FeedBack Work Order List
01/01/2012From date : To date : 31/12/201206/02/2013Print date :
1Page No :
Equipment Code Task Completion DateW.O. No. Due Date Work Done
Department : SAFETY02/01/2012 the work has been done0103S059A 2012-000063 01/01/2012ZB/0010/FOAM/S/DIESEL T.
02/01/2012 the work has been done0103S056A 2012-000091 01/01/2012ZB/0020/F.HYDR/S/F.HYDRANT
05/01/2012 HECK HALLON SYSTEM PRESSURES AS FOLLOW:
initial
H1 : 42 bar
H2 : 20
N:65bar
Reserve
--------------------------
0103S063A 2012-000140 01/01/2012ZB/0010/GT-01A/S/HALLON
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
05/01/2012 HECK HALLON SYSTEM PRESSURES AS FOLLOW:
initial
H2 : 38 bar
H2 : 20
N:71bar
Reserve
H1 : 38bar
H2 : 32 bar
0103S063A 2012-000141 01/01/2012ZB/0010/GT-01C/S/HALLON
01/01/2012 HECK HALLON SYSTEM PRESSURES AS FOLLOW:
initial
H:30 bar
N:70bar
Reserve
H: 32bar
N:65 bar
0603S063A 2012-000016 01/01/2012ZB/0025/B -01C/S/HALLON
15/02/20120103S063A 2012-000142 01/01/2012ZB/0025/B -01A/S/HALLON
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
01/01/2012 HECK HALLON SYSTEM PRESSURES AS FOLLOW:
initial
H: 22 bar
N:67bar
Reserve
0103S063A 2012-000139 01/01/2012ZB/0026/B -02B/S/HALLON
01/01/2011 the work has been done0103S056A 2012-000099 01/01/2012ZB/0026/F.HYDR/S/F.HYDRANT
10/01/2012 HECK HALLON SYSTEM PRESSURES AS FOLLOW:
initial
H1: 16 bar
H2 :36 N:65bar
Reserve
H1 : 24bar
H2 : 25
0103S063A 2012-000270 08/01/2012ZB/0010/GT-01D/S/HALLON
10/01/2012 the work has been done0603S023A 2012-000154 08/01/2012ZB/0020/T -04/S/00-00000
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
09/01/2012 HECK HALLON SYSTEM PRESSURES AS FOLLOW:
initial
H: 17 bar
N:70bar
Reserve
H: 30bar
N:70 bar
0103S063A 2012-000271 08/01/2012ZB/0025/B -01D/S/HALLON
11/01/2012 the work has been done0103S056A 2012-000250 08/01/2012ZB/0030/F.HYDR/S/F.HYDRANT
09/01/2012 the work has been done0103S056A 2012-000253 08/01/2012ZB/0090/BREATH/S/BREATH
15/01/2012 The job has been done as per procedure.0103S059A 2012-000369 15/01/2012ZB/0020/FOAM/S/TANK A
05/02/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 22 bar N: 65 bar
H: 43 bar
RESERVE:
(No Cylinders)
0603S063A 2012-000328 15/01/2012ZB/0010/GT-01A/S/HALLON
10/02/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 25 bar N: 68 bar
RESERVE:
H: 31 bar N: 63 bar
0103S063A 2012-000438 15/01/2012ZB/0025/B -01C/S/HALLON
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
10/02/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 30 bar N: 67 bar
RESERVE:
H: 14 bar N: 65 bar
0603S063A 2012-000327 15/01/2012ZB/0025/B -01D/S/HALLON
16/02/2012 The job has been done as per procedure.0103S056A 2012-000393 15/01/2012ZB/0090/F.HYDR/S/F.HYDRANT
10/02/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
(Out of Service)
INITIAL:
No Cylinders
RESERVE:
H: 360 psi N: 65 bar
0103S063A 2012-000436 15/01/2012ZB/0026/B -02A/S/HALLON
10/02/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 20 bar N: 61 bar
RESERVE:
H: 17 bar N: 64 bar
0103S063A 2012-000437 15/01/2012ZB/0025/B -01B/S/HALLON
25/01/2012 the work has been done0103S056A 2012-000538 22/01/2012ZB/0010/F.HYDR/S/F.HYDRANT
22/01/2012 the work has been done0103S059A 2012-000539 22/01/2012ZB/0010/FOAM/S/FILL.TANK
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
22/01/2012 HECK HALLON SYSTEM PRESSURES AS FOLLOW:
initial
H1: 33 bar
N:70bar
H2 : 35bar
Reserve
H1: 28bar
H2 : 36 bar
0103S063A 2012-000616 22/01/2012ZB/0010/GT-01B/S/HALLON
26/01/2012 the work has been done0603S059A 2012-000482 22/01/2012ZB/0020/FOAM/S/TANK B
23/01/2012 the work has been done0103S056A 2012-000560 22/01/2012ZB/0025/F.HYDR/S/F.HYDRANT
23/01/2012 HECK HALLON SYSTEM PRESSURES AS FOLLOW:
initial
H: 21 bar
N:70bar
Reserve
H: 24bar
N:65bar
0103S063A 2012-000617 22/01/2012ZB/0026/K -07/S/HALLON
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
23/01/2012 HECK HALLON SYSTEM PRESSURES AS FOLLOW:
initial
H: 24 bar
N:66bar
Reserve
H: 17bar
N:66 bar
0103S063A 2012-000618 22/01/2012ZB/0026/K -08/S/HALLON
31/01/2012 the work has been done0603S059A 2012-000667 29/01/2012ZB/0010/FOAM/S/DIESEL T.
