'HIHQFH )2, ,WHP $ UNCLASSIFIED Mathew, · Cc: Jorgensen, Glen MR Subject: FW: DNSDC Moorebank...
Transcript of 'HIHQFH )2, ,WHP $ UNCLASSIFIED Mathew, · Cc: Jorgensen, Glen MR Subject: FW: DNSDC Moorebank...
UUNCLASSIFIED
Mathew,
Apologies for the delayed response but as discussed I have just returned from leave.
All the details you require regarding the asbestos remediation works conducted at DNSDC areavailable on DEMS under Project No SWS1847.
Regards,
Piers MillnerDS-NNSW Regional Asbestos OfficerRisk & ComplianceDefence Support & Reform Group
From: Ryan, Matthew MR 19 Sent: Monday, 20 October 2014 11:26 To: millner, piers MR Cc: Kolano, Robert MR; Thomson, Fiona MS; Fritz, Jurgen MR; Conn, Sandra MS Subject: FW: DNSDC Moorebank Remediation [SEC=UNCLASSIFIED]
UNCLASSIFIED
Piers,
As per my voice message and e-trail below I am trying to gather some evidence of how much we have spent on Asbestos remediation at the DNSDC site at Moorebank.Also we are trying to determine what activities took place.Issue around the DNSDC site are gaining momentum with our branch representatives attending a meeting the DEPSEC DSRG at lunchtime today to discuss a number DNSDC issues.
Could you please provide any details on asbestos remediation of the site.
Happy to discuss.
Regards
Matthew RyanA/ Assistant Director Property LeasingDefence Support & Reform GroupBP26-GF- A029PO Box 7925CANBERRA BC ACT 2610
section 22
section 22section 22
From: Ryan, Matthew MR 19 Sent: Wednesday, 1 October 2014 11:35 To: Kolano, Robert MR Cc: Thomson, Fiona MS; Fritz, Jurgen MR; Conn, Sandra MS Subject: DNSDC Moorebank Remediation [SEC=UNCLASSIFIED]
UUNCLASSIFIED
Rob,
As discussed yesterday we are gathering information on our Make Good requirements under the Lease for the DNSDC Site at Moorebank.I have contacted Joint Logistics who are trying to find out for me what monitoring has been in place on the site since 2002.We will also be engaging GHD to do some additional reports.
We have reviewed previous correspondence from our predecessors stating that Defence has undertaken $8.5m in asbestos remediation works at the DNSDC siteYou mentioned yesterday that this was done by the regional contractors.Could you please provide some evidence on what we have spent at the regional level on remediation of the DNSDC site.Also provide what remediation took place. (Sandra thought it was on a number of buildings, however you thought it may have only been on one large building).
Happy to discuss.
regards
Matthew RyanA/ Assistant Director Property LeasingDefence Support & Reform GroupBP26-GF- A029PO Box 7925CANBERRA BC ACT 2610section 22section 22
UUNCLASSIFIED
Matt & Glen,
We've found this [see screen shot]
You can see the figures.
Also, contact Piers Millner, , the regional asbestos officer.
Peter
P.R. EllisMMgtStud (Proj Mgt), Mbr AIPM, CPPMAssistant Director, DEHP Manager - DEEERMSEnvironment and Engineering Branch – Infrastructure DivisionDefence Support & Reform Group______________________________________EEBranch: Ass't Unit Security OfficerBP26 ECO Comms Officer
26 Brindabella Circuit, Brindabella Business Park
BP26-2-B064 PO Box 7925 CANBERRA BC ACT 2610
DEHP mailbox:
Email:Please don't print this e-mail unless you really need to.
IMPORTANT: This email remains the property of the Australian Defence Organisation and is subject to the jurisdiction of Section 70 of theCrimes Act 1914 (Cwlth). If you have received this email in error you are requested to contact the sender and delete the email.
From: Ryan, Matthew MR 19 Sent: Tuesday, 18 November 2014 09:09 To: Ellis, Peter MR Cc: Jorgensen, Glen MR Subject: FW: DNSDC Moorebank Remediation [SEC=UNCLASSIFIED]
UNCLASSIFIED
Peter,
This is the information I have. (Refer below)We are trying to estbalish how much we have spent on asbestos remediation to assist in our negotiations.
Also as an update on DEHP-ID-044- RFQTSWe accepted GHD to do assessment of the DNSDC site.GHD held inital site visit last week.Monday myself and Jurgen held a conferecne call and we expect Stage 1 report end of this week.This will lead most likely lead to Stage 2 instrusive testing.
Regards
Matthew Ryan A/ Assistant Director Property Leasing Defence Support & Reform GroupBP26-GF- A029 PO Box 7925 CANBERRA BC ACT 2610
section 22
section 22
section 22
section 22
section 22section 22
From: millner, piers MR Sent: Tuesday, 28 October 2014 14:13 To: Ryan, Matthew MR 19 Cc: Kolano, Robert MR; Thomson, Fiona MS; Fritz, Jurgen MR; Conn, Sandra MS; Johnston, Tracey MRS Subject: RE: DNSDC Moorebank Remediation [SEC=UNCLASSIFIED]
UUNCLASSIFIED
Mathew,
Apologies for the delayed response but as discussed I have just returned from leave.
All the details you require regarding the asbestos remediation works conducted at DNSDC areavailable on DEMS under Project No SWS1847.
Regards,
Piers MillnerDS-NNSW Regional Asbestos OfficerRisk & ComplianceDefence Support & Reform Group
From: Ryan, Matthew MR 19 Sent: Monday, 20 October 2014 11:26 To: millner, piers MR Cc: Kolano, Robert MR; Thomson, Fiona MS; Fritz, Jurgen MR; Conn, Sandra MS Subject: FW: DNSDC Moorebank Remediation [SEC=UNCLASSIFIED]
UNCLASSIFIED
Piers,
As per my voice message and e-trail below I am trying to gather some evidence of how much we have spent on Asbestos remediation at the DNSDC site at Moorebank.Also we are trying to determine what activities took place.Issue around the DNSDC site are gaining momentum with our branch representatives attending a meeting the DEPSEC DSRG at lunchtime today to discuss a number DNSDC issues.
Could you please provide any details on asbestos remediation of the site.
Happy to discuss.
Regards
Matthew RyanA/ Assistant Director Property LeasingDefence Support & Reform GroupBP26-GF- A029PO Box 7925CANBERRA BC ACT 2610
section 22
section 22section 22
From: Ryan, Matthew MR 19 Sent: Wednesday, 1 October 2014 11:35 To: Kolano, Robert MR Cc: Thomson, Fiona MS; Fritz, Jurgen MR; Conn, Sandra MS Subject: DNSDC Moorebank Remediation [SEC=UNCLASSIFIED]
UUNCLASSIFIED
Rob,
As discussed yesterday we are gathering information on our Make Good requirements under the Lease for the DNSDC Site at Moorebank.I have contacted Joint Logistics who are trying to find out for me what monitoring has been in place on the site since 2002.We will also be engaging GHD to do some additional reports.
We have reviewed previous correspondence from our predecessors stating that Defence has undertaken $8.5m in asbestos remediation works at the DNSDC siteYou mentioned yesterday that this was done by the regional contractors.Could you please provide some evidence on what we have spent at the regional level on remediation of the DNSDC site.Also provide what remediation took place. (Sandra thought it was on a number of buildings, however you thought it may have only been on one large building).
Happy to discuss.
regards
Matthew RyanA/ Assistant Director Property LeasingDefence Support & Reform GroupBP26-GF- A029PO Box 7925CANBERRA BC ACT 2610section 22section 22
Good evening Jurgen and Matthew
Please see attached a summary table which we hope satisfies your needs in relation to the 11 points raised in the 2002 Site Audit Report and how these items have been addressed by Defence already during previous investigations or will be closed out in the additional investigations proposed by GHD dated 18 December 2014. I have provided as a word document so you can edit or provide comments as appropriate. Please let me know if you need any more details at this stage.
In relation to the building area identified as containing radioactive materials, at this stage we would just propose to undertake a detailed assessment of what is actually stored in the building. In many instances, licence requirements state that signage must be used where radioactive materials are used within certain equipment or infrastructure but the actual risk posed by the presence of such materials is relatively low. There may be no actual need for any sampling if we are able to identify what is being stored and the conditions in which the radioactive material may be present.
I am not in the office tomorrow but Amy should be available if you have any further questions. I will be back in the office on Friday and happy to discuss.
Kind Regards,
Jacqui
Jacqui Hallchurch Senior Environmental Scientist Service Group Manager – Contamination and Environmental Management
Please note I am available in the office on Monday, Tuesday, Wednesday and Friday
GHD
Water | Energy & Resources | Environment | Property & Buildings | Transportation
Please consider the environment before printing this email
section 22section 22
UUNCLASSIFIED
Amy,
Please find attached update from Piers relating to Asbestos.It looks like we have all the reports now, with buildings 6, 46, 48, and 72 not included in the project due to a lack of funding availability.Alos no material was identified at buildings 63 and 87.
Matthew RyanA/ Assistant Director Property LeasingDefence Support & Reform GroupBP26-GF- A029PO Box 7925CANBERRA BC ACT 2610
From: millner, piers MR Sent: Monday, 19 January 2015 13:08 To: Ryan, Matthew MR 19 Cc: Fritz, Jurgen MR Subject: RE: DNSDC Moorebank Remediation [SEC=UNCLASSIFIED]
UNCLASSIFIED
Mathew,
Following a meeting this morning with the CMS remediation project managers and a comprehensive review of all project documentation I can now confirm the following:
- Although identified in the initial SOW buildings 6, 46, 48, and 72 were not included in the project dueto a lack of funding availability. The buildings were sign posted, closed to unauthorisedpersons and the occupants relocated to previously remediated premises.
- Buildings 63 and 87 were never included in the SOW as no asbestos containing dust had beenidentified.
In view of the above I believe that you have now been provided with all project Clearance Reports.
Regards,
Piers MillnerNNSW Hazards Management & Assurance OfficerEstate & Facilities ServicesDefence Support & Reform Group
section 22section 22
section 22
From: Ryan, Matthew MR 19 Sent: Monday, 19 January 2015 11:22 To: millner, piers MR Cc: Fritz, Jurgen MR Subject: RE: DNSDC Moorebank Remediation [SEC=UNCLASSIFIED]
UUNCLASSIFIED
Piers,
Please see below GHD advice they will look for the missing reports.
Regards
Matthew RyanA/ Assistant Director Property LeasingDefence Support & Reform GroupBP26-GF- A029PO Box 7925CANBERRA BC ACT 2610
From: Amy Dobson Sent: Monday, 19 January 2015 07:57 To: Ryan, Matthew MR 19 Subject: FW: DNSDC Moorebank Remediation [SEC=UNCLASSIFIED]
Thanks Matt, We will look into reference 21/20513/174416 for the remaining records on our end and/or with Piers. Regards Amy Dobson Senior Environmental Scientist – Project Management GHD
WATER | ENERGY & RESOURCES | ENVIRONMENT | PROPERTY & BUILDINGS | TRANSPORTATION Please consider our environment before printing this email From: Ryan, Matthew MR 19 Sent: Friday, 16 January 2015 2:26 PM To: Amy Dobson Cc: Piers Millner (InTouch) Subject: FW: DNSDC Moorebank Remediation [SEC=UNCLASSIFIED]
UNCLASSIFIED
section 22section 22
section 22
section 22section 22
section 22
Amy,
As discussed Piers has provided me with Clearance Certificates for Buildings 7,9,10,11,33,34,35,40,44,62,75 and the original scope of works.I will send these in a series of emails due to the size of the files.As per below Piers will also be sending me the clearances following the emu pick.
To complete our records could you please follow up for Piers the Clearance Certificates for Blds 06, 46, 48, 63, 72 and 87. As per attached Scope the reference number is 21/20513/174416
We can then discuss next week the final scope once I have received some additional information regarding the radioactive store at Moorebank as per previous correspondence.
Regards
Matthew RyanA/ Assistant Director Property LeasingDefence Support & Reform GroupBP26-GF- A029PO Box 7925CANBERRA BC ACT 2610
From: millner, piers MR Sent: Friday, 16 January 2015 13:58 To: Ryan, Matthew MR 19 Subject: RE: DNSDC Moorebank Remediation [SEC=UNCLASSIFIED]
UUNCLASSIFIED
Mathew,
Please find attached GHD's Clearance Reports for Blds D44, D62 and D75. That is all we have at the moment.
The old CMS is attempting to get the missing ones (Blds 06, 46, 48, 63, 72 and 87) from Maurice Pignatelli of GHD as discussed.
I will send the clearances following the emu pick of surface asbestos debris with the grid map early next week.
Regards,
Piers MillnerNNSW Hazards Management & Assurance OfficerEstate & Facilities ServicesDefence Support & Reform Group
section 22section 22
section 22
From: Ryan, Matthew MR 19 Sent: Friday, 16 January 2015 10:25 To: millner, piers MR Cc: Kolano, Robert MR; Thomson, Fiona MS; Fritz, Jurgen MR; Alexander, David MR 3; 'Jacqui Hallchurch'; 'Amy Dobson' Subject: RE: DNSDC Moorebank Remediation [SEC=UNCLASSIFIED]
UUNCLASSIFIED
Piers,
Thankyou for your time on the phone this morning.As discussed GHD have prepared a Stage 1 report to assist us in determining what Stage 2 contamination investigations are required for us to meet our obligations under the lease at the DNSDC site at Moorebank.Part of the Stage 2 report is to close out 11 items raised in a Site Management Plan from the NSW Environment Protection Authority Site Audit Statement dated 09 December 2002.Items 8 & 9 of the Site Management Plan refer to Defences handling of Asbestos.
As discussed you have approximately two thirds of the Hygiene Certificates for the site, which were provided by GHD Pty Ltd.Please forward a copy of these reports, and a list of the outstanding reports which we can provide to our consultants who may be able to assist in locating the outstanding items.
You also mentioned that as part of investigations GHD arranged for site inspection(clean up) breaking the site up into grids.Please provide any details you have on this, and as per above if required we can direct GHD tolocate any outstanding reports.
This information should then help us close out our responsibilities relating to asbestos at the site.
regards
Matthew RyanA/ Assistant Director Property LeasingDefence Support & Reform GroupBP26-GF- A029PO Box 7925CANBERRA BC ACT 2610section 22section 22
From: millner, piers MR Sent: Wednesday, 10 December 2014 10:27 To: Ryan, Matthew MR 19 Cc: Kolano, Robert MR; Thomson, Fiona MS; Fritz, Jurgen MR; Conn, Sandra MS; Johnston, Tracey MRS; Smith, Glen MR 1 Subject: RE: DNSDC Moorebank Remediation [SEC=UNCLASSIFIED]
UUNCLASSIFIED
Mathew,
I'm still waiting on some documentation from the CMS.
Regards,
Piers MillnerNNSW Hazards Management & Assurance OfficerEstate & Facilities ServicesDefence Support & Reform Group
From: Ryan, Matthew MR 19 Sent: Wednesday, 10 December 2014 09:41 To: millner, piers MR Cc: Kolano, Robert MR; Thomson, Fiona MS; Fritz, Jurgen MR; Conn, Sandra MS; Johnston, Tracey MRS Subject: RE: DNSDC Moorebank Remediation [SEC=UNCLASSIFIED]
UNCLASSIFIED
Piers,
Have you made any progress on this.We have 2 meetings scheduled with A/ASPM on Monday 15th December 2014 to discuss the DNSDC site.These meetings are pre briefs for a meeting A/ASPM has with the landlord of the DNSDC on Tuesday 16th December 2014.
Regards
Matthew RyanA/ Assistant Director Property LeasingDefence Support & Reform GroupBP26-GF- A029PO Box 7925CANBERRA BC ACT 2610
section 22
section 22section 22
From: millner, piers MR Sent: Monday, 1 December 2014 12:04 To: Ryan, Matthew MR 19 Cc: Kolano, Robert MR; Thomson, Fiona MS; Fritz, Jurgen MR; Conn, Sandra MS; Johnston, Tracey MRS Subject: RE: DNSDC Moorebank Remediation [SEC=UNCLASSIFIED]
UUNCLASSIFIED
Mathew,
I have recently returned from leave and plan to address your request for clearance reports following completion of project SWS1847 later this week.
Regards,
Piers MillnerNNSW Hazards Management & Assurance OfficerEstate & Facilities ServicesDefence Support & Reform Group
From: Ryan, Matthew MR 19 Sent: Wednesday, 19 November 2014 11:39 To: millner, piers MR Cc: Kolano, Robert MR; Thomson, Fiona MS; Fritz, Jurgen MR; Conn, Sandra MS; Johnston, Tracey MRS Subject: RE: DNSDC Moorebank Remediation [SEC=UNCLASSIFIED]
UNCLASSIFIED
piers,
Thanks for the information below we have been able to find the spend amount from DEMS.I have been talking to Robert Kolano and he advised you might be able to send me a copy of the Hygiene (completion) certificate for the site. (Sorry I am not sure of the terminology)Essentially we are looking for something to show that at the end of the project the site is clear.We are preparing a brief and would like to include this to assist our pending negotiations.
Regards
Matthew RyanA/ Assistant Director Property LeasingDefence Support & Reform GroupBP26-GF- A029PO Box 7925CANBERRA BC ACT 2610
section 22
section 22section 22
From: millner, piers MR Sent: Tuesday, 28 October 2014 14:13 To: Ryan, Matthew MR 19 Cc: Kolano, Robert MR; Thomson, Fiona MS; Fritz, Jurgen MR; Conn, Sandra MS; Johnston, Tracey MRS Subject: RE: DNSDC Moorebank Remediation [SEC=UNCLASSIFIED]
UUNCLASSIFIED
Mathew,
Apologies for the delayed response but as discussed I have just returned from leave.
All the details you require regarding the asbestos remediation works conducted at DNSDC areavailable on DEMS under Project No SWS1847.
Regards,
Piers MillnerDS-NNSW Regional Asbestos OfficerRisk & ComplianceDefence Support & Reform Group
From: Ryan, Matthew MR 19 Sent: Monday, 20 October 2014 11:26 To: millner, piers MR Cc: Kolano, Robert MR; Thomson, Fiona MS; Fritz, Jurgen MR; Conn, Sandra MS Subject: FW: DNSDC Moorebank Remediation [SEC=UNCLASSIFIED]
UNCLASSIFIED
Piers,
As per my voice message and e-trail below I am trying to gather some evidence of how much we have spent on Asbestos remediation at the DNSDC site at Moorebank.Also we are trying to determine what activities took place.Issue around the DNSDC site are gaining momentum with our branch representatives attending a meeting the DEPSEC DSRG at lunchtime today to discuss a number DNSDC issues.
Could you please provide any details on asbestos remediation of the site.
Happy to discuss.
Regards
Matthew RyanA/ Assistant Director Property LeasingDefence Support & Reform GroupBP26-GF- A029PO Box 7925CANBERRA BC ACT 2610
section 22
section 22section 22
From: Ryan, Matthew MR 19 Sent: Wednesday, 1 October 2014 11:35 To: Kolano, Robert MR Cc: Thomson, Fiona MS; Fritz, Jurgen MR; Conn, Sandra MS Subject: DNSDC Moorebank Remediation [SEC=UNCLASSIFIED]
UUNCLASSIFIED
Rob,
As discussed yesterday we are gathering information on our Make Good requirements under the Lease for the DNSDC Site at Moorebank.I have contacted Joint Logistics who are trying to find out for me what monitoring has been in place on the site since 2002.We will also be engaging GHD to do some additional reports.
We have reviewed previous correspondence from our predecessors stating that Defence has undertaken $8.5m in asbestos remediation works at the DNSDC siteYou mentioned yesterday that this was done by the regional contractors.Could you please provide some evidence on what we have spent at the regional level on remediation of the DNSDC site.Also provide what remediation took place. (Sandra thought it was on a number of buildings, however you thought it may have only been on one large building).
Happy to discuss.
regards
Matthew RyanA/ Assistant Director Property LeasingDefence Support & Reform GroupBP26-GF- A029PO Box 7925CANBERRA BC ACT 2610section 22section 22
UUNCLASSIFIED
Amy,
Jurgen and I would like to discuss the Stage 2 scope of works.
It will involve the need to have a clearance certificate from an ARPANSA accredited consultant, so that the site/building 27 can be removed from the regulators control.
Also we wanted to discuss how the asbestos report we have provided help close out the EPA report and if we need to do anything further in this regard.
We will also discuss the matrix from your previous correspondence.
Jurgen and I will be available for a half hour at 10.30am otherwise it would need to be after 2.30pm.
Please advise a suitable time and number and I will confirm availability tomorrow.
Regards
Matthew Ryan
A/ Assistant Director Property Leasing
Defence Support & Reform Group
BP26-GF- A029
PO Box 7925
CANBERRA BC ACT 2610
section 22
section 22
ii | GHD | Report for Department of Defence - DNSDC Moorebank, 21/24133
locations in the south western portion of the site, including two off-site locations. At the time of preparation of this report further works were in progress to delineate the extent of the LNAPL impact and the results of these investigations will be reported under a separate cover.
Elevated concentrations of lead were reported in shallow soils from a depth of approximately 0.7 to -0.8 metres in one location adjacent to the rail spur (TP062), corresponding with field observations of a white, waxy material. The extent of the impact appeared to be limited both vertically and horizontally and the material was not encountered at any other test pit locations across the site.
Fragments of asbestos containing material (ACM) were noted on the ground surface and shallow soils at several locations within the southern burial pits and adjacent to the rail spur within the southern area of the site (Figure 1). The potential for widespread presence of ACM on the surface across this portion of the site cannot be discounted.
Site Audit Statement 2002 Requirements
Based on the findings of the data gap analyses (GHD,2014) and subsequent site investigations undertaken by GHD, with the exception of the hydrocarbon impact identified in the vicinity of the refuelling area, the issues raised by the Site Auditor in the 2002 Site Audit Statement appear to have been closed out as part of various stages of works undertaken on the site.
Radiological clearance – building 27
ANSTO was engaged to undertake a radiological clearance in the area around building 27, where radioactive materials were previously stored. The clearance survey was undertaken on 1 May 2015 and included Building 27 and the immediate surrounds within three metres of the building.
The clearance was undertaken to enable the site to be removed from the Defence list of radioactive storage areas registered through regulatory body ARPANSA. The report concluded that the survey provides adequate indication that the item(s) or area(s) surveyed are cleared for free release disposal as set out in RPS No. 6 – National Directory for Radiological Protection (NDRP).
Recommendations
Based on the findings of the data gap analysis and site investigation works completed by GHD and its nominated sub-contractors, the following management recommendations are made:
Further investigation be undertaken in the vicinity of the refuelling area to confirm the extent of LNAPL impact identified in groundwater. The removal of fuel from the remaining tanks is recommended as an interim management measure to minimise any further release of product to the environment.
The presence of fragments of ACM on the ground surface within the southern burial pits should be noted and managed as part of any further works within this area of the site.
Whilst the potential for exposure to contamination is considered to be low, management of the localised lead hotspot at TP062, located adjacent to the rail spur, is recommended as part of any further works in this area of the site.
iv | GHD | Report for Department of Defence - DNSDC Moorebank, 21/24133
7.3 Quality control (QC) / quality assurance (QA) ................................................................... 26
7.4 Soils ................................................................................................................................... 28
7.5 Sediments .......................................................................................................................... 30
7.6 Groundwater ...................................................................................................................... 30
8. Quality control assessment .......................................................................................................... 32
8.1 General .............................................................................................................................. 32
8.2 Overall QA/QC assessment ............................................................................................... 32
9. Field observations ........................................................................................................................ 35
9.1 Summary soil conditions .................................................................................................... 35
9.2 Summary groundwater conditions ..................................................................................... 39
10. Site investigation results .............................................................................................................. 44
10.1 Areas of potential concern ................................................................................................. 44
10.2 Site Audit Statement 2002 ................................................................................................. 52
10.3 Radiological clearance – Building 27 ................................................................................. 53
11. Conclusions and recommendations ............................................................................................. 54
11.1 Conclusions ....................................................................................................................... 54
11.2 Recommendations ............................................................................................................. 55
12. References ................................................................................................................................... 56
13. Limitations .................................................................................................................................... 58
Table index Table 1 Site details summary ............................................................................................................ 4
Table 2 Building use and summary observations in areas of concern..................................................... 4
Table 3 Environmental setting summary .......................................................................................... 9
Table 4 Summary existing reports .................................................................................................. 11
Table 5 Decision rules .................................................................................................................... 17
Table 6 Data quality indicators........................................................................................................ 19
Table 7 - Overview of the scope of work ................................................................................................ 25
Table 8 - Subcontractors / subconsultants ............................................................................................. 25
Table 9 – Soil sampling strategy ............................................................................................................ 28
Table 10 - Soil analytical schedule ......................................................................................................... 29
Table 11 - Groundwater analytical schedule .......................................................................................... 31
Table 12 Overall Sampling and Analysis Methodology Assessment................................................ 32
Table 13 Summary field observations .................................................................................................... 35
Table 14 Summary groundwater field parameters ................................................................................. 41
Table 15 LNAPL gauging – refuelling area ............................................................................................ 43
2 | GHD | Report for Department of Defence - DNSDC Moorebank, 21/24133
1. Introduction 1.1 Project overview
GHD Pty Ltd (GHD) was commissioned by the Department of Defence (Defence) to undertake intrusive site investigations at targeted areas across the Defence National Storage and Distribution Centre (DNSDC) at Moorebank (the site). The site location is shown in Figure 1,Appendix A.
The intrusive site investigation was completed to address the data gaps outlined in GHD’s Stage 1 Contamination Assessment & Data Gap Analysis Report (2014) (Ref. 21/24133/204711), hereafter referred to as the Data Gap Analysis Report (GHD, 2014).
This report documents the outcomes of Tasks 4 and 5 as described within GHD’s Proposal for Contaminated Site Assessment and Management dated 3 November 20142 and the works described in GHD’s Proposal for Intrusive Site Investigations dated 20 February 20153 (detailed in Section 1.4).
1.2 Project background
Moorebank Defence land was acquired by Defence in the early 1900s as part of the broader Holsworthy complex. Since this time, the land has undergone various stages of development and upgrades to allow the land to be utilised for a range of military operations, primarily training and storage.
The DNSDC facility was established in the early 1990s, during which time some remedial works associated with major disposal trenches in the central and northern portion of the site occurred. Defence sold the site in 2003 under a lease-back arrangement. Under the provisions of the contract of sale, Clause 27.4 states:
“The Commonwealth undertakes to remediate the Property (site) in accordance with the provisions of the Lease” (Clause 27.4).
GHD understands Defence intends to terminate it’s lease by 30 June 2015. In regards to Defence obligations for the management of potential contamination on the site, Clause 17.2 of the lease agreement states:
‘By the expiration of the lease, the lessee will remediate the land to a standard suitable for on-going commercial / industrial use and so that no significant contamination is migrating from the site” (Clause 17.2).
GHD prepared a Data Gap Analysis Report in December 2014 which identified a number of areas where additional works were considered to be required in order to fully manage Defence obligations under the lease agreement. The findings of the data gap analysis formed the basis of the Intrusive Site Investigations.
2 Department of Defence, Proposal for Contaminated Site Assessment and Management - Defence National Storage and Distr bution Centre, DEHP - ID – 044.3 Department of Defence, Proposal for Intrusive Site Investigations - Defence National Storage and Distribution Centre, DEHP - ID – 044.
14 | GHD | Report for Department of Defence - DNSDC Moorebank, 21/24133
4. Preliminary conceptual site model4.1 Background
The Conceptual Site Model (CSM) is a qualitative analysis tool which identifies potential contamination sources and associated transport mechanisms, exposure pathways and receptors. A preliminary CSM has been developed based on GHD’s understanding of the site setting, including geology, hydrogeology and surrounding land use in order to identify potentially significant source-pathway-receptor (SPR) linkages which may exist on the site.
The CSM is presented in the context of potential source-pathway-receptor (SPR) linkages; without a complete linkage between a source of contamination and a receptor via a plausible pathway, a risk cannot exist. Even where a complete linkage may be identified, for a potential risk to exist contaminant concentrations are required to exceed scientifically based risk threshold criteria.
The following sections outline the potential sources, pathways and receptors for contamination which may be applicable to the site. This preliminary CSM was used in the development of the scope of works for the intrusive site investigation.
4.2 Sources
Based on the findings of the data gap analysis (GHD, 2014), a number of potential sources of contamination were identified on the site which required further assessment in order to address Defence’s obligations under the lease agreement and contract of sale. These included:
Underground storage infrastructure associated with buildings 6, 15, 21, 49, 67 and 82
Above ground storage infrastructure including in the vicinity of buildings 16 and 40
Chemical use and storage associated with buildings 22, 23 and 26
General maintenance operations and potential for spills including buildings 24, 32, 37, 53,67, 73, 80, 83, 88 and the area identified as the north eastern car park
Indoor firing range at building 67
Potential contamination associated with buried materials and UXO within the southernburial pits
Former rail siding on the site.
Potential radionuclides at Building 27 associated with former storage of radioactivematerials
4.3 Pathways
Potential pathways by which contamination could migrate towards an identified off site receptor (refer to Section 4.4) or present a potential exposure pathway to commercial/industrial site workers include:
Lateral migration of contamination within groundwater
Surface water run off towards drainage channels on the site
Infiltration through unsealed surfaces
Dermal contact
Potential vapour intrusion
16 | GHD | Report for Department of Defence - DNSDC Moorebank, 21/24133
5. Data quality objectives 5.1 Overview
The Data Quality Objective (DQO) process established for this investigation has been defined by NEPC 2013.
The DQO process involves seven steps as defined in the following sections.
5.2 Step 1: State the “problem”
The site has historically been used for Defence operations. General site practices are known to have included the storage of fuel, oils, lubricants, flammable liquids, hazardous chemicals, weapons, foodstuffs, machinery including maintenance, radioactive materials and workshops and the presence of underground and above ground fuel storage infrastructure.
GHD understands Defence intends to terminate its lease by 30 June 2015. In regards to Defence obligations for the management of potential contamination on the site, Clause 17.2 of the lease agreement states:
‘By the expiration of the lease, the lessee will remediate the land to a standard suitable for on-going commercial / industrial use and so that no significant contamination is migrating from the site” (Clause 17.2).
The ‘problem’ as it stands is that there are potential source-pathway-receptor pollutant linkages. Intrusive investigation and assessment of contamination is required to identify the requirements for remediation (if any) prior to the expiration of Defence’s lease on the site.
5.3 Step 2: Identify the decisions
The key decisions to be made in the assessment are:
Is the data of an acceptable quality to make decisions relating to the potential for contamination on the site?
Are soil, surface water, sediment and/or groundwater contamination present on-site at concentrations exceeding adopted site investigation levels?
Is there an unacceptable risk posed by contamination (if present) to human health or the environment?
Are the sources of contamination potentially migrating off site?
If soil, sediment and/or groundwater is identified on-site at concentrations exceeding the adopted site investigation levels, is there a need for further assessment, remediation and/or management of the contamination?
5.4 Step 3: Identify inputs to the decision
The sampling programme was designed to provide sufficient information to allow a sound scientific evaluation of the questions set out in Section 5.3. Inputs to the decision included:
Historical site data reported by others
Visual inspection of site areas including soils, groundwater and sediments at the nominated investigation locations.
Collection of soil, groundwater and sediment samples to provide data upon which to base subsequent decisions.
20 | GHD | Report for Department of Defence - DNSDC Moorebank, 21/24133
5.8 Step 7: Optimise the design for obtaining data
The sampling programme was designed to provide sufficient information to allow a sound scientific and statistical evaluation of the questions set out in Step 2 (Section 5.3). This wasachieved by conducting targeted and systematic sampling of soil, groundwater and sediment in and around the identified contamination source areas.
Works were completed in general accordance with NSW EPA endorsed guidelines and accepted industry standards. To optimise the design of the investigations, a sampling and analytical programme was prepared to specifically target information required to meet the project objectives, and assess the potential contaminant sources, pathways and receptors identified in Section 4.
22 | GHD | Report for Department of Defence - DNSDC Moorebank, 21/24133
6.3 Assessment criteria – soils
Investigation levels applied to soil analytical data collected during this investigation are presented in the summary analytical results tables provided in Appendix C. The rationale for the selection of the nominated investigation levels is provided in the following sections.
6.3.1 General
The NEPM 1999 (Amendment 2013) includes a range of ecological investigation and screening levels, health investigation levels (HILs) and health screening levels (HSLs) for a range of contaminants and for a range of land use and exposure scenarios. The HILs are generic to all soil types. Site specific conditions determine the depth to which HILs apply for land uses other than residential (generally to depth of three metres). The HSLs however are both soil type and depth specific.
The amended NEPM (Schedule B1, Section 2.1.2) states that investigation and screening levels are not clean-up or response levels nor are they desirable soil quality criteria. Investigation and screening levels are intended for assessing existing contamination and to trigger consideration of an appropriate site-specific risk-based approach or appropriate risk management options when they are exceeded.
The assessment criteria (investigation levels) against which the project analytical data has been compared have been taken from those guidelines made or approved by the National Environment Protection Council (NEPC). In addition, the US EPA Region 4 (2009) screening criteria have been adopted as soil investigation levels for the AFFF constituents PFOS and PFOA.
In the case of this site, it is considered that the initial approach for the assessment of the significance of site contamination should be adopted through comparison of sampling data to NEPM 1999 (Amendment 2013) investigation levels. However, a site specific risk assessment to derive site specific screening criteria based on the proposed land use (and the levels of exposure) may be more appropriate. GHD notes that this may need to be reviewed further with Defence following the initial assessment, and comparison of the soils data to the published NEPM health investigation levels (HIL) D and health screening levels (HSL) D for commercial and industrial land use. The results of this data to investigation level comparison are presented in Appendix C.
As the investigation was a targeted assessment of known areas of potential contamination, using statistical analysis such as UCL95% is not considered appropriate as the data was not collected using an unbiased sampling pattern. However the significance of the exceedences was evaluated using 2.5 times the nominated criterion. These exceedences are specifically noted in Section 10.
6.3.2 Health based criteria
Given that the end use for the site is likely to be commercial land use with primarily hard stand and limited potential for exposure to unsealed soils, the following assessment criteria, which are sourced from Schedule B1 of the NEPM 1999 (Amendment 2013), have been considered:
HIL/HSL D – Commercial / industrial.
For the assessment of constituents of AFFF, including PFOS and PFOA, reference is made to US EPA guidelines. In the absence of any Australian based guidance, these investigation levels have been used as a guideline for PFOS and PFOA.
Statistical assessment of the data sets was not undertaken as the investigation programme has been targeted to specific source areas and meaningful statistical calculations may not be
24 | GHD | Report for Department of Defence - DNSDC Moorebank, 21/24133
commonly not within an aqueous environment). In such cases the soil investigation levels discussed above may be more appropriate assessment criteria.
6.5 Assessment criteria –groundwater
The ANZECC/ARMCANZ 2000 Australian and New Zealand Guidelines for Fresh and Marine Water Quality (ANZECC 2000) are approved as guidelines under Section 105 of theContaminated Land Management Act 1997 as of 6 December 2001.
ANZECC 2000 outlines the principles, objectives and philosophical basis underpinning the development and application of the guidelines. It also outlines the management framework recommended for applying the water quality guidelines to the natural and semi-natural marine and freshwater resources in Australia and New Zealand. The guidelines provide a risk-based decision framework where possible, to help refine trigger values for application at local and/or regional scales.
The NSW EPA recommends that when assessing contamination of surface water, consideration needs to be given to the impact of any contaminants to the beneficial uses or resources of the groundwater. The beneficial uses of groundwater may include providing recharge to rivers, lakes, bays, being a source of water for drinking, irrigation and industrial uses.
For the site, the receiving surface water ecosystem is likely to be the Georges River, which is considered fresh water. Given that there is no local biological effects data and the river would be subject to uncontrolled stormwater discharge, a protection of level of 95% was utilised for the assessment of water contamination.
Table C (Appendix C) provides a summary of the adopted water investigation levels that wereused to compare the recorded surface water and groundwater chemical concentrations.
26 | GHD | Report for Department of Defence - DNSDC Moorebank, 21/24133
7.2 Preliminary tasks
Prior to the commencement of intrusive site investigations, GHD completed the following tasks:
Prepared a site specific safety and environment plan for GHD’s field work programme.
Reviewed dial before you dig (DBYD) plans for the site.
Prior to undertaking the intrusive investigations, a specialist utility clearance was completed for each investigation area. While utility clearance works were being undertaken, the investigation locations were marked out.
In addition, UXO safe guarding was undertaken in the area known as the ‘southern burial pits’ prior to the commencement of the intrusive investigations, to ensure that the excavations were cleared of the potential presence of ordnance..
7.3 Quality control (QC) / quality assurance (QA)
7.3.1 Field works programme
All fieldwork was conducted in general accordance with GHD’s Standard Field Operating Procedures (FOP), which are aimed at collecting environmental samples using uniform and systematic methods, as required by GHD’s Quality Assurance system. Key requirements of these procedures are as follows:
Experienced field staff – all field investigations were conducted by staff with sufficient andappropriate site specific training with the experience to assess and document fieldconditions and undertake the investigation tasks in accordance with relevant procedures.
Selection of subcontractors who are experienced, familiar with the site and/or havepreviously worked in the investigation area.
Field Documentation - included photographs, a field logbook that to provide an account ofdaily works and events including works start/end time, weather, presence of odoursand/or dust, calibration results and checks and sample details. Field documentation alsoincluded detailed test pit and borehole logging in general accordance with AustralianStandard – Geotechnical Site Investigations, AS 1726-1993.
Notes included the location and extent of fill and features such as seepage, moisture,water bearing zones, depth of groundwater tables, discolouration, staining, odours andother indications of contamination. This information was recorded on the field boreholelogs.
A visual assessment made on all samples for the potential presence of latent organic orasbestos contamination; field screened using a calibrated Photo-Ionisation Detector (PID)was also conducted.
Decontamination procedures –included the use of new disposable gloves for thecollection of each sample, decontamination of the sampling equipment between eachsampling location (using DECON Neutracon) and the use of dedicated samplingcontainers provided by the laboratory.
Sample procedures - collected samples were immediately transferred into laboratorysupplied jars of appropriate composition and preservation for the required analysis. Thesample containers were transferred to a chilled cooler for sample preservation prior toand during shipment to the testing laboratory.
Each sample was assigned an individual sample identification number that began with alocation code and site number designation for the specific sample type and sample
30 | GHD | Report for Department of Defence - DNSDC Moorebank, 21/24133
7.5 Sediments
7.5.1 Sediment sampling methodology
Sediment samples were collected from six locations within the northern area of the site, adjacent to the north western site boundary (SED47 to SED52 inclusive as shown in Figure 2).The rationale for the selection of sediment sampling locations targeting particular areas of concern is outlined in the data gap analyses (GHD, 2014) as presented in Appendix B.
The stormwater drain runs northwards along the western boundary of the site. Surface water runoff collected from across the site flows northwards and is diverted into the Georges River, some 800 metres to the west.
Locations were targeted towards accessible areas of the drain where the channel was open to receiving run-off from the site and where sediment built up had occurred. The top 100mm of sediment present in each location was sampled by hand. In addition to the QA/QC procedures outlined previously, the sample locations were recorded by hand held GPS.
7.5.2 Sediment analytical schedule
All six sediment samples were analysed for heavy metals, PAH, BTEX and TRH.
7.6 Groundwater
7.6.1 Groundwater sampling methodology
Groundwater samples were collected from the 23 new and six existing (and operational) groundwater wells identified on the site (18 standard 50mm diameter monitoring wells and five 100mm diameter extraction wells). A number of existing groundwater wells reportedly present on the site were either lost or destroyed at the time of this sampling event. Sampling was complete in general accordance with GHD’s Standard Operating Procedures which are based on accepted industry practice).
Groundwater well locations were selected to target areas of particular concern including areas where underground fuel storage infrastructure was known or suspected, evidence of potential groundwater impact was previously reported or to provide general site coverage for the assessment of potential migration across the site and potentially off-site.
The location and elevation of the wells were professionally surveyed to Map Grid of Australia (MGA) and metres Australian Height Datum (m AHD). Prior to sampling, the water level in each well was gauged to assist in calculating the inferred direction of groundwater flow and assess each location for the presence of light non aqueous phase liquid (LNAPL).
Groundwater samples were collected using a low flow sampling technique, with new materials used at each sampling location.
Groundwater field parameters (including pH, electrical conductivity, temperature, dissolved oxygen and redox) were measured continuously using a flow cell attached to the pump to ensure representative measurements were recorded.
Groundwater well locations are shown on Figures 2 to 5 (Appendix A)
40 | GHD | Report for Department of Defence - DNSDC Moorebank, 21/24133
Groundwater flow direction
The elevations of the groundwater wells were surveyed and the groundwater levels within wells measured to metres Australian height datum (AHD). Based on survey data and the recorded standing water levels monitored prior to sampling, the inferred direction of groundwater flow appears to be in a general westerly direction across the site.
Owing to the presence of light non aqueous phase liquid (LNAPL) in the southern area of the site in the vicinity of the refuelling area, the estimation of inferred direction of groundwater flow is indicative only.
Groundwater field parameters and observations
Groundwater field parameters recorded during sampling are presented in Table 14. LNAPL wasidentified in several wells located in the vicinity of the refuelling area. Further comment regarding the presence of LNAPL is provided in the following sections.
44 | GHD | Report for Department of Defence - DNSDC Moorebank, 21/24133
10. Site investigation results10.1 Areas of potential concern
Soil, groundwater and sediment analytical data has been reviewed with respect to the areas of potential concern identified as part of the data gap analysis completed by GHD (2014).
Analytical data is tabulated in Appendix C as follows:
Table A: Summary soil analytical data
Table B: Summary groundwater analytical data
Table C: Summary sediment analytical data.
Copies of laboratory reports are presented in Appendix F.
Table 16 provides a summary analytical results for soil, groundwater and sediment samplingcompleted across the site with reference to the individual areas of potential concern targeted for the purpose of this investigation.
A summary of site data, with reference to the 2002 Site Audit requirements, is provided inSection 10.2, Table 17.
54 | GHD | Report for Department of Defence - DNSDC Moorebank, 21/24133
11. Conclusions and recommendations11.1 Conclusions
GHD was commissioned by Defence to undertake intrusive site investigations at targeted areas across DNSDC Moorebank. The works were completed following the findings of the data gap analysis (GHD, 2014) which identified areas of potential concern where previous site investigation data was either missing or incomplete.
With respect to the overall objectives of the investigation, GHD completed a program of intrusive soil and groundwater sampling to close the identified data gaps and enable the preparation of this report documenting the findings of the works and providing recommendations for management actions or remedial works as required.
11.1.1 Summary analytical data and areas of potential concern
Based on the findings of the site works completed to date, and with reference to the limitations outlined in Section 13, the following conclusions are made:
The findings of the data gap analysis (GHD, 2014) identified a number of areas ofpotential concern across the site including underground and above ground fuel storageinfrastructure, chemical use and storage at various locations across the site, formergeneral maintenance operations and potential for spills, indoor firing range, buriedmaterials and potential for UXO in the southern burial pits and the former rail siding withinthe southern portion of the site.
Soil and groundwater analytical data was generally found to be consistent with thatreported in previous investigations. Detections of some contaminants of potentialconcern, including TRH, PAH VOCs and AFFF compounds were noted in soils andgroundwater at some locations, however concentrations were typically low and, with thefollowing notable exceptions:
– Elevated concentrations of hydrocarbons in soil and groundwater in the vicinity of therefuelling area and the presence of LNAPL at several locations in the south westernportion of the site, including two off-site locations (refer to Figure 6, Appendix A). Atthe time of preparation of this report further works were in progress to delineate theextent of the LNAPL impact and the results of these investigations will be reportedunder a separate cover.
