All Lamposts and signposts in hatched area to be moved back in island to accommodate new lane Carriageway to be widened to accommodate new lane Demolish Approx 176.41mà of Traffic island to provide new lane Existing Central Reservation extended and move traffic signal accordingly New staggered crossing formed from corner of existing island Gulleys to be repositioned to new kerb line 1.14 6.13 6.32 3.70 3.79 3.40 3.21 6.20 4.45 4.41 4.50 4.10 3.36 3.86 10.74 1.50 1.50 1.50 1.50 New Controlled crossing Footway extended to allow for visibility for controlled crossing Right turn into St. Erth Road Closed. Area to be Broken and seeded 3.04 3.00 1.39 3.06 3.00 1.35 3.65 3.47 4.89 23.23 31.58 4.71 Provision of New on road cycleway for 300m Demolish Approx 13.2mà of Central reservation to allow for Vehicle turning Proposed Road markings Proposed Cycle Lane Proposed Kerbline Proposed Buff High Friction Resurfacing Proposed Resurfacing, surfacing finish to be black. Proposed Footway, Central Reservation, Traffic island to be demolished to make room for Carriageway Existing Road imported from design (Not Topo) KEY: Proposed red (controlled crossing) tactile paving Area Proposed to be Broken & Seeded Proposed Footway, Central Reservation, Traffic island to be Constructed Proposed Guardrail A Initial Issue BB BB 24/10/14 File ref - p:\pth highways\xxxx northern corridor traffic signal upgrade programme 201516\5.0 cad - drawings\work area\highways\1 live drawings\northern corridor study - torr lane junction option 2.dwg 0 Project Name Rev Drawing No Scale : Original Drawing Size : Drawing Title Dimensions : A1 As constructed For construction Date Date: Revision details Design: Appd: Rev Drawn: Chkd: For tender For comment Chkd Appd 100 Preliminary Civic Centre | Armada Way | Plymouth | PL1 2AA Public Helpdesk 01752 668000 BB BB AOH AOH 24/10/14 Other Northern Corridor HIGHWAYS Torr Lane Junction As Shown m 1999531 - 001 A NOTES 1. Please type your text here. Please type your text here. Please type your text here. Please type your text here. Please type your text here. Please type your text here. Please type your text here. Please type your text here. 2. Please type your text here. Please type your text here. Please type your text here. Please type your text here. 3. Please type your text here. Please type your text here. Please type your text here. RESIDUAL DESIGN HAZARDS (The following information has been collected from Preconstruction Information and the Amey CDM Hazard Management Process.) 1. Please enter project specific hazards here. Outland Road - Torr Lane Location Scale 1:2000 Outland Road - Torr Lane Junction Scale 1:250 N N ¤ P:\PTH Highways\XXXX Northern Corridor Traffic Signal Upgrade Programme 201516\5.0 CAD - Drawings\Work Area\Highways\1 Live Drawings\Northern Corridor Study - Torr Lane Junction Option 2.dwg, 24/10/2014 15:23:58, 129856

Transcript of HIGHWAYS - Heart of the south west...

Page 1: HIGHWAYS - Heart of the south west LEPheartofswlep.co.uk/wp-content/uploads/2016/09/Appendix-1... · 2016. 9. 15. · P:\PTH Highways\XXXX Northern Corridor Traffic Signal Upgrade

All Lamposts and signposts in hatched area to bemoved back in island to accommodate new lane

Carriageway to be widened toaccommodate new lane

Demolish Approx 176.41m² of Trafficisland to provide new lane

Existing Central Reservation extendedand move traffic signal accordingly

New staggered crossing formed fromcorner of existing island

Gulleys to be repositionedto new kerb line

1.14

6.13

6.323.

703.

79

3.40

3.21

6.20

4.45

4.41

4.504.

10

3.36

3.86

10.74

1.50

1.50

1.50

1.50

New Controlled crossing

Footway extended to allow for visibilityfor controlled crossing

Right turn into St. Erth Road Closed. Areato be Broken and seeded

3.04

3.00

1.39

3.06

3.00

1.35

3.65 3.47

4.89

23.23

31.58

4.71

Provision of New on road cyclewayfor 300m

Demolish Approx 13.2m² ofCentral reservation to allow forVehicle turning

Proposed Road markings

Proposed Cycle Lane

Proposed Kerbline

Proposed Buff High Friction Resurfacing

Proposed Resurfacing, surfacing finish to beblack.

