FeedBack Work Order List 01/01/2012 From date : To date : 31/12/2012 06/02/2013 Print date : 1 Page No : Equipment Code Task Completion Date W.O. No. Due Date Work Done Department : SAFETY 02/01/2012 the work has been done 0103S059A 2012-000063 01/01/2012 ZB/0010/FOAM/S/DIESEL T. 02/01/2012 the work has been done 0103S056A 2012-000091 01/01/2012 ZB/0020/F.HYDR/S/F.HYDRAN 05/01/2012 HECK HALLON SYSTEM PRESSURES AS FOLLOW: initial H1 : 42 bar H2 : 20 N:65bar Reserve -------------------------- 0103S063A 2012-000140 01/01/2012 ZB/0010/GT-01A/S/HALLON

description

History Workord List

Transcript of History Workord List

  • FeedBack Work Order List

    01/01/2012From date : To date : 31/12/201206/02/2013Print date :

    1Page No :

    Equipment Code Task Completion DateW.O. No. Due Date Work Done

    Department : SAFETY02/01/2012 the work has been done0103S059A 2012-000063 01/01/2012ZB/0010/FOAM/S/DIESEL T.

    02/01/2012 the work has been done0103S056A 2012-000091 01/01/2012ZB/0020/F.HYDR/S/F.HYDRANT

    05/01/2012 HECK HALLON SYSTEM PRESSURES AS FOLLOW:

    initial

    H1 : 42 bar

    H2 : 20

    N:65bar

    Reserve

    --------------------------

    0103S063A 2012-000140 01/01/2012ZB/0010/GT-01A/S/HALLON

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    05/01/2012 HECK HALLON SYSTEM PRESSURES AS FOLLOW:

    initial

    H2 : 38 bar

    H2 : 20

    N:71bar

    Reserve

    H1 : 38bar

    H2 : 32 bar

    0103S063A 2012-000141 01/01/2012ZB/0010/GT-01C/S/HALLON

    01/01/2012 HECK HALLON SYSTEM PRESSURES AS FOLLOW:

    initial

    H:30 bar

    N:70bar

    Reserve

    H: 32bar

    N:65 bar

    0603S063A 2012-000016 01/01/2012ZB/0025/B -01C/S/HALLON

    15/02/20120103S063A 2012-000142 01/01/2012ZB/0025/B -01A/S/HALLON

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    01/01/2012 HECK HALLON SYSTEM PRESSURES AS FOLLOW:

    initial

    H: 22 bar

    N:67bar

    Reserve

    0103S063A 2012-000139 01/01/2012ZB/0026/B -02B/S/HALLON

    01/01/2011 the work has been done0103S056A 2012-000099 01/01/2012ZB/0026/F.HYDR/S/F.HYDRANT

    10/01/2012 HECK HALLON SYSTEM PRESSURES AS FOLLOW:

    initial

    H1: 16 bar

    H2 :36 N:65bar

    Reserve

    H1 : 24bar

    H2 : 25

    0103S063A 2012-000270 08/01/2012ZB/0010/GT-01D/S/HALLON

    10/01/2012 the work has been done0603S023A 2012-000154 08/01/2012ZB/0020/T -04/S/00-00000

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    09/01/2012 HECK HALLON SYSTEM PRESSURES AS FOLLOW:

    initial

    H: 17 bar

    N:70bar

    Reserve

    H: 30bar

    N:70 bar

    0103S063A 2012-000271 08/01/2012ZB/0025/B -01D/S/HALLON

    11/01/2012 the work has been done0103S056A 2012-000250 08/01/2012ZB/0030/F.HYDR/S/F.HYDRANT

    09/01/2012 the work has been done0103S056A 2012-000253 08/01/2012ZB/0090/BREATH/S/BREATH

    15/01/2012 The job has been done as per procedure.0103S059A 2012-000369 15/01/2012ZB/0020/FOAM/S/TANK A

    05/02/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 22 bar N: 65 bar

    H: 43 bar

    RESERVE:

    (No Cylinders)

    0603S063A 2012-000328 15/01/2012ZB/0010/GT-01A/S/HALLON

    10/02/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 25 bar N: 68 bar

    RESERVE:

    H: 31 bar N: 63 bar

    0103S063A 2012-000438 15/01/2012ZB/0025/B -01C/S/HALLON

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    10/02/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 30 bar N: 67 bar

    RESERVE:

    H: 14 bar N: 65 bar

    0603S063A 2012-000327 15/01/2012ZB/0025/B -01D/S/HALLON

    16/02/2012 The job has been done as per procedure.0103S056A 2012-000393 15/01/2012ZB/0090/F.HYDR/S/F.HYDRANT

    10/02/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    (Out of Service)

    INITIAL:

    No Cylinders

    RESERVE:

    H: 360 psi N: 65 bar

    0103S063A 2012-000436 15/01/2012ZB/0026/B -02A/S/HALLON

    10/02/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 20 bar N: 61 bar

    RESERVE:

    H: 17 bar N: 64 bar

    0103S063A 2012-000437 15/01/2012ZB/0025/B -01B/S/HALLON

    25/01/2012 the work has been done0103S056A 2012-000538 22/01/2012ZB/0010/F.HYDR/S/F.HYDRANT

    22/01/2012 the work has been done0103S059A 2012-000539 22/01/2012ZB/0010/FOAM/S/FILL.TANK

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    22/01/2012 HECK HALLON SYSTEM PRESSURES AS FOLLOW:

    initial

    H1: 33 bar

    N:70bar

    H2 : 35bar

    Reserve

    H1: 28bar

    H2 : 36 bar

    0103S063A 2012-000616 22/01/2012ZB/0010/GT-01B/S/HALLON

    26/01/2012 the work has been done0603S059A 2012-000482 22/01/2012ZB/0020/FOAM/S/TANK B

    23/01/2012 the work has been done0103S056A 2012-000560 22/01/2012ZB/0025/F.HYDR/S/F.HYDRANT

    23/01/2012 HECK HALLON SYSTEM PRESSURES AS FOLLOW:

    initial

    H: 21 bar

    N:70bar

    Reserve

    H: 24bar

    N:65bar

    0103S063A 2012-000617 22/01/2012ZB/0026/K -07/S/HALLON

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    23/01/2012 HECK HALLON SYSTEM PRESSURES AS FOLLOW:

    initial

    H: 24 bar

    N:66bar

    Reserve

    H: 17bar

    N:66 bar

    0103S063A 2012-000618 22/01/2012ZB/0026/K -08/S/HALLON

    31/01/2012 the work has been done0603S059A 2012-000667 29/01/2012ZB/0010/FOAM/S/DIESEL T.