– Elevated concentrations of lead were reported in shallow soils from a depth ofapproximately 0.7-0.8 metres in one location adjacent to the rail spur (TP062),corresponding with field observations of a white, waxy material. The extent of theimpact appeared to be limited both vertically and horizontally and the material was notencountered at any other test pit locations across the site (refer to Figure 6,Appendix A).
– Fragments of ACM were noted on the ground surface and shallow soils at severallocations within the southern burial pits and adjacent to the rail spur (refer to Figure 6,Appendix A). The potential for widespread presence of ACM on the surface acrossthis portion of the site can not be discounted.
56 | GHD | Report for Department of Defence - DNSDC Moorebank, 21/24133
12. References ANZECC (2000) Australian and New Zealand Guidelines for Fresh and Marine Water Quality,Australian and New Zealand Environment and Conservation Council.
Australian Standard AS4482.1 (2005) Australian Standard Guide to the Sampling and Investigation of Potentially Contaminated Soil - Part 1: Non-volatile and semi-volatile substances.
Australian Standard AS4482.2 (1999) Australian Standard Guide to the Sampling and Investigation of Potentially Contaminated Soil - Part 2: Volatile substances.
Australian Standard AS 1726 (1993) Geotechnical Site Investigations.
Contaminated Land Management Act (CLM Act) 1997.
Contamination Management (2000) Moorebank Defence Lands – Stage 1 Preliminary Site Investigation – Summary Site Audit Report.
Dallas, M. & Steele, D. (2004) Aboriginal Archaeological Survey of Department of Defence Lands at Defence Lands at Moorebank. Report to GHD on behalf of Department of Defence.
DEC (2006) Contaminated Sites: Guidelines for the NSW Site Auditor Scheme (2nd Edition), Department of Environment and Conservation, Sydney NSW.
Department of Conservation and Land Management (1989) 1:100,000 Soil Landscape Series Sheet, 9030, Penrith. Department of Conservation and Land Management, Sydney NSW.
DECC (2009) Contaminated Sites: Guidelines on the Duty to Report Contamination under the Contaminated Land Management Act 1997, Department of Environment and Climate Change.
Department of Defence (2010) Guidelines for Consideration of Sustainability in Remediation of Contaminated Sites. Department of Defence.
Department of Environment and Climate Change (DECC), Contaminated Sites: Guidelines on the Duty to Report Contamination under the Contaminated Land Management Act 1997, 2009.
NSW DECCW (2009) Waste Classification Guidelines Part 1 Classifying Waste
Department of Land and Water Conservation (1997) 1:25,000 Acid Sulfate Soil Risk Map – Liverpool. Department of Land and Water Conservation, Sydney NSW.
Department of Water Resources (1987) Groundwater in New South Wales, Assessment of Pollution Risk. Department of Water Resources, Sydney NSW.
Egis Consulting Australia (2000) Moorebank Defence Lands Preliminary Site Investigations – Stage 1, August 2000.
Environmental Planning and Assessment Act (EPA Act) 1979
EPA (1995) Contaminated Sites: Sampling Design Guidelines.
Environment Protection and Biodiversity Conservation Act (EPBC Act) 1999.
EPA (2011) Contaminated Sites: Guidelines for Consultants Reporting on Contaminated Sites,NSW Environmental Protection Authority.
GHD (2005) Summary of Environmental Planning reports – proposed Inter-modal Freight Hub, Moorebank.
GHD (2011) Stage 1 Environmental Investigation – Holsworthy Barracks and Ranges. (Ref: 22/15904/95649)
58 | GHD | Report for Department of Defence - DNSDC Moorebank, 21/24133
13. LimitationsThis report: has been prepared by GHD for the Department of Defence (Defence) and may only be used and relied on by Defence for the purpose agreed between GHD and the Defence as set out in Section 0 of this report.
GHD otherwise disclaims responsibility to any person other than Defence arising in connection with this report. GHD also excludes implied warranties and conditions, to the extent legally permissible.
The services undertaken by GHD in connection with preparing this report were limited to those specifically detailed in the report and are subject to the scope limitations set out in the report.
The opinions, conclusions and any recommendations in this report are based on conditions encountered and information reviewed at the date of preparation of the report. GHD has no responsibility or obligation to update this report to account for events or changes occurring subsequent to the date that the report was prepared.
The opinions, conclusions and any recommendations in this report are based on information obtained from, and testing undertaken at or in connection with, specific sample points. Site conditions at other parts of the site may be different from the site conditions found at the specific sample points.Investigations undertaken in respect of this report are constrained by the particular site conditions, such as the location of buildings, services and vegetation. As a result, not all relevant site features and conditions may have been identified in this report.
Site conditions (including the presence of hazardous substances and/or site contamination) may change after the date of this Report. GHD does not accept responsibility arising from, or in connection with, any change to the site conditions. GHD is also not responsible for updating this report if the site conditions change.
GHD has prepared this report on the basis of information provided by Defence and others who provided information to GHD (including Government authorities), which GHD has not independently verified or checked beyond the agreed scope of work. GHD does not accept liability in connection with such unverified information, including errors and omissions in the report which were caused by errors or omissions in that information.
Except as otherwise expressly stated in this Report GHD makes no warranty or representation as to the presence or otherwise of asbestos and/or asbestos containing materials (“ACM”) on the site. If fill material has been imported on to the site at any time, or if any buildings constructed prior to the prohibition date of asbestos in Australia, 31 December 2003, have been demolished on the site or material from such buildings disposed of on the site, the site may contain asbestos or ACM.
GHD | Report for Department of Defence - DNSDC Moorebank, 21/24133
Appendices
60 | GHD | Report for Department of Defence - DNSDC Moorebank, 21/24133
Appendix A - Figures
62 | GHD | Report for Department of Defence - DNSDC Moorebank, 21/24133
Appendix C – Summary results tables
64 | GHD | Report for Department of Defence - DNSDC Moorebank, 21/24133
Appendix E - Logs
66 | GHD | Report for Department of Defence - DNSDC Moorebank, 21/24133
Appendix G – Site Audit Statement Memo
www.ghd.com
Good afternoon Matthew
As discussed, please find attached report for Draft DNSDC (text version only). Due to the size of the appendix i am unable to send the complete document via email at this point and I understand Defence is not able to access files via our large file transfer. I am just speaking with admin at the moment about compressing the file so you can receive the appendix. If this does not work, I can split the document but essentially the text, figures and data tables are the key elements for your review.
I will send through LNAPL gauging results from yesterday shortly – just wanted to get this one out to you first.
Kind Regards
Jacqui
Jacqui Hallchurch Principal Environmental Scientist
Service Group Manager – Contamination and Environmental Management
Please note I work Mondays, Tuesdays, Wednesdays and Fridays only.
GHD
Water | Energy & Resources | Environment | Property & Buildings | Transportation
Please consider the environment before printing this email
section 22section 22
Good afternoon Matthew and team
Just a quick note to let you know that the fuel removal at DNSDC was completed this afternoon and the guys have emptied the remaining liquids / wastes which were present within the six tanks in the refuelling area.
One additional point to note is that we have identified that the cathode wells which were installed within the tank pit (10 in total) appear to be constructed with asbestos containing materials. We have collected a sample of this to confirm at the lab. This is something to be aware of in relation to the management of this infrastructure and in particular during future remedial works. I have attached a couple of photographs for your reference of the cathode wells in the tank pits and the suspected ACM.
I will be in the office on Monday if there is any further information or detail you need at this stage. I will send through the report from the contractor with waste disposal documentation as soon as I receive this.
Kind Regards
jacqui
Jacqui Hallchurch Principal Environmental Scientist
Service Group Manager – Contamination and Environmental Management
Please note I work Mondays, Tuesdays, Wednesdays and Fridays only.
GHD
Water | Energy & Resources | Environment | Property & Buildings | Transportation
Please consider the environment before printing this email
communications through their networks._____________________
section 22section 22
UUNCLASSIFIED
Mathew,
Both statements are correct. In addition no intrusive earthworks have been conducted in the burial pit area or anywhere else on site in terms of asbestos remediation.
Asbestos containing material (ACM) and associated debris was removed between 2012 and 2013 in specific buildings on site as previously advised and the ground surface only.
Regards,
Piers MillnerNNSW Hazards Management & Assurance OfficerEstate & Infrastructure GroupDefence Support Operations
From: Ryan, Matthew MR 19 Sent: Friday, 7 August 2015 11:34 To: millner, piers MR Cc: Pearce, Vicki MISS 1; Fritz, Jurgen MR; Holcroft, Lorraine MS; Bennett, Bruce MR 2; 'Misko, Marko'; Kolano, Robert MR Subject: DNSDC Draft Report [SEC=UNCLASSIFIED]
UNCLASSIFIED
Piers,
My confusing voice message refers.
As you are aware, we are investigating our Makegood obligations in preparation of the break lease at the DNSDC site at Moorebank.GHD have prepared a large report on issues we had to address to provide evidence to the Landlord, that we have complied with actions raised under the 2002 NSW EPA Site Audit Statement recommendations.Yesterday Vicki Pearce from EE Branch and myself held a conference call with our lawyers Clayton Utz to discuss the draft report before we send it to the landlord.We have a conference call with GHD booked for next Tuesday 11 August 2015 to advise of some final amendments we require.This report address all issue apart from the POL area issue which will be reported under separate advice.
In the attached report extract under Points 8 and 9 GHD have made comments as follows:
8-"GHD is aware of Defence overall policy for the management of asbestos across its portfolio. It is understood this would be applied to any works which had been undertaken on the site.9-As noted above, GHD is aware of Defence overall policy for the management ofasbestos across its portfolio. It is understood this would be applied to any workswhich had been undertaken on the site. However, it is understood that no remedialworks have been undertaken in this area of the site to date and as such,management of asbestos impacted materials would not have been required."
section 22
We though it prudent to check with yourself if these words are a suitable reflection of our position before sending them to the landlord.Could you please review and advise if we are ok to send these words, alternatively any direction we can relay back to GHD to amend their report would be appreciated.
If this could be done by COB Monday 10 August 2015. it would enable us to advise GHD in our conference call Tuesday.
Happy to discuss.
Regards
Matthew Ryan A/ Assistant Director Property LeasingInfrastructure Division Department of DefenceBP26-GF- A029PO Box 7925CANBERRA BC ACT 2610section 22section 22
Insp
ectio
n da
tApr
-14
Surv
eyor
: Dam
ien
Ben
bow
Dat
e As
sess
edB
ase
IDBu
ildin
g id
entif
icat
ion
Room
or
Spac
eFl
oor I
DPr
imar
y Lo
catio
nSe
cond
ary
Loca
tion
Mat
eria
lAp
plic
atio
nSu
rface
tr
eatm
ent
ACM
Typ
eQ
uant
ityQ
uant
ity
Type
Cond
ition
Sam
ple
IDLa
b Re
sults
Risk
Ra
ting
Like
lihoo
d of
di
stur
banc
eCo
ntro
lLa
belli
ngPh
oto
IDCo
mm
ent
Build
ing
3001
/D00
1- H
eadq
uarte
r bui
ldin
g DN
SDC
Asb
esto
s D
etec
ted
25/0
3/14
3001
DN
SDC
- M
oore
bank
NSW
D00
1 H
eadq
uarte
r Bu
ildin
g - D
NSD
CEx
tern
alG
FEa
ster
n si
deG
roun
d
GH
D 2
012:
Vis
ual i
nspe
ctio
n fo
r the
pre
senc
e of
fibr
e ce
men
t deb
ris
hind
ered
by
the
pres
ence
of w
ood
chip
. Deb
ris p
resu
med
to re
mai
n un
der w
oodc
hip.
PB
2013
A v
isua
l ins
pect
ion
of th
e ar
ea w
as
carr
ied
out a
nd n
o AC
M fr
agm
ents
wer
e lo
cate
d. C
onsi
dera
ble
amou
nt o
f mul
ch a
nd le
af d
ebris
was
not
ed. P
B 20
14: V
isua
l in
spec
tion
of th
e ar
ea c
ondu
cted
and
no
ACM
frag
men
ts lo
cate
d.
25/0
3/14
3001
DN
SDC
- M
oore
bank
NSW
D00
1 H
eadq
uarte
r Bu
ildin
g - D
NSD
CIn
tern
alG
FPl
ant r
oom
Flue
to b
oile
r M
ould
ed fi
bre
cem
ent
Flue
pip
e Se
aled
Non
-Fr
iabl
e10
LmG
ood
3001
/MG
/D01
/00
1
Chr
ysot
ile a
nd
Amos
ite
dete
cted
Low
Low
Mon
itor
A1
GH
D 2
012:
Upd
ated
labe
ls. C
ould
not
loca
te p
ipe
on le
vel t
wo.
PB
2013
ACM
stil
l pre
sent
, con
ditio
n un
chan
ged.
PB
2014
: AC
M
still
pres
ent,
cond
ition
unc
hang
ed
25/0
3/14
3001
DN
SDC
- M
oore
bank
NSW
D00
1 H
eadq
uarte
r Bu
ildin
g - D
NSD
CEx
tern
alG
FSo
uth
elev
atio
nIn
gro
und
Mou
lded
fibr
e ce
men
Serv
ice
pit
Uns
eale
dN
on-fr
iabl
e<1
m2
Poor
3001
/D00
1/14
/A1
Chr
ysot
ile
dete
cted
Med
ium
Hig
hR
emov
eN
/A57
57PB
201
4: N
ot n
oted
in p
revi
ous
surv
ey, a
djac
ent t
raffi
cabl
e ar
ea.
GPS
refe
renc
e: -3
360
2975
000
150.
7944
1500
0
25/0
3/14
3001
DN
SDC
- M
oore
bank
NSW
D00
1 H
eadq
uarte
r Bu
ildin
g - D
NSD
CIn
tern
alG
FSo
uth
entry
Wea
pons
dis
play
Wov
en m
ater
ial
Insu
latio
nU
nsea
led
Non
-fria
ble
<1m
2Fa
irVi
sual
O
bser
vatio
nPr
esum
edLo
wLo
wLe
ave
and
Mai
ntai
nA
5756
PB 2
014:
Not
not
ed in
pre
viou
s su
rvey
. Inf
orm
ed b
y st
aff t
here
is
likel
y AC
M c
ompo
nent
s to
orig
inal
par
ts o
f mac
hine
gun
on
disp
lay.
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D00
1 H
eadq
uarte
r Bu
ildin
g - D
NSD
CIn
tern
alG
F / 1
Fire
hyd
rant
cup
boar
dFl
oor c
over
ing
Viny
l tile
s03
67/3
001/
D00
1/A
YO64
6
No
asbe
stos
fib
res
dete
cted
PB 2
014:
Dat
a ad
ded
from
DC
T.
Rem
oved
Asb
esto
s
25/0
3/14
3001
DN
SDC
- M
oore
bank
NSW
D00
1 H
eadq
uarte
r Bu
ildin
g - D
NSD
CIn
tern
alG
FPl
ant r
oom
Elec
trica
l duc
t hea
ters
Susp
ect m
illboa
rd
Insu
latio
n lin
ing
Unk
now
nFr
iabl
eN
QVi
sual
O
bser
vatio
n Su
spec
t AC
M
GH
D 2
012:
Cle
aran
ce c
ertif
icat
e si
ghte
d by
GH
D 1
8-5-
11, c
ertif
icat
e D
NSD
C B
uild
ing
62 E
DH
s da
ted
7/03
/11.
Dur
ing
the
surv
ey 2
ED
Hs
obse
rved
in th
e G
F pl
ant r
oom
. The
es
cort
stat
ed th
e ite
ms
have
all
been
rem
oved
. With
the
clea
ranc
e ce
rtific
ates
pro
vide
d G
HD
pre
sum
e ite
ms
have
bee
n re
mov
ed
how
ever
loca
tion
desc
riptio
n in
the
certi
ficat
e is
vag
ue a
nd b
uild
ing
id is
wro
ng. F
urth
er in
form
atio
n is
requ
ired
in o
rder
to c
onfir
m
rem
oval
. PB
2014
Una
ble
to c
onfir
m re
mov
al o
f ACM
Build
ing
3001
/D00
2- G
ateh
ouse
Sou
th D
NSDC
Asb
esto
s D
etec
ted
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D00
2 G
ateh
ouse
So
uth
- DN
SDC
In
tern
al /
Exte
rnal
GF
Gat
ehou
seIn
tern
al c
eilin
g an
d ex
tern
al
soffi
t lin
ings
Fibr
e ce
men
t she
et
Lini
ng
Seal
edN
on-
Fria
ble
15m
2G
ood
3001
/D00
2/M
G/0
03
Chr
ysot
ile a
nd
Amos
ite
dete
cted
Low
Low
Leav
e an
d m
aint
ain
A2
Upd
ated
labe
ls. P
aint
ed a
dar
k be
ige.
Fla
t roo
f the
refo
re n
o ro
of
cavi
ty.
PB 2
013
AC
M s
till p
rese
nt.
Con
ditio
n ge
nera
lly
unch
ange
d, h
owev
er m
ovin
g to
war
ds fa
ir co
nditi
on.
Mou
ld
grow
th n
oted
to s
offit
lini
ngs
alon
g ea
st s
ide
of b
uild
ing.
PB
2014
AC
M s
till p
rese
nt c
ondi
tion
unch
ange
d
No
Asb
esto
s D
etec
ted
/ ina
cces
sibl
e ar
eas
3001
DN
SDC
- M
oore
bank
NSW
D00
2 G
ateh
ouse
So
uth
- DN
SDC
Ex
tern
alG
FEx
tern
al: B
uild
ing
Nor
ther
n an
d ea
ster
n ea
veFi
bre
cem
ent s
heet
Li
ning
2
m2
3001
/D00
2/M
G/0
01
No
asbe
stos
fib
res
dete
cted
Pain
ted
whi
te, u
nlik
ely
to b
e as
best
os
3001
DN
SDC
- M
oore
bank
NSW
D00
2 G
ateh
ouse
So
uth
- DN
SDC
In
tern
alG
FG
roun
dFl
oor t
iles
Viny
l tile
s Fl
oor t
iling
6m
230
01/D
002/
MG
/002
No
asbe
stos
fib
res
dete
cted
Dar
k cr
eam
with
whi
te s
treak
s
3001
DN
SDC
- M
oore
bank
NSW
D00
2 G
ateh
ouse
So
uth
- DN
SDC
In
tern
alG
FN
orth
eas
tern
cor
ner
Dis
tribu
tion
boar
d N
o bo
ard
obse
rved
beh
ind
met
al p
anel
s
Build
ing
3001
/D00
3- S
ecur
ity P
ost D
NSDC
No
Asb
esto
s D
etec
ted
No
visi
ble,
acc
essi
ble
asbe
stos
con
tain
ing
mat
eria
ls w
ere
loca
ted
in th
is b
uild
ing
at th
e tim
e of
the
insp
ectio
n
3001
DN
SDC
- M
oore
bank
NSW
D00
3 Se
curit
y Po
st
Inte
rnal
/ Ex
tern
al N
o as
best
os w
as d
etec
ted
in th
is b
uild
ing
/ stru
ctur
e
Build
ing
3001
/D00
4 DN
SDC
Partr
idge
Clu
b/ G
ymna
sium
Asb
esto
s D
etec
ted
25/0
3/14
3001
DN
SDC
- M
oore
bank
NSW
D00
4 D
NSD
C
Partr
idge
Clu
b /
Gym
nasi
um
Exte
rnal
GF
Betw
een
Build
ings
4 &
5G
roun
dFi
bre
cem
ent d
ebris
Deb
ris
Unk
now
nN
on-
Fria
ble
<1m
2Po
or03
67/3
001/
D4/
AYO
596
Asbe
stos
pr
esen
tM
ediu
mM
ediu
mR
emov
eN
/APB
201
4: D
ata
adde
d fro
m D
CT,
con
tinue
mon
itorin
g.
No
Asb
esto
s D
etec
ted
No
visi
ble,
acc
essi
ble
asbe
stos
con
tain
ing
mat
eria
ls w
ere
loca
ted
in th
is b
uild
ing
at th
e tim
e of
the
insp
ectio
n
3001
DN
SDC
- M
oore
bank
NSW
D00
4 D
NSD
C
Partr
idge
Clu
b /
Gym
nasi
um
Inte
rnal
GF
Sout
h ea
st s
ide
of
build
ing
Inte
rnal
: am
eniti
es &
lock
er
room
Fi
bre
cem
ent s
heet
Pa
rtitio
n w
all
12m
230
01/D
002/
MG
/001
No
asbe
stos
fib
res
dete
cted
On
show
ers
and
toile
ts
3001
DN
SDC
- M
oore
bank
NSW
D00
4 D
NSD
C
Partr
idge
Clu
b /
Gym
nasi
um
Inte
rnal
GF
Sout
h ea
st s
ide
of
build
ing
Inte
rnal
: am
eniti
es &
lock
er
room
Fi
bre
cem
ent s
heet
W
all l
inin
g 30
m2
3001
/D00
2/M
G/0
02
No
asbe
stos
fib
res
dete
cted
Upp
er w
alls
, lik
ely
behi
nd ti
les
Bui
ldin
g 30
01/D
005
Def
Cre
dit
Asb
esto
s D
etec
ted
Non
Asb
esto
s co
ntai
ning
mat
eria
l ide
ntifi
ed d
urin
g th
e 20
14 in
spec
tion
not p
revi
ousl
y id
entif
ied
Site
Loc
atio
n: D
NSD
C B
ase
Num
ber 3
001-
Moo
reba
nk N
SW
Asbe
stos
con
tain
ing
mat
eria
l ide
ntifi
ed d
urin
g th
e 20
14 re
insp
ectio
n no
t pre
viou
sly
iden
tifie
d
Insp
ectio
n da
tApr
-14
Surv
eyor
: Dam
ien
Ben
bow
Dat
e As
sess
edB
ase
IDBu
ildin
g id
entif
icat
ion
Room
or
Spac
eFl
oor I
DPr
imar
y Lo
catio
nSe
cond
ary
Loca
tion
Mat
eria
lAp
plic
atio
nSu
rface
tr
eatm
ent
ACM
Typ
eQ
uant
ityQ
uant
ity
Type
Cond
ition
Sam
ple
IDLa
b Re
sults
Risk
Ra
ting
Like
lihoo
d of
di
stur
banc
eCo
ntro
lLa
belli
ngPh
oto
IDCo
mm
ent
Non
Asb
esto
s co
ntai
ning
mat
eria
l ide
ntifi
ed d
urin
g th
e 20
14 in
spec
tion
not p
revi
ousl
y id
entif
ied
Site
Loc
atio
n: D
NSD
C B
ase
Num
ber 3
001-
Moo
reba
nk N
SW
Asbe
stos
con
tain
ing
mat
eria
l ide
ntifi
ed d
urin
g th
e 20
14 re
insp
ectio
n no
t pre
viou
sly
iden
tifie
d
25/0
3/14
3001
DN
SDC
- M
oore
bank
NSW
D00
5 D
ef c
redi
t Ex
tern
alG
FN
orth
sid
eG
roun
dFi
bre
cem
ent d
ebris
Deb
ris
Seal
edN
on-
Fria
ble
3te
mPo
or30
01/D
005/
MG
/002
Chr
ysot
ile a
nd
Amos
ite
dete
cted
Med
ium
Med
ium
Leav
e an
d m
aint
ain
N/A
3
Unk
now
n so
urce
. PB
201
3 G
roun
d de
bris
pro
gram
med
to b
e re
mov
ed 2
013.
PB
2014
: A v
isua
l ins
pect
ion
of th
e ar
ea w
as
cond
ucte
d an
d no
AC
M fr
agm
ents
wer
e fo
und.
Cle
aran
ce c
ertif
icat
e re
qurie
d
No
Asb
esto
s D
etec
ted
/ ina
cces
sibl
e ar
eas
3001
DN
SDC
- M
oore
bank
NSW
D00
5 D
ef c
redi
t Ex
tern
alG
FAl
l fac
esW
alls
Fibr
e ce
men
t she
et
Lini
ng12
5m
230
01/D
005/
MG
/001
No
asbe
stos
fib
res
dete
cted
Som
e ho
les
and
dam
age
thro
ugho
ut s
urfa
ce. G
HD
info
rmed
by
POC
that
bui
ldin
g ha
d re
cent
ly un
derg
one
a co
mpl
ete
inte
rnal
re
furb
ishm
ent.
3001
DN
SDC
- M
oore
bank
NSW
D00
5 D
ef c
redi
t Ex
tern
alG
FAl
l fac
esEa
ves
Fibr
e ce
men
t she
et
Lini
ng8
m2
Ref
er to
30
01/D
005/
MG
/001
No
asbe
stos
fib
res
dete
cted
Pain
ted
light
vio
let
25/0
3/14
3001
DN
SDC
- M
oore
bank
NSW
D00
5 D
ef c
redi
t In
tern
alG
FC
eilin
g sp
ace
Asbe
stos
pr
esum
edN
o ac
cess
bey
ond
fals
e ce
iling,
cou
ld n
ot a
cces
s m
an h
ole
thro
ugh
fals
e ce
iling
Bui
ldin
g 30
01/D
006
Cam
p Ea
rmar
k
Asb
esto
s D
etec
ted
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D00
6 C
amp
Earm
ark
- D
NSD
CEx
tern
alG
FM
id e
ast a
rea
of b
uild
ing
adja
cent
to D
oor 5
Exte
rnal
: With
in g
rass
ed
area
, cab
le p
it
Fibr
e ce
men
t deb
ris
Pit l
inin
g U
nsea
led
Non
-Fr
iabl
e<1
m2
Fair
3001
/D00
6/M
G/0
04
Chr
ysot
ile
Det
ecte
dH
igh
Hig
hR
emov
eN
/A58
51
Like
ly to
be
dist
urbe
d by
law
n m
aint
enan
ce.
PB 2
013
ACM
stil
l pr
esen
t, co
nditi
on u
ncha
nged
. PB
2014
: C
ondi
tion
poor
; re
com
men
d re
mov
al. G
PS re
fere
nce:
-33.
9492
8800
0 15
092
9170
000
1/05
/14
3001
DN
SDC
- M
oore
bank
NSW
D00
6 C
amp
Earm
ark
- D
NSD
CIn
tern
alG
FSo
uth
wes
t cor
ner o
f bu
ildin
gSe
cond
tim
ber b
eam
nea
r ro
of li
ning
Fibr
e ce
men
t deb
ris
Deb
ris
Uns
eale
dN
on-
Fria
ble
1te
mPo
or30
01/D
006/
MG
/008
Chr
ysot
ile
Det
ecte
dH
igh
Low
Rem
ove
N/A
Like
ly a
resu
lt of
poo
r rem
oval
of f
orm
er a
sbes
tos
roof
and
wal
ls,
appr
oxim
atel
y 1
debr
is n
oted
on
uppe
r bea
ms
thro
ugho
ut th
e bu
ildin
g. B
uild
ing
is d
usty
. Deb
ris to
be
rem
oved
in la
te 2
012.
PB
2013
Abo
ve h
eigh
t res
trict
ions
. Un
able
to c
onfir
m re
mov
al o
f de
bris
, pre
sum
e st
ill p
rese
nt. P
B 20
14: A
vis
ual i
nspe
ctio
n of
se
vera
l bea
ms
was
con
duct
ed a
nd n
o AC
M w
as fo
und.
AC
M m
ay
rem
ain
in in
acce
ssib
le a
reas
, cle
aran
ce c
ertif
icat
e re
quire
d fo
r co
nfirm
atio
n
Rem
oved
Asb
esto
s
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D00
6 C
amp
Earm
ark
- D
NSD
CEx
tern
alG
FSo
uth
wes
t cor
ner o
f bu
ildin
gEx
tern
al: W
ithin
gra
ssed
are
a Fi
bre
cem
ent d
ebris
D
ebris
U
nsea
led
Non
-Fr
iabl
e>6
tem
Goo
d30
01/D
006/
MG
/001
Chr
ysot
ile
Det
ecte
dLo
wLo
wM
onito
rN
/A
Unk
now
n so
urce
, lik
ely
to b
e di
stur
bed
by la
wn
mai
nten
ance
. PB
2013
Gro
und
debr
is to
be
rem
oved
201
3. T
his
area
sho
uld
be
insp
ecte
d pe
riodi
cally
due
to th
e te
nden
cy fo
r fra
gmen
ts to
m
igra
te to
the
surf
ace.
PB
2014
: A v
isua
l ins
pect
ion
of th
e ar
ea
was
con
duct
ed a
nd n
o AC
M fr
agm
ents
wer
e fo
und.
Con
tinue
m
onito
ring
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D00
6 C
amp
Earm
ark
- D
NSD
CEx
tern
alG
FM
id s
outh
are
a of
bu
ildin
gEx
tern
al: W
ithin
gra
ssed
ar
ea, e
ast s
ide
of d
rivew
ay
Fibr
e ce
men
t deb
ris
Deb
ris
Uns
eale
dN
onFr
iabl
eAp
prox
. 4te
mG
ood
Ref
er to
30
01/D
006/
MG
/001
Chr
ysot
ile
Det
ecte
dLo
wLo
wM
onito
rN
/A
Parti
ally
burie
d, u
nkno
wn
sour
ce, l
ikel
y to
be
dist
urbe
d by
law
n m
aint
enan
ce.
PB 2
013
Gro
und
debr
is to
be
rem
oved
201
3.
This
are
a sh
ould
be
insp
ecte
d pe
riodi
cally
due
to th
e te
nden
cy
for f
ragm
ents
to m
igra
te to
the
surfa
ce. P
B 20
14: A
vis
ual
insp
ectio
n of
the
area
was
con
duct
ed a
nd n
o AC
M fr
agm
ents
wer
e fo
und.
Con
tinue
mon
itorin
g.
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D00
6 C
amp
Earm
ark
- D
NSD
CEx
tern
alG
FEa
st a
rea
of b
uild
ing
Exte
rnal
: With
in g
rass
ed
area
, up
agai
nst b
uild
ing
slab
Fi
bre
cem
ent d
ebris
D
ebris
U
nsea
led
Non
Fria
ble
Appr
ox. 5
tem
Goo
dR
efer
to
3001
/D00
6/M
G/0
01
Chr
ysot
ile
Det
ecte
dLo
wLo
wM
onito
rN
/A
Parti
ally
burie
d, u
nkno
wn
sour
ce, l
ikel
y to
be
dist
urbe
d by
law
n m
aint
enan
ce.
PB 2
013
Gro
und
debr
is re
mov
ed 2
013.
Con
tinue
m
onito
ring.
PB
2014
: A v
isua
l ins
pect
ion
of th
e ar
ea w
as
cond
ucte
d an
d no
AC
M fr
agm
ents
wer
e fo
und.
Rem
oval
wor
k co
nduc
ted
in 2
013,
refe
r to
"216
0918
A SA
DN
SDC
Cle
aran
ce B
LD
12 0
6 8
2.pd
f"
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D00
6 C
amp
Earm
ark
- D
NSD
CEx
tern
alG
FN
orth
are
a of
bui
ldin
gEx
tern
al: W
ithin
gra
ssed
ar
ea, e
ast o
f driv
eway
, bas
e of
tran
smis
sion
pol
e
Fibr
e ce
men
t deb
ris
Deb
ris
Uns
eale
dN
onFr
iabl
e1
tem
Goo
dR
efer
to
3001
/D00
6/M
G/0
01
Chr
ysot
ile
Det
ecte
dLo
wLo
wM
onito
rN
/A
Parti
ally
burie
d, u
nkno
wn
sour
ce, l
ikel
y to
be
dist
urbe
d by
law
n m
aint
enan
ce.
PB 2
013
Gro
und
debr
is re
mov
ed 2
013.
Con
tinue
m
onito
ring.
PB
2014
: A v
isua
l ins
pect
ion
of th
e ar
ea w
as
cond
ucte
d an
d no
AC
M fr
agm
ents
wer
e fo
und.
Rem
oval
wor
k co
nduc
ted
in 2
013,
refe
r to
"216
0918
A SA
DN
SDC
Cle
aran
ce B
LD
12 0
6 8
2.pd
f"
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D00
6 C
amp
Earm
ark
- D
NSD
CEx
tern
alG
FSo
uth
east
are
a of
bu
ildin
gEx
tern
al: W
ithin
gra
ssed
ar
ea, c
able
pit
Fi
bre
cem
ent d
ebris
Pi
t lin
ing
<1m
2Fa
ir30
01/D
006/
MG
/002
No
asbe
stos
fib
res
dete
cted
Like
ly to
be
dist
urbe
d by
law
n m
aint
enan
ce
3001
DN
SDC
- M
oore
bank
NSW
D00
6 C
amp
Earm
ark
- D
NSD
CEx
tern
alG
FEa
st a
rea
of b
uild
ing
Exte
rnal
: Dow
n pi
pe d
rain
age
pits
M
ould
ed c
emen
t Pr
oduc
t Pi
t lin
ing
8te
mFa
ir30
01/D
006/
MG
/003
No
asbe
stos
fib
res
dete
cted
Stor
mw
ater
pits
3001
DN
SDC
- M
oore
bank
NSW
D00
6 C
amp
Earm
ark
- D
NSD
CEx
tern
alG
FW
est a
rea
of b
uild
ing
Exte
rnal
: Dow
n pi
pe d
rain
age
pits
M
ould
ed c
emen
t Pr
oduc
t Pi
t lin
ing
8te
mFa
ir R
efer
to
3001
/D00
6/M
G/0
03
No
asbe
stos
fib
res
dete
cted
Stor
mw
ater
pits
3001
DN
SDC
- M
oore
bank
NSW
D00
6 C
amp
Earm
ark
- D
NSD
CIn
tern
alG
FN
orth
wes
t cor
ner o
ffice
Exte
rnal
: Offi
ce w
alls
Fi
bre
cem
ent s
heet
W
all l
inin
g 15
m2
Goo
d30
01/D
006/
MG
/005
No
asbe
stos
fib
res
dete
cted
Pain
ted
crea
m, i
nter
nals
are
pla
ster
Bui
ldin
g 30
01/D
007
War
ehou
se B
ulk
Heav
y
Asb
esto
s D
etec
ted
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D00
7 W
areh
ouse
Bu
lk H
eavy
- D
NSD
C
Exte
rnal
GF
Fron
t of b
uild
ing,
sou
th,
north
and
eas
tern
sid
esG
roun
d Fi
bre
cem
ent D
ebris
Deb
ris
Uns
eale
dN
on-
Fria
ble
>10
tem
Poor
3001
/D00
7/M
G/0
01C
hrys
otile
D
etec
ted
Low
Low
Mon
itor
N/A
Maj
ority
pre
sent
und
er b
uild
ing
drip
line
, som
e fra
gmen
ts m
ould
ed
othe
rs w
ere
flat.
Like
ly to
exp
erie
nce
dist
urba
nce
durin
g la
wn
mai
nten
ance
. PB
201
3 G
roun
d de
bris
rem
oved
201
3.
Cont
inue
mon
itorin
g. P
B 20
14: A
vis
ual i
nspe
ctio
n of
the
area
was
co
nduc
ted
and
no A
CM
frag
men
ts w
ere
foun
d. C
lear
ance
cer
tific
ate
requ
ired
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D00
7 W
areh
ouse
Bu
lk H
eavy
- D
NSD
C
Exte
rnal
GF
Sout
h w
este
rn c
orne
r of
build
ing
Elec
trica
l cab
le p
itM
ould
ed c
emen
t Pr
oduc
t Pi
t lin
ing
Uns
eale
dN
on-
Fria
ble
<1te
mPo
or30
01/D
007/
MG
/003
Chr
ysot
ile
Det
ecte
dM
ediu
mM
ediu
mR
emov
eN
/A58
50
Som
e da
mag
e pr
esen
t on
pit.
PB
2013
ACM
pre
sent
. Ex
tens
ive
dam
age
note
d to
in g
roun
d se
rvic
e pi
t. PB
201
4: A
CM
stil
l pr
esen
t, co
nditi
on u
ncha
nged
. GPS
refe
renc
e: -3
394
9288
000
150
9291
7000
0
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D00
7 W
areh
ouse
Bu
lk H
eavy
- D
NSD
C
Inte
rnal
/ Ex
tern
alG
FPi
tche
d ro
ofEa
ve li
ning
sFi
bre
cem
ent s
heet
Eave
s lin
ing
Uns
eale
dN
on-
Fria
ble
70m
2Fa
ir30
01/D
007/
MG
/006
Chr
ysot
ile
Det
ecte
dLo
wLo
wLe
ave
and
mai
ntai
nR
5873
Mix
ture
of n
ew a
nd o
ld p
anel
s. E
aves
wer
e se
aled
with
a P
VA
solu
tion
durin
g as
best
os re
mov
al w
ork
in A
pril
2012
. PB
201
3
Eave
s en
caps
ulat
ed e
xter
nally
with
met
al c
ladd
ing.
PB
2014
: U
nabl
e to
con
firm
the
pres
ence
of A
CM
, pre
sum
ed to
rem
ain
3001
DN
SDC
- M
oore
bank
NSW
D00
7 W
areh
ouse
Bu
lk H
eavy
- D
NSD
C
Inte
rnal
GF
All s
ides
of b
uild
ing
Fire
doo
rIn
sula
tion
Fire
doo
r Se
aled
Fria
ble
8te
mG
ood
Visu
al
Obs
erva
tion
Asbe
stos
Pr
esum
edLo
wLo
wLe
ave
and
mai
ntai
n
PB 2
014:
Dat
a ad
ded
from
DC
T, c
ontin
ue m
onito
ring.
Insp
ectio
n da
tApr
-14
Surv
eyor
: Dam
ien
Ben
bow
Dat
e As
sess
edB
ase
IDBu
ildin
g id
entif
icat
ion
Room
or
Spac
eFl
oor I
DPr
imar
y Lo
catio
nSe
cond
ary
Loca
tion
Mat
eria
lAp
plic
atio
nSu
rface
tr
eatm
ent
ACM
Typ
eQ
uant
ityQ
uant
ity
Type
Cond
ition
Sam
ple
IDLa
b Re
sults
Risk
Ra
ting
Like
lihoo
d of
di
stur
banc
eCo
ntro
lLa
belli
ngPh
oto
IDCo
mm
ent
Non
Asb
esto
s co
ntai
ning
mat
eria
l ide
ntifi
ed d
urin
g th
e 20
14 in
spec
tion
not p
revi
ousl
y id
entif
ied
Site
Loc
atio
n: D
NSD
C B
ase
Num
ber 3
001-
Moo
reba
nk N
SW
Asbe
stos
con
tain
ing
mat
eria
l ide
ntifi
ed d
urin
g th
e 20
14 re
insp
ectio
n no
t pre
viou
sly
iden
tifie
d
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D00
7 W
areh
ouse
Bu
lk H
eavy
- D
NSD
C
Inte
rnal
GF
Sout
h ea
st c
orne
rLo
cate
d R
HS
of o
ffice
, be
twee
n tim
ber s
tudw
ork
and
fixed
alu
min
ium
louv
re
Mou
llded
fibr
e ce
men
t she
et
Lini
ng
Seal
edN
on-
Fria
ble
1m
2Fa
ir30
01/M
G/D
07/0
01
Chr
ysot
ile
Det
ecte
dLo
wLo
wLe
ave
and
mai
ntai
nA
5872
Seal
ed w
ith p
aint
dur
ing
asbe
stos
rem
oval
wor
ks A
pril
2012
. PB
20
13 A
CM s
till p
rese
nt, c
ondi
tion
unch
ange
d. P
B 20
14: A
CM
st
ill pr
esen
t co
nditi
on u
ncha
nged
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D00
7 W
areh
ouse
Bu
lk H
eavy
- D
NSD
C
Exte
rnal
GF
Sout
h ea
st c
orne
r of
build
ing
Offi
ce s
ub-fl
oor a
rea
Fibr
e ce
men
t she
etD
ebris
U
nsea
led
Non
-Fr
iabl
e<1
m2
Poor
N/A
Pres
umed
Med
ium
Low
Rem
ove
N/A
5849
PB 2
013
Unl
ikel
y to
be
dist
urbe
d du
e to
loca
tion
of d
ebris
. PB
2014
: AC
M s
till p
rese
nt, c
ondi
tion
unch
ange
d.
Rem
oved
Asb
esto
s
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D00
7 W
areh
ouse
Bu
lk H
eavy
- D
NSD
C
Inte
rnal
GF
Tow
ards
nor
th e
ast
corn
erD
ebris
of m
etal
bea
ms
and
eave
lini
ngs
Fibr
e ce
men
t deb
risD
ebris
U
nsea
led
Non
Fria
ble
> 8
tem
Poor
3001
/D00
7/M
G/0
07C
hrys
otile
D
etec
ted
Low
RN
/A
Like
ly a
resu
lt of
poo
r rem
oval
of f
orm
er a
sbes
tos
roof
and
wal
ls, >
8
debr
is n
oted
in p
artic
ular
are
as w
ith >
50
debr
is o
bser
ved
on u
pper
be
ams
thro
ugho
ut th
e bu
ildin
g. B
uild
ing
is d
usty
. Deb
ris re
mov
ed
in A
pril
2012
, how
ever
som
e m
ay s
till r
emai
n w
ithin
in
acce
ssib
le a
reas
. PB
2014
: AC
M m
ay s
till r
emai
n in
inac
cess
ible
ar
eas
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D00
7 W
areh
ouse
Bu
lk H
eavy
- D
NSD
C
Exte
rnal
GF
Nor
th a
nd s
outh
sid
es o
f bu
ildin
gD
own
pipe
dra
inag
e pi
tsM
ould
ed c
emen
t Pr
oduc
t Pi
t lin
ing
16te
m30
01/D
007/
MG
/002
No
asbe
stos
fib
res
dete
cted
Stor
m w
ater
dra
inag
e pi
ts
3001
DN
SDC
- M
oore
bank
NSW
D00
7 W
areh
ouse
Bu
lk H
eavy
- D
NSD
C
Inte
rnal
GF
Sout
h ea
st c
orne
r of
build
ing
Inte
rnal
: Offi
ces
Fibr
e ce
men
t she
et
Wal
l lin
ing
10m
230
01/D
007/
MG
/004
No
asbe
stos
fib
res
dete
cted
Pain
ted
crea
m
3001
DN
SDC
- M
oore
bank
NSW
D00
7 W
areh
ouse
Bu
lk H
eavy
- D
NSD
C
Inte
rnal
GF
Pitc
hed
roof
Nor
ther
n ea
ve li
ning
Fibr
e ce
men
t she
etEa
ves
linin
g 35
m2
Goo
d30
01/D
007/
MG
/005
No
asbe
stos
fib
res
dete
cted
Nor
ther
n ea
ve li
ning
onl
y
Bui
ldin
g 30
01/D
008
Form
er T
oile
t
Asb
esto
s D
etec
ted
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D00
8 Fo
rmer
To
ilet -
DN
SDC
Ex
tern
alG
FEa
ster
n si
deG
roun
d Fi
bre
cem
ent D
ebris
Deb
ris
Uns
eale
dN
on-
Fria
ble
1te
mG
ood
3001
/D00
8/M
G/0
01
Chr
ysot
ile
Amos
ite a
nd
croc
idol
ite
dete
cted
Low
Low
Mon
itor
N/A
Unk
now
n so
urce
. Lik
ely
mor
e pr
esen
t thr
ough
out g
rass
ed a
rea.
Li
kely
to e
xper
ienc
e di
stur
banc
e du
ring
law
n m
aint
enan
ce.
PB
2013
Gro
und
debr
is r
emov
ed 2
013.
Con
tinue
mon
itorin
g. P
B20
14: A
vis
ual i
nspe
ctio
n of
the
area
was
con
duct
ed a
nd n
o AC
M
fragm
ents
wer
e fo
und.
Cle
aran
ce c
ertif
icat
e re
quire
d.
