Energy
Compressor
1-3. Example in Thailand (After ESCO)
Energy recovery from hot air of Air Compressor
4
1-4. Project Schedule - ESCO in Thailand
ESCO Service started in April 2007
No ITEM
1 Energy recovery for ZR300After cooler -Order Delivery Comp #4 Shutdown 20days ,Comp #9 Shutdown 20days -Installation Total : 40days -Test & Commissioning
2 Hot water Piping work -Design -Material Order -Installation -Test & Commissioning
3 DI water -Modification DI Pipe
UDI Water Shutdown 12hr/each locationDate to be discussion
J anuary FebruarySeptember October November December
Test run Feb-Mar.
2006 2007
5
1-5. Project Overview - Thailand Case
ESCO Project Opening Ceremony : Apr/03
Implement of heat recovery system for existing air Compressors Global remote monitoring system
6
1-6. Effect of ESCO and Recognitions
Advantage : Energy saving, Cost saving, and CO2 emission reductionESCO realizes 11% of the energy saving
Jul 30, 2008, Thailand Energy Award granted by Lieutenant-General Poonpirom Liptapanlop, Minister of Energy, Thailand
May 13, 2008, the PEZA Outstanding Environmental Performer Award, granted by Executive Secretary Eduardo Ermita and Atty. Gen. Lilia de Lima
ESCO reduces 750 t-CO2 / yearAdvantage : Energy saving, Cost saving, and CO2 emission reduction
7
Content
Industrial Sector
1. ESCO Example in Thailand
2. ESCO Example in Philippine
3. ESCO Example in Singapore
4. ESCO Example for Shopping Center
5. ESCO Example for City Government Office
Commercial Sector
8
2-1. Overview of customer
Country : Philippine
Production : Magnetic recording head
Established : April , 1996
Energy Consumption Amount: Electricity 24,000 MWh : Oil 190,000 kL
9
2-2. ESCO Approach - Philippines Case
ESCO Phase-1 : Feb. 2005 - Apr. 2006
Energy recovery from hot exhaust gas of power generators (Step-1)
Replace aged turbo chillers with new high efficient chillers (Step-1)
Energy recovery from hot water of power generators
ESCO Phase-2 : Sep. 2006 - May 2007
Energy recovery from hot exhaust gas of power generators (Step-2)
Replace aged turbo chillers with new high efficient chillers (Step-2)
Install closed chilled water system
10
2-3. Power Generation Facilities(Before ESCO)
Focus-3
Generator(1500kW)
~
NO.1
・・・
Power network
FuelFuel
Heat-exchanger
Generator(1500kW)
NO.2
DeNOx
silencer
Cooling tower
Heat-exchangerCooling tower
Exhaust gas (285deg.C)
NO.8 Diesel engine
Dieselengines
Dieselengines
Focus-1
Focus-2
Focus-2Turbo chiller
200RT
7℃12℃
Turbo chiller200RT
7℃12℃
Turbo chiller200RT
7℃12℃
Turbo chiller300RT
Four aged chillers
HitachiTurbo chiller
380RT
HitachiTurbo chiller
380RT
HitachiTurbo chiller
380RT7℃
12℃ HitachiTurbo chiller
380RT7℃
12℃ HitachiTurbo chiller
380RT7℃
12℃
#7 #8 #9
7℃
12℃
#67℃
12℃
#5
11
2-4. Final Configuration(After ESCO)
DeNOx Exhaust heat steam boiler
Hot water absorption chiller
350RT
85℃
80℃
Steam Absorption chiller
450RT
Through flow boiler
water supply
:Scope of ESCO(Phase2)
Diesel engines
silencer
NO.1, NO.2
DeNOx
Exhaust gas
Diesel engines
silencer
NO.3, NO.4
Exhaust heat steam boiler
Exhaust gas
7℃12℃7℃12℃< Phase1 >
< Phase1 >
< Phase1 >
< Phase1>
< Phase2>
Steam
Steam
NO.5,NO.6 Diesel engine
NO.7,NO.8 Diesel engine
Carrier chiller200RT
Carrier chiller200RT
Carrier chiller200RT
Back-up
Back-up
Back-up
Tube cleaning system
Tube cleaning system < Phase2> < Phase2>
< Phase1 >High efficiencyTurbo chiller
450RT7℃
12℃
7℃
12℃
7℃
12℃ HitachiTurbo chiller
380RT7℃