05/02/2012 HECK HALLON SYSTEM PRESSURES AS FOLLOW:
initial
H: 40 bar
N:19bar
Reserve
No cylinder
0103S063A 2012-000807 29/01/2012ZB/0010/GT-01A/S/HALLON
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
05/02/2012 HECK HALLON SYSTEM PRESSURES AS FOLLOW:
initial
H1:35 bar
H2: 34 N:70bar
Reserve
H: 26bar
H2:29 N:70bar
0103S063A 2012-000808 29/01/2012ZB/0010/GT-01C/S/HALLON
29/01/2012 the work has been done0103S056A 2012-000755 29/01/2012ZB/0020/F.HYDR/S/F.HYDRANT
30/01/2012 HECK HALLON SYSTEM PRESSURES AS FOLLOW:
initial
H:34 bar
N:65bar
Reserve
H: 18bar
N:62 bar
0103S063A 2012-000809 29/01/2012ZB/0025/B -01A/S/HALLON
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
30/01/2012 HECK HALLON SYSTEM PRESSURES AS FOLLOW:
initial
H: 21 bar
N:62bar
Reserve
H: 18bar
N:65 bar
0603S063A 2012-000675 29/01/2012ZB/0025/B -01B/S/HALLON
30/01/2012 HECK HALLON SYSTEM PRESSURES AS FOLLOW:
initial
H: 23 bar
N:66bar
Reserve
No Cylinder
0103S063A 2012-000806 29/01/2012ZB/0026/B -02B/S/HALLON
28/01/2012 the work has been done0103S056A 2012-000762 29/01/2012ZB/0026/F.HYDR/S/F.HYDRANT
10/02/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 30 bar N: 67 bar
RESERVE:
H: 14 bar N: 65 bar
0103S063A 2012-000981 05/02/2012ZB/0025/B -01D/S/HALLON
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
13/02/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 35 bar N: 65 bar
H: 15 bar
RESERVE:
H: 22 bar
H: 25 bar
0103S063A 2012-000980 05/02/2012ZB/0010/GT-01D/S/HALLON
13/02/2012 The job has been done as per procedure.0103S056A 2012-000963 05/02/2012ZB/0090/BREATH/S/BREATH
09/02/2012 The job has been done as per procedure.0103S056A 2012-000960 05/02/2012ZB/0030/F.HYDR/S/F.HYDRANT
15/02/2012 The job has been done as per procedure.0603S023A 2012-000848 05/02/2012ZB/0020/T -05/S/00-00000
12/02/2012 the work has been done0103S059A 2012-001072 12/02/2012ZB/0020/FOAM/S/TANK A
12/02/2012 HECK HALLON SYSTEM PRESSURES AS FOLLOW:
initial
H: 20 bar
N:61bar
Reserve
H: 17bar
N:64 bar
0103S063A 2012-001129 12/02/2012ZB/0025/B -01B/S/HALLON
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
12/02/2012 HECK HALLON SYSTEM PRESSURES AS FOLLOW:
initial
H: 25 bar
N:68bar
Reserve
H: 31bar
N:63 bar
0103S063A 2012-001130 12/02/2012ZB/0025/B -01C/S/HALLON
12/02/2012 the work has been done0603S075 2012-001028 12/02/2012ZB/0025/B -07/S/B-2507
12/02/2012 HECK HALLON SYSTEM PRESSURES AS FOLLOW:
initial
H: 360 PSI
N:65bar
Reserve
--------------------
0103S063A 2012-001128 12/02/2012ZB/0026/B -02A/S/HALLON
12/02/2012 the work has been done0103S056A 2012-001097 12/02/2012ZB/0090/F.HYDR/S/F.HYDRANT
22/02/2012 The job has been done as per procedure.0103S056A 2012-001206 19/02/2012ZB/0010/F.HYDR/S/F.HYDRANT
21/02/2012 The job has been done as per procedure.0103S059A 2012-001207 19/02/2012ZB/0010/FOAM/S/FILL.TANK
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
21/02/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 25 bar N: 67 bar
RESERVE:
H: 18 bar N: 67 bar
0103S063A 2012-001286 19/02/2012ZB/0026/K -08/S/HALLON
20/02/2012 The job has been done as per procedure.0103S056A 2012-001225 19/02/2012ZB/0025/F.HYDR/S/F.HYDRANT
20/02/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 22 bar N: 70 bar
RESERVE:
H: 24 bar N: 65 bar
0103S063A 2012-001285 19/02/2012ZB/0026/K -07/S/HALLON
22/02/2012 The job has been done as per procedure.0103S059A 2012-001224 19/02/2012ZB/0020/FOAM/S/TANK B
21/02/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 30 bar N: 67 bar
H: 32 bar
RESERVE:
H: 24 bar
H: 35 bar
0103S063A 2012-001284 19/02/2012ZB/0010/GT-01B/S/HALLON
27/02/2012 The job has been done as per procedure0103S059A 2012-001390 26/02/2012ZB/0010/FOAM/S/DIESEL T.
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
29/02/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 42 bar N: 65 bar
H: 20 bar
No RESERVE
0103S063A 2012-001463 26/02/2012ZB/0010/GT-01A/S/HALLON
29/02/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 36 bar N: 70 bar
H: 34 bar
RESERVE:
H: 26 bar
H: 30 ba
0103S063A 2012-001464 26/02/2012ZB/0010/GT-01C/S/HALLON
27/02/2012 The job has been done as per procedure0103S056A 2012-001414 26/02/2012ZB/0020/F.HYDR/S/F.HYDRANT
26/02/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 33 bar N: 64 bar
RESERVE:
H: 17 bar N: 63 bar
0603S063A 2012-001330 26/02/2012ZB/0025/B -01A/S/HALLON
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
26/02/2012
CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 21 bar N: 65 bar
No RESERVE:
0103S063A 2012-001462 26/02/2012ZB/0026/B -02B/S/HALLON
26/02/2012 The job has been done as per procedure0103S056A 2012-001420 26/02/2012ZB/0026/F.HYDR/S/F.HYDRANT
04/03/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 15 bar N: 61 bar
H: 35 bar
RESERVE:
H: 23 bar
H: 23 bar
0103S063A 2012-001618 04/03/2012ZB/0010/GT-01D/S/HALLON
04/03/2012 The job has been done as per procedure0603S023A 2012-001505 04/03/2012ZB/0020/T -06/S/00-00000
05/03/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 30 bar N: 67 bar
RESERVE:
H: 14 bar N: 67 bar
0103S063A 2012-001619 04/03/2012ZB/0025/B -01D/S/HALLON
07/03/2012 The job has been done as per procedure0103S056A 2012-001599 04/03/2012ZB/0030/F.HYDR/S/F.HYDRANT
05/03/2012 The job has been done as per procedure0103S056A 2012-001602 04/03/2012ZB/0090/BREATH/S/BREATH
23/04/2012 THE JOB HAS BEEN DELAYED UPON CIVIL ENGINEER
REQUEST
1203S040 2012-001490 04/03/2012ZB/0025/DV-00/S/00-0000
12/03/2012 The job has been done as per procedure0103S059A 2012-001684 11/03/2012ZB/0020/FOAM/S/TANK A
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
11/03/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 18 bar N: 65 bar
RESERVE:
H: 20 bar N: 62 bar
0103S063A 2012-001759 11/03/2012ZB/0025/B -01B/S/HALLON
11/03/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 26 bar N: 69 bar
RESERVE:
H: 32 bar N: 64 bar
0103S063A 2012-001760 11/03/2012ZB/0025/B -01C/S/HALLON
11/03/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 25 bar N: 70 bar
RESERVE:
H: 19 bar N: 68 bar
0603S063A 2012-001647 11/03/2012ZB/0026/K -08/S/HALLON
14/03/2012 The job has been done as per procedure0103S056A 2012-001714 11/03/2012ZB/0090/F.HYDR/S/F.HYDRANT
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
18/03/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 31 bar N: 66 bar
H: 29 bar
RESERVE:
H: 35 bar
H: 24 bar
0103S063A 2012-001945 18/03/2012ZB/0010/GT-01B/S/HALLON
19/03/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 23 bar N: 70 bar
RESERVE:
H: 24 bar N: 65 bar
0103S063A 2012-001946-2 18/03/2012ZB/0026/K -07/S/HALLON
19/03/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 25 bar N: 70 bar
RESERVE:
H: 19 bar N: 68 bar
0103S063A 2012-001947-2 18/03/2012ZB/0026/K -08/S/HALLON
21/03/2012 the job has been done0103S056A 2012-001863-2 18/03/2012ZB/0010/F.HYDR/S/F.HYDRANT
18/03/2012 the job has been done0103S059A 2012-001864-2 18/03/2012ZB/0010/FOAM/S/FILL.TANK
21/03/2012 the job has been done0103S059A 2012-001884 18/03/2012ZB/0020/FOAM/S/TANK B
19/03/2012 the job has been done0103S056A 2012-001885-2 18/03/2012ZB/0025/F.HYDR/S/F.HYDRANT
26/03/2012 The job has been done as per procedure0103S059A 2012-002037 25/03/2012ZB/0010/FOAM/S/DIESEL T.