Build
ing
3001
/D00
9 W
areh
ouse
Bul
k an
d Pl
ate
Stor
age
Asb
esto
s D
etec
ted
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D00
9 W
areh
ouse
Bu
lk a
nd P
late
St
orag
e
Exte
rnal
GF
Nor
th, s
outh
and
wes
t si
deG
roun
d Fi
bre
cem
ent D
ebris
Deb
ris
Uns
eale
dN
on-
Fria
ble
>10
tem
Goo
d30
01/D
009/
MG
/002
Chr
ysot
ile
Det
ecte
dLo
wLo
wM
onito
rN
/A
Unk
now
n so
urce
, deb
ris h
eavi
ly de
posi
ted
in N
W c
orne
r. Li
kely
to
expe
rienc
e di
stur
banc
e du
ring
law
n m
aint
enan
ce.
PB 2
013
G
roun
d de
bris
rem
oved
201
3. C
ontin
ue m
onito
ring.
PB
2014
: A
visu
al in
spec
tion
of th
e ar
ea w
as c
ondu
cted
and
no
ACM
frag
men
ts
wer
e fo
und.
Cle
aran
ce c
ertif
icat
e re
quire
d
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D00
9 W
areh
ouse
Bu
lk a
nd P
late
St
orag
e
Exte
rnal
GF
Nor
th w
est c
orne
r of
build
ing
Elec
trica
l cab
le p
itM
ould
ed fi
bre
cem
ent p
rodu
ctPi
t lin
ing
Uns
eale
dN
on-
Fria
ble
<1 m
2Po
or30
01/D
009/
MG
/003
Chr
ysot
ile
Det
ecte
dH
igh
Hig
hR
emov
eN
/A58
54
Like
ly to
exp
erie
nce
dist
urba
nce
durin
g la
wn
mai
nten
ance
. PB
20
13 A
CM s
till p
rese
nt, c
ondi
tion
unch
ange
d. P
B 20
14:
ACM
st
ill pr
esen
t, co
nditi
on p
oor.
Rec
omm
end
rem
oval
. GPS
refe
renc
e: -
3394
9288
000
150
9291
7000
0
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D00
9 W
areh
ouse
Bu
lk a
nd P
late
St
orag
e
Inte
rnal
GF
Nor
th e
ast c
orne
rLo
cate
d be
twee
n tim
ber
stud
wor
k an
d fix
ed a
lum
iniu
m
louv
reFi
bre
cem
ent s
heet
Li
ning
Se
aled
Non
-Fr
iabl
e1
m2
Fair
3001
/D00
9/M
G/0
05C
hrys
otile
D
etec
ted
Low
Low
Leav
e an
d m
aint
ain
A58
74
Seal
ed w
ith p
aint
dur
ing
asbe
stos
rem
oval
wor
ks A
pril
2012
. PB
20
13 A
CM s
till p
rese
nt, c
ondi
tion
unch
ange
d. P
B 20
14:
ACM
st
ill pr
esen
t, co
nditi
on u
ncha
nged
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D00
9 W
areh
ouse
Bu
lk a
nd P
late
St
orag
e
Exte
rnal
GF
Nor
th e
ast c
orne
r of
build
ing
Lunc
hroo
m s
ub-fl
oor a
rea
Fibr
e ce
men
t she
et
Deb
ris
Uns
eale
dN
on-
Fria
ble
2m
2Po
or30
01/D
009/
A01
Chr
ysot
ile
Det
ecte
dM
ediu
mLo
wR
emov
eN
/A58
53
PB 2
013
Con
side
rabl
e am
ount
of d
ebris
not
ed to
sub
-floo
r ar
ea.
Unlik
ely
to b
e di
stur
bed
due
to lo
catio
n of
deb
ris. P
B20
14:
ACM
stil
l pre
sent
, con
ditio
n un
chan
ged
3001
DN
SDC
- M
oore
bank
NSW
D00
9 W
areh
ouse
Bu
lk a
nd P
late
St
orag
e
Inte
rnal
GF
All s
ides
of b
uild
ing
Fire
doo
rIn
sula
tion
Fire
doo
r Se
aled
Fria
ble
8te
mG
ood
Visu
al
Obs
erva
tion
Asbe
stos
Pr
esum
edLo
wLo
wLe
ave
and
mai
ntai
n
PB 2
014
Dat
a ad
ded
from
DC
T, c
ontin
ue m
onito
ring.
Rem
oved
Asb
esto
s
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D00
9War
ehou
se
Bulk
Hea
vy -
DN
SDC
In
tern
alG
FM
id s
outh
eas
t por
tion
of b
uild
ing
Deb
ris o
f met
al b
eam
s an
d ea
ve li
ning
sFi
bre
cem
ent d
ebris
Deb
ris
Uns
eale
dN
onFr
iabl
e>
10te
mPo
or30
01/D
009/
MG
/006
Chr
ysot
ile
Det
ecte
dLo
wR
N/A
Like
ly a
resu
lt of
poo
r rem
oval
of f
orm
er a
sbes
tos
roof
and
wal
ls, >
10
deb
ris n
oted
in p
artic
ular
are
as w
ith >
50
debr
is o
bser
ved
on
uppe
r bea
ms
thro
ugho
ut th
e bu
ildin
g. B
uild
ing
is d
usty
. Deb
ris
rem
oved
in A
pril
2012
, how
ever
som
e m
ay s
till r
emai
n w
ithin
in
acce
ssib
le a
reas
. PB
2014
: Ite
m re
mov
ed in
201
2, re
fer t
o "1
8008
3_D
09.p
df".
Deb
ris m
ay s
till r
emai
n in
inac
cess
ible
are
as.
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D00
9 W
areh
ouse
Bu
lk a
nd P
late
St
orag
e
Exte
rnal
GF
Nor
th a
nd s
outh
sid
es
Dow
n pi
pe d
rain
age
pits
Mou
lded
fibr
e ce
men
t pro
duct
Pi
t lin
ing
16te
m30
01/D
009/
MG
/001
No
asbe
stos
fib
res
dete
cted
Stor
m w
ater
dra
inag
e pi
ts
3001
DN
SDC
- M
oore
bank
NSW
D00
9 W
areh
ouse
Bu
lk a
nd P
late
St
orag
e
Inte
rnal
GF
Nor
th e
ast c
orne
rIn
tern
al: O
ffice
s Fi
bre
cem
ent s
heet
W
all l
inin
g 30
m2
3001
/D00
9/M
G/0
04
No
asbe
stos
fib
res
dete
cted
Pain
ted
crea
m
3001
DN
SDC
- M
oore
bank
NSW
D00
9 W
areh
ouse
Bu
lk a
nd P
late
St
orag
e
Inte
rnal
GF
Pitc
hed
roof
Nor
ther
n an
d so
uthe
rn e
ave
linin
gFi
bre
cem
ent s
heet
Eave
s lin
ing
35m
2G
ood
3001
/D00
9/M
G/0
07
No
asbe
stos
fib
res
dete
cted
Both
eav
e lin
ings
onl
y
Bui
ldin
g 30
01/D
010
War
ehou
se B
in S
tock
s
Rem
oved
Asb
esto
s
2/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D01
0 W
areh
ouse
Bi
n St
ocks
Ex
tern
alG
FEa
st s
ide,
nor
th o
f ent
ry
rolle
r doo
r, ad
jace
nt to
dr
ivew
ayG
roun
d Fi
bre
cem
ent d
ebris
Deb
ris
Uns
eale
dN
onFr
iabl
e3
tem
Goo
d30
01/D
010/
MG
/002
Chr
ysot
ile
Det
ecte
dLo
wLo
wM
onito
rN
/A
Unk
now
n so
urce
, lik
ely
mor
e pr
esen
t thr
ough
out g
rass
ed a
rea.
Li
kely
to e
xper
ienc
e di
stur
banc
e du
ring
law
n m
aint
enan
ce.
PB
2013
Gro
und
debr
is re
mov
ed 2
013.
PB
2014
: A v
isua
l ins
pect
ion
of th
e ar
ea w
as c
ondu
cted
and
no
ACM
frag
men
ts w
ere
foun
d. It
em
rem
oved
in 2
013,
refe
r to
"216
0918
A S&
A D
NSD
C C
lear
ance
BLD
10
and
11.
pdf".
Insp
ectio
n da
tApr
-14
Surv
eyor
: Dam
ien
Ben
bow
Dat
e As
sess
edB
ase
IDBu
ildin
g id
entif
icat
ion
Room
or
Spac
eFl
oor I
DPr
imar
y Lo
catio
nSe
cond
ary
Loca
tion
Mat
eria
lAp
plic
atio
nSu
rface
tr
eatm
ent
ACM
Typ
eQ
uant
ityQ
uant
ity
Type
Cond
ition
Sam
ple
IDLa
b Re
sults
Risk
Ra
ting
Like
lihoo
d of
di
stur
banc
eCo
ntro
lLa
belli
ngPh
oto
IDCo
mm
ent
Non
Asb
esto
s co
ntai
ning
mat
eria
l ide
ntifi
ed d
urin
g th
e 20
14 in
spec
tion
not p
revi
ousl
y id
entif
ied
Site
Loc
atio
n: D
NSD
C B
ase
Num
ber 3
001-
Moo
reba
nk N
SW
Asbe
stos
con
tain
ing
mat
eria
l ide
ntifi
ed d
urin
g th
e 20
14 re
insp
ectio
n no
t pre
viou
sly
iden
tifie
d
2/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D01
0 W
areh
ouse
Bi
n St
ocks
Ex
tern
alG
FN
orth
sid
e, n
ext t
o ea
ster
n m
ost r
olle
r doo
rG
roun
d Fi
bre
cem
ent d
ebris
Deb
ris
Uns
eale
dN
onFr
iabl
eAp
prox
. 5te
mG
ood
Ref
er to
30
01/D
010/
MG
/002
Chr
ysot
ile
Det
ecte
dLo
wLo
wM
onito
rN
/A
Larg
e fra
gmen
ts ty
pica
l of a
cor
ruga
ted
roof
, lik
ely
mor
e pr
esen
t th
roug
hout
gra
ssed
are
a. L
ikel
y to
exp
erie
nce
dist
urba
nce
durin
g la
wn
mai
nten
ance
. PB
201
3 G
roun
d de
bris
rem
oved
201
3. P
B20
14: A
vis
ual i
nspe
ctio
n of
the
area
was
con
duct
ed a
nd n
o AC
M
fragm
ents
wer
e fo
und.
Item
rem
oved
in 2
013,
refe
r to
"216
0918
A S&
A D
NSD
C C
lear
ance
BLD
10
and
11.p
df".
2/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D01
0 W
areh
ouse
Bi
n St
ocks
In
tern
alG
FSo
uthe
rn s
ide,
tow
ards
w
alkw
ayG
roun
d Fi
bre
cem
ent d
ebris
Deb
ris
Uns
eale
dN
onFr
iabl
e1
tem
Poor
3001
/D01
0/M
G/0
01C
hrys
otile
D
etec
ted
Hig
hR
N/A
Deb
ris c
olle
cted
for s
ampl
e, u
nkno
wn
sour
ce, e
ntire
bui
ldin
g vi
sual
ly ob
serv
ed, s
ome
inac
cess
ible
are
as d
ue to
she
lves
bei
ng a
gain
st
wal
ls. D
ebris
rem
oved
in M
arch
201
2, h
owev
er s
ome
may
stil
l re
mai
n w
ithin
inac
cess
ible
are
as. P
B 20
14: A
vis
ual i
nspe
ctio
n of
th
e ar
ea w
as c
ondu
cted
and
no
ACM
was
foun
d. C
ontin
ue
mon
itorin
g.
2/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D01
0 W
areh
ouse
Bi
n St
ocks
In
tern
alG
FM
id p
ortio
n of
bui
ldin
gU
pper
tim
ber b
eam
sFi
bre
cem
ent d
ebris
Deb
ris
Uns
eale
dFr
iabl
e03
Jun
tem
Poor
3001
/D01
0/M
G/0
09
Chr
ysot
ile a
nd
Amos
ite
dete
cted
Low
RN
/A
Like
ly a
resu
lt of
poo
r rem
oval
of f
orm
er a
sbes
tos
roof
and
wal
ls, 3
-6
debr
is n
oted
in p
artic
ular
are
as w
ith >
10
debr
is o
bser
ved
on u
pper
be
ams
thro
ugho
ut th
e bu
ildin
g. D
ebris
on
mid
dle
beam
s ar
e ve
ry
smal
l and
fine
and
are
fria
ble.
Bui
ldin
g is
dus
ty.D
ebris
rem
oved
in
Mar
ch 2
012,
how
ever
som
e m
ay s
till r
emai
n w
ithin
inac
cess
ible
ar
eas.
PB
2014
: Deb
ris m
ay s
till r
emai
n in
inac
cess
ible
are
as.
3001
DN
SDC
- M
oore
bank
NSW
D01
0 W
areh
ouse
Bi
n St
ocks
In
tern
alG
FAl
l sid
es o
f bui
ldin
gFi
re d
oor
Insu
latio
n Fi
re d
oor
Seal
edFr
iabl
e9
tem
Goo
dVi
sual
O
bser
vatio
n As
best
os
Pres
umed
Low
Low
Leav
e an
d m
aint
ain
PB 2
014
Dat
a ad
ded
from
DC
T, c
ontin
ue m
onito
ring.
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D01
0 W
areh
ouse
Bi
n St
ocks
Ex
tern
alG
FSo
uth,
nor
th a
nd e
ast
side
sD
own
pipe
dra
inag
e pi
tsM
ould
ed c
emen
t Pr
oduc
t Pi
t lin
ing
19te
m30
01/D
010/
MG
/003
No
asbe
stos
fib
res
dete
cted
Stor
mw
ater
dra
inag
e pi
ts
3001
DN
SDC
- M
oore
bank
NSW
D01
0 W
areh
ouse
Bi
n St
ocks
In
tern
alG
FM
id w
este
rn a
rea,
sou
th
of ro
ller d
oor
Elec
trica
l bac
king
boa
rdR
esin
ous
mat
eria
lEl
ectri
cal m
ount
ing
boar
d1
tem
3001
/D01
0/M
G/0
01
No
asbe
stos
fib
res
dete
cted
Non
asb
esto
s co
ntai
ning
boa
rd, m
anuf
actu
red
by "f
orm
ica"
to
Aust
ralia
n St
anda
rds
Bui
ldin
g 30
01/D
011
War
ehou
se B
in S
tock
s
Asb
esto
s D
etec
ted
2/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D01
1 W
areh
ouse
Bi
n St
ocks
Ex
tern
alG
FM
id s
outh
sid
eG
roun
d Fi
bre
cem
ent d
ebris
Deb
ris
Uns
eale
dN
on-
Fria
ble
1te
mG
ood
3001
/D01
1/M
G/0
03C
hrys
otile
D
etec
ted
Low
Low
Mon
itor
N/A
4
1 de
bris
col
lect
ed fo
r sam
ple,
unk
now
n so
urce
, lik
ely
mor
e pr
esen
t th
roug
hout
gra
ssed
are
a. P
B 20
13 G
roun
d de
bris
rem
oved
20
13.
Cont
inue
mon
itorin
g. P
B 20
14: A
vis
ual i
nspe
ctio
n of
the
wor
k ar
ea w
as c
ondu
cted
and
no
ACM
frag
men
ts w
ere
foun
d. It
em
rem
oved
in 2
013,
refe
r to
"216
0918
A S&
A D
NSD
C C
lear
ance
BLD
10
and
11.
pdf".
2/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D01
1 W
areh
ouse
Bi
n St
ocks
Ex
tern
alG
FEa
st s
ide,
sou
th o
f ent
ry
rolle
r doo
r G
roun
d Fi
bre
cem
ent d
ebris
Deb
ris
Uns
eale
dN
on-
Fria
ble
3te
mG
ood
Ref
er to
30
01/D
011/
MG
/003
Chr
ysot
ile
Det
ecte
dLo
wLo
wM
onito
rN
/A
Unk
now
n so
urce
, lik
ely
mor
e pr
esen
t thr
ough
out g
rass
ed a
rea.
Li
kely
to e
xper
ienc
e di
stur
banc
e du
ring
law
n m
aint
enan
ce.
PB
2013
Gro
und
debr
is re
mov
ed 2
013.
Con
tinue
mon
itorin
g. P
B20
14: A
vis
ual i
nspe
ctio
n of
the
area
was
con
duct
ed a
nd n
o AC
M
fragm
ents
wer
e fo
und.
Item
rem
oved
in 2
013,
refe
r to
"216
0918
A S&
A D
NSD
C C
lear
ance
BLD
10
and
11.p
df".
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D01
1 W
areh
ouse
Bi
n St
ocks
In
tern
alG
FN
orth
eas
tern
cor
ner,
just
bef
ore
wal
kway
Gro
und
Fibr
e ce
men
t deb
risD
ebris
1
tem
3001
/D01
1/M
G/0
01
No
asbe
stos
fib
res
dete
cted
Deb
ris c
olle
cted
for s
ampl
e, v
ery
wea
ther
ed, c
rum
bles
eas
ily,
unkn
own
sour
ce, e
ntire
bui
ldin
g vi
sual
ly ob
serv
ed
3001
DN
SDC
- M
oore
bank
NSW
D01
1 W
areh
ouse
Bi
n St
ocks
In
tern
al
GF
Sout
h ea
st s
ide
cool
ro
omAl
l wal
ls a
nd c
eilin
g lin
ing
Fibr
e ce
men
t she
et
Wal
l lin
ing
88m
230
01/D
011/
MG
/002
No
asbe
stos
fib
res
dete
cted
Pain
ted
crea
m
3001
DN
SDC
- M
oore
bank
NSW
D01
1 W
areh
ouse
Bi
n St
ocks
Ex
tern
alG
FSo
uth,
nor
th a
nd e
ast
side
sD
own
pipe
dra
inag
e pi
tsM
ould
ed c
emen
t Pr
oduc
t Pi
t lin
ing
20te
m30
01/D
011/
MG
/004
No
asbe
stos
fib
res
dete
cted
Stor
mw
ater
dra
inag
e pi
ts
3001
DN
SDC
- M
oore
bank
NSW
D01
1 W
areh
ouse
Bi
n St
ocks
In
tern
alG
FM
id w
este
rn a
rea,
sou
th
of ro
ller d
oor
Elec
trica
l bac
king
boa
rdR
esin
ous
mat
eria
lEl
ectri
cal m
ount
ing
boar
d1
tem
3001
/MG
/D11
/00
1
No
asbe
stos
fib
res
dete
cted
Non
asb
esto
s co
ntai
ning
boa
rd, m
anuf
actu
red
by "f
orm
ica"
to
Aust
ralia
n St
anda
rds.
Rem
oved
asb
esto
s la
bel
Rem
oved
Asb
esto
s
2/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D01
1 W
areh
ouse
Bi
n St
ocks
In
tern
alG
FN
orth
wes
t cor
ner o
f bu
ildin
gU
pper
tim
ber b
eam
sFi
bre
cem
ent d
ebris
Deb
ris
Uns
eale
dN
onFr
iabl
e1
tem
Poor
3001
/D01
1/M
G/0
08
Chr
ysot
ile a
nd
Amos
ite
dete
cted
Low
RN
/A
Like
ly a
resu
lt of
poo
r rem
oval
of f
orm
er a
sbes
tos
roof
and
wal
ls, 1
de
bris
not
ed in
par
ticul
ar a
rea
with
app
roxi
mat
ely
4 de
bris
obs
erve
d on
upp
er b
eam
s th
roug
hout
the
build
ing.
Bui
ldin
g is
dus
ty. D
ebris
re
mov
ed in
Jun
e/Ju
ly 2
012,
how
ever
som
e m
ay s
till r
emai
n w
ithin
inac
cess
ible
are
as. P
B 20
14: I
tem
rem
oved
in 2
012,
refe
r to
"181
831_
D11
- C
lear
ance
Cer
tific
ate
pdf".
AC
M m
ay s
till r
emai
n in
inac
cess
ible
are
as.
Build
ing
3001
/D01
2 Pu
mp
Hous
e
Rem
oved
Asb
esto
s
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D01
2 Pu
mp
hous
e Ex
tern
alG
FAl
l sid
esG
roun
dFi
bre
cem
ent d
ebris
Deb
ris
Uns
eale
dN
on-
Fria
ble
6te
mG
ood
3001
/D01
2/M
G/0
01
Chr
ysot
ile
Amos
ite a
nd
croc
idol
ite
dete
cted
Low
Low
Mon
itor
N/A
Unk
now
n so
urce
, lik
ely
mor
e pr
esen
t thr
ough
out g
rass
ed a
rea.
Li
kely
to e
xper
ienc
e di
stur
banc
e du
ring
law
n m
aint
enan
ce.
PB
2013
Gro
und
debr
is re
mov
ed 2
013.
PB
2014
: A v
isua
l ins
pect
ion
of th
e bu
ildin
g fo
otpr
int w
as c
ondu
cted
and
no
ACM
was
foun
d. It
em
rem
oved
in 2
013,
refe
r to
"216
0918
A SA
DN
SDC
BLD
12,
06,
82
pdf"
Build
ing
3001
/D01
3 Q
Sto
re- D
NSDC
Asb
esto
s D
etec
ted
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D01
3 Q
Sto
re -
DN
SDC
Ex
tern
alG
FN
orth
ern
end
of b
uild
ing
Gro
und
leve
lFi
bre
cem
ent s
heet
Deb
ris
Uns
eale
dN
on-
Fria
ble
<1m
2Po
or30
01/D
013/
A01
Chr
ysot
ile
Det
ecte
dM
ediu
mM
ediu
mR
emov
eN
/A
PB 2
013
Deb
ris n
oted
to e
xpos
ed g
roun
d im
med
iate
ly
adja
cent
to b
uild
ing.
Sou
rce
unkn
own,
pos
sibl
y m
ore
debr
is
pres
ent t
hrou
ghou
t gra
ssed
are
a. P
B 20
14: A
vis
ual i
nspe
ctio
n of
the
wor
k ar
ea w
as c
ondu
cted
and
no
ACM
frag
men
ts w
ere
foun
d.
Con
tinue
mon
itorin
g.
Insp
ectio
n da
tApr
-14
Surv
eyor
: Dam
ien
Ben
bow
Dat
e As
sess
edB
ase
IDBu
ildin
g id
entif
icat
ion
Room
or
Spac
eFl
oor I
DPr
imar
y Lo
catio
nSe
cond
ary
Loca
tion
Mat
eria
lAp
plic
atio
nSu
rface
tr
eatm
ent
ACM
Typ
eQ
uant
ityQ
uant
ity
Type
Cond
ition
Sam
ple
IDLa
b Re
sults
Risk
Ra
ting
Like
lihoo
d of
di
stur
banc
eCo
ntro
lLa
belli
ngPh
oto
IDCo
mm
ent
Non
Asb
esto
s co
ntai
ning
mat
eria
l ide
ntifi
ed d
urin
g th
e 20
14 in
spec
tion
not p
revi
ousl
y id
entif
ied
Site
Loc
atio
n: D
NSD
C B
ase
Num
ber 3
001-
Moo
reba
nk N
SW
Asbe
stos
con
tain
ing
mat
eria
l ide
ntifi
ed d
urin
g th
e 20
14 re
insp
ectio
n no
t pre
viou
sly
iden
tifie
d
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D01
3 Q
Sto
re -
DN
SDC
Ex
tern
alG
FEx
tern
al, g
rass
ed a
rea
adja
cent
to w
este
rn
ram
pG
roun
d, s
ervi
ce p
itM
ould
ed c
emen
t Pr
oduc
t Pi
t lin
ing
Uns
eale
dN
on-
Fria
ble
<1m
2Fa
ir30
01/D
013/
MG
/001
Chr
ysot
ile
Amos
ite a
nd
croc
idol
ite
dete
cted
Low
Med
ium
Enca
psul
ate
N/A
5871
Rel
ativ
ely
good
con
ditio
n m
ay e
xper
ienc
e di
stur
banc
e du
ring
law
n m
aint
enan
ce.
PB 2
013
ACM
stil
l pre
sent
, con
ditio
n un
chan
ged.
PB
201
4: A
CM
stil
l pre
sent
, con
dict
ion
unch
ange
d. G
PS re
fere
nce:
-33
9486
6300
0 15
092
4258
000
Rem
oved
Asb
esto
s
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D01
3 Q
Sto
re -
DN
SDC
Ex
tern
alG
FEx
tern
al, s
outh
wes
tern
co
rner
Gro
und
Fibr
e ce
men
t she
et
Deb
ris
Uns
eale
dN
onFr
iabl
e4
tem
Goo
d30
01/D
013/
MG
/002
Chr
ysot
ile
Det
ecte
dLo
wLo
wM
onito
rN
/A
Unk
now
n so
urce
, lik
ely
mor
e pr
esen
t thr
ough
out g
rass
ed a
rea.
Li
kely
to e
xper
ienc
e di
stur
banc
e du
ring
law
n m
aint
enan
ce .
Visu
al
obse
rvat
ion
ham
pere
d by
pre
senc
e of
long
gra
ss.
PB 2
013
G
roun
d de
bris
rem
oved
201
3. P
B 20
14: A
vis
ual i
nspe
ctio
n of
the
area
was
con
duct
ed a
nd n
o AC
M fr
agm
ents
wer
e fo
und.
Item
re
mov
ed in
201
3, re
fer t
o "2
1609
18A.
S&A.
DN
SDC
.Cle
aran
ce.B
LD.1
3.pd
f"
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D01
3 Q
Sto
re -
DN
SDC
In
tern
alG
FD
isus
ed o
ffice
Und
er c
arpe
tLi
nole
umFl
oor s
heet
ing
4m
230
01/D
013/
MG
/003
No
asbe
stos
fib
res
dete
cted
Aqua
blu
e
3001
DN
SDC
- M
oore
bank
NSW
D01
3 Q
Sto
re -
DN
SDC
In
tern
alG
FSo
uth
of b
uild
ing
Wal
l sep
arat
ing
D01
4Fi
bre
cem
ent s
heet
W
all l
inin
g 16
m2
3001
/D01
3/M
G/0
04
No
asbe
stos
fib
res
dete
cted
Uns
eale
d, a
ppea
rs n
ew
3001
DN
SDC
- M
oore
bank
NSW
D01
3 Q
Sto
re -
DN
SDC
In
tern
alG
FO
ffice
sEx
tern
al o
ffice
Fi
bre
cem
ent s
heet
W
all l
inin
g 18
m2
3001
/D01
3/M
G/0
05
No
asbe
stos
fib
res
dete
cted
Pain
ted
crea
m
3001
DN
SDC
- M
oore
bank
NSW
D01
3 Q
Sto
re -
DN
SDC
In
tern
alG
FO
ffice
Wal
lsFi
bre
cem
ent s
heet
Wal
l lin
ing
0367
/300
1/D
13/
AYO
647
No
asbe
stos
fib
res
dete
cted
PB 2
014:
Dat
a ad
ded
from
DC
T.
Build
ing
3001
/D01
4 Q
Sto
re A
men
ities
Blo
ck -
DNSD
C
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D01
4 Q
Sto
re
Amen
ities
Blo
ck -
DN
SDC
In
tern
alG
FEa
st s
ide
of b
uild
ing
Inte
rnal
: am
eniti
es
Fibr
e ce
men
t she
et
Wal
l lin
ing
35m
230
01/D
013/
MG
/001
No
asbe
stos
fib
res
dete
cted
Unl
ikel
y to
be
asbe
stos
3001
DN
SDC
- M
oore
bank
NSW
D01
4 Q
Sto
re
Amen
ities
Blo
ck -
DN
SDC
In
tern
alG
FEa
st s
ide
of b
uild
ing
Inte
rnal
: am
eniti
es
Fibr
e ce
men
t she
et
Parti
tion
wal
l 03
67/3
001/
D14
/AY
O64
8
No
asbe
stos
fib
res
dete
cted
PB 2
014:
Dat
a ad
ded
from
DC
T.
Build
ing
3001
/D01
5 SP
S Fl
amm
able
Sto
re
No
visi
ble,
acc
essi
ble
asbe
stos
con
tain
ing
mat
eria
ls w
ere
loca
ted
in th
is b
uild
ing
at th
e tim
e of
the
insp
ectio
n
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D01
5 SP
S Fl
amm
able
Sto
reIn
tern
al /
Exte
rnal
Build
ing
fabr
ic
No
asbe
stos
was
det
ecte
d in
this
bui
ldin
g / s
truct
ure
Build
ing
3001
/D01
6 Ce
ntra
l Hub
- St
oreh
ouse
90
No
visi
ble,
acc
essi
ble
asbe
stos
con
tain
ing
mat
eria
ls w
ere
loca
ted
in th
is b
uild
ing
at th
e tim
e of
the
insp
ectio
n
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D01
6 C
entra
l Hub
- S
tore
hous
e 90
In
tern
al /
Exte
rnal
Build
ing
fabr
ic
No
asbe
stos
was
det
ecte
d in
this
bui
ldin
g / s
truct
ure
Build
ing
3001
/D01
7 Ce
ntra
l Hub
- Bu
lk P
alle
t Silo
Rem
oved
Asb
esto
s
2/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D01
7 C
entra
l Hub
-B
ulk
Palle
t Silo
Ex
tern
alG
FEa
st a
nd w
est s
ides
Gro
und
Fibr
e ce
men
t deb
risD
ebris
U
nsea
led
Non
Fria
ble
Appr
ox. 5
tem
Goo
d30
01/D
017/
MG
/002
Chr
ysot
ile
Det
ecte
dLo
wLo
wM
onito
rN
/A
Unk
now
n so
urce
, lik
ely
mor
e pr
esen
t thr
ough
out g
rass
ed a
rea.
Li
kely
to e
xper
ienc
e di
stur
banc
e du
ring
law
n m
aint
enan
ce.
PB
2013
Gro
und
debr
is re
mov
ed 2
013.
PB
2014
: A v
isua
l ins
pect
ion
of th
e w
ork
area
was
con
duct
ed a
nd n
o AC
M fr
agm
ents
wer
e fo
und.
Item
rem
oved
in 2
013,
refe
r to
"216
0918
A SA
DN
SDC
C
lear
ance
BLD
17
1824
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D01
7 C
entra
l Hub
-B
ulk
Palle
t Silo
Ex
tern
alG
FEa
st a
nd w
est s
ides
Dow
n pi
pe d
rain
age
pits
Mou
lded
cem
ent
prod
uct
Pit l
inin
g12
tem
3001
/D01
7/M
G/0
01
No
asbe
stos
fib
res
dete
cted
Stor
mw
ater
dra
inag
e pi
ts
Build
ing
3001
/D01
8 Ce
ntra
l Hub
- Bu
lk P
alle
t Silo
Rem
oved
Asb
esto
s
2/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D01
8 C
entra
l Hub
- B
ulk
Palle
t Silo
Ex
tern
alG
FSo
uth,
eas
t and
wes
t si
des
Gro
und
Fibr
e ce
men
t deb
risD
ebris
U
nsea
led
Non
Fria
ble
Appr
ox. 4
tem
Goo
d30
01/D
018/
MG
/001
Chr
ysot
ile a
nd
Amos
ite
dete
cted
Low
Low
Mon
itor
N/A
Unk
now
n so
urce
, lik
ely
mor
e pr
esen
t thr
ough
out g
rass
ed a
rea.
Li
kely
to e
xper
ienc
e di
stur
banc
e du
ring
law
n m
aint
enan
ce.
PB
2013
Gro
und
debr
is re
mov
ed 2
013.
PB
2014
: A v
isua
l ins
pect
ion
of th
e w
ork
area
was
con
duct
ed a
nd n
o AC
M fr
agm
ents
wer
e fo
und.
C
lear
ance
cer
tific
ate
requ
ired.
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D01
7 C
entra
l Hub
-B
ulk
Palle
t Silo
Ex
tern
alG
FSo
uth,
eas
t and
wes
t si
des
Dow
n pi
pe d
rain
age
pits
Mou
lded
cem
ent
prod
uct
Pit l
inin
g16
tem
Ref
er to
30
01/D
017/
MG
/001
No
asbe
stos
fib
res
dete
cted
Stor
mw
ater
dra
inag
e pi
ts
Build
ing
3001
/D01
9 Ce
ntra
l Hub
- Bu
lk P
alle
t Silo
Rem
oved
Asb
esto
s
Insp
ectio
n da
tApr
-14
Surv
eyor
: Dam
ien
Ben
bow
Dat
e As
sess
edB
ase
IDBu
ildin
g id
entif
icat
ion
Room
or
Spac
eFl
oor I
DPr
imar
y Lo
catio
nSe
cond
ary
Loca
tion
Mat
eria
lAp
plic
atio
nSu
rface
tr
eatm
ent
ACM
Typ
eQ
uant
ityQ
uant
ity
Type
Cond
ition
Sam
ple
IDLa
b Re
sults
Risk
Ra
ting
Like
lihoo
d of
di
stur
banc
eCo
ntro
lLa
belli
ngPh
oto
IDCo
mm
ent
Non
Asb
esto
s co
ntai
ning
mat
eria
l ide
ntifi
ed d
urin
g th
e 20
14 in
spec
tion
not p
revi
ousl
y id
entif
ied
Site
Loc
atio
n: D
NSD
C B
ase
Num
ber 3
001-
Moo
reba
nk N
SW
Asbe
stos
con
tain
ing
mat
eria
l ide
ntifi
ed d
urin
g th
e 20
14 re
insp
ectio
n no
t pre
viou
sly
iden
tifie
d
2/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D01
9 C
entra
l Hub
- B
ulk
Palle
t Silo
In
tern
alG
FSo
uth
of m
ain
entry
ro
ller d
oor,
agai
nst w
all
Adja
cent
to s
pill
stat
ion,
dis
use
Text
ileG
aske
tU
nsea
led
Non
Fria
ble
1te
mFa
ir30
01/D
019/
MG
/002
Chr
ysot
ile
Det
ecte
dLo
wR
N/A
Dis
used
gas
ket.
Cou
ld n
ot b
e lo
cate
d du
ring
2012
sur
vey,
like
ly
to h
ave
been
rem
oved
by
BA
E ho
wev
er it
can
not b
e es
tabl
ishe
d if
it w
as d
ispo
sed
off p
rope
rly. P
B 20
14:
tem
not
lo
cate
d p
resu
med
rem
oved
cle
aran
ce c
ertif
icat
e re
quire
d.
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D01
9 C
entra
l Hub
- B
ulk
Palle
t Silo
Ex
tern
alG
FN
orth
, sou
th a
nd w
est
side
Dow
n pi
pe d
rain
age
pits
Mou
lded
cem
ent
prod
uct
Pit l
inin
g16
tem
3001
/D01
9/M
G/0
01
No
asbe
stos
fib
res
dete
cted
Stor
mw
ater
dra
inag
e pi
ts
Build
ing
3001
/D02
0 HQ
DNS
DC F
orm
er F
oods
tuffs
/ Ra
tion
Stor
e
Asb
esto
s D
etec
ted
2/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D02
0 H
Q D
NSD
C
Form
er
Food
stuf
fs /
Rat
ion
Stor
e
Exte
rnal
GF
Nor
th, e
ast &
wes
t w
indo
ws
Awni
ng a
bove
win
dow
sFl
at c
emen
t she
etAw
ning
lini
ngSe
aled
Non
-Fr
iabl
e30
m2
Fair
3001
/D02
0/M
G/0
01C
hrys
otile
D
etec
ted
Med
ium
Low
Leav
e an
d m
aint
ain
A5,
6,7
Thic
k fib
re c
emen
t she
et.
PB 2
013
Dam
age
note
d to
AC
M
awni
ng o
n ea
st s
ide
of b
uild
ing.
Mou
ld g
row
th a
nd
dete
riora
tion
note
d to
pai
nted
sur
face
s. P
B 20
14: A
CM
stil
l pr
esen
t co
nditi
on u
ncha
nged
2/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D02
0 H
Q D
NSD
C
Form
er
Food
stuf
fs /
Rat
ion
Stor
e
Exte
rnal
GF
Wes
t sid
e, s
outh
of
rolle
r doo
rsEl
ectri
cal m
eter
box
Res
inou
s m
ater
ial
Elec
trica
l mou
ntin
g bo
ard
Seal
edN
on-
Fria
ble
<1m
2Fa
ir30
01/D
020/
MG
/002
Chr
ysot
ile
Det
ecte
dLo
wLo
wLe
ave
and
mai
ntai
nA
8
Cou
ld n
ot a
cces
s re
ar o
f boa
rd.
PB 2
013
AC
M s
till p
rese
nt,
cond
ition
unc
hang
ed. P
B 20
14: A
CM
stil
l pre
sent
, con
ditio
n un
chan
ged.
2/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D02
0 H
Q D
NSD
C
Form
er
Food
stuf
fs /
Rat
ion
Stor
e
Exte
rnal
GF
Nor
th s
ide
Gro
und
Mou
lded
cem
ent
Prod
uct
Serv
ice
pit
Uns
eale
dN
on-
Fria
ble
<1m
2Fa
ir30
01/D
020/
MG
/003
Chr
ysot
ile a
nd
Amos
ite
dete
cted
Low
Med
ium
Rem
ove
N/A
9
Pit i
s da
mag
ed. L
ikel
y to
exp
erie
nce
dist
urba
nce
durin
g la
wn
mai
nten
ance
. PB
201
3 A
CM s
till p
rese
nt.
Cons
ider
able
w
eath
erin
g no
ted.
Mov
ing
tow
ards
poo
r con
ditio
n
3001
DN
SDC
- M
oore
bank
NSW
D02
0 H
Q D
NSD
C
Form
er
Food
stuf
fs /
Rat
ion
Stor
e
Inte
rnal
GF
Mal
e lo
cker
room
, toi
let
and
show
erC
eilin
gFl
at c
emen
t she
etC
eilin
g lin
ing
Seal
edN
on-
Fria
ble
10m
2Po
or30
01/D
020/
MG
/004
Chr
ysot
ile
Det
ecte
dLo
wLo
wN
/AN
/A10
, 11,
12
Deb
ris o
bser
ved
with
in ro
of c
avity
. PB
201
3 S
trong
evi
denc
e su
gges
ts c
eilin
g lin
ings
to th
e am
eniti
es a
rea
are
plas
terb
oard
. Un
able
to lo
cate
ACM
deb
ris fo
llow
ing
visu
al in
spec
tion
of th
e ce
iling
spa
ces
abov
e th
e am
eniti
es, c
old
room
s an
d of
fice
area
s. P
B 20
14: N
o in
tern
al a
cces
s at
tim
e of
sur
vey,
AC
M
pres
umed
to re
mai
n in
situ
.
3001
DN
SDC
- M
oore
bank
NSW
D02
0 H
Q D
NSD
C
Form
er
Food
stuf
fs /
Rat
ion
Stor
e
Inte
rnal
GF
Switc
h ro
om c
upbo
ard
Fire
doo
rIn
sula
tion
Fire
doo
r Se
aled
Fria
ble
2te
mG
ood
3001
/D02
0/M
G/0
08Am
osite
de
tect
edLo
wLo
wLe
ave
and
mai
ntai
nA
13
Doo
r ins
ulat
ion.
Lab
el a
pplie
d. P
B 20
13 A
CM s
till p
rese
nt,
cond
ition
unc
hang
ed. P
B 20
14: N
o in
tern
al a
cces
s at
tim
e of
su
rvey
, AC
M p
resu
med
to re
mai
n in
situ
.
No
Asb
esto
s D
etec
ted
2/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D02
0 H
Q D
NSD
C
Form
er
Food
stuf
fs /
Rat
ion
Stor
e
Exte
rnal
GF
East
ele
vatio
nO
n gr
ound
Fibr
e ce
men
t she
etD
ebris
3001
/D02
0/14
/A5
No
asbe
stos
fib
res
dete
cted
PB 2
014:
Not
not
ed in
pre
viou
s su
rvey
3001
DN
SDC
- M
oore
bank
NSW
D02
0 H
Q D
NSD
C
Form
er
Food
stuf
fs /
Rat
ion
Stor
e
Inte
rnal
GF
Rec
eptio
n
Floo
rTi
les
and
adhe
sive
Floo
r cov
erin
g (B
eige
)5
m2
3001
/D02
0/M
G/0
05
No
asbe
stos
fib
res
dete
cted
Beig
e w
ith w
hite
stre
akin
g
3001
DN
SDC
- M
oore
bank
NSW
D02
0 H
Q D
NSD
C
Form
er
Food
stuf
fs /
Rat
ion
Stor
e
Inte
rnal
GF
Offi
ceFl
oor
Tile
s an
d ad
hesi
veFl
oor c
over
ing
(Cre
am)
30m
230
01/D
020/
MG
/006
No
asbe
stos
fib
res
dete
cted
Cre
am w
ith w
hite
stre
akin
g
3001
DN
SDC
- M
oore
bank
NSW
D02
0 H
Q D
NSD
C
Form
er
Food
stuf
fs /
Rat
ion
Stor
e
Inte
rnal
GF
Nor
ther
n an
d w
este
rn
side
s of
war
ehou
seFl
oor
Tile
s an
d ad
hesi
veFl
oor c
over
ing
(Cre
am)
104
m2
Ref
er to
30
01/D
020/
MG
/006
No
asbe
stos
fib
res
dete
cted
Cre
am w
ith w
hite
stre
akin
g
3001
DN
SDC
- M
oore
bank
NSW
D02
0 H
Q D
NSD
C
Form
er
Food
stuf
fs /
Rat
ion
Stor
e
Inte
rnal
GF
Form
er m
eal r
oom
Floo
rTi
les
and
adhe
sive
Floo
r cov
erin
g (T
an)
10m
230
01/D
020/
MG
/007
No
asbe
stos
fib
res
dete
cted
Tan
with
whi
te s
treak
ing
Build
ing
3001
/D02
1 PO
L Po
int M
oore
bank
Ave
No
visi
ble,
acc
essi
ble
asbe
stos
con
tain
ing
mat
eria
ls w
ere
loca
ted
in th
is b
uild
ing
at th
e tim
e of
the
insp
ectio
n
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D02
1 PO
L Po
int
Moo
reba
nk A
ve
Exte
rnal
GF
Exte
rnal
roof
Eave
s, a
ll si
des
Fibr
e ce
men
t she
et
Eave
s lin
ing
12m
230
01/D
021/
MG
/001
No
asbe
stos
fib
res
dete
cted
Som
e ea
ve p
anel
ling
mis
sing
and
dam
aged
Build
ing
3001
/D02
2 Da
nger
ous
Goo
ds -
Cove
red
Pol S
tora
ge N
o 1
No
visi
ble,
acc
essi
ble
asbe
stos
con
tain
ing
mat
eria
ls w
ere
loca
ted
in th
is b
uild
ing
at th
e tim
e of
the
insp
ectio
n
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D02
2 D
ange
rous
G
oods
- C
over
ed
Pol S
tora
ge N
o 1
Inte
rnal
/ Ex
tern
alBu
ildin
g fa
bric
N
o po
tent
ial a
sbes
tos
cont
aini
ng m
ater
ials
det
ecte
d in
the
build
ing
/ st
ruct
ure
Build
ing
3001
/D02
3 Da
nger
ous
Goo
ds -
Cove
red
Pol S
tora
ge N
o 2
No
visi
ble,
acc
essi
ble
asbe
stos
con
tain
ing
mat
eria
ls w
ere
loca
ted
in th
is b
uild
ing
at th
e tim
e of
the
insp
ectio
n
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D02
3 D
ange
rous
G
oods
- C
over
ed
Pol S
tora
ge N
o 2
Inte
rnal
/ Ex
tern
alBu
ildin
g fa
bric
N
o po
tent
ial a
sbes
tos
cont
aini
ng m
ater
ials
det
ecte
d in
the
build
ing
/ st
ruct
ure
Build
ing
3001
/D02
4 Da
nger
ous
Goo
ds S
tore
hous
e
Rem
oved
Asb
esto
s
Insp
ectio
n da
tApr
-14
Surv
eyor
: Dam
ien
Ben
bow
Dat
e As
sess
edB
ase
IDBu
ildin
g id
entif
icat
ion
Room
or
Spac
eFl
oor I
DPr
imar
y Lo
catio
nSe
cond
ary
Loca
tion
Mat
eria
lAp
plic
atio
nSu
rface
tr
eatm
ent
ACM
Typ
eQ
uant
ityQ
uant
ity
Type
Cond
ition
Sam
ple
IDLa
b Re
sults
Risk
Ra
ting
Like
lihoo
d of
di
stur
banc
eCo
ntro
lLa
belli
ngPh
oto
IDCo
mm
ent
Non
Asb
esto
s co
ntai
ning
mat
eria
l ide
ntifi
ed d
urin
g th
e 20
14 in
spec
tion
not p
revi
ousl
y id
entif
ied
Site
Loc
atio
n: D
NSD
C B
ase
Num
ber 3
001-
Moo
reba
nk N
SW
Asbe
stos
con
tain
ing
mat
eria
l ide
ntifi
ed d
urin
g th
e 20
14 re
insp
ectio
n no
t pre
viou
sly
iden
tifie
d
2/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D02
4 D
ange
rous
G
oods
St
oreh
ouse
Ex
tern
alG
FN
orth
and
nor
thea
st
corn
erG
roun
dFi
bre
cem
ent d
ebris
Deb
ris
Uns
eale
dN
onFr
iabl
e3
tem
Goo
d30
01/D
025/
MG
/003
Chr
ysot
ile
Det
ecte
dLo
wLo
wM
onito
rN
/A
Unk
now
n so
urce
, lik
ely
mor
e pr
esen
t thr
ough
out g
rass
ed a
rea.
