HIGHWAY PROGRAM FY 2020-2021
Transcript of HIGHWAY PROGRAM FY 2020-2021
HIGHWAY PROGRAM
FY 2020-2021
SORTED BY PARISH
FOR LEGISLATIVE REVIEW
AND APPROVAL
This public document is published at a total cost of $3.04. 275 copies of this public document were published in this first printing at a cost of
$836.00. The total cost of all printings of this document including reprints is $836.00. This document was published by the Louisiana
Department of Transportation reproduction unit, 1201 Capitol Access Road, Baton Rouge, LA 70802. This material was printed in accordance with standards for printing by state agencies established in R.S. 43.31.
INTRODUCTION
1. R.S. 48:229.1, 230 states that “the Department shall provide the Legislature and public with this program which shall list projects to be constructed in the ensuing fiscal year”… that considers the “anticipated revenues to be appropriated by the legislature.” The Department shall also provide the Legislature a list of projects “which are in various stages of planning and preparation.”
2. In compliance with this statute, the attached Highway Program identifies the
projects that are scheduled for construction letting in FY 2020-21. These are denoted as being in Stage 4. Projects being developed in the other stages are also included in the document.
3. There are many projects remaining to be let prior to the end of the current
fiscal year, FY 2019-20. For informational purposes, these projects are also listed in this document. In the event any of these projects cannot be let as planned, they will become part of the FY 2020-21 construction program, and will be let as soon as practicable in that fiscal year.
4. The one year construction program and the list of other projects in various
stages are combined into this document which is called the Highway Priority Program or Highway Program. These projects are also submitted to the Federal Highway Administration along with the Transit Program. The two programs together are referred to as the State Transportation Improvement Program (STIP). The Public Hearings held each year in each Highway District fulfill both the State and Federal requirements for public involvement regarding these programs.
5. DOTD has based this preliminary Highway Program on anticipated revenues.
If funding above the expected amount is made available, funding may be used on projects listed in Stages 0, 1, 2, or 3.
6. In the event all of the projects listed for letting in FY 2020-21 cannot be let to
construction due to funding issues or unforeseen problems encountered in the pre-construction process, the affected project(s) will be let as soon as practicable in the following year and other projects listed in Stages 0, 1, 2, or 3 may be advanced into FY 2020-21.
7. Construction estimates are for informational purposes only and are subject to
change.
DOTD’s Project Delivery Process
Elected Officials
MPO
Long Range Plan
Districts
Public
STAGE 0: Feasibility
One Year
STAGE 1: Planning / Environmental
One to Two Years
STAGE 2: Funding
Project Prioritization
Indefinite Period STAGE 3: Final Design Process
One to Three Years
STAGE 4: Letting
One Year
STAGE 5: Construction
One to Three Years
Feasibility Analysis of
the Proposed Project Reject
Detailed Planning and
Environmental Analysis
Funding Allocation for
Design & Construction
Development of Final
Plans & Specifications
Bid Letting Process
Construction of Project
STAGE 6: Operation
Indefinite Period
On-going Monitoring
of Operation &
Maintenance
NON-INTERSTATE (PAVEMENT)(STP) 54.5
NON-INTERSTATE (PAVEMENT) (NHS) 83.4
NON-INTERSTATE (PAVEMENT) (non-federal aid) 36.0
ROAD PREVENTIVE MAINTENANCE 7.5
INTERSTATE (PAVEMENT) 32.4
BRIDGE (ON SYSTEM) 192.8
BRIDGE (OFF SYSTEM) 13.0
SUB-TOTAL 419.6
ITS (regular & earmarks) 11.0
TRAFFIC CONTROL DEVICES 14.8
ROADWAY FLOODING 3.7
WEIGH STATIONS 0.5
TRANSPORTATION SYSTEMS MANAGEMENT 11.1
INTERSTATE LIGHTING 1.9
REST AREAS 0.4
ACCESS MANAGEMENT 8.1
FERRIES/MAJOR REPAIRS 3.5
MOVABLE BRIDGE PREVENTIVE MAINTENANCE 1.9
ADA PROGRAM 2.1
SUB-TOTAL 59.0
HWY. PROGRAM 49.7
RR CROSSING UPGRADES & SEPARATIONS 11.3
SUB-TOTAL 61.0
REGULAR PROGRAM 0.0
CORRIDOR UPGRADE 0.0
SUB-TOTAL 0.0
TRANSPORTATION ALTERNATIVES PROJECTS 4.9
URBAN SYSTEMS, CONGESTION MITIGATION & AIR QUALITY, LOCAL ROAD
SAFETY PROGRAM, SAFE ROUTES TO SCHOOLS, URBAN TRANSIT,
DEMAND MANAGEMENT 86.8
FED EARMARKS (DEMO,...) 0.0
OTHER (BONDS, TOLLS, LOCAL ) 18.5
INTERMODAL CONNECTOR 12.3
ROAD TRANSFER 21.8
GARVEE PROGRAM 45.6
SUB-TOTAL 189.9
GRAND TOTAL 729.5
Subject to funding availability.
PRESERVATION
OPERATIONS
SAFETY
CAPACITY
TENTATIVE FY 20-21 BUDGET PARTITION
(COSTS IN MILLION DOLLARS)
CONSTRUCTION
PROPOSEDCATEGORY SUB-CATEGORY
MISC.
FUNDING TYPES FEDERAL
NHPP (NATIONAL HIGHWAY PERFORMANCE PROGRAM)
STP (SURFACE TRANSPORTATION PROGRAM) STP>200K (URBAN AREAS – NEW ORLEANS, BATON ROUGE, SHREVEPORT,
LAFAYETTE) STP<200K (URBAN AREAS – ALEXANDRIA, HOUMA-THIBODAUX, LAKE CHARLES,
MONROE, SLIDELL, MANDEVILLE-COVINGTON, HAMMOND-PONTCHATOULA) STPFLEX (FLEXIBLE) STP<5K (RURAL AREAS) FBROFF (OFF SYSTEM BRIDGE MAP 21)
TAP (TRANSPORTATION ALTERNATIVES PROGRAM) TAP>200K (URBAN AREAS – NEW ORLEANS, BATON ROUGE, SHREVEPORT,
LAFAYETTE) TAP<200K (URBAN AREAS – ALEXANDRIA, HOUMA-THIBODAUX, LAKE CHARLES,
MONROE, SLIDELL, MANDEVILLE-COVINGTON, HAMMOND-PONTCHATOULA) TAPFLEX (FLEXIBLE) TAP<5K (RURAL AREAS)
HSIP, HSIPPEN, SR2S, HRRR, SATRANS (SAFETY FUNDS, SAFE ROUTES TO SCHOOLS, HIGH RISK RURAL ROADS, SAFETY TRANSFER)
RAIL HE, RAIL PD (ELIMINATIONS OF HAZARDS AT RAILWAY-HIGHWAY CROSSINGS)
CM (CONGESTION MITIGATION AIR QUALITY – EAST BATON ROUGE, WEST BATON ROUGE, LIVINGSTON, ASCENSION, AND IBERVILLE)
DEMO (FEDERAL DEMONSTRATION AND HIGH PRIORITY PROJECTS – DEFINED BY U.S. CONGRESS)
EARMARK (FEDERAL GRANT FUNDING)
ER (FEDERAL EMERGENCY RELIEF PROGRAM FUNDING)
FEMA (FEDERAL EMERGENCY MANAGEMENT AGENCY FUNDS)
GARVEE (GRANT ANTICIPATION REVENUE VEHICLE)
STATE / LOCAL
NFA (STATE TRANSPORTATION FUNDS FOR NON-FEDERAL AID ROUTES)
NFABOND (STATE BONDS FOR NON-FEDERAL AID ROUTES)
STCASH (STATE TRANSPORTATON TRUST FUNDS FOR STATE FUNDED CONSTRUCTION)
TIME (TRANSPORTATION INFRASTRUCTURE MODEL FOR ECONOMIC DEVELOPMENT)
STBONDS (STATE GENERAL OBLIGATION BONDS)
STGEN (STATE GENERAL FUNDS CASH)
TOLLS
LOCAL (FUNDS PROVIDED BY LOCAL GOVERNMENT)
OTHER (OTHER SOURCE NOT LISTED)
NFI (NO FUNDING IDENTIFIED)
Statewide prioritization process for the Highway Priority Program beginning FY2017-2018 According to Louisiana Revised Statute 48:229.1.A the construction projects included in the Highway Priority Program should accomplish the following: Goal 1: Preserve/Sustain the System (1) Brings the state highway system into a good state of repair and optimizes the usage and efficiency of existing transportation facilities. Prospective Outcome 3.1.1, 3.1.2, 3.1.3, 3.1.4, 3.1.5, 3.1.6, 3.2.1
Goal 2: Operate the System (3) Supports resiliency in the transportation system, including safe evacuation of populations when necessitated by catastrophic events such as hurricanes and floods. Prospective Outcome 3.2.1
(7) Encourages innovation and the use of technology. Prospective Outcome 3.2.1
Goal 3: Improve the Safety of the System (2) Improves safety for motorized and non-motorized highway users and communities. Prospective Outcome 3.2.1, 3.2.2, 3.2.3
Goal 4: Expand the System (4) Increases accessibility for people, goods, and services. Prospective Outcome 3.2.1, 3.2.5, 3.2.6 (5) Fosters diverse economic development and job growth, international and domestic commerce, and tourism. Prospective Outcome 3.2.1, 3.2.5, 3.2.6 Goal 5: Improve Quality of Life (6) Fosters multimodalism, promotes a variety of transportation and travel options, and encourages intermodal connectivity. Prospective Outcome 3.2.1 (8) Protects the environment, reduces emissions, and improves public health and quality of life. Prospective Outcome 3.2.1
Per R.S. 48:229.1.C, the following factors must be considered when selecting projects for inclusion in the Highway Priority Program: (1) The condition of the roads, streets, and structures making up the state highway system and the relative urgency of the improvements considering in their order of general needs. (2) The type and volume of traffic on a particular segment of roadway, highway, or bridge. (3) The crash records for a particular segment of roadway, highway, or bridge. (4) The technical difficulties in the preparation of plans and the procurement of rights-of-way for a particular segment of roadway, highway, or bridge. (5) Whether unforeseeable emergencies such as floods have created an immediate need for improvement or reconstruction. (6) Whether capacity improvements are warranted due to population or traffic volume increases in specific geographic areas. (7) Whether or not the highway or bridge is or will be on an evacuation route utilized to evacuate large populations due to catastrophic events such as hurricanes or flooding. (8) Whether the improvement to or addition of a highway or bridge will benefit the economic development potential of the state.
In accordance with R.S. 48:229.1.D, projects must be screened to determine whether they are consistent with the most recent Statewide Transportation Plan and warrant inclusion in the Program. Per R.S. 48:229.1.F, the Department shall identify and report prospective outcomes of each program. The Department shall evaluate the actual outcomes of each program and establish revised prospective outcomes of each program on a biennial basis. 3.1.1. Prospective Outcome: To effectively sustain and improve the Interstate Highway System so that 97% of the system pavement stays in fair or better condition each fiscal year. Percent fair or better as of June 30, 2016 = 98.5% Expected percent fair or better on June 30, 2018 = 97% or more Outcome Achieved: 97.33% Expected percent fair or better on June 30, 2020 = 97% or more Outcome Achieved:
3.1.2. Prospective Outcome: To effectively maintain and improve the National Highway System so that 95% of the system pavement stays in fair or better condition each fiscal year. Percent fair or better as of June 30, 2016 = 91.7% Expected percent fair or better on June 30, 2018 = 95% or more Outcome Achieved: 90.31% Expected percent fair or better on June 30, 2020 = 95% or more Outcome Achieved: 3.1.3. Prospective Outcome: To effectively maintain and improve the Highways of Statewide Significance so that 80% in SFY 2015-2016 of the system pavement stays in fair or better condition each fiscal year. In SFY 2017-2018 the goal was increased to 90%. Percent fair or better as of June 30, 2016 = 95.81% Expected percent fair or better on June 30, 2018 = 90% or more Outcome Achieved: 94.61% Expected percent fair or better on June 30, 2020 = 90% or more Outcome Achieved:
3.1.4. Prospective Outcome: To effectively maintain and improve the Regional Highway System so that 80% in SFY 2015-2016 of the system pavement stays in fair or better condition each fiscal year. In SFY 2017-2018 the goal was decreased to 70%. Percent fair or better as of June 30, 2016 = 89.41% Expected percent fair or better on June 30, 2018 = 70% or more Outcome Achieved: 87.4% Expected percent fair or better on June 30, 2020 = 70% or more Outcome Achieved:
3.1.5. Prospective Outcome: To sustain the condition and safety of Louisiana’s On-System (State-owned) bridges so that deck area of structurally deficient bridges constitutes not more than 10% of the deck area of all bridges. Percent deck area structurally deficient as of June 30, 2016 = 9.5% Expected percent fair or better on June 30, 2018 = 10% or less Outcome Achieved: 8.9% Expected percent fair or better on June 30, 2020 = 10% or less Outcome Achieved:
3.1.6. Prospective Outcome: To sustain the condition and safety of Louisiana’s Off-System (Locally-owned) bridges so that deck area of structurally deficient bridges constitutes not more than 10% of the deck area of all bridges. Percent deck area structurally deficient as of June 30, 2016 = 8.7% Expected percent fair or better on June 30, 2018 = 10% or less Outcome Achieved: 9.0% Expected percent fair or better on June 30, 2020 = 10% or less Outcome Achieved:
3.2.1. Prospective Outcome: Implement an average of three percent of the Louisiana Statewide Transportation Plan each fiscal year. Cumulative percent of Plan implemented as of June 30, 2016 = 3.3% Expected cumulative percent of Plan implemented on June 30, 2018 = 9% Outcome Achieved: 9.9% Expected cumulative percent of Plan implemented on June 30, 2020 = 15% Outcome Achieved: 3.2.2. Prospective Outcome: To reduce the total number of fatalities on Louisiana public roads by six percent each calendar year through 2030. Expected number of fatalities in 2015 = 845 Actual number of fatalities in 2015 = 752 Expected number of fatalities in 2017 = 796 Actual number of fatalities in 2017 = 773 Percent reduction = increased 2.79% Outcome Achieved: Total number of fatalities increased which is similar trend nationally. Most states are seeing increases. Expected number of fatalities in 2019 = 748 Actual number of fatalities in 2019 = Percent reduction = Outcome Achieved: 3.2.3. Prospective Outcome: To achieve at least a 25 % reduction in fatal and non-fatal crashes at selected crash locations through the implementation of safety improvements each year. Average percent reduction in crash rates at all safety improvement project locations on June 30, 2016 = 23.8% Expected percent reduction in fatal and non-fatal crash rates from safety improvements on June 30, 2018 = 25% or greater Outcome Achieved: 10.8% Expected percent reduction in fatal and non-fatal crash rates from safety improvements on June 30, 2020= 25% or greater Outcome Achieved: 3.2.5. Prospective Outcome: Maintain 90% or greater of the Interstate Highway System in uncongested conditions each fiscal year. Percent uncongested as of June 30, 2016 = 88% Expected percent uncongested on June 30, 2018 = 90% or more Outcome Achieved: 80% Expected percent uncongested on June 30, 2020 = 90% or more Outcome Achieved: 3.2.6. Prospective Outcome: Maintain 90% or greater of the National Highway System (NHS) in uncongested conditions each fiscal year. Percent uncongested as of June 30, 2016 = 97% Expected percent uncongested on June 30, 2018 = 90% or more Outcome Achieved: 98% Expected percent uncongested on June 30, 2020 = 90% or more Outcome Achieved:
4 – SCHEDULED FOR LETTING
Per RS 48:229.1, the following is the list of “…projects to be
constructed in the ensuing fiscal year…”
Per RS 48:231.A(6), “When this final construction program
is communicated to the legislature for funding for the
coming fiscal year, any project which the legislature
determines is not in the proper order of priority in
accordance with the factors stated in R.S. 48:229 may be
deleted by the legislature. However, the legislature shall not
add any projects to this final construction program, nor
shall the legislature make substitutions for projects which
have been removed.”
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.009628
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA LA 92 385-04 STPFLEX 1,928 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED IN CURRENT FY 19-20
VERMILION LA 92 385-05 STPFLEX 135 PRESERVATION - NON-INTERSTATEON STP SYSTEM
ASPHALT CONCRETE OVERLAYNOLAN, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA92:LA 13 - 0.108 MI E OF VERMILION P/L
ACADIA
H.011323
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA 000-01 HSIP 769 RAILROADS 4-SCHEDULED IN CURRENT FY 19-20
CONSTRUCT A NEW RR XING BETWEEN TWO XINGS THAT WILL CLOSELUKE, SHAWN Remrks:
Typ Imp:LOCAL FUNDS AND MATCH FROM RAILROAD
Project:Prj Mgr:
NIGHTHAWK/SPAN TRL:BNSF RR XINGS(ACADIA)
H.002123
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA LA 35 207-07 TAP<200K 434 ENHANCEMENTS 4-SCHEDULED FOR LETTING FY 20-21
SIDEWALKS, LIGHTING AND RELATED WORKMEEK, STEPHEN Remrks:
Typ Imp:207-07-0028
Project:Prj Mgr:
RAYNE SIDEWALKS, PH. III
H.010962
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA I-10 450-04 HSIP 4,041 SAFETY 4-SCHEDULED FOR LETTING FY 20-21LAFAYETTE I-10 450-05 HSIP 1,478 SAFETY
INSTALL MEDIAN CABLE BARRIERDOMINGUE, CHRISTOPHER Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: CABLE BARRIER (LAFAYETTE/ACADIA)
H.011829
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA I-10 450-04 STPFLEX 2,500 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 20-21ACADIA LA 100 211-01 LOCAL 75 ROAD TRANSFER
WIDENING, CLASS II BASE, BASE REHAB, AND ASPHALT OVERLAYTONEY, PATRICK Remrks:
Typ Imp:
Project:Prj Mgr:
IMP@LA13 & LA100 & I-10 ACC.RD (CROWLEY)
H.012917
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA LA 754 394-01 NFA 1,465 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED FOR LETTING FY 20-21
BASE STABILIZATION, ASPHALT OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 754: LA 95 - ST LANDRY P/L
H.013526
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA 000-01 RTP 112 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 20-21ACADIA 000-01 LOCAL 23 RECREATIONAL TRAILS PROGRAM
CONSTRUCTION OF 1800' WALKING TRAILNUNES, BRIAN Remrks:
Typ Imp:THE CITY OF CROWLEY WILL PROVIDE THE LOCAL MATCH
Project:Prj Mgr:
BAYOU BLANC NATURE TRAIL
H.013944
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA 000-01 STPFLEX 100 RAILROADS 4-SCHEDULED FOR LETTING FY 20-21
REMOVE THREE SPUR TRACK CROSSINGSSHREWSBERRY,BILL Remrks:
Typ Imp:MATCH BY CITY
Project:Prj Mgr:
PARKERSON: AKDN RR XING (CROWLEY)
Page 1 - 1 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.009298
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ALLEN 000-02 SR2S 262 SAFETY - SAFE ROUTES TO SCHOOLS 4-SCHEDULED FOR LETTING FY 20-21
SIDEWALK IMPROVMENTS, MARKED CROSSINGSRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
TOWN OF OBERLIN SIDEWALKS
ALLEN
H.013858
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ALLEN 000-02 RAIL PD 200 RAILROADS 4-SCHEDULED FOR LETTING FY 20-21
INSTALL SIGNALSSHREWSBERRY,BILL Remrks:
Typ Imp:MATCH FROM RAILROAD
Project:Prj Mgr:
WARD RD: UP RR XING (ALLEN)
H.013859
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ALLEN 000-02 RAIL PD 200 RAILROADS 4-SCHEDULED FOR LETTING FY 20-21
INSTALL SIGNALSSHREWSBERRY,BILL Remrks:
Typ Imp:MATCH BY RAILROAD
Project:Prj Mgr:
GUILLORY AVE: UP RR XING (OBERLIN)
H.010909
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION LA 44 265-01 HSIP 1,200 SAFETY 4-SCHEDULED FOR LETTING FY 20-21ASCENSION LA 941 803-27 HSIP 600 SAFETY
CONST. RAB NEAR LA44/LA941, WIDEN LA44 B/W I-10 & CONWAY RABHANKS, ANNA Remrks:
Typ Imp:FEASIBILITY STUDY FUNDED WITH SATRANS
Project:Prj Mgr:
LA 44: WIDENING AND ROUNDABOUT AT LA 941
ASCENSION
H.010960
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION LA 30 414-03 STPFLEX 2,670 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
4-SCHEDULED FOR LETTING FY 20-21
ASCENSION I-10 450-11 STPFLEX 2,670 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
ASCENSION 000-03 STPFLEX 2,660 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
3 ROUNDABOUTS ON LA 30 INCLUDING 2 AT THE I-10 RAMPSHARROUCH, JOSHUA Remrks:
Typ Imp:PROJECT DEPENDENT ON OUTCOME OF H.010572 CORRIDOR STUDY
Project:Prj Mgr:
LA 30 ROUNDABOUTS @ TANGER MALL & I-10
H.013710
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION I-10 450-11 NHPP 427 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
4-SCHEDULED FOR LETTING FY 20-21
ST JAMES I-10 450-12 NHPP 939 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
ST JOHN I-10 450-13 NHPP 1,839 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
DEPLOY FIBER OPTIC CABLE AND CAMERAS WITH POLESESTEVEN, ROY Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: US 61 TO LAPLACE ITS DEPLOYMENT
H.013726
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION LA 70 232-31 STPFLEX 1,020 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED FOR LETTING FY 20-21
ASCENSION LA 70 426-01 NHPP 1,780 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
ST JAMES LA 70 426-02 NHPP 4,200 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
MILL, PATCH, AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 70: ASCENSION P/L W - ASCENSION P/L E
Page 1 - 2 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.013779
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION 000-03 HSIPPEN 400 RAILROADS 4-SCHEDULED FOR LETTING FY 20-21
EXTEND REINE ST. AND CLOSE RAILROAD ST. XING OF KCSSHREWSBERRY,BILL Remrks:
Typ Imp:
Project:Prj Mgr:
REINE EXT & RAILRD ST:KCS XING(SORRENTO)
H.014088
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION US 61 007-07 NHPP 1,200 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 20-21
ASCENSION LA 427 803-25 STPFLEX 700 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
ADD NB 2ND LEFT & RECEIVING LANESPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 61: INT. IMPROVEMENTS AT LA 427
H.011767
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASSUMPTION 000-04 FBROFF 580 ROAD TRANSFER 4-SCHEDULED IN CURRENT FY 19-20ASSUMPTION 000-04 FBROFF 95 PRESERVATION - BRIDGE (OFF
SYSTEM)
BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:
Typ Imp:USE TTF AS MATCH FOR RT PROGRAM AND PTTF FOR PR BO PROGRA
Project:Prj Mgr:
BAYOU CRAB ROAD BRIDGE
ASSUMPTION
H.007386
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASSUMPTION LA 1 064-10 TAP<200K 223 ENHANCEMENTS 4-SCHEDULED FOR LETTING FY 20-21
SIDEWALKS W/LANDSCAPING, DRAINAGE STRUCTURES, STREET FURNIMEEK, STEPHEN Remrks:
Typ Imp:
Project:Prj Mgr:
NAPOLEONVILLE LINEAR PARK
H.010007
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASSUMPTION LA 70 232-01 STPFLEX 750 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE
4-SCHEDULED FOR LETTING FY 20-21
CLEANING & PAINTINGTULLIER, DANNY Remrks:
Typ Imp:
Project:Prj Mgr:
LA 70:PIERRE PART BAY BR REHAB (HBI)
H.011522
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
AVOYELLES 000-05 FBROFF 669 PRESERVATION - BRIDGE (OFFSYSTEM)
4-SCHEDULED IN CURRENT FY 19-20
AVOYELLES 000-05 FBROFF 737 PRESERVATION - BRIDGE (OFFSYSTEM)
BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
FAITH BAPTIST MISSION & BILL BELT ROADS
AVOYELLES
H.011523
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
AVOYELLES 000-05 FBROFF 582 PRESERVATION - BRIDGE (OFFSYSTEM)
4-SCHEDULED IN CURRENT FY 19-20
AVOYELLES 000-05 FBROFF 273 PRESERVATION - BRIDGE (OFFSYSTEM)
BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
CARL HUNT & GERMAN BAYOU ROAD BRIDGES
Page 1 - 3 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.011524
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
AVOYELLES 000-05 FBROFF 436 PRESERVATION - BRIDGE (OFFSYSTEM)
4-SCHEDULED IN CURRENT FY 19-20
BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
LEO MORROW RD BRIDGE/DRAINAGE DITCH
H.007873
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
AVOYELLES LA 1176 805-09 FBROFF 2,375 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 20-21
BRIDGE REPLACEMENTTOURRES, VALERIE Remrks:
Typ Imp:805-09-0007;2 BRIDGES; USE NFA AS MATCH
Project:Prj Mgr:
BAYOU BOEUF & TURNER CANAL BRIDGES
H.012998
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
AVOYELLES LA 1 052-30 STPFLEX 1,700 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED FOR LETTING FY 20-21
AVOYELLES LA 1 052-07 STPFLEX 300 PRESERVATION - NON-INTERSTATEON STP SYSTEM
CONCRETE PAVEMENT REHABILITATIONSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1: MOREAU ST - END FOUR LANE SECTION
H.013251
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
AVOYELLES LA 114 145-01 STPFLEX 408 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
4-SCHEDULED FOR LETTING FY 20-21
REPLACE EXISTING CROSS DRAINGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 114: X-DRAIN REPLACE WEST OF HESSMER
H.014096
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
AVOYELLES LA 115 805-18 STPFLEX 500 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
4-SCHEDULED FOR LETTING FY 20-21
ASPHALT SURFACE TREATMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 115: AVOYELLES P/L - US 71
H.013231
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BEAUREGARD LA 389 187-04 NFA 1,539 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED IN CURRENT FY 19-20
PATCH, WIDEN AND THIN OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:AC WITH NFA
Project:Prj Mgr:
LA 389: BLACKMON LN-HOOSIER CREEK BRIDGE
BEAUREGARD
H.013259
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BEAUREGARD US 171 024-05 NHPP 438 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED IN CURRENT FY 19-20
MILL AND OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 171: US 190 - 0.03 MI N WEST DR
H.010244
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BEAUREGARD LA 113 139-04 STPFLEX 2,187 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED FOR LETTING FY 20-21
PATCH, CP 2", WIDEN 2.5', OL 4"SPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 113: LA 26 - LA 112
Page 1 - 4 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.012961
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BIENVILLE LA 154 090-03 STPFLEX 500 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
4-SCHEDULED FOR LETTING FY 20-21
ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 154: BOSSIER PL TO LA 4
BIENVILLE
H.013021
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER 000-08 HSIPPEN 100 RAILROADS 4-SCHEDULED IN CURRENT FY 19-20
INSTALL MEDIAN AT XINGSHREWSBERRY,BILL Remrks:
Typ Imp:
Project:Prj Mgr:
BENTON RD: KCS RR XING (BOSSIER CITY)
BOSSIER
H.013708
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER 000-08 STPFLEX 75 RAILROADS 4-SCHEDULED IN CURRENT FY 19-20
REMOVE RR CROSSING AND FILL IN WITH ASPHALTSHREWSBERRY,BILL Remrks:
Typ Imp:
Project:Prj Mgr:
BARKSDALE BLVD: UP XING (BOSSIER CITY)
H.011599
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER LA 529 808-01 STPFLEX 2,900 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED FOR LETTING FY 20-21
ASPHALTIC CONCRETE PAVEMENT RESURFACINGMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 529: LA 160 TO LA 2
H.012013
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER 000-08 STP>200K 8,576 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21
MAJOR WIDENINGLEBAS, MELISSA Remrks:
Typ Imp:BOSSIER CITY PROVIDING MATCH
Project:Prj Mgr:
VIKING DR WIDENING (LA3105-SWAN LAKE RD)
H.012271
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER 000-08 STPFLEX 20 RAILROADS 4-SCHEDULED FOR LETTING FY 20-21
CONNECT TRAFFIC SIGNAL AND WARNING DEVICES FOR PREEMPTIONLUKE, SHAWN Remrks:
Typ Imp:
Project:Prj Mgr:
OLD PLN DLING RD.: UP PREEMPT (BENTON)
H.012889
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER I-20 451-02 NHPP 23,500 PRESERVATION - INTERSTATE 4-SCHEDULED FOR LETTING FY 20-21CADDO I-20 451-01 NHPP 335 PRESERVATION - INTERSTATE
PCCP PATCHING AND JOINT CRACK SEALINGYANG, LI Remrks:
Typ Imp:
Project:Prj Mgr:
I-20 REHAB (W OF LA 3 TO AIRLINE DR)
H.013186
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER 000-08 STPFLEX 1,300 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 20-21
RECONSTRUCT ROAD WITH CURB & GUTTER DRAINAGE AND SIDEWALKUMEOZULU, JOE Remrks:
Typ Imp:
Project:Prj Mgr:
BOSSIER CITY RT: COLEMAN ST IMPROVEMENTS
H.014157
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER LA 154 090-01 STPFLEX 56 RAILROADS 4-SCHEDULED FOR LETTING FY 20-21BOSSIER LA 154 090-01 LOCAL 34 RAILROADS
REPLACE RAILROAD CROSSING SURFACELUKE, SHAWN Remrks:
Typ Imp:MATCH FROM RR
Project:Prj Mgr:
LA 154: KCS RR XING (BOSSIER)
Page 1 - 5 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.001661
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO LA 530 085-01 STPFLEX 2,973 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED IN CURRENT FY 19-20
BRIDGE REPLACEMENTWINDMANN, ANDREW Remrks:
Typ Imp:085-01-0022
Project:Prj Mgr:
BLACK BAYOU BRIDGE
CADDO
H.010206
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO LA 3132 427-01 NHPP 1,183 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
4-SCHEDULED IN CURRENT FY 19-20
CADDO LA 523 103-01 NHPP 1,147 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
EXTEND CONTROL OF ACCESS LA 3132 AT LA 523BRIGNAC, CHRISTINA Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3132 AT LA 523: EXTEND C OF A
H.013854
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO I-20 451-01 NHPP 512 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
4-SCHEDULED IN CURRENT FY 19-20
BOSSIER I-20 451-02 NHPP 246 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
CADDO US 71 053-09 NHPP 118 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
SIGN UPGRADESFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
I-20 & US 71: OVERHEAD SIGN UPGRADE
H.013890
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO LA 3132 427-01 NHPP 600 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
4-SCHEDULED IN CURRENT FY 19-20
PAVEMENT MARKING REPLACEMENTHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3132:LA 523 - I-20(PAVEMENT MARKINGS)
H.013998
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO LA 523 103-01 STPFLEX 20 RAILROADS 4-SCHEDULED IN CURRENT FY 19-20
CONNECT CROSSING WITH TRAFFIC SIGNAL FOR PREEMPTIONLUKE, SHAWN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 523 @ ASHLEY RIDGE: UP RR(SHREVEPORT)
H.001166
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO LA 1 045-01 STPFLEX 21,398 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 20-21
BRIDGE REPLACEMENTFUSILIER, JACOB Remrks:
Typ Imp:045-01-0029; PRIORITY BRIDGE PROJECT
Project:Prj Mgr:
CADDO LAKE BRIDGE (HBI)
H.011510
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO I-20 451-01 NHPP 100 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
4-SCHEDULED FOR LETTING FY 20-21
BOSSIER I-20 451-02 NHPP 100 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
DEPLOY ITS EQUIPMENT AND COMMUNICATIONSKIMBENG, LUCY Remrks:
Typ Imp:
Project:Prj Mgr:
SHREVEPORT ITS PHASE 4
Page 1 - 6 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.012932
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO LA 789 809-07 STPFLEX 70 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
4-SCHEDULED FOR LETTING FY 20-21
ASPHALT SURFACE TREATMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 789: DESOTO PL TO PRESTON RD
H.013254
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO US 71 011-04 NHPP 8,333 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED FOR LETTING FY 20-21
MILL, PATCH AND OVERLAY WITH HMACMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 71 - JCT LA 2 - ARKANSAS STATE LINE
H.013420
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO 000-09 HSIPPEN 2,250 SAFETY 4-SCHEDULED FOR LETTING FY 20-21CADDO 000-09 STPFLEX 2,250 OPER EFFICIENCY/MOTORIST
ASSISTANCE - TRAFFIC CONTROLDEVICES
TRAFFIC SIGNAL UPGRADEFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DIST. 04 FLASHING YELLOW ARROW PART 1
H.014060
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO LA 511 102-01 HSIPPEN 1,310 SAFETY 4-SCHEDULED FOR LETTING FY 20-21CADDO 000-09 HSIPPEN 190 SAFETY
LEFT TURN LANE ADDITION AT 2 INTERSECTIONS.STURDIVANT, PHILLIP Remrks:
Typ Imp:
Project:Prj Mgr:
LA 511: TURN LANES AT WALKER & KENNEDY
H.002075
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 383 197-02 STPFLEX 893 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
4-SCHEDULED IN CURRENT FY 19-20
PAVEMENT WIDENINGSPURLOCK, DLON Remrks:
Typ Imp:197-02-0023;ON GRANDFATHER LIST FOR FED FUNDS
Project:Prj Mgr:
LA 383: I-10 INTCHG-0.408 MI N I-10
CALCASIEU
H.003184
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU I-10 450-91 NHPP 43,411 CORRIDOR 4-SCHEDULED IN CURRENT FY 19-20CALCASIEU I-10 450-91 NHPP 30,477 PRESERVATION - INTERSTATE CALCASIEU I-10 450-91 FREIGHT-HY 43,438 PRESERVATION - INTERSTATE CALCASIEU I-10 450-91 NHPP 5,500 PRESERVATION - BRIDGE (ON
SYSTEM)
CALCASIEU I-10 450-91 NHPP 0 CORRIDOR
WIDEN TO 6 LANESJUDICE, ANDREW Remrks:
Typ Imp:450-91-0078
Project:Prj Mgr:
I-10: TEXAS STATE LINE-E. OF COONE GULLY
H.011839
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU 000-10 STP<200K 348 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 19-20
OVERLAYRICHARD, RYAN Remrks:
Typ Imp:CITY OF SULPHUR PROVIDING MATCH
Project:Prj Mgr:
HENNING DR/WEEKLY RD OVERLAY
Page 1 - 7 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.012053
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 378 810-12 STP<200K 313 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
4-SCHEDULED IN CURRENT FY 19-20
ADD TURN LANESPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 378: SB RT TURN LANE @ PHILLIPS RD
H.012603
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 27 031-04 STP<200K 250 OPER EFFICIENCY/MOTORISTASSISTANCE - MOVABLE BRIDGEREHABILITATION
4-SCHEDULED IN CURRENT FY 19-20
MOVABLE BRIDGE MACHINERY REPAIRSLAMBERT, JARRETT Remrks:
Typ Imp:
Project:Prj Mgr:
ELLENDER BR BEARING AND SPAN LOCK REHAB.
H.013430
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 378 810-12 RAIL PD 0 RAILROADS 4-SCHEDULED IN CURRENT FY 19-20CALCASIEU LA 378 810-12 RAIL HE 300 RAILROADS CALCASIEU LA 378 810-12 STPFLEX 400 RAILROADS
CONSTRUCT RAISED MEDIAN, OVERLAY, UPGRADE RR WARNING DEVICLUKE, SHAWN Remrks:
Typ Imp:USE LOCAL AS MATCH
Project:Prj Mgr:
LA 378: UP RR CROSSING (WESTLAKE)
H.013806
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU 000-10 STCASH 52 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 19-20
REMOVAL OF CATIONIC TANKSCORMIER, CLAYTON Remrks:
Typ Imp:OPERATING/MISCELLANEOUS REPAIR FUNDS WILL BE USED
Project:Prj Mgr:
D07 CATIONIC TANK REMOVAL
H.013844
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU I-10 450-91 NHPP 261 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
4-SCHEDULED IN CURRENT FY 19-20
CALCASIEU US 171 024-01 NHPP 160 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
SIGN UPGRADESFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
I-10 & US 171: LAKE CHARLES SIGN UPGRADE
H.014062
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 397 193-31 STCASH 236 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 19-20
REMOVE AND REPLACE DRAINAGE STRUCTURESCORMIER, CLAYTON Remrks:
Typ Imp:OPERATING/MISCELLANEOUS REPAIR FUNDS WILL BE USED
Project:Prj Mgr:
LA 397: X-DRAIN REPLACEMENT
H.005967
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU 000-10 STGEN 2,500 INTERMODAL CONNECTOR 4-SCHEDULED FOR LETTING FY 20-21CALCASIEU 000-10 NHPP 10,000 INTERMODAL CONNECTOR CALCASIEU 000-10 DEMO 18,300 DEMO / HIGH PRIORITY
NEW ROAD & BRIDGEBRIGNAC, CHRISTINA Remrks:
Typ Imp:706-10-0001;TEA-21. STA 87.USE STGEN$ FOR ENG
Project:Prj Mgr:
NELSON RD EXT & BRIDGE
H.007122
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU 000-10 STP<200K 1,582 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21
SURFACE WIDENING AND OVERLAYRICHARD, RYAN Remrks:
Typ Imp:742-10-0136
Project:Prj Mgr:
MYRTLE SPRINGS ROAD
Page 1 - 8 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.012238
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 378 810-12 STPFLEX 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 20-21
INTERSECTION IMPROVEMENTSSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 378: INT IMPROVEMENT @ PHILLIPS RD
H.012791
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 3063 810-25 STPFLEX 50 RAILROADS 4-SCHEDULED FOR LETTING FY 20-21
PREEMPTING 768-140B WITH ADJACENT TRAFFIC SIGNALLUKE, SHAWN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3063: UP PREEMPTION (VINTON)
H.012928
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 27 031-06 STPFLEX 791 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
4-SCHEDULED FOR LETTING FY 20-21
MICROSURFACESPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 27: HIGH HOPE RD-RIGMAIDEN CEMETERYRD
H.013344
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 14 193-06 HSIP 613 SAFETY 4-SCHEDULED FOR LETTING FY 20-21CALCASIEU LA 14 193-05 HSIP 613 SAFETY CALCASIEU LA 397 193-31 HSIP 613 SAFETY CALCASIEU 000-10 HSIP 613 SAFETY
INSTALL SINGLE LANE ROUNDABOUTTONEY, PATRICK Remrks:
Typ Imp:
Project:Prj Mgr:
LA 14 @ LA 397 ROUNDABOUT
H.013734
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU US 90 003-05 NHPP 250 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED FOR LETTING FY 20-21
CALCASIEU US 90 003-05 STPFLEX 750 PRESERVATION - NON-INTERSTATEON STP SYSTEM
PATCHING, MILL AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 90: LA 14 - LA 397
H.013744
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 385 195-04 NHPP 88 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 20-21
ADJUST LEFT TURNSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 385: LEFT TURN LANE @ COLLEGE ST.
H.013870
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU 000-10 STP<200K 1,093 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21
PATCH, OVERLAY AND MILLRICHARD, RYAN Remrks:
Typ Imp:CITY OF LAKE CHARLES TO PROVIDE MATCH
Project:Prj Mgr:
ENTERPRISE OVERLAY: 12TH ST TO BROAD ST.
H.014035
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU 000-10 STPFLEX 30 RAILROADS 4-SCHEDULED FOR LETTING FY 20-21
CONNECT CROSSING WITH TRAFFIC SIGNAL FOR PREEMPTIONLUKE, SHAWN Remrks:
Typ Imp:
Project:Prj Mgr:
HORRIDGE ST @ US 90:UP RR PREEMP(VINTON)
Page 1 - 9 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.014094
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 397 193-31 STPFLEX 345 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 20-21
ADD LEFT TURN LANESPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 397: LEFT TURN LANE @ MCNEESE EXT
H.014162
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU 000-10 STPFLEX 75 RAILROADS 4-SCHEDULED FOR LETTING FY 20-21CALCASIEU 000-10 LOCAL 45 RAILROADS
RECONSTRUCT RR XINGLUKE, SHAWN Remrks:
Typ Imp:MATCH FROM RAILROAD
Project:Prj Mgr:
COACH WILLIAMS DR.: UP RR XING (SULPHUR)
H.012988
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALDWELL LA 133 171-01 STPFLEX 584 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED IN CURRENT FY 19-20
CALDWELL LA 133 171-01 HRRR 3,085 SAFETY
STABILIZE AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 133: HEBERT - VESTAL LANE
CALDWELL
H.011293
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALDWELL LA 126 091-09 STPFLEX 50 RAILROADS 4-SCHEDULED FOR LETTING FY 20-21
RR SIGNAL PREEMPTIONLUKE, SHAWN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 126: UP RR XING (GRAYSON)
H.012599
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALDWELL LA 851 811-10 NFA 2,000 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED FOR LETTING FY 20-21
STABILIZE BASE & OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 851: LA 126 - LA 849
H.011545
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CAMERON 000-12 FBROFF 553 PRESERVATION - BRIDGE (OFFSYSTEM)
4-SCHEDULED IN CURRENT FY 19-20
BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
LITTLE CHENIER RD / LITTLE CHENIER BAYOU
CAMERON
H.012568
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CAMERON LA 27 031-03 STPFLEX 1,627 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 20-21
MOVABLE BRIDGE REHABILITATIONHINGLE, STEWART Remrks:
Typ Imp:
Project:Prj Mgr:
LA 27: KELSO BAYOU MOVABLE BR REHAB
Page 1 - 10 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.010815
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CATAHOULA LA 124-P 143-03 NFA 9,238 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 20-21CATAHOULA LA 124 143-04 NFA 764 ROAD TRANSFER CATAHOULA 000-13 NFA 465 ROAD TRANSFER CATAHOULA LA 3102 813-24 NFA 432 ROAD TRANSFER
CONSTRUCTION ON NEW ALIGNMENT OF AN EXISTING ROUTEMOORE, DARRELL Remrks:
Typ Imp:
Project:Prj Mgr:
LA 124 EXTENSION (SEGMENT 1)
CATAHOULA
H.013273
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CATAHOULA LA 8 039-04 STPFLEX 2,000 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 20-21
MITIGATION RELATED TO BANK EROSION AND BRIDGE PIER SCOURCAVALIER, STEPHANIE Remrks:
Typ Imp:OTHER FUNDS FROM USACE
Project:Prj Mgr:
LA 8: OUACHITA RIVER BRIDGE SCOUR REPAIR
H.013750
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CATAHOULA LA 126 353-02 STPFLEX 264 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
4-SCHEDULED FOR LETTING FY 20-21
LASALLE US 84 022-05 NHPP 246 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
LASALLE LA 8 040-04 STPFLEX 294 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
LASALLE LA 126 130-02 STPFLEX 150 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
LASALLE LA 8 830-08 STPFLEX 113 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
ASPHALT SURFACE TREATMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 84, LA 8 & LA 126 AST
H.014130
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CATAHOULA LA 923 813-14 NFA 900 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED FOR LETTING FY 20-21
PATCH & OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 923: LA 3101 - END MAINT.
H.010281
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CLAIBORNE LA 2 085-07 STPFLEX 3,350 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED FOR LETTING FY 20-21
COLD PLANE, ASPHALTIC OVERLAY, CTB SHOULDERS, PAVEMENT STRISPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 2: WEBSTER P/L TO LA 3062
CLAIBORNE
H.001749
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DESOTO LA 5 098-03 HSIPPEN 1,200 SAFETY 4-SCHEDULED IN CURRENT FY 19-20
CURVE REALIGNMENTSTURDIVANT, PHILLIP Remrks:
Typ Imp:
Project:Prj Mgr:
LA 5 REALIGNMENT AND CROSS SLOPE IMPROVE
DESOTO
H.010285
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DESOTO LA 512 301-02 STP<5K 5,910 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED IN CURRENT FY 19-20
MILLING, ASPHALT CONCRETE, AND CEMENT TREATED BASENOLAN, RYAN Remrks:
Typ Imp:USE NFA AS MATCH
Project:Prj Mgr:
LA 512 & LA 483: US 171 TO LA 175
Page 1 - 11 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.012227
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DESOTO LA 5 049-01 STPFLEX 2,635 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED FOR LETTING FY 20-21
ASPHALTIC CONCRETE PAVEMENT RESURFACINGSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 5: LA 3015 TO LA 172
H.012965
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DESOTO LA 175 035-03 STPFLEX 748 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
4-SCHEDULED FOR LETTING FY 20-21
ASPHALTIC SURFACE TREATMENTNOLAN, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 175: SABINE PL TO 4.16 MI S OF US 84
H.002320
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 3034 255-30 LOCAL 0 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 19-20E BATON ROUGE LA 3034 255-30 STBONDS 9,310 OTHER / MISCELLANEOUS E BATON ROUGE LA 3034 255-30 STPFLEX 3,000 PRESERVATION - NON-INTERSTATE
ON STP SYSTEM
4 LN DIVIDED CONC HWY RAISED MEDIANPICARD, TOBY Remrks:
Typ Imp:255-30-0014;GREEN LIGHT PROJ; PR NI PROJ INCLUDED SEE NOTES
Project:Prj Mgr:
SULLIVAN RD (WAX - HOOPER)
EAST BATON ROUGE
H.006380
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 HSIP 400 RAILROADS 4-SCHEDULED IN CURRENT FY 19-20
UPGRADE RR SIGNALSSHREWSBERRY,BILL Remrks:
Typ Imp:
Project:Prj Mgr:
GREENWELL SPRINGS: IC RR (BATON ROUGE)
H.010253
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 1248 258-33 STPFLEX 400 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
4-SCHEDULED IN CURRENT FY 19-20
REPLACE PUMP STATION FLOAT SYSTEMGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
BLUEBONNET BLVD. PUMP STAT. IMP LA 1248
H.011098
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 30 414-01 NHPP 1,319 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
4-SCHEDULED IN CURRENT FY 19-20
E BATON ROUGE LA 30 414-01 NHPP 1,080 ROAD TRANSFER E BATON ROUGE LA 30 414-01 NHPP 9,484 ROAD TRANSFER E BATON ROUGE I-10 450-09 NHPP 1,003 ROAD TRANSFER E BATON ROUGE 000-17 NFA 2,130 ROAD TRANSFER
MEDIAN AND PAVEMENT WIDENING, AND RELATED WORKPICARD, TOBY Remrks:
Typ Imp:
Project:Prj Mgr:
LA 30: SOUTH BLVD - W CHIMES ST
H.011261
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 427 258-02 HSIPPEN 3,349 SAFETY 4-SCHEDULED IN CURRENT FY 19-20
INTERSECTION IMPRS, MEDIAN MODS, OVERLAYREVIERE, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA427: S.ACADIAN THRUWAY, I-10-LA73 (BR)
H.011496
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 CM 220 CONGESTION MITIGATION 4-SCHEDULED IN CURRENT FY 19-20E BATON ROUGE LA 427 258-02 CM 220 CONGESTION MITIGATION
CONSTRUCT RIGHT TURN LANE ON NORTHBOUND QUAIL DRLAI, QUANG Remrks:
Typ Imp:USE LOCAL AS MATCH
Project:Prj Mgr:
QUAIL DR: TURN LANE AT PERKINS (LA 427)
Page 1 - 12 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.012344
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 STPFLEX 1,569 RAILROADS 4-SCHEDULED IN CURRENT FY 19-20
RR ACTIVE WARNING DEVICESSHREWSBERRY,BILL Remrks:
Typ Imp:
Project:Prj Mgr:
IC SEVERAL RR XINGS (BATON ROUGE)
H.013261
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE I-110 450-92 NHPP 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
4-SCHEDULED IN CURRENT FY 19-20
INSTALL ITS EQUIPMENT ALONG I-110NICHOLS, BEN Remrks:
Typ Imp:
Project:Prj Mgr:
I-110 ITS DEPLOYMENT
H.013682
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE US 190 013-05 HSIP 280 SAFETY 4-SCHEDULED IN CURRENT FY 19-20
INSTALL 1 TURN LANE AND 2 PARTIAL MEDIAN OPENING ISLANDSNEYLAND, CODI Remrks:
Typ Imp:
Project:Prj Mgr:
US 190: RCUT @ LONGBOW DR
H.013731
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE US 61 007-90 NHPP 6,528 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED IN CURRENT FY 19-20
MILL AND OVERLAYTONEY, PATRICK Remrks:
Typ Imp:
Project:Prj Mgr:
US 61: FLORIDA BLVD - GREENWELL ST
H.013830
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 NHPP 2,000 ROAD TRANSFER 4-SCHEDULED IN CURRENT FY 19-20
SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
EBR SIGNAL DETECTION UPGRADE
H.013837
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 3273 870-23 NFA 775 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 19-20
RAISE & WIDEN RR BRIDGE, RAISE RR, RAISE GRADE OF VALLEY STNUNES, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
GRADE RAISING ON VALLEY ST
H.006499
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 HSIPPEN 536 SAFETY - SAFE ROUTES TO SCHOOLS 4-SCHEDULED FOR LETTING FY 20-21
SIDEWALK CONSTRUCTIONRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
WESTDALE & BERNARD TERRACE SIDEWALKS
H.007160
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 CM 6,200 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21
TRAFFIC SIGNAL SYNCHRONIZATIONHANKS, ANNA Remrks:
Typ Imp:742-17-0159;CHOCTAW @ CHIPPEWA ST. & N.CHOCTAW@
Project:Prj Mgr:
EBR COMPUTERIZED TRAFFIC SIGNAL, PH VB
H.009489
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE US 61 007-90 NHPP 12,000 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 20-21
BRIDGE REPLACEMENTMOSS, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
US 61: JEFFERSON HIGHWAY OVERPASS
H.010251
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE US 61-X 817-20 STPFLEX 500 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
4-SCHEDULED FOR LETTING FY 20-21
REPLACE/UPGRADE PUMP HOUSE COMPONENTSGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
CHIPPEWA ST PUMP STATION IMP US61/190-X
Page 1 - 13 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.010652
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 73 077-05 NHPP 3,500 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 20-21
PCCP PATCHINGFELDER, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 73: US 61 (AIRLINE) - ESSEN LANE
H.012374
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE I-12 454-01 NHPP 750 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
4-SCHEDULED FOR LETTING FY 20-21
LIVINGSTON I-12 454-02 NHPP 250 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
IMPROVE EXISTING RAMP METER SYSTEM TO ALLOW VARIABLE TIMINGKIMBENG, LUCY Remrks:
Typ Imp:
Project:Prj Mgr:
I-12 RAMP METER UPGRADES
H.012449
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 OTHER 1,300 RAILROADS 4-SCHEDULED FOR LETTING FY 20-21E BATON ROUGE US 61-X 013-04 OTHER 200 RAILROADS E BATON ROUGE LA 73 077-05 OTHER 200 RAILROADS
UPGRADE WARNINGS, ADD MEDIANS, REPLACE SURFACES, CLOSE XINLUKE, SHAWN Remrks:
Typ Imp:
Project:Prj Mgr:
KCS XINGS BETWN NORTH ST & LOUISE (BTR)
H.012964
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE US 61 007-90 NHPP 4,500 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED FOR LETTING FY 20-21
THIN ASPHALTIC CONCRETEMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 61: BLUEBONNET BLVD - S END US 190
H.013328
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 73 077-05 NHPP 1,000 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 20-21
FULL/PARTIAL PCCP PATCHING, REPAIR SIDEWALKS, CURBSFELDER, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 73: LA 3064 / ESSEN - LA 426 (RT II)
H.013330
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 42 258-31 NHPP 4,623 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 20-21E BATON ROUGE LA 42 257-04 NHPP 377 ROAD TRANSFER
PCCP PATCHING AND MAJOR REHAB OF EB. MILL AND OVERLAY WBFELDER, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 42: LA 3246 - STARING LANE (RT II)
H.013387
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 HSIPPEN 2,218 SAFETY 4-SCHEDULED FOR LETTING FY 20-21IBERVILLE 000-24 STPFLEX 2,218 OPER EFFICIENCY/MOTORIST
ASSISTANCE - TRAFFIC CONTROLDEVICES
E BATON ROUGE 000-17 HSIPPEN 32 SAFETY IBERVILLE 000-24 STPFLEX 32 OPER EFFICIENCY/MOTORIST
ASSISTANCE - TRAFFIC CONTROLDEVICES
TRAFFIC SIGNAL UPGRADEFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DIST. 61 FLASHING YELLOW ARROW PART 1
Page 1 - 14 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.013422
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 HSIPPEN 2,070 SAFETY 4-SCHEDULED FOR LETTING FY 20-21E BATON ROUGE 000-17 STPFLEX 2,070 OPER EFFICIENCY/MOTORIST
ASSISTANCE - TRAFFIC CONTROLDEVICES
TRAFFIC SIGNAL UPGRADEFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DIST. 61 FLASHING YELLOW ARROW PART 2
H.013482
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE I-10 450-09 NHPP 200 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
4-SCHEDULED FOR LETTING FY 20-21
W BATON ROUGE I-10 450-08 NHPP 400 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
E BATON ROUGE I-10 450-10 NHPP 200 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
IBERVILLE I-10 450-07 NHPP 200 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
I-10 WBR QUEUE WARNING SYSTEMDEVILLE, ROSALINDA Remrks:
Typ Imp:
Project:Prj Mgr:
I-10 WBR QUEUE WARNING SYSTEM PROJECT
H.013546
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 STP>200K 1,275 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21
OVERLAYLEBAS, MELISSA Remrks:
Typ Imp:CITY OF CENTRAL TO PROVIDE MATCH.
Project:Prj Mgr:
THIBODEAUX ROAD IMPROVEMENTS
H.013733
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE US 61-X 013-04 NHPP 4,000 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED FOR LETTING FY 20-21
MILL, PATCH, AND OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 61-X: FOSTER DR - I-110
H.013864
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE US 61 019-01 RAIL PD 300 RAILROADS 4-SCHEDULED FOR LETTING FY 20-21
UPGRADE RR CROSSING'S SIGNALSHREWSBERRY,BILL Remrks:
Typ Imp:USE TTF FOR MATCH
Project:Prj Mgr:
US 61: IC RR XING (BATON ROUGE)
H.013897
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE I-10 450-10 GARVEE 27,705 CAPACITY 4-SCHEDULED FOR LETTING FY 20-21E BATON ROUGE I-12 454-01 GARVEE 6,913 CAPACITY E BATON ROUGE I-10 450-10 GARVEE 264 CAPACITY E BATON ROUGE I-12 454-01 GARVEE 66 CAPACITY E BATON ROUGE I-10 450-10 GARVEE 2,599 CAPACITY E BATON ROUGE I-12 454-01 GARVEE 649 CAPACITY E BATON ROUGE I-10 450-10 GARVEE 105 CAPACITY E BATON ROUGE I-12 454-01 GARVEE 26 CAPACITY
NEW FLYOVER RAMP AND EXIT TO COLLEGEMASTIN, CATHERINE Remrks:
Typ Imp:DESIGN BUILD
Project:Prj Mgr:
I-10 & I-12 COLLEGE DR FLYOVER RAMP
H.014090
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE I-110 450-92 NHPP 150 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 20-21
ADD RIGHT TURNLANESPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
I-110: NB OFF RAMP AT LA 408
Page 1 - 15 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.014171
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 30 414-01 STP>200K 250 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21
CLEARING AND GRUBBINGLEBAS, MELISSA Remrks:
Typ Imp:EBR PROVIDES MATCH
Project:Prj Mgr:
LA 30(NICHOLSON DR) CLEARING & GRUBBING
H.012952
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E CARROLL LA 2 037-04 STPFLEX 416 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
4-SCHEDULED FOR LETTING FY 20-21
ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 2: WEST CARROLL PL - US 65
EAST CARROLL
H.012954
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E CARROLL LA 585 332-05 STPFLEX 133 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
4-SCHEDULED FOR LETTING FY 20-21
ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 585: WEST CARROLL PL - US 65
H.010562
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E FELICIANA 000-19 FBROFF 451 PRESERVATION - BRIDGE (OFFSYSTEM)
4-SCHEDULED IN CURRENT FY 19-20
BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
BANK STREET BRIDGE
EAST FELICIANA
H.002365
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E FELICIANA LA 63 259-01 STPFLEX 5,497 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 20-21
NEW BRIDGESBRAUNER, KURT Remrks:
Typ Imp:259-01-0011;3 BRIDGES
Project:Prj Mgr:
LA 63 BRIDGES NEAR BLUFF CREEK
H.009633
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E FELICIANA LA 67 060-03 STPFLEX 5,677 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED FOR LETTING FY 20-21
STABILIZE AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 67: EBR P/L - 8.0 MI N EBR P/L
H.013643
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E FELICIANA LA 951 819-29 FEMA 1,689 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 20-21
REPAIR OF CROSS DRAIN, EMBANKMENT, ROADWAY, AND SHOULDERSPURLOCK, DLON Remrks:
Typ Imp:PW 01064
Project:Prj Mgr:
LA 951: ROADWAY WASHOUT REPAIRS
H.014214
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E FELICIANA 000-19 FBROFF 908 PRESERVATION - BRIDGE (OFFSYSTEM)
4-SCHEDULED FOR LETTING FY 20-21
BRIDGE REPLACEMENT NO NEW ALIGNEMNTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
SINGLETARY ST. OVER REDWOOD CREEK
Page 1 - 16 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.009784
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
FRANKLIN 000-21 TAP<5K 229 ENHANCEMENTS 4-SCHEDULED IN CURRENT FY 19-20FRANKLIN 000-21 LOCAL 23 ENHANCEMENTS
SIDEWALKS W/LIGHTING, & RELATED WORKMEEK, STEPHEN Remrks:
Typ Imp:MATCH 15% TOLL CREDITS AND 5% LOCAL
Project:Prj Mgr:
WINNSBORO: ADAMS&COMMON ST STREETSCAPI
FRANKLIN
H.013003
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
FRANKLIN LA 865 349-03 STPFLEX 429 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED IN CURRENT FY 19-20
FRANKLIN LA 865 349-03 NFA 659 PRESERVATION - NON-INTERSTATENFA
PATCH AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:PR NF NFA; PR NS TTF AS MATCH
Project:Prj Mgr:
LA 865: LA 4 - END MAINT.
H.013760
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
FRANKLIN LA 128 170-01 STPFLEX 410 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
4-SCHEDULED IN CURRENT FY 19-20
FRANKLIN LA 562 165-03 STPFLEX 237 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
INTERSECTION IMPROVEMENTSSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 4 INTERSECTON IMPROVEMENTS
H.013236
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
FRANKLIN LA 17 051-02 STPFLEX 2,036 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED FOR LETTING FY 20-21
MILL & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 17: WINNSBORO - LA 577
H.002765
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA LA 86 400-31 STPFLEX 1,025 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED IN CURRENT FY 19-20
STABILIZE BASE AND OVERLAYNOLAN, RYAN Remrks:
Typ Imp:400-31-0013; 400-31 MATCH TTF
Project:Prj Mgr:
LA 86: LA 347 - LA 31
IBERIA
H.009861
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA 000-23 RAIL HE 889 RAILROADS 4-SCHEDULED IN CURRENT FY 19-20IBERIA 000-23 LOCAL 311 RAILROADS
TRACK WORK FROM LA 14 TO FRENCH ST. (RAIL HE)SHREWSBERRY,BILL Remrks:
Typ Imp:714-23-0105
Project:Prj Mgr:
BNSF (NEW IBERIA) LA 14/CENTER/FRENCH ST
H.011781
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA LA 675 823-02 NHPP 838 ROAD TRANSFER 4-SCHEDULED IN CURRENT FY 19-20IBERIA LA 87 823-26 STPFLEX 468 ROAD TRANSFER IBERIA LA 675 823-02 NHPP 1,773 OTHER / MISCELLANEOUS
COLD PLANE, PATCH, OVERLAY, AND RELATED WORKDOMINGUE, CHRISTOPHER Remrks:
Typ Imp:
Project:Prj Mgr:
LA 675 & LA 87 IMP. IN NEW IBERIA (RT)
Page 1 - 17 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.012016
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA 000-23 STP>200K 455 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 19-20
SIDEWALKSRICHARD, RYAN Remrks:
Typ Imp:CITY OF LOREAUVILLE PROVIDING MATCH
Project:Prj Mgr:
ED BROUSSARD RD. SIDEWALKS
H.009862
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA 000-23 RAIL HE 44 RAILROADS 4-SCHEDULED FOR LETTING FY 20-21IBERIA 000-23 LOCAL 6 RAILROADS
REMOVE RAILROAD CROSSINGSHREWSBERRY,BILL Remrks:
Typ Imp:714-23-0108
Project:Prj Mgr:
BNSF (NEW IBERIA) CAROLINE ST.