    05/02/2012 HECK HALLON SYSTEM PRESSURES AS FOLLOW:

    initial

    H: 40 bar

    N:19bar

    Reserve

    No cylinder

    0103S063A 2012-000807 29/01/2012ZB/0010/GT-01A/S/HALLON

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    05/02/2012 HECK HALLON SYSTEM PRESSURES AS FOLLOW:

    initial

    H1:35 bar

    H2: 34 N:70bar

    Reserve

    H: 26bar

    H2:29 N:70bar

    0103S063A 2012-000808 29/01/2012ZB/0010/GT-01C/S/HALLON

    29/01/2012 the work has been done0103S056A 2012-000755 29/01/2012ZB/0020/F.HYDR/S/F.HYDRANT

    30/01/2012 HECK HALLON SYSTEM PRESSURES AS FOLLOW:

    initial

    H:34 bar

    N:65bar

    Reserve

    H: 18bar

    N:62 bar

    0103S063A 2012-000809 29/01/2012ZB/0025/B -01A/S/HALLON

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    30/01/2012 HECK HALLON SYSTEM PRESSURES AS FOLLOW:

    initial

    H: 21 bar

    N:62bar

    Reserve

    H: 18bar

    N:65 bar

    0603S063A 2012-000675 29/01/2012ZB/0025/B -01B/S/HALLON

    30/01/2012 HECK HALLON SYSTEM PRESSURES AS FOLLOW:

    initial

    H: 23 bar

    N:66bar

    Reserve

    No Cylinder

    0103S063A 2012-000806 29/01/2012ZB/0026/B -02B/S/HALLON

    28/01/2012 the work has been done0103S056A 2012-000762 29/01/2012ZB/0026/F.HYDR/S/F.HYDRANT

    10/02/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 30 bar N: 67 bar

    RESERVE:

    H: 14 bar N: 65 bar

    0103S063A 2012-000981 05/02/2012ZB/0025/B -01D/S/HALLON

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    13/02/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 35 bar N: 65 bar

    H: 15 bar

    RESERVE:

    H: 22 bar

    H: 25 bar

    0103S063A 2012-000980 05/02/2012ZB/0010/GT-01D/S/HALLON

    13/02/2012 The job has been done as per procedure.0103S056A 2012-000963 05/02/2012ZB/0090/BREATH/S/BREATH

    09/02/2012 The job has been done as per procedure.0103S056A 2012-000960 05/02/2012ZB/0030/F.HYDR/S/F.HYDRANT

    15/02/2012 The job has been done as per procedure.0603S023A 2012-000848 05/02/2012ZB/0020/T -05/S/00-00000

    12/02/2012 the work has been done0103S059A 2012-001072 12/02/2012ZB/0020/FOAM/S/TANK A

    12/02/2012 HECK HALLON SYSTEM PRESSURES AS FOLLOW:

    initial

    H: 20 bar

    N:61bar

    Reserve

    H: 17bar

    N:64 bar

    0103S063A 2012-001129 12/02/2012ZB/0025/B -01B/S/HALLON

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    12/02/2012 HECK HALLON SYSTEM PRESSURES AS FOLLOW:

    initial

    H: 25 bar

    N:68bar

    Reserve

    H: 31bar

    N:63 bar

    0103S063A 2012-001130 12/02/2012ZB/0025/B -01C/S/HALLON

    12/02/2012 the work has been done0603S075 2012-001028 12/02/2012ZB/0025/B -07/S/B-2507

    12/02/2012 HECK HALLON SYSTEM PRESSURES AS FOLLOW:

    initial

    H: 360 PSI

    N:65bar

    Reserve

    --------------------

    0103S063A 2012-001128 12/02/2012ZB/0026/B -02A/S/HALLON

    12/02/2012 the work has been done0103S056A 2012-001097 12/02/2012ZB/0090/F.HYDR/S/F.HYDRANT

    22/02/2012 The job has been done as per procedure.0103S056A 2012-001206 19/02/2012ZB/0010/F.HYDR/S/F.HYDRANT

    21/02/2012 The job has been done as per procedure.0103S059A 2012-001207 19/02/2012ZB/0010/FOAM/S/FILL.TANK

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    21/02/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 25 bar N: 67 bar

    RESERVE:

    H: 18 bar N: 67 bar

    0103S063A 2012-001286 19/02/2012ZB/0026/K -08/S/HALLON

    20/02/2012 The job has been done as per procedure.0103S056A 2012-001225 19/02/2012ZB/0025/F.HYDR/S/F.HYDRANT

    20/02/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 22 bar N: 70 bar

    RESERVE:

    H: 24 bar N: 65 bar

    0103S063A 2012-001285 19/02/2012ZB/0026/K -07/S/HALLON

    22/02/2012 The job has been done as per procedure.0103S059A 2012-001224 19/02/2012ZB/0020/FOAM/S/TANK B

    21/02/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 30 bar N: 67 bar

    H: 32 bar

    RESERVE:

    H: 24 bar

    H: 35 bar

    0103S063A 2012-001284 19/02/2012ZB/0010/GT-01B/S/HALLON

    27/02/2012 The job has been done as per procedure0103S059A 2012-001390 26/02/2012ZB/0010/FOAM/S/DIESEL T.

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    29/02/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 42 bar N: 65 bar

    H: 20 bar

    No RESERVE

    0103S063A 2012-001463 26/02/2012ZB/0010/GT-01A/S/HALLON

    29/02/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 36 bar N: 70 bar

    H: 34 bar

    RESERVE:

    H: 26 bar

    H: 30 ba

    0103S063A 2012-001464 26/02/2012ZB/0010/GT-01C/S/HALLON

    27/02/2012 The job has been done as per procedure0103S056A 2012-001414 26/02/2012ZB/0020/F.HYDR/S/F.HYDRANT

    26/02/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 33 bar N: 64 bar

    RESERVE:

    H: 17 bar N: 63 bar

    0603S063A 2012-001330 26/02/2012ZB/0025/B -01A/S/HALLON

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    26/02/2012

    CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 21 bar N: 65 bar

    No RESERVE:

    0103S063A 2012-001462 26/02/2012ZB/0026/B -02B/S/HALLON

    26/02/2012 The job has been done as per procedure0103S056A 2012-001420 26/02/2012ZB/0026/F.HYDR/S/F.HYDRANT

    04/03/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 15 bar N: 61 bar

    H: 35 bar

    RESERVE:

    H: 23 bar

    H: 23 bar

    0103S063A 2012-001618 04/03/2012ZB/0010/GT-01D/S/HALLON

    04/03/2012 The job has been done as per procedure0603S023A 2012-001505 04/03/2012ZB/0020/T -06/S/00-00000

    05/03/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 30 bar N: 67 bar

    RESERVE:

    H: 14 bar N: 67 bar

    0103S063A 2012-001619 04/03/2012ZB/0025/B -01D/S/HALLON

    07/03/2012 The job has been done as per procedure0103S056A 2012-001599 04/03/2012ZB/0030/F.HYDR/S/F.HYDRANT

    05/03/2012 The job has been done as per procedure0103S056A 2012-001602 04/03/2012ZB/0090/BREATH/S/BREATH

    23/04/2012 THE JOB HAS BEEN DELAYED UPON CIVIL ENGINEER

    REQUEST

    1203S040 2012-001490 04/03/2012ZB/0025/DV-00/S/00-0000

    12/03/2012 The job has been done as per procedure0103S059A 2012-001684 11/03/2012ZB/0020/FOAM/S/TANK A

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    11/03/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 18 bar N: 65 bar

    RESERVE:

    H: 20 bar N: 62 bar

    0103S063A 2012-001759 11/03/2012ZB/0025/B -01B/S/HALLON

    11/03/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 26 bar N: 69 bar

    RESERVE:

    H: 32 bar N: 64 bar

    0103S063A 2012-001760 11/03/2012ZB/0025/B -01C/S/HALLON

    11/03/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 25 bar N: 70 bar

    RESERVE:

    H: 19 bar N: 68 bar

    0603S063A 2012-001647 11/03/2012ZB/0026/K -08/S/HALLON

    14/03/2012 The job has been done as per procedure0103S056A 2012-001714 11/03/2012ZB/0090/F.HYDR/S/F.HYDRANT

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    18/03/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 31 bar N: 66 bar

    H: 29 bar

    RESERVE:

    H: 35 bar

    H: 24 bar

    0103S063A 2012-001945 18/03/2012ZB/0010/GT-01B/S/HALLON

    19/03/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 23 bar N: 70 bar

    RESERVE:

    H: 24 bar N: 65 bar

    0103S063A 2012-001946-2 18/03/2012ZB/0026/K -07/S/HALLON

    19/03/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 25 bar N: 70 bar

    RESERVE:

    H: 19 bar N: 68 bar

    0103S063A 2012-001947-2 18/03/2012ZB/0026/K -08/S/HALLON

    21/03/2012 the job has been done0103S056A 2012-001863-2 18/03/2012ZB/0010/F.HYDR/S/F.HYDRANT

    18/03/2012 the job has been done0103S059A 2012-001864-2 18/03/2012ZB/0010/FOAM/S/FILL.TANK

    21/03/2012 the job has been done0103S059A 2012-001884 18/03/2012ZB/0020/FOAM/S/TANK B

    19/03/2012 the job has been done0103S056A 2012-001885-2 18/03/2012ZB/0025/F.HYDR/S/F.HYDRANT

    26/03/2012 The job has been done as per procedure0103S059A 2012-002037 25/03/2012ZB/0010/FOAM/S/DIESEL T.

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    28/03/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 42 bar N: 65 bar

    H: 22 bar

    No RESERVE:

    0103S063A 2012-002116 25/03/2012ZB/0010/GT-01A/S/HALLON

    28/03/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 37 bar N: 70 bar

    H: 35 bar

    RESERVE:

    H: 27 bar

    H: 31 bar

    0103S063A 2012-002117 25/03/2012ZB/0010/GT-01C/S/HALLON

    25/03/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 33 bar N: 65 bar

    RESERVE:

    H: 17 bar N: 63 bar

    0103S063A 2012-002118 25/03/2012ZB/0025/B -01A/S/HALLON

    26/03/2012 The job has been done as per procedure0103S056A 2012-002063 25/03/2012ZB/0020/F.HYDR/S/F.HYDRANT

    25/03/2012 The job has been done as per procedure0103S056A 2012-002071 25/03/2012ZB/0026/F.HYDR/S/F.HYDRANT

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    03/04/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 16 bar N: 61 bar

    H: 36 bar

    RESERVE:

    H: 25 bar

    H: 25 bar

    0103S063A 2012-002283 01/04/2012ZB/0010/GT-01D/S/HALLON

    02/04/2012 the jop has been done.0603S023A 2012-002159 01/04/2012ZB/0020/T -01/S/00-00000

    02/04/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 34 bar N: 71 bar

    RESERVE:

    H: 21 bar N: 70 bar

    0103S063A 2012-002284 01/04/2012ZB/0025/B -01D/S/HALLON

    04/04/2012 job has been done.0103S056A 2012-002263 01/04/2012ZB/0030/F.HYDR/S/F.HYDRANT

    01/04/2012 the job has been done0103S056A 2012-002266 01/04/2012ZB/0090/BREATH/S/BREATH

    10/04/2012 the job has been done0103S059A 2012-001885 08/04/2012ZB/0020/FOAM/S/TANK A

    12/04/2012 the job has been done0103S056A 2012-001905 08/04/2012ZB/0090/F.HYDR/S/F.HYDRANT

    15/04/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 23 bar N: 68 bar

    RESERVE:

    H: 26 bar N: 62 bar

    0103S063A 2012-001947 08/04/2012ZB/0025/B -01B/S/HALLON

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    15/04/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 29 bar N: 68 bar

    RESERVE:

    H: 35 bar N: 67 bar

    0103S063A 2012-001948 08/04/2012ZB/0025/B -01C/S/HALLON

    15/04/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 500 PSI N: 70 bar

    RESERVE:

    H: bar N: bar

    0103S063A 2012-001946 08/04/2012ZB/0026/B -02A/S/HALLON

    18/04/2012 The job has been done as per procedure0103S056A 2012-002371 15/04/2012ZB/0010/F.HYDR/S/F.HYDRANT

    17/04/2012 The job has been done as per procedure0103S059A 2012-002372 15/04/2012ZB/0010/FOAM/S/FILL.TANK

    17/04/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 35 bar N: 70 bar

    H: 38 bar

    RESERVE:

    H: 30 bar

    H: 37 bar

    0103S063A 2012-002451 15/04/2012ZB/0010/GT-01B/S/HALLON

    18/04/2012 The job has been done as per procedure0103S059A 2012-002394 15/04/2012ZB/0020/FOAM/S/TANK B

    16/04/2012 The job has been done as per procedure0103S056A 2012-002395 15/04/2012ZB/0025/F.HYDR/S/F.HYDRANT

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    16/04/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 29 bar N: 75 bar

    RESERVE:

    H: 30 bar N: 69 bar

    0103S063A 2012-002452 15/04/2012ZB/0026/K -07/S/HALLON

    16/04/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 21 bar N: 72 bar

    RESERVE:

    H: 26 bar N: 70 bar

    0103S063A 2012-002453 15/04/2012ZB/0026/K -08/S/HALLON

    22/04/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H1`: 41 bar N: 68 bar

    RESERVE:

    H: 24 bar N: 63 bar

    0103S063A 2012-002629 22/04/2012ZB/0025/B -01A/S/HALLON

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    22/04/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H1`: 44 bar N: 74 bar

    H2 : 37

    RESERVE:

    H: 32 bar

    H2 : 36

    0103S063A 2012-002628 22/04/2012ZB/0010/GT-01C/S/HALLON

    22/04/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H1`: 50 bar N: 70 bar

    H2 : 26 bar

    0103S063A 2012-002627 22/04/2012ZB/0010/GT-01A/S/HALLON

    22/04/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H1`: 26 bar N: 68 bar

    0103S063A 2012-002626 22/04/2012ZB/0026/B -02B/S/HALLON

    22/04/2012 THE WORK HAS BEEN DONE0103S056A 2012-002582 22/04/2012ZB/0026/F.HYDR/S/F.HYDRANT

    23/04/2012 THE JOB HAS BEEN DONE0103S056A 2012-002579 22/04/2012ZB/0020/F.HYDR/S/F.HYDRANT

    23/04/2012 THE JOB HAS BEEN DONE0103S059A 2012-002553 22/04/2012ZB/0010/FOAM/S/DIESEL T.

