Hisense CAC Introductionacv-bg.com/hisense-bg.com/images/menu_download/01 Hisense CA… · Company...
Transcript of Hisense CAC Introductionacv-bg.com/hisense-bg.com/images/menu_download/01 Hisense CA… · Company...
Hisense CAC Introduction
Hisense International
2013.08
01
1 Company Introduction
Content
2 Commercial AC Product
3
4
Partner Support System
Typical Project
02
1 Company Introduction
Content
2 Commercial AC Product
3
4
Partner Support System
Typical Project
Company Introduction
Founded in 1969, Hisense has grown into a multi-billion dollar global enterprise. With a workforce of over 75,000 worldwide.
03
Company Introduction
With 17 production facilities and 7 R&D centers around the globe.
04
Overseas
Production Bases
Overseas
R&D Centers
Overseas
Companies Overseas Branches
USA
Australia
Hong Kong
South Africa
Spain
Italy
Belgium
Germany
Algeria
Kirghizia
India
Egypt
Russia
UK
Germany
Chicago USA
Saudi Arabia
Algeria 6th October Egypt
South Africa
Helwan Egypt
Atlanta USA
Canada
Malaysia
Indonesia
Japan
Dubai
Company Introduction
05
Business Domains
#1 in flat panel TVs in China for 10
consecutive years
#1 in POS systems with 30% of the Chinese retail market
Leading technology in TD-SCDMA
2nd largest refrigerator market share in China
Communications
Home Appliances
Consumer Electronics
Information Technology
Real Estate
Company Introduction
06
Hisense products are sold in more than 130 countries with sales revenue of USD $12.8 billion in 2012.
Company Introduction
07
Hisense has strategic partnerships with trusted global corporations such as IBM, Hitachi, and Whirlpool for the development and marketing of various products and services.
Company Introduction
08
HITACHI World-wide famous enterprise, covers industrial fields like mechanical manufacturing, integrated circuits, electrical and electronical systems, Magnetically Levitated Trains, etc.
Hitachi Appliance Inc. Air Conditioning is a pole industry for Hitachi, it owns the patent for the first scroll compressor in the world, and has experienced 20 years’ history for development and manufacturing SET FREE series air conditioners.
Company Introduction
09
Joint Venture Establishment Nov 18th, 2002 @
49% Equal Investment 49% Equal Investment
Marketing HR Manufacture QA
Company Introduction
10
HAPB
HAPQ
TANICHI
HAPP
HAPM
HHLI
HAPG
HCPG
HAPE SMZ
Hitachi AP Commercial AC Overseas Production Bases
Company Introduction
11
Establishment Date Jan., 2003 (Production commenced from July, 2003)
Area Occupied 113,010 m2
Construction Area 83,936m2 ( 30,348 m2 +53,588 m2)
Registration Capital USD46,000,000
Ratio of Investment Hitachi: 49%, Hisense: 49%, Others: 2%
Hisense/HITACHI
Company Outline
Production Lineup
ODU
M Series, Modular Type (8~48HP),
W Series, Water –Source VRF (3~6HP),
L Series (4~6HP),
E Series (3~5HP),
I DU
AVC,4-Way Cassette Type,(1~6HP, 1~1.8HP),
AVD, Ceiling Ducted Type ,Low &High Static Pressure (1~6,8,10HP),
AVE, Ceiling Ducted Type, Low-height & Slim(1~2.5HP,1~1.5HP),
AVS, Wall Mounted Type, (1~2.3HP),
AVH, Floor Concealed Type, (1~2.5HP),
AVA, All Fresh Air Indoor Unit (5~20HP)
Employee 1,756 (Sales・Service: 608 ,Factory・Headquarter: 1,148, indirect 406, direct 742)by 2012.12
Company Introduction
12
Technical
Director
Chairman Board
President
Financial
Director Administration
Director
A
D
F
D
Q
A
D
M
D P
C
D
R
&
D
C
S
D
C
S
D
M
D
(Mr. Aoyama)
(Mr.Nishika
wa)
(Mr.Fei) :From Hitachi
Hisense:3
Hitachi :3
UTX :1
VP Assistant
Marketing
Director
AD:
Admin
Dep’t
FD:
Financial
Dep’t
R&D:
R&D Dep’t
MD:
Mfg
Dep’t
MD:
Marketing
Dep’t
Hisense/HITACHI
Company Structure
QAD:
Quality
Assurance
Dep’t
PCD:
Production
Control
Dep’t
CSD:
Customer
Support
Dep’t
CSD:
Customer
Service
Dep’t
Company Introduction
13
- 16 lines (ODU 8 lines, IDU 8 lines)
- 58,368 (25,968+32,400) m2,
- 1,600,000 units per year (USD1.3B)
- Largest oversea factory for
commercial A/C
Same with Hitachi’s factory in Japan
- Most of equipments
- Layout & procedure
-Quality assurance system
-Spare parts procurement standard
Hisense/HITACHI
Factory
For components Constant Temperature Test Low Temperature test High Temperature Test
Salt Spray Test Pressure Switch Test Vibration Test
All components must be qualified by Hitachi Japan.