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
28/03/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 42 bar N: 65 bar
H: 22 bar
No RESERVE:
0103S063A 2012-002116 25/03/2012ZB/0010/GT-01A/S/HALLON
28/03/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 37 bar N: 70 bar
H: 35 bar
RESERVE:
H: 27 bar
H: 31 bar
0103S063A 2012-002117 25/03/2012ZB/0010/GT-01C/S/HALLON
25/03/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 33 bar N: 65 bar
RESERVE:
H: 17 bar N: 63 bar
0103S063A 2012-002118 25/03/2012ZB/0025/B -01A/S/HALLON
26/03/2012 The job has been done as per procedure0103S056A 2012-002063 25/03/2012ZB/0020/F.HYDR/S/F.HYDRANT
25/03/2012 The job has been done as per procedure0103S056A 2012-002071 25/03/2012ZB/0026/F.HYDR/S/F.HYDRANT
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
03/04/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 16 bar N: 61 bar
H: 36 bar
RESERVE:
H: 25 bar
H: 25 bar
0103S063A 2012-002283 01/04/2012ZB/0010/GT-01D/S/HALLON
02/04/2012 the jop has been done.0603S023A 2012-002159 01/04/2012ZB/0020/T -01/S/00-00000
02/04/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 34 bar N: 71 bar
RESERVE:
H: 21 bar N: 70 bar
0103S063A 2012-002284 01/04/2012ZB/0025/B -01D/S/HALLON
04/04/2012 job has been done.0103S056A 2012-002263 01/04/2012ZB/0030/F.HYDR/S/F.HYDRANT
01/04/2012 the job has been done0103S056A 2012-002266 01/04/2012ZB/0090/BREATH/S/BREATH
10/04/2012 the job has been done0103S059A 2012-001885 08/04/2012ZB/0020/FOAM/S/TANK A
12/04/2012 the job has been done0103S056A 2012-001905 08/04/2012ZB/0090/F.HYDR/S/F.HYDRANT
15/04/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 23 bar N: 68 bar
RESERVE:
H: 26 bar N: 62 bar
0103S063A 2012-001947 08/04/2012ZB/0025/B -01B/S/HALLON
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
15/04/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 29 bar N: 68 bar
RESERVE:
H: 35 bar N: 67 bar
0103S063A 2012-001948 08/04/2012ZB/0025/B -01C/S/HALLON
15/04/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 500 PSI N: 70 bar
RESERVE:
H: bar N: bar
0103S063A 2012-001946 08/04/2012ZB/0026/B -02A/S/HALLON
18/04/2012 The job has been done as per procedure0103S056A 2012-002371 15/04/2012ZB/0010/F.HYDR/S/F.HYDRANT
17/04/2012 The job has been done as per procedure0103S059A 2012-002372 15/04/2012ZB/0010/FOAM/S/FILL.TANK
17/04/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 35 bar N: 70 bar
H: 38 bar
RESERVE:
H: 30 bar
H: 37 bar
0103S063A 2012-002451 15/04/2012ZB/0010/GT-01B/S/HALLON
18/04/2012 The job has been done as per procedure0103S059A 2012-002394 15/04/2012ZB/0020/FOAM/S/TANK B
16/04/2012 The job has been done as per procedure0103S056A 2012-002395 15/04/2012ZB/0025/F.HYDR/S/F.HYDRANT
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
16/04/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 29 bar N: 75 bar
RESERVE:
H: 30 bar N: 69 bar
0103S063A 2012-002452 15/04/2012ZB/0026/K -07/S/HALLON
16/04/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 21 bar N: 72 bar
RESERVE:
H: 26 bar N: 70 bar
0103S063A 2012-002453 15/04/2012ZB/0026/K -08/S/HALLON
22/04/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H1`: 41 bar N: 68 bar
RESERVE:
H: 24 bar N: 63 bar
0103S063A 2012-002629 22/04/2012ZB/0025/B -01A/S/HALLON
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
22/04/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H1`: 44 bar N: 74 bar
H2 : 37
RESERVE:
H: 32 bar
H2 : 36
0103S063A 2012-002628 22/04/2012ZB/0010/GT-01C/S/HALLON
22/04/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H1`: 50 bar N: 70 bar
H2 : 26 bar
0103S063A 2012-002627 22/04/2012ZB/0010/GT-01A/S/HALLON
22/04/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H1`: 26 bar N: 68 bar
0103S063A 2012-002626 22/04/2012ZB/0026/B -02B/S/HALLON
22/04/2012 THE WORK HAS BEEN DONE0103S056A 2012-002582 22/04/2012ZB/0026/F.HYDR/S/F.HYDRANT
23/04/2012 THE JOB HAS BEEN DONE0103S056A 2012-002579 22/04/2012ZB/0020/F.HYDR/S/F.HYDRANT
23/04/2012 THE JOB HAS BEEN DONE0103S059A 2012-002553 22/04/2012ZB/0010/FOAM/S/DIESEL T.