    30/04/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 20 bar N: 64 bar

    H: 42 bar

    RESERVE:

    H: 30 bar

    H: 29 bar

    0603S063A 2012-002699 29/04/2012ZB/0010/GT-01D/S/HALLON

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    30/04/2012 The job has been done as per procedure0603S023A 2012-002698 29/04/2012ZB/0020/T -02/S/00-00000

    30/04/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 34 bar N: 73 bar

    RESERVE:

    H: 21 bar N: 70 bar

    0103S063A 2012-002799 29/04/2012ZB/0025/B -01D/S/HALLON

    02/05/2012 The job has been done as per procedure0103S056A 2012-002779 29/04/2012ZB/0030/F.HYDR/S/F.HYDRANT

    30/04/2012 The job has been done as per procedure0103S056A 2012-002782 29/04/2012ZB/0090/BREATH/S/BREATH

    08/05/2012 the work has been done0103S059A 2012-002880 06/05/2012ZB/0020/FOAM/S/TANK A

    06/05/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H1`: 40 bar N: 68 bar

    RESERVE:

    H: 26 bar N: 62 bar

    0103S063A 2012-002952 06/05/2012ZB/0025/B -01B/S/HALLON

    06/05/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H1`: 35 bar N: 68 bar

    RESERVE:

    H: 30 bar N: 68 bar

    0103S063A 2012-002953 06/05/2012ZB/0025/B -01C/S/HALLON

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    06/05/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H1`: 500 PSI N: 70 bar

    0103S063A 2012-002951 06/05/2012ZB/0026/B -02A/S/HALLON

    10/05/2012 THE JOB HAS BEEN DONE0103S056A 2012-002909 06/05/2012ZB/0090/F.HYDR/S/F.HYDRANT

    15/05/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H1`: 35 bar N1: 71 bar

    H2 : 38 bar

    RESERVE:

    H1: 29 bar

    H2 : 38 bar

    0103S063A 2012-003114 13/05/2012ZB/0010/GT-01B/S/HALLON

    14/05/2012 the job hasbeen done0103S056A 2012-003053 13/05/2012ZB/0025/F.HYDR/S/F.HYDRANT

    17/05/2012 THE WORK HAS BEEN DONE0103S056A 2012-003031 13/05/2012ZB/0010/F.HYDR/S/F.HYDRANT

    18/05/2012 the job has been done0103S059A 2012-003052 13/05/2012ZB/0020/FOAM/S/TANK B

    15/05/2012 THE JONB HAS BEEN DONE0103S059A 2012-003032 13/05/2012ZB/0010/FOAM/S/FILL.TANK

    14/05/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H1`: 28 bar N: 75 bar

    RESERVE:

    H: 30 bar N: 69 bar

    0603S063A 2012-002993 13/05/2012ZB/0026/K -07/S/HALLON

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    14/05/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H1`: 32 bar N: 73 bar

    RESERVE:

    H: 25 bar N: 73 bar

    0103S063A 2012-003115 13/05/2012ZB/0026/K -08/S/HALLON

    22/05/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 49 bar N: 70 bar

    H: 28 bar

    0103S063A 2012-003295 20/05/2012ZB/0010/GT-01A/S/HALLON

    26/05/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 28 bar N: 70 bar

    0103S063A 2012-003294 20/05/2012ZB/0026/B -02B/S/HALLON

    26/05/2012 the job has been done0103S056A 2012-003255 20/05/2012ZB/0026/F.HYDR/S/F.HYDRANT

    23/05/2012 the job has been done0103S056A 2012-003247 20/05/2012ZB/0020/F.HYDR/S/F.HYDRANT

    22/05/2012 the job has been done0103S059A 2012-003219 20/05/2012ZB/0010/FOAM/S/DIESEL T.

    22/05/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 45 bar N: 75 bar

    H: 39 bar

    RESERVE:

    H: 32 bar

    H: 21 bar

    0603S063A 2012-003162 20/05/2012ZB/0010/GT-01C/S/HALLON

    08/05/2012 the work has been done0103S063A 2012-003296 20/05/2012ZB/0025/B -01A/S/HALLON

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    27/05/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H1 : 21 bar N: 64 bar

    H2 : 43 bar

    RESERVE:

    H1 : 31 bar N:

    H2 : 30 bar

    0103S063A 2012-003461 27/05/2012ZB/0010/GT-01D/S/HALLON

    31/05/2012 the job has been done as per procedure0603S023A 2012-003339 27/05/2012ZB/0020/T -03/S/00-00000

    27/05/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H1 : 35 bar N: 74 bar

    RESERVE:

    H: 24 bar N: 73 bar

    0103S063A 2012-003462 27/05/2012ZB/0025/B -01D/S/HALLON

    30/05/2012 The job has been done as per procedure0103S056A 2012-003443 27/05/2012ZB/0030/F.HYDR/S/F.HYDRANT

    28/05/2012 The job has been done as per procedure0103S056A 2012-003446 27/05/2012ZB/0090/BREATH/S/BREATH

    20/06/2012 the job has been done0103S056A 2012-003542 03/06/2012ZB/0090/F.HYDR/S/F.HYDRANT

    25/06/2012 The job has been done as per procedure.0603S059A 2012-003472 03/06/2012ZB/0020/FOAM/S/TANK A

    04/06/2012

    CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 24 bar N: 69 bar

    RESERVE:

    H: 27 bar N: 64 bar

    0103S063A 2012-003586 03/06/2012ZB/0025/B -01B/S/HALLON

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    04/06/2012

    CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 32 bar N: 68 bar

    RESERVE:

    H: 34 bar N: 67 bar

    0103S063A 2012-003587 03/06/2012ZB/0025/B -01C/S/HALLON

    04/06/2012

    CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 500 psi N: 70 bar

    0103S063A 2012-003585 03/06/2012ZB/0026/B -02A/S/HALLON

    12/06/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H1`: 33 bar N: 74 bar

    RESERVE:

    H: 28 bar N: 74 bar

    0103S063A 2012-003782 10/06/2012ZB/0026/K -08/S/HALLON

    12/06/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H1`: 30 bar N: 76 bar

    RESERVE:

    H: 32 bar N: 70 bar

    0103S063A 2012-003781 10/06/2012ZB/0026/K -07/S/HALLON

    10/06/2012 the job has been done as per procedure0103S056A 2012-003702 10/06/2012ZB/0010/F.HYDR/S/F.HYDRANT

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    11/06/2012 the job has been done as per procedure0103S059A 2012-003703 10/06/2012ZB/0010/FOAM/S/FILL.TANK

    11/06/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H1`: 36 bar N: 73 bar

    H2 : 39 bar

    RESERVE:

    H: 38 bar N:

    H2 : 32 bar

    0603S063A 2012-003654 10/06/2012ZB/0010/GT-01B/S/HALLON

    11/06/2012 the job has been done as per procedure0603S059A 2012-003631 10/06/2012ZB/0020/FOAM/S/SLOP TANK

    11/06/2012 the job has been done as per procedure0103S059A 2012-003725 10/06/2012ZB/0020/FOAM/S/TANK B

    12/06/2012 the job has been done as per procedure0103S056A 2012-003726 10/06/2012ZB/0025/F.HYDR/S/F.HYDRANT

    12/06/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H : 28 bar N: 70 bar

    RESERVE:

    H: N:

    0603S063A 2012-003653 10/06/2012ZB/0026/B -02B/S/HALLON

    24/06/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW

    INITIAL:

    H1: 56 bar N: 74 bar

    H2: 31 bar

    RESERVE:

    H: ---- N: 74

    0103S063A 2012-003956 17/06/2012ZB/0010/GT-01A/S/HALLON

    18/06/2012 the work has been done0103S056A 2012-003901 17/06/2012ZB/0020/F.HYDR/S/F.HYDRANT

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    24/06/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW

    INITIAL:

    H1: 51 Bar N: 77 bar

    H2 : 41 Bar

    RESERVE:

    H1: 45 bar N: 77 bar

    H2 : 38 bar

    0103S063A 2012-003957 17/06/2012ZB/0010/GT-01C/S/HALLON

    18/06/2012 The job has been done as per procedure.0103S059A 2012-003873 17/06/2012ZB/0010/FOAM/S/DIESEL T.