H.010004
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA LA 320 823-12 STPFLEX 3,642 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 20-21
MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:
Typ Imp:NFA AS MATCH TO C.S. 823-12
Project:Prj Mgr:
LA 320: BAYOU TECHE MB (OLIVIER)
H.010100
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA 000-23 HSIPPEN 209 SAFETY - SAFE ROUTES TO SCHOOLS 4-SCHEDULED FOR LETTING FY 20-21
SIDEWALK CONSTRUCTION, MARKINGS,MORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
PESSON ELEMENTARY SIDEWALKS
H.010155
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA US 90 424-04 STP<5K 20,000 RAILROADS - GRADE SEPARATION 4-SCHEDULED FOR LETTING FY 20-21
BRIDGE OVERPASSMORVANT, RYAN Remrks:
Typ Imp:STBONDS AND UNCLAIMED PROPERTY FUNDS AS MATCH
Project:Prj Mgr:
US 90 RAILROAD OVERPASS SE OF LA 85
H.010922
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA LA 88 397-05 HSIP 3,254 SAFETY 4-SCHEDULED FOR LETTING FY 20-21
REALIGN 2 CURVES ON LA 88 IN COTEAUDOMINGUE, CHRISTOPHER Remrks:
Typ Imp:
Project:Prj Mgr:
LA 88: REALIGN CURVES IN COTEAU
H.011495
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA LA 88 397-05 HSIP 3,840 SAFETY 4-SCHEDULED FOR LETTING FY 20-21IBERIA US 90 424-04 HSIP 960 SAFETY
ROUNDABOUTS, J-TURNS, U-TURNS, AND RELATED WORKDOMINGUE, CHRISTOPHER Remrks:
Typ Imp:
Project:Prj Mgr:
US 90: RAMPS @ LA 88 ROUNDABOUTS
H.012627
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA LA 997 230-04 NFA 450 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
4-SCHEDULED FOR LETTING FY 20-21
ROADWAY EMBANKMENT, BASE COURSE, & SUPERPAVE ASPHALTGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 997: 2 MI S IBERV PL-3 MI S IBERV PL
H.012792
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA LA 675 823-02 STP>200K 1,250 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21IBERIA US 90 424-04 STP>200K 1,250 URBAN SYSTEMS
ROUNDABOUTRICHARD, RYAN Remrks:
Typ Imp:IBERIA PARISH TO PROVIDE MATCH
Project:Prj Mgr:
LA 675 @ AIRPORT RD ROUNDABOUT
Page 1 - 18 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.013265
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA US 90 424-04 NHPP 2,560 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED FOR LETTING FY 20-21
CONCRETE PAVEMENT REHAB, ASPHALT SHOULDERS & RELATED WORMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 90: LA 14 - LEWIS STREET
H.012235
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERVILLE 000-24 SR2S 678 SAFETY - SAFE ROUTES TO SCHOOLS 4-SCHEDULED IN CURRENT FY 19-20
SIDEWALKS, DRAINAGE, STRIPING, AND RELATED ACTIVITIESRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
WHITE CASTLE SIDEWALKS
IBERVILLE
H.012456
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERVILLE LA 77 219-01 OTHER 913 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 19-20IBERVILLE LA 77 219-01 STCASH 494 OTHER / MISCELLANEOUS
REPAIR BAYOU PLAQUEMINE STREAM EROSION TO STABILIZE ROADWANICKEL, TIM Remrks:
Typ Imp:
Project:Prj Mgr:
LA 77 BANK REPAIR AT BAYOU PLAQUEMINE
H.012604
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERVILLE LA 77 219-01 STPFLEX 200 OPER EFFICIENCY/MOTORISTASSISTANCE - MOVABLE BRIDGEREHABILITATION
4-SCHEDULED IN CURRENT FY 19-20
MOVABLE BRIDGE MACHINERY REPAIRS, HYDRAULIC REPAIRSMICHIELS, JASON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 77: GROSSE TETE BR HYD REPAIRS (HBI)
H.013243
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERVILLE LA 997 230-03 STPFLEX 500 OPER EFFICIENCY/MOTORISTASSISTANCE - MOVABLE BRIDGEREHABILITATION
4-SCHEDULED IN CURRENT FY 19-20
MOVABLE BRIDGE MACHINERY REPAIRSMICHIELS, JASON Remrks:
Typ Imp:USE NFA AS MATCH
Project:Prj Mgr:
BAYOU PIGEON PONTOON BR ELECTRIC WINCHE
H.013438
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERVILLE 000-24 RAIL PD 250 RAILROADS 4-SCHEDULED IN CURRENT FY 19-20IBERVILLE 000-24 RAIL HE 100 RAILROADS
INSTALL GATES & CONC SURFACE ON DORCYSHREWSBERRY,BILL Remrks:
Typ Imp:MATCH FROM RAILROAD
Project:Prj Mgr:
DORCY ST: UP RR XING (IBERVILLE)
H.013833
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERVILLE I-10 450-07 STP<5K 621 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
4-SCHEDULED IN CURRENT FY 19-20
E BATON ROUGE US 61 007-90 STP<5K 49 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
SIGN UPGRADESFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
I-10 & US 61 OVERHEAD SIGN UPGRADE
H.013862
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERVILLE I-10 450-07 NHPP 100 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
4-SCHEDULED IN CURRENT FY 19-20
PAVEMENT MARKING REPLACEMENTHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: PAVEMENT MARKER REPLACEMENT III
Page 1 - 19 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.009484
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERVILLE LA 75 257-01 FBROFF 1,381 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 20-21
BRIDGE REPLACEMENTTOURRES, VALERIE Remrks:
Typ Imp:USE NFA AS MATCH
Project:Prj Mgr:
LA 75: BAYOU BREAUX BRIDGE
H.011686
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERVILLE LA 3066 230-02 NFA 4,399 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 20-21
REPAIR AND REALINGMENT OF LA 3066. A PORTION SLID INTO GIWWMASTIN, CATHERINE Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3066 REPAIR REALIGN: LA 3066-S -LA 75
H.012789
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERVILLE LA 74 264-01 STPFLEX 20 RAILROADS 4-SCHEDULED FOR LETTING FY 20-21
PREEMPTING 302-964M WITH ADJACENT TRAFFIC SIGNALLUKE, SHAWN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 74: IC RR PREEMPTION (ST. GABRIEL)
H.012851
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERVILLE 000-24 RAIL PD 1,400 RAILROADS 4-SCHEDULED FOR LETTING FY 20-21IBERVILLE 000-24 RAIL HE 400 RAILROADS IBERVILLE LA 3066 230-01 RAIL PD 300 RAILROADS
UPGRADE WARNINGS AND CLOSE SOME UP CROSSINGS IN PLAQUEMINSHREWSBERRY,BILL Remrks:
Typ Imp:MATCH FROM RAILROAD
Project:Prj Mgr:
UP RR CORRIDOR (PLAQUEMINE)
H.013764
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERVILLE 000-24 RAIL PD 500 RAILROADS 4-SCHEDULED FOR LETTING FY 20-21
UPGRADE AND INSTALL SIGNALSSHREWSBERRY,BILL Remrks:
Typ Imp:MATCH FROM RAILROAD
Project:Prj Mgr:
WEST & HOMESTEAD: UP RR XINGS(IBERVILLE)
H.013861
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERVILLE 000-24 RAIL PD 200 RAILROADS 4-SCHEDULED FOR LETTING FY 20-21
UPGRADE SIGNALSSHREWSBERRY,BILL Remrks:
Typ Imp:MATCH BY RAILROAD
Project:Prj Mgr:
BARROW ST: UP RR XING (IBERVILLE)
H.012810
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JACKSON 000-25 STCASH 653 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 19-20
SILT REMOVAL AND GATE SERVICINGTAYLOR, DOUG Remrks:
Typ Imp:OPERATING/MISCELLANEOUS REPAIR FUNDS
Project:Prj Mgr:
CANEY LAKE GATE REPAIR
JACKSON
H.014074
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JACKSON US 167 023-06 STPFLEX 200 RAILROADS 4-SCHEDULED IN CURRENT FY 19-20
RECONSTRUCT RR XINGLUKE, SHAWN Remrks:
Typ Imp:MATCH FROM RR
Project:Prj Mgr:
US 167: LAS RR XING (HODGE)
H.010452
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JACKSON LA 144 318-01 STPFLEX 1,500 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED FOR LETTING FY 20-21
JACKSON LA 144 319-04 STPFLEX 500 PRESERVATION - NON-INTERSTATENFA
OVERLAYMAY, BRIAN Remrks:
Typ Imp:NFA AS MATCH
Project:Prj Mgr:
LA 144: EROS (LA 34) - OUACHITA P/L
Page 1 - 20 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.009054
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON I-10 450-15 STPFLEX 386 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
4-SCHEDULED IN CURRENT FY 19-20
PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MAKERSHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: JEFFERSON PL TO I-610 (RPMS)
JEFFERSON
H.010626
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON 000-26 FBROFF 704 PRESERVATION - BRIDGE (OFFSYSTEM)
4-SCHEDULED IN CURRENT FY 19-20
BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
SAUVE ROAD / SONIAT CANAL BRIDGE
H.011534
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON 000-26 FBROFF 545 PRESERVATION - BRIDGE (OFFSYSTEM)
4-SCHEDULED IN CURRENT FY 19-20
JEFFERSON 000-26 FBROFF 527 PRESERVATION - BRIDGE (OFFSYSTEM)
BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
WEST LOYOLA & METAIRIE HEIGHTS BRIDGES
H.012595
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 3154 826-44 NHPP 334 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
4-SCHEDULED IN CURRENT FY 19-20
ADD RIGHT TURN LANE BY WIDENING ON LA 3154 AT DOCK STBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3154: RIGHT TURN LANE AT DOCK ST
H.013292
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 466 063-02 STPFLEX 47 RAILROADS 4-SCHEDULED IN CURRENT FY 19-20JEFFERSON LA 466 063-02 LOCAL 7 RAILROADS
REPLACE RAILROAD CROSSING SURFACELUKE, SHAWN Remrks:
Typ Imp:MATCH FROM RAILROAD
Project:Prj Mgr:
LA 466: NOGC RR XING (GRETNA)
H.013435
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 611-9 826-04 STPFLEX 50 RAILROADS 4-SCHEDULED IN CURRENT FY 19-20
CONNECT CROSSING WITH TRAFFIC SIGNAL FOR PREEMPTIONLUKE, SHAWN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 611-9 @ FOCIS ST.: NS RR (METAIRIE)
H.013706
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON US 90-Z 283-09 NHPP 9,818 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED IN CURRENT FY 19-20
REPLACEMENT OF TUNNEL LIGHTING SYSTEMFUSILIER, JACOB Remrks:
Typ Imp:
Project:Prj Mgr:
US 90Z: HARVEY TUNNEL LIGHTING REPL.
H.013768
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON 000-26 HSIP 500 RAILROADS 4-SCHEDULED IN CURRENT FY 19-20
UPGRADE SIGNALSSHREWSBERRY,BILL Remrks:
Typ Imp:
Project:Prj Mgr:
ALLIANCE ST: IC & KCS RR XINGS (KENNER)
Page 1 - 21 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.013829
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON I-10 450-15 NHPP 522 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
4-SCHEDULED IN CURRENT FY 19-20
ORLEANS I-10 450-90 NHPP 1,043 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
ORLEANS LA 47 148-02 NHPP 261 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
SIGN UPGRADESFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
I-10 & LA 47: OVERHEAD SIGN UPGRADE
H.013842
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 3046 423-01 STP>200K 2,481 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 19-20JEFFERSON LA 3046 423-01 NHPP 6,800 PRESERVATION - BRIDGE (ON
SYSTEM)
JEFFERSON LA 3046 423-01 NHPP 11,950 OTHER / MISCELLANEOUS JEFFERSON LA 3046 423-01 LOCAL 1,659 OTHER / MISCELLANEOUS JEFFERSON LA 3046 423-01 LOCAL 250 OTHER / MISCELLANEOUS JEFFERSON LA 3139 430-01 STP>200K 1,456 URBAN SYSTEMS JEFFERSON 000-26 STP>200K 2,800 URBAN SYSTEMS JEFFERSON 000-26 STP>200K 3,073 URBAN SYSTEMS JEFFERSON LA 3046 423-01 STP>200K 985 URBAN SYSTEMS
REHABILITATION BRIDGE AND ROAD AND ADD ONRAMPYANG, LI Remrks:
Typ Imp:JEFFERSON PARISH PROVIDES THE MATCH
Project:Prj Mgr:
CAUSEWAY BLVD - EARHART EXPRESSWAY PH 1
H.002956
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 3139 430-01 STP>200K 3,600 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21
RAMP CONNECTOR (EB EARHART - DAKIN)LEBAS, MELISSA Remrks:
Typ Imp:430-01-0020; USE TTF AS MATCH
Project:Prj Mgr:
EARHART AT DAKIN
H.004424
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON US 61 007-02 STP>200K 3,800 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21JEFFERSON LA 3152 826-03 STP>200K 500 URBAN SYSTEMS
INTERSECTION IMPROVEMENT, WIDENING, SUBSURFACE DRAINAGELANDRY, COREY Remrks:
Typ Imp:USE TTF AS MATCH FOR PHASES 4 AND 6.
Project:Prj Mgr:
AIRLINE AT CLEARVIEW INTERSECTION IMPROV
H.010017
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON US 90-Z 283-09 NHPP 12,000 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 20-21
MAJOR BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:
Typ Imp:USE CCCD TOLL CREDITS AS MATCH
Project:Prj Mgr:
US 90Z: WESTBANK EXPRESSWAY REHAB
H.010570
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 49 283-30 STP>200K 3,200 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21JEFFERSON LA 49 283-30 HSIP 3,200 SAFETY
ACCESS MANAGEMENT/SAFETY IMPROVEMENTS, BIKE LANES, SIDEWALFUSILIER, JACOB Remrks:
Typ Imp:MATCH FROM THE CITY OF KENNER
Project:Prj Mgr:
LA 49/WILLIAMS BLVD CORRIDOR IMPROVS
H.011797
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON 000-26 STP>200K 1,200 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21
COLD-MILL AND OVERLAYLEBAS, MELISSA Remrks:
Typ Imp:JEFFERSON PARISH WILL PROVIDE MATCH
Project:Prj Mgr:
AMES BLVD (WB EXPY - HAPPY ST)
Page 1 - 22 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.012918
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 3139 430-01 NHPP 500 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED FOR LETTING FY 20-21
CONCRETE REHAB PATCH AND JOINT SEALINGMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3139: DICKORY AVE. - ORLEANS P/L
H.012978
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 301 826-06 NFA 600 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED FOR LETTING FY 20-21
JEFFERSON LA 301 826-06 STPFLEX 30 PRESERVATION - NON-INTERSTATEON STP SYSTEM
MILLING AND OVERLAYMAY, BRIAN Remrks:
Typ Imp:PR NF NFA; PR NS TTF AS MATCH
Project:Prj Mgr:
LA 301: 280' W MCMURTY - LA 45
H.013209
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON US 61 007-02 NHPP 1,847 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED FOR LETTING FY 20-21
MILL, PATCH, AND OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 61: WILLIAMS BLVD - RR OVERPASS
H.013339
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON US 90 006-02 STPFLEX 134 RAILROADS 4-SCHEDULED FOR LETTING FY 20-21JEFFERSON US 90 006-02 LOCAL 19 RAILROADS
REPLACE RAILROAD CROSSING SURFACELUKE, SHAWN Remrks:
Typ Imp:MATCH FROM RR
Project:Prj Mgr:
US 90: IC/NOPB RR XING (JEFFERSON)
H.013745
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 3017 826-11 STPFLEX 3,139 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED FOR LETTING FY 20-21
MILL, OVERLAY, AND RESTRIPINGSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3017: 4TH ST - LAPALCO BLVD
H.013757
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON US 90 006-02 NHPP 3,702 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED FOR LETTING FY 20-21
JEFFERSON LA 3046 423-01 NHPP 628 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
MILL AND OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 90 & LA 3046: MILL & OVERLAY
H.013762
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON US 61 007-02 NHPP 1,900 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED FOR LETTING FY 20-21
MILLING AND OVERLAY OF US 61 FROM ORLEANS PL TO LABARREMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 61: LABARRE RD - ORLEANS PL
H.013825
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON 000-26 HSIP 500 RAILROADS 4-SCHEDULED FOR LETTING FY 20-21
INSTALL RR ACTIVE WARNINGSHREWSBERRY,BILL Remrks:
Typ Imp:
Project:Prj Mgr:
NOPB RR XINGS (JEFFERSON PARISH)
H.013939
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON 000-26 STP>200K 415 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21
SIGNAL UPGRADE FOR TRANSIT OPS IMPROVEMENTLEBAS, MELISSA Remrks:
Typ Imp:JEFFERSON PARISH TO PROVIDE MATCH
Project:Prj Mgr:
VETERANS BLVD TRANSIT SIGNAL PRIORITY
Page 1 - 23 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.014079
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 428 410-02 NHPP 250 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 20-21
ADD THROUGH LANE ON WB LA 428SPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 428: WB LANE AT LA 23
H.012805
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFF DAVIS LA 102 827-17 STPFLEX 263 RAILROADS 4-SCHEDULED IN CURRENT FY 19-20JEFF DAVIS LA 102 827-17 LOCAL 38 RAILROADS JEFF DAVIS 000-27 STPFLEX 219 RAILROADS JEFF DAVIS 000-27 LOCAL 31 RAILROADS JEFF DAVIS LA 26 054-05 STPFLEX 219 RAILROADS JEFF DAVIS LA 26 054-05 LOCAL 31 RAILROADS
UPGRADE SIGNALSSHREWSBERRY,BILL Remrks:
Typ Imp:MATCH FROM RAILROAD
Project:Prj Mgr:
BNSF SEVERAL RR XINGS (JENNINGS)
JEFFERSON DAVIS
H.012872
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFF DAVIS 000-27 RAIL PD 311 RAILROADS 4-SCHEDULED IN CURRENT FY 19-20JEFF DAVIS 000-27 RAIL HE 44 RAILROADS JEFF DAVIS 000-27 LOCAL 39 RAILROADS JEFF DAVIS 000-27 LOCAL 6 RAILROADS
INSTALL NEW F/L'S, GATES, AND BELLS AND CLOSE DOYLE ST. XINGSHREWSBERRY,BILL Remrks:
Typ Imp:MATCH FROM RAILROAD
Project:Prj Mgr:
PLAQ/DOYLE: BNSF RR XINGS (JENNINGS)
H.014185
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFF DAVIS LA 26 054-05 STPFLEX 108 RAILROADS 4-SCHEDULED IN CURRENT FY 19-20JEFF DAVIS LA 26 054-05 LOCAL 65 RAILROADS
REPLACE RAILROAD CROSSING SURFACELUKE, SHAWN Remrks:
Typ Imp:MATCH FROM RR
Project:Prj Mgr:
LA 26: BNSF RR XING (JENNINGS)
H.002980
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFF DAVIS I-10 450-03 NHPP 30,000 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 20-21
NEW BRIDGESDELATTE, BRIAN Remrks:
Typ Imp:450-03-0085;PARALLEL BRIDGES
Project:Prj Mgr:
I-10 OVERPASS OVER US 165 & MP R.R
H.006528
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFF DAVIS 000-27 SR2S 198 SAFETY - SAFE ROUTES TO SCHOOLS 4-SCHEDULED FOR LETTING FY 20-21
SIDEWALK CONSTRUCTION AND CROSSWALKSRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
FENTON ELEMENTARY SIDEWALKS
H.013855
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFF DAVIS 000-27 RAIL PD 200 RAILROADS 4-SCHEDULED FOR LETTING FY 20-21
INSTALL SIGNALSSHREWSBERRY,BILL Remrks:
Typ Imp:MATCH FROM RAILROAD
Project:Prj Mgr:
GRO RACCA RD: UP XING (JEFFERSON DAVIS)
H.013857
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFF DAVIS 000-27 RAIL PD 200 RAILROADS 4-SCHEDULED FOR LETTING FY 20-21
INSTALL SIGNALSSHREWSBERRY,BILL Remrks:
Typ Imp:MATCH FROM RAILROAD
Project:Prj Mgr:
ESTES RD: UP RR XING (JEFFERSON DAVIS)
Page 1 - 24 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.010207
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 94 080-03 STPFLEX 540 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED IN CURRENT FY 19-20
ST MARTIN LA 94 080-04 NHPP 2,365 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
ST MARTIN LA 94 850-32 NHPP 290 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
COLD PLANE, PATCH & OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 94: LA 353 - LA 328
LAFAYETTE
H.010557
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE 000-28 FBROFF 527 PRESERVATION - BRIDGE (OFFSYSTEM)
4-SCHEDULED IN CURRENT FY 19-20
BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
LAJAUNIE RD / LATERAL 1 BAYOU ST. CLAIR
H.011748
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 731 828-21 STPFLEX 675 ROAD TRANSFER 4-SCHEDULED IN CURRENT FY 19-20LAFAYETTE LA 731-S 828-47 STPFLEX 150 ROAD TRANSFER
ASPHALT OVERLAY AND RELATED WORKDOMINGUE, CHRISTOPHER Remrks:
Typ Imp:
Project:Prj Mgr:
LA 731 & LA 731-S IMPROVEMENTS
H.011832
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE US 90 003-11 STP>200K 2,682 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 19-20
OVERLAY WITH ISOLATED RECONSTRUCTION WHERE NECESSARYRICHARD, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 90: CAMERON ST. OVERLAY
H.012018
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE 000-28 STP>200K 2,157 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 19-20LAFAYETTE 000-28 STP>200K 1,213 URBAN SYSTEMS
ADAPTIVE SIGNAL IMPLEMENTATIONFILLASTRE, ANDRE Remrks:
Typ Imp:LAFAYETTE CONSOLIDATED GOV'T PROVIDING MATCH ON LOCAL ROA
Project:Prj Mgr:
LAFAYETTE ADAPTIVE SIGNAL IMPLEMENTATION
H.012304
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE 000-28 STPFLEX 2,963 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 19-20
OVERLAY AND REHABILITATERICHARD, RYAN Remrks:
Typ Imp:LAFAYETTE CONSOLIDATED GOVERNMENT WILL PROVIDE MATCH
Project:Prj Mgr:
LCG ROAD OVERLAY PROGRAM
H.012861
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE 000-28 STP>200K 348 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 19-20
OVERLAYRICHARD, RYAN Remrks:
Typ Imp:CITY OF CARENCRO WILL PROVIDE MATCH
Project:Prj Mgr:
PREJEAN ROAD PAVEMENT PRESERVATION
H.012890
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 3073 828-39 NHPP 120 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
4-SCHEDULED IN CURRENT FY 19-20
ADDING A LEFT TURN LANE & MODIFYING MEDIAN OPENINGSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3073: MEDIAN IMPROVEMENTS
Page 1 - 25 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.012915
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 182 032-01 STPFLEX 400 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
4-SCHEDULED IN CURRENT FY 19-20
ROADWAY WIDENING FOR CONTINUOUS TURN LANESPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 182: PONT DES MOUTON - PREJEAN RD
H.012980
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 3073 828-39 NHPP 7,119 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED IN CURRENT FY 19-20
CONCRETE PAVEMENT REHABILITATIONSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3073: US 167 - KALISTE SALOOM ROAD
H.013097
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 93 828-15 STPFLEX 1,380 ROAD TRANSFER 4-SCHEDULED IN CURRENT FY 19-20
PATCH, COLD PLANE, OVERLAY, & RELATED WORKMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 93: 1.53 MI S US 90 - US 90
H.013360
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 93 433-01 STPFLEX 700 ROAD TRANSFER 4-SCHEDULED IN CURRENT FY 19-20
WIDENING, ASPHALT OVERLAY, AND RELATED WORKDOMINGUE, CHRISTOPHER Remrks:
Typ Imp:
Project:Prj Mgr:
LA 93: US 90 - BENOIT PATIN RD
H.002151
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 339-S 216-02 STPFLEX 2,500 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 20-21
BRIDGE REPLACEMENTJUDICE, ANDREW Remrks:
Typ Imp:216-02-0016;
Project:Prj Mgr:
BAYOU PARC PERDU AND CREEK BRIDGES
H.002735
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 1252 391-04 FBROFF 3,311 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 20-21
LAFAYETTE 000-28 NFA 102 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTLAI, QUANG Remrks:
Typ Imp:391-04-0018; USE NFA AS MATCH
Project:Prj Mgr:
BAYOU VERMILION BRIDGE
H.003459
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE I-49 455-01 HSIP 0 SAFETY 4-SCHEDULED FOR LETTING FY 20-21LAFAYETTE LA 726 828-44 HSIP 496 SAFETY LAFAYETTE 000-28 HSIP 676 SAFETY LAFAYETTE LA 98 391-02 HSIP 352 SAFETY
INTERCHANGE IMPROVEMENTSTONEY, PATRICK Remrks:
Typ Imp:455-01-0054 AND 828-44-0015
Project:Prj Mgr:
I-49 INTERCH:LA726/LA98/PONT DES MOUTON
H.006538
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE 000-28 HSIPPEN 820 SAFETY - SAFE ROUTES TO SCHOOLS 4-SCHEDULED FOR LETTING FY 20-21
CONSTRUCTION OF SIDEWALKS AND CROSSWALKSMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
LAFAYETTE CONSOLIDATED GOVT SIDEWALKS
H.007233
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE 000-28 STP>200K 500 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21
PAVEMENT MARKINGSRICHARD, RYAN Remrks:
Typ Imp:742-28-0007
Project:Prj Mgr:
LAFAYETTE MPO NON STATE PVT MARKING
Page 1 - 26 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.009629
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE US 167 424-02 NHPP 8,813 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED FOR LETTING FY 20-21
P.C.C.P. REHABILITATIONMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 90 (EB):RR JCT-JCT US 90BUS (PINHOOK)
H.011833
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE 000-28 STP>200K 3,600 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21
SIDEWALKSRICHARD, RYAN Remrks:
Typ Imp:CITY OF SCOTT PROVIDING MATCH
Project:Prj Mgr:
ST. MARY STREET SIDEWALKS
H.011904
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 182-2 828-50 STPFLEX 2,846 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 20-21LAFAYETTE LA 182-2 828-50 LOCAL 487 ROAD TRANSFER
COLD PLANE, OVERLAY INCLUDING WIDENING, DRAINAGE STRMCMILLAN, RYAN Remrks:
Typ Imp:LOCAL FUNDS PROVIDED BY CITY OF BROUSSARD
Project:Prj Mgr:
LA 182: ST DE PORRES-ALBERTSONS PKWY(RT)
H.012231
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 3025-S 828-38 STP>200K 835 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21LAFAYETTE LA 3025-S 828-38 TAP>200K 583 URBAN SYSTEMS
ENHANCEMENTSRICHARD, RYAN Remrks:
Typ Imp:LAFAYETTE CONSOLIDATED GOVERNMENT WILL PROVIDE MATCH.
Project:Prj Mgr:
BERTRAND DRIVE STREETSCAPE
H.012393
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 98 391-02 HSIP 683 SAFETY 4-SCHEDULED FOR LETTING FY 20-21LAFAYETTE 000-28 HSIP 683 SAFETY
THE EXISTING INTERSECTION WILL BE CONVERTED TO A ROUNDABOUTTONEY, PATRICK Remrks:
Typ Imp:
Project:Prj Mgr:
LA 98: ROUNDABOUT AT MILLS STREET
H.012611
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE US 167 424-02 NHPP 351 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 20-21
LAFAYETTE I-49 455-01 NHPP 49 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
OFFSET TURN LANES, EXTEND MEDIAN ISLAND, REMOVE HURR. XOVERSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 167 @ CHALMETTE/I-49 HURR. CROSSOVER
H.012800
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE 000-28 HSIPPEN 301 SAFETY - LOCAL ROADS SAFETY 4-SCHEDULED FOR LETTING FY 20-21
HIGH FRICTION SURFACE TREATMENTRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
LOCAL ROADS HFST (LAFAYETTE)
H.012864
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 94 080-03 STP>200K 522 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21
CONSTRUCTION OF SIDEWALKSRICHARD, RYAN Remrks:
Typ Imp:LAFAYETTE CONSOLIDATED GOV'T WILL PROVIDE MATCH
Project:Prj Mgr:
LA 94/CARMEL DRIVE SIDEWALKS
H.012866
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 3025 828-23 STP>200K 532 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21
CONSTRUCT SIDEWALKSRICHARD, RYAN Remrks:
Typ Imp:LAFAYETTE CONSOLIDATED GOV'T WILL PROVIDE MATCH
Project:Prj Mgr:
SOUTH COLLEGE RD (LA 3025) SIDEWALKS
Page 1 - 27 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.012867
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE 000-28 STP>200K 1,938 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21
ADD CENTER TURN LANERICHARD, RYAN Remrks:
Typ Imp:CITY OF YOUNGSVILLE WILL PROVIDE MATCH
Project:Prj Mgr:
S LARRIVIERE RD: LA 92 - CHEMIN METAIRIE
H.012868
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE 000-28 STP>200K 1,020 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21
OVERLAYRICHARD, RYAN Remrks:
Typ Imp:CITY OF YOUNGSVILLE WILL PROVIDE MATCH
Project:Prj Mgr:
FORTUNE ROAD PAVEMENT PRESERVATION
H.012870
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 93 217-01 STP>200K 4,400 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21
ADDING TURNING LANESRICHARD, RYAN Remrks:
Typ Imp:CITY OF SCOTT WILL PROVIDE MATCH
Project:Prj Mgr:
LA 93: I-10 RAMP - RENAUD
H.012871
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE 000-28 STP>200K 1,250 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21
PRESERVATIONRICHARD, RYAN Remrks:
Typ Imp:CITY OF YOUNGSVILLE WILL PROVIDE MATCH
Project:Prj Mgr:
DETENTE ROAD PAVEMENT PRESERVATION
H.012914
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 3073 828-39 NHPP 400 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 20-21
EXTENDING TURN LANESSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3073: AMBASSADOR @ BONIN IMPROVEMENTS
H.013256
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE I-10 450-05 NHPP 175 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
4-SCHEDULED FOR LETTING FY 20-21
ACADIA I-10 450-04 NHPP 725 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
JEFF DAVIS I-10 450-03 NHPP 600 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
INSTALL ITS EQUIPMENT ON I-10 BETWEEN SCOTT AND LAKE CHARLESNICHOLS, BEN Remrks:
Typ Imp:
Project:Prj Mgr:
I-10 ITS SCOTT TO LAKE CHARLES
H.013303
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE 000-28 STP>200K 2,000 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21
REHABILITATE AND ADD CONTINUOUS TURN LANERICHARD, RYAN Remrks:
Typ Imp:CITY OF BROUSSARD TO PROVIDE MATCH
Project:Prj Mgr:
W MAIN STREET: S BERNARD TO CLARA
H.013517
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE 000-28 STP>200K 202 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21
SIDEWALKSRICHARD, RYAN Remrks:
Typ Imp:CITY OF CARENCRO TO PROVIDE MATCH
Project:Prj Mgr:
E ST PETER ST SIDEWALKS
H.010404
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE US 90 005-07 NHPP 5,470 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED IN CURRENT FY 19-20
COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETEBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
US 90: 2.5 MI E LA 182 - ST CHARLES P/L
LAFOURCHE
Page 1 - 28 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.002794
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 308 407-90 STPFLEX 1,100 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 20-21
LAFOURCHE LA 308 407-90 STPFLEX 1,100 PRESERVATION - BRIDGE (ONSYSTEM)
LAFOURCHE LA 308 407-90 STPFLEX 1,100 PRESERVATION - BRIDGE (ONSYSTEM)
LAFOURCHE LA 308 407-01 STPFLEX 750 PRESERVATION - BRIDGE (ONSYSTEM)
LAFOURCHE LA 308 407-01 STPFLEX 1,300 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTISEMANN, ROBERT Remrks:
Typ Imp:407-90-0018;
Project:Prj Mgr:
LA 308: CANAL BRIDGES NEAR LAROSE
H.009320
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 20 065-05 HSIP 4,618 SAFETY 4-SCHEDULED FOR LETTING FY 20-21
5 LEGGED ROUNDABOUTRICHARD, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
ACADIAN ROAD ROUNDABOUT
H.011665
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 308 407-90 HSIPPEN 50 SAFETY 4-SCHEDULED FOR LETTING FY 20-21
LA 308 REALIGNMENTROONEY, BRITTANY Remrks:
Typ Imp:
Project:Prj Mgr:
LA 308 NEAR MCCLOUD RD
H.011915
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE 000-29 EARMARK 20,528 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 20-21LAFOURCHE 000-29 STBONDS 7,350 OTHER / MISCELLANEOUS LAFOURCHE 000-29 LOCAL 1,395 OTHER / MISCELLANEOUS
NEW BRIDGE AND NEW ROAD BETWEEN LA 308 AND LA 3235HANKS, ANNA Remrks:
Typ Imp:LOCAL FUNDS LAFOURCHE PARISH GOVT& GREATER LAFOURCHE POR
Project:Prj Mgr:
AIRPORT CONNECTOR ROAD AND BRIDGE
H.013225
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 1 064-90 NHPP 5,090 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED FOR LETTING FY 20-21
LAFOURCHE LA 1 064-04 STPFLEX 80 PRESERVATION - NON-INTERSTATEON STP SYSTEM
MILL, PATCH, AND OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1: LA 1 BRIDGE - FALGOUT LN
H.013250
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE US 90 424-08 NHPP 4,896 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED FOR LETTING FY 20-21
LAFOURCHE US 90 005-07 NHPP 2,193 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
MILL, PATCH, AND OVERLAYBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
US 90: LA 308 - 2.3 MI E LA 182
H.013269
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE 000-29 STP<200K 469 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21
ASPHALT OVERLAYRICHARD, RYAN Remrks:
Typ Imp:CITY OF THIBODAUX WILL PROVIDE MATCH
Project:Prj Mgr:
AUDUBON AVE OVLY:LA 1 TO TERREBONNE P/L
Page 1 - 29 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.013384
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 1 064-02 STCASH 50 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 20-21
ARMORING TEST SECTIONROONEY, BRITTANY Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1 ARMORING: LA 3090 - 3.3 MILES EAST
H.013403
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 304 829-04 STP<200K 131 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21LAFOURCHE LA 20 065-06 STP<200K 131 URBAN SYSTEMS
ADA SIDEWALKSRICHARD, RYAN Remrks:
Typ Imp:LAFOURCHE PARISH TO PROVIDE MATCH
Project:Prj Mgr:
LA 20 & LA 304 SIDEWALK IMP (CHACKBAY)
H.013404
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 1 064-04 STP<200K 117 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21
SIDEWALKSRICHARD, RYAN Remrks:
Typ Imp:LAFOURCHE PARISH PROVIDING MATCH
Project:Prj Mgr:
LA 1 SIDEWALKS (CUT-OFF)
H.013429
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE 000-29 STP<200K 193 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21
ENHANCEMENTS - UPGRADE SIDEWALKS TO ADARICHARD, RYAN Remrks:
Typ Imp:CITY OF THIBODAUX WILL PROVIDE MATCH
Project:Prj Mgr:
DOWNTOWN THIBODAUX SIDEWALKS
H.000754
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LASALLE US 84 022-04 NHPP 7,280 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED IN CURRENT FY 19-20
BRIDGE REPLACEMENTMORVANT, RYAN Remrks:
Typ Imp:022-04-0033
Project:Prj Mgr:
US 84: UP RAILROAD OVERPASS (HBI)
LASALLE
H.001853
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LASALLE 000-30 STPFLEX 200 RAILROADS 4-SCHEDULED FOR LETTING FY 20-21
UPGRADE RR SIGNALS, CLOSE CROSSING, IMPROVE APPROACHSHREWSBERRY,BILL Remrks:
Typ Imp:MATCH FROM RR ON PORTIONS OF THIS PROJECT
Project:Prj Mgr:
UP SEVERAL RR XINGS (OLLA)
H.013541
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LASALLE LA 125 131-01 STPFLEX 250 RAILROADS 4-SCHEDULED FOR LETTING FY 20-21
TO INSTALL FLASHING LIGHTS, GATES AND BELLSSHREWSBERRY,BILL Remrks:
Typ Imp:
Project:Prj Mgr:
LA 125: UP RR CROSSING (LASALLE)
H.013927
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LASALLE LA 500 128-05 STPFLEX 5,100 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED FOR LETTING FY 20-21
STABILIZE & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 500: GRANT P/L - US 84
H.000133
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN US 80 001-07 STP<5K 4,500 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED IN CURRENT FY 19-20
BRIDGE REPLACEMENTMORVANT, RYAN Remrks:
Typ Imp:001-07-0026
Project:Prj Mgr:
US 80 OVERPASS @ KCS RR
LINCOLN
Page 1 - 30 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.008161
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN LA 3072 831-14 STP<5K 1,199 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 20-21
BRIDGE REPLACEMENTBRAUNER, KURT Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3072: COLVIN CREEK BRIDGE
H.010389
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN LA 507 308-04 STPFLEX 735 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED FOR LETTING FY 20-21
STABILIZE BASE & OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 507: US 80 - S. END OVERPASS I-20
H.013524
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN 000-31 RTP 112 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 20-21LINCOLN 000-31 LOCAL 174 RECREATIONAL TRAILS PROGRAM
CONSTRUCTION OF A 1250' LONG BY 10' WIDE MULTI-USE TRAILNUNES, BRIAN Remrks:
Typ Imp:CITY OF RUSTON WILL PROVIDE THE LOCAL MATCH
Project:Prj Mgr:
ROCK ISLAND GREENWAY, PHASE 4
H.002381
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 43 260-07 STPFLEX 1,304 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED IN CURRENT FY 19-20
NEW BRIDGEJUDICE, ANDREW Remrks:
Typ Imp:260-07-0025
Project:Prj Mgr:
LA 43 CREEK BRIDGE NEAR ALBANY
LIVINGSTON
H.011828
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON 000-32 STP>200K 2,265 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 19-20
BRIDGE REPLACEMENT AND OVERLAYLEBAS, MELISSA Remrks:
Typ Imp:LIVINGSTON PARISH PROVIDING MATCH
Project:Prj Mgr:
FORREST DELATTE ROAD IMPROVEMENTS
H.013532
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON 000-32 HSIPPEN 248 SAFETY - LOCAL ROADS SAFETY 4-SCHEDULED IN CURRENT FY 19-20
SIGNS, STRIPING & FLASHING BEACONSMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
DENHAM SPRINGS ROAD SIGNING & STRIPING
H.013724
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 16 262-01 STPFLEX 2,988 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
4-SCHEDULED IN CURRENT FY 19-20
THIN LIFT OVERLAYBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 16: LA 42 to LA 1034
H.013900
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 1024 832-10 STPFLEX 175 RAILROADS 4-SCHEDULED IN CURRENT FY 19-20LIVINGSTON LA 1024 832-10 LOCAL 75 RAILROADS LIVINGSTON 000-32 STPFLEX 175 RAILROADS LIVINGSTON 000-32 LOCAL 75 RAILROADS
UPGRADE LA 1024 TO GATES AND INSTALL GATES AT LEE MARTIN RD.SHREWSBERRY,BILL Remrks:
Typ Imp:MATCH FROM RR
Project:Prj Mgr:
LA 1024 & LEE MARTIN: IC RR (LIVINGSTON)
H.014014
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 1024 832-10 STGEN 150 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 19-20
REPLACE CROSSDRAIN, MILL, REPLACE ASPHALT RDWY, FILL VOIDSBRANTON, JENNIFER Remrks:
Typ Imp:SECRETARY'S EMERGENCY FUND LETTER DATED 7/30/2019
Project:Prj Mgr:
LA 1024 CROSS DRAIN REPLACEMENT
Page 1 - 31 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.011520
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 1019 832-02 STPFLEX 300 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
4-SCHEDULED FOR LETTING FY 20-21
REMOVE AND REPLACE PIPES, CATCH BASINS, AND/OR ASPHALTGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1019: LA 16-CALMES RD DRAINAGE
H.011645
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 3002 832-32 HSIP 961 SAFETY 4-SCHEDULED FOR LETTING FY 20-21
LEFT TURN LANES, ADDING MEDIAN CONTROL AND IMPROVING SIGNALTASSIN, BEN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3002: ACCESS MANAGEMENT
H.012308
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON 000-32 DEMO 9,447 DEMO / HIGH PRIORITY 4-SCHEDULED FOR LETTING FY 20-21
CONCRETE PAVEMENT, DRAINAGE, BRIDGE, SIDEWALKS, EARTHWORKMASTIN, CATHERINE Remrks:
Typ Imp:
Project:Prj Mgr:
COOK ROAD IMP: LA16 TO JUBAN CROSSING
H.013553
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON 000-32 STP>200K 1,296 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21
OVERLAY AND SIDEWALKLEBAS, MELISSA Remrks:
Typ Imp:CITY OF WALKER TO PROVIDE MATCH.
Project:Prj Mgr:
PENDARVIS LANE IMPROVEMENTS PHASE 1
H.013674
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON 000-32 STP>200K 771 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21
OVERLAYLEBAS, MELISSA Remrks:
Typ Imp:CITY OF DENHAM SPRINGS TO PROVIDE MATCH
Project:Prj Mgr:
BENTON LANE IMPROVEMENTS
H.013739
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 63 272-03 STPFLEX 1,800 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED FOR LETTING FY 20-21
MILL AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 63: LA 442 - LA 449
H.014045
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 3283-1 870-24 NFA 23 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 20-21LIVINGSTON LA 3283-2 870-25 NFA 29 ROAD TRANSFER LIVINGSTON LA 3283-3 870-26 NFA 52 ROAD TRANSFER LIVINGSTON LA 3283-4 870-27 NFA 77 ROAD TRANSFER LIVINGSTON LA 3283-5 870-28 NFA 256 ROAD TRANSFER LIVINGSTON LA 3283-6 870-29 NFA 72 ROAD TRANSFER LIVINGSTON LA 1035-1 832-28 NFA 100 ROAD TRANSFER LIVINGSTON LA 1035-2 832-36 NFA 110 ROAD TRANSFER LIVINGSTON LA 1035-3 832-37 NFA 52 ROAD TRANSFER LIVINGSTON LA 1035-4 832-38 NFA 221 ROAD TRANSFER
MILL AND OVERLAYTASSIN, BEN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1035 AND LA 3283: LIVINGSTON RT
H.011446
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
MADISON 000-33 NHPP 9,000 OPER EFFICIENCY/MOTORISTASSISTANCE - REST AREAS
4-SCHEDULED FOR LETTING FY 20-21
REST AREA RENOVATIONGUINN, SCOTT Remrks:
Typ Imp:
Project:Prj Mgr:
MOUND REST AREA RENOVATIONS
MADISON
Page 1 - 32 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.006170
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
MOREHOUSE 000-34 FBROFF 1,081 PRESERVATION - BRIDGE (OFFSYSTEM)
4-SCHEDULED IN CURRENT FY 19-20
BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
MARTIN LUTHER KING SOUTH BRIDGE
MOREHOUSE
H.010470
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
MOREHOUSE LA 138 330-01 STPFLEX 7,196 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED FOR LETTING FY 20-21
STABILIZE BASE & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 138: JCT LA 593 TO JCT LA 2
H.012950
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
MOREHOUSE LA 3051 834-17 STPFLEX 180 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
4-SCHEDULED FOR LETTING FY 20-21
MOREHOUSE LA 3051 834-17 NFA 186 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3051: US 165 - LA 133
H.012144
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 478 116-02 NFA 2,787 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED IN CURRENT FY 19-20
STABILIZE AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:AC
Project:Prj Mgr:
LA 478: VOWELLS MILL TO LA 117
NATCHITOCHES
H.012683
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES I-49 455-06 NHPP 696 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
4-SCHEDULED IN CURRENT FY 19-20
I-49 SIGN UPGRADE FROM LA 6 TO DESOTO P/LFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
I-49: LA 6 TO DESOTO PARISH LINE
H.012972
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 1225 835-02 NFA 2,177 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED IN CURRENT FY 19-20
MILLING, CEMENT TREATED BASE, AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1225: US 71 TO LA 6
H.013832
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 6 034-06 NHPP 1,750 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED IN CURRENT FY 19-20
HYDRO-DEMOLITION AND OVERLAY OF EXISTING MAIN SPAN DECKD'ANDREA, ARTUR Remrks:
Typ Imp:
Project:Prj Mgr:
LA 6: GRAND ECORE BRIDGE DECK REPAIR
H.013204
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 6 034-05 NHPP 2,200 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED FOR LETTING FY 20-21
PATCHING, MILLING, AND OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 6: LA 504 TO LA 1
Page 1 - 33 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.013743
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 493 835-03 NFA 1,357 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED FOR LETTING FY 20-21
STABILIZE AND OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 493: MONTROSE RD. TO LA 1
H.013821
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 6 034-05 NHPP 375 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 20-21
NATCHITOCHES LA 6 034-05 NHPP 375 PRESERVATION - BRIDGE (ONSYSTEM)
ABUTMENT REPAIR AND/OR BRIDGE LENGTHENINGTOURRES, VALERIE Remrks:
Typ Imp:
Project:Prj Mgr:
LA 6: YOUNGS BAYOU BRIDGES REHAB
H.007272
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS 000-36 DEMO 3,226 DEMO / HIGH PRIORITY 4-SCHEDULED IN CURRENT FY 19-20
NEW 2-LANE ROADWAYBRIGNAC, CHRISTINA Remrks:
Typ Imp:742-36-0136;CITY OWNS R/W
Project:Prj Mgr:
HOWARD AVENUE EXTENSION
ORLEANS
H.007273
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS 000-36 STP>200K 3,815 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 19-20
REHABILITATIONLEBAS, MELISSA Remrks:
Typ Imp:742-36-0137; USE LOCAL AS MATCH
Project:Prj Mgr:
MAGAZINE ST (LEAKE AVE TO EAST DRIVE)
H.009354
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS 000-36 RTP 89 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 19-20ORLEANS 000-36 LOCAL 11 RECREATIONAL TRAILS PROGRAM
CONSTRUCTION OF BIKE LANES, A MULTI-USE PATH AND CROSSINGSNUNES, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
BROAD STREET CORRIDOR BIKEWAY
H.010018
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS I-10 450-90 NHPP 32,309 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED IN CURRENT FY 19-20
BRIDGE REPLACEMENTMICHAEL, ANDREW Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: NO EAST DRAIN CANAL BRIDGE REPLACE
H.012373
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS 000-36 STP>200K 4,483 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 19-20
REHABILITATION ASPHALT OVERLAY AND ADA COMPLIANT CURBSLEBAS, MELISSA Remrks:
Typ Imp:ORLEANS PARISH PROVIDING MATCH
Project:Prj Mgr:
ML KING BLVD: S CLAIBORNE - ST. CHARLES
H.012473
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS 000-36 HSIPPEN 700 SAFETY - LOCAL ROADS SAFETY 4-SCHEDULED IN CURRENT FY 19-20ORLEANS 000-36 STP>200K 20 URBAN SYSTEMS
SIDEWALKS AND OTHER SAFETY ENHANCEMENTSMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
MARCONI DR SHARED-USE PATH
Page 1 - 34 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.013211
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS LA 46 046-02 NHPP 3,500 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED IN CURRENT FY 19-20
ORLEANS LA 46 046-02 HSIPPEN 276 SAFETY
MILL, PATCH, OVERLAY AND HANDICAPPED CURB RAMPSBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 46: LA 39 - ST. BERNARD P/L
H.013391
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS 000-36 HSIPPEN 1,610 SAFETY 4-SCHEDULED IN CURRENT FY 19-20ORLEANS 000-36 STPFLEX 1,610 OPER EFFICIENCY/MOTORIST
ASSISTANCE - TRAFFIC CONTROLDEVICES
JEFFERSON 000-26 HSIPPEN 210 SAFETY JEFFERSON 000-26 STPFLEX 210 OPER EFFICIENCY/MOTORIST
ASSISTANCE - TRAFFIC CONTROLDEVICES
ST BERNARD 000-44 HSIPPEN 280 SAFETY ST BERNARD 000-44 STPFLEX 280 OPER EFFICIENCY/MOTORIST
ASSISTANCE - TRAFFIC CONTROLDEVICES
TRAFFIC SIGNAL UPGRADEFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DIST. 02BC FLASHING YELLOW ARROW PART 2
H.013587
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS I-10 450-90 HSIPPEN 2,941 SAFETY 4-SCHEDULED IN CURRENT FY 19-20
HIGH FRICTION SURFACE TREATMENTROONEY, BRITTANY Remrks:
Typ Imp:
Project:Prj Mgr:
I-10 @ MORRISON RD
H.013746
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS I-10 450-90 STPFLEX 1,899 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED IN CURRENT FY 19-20
ORLEANS US 90 006-03 NHPP 567 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
ORLEANS LA 39 046-31 NHPP 1,841 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
MILLING AND OVERLAY WITH ASPHALT CONCRETEBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
US 90/ I-10 SERVICE RD/ LA 39 OVERLAY
H.014132
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS US 90 006-03 STCASH 20 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 19-20
REPAIR CATCH BASINROONEY, BRITTANY Remrks:
Typ Imp:
Project:Prj Mgr:
US 90 @ AMELIA ST DRAINAGE REPAIR
H.014134
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS US 90-Z 283-08 NHPP 300 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
4-SCHEDULED IN CURRENT FY 19-20
INSTALLATION OF SUBSURFACE DRAINAGE STRUCTURESGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
US 90B @ CLAIBORNE EXIT RAMP
H.014205
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS LA 1264 836-15 STCASH 30 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 19-20
REMOVAL OF DAMAGED AIR BUFFER FROM BRIDGEGAUDET, COREY Remrks:
Typ Imp:OPERATING/MISCELLANEOUS REPAIR FUNDS WILL BE USED
Project:Prj Mgr:
TED HICKEY BRIDGE-AIR BUFFER REMOVAL
Page 1 - 35 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.007274
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS 000-36 STP>200K 3,000 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21
REHABILITATIONLEBAS, MELISSA Remrks:
Typ Imp:742-36-0139; USE LOCAL AS MATCH
Project:Prj Mgr:
MAGAZINE ST (EAST DRIVE TO NASHVILLE)
H.009308
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS 000-36 HSIPPEN 1,094 SAFETY - SAFE ROUTES TO SCHOOLS 4-SCHEDULED FOR LETTING FY 20-21ORLEANS US 90 006-03 HSIPPEN 136 SAFETY - SAFE ROUTES TO SCHOOLS
BICYCLE & PEDESTRAIN CROSSING IMPROVEMENTSMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
NEW ORLEANS DPW SRTS SIDEWALK PROJECT
H.010634
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS US 90-Z 283-08 NHPP 5,549 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
4-SCHEDULED FOR LETTING FY 20-21
JEFFERSON US 90-Z 283-09 NHPP 2,393 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
UPGRADING SIGNS ENTIRE LIMITS.UPGRADING STRUCTURES AS NEEDNGO, DUC Remrks:
Typ Imp:
Project:Prj Mgr:
US 90Z (BODENGER BLVD - STUMPF BLVD)
H.012370
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS 000-36 STP>200K 6,618 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21
PRESERVATION ASPHALT OVERLAY AND RELATED ADA CURB WORKLEBAS, MELISSA Remrks:
Typ Imp:ORLEANS PARISH TO PROVIDE MATCH
Project:Prj Mgr:
MORRISON RD: MAYO AVE - READ AVE
H.012372
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS 000-36 STP>200K 4,412 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21
CONCRETE PAVEMENT REHABILITATIONLEBAS, MELISSA Remrks:
Typ Imp:ORLEANS PARISH TO PROVIDE MATCH
Project:Prj Mgr:
MORRISON RD: READ AVE - BULLARD AVE
H.012676
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS I-610 450-34 NHPP 125 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 20-21
EXTEND LEFT TURN LANE AND STORAGE OF I-610 AT WEST ENDSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
I-610: OFF RAMP IMPROVEMENTS @ WEST END
H.012682
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS 000-36 HSIPPEN 980 SAFETY - LOCAL ROADS SAFETY 4-SCHEDULED FOR LETTING FY 20-21ORLEANS US 90 006-03 HSIPPEN 270 SAFETY - LOCAL ROADS SAFETY ORLEANS US 90-Z 283-08 HSIPPEN 390 SAFETY - LOCAL ROADS SAFETY ORLEANS I-10 450-90 HSIPPEN 95 SAFETY - LOCAL ROADS SAFETY
INSTALL PEDESTRIAN COUNTDOWN SIGNALSMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
PEDESTRIAN CROSSWALK ENH. (NO PH 2)
H.010989
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA I-20 451-06 NHPP 2,087 PRESERVATION - INTERSTATE 4-SCHEDULED IN CURRENT FY 19-20LINCOLN I-20 451-05 NHPP 2,796 PRESERVATION - INTERSTATE
RE-SURFACE SELECTED I-20 RAMPS IN LINCOLN & OUACHITA PARISHMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-20: LINCOLN/OUACHITA P. RAMP REHAB
OUACHITA
Page 1 - 36 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.013040
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 RTP 112 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 19-20OUACHITA 000-37 LOCAL 169 RECREATIONAL TRAILS PROGRAM
CONSTRUCTION OF A 6,445' LONG BY 6' WIDE WALKING TRAILNUNES, BRIAN Remrks:
Typ Imp:DCRT IS THE PROJECT MANAGER
Project:Prj Mgr:
TRENTON NATURE TRAIL
H.013392
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 STP<200K 611 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 19-20
MILL AND OVERLAYRICHARD, RYAN Remrks:
Typ Imp:CITY OF WEST MONROE TO PROVIDE MATCH
Project:Prj Mgr:
MANE STREET REHABILITATION PHASE 2
H.013394
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 STP<200K 613 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 19-20
RECONSTRUCT 2-LANE ROADWAYRICHARD, RYAN Remrks:
Typ Imp:CITY OF WEST MONROE TO PROVIDE MATCH.
Project:Prj Mgr:
MANE STREET REHABILITATION PHASE 1
H.013395
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 STP<200K 474 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 19-20
ASPHALT OVERLAYRICHARD, RYAN Remrks:
Typ Imp:CITY OF WEST MONROE TO PROVIDE MATCH.
Project:Prj Mgr:
PARKWOOD DR REHAB: GLENWOOD - LA 143
H.013776
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 STP<200K 665 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 19-20
MILL, PATCH AND OVERLAYRICHARD, RYAN Remrks:
Typ Imp:OUACHITA PARISH POLICE JURY TO PROVIDE MATCH
Project:Prj Mgr:
WELL ROAD (NEW NATCH. RD - I-20 INT.)
H.013791
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 STP<200K 335 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 19-20
REHABILITATIONRICHARD, RYAN Remrks:
Typ Imp:OUACHITA PARISH POLICE JURY TO PROVIDE MATCH
Project:Prj Mgr:
HADLEY ST (U.S. HWY 165 - NUTLAND RD)
H.013796
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 STP<200K 156 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 19-20
MILL, PATCH AND OVERLAYRICHARD, RYAN Remrks:
Typ Imp:OUACHITA PARISH POLICE JURY TO PROVIDE MATCH
Project:Prj Mgr:
TANGLEWOOD DRIVE (LA 15 - DELLWOOD DR.)
H.014052
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA LA 151 317-02 STPFLEX 950 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED IN CURRENT FY 19-20
RE-DECKING CONCRETE BRIDGE DECK.TULLIER, DANNY Remrks:
Typ Imp:
Project:Prj Mgr:
LA 151: I-20 OVERPASS DECK REPLACEMENT
H.007300
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 STPFLEX 642 INTERMODAL CONNECTOR 4-SCHEDULED FOR LETTING FY 20-21OUACHITA 000-37 DEMO 6,672 DEMO / HIGH PRIORITY OUACHITA I-20 451-06 NHPP 5,417 INTERMODAL CONNECTOR OUACHITA I-20 451-06 STBONDS 5,803 OTHER / MISCELLANEOUS OUACHITA LA 594 326-01 STPFLEX 10,641 INTERMODAL CONNECTOR
RD CONNECTOR & INTERCHANGE IMPRVMNTMASTIN, CATHERINE Remrks:
Typ Imp:742-37-0028;4TH FUND SOURCE US $300K STP<200K
Project:Prj Mgr:
KANSAS LANE-GARRETT RD CONNECTOR
Page 1 - 37 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.008226
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA LA 3033 837-12 STPFLEX 9,617 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 20-21
BRIDGE REPLACEMENTMOSS, SARAH Remrks:
Typ Imp:837-12-0026
Project:Prj Mgr:
CHENIERE SPILLWAY & BRIDGE REPLACEMENT
H.011507
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA US 80 001-09 NHPP 1,250 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
4-SCHEDULED FOR LETTING FY 20-21
OUACHITA US 80 002-01 NHPP 1,250 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
INSTALL CCTVS ALONG US 80KIMBENG, LUCY Remrks:
Typ Imp:
Project:Prj Mgr:
MONROE ITS PHASE 3
H.011724
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 STP<200K 208 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21
REHABILITATION, PATCH AND OVERLAYRICHARD, RYAN Remrks:
Typ Imp:WEST MONROE WILL PROVIDE MATCH
Project:Prj Mgr:
COLEMAN AVENUE REHABILITATION
H.012247
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 RTP 112 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 20-21OUACHITA 000-37 LOCAL 18 RECREATIONAL TRAILS PROGRAM
CONSTRUCTION OF 1 MILE AGGREGATE LEVEE TRAILNUNES, BRIAN Remrks:
Typ Imp:DCRT IS THE PROJECT MANAGER
Project:Prj Mgr:
FORSYTHE POINT TRAIL
H.012279
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 HSIPPEN 721 SAFETY - LOCAL ROADS SAFETY 4-SCHEDULED FOR LETTING FY 20-21
IMPROVE SAFETY/OPERATION OF COLEMAN/RIVERFRONT ST INTERSECMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
ENDOM BRIDGE APPROACH REALIGNMENT
H.012438
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 STPFLEX 300 RAILROADS 4-SCHEDULED FOR LETTING FY 20-21OUACHITA 000-37 RAIL HE 0 RAILROADS
INSTALL RR SIGNALSSHREWSBERRY,BILL Remrks:
Typ Imp:
Project:Prj Mgr:
DESIARD/ELYSIAN FIELDS: ALM RR (MONROE)
H.012439
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 HSIP 400 RAILROADS 4-SCHEDULED FOR LETTING FY 20-21OUACHITA 000-37 STPFLEX 0 RAILROADS OUACHITA LA 151 317-01 RAIL PD 400 RAILROADS
RR SIGNALIZATIONSHREWSBERRY,BILL Remrks:
Typ Imp:USE TTF FOR PART OF THIS PROJECT
Project:Prj Mgr:
KCS SEVERAL RR XINGS (OUACHITA)
H.012798
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA LA 594 326-02 HSIP 750 SAFETY 4-SCHEDULED FOR LETTING FY 20-21OUACHITA 000-37 HSIP 750 SAFETY
EXISTING INTERSECTION REPLACED WITH A ROUNDABOUT (SAFETY)TONEY, PATRICK Remrks:
Typ Imp:
Project:Prj Mgr:
LA 594: ROUNDABOUT AT ROWLAND RD.
H.013101
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 HSIPPEN 175 SAFETY - LOCAL ROADS SAFETY 4-SCHEDULED FOR LETTING FY 20-21
PAVEMENT MARKINGS AND SIGNINGMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
CONSTITUTION DR SIGNING & STRIPING
Page 1 - 38 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.013398
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 STP<200K 269 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21
ASPHALT OVERLAYRICHARD, RYAN Remrks:
Typ Imp:CITY OF WEST MONROE TO PROVIDE MATCH
Project:Prj Mgr:
COLEMAN AVE REHABILITATION
H.013798
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 STP<200K 686 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21
MILL, PATCH AND OVERLAYRICHARD, RYAN Remrks:
Typ Imp:OUACHITA PARISH POLICE JURY TO PROVIDE MATCH
Project:Prj Mgr:
HARRELL ROAD (US 80 - ARKANSAS RD)
H.013802
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 STP<200K 340 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21
REHABILITATIONRICHARD, RYAN Remrks:
Typ Imp:OUACHITA PARISH POLICE JURY TO PROVIDE MATCH
Project:Prj Mgr:
GARRETT ROAD ( LA 15 - AUSTIN ST.)
H.013803
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 STP<200K 475 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21
OVERLAYRICHARD, RYAN Remrks:
Typ Imp:OUACHITA PARISH POLICE JURY PROVIDING MATCH
Project:Prj Mgr:
RICHWOOD RD NO. 2 (US 165 - BROWN ST)
H.013804
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 STP<200K 1,155 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21
OVERLAYRICHARD, RYAN Remrks:
Typ Imp:OUACHITA PARISH POLIC JURY TO PROVIDE MATCH
Project:Prj Mgr:
WALL WILLIAMS (GOOD HOPE - WHITES FERRY)
H.006226
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
PLAQUEMINES 000-38 FB DISCR 3,000 OPER EFFICIENCY/MOTORISTASSISTANCE - FERRY PROJECTS
4-SCHEDULED IN CURRENT FY 19-20
PLAQUEMINES 000-38 FB DISCR 3,000 OPER EFFICIENCY/MOTORISTASSISTANCE - FERRY PROJECTS
DESIGN AND CONSTRUCT NEW FERRY LANDINGS AND DOLPHINSSIBLEY, STEVEN Remrks:
Typ Imp:MATCH PROVIDED BY LOCAL AGENCY
Project:Prj Mgr:
POINTE-A-LA-HACHE FERRY LANDING REPLACEM
PLAQUEMINES
H.012560
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
PLAQUEMINES LA 23 062-02 NHPP 4,004 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED FOR LETTING FY 20-21
COLD PLANE AND OVERLAY. APPLY NEW STRIPING AND MARKERSMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 23: TUNNEL - RUSSEL DR
H.014145
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
POINTE COUPEE LA 418 223-03 NFA 650 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED IN CURRENT FY 19-20
STABIILIZE, ASPHALT OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 418: LA 1 - LA 417
POINTE COUPEE
H.002184
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
POINTE COUPEE LA 413 227-04 STPFLEX 4,395 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 20-21
NEW BRIDGESMOORE, DARRELL Remrks:
Typ Imp:227-04-0019;2 BRIDGES
Project:Prj Mgr:
BAYOU CHENAL & BAYOU DISCHARGE BRS.