Li
kely
to e
xper
ienc
e di
stur
banc
e du
ring
law
n m
aint
enan
ce.
PB
2013
Gro
und
debr
is re
mov
ed 2
013.
PB
2014
: A v
isua
l ins
pect
ion
of th
e w
ork
area
was
con
duct
ed a
nd n
o AC
M fr
agm
ents
wer
e fo
und.
Item
rem
oved
in 2
013,
refe
r to
"216
0918
A SA
DN
SDC
C
lear
ance
BLS
17
1824
"
No
Asb
esto
s D
etec
ted
2/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D02
4 D
ange
rous
G
oods
St
oreh
ouse
Exte
rnal
GF
Nor
th e
leva
tion
In ra
inw
ater
dra
inM
ould
ed fi
bre
cem
enD
rain
pip
e30
01/D
024/
14/A
7
No
asbe
stos
fib
res
dete
cted
PB 2
014:
Not
not
ed in
pre
viou
s su
rvey
, poo
r con
ditio
n at
face
of
pipe
, rec
omm
end
enca
psul
atio
n
3001
DN
SDC
- M
oore
bank
NSW
D02
4 D
ange
rous
G
oods
St
oreh
ouse
Inte
rnal
/ Ex
tern
alR
oof
All s
tore
sIn
tern
al: w
areh
ouse
th
roug
hout
- st
eel b
eam
Sp
raye
d in
sula
tion
Beam
cla
ddin
g 46
m2
3001
/D02
5/M
G/0
01
No
asbe
stos
fib
res
dete
cted
Fire
ratin
g in
sula
tion
3001
DN
SDC
- M
oore
bank
NSW
D02
4 D
ange
rous
G
oods
St
oreh
ouse
In
tern
alG
FM
ale
and
fem
ale
toile
tIn
tern
al: a
men
ities
Fi
bre
cem
ent s
heet
Pa
rtitio
n w
all
6m
230
01/D
025/
MG
/002
No
asbe
stos
fib
res
dete
cted
Toile
t par
titio
ns
Build
ing
3001
/D02
5 Da
nger
ous
Goo
ds -
Gas
Sto
re N
o 1
No
visi
ble,
acc
essi
ble
asbe
stos
con
tain
ing
mat
eria
ls w
ere
loca
ted
in th
is b
uild
ing
at th
e tim
e of
the
insp
ectio
n
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D02
5 D
ange
rous
G
oods
- G
as
Stor
e N
o 1
Inte
rnal
/ Ex
tern
alBu
ildin
g fa
bric
N
o po
tent
ial a
sbes
tos
cont
aini
ng m
ater
ials
det
ecte
d in
the
build
ing
/ st
ruct
ure
Build
ing
3001
/D02
6 Da
nger
ous
Goo
ds -
Gas
Sto
re N
o 2
No
visi
ble,
acc
essi
ble
asbe
stos
con
tain
ing
mat
eria
ls w
ere
loca
ted
in th
is b
uild
ing
at th
e tim
e of
the
insp
ectio
n
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D02
6 D
ange
rous
G
oods
- G
as
Stor
e N
o 2
Inte
rnal
/ Ex
tern
alBu
ildin
g fa
bric
N
o po
tent
ial a
sbes
tos
cont
aini
ng m
ater
ials
det
ecte
d in
the
build
ing
/ st
ruct
ure
Build
ing
3001
/D02
7 Da
nger
ous
Goo
ds -
Radi
ac S
tore
Asb
esto
s D
etec
ted
2/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D02
7 D
ange
rous
G
oods
- R
adia
c St
ore
Inte
rnal
GF
Cha
nge
room
Cha
nge
room
thro
ugho
ut a
nd
wal
l lin
ings
to c
hang
e ro
om
area
with
in s
tora
ge a
rea
Fibr
e ce
men
t she
et
Wal
l & c
eilin
g lin
ing
Seal
edN
on-
Fria
ble
70m
2G
ood
3001
/D02
7/M
G/0
01C
hrys
otile
D
etec
ted
Med
ium
Low
Leav
e an
d m
aint
ain
A14
,15
Pain
ted
crea
m (e
xter
nal)
and
whi
te (i
nter
nal).
App
lied
new
labe
ls.
PB 2
013
AC
M s
till p
rese
nt a
nd n
oted
to b
e in
goo
d co
nditi
on.
PB 2
014:
AC
M s
till p
rese
nt, c
ondi
tion
unch
ange
d
No
Asb
esto
s D
etec
ted
2/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D02
7 D
ange
rous
G
oods
- R
adia
c St
ore
Exte
rnal
GF
All s
ides
of b
uild
ing
Wal
lsM
astic
Expa
nsio
n jo
int s
eal t
o ex
tern
al w
alls
3001
/D02
7/14
/A6
No
asbe
stos
fib
res
dete
cted
PB 2
014:
Not
not
ed in
pre
viou
s su
rvey
3001
DN
SDC
- M
oore
bank
NSW
D02
7 D
ange
rous
G
oods
- R
adia
c St
ore
Exte
rnal
GF
Fron
t ent
ranc
eEl
ectri
cal m
ount
ing
boar
d R
esin
ous
boar
d El
ectri
cal m
ount
ing
boar
d<1
m2
3001
/D02
7/M
G/0
01
No
asbe
stos
fib
res
dete
cted
Non
asb
esto
s co
ntai
ning
boa
rd, m
anuf
actu
red
by "f
orm
ica"
to
Aust
ralia
n St
anda
rds
3001
DN
SDC
- M
oore
bank
NSW
D02
7 D
ange
rous
G
oods
- R
adia
c St
ore
Inte
rnal
GF
Cha
nge
room
Elec
trica
l mou
ntin
g bo
ard
Res
inou
s bo
ard
Elec
trica
l mou
ntin
g bo
ard
<1 m
230
01/D
027/
MG
/002
No
asbe
stos
fib
res
dete
cted
Non
asb
esto
s co
ntai
ning
boa
rd, m
anuf
actu
red
by "f
orm
ica"
to
Aust
ralia
n St
anda
rds
3001
DN
SDC
- M
oore
bank
NSW
D02
7 D
ange
rous
G
oods
- R
adia
c St
ore
Inte
rnal
GF
Cha
nge
room
Cei
ling
Fibr
e ce
men
t she
et
Cei
ling
linin
g R
efer
to
0367
/300
1/D
27/
AYO
593
No
asbe
stos
fib
res
dete
cted
PB 2
014:
Dat
a ad
ded
from
DC
T.
3001
DN
SDC
- M
oore
bank
NSW
D02
7 D
ange
rous
G
oods
- R
adia
c St
ore
Inte
rnal
GF
Rea
r, in
met
al c
ase
Fire
doo
rIn
sula
tion
Fire
doo
r Se
aled
Non
-Fr
iabl
eVi
sual
O
bser
vatio
n As
best
os
Pres
umed
PB 2
014:
Dat
a ad
ded
from
DC
T.
Build
ing
3001
/D03
1 Ut
ility
Sto
re R
oom
and
Offi
ce
Asb
esto
s D
etec
ted
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D03
1 U
tility
Sto
re
Roo
m a
nd O
ffice
Ex
tern
alG
FM
ain
entry
driv
eway
Gro
und,
with
in C
hip
seal
dr
ivew
ayFi
bre
cem
ent s
heet
D
ebris
U
nsea
led
Non
-Fr
iabl
e<1
m2
Goo
d30
01/D
031/
MG
/001
Chr
ysot
ile a
nd
Amos
ite
dete
cted
Low
Low
Mon
itor
N/A
16, 5
844
Appe
ars
to h
ave
been
use
d in
driv
eway
agg
rega
te.
PB 2
013
Ev
iden
ce s
ugge
sts
ACM
not
pre
sent
due
to p
ossi
ble
past
re
med
iatio
n. D
rivew
ay n
oted
to b
e co
vere
d in
cru
sher
dus
t. PB
2014
: A v
isua
l ins
pect
ion
of th
e ar
ea w
as c
ondu
cted
and
no
ACM
fra
gmen
ts w
ere
foun
d. D
rivew
ay s
eale
d w
ith b
itum
en, r
efer
to p
hoto
#5
844
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D03
1 U
tility
Sto
re
Roo
m a
nd O
ffice
Ex
tern
alG
FN
orth
eas
t sid
eG
roun
d, s
ervi
ce p
itM
ould
ed c
emen
t pr
oduc
t Se
rvic
e pi
t U
nsea
led
Non
-Fr
iabl
e<1
m2
Poor
3001
/D03
1/M
G/0
02C
hrys
otile
D
etec
ted
Low
Med
ium
Rem
ove
N/A
17
Exte
nsiv
e da
mag
e to
pit,
lik
ely
to e
xper
ienc
e di
stur
banc
e du
ring
law
n m
aint
enan
ce.
PB 2
013
ACM
stil
l pre
sent
, con
ditio
n un
chan
ged.
PB
2014
: AC
M s
till p
rese
nt, c
ondi
tion
unch
ange
d.
GPS
refe
renc
e: -3
394
9288
000
150.
9291
7000
0
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D03
1 U
tility
Sto
re
Roo
m a
nd O
ffice
In
tern
alG
FW
este
rn s
ide
of b
uild
ing
Floo
r cov
erin
gSh
eet v
inyl
Floo
r cov
erin
gN
AN
on-
Fria
ble
25m
2Fa
irPr
esum
edPr
esum
edLo
wLo
wLe
ave
and
mai
ntai
nA
No
acce
ss to
inte
rnal
s of
bui
ldin
g. N
o ke
ys c
ould
be
iden
tifie
d by
se
curit
y. P
B 20
13 N
o ac
cess
to b
uild
ing
at ti
me
of in
spec
tion.
Sh
eet v
inyl
vis
ually
insp
ecte
d vi
a w
indo
w a
nd p
resu
med
to b
e AC
M.
Sam
plin
g re
quire
d to
con
firm
. PB
2014
: No
inte
rnal
ac
cess
at t
ime
of s
urve
y, A
CM
pre
sum
ed to
rem
ain
in s
itu.
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D03
1 U
tility
Sto
re
Roo
m a
nd O
ffice
In
tern
alG
FBu
ildin
g fa
bric
Thro
ugho
utVi
sual
O
bser
vatio
n As
best
os
Pres
umed
PB 2
014:
Dat
a ad
ded
from
DC
T.
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D03
1 U
tility
Sto
re
Roo
m a
nd O
ffice
Ex
tern
alG
FN
orth
eas
t sid
eM
id p
ortio
n of
bui
ldin
g, m
etal
in
sula
ted
pipe
Insu
latio
n Pi
pe w
ork
<1m
230
01/D
031/
MG
/003
No
asbe
stos
fib
res
dete
cted
Insu
latio
n w
rapp
ed a
roun
d pi
pe w
ork,
som
e da
mag
e ev
iden
t
Build
ing
3001
/D03
2 Ut
ility
Sto
re
Insp
ectio
n da
tApr
-14
Surv
eyor
: Dam
ien
Ben
bow
Dat
e As
sess
edB
ase
IDBu
ildin
g id
entif
icat
ion
Room
or
Spac
eFl
oor I
DPr
imar
y Lo
catio
nSe
cond
ary
Loca
tion
Mat
eria
lAp
plic
atio
nSu
rface
tr
eatm
ent
ACM
Typ
eQ
uant
ityQ
uant
ity
Type
Cond
ition
Sam
ple
IDLa
b Re
sults
Risk
Ra
ting
Like
lihoo
d of
di
stur
banc
eCo
ntro
lLa
belli
ngPh
oto
IDCo
mm
ent
Non
Asb
esto
s co
ntai
ning
mat
eria
l ide
ntifi
ed d
urin
g th
e 20
14 in
spec
tion
not p
revi
ousl
y id
entif
ied
Site
Loc
atio
n: D
NSD
C B
ase
Num
ber 3
001-
Moo
reba
nk N
SW
Asbe
stos
con
tain
ing
mat
eria
l ide
ntifi
ed d
urin
g th
e 20
14 re
insp
ectio
n no
t pre
viou
sly
iden
tifie
d
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D03
2 U
tility
Sto
reEx
tern
alG
FSo
uth
wes
t sid
eM
id p
ortio
n of
bui
ldin
g, m
etal
in
sula
ted
pipe
Insu
latio
n Pi
pe w
ork
Seal
edFr
iabl
e<1
m2
Fair
3001
/D03
1/M
G/0
01
No
asbe
stos
fib
res
dete
cted
Insu
latio
n w
rapp
ed a
roun
d pi
pe w
ork,
som
e da
mag
e ev
iden
t
3001
DN
SDC
- M
oore
bank
NSW
D03
2 U
tility
Sto
reEx
tern
alG
FM
ain
entry
doo
rAw
ning
Fibr
e ce
men
t she
et
Cei
ling
linin
g Se
aled
Non
-Fr
iabl
e10
m2
Goo
d30
01/D
031/
MG
/002
No
asbe
stos
fib
res
dete
cted
Pain
ted
whi
te
Build
ing
3001
/D03
3 Bu
lk S
tore
- DN
SDC
Asb
esto
s D
etec
ted
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D03
3 Bu
lk S
tore
- D
NSD
C
Exte
rnal
GF
Sout
h w
est c
orne
rG
roun
dM
ould
ed c
emen
t Pr
oduc
t Se
rvic
e pi
t U
nsea
led
Non
-Fr
iabl
e<1
m2
Fair
3001
/D03
3/M
G/0
02
Chr
ysot
ile a
nd
Amos
ite
dete
cted
Low
Med
ium
Rem
ove
N/A
18
Som
e da
mag
e pr
esen
t on
pit.
Like
ly to
exp
erie
nce
dist
urba
nce
durin
g la
wn
mai
nten
ance
. PB
201
3 A
CM
stil
l pre
sent
, con
ditio
n un
chan
ged.
PB
2014
: AC
M s
till p
rese
nt, c
ondi
tion
unch
ange
d.
GPS
refe
renc
e: -3
394
9288
000
150.
9291
7000
030
01 D
NSD
C-
Moo
reba
nk N
SWD
033
Bulk
Sto
re -
DN
SDC
In
tern
alG
FAl
l sid
es o
f bui
ldin
gFi
re d
oor
Insu
latio
n Fi
re d
oor
Seal
edN
on-
Fria
ble
8te
mG
ood
Visu
al
Obs
erva
tion
Asbe
stos
Pr
esum
edLo
wLo
wLe
ave
and
mai
ntai
nPB
201
4: D
ata
adde
d fro
m D
CT,
con
tinue
mon
itorin
g.
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D03
3 Bu
lk S
tore
- D
NSD
C
Exte
rnal
GF
Nor
th e
ast a
nd s
outh
w
est s
ides
Dow
n pi
pe d
rain
age
pits
Mou
lded
cem
ent
Prod
uct
Pit l
inin
gU
nsea
led
Non
-Fr
iabl
e16
tem
Fair
3001
/D03
3/M
G/0
03
No
asbe
stos
fib
res
dete
cted
N/A
Stor
mw
ater
dra
inag
e pi
ts
Rem
oved
Asb
esto
s
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D03
3 Bu
lk S
tore
- D
NSD
C
Exte
rnal
GF
All s
ides
Gro
und
Fibr
e ce
men
t Deb
risD
ebris
U
nsea
led
Non
Fria
ble
15te
mG
ood
3001
/D03
3/M
G/0
01C
hrys
otile
D
etec
ted
Low
Low
Leav
e an
d m
aint
ain
N/A
Unk
now
n so
urce
, lik
ely
mor
e pr
esen
t thr
ough
out g
rass
ed a
rea.
Li
kely
to e
xper
ienc
e di
stur
banc
e du
ring
law
n m
aint
enan
ce.
PB
2013
ACM
stil
l pre
sent
at t
ime
of in
spec
tion.
Evi
denc
e su
gges
ts fr
agm
ents
of A
CM to
be
cont
aine
d w
ithin
gro
und
surfa
ce.
Gro
und
debr
is p
rogr
amm
ed to
be
rem
oved
201
3.
Cont
inue
mon
itorin
g. C
lear
ance
cer
tific
ate
prov
ided
05
/03/
2013
. PB
2014
: A v
isua
l ins
pect
ion
of th
e ar
ea w
as
cond
ucte
d an
d no
AC
M fr
agm
ents
wer
e lo
cate
d. It
em re
mov
ed in
20
13, r
efer
to "2
1609
18A
S&A
DN
SDC
Cle
aran
ce B
LD
3334
35pd
f"
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D03
3 Bu
lk S
tore
- D
NSD
C
Inte
rnal
GF
Mid
nor
th e
ast s
ide
Gro
und
Fibr
e ce
men
t Deb
risD
ebris
U
nsea
led
Non
Fria
ble
1te
mPo
or30
01/D
033/
MG
/004
Chr
ysot
ile
Det
ecte
dR
A19
Unk
now
n so
urce
, app
roxi
mat
ely
1 m
off
perim
eter
wal
l in
pede
stria
n w
alkw
ay. L
ikel
y to
be
mor
e pr
esen
t, bu
ildin
g is
ver
y du
sty.
Deb
ris
rem
oved
in M
ay 2
012,
how
ever
som
e m
ay s
till r
emai
n w
ithin
in
acce
ssib
le a
reas
. PB
2014
: Ite
m re
mov
ed in
201
2, re
fer t
o "1
8066
4_D
33.p
df".
ACM
may
stil
l rem
ain
in in
acce
ssib
le a
reas
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D03
3 Bu
lk S
tore
- D
NSD
C
Inte
rnal
GF
Mid
nor
th e
ast s
ide
Gro
und
Fibr
e ce
men
t Deb
risD
ebris
U
nsea
led
Non
Fria
ble
1te
mG
ood
3001
/D03
3/M
G/0
04C
hrys
otile
D
etec
ted
Low
Low
Mon
itor
N/A
Unk
now
n so
urce
, app
roxi
mat
ely
1 m
off
perim
eter
wal
l in
pede
stria
n w
alkw
ay. L
ikel
y to
be
mor
e pr
esen
t, bu
ildin
g is
ver
y du
sty.
PB
2013
G
HD n
otes
- D
ebris
rem
oved
in M
ay 2
012,
how
ever
som
e m
ay
still
rem
ain
with
in in
acce
ssib
le a
reas
. PB
2014
: te
m re
mov
ed in
20
12, r
efer
to "1
8066
4_D
33.p
df".
ACM
may
stil
l rem
ain
in
inac
cess
ible
are
as
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D03
3 Bu
lk S
tore
- D
NSD
C
Inte
rnal
GF
Nor
th o
f rea
r ent
ry d
oor
Seco
nd ti
mbe
r wal
l bea
m
from
roof
Fibr
e ce
men
t Deb
risD
ebris
U
nsea
led
Non
Fria
ble
1te
mG
ood
3001
/D03
3/M
G/0
06C
hrys
otile
D
etec
ted
Low
Low
Rem
ove
N/A
20
Like
ly a
resu
lt of
poo
r rem
oval
of f
orm
er a
sbes
tos
roof
and
wal
ls,
appr
oxim
atel
y 4
debr
is n
oted
on
uppe
r bea
ms
thro
ugho
ut th
e bu
ildin
g. B
uild
ing
is d
usty
. To
be re
mov
ed in
201
2.PB
201
3
GHD
not
es re
mov
ed in
May
201
2, h
owev
er s
ome
may
stil
l re
mai
n w
ithin
inac
cess
ible
are
as. P
B 20
14: I
tem
rem
oved
in
2012
, ref
er to
"180
664_
D33
". AC
M m
ay s
till r
emai
n in
in
acce
ssib
lear
eas
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D03
3 Bu
lk S
tore
- D
NSD
C
Inte
rnal
GF
Nor
th o
f rea
r ent
ry d
oor
Seco
nd ti
mbe
r wal
l bea
m
from
roof
Fibr
e ce
men
t Deb
risD
ebris
U
nsea
led
Non
Fria
ble
1te
mPo
or30
01/D
033/
MG
/006
Chr
ysot
ile
Det
ecte
dR
N/A
Like
ly a
resu
lt of
poo
r rem
oval
of f
orm
er a
sbes
tos
roof
and
wal
ls,
appr
oxim
atel
y 4
debr
is n
oted
on
uppe
r bea
ms
thro
ugho
ut th
e bu
ildin
g. B
uild
ing
is d
usty
. Deb
ris re
mov
ed in
May
201
2, h
owev
er
som
e m
ay s
till r
emai
n w
ithin
inac
cess
ible
are
as. P
B 20
14: I
tem
re
mov
ed in
201
2, re
fer t
o "1
8066
4_D
33pd
f". A
CM
may
stil
l rem
ain
in in
acce
ssib
le a
reas
Build
ing
3001
/D03
4 Bu
lk S
tore
- DN
SDC
Asb
esto
s D
etec
ted 30
01 D
NSD
C-
Moo
reba
nk N
SWD
034
Bulk
Sto
re -
DN
SDC
In
tern
alG
FAl
l sid
es o
f bui
ldin
gFi
re d
oor
Insu
latio
n Fi
re d
oor
Seal
edN
on-
Fria
ble
10te
mG
ood
Visu
al
Obs
erva
tion
Asbe
stos
Pr
esum
edLo
wLo
wLe
ave
and
mai
ntai
nPB
201
4: D
ata
adde
d fro
m D
CT,
con
tinue
mon
itorin
g.
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D03
4 Bu
lk S
tore
- D
NSD
C
Exte
rnal
GF
East
and
wes
t sid
esD
own
pipe
dra
inag
e pi
tsM
ould
ed c
emen
t Pr
oduc
t Pi
t lin
ing
16te
m30
01/D
034/
MG
/003
No
asbe
stos
fib
res
dete
cted
Stor
mw
ater
dra
inag
e pi
ts
3001
DN
SDC
- M
oore
bank
NSW
D03
4 Bu
lk S
tore
- D
NSD
C
Exte
rnal
GF
Path
Expa
nsio
n jo
ints
Mas
ticEx
pans
ion
join
ts03
67/3
001/
D34
/AY
O59
9
No
asbe
stos
fib
res
dete
cted
PB 2
014:
Dat
a ad
ded
from
DC
T.
Rem
oved
Asb
esto
s
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D03
4 Bu
lk S
tore
- D
NSD
C
Exte
rnal
GF
All s
ides
Gro
und
Fibr
e ce
men
t Deb
risD
ebris
U
nsea
led
Non
Fria
ble
12te
mG
ood
3001
/D03
4/M
G/0
02C
hrys
otile
D
etec
ted
Low
Low
Leav
e an
d m
aint
ain
N/A
Unk
now
n so
urce
, lik
ely
mor
e pr
esen
t thr
ough
out g
rass
ed a
rea.
Li
kely
to e
xper
ienc
e di
stur
banc
e du
ring
law
n m
aint
enan
ce.
PB
2013
ACM
stil
l pre
sent
at t
ime
of in
spec
tion.
Evi
denc
e su
gges
ts fr
agm
ents
of A
CM to
be
cont
aine
d w
ithin
gro
und
surfa
ce.
Gro
und
debr
is p
rogr
amm
ed to
be
rem
oved
201
3.
Cont
inue
mon
itorin
g. C
lear
ance
cer
tific
ate
prov
ided
05
/03/
2013
. PB
2014
: A v
isua
l ins
pect
ion
of th
e ar
ea w
as
cond
ucte
d an
d no
AC
M fr
agm
ents
wer
e fo
und.
Item
rem
oved
in
2013
, ref
er to
"216
0918
A S&
A D
NSD
C C
lear
ance
BLD
33
3435
pdf"
Insp
ectio
n da
tApr
-14
Surv
eyor
: Dam
ien
Ben
bow
Dat
e As
sess
edB
ase
IDBu
ildin
g id
entif
icat
ion
Room
or
Spac
eFl
oor I
DPr
imar
y Lo
catio
nSe
cond
ary
Loca
tion
Mat
eria
lAp
plic
atio
nSu
rface
tr
eatm
ent
ACM
Typ
eQ
uant
ityQ
uant
ity
Type
Cond
ition
Sam
ple
IDLa
b Re
sults
Risk
Ra
ting
Like
lihoo
d of
di
stur
banc
eCo
ntro
lLa
belli
ngPh
oto
IDCo
mm
ent
Non
Asb
esto
s co
ntai
ning
mat
eria
l ide
ntifi
ed d
urin
g th
e 20
14 in
spec
tion
not p
revi
ousl
y id
entif
ied
Site
Loc
atio
n: D
NSD
C B
ase
Num
ber 3
001-
Moo
reba
nk N
SW
Asbe
stos
con
tain
ing
mat
eria
l ide
ntifi
ed d
urin
g th
e 20
14 re
insp
ectio
n no
t pre
viou
sly
iden
tifie
d
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D03
4 Bu
lk S
tore
- D
NSD
C
Inte
rnal
GF
Sout
h ea
st c
orne
r of
build
ing
Gro
und,
on
low
er ti
mbe
r be
amFi
bre
cem
ent D
ebris
Deb
ris
Uns
eale
dN
on-
Fria
ble
1te
mPo
or30
01/D
034/
MG
/001
Chr
ysot
ile
Det
ecte
dR
N/A
One
deb
ris o
bser
ved.
Unk
now
n so
urce
, ent
ire lo
wer
hal
f of b
uild
ing
visu
ally
obse
rved
in a
cces
sibl
e ar
eas
only.
Bui
ldin
g is
ver
y du
sty.
D
ebris
rem
oved
in J
une
2012
, how
ever
som
e m
ay s
till r
emai
n w
ithin
inac
cess
ible
are
as. P
B 20
14: A
vis
ual i
nspe
ctio
n of
the
area
was
con
duct
ed a
nd n
o AC
M w
as fo
und.
tem
rem
oved
in 2
012,
re
fer t
o "1
8131
6_D
34pd
f". A
CM
may
stil
l rem
ain
in in
acce
ssib
le
area
s c
ontin
ue m
onito
ring.
Build
ing
3001
/D03
5 Bu
lk S
tore
- DN
SDC
Asb
esto
s D
etec
ted 30
01 D
NSD
C-
Moo
reba
nk N
SWD
035
Bulk
Sto
re -
DN
SDC
In
tern
alG
FAl
l sid
es o
f bui
ldin
gFi
re d
oor
Insu
latio
n Fi
re d
oor
Seal
edN
on-
Fria
ble
8te
mG
ood
Visu
al
Obs
erva
tion
Asbe
stos
Pr
esum
edLo
wLo
wLe
ave
and
mai
ntai
nPB
201
4: D
ata
adde
d fro
m D
CT,
con
tinue
mon
itorin
g.
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D03
5 Bu
lk S
tore
- D
NSD
C
Exte
rnal
GF
East
and
wes
t sid
esD
own
pipe
dra
inag
e pi
tsM
ould
ed c
emen
t Pr
oduc
t Pi
t lin
ing
16te
m30
01/D
035/
MG
/003
No
asbe
stos
fib
res
dete
cted
Stor
mw
ater
dra
inag
e pi
ts
3001
DN
SDC
- M
oore
bank
NSW
D03
5 Bu
lk S
tore
- D
NSD
C
Exte
rnal
GF
Wes
tern
sid
e ne
ar ro
ller
door
10
Gro
und
Fibr
e ce
men
t Deb
risD
ebris
03
67/3
001/
D03
5/0
01
No
asbe
stos
fib
res
dete
cted
PB 2
014:
Dat
a ta
ken
from
DC
T.
Rem
oved
Asb
esto
s
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D03
5 Bu
lk S
tore
- D
NSD
C
Exte
rnal
GF
All s
ides
Gro
und
Fibr
e ce
men
t deb
risD
ebris
U
nsea
led
Non
-Fr
iabl
e20
tem
Goo
d30
01/D
035/
MG
/002
Chr
ysot
ile
Det
ecte
dLo
wLo
wLe
ave
and
mai
ntai
nN
/A
Unk
now
n so
urce
, lik
ely
mor
e pr
esen
t thr
ough
out g
rass
ed a
rea.
Li
kely
to e
xper
ienc
e di
stur
banc
e du
ring
law
n m
aint
enan
ce.
PB
2013
ACM
stil
l pre
sent
at t
ime
of in
spec
tion.
Evi
denc
e su
gges
ts fr
agm
ents
of A
CM to
be
cont
aine
d w
ithin
gro
und
surfa
ce.
Gro
und
debr
is p
rogr
amm
ed to
be
rem
oved
201
3.
Cont
inue
mon
itorin
g. C
lear
ance
cer
tific
ate
prov
ided
05
/03/
2013
. PB
2014
: A v
isua
l ins
pect
ion
of th
e ar
ea w
as
cond
ucte
d an
d no
AC
M fr
agm
ents
wer
e fo
und.
Ref
er to
"216
0918
A S&
A D
NSD
C C
lear
ance
BLD
33,
34,3
5.pd
f" an
d "2
1609
18A
S&A
DN
SDC
Cle
aran
ceBL
D35
&36
pdf"
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D03
5 Bu
lk S
tore
- D
NSD
C
Inte
rnal
GF
Mid
eas
tern
per
imet
er &
so
uth
east
cor
ner
Gro
und
& on
tim
ber b
eam
sFi
bre
cem
ent d
ebris
Deb
ris
Uns
eale
dN
onFr
iabl
e2
tem
Poor
3001
/D03
5/M
G/0
01
Chr
ysot
ile a
nd
Amos
ite
dete
cted
RN
/A
Two
debr
is o
bser
ved.
Unk
now
n so
urce
, ent
ire lo
wer
hal
f of b
uild
ing
visu
ally
obse
rved
in a
cces
sibl
e ar
eas
only.
Bui
ldin
g is
ver
y du
sty.
D
ebris
rem
oved
in J
une
2012
, how
ever
som
e m
ay s
till r
emai
n w
ithin
inac
cess
ible
are
as. P
B 20
14: I
tem
rem
oved
in 2
012,
refe
r to
"180
663_
D35
". AC
M m
ay s
till r
emai
n in
inac
cess
ible
are
as.
Build
ing
3001
/D03
6 M
ale
Toile
t - D
NSDC
Rem
oved
Asb
esto
s
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D03
6 M
ale
Toile
t -
DN
SDC
Exte
rnal
GF
All s
ides
Gro
und
Fibr
e ce
men
t she
et
Deb
ris
Uns
eale
dN
onFr
iabl
e8
tem
Goo
d30
01/D
036/
MG
/001
Chr
ysot
ile a
nd
Amos
ite
dete
cted
Low
Low
Leav
e an
d m
aint
ain
N/A
Unk
now
n so
urce
, lik
ely
mor
e pr
esen
t with
in g
rass
ed a
rea.
Lik
ely
to
expe
rienc
e di
stur
banc
e du
ring
law
n m
aint
enan
ce.
PB 2
013
ACM
st
ill p
rese
nt a
t tim
e of
insp
ectio
n. E
vide
nce
sugg
ests
fra
gmen
ts o
f ACM
to b
e co
ntai
ned
with
in g
roun
d su
rface
. G
roun
d de
bris
pro
gram
med
to b
e re
mov
ed 2
013.
Con
tinue
m
onito
ring.
Cle
aran
ce c
ertif
icat
e pr
ovid
ed 0
5/03
/201
3. P
B20
14: A
vis
ual i
nspe
ctio
n of
the
wor
k ar
ea w
as c
ondu
cted
and
no
ACM
frag
men
ts w
ere
foun
d. t
em re
mov
ed in
201
3, re
fer t
o "2
1609
18A
S&A
DN
SDC
Cle
aran
ce B
LD 3
5 &
36.p
df"
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D03
6 M
ale
Toile
t -
DN
SDC
Exte
rnal
GF
Fron
tG
roun
d Fi
bre
cem
ent s
heet
D
ebris
U
nsea
led
Non
Fria
ble
<1m
2Po
or03
67/3
001/
D36
/AY
O60
1As
best
os
Pres
ent
Med
ium
Low
Rem
ove
N/A
PB 2
014:
Dat
a ad
ded
from
DC
T. A
vis
ual i
nspe
ctio
n of
the
wor
k ar
ea w
as c
ondu
cted
and
no
ACM
frag
men
ts w
ere
foun
d. t
em
rem
oved
in 2
013,
refe
r to
"216
0918
A S&
A D
NSD
C C
lear
ance
BLD
35
& 3
6.pd
f"
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D03
6 M
ale
Toile
t -
DN
SDC
Inte
rnal
GF
Abov
e ur
inal
Urin
al c
iste
rnM
ould
ed c
emen
t Pr
oduc
t C
iste
rn
1te
m30
01/D
036/
MG
/002
No
asbe
stos
fib
res
dete
cted
Like
ly m
ade
of c
oncr
ete.
Rem
oved
labe
lling
Build
ing
3001
/D03
7 Ar
tisan
s / C
arpe
nter
s Sh
op A
58
Asb
esto
s D
etec
ted 30
01 D
NSD
C-
Moo
reba
nk N
SW
D03
7 Ar
tisan
s /
Car
pent
ers
Shop
A5
8In
tern
alG
FN
orth
and
eas
t doo
rsFi
re d
oor
Insu
latio
n Fi
re d
oor
Seal
edN
on-
Fria
ble
2te
mG
ood
Visu
al
Obs
erva
tion
Asbe
stos
Pr
esum
edLo
wLo
wLe
ave
and
mai
ntai
n
PB 2
014:
Dat
a ad
ded
from
DC
T, c
ontin
ue m
onito
ring.
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D03
7 Ar
tisan
s /
Car
pent
ers
Shop
A5
7Ex
tern
alG
FEa
st a
nd w
est s
ides
Dow
n pi
pe d
rain
age
pits
Mou
lded
cem
ent
Prod
uct
Pit l
inin
g8
tem
3001
/D03
7/M
G/0
01
No
asbe
stos
fib
res
dete
cted
Stor
mw
ater
dra
inag
e pi
ts
3001
DN
SDC
- M
oore
bank
NSW
D03
7 Ar
tisan
s /
Car
pent
ers
Shop
A5
8 In
tern
alG
FN
orth
sid
e of
bui
ldin
gAm
eniti
es
Fibr
e ce
men
t she
et
Parti
tion
wal
l 6
m2
3001
/D03
7/M
G/0
02
No
asbe
stos
fib
res
dete
cted
Bui
ldin
g 30
01/D
038
Tim
ber S
tore
Asb
esto
s D
etec
ted
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D03
8 Ti
mbe
r St
ore
Exte
rnal
GF
Mid
eas
t and
sou
th e
ast
corn
er o
f bui
ldin
gG
roun
d Fi
bre
cem
ent D
ebris
Deb
ris
Uns
eale
dN
on-
Fria
ble
<1m
2Po
or30
01/D
038/
MG
/001
Chr
ysot
ile
Det
ecte
dM
ediu
mM
ediu
mR
emov
eN
/A21
Unk
now
n so
urce
, lik
ely
mor
e pr
esen
t with
in g
rass
ed a
rea.
Lik
ely
to
expe
rienc
e di
stur
banc
e du
ring
law
n m
aint
enan
ce.
PB 2
013
ACM
st
ill p
rese
nt a
t tim
e of
insp
ectio
n. E
vide
nce
sugg
ests
fra
gmen
ts o
f ACM
to b
e co
ntai
ned
with
in g
roun
d su
rface
. Co
ntin
ue m
onito
ring.
Gro
und
debr
is p
rogr
amm
ed to
be
rem
oved
201
3. P
B 20
14: A
vis
ual i
nspe
ctio
n of
the
wor
k ar
ea w
as
cond
ucte
d an
d no
AC
M fr
agm
ents
wer
e fo
und.
Con
tinue
mon
itorin
g.
Insp
ectio
n da
tApr
-14
Surv
eyor
: Dam
ien
Ben
bow
Dat
e As
sess
edB
ase
IDBu
ildin
g id
entif
icat
ion
Room
or
Spac
eFl
oor I
DPr
imar
y Lo
catio
nSe
cond
ary
Loca
tion
Mat
eria
lAp
plic
atio
nSu
rface
tr
eatm
ent
ACM
Typ
eQ
uant
ityQ
uant
ity
Type
Cond
ition
Sam
ple
IDLa
b Re
sults
Risk
Ra
ting
Like
lihoo
d of
di
stur
banc
eCo
ntro
lLa
belli
ngPh
oto
IDCo
mm
ent
Non
Asb
esto
s co
ntai
ning
mat
eria
l ide
ntifi
ed d
urin
g th
e 20
14 in
spec
tion
not p
revi
ousl
y id
entif
ied
Site
Loc
atio
n: D
NSD
C B
ase
Num
ber 3
001-
Moo
reba
nk N
SW
Asbe
stos
con
tain
ing
mat
eria
l ide
ntifi
ed d
urin
g th
e 20
14 re
insp
ectio
n no
t pre
viou
sly
iden
tifie
d
3001
DN
SDC
- M
oore
bank
NSW
D03
8 Ti
mbe
r St
ore
Exte
rnal
GF
Sout
h ea
st c
orne
r of
build
ing
Gro
und
Fibr
e ce
men
t Deb
risD
ebris
U
nsea
led
Non
-Fr
iabl
e<1
m2
Poor
Ref
er to
03
67/3
001/
D44
/AY
O60
5
Asbe
stos
Pr
esen
tM
ediu
mM
ediu
mR
emov
eN
/APB
201
4: D
ata
adde
d fro
m D
CT.
A v
isua
l ins
pect
ion
of th
e w
ork
area
was
con
duct
ed a
nd n
o AC
M fr
agm
ents
wer
e fo
und.
Con
tinue
m
onito
ring
Build
ing
3001
/D03
9 Co
ntin
genc
y / S
tore
hous
e 90
Ove
rflow
Asb
esto
s D
etec
ted
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D03
9 C
ontin
genc
y /
Stor
ehou
se 9
0 O
verfl
ow
Exte
rnal
GF
Nor
thea
st c
orne
r of
build
ing
In g
roun
d, ~
10 n
orth
east
of
build
ing,
adj
acen
t stre
et li
ght
Mou
lded
fibr
e ce
men
Serv
ice
pit
Uns
eale
dN
on-fr
iabl
e<1
m2
Fair
3001
/D00
39/1
4/A1
0C
hrys
otile
de
tect
edLo
wM
ediu
mR
emov
eN
/A58
43PB
201
4: N
ot n
oted
in p
revi
ous
surv
ey, p
artia
lly b
urie
d w
ith e
xpos
ed
edge
s lik
ely
to b
e di
stur
bed
by g
roun
ds m
aint
enan
ce. G
PS
refe
renc
e: -3
394
9288
000
150
9291
7000
0
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D03
9 C
ontin
genc
y /
Stor
ehou
se 9
0 O
verfl
ow
Exte
rnal
GF
Nor
th, s
outh
and
wes
t si
deG
roun
d Fi
bre
cem
ent D
ebris
Deb
ris
Uns
eale
dN
on-
Fria
ble
Appr
ox. 4
0te
mPo
or30
01/D
039/
MG
/001
Chr
ysot
ile
Amos
ite a
nd
croc
idol
ite
dete
cted
Med
ium
Med
ium
Rem
ove
N/A
22
Sign
ifica
nt c
once
ntra
tion
on w
este
rn s
ide
parti
cula
rly s
urro
undi
ng
door
13,
larg
e co
rruga
ted
fragm
ents
obs
erve
d. U
nkno
wn
sour
ce,
likel
y m
ore
pres
ent w
ithin
gra
ssed
are
a. L
ikel
y to
exp
erie
nce
dist
urba
nce
durin
g la
wn
mai
nten
ance
. PB
201
3 A
CM s
till
pres
ent a
t tim
e of
insp
ectio
n. G
roun
d de
bris
pro
gram
med
to
be re
mov
ed 2
013.
PB
2014
: A v
isua
l ins
pect
ion
of th
e ar
ea w
as
cond
ucte
d; A
CM
frag
men
ts w
ere
note
d to
eas
t and
wes
t ele
vatio
ns.
Rec
omm
end
rem
oval
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D03
9 C
ontin
genc
y /
Stor
ehou
se 9
0 O
verfl
ow
Exte
rnal
GF
All s
ides
of b
uild
ing
Gro
und
Fibr
e ce
men
t Deb
risD
ebris
U
nsea
led
Non
-Fr
iabl
e<1
m2
Poor
Ref
er to
03
67/3
001/
D44
/AY
O60
5
Asbe
stos
Pr
esen
tM
ediu
mM
ediu
mR
emov
eN
/A
PB 2
014:
Dat
a ad
ded
from
DC
T. A
vis
ual i
nspe
ctio
n of
the
area
was
co
nduc
ted
and
debr
is w
as n
oted
to e
ast a
nd w
est e
leva
tions
. R
ecom
men
d re
mov
al.
3001
DN
SDC
- M
oore
bank
NSW
D03
9 C
ontin
genc
y /
Stor
ehou
se 9
0 O
verfl
ow
Inte
rnal
GF
All s
ides
of b
uild
ing
Fire
doo
rIn
sula
tion
Fire
doo
r Se
aled
Non
-Fr
iabl
e8
tem
Goo
dVi
sual
O
bser
vatio
n As
best
os
Pres
umed
Low
Low
Leav
e an
d m
aint
ain
PB 2
014:
Dat
a ad
ded
from
DC
T, c
ontin
ue m
onito
ring.
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D03
9 C
ontin
genc
y /
Stor
ehou
se 9
0 O
verfl
ow
Exte
rnal
GF
East
and
wes
t sid
esD
own
pipe
dra
inag
e pi
tsM
ould
ed c
emen
t Pr
oduc
t Pi
t lin
ing
16te
m30
01/D
039/
MG
/002
No
asbe
stos
fib
res
dete
cted
Stor
mw
ater
dra
inag
e pi
ts
Build
ing
3001
/D04
0 Na
vy P
ublic
atio
ns /
DNSD
C
Asb
esto
s D
etec
ted
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D04
0 N
avy
Publ
icat
ions
- D
NSD
C
Exte
rnal
GF
Nor
thw
est c
orne
rC
omm
unic
atio
n pi
t with
in
grou
ndM
ould
ed fi
bre
cem
ent
Serv
ice
pit
Uns
eale
dN
on-
Fria
ble
<1 m
2Fa
ir30
01/D
040/
MG
/003
Chr
ysot
ile
Det
ecte
dLo
wM
ediu
mLe
ave
and
mai
ntai
nR
23Te
lstra
pit.