    25/06/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 40 bar N: 69 bar

    RESERVE:

    H: 24 bar N: 63 bar

    0103S063A 2012-003958 17/06/2012ZB/0025/B -01A/S/HALLON

    25/06/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 32 bar N: 69 bar

    RESERVE:

    H: 34 bar N: 67 bar

    0603S063A 2012-003816 17/06/2012ZB/0025/B -01C/S/HALLON

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    25/06/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 27 bar N: 68 bar

    0103S063A 2012-003955 17/06/2012ZB/0026/B -02B/S/HALLON

    25/06/2012 The job has been done as per procedure.0103S056A 2012-003909 17/06/2012ZB/0026/F.HYDR/S/F.HYDRANT

    24/06/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 49 bar N: 69 bar

    H: 25 bar

    RESERVE:

    H: 36 bar

    H: 36 bar

    0103S063A 2012-004095 24/06/2012ZB/0010/GT-01D/S/HALLON

    27/06/2012 The job has been done as per procedure0603S023A 2012-003977 24/06/2012ZB/0020/T -04/S/00-00000

    28/06/2012 The job has been done as per procedure0103S056A 2012-004075 24/06/2012ZB/0030/F.HYDR/S/F.HYDRANT

    25/06/2012 The job has been done as per procedure0103S056A 2012-004078 24/06/2012ZB/0090/BREATH/S/BREATH

    25/06/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 34 bar N: 73 bar

    RESERVE:

    H: 21 bar N: 70 bar

    0103S063A 2012-004096 24/06/2012ZB/0025/B -01D/S/HALLON

    25/06/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 500 psi N: 70 bar

    0603S063A 2012-003978 24/06/2012ZB/0026/B -02A/S/HALLON

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    05/07/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 45 bar N: 70 bar

    H: 26 bar

    RESERVE:

    0603S063A 2012-004134 01/07/2012ZB/0010/GT-01A/S/HALLON

    02/07/2012 The job has been done as per procedure0103S059A 2012-004179 01/07/2012ZB/0020/FOAM/S/TANK A

    01/07/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 24 bar N: 69 bar

    RESERVE:

    H: 27 bar N: 64 bar

    0103S063A 2012-004244 01/07/2012ZB/0025/B -01B/S/HALLON

    01/07/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 32 bar N: 68 bar

    RESERVE:

    H: 34 bar N: 69 bar

    0103S063A 2012-004245 01/07/2012ZB/0025/B -01C/S/HALLON

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    01/07/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 34 bar N: 72 bar

    RESERVE:

    H: 21 bar N: 70 bar

    0603S063A 2012-004133 01/07/2012ZB/0025/B -01D/S/HALLON

    01/07/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 500 psi N: 70 bar

    RESERVE:

    0103S063A 2012-004243 01/07/2012ZB/0026/B -02A/S/HALLON

    06/07/2012 The job has been done as per procedure.0103S056A 2012-004199 01/07/2012ZB/0090/F.HYDR/S/F.HYDRANT

    10/07/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 29 bar N: 75 bar

    RESERVE:

    H: 30 bar N: 69 bar

    0103S063A 2012-004428 08/07/2012ZB/0026/K -07/S/HALLON

    10/07/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 32 bar N: 73 bar

    RESERVE:

    H: 27 bar N: 72 bar

    0103S063A 2012-004429 08/07/2012ZB/0026/K -08/S/HALLON

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    08/07/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 35 bar N: 70 bar

    H: 35 bar

    RESERVE:

    H: 36 bar

    H: 28 bar

    0103S063A 2012-004427 08/07/2012ZB/0010/GT-01B/S/HALLON

    09/07/2012 the jobe has been done as per procedure0103S059A 2012-004345 08/07/2012ZB/0010/FOAM/S/FILL.TANK

    03/07/2012 the job has been done as per procedure0103S056A 2012-004344 08/07/2012ZB/0010/F.HYDR/S/F.HYDRANT

    12/07/2012 the jobe has been done as per procedure0603S059A 2012-004288 08/07/2012ZB/0020/FOAM/S/TANK B

    09/07/2012 the jobe has been done as per procedure0103S056A 2012-004367 08/07/2012ZB/0025/F.HYDR/S/F.HYDRANT

    20/07/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 43 bar N: 70 bar

    RESERVE:

    H: 26 bar N: 64 bar

    0103S063A 2012-004623 15/07/2012ZB/0025/B -01A/S/HALLON

    22/07/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 42 bar N: 74 bar

    H: 40 bar

    RESERVE:

    H: 32 bar

    H: 36 bar

    0103S063A 2012-004622 15/07/2012ZB/0010/GT-01C/S/HALLON

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    22/07/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 46 bar N: 69 bar

    H: 26 bar

    0103S063A 2012-004621 15/07/2012ZB/0010/GT-01A/S/HALLON

    20/07/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 28 bar N: 71 bar

    0103S063A 2012-004620 15/07/2012ZB/0026/B -02B/S/HALLON

    20/07/2012 The job has been done as per procedure.0103S056A 2012-004575 15/07/2012ZB/0026/F.HYDR/S/F.HYDRANT

    16/07/2012 The job has been done as per procedure.0103S056A 2012-004568 15/07/2012ZB/0020/F.HYDR/S/F.HYDRANT

    20/07/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 25 bar N: 70 bar

    RESERVE:

    H: 28 bar N: 65 bar

    0603S063A 2012-004480 15/07/2012ZB/0025/B -01B/S/HALLON

    16/07/2012 The job has been done as per procedure.0603S059A 2012-004473 15/07/2012ZB/0010/FOAM/S/DIESEL T.

    26/07/2012 the job has been done as per procedure0103S056A 2012-004760 22/07/2012ZB/0030/F.HYDR/S/F.HYDRANT

    23/07/2012 The job has been done as per procedure.

    & The Tank is out of service

    0603S023A 2012-004645 22/07/2012ZB/0020/T -05/S/00-00000

    23/07/2012 The job has been done as per procedure.0103S056A 2012-004763 22/07/2012ZB/0090/BREATH/S/BREATH

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    23/07/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 34 bar N: 75 bar

    RESERVE:

    H: 22 bar N: 73 bar

    0103S063A 2012-004781 22/07/2012ZB/0025/B -01D/S/HALLON

    22/07/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 20 bar N: 64 bar

    H: 41 bar

    RESERVE:

    H: 30 bar

    H: 30 bar

    0103S063A 2012-004780 22/07/2012ZB/0010/GT-01D/S/HALLON

    03/08/2012

    CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 32 bar N: 69 bar

    RESERVE:

    H: 34 bar N: 68 bar

    0103S063A 2012-004922 29/07/2012ZB/0025/B -01C/S/HALLON

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    03/08/2012

    CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 500 psi N: 71 bar

    RESERVE:

    no cylinders

    0103S063A 2012-004920 29/07/2012ZB/0026/B -02A/S/HALLON

    03/08/2012

    CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 25 bar N: 69 bar

    RESERVE:

    H: 27 bar N: 65 bar

    0103S063A 2012-004921 29/07/2012ZB/0025/B -01B/S/HALLON

    03/08/2012 the job has been done as per procedure0603S075 2012-004807 29/07/2012ZB/0025/B -07/S/B-2507