Page 1 - 39 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.012215
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
POINTE COUPEE 000-39 RTP 101 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 20-21POINTE COUPEE 000-39 LOCAL 18 RECREATIONAL TRAILS PROGRAM
CONSTRUCTION OF CONNECTING TRAILS AND A TRAILHEADNUNES, BRIAN Remrks:
Typ Imp:CRT IS THE PROJECT MANAGER
Project:Prj Mgr:
NEW ROADS RECREATIONAL TRAIL & TRAILHEAD
H.013747
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
POINTE COUPEE LA 415 224-02 STPFLEX 700 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
4-SCHEDULED FOR LETTING FY 20-21
MINOR OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 413 & LA 415: LA 981 - NEW ROADS ST
H.000577
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES US 165-X 015-01 STPFLEX 2,098 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED IN CURRENT FY 19-20
BRIDGE REMOVAL. REPLACE WITH AT GRADE CROSSINGMORVANT, RYAN Remrks:
Typ Imp:015-01-0049;SCOPE CHANGED;MATCH FROM RR FOR ARKANSAS SURFA
Project:Prj Mgr:
US 165-X: KCS RAILWAY OVERPASS
RAPIDES
H.008263
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES LA 3144 840-34 HSIP 1,500 SAFETY 4-SCHEDULED IN CURRENT FY 19-20
ROUNDABOUTRACHAL, JASON Remrks:
Typ Imp:840-34-0008
Project:Prj Mgr:
LA 3144/SUSEK DRIVE ROUNDABOUT
H.011526
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES 000-40 FBROFF 620 PRESERVATION - BRIDGE (OFFSYSTEM)
4-SCHEDULED IN CURRENT FY 19-20
RAPIDES 000-40 FBROFF 610 PRESERVATION - BRIDGE (OFFSYSTEM)
RAPIDES 000-40 FBROFF 614 PRESERVATION - BRIDGE (OFFSYSTEM)
BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
CASTOR PLNGE/H.STRANGE/PALMER CHPL BRDG
H.011531
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES 000-40 FBROFF 536 PRESERVATION - BRIDGE (OFFSYSTEM)
4-SCHEDULED IN CURRENT FY 19-20
RAPIDES 000-40 FBROFF 445 PRESERVATION - BRIDGE (OFFSYSTEM)
BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
DIXIE CHURCH & SETLIFF ROAD BRIDGES
H.011938
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES I-49 455-05 NHPP 2,329 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
4-SCHEDULED IN CURRENT FY 19-20
SIGNING AND RELATED WORKFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
I-49: 2 MILES N LA 3265 - 4 MILES N LA 1
H.012559
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES 000-40 STP<200K 1,056 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 19-20
PATCHING, COLD PLANNING AND RESURFACINGRICHARD, RYAN Remrks:
Typ Imp:CITY OF ALEXANDRIA PROVIDING MATCH
Project:Prj Mgr:
INDUSTRIAL PARK SITE ROAD REHAB
Page 1 - 40 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.013153
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES I-49 455-05 NHPP 700 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
4-SCHEDULED IN CURRENT FY 19-20
PAVEMENT MARKING REPLACEMENTHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-49: PAVEMENT MARKING REPLACEMENT V
H.013288
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES LA 107 142-04 STPFLEX 68 RAILROADS 4-SCHEDULED IN CURRENT FY 19-20RAPIDES LA 107 142-04 LOCAL 41 RAILROADS
REPLACE RAILROAD CROSSING SURFACELUKE, SHAWN Remrks:
Typ Imp:MATCH FROM RAILROAD
Project:Prj Mgr:
LA 107: KCS RR XING (PINEVILLE)
H.013856
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES I-49 455-05 NHPP 506 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
4-SCHEDULED IN CURRENT FY 19-20
SIGN UPGRADESFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
I-49 @ US 165: RAMP TRUSS REPLACEMENT
H.013901
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES LA 28 417-02 HSIP 107 SAFETY 4-SCHEDULED IN CURRENT FY 19-20
MILL AND OVERLAY WITH OPEN GRADED FRICTION COURSERACHAL, JASON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 28: WB FROM OAK WHITE TO BAYOU BOEUF
H.001581
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES LA 28 074-01 NHPP 511 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
4-SCHEDULED FOR LETTING FY 20-21
CONCRETE PATCHINGSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 28: US 167 - LA 3144
H.008271
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES 000-40 STP<200K 2,500 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21RAPIDES 000-40 LOCAL 2,500 URBAN SYSTEMS
NEW CONSTRUCTION, 2-LANE WITH PAVED SHOULDERSRICHARD, RYAN Remrks:
Typ Imp:840-37-0007
Project:Prj Mgr:
SUGARHOUSE RD EXTENSION
H.011504
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES US 167 023-01 NHPP 1,800 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
4-SCHEDULED FOR LETTING FY 20-21
INSTALLING BRIDGE ADVISORIES, CCTVS, AND DMSSKIMBENG, LUCY Remrks:
Typ Imp:
Project:Prj Mgr:
ALEXANDRIA ITS PHASE 2
H.012967
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES LA 112 073-03 STPFLEX 1,320 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
4-SCHEDULED FOR LETTING FY 20-21
ULTRATHIN OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 112: US 165-RUTH FORD DR - ULTRATHIN
H.014127
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES LA 3128 840-33 NFA 224 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED FOR LETTING FY 20-21
THIN OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3128: J A WHELAN RD TO LA 107
Page 1 - 41 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.011087
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RED RIVER 000-41 FBROFF 1,794 PRESERVATION - BRIDGE (OFFSYSTEM)
4-SCHEDULED IN CURRENT FY 19-20
BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
WESTDALE PLANTATION ROAD / BAYOU PIERRE
RED RIVER
H.012615
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RED RIVER US 71 010-03 STPFLEX 2,700 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED FOR LETTING FY 20-21
ASPHALTIC CONCRETE PAVEMENT RESURFACINGSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 71: COUSHATTA TO BOSSIER PARISH LINE
H.012970
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RED RIVER LA 480 305-04 NFA 214 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED FOR LETTING FY 20-21
ASPHALTIC CONCRETE PAVEMENT RESURFACINGMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 480: US 84 TO US 371
H.010204
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RICHLAND US 425 071-01 HSIP 2,334 SAFETY 4-SCHEDULED IN CURRENT FY 19-20RICHLAND 000-42 HSIP 915 SAFETY
INSTALL ROUNDABOUTJESCLARD, TREY Remrks:
Typ Imp:
Project:Prj Mgr:
US 425: ROUNDABOUT @ JULIA & LOUISA
RICHLAND
H.012707
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RICHLAND LA 622 341-02 NFA 2,079 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED IN CURRENT FY 19-20
STABILIZE BASE AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 622: LA 576 - LA 576
H.012657
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RICHLAND LA 17 051-05 STPFLEX 102 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
4-SCHEDULED FOR LETTING FY 20-21
DRAINAGE IMPROVEMENTSGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 17: DRAINAGE IMPROVEMENTS
H.013080
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RICHLAND 000-42 FBROFF 1,727 PRESERVATION - BRIDGE (OFFSYSTEM)
4-SCHEDULED FOR LETTING FY 20-21
BRIDGE REPLACEMENT NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
MCLEMORE ROAD OVER BEE BAYOU
H.014193
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
SABINE LA 6 034-02 STCASH 18 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 19-20
RCB REMOVALRACHAL, JASON Remrks:
Typ Imp:OPERATING/MISCELLANEOUS REPAIR FUNDS WILL BE USED
Project:Prj Mgr:
CONCRETE REMOVAL AT TOLEDO BEND
SABINE
Page 1 - 42 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.014195
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
SABINE 000-43 RAIL PD 390 RAILROADS 4-SCHEDULED IN CURRENT FY 19-20
INSTALL GATESSHREWSBERRY,BILL Remrks:
Typ Imp:MATCH FROM PARISH AND RAILROAD
Project:Prj Mgr:
LYDDY TURNPIKE: KCS RR XING (FISHER)
H.012752
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST BERNARD LA 46 046-03 STP>200K 375 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 19-20ST BERNARD 000-44 STP>200K 1,034 URBAN SYSTEMS
INTERSECTION IMPROVEMENTLEBAS, MELISSA Remrks:
Typ Imp:PORT OF ST. BERNARD WILL PROVIDE THE MATCH FOR CS 000-44
Project:Prj Mgr:
LA 46 @ WEINBERGER RD INTERSECTION
ST BERNARD
H.013560
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST BERNARD LA 47 148-01 NHPP 2,650 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED IN CURRENT FY 19-20
ORLEANS LA 47 148-02 NHPP 758 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
ORLEANS LA 47 148-02 STCASH 164 OTHER / MISCELLANEOUS
MILL AND OVERLAYBROWN, JOSEPH C. Remrks:
Typ Imp:OPERATIONAL/MISCELLANEOUS REPAIR FUNDS
Project:Prj Mgr:
LA 47: LA 46 - S END OF INTRACOASTAL BR
H.009175
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST BERNARD 000-44 HSIPPEN 300 SAFETY - LOCAL ROADS SAFETY 4-SCHEDULED FOR LETTING FY 20-21
PURCHASE AND INSTALL SIGNS AND SOLAR BEACONSMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
ST. BERNARD SIGNING & STRIPING
H.013758
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST BERNARD LA 39 046-32 NHPP 300 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 20-21
EXTEND EB DUAL LEFT TURN LANESSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 39: LEFT TURN LANE AT LA 47
H.013945
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST BERNARD 000-44 STP>200K 470 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21ST BERNARD LA 47 148-01 STP>200K 41 URBAN SYSTEMS ST BERNARD LA 39 046-32 STP>200K 28 URBAN SYSTEMS ST BERNARD LA 46 284-01 STP>200K 14 URBAN SYSTEMS ST BERNARD LA 300 284-30 STP>200K 14 URBAN SYSTEMS ST BERNARD LA 39 046-03 STP>200K 14 URBAN SYSTEMS ST BERNARD LA 1245 046-33 STP>200K 14 URBAN SYSTEMS
DELINEATE/CONSTRUCT BIKEWAYSLEBAS, MELISSA Remrks:
Typ Imp:ST BERNARD PARISH TO PROVIDE MATCH
Project:Prj Mgr:
ST BERNARD BIKEWAYS
H.014031
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST BERNARD 000-44 STPFLEX 30 RAILROADS 4-SCHEDULED FOR LETTING FY 20-21
CONNECT CROSSING WITH TRAFFIC SIGNAL FOR PREEMPTIONLUKE, SHAWN Remrks:
Typ Imp:
Project:Prj Mgr:
MELVYN PEREZ PKWY AT LA 46: NSRR PREEMPT
Page 1 - 43 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.014049
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST BERNARD LA 47 148-01 STP>200K 189 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21ST BERNARD LA 39 046-32 STP>200K 189 URBAN SYSTEMS
SIGNING, STRIPING, SIGNAL, CROSSWALK IMPROVEMENTSLEBAS, MELISSA Remrks:
Typ Imp:ST. BERNARD PARISH TO PROVIDE MATCH
Project:Prj Mgr:
ST BERNARD PEDESTRIAN IMPROVEMENTS
H.014072
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST BERNARD LA 46 046-03 STPFLEX 1,500 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED FOR LETTING FY 20-21
MILL AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 46: LA 47 - HANNAN BLVD
H.011553
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST CHARLES LA 632 845-09 STP<5K 918 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED IN CURRENT FY 19-20
ST CHARLES LA 632 845-09 STPFLEX 66 PRESERVATION - NON-INTERSTATEON STP SYSTEM
ST CHARLES LA 631 845-06 NFA 144 PRESERVATION - NON-INTERSTATENFA
ST CHARLES LA 631 845-06 STPFLEX 258 PRESERVATION - NON-INTERSTATEON STP SYSTEM
ASPHALT OVERLAY, PATCHING, STRIPINGBROWN, JOSEPH C. Remrks:
Typ Imp:PR NF NFA AS MATCH; PR NI TTF AS MATCH
Project:Prj Mgr:
LA 632 & LA 631
ST CHARLES
H.012051
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST CHARLES US 90 005-09 NHPP 964 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
4-SCHEDULED IN CURRENT FY 19-20
JEFFERSON US 90 005-10 NHPP 76 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
TURN LANESBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
US 90: FLOODWALL - S KENNER AVE
H.012617
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST CHARLES I-310 450-38 NHPP 4,100 PRESERVATION - INTERSTATE 4-SCHEDULED IN CURRENT FY 19-20ST CHARLES I-310 450-38 NHPP 408 OPER EFFICIENCY/MOTORIST
ASSISTANCE - TRAFFIC CONTROLDEVICES
ST CHARLES I-310 450-36 NHPP 2,175 PRESERVATION - INTERSTATE ST CHARLES I-310 450-36 NHPP 732 OPER EFFICIENCY/MOTORIST
ASSISTANCE - TRAFFIC CONTROLDEVICES
ST CHARLES I-310 450-37 NHPP 18 PRESERVATION - INTERSTATE ST CHARLES I-310 450-37 NHPP 60 OPER EFFICIENCY/MOTORIST
ASSISTANCE - TRAFFIC CONTROLDEVICES
PCC PATCHING, GUARDRAIL, AND STRIPINGBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
I-310: I-10 TO US 90
H.014078
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST CHARLES US 61 007-03 NHPP 500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 20-21
NORTHBOUND I-310 RAMP MERGING ONTO SOUTHBOUND US 61SPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
I-310: EXTEND OFF RAMP AT US 61
Page 1 - 44 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.014061
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST HELENA LA 10 061-07 STCASH 325 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 19-20
SHEET PILE REMOVE, CLEAR AND GRUB, NEW SHEET PILE & RIP-RAPTASSIN, BEN Remrks:
Typ Imp:OPERATING/MISCELLANEOUS REPAIR FUNDS WILL BE USED
Project:Prj Mgr:
LA 10: SANDY RUN CREEK EROSION CONTROL
ST HELENA
H.014141
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST HELENA LA 43 254-06 STPFLEX 75 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
4-SCHEDULED FOR LETTING FY 20-21
ADDITION OF CROSS DRAIN AND UPSIZING CULVERTSGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 43: DRAINAGE IMPROVEMENTS
H.009481
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JAMES LA 20 065-07 STPFLEX 11,172 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED IN CURRENT FY 19-20
BRIDGE REPLACEMENTWINDMANN, ANDREW Remrks:
Typ Imp:
Project:Prj Mgr:
LA 20 BAYOU CHEVREUIL BRIDGE
ST JAMES
H.012075
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JAMES LA 3125 426-31 STPFLEX 1,167 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
4-SCHEDULED IN CURRENT FY 19-20
ADD EB AND WB LEFT TURN LANES ON LA 3125SPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3125: IMPROVEMENTS AT LA 642
H.012073
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JAMES LA 20 065-07 STPFLEX 577 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 20-21
ADD NB RIGHT TURN LANE ON LA 20SPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 20: IMPROVEMENTS AT LA 3127
H.013730
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JAMES LA 3274 256-32 STPFLEX 800 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 20-21
ADD EB/WB TURN LANESSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3274: LEFT TURNLANES @ LA 3125
H.013946
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JAMES LA 70 426-02 NHPP 3,000 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 20-21
ST JAMES LA 70 426-02 REIMB 1,000 PRESERVATION - BRIDGE (ONSYSTEM)
REPAIR OF PIER 4 FENDERBRAUNER, KURT Remrks:
Typ Imp:
Project:Prj Mgr:
LA 70: SUNSHINE BR. PIER 4 FENDER REPAIR
Page 1 - 45 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.013894
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JOHN I-10 450-13 NHPP 50 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
4-SCHEDULED IN CURRENT FY 19-20
ST CHARLES I-10 450-14 NHPP 200 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
PAVEMENT MARKING REPLACEMENTHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: I-55 TO JEFFERSON P/L RPM
ST JOHN
H.014140
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JOHN I-55 452-01 STPFLEX 2,300 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
4-SCHEDULED IN CURRENT FY 19-20
GRADE RAISING TO PREVENT CONSTANT SUBMERSION OF ROADWAYGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
I-55 SERVICE ROAD: GRADE RAISING
H.011515
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JOHN LA 44 256-01 STPFLEX 50 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
4-SCHEDULED FOR LETTING FY 20-21
ADDITIONAL PIPE(S), CATCH BASINS, AND/OR ASPHALTGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 44: PALM ST & BEECH ST DRAINAGE
H.013017
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JOHN 000-48 HSIP 1,500 RAILROADS 4-SCHEDULED FOR LETTING FY 20-21ST JOHN LA 636-1 848-05 RAIL PD 250 RAILROADS ST JOHN LA 3217 848-17 RAIL PD 250 RAILROADS
INSTALL F/L'S, GATES, AND BELLSSHREWSBERRY,BILL Remrks:
Typ Imp:USE TTF AS MATCH ON C.S. 848-05 & 848-17
Project:Prj Mgr:
IC RR CORRIDOR (ST JOHN THE BAPTIST)
H.013239
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JOHN US 61 007-04 STP>200K 2,365 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21
BIKE/PED IMPROVEMENTSLEBAS, MELISSA Remrks:
Typ Imp:ST. JOHN PARISH TO PROVIDE MATCH
Project:Prj Mgr:
US 61:LA 3188-ORMOND BLVD,BIKE/PED IMP
H.008332
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY LA 360 849-11 FBROFF 2,800 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED IN CURRENT FY 19-20
BRIDGE REPLACEMENTKEMP, KELLY Remrks:
Typ Imp:849-11-0010; USE NFA AS MATCH
Project:Prj Mgr:
LA 360: ROUGE BAYOU BRIDGE REPLACEMENT
ST LANDRY
H.012558
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY LA 182 032-03 STPFLEX 2,440 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED IN CURRENT FY 19-20
COLD PLANE, OVERLAY, PATCHING, AND RELATED WORKSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 182: END ONE WAY COUPLET - US 167
H.013198
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY US 190 012-13 NHPP 6,450 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED IN CURRENT FY 19-20
MILL, PATCH, OVERLAY, AND RELATED WORKMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 190 EB & WB: WALLIOR RD - LA 742
Page 1 - 46 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.013811
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY LA 104 202-03 STPFLEX 1,830 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED IN CURRENT FY 19-20
MILL, BASE STABILIZATION, AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 104: 2.5 MI NW US 190 - US 190
H.014117
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY LA 3043 849-38 NFA 1,855 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED IN CURRENT FY 19-20
BASE STABILIZATION, ASPHALT OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3043: 2.65 MI E LA 104 - LA 104
H.011808
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY LA 10 219-07 STPFLEX 3,337 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 20-21
BRIDGE REPLACEMENTWINDMANN, ANDREW Remrks:
Typ Imp:
Project:Prj Mgr:
LA 10: PALMETTO COMPANY CANAL BR
H.013200
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY US 190 012-13 NHPP 3,075 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED FOR LETTING FY 20-21
MILL, PATCH, OVERLAY, AND RELATED WORKMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 190 (EB): LA 742 - BAYOU COURTABLEU
H.013860
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY LA 742 012-30 RAIL PD 300 RAILROADS 4-SCHEDULED FOR LETTING FY 20-21
UPGRADE RR SIGNALSSHREWSBERRY,BILL Remrks:
Typ Imp:MATCH FROM RAILROAD
Project:Prj Mgr:
LA 742: UP RR XING (ST LANDRY)
H.014202
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY LA 91 849-23 STGEN 1,800 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED FOR LETTING FY 20-21
MILL, PATCH, ASPHALT OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 91: LA 757 - LA 13
H.011485
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARTIN LA 336-1 056-04 NHPP 4,731 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED IN CURRENT FY 19-20
CLEANING AND PAINTING, AND STRUCTURAL REPAIRSGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
LA336-1: BAYOU TECHE BRIDGE REHAB (HBI)
ST MARTIN
H.012574
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARTIN LA 96 238-02 STPFLEX 5,022 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED IN CURRENT FY 19-20
LAFAYETTE LA 96 238-01 STPFLEX 959 PRESERVATION - NON-INTERSTATEON STP SYSTEM
MILL, PATCH, & OVERLAYNOLAN, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 96: LA 182 - 0.56 MI. W. OF LA 31
H.013247
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARTIN I-10 450-06 NHPP 1,200 PRESERVATION - INTERSTATE 4-SCHEDULED IN CURRENT FY 19-20
EMBANKMENT, COLD PLANE, PATCH, OVERLAY, AND RELATED WORWKMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-10 RAMPS @ BUTTE LA ROSE
Page 1 - 47 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.013863
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARTIN I-10 450-06 NHPP 100 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
4-SCHEDULED IN CURRENT FY 19-20
PAVEMENT MARKING REPLACEMENTHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: PAVEMENT MARKER REPLACEMENT IV
H.012863
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARTIN 000-50 STP>200K 1,364 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21
OVERLAYRICHARD, RYAN Remrks:
Typ Imp:ST. MARTIN PARISH WILL PROVIDE MATCH
Project:Prj Mgr:
CYPRESS ISLAND HWY PAVEMENT PRESERVATIO
H.013819
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARTIN LA 350 400-30 STPFLEX 3,642 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 20-21
MOVABLE BRIDGE MECHANICAL, ELECTRICAL, STRUCTURAL REHABGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
LA 350: BYU TECHE MB REHAB (PARKS) (HBI)
H.014212
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARTIN I-10 450-06 NHPP 100 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 20-21
ST MARTIN I-10 450-06 NHPP 100 PRESERVATION - BRIDGE (ONSYSTEM)
ST MARTIN I-10 450-06 NHPP 100 PRESERVATION - BRIDGE (ONSYSTEM)
IBERVILLE I-10 450-07 NHPP 100 PRESERVATION - BRIDGE (ONSYSTEM)
NAVIGATION LIGHTINGARMENTOR, MICHAEL Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: ATCHAFALAYA BRS NAVIG LIGHT REPL
H.010829
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARY 000-51 RTP 125 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 19-20ST MARY 000-51 LOCAL 38 RECREATIONAL TRAILS PROGRAM
CONSTRUCTION OF MULTI-USE TRAILHEADSNUNES, BRIAN Remrks:
Typ Imp:NATIONAL RECREATIONAL TRAILS PROJECT
Project:Prj Mgr:
ST. MARY PARISH BAYOU TECHE TRAILHEADS
ST MARY
H.011706
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARY 000-51 DEMO 585 DEMO / HIGH PRIORITY 4-SCHEDULED FOR LETTING FY 20-21ST MARY 000-51 RAIL HE 452 RAILROADS ST MARY 000-51 LOCAL 63 RAILROADS
NEW ROAD CONSTRUCTION TO CLOSE THREE BNSF & LDRR CROSSINGLUKE, SHAWN Remrks:
Typ Imp:
Project:Prj Mgr:
BNSF SEVERAL RR XINGS (BALDWIN)
H.011723
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARY 000-51 RAIL HE 350 RAILROADS 4-SCHEDULED FOR LETTING FY 20-21
NEW ROAD CONSTRUCTION, RR CROSSING UPGRADE & RR CLOSURERAY, JARED Remrks:
Typ Imp:714-51-0010
Project:Prj Mgr:
COTTON & SILO: BNSF RR XINGS (ST MARY)
H.011937
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARY US 90 424-05 HSIPPEN 550 SAFETY 4-SCHEDULED FOR LETTING FY 20-21ASSUMPTION US 90 424-06 HSIPPEN 440 SAFETY
MEDIAN CABLE BARRIERDOMINGUE, CHRISTOPHER Remrks:
Typ Imp:
Project:Prj Mgr:
US 90: CABLE BARRIER IN ASSUMP & ST MARY
Page 1 - 48 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.013203
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARY US 90 424-05 NHPP 5,100 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED FOR LETTING FY 20-21
SEAL COAT, ASPHALT OVERLAY, ASPHALT SHOULDERS, & RELATED WRMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 90: LA 318 - LA 83
H.010668
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY 000-52 FBROFF 1,000 PRESERVATION - BRIDGE (OFFSYSTEM)
4-SCHEDULED IN CURRENT FY 19-20
ST TAMMANY 000-52 FBROFF 1,500 PRESERVATION - BRIDGE (OFFSYSTEM)
BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
MILLION DOLLAR RD/HOSMER MILL RD BRIDGES
ST TAMMANY
H.011216
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY 000-52 HSIPPEN 367 SAFETY - LOCAL ROADS SAFETY 4-SCHEDULED IN CURRENT FY 19-20
PURCHASE AND INSTALL PAVEMENT MARKINGS ON 12 LOCAL ROADSMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
CITY OF SLIDELL PAVEMENT MARKINGS
H.011260
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY US 190-X 013-10 HSIP 948 SAFETY 4-SCHEDULED IN CURRENT FY 19-20ST TAMMANY 000-52 HSIP 948 SAFETY
ROUNDABOUT CONSTRUCTIONTASSIN, BEN Remrks:
Typ Imp:
Project:Prj Mgr:
US 190B @ JEFFERSON AVE. ROUNDABOUT
H.011721
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 22 013-12 STP<200K 2,134 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 19-20ST TAMMANY LA 22 261-06 STP<200K 1,066 URBAN SYSTEMS
INTERSECTION IMPROVEMENTSRICHARD, RYAN Remrks:
Typ Imp:USE TTF AS MATCH
Project:Prj Mgr:
US 190/LA 22 IMPROVEMENTS
H.011921
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY 000-52 STP<200K 1,146 PRESERVATION - BRIDGE (OFFSYSTEM)
4-SCHEDULED IN CURRENT FY 19-20
BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
HWY 41 SPUR BRIDGE / GUM CREEK
H.012856
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY 000-52 STP<200K 798 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 19-20
REHABILITATIONRICHARD, RYAN Remrks:
Typ Imp:CITY OF SLIDELL WILL PROVIDE MATCH
Project:Prj Mgr:
NATCHEZ DRIVE REHABILITATION
H.012947
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY US 90 006-07 STPFLEX 400 OPER EFFICIENCY/MOTORISTASSISTANCE - MOVABLE BRIDGEREHABILITATION
4-SCHEDULED IN CURRENT FY 19-20
WIRE ROPE REPLACEMENTLAMBERT, JARRETT Remrks:
Typ Imp:
Project:Prj Mgr:
US 90: WEST PEARL BR WIRE ROPE REPL
Page 1 - 49 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.013151
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY US 190 852-24 STP<200K 624 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 19-20
SIDEWALK IMPROVEMENTSRICHARD, RYAN Remrks:
Typ Imp:CITY OF SLIDELL TO PROVIDE MATCH
Project:Prj Mgr:
US 190(GAUSE BLVD) SIDEWALK IMPROVEMENTS
H.013381
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY 000-52 STP<200K 277 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 19-20
TURN LANERICHARD, RYAN Remrks:
Typ Imp:CITY OF SLIDELL TO PROVIDE MATCH
Project:Prj Mgr:
LINDBERG DRIVE @ US 190(GAUSE BLVD)
H.013728
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 41 058-01 STPFLEX 4,200 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED IN CURRENT FY 19-20
MILL & OVERLAYBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 41: DUMP ROAD - LA 435
H.013866
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY I-12 454-04 EARMARK 11,250 CAPACITY 4-SCHEDULED IN CURRENT FY 19-20ST TAMMANY I-12 454-04 NHPP 5,750 CAPACITY ST TAMMANY I-12 454-04 EARMARK 10,000 CAPACITY ST TAMMANY I-12 454-04 EARMARK 10,000 CAPACITY
ROADWAY WIDENING INCLUDES BRIDGE WIDENING/REPLACEMENTFUSILIER, JACOB Remrks:
Typ Imp:ST. TAMMANY PARISH WILL PROVIDE MATCH
Project:Prj Mgr:
I-12: LA 21 TO US 190
H.014023
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY 000-52 STPFLEX 177 ROAD TRANSFER 4-SCHEDULED IN CURRENT FY 19-20
PATCH, CLEAN & RESEAL JOINTS, CRACKS IN PCCP, LINE STRIPINGTASSIN, BEN Remrks:
Typ Imp:
Project:Prj Mgr:
SLIDELL PARK AND RIDE REPAIRS
H.014153
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY I-12 454-04 STCASH 20 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 19-20
VOID DETECTIONHARPER, CALEB Remrks:
Typ Imp:OPERATING/MISCELLANEOUS REPAIR FUNDS WILL BE USED
Project:Prj Mgr:
I-12 WB USE OF GPR TO DETECT VOID
H.012457
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY I-10 450-18 NHPP 1,770 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
4-SCHEDULED FOR LETTING FY 20-21
ST TAMMANY I-10 450-19 NHPP 30 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
INSTALLATION OF SIGNS AND OTHER RELATED ITEMSFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
I-10 SIGNING (TWIN SPAN TO STATE LINE)
H.012572
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 21 030-01 STPFLEX 1,800 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED FOR LETTING FY 20-21
MILL & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 21: W. JCT. LA 1083-FAIRGROUNDS BLVD.
Page 1 - 50 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.012696
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 435-S 852-37 NFA 300 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED FOR LETTING FY 20-21
MILL & OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 435S: LA 435 - LA 41
H.013711
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY I-12 454-04 NHPP 1,900 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
4-SCHEDULED FOR LETTING FY 20-21
ST TAMMANY US 190 013-11 NHPP 100 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
NEW ITS EQUIPMENT, UPGRADE ITS EQUIPMENT, FIBER OPTIC CABLEESTEVEN, ROY Remrks:
Typ Imp:
Project:Prj Mgr:
NORTHSHORE PHASE 3 ITS DEPLOYMENT
H.013725
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY US 190 852-24 NHPP 1,000 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED FOR LETTING FY 20-21
P.C.C.P. REHABILITATIONMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 190: US 11 - I-10
H.013729
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY US 190 013-10 NHPP 2,600 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED FOR LETTING FY 20-21
MILL, PATCH, AND OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 190: LA 1077 - REDWOOD DR
H.013880
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY I-10 450-18 STPFLEX 275 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 20-21ST TAMMANY I-10 450-18 STPFLEX 233 ROAD TRANSFER
MILL, PATCH, OVERLAY AND STRIPINGTASSIN, BEN Remrks:
Typ Imp:
Project:Prj Mgr:
I-10 SERVICE ROADS-SLIDELL ROAD TRANSFER
H.014142
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY US 190 013-12 NHPP 850 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
4-SCHEDULED FOR LETTING FY 20-21
DRAINAGE IMPROVEMENTSGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
US 190: DRAINAGE IMPROVEMENTS (LACOMBE)
H.011519
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA LA 1063 853-34 STPFLEX 225 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
4-SCHEDULED IN CURRENT FY 19-20
ADDITIONAL PIPE(S), CATCH BASINS, AND/OR ASPHALTGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1063: GLENDALE DR - US 51 DRAINAGE
TANGIPAHOA
H.013271
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA 000-53 HSIPPEN 1,682 SAFETY - LOCAL ROADS SAFETY 4-SCHEDULED IN CURRENT FY 19-20
INSTALL SIGNS, STRIPING, PAVEMENT MARKING & OTHER SAFETYIMPRMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
TANGIPAHOA PH LOCAL ROAD SAFETY UPGRADE
Page 1 - 51 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.013334
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA LA 16 047-01 STPFLEX 62 RAILROADS 4-SCHEDULED IN CURRENT FY 19-20TANGIPAHOA LA 16 047-01 LOCAL 37 RAILROADS
REPLACE RAILROAD CROSSING SURFACELUKE, SHAWN Remrks:
Typ Imp:MATCH FROM RAILROAD
Project:Prj Mgr:
LA 16: IC RR XING (AMITE)
H.011512
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA US 51 017-05 STPFLEX 100 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
4-SCHEDULED FOR LETTING FY 20-21
ADDITIONAL PIPE(S), CATCH BASINS, AND/OR ASPHALTGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
US 51 @ SYCAMORE ST AMITE CITY DRAINAGE
H.013520
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA 000-53 STP<200K 225 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21
SIDEWALKSRICHARD, RYAN Remrks:
Typ Imp:CITY OF PONCHATOULA WILL PROVIDE MATCH.
Project:Prj Mgr:
BARRINGER DRIVE SIDEWALKS
H.013740
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA LA 10 061-09 STPFLEX 480 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED FOR LETTING FY 20-21
THIN OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 10: ST. HELENA PL - I-55 COA
H.013886
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA LA 3158 853-39 STP<200K 500 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21
TSM IMPROVEMENTSRICHARD, RYAN Remrks:
Typ Imp:CITY OF HAMMOND AND TANGIPAHOA PARISH
Project:Prj Mgr:
LA 3158: I-12 TO HIPARK RD
H.013938
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA LA 3234 853-40 STP<200K 1,300 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21
SIDEWALKSRICHARD, RYAN Remrks:
Typ Imp:MATCH PROVIDED BY TANGIPAHOA PARISH
Project:Prj Mgr:
LA 3234 UNIVERSITY AVE SIDEWALKS
H.014073
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA LA 22 261-04 STPFLEX 1,100 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED FOR LETTING FY 20-21
MILL AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 22: US 51 - DUNSON RD
H.013742
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TENSAS LA 575 351-01 NFA 2,133 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED IN CURRENT FY 19-20
PATCH & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 575: LA 4 - LA 888
TENSAS
H.013735
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TENSAS LA 573 186-04 STPFLEX 2,000 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED FOR LETTING FY 20-21
PATCH & OVERLAYMAY, BRIAN Remrks:
Typ Imp:USE NFA AS MATCH
Project:Prj Mgr:
LA 573:COOTER POINT RD-BIG CHOCTAW BAYOU
Page 1 - 52 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.010410
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 24 065-04 NHPP 7,479 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED IN CURRENT FY 19-20
COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETEMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 24/LA 20: LA 664 - DUCROS RD
TERREBONNE
H.011533
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE 000-55 FBROFF 729 PRESERVATION - BRIDGE (OFFSYSTEM)
4-SCHEDULED IN CURRENT FY 19-20
BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
N. BAYOU BLACK DRIVE / HANSON CANAL
H.012949
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 315 245-90 NHPP 250 OPER EFFICIENCY/MOTORISTASSISTANCE - MOVABLE BRIDGEREHABILITATION
4-SCHEDULED IN CURRENT FY 19-20
MOVABLE BRIDGE MACHINERY REPAIRSLAMBERT, JARRETT Remrks:
Typ Imp:
Project:Prj Mgr:
DULARGE BR LOCK BAR REHABILITATION
H.012957
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 24 065-91 STPFLEX 350 OPER EFFICIENCY/MOTORISTASSISTANCE - MOVABLE BRIDGEREHABILITATION
4-SCHEDULED IN CURRENT FY 19-20
ELECTRICAL REHABRODY, WALTER Remrks:
Typ Imp:
Project:Prj Mgr:
LA 24: PRESQUE ISLE BR ELEC REHAB
H.013756
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 311 413-01 STPFLEX 623 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
4-SCHEDULED IN CURRENT FY 19-20
ADD LEFT TURN LANE AT LA 311 AND ELLENDALE BLVDBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 311: LEFT TURN LANE AT ELLENDALE
H.002238
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 56 247-01 NFA 1,200 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 20-21
BRIDGE REPLACEMENTYAP, KIAN Remrks:
Typ Imp:247-01-0009
Project:Prj Mgr:
LA 56: ROBINSON CANAL BRIDGE
H.012338
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE 000-55 STP<200K 368 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21
NEW SIDEWALKSRICHARD, RYAN Remrks:
Typ Imp:TERREBONNE PARISH PROVIDING THE MATCH
Project:Prj Mgr:
CIVIC CENTER SIDEWALKS
H.012339
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 24 065-04 STP<200K 781 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21TERREBONNE LA 182 005-05 STP<200K 319 URBAN SYSTEMS
SIDEWALK REHABILITATIONRICHARD, RYAN Remrks:
Typ Imp:TERREBONNE PARISH TO PROVIDE MATCH
Project:Prj Mgr:
LA 24 SIDEWALK REHAB
Page 1 - 53 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.012994
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 3197 855-18 NFA 175 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED FOR LETTING FY 20-21
RESURFACE EXISTING ROADWAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3197: BARROW ST - LA 182
H.013213
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 3040 065-30 NHPP 4,000 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED FOR LETTING FY 20-21
MILL, PATCH, AND OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3040: 600' S HOLLYWOOD - LA 24
H.013340
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE 000-55 STP<200K 973 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21
MULTI-USE PATHRICHARD, RYAN Remrks:
Typ Imp:TERREBONNE PARISH PROVIDING MATCH
Project:Prj Mgr:
VALHI BLVD, MULTI-USE TRAIL, PHASE 1
H.013741
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 55 248-02 STPFLEX 2,000 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED FOR LETTING FY 20-21
MILL AND OVERLAY AND PATCHINGSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 55: HUMBLE CANAL TO LA 58
H.013761
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 315 245-90 STPFLEX 301 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
4-SCHEDULED FOR LETTING FY 20-21
LAFOURCHE LA 24 065-01 STPFLEX 380 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
TERREBONNE LA 20 244-01 STPFLEX 366 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
LAFOURCHE LA 3087 829-28 STPFLEX 417 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
APPROACH SLAB LEVELING WITH ASPHALT CONCRETESPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 02 APPR SLAB LEVELING PHASE 2
H.010392
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
UNION LA 550 311-01 STPFLEX 2,138 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED FOR LETTING FY 20-21
OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 550: LA 2 - LA 15
UNION
H.011661
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
UNION LA 33 069-03 STPFLEX 210 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 20-21
WIDEN INTERSECTION WITH ASPHALTIC CONCRETEHICKS, MELVIN Remrks:
Typ Imp:
Project:Prj Mgr:
INTERSECTION IMPROVEMENT LA 33 @ LA 15
Page 1 - 54 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.010867
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERMILION 000-57 FBROFF 502 PRESERVATION - BRIDGE (OFFSYSTEM)
4-SCHEDULED IN CURRENT FY 19-20
VERMILION 000-57 FBROFF 759 PRESERVATION - BRIDGE (OFFSYSTEM)
BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
JUDE & PLACIDE ROAD BRIDGES
VERMILION
H.009627
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERMILION LA 35 207-02 STPFLEX 2,234 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED FOR LETTING FY 20-21
COLD PLANE, PATCH & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 35: LA 335 - LA 14
H.012099
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERMILION LA 13 057-01 STPFLEX 2,036 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED FOR LETTING FY 20-21
COLD PLANE, PATCH, OVERLAY, & RELATED WORKSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 13: 2.7 MI. N. LA 14 - ACADIA P/L
H.012946
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERMILION LA 697 857-06 NFA 2,935 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED FOR LETTING FY 20-21
BASE STABILIZATION, ASPHALT OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 697: LA 343 - US 167
H.013515
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERMILION LA 92 213-03 STP>200K 2,250 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21
PAVEMENT PRESERVATION AND TURN LANERICHARD, RYAN Remrks:
Typ Imp:DOTD TO PROVIDE MATCH.
Project:Prj Mgr:
LA 92: PAVEMENT PRESERVATION
H.013950
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERMILION LA 3287 870-30 NFA 1,218 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 20-21
STABILIZE BASE, ASPHALT OVERLAY, AND RELATED WORKDOMINGUE, CHRISTOPHER Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3287: LA 700 - LA 343
H.006339
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERNON 000-58 FBROFF 795 PRESERVATION - BRIDGE (OFFSYSTEM)
4-SCHEDULED IN CURRENT FY 19-20
BRIDGE REPLACEMENT - ROADWAY REALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
SECTION LINE ROAD BRIDGE
VERNON
H.010339
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERNON LA 10 066-02 FLH 2,190 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED IN CURRENT FY 19-20
VERNON LA 10 066-02 STPFLEX 791 PRESERVATION - NON-INTERSTATEON STP SYSTEM
MILL, BASE REHABILITATION AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 10: LOOK OUT RD - 850' E BAILEY RD
Page 1 - 55 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.014159
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERNON LA 111 133-02 STPFLEX 113 RAILROADS 4-SCHEDULED IN CURRENT FY 19-20VERNON LA 111 133-02 LOCAL 68 RAILROADS
REPLACE RAILROAD CROSSING SURFACELUKE, SHAWN Remrks:
Typ Imp:MATCH FROM RR
Project:Prj Mgr:
LA 111: KCS RR XING (ANACOCO)
H.001883
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERNON LA 465 137-02 NFA 3,250 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED FOR LETTING FY 20-21
MILL, BASE REHAB & OVERLAYMAY, BRIAN Remrks:
Typ Imp:137-02-0017
Project:Prj Mgr:
LA 465: LA 8 - LA 28
H.006338
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERNON 000-58 FBROFF 400 PRESERVATION - BRIDGE (OFFSYSTEM)
4-SCHEDULED FOR LETTING FY 20-21
BRIDGE REPLACEMENT - NO REALIGNMENTNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
HOLTON HARRIS ROAD BRIDGE
H.012933
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERNON LA 111 132-03 STPFLEX 300 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
4-SCHEDULED FOR LETTING FY 20-21
ASPHALT SURFACE TREATMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 111: LA 8 TO JOHN KELL LOOP-AST
H.014129
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERNON LA 489 858-12 NFA 1,341 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED FOR LETTING FY 20-21
MEDIUM OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 489: FORT POLK TO LA 121
H.014143
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERNON LA 121 029-04 STPFLEX 242 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
4-SCHEDULED FOR LETTING FY 20-21
REPLACE EXISTING UNDERSIZED CROSS DRAINGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 121: CROSS DRAIN REPLACE LM 10.1
H.013732
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WASHINGTON LA 450 859-05 STPFLEX 900 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED FOR LETTING FY 20-21
MILL AND OVERLAYMAY, BRIAN Remrks:
Typ Imp:NFA AS MATCH
Project:Prj Mgr:
LA 450: LA 440 - LA 1056
WASHINGTON
H.014210
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WEBSTER US 80 001-04 STGEN 2,500 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 19-20WEBSTER US 80 001-04 STGEN 444 OTHER / MISCELLANEOUS
ROADWAY LOWERING AND DRAINAGE IMPROVEMENTSSTURDIVANT, PHILLIP Remrks:
Typ Imp:SECRETARY'S EMERGENCY FUND LETTER DATED 11/18/2019
Project:Prj Mgr:
US 80: ROADWAY LOWERING AT I-20
WEBSTER
Page 1 - 56 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.009513
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WEBSTER LA 164 122-03 STPFLEX 3,114 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED FOR LETTING FY 20-21
ASPHALT OVERLAY, DRAINAGE, PAVEMENT STRIPING & RLEATED WORKSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 164: JCT. LA 163 TO JCT. US 371
H.010974
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WEBSTER US 79 027-04 STPFLEX 1,200 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 20-21
ADDING LEFT TURN LANE AT MILLER ROAD (WEBSTER PARISH)SPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 79: NB LEFT TURN LANE AT MILLER ROAD
H.012873
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WEBSTER 000-60 RAIL HE 50 RAILROADS 4-SCHEDULED FOR LETTING FY 20-21
REMOVE CROSSING AND ITS ROAD APPROACHESSHREWSBERRY,BILL Remrks:
Typ Imp:
Project:Prj Mgr:
OLD US 80: LAS RR XING (WEBSTER)
H.014081
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WEBSTER US 371 086-01 STPFLEX 325 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 20-21
TURN LANE EXTENSIONSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 371: TURN LANE EXTENSION AT US 80
H.011558
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W BATON ROUGE 000-61 CM 610 CONGESTION MITIGATION 4-SCHEDULED IN CURRENT FY 19-20
CONSTRUCT ACADIAN TRAILHANKS, ANNA Remrks:
Typ Imp:USE LOCAL AS MATCH
Project:Prj Mgr:
ACADIAN TRAIL (WEST BATON ROUGE)
W BATON ROUGE
H.012076
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W BATON ROUGE LA 415 013-01 NHPP 198 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
4-SCHEDULED IN CURRENT FY 19-20
ADD NB RIGHT TURN LANE ON LA 415SPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 415: IMPROVEMENTS AT PLANTATION AVE
H.012212
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W BATON ROUGE 000-61 RTP 112 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 19-20W BATON ROUGE 000-61 LOCAL 59 RECREATIONAL TRAILS PROGRAM
CONSTRUCTION OF 1055' CONCRETE TRAIL & 800 SQ.FT. OVERLOOKNUNES, BRIAN Remrks:
Typ Imp:CRT IS THE PROJECT MANAGER
Project:Prj Mgr:
WEST BATON ROUGE MUSEUM LEVEE TRAIL
H.012834
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W BATON ROUGE LA 988 861-14 CM 86 CONGESTION MITIGATION 4-SCHEDULED IN CURRENT FY 19-20W BATON ROUGE 000-61 CM 345 CONGESTION MITIGATION
CONSTRUCT TRAILNUNES, BRIAN Remrks:
Typ Imp:ENTITY PROVIDES THE MATCH
Project:Prj Mgr:
JOLIET TRAIL (BRUSLY)
Page 1 - 57 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.013191
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W BATON ROUGE LA 1 050-07 NHPP 7,000 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED IN CURRENT FY 19-20
IBERVILLE LA 1 050-06 NHPP 700 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
MILL, PATCH & OVERLAYNOLAN, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1: LA 75 - PORT ALLEN CANAL BR
H.013891
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W BATON ROUGE I-10 450-08 NHPP 60 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
4-SCHEDULED IN CURRENT FY 19-20
IBERVILLE I-10 450-07 NHPP 40 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
PAVEMENT MARKING REPLACEMENTHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: LA 415 TO RAMAH (RPMS)
H.014037
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W BATON ROUGE LA 990 861-15 STCASH 203 ROAD TRANSFER 4-SCHEDULED IN CURRENT FY 19-20
TRANSFER OF LA 990 TO THE TOWN OF ADDISPORTER BETTS, CONNIE Remrks:
Typ Imp:
Project:Prj Mgr:
LA 990: TOWN OF ADDIS (RT)
H.001234
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W BATON ROUGE LA 1 050-07 NHPP 75,000 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 20-21
BRIDGE REPLACEMENTDELATTE, BRIAN Remrks:
Typ Imp:050-07-0066;2 STRUCTURES PRIORITY BRIDGE PROJECT
Project:Prj Mgr:
LA 1:PORT ALLEN CANAL BR REPL (PH1)(HBI)
H.011133
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W BATON ROUGE LA 1 050-07 STPFLEX 300 RAILROADS 4-SCHEDULED FOR LETTING FY 20-21
REMOVE CROSSINGLUKE, SHAWN Remrks:
Typ Imp:H.011133 MUST LET BEFORE H.009288
Project:Prj Mgr:
LA 1: UP RR XING (WEST BATON ROUGE)
H.014013
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W BATON ROUGE 000-61 STPFLEX 19 RAILROADS 4-SCHEDULED FOR LETTING FY 20-21W BATON ROUGE 000-61 LOCAL 11 RAILROADS
CONNECT CROSSING WITH TRAFFIC SIGNAL FOR PREEMPTIONLUKE, SHAWN Remrks:
Typ Imp:MATCH FROM RR
Project:Prj Mgr:
LA 1 & AVE G: UP PREEMPTION (PORT ALLEN)
H.014146
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W BATON ROUGE US 190 008-01 NHPP 3,000 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED FOR LETTING FY 20-21
POINTE COUPEE US 190 008-02 NHPP 11,500 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
MILL, STABILIZE BASE & SHOULDERS, ASPHALT OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 190: HIGDON LN - 0.5 MI W OF LA 978
H.014188
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W BATON ROUGE LA 986 228-07 STP>200K 550 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 20-21
PAVEMENT REHABILITATIONLEBAS, MELISSA Remrks:
Typ Imp:WEST BATON ROUGE PARISH TO PROVIDE MATCH
Project:Prj Mgr:
LA 986 PAVEMENT REHABILITATION
Page 1 - 58 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.008469
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W CARROLL LA 835 862-22 STPFLEX 3,551 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 20-21
NEW BRIDGEREVIERE, RYAN Remrks:
Typ Imp:862-22-0006
Project:Prj Mgr:
LA 835: BOEUF RIVER BRIDGE NEAR CONCORD
W CARROLL
H.010393
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W CARROLL LA 582 333-02 STPFLEX 3,000 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED FOR LETTING FY 20-21
STABILIZED BASE & OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 582: JCT LA 17 TO EAST CARROLL LINE
H.010597
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W FELICIANA 000-63 FBROFF 3,879 PRESERVATION - BRIDGE (OFFSYSTEM)
4-SCHEDULED IN CURRENT FY 19-20
W FELICIANA 000-63 FBROFF 1,000 PRESERVATION - BRIDGE (OFFSYSTEM)
BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
SLIGO ROAD BRIDGES
W FELICIANA
H.011576
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W FELICIANA LA 965 863-06 STP<5K 1,600 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED FOR LETTING FY 20-21
STABILIZE & OVERLAYMAY, BRIAN Remrks:
Typ Imp:NFA AS MATCH
Project:Prj Mgr:
LA 965: LA 966 TO LA 10
H.012157
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WINN LA 1228 864-04 STPFLEX 1,200 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
4-SCHEDULED FOR LETTING FY 20-21
REPLACE CROSS DRAINS AND RAISE ROADWAY TO PREVENT FLOODINGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1228:CROSS DRAIN REPLACEMENT (WINN)
WINN
H.012951
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WINN LA 126 091-08 STPFLEX 4,260 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED FOR LETTING FY 20-21
MILL, IN-PLACE CEMENTED BASE, OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 126: LA 1237 TO CALDWELL P/L
H.013820
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WINN LA 501 093-01 STPFLEX 300 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 20-21
BRIDGE REPLACEMENTWINDMANN, ANDREW Remrks:
Typ Imp:
Project:Prj Mgr:
LA 501: IRON BRANCH BRIDGE
Page 1 - 59 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.009056
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 07 000-97 NHPP 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
4-SCHEDULED IN CURRENT FY 19-20
PLASTIC PAVEMENT STIPING AND RAISED PAVEMENT MARKERSHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-210: PAVEMENT MARKER REPLACEMENT II
DISTRICT 07
H.009199
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 61 000-96 NHPP 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
4-SCHEDULED IN CURRENT FY 19-20
PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERSHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: PAVEMENT MARKING REPLACEMENT XII
DISTRICT 61
H.013096
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 61 000-96 FEMA 798 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 20-21
RETROFIT EXISTING WINDOWS TO 21 BUILDINGS IN DISTRICT 61NEYLAND, CODI Remrks:
Typ Imp:
Project:Prj Mgr:
DIST. 61 HURRICANE PROTECTION SCREENS
H.013841
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
STATEWIDE 000-99 STPFLEX 300 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
4-SCHEDULED IN CURRENT FY 19-20
SEA, RFP DEVELOPMENT AND IMPLEMENTATION OF REPLACEMENT VDDEVILLE, ROSALINDA Remrks:
Typ Imp:
Project:Prj Mgr:
VDMS SYSTEM REPLACEMENT
STATEWIDE
H.013848
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
STATEWIDE 000-99 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
4-SCHEDULED IN CURRENT FY 19-20
ATMS INET ENHANCEMENTS PROJECTDEVILLE, ROSALINDA Remrks:
Typ Imp:
Project:Prj Mgr:
ATMS INET ENHANCEMENTS PROJECT
H.013868
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
STATEWIDE 000-99 STPFLEX 3,000 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
4-SCHEDULED IN CURRENT FY 19-20
STATEWIDE 000-99 STPFLEX 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
STATEWIDE 000-99 STPFLEX 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
STATEWIDE 000-99 STPFLEX 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
MANAGEMENT, OPERATIONS, AND MAINTENANCE OF ITS DEVICESSMITH, ERIK Remrks:
Typ Imp:
Project:Prj Mgr:
ITS MGMT, OPERATIONS, & MAINT STATEWIDE
H.013899
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
STATEWIDE 000-99 FB DISCR 1,069 OPER EFFICIENCY/MOTORISTASSISTANCE - FERRY PROJECTS
4-SCHEDULED IN CURRENT FY 19-20
STATEWIDE 000-99 LOCAL 50 OPER EFFICIENCY/MOTORISTASSISTANCE - FERRY PROJECTS
DRYDOCK FOR USCG EXAM AND REPAIRSSIBLEY, STEVEN Remrks:
Typ Imp:PLAQUEMINES PARISH GOVERNMENT PROVIDING MATCH
Project:Prj Mgr:
M/V PLAQUEMINES PRIDE DRYDOCK & USCG EXA
Page 1 - 60 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 20214-SCHEDULED FOR LETTING
H.014006
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
STATEWIDE 000-99 STCASH 1,400 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 19-20
REPAIRS TO EXISTING IMPACT ATTENUATORSCALDWELL, SHANE Remrks:
Typ Imp:
Project:Prj Mgr:
STATEWIDE IMPACT ATTENUATOR REPAIR
H.014007
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
STATEWIDE 000-99 STCASH 1,300 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 19-20
REPAIRS TO EXISTING CABLE BARRIERSCALDWELL, SHANE Remrks:
Typ Imp:
Project:Prj Mgr:
STATEWIDE CABLE BARRIER REPAIR
H.014201
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
STATEWIDE 000-99 FB DISCR 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - FERRY PROJECTS
4-SCHEDULED FOR LETTING FY 20-21
DRYDOCK FOR USCG EXAM AND REPAIRSSIBLEY, STEVEN Remrks:
Typ Imp:PLAQUEMINES PARISH GOVERNMENT PROVIDING MATCH
Project:Prj Mgr:
M/V POINTE-A-LA-HACHE DRYDOCK &USCG EXAM
L.000006
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- NHPP 2,100 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
4-SCHEDULED FOR LETTING FY 20-21
- STP>200K 2,800 URBAN SYSTEMS - STP<200K 690 URBAN SYSTEMS
MAPNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
MOTORIST ASSISTANCE PATROL
L-PROJECTS
L.000028
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- STCASH 5,000 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 20-21
HOT MIX, PIPE, BRIDGE MATERIAL, ETCNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
MAINTENANCE MATERIALS
L.000030
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- STCASH 1,500 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 20-21
Not assigned Remrks:
Typ Imp:
Project:Prj Mgr:
IMPACT ATTENUATOR REPLACEMENT/REPAIR
L.000059
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- STCASH 1,250 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 20-21
Not assigned Remrks:
Typ Imp:
Project:Prj Mgr:
CABLE BARRIER REPLACEMENT/REPAIR
L.000098
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- STCASH 2,500 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 20-21
Not assigned Remrks:
Typ Imp:
Project:Prj Mgr:
GUARDRAIL REPLACEMENT/REPAIR
Page 1 - 61 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
PROJECTS IN DEVELOPMENT
Per RS 48:230, the following is “…an additional list of
projects proposed to be commenced within the ensuing four
years which are in various stages of planning and
preparation. This list shall be subject to change by the
department until the department finally approves each
project for construction.”
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.010222
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA LA 97 201-03 STPFLEX 4,130 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
STABILIZE BASE & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 97: LA 98 - LA 368
ACADIA
H.011922
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA 000-01 STP<5K 1,179 ROAD TRANSFER 3-DESIGN/DEVELOPMENT
PATCH, WIDEN, BASE REHAB, ASPHALT OVERLAY, DRAIN., & RELATEDMCMILLAN, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1112 - LA 13 (ROAD TRANSFER IMP.)
H.012021
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA US 90 003-10 TAP<200K 459 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SIDEWALK IMPROVEMENTSNUNES, BRIAN Remrks:
Typ Imp:MATCH PROVIDED BY CITY OF RAYNE.
Project:Prj Mgr:
US 90: ADAMS AVE SW IMPROVEMENTS, PH IV
H.012024
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA 000-01 TAP<200K 761 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SIDEWALK IMPROVEMENTSNUNES, BRIAN Remrks:
Typ Imp:LOCAL MATCH PROVIDED BY THE CITY OF CROWLEY
Project:Prj Mgr:
CROWLEY: PARKERSON AVE SW IMPROVEMENTS
H.012174
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA I-10 450-04 FREIGHT-HY 14,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENTLAFAYETTE I-10 450-05 FREIGHT-HY 6,000 PRESERVATION - INTERSTATE
OGFC, APPROACH SLAB & EMBANKMENT SLIDE REPAIR & RELATEDMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-10:JEFF DAV PL-I-49 (OGFC/SLAB REPAIR)
H.012892
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA LA 1123 801-04 NFA 960 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
ACADIA LA 3116 801-61 STPFLEX 1,320 PRESERVATION - BRIDGE (ONSYSTEM)
LAFAYETTE LA 723 828-03 STPFLEX 240 PRESERVATION - BRIDGE (ONSYSTEM)
ST MARTIN LA 321 850-19 NFA 960 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:
Typ Imp:
Project:Prj Mgr:
DIST03:ABC BR REPLACE AC,LAF,ST MAR PARS
H.012919
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA LA 100 211-30 NFA 4,390 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
BASE STABILIZATION, ASPHALT OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 100: LA 97 - LA 91
Page 2 - 1 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.012923
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA LA 91 801-11 STPFLEX 1,006 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
3-DESIGN/DEVELOPMENT
ACADIA LA 91 211-04 STPFLEX 559 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
ACADIA LA 91 211-03 STPFLEX 671 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
THIN ASPHALT OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 91: LA 3067 - W JCT ST LANDRY PL
H.013195
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA LA 98 210-04 HSIP 1,042 SAFETY 3-DESIGN/DEVELOPMENTACADIA LA 98 210-04 STPFLEX 1,500 PRESERVATION - NON-INTERSTATE
NFA
ACADIA LA 98 210-04 STPFLEX 1,415 PRESERVATION - BRIDGE (ONSYSTEM)
BASE STABILIZATION, OVERLAY, AND CURVE REALIGNMENTMOORE, DARRELL Remrks:
Typ Imp:
Project:Prj Mgr:
LA 98 CURVE REALIGNMENT
H.013363
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA LA 1111 801-30 STPFLEX 1,600 ROAD TRANSFER 3-DESIGN/DEVELOPMENTACADIA LA 1111 801-30 STPFLEX 900 ROAD TRANSFER
WIDEN LA 1111 TO ADD A CONTINUOUS TURN LANENUNES, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1111 WIDENING: LA 13 - LA 1111-S
H.013790
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA LA 98 389-01 STPFLEX 1,200 ROAD TRANSFER 3-DESIGN/DEVELOPMENT
ASPHALT OVERLAY WITH ISOLATED RECONSTRUCTIONPORTER BETTS, CONNIE Remrks:
Typ Imp:
Project:Prj Mgr:
LA 98: LA 35 - LLAMA RD
H.014220
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA 000-01 FBROFF 345 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENT NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
NATION ROAD OVER COULEE DURALDE
H.013772
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA 000-01 0 SAFETY - LOCAL ROADS SAFETY 0-FEASIBILITY/SCOPING
FEASIBILITY STUDYRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
SYSTEMIC CURVE SIGNING (ACADIA)
H.012039
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ALLEN LA 372 802-05 NFA 1,121 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTBABAIZADEH, HAMED Remrks:
Typ Imp:
Project:Prj Mgr:
LA 372: CREEK BRIDGE
ALLEN
Page 2 - 2 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.012899
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ALLEN LA 10 066-04 STPFLEX 480 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BEAUREGARD LA 389 187-04 STPFLEX 2,280 PRESERVATION - BRIDGE (ONSYSTEM)
BEAUREGARD LA 1147 806-02 NFA 2,040 PRESERVATION - BRIDGE (ONSYSTEM)
BEAUREGARD LA 27 031-09 NHPP 600 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:
Typ Imp:
Project:Prj Mgr:
DIST07:ABC BR REP ALLEN, BEA, J DAV PARS
H.013958
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ALLEN 000-02 STP<5K-E 2,842 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTRANCK, AMANDA Remrks:
Typ Imp:
Project:Prj Mgr:
CARPENTERS BR RD OVER WHISKEY CHITTO CR
H.013959
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ALLEN 000-02 STP<5K-E 1,103 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTRANCK, AMANDA Remrks:
Typ Imp:
Project:Prj Mgr:
REEDS BR RD OVER CALCASIEU RIVER RELIEF
H.014003
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ALLEN 000-02 STPFLEX 30 RAILROADS 3-DESIGN/DEVELOPMENT
CONNECT CROSSING WITH TRAFFIC SIGNAL FOR PREEMPTIONLUKE, SHAWN Remrks:
Typ Imp:
Project:Prj Mgr:
7TH AVE@US 165:UP RR PREEMPTION(OAKDALE)
H.014241
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ALLEN LA 10 066-04 STGEN 641 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTTOURRES, VALERIE Remrks:
Typ Imp:AC
Project:Prj Mgr:
LA 10: MILL CREEK BRIDGE
H.006457
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION 000-03 HSIPPEN 1,000 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENTASCENSION 000-03 STP>200K 500 URBAN SYSTEMS
ROUNDABOUT CONSTRUCTIONRIGGS, LAURA Remrks:
Typ Imp:737-03-0104
Project:Prj Mgr:
ROUNDABOUT @ PR 929 & PARKER ROADS
ASCENSION
H.006459
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION 000-03 HSIPPEN 1,000 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENTASCENSION 000-03 STP>200K 600 URBAN SYSTEMS
ROUNDABOUTRIGGS, LAURA Remrks:
Typ Imp:LOCAL FUNDS PROVIDED BY ASCENSION PARISH
Project:Prj Mgr:
ROUNDABOUT AT CHURCHPOINT RD AND RODDY
H.010074
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION LA 3089 426-01 RAIL HE 250 RAILROADS 3-DESIGN/DEVELOPMENT
ROAD WORK AROUND CROSSING TO MAKE SAFERSHREWSBERRY,BILL Remrks:
Typ Imp:426-01-0026
Project:Prj Mgr:
UP (DONALDSONVILLE) LA 3089 SERVICE RD.