12℃ HitachiTurbo chiller
380RT7℃
12℃ HitachiTurbo chiller
380RT7℃
12℃High efficiencyTurbo chiller
450RT
High efficiencyTurbo chiller
450RT
< Phase2> < Phase2>
#7 #8 #9
Action-4
Action-4
Action-512
ESCO
Monitoring
2006
311 19753 41 284 26 1 0
Turbo chiller
Hot water absorption chiller
Steam absorption chiller
Aged Turbo chiller Removal
Exhaust heat steam boilerHot water recovery
Design and Piping
2
2005
Hot water recovery pipe
Installation
Installation
Design exhaust and absorption chiller Common Pipe
Installation
Check energy consumption
Estimation Design Set up Monitor
CP
2-5. Project Schedule - ESCO Phase 1 in Philippines
13
ESCO
2007
Chilled water system
Tube cleaning system
Turbo chiller Removal
Exhaust heat steam boiler
2006
Installation
Installation
Installation
Estimation Design Set up Monitor
CP
2-6. Project Schedule - ESCO Phase 2 in Philippines
311 19 41 2 21 0 5
Turbo chiller HC-F500GX #2Turbo chiller HC-F500GX #3
Installation
Design
Exhaust piping modification
Installation
Common pipingDesign
14
2-7. Project Overview - Philippines Case
Modification of existing diesel engines to cogeneration systemAdoption of three high-efficiency centrifugal chillers and two typeGlobal remote monitoring system
JAPAN
Chilled waterExhaust gas
Power
( existing )
Fuel
Steam
Diesel engines Exhaust heat steam boiler
[2 units]
SteamAbsorption chiller
ESCO
Tube cleaning system
Hot water
Chilled water
Cooling water
Hot water Absorption chiller
Centrifugal chiller [3 units]
Chilled water
Power
Monitoring system
Chilled water
Tube cleaning system Centrifugal chiller
(existing)[3 units]
Chilled water
ESCO Opening Ceremony, April 20, 2006
15
2-8. Media News - Philippines Case
Hitachi To Help Overseas Firms Conserve Energy2005/06/18, 03:07, Nikkei English News, 279 words
TOKYO (Nikkei)--Hitachi Ltd. (6501) is expanding its energy service company (ESCO), which helps firms cut electricity use at factories, to businesses abroad.
In ESCO operations, Hitachi examines a production site, sets up energy-saving equipment and then receives a service fee based on the resulting cost reductions.
Hitachi started the service at the Philippines hard-disk drive plant of its U.S. subsidiary. It plans to install a boiler that recovers heat from the factory's diesel engine generator and powers a freezer that cools electronic parts.
16
Content
Industrial Sector
1. ESCO Example in Thailand
2. ESCO Example in Philippine
3. ESCO Example in Singapore
4. ESCO Example for Shopping Center
5. ESCO Example for City Government Office
Commercial Sector
17
3-1. Overview of customer
Country : Singapore
Production : DRAM(Dynamic random access memory)
Established : July , 1996
Energy Consumption Amount: Electricity 160,000 GWh
18
3-2. ESCO Example in Singapore
19
■ Series counter flow high efficiency for centri fugal chiller(2set)
This is the best method for wide range temperature system
■ Global remote monitoring system
OverviewOverview
MeteringSystem
JAPAN
MonitoringCenter
6℃10℃14℃
Lead Unit Lag Unit
■ Modification for Ball Cleaning System
2600RT : 2 set⇒ Total 5200RT
Hitachi Centrifugal Chiller:Series Counter Flow
Chilled Water-OutChilled Water-In
CO2 Reduction5,000ton/year
CO2 Reduction5,000ton/year
High Efficiency Centrifugal Chiller
3-3. System flow (Before ESCO)
NORTH SIDE
SOUTH SIDE
C/R & INSPN RM
M
M
M
M
M
Before ESCO
Existing chillers (1,200USRT)10units
12℃
16℃
16℃
16℃ 6℃
6℃
6℃
6℃
(12.4℃)(12.4℃)
COP = 4.6 (Spec.)