Company Introduction
14
Hisense/HITACHI
Quality Assurance
Company Introduction
15
For finished products
Performance test EMC test Noise test
Field test Reliability test Piping stress test
Hisense/HITACHI
Quality Assurance
Company Introduction
16
HITACHI DECLARATION
- Dispatched the senior expert with more than 30 years working experience in manufacture and management in SMZ,HITACHI JAPAN as Production Technical Director ,being in charge of manufacture and quality assurance of Hisense/HITACHI.
-After strict certification, the product quality from Hisense/HITACHI has achieved or exceeded the HITACHI JAPAN standard.
1 Company Introduction
Content
2 Commercial AC Product
3
4
Partner Support System
Typical Project
17
Commercial AC Product
- Technology Superiority
- Lineup
- Outdoor unit
- Indoor unit
18
Commercial AC Product
19
Technology Superiority--3 Core Technologies for Inverter Multi Commercial A/C
High Efficiency Scroll Compressor
-New Scroll Compressor Large capacity high-pressure chamber scroll compressor with an interior oil separating section, which maintains most of lubricating oil in compressor.
- Exclusive Asymmetric Scroll Technology Reduces refrigerant gas leakage loss in the process of section and compression.
-DC Inverter-driven Motor Performance is improved at 20~40Hz operation situation which is the longest running time. Meanwhile noise will be reduced dramatically.
Commercial AC Product
20
Technology Superiority--3 Core Technologies for Inverter Multi Commercial A/C
DC Inverter-Driven Technique -1800 Sine Wave DC Inverter Technique
The application of advanced sensorless three phase vectoring control technique on permanent magnetism synchronous motor ensures the output current of DIP-IPM DC inverter to be smooth sine wave curve, enables motor operate more smoothly and efficiency dramatically increased. Also both harmonic current and electromagnetic noise are suppressed.
- Precise Room Temperature Control The operating DC motor speed in compressor can be adjusted continuously and freely relating to the variability of system capacity. This advanced technique ensures a smoother curve of temperature fluctuation.
Commercial AC Product
21
Technology Superiority--3 Core Technologies for Inverter Multi Commercial A/C
Perfect Reliability Control Technique -Oil Control Technique
By synthetic application of interior oil-separating section, exterior separator, accumulator, much less oil enters refrigerant circulation and accordingly efficient oil can be guarantee for lubricating compressor.
- 25-Step Fan Speed Control Technique The outdoor fan speed can be adjusted by 25 steps according to the DC motor. System efficiency can be promoted and power input can be reduced sharply.
- Rapid Cooling/Heating -Intelligent Defrosting -Intelligent Rotational Operation -Double Back-up Operation Function
Commercial AC Product
22
Hisense Commercial AC Lineup
M/R Series W Series L Series E Series F Series Inverter Series
ON/OFF Series
Hi-Smart Hi-Flexi Unitary Type
All Product with CE Certificate
Commercial AC Product
23
M Series Outdoor Unit
8,10,12HP 14,16HP 18,20HP 22,24,26HP 28,30,32HP
34,36,38,40HP 42,44HP 46,48HP
Target
Applications -Shopping center
-Office building
-Hospital
-Theater
-Stadium
-Museum
-Airport
-Hotel
-School
Commercial AC Product
23
R Series Outdoor Unit
8,10,12HP 14,16,18HP 20HP 22,24,26HP 28,30,32,34,36HP
38,40,42HP 44,46,48HP 50,52,54HP
Target
Applications -Shopping center
-Office building
-Hospital
-Theater
-Stadium
-Museum
-Airport
-Hotel
-School
Heat Recovery with 3 Pipes
Commercial AC Product
24
W Series Outdoor Unit
3,4,5,6HP
Target
Applications -Office building
-Hospital
-Theater
-Stadium
-Museum
-Airport
-Hotel
-School
L Series Outdoor Unit
4,5,6HP
Target
Applications
-Small Shop
-Apartment
- villa
-Small office
-Hotel
-Restaurant
Commercial AC Product
25
E Series Outdoor Unit
3,4,5HP
Target
Applications
-Small House
-Small Apartment
-Small villa
F Series Outdoor Unit
2,3,4,5HP
Target
Applications
-Small Shop
-Apartment
- villa
-Small office
-Restaurant
Commercial AC Product
26
Low-Height Ceilng Ducted
Ceilng Ducted Floor Concealed
Wall Mounted
Slim Ceiling Ducted
4-Way Cassette
Indoor Unit
Commercial AC Product
27
3HP All Fresh
Indoor Unit AVA-30UXCSCH-70
5HP
AVA-48UXCSQH-108
8HP
AVA-76UXC/2SRH-168
16HP
AVA-154UX6SSH-400
20HP
AVA-190UX6STH-500/600
12HP
AVA-114UX6SRH-300
10HP
AVA-96UXC/2SRH-210
Commercial AC Product
28
· Cooling/Heating/Dry/Fan/Auto · High/Medium/Low/Swing Louver · Set Temperature/ Timer · Filter Clean · Check · Alarm Code Display · Ventilation Increase
· Cooling/Heating/Dry/Fan/Auto · High/Medium/Low/Swing Louver · Set Temperature/ Timer · Filter Clean · Timer
· Cooling/Heating/Dry/Fan/Auto · High/Medium/Low/Swing Louver · Set Temperature/ Timer · Operation monitoring · Wireless Controller Disable · Alarm Code Display · Max.160 Indoor Units Control · Indoor Unit Selection
Remote Control Switch Wireless Remote Control Switch
Central Station
7-Day Timer
· Timer Setting · Holiday Setting · 3 time period setting on weekday · Two modes of Timetable
Various Controllers
1 Company Introduction
Content
2 Commercial AC Product
3
4
Partner Support System
Typical Project
29
Partner Support System
30
- Professional Technical Support Team
- First-Rate Logistic Service
- Complete Technical Training System
Partner Support System
31
Professional Technical Support Team
Working Experience of Technical HVAC Planning More than 20years.
