![Page 1: HIGHWAYS - Heart of the south west LEPheartofswlep.co.uk/wp-content/uploads/2016/09/Appendix-1... · 2016. 9. 15. · P:\PTH Highways\XXXX Northern Corridor Traffic Signal Upgrade](https://reader035.fdocuments.in/reader035/viewer/2022071413/610c6a62f39ef764b7685c3d/html5/thumbnails/1.jpg)
All Lamposts and signposts in hatched area to bemoved back in island to accommodate new lane
Carriageway to be widened toaccommodate new lane
Demolish Approx 176.41m² of Trafficisland to provide new lane
Existing Central Reservation extendedand move traffic signal accordingly
New staggered crossing formed fromcorner of existing island
Gulleys to be repositionedto new kerb line
1.14
6.13
6.323.
703.
79
3.40
3.21
6.20
4.45
4.41
4.504.
10
3.36
3.86
10.74
1.50
1.50
1.50
1.50
New Controlled crossing
Footway extended to allow for visibilityfor controlled crossing
Right turn into St. Erth Road Closed. Areato be Broken and seeded
3.04
3.00
1.39
3.06
3.00
1.35
3.65 3.47
4.89
23.23
31.58
4.71
Provision of New on road cyclewayfor 300m
Demolish Approx 13.2m² ofCentral reservation to allow forVehicle turning
Proposed Road markings
Proposed Cycle Lane
Proposed Kerbline
Proposed Buff High Friction Resurfacing
Proposed Resurfacing, surfacing finish to beblack.
Proposed Footway, Central Reservation, Trafficisland to be demolished to make room forCarriageway
Existing Road imported from design (Not Topo)
KEY:
Proposed red (controlled crossing) tactile paving
Area Proposed to be Broken & Seeded
Proposed Footway, Central Reservation, Trafficisland to be Constructed
Proposed Guardrail
A Initial Issue BB BB 24/10/14
File ref - p:\pth highways\xxxx northern corridor traffic signal upgrade programme 201516\5.0 cad - drawings\work area\highways\1 live drawings\northern corridor study - torr lane junction option 2.dwg0
Project Name
RevDrawing No
Scale :Original Drawing Size :
Drawing Title
Dimensions :A1
As constructedFor construction
Date
Date:
Revision details
Design:
Appd:
Rev
Drawn:
Chkd: For tenderFor comment
Chkd Appd
100
Preliminary
Civic Centre | Armada Way | Plymouth | PL1 2AAPublic Helpdesk 01752 668000
BBBBAOHAOH24/10/14
Other
Northern Corridor
HIGHWAYS
Torr Lane Junction
As Shown m
1999531 - 001 A
NOTES1. Please type your text here. Please type your text here. Please type
your text here. Please type your text here. Please type your text here.Please type your text here. Please type your text here. Please typeyour text here.
2. Please type your text here. Please type your text here. Please typeyour text here. Please type your text here.
3. Please type your text here. Please type your text here. Please typeyour text here.
RESIDUAL DESIGN HAZARDS(The following information has been collected from PreconstructionInformation and the Amey CDM Hazard Management Process.)
1. Please enter project specific hazards here.
Outland Road - Torr Lane Location Scale 1:2000
Outland Road - Torr Lane JunctionScale 1:250
NN
P:\P
TH H
ighw
ays\
XX
XX
Nor
ther
n C
orrid
or T
raffi
c S
igna
l Upg
rade
Pro
gram
me
2015
16\5
.0 C
AD
- D
raw
ings
\Wor
k A
rea\
Hig
hway
s\1
Live
Dra
win
gs\N
orth
ern
Cor
ridor
Stu
dy -
Torr
Lan
e Ju
nctio
n O
ptio
n 2.
dwg,
24/
10/2
014
15:2
3:58
, 129
856
![Page 2: HIGHWAYS - Heart of the south west LEPheartofswlep.co.uk/wp-content/uploads/2016/09/Appendix-1... · 2016. 9. 15. · P:\PTH Highways\XXXX Northern Corridor Traffic Signal Upgrade](https://reader035.fdocuments.in/reader035/viewer/2022071413/610c6a62f39ef764b7685c3d/html5/thumbnails/2.jpg)
Proposed Road markings
Proposed buff (uncontrolled crossing) tactilepaving
Proposed Cycle Lane
Proposed Kerbline
Proposed Buff High Friction Resurfacing, referto specification for details.
Proposed Resurfacing, surfacing finish to beblack.
Proposed Footway, Central Reservation, Trafficisland to be demolished to make room forCarriageway
Existing Road imported from design (Not Topo)
KEY:
Proposed Guardrail
Proposed Footway, Central Reservation, Trafficisland to be Constructed1.21
2.943.00
2.97
1.50
1.34
0.44
0.48
0.34
0.25
0.25
1.07
Widen central reservationto align and square off junction.May provide enough area toprovide a staggered crossing.