PB
2013
ACM
stil
l pre
sent
, con
ditio
n un
chan
ged.
PB
201
4: A
CM
stil
l pre
sent
, con
ditio
n un
chan
ged.
GPS
refe
renc
e: -
3394
9288
000
150
9291
7000
0
3001
DN
SDC
- M
oore
bank
NSW
D04
0 N
avy
Publ
icat
ions
- D
NSD
C
Inte
rnal
GF
All s
ides
of b
uild
ing
Fire
doo
rIn
sula
tion
Fire
doo
r Se
aled
Non
-Fr
iabl
e8
tem
Goo
dVi
sual
O
bser
vatio
n As
best
os
Pres
umed
Low
Low
Leav
e an
d m
aint
ain
PB 2
014:
Dat
a ad
ded
from
DC
T, c
ontin
ue m
onito
ring.
Rem
oved
Asb
esto
s
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D04
0 N
avy
Publ
icat
ions
- D
NSD
C
Exte
rnal
GF
Nor
th, s
outh
, eas
t and
w
est s
ide
Gro
und
Fibr
e ce
men
t Deb
risD
ebris
U
nsea
led
Non
Fria
ble
9te
mG
ood
3001
/D04
0/M
G/0
01C
hrys
otile
D
etec
ted
Low
Low
Leav
e an
d m
aint
ain
N/A
Smal
l con
cent
ratio
n in
nor
th e
ast c
orne
r. U
nkno
wn
sour
ce, l
ikel
y m
ore
pres
ent w
ithin
gra
ssed
are
a. L
ikel
y to
exp
erie
nce
dist
urba
nce
durin
g la
wn
mai
nten
ance
. PB
201
3 A
CM
stil
l pre
sent
at t
ime
of
insp
ectio
n. G
roun
d de
bris
pro
gram
med
to b
e re
mov
ed 2
013.
C
lear
ance
cer
tific
ate
prov
ided
16/
03/2
013.
PB
2014
: A v
isua
l in
spec
tion
of th
e ar
ea w
as c
ondu
cted
and
no
ACM
frag
men
ts w
ere
foun
d.Ite
m re
mov
ed in
201
3, re
fer t
o "2
1609
18A
S&A
DN
SDC
C
lear
ance
BLD
45,
50,4
4,42
,43
and
166.
pdf"
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D04
0 N
avy
Publ
icat
ions
- D
NSD
C
Inte
rnal
GF
Sout
h w
est c
orne
r of
build
ing
Seco
nd ti
mbe
r bea
m fr
om
grou
ndFi
bre
cem
ent D
ebris
Deb
ris
Uns
eale
dN
onFr
iabl
e1
tem
Poor
3001
/D04
0/M
G/0
04C
hrys
otile
D
etec
ted
Low
RN
/A
Deb
ris c
olle
cted
for s
ampl
e. U
nkno
wn
sour
ce. E
ntire
low
er h
alf o
f bu
ildin
g vi
sual
ly ob
serv
ed in
acc
essi
ble
area
s on
ly. D
ebris
rem
oved
in
Feb
ruar
y 20
12, h
owev
er s
ome
may
stil
l rem
ain
with
in
inac
cess
ible
are
as. P
B 20
14: I
tem
rem
oved
in 2
012,
refe
r to
"Bui
ldin
g 40
Cle
aran
ce_F
NAL
". AC
M m
ay s
till r
emai
n in
in
acce
ssib
le a
reas
.
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D04
0 N
avy
Publ
icat
ions
- D
NSD
C
Inte
rnal
GF
Mid
sou
th e
ast p
ortio
n of
bui
ldin
gU
pper
red
fire
hydr
ant p
ipe
Fibr
e ce
men
t Deb
risD
ebris
U
nsea
led
Non
Fria
ble
1te
mPo
or30
01/D
040/
MG
/007
Chr
ysot
ile
Det
ecte
dLo
wR
N/A
Like
ly a
resu
lt of
poo
r rem
oval
of f
orm
er a
sbes
tos
roof
and
wal
ls,
appr
oxim
atel
y 6
debr
is n
oted
on
uppe
r bea
ms
thro
ugho
ut th
e bu
ildin
g. B
uild
ing
is d
usty
. Deb
ris re
mov
ed in
Feb
ruar
y 20
12,
how
ever
som
e m
ay s
till r
emai
n w
ithin
inac
cess
ible
are
as. P
B20
14: I
tem
rem
oved
in 2
012,
refe
r to
"Bui
ldin
g 40
C
lear
ance
_FIN
AL.p
df".
ACM
may
stil
l rem
ain
in in
acce
ssib
le a
reas
.
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D04
0 N
avy
Publ
icat
ions
- D
NSD
C
Exte
rnal
GF
East
and
wes
t sid
esD
own
pipe
dra
inag
e pi
tsM
ould
ed c
emen
t Pr
oduc
t Pi
t lin
ing
16te
m30
01/D
040/
MG
/002
No
asbe
stos
fib
res
dete
cted
Stor
mw
ater
dra
inag
e pi
ts
3001
DN
SDC
- M
oore
bank
NSW
D04
0 N
avy
Publ
icat
ions
- D
NSD
C
Inte
rnal
GF
Nor
th e
ast c
orne
rEx
tern
al: O
ffice
wal
ls
Flat
cem
ent s
heet
Wal
l lin
ing
26m
230
01/D
040/
MG
/005
No
asbe
stos
fib
res
dete
cted
Som
e sm
all h
ole
dam
age
obse
rved
on
wes
tern
sid
e
Build
ing
3001
/D04
2 M
ale
/ Fem
ale
Amen
ities
& L
unch
Roo
m
Rem
oved
Asb
esto
s
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D04
2 M
ale
/ Fe
mal
e Am
eniti
es
& Lu
nch
Roo
m
Exte
rnal
GF
Nor
th, s
outh
, eas
t and
w
est s
ides
Gro
und
Fibr
e ce
men
t Deb
risD
ebris
U
nsea
led
Non
Fria
ble
<1m
2G
ood
3001
/D04
2/M
G/0
01C
hrys
otile
D
etec
ted
Low
Low
Leav
e an
d m
aint
ain
N/A
Deb
ris re
mov
ed fo
r sam
ple.
Unk
now
n so
urce
, lik
ely
mor
e pr
esen
t w
ithin
gra
ssed
are
a. L
ikel
y to
exp
erie
nce
dist
urba
nce
durin
g la
wn
mai
nten
ance
. PB
201
3 A
dditi
onal
deb
ris lo
cate
d to
nor
th,
sout
h an
d w
est s
ides
dur
ing
insp
ectio
n. G
roun
d de
bris
pr
ogra
mm
ed to
be
rem
oved
201
3. C
lear
ance
cer
tific
ate
prov
ided
16/
03/2
013.
PB
2014
: A v
isua
l ins
pect
ion
of th
e w
ork
area
was
con
duct
ed a
nd n
o AC
M fr
agm
ents
wer
e fo
und.
tem
re
mov
ed in
201
3, re
fer t
o "2
1609
18A
S&A
DN
SDC
Cle
aran
ce B
LD
4550
4442
43an
d16
6pd
f"
No
Asb
esto
s D
etec
ted
Insp
ectio
n da
tApr
-14
Surv
eyor
: Dam
ien
Ben
bow
Dat
e As
sess
edB
ase
IDBu
ildin
g id
entif
icat
ion
Room
or
Spac
eFl
oor I
DPr
imar
y Lo
catio
nSe
cond
ary
Loca
tion
Mat
eria
lAp
plic
atio
nSu
rface
tr
eatm
ent
ACM
Typ
eQ
uant
ityQ
uant
ity
Type
Cond
ition
Sam
ple
IDLa
b Re
sults
Risk
Ra
ting
Like
lihoo
d of
di
stur
banc
eCo
ntro
lLa
belli
ngPh
oto
IDCo
mm
ent
Non
Asb
esto
s co
ntai
ning
mat
eria
l ide
ntifi
ed d
urin
g th
e 20
14 in
spec
tion
not p
revi
ousl
y id
entif
ied
Site
Loc
atio
n: D
NSD
C B
ase
Num
ber 3
001-
Moo
reba
nk N
SW
Asbe
stos
con
tain
ing
mat
eria
l ide
ntifi
ed d
urin
g th
e 20
14 re
insp
ectio
n no
t pre
viou
sly
iden
tifie
d
3001
DN
SDC
- M
oore
bank
NSW
D04
2 M
ale
/ Fe
mal
e Am
eniti
es
& Lu
nch
Roo
m
Inte
rnal
GF
Mal
e an
d fe
mal
e to
ilets
/sho
wer
sW
all l
inin
gFi
bre
cem
ent s
heet
W
all l
inin
g 46
m2
3001
/D04
2/M
G/0
02
No
asbe
stos
fib
res
dete
cted
Pain
ted
crea
m
Build
ing
3001
/D04
3 AD
E PL
HQ
Offi
ce
Asb
esto
s D
etec
ted
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D04
3 AD
E PL
HQ
O
ffice
Ex
tern
alR
oof
East
and
wes
t sid
esEa
ves
Fibr
e ce
men
t she
et
Lini
ng
Seal
edN
on-
Fria
ble
4m
2Fa
ir30
01/D
043/
MG
/002
Chr
ysot
ile
Amos
ite a
nd
croc
idol
ite
dete
cted
Low
Low
Leav
e an
d m
aint
ain
A24
, 25
Pain
ted
whi
te. N
ew la
bels
app
lied.
PB
2013
AC
M s
till p
rese
nt,
cond
ition
unc
hang
ed. P
B 20
14: A
CM
stil
l pre
sent
, con
ditio
n un
chan
ged.
Rem
oved
Asb
esto
s
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D04
3 AD
E PL
HQ
O
ffice
Ex
tern
alG
FAl
l sid
esG
roun
d Fi
bre
cem
ent D
ebris
Deb
ris
Uns
eale
dN
onFr
iabl
e5
tem
Goo
d30
01/D
043/
MG
/001
Chr
ysot
ile a
nd
Amos
ite
dete
cted
Low
Low
Leav
e an
d m
aint
ain
N/A
Unk
now
n so
urce
, lik
ely
mor
e pr
esen
t und
er s
ub fl
oor s
pace
of
build
ing.
Lik
ely
to e
xper
ienc
e di
stur
banc
e du
ring
law
n m
aint
enan
ce.
PB 2
013
AC
M d
ebris
stil
l pre
sent
. G
roun
d de
bris
pr
ogra
mm
ed to
be
rem
oved
201
3. C
lear
ance
cer
tific
ate
prov
ided
16/
03/2
013.
PB
2014
: A v
isua
l ins
pect
ion
of th
e ar
ea w
as
cond
ucte
d an
d no
AC
M fr
agm
ents
wer
e fo
und.
Item
rem
oved
in
2013
, ref
er to
"216
0918
A S&
A D
NSD
C C
lear
ance
BLD
45
5044
4243
and
166.
pdf"
No
Asb
esto
s D
etec
ted
/ ina
cces
sibl
e ar
eas
3001
DN
SDC
- M
oore
bank
NSW
D04
3 AD
E PL
HQ
O
ffice
Ex
tern
alR
oof
Nor
th &
sou
th s
ides
Ex
tern
al: I
nfill
pane
l bel
ow
roof
Fibr
e ce
men
t she
et
Barg
e ca
ppin
g 2
m2
3001
/D04
3/M
G/0
03
No
asbe
stos
fib
res
dete
cted
Pain
ted
whi
te
3001
DN
SDC
- M
oore
bank
NSW
D04
3 AD
E PL
HQ
O
ffice
In
tern
alG
FH
allw
ay a
nd lu
nch
room
Blue
with
whi
te s
treak
s vi
nyl
floor
tile
sVi
nyl t
iles
Floo
r lin
ing
12m
230
01/D
043/
MG
/004
No
asbe
stos
fib
res
dete
cted
Blue
with
whi
te s
treak
s
3001
DN
SDC
- M
oore
bank
NSW
D04
3 AD
E PL
HQ
O
ffice
In
tern
alG
FO
ffice
1 a
nd o
ffice
2R
ed w
ith b
lack
lino
leum
sh
eetin
gLi
nole
umFl
oor s
heet
ing
8m
230
01/D
043/
MG
/005
No
asbe
stos
fib
res
dete
cted
Red
with
bla
ck
3001
DN
SDC
- M
oore
bank
NSW
D04
3 AD
E PL
HQ
O
ffice
In
tern
alG
FO
ffice
1 a
nd o
ffice
2Th
ick
fibre
cem
ent s
heet
ing
unde
r red
with
bla
ck li
nole
um
shee
ting
Fibr
e ce
men
t she
et
Floo
r lin
ing
8m
230
01/D
043/
MG
/006
No
asbe
stos
fib
res
dete
cted
Cov
ered
by
linol
eum
3001
DN
SDC
- M
oore
bank
NSW
D04
3 AD
E PL
HQ
O
ffice
Ex
tern
alG
FEa
st w
all
Elec
trica
l box
Res
inou
s bo
ard
Elec
trica
l mou
ntin
g bo
ard
<1 m
230
01/M
G/D
043/
001
No
asbe
stos
fib
res
dete
cted
Non
asb
esto
s co
ntai
ning
boa
rd, m
anuf
actu
red
by "N
P" to
Aus
tralia
n St
anda
rds
3001
DN
SDC
- M
oore
bank
NSW
D04
3 AD
E PL
HQ
O
ffice
In
tern
alR
oof
Roo
f cav
ity
Lim
ited
acce
ss in
to c
avity
, vie
wed
from
man
hole
onl
y. N
o as
best
os
debr
is o
bser
ved
how
ever
may
be
pres
ent.
PB 2
014
No
acce
ss
past
man
hole
, no
ACM
sig
hted
. ACM
may
rem
ain
in
inac
cess
ible
are
as.
Bui
ldin
g 30
01/D
044
War
ehou
se -
Ret
urn
Stor
es P
roce
ssin
g
Asb
esto
s D
etec
ted 30
01 D
NSD
C-
Moo
reba
nk N
SW
D04
4 W
areh
ouse
R
etur
n St
ores
Pr
oces
sing
In
tern
alG
FAl
l sid
es o
f bui
ldin
gFi
re d
oor
Insu
latio
n Fi
re d
oor
Seal
edN
on-
Fria
ble
8te
mG
ood
Visu
al
Obs
erva
tion
Asbe
stos
Pr
esum
edLo
wLo
wLe
ave
and
mai
ntai
n
PB 2
014:
Dat
a ad
ded
from
DC
T, c
ontin
ue m
onito
ring.
Rem
oved
Asb
esto
s
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D04
4 W
areh
ouse
R
etur
n St
ores
Pr
oces
sing
Ex
tern
alG
FAl
l sid
esG
roun
d Fi
bre
cem
ent d
ebris
Deb
ris
Uns
eale
dN
on-
Fria
ble
20te
mPo
or30
01/D
044/
MG
/001
Chr
ysot
ile
Det
ecte
dM
ediu
mM
ediu
mR
emov
eN
/A
Parti
cula
rly c
once
ntra
ted
in th
e so
uth
wes
t cor
ner.
Unk
now
n so
urce
, lik
ely
mor
e pr
esen
t thr
ough
out g
rass
ed a
rea.
Lik
ely
to e
xper
ienc
e di
stur
banc
e du
ring
law
n m
aint
enan
ce.
PB 2
013
ACM
deb
ris s
till
pres
ent a
t tim
e in
spec
tion.
Gro
und
debr
is p
rogr
amm
ed to
be
rem
oved
201
3. C
lear
ance
cer
tific
ate
prov
ided
for e
aste
rn a
nd
sout
hern
sid
es o
f bui
ldin
g 16
/03/
2013
. PB
2014
: A v
isua
l in
spec
tion
of th
e pe
rimet
er o
f the
bui
ldin
g w
as c
ondu
cted
and
no
ACM
frag
men
ts w
ere
foun
d. t
em re
mov
ed in
201
3, re
fer t
o "2
1609
18A
S&A
DN
SDC
Cle
aran
ce B
LD 4
5,50
,44,
42,4
3 an
d 16
6pd
f" (e
ast a
nd s
outh
ele
vatio
ns o
nly)
.
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D04
4 W
areh
ouse
R
etur
n St
ores
Pr
oces
sing
In
tern
alG
FN
orth
eas
t cor
ner,
north
w
est c
orne
r & a
long
no
rther
n pe
rimet
erG
roun
d &
on ti
mbe
r bea
ms
Fibr
e ce
men
t deb
risD
ebris
U
nsea
led
Non
Fria
ble
4te
mPo
or30
01/D
044/
MG
/003
Chr
ysot
ile
Det
ecte
dM
ediu
mR
N/A
Four
deb
ris o
bser
ved,
3 o
n lo
wer
tim
ber b
eam
or g
roun
d, a
nd o
ne
on s
econ
d tim
ber b
eam
from
gro
und.
Unk
now
n so
urce
, ent
ire lo
wer
ha
lf of
bui
ldin
g vi
sual
ly ob
serv
ed in
acc
essi
ble
area
s on
ly. B
uild
ing
is
very
dus
ty D
ebris
rem
oved
in M
arch
201
2, h
owev
er s
ome
may
stil
l re
mai
n w
ithin
inac
cess
ible
are
as. P
B 20
14 It
em re
mov
ed in
201
2,
refe
r to
"Bui
ldin
g 44
Cle
aran
ceFi
nal.p
df".
Deb
ris m
ay s
till
rem
ain
in in
acce
ssib
le a
reas
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D04
4 W
areh
ouse
R
etur
n St
ores
Pr
oces
sing
In
tern
alG
FEa
ster
n co
rner
Seco
nd ti
mbe
r bea
m fr
om
roof
Fibr
e ce
men
t deb
risD
ebris
U
nsea
led
Non
Fria
ble
3te
mPo
or30
01/D
044/
MG
/004
Chr
ysot
ile a
nd
Amos
ite
dete
cted
Low
RN
/A
Four
deb
ris o
bser
ved,
> 3
0 de
bris
obs
erve
d ac
ross
upp
er ti
mbe
r be
ams
thro
ugho
ut b
uild
ing.
Lik
ely
a re
sult
of p
oor r
emov
al o
f for
mer
as
best
os ro
of a
nd w
alls
. Bui
ldin
g is
ver
y du
sty.
Deb
ris re
mov
ed in
M
arch
201
2, h
owev
er s
ome
may
stil
l rem
ain
with
in in
acce
ssib
le
area
s. P
B 20
14:
tem
rem
oved
in 2
012,
refe
r to
"Bui
ldin
g 44
C
lear
ance
_Fin
al.p
df".
Deb
ris m
ay s
till r
emai
n in
inac
cess
ible
are
as
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D04
4 W
areh
ouse
R
etur
n St
ores
Pr
oces
sing
Ex
tern
alG
FEa
st a
nd w
est s
ides
Dow
n pi
pe d
rain
age
pits
Mou
lded
cem
ent
Prod
uct
Pit l
inin
g18
tem
3001
/D04
4/M
G/0
02
No
asbe
stos
fib
res
dete
cted
Stor
mw
ater
dra
inag
e pi
ts
Bui
ldin
g 30
01/D
045
Air
Des
patc
h St
ocks
Asb
esto
s D
etec
ted 30
01 D
NSD
C-
Moo
reba
nk N
SWD
045
Air
Des
patc
h St
ocks
In
tern
alG
FAl
l sid
es o
f bui
ldin
gFi
re d
oor
Insu
latio
n Fi
re d
oor
Seal
edN
on-
Fria
ble
9te
mG
ood
Visu
al
Obs
erva
tion
Asbe
stos
Pr
esum
edLo
wLo
wLe
ave
and
mai
ntai
n
PB 2
014:
Dat
a ad
ded
from
DC
T, c
ontin
ue m
onito
ring.
Insp
ectio
n da
tApr
-14
Surv
eyor
: Dam
ien
Ben
bow
Dat
e As
sess
edB
ase
IDBu
ildin
g id
entif
icat
ion
Room
or
Spac
eFl
oor I
DPr
imar
y Lo
catio
nSe
cond
ary
Loca
tion
Mat
eria
lAp
plic
atio
nSu
rface
tr
eatm
ent
ACM
Typ
eQ
uant
ityQ
uant
ity
Type
Cond
ition
Sam
ple
IDLa
b Re
sults
Risk
Ra
ting
Like
lihoo
d of
di
stur
banc
eCo
ntro
lLa
belli
ngPh
oto
IDCo
mm
ent
Non
Asb
esto
s co
ntai
ning
mat
eria
l ide
ntifi
ed d
urin
g th
e 20
14 in
spec
tion
not p
revi
ousl
y id
entif
ied
Site
Loc
atio
n: D
NSD
C B
ase
Num
ber 3
001-
Moo
reba
nk N
SW
Asbe
stos
con
tain
ing
mat
eria
l ide
ntifi
ed d
urin
g th
e 20
14 re
insp
ectio
n no
t pre
viou
sly
iden
tifie
d
Rem
oved
Asb
esto
s
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D04
5 Ai
r D
espa
tch
Stoc
ks
Exte
rnal
GF
Nor
th, e
ast a
nd w
est
side
sG
roun
d Fi
bre
cem
ent d
ebris
Deb
ris
Uns
eale
dN
onFr
iabl
e16
tem
Poor
3001
/D04
5/M
G/0
01As
best
os
Pres
ent
Med
ium
Med
ium
Rem
ove
N/A
PB 2
014:
Dat
a ad
ded
from
DC
T. A
vis
ual i
nspe
ctio
n of
the
perim
eter
of
the
build
ing
was
con
duct
ed a
nd n
o AC
M w
as fo
und.
Item
re
mov
ed in
201
3, re
fer t
o "2
1609
18A
S&A
DN
SDC
Cle
aran
ce B
LD
4550
4442
43 a
nd 1
66.p
df"
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D04
5 Ai
r D
espa
tch
Stoc
ks
Exte
rnal
GF
East
and
wes
t sid
esD
own
pipe
dra
inag
e pi
tsM
ould
ed c
emen
t Pr
oduc
t Pi
t lin
ing
15te
m30
01/D
045/
MG
/002
No
asbe
stos
fib
res
dete
cted
Stor
mw
ater
dra
inag
e pi
ts
3001
DN
SDC
- M
oore
bank
NSW
D04
5 Ai
r D
espa
tch
Stoc
ks
Inte
rnal
GF
Def
ence
hal
f of b
uild
ing
Mai
nten
ance
are
a, h
oist
are
a an
d ge
nera
l are
a w
all l
inin
gFl
at c
emen
t she
etW
all l
inin
g 45
0m
230
01/D
045/
MG
/003
No
asbe
stos
fib
res
dete
cted
Som
e sm
all h
ole
dam
age
obse
rved
thro
ugho
ut w
all l
inin
g
Bui
ldin
g 30
01/D
046
OTS
Sto
res
Asb
esto
s D
etec
ted
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D04
6 O
TS S
tore
s Ex
tern
alG
FW
est e
leva
tion
On
grou
ndFi
bre
cem
ent s
heet
Deb
risU
nsea
led
Non
-fria
ble
<1m
2Po
or30
01/D
046/
14/A
9
Chr
ysot
ile a
nd
amos
ite
dete
cted
Hig
hM
ediu
mR
emov
eN
/A58
42PB
201
4: N
ot n
oted
in p
revi
ous
surv
ey, d
ebris
bur
ied
in g
roun
d;
pote
ntia
lly fu
rther
bur
ied
debr
is.
1/05
/14
3001
DN
SDC
- M
oore
bank
NSW
D04
6 O
TS S
tore
s In
tern
alG
FSo
uthe
rn c
orne
rTi
mbe
r bea
m u
p ne
ar ro
of
linin
gFi
bre
cem
ent d
ebris
Deb
ris
Uns
eale
dN
on-
Fria
ble
2te
mPo
or30
01/0
46/M
G/0
07
Chr
ysot
ile a
nd
Amos
ite
dete
cted
Med
ium
Low
RN
/A27
Two
debr
is o
bser
ved,
app
roxi
mat
ely
5 de
bris
obs
erve
d ac
ross
upp
er
timbe
r bea
ms
thro
ugho
ut b
uild
ing.
Lik
ely
a re
sult
of p
oor r
emov
al o
f fo
rmer
asb
esto
s ro
of a
nd w
alls
. Bui
ldin
g is
ver
y du
sty.
To
be
rem
oved
in S
ep/O
ct 2
012.
PB
2013
Abo
ve h
eigh
t res
trict
ions
, un
able
to c
onfir
m re
mov
al o
f ACM
. Pr
esum
e st
ill p
rese
nt. P
B20
14: A
vis
ual i
nspe
ctio
n of
sev
eral
bea
ms
was
con
duct
ed a
nd n
o AC
M w
as fo
und.
AC
M m
ay re
mai
n in
inac
cess
ible
are
as, c
lear
ance
ce
rtific
ate
requ
ired
for c
onfir
mat
ion.
1/05
/14
3001
DN
SDC
- M
oore
bank
NSW
D04
6 O
TS S
tore
s In
tern
alG
FN
orth
eas
t cor
ner
Firs
t and
sec
ond
timbe
r be
am fr
om g
roun
dFi
bre
cem
ent d
ebris
Deb
ris
Uns
eale
dN
on-
Fria
ble
2te
mG
ood
3001
/046
/MG
/00
4
Chr
ysot
ile a
nd
Amos
ite
dete
cted
Low
Low
RN
/A26
Unk
now
n so
urce
. Ent
ire lo
wer
hal
f of b
uild
ing
visu
ally
obse
rved
in
acce
ssib
le a
reas
onl
y, li
mite
d ac
cess
to p
erim
eter
of b
uild
ing
due
to
the
pres
ence
of p
alle
t rac
ks a
gain
st w
alls
. To
be re
mov
ed in
Se
p/O
ct 2
012.
PB 2
013
Evi
denc
e su
gges
ts d
ebris
has
bee
n re
mov
ed. P
B 20
14: A
vis
ual i
nspe
ctio
n of
sev
eral
bea
ms
was
co
nduc
ted
and
no A
CM
was
foun
d. A
CM
may
rem
ain
in
inac
cess
ible
are
as, c
lear
ance
cer
tific
ate
requ
ired
for c
onfir
mat
ion.
3001
DN
SDC
- M
oore
bank
NSW
D04
6 O
TS S
tore
s In
tern
alG
FAl
l sid
es o
f bui
ldin
gFi
re d
oor
Insu
latio
n Fi
re d
oor
Seal
edN
on-
Fria
ble
Visu
al
Obs
erva
tion
Asbe
stos
Pr
esum
edPB
201
4: D
ata
adde
d fro
m D
CT,
con
tinue
mon
itorin
g.
Rem
oved
Asb
esto
s
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D04
6 O
TS S
tore
s Ex
tern
alG
FN
orth
& s
outh
sid
esG
roun
d Fi
bre
cem
ent d
ebris
Deb
ris
Uns
eale
dN
onFr
iabl
eAp
prox
. 3te
mPo
or30
01/0
46/M
G/0
02
Chr
ysot
ile a
nd
Amos
ite
dete
cted
Med
ium
Med
ium
RN
/A
Unk
now
n so
urce
, lik
ely
mor
e pr
esen
t thr
ough
out g
rass
ed a
rea.
Li
kely
to e
xper
ienc
e di
stur
banc
e du
ring
law
n m
aint
enan
ce.
PB
2013
Gro
und
debr
is p
rogr
amm
ed to
be
rem
oved
201
3. P
B20
14: A
vis
ual i
nspe
ctio
n of
the
area
was
con
duct
ed a
nd n
o AC
M
fragm
ents
wer
e fo
und.
Are
a be
neat
h tre
e hi
nder
ed in
spec
tion
due
to
lots
of l
eave
s on
gro
und.
tem
rem
oved
in 2
013,
refe
r to
"216
0918
A S&
A D
NSD
C C
lear
ance
BLD
45,
40,4
4,42
,43
and
166.
pdf"
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D04
6 O
TS S
tore
s Ex
tern
alG
FN
orth
& s
outh
sid
esD
own
pipe
dra
inag
e pi
tsM
ould
ed c
emen
t Pr
oduc
t Pi
t lin
ing
16te
m30
01/0
46/M
G/0
01
No
asbe
stos
fib
res
dete
cted
Stor
mw
ater
dra
inag
e pi
ts
3001
DN
SDC
- M
oore
bank
NSW
D04
6 O
TS S
tore
s In
tern
alG
FEx
tern
al: N
aval
sto
res
repa
irabl
e of
fice
Wal
l lin
ing
Fibr
e ce
men
t she
et
Wal
l lin
ing
10m
230
01/0
46/M
G/0
03
No
asbe
stos
fib
res
dete
cted
Pain
ted
crea
m
3001
DN
SDC
- M
oore
bank
NSW
D04
6 O
TS S
tore
s In
tern
alG
FEx
tern
al: Q
uara
ntin
e &
lunc
h ro
om/o
ffice
Wal
l lin
ing
Fibr
e ce
men
t she
et
Wal
l lin
ing
12m
2R
efer
to
3001
/046
/MG
/00
3
No
asbe
stos
fib
res
dete
cted
Pain
ted
crea
m
3001
DN
SDC
- M
oore
bank
NSW
D04
6 O
TS S
tore
s In
tern
alG
FO
ffice
sW
all l
inin
gFi
bre
cem
ent s
heet
W
all l
inin
g 03
67/3
001/
D46
/AY
O61
2
No
asbe
stos
fib
res
dete
cted
PB 2
014:
Dat
a ad
ded
from
DC
T, c
ontin
ue m
onito
ring.
Build
ing
3001
/D04
7 DN
SDC
Arm
oury
No
visi
ble,
acc
essi
ble
asbe
stos
con
tain
ing
mat
eria
ls w
ere
loca
ted
in th
is b
uild
ing
at th
e tim
e of
the
insp
ectio
n
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D04
7 D
NSD
C
Arm
oury
Bu
ildin
g fa
bric
N
o as
best
os w
as d
etec
ted
with
in th
is b
uild
ing
/ stru
ctur
e
Bui
ldin
g 30
01/D
048
OTS
Sto
res
Asb
esto
s D
etec
ted
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D04
8 O
TS S
tore
s Ex
tern
alG
FEa
st &
wes
t sid
esG
roun
d Fi
bre
cem
ent d
ebris
Deb
ris
Uns
eale
dN
on-
Fria
ble
8te
mPo
or30
01/0
48/M
G/0
01
Chr
ysot
ile
Det
ecte
dLo
wLo
wM
onito
rN
/A29
Unk
now
n so
urce
, lik
ely
mor
e pr
esen
t thr
ough
out g
rass
ed a
rea.
Li
kely
to e
xper
ienc
e di
stur
banc
e du
ring
law
n m
aint
enan
ce.
PB
2013
: G
roun
d de
bris
pro
gram
med
to b
e re
mov
ed 2
013.
PB
2014
A
visu
al in
spec
tion
of th
e ar
ea w
as c
ondu
cted
and
no
ACM
fra
gmen
ts w
ere
foun
d. C
ontin
ue m
onito
ring.
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D04
8 O
TS S
tore
s In
tern
alG
FM
id n
orth
per
imet
er o
f bu
ildin
g, ju
st w
est o
f sp
rinkl
er b
oost
er
Gro
und
Fibr
e ce
men
t deb
risD
ebris
U
nsea
led
Non
-Fr
iabl
e1
tem
Goo
d30
01/0
48/M
G/0
03
Chr
ysot
ile a
nd
Amos
ite
dete
cted
Low
Low
N/A
N/A
28
Unk
now
n so
urce
, rel
ativ
ely
larg
e fra
gmen
t. 1
debr
is c
olle
cted
for
sam
ple.
Aga
inst
wal
l. To
be
rem
oved
in S
ep/O
ct 2
012.
PB
2013
D
ebris
pre
viou
sly
colle
cted
as
sam
ple.
PB
2014
: A v
isua
l in
spec
tion
of th
e ar
ea w
as c
ondu
cted
and
no
ACM
frag
men
ts w
ere
loca
ted.
Con
tinue
mon
itorin
g.
Insp
ectio
n da
tApr
-14
Surv
eyor
: Dam
ien
Ben
bow
Dat
e As
sess
edB
ase
IDBu
ildin
g id
entif
icat
ion
Room
or
Spac
eFl
oor I
DPr
imar
y Lo
catio
nSe
cond
ary
Loca
tion
Mat
eria
lAp
plic
atio
nSu
rface
tr
eatm
ent
ACM
Typ
eQ
uant
ityQ
uant
ity
Type
Cond
ition
Sam
ple
IDLa
b Re
sults
Risk
Ra
ting
Like
lihoo
d of
di
stur
banc
eCo
ntro
lLa
belli
ngPh
oto
IDCo
mm
ent
Non
Asb
esto
s co
ntai
ning
mat
eria
l ide
ntifi
ed d
urin
g th
e 20
14 in
spec
tion
not p
revi
ousl
y id
entif
ied
Site
Loc
atio
n: D
NSD
C B
ase
Num
ber 3
001-
Moo
reba
nk N
SW
Asbe
stos
con
tain
ing
mat
eria
l ide
ntifi
ed d
urin
g th
e 20
14 re
insp
ectio
n no
t pre
viou
sly
iden
tifie
d
1/05
/14
3001
DN
SDC
- M
oore
bank
NSW
D04
8 O
TS S
tore
s In
tern
alG
FM
id p
ortio
n of
bui
ldin
gTi
mbe
r bea
m u
p ne
ar ro
of
linin
gFi
bre
cem
ent d
ebris
Deb
ris
Uns
eale
dN
on-
Fria
ble
1te
mPo
or30
01/0
48/M
G/0
07
Chr
ysot
ile a
nd
Amos
ite
dete
cted
Med
ium
Low
Rem
ove
N/A
30
One
deb
ris o
bser
ved,
app
roxi
mat
ely
4 de
bris
obs
erve
d ac
ross
upp
er
timbe
r bea
ms
thro
ugho
ut b
uild
ing.
Lik
ely
a re
sult
of p
oor r
emov
al o
f fo
rmer
asb
esto
s ro
of a
nd w
alls
. Bui
ldin
g is
ver
y du
sty.
To
be
rem
oved
in S
ep/O
ct 2
012.
PB
2013
Abo
ve h
eigh
t res
trict
ions
. Un
able
to c
onfir
m re
mov
al.
Pres
ume
ACM
stil
l pre
sent
. PB
2014
: A v
isua
l ins
pect
ion
of s
ever
al b
eam
s w
as c
ondu
cted
and
no
ACM
was
foun
d. A
CM
may
rem
ain
in in
acce
ssib
le a
reas
, cle
aran
ce
certi
ficat
e re
quire
d fo
r con
firm
atio
n.
3001
DN
SDC
- M
oore
bank
NSW
D04
8 O
TS S
tore
s In
tern
alG
FAl
l sid
es o
f bui
ldin
gFi
re d
oor
Insu
latio
n Fi
re d
oor
Seal
edN
on-
Fria
ble
8te
mG
ood
Visu
al
Obs
erva
tion
Asbe
stos
Pr
esum
edLo
wLo
wLe
ave
and
mai
ntai
nPB
201
4: D
ata
adde
d fro
m D
CT,
con
tinue
mon
itorin
g.
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D04
8 O
TS S
tore
s Ex
tern
alG
FEa
st &
wes
t sid
esD
own
pipe
dra
inag
e pi
tsM
ould
ed c
emen
t Pr
oduc
t Pi
t lin
ing
17te
mFa
ir30
01/0
48/M
G/0
02
No
asbe
stos
fib
res
dete
cted
Stor
mw
ater
dra
inag
e pi
ts
3001
DN
SDC
- M
oore
bank
NSW
D04
8 O
TS S
tore
s In
tern
alG
FEx
tern
al: O
ffice
wal
lW
all l
inin
gFi
bre
cem
ent s
heet
W
all l
inin
g 10
m2
3001
/048
/MG
/00
4
No
asbe
stos
fib
res
dete
cted
Pain
ted
crea
m
Bui
ldin
g 30
01/D
049
Vehi
cle
Coy
Bat
tery
Sto
res
Asb
esto
s D
etec
ted
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D04
9 Ve
hicl
e C
oy
Batte
ry S
tore
s In
tern
alG
FW
areh
ouse
Upp
er w
all
Fibr
e ce
men
t she
et
Lini
ng
Seal
edN
on-
Fria
ble
90m
2G
ood
3001
D04
9/M
G/0
01C
hrys
otile
D
etec
ted
Low
Low
Leav
e an
d m
aint
ain
A31
, 33
Pain
ted
crea
m. U
pdat
ed la
bels
. PB
201
3 A
CM s
till p
rese
nt,
cond
ition
unc
hang
ed.
Unse
aled
sec
tion
note
d w
ithin
HW
S cu
pboa
rd. P
B 20
14: A
CM
stil
l pre
sent
, con
ditio
n un
chan
ged
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D04
9 Ve
hicl
e C
oy
Batte
ry S
tore
s In
tern
alG
FO
ffice
, am
eniti
es,
war
ehou
se (i
nclu
ding
cu
pboa
rd)
Cei
ling
Fibr
e ce
men
t she
et
Lini
ng
Seal
edN
on-
Fria
ble
32m
2G
ood
Ref
er to
30
01D
049/
MG
/001
Chr
ysot
ile
Det
ecte
dLo
wLo
wLe
ave
and
mai
ntai
nA
32, 3
4
Pain
ted
crea
m a
nd w
hite
, uns
eale
d se
ctio
n ob
serv
ed w
ithin
ho
twat
er c
upbo
ard.
Upd
ated
labe
ls.
PB 2
013
ACM
stil
l pre
sent
, co
nditi
on u
ncha
nged
. PB
2014
: AC
M s
till p
rese
nt, c
ondi
tion
unch
ange
d.
Bui
ldin
g 30
01/D
050
War
ehou
se -
Bul
k St
orag
e
Rem
oved
Asb
esto
s
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D05
0 W
areh
ouse
Bu
lk S
tora
ge
Exte
rnal
GF
Wes
t and
nor
th o
f bu
ildin
gG
roun
d Fi
bre
cem
ent d
ebris
Deb
ris
Uns
eale
dN
onFr
iabl
eAp
prox
. 6te
mG
ood
3001
/D05
0/M
G/0
01C
hrys
otile
D
etec
ted
Low
Low
Mon
itor
N/A
Unk
now
n so
urce
, lik
ely
mor
e pr
esen
t thr
ough
out g
rass
ed a
rea.
Li
kely
to e
xper
ienc
e di
stur
banc
e du
ring
law
n m
aint
enan
ce. I
t was
no
ted
that
dai
ly di
stur
banc
e w
ould
occ
ur o
n th
e no
rth e
ast s
ide
due
to fo
rklif
t tra
ffic.
PB
2013
Gro
und
debr
is re
mov
ed 2
5/02
/201
3.
Cont
inue
mon
itorin
g. C
lear
ance
cer
tific
ate
prov
ided
27
/02/
2013
. PB
2014
: A v
isua
l ins
pect
ion
of th
e ar
ea w
as
cond
ucte
d an
d no
AC
M fr
agm
ents
wer
e fo
und.
Item
rem
oved
in
2013
, ref
er to
"216
0918
A S&
A D
NSD
C C
lear
ance
BLD
47,
50,5
1 an
d72
pdf"
Bui
ldin
g 30
01/D
051
War
ehou
se -
Bul
k St
orag
e
Rem
oved
Asb
esto
s
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D05
1 W
areh
ouse
Bu
lk S
tora
ge
Exte
rnal
GF
Nor
th o
f bui
ldin
gG
roun
d Fi
bre
cem
ent d
ebris
Deb
ris
Uns
eale
dN
onFr
iabl
e9
tem
Goo
d30
01/D
051/
MG
/001
Chr
ysot
ile
Det
ecte
dLo
wLo
wM
onito
rN
/A
Unk
now
n so
urce
, lik
ely
mor
e pr
esen
t thr
ough
out g
rass
ed a
rea.
Li
kely
to e
xper
ienc
e di
stur
banc
e du
ring
law
n m
aint
enan
ce. S
ome
larg
e fra
gmen
ts o
bser
ved.
PB
2013
Gro
und
debr
is re
mov
ed
25/0
2/20
13.
Cont
inue
mon
itorin
g. C
lear
ance
cer
tific
ate
prov
ided
27/
02/2
013.
PB
2014
: A v
isua
l ins
pect
ion
of th
e ar
ea w
as
cond
ucte
d an
d no
AC
M fr
agm
ents
wer
e fo
und.
Item
rem
oved
in
2013
, ref
er to
"216
0918
A S&
A D
NSD
C C
lear
ance
BLD
47,
50,5
1 an
d72
"
Bui
ldin
g 30
01/D
052
War
ehou
se -
Bul
k St
orag
e
Asb
esto
s D
etec
ted
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D05
2 W
areh
ouse
Bu
lk S
tora
ge
Exte
rnal
GF
Nor
th a
nd e
ast o
f bu
ildin
gG
roun
d Fi
bre
cem
ent d
ebris
Deb
ris
Uns
eale
dN
on-
Fria
ble
Appr
ox. 2
0te
mPo
or30
01/D
052/
MG
/001
Chr
ysot
ile
Det
ecte
dM
ediu
mH
igh
RN
/A35
Unk
now
n so
urce
, lik
ely
mor
e pr
esen
t thr
ough
out g
rass
ed a
rea.
Li
kely
to e
xper
ienc
e di
stur
banc
e du
ring
law
n m
aint
enan
ce.
PB 2
013
Gro
und
debr
is p
rogr
amm
ed to
be
rem
oved
201
3. P
B 20
14: A
vi
sual
insp
ectio
n of
the
wor
k ar
ea w
as c
ondu
cted
and
no
ACM
fra
gmen
ts w
ere
foun
d. C
ontin
ue m
onito
ring.
Bui
ldin
g 30
01/D
053
War
ehou
se -
Ove
rsiz
e Pa
llet S
ilo
Rem
oved
Asb
esto
s
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D05
3 W
areh
ouse
O
vers
ize
Palle
t Si
loEx
tern
alG
FSo
uth,
eas
t and
wes
t si
de o
f bui
ldin
gG
roun
d Fi
bre
cem
ent d
ebris
Deb
ris
Uns
eale
dN
onFr
iabl
e6
tem
Goo
d30
01/D
053/
MG
/001
Chr
ysot
ile
Amos
ite a
nd
croc
idol
ite
dete
cted
Low
Low
Mon
itor
N/A
Unk
now
n so
urce
, lik
ely
mor
e pr
esen
t thr
ough
out g
rass
ed a
rea.
Li
kely
to e
xper
ienc
e di
stur
banc
e du
ring
law
n m
aint
enan
ce.
PB
2013
Gro
und
debr
is re
mov
ed 2
013.
Con
tinue
mon
itorin
g.
Cle
aran
ce c
ertif
icat
e pr
ovid
ed 2
2/02
/201
3. P
B 20
14: A
vis
ual
insp
ectio
n of
the
area
was
con
duct
ed a
nd n
o AC
M fr
agm
ents
wer
e fo
und.
Item
rem
oved
in 2
013,
refe
r to
"216
0918
A SA
DN
SDC
C
lear
ance
BLD
5354
and
7322
0213
pdf"
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D05
3 W
areh
ouse
O
vers
ize
Palle
t Si
loIn
tern
alG
FAm
eniti
esPa
rtitio
n w
all
Fibr
e ce
men
t she
et
Parti
tions
03
67/3
001/
D53
/AY
O61
5
No
asbe
stos
fib
res
dete
cted
PB 2
014:
Dat
a ad
ded
from
DC
T.