30/04/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 20 bar N: 64 bar
H: 42 bar
RESERVE:
H: 30 bar
H: 29 bar
0603S063A 2012-002699 29/04/2012ZB/0010/GT-01D/S/HALLON
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
30/04/2012 The job has been done as per procedure0603S023A 2012-002698 29/04/2012ZB/0020/T -02/S/00-00000
30/04/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 34 bar N: 73 bar
RESERVE:
H: 21 bar N: 70 bar
0103S063A 2012-002799 29/04/2012ZB/0025/B -01D/S/HALLON
02/05/2012 The job has been done as per procedure0103S056A 2012-002779 29/04/2012ZB/0030/F.HYDR/S/F.HYDRANT
30/04/2012 The job has been done as per procedure0103S056A 2012-002782 29/04/2012ZB/0090/BREATH/S/BREATH
08/05/2012 the work has been done0103S059A 2012-002880 06/05/2012ZB/0020/FOAM/S/TANK A
06/05/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H1`: 40 bar N: 68 bar
RESERVE:
H: 26 bar N: 62 bar
0103S063A 2012-002952 06/05/2012ZB/0025/B -01B/S/HALLON
06/05/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H1`: 35 bar N: 68 bar
RESERVE:
H: 30 bar N: 68 bar
0103S063A 2012-002953 06/05/2012ZB/0025/B -01C/S/HALLON
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
06/05/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H1`: 500 PSI N: 70 bar
0103S063A 2012-002951 06/05/2012ZB/0026/B -02A/S/HALLON
10/05/2012 THE JOB HAS BEEN DONE0103S056A 2012-002909 06/05/2012ZB/0090/F.HYDR/S/F.HYDRANT
15/05/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H1`: 35 bar N1: 71 bar
H2 : 38 bar
RESERVE:
H1: 29 bar
H2 : 38 bar
0103S063A 2012-003114 13/05/2012ZB/0010/GT-01B/S/HALLON
14/05/2012 the job hasbeen done0103S056A 2012-003053 13/05/2012ZB/0025/F.HYDR/S/F.HYDRANT
17/05/2012 THE WORK HAS BEEN DONE0103S056A 2012-003031 13/05/2012ZB/0010/F.HYDR/S/F.HYDRANT
18/05/2012 the job has been done0103S059A 2012-003052 13/05/2012ZB/0020/FOAM/S/TANK B
15/05/2012 THE JONB HAS BEEN DONE0103S059A 2012-003032 13/05/2012ZB/0010/FOAM/S/FILL.TANK
14/05/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H1`: 28 bar N: 75 bar
RESERVE:
H: 30 bar N: 69 bar
0603S063A 2012-002993 13/05/2012ZB/0026/K -07/S/HALLON
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
14/05/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H1`: 32 bar N: 73 bar
RESERVE:
H: 25 bar N: 73 bar
0103S063A 2012-003115 13/05/2012ZB/0026/K -08/S/HALLON
22/05/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 49 bar N: 70 bar
H: 28 bar
0103S063A 2012-003295 20/05/2012ZB/0010/GT-01A/S/HALLON
26/05/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 28 bar N: 70 bar
0103S063A 2012-003294 20/05/2012ZB/0026/B -02B/S/HALLON
26/05/2012 the job has been done0103S056A 2012-003255 20/05/2012ZB/0026/F.HYDR/S/F.HYDRANT
23/05/2012 the job has been done0103S056A 2012-003247 20/05/2012ZB/0020/F.HYDR/S/F.HYDRANT
22/05/2012 the job has been done0103S059A 2012-003219 20/05/2012ZB/0010/FOAM/S/DIESEL T.
22/05/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 45 bar N: 75 bar
H: 39 bar
RESERVE:
H: 32 bar
H: 21 bar
0603S063A 2012-003162 20/05/2012ZB/0010/GT-01C/S/HALLON
08/05/2012 the work has been done0103S063A 2012-003296 20/05/2012ZB/0025/B -01A/S/HALLON
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
27/05/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H1 : 21 bar N: 64 bar
H2 : 43 bar
RESERVE:
H1 : 31 bar N:
H2 : 30 bar
0103S063A 2012-003461 27/05/2012ZB/0010/GT-01D/S/HALLON
31/05/2012 the job has been done as per procedure0603S023A 2012-003339 27/05/2012ZB/0020/T -03/S/00-00000
27/05/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H1 : 35 bar N: 74 bar
RESERVE:
H: 24 bar N: 73 bar
0103S063A 2012-003462 27/05/2012ZB/0025/B -01D/S/HALLON
30/05/2012 The job has been done as per procedure0103S056A 2012-003443 27/05/2012ZB/0030/F.HYDR/S/F.HYDRANT
28/05/2012 The job has been done as per procedure0103S056A 2012-003446 27/05/2012ZB/0090/BREATH/S/BREATH
20/06/2012 the job has been done0103S056A 2012-003542 03/06/2012ZB/0090/F.HYDR/S/F.HYDRANT
25/06/2012 The job has been done as per procedure.0603S059A 2012-003472 03/06/2012ZB/0020/FOAM/S/TANK A
04/06/2012
CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 24 bar N: 69 bar
RESERVE:
H: 27 bar N: 64 bar
0103S063A 2012-003586 03/06/2012ZB/0025/B -01B/S/HALLON
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
04/06/2012
CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 32 bar N: 68 bar
RESERVE:
H: 34 bar N: 67 bar
0103S063A 2012-003587 03/06/2012ZB/0025/B -01C/S/HALLON
04/06/2012
CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 500 psi N: 70 bar
0103S063A 2012-003585 03/06/2012ZB/0026/B -02A/S/HALLON
12/06/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H1`: 33 bar N: 74 bar
RESERVE:
H: 28 bar N: 74 bar
0103S063A 2012-003782 10/06/2012ZB/0026/K -08/S/HALLON
12/06/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H1`: 30 bar N: 76 bar
RESERVE:
H: 32 bar N: 70 bar
0103S063A 2012-003781 10/06/2012ZB/0026/K -07/S/HALLON
10/06/2012 the job has been done as per procedure0103S056A 2012-003702 10/06/2012ZB/0010/F.HYDR/S/F.HYDRANT
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
11/06/2012 the job has been done as per procedure0103S059A 2012-003703 10/06/2012ZB/0010/FOAM/S/FILL.TANK
11/06/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H1`: 36 bar N: 73 bar
H2 : 39 bar
RESERVE:
H: 38 bar N:
H2 : 32 bar
0603S063A 2012-003654 10/06/2012ZB/0010/GT-01B/S/HALLON
11/06/2012 the job has been done as per procedure0603S059A 2012-003631 10/06/2012ZB/0020/FOAM/S/SLOP TANK
11/06/2012 the job has been done as per procedure0103S059A 2012-003725 10/06/2012ZB/0020/FOAM/S/TANK B
12/06/2012 the job has been done as per procedure0103S056A 2012-003726 10/06/2012ZB/0025/F.HYDR/S/F.HYDRANT
12/06/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H : 28 bar N: 70 bar
RESERVE:
H: N:
0603S063A 2012-003653 10/06/2012ZB/0026/B -02B/S/HALLON
24/06/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW
INITIAL:
H1: 56 bar N: 74 bar
H2: 31 bar
RESERVE:
H: ---- N: 74
0103S063A 2012-003956 17/06/2012ZB/0010/GT-01A/S/HALLON
18/06/2012 the work has been done0103S056A 2012-003901 17/06/2012ZB/0020/F.HYDR/S/F.HYDRANT
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
24/06/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW
INITIAL:
H1: 51 Bar N: 77 bar
H2 : 41 Bar
RESERVE:
H1: 45 bar N: 77 bar
H2 : 38 bar
0103S063A 2012-003957 17/06/2012ZB/0010/GT-01C/S/HALLON
18/06/2012 The job has been done as per procedure.0103S059A 2012-003873 17/06/2012ZB/0010/FOAM/S/DIESEL T.