Proposed Footway, Central Reservation, Trafficisland to be demolished to make room forCarriageway

Existing Road imported from design (Not Topo)

KEY:

Proposed red (controlled crossing) tactile paving

Area Proposed to be Broken & Seeded

Proposed Footway, Central Reservation, Trafficisland to be Constructed

Proposed Guardrail

A Initial Issue BB BB 24/10/14

File ref - p:\pth highways\xxxx northern corridor traffic signal upgrade programme 201516\5.0 cad - drawings\work area\highways\1 live drawings\northern corridor study - torr lane junction option 2.dwg0

Project Name

RevDrawing No

Scale :Original Drawing Size :

Drawing Title

Dimensions :A1

As constructedFor construction

Date

Date:

Revision details

Design:

Appd:

Rev

Drawn:

Chkd: For tenderFor comment

Chkd Appd

100

Preliminary

Civic Centre | Armada Way | Plymouth | PL1 2AAPublic Helpdesk 01752 668000

BBBBAOHAOH24/10/14

Other

Northern Corridor

HIGHWAYS

Torr Lane Junction

As Shown m

1999531 - 001 A

NOTES1. Please type your text here. Please type your text here. Please type

your text here. Please type your text here. Please type your text here.Please type your text here. Please type your text here. Please typeyour text here.

2. Please type your text here. Please type your text here. Please typeyour text here. Please type your text here.

3. Please type your text here. Please type your text here. Please typeyour text here.

RESIDUAL DESIGN HAZARDS(The following information has been collected from PreconstructionInformation and the Amey CDM Hazard Management Process.)

1. Please enter project specific hazards here.

Outland Road - Torr Lane Location Scale 1:2000

Outland Road - Torr Lane JunctionScale 1:250

NN

P:\P

TH H

ighw

ays\

XX

XX

Nor

ther

n C

orrid

or T

raffi

c S

igna

l Upg

rade

Pro

gram

me

2015

16\5

.0 C

AD

- D

raw

ings

\Wor

k A

rea\

Hig

hway

s\1

Live

Dra

win

gs\N

orth

ern

Cor

ridor

Stu

dy -

Torr

Lan

e Ju

nctio

n O

ptio

n 2.

dwg,

24/

10/2

014

15:2

3:58

, 129

856

Page 2: HIGHWAYS - Heart of the south west LEPheartofswlep.co.uk/wp-content/uploads/2016/09/Appendix-1... · 2016. 9. 15. · P:\PTH Highways\XXXX Northern Corridor Traffic Signal Upgrade

Proposed Road markings

Proposed buff (uncontrolled crossing) tactilepaving

Proposed Cycle Lane

Proposed Kerbline

Proposed Buff High Friction Resurfacing, referto specification for details.

Proposed Resurfacing, surfacing finish to beblack.

Proposed Footway, Central Reservation, Trafficisland to be demolished to make room forCarriageway

Existing Road imported from design (Not Topo)

KEY:

Proposed Guardrail

Proposed Footway, Central Reservation, Trafficisland to be Constructed1.21

2.943.00

2.97

1.50

1.34

0.44

0.48

0.34

0.25

0.25

1.07

Widen central reservationto align and square off junction.May provide enough area toprovide a staggered crossing.

10

1.90

2.32.6

4.7

8.3

15.6

3.9

20.8

6.6

2.0

2.0

Widen Existing Islands

Replace Existing Refuge Islandswith Widened staggered Crossing

Widen Existing Central Reservationand Introduce Staggered Crossing

Widen Existing Crossingand rearrange crossing point

Demolish approx 25m² ofexisting footway to ProvideCarriageway Width

6

4

New footway constructed toallow for new carriageway

A Initial Issue AOH AOH 24/10/14

File ref - p:\pth highways\xxxx northern corridor traffic signal upgrade programme 201516\5.0 cad - drawings\work area\highways\1 live drawings\northern corridor study - weston park junction.dwg0

Project Name

RevDrawing No

Scale :Original Drawing Size :

Drawing Title

Dimensions :A1

As constructedFor construction

Date

Date:

Revision details

Design:

Appd:

Rev

Drawn:

Chkd: For tenderFor comment

Chkd Appd

100

Preliminary

Civic Centre | Armada Way | Plymouth | PL1 2AAPublic Helpdesk 01752 668000

BBBBAOHAOH24/10/14

Other

Northern Corridor

HIGHWAYS

Weston Park Road Junction

As Shown m

1999531 - 002 A

RESIDUAL DESIGN HAZARDS(The following information has been collected from PreconstructionInformation and the Amey CDM Hazard Management Process.)