Page 2 - 3 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.010795
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION LA 42 260-01 HSIP 1,497 SAFETY 3-DESIGN/DEVELOPMENTASCENSION 000-03 HSIP 966 SAFETY
INSTALL SINGLE LANE ROUNDABOUTMOORE, DARRELL Remrks:
Typ Imp:
Project:Prj Mgr:
LA 42: ROUNDABOUT AT JOE SEVARIO ROAD
H.011577
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION LA 18 063-10 STPFLEX 2,278 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
ST JAMES LA 18 063-09 STPFLEX 222 PRESERVATION - NON-INTERSTATENFA
COLD PLANE & OVERLAYBROWN, JOSEPH C. Remrks:
Typ Imp:USE NFA AS MATCH
Project:Prj Mgr:
LA 18: SUNSHINE BR - LA 3120
H.012057
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION LA 431 267-02 STPFLEX 1,301 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTHERATH, ANANDA Remrks:
Typ Imp:
Project:Prj Mgr:
LA 431:VILLAR CANAL AND DRAINAGE BRIDGES
H.012713
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION LA 74 264-03 STPFLEX 2,000 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
ASCENSION LA 74 264-02 STPFLEX 1,800 PRESERVATION - NON-INTERSTATEON STP SYSTEM
STABILIZE AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 74: IBERVILLE P/L - US 61
H.013012
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION LA 943 803-01 NFA 480 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
ASCENSION LA 621 803-08 STPFLEX 480 PRESERVATION - BRIDGE (ONSYSTEM)
ASCENSION LA 934 803-12 STPFLEX 480 PRESERVATION - BRIDGE (ONSYSTEM)
ASCENSION LA 935 803-21 STPFLEX 512 PRESERVATION - BRIDGE (ONSYSTEM)
ASSUMPTION LA 308 407-08 STPFLEX 600 PRESERVATION - BRIDGE (ONSYSTEM)
E FELICIANA LA 963 819-19 NFA 720 PRESERVATION - BRIDGE (ONSYSTEM)
POINTE COUPEE LA 970 839-05 NFA 360 PRESERVATION - BRIDGE (ONSYSTEM)
POINTE COUPEE LA 81 839-08 NFA 720 PRESERVATION - BRIDGE (ONSYSTEM)
W BATON ROUGE LA 986 228-07 STPFLEX 480 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:
Typ Imp:
Project:Prj Mgr:
DIST61:ABC BR RP AC,AS,E FL,P CO,WBR PAR
H.013458
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION 000-03 FBROFF 388 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
ASCENSION 000-03 FBROFF 256 PRESERVATION - BRIDGE (OFFSYSTEM)
BRIDGE REPLACEMENT, NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
MANCHAC ACRES RD & H H WILSON RD BRIDGES
Page 2 - 4 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.013621
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION 000-03 HSIPPEN 166 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT
SIGNS, STRIPING, TURN LANES, CROSS OVERSRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
LRSP SIGNS, STRIPING & X-OVERS(GONZALES)
H.013793
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION 000-03 STP>200K 3,600 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
WIDENING/RECONSTRUCTIONLEBAS, MELISSA Remrks:
Typ Imp:ASCENSION PARISH PROVIDING MATCH
Project:Prj Mgr:
GERMANY RD WIDENING (US 61 TO LA 44)
H.013850
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION 000-03 STP>200K 2,970 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
MINOR WIDENINGLEBAS, MELISSA Remrks:
Typ Imp:ASCENSION PARISH TO PROVIDE THE MATCH
Project:Prj Mgr:
DUPLESSIS RD WIDENING (US 61 - LA 73)
H.013934
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION 000-03 RTP 113 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTASCENSION 000-03 LOCAL 56 RECREATIONAL TRAILS PROGRAM
CONST. OF A PADDLE TRAILHEADNUNES, BRIAN Remrks:
Typ Imp:CITY OF DONALDSONVILLE WILL PROVIDE THE LOCAL MATCH
Project:Prj Mgr:
BAYOU LAFOURCHE RECREATIONAL PARK - PH.1
H.014087
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION US 61 007-06 NHPP 9,000 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
MILL, PATCH, AND OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 61: ST. JAMES PL - 2450' S. OF LA 22
H.014104
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION LA 1 050-05 NHPP 4,000 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
MILL AND OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1: LA 3089 - IBERVILLE P/L
H.014116
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION LA 943 803-01 NFA 5,000 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
STABILIZE BASE & OVERLAYBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 943: LA 308 TO LA 1 N. INTERSECTION
H.014131
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION LA 22 266-01 NHPP 300 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
3-DESIGN/DEVELOPMENT
ASCENSION LA 73 077-02 STPFLEX 300 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
PCC PATCHINGSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 22 & LA 73: PCC AT I-10 INTERCHANGES
H.012607
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION LA 933 803-18 STPFLEX 1,250 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTSTONEY, PATRICK Remrks:
Typ Imp:
Project:Prj Mgr:
LA 933: HENDERSON BAYOU BRIDGE
Page 2 - 5 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.012311
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION I-10 450-11 0 CAPACITY 0-FEASIBILITY/SCOPINGASCENSION LA 429 077-30 0 CAPACITY
STUDY FOR PROPOSED NEW CONNECTOR ROADZHANG, HONG Remrks:
Typ Imp:
Project:Prj Mgr:
LA 429 CONNECTOR (LA 30/LA 73 TO US 61)
H.012575
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASSUMPTION LA 70 232-01 STPFLEX 6,502 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
PATCH, COLD PLANE, AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 70: LA 1 - LA 1015-1
ASSUMPTION
H.013001
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASSUMPTION LA 308 407-08 STPFLEX 3,000 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
MILL, STABILIZE, OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 308: LA 70 - ASCENSION P/L
H.013493
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASSUMPTION 000-04 STP<200K 80 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
ADA COMPLIANT SIDEWALKSRICHARD, RYAN Remrks:
Typ Imp:MATCH BY VILLAGE OF NAPOLEONVILLE
Project:Prj Mgr:
WASHINGTON STREET SIDEWALKS
H.013500
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASSUMPTION 000-04 STP<200K 96 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
ADA COMPLIANT SIDEWALKSRICHARD, RYAN Remrks:
Typ Imp:MATCH BY VILLAGE OF NAPOLEONVILLE
Project:Prj Mgr:
DR. MARTIN LUTHER KING PHASE 1
H.013501
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASSUMPTION 000-04 STP<200K 96 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
ADA COMPLIANT SIDEWALKSRICHARD, RYAN Remrks:
Typ Imp:MATCH BY VILLAGE OF NAPOLEONVILLE
Project:Prj Mgr:
DR MARTIN LUTHER KING PHASE 2
H.013786
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASSUMPTION LA 1247 804-43 NFA 800 ROAD TRANSFER 3-DESIGN/DEVELOPMENT
OVERLAY AND STABILIZE BASE COURSEMOSS, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1247: LA 1 - LA 1010
H.011289
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASSUMPTION LA 70 232-01 STPFLEX 15,280 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTALASSUMPTION LA 69 406-01 STPFLEX 1,063 OTHER / MISCELLANEOUS
CONSTRUCTION OF A DETOUR ROUTE FOR LA 70 IF NECESSARYNICKEL, TIM Remrks:
Typ Imp:
Project:Prj Mgr:
LA 70: DETOUR ROAD
Page 2 - 6 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.012909
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
AVOYELLES LA 107 142-02 STPFLEX 480 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
RAPIDES LA 1203 369-02 NFA 480 PRESERVATION - BRIDGE (ONSYSTEM)
RAPIDES LA 1206 840-01 NFA 720 PRESERVATION - BRIDGE (ONSYSTEM)
RAPIDES LA 1200 840-26 NFA 360 PRESERVATION - BRIDGE (ONSYSTEM)
RAPIDES LA 1199 840-27 STPFLEX 360 PRESERVATION - BRIDGE (ONSYSTEM)
RAPIDES LA 1243 840-46 STPFLEX 480 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:
Typ Imp:
Project:Prj Mgr:
DIST08:ABC BR REP AVOYELLE, RAPIDES PARS
AVOYELLES
H.013143
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
AVOYELLES 000-05 FBROFF 869 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENT - NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
CARBON PLANT ROAD OVER BAYOU BOEUF
H.013948
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
AVOYELLES LA 1183 805-25 STP<5K-E 986 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTPATTON, HEATHER Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1183: TURNER CANAL BRIDGE
H.013985
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
AVOYELLES 000-05 STP<5K-E 573 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
AVOYELLES 000-05 STP<5K-E 573 PRESERVATION - BRIDGE (OFFSYSTEM)
AVOYELLES 000-05 STP<5K-E 402 PRESERVATION - BRIDGE (OFFSYSTEM)
BRIDGE REPLACEMENTPATTON, HEATHER Remrks:
Typ Imp:
Project:Prj Mgr:
LOCAL:PRAIRIE BAYOU AND DRAINAGE BRIDGES
H.013994
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
AVOYELLES 000-05 STP<5K-E 915 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTPATTON, HEATHER Remrks:
Typ Imp:
Project:Prj Mgr:
OAK HALL RD OVER BAYOU BOEUF
H.014125
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
AVOYELLES LA 451 374-03 NFA 2,914 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
MEDIUM OVERLAYBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 451: P LABORDE RD TO BOBBY GASPARD RD
Page 2 - 7 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.012542
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
AVOYELLES LA 114 145-01 STPFLEX 3,770 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
AVOYELLES LA 107 147-03 STPFLEX 1,902 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTSMISTICH, BRADLEY Remrks:
Typ Imp:
Project:Prj Mgr:
LA114,LA107:BELLE DEAU & B JACK RL BRS
H.012545
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
AVOYELLES LA 454 370-01 STPFLEX 1,883 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTMISTICH, BRADLEY Remrks:
Typ Imp:
Project:Prj Mgr:
LA 454: WIGGINS BAYOU BRIDGE
H.012556
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
AVOYELLES US 71 008-07 STPFLEX 2,800 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
PATCH, MILL, AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 71: ST LANDRY P/L TO 740' S OF T&P RR
H.009482
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BEAUREGARD LA 113 139-03 STPFLEX 950 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTBUCCI, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
LA 113: JIM BURNEY BRANCH BRIDGE
BEAUREGARD
H.010245
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BEAUREGARD LA 389 187-04 STPFLEX 7,117 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
PATCH, CP 2", WIDEN 2.5', OL 4"SPURLOCK, DLON Remrks:
Typ Imp:USE NFA AS MATCH
Project:Prj Mgr:
LA 389: MONROE WHITMAN RD - US 190
H.010246
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BEAUREGARD LA 112 188-02 STPFLEX 2,163 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
PATCH, CP 2", WIDEN 2.5', OL 4"SPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 112: LA 399 - LA 113
H.012040
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BEAUREGARD LA 394 189-01 STPFLEX 1,472 PRESERVATION - BRIDGE (ONSYSTEM)
BEAUREGARD LA 110 190-01 STPFLEX 1,782 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTSBUCCI, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
LA 394 & LA 110: CREEK BRIDGES
H.013257
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BEAUREGARD US 190 028-02 NHPP 3,937 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
THIN OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 190: TEXAS S/L - LA 111
Page 2 - 8 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.013989
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BEAUREGARD 000-06 STP<5K-E 755 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACMENTRANCK, AMANDA Remrks:
Typ Imp:
Project:Prj Mgr:
GRAYBOW ROAD OVER PALMETTO CREEK
H.014083
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BEAUREGARD US 171 024-05 NHPP 840 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
MILL AND OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 171: LA 112 - MLK DR
H.012569
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BEAUREGARD LA 113 139-04 STPFLEX 1,600 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTALLEN, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 113: LITTLE SUGAR CREEK BRIDGE
H.014244
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BEAUREGARD LA 12 012-05 STGEN 1,428 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTTOURRES, VALERIE Remrks:
Typ Imp:AC
Project:Prj Mgr:
LA 12: COWPEN BAYOU BRIDGE
H.001707
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BIENVILLE LA 507 090-05 FBROFF 1,178 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTMCADAMS, MARY Remrks:
Typ Imp:090-05-0030
Project:Prj Mgr:
LA 507: SALINE BAYOU RELIEF BRIDGE
BIENVILLE
H.012050
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BIENVILLE I-20 451-04 NHPP 300 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
LENGTHING HIGHWAY EXIT DECELERATION LANESPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
I-20: WB EXIT RAMP EXTENSION AT ARCADIA
H.012893
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BIENVILLE LA 4 067-02 STPFLEX 360 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BIENVILLE LA 4 067-03 STPFLEX 600 PRESERVATION - BRIDGE (ONSYSTEM)
BIENVILLE LA 4 067-04 STPFLEX 840 PRESERVATION - BRIDGE (ONSYSTEM)
BIENVILLE LA 517 089-30 STPFLEX 600 PRESERVATION - BRIDGE (ONSYSTEM)
BIENVILLE LA 154 090-03 STPFLEX 480 PRESERVATION - BRIDGE (ONSYSTEM)
BIENVILLE LA 501 093-02 STPFLEX 960 PRESERVATION - BRIDGE (ONSYSTEM)
BIENVILLE LA 516 294-04 NFA 720 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:
Typ Imp:USE NFA AS MATCH ON CS 089-30
Project:Prj Mgr:
DIST 04:ABC BR REPLACE BIENVILLE PARISH
Page 2 - 9 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.012925
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BIENVILLE LA 4 067-03 STPFLEX 560 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
3-DESIGN/DEVELOPMENT
ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 4: CASTOR TO LUCKY
H.012942
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BIENVILLE LA 797 807-05 NFA 1,032 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
ASPHALTIC CONCRETE PAVEMENT RESURFACINGBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 797: LA 507 TO LINCOLN PL
H.012973
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BIENVILLE LA 792 293-02 STPFLEX 360 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 792: LA 154 TO WEBSTER PL
H.013534
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BIENVILLE 000-07 RTP 197 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENT
MAINT, RESTOR, & CONST OF ATV TRAILS & TRAILHEAD INFRASTRNUNES, BRIAN Remrks:
Typ Imp:L & A TRAILS, INC. WILL PROVIDE THE LOCAL MATCH.
Project:Prj Mgr:
RESTOR OF TRAIL BTWN JAMESTOWN & SIBLEY
H.012566
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BIENVILLE LA 154 088-04 STPFLEX 358 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 154: LA 507 TO LA 793
H.013000
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BIENVILLE LA 516 294-04 NFA 2,406 PRESERVATION - NON-INTERSTATENFA
1-PLANNING/ENVIRONMENTAL
ASPHALTIC CONCRETE PAVEMENT RESURFACINGBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 516: US 371 TO LA 154
H.014219
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BIENVILLE LA 507 308-02 STGEN 858 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BIENVILLE LA 507 308-02 FBROFF 607 PRESERVATION - BRIDGE (ONSYSTEM)
LINCOLN LA 507 308-04 FBROFF 573 PRESERVATION - BRIDGE (ONSYSTEM)
LINCOLN LA 507 308-04 FBROFF 231 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTTOURRES, VALERIE Remrks:
Typ Imp:AC; USE NFA AS MATCH
Project:Prj Mgr:
LA 507: CREEK BRIDGES NEAR SIMSBORO
H.014222
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BIENVILLE LA 516 294-04 STGEN 915 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTTOURRES, VALERIE Remrks:
Typ Imp:AC; USE NFA AS MATCH
Project:Prj Mgr:
LA 516: POLAND BRANCH BRIDGE
Page 2 - 10 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.014231
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BIENVILLE LA 153 088-02 STPFLEX 1,337 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BIENVILLE LA 153 088-02 STGEN 1,154 PRESERVATION - BRIDGE (ONSYSTEM)
BIENVILLE LA 153 088-02 STPFLEX 790 PRESERVATION - BRIDGE (ONSYSTEM)
BIENVILLE LA 153 088-02 STPFLEX 607 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTTOURRES, VALERIE Remrks:
Typ Imp:AC
Project:Prj Mgr:
LA 153: TOPY CREEK RELIEF & DRAIN BRS
H.013769
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BIENVILLE 000-07 0 SAFETY - LOCAL ROADS SAFETY 0-FEASIBILITY/SCOPING
FEASIBILITY STUDYRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
LOCAL ROAD SIGNING (BIENVILLE)
H.012171
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER I-220 451-31 NHPP 3,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT
APPROACH SLAB REPLACEMENT AND PCC PAVEMENT PATCHINGMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-220: RED RIVER BRIDGE TO I-20
BOSSIER
H.012537
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER LA 154 090-01 STPFLEX 2,964 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTWINDMANN, ANDREW Remrks:
Typ Imp:
Project:Prj Mgr:
LA 154: RED CHUTE BAYOU BRIDGE
H.012896
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER LA 157 082-04 STPFLEX 3,987 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BOSSIER LA 160 085-03 STPFLEX 960 PRESERVATION - BRIDGE (ONSYSTEM)
BOSSIER LA 537 808-05 NFA 1,560 PRESERVATION - BRIDGE (ONSYSTEM)
CADDO LA 2 045-30 STPFLEX 4,514 PRESERVATION - BRIDGE (ONSYSTEM)
CADDO LA 169 048-02 STPFLEX 1,080 PRESERVATION - BRIDGE (ONSYSTEM)
CADDO LA 789 809-07 STPFLEX 360 PRESERVATION - BRIDGE (ONSYSTEM)
RED RIVER LA 155 091-01 STPFLEX 720 PRESERVATION - BRIDGE (ONSYSTEM)
RED RIVER LA 783 303-01 NFA 840 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:
Typ Imp:
Project:Prj Mgr:
DIST04:ABC BR REP BOSS,CADD,RED RIV PARS
H.012913
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER I-20 451-02 NHPP 350 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
EXTENDING EXISTING INTERSTATE EXIT LANESPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
I-20 EB: EXIT RAMP EXTENSION AT LA 157
Page 2 - 11 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.013129
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER 000-08 FBROFF 2,340 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENT - NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
LINTON ROAD OVER BLACK BAYOU RESERVOIR
H.014098
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER US 71 010-06 NHPP 1,300 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
MILL, PATCH, AND OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 71: BARKSDALE - I-20
H.014106
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER LA 3 044-01 NHPP 3,500 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
PATCH, MILL AND OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3: I-220 - KINGSTON RD
H.001779
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER LA 511 102-03 NFI 65,144 CAPACITY 1-PLANNING/ENVIRONMENTALCADDO LA 511 102-02 NFI 16,286 CAPACITY
REPLACEMENT\REHABILITATION (HBI)MASTIN, CATHERINE Remrks:
Typ Imp:102-03-0010
Project:Prj Mgr:
JIMMIE DAVIS BRIDGE (LA 511) (HBI)
H.007400
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER 000-08 TAP>200K 434 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL
SHARED USE PATHNUNES, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
NORTH BOSSIER SHARED USE TRAIL, PHASE II
H.012004
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER US 80 001-03 NHPP 4,415 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTSMCADAMS, MARY Remrks:
Typ Imp:
Project:Prj Mgr:
US 80: ALLIGATOR BAYOU BRIDGES
H.012538
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER LA 164 122-01 STPFLEX 2,921 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BOSSIER LA 164 122-01 STPFLEX 1,949 PRESERVATION - BRIDGE (ONSYSTEM)
BOSSIER LA 164 122-01 STPFLEX 2,192 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTSWINDMANN, ANDREW Remrks:
Typ Imp:
Project:Prj Mgr:
LA 164: BRIDGES
H.012638
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER LA 3105 808-07 NHPP 1,500 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
1-PLANNING/ENVIRONMENTAL
ACCESS MANAGEMENTHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3105: GREENACRES BLVD - LA 72 PHASE 2
Page 2 - 12 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.012659
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER LA 3105 808-07 NHPP 1,500 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
1-PLANNING/ENVIRONMENTAL
ACCESS MANAGEMENTHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3105: GREENACRES BLVD - LA 72 PHASE 3
H.013492
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER LA 3227 808-08 STPFLEX 950 ROAD TRANSFER 1-PLANNING/ENVIRONMENTAL
REALIGNMENT, EARTHWORK, ASPHALT PAVEMENT, AND STRIPINGSTURDIVANT, PHILLIP Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3227: INTERSECTION REALIGN AT LA 157
H.013538
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER LA 511 102-03 NHPP 25,000 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
MAJOR BRIDGE REHABILITATIONMASTIN, CATHERINE Remrks:
Typ Imp:REFERENCE H.010662 FOR ADDITIONAL PHASE INFORMATION.
Project:Prj Mgr:
LA 511: JIMMIE DAVIS BRIDGE REHAB (HBI)
H.014217
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER LA 537 808-05 STGEN 1,519 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BOSSIER LA 537 808-05 FBROFF 607 PRESERVATION - BRIDGE (ONSYSTEM)
BOSSIER LA 537 808-05 FBROFF 607 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTTOURRES, VALERIE Remrks:
Typ Imp:AC; USE NFA AS MATCH
Project:Prj Mgr:
LA 537: BRIDGES NEAR PLAIN DEALING
H.014225
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER LA 528 107-01 STGEN 972 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTTOURRES, VALERIE Remrks:
Typ Imp:AC; USE NFA AS MATCH
Project:Prj Mgr:
LA 528: CLARKE BAYOU BRIDGE
H.014233
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER LA 160 085-03 FBROFF 573 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BOSSIER LA 160 085-03 STGEN 1,257 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTTOURRES, VALERIE Remrks:
Typ Imp:AC, USE NFA AS MATCH
Project:Prj Mgr:
LA 160: CYPRESS BAYOU & RELIEF BRIDGES
H.011424
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER LA 157 082-04 0 SAFETY 0-FEASIBILITY/SCOPINGBOSSIER LA 157 082-03 0 SAFETY
ACCESS MANAGEMENT AND SAFETY IMPROVEMENTCOLVIN, JODY Remrks:
Typ Imp:
Project:Prj Mgr:
LA157: BOOKER RD TO LA614 CORRIDOR STUDY
H.011428
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER LA 3105 808-07 0 SAFETY 0-FEASIBILITY/SCOPING
ACCESS MANAGEMENT AND SAFETY IMPROVEMENTCOLVIN, JODY Remrks:
Typ Imp:
Project:Prj Mgr:
LA3105:GREENACRES TO LA72 CORRIDOR STUDY
Page 2 - 13 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.014044
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER US 80 001-03 0 SAFETY 0-FEASIBILITY/SCOPING
SAFETY STUDYJESCLARD, TREY Remrks:
Typ Imp:
Project:Prj Mgr:
US 80: INTERSECTION @ BELLEVUE RD
H.000413
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO US 71 011-01 NHPP 12,000 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTWINDMANN, ANDREW Remrks:
Typ Imp:011-01-0054
Project:Prj Mgr:
CROSS BAYOU BRIDGE REPLACEMENT
CADDO
H.006472
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO 000-09 HSIPPEN 216 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT
TRAFFIC SIGNAL POWER GENERATOR INSTRIGGS, LAURA Remrks:
Typ Imp:737-09-0104
Project:Prj Mgr:
CITY OF SHREVEPORT TRAFFIC SIG BKUP
H.006474
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO LA 526 809-08 NHPP 2,500 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
3-DESIGN/DEVELOPMENT
CADDO I-49 455-08 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
CADDO LA 3132 427-01 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
DEVELOP SEA FOR ITS EQUIPMENT DEPLOYMENTKIMBENG, LUCY Remrks:
Typ Imp:
Project:Prj Mgr:
SHREVEPORT IMMEDIATE ITS PHASE 2B
H.006475
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO 000-09 HSIPPEN 158 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT
TRAFFIC SIGNAL POWER GENERATORRIGGS, LAURA Remrks:
Typ Imp:737-09-0108
Project:Prj Mgr:
CITY OF SHRVPRT TRAFFIC SIGNAL BKUP
H.010279
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO LA 173 094-02 STPFLEX 900 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
ASPHALTIC OVERLAY, PAVEMENT STRIPING AND RELATED WORKSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 173: LA 1 TO US 71
H.010286
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO LA 538 078-04 STPFLEX 1,000 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
ASPHALTIC OVERLAY, PAVEMENT STRIPING AND RELATED WORKSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 538: JCT US 71 TO LA 1
H.010468
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO I-20 451-01 NHPP 15,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT
REMOVE AND REPLACE PCCMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-20: WEST END HUDSON ST. BRIDGE TO I-49
H.010475
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO I-20 451-01 NHPP 20,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT
REMOVE AND REPLACE PCCMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-20: MONKHOUSE TO W END OF HUDSON ST BR
Page 2 - 14 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.012005
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO US 80 001-02 STPFLEX 3,567 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENT/REHABILITATIONMORVANT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
US80: KCS RR OVERPASS (HBI)
H.012006
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO LA 1 053-08 STPFLEX 2,785 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTCAVALIER, STEPHANIE Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1: PRAIRIE RIVER BRIDGE
H.012009
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO US 71 053-09 NHPP 12,831 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTS/REHABILITATIONGAUDRY, CARL Remrks:
Typ Imp:
Project:Prj Mgr:
US 71: MARKET ST BRIDGE OVER ICG RR(HBI)
H.012011
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO LA 525 097-01 STPFLEX 2,545 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
CADDO LA 173 094-01 STPFLEX 1,225 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTSWINDMANN, ANDREW Remrks:
Typ Imp:
Project:Prj Mgr:
LA525, LA173: BOGGY BAYOU AND CR BRIDGES
H.012930
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO LA 3049 079-01 NFA 310 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
ASPHALTIC CONCRETE PAVEMENT RESURFACINGBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3049: COWHIDE BAYOU TO LA 530
H.013034
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO US 80 001-01 STPFLEX 7,286 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTMORVANT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 80: I-20 INTERCHANGE (GREENWOOD)
H.013315
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO 000-09 STPENH 425 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SCENIC BYWAY VIEWING AREAMEEK, STEPHEN Remrks:
Typ Imp:CADDO PARISH WILL PROVIDE THE MATCH.
Project:Prj Mgr:
BOOM OR BUST SCENIC VIEWING AREA
H.014082
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO US 171 025-08 NHPP 5,000 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
MILL, PATCH, AND OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 171: LA 3132 - I-20
H.014110
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO US 171 025-08 NHPP 8,000 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
MILL, PATCH, AND OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 171: CADDO P/L - LA 3132
Page 2 - 15 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.014229
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO 000-09 FBROFF 931 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENT NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
CRAWFORD ROAD OVER TIGER BRANCH
H.003915
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO 000-09 0 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL
STAGE 0 AND ENVIRONMENTALUMEOZULU, JOE Remrks:
Typ Imp:USE STATE SURPLUS AS MATCH
Project:Prj Mgr:
I-49 INNER CITY CONNECTOR
H.007404
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO LA 530 809-14 TAP>200K 118 ENHANCEMENTS 1-PLANNING/ENVIRONMENTALCADDO 000-09 TAP>200K 118 ENHANCEMENTS
SHARED USE PATHNUNES, BRIAN Remrks:
Typ Imp:MATCH IS 15% TOLL CREDITS AND 5% LOCAL
Project:Prj Mgr:
OIL CITY SHARED USE PATH
H.009213
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO LA 3132 427-01 NFI 150,000 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL
EXTENSION OF EXISTING ROADWAYUMEOZULU, JOE Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3132 (INNER LOOP) EXTENSION
H.010288
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO LA 789 809-07 STPFLEX 2,000 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
ASPHALTIC OVERLAY, PAVEMENT STRIPING AND RELATED WORKSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 789: PRESTON ROAD TO LA 169
H.011094
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO LA 3094 025-08 NHPP 2,700 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
REPLACE SUPERSTRUCTURE, RAISE GRADE, ROADWAY & EMBANKMENBUCCI, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3094: HEARNE AV BR REHAB
H.011733
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO US 80 001-02 STPFLEX 2,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
1-PLANNING/ENVIRONMENTAL
SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
US 80 TRAFFIC CONTROL UPGRADES
H.012937
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO LA 3049 079-01 NFA 1,122 PRESERVATION - NON-INTERSTATENFA
1-PLANNING/ENVIRONMENTAL
CADDO LA 3049 079-01 STPFLEX 141 PRESERVATION - NON-INTERSTATEON STP SYSTEM
ASPHALTIC CONCRETE PAVEMENT RESURFACINGBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3049: GRIMMIT DR TO GEORGE RD
H.012007
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO LA 1 053-09 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
FEASIBILITY STUDY OF BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1: KCS RAILROAD OVERPASS
Page 2 - 16 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.012008
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO US 71 053-09 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
HISTORIC BRIDGE PRESERVATION PRIORITY FEASIBILITY STUDYGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
US 71:ICG RAILROAD OVERPASS REHAB (HBI)
H.012027
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO I-20 451-01 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
FEASIBILITY STUDY OF BRIDGE REPLACMENT OR REHABILITATIONGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
I 20: MISSOURI PACIFIC RR OVERPASS
H.012028
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO I-20 451-01 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
FEASIBILITY STUDY OF BRIDGE REHABILITATIONMOSS, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
I 20:LAKE SHORE DRIVE/KCS OVERPASS REHAB
H.013766
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO 000-09 0 SAFETY - LOCAL ROADS SAFETY 0-FEASIBILITY/SCOPING
FEASIBILITY STUDYRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
LOCAL ROAD SIGNS & STRIPING (CADDO)
H.014054
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO LA 3276-P 809-15 0 DEMO / HIGH PRIORITY 0-FEASIBILITY/SCOPING
EVALUATE THE FEASIBILITY OF I-69 FRONTAGE ROADZHANG, HONG Remrks:
Typ Imp:
Project:Prj Mgr:
I-69 FRONTAGE ROAD (ELLERBE RD TO LA 1)
H.000186
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU US 90 003-04 NHPP 12,248 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTYANG, LI Remrks:
Typ Imp:003-04-0064
Project:Prj Mgr:
US 90 OVER I-10 RAMPS @ LOCKMOOR (HBI)
CALCASIEU
H.000425
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 12 012-01 STPFLEX 1,739 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
CALCASIEU 000-10 LOCAL 1,739 PRESERVATION - BRIDGE (ONSYSTEM)
NEW BRIDGEMASTIN, CATHERINE Remrks:
Typ Imp:012-01-0004;JOINT PROJECT WITH TEXAS
Project:Prj Mgr:
LA 12 SABINE RIVER BRIDGE
H.009455
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU I-210 450-30 NHPP 3,400 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE
3-DESIGN/DEVELOPMENT
CLEANING & PAINTINGTULLIER, DANNY Remrks:
Typ Imp:
Project:Prj Mgr:
I-210 BRIDGE CLEANING & PAINTING
H.009613
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 14 193-06 STPFLEX 4,926 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
PCCP RECONSTRUCTIONSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 14: MC NEESE ST - E. PRIEN LAKE RD
Page 2 - 17 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.010001
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 27 031-04 STPFLEX 1,800 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE
3-DESIGN/DEVELOPMENT
CLEANING & PAINTING & MISC. REPAIRSTULLIER, DANNY Remrks:
Typ Imp:
Project:Prj Mgr:
LA27 ICWW ELLENDERS BRIDGE CLEAN & PAINT
H.010865
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU I-210 450-30 HSIP 1,314 SAFETY 3-DESIGN/DEVELOPMENTCALCASIEU I-210 450-30 NHPP 5,429 PRESERVATION - INTERSTATE
CABLE BARRIER AND OGFCMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-210: COVE LN INTG - E JCT I-10
H.011065
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 1138-2 810-06 STBONDS 6,000 CAPACITY 3-DESIGN/DEVELOPMENTCALCASIEU I-210 450-30 STBONDS 1,000 CAPACITY CALCASIEU I-210 450-30 LOCAL 7,800 CAPACITY
IMPROVEMENTS TO THE NELSON INTERCHANGEMORVANT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
NELSON INTERCHANGE IMPROVEMENTS
H.011196
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU 000-10 HSIPPEN 408 SAFETY - SAFE ROUTES TO SCHOOLS 3-DESIGN/DEVELOPMENT
SIDEWALKS, STRIPING AND SIGNINGRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
LAKE CHARLES SRTS PROJ. - BARBE ELEM.
H.011509
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU I-10 450-91 NHPP 1,250 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
3-DESIGN/DEVELOPMENT
INSTALL DMSS AND CCTVSKIMBENG, LUCY Remrks:
Typ Imp:
Project:Prj Mgr:
LAKE CHARLES ITS PHASE 4
H.011802
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU 000-10 TAP<200K 358 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SIDEWALKSMEEK, STEPHEN Remrks:
Typ Imp:MATCH PROVIDED BY THE CALCASIEU PARISH POLICE JURY
Project:Prj Mgr:
PINECONE DRIVE SIDEWALK
H.012041
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 109 187-01 STPFLEX 1,220 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTWINDMANN, ANDREW Remrks:
Typ Imp:
Project:Prj Mgr:
LA 109: GULLY BRIDGE
H.012052
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 3092 810-28 HSIP 1,000 SAFETY 3-DESIGN/DEVELOPMENTCALCASIEU 000-10 HSIP 1,000 SAFETY
ADD A ROUNDABOUT TO AID IN TRAFFIC FLOWREVIERE, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3092: ROUNDABOUT
H.012083
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU I-10 450-91 NHPP 3,000 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE INTERIM REPAIRSCAVALIER, STEPHANIE Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: CALCASIEU RIVER BRIDGE INT REPAIRS
Page 2 - 18 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.012108
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 383 197-02 STPFLEX 380 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
CALCASIEU I-10 450-91 NHPP 320 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
ADD TURN LANESPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
I-10 & LA 383:TURN LANE@ EB EXIT 43 RAMP
H.012589
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 27 810-19 STPFLEX 3,292 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
CALCASIEU LA 27 810-19 NHPP 766 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
PATCH, CP AND OLSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 108: I-10 - LA 1256
H.012900
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 3256 810-15 STPFLEX 1,080 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
CALCASIEU LA 3063 810-25 NFA 360 PRESERVATION - BRIDGE (ONSYSTEM)
CAMERON LA 717 812-01 NFA 480 PRESERVATION - BRIDGE (ONSYSTEM)
CAMERON LA 384 812-04 NFA 360 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:
Typ Imp:
Project:Prj Mgr:
DIST07:ABC BR REP CALCASIEU, CAMERON PAR
H.013812
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU 000-10 STP<200K 7,270 URBAN SYSTEMS 3-DESIGN/DEVELOPMENTCALCASIEU 000-10 LOCAL 485 URBAN SYSTEMS
ROADWAY WIDENINGRICHARD, RYAN Remrks:
Typ Imp:CITY OF LAKE CHARLES TO PROVIDE MATCH
Project:Prj Mgr:
IHLES ROAD: W PRIEN LAKE - COUNTRY CLUB
H.003931
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU I-10 450-91 NFI 0 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
CALCASIEU LA 378 810-12 0 PRESERVATION - BRIDGE (ONSYSTEM)
FEASIBILITY & ENVIRON. STUDYUMEOZULU, JOE Remrks:
Typ Imp:700-10-0115;INCL. UPRR GRADE SEPARATION
Project:Prj Mgr:
CALCASIEU RIVER BRIDGE (HBI)
H.009488
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 378 810-12 NFI 0 CAPACITY 1-PLANNING/ENVIRONMENTAL
STAGE 0 STUDY TO WIDEN LA 378 (WESTLAKE TO MOSS BLUFF)LANDRY, COREY Remrks:
Typ Imp:
Project:Prj Mgr:
LA 378 WIDENING (WESTLAKE TO MOSS BLUFF)
H.010000
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU US 171 024-01 NHPP 1,700 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE
1-PLANNING/ENVIRONMENTAL
CLEANING & PAINTING & MISC. REPAIRSTULLIER, DANNY Remrks:
Typ Imp:
Project:Prj Mgr:
US171:CALCASIEU RVR BR REHAB (HBI)
Page 2 - 19 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.011242
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 384 382-05 0 SAFETY 0-FEASIBILITY/SCOPING
TBD BY FEASIBILITY STUDYZHANG, HONG Remrks:
Typ Imp:
Project:Prj Mgr:
LA 384 (BIG LAKE RD TO MCNEESE ST)
H.012042
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 384 382-04 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
FEASIBILITY STUDY OF BRIDGE REPLACEMENTBRIGNAC, CHRISTINA Remrks:
Typ Imp:
Project:Prj Mgr:
LA 384: ICWW BLACK BAYOU MOVABLE BRIDGE
H.012043
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 378 810-12 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
LA 378:W FORK CALCASIEU RIV REHAB (HBI)
H.012632
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU US 171 024-01 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
0-FEASIBILITY/SCOPING
TRAFFIC STUDYHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 171: MLK BLVD TRAFFIC STUDY
H.012685
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 385 195-04 0 SAFETY 0-FEASIBILITY/SCOPING
FEASIBILITY STUDYMCRAE, ADRIANE Remrks:
Typ Imp:
Project:Prj Mgr:
LA 385 RYAN ST. FEASIBILITY STUDY
H.009602
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALDWELL LA 557 159-02 STPFLEX 1,276 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
MICROSURFACINGSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 557: LA 4 - OUACHITA LINE
CALDWELL
H.013011
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALDWELL LA 126 041-05 STPFLEX 1,920 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
CALDWELL LA 4 068-04 STPFLEX 1,320 PRESERVATION - BRIDGE (ONSYSTEM)
CALDWELL LA 127 127-04 STPFLEX 3,720 PRESERVATION - BRIDGE (ONSYSTEM)
CALDWELL LA 506 345-03 NFA 600 PRESERVATION - BRIDGE (ONSYSTEM)
CALDWELL LA 506 345-04 NFA 1,320 PRESERVATION - BRIDGE (ONSYSTEM)
CALDWELL LA 850 811-02 NFA 480 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:
Typ Imp:
Project:Prj Mgr:
DIST58: ABC BR REPLACE CALDWELL PARISH
Page 2 - 20 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.013027
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALDWELL 000-11 RTP 112 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTCALDWELL 000-11 LOCAL 522 RECREATIONAL TRAILS PROGRAM
CONSTRUCTION OF A 3600' LONG BY 5' WIDE ASPHALT TRAILNUNES, BRIAN Remrks:
Typ Imp:DCRT IS THE PROJECT MANAGER
Project:Prj Mgr:
SHERMAN LAKE TRAILS
H.013202
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALDWELL US 165 015-07 NHPP 4,300 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
MILL & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 165: COLUMBIA - 7 MILES NORTH
H.014249
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALDWELL LA 126 041-05 STGEN 915 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
CALDWELL LA 126 041-05 STGEN 573 PRESERVATION - BRIDGE (ONSYSTEM)
CALDWELL LA 126 041-05 STPFLEX 915 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTTOURRES, VALERIE Remrks:
Typ Imp:AC
Project:Prj Mgr:
LA 126: BLACK BAYOU AND CREEK BRIDGES
H.013963
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CAMERON LA 384 812-04 STP<5K-E 582 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTRANCK, AMANDA Remrks:
Typ Imp:
Project:Prj Mgr:
LA 384: CANAL BRIDGE
CAMERON
H.013970
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CAMERON LA 717 812-01 STP<5K-E 755 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
CAMERON LA 717 812-01 FBROFF 744 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTRANCK, AMANDA Remrks:
Typ Imp:NFA AS MATCH
Project:Prj Mgr:
LA 717: KLONDIKE CANAL AND BAYOU BRIDGES
H.014147
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CAMERON LA 384 382-03 STPFLEX 440 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
3-DESIGN/DEVELOPMENT
MICROSURFACINGSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 384: LA 1144 - CALCASIEU P/L
H.009470
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CAMERON LA 82 194-02 STPFLEX 11,161 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENT - MOVEABLE BRIDGEBUCCI, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
LA 82: SUPERIOR CANAL BRIDGE (HBI)
H.012044
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CAMERON LA 384 195-30 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
LA384:ICWW GR LAKE PONTOON MB REHAB (HBI
Page 2 - 21 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.012167
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CATAHOULA US 84 022-06 NHPP 3,700 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
COLD PLANE & OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 84: LA 28 - JONESVILLE
CATAHOULA
H.012842
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CATAHOULA LA 124-P 143-03 NFA 8,149 ROAD TRANSFER 3-DESIGN/DEVELOPMENTCATAHOULA LA 3102 813-24 NFA 1,941 ROAD TRANSFER
NEW ROADWAY CONSTRUCTION/RE-CONSTRUCTION, BRIDGE REPLACEMOORE, DARRELL Remrks:
Typ Imp:
Project:Prj Mgr:
LA3102 @ LARTO LAKE & LA124 EXT(SEG 2&3)
H.013006
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CATAHOULA LA 124 143-04 STPFLEX 2,520 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
CATAHOULA LA 126 353-03 STPFLEX 2,414 PRESERVATION - BRIDGE (ONSYSTEM)
CONCORDIA LA 568 075-01 STPFLEX 480 PRESERVATION - BRIDGE (ONSYSTEM)
FRANKLIN LA 135 167-01 STPFLEX 720 PRESERVATION - BRIDGE (ONSYSTEM)
FRANKLIN LA 577 344-01 STPFLEX 600 PRESERVATION - BRIDGE (ONSYSTEM)
TENSAS LA 605 020-30 STPFLEX 960 PRESERVATION - BRIDGE (ONSYSTEM)
TENSAS LA 569 176-03 NFA 720 PRESERVATION - BRIDGE (ONSYSTEM)
LASALLE LA 772 039-01 NFA 600 PRESERVATION - BRIDGE (ONSYSTEM)
LASALLE LA 127 149-05 STPFLEX 480 PRESERVATION - BRIDGE (ONSYSTEM)
LASALLE LA 778 830-05 NFA 360 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:
Typ Imp:
Project:Prj Mgr:
DIST58:ABC BR REPL CA,CO,FR,TN,LA PARISH
H.013031
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CATAHOULA 000-13 RTP 130 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENT
RESTORATION OF 3.1 MILES OF ATV TRAILNUNES, BRIAN Remrks:
Typ Imp:DCRT IS THE PROJECT MANAGER
Project:Prj Mgr:
DEWEY WILLS WMA - JAKEY ATV TRAIL
H.014126
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CATAHOULA LA 914 813-06 NFA 630 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
CATAHOULA LA 915 813-07 NFA 294 PRESERVATION - NON-INTERSTATENFA
CATAHOULA LA 916 813-04 NFA 1,176 PRESERVATION - NON-INTERSTATENFA
PATCH & OVERLAYBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 914, LA 915, LA 916 OVERLAY
Page 2 - 22 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.012736
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CATAHOULA US 425 026-04 NHPP 6,870 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTWINDMANN, ANDREW Remrks:
Typ Imp:
Project:Prj Mgr:
US 425: TENSAS RIVER BRIDGE @ CLAYTON
H.014248
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CATAHOULA LA 124 143-04 FBROFF 915 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
CATAHOULA LA 124 143-04 FBROFF 744 PRESERVATION - BRIDGE (ONSYSTEM)
CATAHOULA LA 124 143-04 FBROFF 1,428 PRESERVATION - BRIDGE (ONSYSTEM)
CATAHOULA LA 124 143-04 STGEN 1,086 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTTOURRES, VALERIE Remrks:
Typ Imp:AC; USE NFA AS MATCH
Project:Prj Mgr:
LA 124: BRIDGES NEAR LARTO
H.001674
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CLAIBORNE LA 146 085-08 STPFLEX 6,068 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
NEW BRIDGESWINDMANN, ANDREW Remrks:
Typ Imp:085-08-0032;4 BRIDGES
Project:Prj Mgr:
LA 146 BRIDGES NEAR HOMER
CLAIBORNE
H.012894
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CLAIBORNE LA 808 084-05 NFA 360 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
CLAIBORNE LA 146 085-08 STPFLEX 720 PRESERVATION - BRIDGE (ONSYSTEM)
CLAIBORNE LA 520 101-01 STPFLEX 480 PRESERVATION - BRIDGE (ONSYSTEM)
CLAIBORNE LA 518 109-01 STPFLEX 480 PRESERVATION - BRIDGE (ONSYSTEM)
CLAIBORNE LA 534 289-03 NFA 480 PRESERVATION - BRIDGE (ONSYSTEM)
CLAIBORNE LA 615 814-04 NFA 840 PRESERVATION - BRIDGE (ONSYSTEM)
WEBSTER LA 3008 288-02 NFA 4,440 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTSVAUGHT, PAUL Remrks:
Typ Imp:
Project:Prj Mgr:
DIST04:ABC BR REP CLA, WEB PARISHES
H.012943
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CLAIBORNE LA 2-A 083-10 STPFLEX 370 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
3-DESIGN/DEVELOPMENT
ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 2A: LA 9 TO UNION PARISH LINE
H.012986
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CLAIBORNE LA 534 290-01 NFA 867 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
ASPHALTIC CONCRETE PAVEMENT RESURFACINGBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 534: LA 534 SPUR - LOG MILE 5.33
Page 2 - 23 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.013942
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CLAIBORNE LA 9 072-01 STP<5K-E 1,724 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
CLAIBORNE LA 9 072-01 STP<5K-E 2,141 PRESERVATION - BRIDGE (ONSYSTEM)
CLAIBORNE LA 9 072-01 STPFLEX 1,314 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTPATTON, HEATHER Remrks:
Typ Imp:
Project:Prj Mgr:
LA 9:MIDDLE FORK BAYOU AND CREEK BRIDGES
H.013979
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CLAIBORNE 000-14 STP<5K-E 402 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
CLAIBORNE LA 518 109-01 STP<5K-E 573 PRESERVATION - BRIDGE (ONSYSTEM)
CLAIBORNE LA 518 295-03 STPFLEX 1,257 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTPATTON, HEATHER Remrks:
Typ Imp:
Project:Prj Mgr:
LA 518, LOCAL: BRIDGES NEAR ATHENS
H.013987
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CLAIBORNE LA 521 291-02 STP<5K-E 790 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
CLAIBORNE LA 521 291-02 FBROFF 607 PRESERVATION - BRIDGE (ONSYSTEM)
CLAIBORNE LA 521 291-02 FBROFF 1,086 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTPATTON, HEATHER Remrks:
Typ Imp:
Project:Prj Mgr:
LA 521: BRIDGES NEAR DYKESVILLE
H.013988
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CLAIBORNE LA 534 290-01 STP<5K-E 607 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
CLAIBORNE LA 534 290-01 FBROFF 607 PRESERVATION - BRIDGE (ONSYSTEM)
CLAIBORNE LA 534 290-01 FBROFF 607 PRESERVATION - BRIDGE (ONSYSTEM)
CLAIBORNE LA 534 290-01 FBROFF 790 PRESERVATION - BRIDGE (ONSYSTEM)
CLAIBORNE LA 534 290-01 FBROFF 607 PRESERVATION - BRIDGE (ONSYSTEM)
CLAIBORNE LA 534 290-01 FBROFF 790 PRESERVATION - BRIDGE (ONSYSTEM)
CLAIBORNE LA 534 290-01 FBROFF 790 PRESERVATION - BRIDGE (ONSYSTEM)
CLAIBORNE LA 534 289-03 STP<5K-E 573 PRESERVATION - BRIDGE (ONSYSTEM)
CLAIBORNE LA 534 289-03 FBROFF 231 PRESERVATION - BRIDGE (ONSYSTEM)
CLAIBORNE LA 534 289-03 FBROFF 231 PRESERVATION - BRIDGE (ONSYSTEM)
CLAIBORNE LA 534 290-01 FBROFF 790 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTPATTON, HEATHER Remrks:
Typ Imp:NFA AS MATCH
Project:Prj Mgr:
LA 534: BRIDGES (LA 2 TO HAYNESVILLE)
Page 2 - 24 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.013201
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CONCORDIA US 425 026-03 NHPP 2,533 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
MILL & OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 425: LA 903 - US 65
CONCORDIA
H.013919
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CONCORDIA LA 15 177-04 STPFLEX 4,000 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
PATCH & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 15: SLOCUM - DEER PARK
H.013921
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CONCORDIA LA 15 177-03 STPFLEX 6,000 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
PATCH & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 15: W. FELICIANA P/L - LA 910
H.014118
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CONCORDIA LA 900 815-09 NFA 1,200 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
PATCH & OVERLAYBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 900: LA 568 - US 65
H.010462
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CONCORDIA LA 15 177-05 STPFLEX 3,200 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
PATCH & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 15: LA 131 - US 84
H.011930
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CONCORDIA US 84 026-02 0 SAFETY 0-FEASIBILITY/SCOPINGCONCORDIA US 425 026-03 0 SAFETY
CORRIDOR STUDYHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 425/US 84: CORRIDOR STUDY
H.012614
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DESOTO LA 175 035-04 STPFLEX 5,300 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
ASPHALTIC CONCRETE PAVEMENT RESURFACINGSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 175: LA 509 TO LA 5
DESOTO
H.012939
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DESOTO LA 3015 298-03 NFA 2,048 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
ASPHALTIC CONCRETE PAVEMENT RESURFACINGBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3015: US 171 TO LA 175
Page 2 - 25 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.012982
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DESOTO LA 3248 816-07 NFA 1,100 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
ASPHALTIC CONCRETE PAVEMENT RESURFACINGBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3248: NABORTON LOOP
H.013759
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DESOTO LA 3276 816-11 STPFLEX 4,500 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
MILL, BASE STABILIZATION AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3276: US 171 - I-49
H.011860
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DESOTO I-49 455-07 NHPP 2,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
1-PLANNING/ENVIRONMENTAL
CADDO I-49 455-08 NHPP 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
SIGNING REPLACEMENT AND UPGRADEFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
I-49: NATCHITOCHES P/L TO INNER LOOP
H.014056
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DESOTO LA 3276-P 816-12 0 DEMO / HIGH PRIORITY 0-FEASIBILITY/SCOPING
EVALUATE THE FEASIBILITY OF UPGRADING STONEWALL FRIERSON RD.ZHANG, HONG Remrks:
Typ Imp:
Project:Prj Mgr:
I-69 FRONTAGE ROAD (STONEWALL FRIERSON)
H.002337
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 327-S 257-03 STPFLEX 1,182 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
E BATON ROUGE LA 327-S 257-03 HSIP 1,297 SAFETY
NEW BRIDGEMOORE, DARRELL Remrks:
Typ Imp:257-03-0025
Project:Prj Mgr:
LA 327-S: BAYOU FOUNTAIN
EAST BATON ROUGE
H.002825
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 30 414-01 STP>200K 8,588 URBAN SYSTEMS 3-DESIGN/DEVELOPMENTE BATON ROUGE LA 30 414-01 HSIPPEN 3,160 SAFETY
WIDEN TO 4 LANES WITH MEDIANLEBAS, MELISSA Remrks:
Typ Imp:
Project:Prj Mgr:
LA 30(NICHOLSON DR): BRIGHTSIDE-GOURRIER
H.003047
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE I-10 450-10 STPFLEX 15,914 DEMO / HIGH PRIORITY 3-DESIGN/DEVELOPMENTE BATON ROUGE 000-17 STPFLEX 10,441 DEMO / HIGH PRIORITY E BATON ROUGE 000-17 LOCAL 8,787 DEMO / HIGH PRIORITY
NEW INTERCHANGEHANKS, ANNA Remrks:
Typ Imp:450-10-0161
Project:Prj Mgr:
PECUE LANE/I-10 INTERCHANGE
H.004100
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE I-10 450-10 GARVEE 360,000 CAPACITY 3-DESIGN/DEVELOPMENT
INCREASE CAPACITY(STAGE 3, 4 AND 5)OLIVIER, NICHOLAS Remrks:
Typ Imp:700-17-0209; INNOVATIVE PROCUREMENT STAGES 3, 4 AND 5
Project:Prj Mgr:
I-10: LA 415 TO ESSEN ON I-10 AND I-12
Page 2 - 26 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.007963
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 410 817-05 STPFLEX 1,811 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
NEW BRIDGEGAUDRY, CARL Remrks:
Typ Imp:817-05-0017
Project:Prj Mgr:
BLACKWATER BAYOU BRIDGE
H.009290
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 SR2S 190 SAFETY - SAFE ROUTES TO SCHOOLS 3-DESIGN/DEVELOPMENT
BICYCLE LANES AND EDUCATION AND ENCOURAGEMENT ACTIVITIESMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
LSU LABORATORY SCHOOL SRTS PROJECT
H.010319
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE I-110 450-92 NHPP 24,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT
RECONSTRUCT JCP @ GRADEMOORE, DARRELL Remrks:
Typ Imp:
Project:Prj Mgr:
I-110: NORTH ST. - PLANK RD.
H.011684
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 STPFLEX 7,350 ROAD TRANSFER 3-DESIGN/DEVELOPMENTE BATON ROUGE LA 327-S 257-03 STPFLEX 2,450 ROAD TRANSFER
EXTEND 4-LANE DIVIDED ROADWAYREVIERE, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 327 SPUR: STARING LANE EXTENSION
H.011695
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 19 250-01 0 ROAD TRANSFER 3-DESIGN/DEVELOPMENT
WIDENING OF LA 19MOSS, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 19 WIDENING: LA 64 - SUNSET BLVD
H.011791
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 STP>200K 1,025 URBAN SYSTEMS 3-DESIGN/DEVELOPMENTE BATON ROUGE 000-17 STP>200K 1,025 URBAN SYSTEMS
BRIDGE REPLACEMENTLEBAS, MELISSA Remrks:
Typ Imp:EAST BATON ROUGE WILL PROVIDE MATCH
Project:Prj Mgr:
CAL RD AND MOSS SIDE LN BR REPLACEMENTS
H.011843
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 STP>200K 2,700 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
ACCESS MANAGEMENTLEBAS, MELISSA Remrks:
Typ Imp:EAST BATON ROUGE PROVIDING MATCH
Project:Prj Mgr:
S. SHERWOOD FOREST BLVD SUPERSTREET MO
H.011859
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE US 61-X 817-20 TAP>200K 126 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SIDEWALK, STREET SCAPINGNUNES, BRIAN Remrks:
Typ Imp:MATCH PROVIDED BY CITY OF BATON ROUGE
Project:Prj Mgr:
BR: RIVER ROAD MULTI-USE CORRIDOR
H.012022
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 TAP>200K 1,200 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
MULTI-USE PATHMEEK, STEPHEN Remrks:
Typ Imp:LOCAL MATCH PROVIDED BY BREC
Project:Prj Mgr:
BREC: GREENWOOD MULTI-USE TRAIL, PHASE 2
Page 2 - 27 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.012059
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 37 254-03 STPFLEX 3,307 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
E BATON ROUGE LA 19 250-01 NHPP 3,159 PRESERVATION - BRIDGE (ONSYSTEM)
LA. 19 & LA. 37 BRIDGE REPLACEMENTSWINDMANN, ANDREW Remrks:
Typ Imp:
Project:Prj Mgr:
COPPER MILL B, N CANAL, & SANDY CR BRS
H.012469
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE US 190 007-10 NHPP 200 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
E BATON ROUGE US 190 007-10 OTHER 200 PRESERVATION - BRIDGE (ONSYSTEM)
NAVIGATIONAL LIGHTING SYSTEM REPLACEMENTGUIDRY, CHRIS Remrks:
Typ Imp:OTHER FUNDS ARE FROM RAILROAD
Project:Prj Mgr:
US 190: MRB - NAVIG LIGHT REPL (HBI)
H.012499
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 RTP 114 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTE BATON ROUGE 000-17 LOCAL 236 RECREATIONAL TRAILS PROGRAM
CONSTRUCTION OF A 5,700' LONG BY 12' WIDE PED/BIKE TRAILNUNES, BRIAN Remrks:
Typ Imp:DCRT IS THE PROJECT MANAGER
Project:Prj Mgr:
WARDS CREEK TRAIL - PECUE EXTENSION
H.012693
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 42 258-01 NHPP 250 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
ADD RIGHT TURNLANESPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 42 AT I-10: ADD RIGHT TURNLANE
H.013035
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 RTP 112 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTE BATON ROUGE 000-17 LOCAL 768 RECREATIONAL TRAILS PROGRAM
CONSTRUCTION OF 1.35 MILE LONG 12' MULTI-USE TRAILNUNES, BRIAN Remrks:
Typ Imp:DCRT IS THE PROJECT MANAGER
Project:Prj Mgr:
MANSIONS TO PERKINS TRAIL
H.013037
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 RTP 112 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTE BATON ROUGE 000-17 LOCAL 565 RECREATIONAL TRAILS PROGRAM
CONSTRUCTION OF 1.35 MILE BY 12' MULTI USE TRAILNUNES, BRIAN Remrks:
Typ Imp:DCRT IS THE PROJECT MANAGER
Project:Prj Mgr:
WARDS CREEK BRIDGE TO MALL TRAIL
H.013042
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 RTP 112 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTE BATON ROUGE 000-17 LOCAL 13 RECREATIONAL TRAILS PROGRAM
RESTORATION AND CONSTRUCTION OF TRAILS IN LARGE PUBLIC PARKNUNES, BRIAN Remrks:
Typ Imp:DCRT IS THE PROJECT MANAGER
Project:Prj Mgr:
LSU AGCENTER RESTORATION TRAILS
H.013366
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 STPENH 509 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SIDEWALKS, BIKE LANES, STRIPING AND LANDSCAPINGNUNES, BRIAN Remrks:
Typ Imp:EAST BATON ROUGE AND THE DDD WILL PROVIDE THE LOCAL MATCH.
Project:Prj Mgr:
DOWNTOWN GREENWY LOUISIANA CONNECTOR
Page 2 - 28 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.013367
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 STPENH 1,479 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SIDEWALKSMEEK, STEPHEN Remrks:
Typ Imp:EAST BATON ROUGE WILL PROVIDE THE LOCAL MATCH.
Project:Prj Mgr:
ELM GROVE GARDEN DR PED IMPROVEMENT EBR
H.013368
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 327-S 257-03 STPENH 309 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SHARED USE PATHNUNES, BRIAN Remrks:
Typ Imp:EAST BATON ROUGE PARISH WILL PROVIDE THE LOCAL MATCH.
Project:Prj Mgr:
LA 327 S GARDERE LANE SHARED USE PATH
H.013373
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE US 61-X 013-04 STPENH 1,862 ENHANCEMENTS 3-DESIGN/DEVELOPMENTE BATON ROUGE US 190 013-05 STPENH 132 ENHANCEMENTS E BATON ROUGE 000-17 STPENH 495 ENHANCEMENTS
STATIONS AND HUBS ON A NEW RAPID TRANSIT ROUTENUNES, BRIAN Remrks:
Typ Imp:CATS WILL PROVIDE THE LOCAL MATCH.
Project:Prj Mgr:
US 61 BUS: BUS RAPID TRANSIT STATIONS
H.013504
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 RTP 350 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENT
CONSTRUCTION OF 3,696' X 10' WIDE MULTI-USE TRAILNUNES, BRIAN Remrks:
Typ Imp:BREC OF BATON ROUGE WILL PROVIDE THE LOCAL MATCH
Project:Prj Mgr:
BRG TO ESSEN TRAIL
H.013512
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 RTP 112 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTE BATON ROUGE 000-17 LOCAL 810 RECREATIONAL TRAILS PROGRAM
CONSTRUCTION OF 5,808' X 10' WIDE MULTI-USE TRAILNUNES, BRIAN Remrks:
Typ Imp:BREC OF BATON ROUGE WILL PROVIDE LOCAL MATCH
Project:Prj Mgr:
PERKINS TO PAULET TRAIL
H.013542
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 STP>200K 2,119 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENT (OFF-SYSTEM)LEBAS, MELISSA Remrks:
Typ Imp:EAST BATON ROUGE TO PROVIDE MATCH.