25/06/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 40 bar N: 69 bar
RESERVE:
H: 24 bar N: 63 bar
0103S063A 2012-003958 17/06/2012ZB/0025/B -01A/S/HALLON
25/06/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 32 bar N: 69 bar
RESERVE:
H: 34 bar N: 67 bar
0603S063A 2012-003816 17/06/2012ZB/0025/B -01C/S/HALLON
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
25/06/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 27 bar N: 68 bar
0103S063A 2012-003955 17/06/2012ZB/0026/B -02B/S/HALLON
25/06/2012 The job has been done as per procedure.0103S056A 2012-003909 17/06/2012ZB/0026/F.HYDR/S/F.HYDRANT
24/06/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 49 bar N: 69 bar
H: 25 bar
RESERVE:
H: 36 bar
H: 36 bar
0103S063A 2012-004095 24/06/2012ZB/0010/GT-01D/S/HALLON
27/06/2012 The job has been done as per procedure0603S023A 2012-003977 24/06/2012ZB/0020/T -04/S/00-00000
28/06/2012 The job has been done as per procedure0103S056A 2012-004075 24/06/2012ZB/0030/F.HYDR/S/F.HYDRANT
25/06/2012 The job has been done as per procedure0103S056A 2012-004078 24/06/2012ZB/0090/BREATH/S/BREATH
25/06/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 34 bar N: 73 bar
RESERVE:
H: 21 bar N: 70 bar
0103S063A 2012-004096 24/06/2012ZB/0025/B -01D/S/HALLON
25/06/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 500 psi N: 70 bar
0603S063A 2012-003978 24/06/2012ZB/0026/B -02A/S/HALLON
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
05/07/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 45 bar N: 70 bar
H: 26 bar
RESERVE:
0603S063A 2012-004134 01/07/2012ZB/0010/GT-01A/S/HALLON
02/07/2012 The job has been done as per procedure0103S059A 2012-004179 01/07/2012ZB/0020/FOAM/S/TANK A
01/07/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 24 bar N: 69 bar
RESERVE:
H: 27 bar N: 64 bar
0103S063A 2012-004244 01/07/2012ZB/0025/B -01B/S/HALLON
01/07/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 32 bar N: 68 bar
RESERVE:
H: 34 bar N: 69 bar
0103S063A 2012-004245 01/07/2012ZB/0025/B -01C/S/HALLON
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
01/07/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 34 bar N: 72 bar
RESERVE:
H: 21 bar N: 70 bar
0603S063A 2012-004133 01/07/2012ZB/0025/B -01D/S/HALLON
01/07/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 500 psi N: 70 bar
RESERVE:
0103S063A 2012-004243 01/07/2012ZB/0026/B -02A/S/HALLON
06/07/2012 The job has been done as per procedure.0103S056A 2012-004199 01/07/2012ZB/0090/F.HYDR/S/F.HYDRANT
10/07/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 29 bar N: 75 bar
RESERVE:
H: 30 bar N: 69 bar
0103S063A 2012-004428 08/07/2012ZB/0026/K -07/S/HALLON
10/07/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 32 bar N: 73 bar
RESERVE:
H: 27 bar N: 72 bar
0103S063A 2012-004429 08/07/2012ZB/0026/K -08/S/HALLON
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
08/07/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 35 bar N: 70 bar
H: 35 bar
RESERVE:
H: 36 bar
H: 28 bar
0103S063A 2012-004427 08/07/2012ZB/0010/GT-01B/S/HALLON
09/07/2012 the jobe has been done as per procedure0103S059A 2012-004345 08/07/2012ZB/0010/FOAM/S/FILL.TANK
03/07/2012 the job has been done as per procedure0103S056A 2012-004344 08/07/2012ZB/0010/F.HYDR/S/F.HYDRANT
12/07/2012 the jobe has been done as per procedure0603S059A 2012-004288 08/07/2012ZB/0020/FOAM/S/TANK B
09/07/2012 the jobe has been done as per procedure0103S056A 2012-004367 08/07/2012ZB/0025/F.HYDR/S/F.HYDRANT
20/07/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 43 bar N: 70 bar
RESERVE:
H: 26 bar N: 64 bar
0103S063A 2012-004623 15/07/2012ZB/0025/B -01A/S/HALLON
22/07/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 42 bar N: 74 bar
H: 40 bar
RESERVE:
H: 32 bar
H: 36 bar
0103S063A 2012-004622 15/07/2012ZB/0010/GT-01C/S/HALLON
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
22/07/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 46 bar N: 69 bar
H: 26 bar
0103S063A 2012-004621 15/07/2012ZB/0010/GT-01A/S/HALLON
20/07/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 28 bar N: 71 bar
0103S063A 2012-004620 15/07/2012ZB/0026/B -02B/S/HALLON
20/07/2012 The job has been done as per procedure.0103S056A 2012-004575 15/07/2012ZB/0026/F.HYDR/S/F.HYDRANT
16/07/2012 The job has been done as per procedure.0103S056A 2012-004568 15/07/2012ZB/0020/F.HYDR/S/F.HYDRANT
20/07/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 25 bar N: 70 bar
RESERVE:
H: 28 bar N: 65 bar
0603S063A 2012-004480 15/07/2012ZB/0025/B -01B/S/HALLON
16/07/2012 The job has been done as per procedure.0603S059A 2012-004473 15/07/2012ZB/0010/FOAM/S/DIESEL T.
26/07/2012 the job has been done as per procedure0103S056A 2012-004760 22/07/2012ZB/0030/F.HYDR/S/F.HYDRANT
23/07/2012 The job has been done as per procedure.