    31/07/2012 the job has been done as per procedure0103S059A 2012-004853 29/07/2012ZB/0020/FOAM/S/TANK A

    02/08/2012 the job has been done as per procedure0103S056A 2012-004881 29/07/2012ZB/0090/F.HYDR/S/F.HYDRANT

    05/08/2012 the job has been done as per procedure0103S056A 2012-005029 05/08/2012ZB/0025/F.HYDR/S/F.HYDRANT

    06/08/2012 the job has been done as per procedure0103S059A 2012-005009 05/08/2012ZB/0010/FOAM/S/FILL.TANK

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    05/08/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 37 bar N: 71 bar

    H: 35 bar

    RESERVE:

    H: 37 bar

    H: 27 bar

    0103S063A 2012-005087 05/08/2012ZB/0010/GT-01B/S/HALLON

    05/08/2012

    CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 30 bar N: 75 bar

    RESERVE:

    H: 30 bar N: 70 bar

    0103S063A 2012-005088 05/08/2012ZB/0026/K -07/S/HALLON

    05/08/2012

    CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 33 bar N: 74 bar

    RESERVE:

    H: 27 bar N: 73 bar

    0103S063A 2012-005089 05/08/2012ZB/0026/K -08/S/HALLON

    08/08/2012 the job has been done as per procedure0103S059A 2012-005028 05/08/2012ZB/0020/FOAM/S/TANK B

    08/08/2012 the job has been done as per procedure0103S056A 2012-005008 05/08/2012ZB/0010/F.HYDR/S/F.HYDRANT

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    13/08/2012

    CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 48 bar N: 72 bar

    RESERVE:

    H: 30 bar N: 64 bar

    0603S063A 2012-005126 12/08/2012ZB/0025/B -01A/S/HALLON

    13/08/2012 The job has been done as per procedure.0103S056A 2012-005220 12/08/2012ZB/0026/F.HYDR/S/F.HYDRANT

    13/08/2012

    CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 32 bar N: 72 bar

    RESERVE:

    No Cylinders (Out of service)

    0103S063A 2012-005264 12/08/2012ZB/0026/B -02B/S/HALLON

    14/08/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 40 bar N: 70 bar

    H: 30 bar

    RESERVE:

    No Cylinders (Out of Service)

    0103S063A 2012-005265 12/08/2012ZB/0010/GT-01A/S/HALLON

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    14/08/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 45 bar N: 75 bar

    H: 40 bar

    RESERVE:

    H: 40 bar

    H: 35 bar

    0103S063A 2012-005266 12/08/2012ZB/0010/GT-01C/S/HALLON

    15/08/2012 The job has been done as per procedure.0103S056A 2012-005212 12/08/2012ZB/0020/F.HYDR/S/F.HYDRANT

    16/08/2012 The job has been done as per procedure0103S059A 2012-005184 12/08/2012ZB/0010/FOAM/S/DIESEL T.

    20/08/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 45 bar N: 65 bar

    H: 22 bar

    RESERVE:

    H: 32 bar

    H: 32 bar

    0103S063A 2012-005428 19/08/2012ZB/0010/GT-01D/S/HALLON

    20/08/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 37 bar N: 75 bar

    RESERVE:

    H: 27 bar N: 75 bar

    0103S063A 2012-005429 19/08/2012ZB/0025/B -01D/S/HALLON

    21/08/2012 The job has been done as per procedure0603S023A 2012-005316 19/08/2012ZB/0020/T -06/S/00-00000

    30/08/2012 The job has been done as per procedure.0603S040 2012-005315 19/08/2012ZB/0025/DV-00/S/00-0000

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    31/08/2012 The job has been done as per procedure.0103S059A 2012-005482 26/08/2012ZB/0020/FOAM/S/TANK A

    27/08/2012

    CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 33 bar N: 74 bar

    RESERVE:

    H: 27 bar N: 74 bar

    0603S063A 2012-005445 26/08/2012ZB/0026/K -08/S/HALLON

    27/08/2012

    CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 32 bar N: 69 bar

    RESERVE:

    H: 35 bar N: 69 bar

    0103S063A 2012-005558 26/08/2012ZB/0025/B -01C/S/HALLON

    27/08/2012

    CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 25 bar N: 70 bar

    RESERVE:

    H: 29 bar N: 65 bar

    0103S063A 2012-005557 26/08/2012ZB/0025/B -01B/S/HALLON

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    27/08/2012

    CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 500 psi N: 71 bar

    RESERVE:

    No Cylinders / Out of Service

    0103S063A 2012-005556 26/08/2012ZB/0026/B -02A/S/HALLON

    26/08/2012 The job has been done as per procedure.0103S056A 2012-005512 26/08/2012ZB/0090/F.HYDR/S/F.HYDRANT

    01/09/2012 The job has been done as per procedure.0103S056A 2012-005665 02/09/2012ZB/0025/F.HYDR/S/F.HYDRANT

    05/09/2012 The job has been done as per procedure.0103S059A 2012-005643 02/09/2012ZB/0010/FOAM/S/FILL.TANK

    02/09/2012 The job has been done as per procedure.0103S059A 2012-005664 02/09/2012ZB/0020/FOAM/S/TANK B

    03/09/2012 The job has been done as per procedure.0103S056A 2012-005642 02/09/2012ZB/0010/F.HYDR/S/F.HYDRANT

    02/09/2012 The system was changed from Hallon to CO20103S063A 2012-005725 02/09/2012ZB/0010/GT-01B/S/HALLON

    01/09/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 33 bar N: 74 bar

    RESERVE:

    H: 27 bar N: 74 bar

    0103S063A 2012-005727 02/09/2012ZB/0026/K -08/S/HALLON

    01/09/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 30 bar N: 75 bar

    RESERVE:

    H: 31 bar N: 70 bar

    0103S063A 2012-005726 02/09/2012ZB/0026/K -07/S/HALLON

    14/09/2012 The job has been done as per procedure.0103S059A 2012-005817 09/09/2012ZB/0010/FOAM/S/DIESEL T.

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    13/09/2012 The job has been done as per procedure.0103S056A 2012-005843 09/09/2012ZB/0020/F.HYDR/S/F.HYDRANT

    10/09/2012 The job has been done as per procedure.0103S056A 2012-005851 09/09/2012ZB/0026/F.HYDR/S/F.HYDRANT

    10/09/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 48 bar N: 72 bar

    RESERVE:

    H: 28 bar N: 64 bar

    0103S063A 2012-005900 09/09/2012ZB/0025/B -01A/S/HALLON

    12/09/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 40 bar N: 75 bar

    H: 43 bar

    RESERVE:

    H: 36 bar

    H: 32 bar

    0103S063A 2012-005899 09/09/2012ZB/0010/GT-01C/S/HALLON

    12/09/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 27 bar N: 70 bar

    H: 47 bar

    RESERVE:

    ( No Reserve )

    0103S063A 2012-005898 09/09/2012ZB/0010/GT-01A/S/HALLON

    17/09/2012 The job has been done as per procedure.0603S023A 2012-005950 16/09/2012ZB/0020/T -01/S/00-00000

    16/09/2012 The system was changed from Hallon to CO20103S063A 2012-006073 16/09/2012ZB/0010/GT-01D/S/HALLON

    17/09/2012 The job has been done as per procedure.0103S056A 2012-006056 16/09/2012ZB/0090/BREATH/S/BREATH