Project:Prj Mgr:
CHEVELLE AND SARASOTA DR BR REPLACEMENT
H.013755
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE I-10 450-10 0 CAPACITY 3-DESIGN/DEVELOPMENT
AMICABLE ADVANCE RIGHT OF WAY ACQUISITIONKENDRICK, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-10:NICHOLSON - ACADIAN R/W ACQUISITION
H.013931
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 RTP 63 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTE BATON ROUGE 000-17 LOCAL 178 RECREATIONAL TRAILS PROGRAM
CONST. OF 575' PED-BIKE CONNECTING TRAILNUNES, BRIAN Remrks:
Typ Imp:BREC WILL PROVIDE THE LOCAL MATCH
Project:Prj Mgr:
ESSEN BRIDGE TO OLOL TRAIL
H.013933
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 RTP 63 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTE BATON ROUGE 000-17 LOCAL 199 RECREATIONAL TRAILS PROGRAM
CONST. OF 520' PED-BIKE CONNECTING TRAILNUNES, BRIAN Remrks:
Typ Imp:BREC WILL PROVIDE THE LOCAL MATCH
Project:Prj Mgr:
DIJON TO ESSEN BRIDGE TRAIL
Page 2 - 29 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.014100
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 408 255-01 NHPP 1,400 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
E BATON ROUGE LA 408 255-02 NHPP 12,600 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
PCCP PATCH, MILL AND OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 408: I-110 - LA 37
H.014128
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE US 190 013-05 NHPP 9,500 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
MILL, PATCH, OVERLAY, AND DRAINAGEMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 190: UPASS US 61 - LIVINGSTON P/L
H.014259
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 37 254-02 STPFLEX 825 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
E BATON ROUGE LA 37 254-03 STPFLEX 3,307 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTWINDMANN, ANDREW Remrks:
Typ Imp:
Project:Prj Mgr:
LA 37: SANDY BYU AND HUBS CREEK BRIDGES
H.007439
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 TAP>200K 609 ENHANCEMENTS 1-PLANNING/ENVIRONMENTALE BATON ROUGE 000-17 LOCAL 596 ENHANCEMENTS
WIDENING EXISTING ROAD TO CONSTRUCT BIKE LANESNUNES, BRIAN Remrks:
Typ Imp:MATCH IS 15% TOLL CREDITS AND 5% LOCAL
Project:Prj Mgr:
HYACINTH AVENUE BIKE LANES
H.010051
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 TAP>200K 267 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL
SIDEWALKS W/LIGHTING & LANDSCAPINGMEEK, STEPHEN Remrks:
Typ Imp:
Project:Prj Mgr:
LSU HIGHLAND RD PED CORRIDOR, PHASE I
H.010729
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 67 060-01 CM 4,413 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTALE BATON ROUGE LA 73 077-05 CM 232 CONGESTION MITIGATION E BATON ROUGE US 61-X 013-04 CM 697 CONGESTION MITIGATION E BATON ROUGE 000-17 CM 2,787 CONGESTION MITIGATION
TRAFFIC SIGNAL COORDINATION & SYNCHRONIZATIONHANKS, ANNA Remrks:
Typ Imp:EBR WILL PROVIDE 20% MATCH
Project:Prj Mgr:
TRAFFIC SIGNAL COORD & SYNCH PH VI (EBR)
H.011186
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 3164 019-01 STPFLEX 375 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
1-PLANNING/ENVIRONMENTAL
NOT ASSIGNED 013-04 NHPP 125 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
NOT ASSIGNED 060-01 NHPP 250 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
UPDATE OF SIGNAL TIMINGS ALONG US 61#MULTIVALUE Remrks:
Typ Imp:
Project:Prj Mgr:
US 61: LA 408-THOMAS RD SIGNAL RETIMING
Page 2 - 30 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.011310
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 3244-1 870-18 0 ROAD TRANSFER 1-PLANNING/ENVIRONMENTAL
CONSTRUCTION OF NEW ROADWAY (DETAILS TBD BY STUDY)MASTIN, CATHERINE Remrks:
Typ Imp:
Project:Prj Mgr:
FORD STREET EXTENSION
H.011543
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 3164 019-01 CM 3,421 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTALE BATON ROUGE US 61 019-02 CM 540 CONGESTION MITIGATION E BATON ROUGE LA 408 255-01 CM 398 CONGESTION MITIGATION E BATON ROUGE 000-17 CM 1,385 CONGESTION MITIGATION E BATON ROUGE LA 37 254-01 CM 1,014 CONGESTION MITIGATION E BATON ROUGE LA 37 254-02 CM 1,022 CONGESTION MITIGATION
TRAFFIC SIGNAL COORDINATION AND SIGNAL SYNCHRONIZATIONHANKS, ANNA Remrks:
Typ Imp:USE LOCAL AS MATCH
Project:Prj Mgr:
TRAFFIC SIGNAL COORD & SYNCH PH VII(EBR)
H.013053
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE I-10 450-10 NHPP 250 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
1-PLANNING/ENVIRONMENTAL
REPLACE EXISTING OVERHEAD SIGN TRUSS AND SIGN FACESNGO, DUC Remrks:
Typ Imp:
Project:Prj Mgr:
I-10/I-110 SPLIT OH SIGN TRUSS UPGRADE
H.013267
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 CM 4,026 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTALE BATON ROUGE US 61-X 019-01 CM 76 CONGESTION MITIGATION E BATON ROUGE I-110 450-92 CM 25 CONGESTION MITIGATION
CONSTRUCT PEDESTRIAN/BIKE PATHSNUNES, BRIAN Remrks:
Typ Imp:BREC WILL PROVIDE MATCH
Project:Prj Mgr:
SCOTLANDVILLE PKWY TO DWTN BR TRAIL-PH 1
H.013410
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 CM 975 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL
CONSTRUCT ROUNDABOUTMCMILLAN, RYAN Remrks:
Typ Imp:CITY OF BATON ROUGE TO PROVIDE MATCH
Project:Prj Mgr:
LEE DR AT HYACINTH AVE ROUNDABOUT
H.013797
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 30 414-01 0 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTALIBERVILLE LA 30 414-02 0 URBAN SYSTEMS ASCENSION LA 30 414-03 0 URBAN SYSTEMS
ENVIRONMENTAL ANALYSIS FOR CORRIDOR WIDENINGLEBAS, MELISSA Remrks:
Typ Imp:CRPC TO PROVIDE MATCH
Project:Prj Mgr:
LA 30 WIDENING: BRIGHTSIDE - I-10
H.002297
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 37 254-02 NFI 0 OTHER / MISCELLANEOUS 0-FEASIBILITY/SCOPINGE BATON ROUGE LA 37 254-03 NFI 0 OTHER / MISCELLANEOUS
RECON W/GEOMETRIC IMPROVEMENTSPICARD, TOBY Remrks:
Typ Imp:254-02-0040;
Project:Prj Mgr:
LA 37: SULLIVAN ROAD - LIBERTY ROAD
H.011690
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 0 ROAD TRANSFER 0-FEASIBILITY/SCOPING
FEASIBILITY STUDY TO WIDEN PORT HUDSON PRIDE RDMOSS, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
PORT HUDSON PRIDE RD: LA 964-LA 19 STUDY
Page 2 - 31 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.012025
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE I-110 450-92 0 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE
0-FEASIBILITY/SCOPING
BRIDGE PREVENTIVE MAINTENANCE WORKTULLIER, DANNY Remrks:
Typ Imp:
Project:Prj Mgr:
I-110 IN BATON ROUGE BRIDGE REPAIRS
H.012306
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 42 258-31 0 ROAD TRANSFER 0-FEASIBILITY/SCOPINGE BATON ROUGE 000-17 0 ROAD TRANSFER
INTERSECTION IMPROVEMENTSZHANG, HONG Remrks:
Typ Imp:
Project:Prj Mgr:
LA 42: HIGHLAND ROAD AT PECUE LANE
H.012324
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE US 61 007-90 0 SAFETY 0-FEASIBILITY/SCOPING
TRAFFIC STUDYTONEY, PATRICK Remrks:
Typ Imp:
Project:Prj Mgr:
US61:FL BLVD-MISS RIVER BR(TRAFFIC STDY)
H.012357
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE I-12 454-01 0 SAFETY 0-FEASIBILITY/SCOPINGLIVINGSTON I-12 454-02 0 SAFETY
FEASIBILITY STUDYGLASCOCK, STEPHEN Remrks:
Typ Imp:
Project:Prj Mgr:
I-12 SHOULDER FEASIBILITY STUDY
H.012563
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 73 077-04 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
FEASIBILITY STUDY TO DETERMINE REHABILITATION/REPLACEMENTBUCCI, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
LA 73: BAYOU MANCHAC BRIDGE (HBI)
H.013029
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 0 SAFETY 0-FEASIBILITY/SCOPING
SAFETY STUDY FOR INTERSECTION IMPROV. FOCUSED ON PED/BIKESDEVILLE, JESSICA Remrks:
Typ Imp:
Project:Prj Mgr:
BATON ROUGE PED/BIKE SAFETY ACTION PLAN
H.013073
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 HSIPPEN 173 SAFETY - SAFE ROUTES TO PUBLICPLACES
0-FEASIBILITY/SCOPING
E BATON ROUGE LA 37 254-01 HSIPPEN 403 SAFETY - SAFE ROUTES TO PUBLICPLACES
FEASIBILITY STUDY FOR SIDEWALKS AND BICYCLE PATHS CONSTRUCTRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
LA 37 & WOODDALE BLVD: PED IMP (BR)
H.013622
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 0 SAFETY - LOCAL ROADS SAFETY 0-FEASIBILITY/SCOPING
FEASIBILITYRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
LRSP ARDENWOOD DR ROAD DIET
H.013751
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 HSIPPEN 0 SAFETY - SAFE ROUTES TO PUBLICPLACES
0-FEASIBILITY/SCOPING
FEASIBILITY STUDYRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
DOWNTOWN GREENWAY LA CONNECTOR (BR)
Page 2 - 32 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.014043
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 0 DEMO / HIGH PRIORITY 0-FEASIBILITY/SCOPING
VALUE CAPTURE FOR LPAMOORE, TANYA Remrks:
Typ Imp:CAPITAL REGION PLANNING COMMISION TO PAY MATCH
Project:Prj Mgr:
VALUE CAPTURE FOR LOCAL PUBLIC AGENCIES
H.001961
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E CARROLL LA 134 161-08 STPFLEX 1,350 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
E CARROLL LA 134 161-08 STP<5K-E 1,947 PRESERVATION - BRIDGE (ONSYSTEM)
NEW BRIDGESMISTICH, BRADLEY Remrks:
Typ Imp:161-08-0022;2 BRIDGES
Project:Prj Mgr:
JOES BAYOU & CARRAWAY LAKE BRIDGES
EAST CARROLL
H.012031
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E CARROLL LA 585 332-05 STPFLEX 1,334 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTHERATH, ANANDA Remrks:
Typ Imp:
Project:Prj Mgr:
LA 585: DRAINAGE CANAL BRIDGE
H.012895
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E CARROLL LA 580 818-01 STPFLEX 2,040 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
W CARROLL LA 585 185-03 STPFLEX 840 PRESERVATION - BRIDGE (ONSYSTEM)
W CARROLL LA 582 333-01 NFA 360 PRESERVATION - BRIDGE (ONSYSTEM)
W CARROLL LA 877 337-03 NFA 640 PRESERVATION - BRIDGE (ONSYSTEM)
MOREHOUSE LA 554 160-02 NFA 480 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:
Typ Imp:USE NFA AS MATCH ON CS 818-01
Project:Prj Mgr:
DIST05:ABC BR REP E CAR,W CAR,MOR PARISH
H.012110
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E FELICIANA LA 68 252-02 STPFLEX 2,900 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
STABILIZE AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 68: US 61 - LA 964
EAST FELICIANA
H.013955
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E FELICIANA LA 961 819-04 STP<5K-E 929 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTRANCK, AMANDA Remrks:
Typ Imp:
Project:Prj Mgr:
LA 961: SANDY CREEK BRIDGE
H.012554
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E FELICIANA LA 67 060-04 STPFLEX 2,963 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
STABILIZE AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 67: LA 432 - MISS ST LN
Page 2 - 33 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.012565
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E FELICIANA LA 963 819-19 FBROFF 1,202 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
E FELICIANA LA 963 819-19 STGEN 915 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTSMISTICH, BRADLEY Remrks:
Typ Imp:AC; USE NFA AS MATCH
Project:Prj Mgr:
LA 963: LITTLE REDWOOD & REDWOOD CR BRS
H.012995
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E FELICIANA LA 67 060-04 STPFLEX 5,850 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
MILL, STABILIZE, OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 67: LA 10 - LA 432
H.014251
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E FELICIANA LA 422 819-02 STGEN 573 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
E FELICIANA LA 422 819-02 FBROFF 744 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTTOURRES, VALERIE Remrks:
Typ Imp:AC; USE NFA AS MATCH
Project:Prj Mgr:
LA 422: RICHLAND CREEK & STREAM BRIDGES
H.014254
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E FELICIANA LA 955 819-15 STGEN 915 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
E FELICIANA LA 955 819-15 FBROFF 402 PRESERVATION - BRIDGE (ONSYSTEM)
E FELICIANA LA 955 819-15 STGEN 1,257 PRESERVATION - BRIDGE (ONSYSTEM)
E FELICIANA LA 955 819-15 FBROFF 573 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTTOURRES, VALERIE Remrks:
Typ Imp:AC; USE NFA AS MATCH
Project:Prj Mgr:
LA 955: BRIDGES NEAR CLINTON
H.014256
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E FELICIANA LA 952 819-05 STGEN 915 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
E FELICIANA LA 952 819-05 STGEN 2,112 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTTOURRES, VALERIE Remrks:
Typ Imp:AC, USE NFA AS MATCH
Project:Prj Mgr:
LA 952: MCKOWEN & BEAVER CREEK BRS
H.014257
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E FELICIANA LA 68 252-03 STGEN 2,625 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTTOURRES, VALERIE Remrks:
Typ Imp:AC
Project:Prj Mgr:
LA 68: KARRS CREEK BRIDGE
H.010219
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
EVANGELINE LA 104 200-02 STPFLEX 2,286 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
STABLIZE BASE & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 104: ALLEN P/L - LA 3277
EVANGELINE
Page 2 - 34 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.013009
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
EVANGELINE LA 104 202-01 STPFLEX 600 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
EVANGELINE LA 3149 820-42 NFA 480 PRESERVATION - BRIDGE (ONSYSTEM)
EVANGELINE LA 3187 820-43 NFA 240 PRESERVATION - BRIDGE (ONSYSTEM)
ST LANDRY LA 752 849-07 NFA 360 PRESERVATION - BRIDGE (ONSYSTEM)
ST LANDRY LA 358 849-18 NFA 240 PRESERVATION - BRIDGE (ONSYSTEM)
ST LANDRY LA 755-S 849-48 STPFLEX 240 PRESERVATION - BRIDGE (ONSYSTEM)
IBERIA LA 85 236-02 STPFLEX 360 PRESERVATION - BRIDGE (ONSYSTEM)
IBERIA LA 682 823-34 NFA 720 PRESERVATION - BRIDGE (ONSYSTEM)
VERMILION LA 700 207-04 NFA 360 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:
Typ Imp:
Project:Prj Mgr:
DIST03:ABC BR REP EV,ST LA,IB,VER PARS
H.013141
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
EVANGELINE 000-20 FBROFF 583 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENT - NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
GREEN VALLEY ROAD OVER PETITE PASSE
H.013951
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
EVANGELINE LA 1162 820-18 STP<5K-E 582 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTRANCK, AMANDA Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1162: BAYOU BRIDGE
H.013976
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
EVANGELINE LA 376 820-30 STP<5K-E 408 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
EVANGELINE LA 376 820-30 FBROFF 573 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTRANCK, AMANDA Remrks:
Typ Imp:NFA AS MATCH
Project:Prj Mgr:
LA 376: BAYOU BRIDGES
H.013460
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
EVANGELINE US 167 066-07 0 SAFETY 0-FEASIBILITY/SCOPING
FEASIBILITY STUDY FOR REALIGNMENT OF US 167ZHANG, HONG Remrks:
Typ Imp:
Project:Prj Mgr:
US 167: ENOLA STREET TO ROSS ROAD
H.013789
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
EVANGELINE 000-20 0 SAFETY - LOCAL ROADS SAFETY 0-FEASIBILITY/SCOPING
FEASIBILITY STUDYRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
CURVE SIGNING & STRIPING (EVANGELINE)
Page 2 - 35 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.009583
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
FRANKLIN LA 4 036-02 STPFLEX 452 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
PATCHING & SINGLE LIFT OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 4: LA 562 - LA 128
FRANKLIN
H.009605
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
FRANKLIN LA 4 036-03 STPFLEX 1,716 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
CHIP SEALSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 4: LA 128 - LA 15
H.011564
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
FRANKLIN LA 857 168-01 STPFLEX 2,400 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
PATCH & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 857: LA 15 - LA 132
H.012199
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
FRANKLIN US 425 026-06 NHPP 1,700 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
FRANKLIN US 425 026-07 NHPP 1,300 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
COLD PLANE & OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 425: WINNSBORO 5-LANE
H.014119
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
FRANKLIN LA 868 821-10 NFA 1,500 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
STABILIZE BASE & OVERLAYBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 868: LA 15 - LA 867
H.014250
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
FRANKLIN LA 577 344-01 STPFLEX 744 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
FRANKLIN LA 577 344-01 STGEN 744 PRESERVATION - BRIDGE (ONSYSTEM)
FRANKLIN LA 577 344-01 STPFLEX 425 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTTOURRES, VALERIE Remrks:
Typ Imp:AC
Project:Prj Mgr:
LA 577: BULL BAYOU AND CREEK BRIDGES
Page 2 - 36 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.012910
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
GRANT US 167 023-03 NHPP 1,290 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
GRANT LA 472 365-01 NFA 840 PRESERVATION - BRIDGE (ONSYSTEM)
NATCHITOCHES LA 119 118-02 STPFLEX 720 PRESERVATION - BRIDGE (ONSYSTEM)
NATCHITOCHES LA 1226 359-01 NFA 960 PRESERVATION - BRIDGE (ONSYSTEM)
WINN LA 126 091-07 STPFLEX 600 PRESERVATION - BRIDGE (ONSYSTEM)
WINN LA 124 125-01 STPFLEX 2,640 PRESERVATION - BRIDGE (ONSYSTEM)
WINN LA 499 126-02 NFA 360 PRESERVATION - BRIDGE (ONSYSTEM)
WINN LA 505 321-02 NFA 480 PRESERVATION - BRIDGE (ONSYSTEM)
WINN LA 1229 864-13 NFA 480 PRESERVATION - BRIDGE (ONSYSTEM)
WINN LA 1234 864-14 NFA 1,320 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:
Typ Imp:
Project:Prj Mgr:
DIST08:ABC BR REP GRAN, NATCH, WINN PARS
GRANT
H.013205
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
GRANT US 165 015-04 NHPP 800 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
PATCHING, MILLING, AND OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 165: SB LANE - LA 1230 TO LASALLE P/L
H.013206
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
GRANT US 165 015-04 NHPP 1,300 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
PATCHING, MILLING, AND OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 165: SB LANE - LA 524 TO LA 123
H.013906
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
GRANT 000-22 RTP 150 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTGRANT 000-22 LOCAL 100 RECREATIONAL TRAILS PROGRAM
CONST. 35 MILES, SINGLE TRACK TRAILS AND TRAILHEAD INFRASTRCNUNES, BRIAN Remrks:
Typ Imp:BREEZY HILL DIRT RIDERS WILL PROVIDE MATCH
Project:Prj Mgr:
SOCIA BRANCH SINGLE TRACK TRAIL
H.014103
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
GRANT LA 8 040-03 STPFLEX 732 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
3-DESIGN/DEVELOPMENT
ASPHALT SURFACE TREATMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 8: US 165 - GRANT P/L
H.014144
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
GRANT LA 500 128-03 NFA 5,016 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
OVERLAYBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 500: WINN PL TO US 165
Page 2 - 37 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.012543
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
GRANT LA 8 040-03 STPFLEX 4,985 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTMISTICH, BRADLEY Remrks:
Typ Imp:
Project:Prj Mgr:
LA 8: BIG CREEK BRIDGE
H.014243
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
GRANT LA 472 365-01 STGEN 1,257 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
GRANT LA 472 365-01 FBROFF 1,086 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTTOURRES, VALERIE Remrks:
Typ Imp:AC; USE NFA AS MATCH
Project:Prj Mgr:
LA 472: INDIAN & BIG BEAR CREEK BRS
H.002762
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA LA 86 400-01 STPFLEX 3,850 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
STABILIZE BASE AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:400-01-0007; 400-01 NFA MATCH
Project:Prj Mgr:
LA 86: LA 3242 - LA 347
IBERIA
H.006128
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA 000-23 FBROFF 4,177 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:
Typ Imp:713-23-0001;MOVEABLE BRIDGE
Project:Prj Mgr:
VIDA SHAW BRIDGE OVER BAYOU TECHE
H.007453
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA LA 675 823-02 TAP>200K 865 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
NEW SIDEWALKSNUNES, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
HOPKINS STREET SIDEWALKS, PHASE II
H.009856
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA 000-23 RAIL PD 280 RAILROADS 3-DESIGN/DEVELOPMENTIBERIA 000-23 LOCAL 70 RAILROADS
INSTALL FLASHING LIGHTS & GATESSHREWSBERRY,BILL Remrks:
Typ Imp:714-23-0100
Project:Prj Mgr:
BNSF (NEW IBERIA) JULIA ST.
H.009857
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA 000-23 RAIL PD 280 RAILROADS 3-DESIGN/DEVELOPMENTIBERIA 000-23 LOCAL 70 RAILROADS
INSTALL FLASHING LIGHTS & GATESSHREWSBERRY,BILL Remrks:
Typ Imp:714-23-0101
Project:Prj Mgr:
BNSF (NEW IBERIA) IBERIA ST.
H.009891
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA 000-23 RAIL PD 280 RAILROADS 3-DESIGN/DEVELOPMENTIBERIA 000-23 LOCAL 70 RAILROADS
INSTALL F/L'S AND GATESSHREWSBERRY,BILL Remrks:
Typ Imp:714-23-0099
Project:Prj Mgr:
BNSF (NEW IBERIA) WEEKS ST.
Page 2 - 38 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.009892
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA US 90 424-04 STPFLEX 340 RAILROADS 3-DESIGN/DEVELOPMENTIBERIA US 90 424-04 LOCAL 10 RAILROADS
NEW XING PER DISTRICT 03 & NEW IBERIARICHARD, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
LDRR (NEW IBERIA) US 90 FR
H.011026
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA LA 182 004-04 STPFLEX 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
3-DESIGN/DEVELOPMENT
DRAINAGE STRUCTURE REMOVAL AND REPLACEMENT, ROADWAY WORGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 182 WB: LASALLE ST. - VINE ST.
H.012991
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA LA 87 823-27 STPFLEX 1,530 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
IBERIA LA 87 241-01 STPFLEX 510 PRESERVATION - NON-INTERSTATEON STP SYSTEM
COLD PLANE, PATCH, ASPHALT OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 87: LA 3182 - ST MARY P/L
H.013083
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA LA 675 823-02 HSIPPEN 272 SAFETY - SAFE ROUTES TO PUBLICPLACES
3-DESIGN/DEVELOPMENT
INSTALLATION OF SIDEWALKMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
JEFFERSON ISLAND SIDEWALK
H.013140
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA 000-23 FBROFF 388 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENT - NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
EIGHTY ARPENT ROAD OVER UNNAMED COULEE
H.013522
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA 000-23 STP>200K 1,776 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
CONTINUOUS TURN LANERICHARD, RYAN Remrks:
Typ Imp:IBERIA PARISH TO PROVIDE MATCH.
Project:Prj Mgr:
S LEWIS ST WIDENING
H.013910
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA 000-23 RTP 113 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTIBERIA 000-23 LOCAL 52 RECREATIONAL TRAILS PROGRAM
CONST. OF A .42 ACRE PED-BIKE AND PADDLE TRAILHEADNUNES, BRIAN Remrks:
Typ Imp:CITY OF NEW IBERIA WILL PROVIDE LOCAL MATCH
Project:Prj Mgr:
NEW IBERIA TRAILHEAD
H.011987
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA LA 182 004-05 STPFLEX 1,333 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTYAP, KIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 182: SANDAGER CANAL BRIDGE
Page 2 - 39 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.012295
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA LA 182 004-04 STPFLEX 2,850 OPER EFFICIENCY/MOTORISTASSISTANCE - AMERICANS WITHDISABILITIES ACT
1-PLANNING/ENVIRONMENTAL
IBERIA LA 182 004-05 STPFLEX 2,929 OPER EFFICIENCY/MOTORISTASSISTANCE - AMERICANS WITHDISABILITIES ACT
SIDEWALK IMPROVEMENTS AND ADA RAMPSBRIGNAC, CHRISTINA Remrks:
Typ Imp:
Project:Prj Mgr:
LA 182 NEW IBERIA SIDEWALKS
H.014216
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA LA 682 823-34 STGEN 915 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
IBERIA LA 682 823-34 FBROFF 402 PRESERVATION - BRIDGE (ONSYSTEM)
IBERIA LA 682 823-34 FBROFF 402 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENT.TOURRES, VALERIE Remrks:
Typ Imp:AC; USE NFA AS MATCH
Project:Prj Mgr:
LA 682: NORRIS CANAL & CREEK BRIDGES
H.011988
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA LA 86 237-01 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
LA 86: BAYOU TECHE MB REHAB (HBI)
H.011991
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA LA 86 400-31 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
LA 86:BAYOU TECHE MB DASPIT REHAB (HBI)
H.012738
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA LA 344 823-14 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
MOVABLE BRIDGE REHABILITATIONHINGLE, STEWART Remrks:
Typ Imp:
Project:Prj Mgr:
LA 344:B TECHE MB REHAB - MORBIHAN (HBI)
H.013770
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA 000-23 0 SAFETY - LOCAL ROADS SAFETY 0-FEASIBILITY/SCOPING
FEASIBILITY STUDYRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
LRSP SIGNING AND STRIPING (IBERIA)
H.014191
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA LA 3195 823-44 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
FEASIBILITY STUDY OF MOVABLE BRIDGE REHABHINGLE, STEWART Remrks:
Typ Imp:
Project:Prj Mgr:
LA3195:BYU TECHE MB-NELSON (HBI)
Page 2 - 40 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.012512
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERVILLE 000-24 RTP 76 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTIBERVILLE LA 69 231-02 RTP 38 RECREATIONAL TRAILS PROGRAM IBERVILLE 000-24 LOCAL 13 RECREATIONAL TRAILS PROGRAM IBERVILLE LA 69 231-02 LOCAL 13 RECREATIONAL TRAILS PROGRAM
CONSTRUCTION OF 2,640' SHARED USE PATHNUNES, BRIAN Remrks:
Typ Imp:DCRT IS THE PROJECT MANAGER
Project:Prj Mgr:
WHITE CASTLE MISS RIVER LEVEE TRAIL
IBERVILLE
H.012588
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERVILLE I-10 450-07 NHPP 13,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT
GRADE RAISINGMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: ATCH BASIN BR - W BATON ROUGE P/L
H.013242
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERVILLE LA 75 230-03 STPFLEX 550 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
3-DESIGN/DEVELOPMENT
RAISE ROADWAY ELEVATION TO PREVENT FLOODINGGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 75 ROADWAY FLOODING: 3 MI N LA 404
H.013509
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERVILLE 000-24 RTP 202 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTIBERVILLE 000-24 LOCAL 115 RECREATIONAL TRAILS PROGRAM
CONST. OF 1400' PED/BIKE TRAIL ON TOP OF LEVEENUNES, BRIAN Remrks:
Typ Imp:CITY OF PLAQUEMINE WILL PROVIDE THE LOCAL MATCH
Project:Prj Mgr:
PLAQUEMINE RIVERFRONT RECREATIONAL TRAIL
H.013715
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERVILLE LA 77 219-01 RAIL HE 600 RAILROADS 3-DESIGN/DEVELOPMENTIBERVILLE LA 75 824-02 RAIL HE 300 RAILROADS
ROAD WORK & UPGRADE WARNINGLUKE, SHAWN Remrks:
Typ Imp:MATCH FROM RAILROAD
Project:Prj Mgr:
LA 77 & 75: UP RR XINGS (IBERVILLE)
H.013935
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERVILLE 000-24 RTP 63 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTIBERVILLE 000-24 LOCAL 254 RECREATIONAL TRAILS PROGRAM
CONST. OF 2510' PED-BIKE TRAIL ON TOP OF LEVEENUNES, BRIAN Remrks:
Typ Imp:CITY OF PLAQUEMINE TO PROVIDE LOCAL MATCH
Project:Prj Mgr:
NORTH TRAIL PARK CONNECTION (PH 2)
H.013968
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERVILLE LA 404 405-01 STP<5K-E 1,625 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
IBERVILLE LA 404 405-01 STP<5K-E 1,277 PRESERVATION - BRIDGE (ONSYSTEM)
IBERVILLE LA 404 405-01 STPFLEX 573 PRESERVATION - BRIDGE (ONSYSTEM)
IBERVILLE LA 404 405-01 STPFLEX 402 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTRANCK, AMANDA Remrks:
Typ Imp:
Project:Prj Mgr:
LA 404: BAYOU AND CANAL BRIDGES
Page 2 - 41 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.012060
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERVILLE LA 75-S 824-18 FBROFF 15,535 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
MOVABLE BRIDGE REPLACEMENT/REHABILITATIONBRIGNAC, CHRISTINA Remrks:
Typ Imp:NFA AS MATCH
Project:Prj Mgr:
LA75S:BAYOU SORREL MOVABLE BRIDGE (HBI)
H.001553
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JACKSON LA 146 068-02 STP<5K 4,696 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
NEW BRIDGESMISTICH, BRADLEY Remrks:
Typ Imp:068-02-0017;3 BRIDGES & JT W/068-03-0021 2BRS
Project:Prj Mgr:
LA 146 BRIDGES NEAR KELLEYS
JACKSON
H.012897
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JACKSON LA 148 316-02 NFA 840 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
JACKSON LA 144 318-01 STPFLEX 240 PRESERVATION - BRIDGE (ONSYSTEM)
JACKSON LA 556 318-02 NFA 2,880 PRESERVATION - BRIDGE (ONSYSTEM)
JACKSON LA 542 319-01 STPFLEX 1,080 PRESERVATION - BRIDGE (ONSYSTEM)
JACKSON LA 810 825-04 NFA 720 PRESERVATION - BRIDGE (ONSYSTEM)
LINCOLN LA 507 308-04 STPFLEX 240 PRESERVATION - BRIDGE (ONSYSTEM)
LINCOLN LA 3061 831-13 STPFLEX 240 PRESERVATION - BRIDGE (ONSYSTEM)
UNION LA 550 311-01 STPFLEX 480 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:
Typ Imp:
Project:Prj Mgr:
DIST05:ABC BR REP JACK,LIN,UNION PARISH
H.012962
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JACKSON LA 155 090-06 STPFLEX 217 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
3-DESIGN/DEVELOPMENT
ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 155: BIENVILLE PL - US 167
H.002861
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 3139 430-01 NFI 70,000 DEMO / HIGH PRIORITY 3-DESIGN/DEVELOPMENTJEFFERSON LA 3046 423-01 0 DEMO / HIGH PRIORITY
NEW INTERCHANGEYANG, LI Remrks:
Typ Imp:430-01-0013;JEFF. PH CONSULTANT WORKING (E)
Project:Prj Mgr:
CAUSEWAY BLVD - EARHART EXPRESSWAY INTE
JEFFERSON
H.007181
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON 000-26 STP>200K 4,500 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
NEW ROADWAY AND ALIGNMENTLEBAS, MELISSA Remrks:
Typ Imp:USE LOCAL AS MATCH
Project:Prj Mgr:
L&A ROAD IMPROVEMENTS
Page 2 - 42 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.007208
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 3017 826-11 STP>200K 1,537 URBAN SYSTEMS 3-DESIGN/DEVELOPMENTJEFFERSON 000-26 STP>200K 13,040 URBAN SYSTEMS
NEW ROADWAY EXTENSIONLEBAS, MELISSA Remrks:
Typ Imp:742-26-0073; SEE NOTES
Project:Prj Mgr:
HARVEY BLVD EXT(PETERS RD-MANHATTAN
H.010418
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 611-1 826-14 STPFLEX 200 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
JEFFERSON LA 611-1 826-16 STPFLEX 500 PRESERVATION - NON-INTERSTATEON STP SYSTEM
JEFFERSON LA 611-1 826-16 STPFLEX 100 PRESERVATION - NON-INTERSTATEON STP SYSTEM
JEFFERSON LA 611-1 826-17 STPFLEX 325 PRESERVATION - NON-INTERSTATEON STP SYSTEM
COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETESPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 611-1 & LA 611-3:COLD PLANE & OVERLAY
H.010673
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON US 90-Z 283-09 NHPP 10,160 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
JEFFERSON US 90-Z 283-09 STP>200K 2,540 URBAN SYSTEMS JEFFERSON US 90-Z 283-09 NFI 14,300 #
CLEANING, MECHANICAL, ELECTRICAL AND STRUCTURAL REHABILITATIFUSILIER, JACOB Remrks:
Typ Imp:SEE NOTES FOR FUNDING INFO.
Project:Prj Mgr:
US90Z:HARVEY CANAL TUNNEL REHABILITATION
H.011732
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON 000-26 STP>200K 6,557 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
BIKE LANES; SIDEWALKS AND CROSSWALKSLEBAS, MELISSA Remrks:
Typ Imp:JEFFERSON PARISH PROVIDING MATCH
Project:Prj Mgr:
JEFFERSON PARISH: CANAL ST. IMPROVEMENTS
H.011779
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON 000-26 TAP>200K 2,011 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
MULTI-USE PATHNUNES, BRIAN Remrks:
Typ Imp:MATCH PROVIDED BY CITY OF KENNER.
Project:Prj Mgr:
POWER BLVD MEDIAN IMPROVEMENTS
H.011805
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON 000-26 TAP>200K 481 ENHANCEMENTS 3-DESIGN/DEVELOPMENTJEFFERSON LA 541 826-13 TAP>200K 141 ENHANCEMENTS
MULTI-USE PATHNUNES, BRIAN Remrks:
Typ Imp:MATCH PROVIDED BY JEFFERSON PARISH
Project:Prj Mgr:
JEFFERSON WB MISS RIVER MU PATH 3B & 3C
H.012012
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON 000-26 STP>200K 1,434 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
CONCRETE OVERLAYLEBAS, MELISSA Remrks:
Typ Imp:JEFFERSON PARISH PROVIDING MATCH
Project:Prj Mgr:
RIDGEWOOD/STROELITZ (AIRLINE TO LOUMOR)
H.012489
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON I-10 450-15 RTP 114 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTJEFFERSON I-10 450-15 LOCAL 66 RECREATIONAL TRAILS PROGRAM
CONSTRUCTION OF A 3,665' LONG BY 13' WIDE PED-BIKE TRAILNUNES, BRIAN Remrks:
Typ Imp:DCRT IS THE PROJECT MANAGER
Project:Prj Mgr:
I-10 TRAIL WIDENING, JEFFERSON PARISH
Page 2 - 43 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.012594
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 3134 429-02 STPFLEX 250 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
ADD J TURNS & U TURNS AT THE INTERSECTION OF LA 3134 & LA 45SPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3134: INTERSECTION IMP @ LA 45
H.012619
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 48 006-30 NHPP 450 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
3-DESIGN/DEVELOPMENT
DRAINAGE IMPROVEMENTSGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 48 @ PLANTATION RD
H.012620
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 48 006-30 NHPP 600 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
3-DESIGN/DEVELOPMENT
DRAINAGE IMPROVEMENTSGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 48: EVANS RD - EDWARDS AVE
H.012885
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 466 063-02 STP>200K 4,364 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
BIKE LANES, MULTI-USE PATHS, ADA SIDEWALKSLEBAS, MELISSA Remrks:
Typ Imp:CITY OF GRETNA WILL PROVIDE MATCH
Project:Prj Mgr:
LA 466: 5TH ST IMPROVEMENTS (GRETNA)
H.013090
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 18 063-02 HSIPPEN 120 SAFETY - SAFE ROUTES TO PUBLICPLACES
3-DESIGN/DEVELOPMENT
JEFFERSON LA 18 063-02 STPFLEX 96 OPER EFFICIENCY/MOTORISTASSISTANCE - AMERICANS WITHDISABILITIES ACT
SIDEWALKS, ADA RAMPS, DRAINAGE STRUCTURES, PED ISLANDSMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
GRETNA DOWNTOWN PEDESTRIAN IMPROVEMEN
H.013345
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON 000-26 STPENH 546 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SIGNING, STRIPING AND BRIDGENUNES, BRIAN Remrks:
Typ Imp:JEFFERSON PARISH WILL PROVIDE THE LOCAL MATCH.
Project:Prj Mgr:
KAWANEE AVENUE BIKE ROUTE PHASE I
H.013346
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON 000-26 STPENH 572 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
PEDESTRIAN IMPROVEMENTSNUNES, BRIAN Remrks:
Typ Imp:JEFFERSON PARISH WILL PROVIDE LOCAL MATCH.
Project:Prj Mgr:
MANHATTEN BLVD PEDESTRIAN IMPROVEMENTS
H.013347
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 18 063-02 STPENH 517 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
BIKE PATHSNUNES, BRIAN Remrks:
Typ Imp:JEFFERSON PARISH WILL PROVIDE THE LOCAL MATCH.
Project:Prj Mgr:
LA 18: 4TH ST BIKE PATH JEFFERSON PARISH
H.013365
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 303 826-07 STPENH 551 ENHANCEMENTS 3-DESIGN/DEVELOPMENTJEFFERSON LA 45 249-90 STPENH 643 ENHANCEMENTS
SHARED USE PATHMEEK, STEPHEN Remrks:
Typ Imp:THE TOWN OF JEAN LAFITTE WILL PROVIDE THE LOCAL MATCH.
Project:Prj Mgr:
LA 45/LA 303 ROSETHORNE PATH (LAFITTE)
Page 2 - 44 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.013370
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 48 282-01 STPENH 282 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SIDEWALKS, BICYCLE FACILITIES, LANDSCAPING AND BUS SHELTERSMEEK, STEPHEN Remrks:
Typ Imp:THE CITY OF KENNER WILL PROVIDE THE LOCAL MATCH.
Project:Prj Mgr:
LA 48: KENNER LEVEE TRAILHEAD EXPANSION
H.013411
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 48 006-30 TAP>200K 423 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SIDEWALKS, DRAINAGEMEEK, STEPHEN Remrks:
Typ Imp:THE CITY OF HARAHAN WILL PROVIDE THE LOCAL MATCH.
Project:Prj Mgr:
LA 48 PED IMPROVEMENTS CITY OF HARAHAN
H.013558
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON US 90 005-10 NHPP 150 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
WHITE-TOPPING CONCRETE REPAIRINGMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 90: WHITE-TOPPING AT LAPALCO REPAIR
H.013813
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON 000-26 STP>200K 1,667 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
MUTLI USE PATHLEBAS, MELISSA Remrks:
Typ Imp:JEFFERSON PARISH TO PROVIDE THE MATCH
Project:Prj Mgr:
VINTAGE DR MU PATH: POWER - WILSON
H.014076
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 18 063-03 STPFLEX 2,000 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
MILL AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 18: BARATARIA BLVD - LOUISIANA ST
H.014092
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 3152 006-25 NHPP 400 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
JEFFERSON LA 3152 826-03 NHPP 250 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
ADD ADDITIONAL LANE TO EB I-10 ON RAMP AND NEAR HUEY P LONGSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3152: LANE MODIFICATIONS
H.014102
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 23 062-01 NHPP 1,000 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
PLAQUEMINES LA 23 062-02 NHPP 200 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
PCCP REHABMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 23: LAPALCO BLVD - TUNNEL
H.014150
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON US 90 005-10 NHPP 300 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
ADD TRAVEL LANE AT THE INTERSECTION OF US 90 AT US 90BSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 90 @ US 90B
Page 2 - 45 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.014154
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON US 90 005-10 NHPP 5,000 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
ASPHALT CONCRETE MILL AND OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 90: ST CHARLES P/L - LA 18
H.008065
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 3154 826-44 STPFLEX 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
1-PLANNING/ENVIRONMENTAL
JEFFERSON 000-26 STPFLEX 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
ROUNDABOUT INSTALLATIONHARROUCH, JOSHUA Remrks:
Typ Imp:826-44-0032
Project:Prj Mgr:
LA 3154 @ DOCK ST. ROUNDABOUT
H.013718
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 23 062-01 0 SAFETY - SAFE ROUTES TO PUBLICPLACES
0-FEASIBILITY/SCOPING
FEASIBILITY STUDYRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
LA 23: 23RD ST - GRETNA BLVD PED IMPR
H.013765
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON 000-26 0 SAFETY - SAFE ROUTES TO PUBLICPLACES
0-FEASIBILITY/SCOPING
FEASIBILITY STUDYRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
LOYOLA AVE & SAL LENTINI PKWYBIKE LANES
H.009486
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFF DAVIS US 90 003-07 STPFLEX 1,370 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTCAVALIER, STEPHANIE Remrks:
Typ Imp:
Project:Prj Mgr:
US 90: BAYOU BRIDGE
JEFFERSON DAVIS
H.012621
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFF DAVIS I-10 450-03 NHPP 3,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT
APPROACH SLAB REPLACEMENTMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: JEFF DAVIS APP. SLAB REPLACEMENTS
H.013255
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFF DAVIS US 165 014-02 NHPP 6,860 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
JEFF DAVIS US 165 014-02 HSIP 825 SAFETY
MILL AND OVERLAY (SOUTHBOUND ONLY)MAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 165: 0.26 M N I-10 - ALLEN P/L
H.014114
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFF DAVIS LA 99 199-02 STPFLEX 1,678 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
MILL AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 99 & LA 102: LA 3086 - LA 26
Page 2 - 46 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.014149
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFF DAVIS LA 101 197-30 STP<5K 341 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
3-DESIGN/DEVELOPMENT
MICROSURFACESPURLOCK, DLON Remrks:
Typ Imp:NFA AS MATCH
Project:Prj Mgr:
LA 101: LA 383 - US 165
H.014235
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFF DAVIS 000-27 FBROFF 1,455 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENT NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
WEST RACCA RD OVER E GRAND MARAIS DITCH
H.002091
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFF DAVIS LA 97 201-01 STPFLEX 6,000 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
JEFF DAVIS I-10 450-03 NHPP 3,600 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTBUCCI, MARK Remrks:
Typ Imp:201-01-0008;PROJECT TO BE SCOPED
Project:Prj Mgr:
LA 97 OVERPASS (I-10)
H.006534
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE 000-28 HSIPPEN 500 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT
CONSTRUCT A ROUNDABOUTRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
ROUNDABOUT ON DULLES DR. AT NORTH DOMIN
LAFAYETTE
H.010005
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 733 828-14 STPFLEX 8,838 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
VERMILION LA 82 194-07 STPFLEX 9,112 PRESERVATION - BRIDGE (ONSYSTEM)
MOVABLE BRIDGE REHABILITATIONBRAUNER, KURT Remrks:
Typ Imp:
Project:Prj Mgr:
VERMILLION RIVER MOVABLE BRS REHAB (HBI)
H.011932
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 89-1 216-03 STPFLEX 750 ROAD TRANSFER 3-DESIGN/DEVELOPMENT
PATCH, COLD PLANE, ASPHALT OVERLAY, AND RELATED WORKDOMINGUE, CHRISTOPHER Remrks:
Typ Imp:
Project:Prj Mgr:
LA 89-1:N IBERIA ST-HEART D FARM RD(RT)
H.011992
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 343 393-03 STPFLEX 1,463 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTHERATH, SUBA Remrks:
Typ Imp:
Project:Prj Mgr:
LA 343: INDIAN BAYOU BRIDGE
H.012869
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 182 032-01 STP>200K 1,650 URBAN SYSTEMS 3-DESIGN/DEVELOPMENTLAFAYETTE LA 723 828-03 STP>200K 1,650 URBAN SYSTEMS
ROUNDABOUTRICHARD, RYAN Remrks:
Typ Imp:LAFAYETTE CONSOLIDATED GOV'T WILL PROVIDE MATCH
Project:Prj Mgr:
LA 182(UNIV) @ LA 723(RENAUD) ROUNDABOUT
Page 2 - 47 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.012880
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE 000-28 FBROFF 700 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENT NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
HAPSBURG LANE / COULEE
H.013304
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE 000-28 STP>200K 3,780 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
REHABILITATE AND MINOR WIDENING - ADD CONTINUOUS TURN LANERICHARD, RYAN Remrks:
Typ Imp:CITY OF BROUSSARD TO PROVIDE MATCH
Project:Prj Mgr:
MAIN STREET: CLARA TO ST. DEPORRES
H.013412
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE 000-28 TAP>200K 356 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SIDEWALKSNUNES, BRIAN Remrks:
Typ Imp:THE LAFAYETTE C-P GOVERNMENT WILL PROVIDE THE LOCAL MATCH.
Project:Prj Mgr:
SIXTH STREET SIDEWALKS LAFAYETTE
H.013413
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE 000-28 TAPFLEX 262 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
PEDESTRIAN AND BIKE PATHNUNES, BRIAN Remrks:
Typ Imp:THE LAFAYETTE C-P GOVERNMENT WILL PROVIDE THE LOCAL MATCH.
Project:Prj Mgr:
NORTHSIDE HS PED BIKEWAY PLAZA LAFAYETTE
H.013443
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE 000-28 TAP>200K 701 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
NEW SIDEWALK CONSTRUCTIONMEEK, STEPHEN Remrks:
Typ Imp:LOCAL MATCH FROM CITY OF YOUNGSVILLE.
Project:Prj Mgr:
IBERIA STREET SIDEWALK, PH 1 YOUNGSVILLE
H.013911
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE 000-28 RTP 113 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTLAFAYETTE 000-28 RTP 195 RECREATIONAL TRAILS PROGRAM
SIGNAGE & MAPS FOR TRAIL & TRAILHEAD ALONG BAYOU VERMILIONNUNES, BRIAN Remrks:
Typ Imp:BAYOU VERMILION DISTRICT WILL PROVIDE LOCAL MATCH
Project:Prj Mgr:
BAYOU VERMILION PADDLE TRAIL
H.013913
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE 000-28 RTP 113 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTLAFAYETTE 000-28 LOCAL 51 RECREATIONAL TRAILS PROGRAM
CONST. OF 3020' PED-BIKE TRAIL THROUGH AN URBAN PARKNUNES, BRIAN Remrks:
Typ Imp:LAFAYETTE CENTRAL PARK, INC. IS PROVIDING LOCAL MATCH
Project:Prj Mgr:
MONCUS PARK TRAIL
H.013941
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 724 218-30 HSIPPEN 610 SAFETY 3-DESIGN/DEVELOPMENTLAFAYETTE 000-28 HSIPPEN 610 SAFETY
CONSTRUCT ROUNDABOUTREVIERE, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 724: ROUNDABOUT @ LANDRY RD
H.014041
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 92 213-05 HSIPPEN 1,883 SAFETY 3-DESIGN/DEVELOPMENTLAFAYETTE LA 733 828-14 HSIPPEN 273 SAFETY LAFAYETTE 000-28 HSIPPEN 48 SAFETY
INTERSECTION IMPROVEMENTS ON LA 92 @ LA 733 & GALLET RD.DOMINGUE, CHRISTOPHER Remrks:
Typ Imp:
Project:Prj Mgr:
INTER. IMP. ON LA92 @ LA733 & GALLET RD
Page 2 - 48 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.004490
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE 000-28 STP<200K 0 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL
STAGE 0 STUDYDUET, JASON Remrks:
Typ Imp:700-28-0221; MATCH BY LAF MPO
Project:Prj Mgr:
STAGE 0 STUDY FOR VARIOUS ROUNDABOUTS
H.009500
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE 000-28 0 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL
PLAN IMPLEMENTATION AND ACTION PLANBROUSSARD, DAN Remrks:
Typ Imp:
Project:Prj Mgr:
2040PLAN IMPLEMENTATION&I-49 ACTION PLAN
H.011971
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 176 828-20 STPFLEX 277 ROAD TRANSFER 1-PLANNING/ENVIRONMENTALLAFAYETTE 000-28 LOCAL 258 OTHER / MISCELLANEOUS LAFAYETTE LA 176 828-05 LOCAL 77 OTHER / MISCELLANEOUS
STREETSCAPE IMPROVEMENTS, COLD PLANE, OVERLAY, CONC. REHABBRIGNAC, CHRISTINA Remrks:
Typ Imp:
Project:Prj Mgr:
LA 176: DT LFT ST. & SW. CONS. PHASE 3
H.012533
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 1252 391-04 STPFLEX 1,871 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTSBRAUNER, KURT Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1252: BAYOU PT BRULE BRIDGE
H.012665
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE US 90 424-02 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
1-PLANNING/ENVIRONMENTAL
TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
US 90 RETIMING PROJECT
H.013537
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 93 828-15 STPFLEX 1,250 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTBRAUNER, KURT Remrks:
Typ Imp:
Project:Prj Mgr:
LA 93: DITCH BRIDGE
H.014213
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 700 207-05 STGEN 1,154 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
VERMILION LA 700 207-04 FBROFF 402 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTTOURRES, VALERIE Remrks:
Typ Imp:AC
Project:Prj Mgr:
LA 700: INDIAN BAYOU & B GRAND MARAIS BR
H.009997
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE US 167 080-02 STP>200K 1,645 URBAN SYSTEMS 0-FEASIBILITY/SCOPINGLAFAYETTE US 167 080-02 HSIPPEN 3,013 SAFETY LAFAYETTE US 167 080-02 NHPP 3,013 OPER EFFICIENCY/MOTORIST
ASSISTANCE - ACCESSMANAGEMENT
LAFAYETTE US 167 080-02 STPFLEX 1,368 URBAN SYSTEMS
ACCESS MANAGEMENT AND OTHER SAFETY COUNTERMEASURESFUSILIER, JACOB Remrks:
Typ Imp:STUDY FUNDED WITH SAFETY TRANSFER FUNDS
Project:Prj Mgr:
US 167: JOHNSTON ST IMPROVEMENTS
Page 2 - 49 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.011990
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 92 213-05 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
LA 92: VERMILLION RIVER MB REHAB (HBI)
H.013025
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 182 032-01 0 URBAN SYSTEMS 0-FEASIBILITY/SCOPING
CONSTRUCT RAISED MEDIAN, SIDEWALKS AND INTERSECTION IMPROVRICHARD, RYAN Remrks:
Typ Imp:ACADIANA MPO PROVIDING MATCH
Project:Prj Mgr:
LA 182: JEANNE ST. TO GILMAN RD.
H.013716
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE US 167 080-02 0 SAFETY - SAFE ROUTES TO PUBLICPLACES
0-FEASIBILITY/SCOPING
FEASIBILITY STUDYRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
US 167: CAMELLIA BLVD-CHURCHILL DR (LAF)
H.014008
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE 000-28 0 URBAN SYSTEMS 0-FEASIBILITY/SCOPING
CORRIDOR PLANNING STUDYDUET, JASON Remrks:
Typ Imp:ACADIANA MPO TO PROVIDE THE MATCH
Project:Prj Mgr:
SIMCOE STREET CORRIDOR STUDY
H.008118
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 653 829-12 FBROFF 3,661 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTBUCCI, MARK Remrks:
Typ Imp:829-12-0021
Project:Prj Mgr:
LA 653: BAYOU DUMAR BRIDGE REPLACEMENT
LAFOURCHE
H.009662
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 308 407-01 STPFLEX 2,115 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
ASPHALTIC CONCRETE OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 308: GOLDEN MEADOW BR - GALLIANO BR
H.011517
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 654 829-10 NFA 700 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
3-DESIGN/DEVELOPMENT
RAISING ROADWAY ELEVATION BY ADDING ASPHALTGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 654: LA 308 - GREENS S. CUT RD.
H.012447
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 182 005-07 STPFLEX 20,000 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
REPLACE EXISTING VERTICAL LIFT BRIDGEBRIGNAC, CHRISTINA Remrks:
Typ Imp:
Project:Prj Mgr:
LA 182: BAYOU LAF BR AT RACELAND (HBI)
H.013369
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 1 064-06 STPENH 592 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SIDEWALKS, SIGNS, STRIPING, PARKING AND LANDSCAPINGNUNES, BRIAN Remrks:
Typ Imp:LAFOURCHE PARISH WILL PROVIDE THE LOCAL MATCH.
Project:Prj Mgr:
LA1: LAFOURCHE PARISH GVMT CTR TRAILHEAD
Page 2 - 50 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.013388
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE 000-29 HSIPPEN 1,140 SAFETY 3-DESIGN/DEVELOPMENTLAFOURCHE 000-29 STPFLEX 1,140 OPER EFFICIENCY/MOTORIST
ASSISTANCE - TRAFFIC CONTROLDEVICES
TRAFFIC SIGNAL UPGRADEFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DIST. 02H FLASHING YELLOW ARROW PART 1
H.013402
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 1 064-06 STP<200K 110 URBAN SYSTEMS 3-DESIGN/DEVELOPMENTLAFOURCHE 000-29 STP<200K 74 URBAN SYSTEMS LAFOURCHE LA 308 407-90 STP<200K 36 URBAN SYSTEMS
SIDEWALK AND MULTIUSE PATHRICHARD, RYAN Remrks:
Typ Imp:LAFOURCHE PARISH TO PROVIDE MATCH
Project:Prj Mgr:
LA1 &LA308 PED & MULTIUSE PATH(LOCKPORT)
H.013490
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 1 064-06 STP<200K 1,200 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
MULTI-USE PATHRICHARD, RYAN Remrks:
Typ Imp:LAFOURCHE PARISH PROVIDING MATCH
Project:Prj Mgr:
CENTRAL LAFOURCHE MULTI-USE PATH PH 1A
H.013926
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE 000-29 RTP 113 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTLAFOURCHE 000-29 LOCAL 47 RECREATIONAL TRAILS PROGRAM
CONST. OF PADDLE TRAILHEAD CONNECTED TO EXIST. TRAILNUNES, BRIAN Remrks:
Typ Imp:FRIENDS OF BAYOU LAFOURCHE WILL PROVIDE LOCAL MATCH
Project:Prj Mgr:
NSU BAYOUSIDE TRAILHEAD
H.014066
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 1 064-05 NHPP 3,500 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
3.5" MILL AND OVERLAY OF LA 1 FROM INTRACOSTAL-VALENTINE BRMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1: INTRACOSTAL - VALENTINE BR.
H.014068
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 1 064-06 NHPP 2,404 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
LAFOURCHE LA 1 064-06 STPFLEX 1,921 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3.5" MILL AND OVERLAY OF LA 1 FROM ELSON LN. TO LA 182MAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1: ELSON LN. - LA 182
H.014071
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 308 407-04 STPFLEX 1,900 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
MILLING AND OVERLAY WITH ASPHALT CONCRETESPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 308: THERIOT CANAL - ST. CHARLES BR.
H.001461
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 1 064-06 TAP<200K 66 ENHANCEMENTS 1-PLANNING/ENVIRONMENTALLAFOURCHE US 90 424-08 TAP<200K 66 ENHANCEMENTS
SCENIC OVERLOOK AND PARKING LOTNUNES, BRIAN Remrks:
Typ Imp:MATCH IS 15% TOLL CREDITS AND 5% LOCAL
Project:Prj Mgr:
LAFOURCHE-TERREBONNE SCENIC OVERLOOK
Page 2 - 51 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.011963
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 648-S 829-29 STPFLEX 1,185 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTYAP, KIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 648: DRAIN CANAL BRIDGE
H.012530
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 3185 829-25 STPFLEX 1,242 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
LAFOURCHE LA 3185 829-25 STPFLEX 1,284 PRESERVATION - BRIDGE (ONSYSTEM)
LAFOURCHE LA 3185 829-25 STPFLEX 1,242 PRESERVATION - BRIDGE (ONSYSTEM)
LAFOURCHE LA 3185 829-25 STPFLEX 1,242 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTSYAP, KIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3185: DRAIN CANAL BRIDGES
H.014215
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 20 065-06 STGEN 1,428 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
LAFOURCHE LA 20 065-06 STPFLEX 402 PRESERVATION - BRIDGE (ONSYSTEM)
LAFOURCHE LA 20 065-06 STGEN 402 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTTOURRES, VALERIE Remrks:
Typ Imp:AC
Project:Prj Mgr:
LA 20: 40 ARPENT & DRAIN CANAL BRS
H.011962
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 1 064-06 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
MOVABLE BRIDGE REHABILITATION FEASIBILITY STUDYGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1:COMPANY CANAL MB-LOCKPORT(HBI)
H.012734
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 307 829-15 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
MOVABLE BRIDGE REHABILITATIONHINGLE, STEWART Remrks:
Typ Imp:USE NFA AS MATCH
Project:Prj Mgr:
LA 307:BAYOU BOEUF BRIDGE REHABILITATION
H.013818
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 308 407-01 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
MOVABLE BRIDGE MECHANICAL, ELECTRICAL, STRUCTURAL REHABGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
LA 308:BYU LAFOURCHE MB-GOLDEN MED.(HBI)
H.013940
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 648 829-07 0 URBAN SYSTEMS 0-FEASIBILITY/SCOPINGLAFOURCHE 000-29 0 URBAN SYSTEMS
INTERSECTION FEASIBILITY STUDYSHOLMIRE, DAWN Remrks:
Typ Imp:SCPDC(HOUMA MPO) TO PROVIDE MATCH
Project:Prj Mgr:
LA 648 & N ACADIA RD INTERSECTION STUDY
Page 2 - 52 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.009603
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LASALLE LA 3259 830-21 STPFLEX 294 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
ASPHALT OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3259: LA 125 - US 165
LASALLE
H.012048
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LASALLE US 84 022-04 NHPP 15,325 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
WINN US 84 022-03 NHPP 1,050 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTSBUCCI, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
US 84: CASTOR CREEK AND RELIEF BRIDGES
H.012520
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LASALLE 000-30 RTP 194 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENT
RESTORE 4.5 MILES OF ATV TRAIL AND CONST. OF TRAILHEAD PARKNUNES, BRIAN Remrks:
Typ Imp:DCRT IS THE PROJECT MANAGER
Project:Prj Mgr:
DEWEY WILLS WMA YEAR ROUND ATV TRAIL
H.013093
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LASALLE 000-30 FBROFF 593 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENT NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
BREITHAUPT CUTOFF RD OVER RHINEHART CRK
H.013221
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LASALLE US 84 022-05 NHPP 280 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
CATAHOULA US 425 026-05 NHPP 82 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
FRANKLIN US 425 026-06 NHPP 338 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
ASPHALT SURFACE TREATMENTMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 84 AND US 425 ASPHALT SURFACE TREATME
H.013918
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LASALLE LA 126 041-04 STPFLEX 2,400 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
CALDWELL LA 126 041-05 STPFLEX 4,600 PRESERVATION - NON-INTERSTATEON STP SYSTEM
STABILIZE BASE & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 126: LA 124 - LA 849 S.
H.013954
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LASALLE 000-30 STP<5K-E 431 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTPATTON, HEATHER Remrks:
Typ Imp:
Project:Prj Mgr:
PLEASANT RIDGE RD OVER RABBIT BRANCH
Page 2 - 53 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.007492
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN LA 145 157-03 TAP<5K 204 ENHANCEMENTS 3-DESIGN/DEVELOPMENTLINCOLN US 80 001-08 TAP<5K 146 ENHANCEMENTS LINCOLN LA 145 157-02 TAP<5K 35 ENHANCEMENTS
SIDEWALK AND BIKE PATHMEEK, STEPHEN Remrks:
Typ Imp:15% OF MATCH IS TOLL CREDITS 5% IS LOCAL MATCH
Project:Prj Mgr:
CHOUDRANT SIDEWALK PROJECT
LINCOLN
H.009871
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN 000-31 RAIL PD 300 RAILROADS 3-DESIGN/DEVELOPMENT
INSTALL F/L'S AND GATESSHREWSBERRY,BILL Remrks:
Typ Imp:MATCH FROM RAILROAD
Project:Prj Mgr:
KCS(SIMSBORO) WOODLAND DR.
H.010616
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN LA 544 296-03 STPFLEX 6,500 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
LINCOLN LA 544 296-03 STPFLEX 4,590 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
LINCOLN LA 544 296-03 LOCAL 4,500 PRESERVATION - BRIDGE (ONSYSTEM)
OVERPASS REHABILITATIONFUSILIER, JACOB Remrks:
Typ Imp:
Project:Prj Mgr:
I 20: LA 544 OVERPASS REPLACEMENT
H.011627
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN I-20 451-05 NHPP 11,900 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT
ASPHALT OVERLAY OF ASPHALT PAVEMENTMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-20: BIENVILLE P/L - 1 MILE WEST LA 149
H.011772
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN LA 824-3 831-21 TAPFLEX 41 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SIDEWALKSNUNES, BRIAN Remrks:
Typ Imp:MATCH BY THE TOWN OF DUBACH
Project:Prj Mgr:
LA 824-3: TOWN OF DUBACH SIDEWALKS
H.011803
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN 000-31 TAP<200K 660 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SIDEWALKS AND STREETSCAPINGNUNES, BRIAN Remrks:
Typ Imp:MATCH PROVIDED BY THE CITY OF RUSTON.
Project:Prj Mgr:
RUSTON DOWNTOWN REVITALIZATION PHASE VII
H.011804
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN 000-31 TAP<200K 675 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SIDEWALKS AND STREETSCAPINGNUNES, BRIAN Remrks:
Typ Imp:MATCH PROVIDED BY CITY OF RUSTON
Project:Prj Mgr:
RUSTON DOWNTOWN REVITALIZATION PHASE IX
H.012123
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN LA 33 069-01 STPFLEX 200 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
NB RIGHT TURN LANE AT LA 821SPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 33: NB RIGHT TURN LANE AT LA 821
Page 2 - 54 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.012695
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN US 80 001-07 STPFLEX 450 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
ADD LEFT TURN LANE AT NUTMEGSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 80: LEFT TURN LANE NUTMEG DRIVE
H.012697
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN US 80 001-07 NHPP 900 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
ADDITION OF TURN LANESSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 80: LTURN LANES BARNETT/WESLEY CHAPLE
H.012740
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN I-20 451-05 NHPP 5,000 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
LINCOLN I-20 451-05 NHPP 5,000 PRESERVATION - BRIDGE (ONSYSTEM)
LINCOLN I-20 451-05 NHPP 5,000 PRESERVATION - BRIDGE (ONSYSTEM)
LINCOLN I-20 451-05 NHPP 5,000 PRESERVATION - BRIDGE (ONSYSTEM)
LINCOLN I-20 451-05 NHPP 5,000 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTSWINDMANN, ANDREW Remrks:
Typ Imp:
Project:Prj Mgr:
I-20: REPLACE FIVE OVERPASSES (LINCOLN)
H.013033
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN 000-31 RTP 112 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTLINCOLN 000-31 LOCAL 305 RECREATIONAL TRAILS PROGRAM
CONSTRUCTION OF A 10,078' LONG BY 12' WIDE, MULTI-USE TRAILNUNES, BRIAN Remrks:
Typ Imp:DCRT IS THE PROJECT MANAGER
Project:Prj Mgr:
ROCK ISLAND GREENWAY, PHASE 2
H.013086
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN 000-31 HSIPPEN 350 SAFETY - SAFE ROUTES TO PUBLICPLACES
3-DESIGN/DEVELOPMENT
LINCOLN 000-31 LOCAL 115 SAFETY - SAFE ROUTES TO PUBLICPLACES
CONSTRUCT SIDEWALKS, DRAINAGE, AND OTHER SAFETY IMPROVEMEMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
I.A. LEWIS ELEM SIDEWALK - PHASE 2
H.013409
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN LA 544 296-03 TAPFLEX 30 ENHANCEMENTS 3-DESIGN/DEVELOPMENTLINCOLN 000-31 TAPFLEX 16 ENHANCEMENTS LINCOLN LA 150 831-07 TAPFLEX 45 ENHANCEMENTS
SIDEWALKSNUNES, BRIAN Remrks:
Typ Imp:LA TECH UNIVERSITY WILL PROVIDE THE LOCAL MATCH.
Project:Prj Mgr:
LA TECH UNIV N CAMPUS TRAILS RUSTON
H.013414
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN 000-31 TAP<200K 406 ENHANCEMENTS 3-DESIGN/DEVELOPMENTLINCOLN US 80 001-08 TAP<200K 296 ENHANCEMENTS
PED IMPROVEMENTS (SIDEWALKS, LANDSCAPING AND STREETSCAPINNUNES, BRIAN Remrks:
Typ Imp:THE CITY OF RUSTON WILL PROVIDE THE LOCAL MATCH.
Project:Prj Mgr:
RUSTON DOWNTOWN REVITALIZATION PHASE X
Page 2 - 55 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.013932
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN 000-31 RTP 63 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTLINCOLN 000-31 LOCAL 418 RECREATIONAL TRAILS PROGRAM LINCOLN US 63 023-10 LOCAL 10 RECREATIONAL TRAILS PROGRAM
CONST. OF 3975' LONG BY 10' WIDE SHARED USE TRAILNUNES, BRIAN Remrks:
Typ Imp:CITY OF RUSTON WILL PROVIDE LOCAL MATCH
Project:Prj Mgr:
ROCK ISLAND GREENWAY-HILLCREST CONNECT.
H.012711
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN LA 151 317-04 NFA 3,123 PRESERVATION - NON-INTERSTATENFA
1-PLANNING/ENVIRONMENTAL
UNION LA 151 317-03 NFA 107 PRESERVATION - NON-INTERSTATENFA
UNION LA 151 317-05 NFA 252 PRESERVATION - NON-INTERSTATENFA
STABILIZE BASE AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 151: LA 145 - LA 33
H.014238
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN LA 818 309-03 STGEN 881 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
LINCOLN LA 818 309-03 STPFLEX 573 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTTOURRES, VALERIE Remrks:
Typ Imp:AC
Project:Prj Mgr:
LA 818: BARNET SPRINGS & CREEK BRIDGES
H.013720
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN 000-31 0 SAFETY - SAFE ROUTES TO PUBLICPLACES
0-FEASIBILITY/SCOPING
FEASIBILITY STUDYRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
BONNER ST BRIDGE PED IMPR (RUSTON)
H.003425
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON I-12 454-02 NHPP 7,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT
C.P. AND OVERLAYMAY, BRIAN Remrks:
Typ Imp:454-02-0077
Project:Prj Mgr:
I-12: LA 63 - TANGIPAHOA PARISH LINE
LIVINGSTON
H.008170
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 1024 832-10 FBROFF 1,302 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTJUDICE, ANDREW Remrks:
Typ Imp:832-10-0019;2 BRIDGES; USE NFA AS MATCH
Project:Prj Mgr:
LA 1024 CREEK BRS. NEAR FRIENDSHIP
H.010384
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 442 269-01 STPFLEX 2,420 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
LIVINGSTON LA 441 270-02 STPFLEX 190 PRESERVATION - NON-INTERSTATEON STP SYSTEM
COLD PLANE & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 442: LA 63 - W. JCT. LA 441
Page 2 - 56 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.010551
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 16 262-02 STPFLEX 199 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
PCCP REHABILITATIONSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 16: LA 64/LA 1026 - AMITE CHURCH RD.
H.012348
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 1026 273-03 STPFLEX 1,250 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
3-DESIGN/DEVELOPMENT
LIVINGSTON 000-32 STPFLEX 500 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
ROUNDABOUT INTERSECTION IMPROVEMENTSISEMANN, ROBERT Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1026: ROUNDABOUT @ EDEN CHURCH ROAD
H.012573
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 1026 832-13 STPFLEX 1,725 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
IN PLACE STABILIZATION AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1026: LA 16 - FORREST DELATTE RD.
H.012622
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON I-12 454-02 NHPP 16,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT
I-12 APPROACH SLAB REPLACEMENT AT HOG BRANCH BRIDGEBRAUNER, KURT Remrks:
Typ Imp:
Project:Prj Mgr:
I-12:LIVINGSTON PAR APPROACH SLAB REP P3
H.013010
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 449 271-01 STPFLEX 480 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
LIVINGSTON LA 63 272-03 STPFLEX 600 PRESERVATION - BRIDGE (ONSYSTEM)
LIVINGSTON LA 1027 273-03 STPFLEX 600 PRESERVATION - BRIDGE (ONSYSTEM)
LIVINGSTON LA 1032 832-12 STPFLEX 840 PRESERVATION - BRIDGE (ONSYSTEM)
ST HELENA LA 37 254-05 STPFLEX 2,760 PRESERVATION - BRIDGE (ONSYSTEM)
ST HELENA LA 38 263-01 STPFLEX 1,200 PRESERVATION - BRIDGE (ONSYSTEM)
ST HELENA LA 38 263-02 STPFLEX 1,440 PRESERVATION - BRIDGE (ONSYSTEM)
ST HELENA LA 1042 846-03 NFA 240 PRESERVATION - BRIDGE (ONSYSTEM)
ST HELENA LA 1047 846-07 STPFLEX 240 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:
Typ Imp:
Project:Prj Mgr:
DIST62:ABC BR REPL LIVING, ST HELENA PAR
H.013088
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 1031 832-11 HSIPPEN 305 SAFETY - SAFE ROUTES TO PUBLICPLACES
3-DESIGN/DEVELOPMENT
CONSTRUCT SIDEWALKS AND OTHER SAFETY IMPROVEMENTSMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
HATCHELL LANE SIDEWALKS
Page 2 - 57 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.013166
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON 000-32 FBROFF 1,145 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENT - NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
WHITTINGTON ROAD OVER GRAYS CREEK
H.013454
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON 000-32 TAP>200K 281 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
NEW SIDEWALK CONSTURCTIONNUNES, BRIAN Remrks:
Typ Imp:LOCAL ENTITY (CITY OF DENHAM SPRINGS) TO PROVIDE 20% MATCH.
Project:Prj Mgr:
CENTERVILLE ST. SIDEWALKS DENHAM SPRINGS
H.013543
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON 000-32 STP>200K 3,594 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
OVERLAY AND CLOSED DRAINAGELEBAS, MELISSA Remrks:
Typ Imp:LIVINGSTON PARISH PROVIDING THE MATCH.
Project:Prj Mgr:
SIMS ROAD IMPROVEMENTS
H.013545
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON 000-32 STP>200K 471 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
OVERLAYLEBAS, MELISSA Remrks:
Typ Imp:DENHAM SPRINGS TO PROVIDE MATCH.
