1HiLoad during DP Operation – November 2010
Docking and Attachment Test Norway - December 13, 2010
2Approach to Submersible Barge on DP
3
Attachment System Activated Maneuvering of Barge by HiLoad DP
4HiLoad during DP Operation – November 2010
5
First Ballast Test – Oct 2010First Ballast Test – Oct 2010
6HiLoad during DP Operation – November 2010
7HiLoad DP No. 1 in Transit to Test Location on the West Coast of NorwayHiLoad DP No. 1 at “Sea Trial Base” in NorwayHiLoad DP at 42 m draught (138 feet)
HiLoad DP No. 1 – In OperationHiLoad DP No. 1 – In Operation
8HiLoad DP No. 1 in Transit to Test Location on the West Coast of NorwayHiLoad DP No. 1 at “Sea Trial Base” in Norway
28.0 m 27.0 m
42.0 m42.0 m
Min draught17.0 m