& The Tank is out of service
0603S023A 2012-004645 22/07/2012ZB/0020/T -05/S/00-00000
23/07/2012 The job has been done as per procedure.0103S056A 2012-004763 22/07/2012ZB/0090/BREATH/S/BREATH
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
23/07/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 34 bar N: 75 bar
RESERVE:
H: 22 bar N: 73 bar
0103S063A 2012-004781 22/07/2012ZB/0025/B -01D/S/HALLON
22/07/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 20 bar N: 64 bar
H: 41 bar
RESERVE:
H: 30 bar
H: 30 bar
0103S063A 2012-004780 22/07/2012ZB/0010/GT-01D/S/HALLON
03/08/2012
CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 32 bar N: 69 bar
RESERVE:
H: 34 bar N: 68 bar
0103S063A 2012-004922 29/07/2012ZB/0025/B -01C/S/HALLON
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
03/08/2012
CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 500 psi N: 71 bar
RESERVE:
no cylinders
0103S063A 2012-004920 29/07/2012ZB/0026/B -02A/S/HALLON
03/08/2012
CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 25 bar N: 69 bar
RESERVE:
H: 27 bar N: 65 bar
0103S063A 2012-004921 29/07/2012ZB/0025/B -01B/S/HALLON
03/08/2012 the job has been done as per procedure0603S075 2012-004807 29/07/2012ZB/0025/B -07/S/B-2507
31/07/2012 the job has been done as per procedure0103S059A 2012-004853 29/07/2012ZB/0020/FOAM/S/TANK A
02/08/2012 the job has been done as per procedure0103S056A 2012-004881 29/07/2012ZB/0090/F.HYDR/S/F.HYDRANT
05/08/2012 the job has been done as per procedure0103S056A 2012-005029 05/08/2012ZB/0025/F.HYDR/S/F.HYDRANT
06/08/2012 the job has been done as per procedure0103S059A 2012-005009 05/08/2012ZB/0010/FOAM/S/FILL.TANK
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
05/08/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 37 bar N: 71 bar
H: 35 bar
RESERVE:
H: 37 bar
H: 27 bar
0103S063A 2012-005087 05/08/2012ZB/0010/GT-01B/S/HALLON
05/08/2012
CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 30 bar N: 75 bar
RESERVE:
H: 30 bar N: 70 bar
0103S063A 2012-005088 05/08/2012ZB/0026/K -07/S/HALLON
05/08/2012
CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 33 bar N: 74 bar
RESERVE:
H: 27 bar N: 73 bar
0103S063A 2012-005089 05/08/2012ZB/0026/K -08/S/HALLON
08/08/2012 the job has been done as per procedure0103S059A 2012-005028 05/08/2012ZB/0020/FOAM/S/TANK B
08/08/2012 the job has been done as per procedure0103S056A 2012-005008 05/08/2012ZB/0010/F.HYDR/S/F.HYDRANT
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
13/08/2012
CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 48 bar N: 72 bar
RESERVE:
H: 30 bar N: 64 bar
0603S063A 2012-005126 12/08/2012ZB/0025/B -01A/S/HALLON
13/08/2012 The job has been done as per procedure.0103S056A 2012-005220 12/08/2012ZB/0026/F.HYDR/S/F.HYDRANT
13/08/2012
CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 32 bar N: 72 bar
RESERVE:
No Cylinders (Out of service)
0103S063A 2012-005264 12/08/2012ZB/0026/B -02B/S/HALLON
14/08/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 40 bar N: 70 bar
H: 30 bar
RESERVE:
No Cylinders (Out of Service)
0103S063A 2012-005265 12/08/2012ZB/0010/GT-01A/S/HALLON
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
14/08/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 45 bar N: 75 bar
H: 40 bar
RESERVE:
H: 40 bar
H: 35 bar
0103S063A 2012-005266 12/08/2012ZB/0010/GT-01C/S/HALLON
15/08/2012 The job has been done as per procedure.0103S056A 2012-005212 12/08/2012ZB/0020/F.HYDR/S/F.HYDRANT
16/08/2012 The job has been done as per procedure0103S059A 2012-005184 12/08/2012ZB/0010/FOAM/S/DIESEL T.
20/08/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 45 bar N: 65 bar
H: 22 bar
RESERVE:
H: 32 bar
H: 32 bar
0103S063A 2012-005428 19/08/2012ZB/0010/GT-01D/S/HALLON
20/08/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 37 bar N: 75 bar
RESERVE:
H: 27 bar N: 75 bar
0103S063A 2012-005429 19/08/2012ZB/0025/B -01D/S/HALLON
21/08/2012 The job has been done as per procedure0603S023A 2012-005316 19/08/2012ZB/0020/T -06/S/00-00000
30/08/2012 The job has been done as per procedure.0603S040 2012-005315 19/08/2012ZB/0025/DV-00/S/00-0000
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
31/08/2012 The job has been done as per procedure.0103S059A 2012-005482 26/08/2012ZB/0020/FOAM/S/TANK A
27/08/2012
CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 33 bar N: 74 bar
RESERVE:
H: 27 bar N: 74 bar
0603S063A 2012-005445 26/08/2012ZB/0026/K -08/S/HALLON
27/08/2012
CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 32 bar N: 69 bar
RESERVE:
H: 35 bar N: 69 bar
0103S063A 2012-005558 26/08/2012ZB/0025/B -01C/S/HALLON
27/08/2012
CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 25 bar N: 70 bar
RESERVE:
H: 29 bar N: 65 bar
0103S063A 2012-005557 26/08/2012ZB/0025/B -01B/S/HALLON
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
27/08/2012
CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 500 psi N: 71 bar
RESERVE:
No Cylinders / Out of Service
0103S063A 2012-005556 26/08/2012ZB/0026/B -02A/S/HALLON
26/08/2012 The job has been done as per procedure.0103S056A 2012-005512 26/08/2012ZB/0090/F.HYDR/S/F.HYDRANT
01/09/2012 The job has been done as per procedure.0103S056A 2012-005665 02/09/2012ZB/0025/F.HYDR/S/F.HYDRANT
05/09/2012 The job has been done as per procedure.0103S059A 2012-005643 02/09/2012ZB/0010/FOAM/S/FILL.TANK
02/09/2012 The job has been done as per procedure.0103S059A 2012-005664 02/09/2012ZB/0020/FOAM/S/TANK B
03/09/2012 The job has been done as per procedure.0103S056A 2012-005642 02/09/2012ZB/0010/F.HYDR/S/F.HYDRANT
02/09/2012 The system was changed from Hallon to CO20103S063A 2012-005725 02/09/2012ZB/0010/GT-01B/S/HALLON
01/09/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 33 bar N: 74 bar
RESERVE:
H: 27 bar N: 74 bar
0103S063A 2012-005727 02/09/2012ZB/0026/K -08/S/HALLON
01/09/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 30 bar N: 75 bar
RESERVE:
H: 31 bar N: 70 bar
0103S063A 2012-005726 02/09/2012ZB/0026/K -07/S/HALLON
14/09/2012 The job has been done as per procedure.0103S059A 2012-005817 09/09/2012ZB/0010/FOAM/S/DIESEL T.
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
13/09/2012 The job has been done as per procedure.0103S056A 2012-005843 09/09/2012ZB/0020/F.HYDR/S/F.HYDRANT
10/09/2012 The job has been done as per procedure.0103S056A 2012-005851 09/09/2012ZB/0026/F.HYDR/S/F.HYDRANT
10/09/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 48 bar N: 72 bar
RESERVE:
H: 28 bar N: 64 bar
0103S063A 2012-005900 09/09/2012ZB/0025/B -01A/S/HALLON
12/09/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 40 bar N: 75 bar
H: 43 bar
RESERVE:
H: 36 bar
H: 32 bar
0103S063A 2012-005899 09/09/2012ZB/0010/GT-01C/S/HALLON
12/09/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 27 bar N: 70 bar
H: 47 bar
RESERVE:
( No Reserve )
0103S063A 2012-005898 09/09/2012ZB/0010/GT-01A/S/HALLON
17/09/2012 The job has been done as per procedure.0603S023A 2012-005950 16/09/2012ZB/0020/T -01/S/00-00000
16/09/2012 The system was changed from Hallon to CO20103S063A 2012-006073 16/09/2012ZB/0010/GT-01D/S/HALLON
17/09/2012 The job has been done as per procedure.0103S056A 2012-006056 16/09/2012ZB/0090/BREATH/S/BREATH
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
17/09/2012 The job has been done as per procedure.0103S056A 2012-006053 16/09/2012ZB/0030/F.HYDR/S/F.HYDRANT
17/09/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 26 bar N: 75 bar
RESERVE:
H: 37 bar N: 75 bar
0103S063A 2012-006074 16/09/2012ZB/0025/B -01D/S/HALLON
25/09/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
No Cylinders (Out of Service)
RESERVE:
H: 400 psi N: 69 bar
0103S063A 2012-006221 23/09/2012ZB/0026/B -02A/S/HALLON
25/09/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 31 bar N: 68 bar
RESERVE:
H: 33 bar N: 65 bar
0103S063A 2012-006223 23/09/2012ZB/0025/B -01C/S/HALLON
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
25/09/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 22 bar N: 67 bar
RESERVE:
H: 25 bar N: 64 bar
0103S063A 2012-006222 23/09/2012ZB/0025/B -01B/S/HALLON
24/09/2012 The job has been done as per procedure.0103S056A 2012-006180 23/09/2012ZB/0090/F.HYDR/S/F.HYDRANT
27/09/2012 The job has been done as per procedure.0103S059A 2012-006159 23/09/2012ZB/0020/FOAM/S/TANK A
30/09/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 23 bar N: 70 bar
RESERVE:
H: 30 bar N: 73 bar
0103S063A 2012-006401 30/09/2012ZB/0026/K -08/S/HALLON
30/09/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 27 bar N: 75 bar
RESERVE:
H: 27 bar N: 68 bar
0103S063A 2012-006400 30/09/2012ZB/0026/K -07/S/HALLON
03/10/2012 Visually Check has been done for CO2 system.