Area of Successful Project Application China, Europe, Asia, Africa….
Working Experience of After-Sale Service More than 20years with 24 hours full-time service mode.
Partner Support System
32
First-Rate Logistic Service
Short Production Cycle At least 30days as standard production.
Specialized Logistic Team Working More than 10years operation experience.
Partner Support System
33
Complete Technical Training System Training Centre Summary
More than 2000m2. Area of Training Centre Occupied
1 Contracted Postdoctoral Mentor, 2 Doctors, 3 National Registered HVAC Engineer, 3 Contracted College Professor 10 Masters, 11 Senior Engineers...
Faculty Resource
Theory Explanation and Actual Operation Training Method
-VRF AC System Operation Principle -VRF Advantages Compared with Conventional Chiller and Ducted System
Partner Support System
34
Complete Technical Training System Training Course
Technology Training Course for Pre-Sales Phase
Inverter Driven Multi-Split AC Introduction
-Controller Introduction -H-NET Central Management System Instruction
Intelligent Control Instruction
- AC Load Calculation and Unit Selection -AC System Planning Design Application -Duct System Plan Design
AC System Planning Design
- Noise Handle Measure -Outdoor Unit Location Selection and Piping Length Control Technology -Large Space AC Planning Design Technology
Professional Design Technology
-Preparation before Installation -Installation Steps and Specification -Installation FAQ and Analysis
Partner Support System
35
Complete Technical Training System Training Course
Technology Training Course for After-Sales Phase
Installation Specification
-Method, Steps and Judgement of Commissioning -Protection and Alarm Code Analysis -Commissioning FAQ and Analysis
AC System Commissioning
- AC System Refrigerant Circuit Spare Part Detection -AC System Electric Spare Part Detection -Regular Malfunction Solution and Analysis
AC System Maintainance
1 Company Introduction
Content
2 Commercial AC Product
3
4
Partner Support System
Typical Project
36
Typical Project
37
In Europe
Project Name: Calvin Klein Atelier
Project Address: Umbria, Italia
Product Series: Hisense M Series
Typical Project
38
In Europe
Project Name: Italian Euronics
Project Address: Roma, Italia
Product Series: Hisense M Series
Typical Project
39
In Europe
Project Name: Moonlight Hotel
Project Address: Sofia, Bulgaria
Product Series: Hisense M Series
Typical Project
40
Project Pangu Daguan
Size Construction area: 200,000m2
14 high class residential buildings
Developer Beijing Pangu Investment Co., Ltd
In China
Typical Project
41
Project Banshan Peninsula
Size Area occupied 1,500,000㎡
Developer Sanya Luhuitou Tourism Co., Ltd
Capacity 30,000HP
In China
Typical Project
42
In China
SZ Philips Tower
46,000m2
HZ Citizen Center
400,000m2
QZ Traffic Headquarter
20,000m2
BJ China Science Ministry
17,400m2
SZ Fortune Square
120,000m2
National Development
Bank 20,000m2
Typical Project
43
In China
SZ Zhongxin
Apartment 100,000m2
QD Yihe Hotel
300,000m2
QD Hisense Yandao Apartment
400,000m2
SZ Ease Hotel
40,000m2
Typical Project
44
In China
GZ Zhongxin Longgang Green Glof
Villa 100,000m2 SH Wanke Hongjun Villa
80,000m2
SH Yunjianlvdadi Villa
100,000m2
Typical Project
45
In China
Library of QD College
22,000m2
QZ Renmin Hospital
30,000m2
SH New International Expo Center
300,000m2 SH Fudan University Art Center
50,000m2
SH SVA/NEC LCD Factory
15,000m2
KM Gaoxin District Stadium
5,000m2
THANKS!