Project:Prj Mgr:
EDGEWOOD DRIVE IMPROVEMENTS
H.013555
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON 000-32 STP>200K 879 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
OVERLAY AND SIDEWALKSLEBAS, MELISSA Remrks:
Typ Imp:CITY OF WALKER TO PROVIDE MATCH.
Project:Prj Mgr:
PENDARVIS LANE IMPROVEMENTS PHASE II
H.013557
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON 000-32 STP>200K 1,318 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
OVERLAY AND SIDEWALKSLEBAS, MELISSA Remrks:
Typ Imp:CITY OF WALKER TO PROVIDE MATCH.
Project:Prj Mgr:
PENDARVIS LANE IMPROVEMENTS PHASE III
H.013738
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 441 270-01 STPFLEX 900 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
MILL AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 441: LA 42 - 1-12 COA
H.014058
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 16 262-01 HSIP 1,015 SAFETY 3-DESIGN/DEVELOPMENT
CURVE REALIGNMENTTASSIN, BEN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 16: CURVE REALIGNMENT AT GOURDON LANE
H.014186
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 63 272-02 STGEN 1,100 OTHER / MISCELLANEOUS 3-DESIGN/DEVELOPMENTLIVINGSTON 000-32 STGEN 1,100 OTHER / MISCELLANEOUS
CONSTRUCT ROUNDABOUTNot assigned Remrks:
Typ Imp:SEE NOTES FOR FUNDING
Project:Prj Mgr:
LA 63 ROUNDABOUT AT TEXAS STREET
H.002397
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 16 262-01 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTALLIVINGSTON I-12 454-02 0 DEMO / HIGH PRIORITY
INTERCHANGE IMPROVEMENTSMASTIN, CATHERINE Remrks:
Typ Imp:262-01-0037
Project:Prj Mgr:
PETE'S HWY(LA 16)INTERCHANGE @ I-12
Page 2 - 58 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.009552
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 16 262-01 STPFLEX 1,405 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
MAINTENANCE RESTORATION & REHABILITATIONSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
JCT. LA 1034 - JCT. US 190
H.009837
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 64 262-31 NFI 1,667 CAPACITY 1-PLANNING/ENVIRONMENTALLIVINGSTON LA 1019 832-05 NFI 1,667 CAPACITY LIVINGSTON LA 64 273-03 NFI 1,667 CAPACITY
CAPACITY AND SAFETY IMPROVEMENTS AT LA 64 AND LA 1019MOSS, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 64: ROUNDABOUT @ LA 1019
H.010672
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 3002 832-32 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
1-PLANNING/ENVIRONMENTAL
LIVINGSTON LA 16 262-01 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
LIVINGSTON LA 1034 832-14 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
TRAFFIC STUDY ON LA 3002, LA 16, AND LA 1034COLVIN, JODY Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3002 & LA 16 CORRIDOR STUDY
H.012068
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 1026 273-03 STPFLEX 1,067 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTWINDMANN, ANDREW Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1026: CREEK BRIDGE
H.012069
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 16 262-01 STPFLEX 1,491 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTBRAUNER, KURT Remrks:
Typ Imp:
Project:Prj Mgr:
LA 16: CANAL BRIDGE
H.012971
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 42 260-02 STPFLEX 233 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
LIVINGSTON LA 16 262-01 STPFLEX 32 PRESERVATION - NON-INTERSTATEON STP SYSTEM
PATCH, MILL & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 42/LA 16:AMITE RIVER-MAIN ST.
H.010897
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
MADISON I-20 451-09 NHPP 13,500 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
MADISON 000-33 OTHER 13,500 PRESERVATION - BRIDGE (ONSYSTEM)
REHABILITATIOND'ANDREA, ARTUR Remrks:
Typ Imp:
Project:Prj Mgr:
I-20: MRB ISLAND ANCHORING PIER E1
MADISON
Page 2 - 59 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.011623
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
MADISON I-20 451-08 NHPP 14,200 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT
ASPHALT OVERLAY OF ASPHALT PAVEMENTMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-20: LA 577 - WALNUT BAYOU
H.011628
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
MADISON I-20 451-08 NHPP 6,395 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENTRICHLAND I-20 451-07 NHPP 1,305 PRESERVATION - INTERSTATE
ASPHALT OVERLAY OF ASPHALT PAVEMENTMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-20: LA 17 - LA 577
H.013947
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
MADISON 000-33 STP<5K-E 986 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTPATTON, HEATHER Remrks:
Typ Imp:
Project:Prj Mgr:
ATKINS ROAD OVER JOES BAYOU
H.011861
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
MADISON I-20 451-09 NHPP 400 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
1-PLANNING/ENVIRONMENTAL
MADISON I-20 451-08 NHPP 200 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
SIGNING AND SIGN STRUCTURE REPLACEMENT AND UPGRADEFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
I-20: US 80 TO MISSISSIPPI STATE LINE
H.000665
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
MOREHOUSE US 165 016-05 STPFLEX 21,000 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
NEW BRIDGEMASTIN, CATHERINE Remrks:
Typ Imp:016-05-0031
Project:Prj Mgr:
UP R.R. OVERPASS NEAR BONITA (HBI)
MOREHOUSE
H.008203
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
MOREHOUSE LA 835 834-07 STPFLEX 2,892 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
MOREHOUSE LA 835 834-07 STPFLEX 120 PRESERVATION - NON-INTERSTATEON STP SYSTEM
NEW BRIDGESMASTIN, CATHERINE Remrks:
Typ Imp:834-07-0022;2 BRIDGES
Project:Prj Mgr:
LA 835 CREEK BRIDGES
H.011613
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
MOREHOUSE US 425 038-03 NHPP 320 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
3-DESIGN/DEVELOPMENT
SUBSURFACE DRAINAGE IMPROVEMENTSGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
US 425: DRAINAGE IMPROV AT EAST PINE AVE
Page 2 - 60 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.012032
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
MOREHOUSE LA 2 037-01 STPFLEX 2,047 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
MOREHOUSE LA 2 037-01 STPFLEX 975 PRESERVATION - BRIDGE (ONSYSTEM)
W CARROLL LA 2 037-02 STPFLEX 2,300 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTHERATH, ANANDA Remrks:
Typ Imp:
Project:Prj Mgr:
LA 2: BRIDGES NEAR MER ROUGE
H.013118
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
MOREHOUSE 000-34 FBROFF 266 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENT, NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
HILL AVENUE OVER DRAINAGE CANAL
H.013915
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
MOREHOUSE 000-34 RTP 113 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTMOREHOUSE 000-34 LOCAL 23 RECREATIONAL TRAILS PROGRAM
CONST. OF 800' WALKING TRAIL AND 1100' PED-BIKE TRAILNUNES, BRIAN Remrks:
Typ Imp:CITY OF BASTROP WILL PROVIDE LOCAL MATCH
Project:Prj Mgr:
BASTROP TRAILS CONNECTOR
H.001145
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 120 042-05 STPFLEX 3,812 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
PATCH, COLD PLANE, AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 120: SABINE PARISH LINE TO LA 6
NATCHITOCHES
H.001270
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 1-X 053-04 STPFLEX 5,000 CAPACITY 3-DESIGN/DEVELOPMENTNATCHITOCHES LA 1-X 053-04 STPFLEX 5,000 PRESERVATION - BRIDGE (ON
SYSTEM)
WIDEN TO 3 LANESTONEY, PATRICK Remrks:
Typ Imp:053-04-0025
Project:Prj Mgr:
LA 1X: 200' S WOODYARD DR - HANCOCK AVE.
H.001271
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 1-X 053-04 NHPP 7,800 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTMORVANT, RYAN Remrks:
Typ Imp:053-04-0031;STAGE 0
Project:Prj Mgr:
CANE RIVER BRIDGE AT CHURCH STREET
H.001820
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 485 115-01 FBROFF 5,159 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
NATCHITOCHES LA 485 115-02 FBROFF 2,085 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTYANG, LI Remrks:
Typ Imp:115-01-0017;4 NEW BRIDGES.JT W/115-02-0011
Project:Prj Mgr:
LA 485: BRIDGES NEAR ALLEN
H.010342
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 155 091-02 STPFLEX 1,939 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
PATCH, COLD PLANE, AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 155: RED RIVER P/L - S JCT LA 153
Page 2 - 61 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.010346
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 487 113-03 STPFLEX 3,844 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
PATCH, COLD PLANE, AND OVERLAYBROWN, JOSEPH C. Remrks:
Typ Imp:USE NFA AS MATCH
Project:Prj Mgr:
LA 487: LA 120 - LA 174
H.010365
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 117 114-03 STPFLEX 1,288 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
PATCH, COLD PLANE, AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 117: BELLWOOD - LA 478
H.012145
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 120 042-07 STP<5K 2,651 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
STABILIZE AND OVERLAYBROWN, JOSEPH C. Remrks:
Typ Imp:NFA AS MATCH
Project:Prj Mgr:
LA 120: LA 117 - 830' E OF BENNETT ROAD
H.012999
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 1 034-30 NHPP 4,000 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
REMOVAL OF PCCP, IN-PLACE CEMENTED BASE, OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1: FOUR LANE SECTION TO LA 6
H.013498
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES 000-35 RTP 312 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENT
CONSTRUCTION OF 3,488' OF WALKING TRAIL THROUGH URBAN PARKNUNES, BRIAN Remrks:
Typ Imp:CITY OF NATCHITOCHES WILL PROVIDE THE LOCAL MATCH
Project:Prj Mgr:
NATCHITOCHES RECREATIONAL TRAILS
H.013514
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES 000-35 RTP 199 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENT
NON-ROUTINE MAINTENANCE, RESTOR. & CONST. OF ATV TRAILSNUNES, BRIAN Remrks:
Typ Imp:L&A TRAILS WILL PROVIDE THE LOCAL MATCH
Project:Prj Mgr:
RESTOR. OF TRAIL BTWN WINNFIELD & SIBLEY
H.013912
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES 000-35 RTP 113 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTNATCHITOCHES 000-35 LOCAL 73 RECREATIONAL TRAILS PROGRAM
CONST. OF 2100' TRAIL AND 8.5 ACRES OF TRAILHEADNUNES, BRIAN Remrks:
Typ Imp:CANE RIVER NATIONAL HERITAGE WILL PROVIDE LOCAL MATCH
Project:Prj Mgr:
CAMINO DE LOS ADAES HERITAGE TRAIL
H.013949
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 1226 359-01 STP<5K-E 1,542 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTPATTON, HEATHER Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1226: BAYOU CHEVREUILLE BRIDGE
H.014120
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 1226 359-01 NFA 1,672 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
STABILIZE BASE & OVERLAYBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1225: LA 1225 TO US 84
Page 2 - 62 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.014121
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 480 305-30 NFA 205 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
NATCHITOCHES LA 480 305-30 STPFLEX 135 PRESERVATION - NON-INTERSTATEON STP SYSTEM
OVERLAYBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 480: US 71 TO LA 486
H.014138
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 479 358-02 STP<5K 3,619 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
OVERLAYBROWN, JOSEPH C. Remrks:
Typ Imp:NFA AS MATCH
Project:Prj Mgr:
LA 479: LA 9 TO LA 156
H.014160
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 6-X 034-05 STPFLEX 222 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
PATCH, MILL, AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 6-X: LA 1223 TO TOULINE ST
H.014161
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 6-X 034-06 STPFLEX 103 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
PATCH, MILL, AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 6-X: LAFAYETTE ST TO TEXAS ST
H.014163
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 1-X 053-04 STPFLEX 210 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
PATCH, MILL, AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1-X: KEYSER AVE TO CHURCH ST
H.010343
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 174 112-06 STPFLEX 1,925 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
PATCH. COLD PLANE, AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 174: DESOTO P/L - I-49 INTERCHANGE
H.014245
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 119 118-02 STGEN 972 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
NATCHITOCHES LA 119 118-02 FBROFF 573 PRESERVATION - BRIDGE (ONSYSTEM)
NATCHITOCHES LA 119 118-02 FBROFF 1,154 PRESERVATION - BRIDGE (ONSYSTEM)
NATCHITOCHES LA 119 118-03 FBROFF 744 PRESERVATION - BRIDGE (ONSYSTEM)
NATCHITOCHES LA 119 118-03 FBROFF 402 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTTOURRES, VALERIE Remrks:
Typ Imp:AC,USE NFA AS MATCH
Project:Prj Mgr:
LA 119: BAYOU PIERRE & CREEK BRIDGES
Page 2 - 63 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.010331
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS US 90 006-90 STPFLEX 1,119 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
3-DESIGN/DEVELOPMENT
RAISING ROADWAY GRADE TO CONSISTENT ELEVATION BY ADDING ASGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
US 90: FLOODWALL - VICTORY RD
ORLEANS
H.011219
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS I-10 450-90 NFI 3,970 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
3-DESIGN/DEVELOPMENT
JEFFERSON I-10 450-15 NFI 30 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
SIGNING & SIGNING STRUCTURES REPLACEMENT & UPGRADE IN NO CBNGO, DUC Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: NO CBD1 I610-CARROLLTON
H.011221
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS I-10 450-90 NFI 5,700 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
3-DESIGN/DEVELOPMENT
SIGNING & SIGNING STRUCTURES REPLACEMENT & UPGRADE IN NO CBNGO, DUC Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: NO CBD3 POYDRAS - LOUISA
H.011222
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS I-10 450-90 NHPP 5,800 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
3-DESIGN/DEVELOPMENT
SIGNING & SIGNING STRUCTURES REPLACEMENT & UPGRADE IN NO CBNGO, DUC Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: NO CBD4 LOUISA - I-510
H.011223
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS I-10 450-90 NHPP 2,800 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
3-DESIGN/DEVELOPMENT
ORLEANS I-10 450-17 NHPP 600 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
SIGNING & SIGNING STRUCTURES REPLACEMENT &UPGRADENGO, DUC Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: CBD5 (I-510 TO END OF TWIN SPAN)
H.011447
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS US 90 006-03 NHPP 500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
INTERSECTION IMPROVEMENTS ON US 90 AT MLK BLVDSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 90: INTERSECTION IMP AT MLK BLVD
H.011823
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS 000-36 TAP>200K 287 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
TRAILHEADNUNES, BRIAN Remrks:
Typ Imp:MATCH PROVIDED BY CITY PARK IMPROVEMENT ASSOCIATION
Project:Prj Mgr:
NO CITY PARK: HARRISON AVENUE TRAILHEAD
Page 2 - 64 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.011841
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS 000-36 TAP>200K 348 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
PEDESTRIAN IMPROVEMENTSNUNES, BRIAN Remrks:
Typ Imp:MATCH PROVIDED BY NON-FLOOD PROTECTION MANAGEMENT AUTHO
Project:Prj Mgr:
NO: LAKESHORE DR. REC/OPERATIONAL IMPR
H.011965
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS LA 47 148-02 NHPP 30,000 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
CLEANING, PAINTING, AND STRUCTURAL REPAIRSKEMP, KELLY Remrks:
Typ Imp:
Project:Prj Mgr:
LA 47: IWGO BRIDGE REHABILITATION (HBI)
H.012591
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS I-10 450-90 NHPP 18,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT
2" OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: PARIS RD - LAKE PONTCHARTRAIN
H.013041
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS 000-36 RTP 112 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTORLEANS 000-36 LOCAL 16 RECREATIONAL TRAILS PROGRAM
RESTORATION AND CONST. OF A 6325' LONG X 10' WIDE TRAILNUNES, BRIAN Remrks:
Typ Imp:DCRT IS THE PROJECT MANAGER
Project:Prj Mgr:
CITY PARK NATURE TRAILS (NOLA)
H.013094
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS US 90 006-03 HSIPPEN 342 SAFETY - SAFE ROUTES TO PUBLICPLACES
3-DESIGN/DEVELOPMENT
ORLEANS US 90 006-03 STPFLEX 743 OPER EFFICIENCY/MOTORISTASSISTANCE - AMERICANS WITHDISABILITIES ACT
ORLEANS I-10 450-90 HSIPPEN 453 SAFETY - SAFE ROUTES TO PUBLICPLACES
SIDEWALKS, MULTIUSE PATHS, RAMPS, PED SIGNALS, STRIPINGMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
BROAD ST - READ BLVD PED IMPROVEMENTS
H.013150
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS 000-36 STP>200K 1,743 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
BICYCLE AND SIDEWALK IMPROVEMENTSLEBAS, MELISSA Remrks:
Typ Imp:CITY OF NEW ORLEANS TO MATCH
Project:Prj Mgr:
ANDREW HIGGINS DR STREETSCAPES
H.013364
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS 000-36 STPENH 229 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SIDEWALKSNUNES, BRIAN Remrks:
Typ Imp:THE CPIA WILL PROVIDE THE LOCAL MATCH
Project:Prj Mgr:
CITY PARK PALM DRIVE SIDEWALKS (NO)
H.013511
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS 000-36 RTP 112 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTORLEANS 000-36 LOCAL 28 RECREATIONAL TRAILS PROGRAM
CONSTRUCTION OF 1000' X 10' WIDE MULTI-USE TRIALNUNES, BRIAN Remrks:
Typ Imp:CITY OF NEW ORLEANS WILL PROVIDE LOCAL MATCH
Project:Prj Mgr:
HOLLYGROVE GREENLINE TRAIL
H.013617
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS I-10 450-90 NHPP 2,200 OPER EFFICIENCY/MOTORISTASSISTANCE - INTERSTATE LIGHTING
3-DESIGN/DEVELOPMENT
PROVIDE ROADWAY LIGHTINGDOUGLAS, JOSEPH Remrks:
Typ Imp:ENTITY MATCH PHASE 6
Project:Prj Mgr:
I-10: I-610E INTERCHANGE LIGHTING
Page 2 - 65 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.013929
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS 000-36 RTP 50 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTORLEANS 000-36 LOCAL 28 RECREATIONAL TRAILS PROGRAM
CONST. OF TRAILHEAD WITH CONNECTING TRAIL WITHIN URBAN PARKNUNES, BRIAN Remrks:
Typ Imp:AUDUBON NATURE INSTITUTE WILL PROVIDE LOCAL MATCH
Project:Prj Mgr:
AUDUBON NATURE CENTER TRAILHEAD
H.014064
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS I-10 450-90 NHPP 10,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT
MILLING AND OVERLAY WITH ASPHALT CONCRETEMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: FRANKLIN AVE - I-510
H.014065
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS I-610 450-34 NHPP 5,500 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT
MILLING AND OVERLAY WITH ASPHALT CONCRETEMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-610: ORLEANS P/L - FRANKLIN AVE
H.014080
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS US 90 006-03 NHPP 150 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
LEFT TURN LANE ONTO WB US 90 AT TOLEDANO STSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 90: LEFT TURN LANE AT TOLEDANO ST
H.014097
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS LA 3021 419-01 NHPP 1,400 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
MILL AND OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3021: LA 39 - US 90
H.014200
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS US 90 006-03 HSIPPEN 39 SAFETY 3-DESIGN/DEVELOPMENT
CLOSE EXISTING MEDIAN CROSSOVERROONEY, BRITTANY Remrks:
Typ Imp:
Project:Prj Mgr:
US 90 @ CATON ST
H.000304
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS US 61 007-01 NHPP 4,000 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REHABILITATIOND'ANDREA, ARTUR Remrks:
Typ Imp:007-01-0022;STAGE 0 PROJECT FEASIBILITY STUDY
Project:Prj Mgr:
I 10 - US 61 OVERPASS
H.011836
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS 000-36 TAP>200K 499 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL
SIDEWALKSMEEK, STEPHEN Remrks:
Typ Imp:MATCH PROVIDED BY NON-FLOOD PROTECTION MANAGEMENT AUTHO
Project:Prj Mgr:
NEW ORLEANS: LAKE VISTA, SIDEWALKS
H.011964
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS LA 39 046-31 NHPP 2,271 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REHABILITATIONDELATTE, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 39: INDUSTRIAL CANAL BRIDGE REHAB
Page 2 - 66 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.014042
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS LA 428 410-01 STP>200K 50 ENHANCEMENTS 1-PLANNING/ENVIRONMENTALORLEANS 000-36 STP>200K 681 ENHANCEMENTS
SHARED USE PATH, STRIPING, SIGNAGENUNES, BRIAN Remrks:
Typ Imp:CITY OF NEW ORLEANS TO PROVIDE MATCH
Project:Prj Mgr:
NEW ORLEANS TULLIS - RIVER ROUTE
H.011967
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS US 90-Z 283-08 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
FEASIBILITY STUDY OF CLEANING, PAINTING, & STRUCTURAL REPAIRCAVALIER, STEPHANIE Remrks:
Typ Imp:PHASE 1 CCCD TOLL CREDITS AS MATCH
Project:Prj Mgr:
US 90Z: GNO1 BRIDGE & APP REHABILITATION
H.011968
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS US 90-Z 283-08 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
FEASIBILITY STUDY OF CLEANING, PAINTING, & STRUCTURAL REPAIRDELATTE, BRIAN Remrks:
Typ Imp:PHASE 1 CCCD TOLL CREDITS AS MATCH
Project:Prj Mgr:
US90Z:GNO2 BRIDGE AND APP REHABILITATION
H.011969
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS LA 1264 836-15 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1264: TED HICKEY MOVABLE BRIDGE REHAB
H.012837
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS I-10 450-90 0 DEMO / HIGH PRIORITY 0-FEASIBILITY/SCOPING
STUDY WILL ADDRESS CONGESTION ON I-10 CORRIDOR INTO PORT/NONGUYEN, WAYNE Remrks:
Typ Imp:MATCH FROM NO RPC
Project:Prj Mgr:
I-10 NEW ORLEANS MASTER PLAN
H.013719
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS US 61 007-01 0 SAFETY - SAFE ROUTES TO PUBLICPLACES
0-FEASIBILITY/SCOPING
FEASIBILITY STUDYRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
US 61 @ I-10 EB OFF RAMP PED IMPR (NO)
H.013753
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS LA 428 410-01 0 SAFETY - SAFE ROUTES TO PUBLICPLACES
0-FEASIBILITY/SCOPING
FEASIBILITY STUDY FOR INTERSECTION AND PED/BIKE IMPROVEMENTSRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
LA 428: GEN DEGAULLE - OLD BEHRMAN
H.013960
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS I-10 450-90 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
0-FEASIBILITY/SCOPING
ORLEANS I-10 450-17 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
ST TAMMANY I-10 450-18 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
I-10 NO TO SLIDELL SHOULDER FEASIBILITY STUDYDEVILLE, ROSALINDA Remrks:
Typ Imp:
Project:Prj Mgr:
I-10 NO TO SLIDELL SHOULDER FEASIBILITY
Page 2 - 67 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.008230
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA LA 838 837-14 STPFLEX 1,055 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
NEW BRIDGEWINDMANN, ANDREW Remrks:
Typ Imp:837-14-0009
Project:Prj Mgr:
LA 838: STEEP BAYOU BRIDGE REPLACEMENT
OUACHITA
H.010015
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA LA 143 315-02 STPFLEX 8,000 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTBRAUNER, KURT Remrks:
Typ Imp:
Project:Prj Mgr:
LA 143: BAYOU D'ARBONNE BRIDGE
H.010430
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA LA 594 326-01 STPFLEX 1,200 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
THROUGH LANE WITH RIGHT TURN LANE AT HIGH SCHOOLSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 594: TURN LANE @ OUACHITA PAR HIGH
H.010698
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 RAIL PD 300 RAILROADS 3-DESIGN/DEVELOPMENT
INSTALL F/L'S & GATES AT UP RIVERBARGE ST. CROSSINGSHREWSBERRY,BILL Remrks:
Typ Imp:MATCH FROM RR
Project:Prj Mgr:
RIVERBARGE ST: UP RR XING (MONROE)
H.011508
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA LA 617 837-17 NHPP 1,400 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
3-DESIGN/DEVELOPMENT
OUACHITA LA 840-6 837-04 NHPP 1,400 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
INSTALL CCTVSKIMBENG, LUCY Remrks:
Typ Imp:
Project:Prj Mgr:
MONROE ITS PHASE 4
H.011895
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 HSIP 60 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT
INSTALL GAURD RAILMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
CITY OF MONROE GUARD RAIL INSTALLATION
H.012033
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA LA 143 315-02 STPFLEX 2,335 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
OUACHITA LA 594 326-02 STPFLEX 1,215 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTSWINDMANN, ANDREW Remrks:
Typ Imp:
Project:Prj Mgr:
LA 143, LA594:CROSS BAYOU & CANEY CR BRS
H.012626
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA LA 838 837-14 STPFLEX 105 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
3-DESIGN/DEVELOPMENT
DRAINAGE IMPROVEMENTSGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 838: DRAINAGE IMPROVEMENTS
Page 2 - 68 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.012898
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA LA 151 317-02 STPFLEX 720 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
OUACHITA LA 838 837-14 STPFLEX 1,320 PRESERVATION - BRIDGE (ONSYSTEM)
OUACHITA LA 134 837-15 STPFLEX 720 PRESERVATION - BRIDGE (ONSYSTEM)
RICHLAND LA 132 166-05 STPFLEX 1,800 PRESERVATION - BRIDGE (ONSYSTEM)
RICHLAND LA 135 167-04 STPFLEX 600 PRESERVATION - BRIDGE (ONSYSTEM)
RICHLAND LA 3048 339-03 STPFLEX 600 PRESERVATION - BRIDGE (ONSYSTEM)
RICHLAND LA 576 341-01 NFA 600 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:
Typ Imp:
Project:Prj Mgr:
DIST05:ABC BR REP OUACHITA, RICH PARS
H.013122
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 FBROFF 475 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
OUACHITA 000-37 FBROFF 368 PRESERVATION - BRIDGE (OFFSYSTEM)
BRIDGE REPLACEMENT - NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
PINE ST. & HARRISON/COLLIER BRIDGES
H.013127
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 FBROFF 317 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
OUACHITA 000-37 FBROFF 317 PRESERVATION - BRIDGE (OFFSYSTEM)
BRIDGE REPLACEMENT - NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
BRITTON RD & HERMAN DICKERSON RD BRS
H.013130
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 FBROFF 583 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
OUACHITA 000-37 FBROFF 787 PRESERVATION - BRIDGE (OFFSYSTEM)
BRIDGE REPLACEMENT - NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
RED CUT RD & CHARLES RAWLS RD BRIDGES
H.013137
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 FBROFF 470 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
OUACHITA 000-37 FBROFF 204 PRESERVATION - BRIDGE (OFFSYSTEM)
BRIDGE REPLACEMENT - NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
HARMON JOHNSON RD & GOOD HOPE RD BRS
H.013144
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 FBROFF 593 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
OUACHITA 000-37 FBROFF 235 PRESERVATION - BRIDGE (OFFSYSTEM)
BRIDGE REPLACEMENT - NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
PINE BLUFF RD & TACK ALLEN RD BRIDGES
Page 2 - 69 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.013371
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 STPENH 215 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SIDEWALKS, TRUNCATED DOMES, SIGNS, STRIPING & FLASHING SIGNAMEEK, STEPHEN Remrks:
Typ Imp:THE CITY OF WEST MONROE WILL PROVIDE THE LOCAL MATCH.
Project:Prj Mgr:
KIROLI RD SIDEWALKS AND PED IMPROVEMENTS
H.013400
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 STP<200K 585 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
ASPHALT OVERLAYRICHARD, RYAN Remrks:
Typ Imp:CITY OF WEST MONROE TO PROVIDE MATCH
Project:Prj Mgr:
NATCHITOCHES ST REHAB: TRENTON - N 7TH
H.013401
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 STP<200K 350 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
ASPHALT OVERLAYRICHARD, RYAN Remrks:
Typ Imp:CITY OF WEST MONROE TO PROVIDE MATCH
Project:Prj Mgr:
CROSELY ST REHAB: TRENTON - N 7TH
H.013518
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 STP<200K 408 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
REHABILITATIONRICHARD, RYAN Remrks:
Typ Imp:CITY OF MONROE TO PROVIDE MATCH.
Project:Prj Mgr:
OTIS STREET REHABILITATION
H.013564
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA I-20 451-06 NHPP 850 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
3-DESIGN/DEVELOPMENT
PAVEMENT MARKING REPLACEMENTHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-20: PAVEMENT MARKING REPLACEMENT VII
H.013805
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 STP<200K 1,330 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
MILL, PATCH AND OVERLAYRICHARD, RYAN Remrks:
Typ Imp:OUACHITA PARISH POLICE JURY TO PROVIDE MATCH
Project:Prj Mgr:
FINKS'S HIDE-A-WAY: BARKLEY - BAYOU OAKS
H.014105
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA US 165 016-02 NHPP 2,000 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
MOREHOUSE US 165 016-03 NHPP 958 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
MILL AND OVERLAY (SOUTHBOUND), SEAL JOINTS (NORTHBOUND)MAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 165: 0.3 MI S LA 2 - PARISH RD 1110
H.014108
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA US 165 015-31 NHPP 3,672 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
MILL AND OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 165: RILLA - LA 15
H.014232
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 FBROFF 679 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENT NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
RUFFIN DRIVE OVER DRAIN TO YOUNGS BAYOU
Page 2 - 70 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.004782
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 NFI 328,000 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
CONNECTOR & OUACHITA R. BR.(ENGR)NICKEL, TIM Remrks:
Typ Imp:700-37-0129;STAGE O
Project:Prj Mgr:
LA 143 - US 165 CONNECTOR& OUACH
H.007289
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 STBONDS 23,790 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTALOUACHITA US 80 002-01 STBONDS 2,468 DEMO / HIGH PRIORITY OUACHITA US 165 016-01 STBONDS 1,336 DEMO / HIGH PRIORITY OUACHITA LA 840-6 837-23 STBONDS 717 DEMO / HIGH PRIORITY
ASPHALT NEW PAVEMENTMASTIN, CATHERINE Remrks:
Typ Imp:742-37-0016;US 80 - US 165. R/W & UTIL BY CITY
Project:Prj Mgr:
KANSAS LANE EXTENSION
H.007528
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA US 80 001-09 TAP<200K 1,396 ENHANCEMENTS 1-PLANNING/ENVIRONMENTALOUACHITA US 80 001-09 LOCAL 152 ENHANCEMENTS
NEW SIDEWALKS AND SIDEWALK LIGHTINGNUNES, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 80:6TH ST-LAMY LN STREETSCAPING
H.007530
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 TAP<200K 339 ENHANCEMENTS 1-PLANNING/ENVIRONMENTALOUACHITA 000-37 LOCAL 199 ENHANCEMENTS OUACHITA US 165-Y 015-08 TAP<200K 339 ENHANCEMENTS OUACHITA US 165-Y 015-08 LOCAL 199 ENHANCEMENTS
NEW SIDEWALKS AND SIDEWALK LIGHTINGNUNES, BRIAN Remrks:
Typ Imp:MATCH IS 15% TOLL CREDITS AND 5% LOCAL
Project:Prj Mgr:
JACKSON STREET CORRIDOR ENHANCEMENT
H.009932
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA US 80 001-09 STPFLEX 7,000 CAPACITY 1-PLANNING/ENVIRONMENTAL
WIDEN ROADWAY, ADD LANESBRIGNAC, CHRISTINA Remrks:
Typ Imp:
Project:Prj Mgr:
US 80: VANCIL ROAD - WELL ROAD
H.011688
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA US 165 015-31 0 SAFETY 0-FEASIBILITY/SCOPINGOUACHITA US 165 016-01 0 SAFETY
CORRIDOR STUDYHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 165: CORRIDOR STUDY US 165 BUS - LA 2
H.012541
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA LA 594 326-01 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
FEASIBILITY STUDY REHABILITATION OR REPLACEMENTMOSS, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 594: OVERPASS I-20
H.011949
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
PLAQUEMINES 000-38 HSIPPEN 150 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT
PURCHASE AND INSTALL REGULATORY & WARNING SIGNS, ETCMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
RWD SIGNING PLAQUEMINES PARISH
PLAQUEMINES
Page 2 - 71 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.012987
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
PLAQUEMINES LA 23 062-02 STPFLEX 174 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
3-DESIGN/DEVELOPMENT
PLAQUEMINES LA 23 062-03 STPFLEX 426 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 23: RAVENNA RD-LM 4.040
H.012079
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
PLAQUEMINES LA 23 062-02 NHPP 15,000 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
TUNNEL REPAIRSTOURRES, VALERIE Remrks:
Typ Imp:
Project:Prj Mgr:
LA23:BELLE CHASSE TUNNEL INTERIM REPAIRS
H.010434
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
POINTE COUPEE LA 15 177-01 STPFLEX 4,200 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
STABILIZE & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 15: LA 1 - W. FELICIANA P/L
POINTE COUPEE
H.010724
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
POINTE COUPEE 000-39 FBROFF 1,045 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
PECAN ISLAND ROAD BRIDGE OVER THE CHENAL
H.012061
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
POINTE COUPEE LA 1 052-04 STPFLEX 1,997 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
POINTE COUPEE LA 1 052-04 STGEN 1,433 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTBOURGEOIS, COREY Remrks:
Typ Imp:AC
Project:Prj Mgr:
LA 1: BYU MOREAU AND LATERAL W15#7A BRS
H.012936
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
POINTE COUPEE LA 78 229-05 STPFLEX 1,476 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
PATCH, THIN ASPHALTIC CONCRETE OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 78: US 190 - LA 1
H.013192
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
POINTE COUPEE US 190 008-03 NHPP 10,000 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
MILL, OVERLAY AND SHOULDER REHABMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 190: E GROSSE TETE BR-E ATCH RIVER BR
H.013196
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
POINTE COUPEE US 190 008-02 NHPP 6,000 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
MILL, OVERLAY AND SHOULDER REHABMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 190: LA 978 TO LA 976
Page 2 - 72 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.013956
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
POINTE COUPEE 000-39 STP<5K-E 755 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTRANCK, AMANDA Remrks:
Typ Imp:
Project:Prj Mgr:
BEAMOW ROAD OVER BAYOU MARINGOUIN
H.014124
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
POINTE COUPEE LA 414 839-13 NFA 3,000 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
MILL, PATCH, & OVERLAYBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 414: LA 413 - LA 415
H.012063
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
POINTE COUPEE LA 15 177-01 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
LA 15: OR NAV CANAL MB REHAB (HBI)
H.009122
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES LA 1204 840-31 STPFLEX 3,000 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
NEW BRIDGESYANG, LI Remrks:
Typ Imp:840-31-0015; 3 BRIDGES
Project:Prj Mgr:
LA1204:BAYOU FLAGON & KITCHEN CR BRIDGES
RAPIDES
H.009498
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES LA 121 029-05 STPFLEX 8,900 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTBUCCI, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
LA 121: CALCASIEU RIVER BRIDGE
H.011194
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES US 165-X 015-01 HSIPPEN 165 SAFETY - SAFE ROUTES TO SCHOOLS 3-DESIGN/DEVELOPMENTRAPIDES 000-40 HSIPPEN 55 SAFETY - SAFE ROUTES TO SCHOOLS
SIDEWALKS, SIGNING AND STRIPINGRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
PINEVILLE ELEMENTARY SIDEWALKS
H.011361
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES US 71 008-09 NFI 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
MILL, CONSTRUCT TURN LANES, AND INSTALL PAVEMENT STRIPINGSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 71: TURN LANES FOR EMERG STAGING AREA
H.011506
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES I-49 455-05 NHPP 1,300 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
3-DESIGN/DEVELOPMENT
INSTALLING CCTVS AND DMSSKIMBENG, LUCY Remrks:
Typ Imp:
Project:Prj Mgr:
ALEXANDRIA ITS PHASE 4
H.011536
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES I-49 455-05 NHPP 4,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT
PATCH, COLD PLANE, & OVERLAY I-49 SHOULDERS AND RAMPSMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-49: 0.44 MI N US 167 TO EXIT 80
Page 2 - 73 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.011565
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES I-49 455-05 NHPP 7,400 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENTRAPIDES 000-40 NHPP 340 PRESERVATION - INTERSTATE
PATCH, MILL, OLY (I-49 MAINELINE, SHOULDERS & RAMPS) & SIDEMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-49: N OF LA 498 TO 0.66 MI E LA 1200
H.011569
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES I-49 455-05 NHPP 1,700 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENTRAPIDES 000-40 NHPP 350 PRESERVATION - INTERSTATE
PATCH, MILL, & OLY (I-49 MAINLINE SHOULDERS, RAMP & SIDE RD)MAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-49: NORTH OF LA 8 TO NATCHITOCHES P/L
H.011597
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES LA 8 134-03 STPFLEX 2,210 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
PATCHING, COLD PLANING, AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 8: VERNON PARISH LINE TO LA 119
H.012046
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES LA 3170 840-35 STPFLEX 2,807 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
RAPIDES LA 1208-1 840-48 STPFLEX 2,376 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTSGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
CHATLIN LAKE & HORSESHOE CANAL BRIDGES
H.012931
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES LA 3128 840-33 STPFLEX 250 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
3-DESIGN/DEVELOPMENT
MICORSURFACINGSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3128: LA 107 TO LA 28-ULTRATHIN
H.012935
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES LA 121 029-06 STPFLEX 720 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 121: LA 112 TO LA 28- AST
H.013120
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES 000-40 FBROFF 368 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENT - NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
BETHEL ROAD OVER SLASH BAYOU TRIBUTARY
H.013207
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES US 165 014-05 NHPP 350 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
PATCHING, MILLING, AND OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 165: NB LANE - MCNARY TO BOY SCOUT RD
H.013887
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES 000-40 STP<200K 3,364 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
REHABILITATIONRICHARD, RYAN Remrks:
Typ Imp:CITY OF ALEXANDRIA TO PROVIDE MATCH
Project:Prj Mgr:
RAPIDES AVE AND 3RD ST ROAD IMPROVEMENTS
Page 2 - 74 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.013905
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES US 167 023-01 NHPP 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
3-DESIGN/DEVELOPMENT
PAVEMENT MARKING REPLACEMENTHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 167: PINEVILLE EXPWY PAVEMENT MARKING
H.014084
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES LA 1208-5 014-07 NHPP 106 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
MAJOR REHAB, THIN OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1208-5: TRAFFIC CIRCLE TO SERVICE RD
H.014095
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES US 167 023-01 NHPP 5,988 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
MAJOR REHABMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 167: I-49 - US 165
H.014099
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES US 71 008-30 NHPP 1,767 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
MILL AND OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 71: LEE ST TO POWER CENTER
H.014167
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES 000-40 STP<200K 1,870 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTRICHARD, RYAN Remrks:
Typ Imp:CITY OF ALEXANDRIA TO PROVIDE MATCH
Project:Prj Mgr:
NORTH 16TH STREET BRIDGE REPLACEMENT
H.014255
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES 000-40 FBROFF 299 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENT NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
BEESON ROAD OVER FLAGON BAYOU TRIBUTARY
H.014261
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES 000-40 FBROFF 396 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENT NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
DOSHIE ROAD OVER CHERRY WINCHE CRK TRIB
H.000574
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES 000-40 TAP<200K 837 ENHANCEMENTS 1-PLANNING/ENVIRONMENTALRAPIDES LA 1208-5 014-07 TAP<200K 59 ENHANCEMENTS
SIDEWALKS AND SIDEWALK LIGHTINGNUNES, BRIAN Remrks:
Typ Imp:MATCH IS 15% TOLL CREDITS AND 5% LOCAL
Project:Prj Mgr:
MASONIC DRIVE STREETSCAPE, PHASE II
H.007538
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES LA 498 840-22 NHPP 1,113 ROAD TRANSFER 1-PLANNING/ENVIRONMENTALRAPIDES LA 498 840-22 TAP<200K 928 ENHANCEMENTS
SIDEWALKS AND LANDSCAPINGRACHAL, JASON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 498: ENGLAND AIR PARK TO LA 1 GATEWAY
Page 2 - 75 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.010341
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES LA 115 033-04 STPFLEX 1,928 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
PATCH, COLD PLANE, AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 115: LA 1207 - LA 28
H.010824
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES US 71 008-09 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
1-PLANNING/ENVIRONMENTAL
RAPIDES US 71 840-43 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
RAPIDES US 71 008-30 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
CONDUCT CORRIDOR STUDY ALONG US 71COLVIN, JODY Remrks:
Typ Imp:
Project:Prj Mgr:
US 71 CORRIDOR STUDY
H.011942
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES US 165 015-01 NHPP 650 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
1-PLANNING/ENVIRONMENTAL
RAPIDES US 165 015-02 NHPP 650 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
RAPIDES 000-40 STPFLEX 650 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
CONSTRUCT ROUNDABOUT AND ADD TURN LANESHARROUCH, JOSHUA Remrks:
Typ Imp:
Project:Prj Mgr:
US 165: ROUNDABOUT AT PINECREST
H.012468
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES I-49 455-05 NHPP 1,200 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
1-PLANNING/ENVIRONMENTAL
AVOYELLES I-49 455-04 NHPP 300 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
EVANGELINE I-49 455-92 NHPP 12 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
SIGN UPGRADE ALONG I-49FILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
I-49 (ST LANDRY P/L - 2 MI. N. LA 3265)
H.014067
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES 000-40 FLH 692 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTALRAPIDES 000-40 LOCAL 757 OTHER / MISCELLANEOUS
PATCHING AND OVERLAYNUNES, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 12: VALENTINE LAKE ROAD
Page 2 - 76 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.014246
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES LA 1199 840-27 FBROFF 573 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
RAPIDES LA 1199 840-27 STGEN 402 PRESERVATION - BRIDGE (ONSYSTEM)
RAPIDES LA 1199 840-27 FBROFF 744 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTTOURRES, VALERIE Remrks:
Typ Imp:AC; USE NFA AS MATCH
Project:Prj Mgr:
LA 1199: SPRING CREEK & CREEK BRIDGES
H.011403
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES LA 1208-3 368-03 0 SAFETY 0-FEASIBILITY/SCOPING
CORRIDOR STUDY FOR SAFETY & ACCESS MANAGEMENT IMPROVEMENHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA1208-3 TRAFFIC STUDY:VERSAILLES- LA488
H.014046
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES 000-40 0 DEMO / HIGH PRIORITY 0-FEASIBILITY/SCOPING
VIRTUAL PUBLIC INVOLVEMENT FOR LPAMOORE, TANYA Remrks:
Typ Imp:RAPIDES AREA PLANNING COMMISSION TO PAY MATCH
Project:Prj Mgr:
VIRTUAL PUBLIC INVOLVEMENT FOR LPA
H.012974
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RED RIVER LA 174 112-07 STPFLEX 150 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
3-DESIGN/DEVELOPMENT
ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 174: NATCHITOCHES PL TO LA 1
RED RIVER
H.013986
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RED RIVER LA 155 091-01 STP<5K-E 3,161 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
RED RIVER LA 155 091-01 STPFLEX 972 PRESERVATION - BRIDGE (ONSYSTEM)
RED RIVER LA 155 091-01 STPFLEX 1,154 PRESERVATION - BRIDGE (ONSYSTEM)
RED RIVER LA 155 091-01 STPFLEX 1,154 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTPATTON, HEATHER Remrks:
Typ Imp:
Project:Prj Mgr:
LA 155: BRIDGES NEAR COUSHATTA
H.013995
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RED RIVER LA 507 304-02 STP<5K-E 607 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
RED RIVER LA 507 304-02 FBROFF 972 PRESERVATION - BRIDGE (ONSYSTEM)
RED RIVER LA 514 100-01 STP<5K-E 1,337 PRESERVATION - BRIDGE (ONSYSTEM)
RED RIVER LA 514 100-02 STPFLEX 790 PRESERVATION - BRIDGE (ONSYSTEM)
RED RIVER LA 514 100-02 STPFLEX 2,283 PRESERVATION - BRIDGE (ONSYSTEM)
BIENVILLE LA 507 100-03 STPFLEX 402 PRESERVATION - BRIDGE (ONSYSTEM)
RED RIVER 000-41 STP<5K-E 402 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTPATTON, HEATHER Remrks:
Typ Imp:
Project:Prj Mgr:
LA 507, LA 514, LOCAL: BAYOU AND CR BRS
Page 2 - 77 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.011600
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RED RIVER LA 514 100-02 STPFLEX 1,260 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
ASPHALTIC CONCRETE PAVEMENT RESURFACING WITH MINOR WIDENISPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 514 & 507: US 371 TO BIENVILLE PL
H.012613
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RED RIVER LA 509 105-03 STPFLEX 144 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 509: DESOTO PL TO LA 1
H.001970
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RICHLAND LA 561 166-03 FBROFF 7,011 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTALLEN, BRIAN Remrks:
Typ Imp:166-03-0015
Project:Prj Mgr:
BOEUF RIVER BRIDGE NEAR HEBERT
RICHLAND
H.001971
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RICHLAND LA 132 166-04 STP<5K 4,221 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
RICHLAND LA 132 842-13 STP<5K 1,809 PRESERVATION - NON-INTERSTATENFA
STABLIZE BASE & OVERLAYBROWN, JOSEPH C. Remrks:
Typ Imp:NFA AS MATCH
Project:Prj Mgr:
LA 132: LA 561 - LA 135
H.008288
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RICHLAND LA 132 842-13 FBROFF 3,672 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDE REPLACEMENTWINDMANN, ANDREW Remrks:
Typ Imp:842-13-0009;USE NFA AS MATCH
Project:Prj Mgr:
BOEUF RIVER BRIDGE NEAR BUCKNER (HBI)
H.009529
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RICHLAND US 80 002-02 STPFLEX 3,416 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
BASE STABILIZATION & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 80:BAYOU LAFOURCHE BR. - 1.44 MILES E
H.011021
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RICHLAND LA 17 051-04 STPFLEX 1,114 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
3-DESIGN/DEVELOPMENT
REMOVE AND REPLACE EXISTING SUBSURFACE DRAINAGE STRUCTURGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 17: SHARON STREET TO TENNESSEE STREET
H.011603
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RICHLAND LA 132 166-05 STPFLEX 913 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
ASPHALT OVERLAY OF ASPHALT PAVEMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 132: LA 135 TO LA 576
Page 2 - 78 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.012036
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RICHLAND US 80 002-03 STPFLEX 3,079 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTBUCCI, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
US 80: BOEUF RIVER BRIDGE
H.012955
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RICHLAND LA 15 026-09 STPFLEX 829 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
3-DESIGN/DEVELOPMENT
ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 15: US 425 - OUACHITA PL
H.013953
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RICHLAND 000-42 STP<5K-E 1,542 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTPATTON, HEATHER Remrks:
Typ Imp:
Project:Prj Mgr:
MCMANUS ROAD OVER CYPRESS CREEK
H.013990
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RICHLAND LA 132 166-05 STP<5K-E 790 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
RICHLAND LA 132 166-05 STPFLEX 607 PRESERVATION - BRIDGE (ONSYSTEM)
RICHLAND LA 132 166-05 STPFLEX 425 PRESERVATION - BRIDGE (ONSYSTEM)
RICHLAND LA 132 166-05 STPFLEX 607 PRESERVATION - BRIDGE (ONSYSTEM)
RICHLAND LA 132 166-05 STP<5K-E 972 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTPATTON, HEATHER Remrks:
Typ Imp:
Project:Prj Mgr:
LA 132: BRIDGES NEAR MANGHAM
H.014135
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RICHLAND I-20 451-07 NHPP 160 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
3-DESIGN/DEVELOPMENT
DRAINAGE IMPROVEMENTSGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
I-20: DRAINAGE IMPROVEMENTS AT LA 583
H.014234
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RICHLAND 000-42 FBROFF 507 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENT NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
COMEAUX ROAD OVER STEEP BAYOU
H.008793
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RICHLAND LA 183 185-01 NFI 95,000 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
INTERCHANGE IMPROV., NEW ROADWAY, ROADWAY WIDENINGLANDRY, COREY Remrks:
Typ Imp:
Project:Prj Mgr:
FRANKLIN FARMS MEGA SITE
H.012966
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
SABINE US 171 025-04 NHPP 850 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
MIRCOSURFACINGMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 171: CONVERSE TO DESOTO P/L-MICORSURF
SABINE
Page 2 - 79 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.013005
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
SABINE LA 1215 132-07 NFA 2,760 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
VERNON LA 117 114-01 STPFLEX 360 PRESERVATION - BRIDGE (ONSYSTEM)
VERNON LA 399 138-03 NFA 1,320 PRESERVATION - BRIDGE (ONSYSTEM)
VERNON LA 463 139-06 STPFLEX 2,520 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:
Typ Imp:
Project:Prj Mgr:
DIST08:ABC BR REP SABINE, VERNON PARS
H.014093
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
SABINE LA 6 034-03 NHPP 4,925 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
SABINE LA 6 034-02 NHPP 247 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
MILL AND OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 6: US 171 TO NATCHITOCHES P.L.
H.010345
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
SABINE LA 175 035-02 STPFLEX 1,973 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
STABILIZE AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 175: N JCT LA 120 - RAY CANTO RD
H.012544
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
SABINE LA 120 042-03 STPFLEX 1,513 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
SABINE LA 120 042-03 STPFLEX 1,513 PRESERVATION - BRIDGE (ONSYSTEM)
SABINE LA 120 042-03 STPFLEX 1,630 PRESERVATION - BRIDGE (ONSYSTEM)
SABINE LA 120 042-03 STPFLEX 1,928 PRESERVATION - BRIDGE (ONSYSTEM)
SABINE LA 120 042-03 STPFLEX 1,646 PRESERVATION - BRIDGE (ONSYSTEM)
SABINE LA 474 120-01 STPFLEX 1,574 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTSMISTICH, BRADLEY Remrks:
Typ Imp:
Project:Prj Mgr:
LA 120, LA 474: BRIDGES
H.013763
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
SABINE 000-43 0 SAFETY - LOCAL ROADS SAFETY 0-FEASIBILITY/SCOPINGVERNON 000-58 0 SAFETY - LOCAL ROADS SAFETY
FEASIBILITY STUDYRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
LRSP SIGNS & STRIPING (VERNON, SABINE)
H.011800
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST BERNARD 000-44 TAP>200K 1,022 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SHARED USE PATH ON LEVEE TOPNUNES, BRIAN Remrks:
Typ Imp:MATCH PROVIDED BY ST. BERNARD PARISH GOVERNMENT
Project:Prj Mgr:
ST. BERNARD MISS RIVER TRAIL PH III
ST BERNARD
Page 2 - 80 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.011820
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST BERNARD 000-44 TAP>200K 433 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SIDEWALKS AND SHARED USE PATHNUNES, BRIAN Remrks:
Typ Imp:MATCH PROVIDED BY ST. BERNARD PARISH
Project:Prj Mgr:
JEAN LAFITTE PARKWAY SHARED USE PATH
H.012891
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST BERNARD LA 300 284-30 STGEN 600 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTTOURRES, VALERIE Remrks:
Typ Imp:USE NFA AS MATCH; AC PHASE 6
Project:Prj Mgr:
LA 300: BAYOU LALOUTRE BRIDGE
H.013343
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST BERNARD 000-44 STPENH 728 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SHARED USE PATHMEEK, STEPHEN Remrks:
Typ Imp:ST. BERNARD PARISH WILL PROVIDE THE LOCAL MATCH.
Project:Prj Mgr:
ST. BERNARD MISS RIVER TRAIL, PH IV
H.013525
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST BERNARD 000-44 STP>200K 4,070 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
CONSTRUCTION OF A 8.5 MILE X 10' WIDE, MULTI-USE TRAILNUNES, BRIAN Remrks:
Typ Imp:ST. BERNARD PARISH GOVERNMENT WILL PROVIDE THE LOCAL MATCH
Project:Prj Mgr:
ST. BERNARD PARISH 40 ARPENT TRAIL, PH 1
H.013936
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST BERNARD 000-44 STP>200K 4,950 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
GRADE SEPARATION TRAIL - BIKE/PED BRIDGELEBAS, MELISSA Remrks:
Typ Imp:MATCH PROVIDED BY ST. BERNARD PARISH
Project:Prj Mgr:
40 ARPENT TRAIL BIKE/PEDESTRIAN BRIDGE
H.010413
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST CHARLES LA 48 282-02 STPFLEX 1,750 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETESPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 48: ORMOND PLANTATION - WESCO ST
ST CHARLES
H.010416
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST CHARLES LA 3127 428-03 STPFLEX 5,500 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETESPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3127: ST. JOHN P/L - 3700' W I-310
H.010417
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST CHARLES LA 306 845-07 STPFLEX 3,600 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
COLD PLANE, GEOGRID & 4" OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 306: LA 631 - LA 632
H.011801
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST CHARLES 000-45 TAP>200K 2,602 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SHARED USE PATHMEEK, STEPHEN Remrks:
Typ Imp:MATCH PROVIDED BY ST. CHARLES PARISH
Project:Prj Mgr:
ST. CHARLES WB LEVEE PATH PH IV AND V
Page 2 - 81 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.013494
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST CHARLES LA 52 845-03 STP>200K 3,466 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
BIKE/PED - COMPLETE STREETSLEBAS, MELISSA Remrks:
Typ Imp:MATCH BY ST. CHARLES PARISH
Project:Prj Mgr:
LA 52 (PH1): BLUEBERRY HILL - ANGUS DR
H.013495
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST CHARLES LA 52 845-03 STP>200K 3,351 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
BIKE/PED - COMPLETE STREETSLEBAS, MELISSA Remrks:
Typ Imp:MATCH BY ST. CHARLES PARISH
Project:Prj Mgr:
LA 52 (PH2): US 90 - BLUEBERRY HILL
H.014050
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST CHARLES 000-45 STP>200K 370 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
PAVEMENT REHAB, TURN LANELEBAS, MELISSA Remrks:
Typ Imp:ST. CHARLES PARISH TO PROVIDE MATCH
Project:Prj Mgr:
WILLOWDALE BLVD: US 90 - E. HEATHER DR.
H.014051
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST CHARLES 000-45 STP>200K 5,200 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
RECONSTRUCTIONLEBAS, MELISSA Remrks:
Typ Imp:ST. CHARLES TO PROVID MATCH
Project:Prj Mgr:
LAKEWOOD DR. RECONSTRUCTION
H.010753
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST CHARLES I-310 450-38 NFI 0 CAPACITY 1-PLANNING/ENVIRONMENTALST CHARLES US 90 005-08 NFI 0 CAPACITY
RECONSTRUCTION OF INTERCHANGE OR NEW FLYOVER RAMPLANDRY, COREY Remrks:
Typ Imp:MATCH FOR ENVIRONMENTAL FROM DOTD SURPLUS
Project:Prj Mgr:
US 90/I-310 INTERCHANGE
H.012532
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST CHARLES LA 631 845-06 STPFLEX 1,498 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTYAP, KIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 631: DRAIN CANAL BRIDGE
H.013496
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST CHARLES LA 52 845-03 STP>200K 2,439 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL
BIKE/PED - COMPLETE STREETSLEBAS, MELISSA Remrks:
Typ Imp:MATCH BY ST. CHARLES PARISH
Project:Prj Mgr:
LA 52 (PH3): ANGUS DR - LA 18
H.013567
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST CHARLES I-310 450-36 NHPP 700 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
1-PLANNING/ENVIRONMENTAL
ST CHARLES I-310 450-38 NHPP 500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
PAVEMENT MARKING REPLACEMENTHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-310: PAVMENT MARKING REPLACEMENT I
H.012977
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST HELENA LA 432 846-10 STPFLEX 1,350 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
3-DESIGN/DEVELOPMENT
THIN LIFT OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 432: DOUGHTY RD-LA 38
ST HELENA
Page 2 - 82 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.013736
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST HELENA LA 16 262-04 STPFLEX 3,000 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
MILL AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 16: LIVINGSTON PL - LA 63
H.013982
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST HELENA LA 10-S 846-12 STP<5K-E 929 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
ST HELENA LA 1042 846-03 FBROFF 231 PRESERVATION - BRIDGE (ONSYSTEM)
ST HELENA LA 1042 846-03 FBROFF 231 PRESERVATION - BRIDGE (ONSYSTEM)
ST HELENA LA 10-S 846-12 FBROFF 402 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTRANCK, AMANDA Remrks:
Typ Imp:
Project:Prj Mgr:
LA 10 SPUR, LA 1042: BRS NEAR GREENSBURG
H.014115
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST HELENA LA 448 254-31 STP<5K 4,200 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
MILL & OVERLAYBROWN, JOSEPH C. Remrks:
Typ Imp:NFA AS MATCH
Project:Prj Mgr:
LA 448: LA 37 - LA 10
H.014123
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST HELENA LA 1043 846-02 NFA 3,700 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
MILL & OVERLAYBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1043: LA 10 - LA 43
H.013116
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JAMES LA 20 065-07 HSIPPEN 4,822 SAFETY 3-DESIGN/DEVELOPMENTST JAMES LA 20 065-07 HSIPPEN 655 SAFETY LAFOURCHE LA 20 065-06 HSIPPEN 1,456 SAFETY
WIDENING LA 20 TO INCLUDE 8' SHOULDERSLANDRY, COREY Remrks:
Typ Imp:
Project:Prj Mgr:
LA 20 WIDEN: LA 307 - S. VACHERIE
ST JAMES
H.013997
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JAMES 000-47 STP<5K-E 755 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTRANCK, AMANDA Remrks:
Typ Imp:
Project:Prj Mgr:
LOC RD OVER BORROW PIT(BLIND RV BT LNCH)
H.014086
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JAMES US 61 007-05 NHPP 8,000 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
MILL & OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 61: ST. JOHN PL - ASCENSION PL
Page 2 - 83 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.011717
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JAMES LA 70 426-02 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
PIER PROTECTION SYSTEMGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
LA 70: SUNSHINE BRIDGE PIER PROTECTION
H.012066
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JAMES LA 3213 434-02 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
MAJOR BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3213: GRAMERCY BRIDGE REHABILITATION
H.002960
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JOHN LA 3213 434-01 STPFLEX 15,652 RAILROADS - GRADE SEPARATION 3-DESIGN/DEVELOPMENT
GRADE SEPARATE EXISTING AT GRADE CROSSINGRAY, JARED Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3213:GRAMERCY BRIDGE OVER UP RAILROAD
ST JOHN
H.010076
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JOHN 000-48 HSIP 300 RAILROADS 3-DESIGN/DEVELOPMENT
RAILROAD SIGNALIZATIONSHREWSBERRY,BILL Remrks:
Typ Imp:
Project:Prj Mgr:
IC (RESERVE) W. 19TH ST.
H.010385
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JOHN LA 3127 428-02 STPFLEX 5,500 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
COLD PLANE & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3127: ST. JAMES P/L - ST. CHARLES P/L
H.012074
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JOHN US 51 256-12 NHPP 150 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
RECONFIG STRIPING FOR OFF RAMP MERGESPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 51 @ I-55 OFF RAMP
H.014109
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JOHN US 61 007-04 NHPP 2,100 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
MEDIUM OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 61: WILDCAT DR - AIRPORT RD
H.014111
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JOHN US 61 007-04 NHPP 3,700 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
MEDIUM OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 61: AIRPORT RD - ST JAMES P/L
H.009594
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JOHN I-10 450-13 NFI 0 PRESERVATION - INTERSTATE 1-PLANNING/ENVIRONMENTAL
GRADE RAISING AND CROSS DRAIN WORK FEASIBILITY STUDYHANKS, ANNA Remrks:
Typ Imp:
Project:Prj Mgr:
I-10:E END OF RESERVE RELIEF CANAL-US 51
Page 2 - 84 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.010902
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JOHN US 61 007-04 0 SAFETY 0-FEASIBILITY/SCOPING
FEASIBILITY STUDYJESCLARD, TREY Remrks:
Typ Imp:FEASIBILITY STUDY
Project:Prj Mgr:
US 61 FEASIBILITY STUDY
H.011136
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JOHN LA 44 256-02 0 DEMO / HIGH PRIORITY 0-FEASIBILITY/SCOPING
STAGE 0 FEASIBILITY STUDYNGUYEN, WAYNE Remrks:
Typ Imp:20% NON-FEDERAL MATCH PROVIDED BY RPC
Project:Prj Mgr:
MRT EXTENSION ST. JOHN PARISH
H.000445
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY US 190 012-13 NHPP 27,900 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REHAB.REDECK & MAYBE WIDENGAUDRY, CARL Remrks:
Typ Imp:012-13-0101
Project:Prj Mgr:
US 190: UPRR OVERPASS NEAR OPELOUSAS
ST LANDRY
H.002176
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY LA 10 219-07 STPFLEX 4,950 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
NEW BRIDGESBUCCI, MARK Remrks:
Typ Imp:219-07-0025;2 BRIDGES
Project:Prj Mgr:
LA 10 BRIDGES
H.010225
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY LA 178 208-02 STPFLEX 700 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
STABILIZE BASE & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 178: ACADIA P/L - LA 357
H.011549
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY US 190 012-12 STPFLEX 800 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
3-DESIGN/DEVELOPMENT
REMOVE BASE & SURFACING, RECONSTRUCT AT HIGHER ELEVGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
US 190 EB: DRAINAGE IMPROVEMENTS
H.011550
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY I-49 455-02 NHPP 6,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT
CONCRETE REMOVAL & REPLACEMENT, STONE BASE, SHLDER UNDERDDOMINGUE, CHRISTOPHER Remrks:
Typ Imp:
Project:Prj Mgr:
I-49: LA 93 OPASS(0.31 MI S - 0.37 MI N)
H.011844
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY 000-49 TAP<200K 115 ENHANCEMENTS 3-DESIGN/DEVELOPMENTST LANDRY US 190 012-12 TAP<200K 58 ENHANCEMENTS
SIDEWALKMEEK, STEPHEN Remrks:
Typ Imp:MATCH PROVIDED BY THE CITY OF OPELOUSAS
Project:Prj Mgr:
US 190: MARKET - MAIN, SIDEWALKS
H.011993
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY LA 10 032-03 STPFLEX 1,984 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTBRAUNER, KURT Remrks:
Typ Imp:
Project:Prj Mgr:
LA 10: BAYOU CARRON BRIDGE
Page 2 - 85 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.012681
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY 000-49 RTP 114 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTST LANDRY 000-49 LOCAL 39 RECREATIONAL TRAILS PROGRAM
1.6 M. OF PED-BIKE TRAIL, 1 M. OF SHARROW AND 3 TRAILHEADSNUNES, BRIAN Remrks:
Typ Imp:DCRT IS THE PROJECT MANAGER
Project:Prj Mgr:
OPELOUSAS PARKS PED-BIKE TRAIL
H.013407
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY LA 93 221-01 TAP<5K 498 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SIDEWALKSNUNES, BRIAN Remrks:
Typ Imp:THE TOWN OF GRAND COTEAU WILL PROVIDE THE LOCAL MATCH.
Project:Prj Mgr:
LA 93 (WMLK DR) SIDEWALKS GRAND COTEAU
H.013510
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY 000-49 RTP 129 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENT
ACQUISTION OF TRAIL MAINTENANCE EQUIPMENTNUNES, BRIAN Remrks:
Typ Imp:LA WILDLIFE AND FISHERIES WILL PROVIDE THE LOCAL MATCH
Project:Prj Mgr:
OPELOUSAS REG.-TRAIL MAINT. EQUIP. ACQ.