Bui
ldin
g 30
01/D
054
War
ehou
se -
Ove
rsiz
e Pa
llet S
ilo
Rem
oved
Asb
esto
s
Insp
ectio
n da
tApr
-14
Surv
eyor
: Dam
ien
Ben
bow
Dat
e As
sess
edB
ase
IDBu
ildin
g id
entif
icat
ion
Room
or
Spac
eFl
oor I
DPr
imar
y Lo
catio
nSe
cond
ary
Loca
tion
Mat
eria
lAp
plic
atio
nSu
rface
tr
eatm
ent
ACM
Typ
eQ
uant
ityQ
uant
ity
Type
Cond
ition
Sam
ple
IDLa
b Re
sults
Risk
Ra
ting
Like
lihoo
d of
di
stur
banc
eCo
ntro
lLa
belli
ngPh
oto
IDCo
mm
ent
Non
Asb
esto
s co
ntai
ning
mat
eria
l ide
ntifi
ed d
urin
g th
e 20
14 in
spec
tion
not p
revi
ousl
y id
entif
ied
Site
Loc
atio
n: D
NSD
C B
ase
Num
ber 3
001-
Moo
reba
nk N
SW
Asbe
stos
con
tain
ing
mat
eria
l ide
ntifi
ed d
urin
g th
e 20
14 re
insp
ectio
n no
t pre
viou
sly
iden
tifie
d
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D05
4 W
areh
ouse
O
vers
ize
Palle
t Si
loEx
tern
alG
FN
orth
and
eas
t sid
e of
bu
ildin
gG
roun
d Fi
bre
cem
ent d
ebris
Deb
ris
Uns
eale
dN
onFr
iabl
e8
tem
Goo
d30
01/D
054/
MG
/001
Chr
ysot
ile
Det
ecte
dLo
wLo
wM
onito
rN
/A
Unk
now
n so
urce
, lik
ely
mor
e pr
esen
t thr
ough
out g
rass
ed a
rea.
Li
kely
to e
xper
ienc
e di
stur
banc
e du
ring
law
n m
aint
enan
ce.
PB
2013
Gro
und
debr
is re
mov
ed 2
013.
Con
tinue
mon
itorin
g.
Cle
aran
ce c
ertif
icat
e pr
ovid
ed 2
2/02
/201
3. P
B 20
14: A
vis
ual
insp
ectio
n of
the
wor
k ar
ea w
as c
ondu
cted
and
no
ACM
frag
men
ts
wer
e fo
und
Bui
ldin
g 30
01/D
057
POL
Poin
t
3001
DN
SDC
- M
oore
bank
NSW
D05
7 PO
L Po
int
Exte
rnal
GF
Con
cret
e sl
abBe
twee
n ke
rb a
nd c
oncr
ete
slab
Mas
ticSe
alan
t N
AN
on-
Fria
ble
10Lm
Fair
3001
/D05
7/A0
1N
o as
best
os
fibre
s de
tect
edLo
wLo
wR
emov
eN
/APB
201
3 C
onsi
dera
ble
dete
riora
tion
note
d to
mas
tic.
Rec
omm
end
rem
oval
and
repl
acem
ent
Build
ing
3001
/D05
9 Co
mse
c Pl
atoo
n
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D05
9 C
omse
c Pl
atoo
nEx
tern
alG
FEx
tern
al g
roun
ds to
bu
ildin
g
PB 2
013
Ins
pect
ion
of g
roun
ds s
urro
undi
ng b
uild
ing
hind
ered
by
leng
th o
f gra
ss a
nd in
clem
ent w
eath
er. P
B 20
14: A
vis
ual
insp
ectio
n of
the
area
was
con
duct
ed a
nd n
o AC
M fr
agm
ents
wer
e fo
und.
Cle
aran
ce c
ertif
icat
e re
quire
d.
3001
DN
SDC
- M
oore
bank
NSW
D05
9 C
omse
c Pl
atoo
nEx
tern
alG
F
Mai
n en
try to
bui
ldin
g (N
orth
ele
vatio
n) &
N
orth
wal
l in
cour
tyar
d ar
ea
Exte
rnal
met
al c
ladd
ing
Mas
ticSe
alan
t N
AN
on-
Fria
ble
80Lm
Goo
d30
01/D
059/
A01
No
asbe
stos
fib
res
dete
cted
Low
Low
Leav
e an
d m
aint
ain
N/A
3001
DN
SDC
- M
oore
bank
NSW
D05
9 C
omse
c Pl
atoo
nEx
tern
alG
FAl
l sid
es o
f bui
ldin
gM
astic
to d
ownp
ipes
at
grou
nd le
vel
Mas
ticSe
alan
t N
AN
on-
Fria
ble
5Lm
Poor
3001
/D05
9/A0
2N
o as
best
os
fibre
s de
tect
edLo
wLo
wLe
ave
and
mai
ntai
nN
/APB
201
3 M
astic
not
ed to
be
dela
min
atin
g aw
ay fr
om a
pplie
d su
rface
s.
3001
DN
SDC
- M
oore
bank
NSW
D05
9 C
omse
c Pl
atoo
nIn
tern
alG
FEa
ster
n si
de a
nd N
W
corn
er o
f bui
ldin
g
Mal
e an
d fe
mal
e am
eniti
es;
Mal
e an
d fe
mal
e sh
ower
fa
cilit
ies
Fibr
e ce
men
tPa
rtitio
ns
Seal
edN
on-
Fria
ble
100
m2
Goo
d30
01/D
059/
A03
No
asbe
stos
fib
res
dete
cted
Low
Low
Leav
e an
d m
aint
ain
N/A
3001
DN
SDC
- M
oore
bank
NSW
D05
9 C
omse
c Pl
atoo
nEx
tern
alG
FC
entre
cou
rtyar
dBB
Q s
helte
r, m
astic
to
bric
kwor
kM
astic
Seal
ant
NA
Non
-Fr
iabl
e15
LmG
ood
3001
/D05
9/A0
4N
o as
best
os
fibre
s de
tect
edLo
wLo
wLe
ave
and
mai
ntai
nN
/A
3001
DN
SDC
- M
oore
bank
NSW
D05
9 C
omse
c Pl
atoo
nEx
tern
alG
FO
pen
area
with
in c
entre
of
bui
ldin
gC
oncr
ete
pave
men
tsM
astic
Expa
nsio
n jo
ints
NA
Non
-Fr
iabl
eTh
roug
hout
tem
Goo
d30
01/D
059/
A05
No
asbe
stos
fib
res
dete
cted
Low
Low
Leav
e an
d m
aint
ain
N/A
PB 2
013
Mas
tic to
exp
ansi
on jo
ints
not
ed to
be
dela
min
atin
g aw
ay fr
om a
pplie
d su
rfac
es in
som
e ar
eas
3001
DN
SDC
- M
oore
bank
NSW
D05
9 C
omse
c Pl
atoo
nIn
tern
alG
FSo
uth
side
of b
uild
ing
Com
sec
NM
F w
orks
hop
Shee
t vin
ylFl
oor c
over
ing
NA
Non
-Fr
iabl
e49
5m
2Fa
ir30
01/D
059/
A06
No
asbe
stos
fib
res
dete
cted
Low
Low
Leav
e an
d m
aint
ain
N/A
PB 2
013
Una
ble
to ta
ke p
hoto
of f
loor
cov
erin
g du
e to
se
curit
y re
stric
tions
Bui
ldin
g 30
01/D
061
Mec
hani
cal W
orks
hop
Flam
mab
le S
tore
3001
DN
SDC
- M
oore
bank
NSW
D06
1 M
echa
nica
l W
orks
hop
Flam
mab
le S
tore
Exte
rnal
Roo
fR
oof o
f bui
ldin
gJu
nctio
n be
twee
n un
ders
ide
of s
uspe
nded
con
cret
e sl
ab
and
exte
rnal
bric
kwor
k Bi
tum
inou
s m
ater
ial
Wat
erpr
oofin
gN
AN
on-
Fria
ble
Appr
ox. 2
5Lm
Fair
3001
/D06
1/A0
1N
o as
best
os
fibre
s de
tect
edLo
wLo
wE
N/A
PB 2
013
Evi
denc
e su
gges
ts m
ater
ial m
ay b
e us
ed a
s a
wat
erpr
oof m
embr
ane
at th
e ju
nctio
n be
twee
n th
e sl
ab a
nd
exte
rnal
bric
kwor
k
No
visi
ble,
acc
essi
ble
asbe
stos
con
tain
ing
mat
eria
ls w
ere
loca
ted
in th
is b
uild
ing
at th
e tim
e of
the
insp
ectio
n
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D06
1 M
echa
nica
l W
orks
hop
Flam
mab
le S
tore
Inte
rnal
/ Ex
tern
alBu
ildin
g fa
bric
No
asbe
stos
was
det
ecte
d in
this
bui
ldin
g / s
truct
ure.
Build
ing
3001
/D06
2 DN
SDC
Vehi
cle
Wor
ksho
p No
2
Asb
esto
s D
etec
ted
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D06
2 D
NSD
C
Vehi
cle
Wor
ksho
p N
o 2
Exte
rnal
GF
Tow
ards
sou
thea
st
corn
erG
roun
d, s
ervi
ce p
itM
ould
ed c
emen
t Pr
oduc
t Se
rvic
e pi
t U
nsea
led
Non
-Fr
iabl
e<1
m2
Fair
3001
/D06
2/M
G/0
01C
hrys
otile
D
etec
ted
Low
Low
Leav
e an
d m
aint
ain
N/A
5864
Tels
tra p
it. P
B 20
13 A
CM s
till p
rese
nt, c
ondi
tion
unch
ange
d.
Loca
ted
betw
een
door
15
& 16
. PB
2014
: AC
M s
till p
rese
nt,
cond
ition
unc
hang
ed. G
PS re
fere
nce:
-33.
9490
1300
0 15
092
3648
000
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D06
2 D
NSD
C
Vehi
cle
Wor
ksho
p N
o 2
Inte
rnal
GF
Tow
ards
sou
th w
est
corn
erW
edge
d be
twee
n co
ncre
te
bund
wal
l and
tin
wal
lFi
bre
cem
ent s
heet
D
ebris
U
nsea
led
Non
-Fr
iabl
e1
tem
Poor
3001
/D06
2/M
G/0
03
Chr
ysot
ile a
nd
Amos
ite
dete
cted
Low
Low
N/A
N/A
Deb
ris re
mov
ed fo
r sam
ple,
unk
now
n so
urce
, sar
king
to ro
of, n
o ob
viou
s vo
id. B
uild
ing
is v
ery
dust
y. T
o be
rem
oved
in 2
012.
PB
2013
Bui
ldin
g cl
eane
d 20
12. P
B 20
14: A
vis
ual i
nspe
ctio
n of
the
area
was
con
duct
ed a
nd n
o fra
gmen
ts w
ere
foun
d. C
lear
ance
ce
rtific
ate
requ
ired.
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D06
2 D
NSD
C
Vehi
cle
Wor
ksho
p N
o 2
Inte
rnal
GF
Mid
wes
tW
ithin
dra
inag
e de
pres
sion
an
d ad
jace
nt to
ele
vate
d co
ncre
te s
lab
Fibr
e ce
men
t she
et
Deb
ris
Uns
eale
dN
on-
Fria
ble
2te
mPo
orR
efer
to
3001
/D06
2/M
G/0
03
Chr
ysot
ile a
nd
Amos
ite
dete
cted
Low
Low
N/A
N/A
Unk
now
n so
urce
, sar
king
to ro
of, n
o ob
viou
s vo
id. B
uild
ing
is v
ery
dust
y. T
o be
rem
oved
in 2
012.
PB
201
3 B
uild
ing
clea
ned
2012
. PB
201
4: A
vis
ual i
nspe
ctio
n of
the
wor
k ar
ea w
as c
ondu
cted
and
no
AC
M fr
agm
ents
wer
e fo
und.
Cle
aran
ce c
ertif
icat
e re
quire
d.
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D06
2 D
NSD
C
Vehi
cle
Wor
ksho
p N
o 2
Inte
rnal
GF
Mid
eas
t sid
eW
ithin
voi
d be
twee
n co
ncre
te
bund
and
tin
wal
lFi
bre
cem
ent s
heet
D
ebris
U
nsea
led
Non
-Fr
iabl
e5
tem
Poor
3001
/D06
2/M
G/0
05
Chr
ysot
ile
Amos
ite a
nd
croc
idol
ite
dete
cted
Low
Low
N/A
N/A
Unk
now
n so
urce
, sar
king
to ro
of, n
o ob
viou
s vo
id. B
uild
ing
is v
ery
dust
y. T
o be
rem
oved
in 2
012.
PB
201
3 B
uild
ing
clea
ned
2012
. PB
2014
: A v
isua
l ins
pect
ion
of th
e w
ork
area
was
con
duct
ed
and
no A
CM
frag
men
ts w
ere
foun
d. C
lear
ance
cer
tific
ate
requ
ired.
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D06
2 D
NSD
C
Vehi
cle
Wor
ksho
p N
o 2
Inte
rnal
GF
Sout
hern
cor
ner
Third
tim
ber b
eam
from
roof
lin
ing
Fibr
e ce
men
t she
et
Deb
ris
Uns
eale
dN
on-
Fria
ble
3te
mPo
or30
01/D
062/
MG
/008
Chr
ysot
ile
Det
ecte
dLo
wLo
wN
/AN
/A
Thre
e de
bris
obs
erve
d, >
30
debr
is o
bser
ved
acro
ss a
ll pe
rimet
er
timbe
r bea
ms
thro
ugho
ut b
uild
ing.
Lik
ely
a re
sult
of p
oor r
emov
al o
f fo
rmer
asb
esto
s w
alls
. Bui
ldin
g is
ver
y du
sty.
To
be re
mov
ed in
20
12.
PB
201
3 B
uild
ing
clea
ned
2012
. PB
2014
: A v
isua
l in
spec
tion
of th
e w
ork
area
was
con
duct
ed a
nd n
o AC
M fr
agm
ents
w
ere
foun
d. C
lear
ance
cer
tific
ate
requ
ired.
No
Asb
esto
s D
etec
ted
/ ina
cces
sibl
e ar
eas
3001
DN
SDC
- M
oore
bank
NSW
D06
2 D
NSD
C
Vehi
cle
Wor
ksho
p N
o 2
Exte
rnal
GF
East
and
wes
t sid
esD
own
pipe
dra
inag
e pi
tsM
ould
ed c
emen
t Pr
oduc
t Pi
t lin
ing
26te
m30
01/D
062/
MG
/002
No
asbe
stos
fib
res
dete
cted
Stor
mw
ater
dra
inag
e pi
ts
3001
DN
SDC
- M
oore
bank
NSW
D06
2 D
NSD
C
Vehi
cle
Wor
ksho
p N
o 2
Inte
rnal
GF
Nor
ther
n of
fice
and
stor
eW
alls
Fibr
e ce
men
t she
et
Wal
l lin
ing
16m
230
01/D
062/
MG
/004
No
asbe
stos
fib
res
dete
cted
Exte
nsiv
e da
mag
e pr
esen
t nex
t to
stor
e do
or
3001
DN
SDC
- M
oore
bank
NSW
D06
2 D
NSD
C
Vehi
cle
Wor
ksho
p N
o 2
Inte
rnal
GF
Sout
h ea
st c
orne
r, of
fice
area
Exte
rnal
wal
l Fi
bre
cem
ent s
heet
W
all l
inin
g 32
m2
3001
/D06
2/M
G/0
06
No
asbe
stos
fib
res
dete
cted
Pain
ted
crea
m
Insp
ectio
n da
tApr
-14
Surv
eyor
: Dam
ien
Ben
bow
Dat
e As
sess
edB
ase
IDBu
ildin
g id
entif
icat
ion
Room
or
Spac
eFl
oor I
DPr
imar
y Lo
catio
nSe
cond
ary
Loca
tion
Mat
eria
lAp
plic
atio
nSu
rface
tr
eatm
ent
ACM
Typ
eQ
uant
ityQ
uant
ity
Type
Cond
ition
Sam
ple
IDLa
b Re
sults
Risk
Ra
ting
Like
lihoo
d of
di
stur
banc
eCo
ntro
lLa
belli
ngPh
oto
IDCo
mm
ent
Non
Asb
esto
s co
ntai
ning
mat
eria
l ide
ntifi
ed d
urin
g th
e 20
14 in
spec
tion
not p
revi
ousl
y id
entif
ied
Site
Loc
atio
n: D
NSD
C B
ase
Num
ber 3
001-
Moo
reba
nk N
SW
Asbe
stos
con
tain
ing
mat
eria
l ide
ntifi
ed d
urin
g th
e 20
14 re
insp
ectio
n no
t pre
viou
sly
iden
tifie
d
Build
ing
3001
/D06
3 Co
mpr
esso
r She
d
Rem
oved
Asb
esto
s
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D06
3 C
ompr
esso
r Sh
edIn
tern
alG
FEa
st w
all,
north
of e
ntry
do
orG
roun
d, d
ebris
Fibr
e ce
men
t deb
risD
ebris
U
nsea
led
Non
Fria
ble
2te
mG
ood
3001
/D06
3/M
G/0
01C
hrys
otile
D
etec
ted
Low
Low
Mon
itor
N/A
Deb
ris re
mov
ed a
s sa
mpl
e, u
nkno
wn
sour
ce, t
in ro
of, n
o sa
rkin
g.
PB 2
013
Gro
und
debr
is re
mov
ed 2
013.
Con
tinue
mon
itorin
g.
Cle
aran
ce c
ertif
icat
e is
sued
18/
02/2
013.
PB
2014
: A v
isua
l in
spec
tion
of th
e ar
ea w
as c
ondu
cted
and
no
ACM
frag
men
ts w
ere
foun
d.
3001
DN
SDC
- M
oore
bank
NSW
D06
3 C
ompr
esso
r Sh
edEx
tern
alG
FSo
uth
wes
t cor
ner o
f bu
ildin
gG
roun
d Fi
bre
cem
ent d
ebris
Deb
ris
Uns
eale
dN
onFr
iabl
e>8
tem
Goo
d30
01/D
063/
MG
/002
No
asbe
stos
fib
res
dete
cted
Low
Low
Mon
itor
N/A
Unk
now
n so
urce
. PB
201
3 G
roun
d de
bris
rem
oved
201
3.
Con
tinue
mon
itorin
g. C
lear
ance
cer
tific
ate
issu
ed 1
8/02
/201
3
3001
DN
SDC
- M
oore
bank
NSW
D06
3 C
ompr
esso
r Sh
edEx
tern
alG
HD
wer
e in
form
ed b
y R
on (D
062)
that
pre
viou
sly
iden
tifie
d ga
sket
s an
d el
ectri
cal b
oard
wer
e re
mov
ed in
mid
201
1
Bui
ldin
g 30
01/D
064
Vehi
cle
Serv
ice
Cen
tre
3001
DN
SDC
- M
oore
bank
NSW
D06
4 D
NSD
C
Vehi
cle
Serv
ice
Cen
treEx
tern
alG
FN
orth
eas
t and
sou
th
wes
t cor
ners
of b
uild
ing
Met
al b
olla
rds
at g
roun
d le
vel
and
expa
nsio
n jo
ints
on
north
si
de o
f bui
ldin
gM
astic
Seal
ant/e
xpan
sion
jo
ints
NA
Non
-Fr
iabl
e25
LmFa
ir30
01/D
064/
A01
No
asbe
stos
fib
res
dete
cted
Low
Low
Leav
e an
d m
aint
ain
N/A
PB 2
013
- Det
erio
ratio
n an
d w
eath
erin
g no
ted
to m
astic
3001
DN
SDC
- M
oore
bank
NSW
D06
4 D
NSD
C
Vehi
cle
Serv
ice
Cen
treIn
tern
alG
FW
orks
hop
area
and
co
mpr
esso
r roo
mM
astic
to d
uctw
ork
Mas
ticM
astic
to d
uctw
ork
NA
Non
-Fr
iabl
e5
LmG
ood
3001
/D06
4/A0
2N
o as
best
os
fibre
s de
tect
edLo
wLo
wLe
ave
and
mai
ntai
nN
/A
3001
DN
SDC
- M
oore
bank
NSW
D06
4 D
NSD
C
Vehi
cle
Serv
ice
Cen
treIn
tern
alG
FSo
uth
wes
t cor
ner o
f bu
ildin
gC
ompr
esso
r roo
mM
astic
Mas
tic to
junc
tion
betw
een
conc
rete
bl
ock
wor
k an
d su
spen
ded
conc
rete
sl
ab
NA
Non
-Fr
iabl
e15
LmG
ood
3001
/D06
4/A0
3N
o as
best
os
fibre
s de
tect
edLo
wLo
wLe
ave
and
mai
ntai
nN
/A
3001
DN
SDC
- M
oore
bank
NSW
D06
4 D
NSD
C
Vehi
cle
Serv
ice
Cen
treIn
tern
alG
FW
orks
hop
area
Ex
pans
ion
join
ts to
con
cret
e bl
ock
wor
kM
astic
Expa
nsio
n jo
ints
NA
Non
-Fr
iabl
e6
LmG
ood
3001
/D06
4/A0
4N
o as
best
os
fibre
s de
tect
edLo
wLo
wLe
ave
and
mai
ntai
nN
/A
Bui
ldin
g 30
01/D
065
Tyre
Bay
No
visi
ble,
acc
essi
ble
asbe
stos
con
tain
ing
mat
eria
ls w
ere
loca
ted
in th
is b
uild
ing
at th
e tim
e of
the
insp
ectio
n
3001
DN
SDC
- M
oore
bank
NSW
D06
5 D
NSD
C
Tyre
Bay
In
tern
al /
Exte
rnal
Con
cret
e sl
abEx
pans
ion
join
tsC
ork
Expa
nsio
n jo
ints
PB 2
013
No
visi
ble,
acc
essi
ble
AC
M w
as d
etec
ted
at th
e tim
e of
insp
ectio
n. E
xpan
sion
join
ts w
ere
visu
ally
insp
ecte
d an
d w
ere
note
d to
con
tain
cor
k or
fille
d w
ith a
cem
entit
ous
mat
eria
l
3001
DN
SDC
- M
oore
bank
NSW
D06
5 D
NSD
C
Tyre
Bay
In
tern
al /
Exte
rnal
Build
ing
fabr
ic
No
asbe
stos
was
det
ecte
d in
this
bui
ldin
g / s
truct
ure
Build
ing
3001
/D06
6 M
echa
nica
l Ins
pect
ion
Faci
lity
No
Asb
esto
s D
etec
ted
No
visi
ble,
acc
essi
ble
asbe
stos
con
tain
ing
mat
eria
ls w
ere
loca
ted
in th
is b
uild
ing
at th
e tim
e of
the
insp
ectio
n
3001
DN
SDC
- M
oore
bank
NSW
D06
6 M
echa
nica
l In
spec
tion
Faci
lity
Inte
rnal
GF
Nor
th s
ide
of b
uild
ing
Exte
rnal
offi
ce, i
nter
nal t
oile
t, ki
tche
n an
d m
ezza
nine
are
aFi
bre
cem
ent s
heet
W
all l
inin
g 58
m2
3001
/D06
6/M
G/0
01
No
asbe
stos
fib
res
dete
cted
Pain
ted
crea
m
Build
ing
3001
/D06
7 Sm
all A
rms
Repa
ir Fa
cilit
yPB
201
3 P
hoto
rest
rictio
ns a
pply
to th
is b
uild
ing.
Pho
to o
f bu
ildin
g nu
mbe
r onl
y
Asb
esto
s D
etec
ted
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D06
7 Sm
all A
rms
Rep
air F
acilit
y (S
ABR
F)
Exte
rnal
GF
Sout
h w
est c
orne
r of
build
ing
Gro
und
Fibr
e ce
men
t deb
risD
ebris
U
nsea
led
Non
-Fr
iabl
e3
tem
Poor
3001
/D06
7/M
G/0
01C
hrys
otile
D
etec
ted
Low
Low
Mon
itor
N/A
36
Unk
now
n so
urce
, thr
ough
out r
ocks
. PB
201
3 G
roun
d de
bris
pr
ogra
mm
ed to
be
rem
oved
201
3. P
B 20
14: A
vis
ual i
nspe
ctio
n of
th
e w
ork
area
was
con
duct
ed a
nd n
o AC
M fr
agm
ents
wer
e fo
und.
C
lear
ance
cer
tific
ate
requ
ired.
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D06
7 Sm
all A
rms
Rep
air F
acilit
y (S
ABR
F)
Exte
rnal
GF
Sout
h ea
st c
orne
r of
build
ing
Gro
und,
ser
vice
pits
(x2)
Mou
lded
cem
ent
Prod
uct
Pit l
inin
gU
nsea
led
Non
-Fr
iabl
e<1
m2
Poor
3001
/D06
7/M
G/0
02
Chr
ysot
ile a
nd
Amos
ite
dete
cted
Low
Med
ium
Rem
ove
N/A
37
Pit h
as b
een
dam
aged
. PB
201
3 C
onsi
dera
ble
dam
age
and
wea
ther
ing
note
d to
in g
roun
d se
rvic
e pi
t. D
amag
e al
so n
oted
to
pit
cove
r. PB
201
4: A
CM
stil
l pre
sent
, con
ditio
n un
chan
ged.
Tw
o pi
ts lo
cate
d. G
PS re
fere
nce:
-33
9492
8800
0 15
0.92
9170
000
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D06
7 Sm
all A
rms
Rep
air F
acilit
y (S
ABR
F)
Inte
rnal
GF
Phos
phat
e ta
nks
Flan
ge G
aske
tsW
oven
pro
duct
Gas
ket
Seal
edN
on-
Fria
ble
10te
mFa
ir30
01/D
067/
MG
/003
Chr
ysot
ile
Det
ecte
dM
ediu
mM
ediu
mR
emov
eA
38, 3
9, 4
0
Gas
ket,
been
sea
led
befo
re.
PB 2
013
Pho
spha
te ta
nks
not
ed
to b
e ta
gged
and
out
of s
ervi
ce.
Dete
riora
tion
note
d to
en
caps
ulat
ing
tape
. PB
2014
: AC
M s
till p
rese
nt, c
ondi
tion
unch
ange
d. In
form
ed fr
om s
taff
that
Tan
k 4
is p
oten
tially
inte
rnal
ly lin
ed w
ith A
CM
.
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D06
7 Sm
all A
rms
Rep
air F
acilit
y (S
ABR
F)
Inte
rnal
GF
Ther
mal
dry
ing
oven
Rop
e se
alW
oven
pro
duct
Insu
latin
g se
alSe
aled
Non
-Fr
iabl
e<1
m2
Poor
3001
/D06
7/M
G/0
04C
hrys
otile
D
etec
ted
Med
ium
Med
ium
Rem
ove
A41
Rop
e se
al.
PB 2
013
AC
M s
till p
rese
nt.
Evid
ence
sug
gest
s m
ovin
g to
war
ds p
oor c
ondi
tion.
PB
2014
: AC
M s
till p
rese
nt,
cond
ition
poo
r. St
aff a
dvis
ed o
ven
is in
incr
easi
ngly
less
freq
uent
us
e. R
ecom
men
d re
mov
al.
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D06
7 Sm
all A
rms
Rep
air F
acilit
y (S
ABR
F)
Inte
rnal
GF
Indu
stria
l hea
ter
Rop
e se
alW
oven
pro
duct
Insu
latin
g se
alSe
aled
Non
-Fr
iabl
e<1
m2
Fair
3001
/D06
7/M
G/0
05C
hrys
otile
D
etec
ted
Med
ium
Med
ium
Enca
psul
ate
A42
Rop
e se
al.
PB 2
013
AC
M s
till p
rese
nt.
Cond
ition
unc
hang
ed.
One
cor
ner n
oted
to b
e pr
evio
usly
enc
apsu
late
d w
ith ta
pe. P
B20
14: A
CM
stil
l pre
sent
, con
ditio
n un
chan
ged.
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D06
7 Sm
all A
rms
Rep
air F
acilit
y (S
ABR
F)
Inte
rnal
GF
Plan
t roo
mH
eatin
g un
it, E
DH
Insu
latio
n El
ectri
cal d
uct h
eate
r co
il lin
ing
Unk
now
nU
nkno
wn
Unk
now
nU
nkno
wn
Unk
now
nN
o sa
mpl
ePr
esum
edU
nkno
wn
Unk
now
nU
nkno
wn
Unk
now
n43
DM
M a
dvis
ed G
HD
that
the
sect
ion
of d
uctin
g th
at E
DH
is
asso
ciat
ed w
ith h
as b
een
redu
ndan
t sin
ce 2
007.
Rec
omm
ende
d fu
rther
inve
stig
atio
n pr
ior t
o re
furb
ishm
ent o
r rem
oval
wor
ks. T
o be
re
mov
ed in
201
2 .PB
201
3 U
nabl
e to
con
firm
rem
oval
. PB
2014
: Una
ble
to c
onfir
m re
mov
al, f
urth
er in
vest
igat
ion
requ
ired.
Rem
oved
Asb
esto
s
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D06
7 Sm
all A
rms
Rep
air F
acilit
y (S
ABR
F)
Inte
rnal
GF
Flam
mab
le g
oods
ca
bine
tR
ope
seal
Wov
en p
rodu
ctIn
sula
ting
seal
Seal
edN
onFr
iabl
e<1
m2
Fair
3001
/D06
7/M
G/0
06C
hrys
otile
D
etec
ted
Med
ium
RA
Rop
e se
al. A
ppea
red
to h
ave
been
rem
oved
from
wor
ksho
p an
d w
as c
onfir
med
by
empl
oyee
s. C
ould
not
est
ablis
h of
asb
esto
s ha
d be
en d
ispo
sed
off a
ppro
pria
tely.
PB
2014
Not
loca
ted.
No
Asb
esto
s D
etec
ted
Insp
ectio
n da
tApr
-14
Surv
eyor
: Dam
ien
Ben
bow
Dat
e As
sess
edB
ase
IDBu
ildin
g id
entif
icat
ion
Room
or
Spac
eFl
oor I
DPr
imar
y Lo
catio
nSe
cond
ary
Loca
tion
Mat
eria
lAp
plic
atio
nSu
rface
tr
eatm
ent
ACM
Typ
eQ
uant
ityQ
uant
ity
Type
Cond
ition
Sam
ple
IDLa
b Re
sults
Risk
Ra
ting
Like
lihoo
d of
di
stur
banc
eCo
ntro
lLa
belli
ngPh
oto
IDCo
mm
ent
Non
Asb
esto
s co
ntai
ning
mat
eria
l ide
ntifi
ed d
urin
g th
e 20
14 in
spec
tion
not p
revi
ousl
y id
entif
ied
Site
Loc
atio
n: D
NSD
C B
ase
Num
ber 3
001-
Moo
reba
nk N
SW
Asbe
stos
con
tain
ing
mat
eria
l ide
ntifi
ed d
urin
g th
e 20
14 re
insp
ectio
n no
t pre
viou
sly
iden
tifie
d
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D06
7 Sm
all A
rms
Rep
air F
acilit
y (S
ABR
F)
Inte
rnal
GF
Ther
mal
Dry
ing
Ove
nIn
sula
tive
linin
g to
wal
lsIn
sula
tion
Insu
latio
n30
01/D
067/
14/A
8 N
o as
best
os
fibre
s de
tect
edPB
201
4: N
ot n
oted
in p
revi
ous
surv
ey
Bui
ldin
g 30
01/D
068
Wea
pons
Sto
re
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D06
8 W
eapo
ns
Stor
e In
tern
al /
Exte
rnal
Build
ing
fabr
ic
No
asbe
stos
det
ecte
d du
ring
the
surv
ey, b
uild
ing
is p
ost 1
990
Build
ing
3001
/D06
9 El
ectro
nic
Inst
rum
ent R
epai
r Fac
ility
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D06
9 El
ectro
nic
Inst
rum
ent R
epai
r Fa
cilit
y Ex
tern
alG
FSo
uthe
rn s
ide
of b
uild
ing
Adja
cent
to p
ump
cont
rol u
nit
Fibr
e ce
men
t she
et
Deb
ris
Uns
eale
dN
on-
Fria
ble
1te
mPo
or30
01/D
069/
A01
No
asbe
stos
fib
res
dete
cted
Low
Low
Mon
itor
N/A
PB 2
013
Deb
ris ta
ken
as s
ampl
e. N
o ot
her v
isib
le fr
agm
ents
lo
cate
d.
3001
DN
SDC
- M
oore
bank
NSW
D06
9 El
ectro
nic
Inst
rum
ent R
epai
r Fa
cilit
y In
tern
alG
FTo
ilets
Inte
rnal
: am
eniti
es
Fibr
e ce
men
t she
et
Parti
tion
wal
l 8
m2
3001
/D06
9/M
G/0
01
No
asbe
stos
fib
res
dete
cted
Pain
ted
crea
m
3001
DN
SDC
- M
oore
bank
NSW
D06
9 El
ectro
nic
Inst
rum
ent R
epai
r Fa
cilit
y In
tern
alG
FN
orth
eas
t sid
e st
ore
Flam
mab
le g
ood
cabi
net i
n so
uth
east
cor
ner
Wov
en m
ater
ial
Rop
e se
al<1
m2
3001
/D06
9/M
G/0
02
No
asbe
stos
fib
res
dete
cted
Som
e w
hite
and
bla
ck s
ectio
ns
3001
DN
SDC
- M
oore
bank
NSW
D06
9 El
ectro
nic
Inst
rum
ent R
epai
r Fa
cilit
y Ex
tern
alG
FW
este
rn s
ide
Serv
ice
pit
Mou
lded
cem
ent
Prod
uct
Serv
ice
pit
<1m
230
01/D
069/
MG
/003
No
asbe
stos
fib
res
dete
cted
Like
ly to
exp
erie
nce
dam
age
durin
g la
wn
mai
nten
ance
, dam
aged
3001
DN
SDC
- M
oore
bank
NSW
D06
9 El
ectro
nic
Inst
rum
ent R
epai
r Fa
cilit
y Ex
tern
alG
FAl
l sid
esEa
ves
Fibr
e ce
men
t she
et
Eave
s lin
ing
78m
230
01/D
069/
MG
/004
No
asbe
stos
fib
res
dete
cted
Pain
ted
whi
te, s
light
wea
ther
ing
Bui
ldin
g 30
01/D
070
Plan
t Roo
m
No
visi
ble,
acc
essi
ble
asbe
stos
con
tain
ing
mat
eria
ls w
ere
loca
ted
in th
is b
uild
ing
at th
e tim
e of
the
insp
ectio
n
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D07
0 Pl
ant R
oom
Inte
rnal
/ Ex
tern
alBu
ildin
g fa
bric
N
o as
best
os w
as d
etec
ted
in th
is b
uild
ing
/ stru
ctur
e
Build
ing
3001
/D07
1 Co
mm
s / E
lec
Offi
ce /
Amen
ities
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D07
1 C
omm
s /
Elec
Offi
ce /
Amen
ities
Ex
tern
alG
FEa
ster
n si
de o
f bui
ldin
gG
roun
d le
vel a
djac
ent t
o A/
C
unit
Fibr
e ce
men
t she
et
Deb
ris
Uns
eale
dN
on-
Fria
ble
1te
mPo
or30
01/D
071/
A01
No
asbe
stos
fib
res
dete
cted
Low
Low
Mon
itor
N/A
PB 2
013
Deb
ris ta
ken
as s
ampl
e. N
o ot
her v
isib
le fr
agm
ents
lo
cate
d.
3001
DN
SDC
- M
oore
bank
NSW
D07
1 C
omm
s /
Elec
Offi
ce /
Amen
ities
In
tern
alG
FTo
ilets
Inte
rnal
: mal
e &
fem
ale
toile
ts; w
alls
Fi
bre
cem
ent s
heet
W
all l
inin
g 52
m2
3001
/071
/MG
/00
1
No
asbe
stos
fib
res
dete
cted
Pain
ted
crea
m
Build
ing
3001
/D07
2 Co
mm
s El
ec S
tore
s - D
NSDC
Asb
esto
s D
etec
ted
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D07
2 C
omm
s El
ec S
tore
s -
Dns
dc
Inte
rnal
GF
Wes
t sid
e, a
ppro
x. 8
m
eter
s so
uth
of n
orth
ern
mos
t rol
ler d
oor,
on
timbe
r bea
m u
nder
fire
ho
se re
el
Gro
und
Fibr
e ce
men
t deb
risD
ebris
U
nsea
led
Non
-Fr
iabl
e1
tem
Goo
d30
01/D
072/
MG
/003
Chr
ysot
ile a
nd
Amos
ite
dete
cted
Low
Low
N/A
N/A
1 de
bris
rem
oved
for s
ampl
e. U
nkno
wn
sour
ce. E
ntire
bui
ldin
g vi
sual
ly ob
serv
ed in
acc
essi
ble
area
s on
ly. T
o be
rem
oved
in 2
012.
PB 2
013
Una
ble
to lo
cate
deb
ris.
Evid
ence
sug
gest
s de
bris
ha
s be
en re
mov
ed. P
B 20
14: A
vis
ual i
nspe
ctio
n of
the
area
was
co
nduc
ted
and
no A
CM
frag
men
ts w
ere
foun
d. C
ontin
ue m
onito
ring.
1/05
/14
3001
DN
SDC
- M
oore
bank
NSW
D07
2 C
omm
s El
ec S
tore
s -
Dns
dc
Inte
rnal
GF
Sout
h w
est c
orne
r of
build
ing
Abov
e of
fice,
on
timbe
r bea
m
clos
e to
roof
lini
ngFi
bre
cem
ent d
ebris
Deb
ris
Uns
eale
dN
on-
Fria
ble
2te
mPo
or30
01/D
072/
MG
/010
Chr
ysot
ile
Det
ecte
dH
igh
Low
Rem
ove
N/A
Two
debr
is o
bser
ved,
app
roxi
mat
ely
four
deb
ris o
bser
ved
acro
ss th
e up
per t
imbe
r bea
ms
thro
ugho
ut b
uild
ing.
Lik
ely
a re
sult
of p
oor
rem
oval
of f
orm
er a
sbes
tos
roof
and
wal
ls. B
uild
ing
is v
ery
dust
y. T
obe
rem
oved
in 2
012 .
PB 2
013
Abo
ve h
eigh
t lim
itatio
ns.
Unab
le to
con
firm
rem
oval
. Pr
esum
e st
ill p
rese
nt. P
B 20
14: A
vi
sual
insp
ectio
n of
sev
eral
bea
ms
was
con
duct
ed a
nd n
o AC
M w
as
foun
d. A
CM
may
rem
ain
in in
acce
ssib
le a
reas
, cle
aran
ce c
ertif
icat
e re
quire
d fo
r con
firm
atio
n.
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D07
2 C
omm
s El
ec S
tore
s -
Dns
dc
Exte
rnal
GF
East
ern
side
of b
uild
ing
Gro
und
leve
lFi
bre
cem
ent d
ebris
Deb
ris
Uns
eale
dN
on-
Fria
ble
5te
mPo
orM
ediu
mM
ediu
mR
emov
eN
/A
PB 2
013
Sou
rce
unkn
own.
Lik
ely
to b
e di
stur
bed
durin
g gr
ound
s m
aint
enan
ce. P
B 20
14: A
vis
ual i
nspe
ctio
n of
the
area
w
as c
ondu
cted
and
no
ACM
frag
men
ts w
ere
foun
d. R
emov
al w
ork
in 2
013
was
lim
ited
to s
outh
ern
elev
atio
n. C
ontin
ue m
onito
ring.
3001
DN
SDC
- M
oore
bank
NSW
D07
2 C
omm
s El
ec S
tore
s -
Dns
dc
Inte
rnal
GF
All s
ides
of b
uild
ing
Fire
doo
rIn
sula
tion
Fire
doo
r Se
aled
Non
-Fr
iabl
e10
tem
Goo
dVi
sual
O
bser
vatio
n As
best
os
Pres
umed
Low
Low
Leav
e an
d m
aint
ain
PB 2
014:
Dat
a ad
ded
from
DC
T, c
ontin
ue m
onito
ring.
Rem
oved
Asb
esto
s
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D07
2 C
omm
s El
ec S
tore
s -
Dns
dc
Exte
rnal
GF
Sout
h ea
st c
orne
r of
build
ing
Gro
und
Fibr
e ce
men
t deb
risD
ebris
U
nsea
led
Non
Fria
ble
4te
mPo
or30
01/D
072/
MG
/002
Chr
ysot
ile a
nd
Amos
ite
dete
cted
Low
Low
Mon
itor
N/A
Unk
now
n so
urce
, lik
ely
mor
e pr
esen
t thr
ough
out g
rass
ed a
rea.
Li
kely
to e
xper
ienc
e di
stur
banc
e du
ring
law
n m
aint
enan
ce.
PB
2013
Gro
und
debr
is p
rogr
amm
ed to
be
rem
oved
201
3.
Cle
aran
ce c
ertif
icat
e pr
ovid
ed 2
7/02
/201
3. P
B 20
14: A
vis
ual
insp
ectio
n of
the
area
was
con
duct
ed a
nd n
o AC
M fr
agm
ents
wer
e fo
und.
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D07
2 C
omm
s El
ec S
tore
s -
Dns
dc
Exte
rnal
GF
Wes
t and
eas
t sid
es o
f th
e bu
ildin
gD
own
pipe
dra
inag
e pi
tsM
ould
ed c
emen
t Pr
oduc
t Pi
t lin
ing
17te
m30
01/D
072/
MG
/001
No
asbe
stos
fib
res
dete
cted
Stor
mw
ater
dra
inag
e pi
ts
3001
DN
SDC
- M
oore
bank
NSW
D07
2 C
omm
s El
ec S
tore
s -
Dns
dc
Inte
rnal
GF
Com
ms
insp
ectio
n ro
omIn
tern
al: W
all &
cei
ling
Fibr
e ce
men
t she
et
Lini
ng48
m2
3001
/D07
2/M
G/0
04
No
asbe
stos
fib
res
dete
cted
Pain
ted
crea
m
Insp
ectio
n da
tApr
-14
Surv
eyor
: Dam
ien
Ben
bow
Dat
e As
sess
edB
ase
IDBu
ildin
g id
entif
icat
ion
Room
or
Spac
eFl
oor I
DPr
imar
y Lo
catio
nSe
cond
ary
Loca
tion
Mat
eria
lAp
plic
atio
nSu
rface
tr
eatm
ent
ACM
Typ
eQ
uant
ityQ
uant
ity
Type
Cond
ition
Sam
ple
IDLa
b Re
sults
Risk
Ra
ting
Like
lihoo
d of
di
stur
banc
eCo
ntro
lLa
belli
ngPh
oto
IDCo
mm
ent
Non
Asb
esto
s co
ntai
ning
mat
eria
l ide
ntifi
ed d
urin
g th
e 20
14 in
spec
tion
not p
revi
ousl
y id
entif
ied
Site
Loc
atio
n: D
NSD
C B
ase
Num
ber 3
001-
Moo
reba
nk N
SW
Asbe
stos
con
tain
ing
mat
eria
l ide
ntifi
ed d
urin
g th
e 20
14 re
insp
ectio
n no
t pre
viou
sly
iden
tifie
d
3001
DN
SDC
- M
oore
bank
NSW
D07
2 C
omm
s El
ec S
tore
s -
Dns
dc
Inte
rnal
GF
Offi
ce &
lunc
h ro
omIn
tern
al: W
all
Fibr
e ce
men
t she
et
Lini
ng15
m2
Ref
er to
30
01/D
072/
MG
/004
No
asbe
stos
fib
res
dete
cted
Pain
ted
whi
te
3001
DN
SDC
- M
oore
bank
NSW
D07
2 C
omm
s El
ec S
tore
s -
Dns
dc
Inte
rnal
GF
Offi
ce &
lunc
h ro
omIn
tern
al: U
pper
infil
l pan
elFi
bre
cem
ent s
heet
Li
ning
4m
230
01/D
072/
MG
/005
No
asbe
stos
fib
res
dete
cted
Imita
tion
timbe
r, pa
inte
d w
hite
Build
ing
3001
/D07
3 G
E St
ores
- O
TS -
Stor
es
Asb
esto
s D
etec
ted
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D07
3 G
E St
ores
- O
TS -
Stor
es
Exte
rnal
GF
Nor
th o
f bui
ldin
gG
roun
d Fi
bre
cem
ent d
ebris
Deb
ris
Uns
eale
dN
on-
Fria
ble
<1m
2Po
or03
67/3
001/
D73
/AY
O63
6As
best
os
Pres
ent
Med
ium
Med
ium
Rem
ove
N/A
PB 2
014:
Dat
a ad
ded
from
DC
T. A
vis
ual i
nspe
ctio
n of
the
area
was
co
nduc
ted
and
no A
CM
was
foun
d. R
emov
al w
ork
in 2
013
was
lim
ited
to e
ast e
leva
tion.
