HIGHWAY PROGRAM
FY 2019-2020
SORTED BY PARISH
FOR LEGISLATIVE REVIEW
AND APPROVAL This public document is published at a total cost of $3.12. 205 copies of this public document were published in this second printing at a cost of
$639.60. The total cost of all printings of this document including reprints is $795.60. This document was published by the Louisiana
Department of Transportation reproduction unit, 1201 Capitol Access Road, Baton Rouge, LA 70802. This material was printed in accordance with standards for printing by state agencies established in R.S. 43.31.
INTRODUCTION
1. R.S. 48:229.1, 230 states that “the Department shall provide the Legislature and public with this program which shall list projects to be constructed in the ensuing fiscal year”… that considers the “anticipated revenues to be appropriated by the legislature.” The Department shall also provide the Legislature a list of projects “which are in various stages of planning and preparation.”
2. In compliance with this statute, the attached Highway Program identifies the
projects that are scheduled for construction letting in FY 2019-20. These are denoted as being in Stage 4. Projects being developed in the other stages are also included in the document.
3. There are many projects remaining to be let prior to the end of the current
fiscal year, FY 2018-19. For informational purposes, these projects are also listed in this document. In the event any of these projects cannot be let as planned, they will become part of the FY 2019-20 construction program, and will be let as soon as practicable in that fiscal year.
4. The one year construction program and the list of other projects in various
stages are combined into this document which is called the Highway Priority Program or Highway Program. These projects are also submitted to the Federal Highway Administration along with the Transit Program. The two programs together are referred to as the State Transportation Improvement Program (STIP). The Public Hearings held each year in each Highway District fulfill both the State and Federal requirements for public involvement regarding these programs.
5. DOTD has based this preliminary Highway Program on anticipated revenues.
If funding above the expected amount is made available, funding may be used on projects listed in Stages 0, 1, 2, or 3.
6. In the event all of the projects listed for letting in FY 2019-20 cannot be let to
construction due to funding issues or unforeseen problems encountered in the pre-construction process, the affected project(s) will be let as soon as practicable in the following year and other projects listed in Stages 0, 1, 2, or 3 may be advanced into FY 2019-20.
7. Construction estimates are for informational purposes only and are subject to
change.
DOTD’s Project Delivery Process
Elected Officials
MPO
Long Range Plan
Districts
Public
STAGE 0: Feasibility
One Year
STAGE 1: Planning / Environmental
One to Two Years
STAGE 2: Funding
Project Prioritization
Indefinite Period STAGE 3: Final Design Process
One to Three Years
STAGE 4: Letting
One Year
STAGE 5: Construction
One to Three Years
Feasibility Analysis of
the Proposed Project Reject
Detailed Planning and
Environmental Analysis
Funding Allocation for
Design & Construction
Development of Final
Plans & Specifications
Bid Letting Process
Construction of Project
STAGE 6: Operation
Indefinite Period
On-going Monitoring
of Operation &
Maintenance
NON-INTERSTATE (PAVEMENT)(STP) 46.7
NON-INTERSTATE (PAVEMENT) (NHS) 63.2
NON-INTERSTATE (PAVEMENT) (non-federal aid) 42.7
ROAD PREVENTIVE MAINTENANCE 7.5
INTERSTATE (PAVEMENT) 76.0
BRIDGE (ON SYSTEM) 130.8
BRIDGE (OFF SYSTEM) 13.0
SUB-TOTAL 379.9
ITS (regular & earmarks) 11.0
TRAFFIC CONTROL DEVICES 14.8
ROADWAY FLOODING 3.7
WEIGH STATIONS 0.0
TRANSPORTATION SYSTEMS MANAGEMENT 7.4
INTERSTATE LIGHTING 1.9
REST AREAS 0.0
ACCESS MANAGEMENT 8.1
FERRIES/MAJOR REPAIRS 3.2
MOVABLE BRIDGE PREVENTIVE MAINTENANCE 1.9
ADA PROGRAM 0.0
SUB-TOTAL 52.0
HWY. PROGRAM 36.5
RR CROSSING UPGRADES & SEPARATIONS 24.0
SUB-TOTAL 60.5
REGULAR PROGRAM 0.0
CORRIDOR UPGRADE 0.0
SUB-TOTAL 0.0
TRANSPORTATION ALTERNATIVES PROJECTS 4.4
URBAN SYSTEMS, CONGESTION MITIGATION & AIR QUALITY, LOCAL ROAD
SAFETY PROGRAM, SAFE ROUTES TO SCHOOLS, URBAN TRANSIT,
DEMAND MANAGEMENT 77.1
FED EARMARKS (DEMO,...) 6.3
OTHER (BONDS, TOLLS, LOCAL ) 15.5
INTERMODAL CONNECTOR 15.1
ROAD TRANSFER 20.5
PPP/GARVEE CONSTRUCTION 280.0
GARVEE PROGRAM 28.7
SUB-TOTAL 447.6
GRAND TOTAL 940.0
Subject to funding availability.
MISC.
PRESERVATION
OPERATIONS
SAFETY
CAPACITY
TENTATIVE FY 19-20 BUDGET PARTITION
(COSTS IN MILLION DOLLARS)
CONSTRUCTION
PROPOSEDCATEGORY SUB-CATEGORY
FUNDING TYPES FEDERAL
NHPP (NATIONAL HIGHWAY PERFORMANCE PROGRAM)
STP (SURFACE TRANSPORTATION PROGRAM) STP>200K (URBAN AREAS – NEW ORLEANS, BATON ROUGE, SHREVEPORT,
LAFAYETTE) STP<200K (URBAN AREAS – ALEXANDRIA, HOUMA-THIBODAUX, LAKE CHARLES,
MONROE, SLIDELL, MANDEVILLE-COVINGTON, HAMMOND-PONTCHATOULA) STPFLEX (FLEXIBLE) STP<5K (RURAL AREAS) FBROFF (OFF SYSTEM BRIDGE MAP 21)
TAP (TRANSPORTATION ALTERNATIVES PROGRAM) TAP>200K (URBAN AREAS – NEW ORLEANS, BATON ROUGE, SHREVEPORT,
LAFAYETTE) TAP<200K (URBAN AREAS – ALEXANDRIA, HOUMA-THIBODAUX, LAKE CHARLES,
MONROE, SLIDELL, MANDEVILLE-COVINGTON, HAMMOND-PONTCHATOULA) TAPFLEX (FLEXIBLE) TAP<5K (RURAL AREAS)
HSIP, HSIPPEN, SR2S, HRRR, SATRANS (SAFETY FUNDS, SAFE ROUTES TO SCHOOLS, HIGH RISK RURAL ROADS, SAFETY TRANSFER)
RAIL HE, RAIL PD (ELIMINATIONS OF HAZARDS AT RAILWAY-HIGHWAY CROSSINGS)
CM (CONGESTION MITIGATION AIR QUALITY – EAST BATON ROUGE, WEST BATON ROUGE, LIVINGSTON, ASCENSION, AND IBERVILLE)
DEMO (FEDERAL DEMONSTRATION AND HIGH PRIORITY PROJECTS – DEFINED BY U.S. CONGRESS)
ER (FEDERAL EMERGENCY RELIEF PROGRAM FUNDING)
FEMA (FEDERAL EMERGENCY MANAGEMENT AGENCY FUNDS)
STATE / LOCAL
NFA (STATE TRANSPORTATION FUNDS FOR NON-FEDERAL AID ROUTES)
NFABOND (STATE BONDS FOR NON-FEDERAL AID ROUTES)
STCASH (STATE TRANSPORTATON TRUST FUNDS FOR STATE FUNDED CONSTRUCTION)
TIME (TRANSPORTATION INFRASTRUCTURE MODEL FOR ECONOMIC DEVELOPMENT)
STBONDS (STATE GENERAL OBLIGATION BONDS)
STGEN (STATE GENERAL FUNDS CASH)
TOLLS
LOCAL (FUNDS PROVIDED BY LOCAL GOVERNMENT)
OTHER (OTHER SOURCE NOT LISTED)
NFI (NO FUNDING IDENTIFIED)
Statewide prioritization process for the Highway Priority Program beginning FY2017-2018 According to Louisiana Revised Statute 48:229.1.A the construction projects included in the Highway Priority Program should accomplish the following: Goal 1: Preserve/Sustain the System (1) Brings the state highway system into a good state of repair and optimizes the usage and efficiency of existing transportation facilities. Prospective Outcome 3.1.1, 3.1.2, 3.1.3, 3.1.4, 3.1.5, 3.1.6, 3.2.1
Goal 2: Operate the System (3) Supports resiliency in the transportation system, including safe evacuation of populations when necessitated by catastrophic events such as hurricanes and floods. Prospective Outcome 3.2.1
(7) Encourages innovation and the use of technology. Prospective Outcome 3.2.1
Goal 3: Improve the Safety of the System (2) Improves safety for motorized and non-motorized highway users and communities. Prospective Outcome 3.2.1, 3.2.2, 3.2.3
Goal 4: Expand the System (4) Increases accessibility for people, goods, and services. Prospective Outcome 3.2.1, 3.2.5, 3.2.6 (5) Fosters diverse economic development and job growth, international and domestic commerce, and tourism. Prospective Outcome 3.2.1, 3.2.5, 3.2.6 Goal 5: Improve Quality of Life (6) Fosters multimodalism, promotes a variety of transportation and travel options, and encourages intermodal connectivity. Prospective Outcome 3.2.1 (8) Protects the environment, reduces emissions, and improves public health and quality of life. Prospective Outcome 3.2.1
Per R.S. 48:229.1.C, the following factors must be considered when selecting projects for inclusion in the Highway Priority Program: (1) The condition of the roads, streets, and structures making up the state highway system and the relative urgency of the improvements considering in their order of general needs. (2) The type and volume of traffic on a particular segment of roadway, highway, or bridge. (3) The crash records for a particular segment of roadway, highway, or bridge. (4) The technical difficulties in the preparation of plans and the procurement of rights-of-way for a particular segment of roadway, highway, or bridge. (5) Whether unforeseeable emergencies such as floods have created an immediate need for improvement or reconstruction. (6) Whether capacity improvements are warranted due to population or traffic volume increases in specific geographic areas. (7) Whether or not the highway or bridge is or will be on an evacuation route utilized to evacuate large populations due to catastrophic events such as hurricanes or flooding. (8) Whether the improvement to or addition of a highway or bridge will benefit the economic development potential of the state.