20
3-4. System flow (After ESCO)
NORTH SIDE
SOUTH SIDE
C/R & INSPN RM
M
M
M
M
M
After ESCO
New chiller
Existing chillers (1,200USRT) 6units
New chiller
New chiller New chiller
12℃
16℃
16℃
16℃ 6℃
6℃
6℃
6℃
(12.4℃)(12.4℃)
COP = 4.6 (Spec.) COP = 5.8 (Spec.)
21
Content
Industrial Sector
1. ESCO Example in Thailand
2. ESCO Example in Philippine
3. ESCO Example in Singapore
4. ESCO Example for Shopping Center
5. ESCO Example for City Government Office
Commercial Sector
22
4-1 Example for Shopping Center
Country Country :: JapanJapan
Customer Customer :: Shopping CenterShopping Center
Total Floor Space : 76,000m2Total Floor Space : 76,000m2
Installation Equipment Installation Equipment :: Gas Engine CoGas Engine Co--generation generation SystemSystem
(720kW(720kW--630RT : 3 630RT : 3 sets)sets)● Energy conservation and CO2 emissions reduction effect
Annual energy amount (KL) CO2 gas emissions (ton-CO2)Reduction amount 1,060 3,000
Reduction rate 13% 15%
23
4-2 Example for Shopping Center
24
Electricity
Gas EngineAbsorption
He
Electricity
Gas EngineAbsorption
Exhaust gas
hot water
Cooling Water
Gas
Generator
Chilled Water
Cooling Tower
Cooling Tower
Chilled Water
Exhaust gas
Generator
Cooling Water
hot water
Gas
Electricity
Gas Eco-Pack system diagram
Content
Industrial Sector
1. ESCO Example in Thailand
2. ESCO Example in Philippine
3. ESCO Example in Singapore
4. ESCO Example for Shopping Center
5. ESCO Example for City Government Office
Commercial Sector
25
5-1 Example for City Government Office
Country Country :: JapanJapan
Number of floorsNumber of floors:: 8 above ground level8 above ground level2 under ground level2 under ground level
Total floor areaTotal floor area: 18,875 m: 18,875 m22
Contract demandContract demand: 680 kW: 680 kW
Air conditioning equipmentAir conditioning equipment::Absorption chillerAbsorption chillerAir cooled chillerAir cooled chiller
Guaranteed SavingsGuaranteed Savings3 years3 years’’ contract contract
26
5-2 Example for City Government Office
Energy Conservation MeasuresEnergy Conservation Measures Energy Saving EffectEnergy Saving Effect
Introduction of highIntroduction of high--efficiencyefficiencyLighting equipment(2,053unit)Lighting equipment(2,053unit)
5.0%5.0%
Inverter Control on Inverter Control on Chilled water pump(3unit)Chilled water pump(3unit)and AHU(9unit)and AHU(9unit)
8.0%8.0%
Unutilized Energy GeneratorUnutilized Energy Generator 0.2%0.2%
TotalTotal 13.2%13.2%
27
5-3 Example for City Government Office
Generator integrated type
in-line hydraulic turbine
Drain protective
valve
Storage tank(chilled and hot
water)
Pump for chilled/hot water supply
Water flow
P
Drain protectivevalve
AHUEnergy recovery
systemControl panel
To grid
Outletvalve
Pressure gauge
Inletvalve
Unused energy recovery system diagram
28
Hitachi Energy Solution
Dec 18th 2008
Hitachi , Ltd.
Energy Solution Div.
Kenichi Kuwabara, Department Manager