Con
tinue
mon
torin
g.
3001
DN
SDC
- M
oore
bank
NSW
D07
3 G
E St
ores
- O
TS -
Stor
es
Inte
rnal
GF
All s
ides
of b
uild
ing
Fire
doo
rIn
sula
tion
Fire
doo
r Se
aled
Non
-Fr
iabl
e8
tem
Goo
dVi
sual
O
bser
vatio
n As
best
os
Pres
umed
Low
Low
Leav
e an
d m
aint
ain
PB 2
014:
Dat
a ad
ded
from
DC
T, c
ontin
ue m
onito
ring.
Rem
oved
Asb
esto
s
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D07
3 G
E St
ores
- O
TS -
Stor
es
Exte
rnal
GF
East
of b
uild
ing
Gro
und
Fibr
e ce
men
t deb
risD
ebris
U
nsea
led
Non
Fria
ble
4te
mFa
ir30
01/D
073/
MG
/001
Chr
ysot
ile a
nd
Amos
ite
dete
cted
Med
ium
Med
ium
Mon
itor
N/A
Unk
now
n so
urce
, lik
ely
mor
e pr
esen
t thr
ough
out g
rass
ed a
rea.
Li
kely
to e
xper
ienc
e di
stur
banc
e du
ring
law
n m
aint
enan
ce.
PB
2013
Gro
und
debr
is re
mov
ed 2
013.
Cle
aran
ce c
ertif
icat
e pr
ovid
ed 2
2/02
/201
3. M
achi
nery
and
equ
ipm
ent p
ositi
oned
al
ong
east
ern
elev
atio
n ca
usin
g ob
stru
ctio
ns.
Pres
ume
debr
is
may
stil
l be
pres
ent u
nder
neat
h m
achi
nery
. PB
2014
: A v
isua
l in
spec
tion
of th
e ar
ea w
as c
ondu
cted
and
no
ACM
frag
men
ts w
ere
foun
d. P
resu
med
to re
mai
n be
neat
h m
achi
nery
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D07
3 G
E St
ores
- O
TS -
Stor
es
Exte
rnal
GF
East
and
wes
t of
build
ing
Dow
n pi
pe d
rain
age
pits
Mou
lded
cem
ent
Prod
uct
Pit l
inin
g18
tem
3001
/D07
3/M
G/0
02
No
asbe
stos
fib
res
dete
cted
Stor
mw
ater
dra
inag
e pi
ts
3001
DN
SDC
- M
oore
bank
NSW
D07
3 G
E St
ores
- O
TS -
Stor
es
Inte
rnal
GF
Nor
ther
n of
fice
Wal
lsFi
bre
cem
ent s
heet
W
all l
inin
g 18
m2
3001
/D07
3/M
G/0
03
No
asbe
stos
fib
res
dete
cted
Pain
ted
crea
m
Build
ing
3001
/D07
4 M
ale
/ Fem
ale
Toile
t
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D07
4 M
ale
/ Fe
mal
e To
ilet
Inte
rnal
GF
Mal
e to
ilets
M
ount
ed u
pon
wal
l M
ould
ed fi
bre
cem
ent
Cis
tern
(x2)
<1 m
230
01/D
074/
MG
/001
No
asbe
stos
fib
res
dete
cted
Appe
ar to
be
conc
rete
in n
atur
e. R
emov
ed la
bels
. PB
201
3R
epla
ced
with
pla
stic
cis
tern
s
Build
ing
3001
/D07
5 G
E St
ores
- O
TS -
Pool
s
Asb
esto
s D
etec
ted
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D07
5 G
E St
ores
- O
TS -
Pool
s Ex
tern
alG
FN
orth
wes
t cor
ner
Com
mun
icat
ion
pit
Mou
lded
fibr
e ce
men
t Se
rvic
e pi
t U
nsea
led
Non
-Fr
iabl
e<1
m2
Fair
3001
/D07
5/M
G/0
02
Chr
ysot
ile a
nd
Amos
ite
dete
cted
Low
Med
ium
Enca
psul
ate
N/A
5861
Uns
eale
d, w
ithin
pat
hway
. PB
201
3 A
CM
stil
l pre
sent
, con
ditio
n un
chan
ged.
PB
2014
: AC
M s
till p
rese
nt, c
ondi
tion
unch
ange
d. P
it is
enc
ased
in c
oncr
ete,
GPS
refe
renc
e: -3
3.94
9145
417
150
9247
5500
0
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D07
5 G
E St
ores
- O
TS -
Pool
s Ex
tern
alG
FN
orth
wes
t cor
ner o
f bu
ildin
g
Gro
und
leve
l adj
acen
t to
road
an
d pa
inte
d tre
ated
pin
e bo
llard
s
Mou
lded
cem
ent
prod
uct
Serv
ice
pit
Uns
eale
dN
on-
Fria
ble
<1m
2Po
or30
01/D
075/
A01
Chr
ysot
ile a
nd
Amos
ite
dete
cted
Low
Med
ium
Rem
ove
N/A
5860
PB 2
013
Loc
ated
in g
rass
ed a
rea
near
tree
/pai
nted
trea
ted
pine
bol
lard
s. L
ikel
y to
be
dist
urbe
d du
ring
grou
nds
mai
nten
ance
. PB
2014
: AC
M s
till p
rese
nt, c
ondi
tion
poor
. R
ecom
men
d re
mov
al. G
PS re
fere
nce:
-33.
9515
2700
0 15
092
4517
000
3001
DN
SDC
- M
oore
bank
NSW
D07
5 G
E St
ores
- O
TS -
Pool
s In
tern
alG
FAl
l sid
es o
f bui
ldin
gFi
re d
oor
Insu
latio
n Fi
re d
oor
Seal
edN
on-
Fria
ble
8te
mG
ood
Visu
al
Obs
erva
tion
Asbe
stos
Pr
esum
edLo
wLo
wLe
ave
and
mai
ntai
nPB
201
4: D
ata
adde
d fro
m D
CT,
con
tinue
mon
itorin
g.
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D07
5 G
E St
ores
- O
TS -
Pool
s Ex
tern
alG
FN
orth
and
sou
th s
ides
Gro
und
Fibr
e ce
men
t deb
risD
ebris
U
nkno
wn
Non
-Fr
iabl
e<1
m2
Poor
0367
/300
1/D
75/
AYO
635
Asbe
stos
Pr
esen
tM
ediu
mM
ediu
mR
emov
eN
/A
PB 2
014:
Dat
a ad
ded
from
DC
T. A
vis
ual i
nspe
ctio
n of
the
wor
k ar
ea w
as c
ondu
cted
and
no
ACM
frag
men
ts w
ere
foun
d. R
emov
al
wor
k in
201
3 w
as li
mite
d to
eas
t, so
uth
and
wes
t ele
vatio
ns.
Con
tinue
mon
itorin
g
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D07
5 G
E St
ores
- O
TS -
Pool
s Ex
tern
alG
FEa
st a
nd w
est s
ides
of
build
ing
Dow
n pi
pe d
rain
age
pits
Mou
lded
fibr
e ce
men
t Pi
t lin
ing
18te
m30
01/D
075/
MG
/003
No
asbe
stos
fib
res
dete
cted
Stor
mw
ater
dra
inag
e pi
ts
Rem
oved
Asb
esto
s
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D07
5 G
E St
ores
- O
TS -
Pool
s Ex
tern
alG
FEa
st, s
outh
and
wes
t si
des
of b
uild
ing
Gro
und
Fibr
e ce
men
t deb
risD
ebris
U
nsea
led
Non
Fria
ble
Appr
ox. 6
tem
Goo
d30
01/D
075/
MG
/001
Chr
ysot
ile
Det
ecte
dLo
wLo
wM
onito
rN
/A
Unk
now
n so
urce
, lik
ely
mor
e pr
esen
t thr
ough
out g
rass
ed a
rea.
Li
kely
to e
xper
ienc
e di
stur
banc
e du
ring
law
n m
aint
enan
ce.
PB
2013
Gro
und
debr
is re
mov
ed 2
013.
Con
tinue
mon
itorin
g.
Cle
aran
ce c
ertif
icat
e pr
ovid
ed 1
9/02
/201
3. P
B 20
14: I
tem
re
mov
ed in
201
3, re
fer t
o "2
1609
18A
SA D
NSD
C C
lear
ance
BLD
75
pdf".
A v
isua
l ins
pect
ion
of th
e ar
ea w
as c
ondu
cted
and
no
ACM
fra
gmen
tsw
ere
foun
d.
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D07
5 G
E St
ores
- O
TS -
Pool
s In
tern
alG
FN
orth
eas
t cor
ner o
f bu
ildin
gSe
cond
tim
ber b
eam
from
ro
ofFi
bre
cem
ent d
ebris
Deb
ris
Uns
eale
dN
onFr
iabl
e1
tem
Poor
3001
/D07
5/M
G/0
05
Chr
ysot
ile a
nd
Amos
ite
dete
cted
Low
RN
/A
One
deb
ris o
bser
ved,
app
roxi
mat
ely
six
debr
is o
bser
ved
acro
ss th
e up
per t
imbe
r bea
ms
thro
ugho
ut b
uild
ing.
Lik
ely
a re
sult
of p
oor
rem
oval
of f
orm
er a
sbes
tos
roof
and
wal
ls. B
uild
ing
is v
ery
dust
y.
Deb
ris re
mov
ed in
Jul
y 20
12, h
owev
er s
ome
may
stil
l rem
ain
with
in in
acce
ssib
le a
reas
. PB
2014
: Ite
m re
mov
ed in
201
2, re
fer
to "1
8232
5 Bu
ildin
g D
75 C
lear
ance
Rep
ort.p
df".
Deb
ris m
ay s
till
rem
ain
in in
acce
ssib
le a
reas
.
Build
ing
3001
/D07
9 G
en S
et T
estin
g Sh
elte
r
No
visi
ble,
acc
essi
ble
asbe
stos
con
tain
ing
mat
eria
ls w
ere
loca
ted
in th
is b
uild
ing
at th
e tim
e of
the
insp
ectio
n
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D07
9 G
en S
et
Test
ing
Shel
ter
Inte
rnal
/ Ex
tern
alBu
ildin
g fa
bric
N
o as
best
os w
as d
etec
ted
in th
is b
uild
ing
/ stru
ctur
e
Build
ing
3001
/D08
0 G
rit b
last
Wor
ksho
p - D
NSDC
Insp
ectio
n da
tApr
-14
Surv
eyor
: Dam
ien
Ben
bow
Dat
e As
sess
edB
ase
IDBu
ildin
g id
entif
icat
ion
Room
or
Spac
eFl
oor I
DPr
imar
y Lo
catio
nSe
cond
ary
Loca
tion
Mat
eria
lAp
plic
atio
nSu
rface
tr
eatm
ent
ACM
Typ
eQ
uant
ityQ
uant
ity
Type
Cond
ition
Sam
ple
IDLa
b Re
sults
Risk
Ra
ting
Like
lihoo
d of
di
stur
banc
eCo
ntro
lLa
belli
ngPh
oto
IDCo
mm
ent
Non
Asb
esto
s co
ntai
ning
mat
eria
l ide
ntifi
ed d
urin
g th
e 20
14 in
spec
tion
not p
revi
ousl
y id
entif
ied
Site
Loc
atio
n: D
NSD
C B
ase
Num
ber 3
001-
Moo
reba
nk N
SW
Asbe
stos
con
tain
ing
mat
eria
l ide
ntifi
ed d
urin
g th
e 20
14 re
insp
ectio
n no
t pre
viou
sly
iden
tifie
d
Asb
esto
s D
etec
ted
25/0
3/14
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
Ex
tern
alG
FN
orth
east
cor
ner o
f bu
ildin
gIn
gro
und,
with
in fe
nced
co
urty
ard
Mou
lded
fibr
e ce
men
tSe
rvic
e pi
tU
nsea
led
Non
-fria
ble
<1m
2Po
or30
01/D
080/
14/A
2C
hrys
otile
de
tect
edLo
wM
ediu
mEn
caps
ulat
eN
/A57
58PB
201
4: N
ot n
oted
in p
revi
ous
surv
ey, e
ncas
ed in
con
cret
e. G
PS
refe
renc
e: -3
395
2445
000
150
9234
4000
0
25/0
3/14
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
Ex
tern
alG
FN
orth
ele
vatio
nO
n gr
ound
Fibr
e ce
men
t she
etD
ebris
Uns
eale
dN
on-fr
iabl
e<1
m2
Poor
3001
/D08
0/14
/A3
Chr
ysot
ile
dete
cted
Hig
hM
ediu
mR
emov
eN
/A57
59PB
201
4: N
ot n
oted
in p
revi
ous
surv
ey. D
ebris
rem
oved
as
sam
ple,
or
igin
unk
now
n. P
oten
tially
mor
e de
bris
bur
ied
in g
roun
d.
25/0
3/14
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
Ex
tern
alG
FW
est e
leva
tion
On
grou
ndFi
bre
cem
ent s
heet
Deb
risU
nsea
led
Non
-fria
ble
<1m
2Po
or30
01/D
080/
14/A
4C
hrys
otile
de
tect
edH
igh
Med
ium
Rem
ove
N/A
5761
PB 2
014:
Not
not
ed in
pre
viou
s su
rvey
. Deb
ris re
mov
ed a
s sa
mpl
e,
orig
in u
nkno
wn.
Pot
entia
lly m
ore
debr
is b
urie
d in
gro
und.
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FW
areh
ouse
Roo
f cav
ity a
bove
sar
king
th
roug
hout
Fibr
e ce
men
t she
et
debr
isD
ebris
U
nsea
led
Non
-Fr
iabl
eN
Qm
2G
ood
Ref
er D
80-0
1C
hrys
otile
D
etec
ted
Med
ium
Low
RR
5866
GH
D 2
011:
Deb
ris o
bser
ved
abov
e sa
rkin
g th
roug
hout
. Sar
king
ob
serv
ed to
con
tain
hol
es o
r tea
rs.
Enca
psul
ated
201
1. P
B 20
13A
dvis
ed a
rea
has
been
cle
aned
. No
rth
east
cor
ner
enca
psul
ated
how
ever
dam
age
note
d to
cei
ling
linin
gs.
Roof
ca
vity
exp
osed
. Re
med
ial w
orks
requ
ired.
PB
2014
: AC
M
pres
umed
tore
mai
nin
situ
cond
ition
unch
ange
d
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FW
areh
ouse
Roo
f cav
ity a
bove
sar
king
th
roug
hout
Dus
tD
ust
Uns
eale
dFr
iabl
eN
Qm
2G
ood
Ref
er D
80-0
2C
hrys
otile
D
etec
ted
Med
ium
Low
RR
5866
GH
D 2
011:
Dus
t obs
erve
d ab
ove
sark
ing
thro
ugho
ut. S
arki
ng
obse
rved
to c
onta
in h
oles
or t
ears
. Enc
apsu
late
d in
201
1. P
B 20
13 A
dvis
ed a
rea
has
been
cle
aned
. No
rth
east
cor
ner
enca
psul
ated
how
ever
dam
age
note
d to
cei
ling
linin
gs.
Roof
ca
vity
exp
osed
. Re
med
ial w
orks
requ
ired.
PB
2014
: AC
M
pres
umed
tore
mai
nin
situ
cond
ition
unch
ange
d.
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FN
orth
eas
t are
a, ro
of
cavi
ty a
bove
sar
king
Cen
tre o
f are
aFi
bre
cem
ent s
heet
de
bris
Deb
ris
Uns
eale
dN
on-
Fria
ble
NQ
m2
Poor
D80
-01
Chr
ysot
ile
Det
ecte
dM
ediu
mLo
wR
R58
66
GH
D 2
011:
Deb
ris o
bser
ved
abov
e sa
rkin
g th
roug
hout
. Sar
king
ob
serv
ed to
con
tain
hol
es o
r tea
rs. E
ncap
sula
ted
in 2
011.
PB
2013
Are
a en
caps
ulat
ed h
owev
er d
amag
e no
ted
to c
eilin
g lin
ings
in c
entr
e of
Nor
th e
ast c
orne
r of b
uild
ing.
Roo
f cav
ity
expo
sed.
Rem
edia
l wor
ks re
quire
d. P
B 20
14: A
CM
pre
sum
ed to
re
mai
nin
situ
cond
ition
unch
ange
d.
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FN
orth
eas
t are
a of
w
areh
ouse
, roo
f cav
ity
abov
e sa
rkin
gC
entre
of a
rea
Dus
tD
ust
Uns
eale
dFr
iabl
eN
Qm
2Po
orD
80-0
2C
hrys
otile
D
etec
ted
Med
ium
Low
RR
5866
GH
D 2
011:
Dus
t obs
erve
d ab
ove
sark
ing
thro
ugho
ut. S
arki
ng
obse
rved
to c
onta
in h
oles
or t
ears
. Enc
apsu
late
d in
201
1. P
B 20
13 A
rea
enca
psul
ated
how
ever
dam
age
note
d to
cei
ling
linin
gs in
cen
tre
of N
orth
eas
t cor
ner o
f bui
ldin
g. R
oof c
avity
ex
pose
d. R
emed
ial w
orks
requ
ired.
PB
2014
: AC
M p
resu
med
to
rem
ain
insi
tuco
nditi
onun
chan
ged.
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FN
orth
eas
t are
a of
w
areh
ouse
, roo
f cav
ity
abov
e sa
rkin
gSo
uth
edge
of a
rea
Fibr
e ce
men
t she
et
debr
isD
ebris
U
nsea
led
Non
-Fr
iabl
eN
Qm
2G
ood
D80
-05
Chr
ysot
ile
Det
ecte
dLo
wLo
wL
& M
R58
67 /
5868
GH
D 2
011:
Dus
t obs
erve
d ab
ove
sark
ing
thro
ugho
ut. S
arki
ng
obse
rved
to c
onta
in h
oles
or t
ears
. Enc
apsu
late
d in
201
1.PB
20
13 A
rea
enca
psul
ated
, cei
ling
note
d to
be
in g
ood
cond
ition
. PB
2014
: AC
M p
resu
med
to re
mai
n in
situ
, con
ditio
n un
chan
ged.
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FN
orth
eas
t are
a of
w
areh
ouse
, roo
f cav
ity
abov
e sa
rkin
gSo
uth
edge
of a
rea
Dus
tD
ust
Uns
eale
dFr
iabl
eN
Qm
2G
ood
D80
-06
Chr
ysot
ile
Det
ecte
dLo
wLo
wL
& M
R58
67 /
5868
GH
D 2
011:
Dus
t obs
erve
d ab
ove
sark
ing
thro
ugho
ut. S
arki
ng
obse
rved
to c
onta
in h
oles
or t
ears
. Enc
apsu
late
d in
201
1.PB
20
13 A
rea
enca
psul
ated
, cei
ling
note
d to
be
in g
ood
cond
ition
. PB
2014
: AC
M p
resu
med
to re
mai
n in
situ
, con
ditio
n un
chan
ged.
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FN
orth
eas
t are
a of
w
areh
ouse
, roo
f cav
ity
abov
e sa
rkin
gN
orth
wes
t cor
ner o
f are
aD
ust
Dus
tU
nsea
led
Fria
ble
NQ
m2
Goo
dD
80-0
8C
hrys
otile
D
etec
ted
Low
Low
L &
MR
5867
/ 58
68
GH
D 2
011:
Dus
t obs
erve
d ab
ove
sark
ing
thro
ugho
ut. S
arki
ng
obse
rved
to c
onta
in h
oles
or t
ears
. Enc
apsu
late
d in
201
1.PB
20
13 A
rea
enca
psul
ated
, cei
ling
note
d to
be
in g
ood
cond
ition
. PB
2014
: AC
M p
resu
med
to re
mai
n in
situ
, con
ditio
n un
chan
ged.
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FN
orth
eas
t are
a of
w
areh
ouse
, roo
f cav
ity
abov
e sa
rkin
gN
orth
wes
t cor
ner o
f are
aFi
bre
cem
ent s
heet
de
bris
Deb
ris
Uns
eale
dN
on-
Fria
ble
NQ
m2
Goo
dD
80-0
9C
hrys
otile
and
Am
osite
de
tect
edLo
wLo
wL
& M
R58
67 /
5868
GH
D 2
011:
Dus
t obs
erve
d ab
ove
sark
ing
thro
ugho
ut. S
arki
ng
obse
rved
to c
onta
in h
oles
or t
ears
. Enc
apsu
late
d in
201
1.PB
20
13 A
rea
enca
psul
ated
, cei
ling
note
d to
be
in g
ood
cond
ition
. PB
2014
: AC
M p
resu
med
to re
mai
n in
situ
, con
ditio
n un
chan
ged.
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FN
orth
eas
t are
a of
w
areh
ouse
, roo
f cav
ity
abov
e sa
rkin
gW
est e
dge
of a
rea
Dus
tD
ust
Uns
eale
dFr
iabl
eN
Qm
2G
ood
D80
-10
Chr
ysot
ile
Det
ecte
dLo
wLo
wL
& M
R58
67 /
5868
GH
D 2
011:
Dus
t obs
erve
d ab
ove
sark
ing
thro
ugho
ut. S
arki
ng
obse
rved
to c
onta
in h
oles
or t
ears
. Enc
apsu
late
d in
201
1.PB
20
13 A
rea
enca
psul
ated
, cei
ling
note
d to
be
in g
ood
cond
ition
. PB
2014
: AC
M p
resu
med
to re
mai
n in
situ
, con
ditio
n un
chan
ged.
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FN
orth
eas
t are
a of
w
areh
ouse
, roo
f cav
ity
abov
e sa
rkin
gW
est e
dge
of a
rea
Fibr
e ce
men
t she
et
debr
isD
ebris
U
nsea
led
Non
-Fr
iabl
eN
Qm
2G
ood
D80
-11
Chr
ysot
ile
Det
ecte
dLo
wLo
wL
& M
R58
67 /
5868
GH
D 2
011:
Dus
t obs
erve
d ab
ove
sark
ing
thro
ugho
ut. S
arki
ng
obse
rved
to c
onta
in h
oles
or t
ears
. Enc
apsu
late
d in
201
1.PB
20
13 A
rea
enca
psul
ated
, cei
ling
note
d to
be
in g
ood
cond
ition
. PB
2014
: AC
M p
resu
med
to re
mai
n in
situ
, con
ditio
n un
chan
ged
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FN
orth
eas
t are
a of
w
areh
ouse
, roo
f cav
ity
abov
e sa
rkin
gSo
uth
wes
t cor
ner o
f are
aD
ust
Dus
tU
nsea
led
Fria
ble
NQ
m2
Goo
dD
80-1
2C
hrys
otile
and
Am
osite
de
tect
edLo
wLo
wL
& M
R58
67 /
5868
GH
D 2
011:
Dus
t obs
erve
d ab
ove
sark
ing
thro
ugho
ut. S
arki
ng
obse
rved
to c
onta
in h
oles
or t
ears
. Enc
apsu
late
d in
201
1.PB
20
13 A
rea
enca
psul
ated
, cei
ling
note
d to
be
in g
ood
cond
ition
. PB
2014
: AC
M p
resu
med
to re
mai
n in
situ
, con
ditio
n un
chan
ged.
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FN
orth
eas
t are
a of
w
areh
ouse
, roo
f cav
ity
abov
e sa
rkin
gSo
uth
wes
t cor
ner o
f are
aD
ust
Dus
tU
nsea
led
Fria
ble
NQ
m2
Goo
dD
80-1
3C
hrys
otile
D
etec
ted
Low
Low
L &
MR
5867
/ 58
68
GH
D 2
011:
Dus
t obs
erve
d ab
ove
sark
ing
thro
ugho
ut. S
arki
ng
obse
rved
to c
onta
in h
oles
or t
ears
. Enc
apsu
late
d in
201
1.PB
20
13 A
rea
enca
psul
ated
, cei
ling
note
d to
be
in g
ood
cond
ition
. PB
2014
: AC
M p
resu
med
to re
mai
n in
situ
, con
ditio
n un
chan
ged
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
Ex
tern
alG
FN
orth
wes
t cor
ner o
f bu
ildin
gG
roun
d le
vel c
omm
unic
atio
ns
pit
Mou
lded
cem
ent
Prod
uct
Serv
ice
pit
Uns
eale
dN
on-
Fria
ble
<1m
2Fa
ir30
01/D
080/
A01
Chr
ysot
ile
Det
ecte
dLo
wLo
wLe
ave
and
mai
ntai
nA
5760
PB 2
013
As
serv
ice
pit i
s en
case
d in
con
cret
e an
d ra
ised
ab
ove
grou
nd le
vel,
unlik
ely
to b
e di
stur
bed
durin
g gr
ound
s m
aint
enan
ce. P
B 20
14: A
CM
stil
l pre
sent
, con
ditio
n un
chan
ged.
G
PS re
fere
nce:
-33
6029
7500
0 15
0.79
4415
000
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FW
areh
ouse
Burn
er /
kiln
s (x
4)R
ope
Seal
Lini
ng
Uns
eale
dFr
iabl
eN
QLm
Poor
D80
-15
Chr
ysot
ile
Det
ecte
dLo
wLo
wLe
ave
and
mai
ntai
nA
5865
Enca
psul
ated
with
sili
cone
sea
lant
& m
etal
stri
p du
ring
2011
de
bris
rem
oval
. Upd
ated
labe
ls.
PB 2
013
ACM
stil
l pre
sent
, co
nditi
on u
ncha
nged
. PB
2014
: AC
M s
till p
rese
nt, c
ondi
tion
unch
ange
d.
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FSo
uthe
rn A
rea
of
war
ehou
seU
pper
eav
e lin
ing
Fibr
e ce
men
t she
etLi
ning
Seal
edN
on-
Fria
ble
NQ
m2
Fair
D80
-20
Chr
ysot
ile
Det
ecte
dLo
wLo
wLe
ave
and
mai
ntai
nR
5869
Enca
psul
ated
with
PVA
sol
utio
n du
ring
2011
deb
ris re
mov
al.
Upda
ted
labe
ls.
PB 2
013
Enc
apsu
late
d ex
tern
ally
with
met
al
clad
ding
. PB
2014
: AC
M p
resu
med
to re
mai
n in
situ
.
Rem
oved
Asb
esto
s
Insp
ectio
n da
tApr
-14
Surv
eyor
: Dam
ien
Ben
bow
Dat
e As
sess
edB
ase
IDBu
ildin
g id
entif
icat
ion
Room
or
Spac
eFl
oor I
DPr
imar
y Lo
catio
nSe
cond
ary
Loca
tion
Mat
eria
lAp
plic
atio
nSu
rface
tr
eatm
ent
ACM
Typ
eQ
uant
ityQ
uant
ity
Type
Cond
ition
Sam
ple
IDLa
b Re
sults
Risk
Ra
ting
Like
lihoo
d of
di
stur
banc
eCo
ntro
lLa
belli
ngPh
oto
IDCo
mm
ent
Non
Asb
esto
s co
ntai
ning
mat
eria
l ide
ntifi
ed d
urin
g th
e 20
14 in
spec
tion
not p
revi
ousl
y id
entif
ied
Site
Loc
atio
n: D
NSD
C B
ase
Num
ber 3
001-
Moo
reba
nk N
SW
Asbe
stos
con
tain
ing
mat
eria
l ide
ntifi
ed d
urin
g th
e 20
14 re
insp
ectio
n no
t pre
viou
sly
iden
tifie
d
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
Ex
tern
alG
F
Nea
r tre
e in
fron
t of d
oor
32, r
ear o
f bui
ldin
g an
d al
ong
the
wes
tern
face
s,
alon
g st
orm
wat
er d
rain
Gro
und
Fibr
e ce
men
t deb
risD
ebris
U
nsea
led
Non
-Fr
iabl
e<1
m2
Goo
d03
67/3
001/
D8
0/AY
O63
1 As
best
os
Pres
ent
Low
Low
Mon
itor
N/A
PB 2
013
No
AC
M d
ebris
loca
ted
near
tree
or r
ear o
f bui
ldin
g.
Cont
inue
mon
itorin
g. G
roun
d de
bris
alo
ng w
este
rn s
ide
rem
oved
201
3. C
lear
ance
cer
tific
ate
prov
ided
19/
02/2
013.
PB
2014
: A v
isua
l ins
pect
ion
of th
e ar
ea w
as c
ondu
cted
and
no
ACM
fra
gmen
ts w
ere
loca
ted.
Item
rem
oved
in 2
013,
refe
r to
"216
0918
A SA
DN
SDC
Cle
aran
ce B
LD 8
0pd
f"
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FSo
uthe
rn A
rea
of
war
ehou
seC
rane
bea
mFi
bre
cem
ent s
heet
de
bris
Deb
ris
Uns
eale
dFr
iabl
eN
Qm
2Po
orD
8017
Chr
ysot
ile
Det
ecte
dH
igh
RR
GH
D 2
011:
Dus
t obs
erve
d th
roug
hout
. Rem
oved
in 2
011.
PB
2014
: C
lear
ance
cer
tific
ate
requ
ired.
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FSo
uthe
rn A
rea
of
war
ehou
sePa
ckin
g un
der m
etal
lic b
eam
Fibr
e ce
men
t she
et
debr
isPa
ckin
gU
nsea
led
Non
Fria
ble
NQ
m2
Poor
D80
18C
hrys
otile
D
etec
ted
Hig
hE
RG
HD
201
1: D
ust o
bser
ved
thro
ugho
ut. R
emov
ed in
201
1. P
B 20
14:
Cle
aran
ce c
ertif
icat
e re
quire
d.
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FSo
uthe
rn A
rea
of
war
ehou
seM
etal
lic b
eam
join
poi
ntFi
bre
cem
ent s
heet
de
bris
Deb
ris
Uns
eale
dN
onFr
iabl
eN
Qm
2Po
orD
8021
Chr
ysot
ile
Det
ecte
dH
igh
ER
GH
D 2
011:
Dus
t obs
erve
d th
roug
hout
. Rem
oved
in 2
011.
PB
2014
: C
lear
ance
cer
tific
ate
requ
ired.
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FSo
uthe
rn A
rea
of
war
ehou
seTi
mbe
r bea
m a
bove
cab
le
tray
Dus
tD
ust
Uns
eale
dFr
iabl
eN
Qm
2Po
orD
8024
Chr
ysot
ile
Det
ecte
dH
igh
RR
GH
D 2
011:
Dus
t obs
erve
d th
roug
hout
. Rem
oved
in 2
011.
PB
2014
: C
lear
ance
cer
tific
ate
requ
ired.
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FSo
uthe
rn A
rea
of
war
ehou
seU
pper
hor
izon
tal b
eam
abo
ve
rolle
r doo
rD
ust
Dus
tU
nsea
led
Fria
ble
NQ
m2
Poor
D80
33C
hrys
otile
D
etec
ted
Hig
hR
RG
HD
201
1: D
ust o
bser
ved
thro
ugho
ut. R
emov
ed in
201
1. P
B 20
14:
Cle
aran
ce c
ertif
icat
e re
quire
d.
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FSo
uthe
rn A
rea
of
war
ehou
seG
roun
d no
rth e
ast c
orne
r of
area
Dus
tD
ust
Uns
eale
dFr
iabl
eN
Qm
2Po
orD
80D
C01
Chr
ysot
ile
Det
ecte
dH
igh
RR
GH
D 2
011:
Dus
t obs
erve
d th
roug
hout
. Rem
oved
in 2
011.
PB
2014
: C
lear
ance
cer
tific
ate
requ
ired.
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FSo
uthe
rn A
rea
of
war
ehou
seN
orth
eas
t cor
ner s
tora
ge
rack
ing
Dus
tD
ust
Uns
eale
dFr
iabl
eN
Qm
2Po
orD
80D
C02
Chr
ysot
ile
Det
ecte
dH
igh
RR
GH
D 2
011:
Dus
t obs
erve
d th
roug
hout
. Rem
oved
in 2
011.
PB
2014
: C
lear
ance
cer
tific
ate
requ
ired.
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FSo
uthe
rn A
rea
of
war
ehou
seG
roun
d ea
st s
ide
of a
rea
Fibr
e ce
men
t she
et
debr
isD
ebris
U
nsea
led
Non
Fria
ble
NQ
m2
Poor
D80
-DC
-07
Chr
ysot
ile
Det
ecte
dH
igh
ER
GH
D 2
011:
Dus
t obs
erve
d th
roug
hout
. Rem
oved
in 2
011.
PB
2014
: C
lear
ance
cer
tific
ate
requ
ired.
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FSo
uthe
rn A
rea
of
war
ehou
seN
orth
eas
t cor
ner o
f are
a gr
ound
deb
risFi
bre
cem
ent s
heet
de
bris
Deb
ris
Uns
eale
dN
onFr
iabl
eN
Qm
2Po
orD
80D
C08
Chr
ysot
ile
Det
ecte
dH
igh
ER
GH
D 2
011:
Dus
t obs
erve
d th
roug
hout
. Rem
oved
in 2
011.
PB
2014
: C
lear
ance
cer
tific
ate
requ
ired.
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FSo
uthe
rn A
rea
of
war
ehou
seN
orth
eas
t cor
ner o
f are
a gr
ound
deb
risFi
bre
cem
ent s
heet
de
bris
Deb
ris
Uns
eale
dN
onFr
iabl
eN
Qm
2Po
orD
80D
C11
Chr
ysot
ile
Det
ecte
dH
igh
ER
GH
D 2
011:
Dus
t obs
erve
d th
roug
hout
. Rem
oved
in 2
011.
PB
2014
: C
lear
ance
cer
tific
ate
requ
ired.
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FW
areh
ouse
Cei
ling
Fibr
e ce
men
t she
et
Lini
ng
Seal
edN
onFr
iabl
e11
0m
2G
ood
Visu
al
Obs
erva
tion
Pres
umed
Ac
cess
ible
L&
M
AG
HD
201
2: In
stan
ce re
mov
ed a
s a
part
of re
med
iatio
n pr
ojec
t. PB
20
14 C
lear
ance
cer
tific
ate
requ
ired.
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FW
areh
ouse
East
ern
inte
rnal
wal
lFi
bre
cem
ent s
heet
Lini
ng15
0m
2D
80-D
C-1
2N
o as
best
os
fibre
s de
tect
ed
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FW
areh
ouse
Wes
tern
inte
rnal
wal
lFi
bre
cem
ent s
heet
Lini
ng15
0m
2R
efer
D80
-DC
-12
No
asbe
stos
fib
res
dete
cted
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FSo
uthe
rn A
rea
of
war
ehou
seN
orth
wes
t cor
ner g
roun
d du
stD
ust
Dus
tN
Qm
2D
80-D
C-0
9N
o as
best
os
fibre
s de
tect
ed
GH
D 2
011:
Dus
t obs
erve
d th
roug
hout
.
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FSo
uthe
rn A
rea
of
war
ehou
seN
orth
wes
t cor
ner g
roun
d le
vel o
f roo
f sup
port
beam
Dus
tD
ust
NQ
m2
D80
-DC
-10
No
asbe
stos
fib
res
dete
cted
GH
D 2
011:
Dus
t obs
erve
d th
roug
hout
.
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FSo
uthe
rn A
rea
of
war
ehou
seEa
st s
ide
stor
ed to
olbo
x on
pa
llet
Dus
tD
ust
NQ
m2
D80
-DC
-03
No
asbe
stos
fib
res
dete
cted
GH
D 2
011:
Dus
t obs
erve
d th
roug
hout
.
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FSo
uthe
rn A
rea
of
war
ehou
seSo
uth
east
cor
ner w
all b
race
at
gro
und
leve
lD
ust
Dus
tN
Qm
2D
80-D
C-0
4N
o as
best
os
fibre
s de
tect
ed
GH
D 2
011:
Dus
t obs
erve
d th
roug
hout
.
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FSo
uthe
rn A
rea
of
war
ehou
seSo
uth
wes
t cor
ner w
all b
race
at
gro
und
leve
lD
ust
Dus
tN
Qm
2D
80-D
C-0
5N
o as
best
os
fibre
s de
tect
ed
GH
D 2
011:
Dus
t obs
erve
d th
roug
hout
.
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FSo
uthe
rn A
rea
of
war
ehou
seW
est w
all w
indo
w s
illD
ust
Dus
tN
Qm
2D
80-D
C-0
6N
o as
best
os
fibre
s de
tect
ed
GH
D 2
011:
Dus
t obs
erve
d th
roug
hout
.
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FSo
uthe
rn A
rea
of
war
ehou
seU
pper
eas
t cor
ner b
eam
Dus
tD
ust
NQ
m2
D80
-34
No
asbe
stos
fib
res
dete
cted
GH
D 2
011:
Dus
t obs
erve
d th
roug
hout
.
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FSo
uthe
rn A
rea
of
war
ehou
seU
pper
eas
t hor
izon
tal b
eam
Dus
tD
ust
NQ
m2
D80
-35
No
asbe
stos
fib
res
dete
cted
GH
D 2
011:
Dus
t obs
erve
d th
roug
hout
.
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FSo
uthe
rn A
rea
of
war
ehou
seU
pper
met
al b
eam
that
di
vide
s w
orks
hop
Dus
tD
ust
NQ
m2
D80
-25
No
asbe
stos
fib
res
dete
cted
GH
D 2
011:
Dus
t obs
erve
d th
roug
hout
.
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FSo
uthe
rn A
rea
of
war
ehou
seM
etal
lic b
eam
join
poi
ntD
ust
Dus
tN
Qm
2D
80-2
6N
o as
best
os
fibre
s de
tect
ed
GH
D 2
011:
Dus
t obs
erve
d th
roug
hout
.
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FSo
uthe
rn A
rea
of
war
ehou
seC
rane
railin
gD
ust
Dus
tN
Qm
2D
80-2
7N
o as
best
os
fibre
s de
tect
ed
GH
D 2
011:
Dus
t obs
erve
d th
roug
hout
.
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FSo
uthe
rn A
rea
of
war
ehou
seFi
re p
ipe
east
ern
side
of a
rea
Dus
tD
ust
NQ
m2
D80
-28
No
asbe
stos
fib
res
dete
cted
GH
D 2
011:
Dus
t obs
erve
d th
roug
hout
.
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FSo
uthe
rn A
rea
of
war
ehou
seU
pper
hor
izon
tal b
eam
ea
ster
n si
de o
f are
aD
ust
Dus
tN
Qm
2D
80-2
9N
o as
best
os
fibre
s de
tect
ed
GH
D 2
011:
Dus
t obs
erve
d th
roug
hout
.
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FSo
uthe
rn A
rea
of
war
ehou
seU
pper
hor
izon
tal b
eam
ad
jace
nt ro
ller d
oor
Dus
tD
ust
NQ
m2
D80
-30
No
asbe
stos
fib
res
dete
cted
GH
D 2
011:
Dus
t obs
erve
d th
roug
hout
.
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FSo
uthe
rn A
rea
of
war
ehou
seFi
re p
ipe
adja
cent
rolle
r doo
rD
ust
Dus
tN
Qm
2D
80-3
1N
o as
best
os
fibre
s de
tect
ed
GH
D 2
011:
Dus
t obs
erve
d th
roug
hout
.
Insp
ectio
n da
tApr
-14
Surv
eyor
: Dam
ien
Ben
bow
Dat
e As
sess
edB
ase
IDBu
ildin
g id
entif
icat
ion
Room
or
Spac
eFl
oor I
DPr
imar
y Lo
catio
nSe
cond
ary
Loca
tion
Mat
eria
lAp
plic
atio
nSu
rface
tr
eatm
ent
ACM
Typ
eQ
uant
ityQ
uant
ity
Type
Cond
ition
Sam
ple
IDLa
b Re
sults
Risk
Ra
ting
Like
lihoo
d of
di
stur
banc
eCo
ntro
lLa
belli
ngPh
oto
IDCo
mm
ent
Non
Asb
esto
s co
ntai
ning
mat
eria
l ide
ntifi
ed d
urin
g th
e 20
14 in
spec
tion
not p
revi
ousl
y id
entif
ied
Site
Loc
atio
n: D
NSD
C B
ase
Num
ber 3
001-
Moo
reba
nk N
SW
Asbe
stos
con
tain
ing
mat
eria
l ide
ntifi
ed d
urin
g th
e 20
14 re
insp
ectio
n no
t pre
viou
sly
iden
tifie
d
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FSo
uthe
rn A
rea
of
war
ehou
seM
etal
pla
te a
djac
ent r
olle
r do
orD
ust
Dus
tN
Qm
2D
80-3
2N
o as
best
os
fibre
s de
tect
ed
GH
D 2
011:
Dus
t obs
erve
d th
roug
hout
.
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FSo
uthe
rn A
rea
of
war
ehou
seU
pper
hor
izon
tal b
eam
, m
iddl
e of
are
aD
ust
Dus
tN
Qm
2D
80-2
2N
o as
best
os
fibre
s de
tect
ed
GH
D 2
011:
Dus
t obs
erve
d th
roug
hout
.
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FSo
uthe
rn A
rea
of
war
ehou
seU
pper
red
fire
fight
ing
wat
er
pipe
, mid
dle
of a
rea
Dus
tD
ust
NQ
m2
D80
-23
No
asbe
stos
fib
res
dete
cted
GH
D 2
011:
Dus
t obs
erve
d th
roug
hout
.
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FSo
uthe
rn A
rea
of
war
ehou
seU
pper
hor
izon
tal b
eam
Dus
tD
ust
NQ
m2
D80
-19
No
asbe
stos
fib
res
dete
cted
GH
D 2
011:
Dus
t obs
erve
d th
roug
hout
.
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FSo
uthe
rn A
rea
of
war
ehou
seC
rane
bea
mD
ust
Dus
tN
Qm
2D
80-1
6N
o as
best
os
fibre
s de
tect
ed
GH
D 2
011:
Dus
t obs
erve
d th
roug
hout
.
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FN
orth
eas
t are
a of
w
areh
ouse
Nor
th w
all l
inin
gFi
bre
cem
ent s
heet
Lini
ng50
m2
D80
-14
No
asbe
stos
fib
res
dete
cted
GH
D 2
011:
Are
as o
f dam
age
obse
rved
.
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FN
orth
eas
t are
a of
w
areh
ouse
, roo
f cav
ity
abov
e sa
rkin
gN
orth
wes
t cor
ner o
f are
aD
ust
Dus
tN
Qm
2D
80-0
7N
o as
best
os
fibre
s de
tect
ed
GH
D 2
011:
Dus
t obs
erve
d ab
ove
sark
ing
thro
ugho
ut. S
arki
ng
obse
rved
to c
onta
in h
oles
or t
ears
.
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FN
orth
eas
t are
a of
w
areh
ouse
, roo
f cav
ity
abov
e sa
rkin
gN
orth
edg
e of
are
aFi
bre
cem
ent s
heet
de
bris
Deb
ris
NQ
m2
D80
-03
No
asbe
stos
fib
res
dete
cted
GH
D 2
011:
Deb
ris o
bser
ved
abov
e sa
rkin
g th
roug
hout
. Sar
king
ob
serv
ed to
con
tain
hol
es o
r tea
rs.