In accordance with R.S. 48:229.1.D, projects must be screened to determine whether they are consistent with the most recent Statewide Transportation Plan and warrant inclusion in the Program. Per R.S. 48:229.1.E, the Department shall identify and report prospective outcomes of each program. The Department shall evaluate the actual outcomes of each program and establish revised prospective outcomes of each program on a biennial basis. 3.1.1. Prospective Outcome: To effectively sustain and improve the Interstate Highway System so that 97% of the system pavement stays in fair or better condition each fiscal year. Percent fair or better as of June 30, 2016 = 98.5% Expected percent fair or better on June 30, 2018 = 97% or more Outcome Achieved: 97.33% Expected percent fair or better on June 30, 2020 = 97% or more Outcome Achieved:
3.1.2. Prospective Outcome: To effectively maintain and improve the National Highway System so that 95% of the system pavement stays in fair or better condition each fiscal year. Percent fair or better as of June 30, 2016 = 91.7% Expected percent fair or better on June 30, 2018 = 95% or more Outcome Achieved: 90.31% Expected percent fair or better on June 30, 2020 = 95% or more Outcome Achieved: 3.1.3. Prospective Outcome: To effectively maintain and improve the Highways of Statewide Significance so that 80% in SFY 2015-2016 of the system pavement stays in fair or better condition each fiscal year. In SFY 2017-2018 the goal was increased to 90%. Percent fair or better as of June 30, 2016 = 95.81% Expected percent fair or better on June 30, 2018 = 90% or more Outcome Achieved: 94.61% Expected percent fair or better on June 30, 2020 = 90% or more Outcome Achieved:
3.1.4. Prospective Outcome: To effectively maintain and improve the Regional Highway System so that 80% in SFY 2015-2016 of the system pavement stays in fair or better condition each fiscal year. In SFY 2017-2018 the goal was decreased to 70%. Percent fair or better as of June 30, 2016 = 89.41% Expected percent fair or better on June 30, 2018 = 70% or more Outcome Achieved: 87.4% Expected percent fair or better on June 30, 2020 = 70% or more Outcome Achieved:
3.1.5. Prospective Outcome: To sustain the condition and safety of Louisiana’s On-System (State-owned) bridges so that deck area of structurally deficient bridges constitutes not more than 10% of the deck area of all bridges. Percent deck area structurally deficient as of June 30, 2016 = 9.5% Expected percent fair or better on June 30, 2018 = 10% or less Outcome Achieved: 8.9% Expected percent fair or better on June 30, 2020 = 10% or less Outcome Achieved:
3.1.6. Prospective Outcome: To sustain the condition and safety of Louisiana’s Off-System (Locally-owned) bridges so that deck area of structurally deficient bridges constitutes not more than 10% of the deck area of all bridges. Percent deck area structurally deficient as of June 30, 2016 = 8.7% Expected percent fair or better on June 30, 2018 = 10% or less Outcome Achieved: 9.0% Expected percent fair or better on June 30, 2020 = 10% or less Outcome Achieved:
3.2.1. Prospective Outcome: Implement an average of three percent of the Louisiana Statewide Transportation Plan each fiscal year. Cumulative percent of Plan implemented as of June 30, 2016 = 3.3% Expected cumulative percent of Plan implemented on June 30, 2018 = 9% Outcome Achieved: 9.9% Expected cumulative percent of Plan implemented on June 30, 2020 = 15% Outcome Achieved: 3.2.2. Prospective Outcome: To reduce the total number of fatalities on Louisiana public roads by six percent each calendar year through 2030. Expected number of fatalities in 2015 = 845 Actual number of fatalities in 2015 = 752 Expected number of fatalities in 2017 = 796 Actual number of fatalities in 2017 = 773 Percent reduction = increased 2.79% Outcome Achieved: Total number of fatalities increased which is similar trend nationally. Most states are seeing increases. Expected number of fatalities in 2019 = 748 Actual number of fatalities in 2019 = Percent reduction = Outcome Achieved: 3.2.3. Prospective Outcome: To achieve at least a 25 % reduction in fatal and non-fatal crashes at selected crash locations through the implementation of safety improvements each year. Average percent reduction in crash rates at all safety improvement project locations on June 30, 2016 = 23.8% Expected percent reduction in fatal and non-fatal crash rates from safety improvements on June 30, 2018 = 25% or greater Outcome Achieved: 10.8% Expected percent reduction in fatal and non-fatal crash rates from safety improvements on June 30, 2020= 25% or greater Outcome Achieved: 3.2.5. Prospective Outcome: Maintain 90% or greater of the Interstate Highway System in uncongested conditions each fiscal year. Percent uncongested as of June 30, 2016 = 88% Expected percent uncongested on June 30, 2018 = 90% or more Outcome Achieved: 80% Expected percent uncongested on June 30, 2020 = 90% or more Outcome Achieved: 3.2.6. Prospective Outcome: Maintain 90% or greater of the National Highway System (NHS) in uncongested conditions each fiscal year. Percent uncongested as of June 30, 2016 = 97% Expected percent uncongested on June 30, 2018 = 90% or more Outcome Achieved: 98% Expected percent uncongested on June 30, 2020 = 90% or more Outcome Achieved:
4 – SCHEDULED FOR LETTING
Per RS 48:229.1, the following is the list of “…projects to be
constructed in the ensuing fiscal year…”
Per RS 48:231.A(6), “When this final construction program
is communicated to the legislature for funding for the
coming fiscal year, any project which the legislature
determines is not in the proper order of priority in
accordance with the factors stated in R.S. 48:229 may be
deleted by the legislature. However, the legislature shall not
add any projects to this final construction program, nor
shall the legislature make substitutions for projects which
have been removed.”
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.012968
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA LA 370 801-28 NFA 2,213 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED IN CURRENT FY 18-19
BASE STABILIZATION, ASPHALT OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 370: LA 91 - LA 3070
ACADIA
H.013800
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA LA 98 389-01 STCASH 281 ROAD TRANSFER 4-SCHEDULED IN CURRENT FY 18-19
PROVIDE $281,000 IN FUNDS TO THE CITY OF RAYNE.PORTER BETTS, CONNIE Remrks:
Typ Imp:
Project:Prj Mgr:
LA 98: CITY OF RAYNE (RT)
H.009628
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA LA 92 385-04 STPFLEX 1,520 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED FOR LETTING FY 19-20
VERMILION LA 92 385-05 STPFLEX 150 PRESERVATION - NON-INTERSTATEON STP SYSTEM
ASPHALT CONCRETE OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA92:LA 13 - 0.108 MI E OF VERMILION P/L
H.011323
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA 000-01 HSIP 769 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20
CONSTRUCT A NEW RR XING BETWEEN TWO XINGS THAT WILL CLOSELUKE, SHAWN Remrks:
Typ Imp:LOCAL FUNDS AND MATCH FROM RAILROAD
Project:Prj Mgr:
NIGHTHAWK/SPAN TRL:BNSF RR XINGS(ACADIA)
H.012917
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA LA 754 394-01 NFA 1,465 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED FOR LETTING FY 19-20
BASE STABILIZATION, ASPHALT OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 754: LA 95 - ST LANDRY P/L
H.002077
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ALLEN LA 383 197-04 NFA 1,768 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED IN CURRENT FY 18-19
PATCH AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:AC WITH NFA
Project:Prj Mgr:
LA 383:JEFFERSON DAVIS P/L-LAKEVIEW LOOP
ALLEN
H.013858
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ALLEN 000-02 RAIL PD 200 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20
INSTALL SIGNALSSHREWSBERRY,BILL Remrks:
Typ Imp:MATCH FROM RAILROAD
Project:Prj Mgr:
WARD RD: UP RR XING (ALLEN)
H.013859
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ALLEN 000-02 RAIL PD 200 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20
INSTALL SIGNALSSHREWSBERRY,BILL Remrks:
Typ Imp:MATCH BY RAILROAD
Project:Prj Mgr:
GUILLORY AVE: UP RR XING (OBERLIN)
Page 1 - 1 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.000337
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION US 61 007-07 NHPP 1,700 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED IN CURRENT FY 18-19
E BATON ROUGE US 61 007-08 NHPP 10,300 PRESERVATION - BRIDGE (ONSYSTEM)
NEW BRIDGESTOURRES, VALERIE Remrks:
Typ Imp:007-07-0058;JT W/007-08-0040
Project:Prj Mgr:
US 61:BAYOU MANCHAC & FRANCOIS BRS.