H.013952
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY 000-49 STP<5K-E 408 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTRANCK, AMANDA Remrks:
Typ Imp:
Project:Prj Mgr:
JESSE B ROAD OVER BAYOU MALLET
H.011994
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY US 167 066-08 STPFLEX 2,981 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTYAP, KIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 167: BAYOU GRAND LOUIS BRIDGE
H.012534
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY LA 103 849-03 STPFLEX 1,238 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTGAUDRY, CARL Remrks:
Typ Imp:
Project:Prj Mgr:
LA103: DRAINAGE CANAL BRIDGE
H.011243
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY US 190 012-13 0 SAFETY 0-FEASIBILITY/SCOPING
TBD BY FEASIBILITY STUDYFUSILIER, JACOB Remrks:
Typ Imp:
Project:Prj Mgr:
I-49 INTERCHANGE IMP. AT US 190 & LA 31
H.013459
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY US 167 066-08 0 SAFETY 0-FEASIBILITY/SCOPING
FEASIBILITY STUDY TO 3 LANE SECTION OF US 167ZHANG, HONG Remrks:
Typ Imp:
Project:Prj Mgr:
US 167: ELSIE STREET TO GILBERT DRIVE
H.013767
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY 000-49 0 SAFETY - LOCAL ROADS SAFETY 0-FEASIBILITY/SCOPINGST MARTIN 000-50 0 SAFETY - LOCAL ROADS SAFETY
FEASIBILITY STUDYRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
SIGNS & MARKINGS (ST LANDRY&ST MARTIN)
Page 2 - 86 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.012130
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARTIN LA 347 404-03 STPFLEX 3,376 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
COLD PLANE, PATCH, OVERLAY, & RELATED WORKBROWN, JOSEPH C. Remrks:
Typ Imp:NFA AS MATCH
Project:Prj Mgr:
LA 347: LA 328 - LA 686
ST MARTIN
H.012618
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARTIN LA 347 056-04 STPFLEX 540 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
3-DESIGN/DEVELOPMENT
RAISE ROAD X-SECTION AND/OR REPLACE SUBDRAINAGE STRUCTUREGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 347 DRAINAGE IMPROVEMENTS
H.013089
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARTIN 000-50 HSIPPEN 350 SAFETY - SAFE ROUTES TO PUBLICPLACES
3-DESIGN/DEVELOPMENT
CONSTRUCTION OF SIDEWALKSRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
MARTIN STREET SIDEWALKS
H.013142
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARTIN 000-50 FBROFF 388 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENT - NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
CHES COURVILLE RD OVER COULEE NICOLE G.
H.013516
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARTIN LA 353 403-02 STP>200K 3,000 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
PAVEMENT PRESERVATIONRICHARD, RYAN Remrks:
Typ Imp:DOTD TO PROVIDE MATCH.
Project:Prj Mgr:
LA 353 PAVEMENT PRESERVATION
H.013964
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARTIN 000-50 STP<5K-E 929 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
ST MARTIN 000-50 STP<5K-E 582 PRESERVATION - BRIDGE (OFFSYSTEM)
BRIDGE REPLACEMENTRANCK, AMANDA Remrks:
Typ Imp:
Project:Prj Mgr:
FOUR MILE BAYOU ROAD BRIDGE REPLACEMENT
H.013966
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARTIN LA 321 850-19 STP<5K-E 408 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
ST MARTIN LA 321 850-19 FBROFF 231 PRESERVATION - BRIDGE (ONSYSTEM)
ST MARTIN LA 321 850-19 FBROFF 573 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTRANCK, AMANDA Remrks:
Typ Imp:FBROFF FUNDING USES NFA AS MATCH
Project:Prj Mgr:
LA 321: CREEK BRIDGES
H.014226
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARTIN 000-50 FBROFF 410 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENT NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
AUGUILLARD ROAD OVER COULEE
Page 2 - 87 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.011279
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARTIN LA 328 404-02 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
0-FEASIBILITY/SCOPING
STAGE 0/FEASIBILITY STUDYZHANG, HONG Remrks:
Typ Imp:
Project:Prj Mgr:
LA 328: LATIOLAIS DRIVE TO JULIE STREET
H.011995
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARTIN LA 96 238-03 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
LA 96: BAYOU TECHE MB REHAB (HBI)
H.013023
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARTIN LA 328 404-02 0 URBAN SYSTEMS 0-FEASIBILITY/SCOPING
FEASIBILITY STUDYZHANG, HONG Remrks:
Typ Imp:ACADIANA MPO PROVIDING MATCH
Project:Prj Mgr:
LA 328 CORRIDOR STUDY IN BREAUX BRIDGE
H.011487
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARY LA 182 005-01 STPFLEX 15,000 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE CLEANING, PAINTING AND STRUCTURAL REPAIRSGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
LA 182: BERWICK BAY BRIDGE REHAB (HBI)
ST MARY
H.012990
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARY LA 182 004-07 STPFLEX 3,000 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
COLD PLANE, PATCH, ASPHALT OVERLAY, AND RELATED WORKSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 182: 0.45 MI S LA 3069 - LA 317
H.013503
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARY 000-51 RTP 112 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTST MARY 000-51 LOCAL 16 RECREATIONAL TRAILS PROGRAM
CONSTRUCTION OF A 925' X 6' WIDE TRAIL THROUGH A CITY PARKNUNES, BRIAN Remrks:
Typ Imp:CITY OF PATTERSON WILL PROVIDE LOCAL MATCH
Project:Prj Mgr:
MOREY PARK TRAIL
H.013914
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARY 000-51 RTP 113 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTST MARY 000-51 LOCAL 18 RECREATIONAL TRAILS PROGRAM
CONST. OF 1370' PED-BIKE CONNECTING TRAILNUNES, BRIAN Remrks:
Typ Imp:CITY OF MORGAN CITY WILL PROVIDE LOCAL MATCH
Project:Prj Mgr:
BIKE MORGAN CITY
H.011328
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARY US 90 424-05 NFI 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
UPGRADING US 90 FOR FUTURE I-49 SOUTHLANDRY, COREY Remrks:
Typ Imp:REF. H.005171 FEASIBILITY
Project:Prj Mgr:
I-49 SOUTH (RICOHOC TO BERWICK)
H.012535
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARY LA 182 004-07 STPFLEX 1,408 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTALLEN, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 182: HANSON CANAL BRIDGE
Page 2 - 88 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.011996
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARY LA 182 004-06 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
FEASIBILITY STUDY OF CLEANING, PAINTING, & STRUCTURAL REPAIRCAVALIER, STEPHANIE Remrks:
Typ Imp:
Project:Prj Mgr:
LA 182: CHARENTON BRIDGE REHAB (HBI)
H.013722
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARY 000-51 0 SAFETY - SAFE ROUTES TO PUBLICPLACES
0-FEASIBILITY/SCOPING
FEASIBILITY STUDYRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
MORGAN CITY SIDEWALKS & SHARED USE PATH
H.000286
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY US 90 006-08 STPFLEX 22,400 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
ST TAMMANY US 90 006-07 STPFLEX 850 PRESERVATION - BRIDGE (ONSYSTEM)
ST TAMMANY US 90 006-08 OTHER 23,250 OTHER / MISCELLANEOUS
BRIDGE REPLACEMENTMASTIN, CATHERINE Remrks:
Typ Imp:006-08-0031;STAGE 0 PROJECT
Project:Prj Mgr:
EAST PEARL RIVER BRIDGE
ST TAMMANY
H.001344
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY US 190 059-30 STP<200K 17,000 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
WIDEN TO 4 LANES, NEW BRIDGELANDRY, COREY Remrks:
Typ Imp:059-30-0008
Project:Prj Mgr:
US 190: LA 437 - US 190 BUS (PH 1)
H.004985
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 434 852-12 NHPP 2,000 CAPACITY 3-DESIGN/DEVELOPMENTST TAMMANY LA 434 852-12 NHPP 1,000 CAPACITY ST TAMMANY LA 434 852-12 NHPP 3,500 CAPACITY ST TAMMANY LA 434 852-12 NHPP 35,000 CAPACITY ST TAMMANY LA 434 852-12 STPFLEX 2,700 CAPACITY ST TAMMANY LA 434 852-12 STPFLEX 500 CAPACITY ST TAMMANY LA 434 852-12 STPFLEX 3,500 CAPACITY ST TAMMANY LA 434 852-12 STPFLEX 35,000 CAPACITY ST TAMMANY LA 3241 852-33 NHPP 10,000 CAPACITY ST TAMMANY LA 3241 852-33 NHPP 1,500 CAPACITY ST TAMMANY LA 3241 852-33 NHPP 13,000 CAPACITY ST TAMMANY LA 3241 852-33 NHPP 135,000 CAPACITY
NEW ROADWAYUMEOZULU, JOE Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3241: I-12 TO BUSH
H.007588
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY 000-52 TAP<200K 156 ENHANCEMENTS 3-DESIGN/DEVELOPMENTST TAMMANY 000-52 LOCAL 36 ENHANCEMENTS
LANDSCAPING AND LIGHTING FOR SIDEWALKNUNES, BRIAN Remrks:
Typ Imp:MATCH IS 15% TOLL CREDITS AND 5% LOCAL
Project:Prj Mgr:
GIROD STREET LANDSCAPING AND LIGHTING, P
H.008358
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 1077 852-13 FBROFF 1,854 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTGAUDRY, CARL Remrks:
Typ Imp:852-13-0017; USE NFA AS MATCH
Project:Prj Mgr:
BLACK BAYOU BR. NEAR MADISONVILLE
Page 2 - 89 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.010377
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 36 280-03 STPFLEX 1,120 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
COLD PLANE & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 36: LA 41 - IGC RAILROAD
H.010380
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 433 018-30 STPFLEX 740 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
COLD PLANE & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 433: U-PASS I-10 - BEHRMAN STREET
H.010387
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY US 90 006-07 STPFLEX 3,323 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
RUBBILIZE & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
U.S. 90: LA 433 - U.S. 190
H.011775
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY US 11 018-03 TAP<200K 372 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
PED/BICYCLE CROSSWALKS, SIGNS AND SIGNALSNUNES, BRIAN Remrks:
Typ Imp:CITY OF SLIDELL PROVIDES MATCH
Project:Prj Mgr:
US 11 & US 190 BICYCLE AND PED CROSSINGS
H.011799
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY 000-52 TAP<200K 986 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SHARED USE PATHMEEK, STEPHEN Remrks:
Typ Imp:MATCH PROVIDED BY CITY OF SLIDELL.
Project:Prj Mgr:
SPARTAN DRIVE SHARED USE PATH
H.011822
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY 000-52 TAP<200K 783 ENHANCEMENTS 3-DESIGN/DEVELOPMENTST TAMMANY LA 21 059-01 TAP<200K 363 ENHANCEMENTS
SHARED USE PATHNUNES, BRIAN Remrks:
Typ Imp:MATCH PROVIDED BY ST. TAMMANY PARISH
Project:Prj Mgr:
LA21: LA1085 - PINNACLE, SHARED USE PATH
H.012062
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 21 059-01 STPFLEX 2,814 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
WIDEN TO 3 LANESSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 21: LALANNE RD - BAYOU DEZAIRE
H.012497
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY 000-52 RTP 110 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTST TAMMANY 000-52 LOCAL 15 RECREATIONAL TRAILS PROGRAM
CONSTRUCT A 3,160' LONG BY 4' WIDE PED-BIKE TRAILNUNES, BRIAN Remrks:
Typ Imp:DCRT IS THE PROJECT MANAGER
Project:Prj Mgr:
ABITA SPRINGS TRAILS, PHASE 2
H.012633
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 1088 852-11 STPFLEX 2,500 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
3-DESIGN/DEVELOPMENT
CONSTRUCT ROUNDABOUTHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1088: FOREST BROOK BLVD ROUNDABOUT
Page 2 - 90 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.012812
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY US 190 013-12 STP<200K 6,655 URBAN SYSTEMS 3-DESIGN/DEVELOPMENTST TAMMANY 000-52 STP<200K 300 URBAN SYSTEMS
ROUNDABOUT INTERSECTION IMPROVEMENTSFUSILIER, JACOB Remrks:
Typ Imp:DOTD TO PROVIDE MATCH
Project:Prj Mgr:
US 190 @ NORTHSHORE & CAMP VILLERE
H.013008
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 16 058-03 STPFLEX 1,320 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
ST TAMMANY LA 1129 279-02 NFA 480 PRESERVATION - BRIDGE (ONSYSTEM)
ST TAMMANY LA 36 280-03 STPFLEX 1,680 PRESERVATION - BRIDGE (ONSYSTEM)
ST TAMMANY LA 450 852-07 STPFLEX 480 PRESERVATION - BRIDGE (ONSYSTEM)
ST TAMMANY LA 59 852-09 STPFLEX 600 PRESERVATION - BRIDGE (ONSYSTEM)
ST TAMMANY LA 434 852-12 STPFLEX 720 PRESERVATION - BRIDGE (ONSYSTEM)
WASHINGTON LA 16 058-04 STPFLEX 1,680 PRESERVATION - BRIDGE (ONSYSTEM)
WASHINGTON LA 438 275-02 STPFLEX 2,040 PRESERVATION - BRIDGE (ONSYSTEM)
WASHINGTON LA 436 859-08 STPFLEX 720 PRESERVATION - BRIDGE (ONSYSTEM)
WASHINGTON LA 1072 859-21 NFA 720 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:
Typ Imp:
Project:Prj Mgr:
DIST62:ABC BR REPLACE ST TAM,WASH PARS
H.013082
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY 000-52 HSIPPEN 350 SAFETY - SAFE ROUTES TO PUBLICPLACES
3-DESIGN/DEVELOPMENT
ST TAMMANY 000-52 LOCAL 315 SAFETY - SAFE ROUTES TO PUBLICPLACES
SIDEWALKS, ADA RAMPS, DRAINAGE STRUCTURES AND RELATED WORMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
BOOTLEGGER ROAD SIDEWALKS
H.013268
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 1129 279-02 NFA 2,900 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
PATCH, MILL, OVERLAYBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1129: LA 40 - LA TUNG RD
H.013406
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY 000-52 TAP<200K 419 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SIDEWALKS AND BIKE PATHSNUNES, BRIAN Remrks:
Typ Imp:THE CITY OF MANDEVILLE WILL PROVIDE THE LOCAL MATCH
Project:Prj Mgr:
W CAUSEWAY APPROACH BIKE/PED MANDEVILLE
H.013408
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY 000-52 TAP<200K 1,198 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SHARED USE PATHMEEK, STEPHEN Remrks:
Typ Imp:THE CITY OF COVINGTON WILL PROVIDE THE LOCAL MATCH.
Project:Prj Mgr:
JEFFERSON AVE SHARED USE PATH COVINGTON
Page 2 - 91 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.013737
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 41 058-01 STPFLEX 1,200 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
MILL AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 41: LA 41 SPUR - LA 36
H.013872
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 22 261-05 STP<200K 500 URBAN SYSTEMS 3-DESIGN/DEVELOPMENTST TAMMANY LA 1085 852-02 STP<200K 500 URBAN SYSTEMS
CONSTRUCT A ROUNDABOUTRICHARD, RYAN Remrks:
Typ Imp:DOTD TO PROVIDE MATCH
Project:Prj Mgr:
LA 22 @ LA 1085 ROUNDABOUT
H.013984
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 16 058-03 STP<5K-E 582 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
WASHINGTON LA 16 058-04 STPFLEX 2,283 PRESERVATION - BRIDGE (ONSYSTEM)
ST TAMMANY LA 16 058-03 STPFLEX 1,770 PRESERVATION - BRIDGE (ONSYSTEM)
ST TAMMANY LA 16 058-03 STPFLEX 1,770 PRESERVATION - BRIDGE (ONSYSTEM)
ST TAMMANY LA 16 058-03 STPFLEX 1,770 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTRANCK, AMANDA Remrks:
Typ Imp:
Project:Prj Mgr:
LA 16: BRIDGES (ISABEL TO SUN)
H.014011
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY 000-52 STP<200K 1,644 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
PAVEMENT REHABRICHARD, RYAN Remrks:
Typ Imp:CITY OF SLIDELL TO PROVIDE THE MATCH
Project:Prj Mgr:
N CARNATION ST PAVEMENT REHAB
H.014091
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY US 190 013-10 NHPP 2,200 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
MILL, PATCH, AND OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 190: ST TAMMANY P.L. TO LA 1077
H.014101
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY US 190 013-11 NHPP 3,000 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
MILL, PATCH, AND OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 190: ROGERS LN - I-12
H.014113
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY US 190 013-12 NHPP 4,000 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
MILL, PATCH, AND OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 190: LA 434 - LA 433
H.004981
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 434 852-12 0 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL
PHASES 1 AND 2 ENVIRONMENTAL STUDYRICHARD, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 434 CORRIDOR
Page 2 - 92 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.010116
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 1088 852-11 STPFLEX 25,136 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
1-PLANNING/ENVIRONMENTAL
TRAFFIC STUDY ON LA 1088MORVANT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1088 CORRIDOR STUDY
H.012567
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 36 280-03 STPFLEX 771 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
REMOVE STRUCTURE CONSTRUCT ROADWAYMETCALF, WILLIAM Remrks:
Typ Imp:
Project:Prj Mgr:
LA 36: ICG RAILROAD BRIDGE REMOVAL
H.012658
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 59 281-03 STPFLEX 2,500 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
1-PLANNING/ENVIRONMENTAL
ROUNDABOUTHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 59: KOOP DRIVE ROUNDABOUT
H.012660
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 59 281-03 STPFLEX 4,000 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
1-PLANNING/ENVIRONMENTAL
ROUNDABOUTSHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 59: LITTLE CREEK, I-12, DOVE RNBT
H.012662
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 1088 852-11 STPFLEX 4,000 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
1-PLANNING/ENVIRONMENTAL
ACCESS MANAGEMENTHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1088: I-12 ROUNDABOUTS
H.011454
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 22 261-06 0 SAFETY 0-FEASIBILITY/SCOPING
ACCESS MANAGEMENT AND SAFETY IMPROVEMENTHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA22:DALWILL-RODGER STORME CORRIDOR STU
H.012737
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 433 852-21 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
FEASIBILITY STUDY FOR BRIDGE REHABILITATIONHINGLE, STEWART Remrks:
Typ Imp:
Project:Prj Mgr:
LA433:BAYOU BONFOUCA MVBR REHABILITATION
H.013717
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY 000-52 0 SAFETY - SAFE ROUTES TO PUBLICPLACES
0-FEASIBILITY/SCOPING
FEASIBILITY STUDYRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
W 11TH AVENUE PED AND BICYCLE IMPR (COV)
Page 2 - 93 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.009425
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA LA 16 047-01 STPFLEX 1,311 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
3-DESIGN/DEVELOPMENT
DRAINAGE IMPROVEMENTSGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 16 AMITE DRAINAGE IMPROVEMENTS
TANGIPAHOA
H.010108
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA 000-53 SR2S 300 SAFETY - SAFE ROUTES TO SCHOOLS 3-DESIGN/DEVELOPMENTTANGIPAHOA LA 40 415-02 SR2S 50 SAFETY - SAFE ROUTES TO SCHOOLS
SIDEWALK IMPROVMENTS, CROSSING AND STRIPING, NON-INFRASTRUMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
INDEPENDENCE SRTS - PHASE II
H.010289
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA LA 22 261-04 HSIP 1,652 SAFETY 3-DESIGN/DEVELOPMENTTANGIPAHOA 000-53 HSIP 28 SAFETY
CONSTRUCT ROUNDABOUT @ LA 22/DUNSON/RIDGEDELLBRANTON, JENNIFER Remrks:
Typ Imp:
Project:Prj Mgr:
LA 22: ROUNDABOUT DUNSON/RIDGEDELL RDS.
H.010702
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA 000-53 HSIP 600 RAILROADS 3-DESIGN/DEVELOPMENT
INSTALL F/L'S & GATES AT SEVERAL IC CROSSINGS IN HAMMONDSHREWSBERRY,BILL Remrks:
Typ Imp:
Project:Prj Mgr:
IC SEVERAL RR XINGS (HAMMOND)
H.011856
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA LA 22 261-04 TAP<200K 295 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SIDEWALK RECONSTRUCTIONNUNES, BRIAN Remrks:
Typ Imp:MATCH PROVIDED BY CITY OF PONCHATOULA
Project:Prj Mgr:
LA 22: FIFTH ST - WAYNE STREET, SW
H.011858
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA 000-53 TAP<200K 570 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SIDEWALKSMEEK, STEPHEN Remrks:
Typ Imp:MATCH PROVIDED BY THE CITY OF HAMMOND
Project:Prj Mgr:
HAMMOND: JW DAVIS & CM FAGAN SW
H.012071
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA US 51 017-04 NHPP 2,017 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTBOURGEOIS, COREY Remrks:
Typ Imp:
Project:Prj Mgr:
US 51: YELLOW WATER RIVER BRIDGE
H.012996
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA LA 10 061-09 STPFLEX 128 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
3-DESIGN/DEVELOPMENT
THIN LIFT OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 10:I-55 COA - US 51
Page 2 - 94 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.013007
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA LA 38 263-03 STPFLEX 600 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
TANGIPAHOA LA 442 269-04 STPFLEX 800 PRESERVATION - BRIDGE (ONSYSTEM)
TANGIPAHOA LA 40 415-02 STPFLEX 1,200 PRESERVATION - BRIDGE (ONSYSTEM)
TANGIPAHOA LA 1062 415-04 NFA 1,680 PRESERVATION - BRIDGE (ONSYSTEM)
TANGIPAHOA LA 1061 853-20 NFA 600 PRESERVATION - BRIDGE (ONSYSTEM)
TANGIPAHOA LA 1054 853-22 NFA 360 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:
Typ Imp:
Project:Prj Mgr:
DIST62:ABC BR REPLACE TANGIPAHOA PARISH
H.013163
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA 000-53 FBROFF 317 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENT NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
WADESBORO ROAD OVER UNNAMED CREEK
H.013372
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA US 51-X 853-36 STPENH 1,074 ENHANCEMENTS 3-DESIGN/DEVELOPMENTTANGIPAHOA LA 22 261-04 STPENH 668 ENHANCEMENTS
SIGNALS, LANDSCAPING, CURB AND GUTTER, PED IMPROVEMENTSNUNES, BRIAN Remrks:
Typ Imp:THE CITY OF PONCHATOULA WILL PROVIDE THE LOCAL MATCH.
Project:Prj Mgr:
LA 22:PINE ST CORRIDOR IMPRV PONCHATOULA
H.014048
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA 000-53 STP<200K 2,000 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
PAVEMENT REHABRICHARD, RYAN Remrks:
Typ Imp:TANGIPAHOA PARISH TO PROVIDE MATCH
Project:Prj Mgr:
S TANGIPAHOA ROADS - PAVEMENT REHAB
H.014112
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA LA 16 047-01 STPFLEX 5,500 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
STABILIZE BASE AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 16: US 51 TO LA 445
H.014262
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA 000-53 FBROFF 570 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENT NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
RANDLE ROAD OVER YELLOW WATER RIVER
H.014263
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA 000-53 FBROFF 560 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENT NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
N. HOOVER ROAD OVER UNNAMED CREEK
Page 2 - 95 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.007598
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA LA 16 262-07 TAP<200K 302 ENHANCEMENTS 1-PLANNING/ENVIRONMENTALTANGIPAHOA LA 16 047-01 TAP<200K 302 ENHANCEMENTS
NEW SIDEWALKSNUNES, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
AMITE LA 16 PEDESTRIAN PROJECT - PHASE I
H.008399
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA US 51-X 853-36 NFI 40,000 CAPACITY 1-PLANNING/ENVIRONMENTAL
WIDEN TO 4 LANESMOSS, SARAH Remrks:
Typ Imp:853-36-0031;PORTION OF PROJECT COMPLETED UNDER
Project:Prj Mgr:
US 51 BUSINESS: LA 22 TO CLUB DELUXE RD
H.008915
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA LA 3234 853-40 27,500 INTERMODAL CONNECTOR 1-PLANNING/ENVIRONMENTAL
FEASIBILITY STUDY FOR LA 3234 EXTENSIONFUSILIER, JACOB Remrks:
Typ Imp:
Project:Prj Mgr:
LA3234 EXT FROM LA1065 - HAMMOND AIRPORT
H.011618
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA US 51-X 853-36 STPFLEX 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
1-PLANNING/ENVIRONMENTAL
TANGIPAHOA LA 22 261-03 STPFLEX 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
TANGIPAHOA LA 22 261-04 STPFLEX 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
CORRIDOR STUDY FOR ACCESS MGMNT/TRAFFIC OP IMPROVEMENTSHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 22 CORRIDOR STUDY: ROU MAR NEI TO 1ST
H.014252
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA LA 1054 853-22 STGEN 402 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTTOURRES, VALERIE Remrks:
Typ Imp:AC, USE NFA AS MATCH
Project:Prj Mgr:
LA 1054: TYNER CREEK BRIDGE
H.011401
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA US 51 017-04 0 SAFETY 0-FEASIBILITY/SCOPING
CORRIDOR/TRAFFIC STUDY FOR ACCESSMAN AND SAFETY IMPROVEMEHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 51: W UNIV AVE TO I55 CORRIDOR STUDY
H.011402
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA US 51-X 853-36 0 SAFETY 0-FEASIBILITY/SCOPING
TRAFFIC/CORRIDOR STUDY FOR ACCESS MGMT AND SAFETY IMPVEMEHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 51 BUS: I12 TO COLEMAN CORRIDOR STUDY
H.009585
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TENSAS LA 128 036-06 STPFLEX 1,772 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
ASPHALT OVERLAY OF ASPHALT PAVEMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 128: LA 573 - US 65
TENSAS
Page 2 - 96 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.012113
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TENSAS US 65 020-04 NHPP 3,800 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
TENSAS US 65 020-02 NHPP 500 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
COLD PLANE, BREAK & SEAT, OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 65: SOUTH OF NEWELLTON
H.013920
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TENSAS LA 4 173-01 STPFLEX 2,000 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
PATCH & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 4: 1.6 MI. E. LA 888 - LA 575
H.013925
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TENSAS LA 4 173-01 STPFLEX 2,000 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
PATCH & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 4: LA 128 - 1.6 MI. E. LA 888
H.014133
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TENSAS LA 608 181-02 NFA 4,500 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
STABILIZE BASE & OVERLAYBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 608: 7.9 MI. E. LA 605 - LA 887
H.014136
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TENSAS LA 573 186-30 STP<5K 2,000 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
PATCH & OVERLAYBROWN, JOSEPH C. Remrks:
Typ Imp:NFA AS MATCH
Project:Prj Mgr:
LA 573: COOTER POINT RD. - LA 892
H.014137
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TENSAS LA 608 854-06 NFA 3,500 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
PATCH, OVERLAY, BASE STABILIZATIONBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 608: LA 605 - 7.9 MILES EAST
H.014197
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TENSAS LA 604 854-11 REIMB 6,000 OTHER / MISCELLANEOUS 3-DESIGN/DEVELOPMENT
REALIGNMENTMOSS, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 604: REALIGNMENT NEAR MISSISSIPPI RIV
H.009591
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TENSAS LA 4 173-01 STPFLEX 541 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
ASPHALT OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 4: US 65 - LA 605
Page 2 - 97 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.010006
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 58 247-30 STPFLEX 6,928 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
MOVABLE BRIDGE REHABILITATIONBRAUNER, KURT Remrks:
Typ Imp:BOTH CONTROL SECTIONS IN HOUMA MPO AREA.
Project:Prj Mgr:
LA 58: PETIT CAILLOU BR RH (SARAH) (HBI)
TERREBONNE
H.010411
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 24 065-91 STPFLEX 4,500 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETESPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 24: LA 55 - PROSPECT STREET BRIDGE
H.010997
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 3185 855-17 STPFLEX 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
3-DESIGN/DEVELOPMENT
TERREBONNE 000-55 STPFLEX 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
INTERSECTION IMPROVEMENTSHARROUCH, JOSHUA Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3185 @ MAIN PROJECT RD ROUNDABOUT
H.012026
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 24 065-91 TAP<200K 146 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SIDEWALKSMEEK, STEPHEN Remrks:
Typ Imp:LOCAL MATCH BY TERREBONNE PARISH CONSOLIDATED GOVERNMEN
Project:Prj Mgr:
BAYOU TERREBONNE EAST SW PROJECT, PH 2
H.012940
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 665 855-09 NFA 1,225 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
ASPHALT CONCRETE OVERLAYBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 665: HOPE FARM RD.-L.M. 9.878
H.013199
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE 000-55 STPFLEX 777 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENT - NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
COUNTRY ESTATES DR OVER ST. LOUIS BAYOU
H.013319
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE 000-55 STPENH 238 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SHARED USE PATHMEEK, STEPHEN Remrks:
Typ Imp:TERREBONNE PARISH WILL PROVIDE LOCAL MATCH.
Project:Prj Mgr:
WILLIAMS AVE SHARED USE PATH (HOUMA)
H.013421
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE 000-55 HSIPPEN 1,770 SAFETY 3-DESIGN/DEVELOPMENTTERREBONNE 000-55 STPFLEX 1,770 OPER EFFICIENCY/MOTORIST
ASSISTANCE - TRAFFIC CONTROLDEVICES
TRAFFIC SIGNAL UPGRADEFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DIST. 02H FLASHING YELLOW ARROW PART 2
Page 2 - 98 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.013453
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 316 412-04 STP<200K 126 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
SIDEWALKSRICHARD, RYAN Remrks:
Typ Imp:TERREBONNE PARISH TO PROVIDE THE MATCH.
Project:Prj Mgr:
BLUE BAYOU (LA 316) SIDEWALKS
H.014069
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 20 065-04 NHPP 900 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
MILL, OVERLAY, AND PATCHING OF LA 20 FROM DURCOS RD - LA 648MAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 20: DUCROS RD. - LA 648
H.014070
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 24 065-04 NHPP 4,300 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
MILL AND OVERLAY OF LA 24 NBMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 24 NB: LA 664 - ST. GEORGE RD.
H.014075
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 648 855-15 STPFLEX 300 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
LAFOURCHE LA 648 829-07 STPFLEX 100 PRESERVATION - NON-INTERSTATEON STP SYSTEM
LAFOURCHE LA 648 829-29 STPFLEX 200 PRESERVATION - NON-INTERSTATEON STP SYSTEM
MILL AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 648: LA 20 - LA 308
H.014085
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 661 855-08 STPFLEX 232 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
TERREBONNE LA 661 855-08 NHPP 418 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
MILL, PATCH, AND OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 661: LA 57 - LA 659
H.011970
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 182 005-05 STPFLEX 2,697 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTSBUCCI, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
LA 182: BAYOU TERREBONNE BRIDGES
H.002244
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 56 247-02 STPFLEX 30,000 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
BRIDGE REPLACEMENTFUSILIER, JACOB Remrks:
Typ Imp:247-02-0030
Project:Prj Mgr:
LA 56: BOUDREAUX CANAL BR REPLACEMENT
H.011972
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 3040 065-30 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
TUNNEL REHABILITATIONTOURRES, VALERIE Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3040: ICW HOUMA TUNNEL REHABILITATION
Page 2 - 99 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.011973
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 315 245-90 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
CLEANING, PAINTING, AND STRUCTURAL REPAIRSGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
LA 315:ICWW DULARGE MOVABLE BRIDGE REHAB
H.011974
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 57 246-01 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
FEASIBILITY STUDY OF CLEANING, PAINTING, AND REPAIRSGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
LA 57: BAYOU DULAC MOVABLE BRIDGE REHAB
H.011986
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 58 247-30 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
FEASIBILITY STUDY - MOVABLE BRIDGE REHABILITATION OR REPLACEGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
LA 58: BAYOU TERREBONNE MB REHAB (HBI)
H.012735
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 182 005-05 STPFLEX 890 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
REPLACE THE EXISTING BRIDGEHERATH, SUBA Remrks:
Typ Imp:
Project:Prj Mgr:
LA 182: BARROW STREET BRIDGE
H.013322
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 3040 065-30 0 SAFETY 0-FEASIBILITY/SCOPING
FEASIBILITY STUDYCOSTELLO, BRYAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3040 FEASIBILITY STUDY (HOUMA,LA)
H.013714
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE 000-55 0 SAFETY - SAFE ROUTES TO PUBLICPLACES
0-FEASIBILITY/SCOPING
FEASIBILITY STUDYRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
VALHI BLVD SHARED-USE PATH (HOUMA)
H.011662
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
UNION LA 2 070-04 STPFLEX 200 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
INTERSECTION IMPROVEMENTSHICKS, MELVIN Remrks:
Typ Imp:
Project:Prj Mgr:
INTERSECTION IMPROVEMENT LA 2 @ LA 15
UNION
H.012037
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
UNION US 63 023-11 NHPP 2,302 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
UNION LA 2 070-05 STPFLEX 1,047 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTSWINDMANN, ANDREW Remrks:
Typ Imp:
Project:Prj Mgr:
US 167,LA2:MIDDLE SLOUGH & CREEK BRIDGES
Page 2 - 100 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.012924
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
UNION LA 2 070-06 STPFLEX 514 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
3-DESIGN/DEVELOPMENT
THIN OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 2: 0.48 M W LA 143 - OUACHITA PL
H.013992
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
UNION LA 151 317-05 STP<5K-E 915 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
UNION LA 151 317-05 STPFLEX 402 PRESERVATION - BRIDGE (ONSYSTEM)
UNION LA 151 317-05 STPFLEX 915 PRESERVATION - BRIDGE (ONSYSTEM)
LINCOLN LA 151 317-04 STPFLEX 2,319 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTPATTON, HEATHER Remrks:
Typ Imp:USE NFA AS MATCH
Project:Prj Mgr:
LA 151: CREEK AND RELIEF BRIDGES
H.012001
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERMILION LA 339 216-01 STPFLEX 2,864 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTREVIERE, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 339: CANAL & CREEK BRIDGES
VERMILION
H.013014
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERMILION 000-57 HSIPPEN 114 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT
SIGNS, STRIPING, RUMBLE STRIPS, LIGHTING, STOP BARSRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
LOCAL ROAD SIGNING(VERMILION)
H.013428
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERMILION LA 35 207-03 TAP<5K 696 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SIDEWALKS, LANDSCAPING AND SIGNAGEMEEK, STEPHEN Remrks:
Typ Imp:THE CITY OF KAPLAN WILL PROVIDE THE LOCAL MATCH.
Project:Prj Mgr:
LA 35 REVITALIZATION PHASE III KAPLAN
H.014198
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERMILION LA 14-X 055-06 TAP<200K 340 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
REMOVE AND REPLACE SIDEWALK, LIGHTINGMEEK, STEPHEN Remrks:
Typ Imp:ENTITY WILL PROVIDE MATCH
Project:Prj Mgr:
DOWNTOWN ABBEVILLE STREETSCAPING, PH. II
H.014223
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERMILION 000-57 FBROFF 507 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENT NO NEW ALIGNAMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
CAMILE ROAD OVER BAYOU GRAND MARAIS
H.010226
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERMILION LA 82 215-01 STPFLEX 5,383 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
STABILIZE BASE & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 82: LA 35 - LA 333
Page 2 - 101 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.011997
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERMILION LA 14-X 055-06 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
LA 14X: VERMILION RIVER MB REHAB (HBI)
H.011998
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERMILION LA 14 055-30 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
LA 14: VERMILION RIVER MB REHAB (HBI)
H.012000
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERMILION LA 82 207-01 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
LA 82: OLD ICC MB REHABILITATION (HBI)
H.012003
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERMILION LA 330 397-03 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
LA 330: BAYOU TIGRE MB REHAB (HBI)
H.001881
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERNON LA 392 135-02 FBROFF 3,560 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTGAUDRY, CARL Remrks:
Typ Imp:135-02-0009;2 BRIDGES; USE NFA AS MATCH
Project:Prj Mgr:
LA 392 BRIDGES NEAR HORNBECK
VERNON
H.006618
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERNON 000-58 NFI 96 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENTVERNON 000-58 LOCAL 8 SAFETY - LOCAL ROADS SAFETY
SIDEWALK INSTALLATIONRIGGS, LAURA Remrks:
Typ Imp:737-58-0001
Project:Prj Mgr:
SIDEWALK ON HIGH SCHOOL DRIVE
H.006619
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERNON 000-58 HSIP 131 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENTVERNON 000-58 HSIPPEN 17 SAFETY - LOCAL ROADS SAFETY VERNON 000-58 LOCAL 10 SAFETY - LOCAL ROADS SAFETY
SIDEWALK INSTALLATIONRIGGS, LAURA Remrks:
Typ Imp:737-58-0002
Project:Prj Mgr:
SIDEWALK ON LOUISIANA AVENUE
H.009955
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERNON LA 111 132-02 STPFLEX 4,167 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
CTB AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 111: BEAUREGARD LINE - C DAVIS LOOP
Page 2 - 102 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.010358
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERNON LA 3226 858-11 STPFLEX 2,329 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
PATCH. COLD PLANE, AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3226: BEAUREGARD P/L - US 171
H.011404
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERNON US 171 024-06 NHPP 300 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
CONSTRUCT ACCELERATION LANE SOUTH OF CRYER CEMETERY RDSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 171: ADD ACCELERATION LANE CRYER RD
H.011909
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERNON US 171 024-06 NHPP 2,302 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
3-DESIGN/DEVELOPMENT
VERNON 000-58 STPFLEX 2,302 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
ROUNDABOUT INTERSECTION IMPROVEMENTHARROUCH, JOSHUA Remrks:
Typ Imp:
Project:Prj Mgr:
ROUNDABOUT: US 171 AT BOONE ST.
H.012058
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERNON LA 8 029-02 NHPP 2,464 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTMETCALF, WILLIAM Remrks:
Typ Imp:
Project:Prj Mgr:
LA 8: FORKER CREEK BRIDGE
H.013098
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERNON 000-58 FBROFF 1,942 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENT; NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
JIM CRYER LANE OVER BAYOU ANACOCO
H.014107
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERNON US 171 024-06 NHPP 450 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
VERNON US 171 025-01 NHPP 677 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
MILL AND OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 171: SCHWEITZER AVE TO LA 28
H.014151
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERNON LA 8 373-01 NHPP 3,625 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
VERNON LA 8 417-01 NHPP 1,105 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
MILL & OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 8: US 171 TO LA 28
H.010348
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERNON LA 8 029-02 STPFLEX 4,661 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
PATCH, COLD PLANE, AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 8: LA 464 - US 171
Page 2 - 103 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.014247
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERNON LA 399 138-03 FBROFF 1,417 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
VERNON LA 399 138-03 FBROFF 835 PRESERVATION - BRIDGE (ONSYSTEM)
VERNON LA 399 138-03 STGEN 402 PRESERVATION - BRIDGE (ONSYSTEM)
VERNON LA 399 138-03 FBROFF 573 PRESERVATION - BRIDGE (ONSYSTEM)
VERNON LA 399 138-03 FBROFF 1,257 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTTOURRES, VALERIE Remrks:
Typ Imp:AC; USE NFA AS MATCH
Project:Prj Mgr:
LA 399: BRIDGES NEAR FULLERTON
H.013817
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERNON LA 117 114-01 0 OTHER / MISCELLANEOUS 0-FEASIBILITY/SCOPINGNATCHITOCHES LA 117 114-02 0 OTHER / MISCELLANEOUS
FEASIBILITY STUDY FOR LANE AND SHOULDER WIDENINGZHANG, HONG Remrks:
Typ Imp:
Project:Prj Mgr:
LA 117 IMPROVEMENTS (LA 8 TO LA 118)
H.008449
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WASHINGTON LA 450 859-04 FBROFF 1,093 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTMOORE, DARRELL Remrks:
Typ Imp:859-04-0010;USE NFA AS MATCH
Project:Prj Mgr:
DRAIN BRIDGE NEAR STONEY POINT
WASHINGTON
H.010980
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WASHINGTON LA 10 047-04 NHPP 150 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
LANE CONFIGURATION MODIFICATIONSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 10:CUMBERLAND ST- AUSTIN ST(BOGALUSA)
H.011202
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WASHINGTON 000-59 SR2S 225 SAFETY - SAFE ROUTES TO SCHOOLS 3-DESIGN/DEVELOPMENT
SIDEWALKS STRIPING AND SIGNAGEMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
FRANKLINTON JR HIGH SCHOOL SIDEWALKS
H.012072
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WASHINGTON LA 60 279-04 STPFLEX 888 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTYAP, KIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 60: DRAIN BRIDGE
H.012159
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WASHINGTON LA 430 859-26 STPFLEX 250 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
3-DESIGN/DEVELOPMENT
REMOVE AND REPLACE PIPES, CATCH BASINS, AND/OR ASPHALTGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 430: LA 25 - LA 1069 DRAINAGE
Page 2 - 104 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.012975
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WASHINGTON LA 62 859-10 STPFLEX 1,150 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
THIN LIFT OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 62: LA 10 - LA 436
H.013928
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WASHINGTON 000-59 RTP 20 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTWASHINGTON 000-59 LOCAL 150 RECREATIONAL TRAILS PROGRAM
CONST. OF 17 MILES OF MOUNTAIN BIKE TRAILSNUNES, BRIAN Remrks:
Typ Imp:NORTHSHORE OFF ROAD BICYCLING ASSC. WILL PROVIDE LOCAL MAT
Project:Prj Mgr:
BOGUE CHITTO SP MOUNTAIN BIKE TRAIL
H.013996
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WASHINGTON LA 1074 859-19 STP<5K-E 929 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
WASHINGTON LA 1074 859-19 FBROFF 1,599 PRESERVATION - BRIDGE (ONSYSTEM)
WASHINGTON LA 1074 859-19 FBROFF 915 PRESERVATION - BRIDGE (ONSYSTEM)
WASHINGTON LA 1075 859-18 STPFLEX 915 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACMENTRANCK, AMANDA Remrks:
Typ Imp:FBROFF HAS NFA AS MATCH
Project:Prj Mgr:
LA 1074, LA 1075: BRIDGES NEAR RIO
H.014169
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WASHINGTON LA 3124 030-32 STPFLEX 2,818 ROAD TRANSFER 3-DESIGN/DEVELOPMENT
MILL, OVERLAY, WATERLINE RELOCATION, HC RAMPS, STRIPINGTASSIN, BEN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3124: BOGALUSA CITY LIMITS - LA 10
H.014194
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WASHINGTON 000-59 STPFLEX 212 ROAD TRANSFER 3-DESIGN/DEVELOPMENTWASHINGTON 000-59 NFA 900 ROAD TRANSFER
MILLING, OVERLAYTASSIN, BEN Remrks:
Typ Imp:
Project:Prj Mgr:
BOGALUSA CITY STREETS - ROAD TRANSFER
H.011280
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WASHINGTON LA 10 047-04 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
0-FEASIBILITY/SCOPING
STAGE 0/FEASIBILITY STUDYZHANG, HONG Remrks:
Typ Imp:
Project:Prj Mgr:
LA 10 IMPROVEMENTS IN BOGALUSA
H.013713
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WASHINGTON LA 60 279-04 0 SAFETY - SAFE ROUTES TO PUBLICPLACES
0-FEASIBILITY/SCOPING
FEASIBILITY STUDYRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
LA 60: BOGALUSA H.S. PED IMPROVEMENTS
H.001666
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WEBSTER LA 160 085-05 FBROFF 4,100 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTBRAUNER, KURT Remrks:
Typ Imp:085-05-0029
Project:Prj Mgr:
DORCHEAT BAYOU BRIDGE
WEBSTER
Page 2 - 105 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.001799
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WEBSTER LA 531 111-02 STPFLEX 4,100 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
WEBSTER LA 531 111-02 STPFLEX 450 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
WEBSTER I-20 451-03 NHPP 450 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
BRIDGE REPLACEMENTFUSILIER, JACOB Remrks:
Typ Imp:451-03-0047;GEOM. STUDY UNDERWAY (E)
Project:Prj Mgr:
LA 531 OVERPASS
H.012029
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WEBSTER US 80 001-05 STPFLEX 2,325 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BIENVILLE US 80 001-06 STPFLEX 1,991 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTMICHAEL, ANDREW Remrks:
Typ Imp:
Project:Prj Mgr:
US 80: COOLEY, CROWS, AND CREEK BRS
H.012030
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WEBSTER US 371 027-03 STPFLEX 7,679 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTS/REHABILITATIONMOORE, DARRELL Remrks:
Typ Imp:
Project:Prj Mgr:
US371:ICG & KCS RAILROAD OVERPASSES HBI
H.013111
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WEBSTER 000-60 FBROFF 797 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENT, NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
DORCHEAT ROAD OVER CANEY CREEK
H.014059
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WEBSTER US 80 001-04 STPFLEX 1,750 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
WEBSTER US 80 001-04 STPFLEX 3,500 PRESERVATION - BRIDGE (ONSYSTEM)
WEBSTER US 80 001-04 STPFLEX 3,000 PRESERVATION - BRIDGE (ONSYSTEM)
WEBSTER US 80 001-04 STPFLEX 3,000 PRESERVATION - BRIDGE (ONSYSTEM)
WEBSTER US 80 001-04 STPFLEX 1,250 PRESERVATION - BRIDGE (ONSYSTEM)
WEBSTER US 80 001-04 STPFLEX 850 PRESERVATION - BRIDGE (ONSYSTEM)
BOSSIER US 80 001-03 STPFLEX 2,000 PRESERVATION - BRIDGE (ONSYSTEM)
BOSSIER US 80 001-03 STPFLEX 1,100 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTISEMANN, ROBERT Remrks:
Typ Imp:
Project:Prj Mgr:
US 80: BRIDGES NEAR MINDEN
Page 2 - 106 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.001798
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WEBSTER LA 531 111-01 STPFLEX 1,843 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
WEBSTER LA 531 111-01 STPFLEX 800 PRESERVATION - BRIDGE (ONSYSTEM)
WEBSTER LA 531 111-01 STPFLEX 600 PRESERVATION - BRIDGE (ONSYSTEM)
WEBSTER LA 531 111-02 STPFLEX 1,300 PRESERVATION - BRIDGE (ONSYSTEM)
NEW BRIDGEMCADAMS, MARY Remrks:
Typ Imp:111-01-0018
Project:Prj Mgr:
LA 531: BRIDGES NEAR DUBBERLY
H.012958
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WEBSTER LA 159 087-01 STPFLEX 315 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 159: COUNTRY CLUB DR TO BENSON RD
H.014218
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WEBSTER LA 2-A 083-06 STGEN 573 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
WEBSTER LA 2-A 083-06 STPFLEX 1,428 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTTOURRES, VALERIE Remrks:
Typ Imp:AC
Project:Prj Mgr:
LA 2A: THORNY BRANCH & INDIAN CREEK BRS
H.014228
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WEBSTER LA 159 087-02 STPFLEX 573 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
WEBSTER LA 159 087-02 STPFLEX 402 PRESERVATION - BRIDGE (ONSYSTEM)
WEBSTER LA 159 087-02 STGEN 1,086 PRESERVATION - BRIDGE (ONSYSTEM)
WEBSTER LA 159 087-02 STPFLEX 1,086 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTTOURRES, VALERIE Remrks:
Typ Imp:AC
Project:Prj Mgr:
LA 159: BRIDGES NEAR SHONGALOO
H.014236
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WEBSTER LA 3008 288-02 FBROFF 972 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
WEBSTER LA 3008 288-02 FBROFF 1,154 PRESERVATION - BRIDGE (ONSYSTEM)
WEBSTER LA 3008 288-02 FBROFF 2,066 PRESERVATION - BRIDGE (ONSYSTEM)
WEBSTER LA 3008 288-02 FBROFF 2,066 PRESERVATION - BRIDGE (ONSYSTEM)
WEBSTER LA 3008 288-02 STGEN 1,337 PRESERVATION - BRIDGE (ONSYSTEM)
WEBSTER LA 3008 288-02 FBROFF 607 PRESERVATION - BRIDGE (ONSYSTEM)
WEBSTER LA 3008 288-02 FBROFF 1,702 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTTOURRES, VALERIE Remrks:
Typ Imp:AC, USE NFA AS MATCH
Project:Prj Mgr:
LA 3008: BRIDGES NEAR COTTON VALLEY
Page 2 - 107 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.000358
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W BATON ROUGE US 190 008-01 NHPP 30,000 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTHANKS, ANNA Remrks:
Typ Imp:008-01-0051; PRIORITY BRIDGE PROJECT
Project:Prj Mgr:
US 190: LA 415 & RR OVERPASS REPL (HBI)
W BATON ROUGE
H.005121
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W BATON ROUGE 000-61 NFI 125,000 OTHER / MISCELLANEOUS 3-DESIGN/DEVELOPMENT
FEDERAL EARMARK FOR STUDYHANKS, ANNA Remrks:
Typ Imp:700-61-0113;STAGE 0 COMPLETED
Project:Prj Mgr:
LA 1/LA 415 CONNECTOR
H.012169
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W BATON ROUGE I-10 450-08 NHPP 13,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT
GRADE RAISINGMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: IBERVILLE P/L - W END OF BR 290
H.012587
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W BATON ROUGE I-10 450-08 NHPP 16,500 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT
GRADE RAISINGMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: W END OF BR 290 - W END OF LA 415
H.014258
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W BATON ROUGE LA 1 050-07 NHPP 75,000 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTDELATTE, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1:PORT ALLEN CANAL BR REPL (PH2)(HBI)
H.012067
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W BATON ROUGE LA 76 013-01 STPFLEX 1,352 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTWINDMANN, ANDREW Remrks:
Typ Imp:
Project:Prj Mgr:
LA 76: NO NAME STREAM BRIDGE
H.012394
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W BATON ROUGE LA 415 225-01 STPFLEX 1,600 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
THIN OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 415: CSLM 1.67 TO LA 620
H.012491
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W CARROLL LA 17 051-08 RTP 114 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTW CARROLL LA 17 051-08 LOCAL 66 RECREATIONAL TRAILS PROGRAM
CONSTRUCTION OF A 3,286' LONG BY 6' WIDE PED-BIKE TRAILNUNES, BRIAN Remrks:
Typ Imp:DCRT IS THE PROJECT MANAGER
Project:Prj Mgr:
OAK GROVE RECREATIONAL TRAIL
W CARROLL
H.012780
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W CARROLL LA 2 037-03 STPFLEX 313 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
3-DESIGN/DEVELOPMENT
DRAINAGE IMPROVEMENTGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 2: DRAINAGE IMPROVEMENTS
Page 2 - 108 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.013081
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W CARROLL 000-62 FBROFF 593 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENT NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
ROUNDHILL ROAD OVER LITTLE COLEWA BAYOU
H.014077
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W CARROLL LA 17 051-06 STPFLEX 3,314 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
MILL AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 17: RICHLAND P/L - 1.5 MILES N DARNEL
H.014122
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W CARROLL LA 587 862-20 STPFLEX 1,852 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
OVERLAYBROWN, JOSEPH C. Remrks:
Typ Imp:NFA AS MATCH
Project:Prj Mgr:
LA 587: LA 2 - LA 585
H.014239
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W CARROLL LA 589 862-14 STGEN 573 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTTOURRES, VALERIE Remrks:
Typ Imp:AC, USE NFA AS MATCH
Project:Prj Mgr:
LA 589: LYON BAYOU BRIDGE
H.012498
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W FELICIANA 000-63 RTP 114 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTW FELICIANA 000-63 LOCAL 63 RECREATIONAL TRAILS PROGRAM
CONSTRUCTION OF A TRAILHEAD AND 3.2 MILES OF BIKE TRAILNUNES, BRIAN Remrks:
Typ Imp:DCRT IS THE PROJECT MANAGER
Project:Prj Mgr:
ROSEDOWN BRANCH TRAIL-W FELICIANA PARISH
W FELICIANA
H.012505
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W FELICIANA LA 10 061-04 RTP 114 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTW FELICIANA LA 10 061-04 LOCAL 39 RECREATIONAL TRAILS PROGRAM
CONSTRUCTION OF TWO TRAILHEADS AND 6300' OF PED/BIKE TRAILNUNES, BRIAN Remrks:
Typ Imp:DCRT IS THE PROJECT MANAGER
Project:Prj Mgr:
TOWN CENTER BRANCH TRAIL
H.012518
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W FELICIANA 000-63 RTP 121 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENT
RESTORE 2.7 MILES OF ATV TRAILNUNES, BRIAN Remrks:
Typ Imp:DCRT IS THE PROJECT MANAGER
Project:Prj Mgr:
TUNICA HILLS WMA YEAR ROUND TRAM TRAIL
H.012527
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W FELICIANA 000-63 HSIPPEN 929 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT
THERMOPLASTIC STRIPING AND SIGNSMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
LOCAL ROAD SAFETY UPGRADES (W FELICIANA)
H.013957
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W FELICIANA 000-63 STP<5K-E 582 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTRANCK, AMANDA Remrks:
Typ Imp:
Project:Prj Mgr:
SLIGO ROAD OVER WALTER CREEK
Page 2 - 109 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.014253
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W FELICIANA LA 421 863-02 STGEN 915 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTTOURRES, VALERIE Remrks:
Typ Imp:AC
Project:Prj Mgr:
LA 421: THOM CREEK BRIDGE
H.000382
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WINN US 71 009-04 STPFLEX 3,390 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
NATCHITOCHES US 71 009-05 STPFLEX 1,930 PRESERVATION - BRIDGE (ONSYSTEM)
NATCHITOCHES US 71 009-05 STP<5K-E 5,410 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTBUCCI, MARK Remrks:
Typ Imp:009-04-0010
Project:Prj Mgr:
US 71: BRIDGES NEAR ST. MAURICE
WINN
H.001711
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WINN LA 126 091-05 STPFLEX 3,023 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
NEW BRIDGESYANG, LI Remrks:
Typ Imp:091-05-0014;2 BRIDGES
Project:Prj Mgr:
SALINE BAYOU RELIEF & MILL CR. BRS.