(Hallon System is replaced by CO2 system)
0103S063A 2012-006399 30/09/2012ZB/0010/GT-01B/S/HALLON
30/09/2012 The job has been done as per procedure.0103S056A 2012-006342 30/09/2012ZB/0025/F.HYDR/S/F.HYDRANT
03/10/2012 The job has been done as per procedure.0103S059A 2012-006341 30/09/2012ZB/0020/FOAM/S/TANK B
03/10/2012 The job has been done as per procedure.0103S059A 2012-006319 30/09/2012ZB/0010/FOAM/S/FILL.TANK
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
01/10/2012 The job has been done as per procedure.0103S056A 2012-006318 30/09/2012ZB/0010/F.HYDR/S/F.HYDRANT
07/10/2012 The system has been changed from Hallon to CO2.0103S063A 2012-006574 07/10/2012ZB/0010/GT-01C/S/HALLON
11/10/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 38 bar N: 67 bar
RESERVE:
H: 22 bar N: 63 bar
0103S063A 2012-006575 07/10/2012ZB/0025/B -01A/S/HALLON
11/10/2012 The job has been done as per procedure.0103S056A 2012-006527 07/10/2012ZB/0026/F.HYDR/S/F.HYDRANT
10/10/2012 The job has been done as per procedure.0103S056A 2012-006520 07/10/2012ZB/0020/F.HYDR/S/F.HYDRANT
11/10/2012 The job has been done as per procedure.0103S059A 2012-006495 07/10/2012ZB/0010/FOAM/S/DIESEL T.
07/10/2012 The system has been changed from Hallon to CO2.0103S063A 2012-006573 07/10/2012ZB/0010/GT-01A/S/HALLON
11/10/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 25 bar N: 67 bar
RESERVE:
No Cylinders (Out of Service)
0103S063A 2012-006572 07/10/2012ZB/0026/B -02B/S/HALLON
14/10/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 33 bar N: 70 bar
RESERVE:
H: 19 bar N: 70 bar
0103S063A 2012-006721 14/10/2012ZB/0025/B -01D/S/HALLON
14/10/2012 The job has been done as per procedure0103S056A 2012-006704 14/10/2012ZB/0090/BREATH/S/BREATH
13/10/2012 The job has been done as per procedure0103S056A 2012-006701 14/10/2012ZB/0030/F.HYDR/S/F.HYDRANT
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
15/10/2012 The job has been done as per procedure0603S023A 2012-006614 14/10/2012ZB/0020/T -02/S/00-00000
25/10/2012 The job has been done as per procedure0103S056A 2012-006832 21/10/2012ZB/0090/F.HYDR/S/F.HYDRANT
22/10/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 31 bar N: 69 bar
RESERVE:
H: 35 bar N: 70 bar
0103S063A 2012-006877 21/10/2012ZB/0025/B -01C/S/HALLON
22/10/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 25 bar N: 70 bar
RESERVE:
H: 28 bar N: 65 bar
0103S063A 2012-006876 21/10/2012ZB/0025/B -01B/S/HALLON
22/10/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 450 psi N: 71 bar
RESERVE:
No Cylinders ( The unit is out of service )
0103S063A 2012-006875 21/10/2012ZB/0026/B -02A/S/HALLON
23/10/2012 The job has been done as per procedure.0103S059A 2012-006804 21/10/2012ZB/0020/FOAM/S/TANK A
28/10/2012 the job has been done as per procedure0103S059A 2012-007743 28/10/2012ZB/0020/FOAM/S/TANK B
28/10/2012 the job has been done as per procedure0103S059A 2012-006952 28/10/2012ZB/0010/FOAM/S/FILL.TANK
28/10/2012 the job has been done as per procedure0103S056A 2012-006951 28/10/2012ZB/0010/F.HYDR/S/F.HYDRANT
28/10/2012 the job has been done as per procedure0103S056A 2012-007744 28/10/2012ZB/0025/F.HYDR/S/F.HYDRANT
28/10/2012 the job has been done as per procedure0103S063A 2012-007033 28/10/2012ZB/0010/GT-01B/S/HALLON
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
28/10/2012
CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 29 bar N: 74 bar
RESERVE:
H: 33 bar N: 74 bar
0103S063A 2012-007034 28/10/2012ZB/0026/K -08/S/HALLON
28/10/2012
CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 31 bar N: 76 bar
RESERVE:
H: 30 bar N: 70 bar
0603S063A 2012-007684 28/10/2012ZB/0026/K -07/S/HALLON
06/11/2012 the job has been done as per procedure0103S059A 2012-006984 04/11/2012ZB/0010/FOAM/S/DIESEL T.