ASCENSION
H.013843
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION LA 930 803-14 STCASH 1,740 ROAD TRANSFER 4-SCHEDULED IN CURRENT FY 18-19ASCENSION LA 934 803-20 STCASH 1,043 ROAD TRANSFER ASCENSION LA 934 803-20 STCASH 1,043 ROAD TRANSFER ASCENSION LA 934 803-20 STCASH 1,043 ROAD TRANSFER
PROVIDE $4,869,503 IN FUNDS TO ASCENSION PARISH OVER 4 FYSPORTER BETTS, CONNIE Remrks:
Typ Imp:
Project:Prj Mgr:
LA 930 - LA 934: ASCENSION PARISH (RT)
H.012934
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION LA 936 803-22 NFA 2,166 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED FOR LETTING FY 19-20
MILL, STABILIZE, OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 936: W JCT LA 22 - E JCT LA 22
H.010443
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASSUMPTION LA 308 407-07 SATRANS 1,369 SAFETY 4-SCHEDULED IN CURRENT FY 18-19ASSUMPTION LA 308 407-08 SATRANS 865 SAFETY
REALIGN CURVE AND ADD SHOULDERSGARY, VERTIE Remrks:
Typ Imp:
Project:Prj Mgr:
LA 308: CURVE REALIGN AND SHOULDERS
ASSUMPTION
H.013871
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASSUMPTION LA 1 064-09 STCASH 151 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 18-19ASSUMPTION LA 401 233-01 STCASH 99 OTHER / MISCELLANEOUS
INSTALL DRAINAGE STRUCTURES AND REPAIR EMBANKMENTNEYLAND, CODI Remrks:
Typ Imp:MISCELLANEOUS REPAIR/NO QUALIFYING PROGRAM FUND
Project:Prj Mgr:
LA 1 @ LA 401 EMER. DRAINAGE REPAIR
H.011767
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASSUMPTION 000-04 FBROFF 675 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 19-20
BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:
Typ Imp:USE TTF AS MATCH
Project:Prj Mgr:
BAYOU CRAB ROAD BRIDGE
H.012927
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASSUMPTION LA 998 804-07 NFA 339 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED FOR LETTING FY 19-20
MINOR OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 998: LA 1 - END CONTROL
Page 1 - 2 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.012143
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
AVOYELLES LA 451 374-02 NFA 1,203 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED IN CURRENT FY 18-19
AVOYELLES LA 451 374-02 HRRR 3,225 SAFETY
WIDENING, PATCH, MILL AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:NFA AS MATCH
Project:Prj Mgr:
LA 451: LA 114 TO P LABORDE ROAD
AVOYELLES
H.006016
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
AVOYELLES 000-05 FBROFF 550 PRESERVATION - BRIDGE (OFFSYSTEM)
4-SCHEDULED FOR LETTING FY 19-20
AVOYELLES 000-05 FBROFF 450 PRESERVATION - BRIDGE (OFFSYSTEM)
BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
LIL RIVER & E. BRYANT ROAD BRIDGES
H.011522
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
AVOYELLES 000-05 FBROFF 669 PRESERVATION - BRIDGE (OFFSYSTEM)
4-SCHEDULED FOR LETTING FY 19-20
AVOYELLES 000-05 FBROFF 737 PRESERVATION - BRIDGE (OFFSYSTEM)
BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
FAITH BAPTIST MISSION & BILL BELT ROADS
H.011523
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
AVOYELLES 000-05 FBROFF 582 PRESERVATION - BRIDGE (OFFSYSTEM)
4-SCHEDULED FOR LETTING FY 19-20
AVOYELLES 000-05 FBROFF 273 PRESERVATION - BRIDGE (OFFSYSTEM)
BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
CARL HUNT & GERMAN BAYOU ROAD BRIDGES
H.011524
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
AVOYELLES 000-05 FBROFF 363 PRESERVATION - BRIDGE (OFFSYSTEM)
4-SCHEDULED FOR LETTING FY 19-20
AVOYELLES 000-05 FBROFF 263 PRESERVATION - BRIDGE (OFFSYSTEM)
BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
KATIE LANE & LEO MORROW ROAD BRIDGES
H.013251
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
AVOYELLES LA 114 145-01 STPFLEX 408 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
4-SCHEDULED FOR LETTING FY 19-20
REPLACE EXISTING CROSS DRAINGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 114: X-DRAIN REPLACE WEST OF HESSMER
H.013847
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
AVOYELLES US 71 008-07 RAIL PD 200 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20
INSTALL SIGNALSSHREWSBERRY,BILL Remrks:
Typ Imp:USE TTF FOR MATCH
Project:Prj Mgr:
US 71: AKDN RR XING (BUNKIE)
Page 1 - 3 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.012948
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BEAUREGARD LA 109 377-02 NHPP 1,073 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
4-SCHEDULED IN CURRENT FY 18-19
MICROSURFACESPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 109: LA 389 - LA 27
BEAUREGARD
H.013262
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BEAUREGARD US 190 028-03 NHPP 6,398 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED IN CURRENT FY 18-19
MILL AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 190: LA 111 - US 171
H.013807
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BEAUREGARD US 190 028-03 HSIPPEN 89 SAFETY 4-SCHEDULED IN CURRENT FY 18-19
STRIPING AND PAVEMENT MARKINGSCORMIER, CLAYTON Remrks:
Typ Imp:
Project:Prj Mgr:
US 190:0.04 MI W OF S FRUSHA DR - US 171
H.009615
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BEAUREGARD LA 26 028-04 STPFLEX 8,071 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED FOR LETTING FY 19-20
CP 2", OVERLAY 4", 2" SHLDBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 26: US 171 - ALLEN P/L
H.013231
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BEAUREGARD LA 389 187-04 NFA 1,369 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED FOR LETTING FY 19-20
PATCH, WIDEN AND THIN OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:AC WITH NFA
Project:Prj Mgr:
LA 389: MATTIE MEADOWS RD - HOOSIER RD
H.013259
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BEAUREGARD US 171 024-05 NHPP 260 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED FOR LETTING FY 19-20
MILL AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 171: US 190 - 0.03 MI N WEST DR
H.001537
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BIENVILLE LA 4 067-03 STPFLEX 2,770 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 19-20
NEW BRIDGEYANG, LI Remrks:
Typ Imp:067-03-0014
Project:Prj Mgr:
LA 4: BEE BRANCH BRIDGE
BIENVILLE
H.010273
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BIENVILLE LA 154 090-04 STPFLEX 1,450 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED FOR LETTING FY 19-20
ASPHALTIC OVERLAY, PAVEMENT STRIPING AND RELATED WORKBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 154: EAST JCT LA 4 TO JCT LA 792
Page 1 - 4 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.012961
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BIENVILLE LA 154 090-03 STPFLEX 427 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
4-SCHEDULED FOR LETTING FY 19-20
ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 154: BOSSIER PL TO LA 4
H.012953
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER LA 157 082-03 STPFLEX 285 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
4-SCHEDULED IN CURRENT FY 18-19
ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 157: OAKLAND TO KCS R/R TRACKS
BOSSIER
H.000118
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER US 80 001-03 STPFLEX 4,008 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 19-20
BRIDGE REPLACEMENTMASTIN, CATHERINE Remrks:
Typ Imp:001-03-0095
Project:Prj Mgr:
BAYOU FIFI BRIDGE (HBI)
H.012013
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER 000-08 STP>200K 8,576 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20
MAJOR WIDENINGLEBAS, MELISSA Remrks:
Typ Imp:BOSSIER CITY PROVIDING MATCH
Project:Prj Mgr:
VIKING DR WIDENING (LA3105-SWAN LAKE RD)
H.013021
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER 000-08 HSIPPEN 100 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20
INSTALL MEDIAN AT XINGSHREWSBERRY,BILL Remrks:
Typ Imp:
Project:Prj Mgr:
BENTON RD: KCS RR XING (BOSSIER CITY)
H.013492
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER LA 3227 808-08 STPFLEX 950 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 19-20
REALIGNMENT, EARTHWORK, ASPHALT PAVEMENT, AND STRIPINGSTURDIVANT, PHILLIP Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3227: INTERSECTION REALIGN AT LA 157
H.013581
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER I-20 451-02 NHPP 4,350 PRESERVATION - INTERSTATE 4-SCHEDULED FOR LETTING FY 19-20WEBSTER I-20 451-03 NHPP 6,679 PRESERVATION - INTERSTATE BIENVILLE I-20 451-04 NHPP 1,619 PRESERVATION - INTERSTATE
MILL & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
I-20: US 80 OPASS - CRAWFORD ST OPASS
H.013708
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER 000-08 STPFLEX 75 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20
REMOVE RR CROSSING AND FILL IN WITH ASPHALTSHREWSBERRY,BILL Remrks:
Typ Imp:
Project:Prj Mgr:
BARKSDALE BLVD: UP XING (BOSSIER CITY)
H.001623
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO LA 3049 079-01 NFA 1,278 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED IN CURRENT FY 18-19
BRIDGE REPLACEMENTMOORE, DARRELL Remrks:
Typ Imp:079-01-0034;USE NFA AS MATCH PHASES 1 TO 5
Project:Prj Mgr:
CREEK BRIDGE & IRISH BAYOU BRIDGE
CADDO
Page 1 - 5 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.011917
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO I-49 455-09 HSIPPEN 5,623 SAFETY 4-SCHEDULED IN CURRENT FY 18-19
INSTALLING CABLE BARRIERALLEN, JEFFREY Remrks:
Typ Imp:
Project:Prj Mgr:
I-49 CB: MLK DR. TO ARKANSAS S/L
H.013253
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO US 79 048-01 NHPP 5,526 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED IN CURRENT FY 18-19
CADDO US 80 001-01 STPFLEX 1,397 PRESERVATION - NON-INTERSTATEON STP SYSTEM
MILL, PATCH AND OVERLAY WITH HMACSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 79/US 80:TEXAS STATE LINE - JCT US 80
H.013426
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO US 71 011-01 NHPP 675 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 18-19
REHAB/REPLACE PIPE FROM US 71 TO GRIMMETT DRIVESTURDIVANT, PHILLIP Remrks:
Typ Imp:
Project:Prj Mgr:
GRIMMETT DR PIPE REHAB
H.013673
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO I-20 451-01 NHPP 392 OPER EFFICIENCY/MOTORISTASSISTANCE - WEIGH STATIONS
4-SCHEDULED IN CURRENT FY 18-19
SCALE REHAB OF THE STATIC PIT SCALEBROWN, JEFF Remrks:
Typ Imp:
Project:Prj Mgr:
REHAB OF GREENWOOD PIT SCALE
H.013879
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO US 79 048-01 NHPP 420 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED IN CURRENT FY 18-19
ASPHALT WIDENING AND OVERALYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 79: TX S/L TO 0.2 MI E OF TX S/L
H.013893
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO I-20 451-01 NHPP 500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
4-SCHEDULED IN CURRENT FY 18-19
BOSSIER I-20 451-02 NHPP 350 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
CADDO I-49 455-08 NHPP 350 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
PAVEMENT MARKING REPLACEMENTHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-20:I-220-I-220 & I-49:LA3132-I-20 RPM
H.001661
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO LA 530 085-01 FBROFF 2,973 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 19-20
BRIDGE REPLACEMENTWINDMANN, ANDREW Remrks:
Typ Imp:085-01-0022
Project:Prj Mgr:
BLACK BAYOU BRIDGE
Page 1 - 6 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.010206
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO LA 3132 427-01 NHPP 1,183 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
4-SCHEDULED FOR LETTING FY 19-20
CADDO LA 523 103-01 NHPP 1,147 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
EXTEND CONTROL OF ACCESS LA 3132 AT LA 523BRIGNAC, CHRISTINA Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3132 AT LA 523: EXTEND C OF A
H.011420
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO LA 3132 427-01 NHPP 750 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 19-20
EXTENDING ACCELERATION LANE FROM ENTRANCE RAMPSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3132: EB ENTRANCE LANE EXTENSION
H.012979
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO LA 169 048-03 STPFLEX 448 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
4-SCHEDULED FOR LETTING FY 19-20
ASPHALT SURFACE TREATMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 169: LONGWOOD TO MOORINGSPORT
H.013254
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO US 71 011-04 NHPP 7,500 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED FOR LETTING FY 19-20
MILL, PATCH AND OVERLAY WITH HMACSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 71 - JCT LA 2 - ARKANSAS STATE LINE
H.013854
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO I-20 451-01 NHPP 512 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
4-SCHEDULED FOR LETTING FY 19-20
BOSSIER I-20 451-02 NHPP 246 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
CADDO US 71 053-09 NHPP 118 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
SIGN UPGRADESFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
I-20 & US 71: OVERHEAD SIGN UPGRADE
H.007113
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU 000-10 STP<200K 580 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 18-19
OVERLAYBANKSTON, TANYA Remrks:
Typ Imp:742-10-0125
Project:Prj Mgr:
J.BENNETT JOHNSTON AVENUE
CALCASIEU
H.009620
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU I-10 450-91 NHPP 13,323 PRESERVATION - INTERSTATE 4-SCHEDULED IN CURRENT FY 18-19CALCASIEU I-10 450-91 NHPP 8,284 PRESERVATION - INTERSTATE CALCASIEU I-10 450-91 NHPP 5,889 PRESERVATION - BRIDGE (ON
SYSTEM)
BRIDGE REPLACEMENT, PAVEMENT REPLACMNT, MILL&OVERLAY & WIDBALLMER, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
I-10:WEST OF LA 108 TO I-210 INTERCHANGE
Page 1 - 7 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.009751
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 14 196-01 TAPFLEX 60 ENHANCEMENTS 4-SCHEDULED IN CURRENT FY 18-19
SIDEWALKS, SUBSURFACE DRAINAGE, WARNING LIGHTS &RELATED WOMEEK, STEPHEN Remrks:
Typ Imp:MATCH IS 15% TOLL CREDITS AND 5% LOCAL
Project:Prj Mgr:
BELL CITY SCHOOL SIDEWALK
H.010241
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 12 012-04 STPFLEX 1,425 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED IN CURRENT FY 18-19
PATCH, CP2", 4" OVERLAY RDWY, 2" PAVED SHOULDERSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 12: 0.6 MI NE AIRPORT DR-BUXTON CREEK
H.011546
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU 000-10 FBROFF 1,085 PRESERVATION - BRIDGE (OFFSYSTEM)
4-SCHEDULED IN CURRENT FY 18-19
BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
NURSERY STREET / BUXTON CREEK
H.012603
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 27 031-04 STP<200K 250 OPER EFFICIENCY/MOTORISTASSISTANCE - MOVABLE BRIDGEREHABILITATION
4-SCHEDULED IN CURRENT FY 18-19
MOVABLE BRIDGE MACHINERY REPAIRSLAMBERT, JARRETT Remrks:
Typ Imp:
Project:Prj Mgr:
ELLENDER BR BEARING AND SPAN LOCK REHAB.
H.012878
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU 000-10 NHPP 200 OPER EFFICIENCY/MOTORISTASSISTANCE - REST AREAS
4-SCHEDULED IN CURRENT FY 18-19
RENOVATIONSANDERS, ANDREW Remrks:
Typ Imp:
Project:Prj Mgr:
TOOMEY NATURE WALK
H.002075
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 383 197-02 STPFLEX 1,500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 19-20
PAVEMENT WIDENINGSPURLOCK, DLON Remrks:
Typ Imp:197-02-0023;ON GRANDFATHER LIST FOR FED FUNDS
Project:Prj Mgr:
PAVEMENT WIDENING-MP42.7-I-10 FR RD
H.003184
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU I-10 450-91 NHPP 43,411 CORRIDOR 4-SCHEDULED FOR LETTING FY 19-20CALCASIEU I-10 450-91 NHPP 33,011 PRESERVATION - INTERSTATE CALCASIEU I-10 450-91 FREIGHT-HY 40,904 PRESERVATION - INTERSTATE CALCASIEU I-10 450-91 NHPP 5,500 PRESERVATION - BRIDGE (ON
SYSTEM)
WIDEN TO 6 LANESJUDICE, ANDREW Remrks:
Typ Imp:450-91-0078
Project:Prj Mgr:
I-10: TEXAS STATE LINE-E. OF COONE GULLY
H.005967
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU 000-10 STGEN 2,500 INTERMODAL CONNECTOR 4-SCHEDULED FOR LETTING FY 19-20CALCASIEU 000-10 NHPP 10,000 INTERMODAL CONNECTOR CALCASIEU 000-10 DEMO 18,300 DEMO / HIGH PRIORITY
NEW ROAD & BRIDGEBRIGNAC, CHRISTINA Remrks:
Typ Imp:706-10-0001;TEA-21. STA 87.USE STGEN$ FOR ENG
Project:Prj Mgr:
NELSON RD EXT & BRIDGE
Page 1 - 8 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.011500
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU I-210 450-30 NHPP 6,075 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
4-SCHEDULED FOR LETTING FY 19-20
CALCASIEU I-10 450-91 NHPP 364 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
INSTALLING CAMERAS & DMSS ALONG I-210KIMBENG, LUCY Remrks:
Typ Imp:
Project:Prj Mgr:
LAKE CHARLES ITS PHASE 3
H.011838
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU 000-10 STP<200K 1,384 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20
OVERLAYBANKSTON, TANYA Remrks:
Typ Imp:CITY OF SULPHUR PROVIDING MATCH
Project:Prj Mgr:
RUTH/HUNTINGTON OVERLAY
H.011839
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU 000-10 STP<200K 348 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20
OVERLAYBANKSTON, TANYA Remrks:
Typ Imp:CITY OF SULPHUR PROVIDING MATCH
Project:Prj Mgr:
HENNING DR/WEEKLY RD OVERLAY
H.012053
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 378 810-12 STPFLEX 600 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 19-20
ADD TURN LANESPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 378: SB RT TURN LANE @ PHILLIPS RD
H.013430
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 378 810-12 RAIL PD 0 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20CALCASIEU LA 378 810-12 RAIL HE 300 RAILROADS CALCASIEU LA 378 810-12 STPFLEX 400 RAILROADS
CONSTRUCT RAISED MEDIAN, OVERLAY, UPGRADE RR WARNING DEVICLUKE, SHAWN Remrks:
Typ Imp:USE LOCAL AS MATCH
Project:Prj Mgr:
LA 378: UP RR CROSSING (WESTLAKE)
H.013806
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU 000-10 STCASH 52 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 19-20
REMOVAL OF CATIONIC TANKSCORMIER, CLAYTON Remrks:
Typ Imp:OPERATING/MISCELLANEOUS REPAIR FUNDS WILL BE USED
Project:Prj Mgr:
D07 CATIONIC TANK REMOVAL
H.013844
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU I-10 450-91 NHPP 261 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
4-SCHEDULED FOR LETTING FY 19-20
CALCASIEU US 171 024-01 NHPP 160 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
SIGN UPGRADESFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
I-10 & US 171: LAKE CHARLES SIGN UPGRADE
H.013574
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALDWELL LA 3239 811-12 NFA 1,912 ROAD TRANSFER 4-SCHEDULED IN CURRENT FY 18-19