10
1.90
2.32.6
4.7
8.3
15.6
3.9
20.8
6.6
2.0
2.0
Widen Existing Islands
Replace Existing Refuge Islandswith Widened staggered Crossing
Widen Existing Central Reservationand Introduce Staggered Crossing
Widen Existing Crossingand rearrange crossing point
Demolish approx 25m² ofexisting footway to ProvideCarriageway Width
6
4
New footway constructed toallow for new carriageway
A Initial Issue AOH AOH 24/10/14
File ref - p:\pth highways\xxxx northern corridor traffic signal upgrade programme 201516\5.0 cad - drawings\work area\highways\1 live drawings\northern corridor study - weston park junction.dwg0
Project Name
RevDrawing No
Scale :Original Drawing Size :
Drawing Title
Dimensions :A1
As constructedFor construction
Date
Date:
Revision details
Design:
Appd:
Rev
Drawn:
Chkd: For tenderFor comment
Chkd Appd
100
Preliminary
Civic Centre | Armada Way | Plymouth | PL1 2AAPublic Helpdesk 01752 668000
BBBBAOHAOH24/10/14
Other
Northern Corridor
HIGHWAYS
Weston Park Road Junction
As Shown m
1999531 - 002 A
RESIDUAL DESIGN HAZARDS(The following information has been collected from PreconstructionInformation and the Amey CDM Hazard Management Process.)
1. Please enter project specific hazards here.
N
Outland Road - Weston Park Road Location Scale 1:2000
N
Outland Road - Weston Park Road JunctionScale 1:250
P:\P
TH H
ighw
ays\
XX
XX
Nor
ther
n C
orrid
or T
raffi
c S
igna
l Upg
rade
Pro
gram
me
2015
16\5
.0 C
AD
- D
raw
ings
\Wor
k A
rea\
Hig
hway
s\1
Live
Dra
win
gs\N
orth
ern
Cor
ridor
Stu
dy -
Wes
ton
Par
k Ju
nctio
n.dw
g, 2
4/10
/201
4 15
:27:
52, 1
2985
6
![Page 3: HIGHWAYS - Heart of the south west LEPheartofswlep.co.uk/wp-content/uploads/2016/09/Appendix-1... · 2016. 9. 15. · P:\PTH Highways\XXXX Northern Corridor Traffic Signal Upgrade](https://reader035.fdocuments.in/reader035/viewer/2022071413/610c6a62f39ef764b7685c3d/html5/thumbnails/3.jpg)
1.21
1.30
2.75
7.03
New Guardrail to replace bollards
Widen Existing islands toform Staggered crossing
Demolish Approx. 55.7m² of CentralReservation to allow for extra right turnlane into Peverell Park Road
Ensure back to back kerbs hereto prevent Right Turn from BeauchampRoad onto Outland Road
Demolish Approx. 3.33m² of CentralReservation to allow for large vehiclesturning onto Peverell Park Road.Bollard to be moved back accordingly
Extend Central reservation on this sideto allow for extra lane on other side ofcarriageway.
3.01
2.972.8
7
3.153.00
3.042.96
2.792.87
1.97
2.13
6.52
3.02
3.08
3.053.063.06
3.04
3.95
2.842.84
2.902.92
2.952.91
2.932.93
2.932.93
2.76
2.75
2.76
2.762.75
2.75
2.752.75
2.75
2.752.75
2.822.75
2.75
2.872.75
2.75
2.78
1.19
1.072.88
Proposed Road markings
Proposed Cycle Lane
Proposed Kerbline
Proposed Buff High Friction Resurfacing
Proposed Resurfacing, surfacing finish to beblack.
Proposed Footway, Central Reservation, Trafficisland to be demolished to make room forCarriageway
Existing Road imported from design (Not Topo)
KEY:
Proposed Footway, Central Reservation, Trafficisland to be Constructed
Proposed buff (uncontrolled crossing) tactilepaving
Proposed Guardrail
A Initial Issue AOH AOH 24/10/14
File ref - p:\pth highways\xxxx northern corridor traffic signal upgrade programme 201516\5.0 cad - drawings\work area\highways\1 live drawings\northern corridor study - peverell pk road junction.dwg0
Project Name
RevDrawing No
Scale :Original Drawing Size :
Drawing Title
Dimensions :A1
As constructedFor construction
Date
Date:
Revision details
Design:
Appd:
Rev
Drawn:
Chkd: For tenderFor comment
Chkd Appd
100
Preliminary
Civic Centre | Armada Way | Plymouth | PL1 2AAPublic Helpdesk 01752 668000
BBBBAOHAOH24/10/14
Other
Northern Corridor
HIGHWAYS
Peverell Park Road Junction
As Shown m
1999531 - 003 A
RESIDUAL DESIGN HAZARDS(The following information has been collected from PreconstructionInformation and the Amey CDM Hazard Management Process.)
1. Please enter project specific hazards here.
Outland Road - Peverell Park Road Location Scale 1:2000
Outland Road - Peverell Park Road JunctionScale 1:250
NN
P:\P
TH H
ighw
ays\
XX
XX
Nor
ther
n C
orrid
or T
raffi
c S
igna
l Upg
rade
Pro
gram
me
2015
16\5
.0 C
AD
- D
raw
ings
\Wor
k A
rea\
Hig
hway
s\1
Live
Dra
win
gs\N
orth
ern
Cor
ridor
Stu
dy -
Pev
erel
l Pk
Roa
d Ju
nctio
n.dw
g, 2
4/10
/201
4 15
:18:
04, 1
2985
6