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    17/09/2012 The job has been done as per procedure.0103S056A 2012-006053 16/09/2012ZB/0030/F.HYDR/S/F.HYDRANT

    17/09/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 26 bar N: 75 bar

    RESERVE:

    H: 37 bar N: 75 bar

    0103S063A 2012-006074 16/09/2012ZB/0025/B -01D/S/HALLON

    25/09/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    No Cylinders (Out of Service)

    RESERVE:

    H: 400 psi N: 69 bar

    0103S063A 2012-006221 23/09/2012ZB/0026/B -02A/S/HALLON

    25/09/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 31 bar N: 68 bar

    RESERVE:

    H: 33 bar N: 65 bar

    0103S063A 2012-006223 23/09/2012ZB/0025/B -01C/S/HALLON

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    25/09/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 22 bar N: 67 bar

    RESERVE:

    H: 25 bar N: 64 bar

    0103S063A 2012-006222 23/09/2012ZB/0025/B -01B/S/HALLON

    24/09/2012 The job has been done as per procedure.0103S056A 2012-006180 23/09/2012ZB/0090/F.HYDR/S/F.HYDRANT

    27/09/2012 The job has been done as per procedure.0103S059A 2012-006159 23/09/2012ZB/0020/FOAM/S/TANK A

    30/09/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 23 bar N: 70 bar

    RESERVE:

    H: 30 bar N: 73 bar

    0103S063A 2012-006401 30/09/2012ZB/0026/K -08/S/HALLON

    30/09/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 27 bar N: 75 bar

    RESERVE:

    H: 27 bar N: 68 bar

    0103S063A 2012-006400 30/09/2012ZB/0026/K -07/S/HALLON

    03/10/2012 Visually Check has been done for CO2 system.

    (Hallon System is replaced by CO2 system)

    0103S063A 2012-006399 30/09/2012ZB/0010/GT-01B/S/HALLON

    30/09/2012 The job has been done as per procedure.0103S056A 2012-006342 30/09/2012ZB/0025/F.HYDR/S/F.HYDRANT

    03/10/2012 The job has been done as per procedure.0103S059A 2012-006341 30/09/2012ZB/0020/FOAM/S/TANK B

    03/10/2012 The job has been done as per procedure.0103S059A 2012-006319 30/09/2012ZB/0010/FOAM/S/FILL.TANK

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    01/10/2012 The job has been done as per procedure.0103S056A 2012-006318 30/09/2012ZB/0010/F.HYDR/S/F.HYDRANT

    07/10/2012 The system has been changed from Hallon to CO2.0103S063A 2012-006574 07/10/2012ZB/0010/GT-01C/S/HALLON

    11/10/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 38 bar N: 67 bar

    RESERVE:

    H: 22 bar N: 63 bar

    0103S063A 2012-006575 07/10/2012ZB/0025/B -01A/S/HALLON

    11/10/2012 The job has been done as per procedure.0103S056A 2012-006527 07/10/2012ZB/0026/F.HYDR/S/F.HYDRANT

    10/10/2012 The job has been done as per procedure.0103S056A 2012-006520 07/10/2012ZB/0020/F.HYDR/S/F.HYDRANT

    11/10/2012 The job has been done as per procedure.0103S059A 2012-006495 07/10/2012ZB/0010/FOAM/S/DIESEL T.

    07/10/2012 The system has been changed from Hallon to CO2.0103S063A 2012-006573 07/10/2012ZB/0010/GT-01A/S/HALLON

    11/10/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 25 bar N: 67 bar

    RESERVE:

    No Cylinders (Out of Service)

    0103S063A 2012-006572 07/10/2012ZB/0026/B -02B/S/HALLON

    14/10/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 33 bar N: 70 bar

    RESERVE:

    H: 19 bar N: 70 bar

    0103S063A 2012-006721 14/10/2012ZB/0025/B -01D/S/HALLON

    14/10/2012 The job has been done as per procedure0103S056A 2012-006704 14/10/2012ZB/0090/BREATH/S/BREATH

    13/10/2012 The job has been done as per procedure0103S056A 2012-006701 14/10/2012ZB/0030/F.HYDR/S/F.HYDRANT

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    15/10/2012 The job has been done as per procedure0603S023A 2012-006614 14/10/2012ZB/0020/T -02/S/00-00000

    25/10/2012 The job has been done as per procedure0103S056A 2012-006832 21/10/2012ZB/0090/F.HYDR/S/F.HYDRANT

    22/10/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 31 bar N: 69 bar

    RESERVE:

    H: 35 bar N: 70 bar

    0103S063A 2012-006877 21/10/2012ZB/0025/B -01C/S/HALLON

    22/10/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 25 bar N: 70 bar

    RESERVE:

    H: 28 bar N: 65 bar

    0103S063A 2012-006876 21/10/2012ZB/0025/B -01B/S/HALLON

    22/10/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 450 psi N: 71 bar

    RESERVE:

    No Cylinders ( The unit is out of service )

    0103S063A 2012-006875 21/10/2012ZB/0026/B -02A/S/HALLON

    23/10/2012 The job has been done as per procedure.0103S059A 2012-006804 21/10/2012ZB/0020/FOAM/S/TANK A

    28/10/2012 the job has been done as per procedure0103S059A 2012-007743 28/10/2012ZB/0020/FOAM/S/TANK B

    28/10/2012 the job has been done as per procedure0103S059A 2012-006952 28/10/2012ZB/0010/FOAM/S/FILL.TANK

    28/10/2012 the job has been done as per procedure0103S056A 2012-006951 28/10/2012ZB/0010/F.HYDR/S/F.HYDRANT

    28/10/2012 the job has been done as per procedure0103S056A 2012-007744 28/10/2012ZB/0025/F.HYDR/S/F.HYDRANT

    28/10/2012 the job has been done as per procedure0103S063A 2012-007033 28/10/2012ZB/0010/GT-01B/S/HALLON

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    28/10/2012

    CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 29 bar N: 74 bar

    RESERVE:

    H: 33 bar N: 74 bar

    0103S063A 2012-007034 28/10/2012ZB/0026/K -08/S/HALLON

    28/10/2012

    CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 31 bar N: 76 bar

    RESERVE:

    H: 30 bar N: 70 bar

    0603S063A 2012-007684 28/10/2012ZB/0026/K -07/S/HALLON

    06/11/2012 the job has been done as per procedure0103S059A 2012-006984 04/11/2012ZB/0010/FOAM/S/DIESEL T.