STABILIZE AND OVERLAYZIECKER, MATTHEW Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3239: LA 126 - LA 4
CALDWELL
Page 1 - 9 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.001557
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALDWELL LA 4 068-04 HSIPPEN 1,400 SAFETY 4-SCHEDULED FOR LETTING FY 19-20
WIDENING & OVERLAYZIECKER, MATTHEW Remrks:
Typ Imp:068-04-0030
Project:Prj Mgr:
LA 4: BANKS SPRINGS - JCT. US 165
H.012988
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALDWELL LA 133 171-01 STPFLEX 4,000 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED FOR LETTING FY 19-20
STABILIZE AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 133: HEBERT - VESTIL LANE
H.011545
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CAMERON 000-12 FBROFF 345 PRESERVATION - BRIDGE (OFFSYSTEM)
4-SCHEDULED FOR LETTING FY 19-20
BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
LITTLE CHENIER RD / LITTLE CHENIER BAYOU
CAMERON
H.013232
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CAMERON LA 384 195-01 STP<5K 1,793 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED FOR LETTING FY 19-20
PATCH AND THIN OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:NFA AS MATCH
Project:Prj Mgr:
LA 384: LA 27 - LA 385
H.012888
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CATAHOULA LA 124 041-01 STPFLEX 476 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
4-SCHEDULED IN CURRENT FY 18-19
CATAHOULA LA 124 143-06 STPFLEX 211 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
LASALLE LA 8 152-02 STPFLEX 131 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
CATAHOULA LA 8 152-03 STPFLEX 222 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
CATAHOULA LA 126 353-03 STPFLEX 296 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
ASPHALT SURFACE TREATMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
58 AST: CATAHOULA AND LASALLE PARISHES
CATAHOULA
H.001140
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CATAHOULA LA 124 041-03 FBROFF 2,047 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 19-20
BRIDGE REPLACEMENTBALLMER, SARAH Remrks:
Typ Imp:041-03-0025; USE NFA AS MATCH
Project:Prj Mgr:
LA 124: HOOTER CREEK BRIDGE
H.010815
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CATAHOULA LA 124-P 143-03 NFA 6,939 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 19-20CATAHOULA LA 124 143-04 NFA 574 ROAD TRANSFER CATAHOULA 000-13 NFA 349 ROAD TRANSFER CATAHOULA LA 3102 813-24 NFA 325 ROAD TRANSFER
CONSTRUCTION ON NEW ALIGNMENT OF AN EXISTING ROUTEMOORE, DARRELL Remrks:
Typ Imp:
Project:Prj Mgr:
LA 124 EXTENSION (SEGMENT 1)
Page 1 - 10 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.013273
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CATAHOULA LA 8 039-04 STPFLEX 2,000 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 19-20
MITIGATION RELATED TO BANK EROSION AND BRIDGE PIER SCOURCAVALIER, STEPHANIE Remrks:
Typ Imp:OTHER FUNDS FROM USACE
Project:Prj Mgr:
LA 8: OUACHITA RIVER BRIDGE SCOUR REPAIR
H.012960
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CLAIBORNE LA 154 088-06 STPFLEX 243 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
4-SCHEDULED IN CURRENT FY 18-19
ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 154: BIENVILLE PL TO ATHENS
CLAIBORNE
H.001749
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DESOTO LA 5 098-03 HSIPPEN 1,200 SAFETY 4-SCHEDULED FOR LETTING FY 19-20
CURVE REALIGNMENTSTURDIVANT, PHILLIP Remrks:
Typ Imp:
Project:Prj Mgr:
LA 5 REALIGNMENT AND CROSS SLOPE IMPROVE
DESOTO
H.010285
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DESOTO LA 483 301-02 STP<5K 1,931 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED FOR LETTING FY 19-20
ASPHALTIC OVERLAY, PAVEMENT STRIPING AND RELATED WORKSPURLOCK, DLON Remrks:
Typ Imp:USE NFA AS MATCH
Project:Prj Mgr:
LA 512 & LA 483: US 171 TO LA 175
H.012965
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DESOTO LA 175 035-03 STPFLEX 748 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
4-SCHEDULED FOR LETTING FY 19-20
ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 175: SABINE PL TO 4.16 MI S OF US 84
H.013759
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DESOTO LA 3276 816-11 STPFLEX 4,500 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED FOR LETTING FY 19-20
MILL, BASE STABILIZATION AND OVERLAYBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3276: US 171 - I-49
H.006380
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 HSIP 400 RAILROADS 4-SCHEDULED IN CURRENT FY 18-19
UPGRADE RR SIGNALSSHREWSBERRY,BILL Remrks:
Typ Imp:
Project:Prj Mgr:
GREENWELL SPRINGS: IC RR (BATON ROUGE)
EAST BATON ROUGE
H.010565
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 427 258-02 STPFLEX 816 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
4-SCHEDULED IN CURRENT FY 18-19
REPLACE/UPGRADE PUMPHOUSE COMPONENTSGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
ACADIAN STREET PUMPING STATION
Page 1 - 11 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.010869
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 RTP 256 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 18-19E BATON ROUGE 000-17 LOCAL 140 RECREATIONAL TRAILS PROGRAM
CONSTRUCTION OF A PED-BIKE TRAIL ON WARDS CREEKNUNES, BRIAN Remrks:
Typ Imp:NATIONAL RECREATIONAL TRAILS PROJECT
Project:Prj Mgr:
WARDS CREEK TRAIL - BLUEBONNET EXTENSION
H.011261
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 427 258-02 HSIPPEN 3,349 SAFETY 4-SCHEDULED IN CURRENT FY 18-19
INTERSECTION IMPRS, MEDIAN MODS, OVERLAYREVIERE, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA427: S.ACADIAN THRUWAY, I-10-LA73 (BR)
H.012469
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE US 190 007-10 NHPP 200 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED IN CURRENT FY 18-19
E BATON ROUGE US 190 007-10 OTHER 200 PRESERVATION - BRIDGE (ONSYSTEM)
NAVIGATIONAL LIGHTING SYSTEM REPLACEMENTGUIDRY, CHRIS Remrks:
Typ Imp:OTHER FUNDS ARE FROM RAILROAD
Project:Prj Mgr:
US 190: MRB - NAVIG LIGHT REPL (HBI)
H.012640
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE I-10 450-10 NHPP 4 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
4-SCHEDULED IN CURRENT FY 18-19
E BATON ROUGE LA 3246 817-40 NHPP 139 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 61 PERFORMANCE MEASURE
H.012902
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 327 817-16 STPFLEX 730 ROAD TRANSFER 4-SCHEDULED IN CURRENT FY 18-19
SAWCUT, PCC PATCHING, SIDEWALKS, CURBS AND RESTRIPE; RR WORMOSS, SARAH Remrks:
Typ Imp:MATCH FOR RR SURFACE WORK IS FROM THE RR AND TTF
Project:Prj Mgr:
LA 327: S. RIVER RD- LA 30
H.013320
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 42 257-04 NHPP 5,550 ROAD TRANSFER 4-SCHEDULED IN CURRENT FY 18-19
PCCP PATCHING AND MAJOR REHAB OF EB. MILL AND OVERLAY WBMOSS, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 42: GARDERE LANE - LA 30 (RT II)
H.013331
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 427 258-02 NHPP 2,753 ROAD TRANSFER 4-SCHEDULED IN CURRENT FY 18-19
PCCP PATCHING, AND MILL AND OVERLAYMOSS, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 427: LA 3064 -ACADIAN THRUWAY (RT II)
H.013830
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 NHPP 2,000 ROAD TRANSFER 4-SCHEDULED IN CURRENT FY 18-19
SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
EBR SIGNAL DETECTION UPGRADE
Page 1 - 12 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.002320
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 3034 255-30 LOCAL 0 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 19-20E BATON ROUGE LA 3034 255-30 STBONDS 9,310 OTHER / MISCELLANEOUS E BATON ROUGE LA 3034 255-30 STPFLEX 3,000 PRESERVATION - NON-INTERSTATE
ON STP SYSTEM
4 LN DIVIDED CONC HWY RAISED MEDIANREVIERE, RYAN Remrks:
Typ Imp:255-30-0014;GREEN LIGHT PROJ; PR NI PROJ INCLUDED SEE NOTES
Project:Prj Mgr:
SULLIVAN RD (WAX - HOOPER)
H.007160
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 CM 6,200 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20
TRAFFIC SIGNAL SYNCHRONIZATIONHANKS, ANNA Remrks:
Typ Imp:742-17-0159;CHOCTAW @ CHIPPEWA ST. & N.CHOCTAW@
Project:Prj Mgr:
EBR COMPUTERIZED TRAFFIC SIGNAL, PH VB
H.010253
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 1248 258-33 STPFLEX 400 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
4-SCHEDULED FOR LETTING FY 19-20
REPLACE PUMP STATION FLOAT SYSTEMGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
BLUEBONNET BLVD. PUMP STAT. IMP LA 1248
H.011098
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 30 414-01 NHPP 1,319 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
4-SCHEDULED FOR LETTING FY 19-20
E BATON ROUGE LA 30 414-01 NHPP 1,080 ROAD TRANSFER E BATON ROUGE LA 30 414-01 NHPP 10,000 ROAD TRANSFER
MEDIAN AND PAVEMENT WIDENING, AND RELATED WORKMCMILLAN, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 30: SOUTH BLVD - W CHIMES ST
H.011496
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 CM 220 CONGESTION MITIGATION 4-SCHEDULED FOR LETTING FY 19-20E BATON ROUGE LA 427 258-02 CM 220 CONGESTION MITIGATION
CONSTRUCT RIGHT TURN LANE ON NORTHBOUND QUAIL DRLAI, QUANG Remrks:
Typ Imp:USE LOCAL AS MATCH
Project:Prj Mgr:
QUAIL DR: TURN LANE AT PERKINS (LA 427)
H.011842
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 STP>200K 4,645 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20
REHABILITATIONLEBAS, MELISSA Remrks:
Typ Imp:EAST BATON ROUGE PROVIDING MATCH
Project:Prj Mgr:
CHOCTAW DRIVE PAVEMENT PRESERVATION
H.012344
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 STPFLEX 1,250 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20
RR ACTIVE WARNING DEVICESSHREWSBERRY,BILL Remrks:
Typ Imp:
Project:Prj Mgr:
IC SEVERAL RR XINGS (BATON ROUGE)
H.012374
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE I-12 454-01 NHPP 750 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
4-SCHEDULED FOR LETTING FY 19-20
LIVINGSTON I-12 454-02 NHPP 250 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
IMPROVE EXISTING RAMP METER SYSTEM TO ALLOW VARIABLE TIMINGKIMBENG, LUCY Remrks:
Typ Imp:
Project:Prj Mgr:
I-12 RAMP METER UPGRADES
Page 1 - 13 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.012449
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 OTHER 1,300 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20E BATON ROUGE US 61-X 013-04 OTHER 200 RAILROADS E BATON ROUGE LA 73 077-05 OTHER 200 RAILROADS
UPGRADE WARNINGS, ADD MEDIANS, REPLACE SURFACES, CLOSE XINLUKE, SHAWN Remrks:
Typ Imp:
Project:Prj Mgr:
KCS XINGS BETWN NORTH ST & LOUISE (BTR)
H.013261
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE I-110 450-92 STPFLEX 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
4-SCHEDULED FOR LETTING FY 19-20
INSTALL ITS EQUIPMENT ALONG I-110NICHOLS, BEN Remrks:
Typ Imp:
Project:Prj Mgr:
I-110 ITS DEPLOYMENT
H.013482
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE I-10 450-09 NHPP 200 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
4-SCHEDULED FOR LETTING FY 19-20
W BATON ROUGE I-10 450-08 NHPP 400 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
E BATON ROUGE I-10 450-10 NHPP 200 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
IBERVILLE I-10 450-07 NHPP 200 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
I-10 WBR QUEUE WARNING SYSTEMSOLLIE, CARRYN Remrks:
Typ Imp:
Project:Prj Mgr:
I-10 WBR QUEUE WARNING SYSTEM PROJECT
H.013682
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE US 190 013-05 HSIP 200 SAFETY 4-SCHEDULED FOR LETTING FY 19-20
INSTALL 1 TURN LANE AND 2 PARTIAL MEDIAN OPENING ISLANDSKELLEY, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
US 190: RCUT @ LONGBOW DR
H.013731
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE US 61 007-90 NHPP 5,000 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED FOR LETTING FY 19-20
MILL AND OVERLAYTONEY, PATRICK Remrks:
Typ Imp:
Project:Prj Mgr:
US 61: FLORIDA BLVD - GREENWELL ST
H.013837
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 NFA 900 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 19-20
RAISE & WIDEN RR BRIDGE, RAISE RR, RAISE GRADE OF VALLEY STNUNES, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
GRADE RAISING ON VALLEY ST
H.013897
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE I-10 450-10 GARVEE 31,222 CAPACITY 4-SCHEDULED FOR LETTING FY 19-20E BATON ROUGE I-12 454-01 GARVEE 2,000 CAPACITY
NEW FLYOVER RAMP AND NEW SERVICE ROADS/EXIT TO COLLEGEMASTIN, CATHERINE Remrks:
Typ Imp:
Project:Prj Mgr:
I-10 & I-12 COLLEGE DR FLYOVER RAMP
H.013869
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E CARROLL LA 882 818-06 NFA 6,400 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 19-20
STABILIZE BASE AND OVERLAYHICKS, MELVIN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 882: S JCT LA 134 - N JCT LA 134
EAST CARROLL
Page 1 - 14 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.010562
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E FELICIANA 000-19 FBROFF 853 PRESERVATION - BRIDGE (OFFSYSTEM)
4-SCHEDULED FOR LETTING FY 19-20
E FELICIANA 000-19 FBROFF 451 PRESERVATION - BRIDGE (OFFSYSTEM)
BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
BANK STREET & SINGLETARY STREET BRIDGES
EAST FELICIANA
H.013643
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E FELICIANA LA 951 819-29 FEMA 1,689 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 19-20
REPAIR OF CROSS DRAIN, EMBANKMENT, ROADWAY, AND SHOULDERSPURLOCK, DLON Remrks:
Typ Imp:PW 01064
Project:Prj Mgr:
LA 951: ROADWAY WASHOUT REPAIRS
H.012969
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
EVANGELINE LA 374 820-02 NFA 1,585 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED IN CURRENT FY 18-19
BASE STABILIZATION, ASPHALT OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 374: LA 13 - JCT LOCAL RD
EVANGELINE
H.013092
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
EVANGELINE LA 376 820-07 NFA 2,756 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED FOR LETTING FY 19-20
COLD PLANE, STABILIZE BASE, AND ASPHALT OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 376: LA 1172 - US 167
H.013853
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
EVANGELINE 000-20 HSIP 250 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20
INSTALL SIGNALSSHREWSBERRY,BILL Remrks:
Typ Imp:
Project:Prj Mgr:
INDUSTRIAL PARK RD:AKDN XING(EVANGELINE)
H.012886
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
FRANKLIN LA 869 821-21 NFA 1,200 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED FOR LETTING FY 19-20
PATCH & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 869: E. JCT LA 618 - W. JCT LA 618
FRANKLIN
H.013003
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
FRANKLIN LA 865 349-03 STPFLEX 300 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED FOR LETTING FY 19-20
FRANKLIN LA 865 349-03 NFA 800 PRESERVATION - NON-INTERSTATENFA
PATCH AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:PR NF NFA; PR NS TTF AS MATCH
Project:Prj Mgr:
LA 865: LA 4 - END MAINT.
Page 1 - 15 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.013258
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
FRANKLIN LA 858 821-02 NFA 140 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED FOR LETTING FY 19-20
FRANKLIN LA 859 821-04 NFA 163 PRESERVATION - NON-INTERSTATENFA
FRANKLIN LA 865 821-17 NFA 23 PRESERVATION - NON-INTERSTATENFA
FRANKLIN LA 865 349-02 NFA 79 PRESERVATION - NON-INTERSTATENFA
LASALLE LA 774 830-10 NFA 53 PRESERVATION - NON-INTERSTATENFA
CONCORDIA LA 566 355-03 NFA 196 PRESERVATION - NON-INTERSTATENFA
CALDWELL LA 850 811-02 NFA 276 PRESERVATION - NON-INTERSTATENFA
CHIP SEALSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA858,LA859,LA865,LA774,LA566,LA850: AST
H.013760
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
FRANKLIN LA 128 170-01 STPFLEX 100 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 19-20
FRANKLIN LA 562 165-03 STPFLEX 100 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
INTERSECTION IMPROVEMENTSSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 4 INTERSECTON IMPROVEMENTS
H.012916
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
GRANT LA 158 822-12 NFA 3,033 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED IN CURRENT FY 18-19
PATCHING, MILLING, AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 158: US 71 TO VINEY RIDGE RD
GRANT
H.001842
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
GRANT LA 471 123-01 FBROFF 3,534 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 19-20
NEW BRIDGEPAINE, PEGGY JO Remrks:
Typ Imp:NFA AS MATCH FOR PHASES 1 TO 6
Project:Prj Mgr:
LA 471: DARTIGO CREEK & CREEK BRIDGES
H.011655
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA LA 675 823-02 DEMO 490 DEMO / HIGH PRIORITY 4-SCHEDULED IN CURRENT FY 18-19IBERIA LA 675 823-02 STPFLEX 82 PRESERVATION - ROAD PREVENTIVE
MAINTENANCE
DRAINAGE STRUCTURES, PATCH & THIN OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 675: 0.53 MI SE US 90 - LA 674
IBERIA
H.011989
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA US 90 424-04 NHPP 2,776 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED IN CURRENT FY 18-19
BRIDGE REHABILIATIONWINDMANN, ANDREW Remrks:
Typ Imp:
Project:Prj Mgr:
US 90: LDRR AND LA329 OVERPASS
Page 1 - 16 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.013685
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA LA 87 241-01 STCASH 50 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 18-19
REPAIR CROSS DRAINDOMINGUE, CHRISTOPHER Remrks:
Typ Imp:
Project:Prj Mgr:
LA 87 CROSS DRAIN REPAIR @ LM 0.455
H.002765
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA LA 86 400-31 STPFLEX 1,025 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED FOR LETTING FY 19-20
STABILIZE BASE AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:400-31-0013; 400-31 MATCH TTF
Project:Prj Mgr:
LA 86: LA 347 - LA 31
H.009860
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA 000-23 RAIL PD 1,644 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20IBERIA 000-23 LOCAL 411 RAILROADS
INSTALL RAILROAD CROSSING FLASHING LIGHTS & GATESSHREWSBERRY,BILL Remrks:
Typ Imp:714-23-0102
Project:Prj Mgr:
BNSF SEVERAL RR XINGS (NEW IBERIA)
H.009861
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA 000-23 RAIL HE 889 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20IBERIA 000-23 LOCAL 311 RAILROADS
TRACK WORK FROM LA 14 TO FRENCH ST. (RAIL HE)SHREWSBERRY,BILL Remrks:
Typ Imp:714-23-0105
Project:Prj Mgr:
BNSF (NEW IBERIA) LA 14/CENTER/FRENCH ST
H.009862
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA 000-23 RAIL HE 44 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20IBERIA 000-23 LOCAL 6 RAILROADS
REMOVE RAILROAD CROSSINGSHREWSBERRY,BILL Remrks:
Typ Imp:714-23-0108
Project:Prj Mgr:
BNSF (NEW IBERIA) CAROLINE ST.