06/11/2012 the job has been done as per procedure0103S056A 2012-007012 04/11/2012ZB/0020/F.HYDR/S/F.HYDRANT
06/11/2012 the job has been done as per procedure0103S056A 2012-007768 04/11/2012ZB/0026/F.HYDR/S/F.HYDRANT
11/11/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 33 bar N: 71 bar
RESERVE:
H: 20 bar N: 70 bar
0103S063A 2012-007217 11/11/2012ZB/0025/B -01D/S/HALLON
11/11/2012 The job has been done as per procedure.0103S056A 2012-007202 11/11/2012ZB/0090/BREATH/S/BREATH
12/11/2012 The job has been done as per procedure.0103S056A 2012-007199 11/11/2012ZB/0030/F.HYDR/S/F.HYDRANT
13/11/2012 The job has been done as per procedure.0603S023A 2012-007092 11/11/2012ZB/0020/T -03/S/00-00000
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
20/11/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 27 bar N: 69 bar
RESERVE:
H: 32 bar N: 65 bar
0103S063A 2012-007343 18/11/2012ZB/0025/B -01C/S/HALLON
20/11/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 20 bar N: 65 bar
RESERVE:
H: 22 bar N: 62 bar
0103S063A 2012-007342 18/11/2012ZB/0025/B -01B/S/HALLON
20/11/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 450 psi N: 68 bar
RESERVE:
No Cylinders ( The unit is out of service )
0103S063A 2012-007341 18/11/2012ZB/0026/B -02A/S/HALLON
22/11/2012 The job has been done as per procedure.0103S056A 2012-007298 18/11/2012ZB/0090/F.HYDR/S/F.HYDRANT
29/11/2012 The job has been done as per procedure.0603S059A 2012-007229 18/11/2012ZB/0020/FOAM/S/TANK A
27/11/2012 The job has been done as per procedure.0103S059A 2012-007458 25/11/2012ZB/0010/FOAM/S/FILL.TANK
01/12/2012 The job has been done as per procedure.0603S059A 2012-007827 25/11/2012ZB/0020/FOAM/S/SLOP TANK
11/01/20130603S063A 2012-007411 25/11/2012ZB/0010/GT-01B/S/HALLON
08/01/20130103S063A 2012-007536 25/11/2012ZB/0026/K -07/S/HALLON
08/01/20130103S063A 2012-007537 25/11/2012ZB/0026/K -08/S/HALLON
08/01/20130103S056A 2012-007457 25/11/2012ZB/0010/F.HYDR/S/F.HYDRANT
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
07/01/20130103S059A 2012-007478 25/11/2012ZB/0020/FOAM/S/TANK B
07/01/20130103S056A 2012-007479 25/11/2012ZB/0025/F.HYDR/S/F.HYDRANT
11/01/20130103S063A 2012-007514 02/12/2012ZB/0010/GT-01A/S/HALLON
04/01/20130603S063A 2012-007808 02/12/2012ZB/0025/B -01C/S/HALLON
03/12/2012 The job has been done as per procedure.0103S056A 2012-007885 02/12/2012ZB/0020/F.HYDR/S/F.HYDRANT
04/12/2012 The job has been done as per procedure.0103S056A 2012-007893 02/12/2012ZB/0026/F.HYDR/S/F.HYDRANT
03/12/2012 The job has been done as per procedure.0103S059A 2012-007434 02/12/2012ZB/0010/FOAM/S/DIESEL T.
02/12/2012 The system was changed from Hallon to CO2.0103S063A 2012-007515 02/12/2012ZB/0010/GT-01C/S/HALLON
04/12/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 39 bar N: 66 bar
RESERVE:
H: 22 bar N: 63 bar
0103S063A 2012-007516 02/12/2012ZB/0025/B -01A/S/HALLON
09/12/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 33 bar N: 70 bar
RESERVE:
H: 18 bar N: 67 bar
0103S063A 2012-007660 09/12/2012ZB/0025/B -01D/S/HALLON
10/12/2012 Hallon system is replaced by CO2 system & visually check have been done.0103S063A 2012-007659 09/12/2012ZB/0010/GT-01D/S/HALLON
10/12/2012 The job has been done as per procedure.0103S056A 2012-007642 09/12/2012ZB/0090/BREATH/S/BREATH
12/12/2012 The job has been done as per procedure.0103S056A 2012-007639 09/12/2012ZB/0030/F.HYDR/S/F.HYDRANT
29/11/2012 pm has been done as job sheet0603S023A 2012-007945 09/12/2012ZB/0020/T -04/S/00-00000
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
18/12/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 25 bar N: 67 bar
RESERVE:
H: 31 bar N: 64 bar
0103S063A 2012-008090 16/12/2012ZB/0025/B -01C/S/HALLON
18/12/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 18 bar N: 65 bar
RESERVE:
H: 21 bar N: 63 bar
0103S063A 2012-008089 16/12/2012ZB/0025/B -01B/S/HALLON
18/12/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 450 psi N: 66 bar
RESERVE:
No Cylinders ( The unit is out of service )
0103S063A 2012-008088 16/12/2012ZB/0026/B -02A/S/HALLON
19/12/2012 The job has been done as per procedure.0103S056A 2012-008045 16/12/2012ZB/0090/F.HYDR/S/F.HYDRANT
17/12/2012 The job has been done as per procedure.0103S059A 2012-008021 16/12/2012ZB/0020/FOAM/S/TANK A
16/12/2012 The Hallon system has been changed to CO2 system.0603S063A 2012-007978 16/12/2012ZB/0010/GT-01A/S/HALLON
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
18/12/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 31 bar N: 69 bar
RESERVE:
H: 15 bar N: 66 bar
0603S063A 2012-007977 16/12/2012ZB/0025/B -01D/S/HALLON
24/12/2012 The job has been done as per procedure.0103S059A 2012-008182 23/12/2012ZB/0010/FOAM/S/FILL.TANK
24/12/2012 The job has been done as per procedure.0103S056A 2012-008181 23/12/2012ZB/0010/F.HYDR/S/F.HYDRANT
24/12/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 20 bar N: 68 bar
RESERVE:
H: 26 bar N: 70 bar
0103S063A 2012-008263 23/12/2012ZB/0026/K -08/S/HALLON
24/12/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 23 bar N: 70 bar
RESERVE:
H: 24 bar N: 65 bar
0103S063A 2012-008262 23/12/2012ZB/0026/K -07/S/HALLON
23/12/2012 The hallon system has been changed to CO2 system.0103S063A 2012-008261 23/12/2012ZB/0010/GT-01B/S/HALLON
04/01/2013 The job has been done as per procedure.0603S059A 2012-008128 23/12/2012ZB/0020/FOAM/S/TANK B
06/01/20130103S056A 2012-008203 23/12/2012ZB/0025/F.HYDR/S/F.HYDRANT
04/01/2013 The job has been done as per procedure.0603S059A 2012-008304 30/12/2012ZB/0010/FOAM/S/DIESEL T.
-
Equipment Code Task Completion DateW.O. No. Due Date Work Done
31/12/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 19 bar N: 65 bar
RESERVE:
H: 22 bar N: 63 bar
0603S063A 2012-008310 30/12/2012ZB/0025/B -01B/S/HALLON
31/12/2012 CHECK HALON SYSTEM PRESSURES AS FOLLOW:
INITIAL:
H: 34 bar N: 65 bar
RESERVE:
H: 19 bar N: 63 bar
0103S063A 2012-008444 30/12/2012ZB/0025/B -01A/S/HALLON
30/12/2012 The system has been changed from Hallon to CO2.0103S063A 2012-008443 30/12/2012ZB/0010/GT-01C/S/HALLON
30/12/2012 The system has been changed from Hallon to CO2.0103S063A 2012-008442 30/12/2012ZB/0010/GT-01A/S/HALLON
01/01/2013 The job has been done as per procedure.0103S056A 2012-008392 30/12/2012ZB/0020/F.HYDR/S/F.HYDRANT
31/12/2012 The job has been done as per procedure.0103S056A 2012-008399 30/12/2012ZB/0026/F.HYDR/S/F.HYDRANT