1. Please enter project specific hazards here.

N

Outland Road - Weston Park Road Location Scale 1:2000

N

Outland Road - Weston Park Road JunctionScale 1:250

P:\P

TH H

ighw

ays\

XX

XX

Nor

ther

n C

orrid

or T

raffi

c S

igna

l Upg

rade

Pro

gram

me

2015

16\5

.0 C

AD

- D

raw

ings

\Wor

k A

rea\

Hig

hway

s\1

Live

Dra

win

gs\N

orth

ern

Cor

ridor

Stu

dy -

Wes

ton

Par

k Ju

nctio

n.dw

g, 2

4/10

/201

4 15

:27:

52, 1

2985

6

Page 3: HIGHWAYS - Heart of the south west LEPheartofswlep.co.uk/wp-content/uploads/2016/09/Appendix-1... · 2016. 9. 15. · P:\PTH Highways\XXXX Northern Corridor Traffic Signal Upgrade

1.21

1.30

2.75

7.03

New Guardrail to replace bollards

Widen Existing islands toform Staggered crossing

Demolish Approx. 55.7m² of CentralReservation to allow for extra right turnlane into Peverell Park Road

Ensure back to back kerbs hereto prevent Right Turn from BeauchampRoad onto Outland Road

Demolish Approx. 3.33m² of CentralReservation to allow for large vehiclesturning onto Peverell Park Road.Bollard to be moved back accordingly

Extend Central reservation on this sideto allow for extra lane on other side ofcarriageway.

3.01

2.972.8

7

3.153.00

3.042.96

2.792.87

1.97

2.13

6.52

3.02

3.08

3.053.063.06

3.04

3.95

2.842.84

2.902.92

2.952.91

2.932.93

2.932.93

2.76

2.75

2.76

2.762.75

2.75

2.752.75

2.75

2.752.75

2.822.75

2.75

2.872.75

2.75

2.78

1.19

1.072.88

Proposed Road markings

Proposed Cycle Lane

Proposed Kerbline

Proposed Buff High Friction Resurfacing

Proposed Resurfacing, surfacing finish to beblack.

Proposed Footway, Central Reservation, Trafficisland to be demolished to make room forCarriageway

Existing Road imported from design (Not Topo)

KEY:

Proposed Footway, Central Reservation, Trafficisland to be Constructed

Proposed buff (uncontrolled crossing) tactilepaving

Proposed Guardrail

A Initial Issue AOH AOH 24/10/14

File ref - p:\pth highways\xxxx northern corridor traffic signal upgrade programme 201516\5.0 cad - drawings\work area\highways\1 live drawings\northern corridor study - peverell pk road junction.dwg0

Project Name

RevDrawing No

Scale :Original Drawing Size :

Drawing Title

Dimensions :A1

As constructedFor construction

Date

Date:

Revision details

Design:

Appd:

Rev

Drawn:

Chkd: For tenderFor comment

Chkd Appd

100

Preliminary

Civic Centre | Armada Way | Plymouth | PL1 2AAPublic Helpdesk 01752 668000

BBBBAOHAOH24/10/14

Other

Northern Corridor

HIGHWAYS

Peverell Park Road Junction

As Shown m

1999531 - 003 A

RESIDUAL DESIGN HAZARDS(The following information has been collected from PreconstructionInformation and the Amey CDM Hazard Management Process.)

1. Please enter project specific hazards here.

Outland Road - Peverell Park Road Location Scale 1:2000

Outland Road - Peverell Park Road JunctionScale 1:250

NN

P:\P

TH H

ighw

ays\

XX

XX

Nor

ther

n C

orrid

or T

raffi

c S

igna

l Upg

rade

Pro

gram

me

2015

16\5

.0 C

AD

- D

raw

ings

\Wor

k A

rea\

Hig

hway

s\1

Live

Dra

win

gs\N

orth

ern

Cor

ridor

Stu

dy -

Pev

erel

l Pk

Roa

d Ju

nctio

n.dw

g, 2

4/10

/201

4 15

:18:

04, 1

2985

6