H.011781
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA LA 675 823-02 NHPP 838 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 19-20IBERIA LA 87 823-26 STPFLEX 468 ROAD TRANSFER IBERIA LA 675 823-02 NHPP 1,773 OTHER / MISCELLANEOUS
COLD PLANE, PATCH, OVERLAY, AND RELATED WORKDOMINGUE, CHRISTOPHER Remrks:
Typ Imp:
Project:Prj Mgr:
LA 675 & LA 87 IMP. IN NEW IBERIA (RT)
H.012016
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA 000-23 STP>200K 455 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20
SIDEWALKSBANKSTON, TANYA Remrks:
Typ Imp:CITY OF LOREAUVILLE PROVIDING MATCH
Project:Prj Mgr:
ED BROUSSARD RD. SIDEWALKS
H.012627
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA LA 997 230-04 NFA 450 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
4-SCHEDULED FOR LETTING FY 19-20
ROADWAY EMBANKMENT, BASE COURSE, & SUPERPAVE ASPHALTGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 997: 2 MI S IBERV PL-3 MI S IBERV PL
H.012792
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA LA 675 823-02 STP>200K 1,250 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20IBERIA US 90 424-04 STP>200K 1,250 URBAN SYSTEMS
ROUNDABOUTBANKSTON, TANYA Remrks:
Typ Imp:IBERIA PARISH TO PROVIDE MATCH
Project:Prj Mgr:
LA 675 @ AIRPORT RD ROUNDABOUT
Page 1 - 17 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.013265
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA US 90 424-04 NHPP 2,560 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED FOR LETTING FY 19-20
CONCRETE PAVEMENT REHAB, ASPHALT SHOULDERS & RELATED WORSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 90: LA 14 - LEWIS STREET
H.013640
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA US 90 424-04 STCASH 375 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 19-20
IMPROVE DRAINAGE IN THE AREADOMINGUE, CHRISTOPHER Remrks:
Typ Imp:MISCELLANEOUS REPAIR/NO QUALIFYING PROGRAM FUNDS PROJECT
Project:Prj Mgr:
US90 W FR. DRAINAGE IMP. @ SEGURA CANAL
H.013770
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA 000-23 0 SAFETY - LOCAL ROADS SAFETY 4-SCHEDULED FOR LETTING FY 19-20
FEASIBILITY STUDYRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
LRSP SIGNING AND STRIPING (IBERIA)
H.012604
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERVILLE LA 77 219-01 STPFLEX 200 OPER EFFICIENCY/MOTORISTASSISTANCE - MOVABLE BRIDGEREHABILITATION
4-SCHEDULED IN CURRENT FY 18-19
MOVABLE BRIDGE MACHINERY REPAIRS, HYDRAULIC REPAIRSMICHIELS, JASON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 77: GROSSE TETE BR HYD REPAIRS (HBI)
IBERVILLE
H.013243
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERVILLE LA 997 230-03 STPFLEX 500 OPER EFFICIENCY/MOTORISTASSISTANCE - MOVABLE BRIDGEREHABILITATION
4-SCHEDULED IN CURRENT FY 18-19
MOVABLE BRIDGE MACHINERY REPAIRSMICHIELS, JASON Remrks:
Typ Imp:USE NFA AS MATCH
Project:Prj Mgr:
BAYOU PIGEON PONTOON BR ELECTRIC WINCHE
H.012235
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERVILLE 000-24 SR2S 290 SAFETY - SAFE ROUTES TO SCHOOLS 4-SCHEDULED FOR LETTING FY 19-20IBERVILLE 000-24 SR2S 25 SAFETY - SAFE ROUTES TO SCHOOLS
SIDEWALKS, DRAINAGE, STRIPING, AND RELATED ACTIVITIESRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
WHITE CASTLE SIDEWALKS
H.012456
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERVILLE LA 77 219-01 OTHER 913 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 19-20IBERVILLE LA 77 219-01 STCASH 494 OTHER / MISCELLANEOUS
REPAIR BAYOU PLAQUEMINE STREAM EROSION TO STABILIZE ROADWANICKEL, TIM Remrks:
Typ Imp:
Project:Prj Mgr:
LA 77 BANK REPAIR AT BAYOU PLAQUEMINE
H.013438
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERVILLE 000-24 RAIL PD 250 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20IBERVILLE 000-24 RAIL HE 100 RAILROADS
INSTALL GATES & CONC SURFACE ON DORCYSHREWSBERRY,BILL Remrks:
Typ Imp:MATCH FROM RAILROAD
Project:Prj Mgr:
DORCY ST: UP RR XING (IBERVILLE)
Page 1 - 18 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.013727
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERVILLE LA 30 414-02 NHPP 1,834 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED FOR LETTING FY 19-20
MILL, PATCH, AND OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 30: LA 74 - ASCENSION P/L
H.013833
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERVILLE I-10 450-07 NHPP 783 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
4-SCHEDULED FOR LETTING FY 19-20
SIGN UPGRADESFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: EXIT 127 OVERHEAD SIGN UPGRADE
H.010388
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JACKSON LA 155 319-30 STPFLEX 2,067 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED FOR LETTING FY 19-20
JACKSON LA 155 090-06 STPFLEX 90 PRESERVATION - NON-INTERSTATENFA
OVERLAYBROWN, JOSEPH C. Remrks:
Typ Imp:USE NFA AS MATCH ON CS 090-06
Project:Prj Mgr:
LA 155: LA 542 - QUITMAN HWY
JACKSON
H.012236
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON 000-26 SR2S 198 SAFETY - SAFE ROUTES TO SCHOOLS 4-SCHEDULED IN CURRENT FY 18-19JEFFERSON 000-26 HSIPPEN 126 SAFETY - SAFE ROUTES TO PUBLIC
PLACES
SIDEWALKS, SAFETY IMPROVEMENTS AND OTHER RELATED ACTIVITIESMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
NORTH KENNER PEDESTRIAN SAFETY IMPR
JEFFERSON
H.012989
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON I-10 450-15 NHPP 288 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
4-SCHEDULED IN CURRENT FY 18-19
ORLEANS LA 428 410-01 NHPP 239 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
ST CHARLES US 90 005-09 NHPP 383 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
APPROACH SLAB LEVELING WITH ASPHALT CONCRETEBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 02 APPROACH SLAB LEVELING
H.013846
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON I-10 450-15 STGEN 68 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 18-19JEFFERSON I-10 450-15 REIMB 5 OTHER / MISCELLANEOUS
TEMP. SHORING FOR EB I-10JOHNSON, ENNIS Remrks:
Typ Imp:SECRETARY'S EMERGENCY FUND LETTER DATED 1/16/2019
Project:Prj Mgr:
EMERGENCY TEMP. SHORING I-10 FIRE DAMAGE
H.007181
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON 000-26 STP>200K 4,500 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20
NEW ROADWAY AND ALIGNMENTLEBAS, MELISSA Remrks:
Typ Imp:USE LOCAL AS MATCH
Project:Prj Mgr:
L&A ROAD IMPROVEMENTS
Page 1 - 19 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.007208
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 3017 826-11 STP>200K 1,537 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20JEFFERSON 000-26 STP>200K 13,040 URBAN SYSTEMS
NEW ROADWAY EXTENSIONLEBAS, MELISSA Remrks:
Typ Imp:742-26-0073; SEE NOTES
Project:Prj Mgr:
HARVEY BLVD EXT(PETERS RD-MANHATTAN
H.010626
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON 000-26 FBROFF 1,033 PRESERVATION - BRIDGE (OFFSYSTEM)
4-SCHEDULED FOR LETTING FY 19-20
BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
SAUVE ROAD / SONIAT CANAL BRIDGE
H.011534
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON 000-26 FBROFF 545 PRESERVATION - BRIDGE (OFFSYSTEM)
4-SCHEDULED FOR LETTING FY 19-20
JEFFERSON 000-26 FBROFF 527 PRESERVATION - BRIDGE (OFFSYSTEM)
BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
WEST LOYOLA & METAIRIE HEIGHTS BRIDGES
H.011670
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON I-10 450-15 GARVEE 100,000 INTERMODAL CONNECTOR 4-SCHEDULED FOR LETTING FY 19-20
INTERCHANGE IMPROVEMENTNICKEL, TIM Remrks:
Typ Imp:STIP PH 6 AC W/GARVEE. SEE NOTES FOR CONVERSION PLAN
Project:Prj Mgr:
I-10 / LOYOLA INTERCHANGE IMPROVEMENT
H.011797
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON 000-26 STP>200K 1,200 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20
COLD-MILL AND OVERLAYLEBAS, MELISSA Remrks:
Typ Imp:JEFFERSON PARISH WILL PROVIDE MATCH
Project:Prj Mgr:
AMES BLVD (WB EXPY - HAPPY ST)
H.012012
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON 000-26 STP>200K 1,434 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20
CONCRETE OVERLAYLEBAS, MELISSA Remrks:
Typ Imp:JEFFERSON PARISH PROVIDING MATCH
Project:Prj Mgr:
RIDGEWOOD/STROELITZ (AIRLINE TO LOUMOR)
H.012571
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 3152 826-03 NHPP 1,391 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED FOR LETTING FY 19-20
COLD PLANE AND OVERLAYBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3152: W. METAIRIE - ARGONNE ST.
H.012595
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 3154 826-44 NHPP 291 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 19-20
ADD RIGHT TURN LANE BY WIDENING ON LA 3154 AT DOCK STBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3154: RIGHT TURN LANE AT DOCK ST
H.012596
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 23 062-01 NHPP 499 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 19-20
ADD AN ADDITIONAL LEFT TURN LANE ON LA 23 AT GRETNA BLVDBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 23: INTERSECTION IMP @ GRETNA BLVD
Page 1 - 20 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.013292
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 466 063-02 STPFLEX 47 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20JEFFERSON LA 466 063-02 LOCAL 7 RAILROADS
REPLACE RAILROAD CROSSING SURFACELUKE, SHAWN Remrks:
Typ Imp:MATCH FROM RAILROAD
Project:Prj Mgr:
LA 466: NOGC RR XING (GRETNA)
H.013339
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON US 90 006-02 STPFLEX 134 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20JEFFERSON US 90 006-02 LOCAL 19 RAILROADS
REPLACE RAILROAD CROSSING SURFACELUKE, SHAWN Remrks:
Typ Imp:MATCH FROM RR
Project:Prj Mgr:
US 90: IC/NOPB RR XING (JEFFERSON)
H.013435
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 611-9 826-04 STPFLEX 50 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20
CONNECT CROSSING WITH TRAFFIC SIGNAL FOR PREEMPTIONLUKE, SHAWN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 611-9 @ FOCIS ST.: NS RR (METAIRIE)
H.013706
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON US 90-Z 283-09 NHPP 2,500 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 19-20
REPLACEMENT OF TUNNEL LIGHTING SYSTEMRODY, WALTER Remrks:
Typ Imp:
Project:Prj Mgr:
US 90Z: HARVEY TUNNEL LIGHTING REPL.
