Renovation Project: 2007– 2008

description

Hinsdale Public Library Renovation Project Part 1

Transcript of Hinsdale Public Library Renovation Project Part 1

Page 1: Hinsdale Public Library Renovation Project Part 1

Renovation Project: 2007–2008

Page 2: Hinsdale Public Library Renovation Project Part 1

The ReferendumThe Referendum

On March 21, 2006, Hinsdale Residents overwhelmingly approved a rate increase

to renovate the library building and to fund capital repairs and replacement.

Page 3: Hinsdale Public Library Renovation Project Part 1

Before the Renovation Project…

Page 4: Hinsdale Public Library Renovation Project Part 1

Before the renovation, shades of Before the renovation, shades of blue, teal and maroon dominated.blue, teal and maroon dominated.

Page 5: Hinsdale Public Library Renovation Project Part 1
Page 6: Hinsdale Public Library Renovation Project Part 1
Page 7: Hinsdale Public Library Renovation Project Part 1
Page 8: Hinsdale Public Library Renovation Project Part 1

Hard surfaces and an open central staircase Hard surfaces and an open central staircase created a noisy environment.created a noisy environment.

Page 9: Hinsdale Public Library Renovation Project Part 1
Page 10: Hinsdale Public Library Renovation Project Part 1

The lower level The lower level featured large planters featured large planters with tropical foliage. with tropical foliage.

Page 11: Hinsdale Public Library Renovation Project Part 1

The pre-renovation Youth Services DepartmentThe pre-renovation Youth Services Department

Page 12: Hinsdale Public Library Renovation Project Part 1

The Large Meeting Room before the renovation The Large Meeting Room before the renovation

Page 13: Hinsdale Public Library Renovation Project Part 1

Phase I

Page 14: Hinsdale Public Library Renovation Project Part 1

Moving all of the Moving all of the books from the east to books from the east to the west side of the the west side of the second floor was the second floor was the first order of business.first order of business.

Page 15: Hinsdale Public Library Renovation Project Part 1
Page 16: Hinsdale Public Library Renovation Project Part 1

The Reference Desk showed a lot of wear The Reference Desk showed a lot of wear by the end of its service.by the end of its service.

Page 17: Hinsdale Public Library Renovation Project Part 1

A demolition crew A demolition crew came in and came in and dismantled it one dismantled it one snowy morning. snowy morning.

Page 18: Hinsdale Public Library Renovation Project Part 1

Meanwhile, demolition prepared the way for new Meanwhile, demolition prepared the way for new administrative offices on the west side administrative offices on the west side

of the second floor.of the second floor.

Page 19: Hinsdale Public Library Renovation Project Part 1

The new administrative offices framed The new administrative offices framed and covered with plywoodand covered with plywood

Page 20: Hinsdale Public Library Renovation Project Part 1

Inside the administrative Inside the administrative offices, drywall workers offices, drywall workers prepared the walls prepared the walls for painting.for painting.

Page 21: Hinsdale Public Library Renovation Project Part 1

As work begins on the As work begins on the staircase, cement is staircase, cement is transported into the transported into the library… one library… one wheelbarrow at a time. wheelbarrow at a time.

Page 22: Hinsdale Public Library Renovation Project Part 1

Then it was sent down a Then it was sent down a trough to the lower trough to the lower level, where it was used level, where it was used to create new sections to create new sections of foundation.of foundation.

Page 23: Hinsdale Public Library Renovation Project Part 1

A crane lifts steel beams onto the roof of the library.A crane lifts steel beams onto the roof of the library.

Page 24: Hinsdale Public Library Renovation Project Part 1

The beams will support The beams will support new floor space new floor space created by filling in created by filling in portions of the open portions of the open central staircase.central staircase.

Page 25: Hinsdale Public Library Renovation Project Part 1

Old metal in the central staircase is cut away Old metal in the central staircase is cut away by steelworkers to make way for the new beams.by steelworkers to make way for the new beams.

Page 26: Hinsdale Public Library Renovation Project Part 1

The beams are winched The beams are winched into position until they can into position until they can be permanently attached.be permanently attached.

Page 27: Hinsdale Public Library Renovation Project Part 1

The corrugated metal floor pan resting on top of the The corrugated metal floor pan resting on top of the steel beams will be filled with concrete steel beams will be filled with concrete

to create new floor space.to create new floor space.

Page 28: Hinsdale Public Library Renovation Project Part 1
Page 29: Hinsdale Public Library Renovation Project Part 1

Phase II

Page 30: Hinsdale Public Library Renovation Project Part 1

Renovation of Renovation of restrooms on the restrooms on the lower levellower level

Page 31: Hinsdale Public Library Renovation Project Part 1
Page 32: Hinsdale Public Library Renovation Project Part 1

Colorful new tile adds Colorful new tile adds visual interest to the visual interest to the remodeled restrooms.remodeled restrooms.

Page 33: Hinsdale Public Library Renovation Project Part 1

New carpeting in the New carpeting in the youth services area youth services area on the first flooron the first floor

Page 34: Hinsdale Public Library Renovation Project Part 1

One of the exciting new features of the One of the exciting new features of the renovation project is the Reading Cabin.renovation project is the Reading Cabin.

Page 35: Hinsdale Public Library Renovation Project Part 1

Designed in a rustic style, it offers a safe and inviting Designed in a rustic style, it offers a safe and inviting place for young kids to play and read.place for young kids to play and read.

Page 36: Hinsdale Public Library Renovation Project Part 1

A new book display A new book display area is adjacent to the area is adjacent to the Reading Cabin.Reading Cabin.

Page 37: Hinsdale Public Library Renovation Project Part 1

There’s a new Storytime There’s a new Storytime Room too!Room too!

Page 38: Hinsdale Public Library Renovation Project Part 1

A new aquarium at the base of the stairs on the A new aquarium at the base of the stairs on the first floor entertains kids and adults alike.first floor entertains kids and adults alike.

Page 39: Hinsdale Public Library Renovation Project Part 1

Meanwhile, on the first Meanwhile, on the first floor…floor…

The space formerly The space formerly housing adult fiction housing adult fiction books highlights books highlights new arrivals and new arrivals and audiovisual materials. audiovisual materials.

Page 40: Hinsdale Public Library Renovation Project Part 1

More energy efficient lighting is installed More energy efficient lighting is installed throughout the building.throughout the building.

Page 41: Hinsdale Public Library Renovation Project Part 1

The new quiet room, at the west end of the library’s The new quiet room, at the west end of the library’s main level, faces Washington Street.main level, faces Washington Street.

Page 42: Hinsdale Public Library Renovation Project Part 1

Phase II also brought a major change Phase II also brought a major change to the exterior of the library: to the exterior of the library: a dedicated exterior entrance.a dedicated exterior entrance.

Page 43: Hinsdale Public Library Renovation Project Part 1
Page 44: Hinsdale Public Library Renovation Project Part 1

Inside the new Inside the new entrance doors, entrance doors, updated lighting updated lighting and tile combine to and tile combine to create a create a sophisticated first sophisticated first impression.impression.

Page 45: Hinsdale Public Library Renovation Project Part 1

Phase III

Page 46: Hinsdale Public Library Renovation Project Part 1

Phase III began with a celebration Phase III began with a celebration of the new entrance.of the new entrance.

Executive Director Lynn Elam Executive Director Lynn Elam greeted the first patrons greeted the first patrons

to enter the doors.to enter the doors.