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FN
orth
eas
t are
a of
w
areh
ouse
, roo
f cav
ity
abov
e sa
rkin
gSo
uth
edge
of a
rea
Dus
tD
ust
NQ
m2
D80
-04
No
asbe
stos
fib
res
dete
cted
GH
D 2
011:
Dus
t obs
erve
d ab
ove
sark
ing
thro
ugho
ut. S
arki
ng
obse
rved
to c
onta
in h
oles
or t
ears
.
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
Ex
tern
alG
FW
areh
ouse
Exte
rnal
Mai
n of
fice
wal
l lin
ings
Fibr
e ce
men
t she
et
Wal
l lin
ing
NQ
m2
3001
/D80
/DC
/03
No
asbe
stos
fib
res
dete
cted
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FM
eal R
oom
/Am
eniti
esTo
ilet a
nd s
how
er p
artit
ions
Fibr
e ce
men
t she
et
Wal
l lin
ing
NQ
m2
3001
/D80
/DC
/01
No
asbe
stos
fib
res
dete
cted
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FM
eal R
oom
/Am
eniti
esW
all l
inin
gsFi
bre
cem
ent s
heet
W
all l
inin
g N
Qm
230
01/D
80/D
C/0
2N
o as
best
os
fibre
s de
tect
ed
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
Ex
tern
alG
FEa
ster
n si
de o
f D80
Filin
g ca
bine
tD
ust
Dus
tN
Qm
2D
NSD
C/D
080/
KLO
1
No
asbe
stos
fib
res
dete
cted
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
Ex
tern
alG
FEa
ster
n si
de o
f D80
Wor
kben
chD
ust
Dus
tN
Qm
2D
NSD
C/D
080/
KLO
2
No
asbe
stos
fib
res
dete
cted
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
Ex
tern
alG
FEa
ster
n si
de o
f D80
Wor
kben
chD
ust
Dus
tN
Qm
2D
NSD
C/D
080/
KLO
3
No
asbe
stos
fib
res
dete
cted
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
Ex
tern
alG
FEa
ster
n si
de o
f D80
Cab
le fr
ames
Dus
tD
ust
NQ
m2
DN
SDC
/D08
0/K
LO4
No
asbe
stos
fib
res
dete
cted
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
Ex
tern
alG
FEa
ster
n si
de o
f D80
Arm
y tru
nk c
asin
gD
ust
Dus
tN
Qm
2D
NSD
C/D
080/
KLO
5
No
asbe
stos
fib
res
dete
cted
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
Ex
tern
alG
FEa
ster
n si
de o
f D80
Mis
cella
neou
s pa
llets
Dus
tD
ust
NQ
m2
DN
SDC
/D08
0/K
LO6
No
asbe
stos
fib
res
dete
cted
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
Ex
tern
alG
FEa
ster
n si
de o
f D80
Flam
mab
le li
quid
con
tain
erD
ust
Dus
tN
Qm
2D
NSD
C/D
080/
KLO
7
No
asbe
stos
fib
res
dete
cted
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
Ex
tern
alG
FEa
ster
n si
de o
f D80
Mis
cella
neou
s to
olbo
xD
ust
Dus
tN
Qm
2D
NSD
C/D
080/
KLO
8
No
asbe
stos
fib
res
dete
cted
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
Ex
tern
alG
FEa
ster
n si
de o
f D80
Mis
cella
neou
s pa
llets
Dus
tD
ust
NQ
m2
DN
SDC
/D08
0/K
LO9
No
asbe
stos
fib
res
dete
cted
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FC
entra
l eas
tern
tool
st
ore
of D
80Sh
elve
sD
ust
Dus
tN
Qm
2D
NSD
C/D
080/
KLO
10
No
asbe
stos
fib
res
dete
cted
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FC
entra
l eas
tern
tool
st
ore
of D
80C
ardb
oard
on
shel
fD
ust
Dus
tN
Qm
2D
NSD
C/D
080/
KLO
11
No
asbe
stos
fib
res
dete
cted
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FC
entra
l eas
tern
tool
st
ore
of D
80Sh
elf a
rchi
veD
ust
Dus
tN
Qm
2D
NSD
C/D
080/
KLO
12
No
asbe
stos
fib
res
dete
cted
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FC
entra
l eas
tern
tool
st
ore
of D
80Fl
oor
Dus
tD
ust
NQ
m2
DN
SDC
/D08
0/K
LO13
No
asbe
stos
fib
res
dete
cted
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FC
entra
l eas
tern
tool
st
ore
of D
80C
ardb
oard
on
shel
fD
ust
Dus
tN
Qm
2D
NSD
C/D
080/
KLO
14
No
asbe
stos
fib
res
dete
cted
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
Ex
tern
alG
FSo
uth
side
of D
80G
ener
ator
sD
ust
Dus
tN
Qm
2D
NSD
C/D
080/
KLO
15
No
asbe
stos
fib
res
dete
cted
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
Ex
tern
alG
FSo
uth
side
of D
80C
abin
ets
Dus
tD
ust
NQ
m2
DN
SDC
/D08
0/K
LO16
No
asbe
stos
fib
res
dete
cted
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
Ex
tern
alG
FSo
uth
side
of D
80C
onta
iner
s an
d ca
ges
Dus
tD
ust
NQ
m2
DN
SDC
/D08
0/K
LO17
No
asbe
stos
fib
res
dete
cted
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
Ex
tern
alG
FSo
uth
side
of D
80C
hair
cove
r mat
eria
lD
ust
Dus
tN
Qm
2D
NSD
C/D
080/
KLO
18
No
asbe
stos
fib
res
dete
cted
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
Ex
tern
alG
FSo
uth
side
of D
80R
oll m
ater
ial
Dus
tD
ust
NQ
m2
DN
SDC
/D08
0/K
LO19
No
asbe
stos
fib
res
dete
cted
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
Ex
tern
alG
FSo
uth
side
of D
80H
essi
an b
agD
ust
Dus
tN
Qm
2D
NSD
C/D
080/
KLO
20
No
asbe
stos
fib
res
dete
cted
Insp
ectio
n da
tApr
-14
Surv
eyor
: Dam
ien
Ben
bow
Dat
e As
sess
edB
ase
IDBu
ildin
g id
entif
icat
ion
Room
or
Spac
eFl
oor I
DPr
imar
y Lo
catio
nSe
cond
ary
Loca
tion
Mat
eria
lAp
plic
atio
nSu
rface
tr
eatm
ent
ACM
Typ
eQ
uant
ityQ
uant
ity
Type
Cond
ition
Sam
ple
IDLa
b Re
sults
Risk
Ra
ting
Like
lihoo
d of
di
stur
banc
eCo
ntro
lLa
belli
ngPh
oto
IDCo
mm
ent
Non
Asb
esto
s co
ntai
ning
mat
eria
l ide
ntifi
ed d
urin
g th
e 20
14 in
spec
tion
not p
revi
ousl
y id
entif
ied
Site
Loc
atio
n: D
NSD
C B
ase
Num
ber 3
001-
Moo
reba
nk N
SW
Asbe
stos
con
tain
ing
mat
eria
l ide
ntifi
ed d
urin
g th
e 20
14 re
insp
ectio
n no
t pre
viou
sly
iden
tifie
d
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
Ex
tern
alG
FSo
uth
side
of D
80H
essi
an b
agD
ust
Dus
tN
Qm
2D
NSD
C/D
080/
KLO
21
No
asbe
stos
fib
res
dete
cted
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FD
033
War
ehou
se -
orig
inal
ly lo
cate
d in
D
080
Car
dboa
rd b
oxD
ust
Dus
tN
Qm
2D
NSD
C/D
033/
KL2
2
No
asbe
stos
fib
res
dete
cted
GH
D 2
011:
Inve
ntor
y ha
d be
en re
loca
ted
to D
33 w
areh
ouse
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FD
033
War
ehou
se -
orig
inal
ly lo
cate
d in
D
080
Tarp
aulin
Dus
tD
ust
NQ
m2
DN
SDC
/D03
3/K
L23
No
asbe
stos
fib
res
dete
cted
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FD
033
War
ehou
se -
orig
inal
ly lo
cate
d in
D
080
Cam
oufla
ge n
etD
ust
Dus
tN
Qm
2D
NSD
C/D
033/
KL2
4
No
asbe
stos
fib
res
dete
cted
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FD
033
War
ehou
se -
orig
inal
ly lo
cate
d in
D
080
Arm
y tru
nk c
asin
gD
ust
Dus
tN
Qm
2D
NSD
C/D
033/
KL2
5
No
asbe
stos
fib
res
dete
cted
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FD
033
War
ehou
se -
orig
inal
ly lo
cate
d in
D
080
Car
dboa
rd b
oxD
ust
Dus
tN
Qm
2D
NSD
C/D
033/
KL2
6
No
asbe
stos
fib
res
dete
cted
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FD
033
War
ehou
se -
orig
inal
ly lo
cate
d in
D
080
Cab
inet
Dus
tD
ust
NQ
m2
DN
SDC
/D03
3/K
L27
No
asbe
stos
fib
res
dete
cted
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FD
033
War
ehou
se -
orig
inal
ly lo
cate
d in
D
080
Cha
ir co
ver m
ater
ial
Dus
tD
ust
NQ
m2
DN
SDC
/D03
3/K
L28
No
asbe
stos
fib
res
dete
cted
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FD
033
War
ehou
se -
orig
inal
ly lo
cate
d in
D
080
Car
dboa
rd b
ox -
Sout
h en
dD
ust
Dus
tN
Qm
2D
NSD
C/D
033/
KL2
9
No
asbe
stos
fib
res
dete
cted
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FD
033
War
ehou
se -
orig
inal
ly lo
cate
d in
D
080
Wire
reel
Dus
tD
ust
NQ
m2
DN
SDC
/D03
3/K
L30
No
asbe
stos
fib
res
dete
cted
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FD
033
War
ehou
se -
orig
inal
ly lo
cate
d in
D
080
Rol
l mat
eria
lD
ust
Dus
tN
Qm
2D
NSD
C/D
033/
KL3
1
No
asbe
stos
fib
res
dete
cted
Inac
cess
ible
are
as
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D08
0 G
E G
rit
blas
t Wor
ksho
p -
DN
SDC
In
tern
alG
FW
areh
ouse
Abov
e sa
rkin
g w
ithin
Cen
tral
area
and
Sou
ther
n Ar
ea
GH
D 2
012:
No
acce
ss, s
arki
ng li
kely
to b
e at
tach
ed to
roof
. PB
2014
AC
M p
resu
med
to re
mai
n in
situ
.
Build
ing
3001
/D08
1 G
rit b
last
/ Ho
se T
estin
g Fa
cilit
y
Asb
esto
s D
etec
ted
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D08
1 G
rit b
last
/ H
ose
Test
ing
Faci
lity
Inte
rnal
GF
Gen
erat
or-b
reat
hing
air
room
Wes
tern
wal
l met
er b
oxR
esin
ous
boar
d El
ectri
cal m
ount
ing
boar
dSe
aled
Non
-Fr
iabl
e<1
m2
Goo
d30
01/M
G/D
81/0
01
Chr
ysot
ile
Det
ecte
dLo
wLo
wLe
ave
and
mai
ntai
nR
Boar
d is
pos
itive
for a
sbes
tos.
Leb
ah m
anuf
actu
ring
stam
p
obse
rved
on
rear
of b
oard
whi
ch is
a k
now
n as
best
os c
onta
inin
g bo
ard
. Som
e dr
ill ho
les
pres
ent.
PB
2013
AC
M s
till p
rese
nt,
cond
ition
unc
hang
ed. P
B 20
14: B
oard
not
foun
d at
tim
e of
in
spec
tion.
Build
ing
3001
/D08
2 Bu
lk a
nd C
antil
ever
Sto
rage
Asb
esto
s D
etec
ted
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D08
2 Bu
lk a
nd
Can
tilev
er
Stor
age
Exte
rnal
GF
Nor
th e
leva
tion
On
grou
ndFi
bre
cem
ent s
heet
Deb
risU
nsea
led
Non
-fria
ble
<1m
2Po
or30
01/D
082/
14/A
11
Chr
ysot
ile a
nd
amos
ite
dete
cted
Med
ium
Med
ium
Rem
ove
N/A
5847
PB 2
014:
Not
not
ed in
pre
viou
s su
rvey
, deb
ris b
urie
d in
gro
und;
po
tent
ially
furth
er b
urie
d de
bris
.
No
Asb
esto
s D
etec
ted
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D08
2 Bu
lk a
nd
Can
tilev
er
Stor
age
Exte
rnal
GF
East
ele
vatio
nEl
ectri
cal h
ousi
ng to
pum
pEl
ectri
cal b
acki
ng
boar
dEl
ectri
cal m
ount
ing
boar
d30
01/D
0082
/14/
A12
No
asbe
stos
fib
res
dete
cted
PB 2
014:
Not
not
ed in
pre
viou
s su
rvey
Rem
oved
Asb
esto
s
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D08
2 Bu
lk a
nd
Can
tilev
er
Stor
age
Exte
rnal
GF
Sout
h ea
st c
orne
r of
build
ing
Gro
und
Fibr
e ce
men
t deb
risD
ebris
U
nsea
led
Non
Fria
ble
2te
mG
ood
3001
/082
/MG
/00
1
Chr
ysot
ile a
nd
Amos
ite
dete
cted
Low
Low
Mon
itor
N/A
Like
ly fo
r mor
e to
be
pres
ent i
n gr
asse
d ar
eas
surro
undi
ng b
uild
ing
foot
prin
t. Li
kely
to e
xper
ienc
e di
stur
banc
e du
ring
law
n m
aint
enan
ce.
PB G
roun
d de
bris
rem
oved
201
3. C
ontin
ue m
onito
ring.
C
lear
ance
cer
tific
ate
prov
ided
25/
02/2
013.
PB
2014
: A v
isua
l in
spec
tion
of th
e ar
ea w
as c
ondu
cted
and
no
ACM
frag
men
ts w
ere
foun
d. It
em re
mov
ed in
201
4, re
fer t
o "2
1609
18A
SA D
NSD
C
Cle
aran
ce B
LD 1
2 0
6 8
2.pd
f"
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D08
2 Bu
lk a
nd
Can
tilev
er
Stor
age
Inte
rnal
GF
Mid
eas
t are
a of
bui
ldin
gAg
ains
t met
al w
all
Fibr
e ce
men
t deb
risD
ebris
U
nsea
led
Non
Fria
ble
1te
mPo
or30
01/0
82/M
G/0
02
Chr
ysot
ile
Det
ecte
d
Deb
ris re
mov
ed a
s sa
mpl
e. E
ntire
inte
rnal
floo
r of b
uild
ing
visu
ally
obse
rved
. Unl
ikel
y to
be
from
bui
ldin
g. P
B 20
14 A
vis
ual
insp
ectio
n of
the
area
was
con
duct
ed a
nd n
o AC
M fr
agm
ents
w
ere
foun
d. C
ontin
ue m
onito
ring.
Build
ing
3001
/D08
3 DN
SDC
Pain
t Sho
p
Asb
esto
s D
etec
ted 30
01 D
NSD
C-
Moo
reba
nk N
SWD
083
DN
SDC
Pa
int S
hop
Inte
rnal
GF
Mid
wes
tern
per
imet
er
Exte
rnal
/Inte
rnal
: Pai
nt
mix
ing
shop
, wal
ls a
nd c
eilin
g Fi
bre
cem
ent s
heet
W
all &
cei
ling
linin
g Se
aled
Non
-Fr
iabl
e24
m2
Goo
d30
01/D
083/
MG
/003
Chr
ysot
ile a
nd
Amos
ite
dete
cted
Med
ium
Low
Leav
e an
d m
aint
ain
APa
inte
d cr
eam
. Upd
ated
labe
ls.
PB 2
013
ACM
stil
l pre
sent
, co
nditi
on u
ncha
nged
. PB
201
4: N
o ac
cess
at t
ime
of s
urve
y,
ACM
pre
sum
ed to
rem
ain
in s
itu
3001
DN
SDC
- M
oore
bank
NSW
D08
3 D
NSD
C
Pain
t Sho
p In
tern
alG
FN
orth
wes
tern
cor
ner o
f bu
ildin
gG
roun
d. F
ibre
cem
ent p
ipe
Mou
lded
cem
ent
Prod
uct
Pipe
wor
k N
QN
QFa
ir30
01/D
083/
MG
/001
Chr
ysot
ile
Det
ecte
dLo
wLo
wR
emov
eR
In a
n ar
ea n
ot fr
eque
ntly
used
, dam
aged
. Re-
sam
pled
in 2
012.
PB
2013
ACM
stil
l pre
sent
, unl
ikel
y to
be
dist
urbe
d du
e to
lo
catio
n. L
ocat
ed a
t gro
und
leve
l nea
r ste
el c
olum
n be
hind
sp
ray
boot
h. P
B 20
14: N
o ac
cess
at t
ime
of s
urve
y, A
CM
pr
esum
edto
rem
ain
insi
tu
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D08
3 D
NSD
C
Pain
t Sho
p Ex
tern
alG
FSo
uth
east
cor
ner o
f bu
ildin
gG
roun
d, s
ervi
ce p
itM
ould
ed c
emen
t Pr
oduc
t Pi
t lin
ing
<1m
230
01/D
083/
MG
/001
No
asbe
stos
fib
res
dete
cted
Som
e da
mag
e ev
iden
t, lik
ely
to e
xper
ienc
e di
stur
banc
e du
ring
law
n m
aint
enan
ce
3001
DN
SDC
- M
oore
bank
NSW
D08
3 D
NSD
C
Pain
t Sho
p In
tern
alG
FSo
uth
wes
t cor
ner o
f bu
ildin
gEx
tern
al/In
tern
al: T
oile
t wal
ls
and
ceilin
gFi
bre
cem
ent s
heet
W
all &
cei
ling
linin
g 12
m2
3001
/D08
3/M
G/0
02
No
asbe
stos
fib
res
dete
cted
Pain
ted
crea
m
Insp
ectio
n da
tApr
-14
Surv
eyor
: Dam
ien
Ben
bow
Dat
e As
sess
edB
ase
IDBu
ildin
g id
entif
icat
ion
Room
or
Spac
eFl
oor I
DPr
imar
y Lo
catio
nSe
cond
ary
Loca
tion
Mat
eria
lAp
plic
atio
nSu
rface
tr
eatm
ent
ACM
Typ
eQ
uant
ityQ
uant
ity
Type
Cond
ition
Sam
ple
IDLa
b Re
sults
Risk
Ra
ting
Like
lihoo
d of
di
stur
banc
eCo
ntro
lLa
belli
ngPh
oto
IDCo
mm
ent
Non
Asb
esto
s co
ntai
ning
mat
eria
l ide
ntifi
ed d
urin
g th
e 20
14 in
spec
tion
not p
revi
ousl
y id
entif
ied
Site
Loc
atio
n: D
NSD
C B
ase
Num
ber 3
001-
Moo
reba
nk N
SW
Asbe
stos
con
tain
ing
mat
eria
l ide
ntifi
ed d
urin
g th
e 20
14 re
insp
ectio
n no
t pre
viou
sly
iden
tifie
d
Build
ing
3001
/D08
4 DN
SDC
Pain
t Sto
re
Asb
esto
s D
etec
ted
4/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D08
4 D
NSD
C
Pain
t Sto
re
Exte
rnal
GF
Nor
th fa
ce o
f bui
ldin
gEl
ectri
cal b
oxR
esin
ous
boar
d El
ectri
cal m
ount
ing
boar
dN
AN
on-
Fria
ble
<1 m
2G
ood
3001
/MG
/D84
/00
1C
hrys
otile
D
etec
ted
Low
Low
Leav
e an
d m
aint
ain
A57
62
Boar
d is
pos
itive
for a
sbes
tos.
Leb
ah m
anuf
actu
ring
stam
p
obse
rved
on
rear
of b
oard
whi
ch is
a k
now
n as
best
os c
onta
inin
g bo
ard.
PB
2013
AC
M s
till p
rese
nt, c
ondi
tion
unch
ange
d. P
B20
14: A
CM
stil
l pre
sent
, con
ditio
n un
chan
ged.
Upd
ated
labe
ls.
Bui
ldin
g 30
01/D
085
Gas
Sto
re
No
visi
ble,
acc
essi
ble
asbe
stos
con
tain
ing
mat
eria
ls w
ere
loca
ted
in th
is b
uild
ing
at th
e tim
e of
the
insp
ectio
n
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D08
5 G
as S
tore
Inte
rnal
/ Ex
tern
alBu
ildin
g fa
bric
N
o as
best
os w
as d
etec
ted
in th
is b
uild
ing
/ stru
ctur
e
Build
ing
3001
/D08
6 Am
eniti
es B
lock
- To
ilets
No
visi
ble,
acc
essi
ble
asbe
stos
con
tain
ing
mat
eria
ls w
ere
loca
ted
in th
is b
uild
ing
at th
e tim
e of
the
insp
ectio
n
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D08
6 Am
eniti
es
Bloc
k - T
oile
ts
Inte
rnal
GF
Inte
rnal
Mal
e &
fem
ale
toile
ts: W
alls
Fi
bre
cem
ent s
heet
W
all l
inin
g 35
m2
3001
/D08
6/M
G/0
01
No
asbe
stos
fib
res
dete
cted
Cub
icle
s ar
e tim
ber
Bui
ldin
g 30
01/D
087
Stea
m C
lean
er S
hed
No
visi
ble,
acc
essi
ble
asbe
stos
con
tain
ing
mat
eria
ls w
ere
loca
ted
in th
is b
uild
ing
at th
e tim
e of
the
insp
ectio
n
Build
ing
3001
/D08
8 Pu
mp
Shed
No
visi
ble,
acc
essi
ble
asbe
stos
con
tain
ing
mat
eria
ls w
ere
loca
ted
in th
is b
uild
ing
at th
e tim
e of
the
insp
ectio
n
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D08
8 Pu
mp
Shed
Inte
rnal
/ Ex
tern
alG
FBu
ildin
g fa
bric
N
o as
best
os w
as d
etec
ted
in th
is b
uild
ing
/ stru
ctur
e
Build
ing
3001
/D09
0 DN
SDC
Gat
ehou
se N
orth
Asb
esto
s D
etec
ted
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D09
0 D
NSD
C
Gat
ehou
se N
orth
Ex
tern
alG
FSo
uth
elev
atio
nIn
gro
und,
opp
osite
sid
e of
ro
adM
ould
ed fi
bre
cem
enSe
rvic
e pi
tU
nsea
led
Non
-fria
ble
<1m
2Po
or30
01/D
0090
/14/
A14
Chr
ysot
ile a
nd
amos
ite
dete
cted
Med
ium
Med
ium
Rem
ove
N/A
5862
PB 2
014:
Not
not
ed in
pre
viou
s su
rvey
, da
mag
e to
edg
es a
nd
high
ly lik
ely
to b
e di
stur
bed
durin
g gr
ound
s m
aint
enan
ce. G
PS
refe
renc
e: -3
394
9026
000
150
9236
5700
0
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D09
0 D
NSD
C
Gat
ehou
se N
orth
In
tern
al /
Exte
rnal
Build
ing
fabr
ic
No
asbe
stos
was
det
ecte
d in
this
bui
ldin
g / s
truct
ure
Build
ing
3001
/D09
1 DN
SDC
OH&
S Fa
cilit
y - A
men
ities
Blo
ck
Asb
esto
s D
etec
ted
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D09
1 D
NSD
C
OH
&S F
acilit
y -
Amen
ities
Blo
ck
Exte
rnal
GF
Nor
th e
leva
tion
In g
roun
dM
ould
ed fi
bre
cem
enSe
rvic
e pi
tU
nsea
led
Non
-fria
ble
<1m
2Po
or30
01/D
0091
/14/
A15
Chr
ysot
ile a
nd
amos
ite
dete
cted
Med
ium
Med
ium
Rem
ove
N/A
5863
PB 2
014:
Not
not
ed in
pre
viou
s su
rvey
, lik
ely
to b
e di
stur
bed
durin
g gr
ound
s m
aint
enan
ce. G
PS re
fere
nce:
-33.
9490
1300
0 15
092
3648
000
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D09
1 D
NSD
C
OH
&S F
acilit
y -
Amen
ities
Blo
ck
Exte
rnal
GF
Sout
heas
tern
cor
ner o
f bu
ildin
gC
omm
unic
atio
n pi
t M
ould
ed fi
bre
cem
ent
Serv
ice
pit
Uns
eale
dN
on-
Fria
ble
<1 m
2Fa
ir30
01/D
091/
MG
/001
Chr
ysot
ile a
nd
Amos
ite
dete
cted
Low
Med
ium
Leav
e an
d m
aint
ain
R58
56
Uns
eale
d, li
kely
to e
xper
ienc
e di
stur
banc
e du
ring
law
n m
aint
enan
ce.
PB 2
013
AC
M s
till p
rese
nt, c
ondi
tion
unch
ange
d. P
B 20
14:
ACM
stil
l pre
sent
, con
ditio
n un
chan
ged.
GPS
refe
renc
e: -
3395
1527
000
150
9245
1700
0
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D09
1 D
NSD
C
OH
&S F
acilit
y -
Amen
ities
Blo
ck
Exte
rnal
GF
Nor
th a
nd s
outh
sid
es o
f bu
ildin
gEa
ves
Fibr
e ce
men
t she
et
Lini
ng
Seal
edN
on-
Fria
ble
8m
2Fa
ir30
01/D
091/
MG
/002
Chr
ysot
ile
Det
ecte
dLo
wLo
wLe
ave
and
mai
ntai
nA
5857
Pain
ted
crea
m. U
pdat
ed la
bels
. PB
201
3 A
CM
stil
l pre
sent
, co
nditi
on u
ncha
nged
. PB
2014
: AC
M s
till p
rese
nt, c
ondi
tion
unch
ange
d.
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D09
1 D
NSD
C
OH
&S F
acilit
y -
Amen
ities
Blo
ck
Inte
rnal
GF
Thro
ugho
utC
eilin
gFi
bre
cem
ent s
heet
Li
ning
Se
aled
Non
-Fr
iabl
e50
m2
Goo
d30
01/D
091/
MG
/003
Chr
ysot
ile
Det
ecte
dLo
wLo
wLe
ave
and
mai
ntai
nA
5858
Pain
ted
whi
te, s
ame
text
ure
as e
ave
linin
g. U
pdat
ed la
bels
. PB
20
13 N
o ac
cess
inte
rnal
ly to
bot
h bu
ildin
gs a
t tim
e of
in
spec
tion.
Vie
wed
lini
ngs
thro
ugh
win
dow
. A
CM
stil
l pre
sent
an
d ev
iden
ce s
ugge
sts
cond
ition
unc
hang
ed.
PB
2014
: AC
M
still
pres
ent
cond
ition
unch
ange
d
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D09
1 D
NSD
C
OH
&S F
acilit
y -
Amen
ities
Blo
ck
Exte
rnal
GF
Rea
rG
roun
dFi
bre
cem
ent s
heet
Deb
ris
Uns
eale
dN
on-
Fria
ble
<1m
2Po
or03
67/3
001/
D91
/AY
O62
6As
best
os
Pres
ent
Med
ium
Med
ium
Rem
ove
PB 2
014:
Dat
a ad
ded
from
DC
T. A
vis
ual i
nspe
ctio
n of
the
area
was
co
nduc
ted
and
no A
CM
was
foun
d. C
ontin
ue m
onito
ring.
Bui
ldin
g 30
01/D
092
GE
RMT
HQ
No
visi
ble,
acc
essi
ble
asbe
stos
con
tain
ing
mat
eria
ls w
ere
loca
ted
in th
is b
uild
ing
at th
e tim
e of
the
insp
ectio
n
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D09
2 G
E R
MT
HQ
Ex
tern
alG
FN
orth
and
sou
th s
ides
Gab
le c
ladd
ing
Fibr
e ce
men
t she
et
Gab
le e
nd
5m
230
01/D
092/
MG
/001
No
asbe
stos
fib
res
dete
cted
Pain
ted
off w
hite
3001
DN
SDC
- M
oore
bank
NSW
D09
2 G
E R
MT
HQ
Ex
tern
alG
FEa
st a
nd w
est s
ides
Eave
sFi
bre
cem
ent s
heet
Ea
ves
linin
g 8
m2
3001
/D09
2/M
G/0
02
No
asbe
stos
fib
res
dete
cted
Pain
ted
off w
hite
Build
ing
3001
/D09
3 Tr
ansp
ort C
ompo
und
Asb
esto
s D
etec
ted
Insp
ectio
n da
tApr
-14
Surv
eyor
: Dam
ien
Ben
bow
Dat
e As
sess
edB
ase
IDBu
ildin
g id
entif
icat
ion
Room
or
Spac
eFl
oor I
DPr
imar
y Lo
catio
nSe
cond
ary
Loca
tion
Mat
eria
lAp
plic
atio
nSu
rface
tr
eatm
ent
ACM
Typ
eQ
uant
ityQ
uant
ity
Type
Cond
ition
Sam
ple
IDLa
b Re
sults
Risk
Ra
ting
Like
lihoo
d of
di
stur
banc
eCo
ntro
lLa
belli
ngPh
oto
IDCo
mm
ent
Non
Asb
esto
s co
ntai
ning
mat
eria
l ide
ntifi
ed d
urin
g th
e 20
14 in
spec
tion
not p
revi
ousl
y id
entif
ied
Site
Loc
atio
n: D
NSD
C B
ase
Num
ber 3
001-
Moo
reba
nk N
SW
Asbe
stos
con
tain
ing
mat
eria
l ide
ntifi
ed d
urin
g th
e 20
14 re
insp
ectio
n no
t pre
viou
sly
iden
tifie
d
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
D09
3 Tr
ansp
ort
Com
poun
d Ex
tern
alG
FN
orth
east
ele
vatio
nIn
gro
und
Mou
lded
fibr
e ce
men
Serv
ice
pit
Uns
eale
dN
on-fr
iabl
e<1
m2
Fair
3001
/D00
93/1
4/A1
3
Chr
ysot
ile a
nd
amos
ite
dete
cted
Med
ium
Med
ium
Rem
ove
N/A
5855
PB 2
014:
Not
not
ed in
pre
viou
s su
rvey
, lik
ely
to b
e di
stur
bed
durin
g gr
ound
s m
aint
enan
ce. G
PS re
fere
nce:
-33.
9515
2700
0 15
092
4517
000
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D09
3 Tr
ansp
ort
Com
poun
d In
tern
alG
FG
arag
eW
alls
Fibr
e ce
men
t she
et
Wal
l lin
ing
36m
230
01/D
093/
MG
/001
No
asbe
stos
fib
res
dete
cted
Pain
ted
crea
m
3001
DN
SDC
- M
oore
bank
NSW
D09
3 Tr
ansp
ort
Com
poun
d In
tern
alG
FEl
ectri
cal c
upbo
ard,
m
ale
and
fem
ale
toile
tsW
alls
Fibr
e ce
men
t she
et
Wal
l lin
ing
150
m2
3001
/D09
3/M
G/0
02
No
asbe
stos
fib
res
dete
cted
Pain
ted
crea
m
Build
ing
3001
/D16
2 6
Tran
spor
t Adm
in -
Dem
ount
able
Rel
ocat
ed fr
om 4
05/0
01
Asb
esto
s D
etec
ted 30
01 D
NSD
C-
Moo
reba
nk N
SWD
162
6 Tr
ansp
ort
Adm
inEx
tern
alG
FU
nder
bui
ldin
gPa
ckin
g m
ater
ial
Fibr
e ce
men
t she
etPa
ckin
g m
ater
ial
Non
-Fr
iabl
e<1
m2
Poor
0367
/300
1/D
162
/AYO
654
Asbe
stos
Pr
esen
tM
ediu
mM
ediu
mR
emov
eN
/APB
201
4: D
ata
adde
d fro
m D
CT.
Con
tinue
mon
itorin
g.
3001
DN
SDC
- M
oore
bank
NSW
D16
2 6
Tran
spor
t Ad
min
Exte
rnal
GF
Fron
tG
roun
dFi
bre
cem
ent s
heet
Deb
ris
Fria
ble
<1m
2Po
or03
67/3
001/
D16
2/A
YO65
3As
best
os
Pres
ent
Med
ium
Med
ium
Rem
ove
N/A
PB 2
014:
Dat
a ad
ded
from
DC
T. C
ontin
ue m
onito
ring.
Bui
ldin
g 30
01/D
163
Fuel
Bow
ser A
wni
ng
No
visi
ble,
acc
essi
ble
asbe
stos
con
tain
ing
mat
eria
ls w
ere
loca
ted
in th
is b
uild
ing
at th
e tim
e of
the
insp
ectio
n
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D16
3 Fu
el
Bow
ser A
wni
ng
Inte
rnal
/ Ex
tern
alBu
ildin
g fa
bric
N
o as
best
os w
as d
etec
ted
in th
is b
uild
ing
/ stru
ctur
e
Bui
ldin
g 30
01/D
164
Was
h Po
int A
wni
ng
No
visi
ble,
acc
essi
ble
asbe
stos
con
tain
ing
mat
eria
ls w
ere
loca
ted
in th
is b
uild
ing
at th
e tim
e of
the
insp
ectio
n
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D16
4 W
ash
poin
t Aw
ning
In
tern
al /
Exte
rnal
GF
Build
ing
fabr
icN
o as
best
os w
as d
etec
ted
in th
is b
uild
ing/
stru
ctur
e
Build
ing
3001
/D16
5 Da
nger
ous
Goo
ds G
as S
tore
No
visi
ble,
acc
essi
ble
asbe
stos
con
tain
ing
mat
eria
ls w
ere
loca
ted
in th
is b
uild
ing
at th
e tim
e of
the
insp
ectio
n
No
Asb
esto
s D
etec
ted
3001
DN
SDC
- M
oore
bank
NSW
D16
5 D
ange
rous
go
ods
stor
eIn
tern
al /
Exte
rnal
GF
Build
ing
fabr
icN
o as
best
os w
as d
etec
ted
in th
is b
uild
ing/
stru
ctur
e
Exte
rnal
Gro
unds
Asb
esto
s D
etec
ted
7/04
/14
3001
DN
SDC
- M
oore
bank
NSW
Exte
rnal
, far
so
uth
wes
t cor
ner
of s
iteEx
tern
alG
FFa
r sou
th w
est c
orne
r of
site
Und
er D
NSD
C s
ign
Mou
lded
cem
ent
Prod
uct
Com
mun
icat
ions
Pit
Uns
eale
dN
on-
Fria
ble
1m
2Fa
ir30
01/M
G/s
outh
wes
t cor
ner/0
01
Chr
ysot
ile a
nd
Amos
ite
dete
cted
Med
ium
Med
ium
EN
/AM
ay e
xper
ienc
e di
stur
banc
e du
ring
law
n m
aint
enan
ce a
ctiv
ities
. PB
2014
Item
not
foun
d at
tim
e of
sur
vey,
pre
sum
ed to
rem
ain
in
situ
.30
01 D
NSD
C-
Moo
reba
nk N
SWEx
tern
al, m
id
north
fenc
eEx
tern
alG
FM
id n
orth
fenc
e, p
illar
box
Elec
trica
l box
Res
inou
s bo
ard
Elec
trica
l mou
ntin
g bo
ard
Seal
edN
on-
Fria
ble
1m
2Fa
ir30
01/M
G/m
id
north
fenc
e/00
1
No
asbe
stos
fib
res
dete
cted
NP
Boar
d co
nstru
cted
to A
ustra
lian
Stan
dard
s
UUNOFFICIAL
Matt,
Do you have an email address for Qube?
Regards
Jurgen
From: Palejs, Wayne MR Sent: Tuesday, 2 June 2015 08:23 To: Fritz, Jurgen MR Subject: FW: DNSDC Site Migration/ Hand Back/ Make Good/ Fuel Point/ Easements/ Break Lease Update ADO/Qube Meeting 20 May 15 [SEC=UNOFFICIAL]
UNOFFICIAL
Jurgen
As requested, attached is the DNSDC Asbestos register.
Regards
Wayne Palejs
Base Support Operations ManagerLiverpool Military AreaDefence Support - Northern New South Wales
From: Fritz, Jurgen MR Sent: Thursday, 21 May 2015 14:12 To: Holcroft, Lorraine MS; Brick, Mal COL; Palejs, Wayne MR Cc: Doyle, Judy MRS 1; Tolson, Christine AIRCDRE; Rosenberger, Paul COL; Pearce, Vicki MISS 1; McGahey, David BRIG; Ryan, Matthew MR 19 Subject: RE: DNSDC Site Migration/ Hand Back/ Make Good/ Fuel Point/ Easements/ Break Lease Update ADO/Qube Meeting 20 May 15 [SEC=UNOFFICIAL]
UNOFFICIAL
Guys,
Happy to arrange for the asbestos register to get to Qube. Wayne, if you could send through an appropriate document please.
Regards
Jurgen
section 22section 22section 22
From: Brick, Mal COL Sent: Thursday, 21 May 2015 13:49 To: Holcroft, Lorraine MS; McGahey, David BRIG Cc: Fritz, Jurgen MR; Doyle, Judy MRS 1; Tolson, Christine AIRCDRE; Rosenberger, Paul COL; Pearce, Vicki MISS 1; Palejs, Wayne MR Subject: RE: DNSDC Site Migration/ Hand Back/ Make Good/ Fuel Point/ Easements/ Break Lease Update ADO/Qube Meeting 20 May 15 [SEC=UNOFFICIAL]
UUNOFFICIAL
Hi Lorraine,
From a JLU(E) perspective, the meeting had great value. It was good to be able to put faces to names and to show you the facility and the work we have done.The confirmation that there were no unforseen handback requirements that might change what I needmy team to do has taken an unkown off our critical path.At this stage of the process that is a very good thing.
WRT to the site asbestos register, that is a local DSRG document.I have cc'd Wayne to this email. Suggest easiest way forward is for him to pass the document to Jurgen for enforwarding to Qube.I would prefer not to establish a direct relationship with them at this stage if possible.Happy to do what is required though.
Regards,
M.G. BRICKCOLONELCommanderJoint Logistics Unit (East)Moorebank NSW 2170
section 22
section 22
section 22
From: Holcroft, Lorraine MS Sent: Thursday, 21 May 2015 13:40 To: McGahey, David BRIG Cc: Fritz, Jurgen MR; Brick, Mal COL; Doyle, Judy MRS 1; Tolson, Christine AIRCDRE; Rosenberger, Paul COL; Pearce, Vicki MISS 1 Subject: RE: DNSDC Site Migration/ Hand Back/ Make Good/ Fuel Point/ Easements/ Break Lease Update ADO/Qube Meeting 20 May 15 [SEC=UNOFFICIAL]
UUNOFFICIAL
Thanks Dave,
Just a point of clarification that doesn't need to go to seniors is in relation to the asbestos issue. Qube also requested to see the site asbestos register which I understood JLU would provide.
Thank you for your assistance yesterday and that of Mal and his team. I think it was a worthwhile meeting, even if the outcome on the break lease issue was less than satisfactory.
I will let you know as soon as I hear back from Qube's lawyers.
RegardsLorraine
Acting Assistant SecretaryProperty Management BranchInfrastructure DivisionDefence Support and Reform Group
BP26-G-B003PO Box 7925CANBERRA BC ACT 2610
From: McGahey, David BRIG Sent: Thursday, 21 May 2015 13:02 To: Thomas, Clint RADM; Divall, Gregory MR Cc: Holcroft, Lorraine MS; Fritz, Jurgen MR; Brick, Mal COL; Doyle, Judy MRS 1; Tolson, Christine AIRCDRE; Rosenberger, Paul COL Subject: DNSDC Site Migration/ Hand Back/ Make Good/ Fuel Point/ Easements/ Break Lease Update ADO/Qube Meeting 20 May 15 [SEC=UNOFFICIAL]
UNOFFICIAL
Sir and Greg,
Yesterday, Lorraine, Comd JLU (E) and I with supporting staff met with Qube at JLU (E) to discuss DNSDC Site Migration, Hand Back, Make Good, Fuel Point Remediation and Break Lease outcomes. After a confirmatory site visit with Qube, briefly the following issues were progressed.
Site Migration- Comd JLU (E) reported he is on track to be off the DNSDC site completely by 30 Jun 15. This will include the shut down of all residual ICT including DSN, DRN and RFID. Comment anexcellent outcome from JLU (E) often in difficult circumstances.
section 22
section 22
Handback We visited a representative sample of buildings at DNSC and observed wpns storage, repair, warehousing, DG and Fuel facilities. Qube were happy with the quality of the 66 buildings already accepted back from JLU(E) by Regional DSRG staff. The remaining 22 buildings once empty will be prepared to the same standard. Qube accepted that most of the warehousing and some of the workshops will be handed back with shelving, surplus furniture and heavy machine tools in place.
Make Good: Qube accepted in prinicple that the datum for DNSDC site make good is the 2003 Condition Report conducted on the sale of the DNSDC site from Defence to Westpac ( its was subsquently sold to Qube/SIMTA). There are no issues of signficance in regard to buildings, plant andequipment. The following environmental issues were discussed:
Radiation the radiation storage facility at DNSDC is now empty. An ANSTO endorsedclearance certificate is now available for Qube. Comment Qube accepted this outcomesubject to receiving the ANSTO clearance reportLead an enviromental survey of lead contamination at the old Wpns Firing Facility hasindicated low levels of lead contamination. This is certification will not require remediation.Comment Qube accepted this outcome subject to receiving the site environmental reportAsbestos From 2003 Defence has spent up to $12m remediating asbestos roofing and duston site in several old warehouses. The balance of the latent asbestos issues at DNSDCremain in the unremediated asbestos roofing in old warehouses. These are now locked toprevent exposure and accidental access. It was indicated to Qube that Defence will handthese buildings back in this condition. Comment Qube accepted this outcome subject toreceiving the asbestos clearance report for the remediated buildings.Fuel Point (Moorebank DFI) . There are six 50k litre in ground fuel tanks at the Moorebank.The facility has been closed for 2 months. 2 of the 6 tanks are currently leaking. Of theremaining four tanks, two tanks still contain about 40k of fuel. An environmental impact studyis underway to access the level of fuel contamination in the water table around the DFI. Qubeexpressed an interest in continuing the use of the Moorebank DFI and potentially sharing thecost of remediating the facility. Comment Until the environmental impact study is complete infour weeks Defence will not know the extent of works to clean up and remediate the site. Asthe amount of hydrocarbon seepage seems extensive it would seem good practice to emptythe rermaining tanks and fill them with water until the issue can be resolved.
Easements. Defence update Qube on the progress of the easement requests from Qube/SIMTA for the DNSDC/JLU (E) site. Comment A letter from Defence to Qube on the progress of the easement approvals will be issued next week.Break Lease. Defence requested feedback on the Norton Rose drafted response letter to Qube on break lease conditions. Comment Qube did not provide a written response, they only indicated a response would be forthcoming and to point out they were seeking a WOG way forward for the DNSDC/MIC break lease outcomes.
regards
Dave McGahey
PD DLTP
21 May 15
UUNOFFICIAL
Michael,
At the meeting on 20 May 2015, we undertook to provide you with a copy of the asbestos register for the DNSDC site. A copy is attached.
This document is provided by the Commonwealth for information only. Neither the Commonwealth, nor anyone on the Commonwealth's behalf, warrants (and Qube should not rely upon) this document or the relevance, completeness, accuracy or adequacy of this document. To the extent permitted by law, the Commonwealth will not be liable upon any claim by Qube for any costs, expenses, losses or damages incurred or suffered arising out of or in connection with this document.
Regards
Jurgen
Jurgen FritzDirector Property DisposalsProperty Management BranchInfrastructure Division_________________________________________________BP26-G-B034, 26 Brindabella CircuitBrindabella Business ParkPO Box 7925 Canberra BC 2610section 22section 22