H.010356
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WINN LA 126 091-07 STPFLEX 2,733 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
CTB AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 126: JCT LA 34 - NW JCT LA 499
H.012047
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WINN US 167 023-05 NHPP 2,822 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTMISTICH, BRADLEY Remrks:
Typ Imp:
Project:Prj Mgr:
US167: BIG CREEK BRIDGE
H.014148
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WINN LA 1236 864-09 NFA 2,238 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
OVERLAYBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1236: US 167 TO LA 34
H.009153
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WINN US 84 022-02 NFI 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTALWINN US 84 022-03 NFI 0 DEMO / HIGH PRIORITY
MAJOR WIDENINGMASTIN, CATHERINE Remrks:
Typ Imp:STBONDS AS MATCH; $1.5M IN CLOC PRIORITY 1 AVAILABLE
Project:Prj Mgr:
US HWY 84 IMPROVEMENTS
Page 2 - 110 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.012562
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WINN LA 1232 864-06 STPFLEX 1,228 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
WINN LA 1232 864-06 STPFLEX 1,251 PRESERVATION - BRIDGE (ONSYSTEM)
WINN LA 1232 864-06 STPFLEX 1,251 PRESERVATION - BRIDGE (ONSYSTEM)
WINN LA 1232 864-06 STPFLEX 1,644 PRESERVATION - BRIDGE (ONSYSTEM)
WINN LA 1231-1 864-08 STPFLEX 1,377 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTSMISTICH, BRADLEY Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1232, LA 1231-1: BRIDGES
H.014242
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WINN LA 124 125-01 STGEN 744 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
WINN LA 124 125-01 STGEN 744 PRESERVATION - BRIDGE (ONSYSTEM)
WINN LA 124 125-01 STGEN 915 PRESERVATION - BRIDGE (ONSYSTEM)
WINN LA 124 125-01 STGEN 1,257 PRESERVATION - BRIDGE (ONSYSTEM)
WINN LA 124 125-01 STPFLEX 1,428 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTTOURRES, VALERIE Remrks:
Typ Imp:AC
Project:Prj Mgr:
LA 124: BRIDGES NEAR WINNFIELD
H.009186
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 02 000-92 STPFLEX 2,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
3-DESIGN/DEVELOPMENT
PLASTIC PAVEMENT STRIPING AND RAVISED PAVEMENT MARKERSHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: PAVEMENT MARKING REPLACEMENT X
DISTRICT 02
H.005158
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 02 000-92 DEMO 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
UPRGRADING US 90 FOR FUTURE I-49 SOUTHLANDRY, COREY Remrks:
Typ Imp:700-92-0011; EIS
Project:Prj Mgr:
FUTURE I-49 SOUTH (RACELAND TO WESTBANK
H.005168
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 02 000-92 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
EISGOODELL, DEAN Remrks:
Typ Imp:STATE & RR EACH PUTTING UP 10% OF MATCH FOR DEMO
Project:Prj Mgr:
NEW ORLEANS RAIL GATEWAY EIS
H.009731
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 02 000-92 NFI 4,427 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL
FLEET CONVERSION TO CNGBROWN, JEFF Remrks:
Typ Imp:
Project:Prj Mgr:
L/CNG FUEL FLEETS DISTRICT 02
Page 2 - 111 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.012663
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 02 000-92 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
1-PLANNING/ENVIRONMENTAL
TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 02H TRAFFIC CONTROL UPGRADE Y3
H.012664
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 02 000-92 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
1-PLANNING/ENVIRONMENTAL
TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 02BC TRAFFIC CONTROL UPGRADE Y2
H.012680
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 02 000-92 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
1-PLANNING/ENVIRONMENTAL
TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 02BC TRAFFIC CONTROL UPGRADE Y3
H.013822
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 03 000-93 HSIPPEN 2,920 SAFETY 3-DESIGN/DEVELOPMENT
SAFETY IMPROVEMENT PROJECT TO INSTALL RUMBLESTRIPSDOMINGUE, CHRISTOPHER Remrks:
Typ Imp:
Project:Prj Mgr:
DIST. 03 RUMBLESTRIPS (NORTH)
DISTRICT 03
H.013823
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 03 000-93 HSIP 2,470 SAFETY 3-DESIGN/DEVELOPMENT
SAFETY IMPROVEMENT PROJECT TO INSTALL RUMBLESTRIPSDOMINGUE, CHRISTOPHER Remrks:
Typ Imp:
Project:Prj Mgr:
DIST. 03 RUMBLESTRIPS (SOUTH)
H.009732
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 03 000-93 NFI 3,712 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL
FLEET CONVERSION TO CNGBROWN, JEFF Remrks:
Typ Imp:
Project:Prj Mgr:
L/CNG FUEL FLEETS DISTRICT 03
H.012644
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 03 000-93 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
1-PLANNING/ENVIRONMENTAL
TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 03 TRAFFIC CONTROL UPGRADE Y3
H.009189
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 04 000-94 STPFLEX 2,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
3-DESIGN/DEVELOPMENT
PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERSHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-20: PAVEMENT MARKING REPLACEMENT X
DISTRICT 04
Page 2 - 112 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.012643
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 04 000-94 STPFLEX 2,250 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
3-DESIGN/DEVELOPMENT
DISTRICT 04 000-94 HSIPPEN 2,250 SAFETY
TRAFFIC SIGNALSFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 04 FLASHING YELLOW ARROW PART 2
H.012666
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 04 000-94 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
3-DESIGN/DEVELOPMENT
TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 04 FLASHING YELLOW ARROW PART 3
H.009733
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 04 000-94 NFI 5,872 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL
FLEET CONVERSION TO CNGBROWN, JEFF Remrks:
Typ Imp:
Project:Prj Mgr:
L/CNG FUEL FLEETS DISTRICT 04
H.009191
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 05 000-95 STPFLEX 2,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
3-DESIGN/DEVELOPMENT
PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERSHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-20: PAVEMENT MARKING REPLACEMENT XI
DISTRICT 05
H.009734
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 05 000-95 NFI 3,269 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL
FLEET CONVERSION TO CNGBROWN, JEFF Remrks:
Typ Imp:
Project:Prj Mgr:
L/CNG FUEL FLEETS DISTRICT 05
H.012642
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 05 000-95 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
1-PLANNING/ENVIRONMENTAL
TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 05 TRAFFIC CONTROL UPGRADE Y3
H.012668
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 05 000-95 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
1-PLANNING/ENVIRONMENTAL
TRAFFIC SIGNAL UPGRADEFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 05 TRAFFIC CONTROL UPGRADE Y2
H.009193
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 07 000-97 STPFLEX 2,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
3-DESIGN/DEVELOPMENT
PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERSHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: PAVEMENT MARKING REPLACEMENT XI
DISTRICT 07
Page 2 - 113 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.009735
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 07 000-97 NFI 2,326 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL
FLEET CONVERSION TO CNGBROWN, JEFF Remrks:
Typ Imp:
Project:Prj Mgr:
L/CNG FUEL FLEETS DISTRICT 07
H.012467
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 07 000-97 STPFLEX 1,650 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
1-PLANNING/ENVIRONMENTAL
TRAFFIC SIGNAL IMPROVEMENTSFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 07 TRAFFIC CONTROL UPGRADE I
H.013826
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 07 000-97 0 SAFETY 0-FEASIBILITY/SCOPING
IDENTIFIY POTENTIAL SAFETY IMPROVEMENT PROJECTS IN D07DEVILLE, JESSICA Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 07 SAFETY INVESTMENT PLAN
H.009194
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 08 000-98 NFI 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
3-DESIGN/DEVELOPMENT
PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERSHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-49: PAVEMENT MARKING REPL. VIII
DISTRICT 08
H.012486
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 08 000-98 STPFLEX 1,250 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
3-DESIGN/DEVELOPMENT
DISTRICT 08 000-98 HSIPPEN 1,250 SAFETY
TRAFFIC SIGNAL UPGRADEFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 08 FLASHING YELLOW ARROW PART 1
H.012641
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 08 000-98 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
3-DESIGN/DEVELOPMENT
TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 08 FLASHING YELLOW ARROW PART 2
H.009736
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 08 000-98 NFI 2,848 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL
FLEET CONVERSION TO CNGBROWN, JEFF Remrks:
Typ Imp:
Project:Prj Mgr:
L/CNG FUEL FLEETS DISTRICT 08
H.011960
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 08 000-98 STPFLEX 409 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
1-PLANNING/ENVIRONMENTAL
UPGRADE OF EXISTING SIGNAL CONTROLLERSFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 08 CONTROLLER UPGRADES
Page 2 - 114 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.013264
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 08 000-98 0 SAFETY 0-FEASIBILITY/SCOPING
SAFETY PLAN TO PRIORITIZE POTENTIAL SAFETY PROJECTSDEVILLE, JESSICA Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 08 SAFETY INVESTMENT PLAN
H.009052
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 58 000-91 STPFLEX 2,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
3-DESIGN/DEVELOPMENT
PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERSHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-20: PAVEMENT MARKING REPLACEMENT IX
DISTRICT 58
H.009197
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 58 000-91 STPFLEX 500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
3-DESIGN/DEVELOPMENT
PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERSHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-20: PAVEMENT MARKING REPLACEMENT VIII
H.009737
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 58 000-91 NFI 2,125 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL
FLEET CONVERSION TO CNGBROWN, JEFF Remrks:
Typ Imp:
Project:Prj Mgr:
L/CNG FUEL FLEETS DISTRICT 58
H.012465
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 61 000-96 STPFLEX 3,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
3-DESIGN/DEVELOPMENT
DISTRICT 61 000-96 HSIPPEN 3,000 SAFETY
TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 61 FLASHING YELLOW ARROW PART 3
DISTRICT 61
H.009738
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 61 000-96 NFI 5,145 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL
FLEET CONVERSION TO CNGBROWN, JEFF Remrks:
Typ Imp:
Project:Prj Mgr:
L/CNG FUEL FLEETS DISTRICT 61
H.012667
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 61 000-96 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
1-PLANNING/ENVIRONMENTAL
TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 61 TRAFFIC CONTROL UPGRADE Y2
H.012639
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 62 000-90 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
3-DESIGN/DEVELOPMENT
TRAFFIC SIGNAL UPGRADEFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 62 FLASHING YELLOW ARROW
DISTRICT 62
Page 2 - 115 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
H.009739
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 62 000-90 NFI 5,747 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL
FLEET CONVERSION TO CNGBROWN, JEFF Remrks:
Typ Imp:
Project:Prj Mgr:
L/CNG FUEL FLEETS DISTRICT 62
H.012466
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 62 000-90 STPFLEX 1,650 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
1-PLANNING/ENVIRONMENTAL
TRAFFIC SIGNAL UPGRADEFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 62 TRAFFIC CONTROL UPGRADE I
H.009884
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
STATEWIDE 000-99 STPFLEX 250 RAILROADS 3-DESIGN/DEVELOPMENT
RELOCATING LED CROSSBUCK ASSEMBLIESSHREWSBERRY,BILL Remrks:
Typ Imp:
Project:Prj Mgr:
NOGC (STATEWIDE)
STATEWIDE
H.012832
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
STATEWIDE 000-99 STPFLEX 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
3-DESIGN/DEVELOPMENT
ADVANCED VEHICLE SYSTEM RESEARCH, DESIGN, AND IMPLEMENTATIKIMBENG, LUCY Remrks:
Typ Imp:
Project:Prj Mgr:
AV/CV TECHNOLOGY DEPLOYMENT PHASE 1
H.013164
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
STATEWIDE 000-99 STPFLEX 5,000 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
3-DESIGN/DEVELOPMENT
ACQUIRE A NEW TOLL SYSTEMRUNDELL, SCOTT Remrks:
Typ Imp:
Project:Prj Mgr:
STATEWIDE TOLL SYSTEM
H.013909
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
STATEWIDE 000-99 RTP 375 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENT
MAINTENANCE, RESTORE AND CONSTRUCT TRAIL & TRAILHEAD INFRASNUNES, BRIAN Remrks:
Typ Imp:L&A TRAILS WILL PROVIDE THE LOCAL MATCH
Project:Prj Mgr:
WINNFIELD TRAILHEAD &TRAIL RESTORATION
H.011247
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
STATEWIDE 000-99 0 OTHER / MISCELLANEOUS 0-FEASIBILITY/SCOPING
UPDATE THE STATE GIS DATABASE FOR HISTORIC SITESARDOIN, NOEL Remrks:
Typ Imp:
Project:Prj Mgr:
UPDATES TO GIS HISTORIC SITES DATABASE
H.014047
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
STATEWIDE 000-99 0 DEMO / HIGH PRIORITY 0-FEASIBILITY/SCOPING
LOCAL ROADS PILOT PROGRAMMOORE, TANYA Remrks:
Typ Imp:DOTD TO PROVIDE MATCH
Project:Prj Mgr:
LOCAL ROADS PILOT PROGRAM
L.000001
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- STPFLEX 3,100 INTERMODAL CONNECTOR STAGES 4, 3, 2, 1, 0 - NHPP 6,200 INTERMODAL CONNECTOR
Not assigned Remrks:
Typ Imp:
Project:Prj Mgr:
INTERMODAL CONNECTORS PROGRAM
L-PROJECTS
Page 2 - 116 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
L.000002
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- NHPP 1,000 PRESERVATION - INTERSTATE STAGES 4, 3, 2, 1, 0
SURFACE IMP, PM, REPAIR FOR PAVEMENT/EMBANKMENTNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
INTERSTATE PAVEMENT PREVENTIVE MAINT
L.000003
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- STPFLEX 2,000 PRESERVATION - NON-INTERSTATEON NHS & STP SYSTEM
STAGES 4, 3, 2, 1, 0
PREVENTIVE MAINTENANCE/REHABILITATIONNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
PREVENTIVE MAINTENANCE NON-INTERSTATE
L.000004
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- NFA 2,500 PRESERVATION - NON-INTERSTATENFA
STAGES 4, 3, 2, 1, 0
PREVENTIVE MAINTENANCE/REHABILITATIONNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
PREVENTIVE MAINT NON-INTERSTATE (NFA)
L.000005
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- STPFLEX 4,400 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
STAGES 4, 3, 2, 1, 0
- STCASH 6,000 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
Not assigned Remrks:
Typ Imp:
Project:Prj Mgr:
ROAD PREVENTIVE MAINTENANCE
L.000007
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- STPFLEX 250 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
STAGES 4, 3, 2, 1, 0
- STCASH 500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
Not assigned Remrks:
Typ Imp:
Project:Prj Mgr:
TRANSPORTATION SYSTEMS MANAGEMENT
L.000008
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- STP>200K 1,000 URBAN SYSTEMS STAGES 4, 3, 2, 1, 0 - STP<200K 1,000 URBAN SYSTEMS
SELECTED BY MPO'SNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
URBAN SYSTEM PROJECTS
L.000009
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- STBONDS 1,000 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0
AS APPROVED BY LEGISLATURENot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
MISC BOND PROJECTS
Page 2 - 117 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
L.000010
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- REIMB 5,000 PRESERVATION - BRIDGE (ONSYSTEM)
STAGES 4, 3, 2, 1, 0
- NHPP 1,000 PRESERVATION - BRIDGE (ONSYSTEM)
- STPFLEX 1,000 PRESERVATION - BRIDGE (ONSYSTEM)
- STCASH 1,000 PRESERVATION - BRIDGE (ONSYSTEM)
REIMBURSABLE AND NON-REIMBURSABLENot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
URGENT BRIDGE REPAIR/REPLACEMENT
L.000011
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- NHPP 1,500 PRESERVATION - BRIDGE (ONSYSTEM)
STAGES 4, 3, 2, 1, 0
- STPFLEX 1,500 PRESERVATION - BRIDGE (ONSYSTEM)
- STCASH 1 PRESERVATION - BRIDGE (ONSYSTEM)
MAINTENANCENot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
BRIDGE PREVENTIVE MAINTENANCE
L.000012
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- STPFLEX 1,000 PRESERVATION - BRIDGE (ONSYSTEM)
STAGES 4, 3, 2, 1, 0
- STCASH 1 PRESERVATION - BRIDGE (ONSYSTEM)
MISC SITESNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
BRIDGE PAINTING PROGRAM
L.000013
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- STCASH 500 OPER EFFICIENCY/MOTORISTASSISTANCE - MOVABLE BRIDGEREHABILITATION
STAGES 4, 3, 2, 1, 0
Not assigned Remrks:
Typ Imp:
Project:Prj Mgr:
MOVABLE BRIDGE PREVENTIVE MAINTENANCE
L.000014
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- STCASH 500 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0 - STBONDS 500 OTHER / MISCELLANEOUS
IN CONJUNCTION WITH DEDNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
MISC ECONOMIC DEVELOPMENT INITIATIVES
L.000015
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- OTHER 500 OPER EFFICIENCY/MOTORISTASSISTANCE - FERRY PROJECTS
STAGES 4, 3, 2, 1, 0
- STCASH 500 OPER EFFICIENCY/MOTORISTASSISTANCE - FERRY PROJECTS
REHABILITATION/REPAIRNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
MISC FERRY PROJECTS
Page 2 - 118 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
L.000016
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- HSIP 300 SAFETY STAGES 4, 3, 2, 1, 0 - STPFLEX 200 SAFETY - STCASH 100 SAFETY
MISC PROJECTSNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
FEDERAL SAFETY PROGRAMS
L.000017
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- NHPP 300 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
STAGES 4, 3, 2, 1, 0
- DEMO 300 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
- CM 400 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
ENGINEERING, CONSTRUCTION, MAINTENANCE, OPERATIONSNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
MISC ITS SYSTEMS
L.000018
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- NHPP 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - INTERSTATE LIGHTING
STAGES 4, 3, 2, 1, 0
- STCASH 100 OPER EFFICIENCY/MOTORISTASSISTANCE - INTERSTATE LIGHTING
IN ACCORDANCE WITH MAINTENANCE AGREEMENTSNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
INTERSTATE LIGHTING PROGRAM
L.000019
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- STBONDS 100 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0
OVERLAY/REHABILITATIONNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
STATE PARK ROADS
L.000020
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- STPFLEX 500 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
STAGES 4, 3, 2, 1, 0
- STCASH 250 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
TO ALLEVIATE FLOODINGNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
MISC DRAINAGE PROJECTS
L.000021
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- FLH 500 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0
FEDERAL LANDS HIGHWAYS, ETC.Not assigned Remrks:
Typ Imp:
Project:Prj Mgr:
MISC FEDERAL PROJECTS/PROGRAMS
L.000022
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- RAIL HE 3,000 RAILROADS STAGES 4, 3, 2, 1, 0 - RAIL PD 3,000 RAILROADS - STPFLEX 2,000 RAILROADS - STCASH 200 RAILROADS
FEDERAL RAILROAD CROSSING IMPROVEMENTS PROGRAMNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
RAILROAD CROSSING IMPROVEMENTS
L.000025
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- TOLLS 1,000 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0
ORLEANS AND JEFFERSON PARISHESNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
TOLL FUNDED PROJECTS
Page 2 - 119 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
L.000026
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- STCASH 1,000 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0 - TIME 1,000 OTHER / MISCELLANEOUS
Not assigned Remrks:
Typ Imp:
Project:Prj Mgr:
WETLAND MITIGATION BANK
L.000027
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- ER 100 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0
EMERGENCY RELIEFNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
EMERGENCY RELIEF PROVIDED BY CONGRESS
L.000029
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- TAPFLEX 1,000 ENHANCEMENTS STAGES 4, 3, 2, 1, 0
MISC PROJECTSNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
FEDERAL ENHANCEMENT PROGRAM
L.000031
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- DEMO 10,000 DEMO / HIGH PRIORITY STAGES 4, 3, 2, 1, 0
AS DEFINED BY FEDERAL GOVERNMENTNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
DEMO/HI-PRI/OTHER FEDERAL PROGRAMS
L.000032
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- NHPP 500 OPER EFFICIENCY/MOTORISTASSISTANCE - REST AREAS
STAGES 4, 3, 2, 1, 0
FACILITY REHABILITATIONNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
REST AREA REHABILITATION
L.000033
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- NHPP 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
STAGES 4, 3, 2, 1, 0
- STPFLEX 500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
Not assigned Remrks:
Typ Imp:
Project:Prj Mgr:
MISC SIGNS, STRIPING, SIGNALS
L.000034
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- STCASH 2,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
STAGES 4, 3, 2, 1, 0
Not assigned Remrks:
Typ Imp:
Project:Prj Mgr:
INSTALL RAISED PAVEMENT MARKERS
L.000035
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- FBROFF 1,000 PRESERVATION - BRIDGE (OFFSYSTEM)
STAGES 4, 3, 2, 1, 0
- STCASH 200 PRESERVATION - BRIDGE (OFFSYSTEM)
BRIDGE REPLACEMENTS/INSPECTIONSNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
MISC FEDERAL OFF-SYSTEM BRIDGES
Page 2 - 120 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
L.000036
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- NHPP 1,900 OPER EFFICIENCY/MOTORISTASSISTANCE - WEIGH STATIONS
STAGES 4, 3, 2, 1, 0
MISC SITES STATEWIDENot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
WEIGH STATION REHABILITATION/UPGRADE
L.000037
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- NHPP 2,000 SAFETY STAGES 4, 3, 2, 1, 0
RUMBLE STRIPSNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
HIGHWAY SAFETY IMPROVEMENTS
L.000039
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- STPFLEX 50 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0
CONSTRUCT TEST SECTIONSNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
ACCELERATED LOADING FACILITY
L.000040
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- STPFLEX 3,000 PRESERVATION - BRIDGE (ONSYSTEM)
STAGES 4, 3, 2, 1, 0
- STCASH 600 PRESERVATION - BRIDGE (ONSYSTEM)
INSPECTIONS, RATINGS, LOAD FACTORSNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
FEDERAL BRIDGE INSPECTION PROGRAMS
L.000041
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- CM 1,000 URBAN SYSTEMS STAGES 4, 3, 2, 1, 0
NON-ATTAINMENT AREASNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
CONGESTION MITIGATION PROJECTS
L.000042
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- CM 500 URBAN SYSTEMS STAGES 4, 3, 2, 1, 0
IN LAKE CHARLES AS APPROVED BY FHWANot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
MISC CONGESTION MITIGATION PROJ - LKC
L.000043
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- CM 1,000 URBAN SYSTEMS STAGES 4, 3, 2, 1, 0
IN BATON ROUGE AS APPROVED BY FHWANot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
MISC CONGESTION MITIGATION PROJ - BTR
L.000068
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- STPFLEX 2,500 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
STAGES 4, 3, 2, 1, 0
- STPFLEX 2,500 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
- STPFLEX 8,300 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
- STPFLEX 8,100 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
Not assigned Remrks:
Typ Imp:
Project:Prj Mgr:
ACCESS MANAGEMENT PROJECTS
Page 2 - 121 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021PROJECTS IN DEVELOPMENT
L.000069
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- STCASH 1,000 ROAD TRANSFER STAGES 4, 3, 2, 1, 0 - STPFLEX 1,000 ROAD TRANSFER
Not assigned Remrks:
Typ Imp:
Project:Prj Mgr:
ROAD TRANSFER PROGRAM
L.000093
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- CM 5,500 CONGESTION MITIGATION STAGES 4, 3, 2, 1, 0
Not assigned Remrks:
Typ Imp:
Project:Prj Mgr:
STATEWIDE CONGESTION MITIGATION
L.000094
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- CM 100 URBAN SYSTEMS STAGES 4, 3, 2, 1, 0 - STP<200K 100 URBAN SYSTEMS - STPFLEX 100 URBAN SYSTEMS
Not assigned Remrks:
Typ Imp:
Project:Prj Mgr:
URBAN TRANSIT(INCL TRANSFER TO AGENCIES)
L.000097
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- STPFLEX 1,500 OPER EFFICIENCY/MOTORISTASSISTANCE - AMERICANS WITHDISABILITIES ACT
STAGES 4, 3, 2, 1, 0
- NHPP 1,500 OPER EFFICIENCY/MOTORISTASSISTANCE - AMERICANS WITHDISABILITIES ACT
ADA PROGRAMNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
ADA PROGRAM
L.000024
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- HSIP 1,000 SAFETY STAGES 2, 1, 0 - STCASH 500 SAFETY
HANDLED THROUGH OPERATIONS BUDGETNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
SOFT SIDE SAFETY
L.000038
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- SPR MAND 7,000 OTHER / MISCELLANEOUS STAGES 2, 1, 0 - SPR OPT 7,000 OTHER / MISCELLANEOUS
HANDLED THROUGH OPERATING BUDGETNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
PLANNING, TRAINING AND RESEARCH
L.000023
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- NHPP 400 OTHER / MISCELLANEOUS STAGES 1, 0 - STPFLEX 300 OTHER / MISCELLANEOUS - STCASH 300 OTHER / MISCELLANEOUS
Not assigned Remrks:
Typ Imp:
Project:Prj Mgr:
SCOPING AND ENVIRONMENTAL STUDIES
Page 2 - 122 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
STAGE 2 – WAITING FOR FUNDING
This is a list of all projects in the program that can be funded
if additional revenues become available.
Projects in this list may also be funded in future fiscal years
with existing revenue sources if identified through the project
selection process as a high priority relative to other candidate
projects within the same category.
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021WAITING FOR FUNDING
H.002729
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA LA 98 389-01 NFI 19,734 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDINGACADIA I-10 450-04 0 DEMO / HIGH PRIORITY
NEW BRIDGE. NEW CONCRETE PAVEMENTYANG, LI Remrks:
Typ Imp:389-01-0011
Project:Prj Mgr:
GRAND PRAIRIE HWY INTR.&FRONTAGE RD
ACADIA
H.003756
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA 000-01 DEMO 0 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING
FED EARMARK FOR STUDYNGUYEN, WAYNE Remrks:
Typ Imp:700-01-0112;$993.500(IMD)&$110.000C.O.AVAILABLE
Project:Prj Mgr:
NEW INTERCHANGE LA 98 RAYNE
H.010885
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA LA 91 801-09 0 PRESERVATION - BRIDGE (ONSYSTEM)
2-WAITING FOR FUNDING
REPLACEMENT OF PONTOON BRIDGEMOSS, SARAH Remrks:
Typ Imp:CONSTRUCTION FUNDS WILL BE STATE BONDS
Project:Prj Mgr:
LA 91: BAYOU PLAQUEMINE BRULE BR REPLACE
H.009266
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION I-10 450-11 NFI 46,700 CORRIDOR 2-WAITING FOR FUNDING
WIDEN INTERSTATE TO 3 LANES EACH DIRECTIONPAINE, PEGGY JO Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: LA 73 TO LA 30
ASCENSION
H.009276
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION I-10 450-11 NFI 50,300 CORRIDOR 2-WAITING FOR FUNDING
WIDEN INTERSTATE TO 3 LANES EACH DIRECTIONPAINE, PEGGY JO Remrks:
Typ Imp:LHIP USED FOR ENG
Project:Prj Mgr:
I-10: LA 30 TO LA 22
H.010571
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASSUMPTION LA 70 232-01 NFI 140,000 CAPACITY 2-WAITING FOR FUNDING
STUDY FOR BYPASS ROAD FOR LA 70-PIERRE PART TO NEAR LA 69JONES, MATTHEW Remrks:
Typ Imp:
Project:Prj Mgr:
LA 70 BYPASS
ASSUMPTION
H.009493
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
AVOYELLES LA 107 147-03 NFI 2,322 PRESERVATION - NON-INTERSTATEON STP SYSTEM
2-WAITING FOR FUNDING
CTB AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 107: LA 1179 - LA 1181
AVOYELLES
H.009741
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
AVOYELLES 000-05 NFI 338 ENHANCEMENTS 2-WAITING FOR FUNDING
SIDEWALK W/ LIGHTING, LANDSCAPE & SUBSURFACE DRAINAGENUNES, BRIAN Remrks:
Typ Imp:MATCH 15% TOLL CREDITS AND 5% LOCAL
Project:Prj Mgr:
MARKSVILLE SIDEWALK IMPROVEMENTS
Page 3 - 1 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021WAITING FOR FUNDING
H.003251
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER I-20 451-02 NFI 61,140 PRESERVATION - INTERSTATE 2-WAITING FOR FUNDINGBOSSIER I-20 451-02 NFI 69,390 PRESERVATION - BRIDGE (ON
SYSTEM)
BOSSIER I-20 451-02 NFI 26,360 CAPACITY
WIDEN INTERSTATE TO 3 LANES EACH DIRECTIONOLIVIER, NICHOLAS Remrks:
Typ Imp:451-02-0078
Project:Prj Mgr:
I-20 (HAMILTON RD TO AIRLINE DR)
BOSSIER
H.003855
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER 000-08 NFI 27,900 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING
ROADWAY EXT (WINFIELD RD) STUDYOLIVIER, NICHOLAS Remrks:
Typ Imp:700-08-0130;STAGE 0
Project:Prj Mgr:
BOSSIER PAR CONG RELIEF WINFIELD RD
H.003857
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER 000-08 0 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING
ROAD EXTENSION (ENGINEERING) STUDYOLIVIER, NICHOLAS Remrks:
Typ Imp:700-08-0132
Project:Prj Mgr:
WAFER ROAD EXTENSION
H.005184
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER 000-08 DEMO 0 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDINGCADDO 000-09 0 DEMO / HIGH PRIORITY
ENVIRONMENTAL IMPACT STATEMENTMOSS, SARAH Remrks:
Typ Imp:700-94-0003;NCPD FUNDS
Project:Prj Mgr:
HIGH PRIORITY CORRIDOR NO. 18
H.009522
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER LA 3105 808-07 NFI 9,100 RAILROADS - GRADE SEPARATION 2-WAITING FOR FUNDINGBOSSIER I-20 451-02 NFI 300 RAILROADS - GRADE SEPARATION
GRADE SEPARATE EXISTING AT-GRADE CROSSINGRAY, JARED Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3105:UNDERPASS@KCS S OF I-20(BOSSIER)
H.011319
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER I-20 451-02 NFI 94,907 PRESERVATION - INTERSTATE 2-WAITING FOR FUNDINGBOSSIER I-20 451-02 NFI 40,919 CAPACITY BOSSIER I-20 451-02 NFI 19,977 PRESERVATION - BRIDGE (ON
SYSTEM)
INTERSTATE WIDENINGMOSS, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
I-20: AIRLINE DR. TO I-220
H.001618
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO LA 538 078-02 NFI 5,604 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDINGCADDO LA 173 094-01 0 OTHER / MISCELLANEOUS
RECONST.W/GEOMETRIC IMP NEED STAGE 0KENDRICK, BRIAN Remrks:
Typ Imp:078-02-0019;NEED FUNDS
Project:Prj Mgr:
JCT LA 173 - MIDDLE SCHOOL
CADDO
H.001724
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO LA 173 094-01 NFI 25,000 CAPACITY 2-WAITING FOR FUNDING
4 LANING (CONTINGENT ON BOND FUNDS)MCMILLAN, RYAN Remrks:
Typ Imp:094-01-0029;ORIGINATED BY DEPT OF ECON DEV.
Project:Prj Mgr:
SHREVEPORT-BLANCHARD HWY.
Page 3 - 2 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021WAITING FOR FUNDING
H.001725
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO LA 173 094-01 NFI 10,000 CAPACITY 2-WAITING FOR FUNDING
WIDENINGMCMILLAN, RYAN Remrks:
Typ Imp:094-01-0032
Project:Prj Mgr:
JCT. LA 3094 - JCT. I-220
H.006447
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO 000-09 0 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING
DESIGN AND ACQUIRE R/WBRIGNAC, CHRISTINA Remrks:
Typ Imp:736-99-1032
Project:Prj Mgr:
I-69: SIU 14 JCT I-20 TO US 82
H.009744
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO 000-09 NFI 438 ENHANCEMENTS 2-WAITING FOR FUNDING
MULTI-USE TRAIL AND RELATED WORKNUNES, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
OIL CITY MULTI-USE TRAIL, PHASE 2
H.011448
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO 000-09 NFI 19,000 OPER EFFICIENCY/MOTORISTASSISTANCE - REST AREAS
2-WAITING FOR FUNDING
DESIGN AND CONSTRUCT NEW REST AREAGUINN, SCOTT Remrks:
Typ Imp:
Project:Prj Mgr:
IDA SAFETY REST AREA
H.009521
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 397 193-31 NFI 10,200 RAILROADS - GRADE SEPARATION 2-WAITING FOR FUNDING
GRADE SEPARATE EXISTING AT-GRADE CROSSINGRAY, JARED Remrks:
Typ Imp:
Project:Prj Mgr:
LA 397: NEW BRIDGE AT UPRR
CALCASIEU
H.009750
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU 000-10 NFI 145 ENHANCEMENTS 2-WAITING FOR FUNDING
SIDEWALKS, SUBSURFACE DRAINAGE, & RELATED WORKMEEK, STEPHEN Remrks:
Typ Imp:ROW IS 80/20, CONSTRUCTION 95/5
Project:Prj Mgr:
TOPSY ROAD SIDEWALK
H.000762
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CATAHOULA US 84 022-06 NFI 6,000 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDINGCATAHOULA US 84 022-06 NFI 6,000 CAPACITY
WIDEN TO 4 LANESMOORE, DARRELL Remrks:
Typ Imp:022-06-0038
Project:Prj Mgr:
JCT LA 28 - JCT LA 3037
CATAHOULA
H.011029
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CATAHOULA LA 559 813-29 NFI 0 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDINGCATAHOULA LA 559 346-01 NFI 0 OTHER / MISCELLANEOUS
FEASIBILITY STUDY TO REPLACE DUTY FERRY WITH A BRIDGEWINDMANN, ANDREW Remrks:
Typ Imp:
Project:Prj Mgr:
LA 559: REPLACE DUTY FERRY WITH BRIDGE
H.000770
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CONCORDIA US 84 022-07 0 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
WIDEN TO 4 LANESMOORE, DARRELL Remrks:
Typ Imp:022-07-0053
Project:Prj Mgr:
JCT LA 565 - JCT LA 129
CONCORDIA
Page 3 - 3 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021WAITING FOR FUNDING
H.000771
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CONCORDIA US 84 022-07 NFI 3,000 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
WIDEN TO 4 LANESMORVANT, RYAN Remrks:
Typ Imp:022-07-0054
Project:Prj Mgr:
LA 129 - US 65 (FERRIDAY)
H.001790
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DESOTO LA 509 105-02 NFI 0 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDINGRED RIVER LA 509 105-03 0 OTHER / MISCELLANEOUS
RECON W/GEOMETRIC IMPROVEMENTSMCMILLAN, RYAN Remrks:
Typ Imp:105-02-0017;$.5 AVAIL. (ORIGINATED BY DED)
Project:Prj Mgr:
INT. PAPER PLANT - LA 1
DESOTO
H.002317
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 408 255-02 LOCAL 10,928 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
NEW 4 LANE DIVIDED CONCRETE HIGHWAY WITH RAISED MEDIANPICARD, TOBY Remrks:
Typ Imp:GREEN LIGHT PROJECT
Project:Prj Mgr:
LA 408: HOOPER RD (JOOR RD-SULLIVAN RD)
EAST BATON ROUGE
H.002344
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 427 258-01 LOCAL 44,552 CAPACITY 2-WAITING FOR FUNDING
WIDEN TO 4 LANESREVIERE, RYAN Remrks:
Typ Imp:258-01-0033;GREEN LIGHT PROJECT(LET BY CITY); STAGE 0 COMP
Project:Prj Mgr:
LA 427: PERKINS RD (SIEGEN - HIGHLAND)
H.002358
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 3064 258-32 DEMO 14,000 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING
(PHASE 2)(REQ DEMO FUNDS)REVIERE, RYAN Remrks:
Typ Imp:454-01-0068;IM-D $250K FY03.REQ MORE DEMO
Project:Prj Mgr:
ESSEN LANE INTERCHANGE (WB)
H.005403
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 NFI 108,100 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
EXTENSION OF HOOPER ROAD FROM LA 37 TO LA 16MOSS, SARAH Remrks:
Typ Imp:700-99-0527;GEN.OBLIGATION BOND(PR2=$100K & PR5=$900K)
Project:Prj Mgr:
LA408(HOOPER RD EXT)LA37-LA16
H.007970
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 426 817-09 NFI 8,658 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
WIDEN TO 4 LANESPICARD, TOBY Remrks:
Typ Imp:817-09-0035; INCLUDES I'SECT @ FLANNERY
Project:Prj Mgr:
OLD HAMMOND (BLVD DE PROV-MILL)
H.007974
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 426 817-09 LOCAL 9,681 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
NEW CONC PAVEMENTPICARD, TOBY Remrks:
Typ Imp:817-09-0042; LET BY CITY. GREEN LIGHT PROJECT
Project:Prj Mgr:
OLD HAMMOND HWY(MILLERVILLE-O'NEAL)
H.008415
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 DEMO 600 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDINGE BATON ROUGE 000-17 OTHER 1,773 OTHER / MISCELLANEOUS
FEDERAL EARMARKUMEOZULU, JOE Remrks:
Typ Imp:DEMO$ & $ FROM SOUTHERN;AUTHORIZED
Project:Prj Mgr:
INFORMATION CENTER @ SOUTHERN UNIVERSIT
Page 3 - 4 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021WAITING FOR FUNDING
H.008732
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 0 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING
EISARDOIN, NOEL Remrks:
Typ Imp:EIS IS DEMO WITH MATCH FROM LOCALS
Project:Prj Mgr:
STUDY OF BATON ROUGE LOOP
H.009300
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 408 255-02 NFI 51,000 CAPACITY 2-WAITING FOR FUNDING
WIDEN TO FOUR LANESMOSS, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
HOOPER ROAD WIDENING (LA 3034 - LA 37)
H.009327
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE I-10 450-10 NFI 10,139 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE
2-WAITING FOR FUNDING
E BATON ROUGE I-110 450-92 NFI 123 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE
W BATON ROUGE I-10 450-08 NFI 4,432 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE
EPOXY BRIDGE DECK OVERLAYTULLIER, DANNY Remrks:
Typ Imp:
Project:Prj Mgr:
I-10/110 EPOXY BR DECK OVERLAY-BTN ROUGE
H.011892
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE I-10 450-09 NFI 35,000 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE
2-WAITING FOR FUNDING
CLEAINING & PAINTING BRIDGE APPROACHES AND MAIN SPAN STEELTULLIER, DANNY Remrks:
Typ Imp:
Project:Prj Mgr:
I-10 MISS RIVER BRIDGE CLEAN & PAINT
H.011906
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 408 255-02 NFI 2,000 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDINGE BATON ROUGE LA 37 254-02 NFI 2,000 OTHER / MISCELLANEOUS
ROUNDABOUT AT HOOPER RD AND GREENWELL SPRINGS RDMOSS, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
HOOPER RD: ROUNDABOUT AT LA 37
H.011923
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 408 255-02 NFI 2,000 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDINGE BATON ROUGE LA 3034 255-30 NFI 2,000 OTHER / MISCELLANEOUS
ROUNDABOUT: INTERSECTION IMPROVEMENTMOSS, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
HOOPER RD: ROUNDABOUT AT SULLIVAN RD
H.012232
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 STP>200K 5,400 URBAN SYSTEMS 2-WAITING FOR FUNDINGE BATON ROUGE 000-17 LOCAL 2,700 URBAN SYSTEMS
NEW ALIGNMENTBRIGNAC, CHRISTINA Remrks:
Typ Imp:ENTITY WILL PROVIDE MATCH
Project:Prj Mgr:
LA 3064 TO LA 1248 PHASE 2
H.002893
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA US 90 424-04 NFI 21,391 PRESERVATION - BRIDGE (ONSYSTEM)
2-WAITING FOR FUNDING
BRIDGE REPLACEMENTKEMP, KELLY Remrks:
Typ Imp:424-04-0059;EAST AND WEST BOUND LANES
Project:Prj Mgr:
US 90: LA 14 OVERPASS REPLACEMENT
IBERIA
Page 3 - 5 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021WAITING FOR FUNDING
H.002264
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 45 249-90 NFI 0 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDINGJEFFERSON LA 45 249-90 NFI 6,289 PRESERVATION - BRIDGE (ON
SYSTEM)
JEFFERSON LA 302 826-39 NFI 86,521 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPL.(KERNER'S)YANG, LI Remrks:
Typ Imp:249-90-0041;TEA-21 KERNER'S FERRY BRIDGE
Project:Prj Mgr:
BAYOU BARATARIA BRIDGE@JEAN LAFITTE
JEFFERSON
H.002955
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 3139 430-01 NFI 5,000 URBAN SYSTEMS 2-WAITING FOR FUNDING
ACCESS IMPROVEMENTSLEBAS, MELISSA Remrks:
Typ Imp:430-01-0016
Project:Prj Mgr:
EARHART EXPRESSWAY
H.003074
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON I-10 450-15 NFI 100,000 CORRIDOR 2-WAITING FOR FUNDING
MAJOR WIDENING - ADD TRAVEL LANESYANG, LI Remrks:
Typ Imp:450-15-0124; TOLL CREDITS USED AS MATCH FOR PART OF PHASE 5
Project:Prj Mgr:
I 10: WILLIAMS BLVD - VETERANS BLVD
H.004359
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 3154 826-44 STBONDS 7,296 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDINGJEFFERSON LA 3154 826-44 OTHER 2,673 OTHER / MISCELLANEOUS
RELOCATION AND 4-LANINGYANG, LI Remrks:
Typ Imp:826-44-0027
Project:Prj Mgr:
HICKORY (LA 48 - MOUNES)
H.004367
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON 000-26 NFI 125,000 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDINGORLEANS 000-36 0 DEMO / HIGH PRIORITY
ENVIRONMENTAL. LINE & GRADE STUDYYANG, LI Remrks:
Typ Imp:700-26-0242;HP NO.1600 (SEE ALSO 736-92-0003)
Project:Prj Mgr:
LA3139:EARHART EXPRESSWAY EXT TO US 61
H.006513
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON 000-26 DEMO 6,750 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDINGORLEANS 000-36 0 DEMO / HIGH PRIORITY ST CHARLES 000-45 0 DEMO / HIGH PRIORITY
ABANDONED RR R/W ACQ. (HP NO 1600)NGUYEN, WAYNE Remrks:
Typ Imp:737-26-0001;HP=$0.5M. >2OOK=$0.3M IN FY 2001
Project:Prj Mgr:
US 61 CORRIDOR PRESERVATION
H.007214
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON 000-26 NFI 7,400 URBAN SYSTEMS 2-WAITING FOR FUNDING
WIDEN FROM 2 TO 3 LANESLEBAS, MELISSA Remrks:
Typ Imp:742-26-0080;OREGON DR.-BLANCHE DR
Project:Prj Mgr:
EAST AMES BOULEVARD IMPROVEMENTS
H.007223
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON 000-26 NFI 7,100 URBAN SYSTEMS 2-WAITING FOR FUNDING
WIDEN TO 4 LANE URBAD SECT W MEDIANLEBAS, MELISSA Remrks:
Typ Imp:742-26-0090; USE LOCAL AS MATCH
Project:Prj Mgr:
HARVEY BLVD (MANHATTAN - WALL)
Page 3 - 6 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021WAITING FOR FUNDING
H.008068
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 3017 826-11 NFI 15,102 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDINGJEFFERSON LA 3017 826-11 NFI 4,963 OTHER / MISCELLANEOUS JEFFERSON LA 1261 826-63 NFI 307 OTHER / MISCELLANEOUS PLAQUEMINES LA 3017 838-01 NFI 10,377 OTHER / MISCELLANEOUS
CREATING COUPLET FOR NB AND SB PETER'S RD WITH NEW BRIDGEMASTIN, CATHERINE Remrks:
Typ Imp:
Project:Prj Mgr:
PETERS ROAD BRIDGE & EXTENSION (PHASE 2)
H.008069
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 1261 826-63 NFI 119,200 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDINGPLAQUEMINES LA 1261 838-07 0 OTHER / MISCELLANEOUS
CONSTRUCT NEW BRIDGEMASTIN, CATHERINE Remrks:
Typ Imp:
Project:Prj Mgr:
PETERS ROAD BRIDGE & EXTENSION (PHASE 3)
H.009087
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON I-10 450-15 NFI 10,000 CORRIDOR 2-WAITING FOR FUNDING
MAJOR WIDENING - ADD TRAVEL LANESNICKEL, TIM Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: LOYOLA DR. TO WILLIAMS BLVD.
H.009794
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON 000-26 NFI 170 ENHANCEMENTS 2-WAITING FOR FUNDINGJEFFERSON US 90-Z 283-09 NFI 75 ENHANCEMENTS JEFFERSON LA 18 063-02 NFI 50 ENHANCEMENTS JEFFERSON LA 18 063-02 NFI 25 ENHANCEMENTS
SIGNING, PAVEMENT MARKINGS, M/U PATH & RELATED WORKNUNES, BRIAN Remrks:
Typ Imp:MATCH IS 15% TOLL CREDITS AND 5% LOCAL
Project:Prj Mgr:
GRETNA BICYCLE ACCESS IMPROVEMENTS
H.009804
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON 000-26 NFI 446 ENHANCEMENTS 2-WAITING FOR FUNDING
SIDEWALKS W/ LIGHTING, STREETSCPAING & RELATED WORKNUNES, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
KENNER: S WILLIAMS BLVD STREETSCAPING
H.011309
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON US 90-Z 283-09 NFI 60,000 CAPACITY 2-WAITING FOR FUNDING
RELOCATE THE EXIT RAMP AND CONSTRUCT AN ENTRANCE RAMPYANG, LI Remrks:
Typ Imp:USE CCCD TOLL CREDITS AS MATCH TO THE PHASE 5 FUNDS
Project:Prj Mgr:
MACARTHUR INTERCHANGE COMPLETION PH. II
H.009420
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFF DAVIS US 165 014-02 NFI 1,000 SAFETY 2-WAITING FOR FUNDING
INSTALL J-TURN ON US 165 @ LA 101CORMIER, CLAYTON Remrks:
Typ Imp:
Project:Prj Mgr:
US 165: INSTALL J-TURN @ LA 101
JEFFERSON DAVIS
H.002868
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE US 90 424-02 NFI 105,000 CORRIDOR 2-WAITING FOR FUNDING
NEW INTERCHANGEPAINE, PEGGY JO Remrks:
Typ Imp:424-02-0090;ENG DEMO. RW/UTL S9$1.2M AVAILABLE.NFI FOR CONST
Project:Prj Mgr:
I-49 S:AMB CAFFERY/US90 INTERCHANGE
LAFAYETTE
Page 3 - 7 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021WAITING FOR FUNDING
H.003454
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE I-49 455-01 NFI 850,000 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING
IN LAFAYETTE NEW INTERSTATENICKEL, TIM Remrks:
Typ Imp:455-01-0035;ENGR 700-24-0073. R/W 455-01-0034
Project:Prj Mgr:
LAFAYETTE CONNECTOR
H.004492
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE 000-28 0 URBAN SYSTEMS 2-WAITING FOR FUNDING
INTERCHANGE DESIGNUMEOZULU, JOE Remrks:
Typ Imp:700-28-0223;STUDY FED FY2013.ENGR FED FY2014
Project:Prj Mgr:
I-10 INTERCHANGE AT N AMBASSADOR CAFFERY
H.009214
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 339 828-11 0 CAPACITY 2-WAITING FOR FUNDINGLAFAYETTE LA 339 828-12 0 CAPACITY
WIDENINGBRIGNAC, CHRISTINA Remrks:
Typ Imp:LCG PROVIDE MATCH PHASE 2
Project:Prj Mgr:
LA 339: WIDENING (LA 82 TO LA 3073)
H.009215
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 182 032-01 0 CAPACITY 2-WAITING FOR FUNDING
WIDENINGBRIGNAC, CHRISTINA Remrks:
Typ Imp:LCG PROVIDE MATCH PHASE 2
Project:Prj Mgr:
LA182:WIDENING(W PONT DES MOUTON RD-I49)
H.009335
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 182 032-01 NFI 40,200 CAPACITY 2-WAITING FOR FUNDING
WIDENING AND ADDING TRAVEL LANES TO PROVIDE 4 LANE HIGHWAYBABIN, TEDDY Remrks:
Typ Imp:
Project:Prj Mgr:
LA 182: I-10 TO WEST PONT DES MOUTON RD
H.009520
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 3168 433-01 NFI 24,700 RAILROADS - GRADE SEPARATION 2-WAITING FOR FUNDING
GRADE SEPARATE EXISTING AT-GRADE CROSSINGRAY, JARED Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3168:NEW BRIDGE@BNSF-US 90(LAFAYETTE)
H.009795
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 182 032-01 NFI 571 ENHANCEMENTS 2-WAITING FOR FUNDING
SIDEWALKS & RELATED WORKNUNES, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 182: US 90-MLK DRIVE SIDEWALKS
H.011235
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE US 90 424-02 NFI 97,000 CAPACITY 2-WAITING FOR FUNDING
CONSTRUCT NEW INTERSECTION - CONCRETELANDRY, COREY Remrks:
Typ Imp:
Project:Prj Mgr:
I-49 SOUTH @ VEROT SCHOOL ROAD
H.011303
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE US 90 424-02 NFI 6,000 CAPACITY 2-WAITING FOR FUNDING
FRONTAGE RD CONSTRUCTIONBRIGNAC, CHRISTINA Remrks:
Typ Imp:
Project:Prj Mgr:
US 90:ALBERTSON TO SOUTHPARK FRONTAGE R
H.008145
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 1 829-32 STBONDS 30,280 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDINGLAFOURCHE LA 1 829-32 LOCAL 4,995 OTHER / MISCELLANEOUS
ROUTE LA 1 RELOCATIONHANKS, ANNA Remrks:
Typ Imp:829-32-0010;NEW BRIDGE.NEW ALIGNMENT; AC-ING WITH STBONDS
Project:Prj Mgr:
LA 1: LEEVILLE TO GOLDEN MEADOW PHASE 2C
LAFOURCHE
Page 3 - 8 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021WAITING FOR FUNDING
H.010152
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 1 064-90 STBONDS 2,000 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
DREDGE CANAL AND MITIGATION FOR LA 1 ELEVATED CONSTRUCTIONHANKS, ANNA Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1: CONSTRUCTION CANAL DREDGING
H.011207
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 1 829-32 NFI 70,009 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
CONSTRUCT RELOCATED LA 1 ON ELEVATED STRUCTUREHANKS, ANNA Remrks:
Typ Imp:SEE NOTES FOR FUNDING INFO
Project:Prj Mgr:
LA 1: LEEVILLE TO GOLDEN MEADOW PHASE 2A
H.011208
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 1 829-32 NFI 230,000 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
ELEVATED RELOCATED LA 1 -LEEVILLE TO GOLDEN MEADOW LEVEEHANKS, ANNA Remrks:
Typ Imp:SEE NOTES FOR FUNDING INFO
Project:Prj Mgr:
LA 1: LEEVILLE TO GOLDEN MEADOW PHASE 2B
H.011209
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 1 829-32 NFI 10,000 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
NEW TOLL FACILITY FOR LA 1 SOUTHBOUND AND APPROACHHANKS, ANNA Remrks:
Typ Imp:SEE NOTES FOR FUNDING INFO
Project:Prj Mgr:
LA 1: LEEVILLE TO GOLDEN MEADOW PHASE 2D
H.000758
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LASALLE US 84 022-05 NFI 43,940 CORRIDOR 2-WAITING FOR FUNDING
WIDENINGMASTIN, CATHERINE Remrks:
Typ Imp:022-05-0045
Project:Prj Mgr:
LA 772 - HAIR CREEK(JENA)
LASALLE
H.009644
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LASALLE LA 125 131-01 NFI 1,384 PRESERVATION - NON-INTERSTATEON STP SYSTEM
2-WAITING FOR FUNDING
ASPHALT OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 125: US 165-PENTECOSTAL CHURCH ROAD
H.001550
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN LA 146 068-01 0 CAPACITY 2-WAITING FOR FUNDING
WIDEN TO 5 LANESMCMILLAN, RYAN Remrks:
Typ Imp:068-01-0009;$200 BONDS AVAIL. FOR PE (E?)
Project:Prj Mgr:
CHATHAM RD. (RUSTON)
LINCOLN
H.004608
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN 000-31 LOCAL 6,500 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING
NEW SERVICE ROADMORVANT, RYAN Remrks:
Typ Imp:700-31-0121;STAGE 0 COMPLETED
Project:Prj Mgr:
CHOUDRANT I-20 SERVICE ROAD
H.008157
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN LA 150 831-07 NFI 4,000 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDINGLINCOLN LA 818 831-12 NFI 5,000 OTHER / MISCELLANEOUS
RECON W/GEOMETRIC IMPROVEMENTSMCMILLAN, RYAN Remrks:
Typ Imp:831-12-0008;$4.0 M SAFETY TRANSFER FUNDS MAX
Project:Prj Mgr:
JCT US 80 - JCT LA 150
Page 3 - 9 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021WAITING FOR FUNDING
H.009746
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN LA 150 831-07 NFI 695 ENHANCEMENTS 2-WAITING FOR FUNDINGLINCOLN LA 150 831-07 LOCAL 150 OTHER / MISCELLANEOUS LINCOLN 000-31 NFI 1,210 ENHANCEMENTS LINCOLN 000-31 LOCAL 220 OTHER / MISCELLANEOUS LINCOLN US 80 001-08 NFI 277 ENHANCEMENTS LINCOLN US 80 001-08 LOCAL 9 OTHER / MISCELLANEOUS
SIDEWALK W/ LIGHTING, STREETSCAPING, & RELATED WORKNUNES, BRIAN Remrks:
Typ Imp:FEDERAL SHARE IS 80%. 15% MATCH TOLL CREDITS & 5% LOCAL
Project:Prj Mgr:
RUSTON DOWNTOWN REVITALIZATION PHASE 6
H.000470
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 441 270-02 NFI 236 ENHANCEMENTS 2-WAITING FOR FUNDINGLIVINGSTON LA 441 270-02 LOCAL 16 ENHANCEMENTS
ENHANCEMENTMEEK, STEPHEN Remrks:
Typ Imp:744-32-0011
Project:Prj Mgr:
HOLDEN SIDEWALK PROGRAM
LIVINGSTON
H.011014
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 3002 832-32 NHPP 545 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
2-WAITING FOR FUNDING
ADD SOUTH BOUND U-TURN FOR LEFT TURNING VEHICLES EXITING CVHARROUCH, JOSHUA Remrks:
Typ Imp:RT CREDITS USED AS MATCH FOR PHASE 3; OE AM PROGRAM MATCH
Project:Prj Mgr:
LA 3002: U-TURN
H.001061
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 6 034-05 DEMO 0 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDINGNATCHITOCHES LA 6 034-05 NFI 20,182 DEMO / HIGH PRIORITY
MAJOR WIDENING LA 117 TO I 49MASTIN, CATHERINE Remrks:
Typ Imp:034-05-0035;USING STBONDS AS MATCH TO DEMO TO ACQUIRE R/W
Project:Prj Mgr:
EL CAMINO EAST/WEST COR (EAST SEG )
NATCHITOCHES
H.001809
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 174 112-06 NFI 2,410 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
CURVE REALIGNMENTMOORE, DARRELL Remrks:
Typ Imp:112-06-0008;PROJECT TO BE RE-SCOPED
Project:Prj Mgr:
AJAX - I-49
H.010359
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 9 089-01 NFI 1,509 PRESERVATION - NON-INTERSTATEON STP SYSTEM
2-WAITING FOR FUNDING
PATCH. COLD PLANE, AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 9: JCT US 71 - JCT LA 156
H.000263
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS US 90 006-05 NFI 47,348 PRESERVATION - BRIDGE (ONSYSTEM)
2-WAITING FOR FUNDING
ORLEANS US 90 006-90 NFI 42,343 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTMASTIN, CATHERINE Remrks:
Typ Imp:006-05-0067;STAGE 1 PROJECT
Project:Prj Mgr:
CHEF MENTEUR PASS BRIDGE & APPROACH
ORLEANS
Page 3 - 10 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021WAITING FOR FUNDING
H.007250
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS 000-36 NFI 20,000 INTERMODAL CONNECTOR 2-WAITING FOR FUNDINGORLEANS 000-36 NFI 20,000 PRESERVATION - BRIDGE (ON
SYSTEM)
ORLEANS 000-36 OTHER 22,000 OTHER / MISCELLANEOUS
BRIDGE REPLACEMENTYANG, LI Remrks:
Typ Imp:742-36-0104;OTHER FUNDS - PORT
Project:Prj Mgr:
ALMONASTER AVENUE BRIDGE REPLACEMENT
H.008220
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS LA 406 836-14 NFI 1,500 URBAN SYSTEMS 2-WAITING FOR FUNDINGPLAQUEMINES LA 406 838-03 0 URBAN SYSTEMS PLAQUEMINES LA 406 838-06 0 URBAN SYSTEMS
WIDENINGLEBAS, MELISSA Remrks:
Typ Imp:836-14-0002;JT W 838-06-0002
Project:Prj Mgr:
LA406/WOODLAND HWY (LA23 - LA407)
H.009499
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS 000-36 0 URBAN SYSTEMS 2-WAITING FOR FUNDING
PLANNING STUDYBROUSSARD, DAN Remrks:
Typ Imp:
Project:Prj Mgr:
LEAKE AVENUE IMPROVEMENTS
H.009752
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 NFI 513 ENHANCEMENTS 2-WAITING FOR FUNDING
SIDEWALK W/ LIGHTING, LANDSCAPE & RELATED WORKMEEK, STEPHEN Remrks:
Typ Imp:
Project:Prj Mgr:
DESIARD ST: STREETSCAPING S GRAND-6TH ST
OUACHITA
H.001399
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
PLAQUEMINES LA 23 062-04 NFI 30,000 CORRIDOR 2-WAITING FOR FUNDING
WIDEN TO 4 LANESUMEOZULU, JOE Remrks:
Typ Imp:062-04-0029;$1M GS9$ FOR STUDY
Project:Prj Mgr:
HAPPY JACK - N.PORT SULPHUR
PLAQUEMINES
H.000790
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES US 167 023-01 NFI 3,000 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE
2-WAITING FOR FUNDING
BRIDGE MAINTENANCERACHAL, JASON Remrks:
Typ Imp:023-01-0069;BRPM
Project:Prj Mgr:
US 167 BRIDGE MAINTENANCE
RAPIDES
H.004825
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES LA 28 074-02 NFI 29,185 CAPACITY 2-WAITING FOR FUNDING
WIDEN FROM 3 TO 4 LANESMORVANT, RYAN Remrks:
Typ Imp:700-40-0145;FEASIBILITY/STAGE 0 WIDEN TO 4 LANE
Project:Prj Mgr:
WIDENING LA 28 EAST (LIBUSE TO HOLLOWAY)
H.008277
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES US 71 840-43 NFI 32,500 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
RED RIVER BRIDGEUMEOZULU, JOE Remrks:
Typ Imp:840-43-0014;PHASE 3 OF FORT BUHLOW RED RIVER BR
Project:Prj Mgr:
FT. BUHLOW BR (US 71/US 165)
Page 3 - 11 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021WAITING FOR FUNDING
H.009543
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES LA 113 140-02 NFI 3,449 PRESERVATION - NON-INTERSTATEON STP SYSTEM
2-WAITING FOR FUNDING
BASE AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 113: VERNON LINE - LA 112
H.011598
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES LA 8 134-04 NFI 4,626 PRESERVATION - NON-INTERSTATEON STP SYSTEM
2-WAITING FOR FUNDING
PATCHING, COLD PLANING, STABILIZING, AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 8: LA 119 TO LA 1
H.009402
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RED RIVER US 371 021-30 NFI 535 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
2-WAITING FOR FUNDING
SUBSURFACE DRAINAGE AND OUTFALL CHANNEL IMPROVEMENTSGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
RDWY DRAINAGE IMP.-US 71 @ US 371 PH III
RED RIVER
H.012531
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST CHARLES I-310 450-36 NFI 1,773 PRESERVATION - BRIDGE (ONSYSTEM)
2-WAITING FOR FUNDING
ST CHARLES I-310 450-36 NFI 1,773 PRESERVATION - BRIDGE (ONSYSTEM)
ST CHARLES I-310 450-37 NFI 55,697 PRESERVATION - BRIDGE (ONSYSTEM)
ST CHARLES I-310 450-38 NFI 995 PRESERVATION - BRIDGE (ONSYSTEM)
ST CHARLES I-310 450-38 NFI 995 PRESERVATION - BRIDGE (ONSYSTEM)
ST CHARLES I-310 450-38 NFI 995 PRESERVATION - BRIDGE (ONSYSTEM)
CLEANING, PAINTING, AND STRUCTURAL REHABILITATIONGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
I-310: LULING BRIDGE REHBILITATION
ST CHARLES
H.002424
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JAMES LA 70 426-02 NFI 6,226 CAPACITY 2-WAITING FOR FUNDINGASCENSION LA 70 426-03 NFI 12,733 CAPACITY ST JAMES LA 3125 426-31 NFI 628 CAPACITY ASCENSION 000-03 NFI 63 CAPACITY
WIDEN TO 4 LANESFUSILIER, JACOB Remrks:
Typ Imp:426-02-0042;(C&G)426-02-52.426-03-05.NO FUNDING
Project:Prj Mgr:
LA 70: SUNSHINE BRIDGE - LA 22
ST JAMES
H.009483
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JAMES LA 3125 426-31 LOCAL 775 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDINGST JAMES LA 44 256-05 LOCAL 620 OTHER / MISCELLANEOUS
ADDING TURN LANES ON LA 3125 AND REALIGNING LA 44WAGUESPACK, BRENT Remrks:
Typ Imp:
Project:Prj Mgr:
LA HIGHWAY 44 RE-ROUTE
Page 3 - 12 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021WAITING FOR FUNDING
H.009724
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JAMES 000-47 NFI 1,259 ENHANCEMENTS 2-WAITING FOR FUNDING
MULTI-USE PATH AND RELATED WORKMEEK, STEPHEN Remrks:
Typ Imp:MATCH 15% TOLL CREDITS AND 5% LOCAL
Project:Prj Mgr:
ST JAMES MISS EBANK MULTI-USE TRAIL PH 1
H.011358
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY US 190 012-12 NFI 6,384 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDINGST LANDRY US 190 012-13 NFI 3,888 OTHER / MISCELLANEOUS
STAGE 0/FEASIBILITY STUDYHANKS, ANNA Remrks:
Typ Imp:
Project:Prj Mgr:
US 190 (VINE STREET) RECONSTRUCTION
ST LANDRY
H.004924
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARTIN 000-50 NFI 0 URBAN SYSTEMS 2-WAITING FOR FUNDING
FEDERAL EARMARK FOR STUDYYANG, LI Remrks:
Typ Imp:700-50-0112;STAGE 0 COMPLETED
Project:Prj Mgr:
DEV.& CONST ST. MARTINVILLE BYPASS
ST MARTIN
H.011298
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARTIN US 90 424-03 NFI 3,500 CAPACITY 2-WAITING FOR FUNDINGLAFAYETTE US 90 424-02 NFI 2,500 CAPACITY IBERIA US 90 424-04 NFI 1,500 CAPACITY
NEW CONSTRUCTION OF FRONTAGE RDSBRIGNAC, CHRISTINA Remrks:
Typ Imp:
Project:Prj Mgr:
US 90: CAPT CADE TO AMB CAFF FRONTAGE RD
H.009748
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARY 000-51 NFI 87 ENHANCEMENTS 2-WAITING FOR FUNDINGST MARY 000-51 LOCAL 58 ENHANCEMENTS
SIDEWALKS AND RELATED WORKNUNES, BRIAN Remrks:
Typ Imp:USE LOCAL AS MATCH
Project:Prj Mgr:
BERWICK DOWNTOWN SIDEWALKS
ST MARY
H.000284
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY US 90 006-07 NFI 40,733 PRESERVATION - BRIDGE (ONSYSTEM)
2-WAITING FOR FUNDING
NEW BRIDGESMASTIN, CATHERINE Remrks:
Typ Imp:006-07-0048; PRIORITY BRIDGE PROJECT
Project:Prj Mgr:
US 90: PEARL RIVER BRIDGES (HBI)
ST TAMMANY
H.000494
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY US 190 013-12 0 CORRIDOR 2-WAITING FOR FUNDING
WIDEN TO 4 LANESMCMILLAN, RYAN Remrks:
Typ Imp:013-12-0031;404 REQ.(E?). PUB.MT.TO BE HELD
Project:Prj Mgr:
LA 433 - US 11
H.000497
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY US 190 013-12 NFI 12,000 CORRIDOR 2-WAITING FOR FUNDING
WIDEN TO 4 LANESMCMILLAN, RYAN Remrks:
Typ Imp:013-12-0039;PROJ ON XXX PER LIST FROM F.BORNE
Project:Prj Mgr:
US190: BAYOU CASTINE-SE LA HOSPITAL
Page 3 - 13 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021WAITING FOR FUNDING
H.000688
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY US 11 018-04 NFI 63,700 PRESERVATION - BRIDGE (ONSYSTEM)
2-WAITING FOR FUNDING
BRIDGE REPLACEMENTMOSS, SARAH Remrks:
Typ Imp:018-04-0049; PRIORITY BRIDGE PROJECT
Project:Prj Mgr:
US 11 NORFOLK SOUTHERN RR OVERPASS (HBI)
H.002391
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 22 261-06 0 CAPACITY 2-WAITING FOR FUNDINGST TAMMANY LA 22 261-06 0 OTHER / MISCELLANEOUS
WIDEN TO 4 LANESMORVANT, RYAN Remrks:
Typ Imp:261-06-0030;CITY/STATE AGREEMENT REQUIRED
Project:Prj Mgr:
TCHEFUNCTE - CAUSEWAY APPROACH
H.004983
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY US 11 018-03 DEMO 0 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDINGST TAMMANY US 11 018-03 NFI 19,346 DEMO / HIGH PRIORITY
WIDENING WITH BIKE PATHOLIVIER, NICHOLAS Remrks:
Typ Imp:700-52-0196
Project:Prj Mgr:
US HIGHWAY 11 WIDENING
H.009793
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY 000-52 NFI 954 ENHANCEMENTS 2-WAITING FOR FUNDING
SIDEWALKS W/LIGHTING, LANDSCAPING, & RELATED WORKMEEK, STEPHEN Remrks:
Typ Imp:
Project:Prj Mgr:
SLIDELL: OLDE TOWN STREETSCAPING
H.009934
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY 000-52 NFI 218 ENHANCEMENTS 2-WAITING FOR FUNDINGST TAMMANY LA 435 281-04 NFI 82 ENHANCEMENTS
SIDEWALK LIGHTING & RELATED WORKMEEK, STEPHEN Remrks:
Typ Imp:
Project:Prj Mgr:
ABITA SPRINGS TOWN CTR SIDEWALK LIGHTING
H.010274
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY US 190 013-12 0 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING
STAGE 0 FEASIBILITY STUDY FOR INTERIM CAPACITY IMPROVEMENTSNGUYEN, WAYNE Remrks:
Typ Imp:DUE TO HURRICANE ISAAC MPO CAN'T FORMALLY APPROVE PROJECT
Project:Prj Mgr:
US 190: US 11 TO LA 433
H.010441
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 1077 852-13 NFI 2,000 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
2-WAITING FOR FUNDING
DRAINAGEGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
GRADE RAISING ON LA 1077
H.011137
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY I-12 454-04 NFI 40,000 CAPACITY 2-WAITING FOR FUNDING
ROADWAY WIDENING AND OVERLAY, BRIDGE WIDENING/REPLACEMENTFUSILIER, JACOB Remrks:
Typ Imp:
Project:Prj Mgr:
I-12: LA 1077 to LA 21
H.012382
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY US 190 059-30 NFI 16,000 CAPACITY 2-WAITING FOR FUNDING
WIDEN TO 4 LANES, 5 ROUNDABOUTSLANDRY, COREY Remrks:
Typ Imp:059-30-0008
Project:Prj Mgr:
US 190: LA 25 - BOGUE FALAYA (PH 2B)
Page 3 - 14 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021WAITING FOR FUNDING
H.012386
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY US 190 059-30 NFI 18,000 CAPACITY 2-WAITING FOR FUNDINGST TAMMANY US 190 059-30 NFI 15,000 CAPACITY
WIDEN BRIDGE, 4 ROUNDABOUTSLANDRY, COREY Remrks:
Typ Imp:059-30-0008
Project:Prj Mgr:
US 190: LA 437 - US 190 BUS (PH 3)
H.012398
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 25 059-02 NFI 2,500 CAPACITY 2-WAITING FOR FUNDINGST TAMMANY US 190 059-30 NFI 2,500 CAPACITY ST TAMMANY US 190 030-31 NFI 2,500 CAPACITY ST TAMMANY 000-52 NFI 1,200 CAPACITY
TWO LANE ROUNDABOUTLANDRY, COREY Remrks:
Typ Imp:059-30-0008
Project:Prj Mgr:
US 190 @ LA 25 ROUNDABOUT (PH 2A)
H.005043
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 311 413-01 NFI 38,000 CAPACITY 2-WAITING FOR FUNDING
WIDEN TO 4 LANESMORVANT, RYAN Remrks:
Typ Imp:700-55-0122
Project:Prj Mgr:
LA311: LA 664 (ST CHARLES ST)-SAVANNE RD
TERREBONNE
H.010328
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 659 855-04 NFI 200 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
2-WAITING FOR FUNDING
CB-06 TOP MODIFICATIONS, CROSS DRAIN REMOVAL AND REPLACEMENGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 659: HOWARD BRIDGE-DAIGLEVILLE BRIDGE
H.000986
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERNON LA 8 029-01 NFI 12,700 PRESERVATION - BRIDGE (ONSYSTEM)
2-WAITING FOR FUNDING
BRIDGE REPLACEMENTMORVANT, RYAN Remrks:
Typ Imp:029-01-0004;ADMIN. BY TEXAS
Project:Prj Mgr:
SABINE RIVER BR (BURR FERRY)
VERNON
H.010354
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERNON LA 111 133-03 NFI 1,898 PRESERVATION - NON-INTERSTATEON STP SYSTEM
2-WAITING FOR FUNDING
PATCH, COLD PLANE, AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 111: US 171 - LA 117
H.009288
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W BATON ROUGE LA 1 050-07 NFI 20,000 RAILROADS - GRADE SEPARATION 2-WAITING FOR FUNDING
GRADE SEPARATE EXISTING AT-GRADE CROSSINGRAY, JARED Remrks:
Typ Imp:H.011133 MUST LET BEFORE H.009288
Project:Prj Mgr:
LA 1:NEW RR BRIDGE@DOW SPUR XING (WBR)
W BATON ROUGE
H.010037
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 07 000-97 NFI 16,640 OPER EFFICIENCY/MOTORISTASSISTANCE - FERRY PROJECTS
2-WAITING FOR FUNDING
CONSTRUCT NEW FERRY BOATSIBLEY, STEVEN Remrks:
Typ Imp:
Project:Prj Mgr:
NEW FERRY BOAT / CAMERON FERRY CROSSING
DISTRICT 07
Page 3 - 15 Version: 1.18.1 Report Date: 1/6/20 4:44 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2020 - 2021WAITING FOR FUNDING
H.013284
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 61 000-96 NFI 0 CAPACITY 2-WAITING FOR FUNDING
NEW BRIDGE AND APPROACHES TO FEASIBILITY STUDYVAUGHT, PAUL Remrks:
Typ Imp:
Project:Prj Mgr:
MRB SOUTH GBR: LA 1 TO LA 30 CONNECTOR
DISTRICT 61
H.009200
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 62 000-90 NFI 500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
2-WAITING FOR FUNDING
PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERSHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-12: PAVEMENT MARKING REPLACEMENT II
DISTRICT 62
Page 3 - 16 Version: 1.18.1 Report Date: 1/6/20 4:44 AM