    06/11/2012 the job has been done as per procedure0103S056A 2012-007012 04/11/2012ZB/0020/F.HYDR/S/F.HYDRANT

    06/11/2012 the job has been done as per procedure0103S056A 2012-007768 04/11/2012ZB/0026/F.HYDR/S/F.HYDRANT

    11/11/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 33 bar N: 71 bar

    RESERVE:

    H: 20 bar N: 70 bar

    0103S063A 2012-007217 11/11/2012ZB/0025/B -01D/S/HALLON

    11/11/2012 The job has been done as per procedure.0103S056A 2012-007202 11/11/2012ZB/0090/BREATH/S/BREATH

    12/11/2012 The job has been done as per procedure.0103S056A 2012-007199 11/11/2012ZB/0030/F.HYDR/S/F.HYDRANT

    13/11/2012 The job has been done as per procedure.0603S023A 2012-007092 11/11/2012ZB/0020/T -03/S/00-00000

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    20/11/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 27 bar N: 69 bar

    RESERVE:

    H: 32 bar N: 65 bar

    0103S063A 2012-007343 18/11/2012ZB/0025/B -01C/S/HALLON

    20/11/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 20 bar N: 65 bar

    RESERVE:

    H: 22 bar N: 62 bar

    0103S063A 2012-007342 18/11/2012ZB/0025/B -01B/S/HALLON

    20/11/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 450 psi N: 68 bar

    RESERVE:

    No Cylinders ( The unit is out of service )

    0103S063A 2012-007341 18/11/2012ZB/0026/B -02A/S/HALLON

    22/11/2012 The job has been done as per procedure.0103S056A 2012-007298 18/11/2012ZB/0090/F.HYDR/S/F.HYDRANT

    29/11/2012 The job has been done as per procedure.0603S059A 2012-007229 18/11/2012ZB/0020/FOAM/S/TANK A

    27/11/2012 The job has been done as per procedure.0103S059A 2012-007458 25/11/2012ZB/0010/FOAM/S/FILL.TANK

    01/12/2012 The job has been done as per procedure.0603S059A 2012-007827 25/11/2012ZB/0020/FOAM/S/SLOP TANK

    11/01/20130603S063A 2012-007411 25/11/2012ZB/0010/GT-01B/S/HALLON

    08/01/20130103S063A 2012-007536 25/11/2012ZB/0026/K -07/S/HALLON

    08/01/20130103S063A 2012-007537 25/11/2012ZB/0026/K -08/S/HALLON

    08/01/20130103S056A 2012-007457 25/11/2012ZB/0010/F.HYDR/S/F.HYDRANT

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    07/01/20130103S059A 2012-007478 25/11/2012ZB/0020/FOAM/S/TANK B

    07/01/20130103S056A 2012-007479 25/11/2012ZB/0025/F.HYDR/S/F.HYDRANT

    11/01/20130103S063A 2012-007514 02/12/2012ZB/0010/GT-01A/S/HALLON

    04/01/20130603S063A 2012-007808 02/12/2012ZB/0025/B -01C/S/HALLON

    03/12/2012 The job has been done as per procedure.0103S056A 2012-007885 02/12/2012ZB/0020/F.HYDR/S/F.HYDRANT

    04/12/2012 The job has been done as per procedure.0103S056A 2012-007893 02/12/2012ZB/0026/F.HYDR/S/F.HYDRANT

    03/12/2012 The job has been done as per procedure.0103S059A 2012-007434 02/12/2012ZB/0010/FOAM/S/DIESEL T.

    02/12/2012 The system was changed from Hallon to CO2.0103S063A 2012-007515 02/12/2012ZB/0010/GT-01C/S/HALLON

    04/12/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 39 bar N: 66 bar

    RESERVE:

    H: 22 bar N: 63 bar

    0103S063A 2012-007516 02/12/2012ZB/0025/B -01A/S/HALLON

    09/12/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 33 bar N: 70 bar

    RESERVE:

    H: 18 bar N: 67 bar

    0103S063A 2012-007660 09/12/2012ZB/0025/B -01D/S/HALLON

    10/12/2012 Hallon system is replaced by CO2 system & visually check have been done.0103S063A 2012-007659 09/12/2012ZB/0010/GT-01D/S/HALLON

    10/12/2012 The job has been done as per procedure.0103S056A 2012-007642 09/12/2012ZB/0090/BREATH/S/BREATH

    12/12/2012 The job has been done as per procedure.0103S056A 2012-007639 09/12/2012ZB/0030/F.HYDR/S/F.HYDRANT

    29/11/2012 pm has been done as job sheet0603S023A 2012-007945 09/12/2012ZB/0020/T -04/S/00-00000

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    18/12/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 25 bar N: 67 bar

    RESERVE:

    H: 31 bar N: 64 bar

    0103S063A 2012-008090 16/12/2012ZB/0025/B -01C/S/HALLON

    18/12/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 18 bar N: 65 bar

    RESERVE:

    H: 21 bar N: 63 bar

    0103S063A 2012-008089 16/12/2012ZB/0025/B -01B/S/HALLON

    18/12/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 450 psi N: 66 bar

    RESERVE:

    No Cylinders ( The unit is out of service )

    0103S063A 2012-008088 16/12/2012ZB/0026/B -02A/S/HALLON

    19/12/2012 The job has been done as per procedure.0103S056A 2012-008045 16/12/2012ZB/0090/F.HYDR/S/F.HYDRANT

    17/12/2012 The job has been done as per procedure.0103S059A 2012-008021 16/12/2012ZB/0020/FOAM/S/TANK A

    16/12/2012 The Hallon system has been changed to CO2 system.0603S063A 2012-007978 16/12/2012ZB/0010/GT-01A/S/HALLON

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    18/12/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 31 bar N: 69 bar

    RESERVE:

    H: 15 bar N: 66 bar

    0603S063A 2012-007977 16/12/2012ZB/0025/B -01D/S/HALLON

    24/12/2012 The job has been done as per procedure.0103S059A 2012-008182 23/12/2012ZB/0010/FOAM/S/FILL.TANK

    24/12/2012 The job has been done as per procedure.0103S056A 2012-008181 23/12/2012ZB/0010/F.HYDR/S/F.HYDRANT

    24/12/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 20 bar N: 68 bar

    RESERVE:

    H: 26 bar N: 70 bar

    0103S063A 2012-008263 23/12/2012ZB/0026/K -08/S/HALLON

    24/12/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 23 bar N: 70 bar

    RESERVE:

    H: 24 bar N: 65 bar

    0103S063A 2012-008262 23/12/2012ZB/0026/K -07/S/HALLON

    23/12/2012 The hallon system has been changed to CO2 system.0103S063A 2012-008261 23/12/2012ZB/0010/GT-01B/S/HALLON

    04/01/2013 The job has been done as per procedure.0603S059A 2012-008128 23/12/2012ZB/0020/FOAM/S/TANK B

    06/01/20130103S056A 2012-008203 23/12/2012ZB/0025/F.HYDR/S/F.HYDRANT

    04/01/2013 The job has been done as per procedure.0603S059A 2012-008304 30/12/2012ZB/0010/FOAM/S/DIESEL T.

  • Equipment Code Task Completion DateW.O. No. Due Date Work Done

    31/12/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 19 bar N: 65 bar

    RESERVE:

    H: 22 bar N: 63 bar

    0603S063A 2012-008310 30/12/2012ZB/0025/B -01B/S/HALLON

    31/12/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:

    INITIAL:

    H: 34 bar N: 65 bar

    RESERVE:

    H: 19 bar N: 63 bar

    0103S063A 2012-008444 30/12/2012ZB/0025/B -01A/S/HALLON

    30/12/2012 The system has been changed from Hallon to CO2.0103S063A 2012-008443 30/12/2012ZB/0010/GT-01C/S/HALLON

    30/12/2012 The system has been changed from Hallon to CO2.0103S063A 2012-008442 30/12/2012ZB/0010/GT-01A/S/HALLON

    01/01/2013 The job has been done as per procedure.0103S056A 2012-008392 30/12/2012ZB/0020/F.HYDR/S/F.HYDRANT

    31/12/2012 The job has been done as per procedure.0103S056A 2012-008399 30/12/2012ZB/0026/F.HYDR/S/F.HYDRANT