H.013768
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON 000-26 HSIP 500 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20
UPGRADE SIGNALSSHREWSBERRY,BILL Remrks:
Typ Imp:
Project:Prj Mgr:
ALLIANCE ST: IC & KCS RR XINGS (KENNER)
H.013829
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON I-10 450-15 NHPP 522 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
4-SCHEDULED FOR LETTING FY 19-20
ORLEANS I-10 450-90 NHPP 1,043 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
ORLEANS LA 47 148-02 NHPP 261 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
SIGN UPGRADESFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
I-10 & LA 47: OVERHEAD SIGN UPGRADE
H.013839
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON I-10 450-15 NHPP 1,500 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 19-20
JEFFERSON I-10 450-15 NHPP 1,500 PRESERVATION - BRIDGE (ONSYSTEM)
SLAB SPAN SUPERSTRUCTURE REPAIRPATTON, HEATHER Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: LOYOLA BRIDGES (SLAB SPAN REPAIR)
H.013840
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON I-10 450-15 REIMB 100 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 19-20
JEFFERSON I-10 450-15 NHPP 100 PRESERVATION - BRIDGE (ONSYSTEM)
SLAB SPAN FIRE DAMAGE REPAIRPATTON, HEATHER Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: EB VETS BLVD BRIDGE (FIRE REPAIR)
Page 1 - 21 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.013842
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 3046 423-01 STP>200K 2,481 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20JEFFERSON LA 3046 423-01 NHPP 6,800 PRESERVATION - BRIDGE (ON
SYSTEM)
JEFFERSON LA 3046 423-01 NHPP 11,950 OTHER / MISCELLANEOUS JEFFERSON LA 3046 423-01 NFI 1,659 OTHER / MISCELLANEOUS JEFFERSON LA 3046 423-01 LOCAL 250 OTHER / MISCELLANEOUS JEFFERSON LA 3139 430-01 STP>200K 1,456 URBAN SYSTEMS JEFFERSON 000-26 STP>200K 2,800 URBAN SYSTEMS JEFFERSON 000-26 STP>200K 3,073 URBAN SYSTEMS JEFFERSON LA 3046 423-01 STP>200K 985 URBAN SYSTEMS
REHABILITATION BRIDGE AND ROAD AND ADD ONRAMPYANG, LI Remrks:
Typ Imp:JEFFERSON PARISH PROVIDES THE MATCH
Project:Prj Mgr:
CAUSEWAY BLVD - EARHART EXPRESSWAY PH 1
H.013849
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON 000-26 STBONDS 2,347 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 19-20JEFFERSON 000-26 NFI 2,653 OTHER / MISCELLANEOUS
NEW ROADWAYSHANKS, ANNA Remrks:
Typ Imp:
Project:Prj Mgr:
LAND RDWYS @ LOUIS ARMSTRONG INTL N TERM
H.012805
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFF DAVIS LA 102 827-17 STPFLEX 263 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20JEFF DAVIS LA 102 827-17 LOCAL 38 RAILROADS JEFF DAVIS 000-27 STPFLEX 219 RAILROADS JEFF DAVIS 000-27 LOCAL 31 RAILROADS JEFF DAVIS LA 26 054-05 STPFLEX 219 RAILROADS JEFF DAVIS LA 26 054-05 LOCAL 31 RAILROADS
UPGRADE SIGNALSSHREWSBERRY,BILL Remrks:
Typ Imp:MATCH FROM RAILROAD
Project:Prj Mgr:
BNSF SEVERAL RR XINGS (JENNINGS)
JEFFERSON DAVIS
H.012872
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFF DAVIS 000-27 RAIL PD 311 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20JEFF DAVIS 000-27 RAIL HE 44 RAILROADS JEFF DAVIS 000-27 LOCAL 39 RAILROADS JEFF DAVIS 000-27 LOCAL 6 RAILROADS
INSTALL NEW F/L'S, GATES, AND BELLS AND CLOSE DOYLE ST. XINGSHREWSBERRY,BILL Remrks:
Typ Imp:MATCH FROM RAILROAD
Project:Prj Mgr:
PLAQ/DOYLE: BNSF RR XINGS (JENNINGS)
H.006531
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE 000-28 HSIP 500 SAFETY - LOCAL ROADS SAFETY 4-SCHEDULED IN CURRENT FY 18-19LAFAYETTE 000-28 STP>200K 242 URBAN SYSTEMS
CONSTRUCTION OF A ROUNDABOUTRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
ROUNDABOUT AT GIRARD PK AND HOSPITAL DR
LAFAYETTE
H.010557
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE 000-28 FBROFF 527 PRESERVATION - BRIDGE (OFFSYSTEM)
4-SCHEDULED IN CURRENT FY 18-19
BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
LAJAUNIE RD / LATERAL 1 BAYOU ST. CLAIR
Page 1 - 22 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.012286
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 339 828-12 STPFLEX 675 ROAD TRANSFER 4-SCHEDULED IN CURRENT FY 18-19
TURN LANE WIDENING, MILL, PATCH, OVERLAY, AND RELATED WORKDOMINGUE, CHRISTOPHER Remrks:
Typ Imp:
Project:Prj Mgr:
LA 339: 0.41 MI W LA 182 - LA 182
H.012980
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 3073 828-39 NHPP 3,535 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED IN CURRENT FY 18-19
CONCRETE PAVEMENT REHABILITATIONSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3073: US 167 - LA 3095
H.006538
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE 000-28 SR2S 440 SAFETY - SAFE ROUTES TO SCHOOLS 4-SCHEDULED FOR LETTING FY 19-20
CONSTRUCTION OF SIDEWALKS AND CROSSWALKSMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
LAFAYETTE CONSOLIDATED GOVT SIDEWALKS
H.007233
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE 000-28 STP>200K 500 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20
PAVEMENT MARKINGSBANKSTON, TANYA Remrks:
Typ Imp:742-28-0007
Project:Prj Mgr:
LAFAYETTE MPO NON STATE PVT MARKING
H.010207
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 94 080-03 STPFLEX 540 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED FOR LETTING FY 19-20
ST MARTIN LA 94 080-04 NHPP 2,365 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
ST MARTIN LA 94 850-32 NHPP 290 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
COLD PLANE, PATCH & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 94: LA 353 - LA 328
H.011748
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 731 828-21 STPFLEX 675 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 19-20LAFAYETTE LA 731-S 828-47 STPFLEX 150 ROAD TRANSFER
ASPHALT OVERLAY AND RELATED WORKDOMINGUE, CHRISTOPHER Remrks:
Typ Imp:
Project:Prj Mgr:
LA 731 & LA 731-S IMPROVEMENTS
H.011832
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE US 90 003-11 STP>200K 2,682 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20
OVERLAY WITH ISOLATED RECONSTRUCTION WHERE NECESSARYBANKSTON, TANYA Remrks:
Typ Imp:
Project:Prj Mgr:
US 90: CAMERON ST. OVERLAY
H.011833
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE 000-28 STP>200K 3,600 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20
SIDEWALKSBANKSTON, TANYA Remrks:
Typ Imp:CITY OF SCOTT PROVIDING MATCH
Project:Prj Mgr:
ST. MARY STREET SIDEWALKS
H.012018
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE 000-28 STP>200K 2,157 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20LAFAYETTE 000-28 STP>200K 1,213 URBAN SYSTEMS
ADAPTIVE SIGNAL IMPLEMENTATIONFILLASTRE, ANDRE Remrks:
Typ Imp:LAFAYETTE CONSOLIDATED GOV'T PROVIDING MATCH ON LOCAL ROA
Project:Prj Mgr:
LAFAYETTE ADAPTIVE SIGNAL IMPLEMENTATION
Page 1 - 23 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.012304
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE 000-28 STPFLEX 3,568 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20
OVERLAY AND REHABILITATEBANKSTON, TANYA Remrks:
Typ Imp:LAFAYETTE CONSOLIDATED GOVERNMENT WILL PROVIDE MATCH
Project:Prj Mgr:
LCG ROAD OVERLAY PROGRAM
H.012861
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE 000-28 STP>200K 348 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20
OVERLAYBANKSTON, TANYA Remrks:
Typ Imp:CITY OF CARENCRO WILL PROVIDE MATCH
Project:Prj Mgr:
PREJEAN ROAD PAVEMENT PRESERVATION
H.012864
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 94 080-03 STP>200K 522 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20
CONSTRUCTION OF SIDEWALKSBANKSTON, TANYA Remrks:
Typ Imp:LAFAYETTE CONSOLIDATED GOV'T WILL PROVIDE MATCH
Project:Prj Mgr:
LA 94/CARMEL DRIVE SIDEWALKS
H.012866
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 3025 828-23 STP>200K 532 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20
CONSTRUCT SIDEWALKSBANKSTON, TANYA Remrks:
Typ Imp:LAFAYETTE CONSOLIDATED GOV'T WILL PROVIDE MATCH
Project:Prj Mgr:
SOUTH COLLEGE RD (LA 3025) SIDEWALKS
H.012890
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 3073 828-39 NHPP 120 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 19-20
ADDING A LEFT TURN LANE & MODIFYING MEDIAN OPENINGSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3073: MEDIAN IMPROVEMENTS
H.012915
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 182 032-01 STPFLEX 400 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 19-20
ROADWAY WIDENING FOR CONTINUOUS TURN LANESPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 182: PONT DES MOUTON - PREJEAN RD
H.012997
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 343 393-03 STPFLEX 617 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
4-SCHEDULED FOR LETTING FY 19-20
THIN LIFT OVERLAY OGFCSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 343: VERMILION PL - 0.6 MI S US 90
H.013097
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 93 828-15 STPFLEX 1,380 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 19-20
PATCH, COLD PLANE, OVERLAY, & RELATED WORKMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 93: 1.53 MI S US 90 - US 90
H.013256
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE I-10 450-05 STPFLEX 175 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
4-SCHEDULED FOR LETTING FY 19-20
ACADIA I-10 450-04 STPFLEX 725 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
JEFF DAVIS I-10 450-03 STPFLEX 600 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
INSTALL ITS EQUIPMENT ON I-10 BETWEEN SCOTT AND LAKE CHARLESNICHOLS, BEN Remrks:
Typ Imp:
Project:Prj Mgr:
I-10 ITS SCOTT TO LAKE CHARLES
Page 1 - 24 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.013360
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 93 433-01 STPFLEX 700 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 19-20
WIDENING, ASPHALT OVERLAY, AND RELATED WORKDOMINGUE, CHRISTOPHER Remrks:
Typ Imp:
Project:Prj Mgr:
LA 93: US 90 - BENOIT PATIN RD
H.008118
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 653 829-12 FBROFF 3,661 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED IN CURRENT FY 18-19
BRIDGE REPLACEMENTBUCCI, MARK Remrks:
Typ Imp:829-12-0021
Project:Prj Mgr:
LA 653: BAYOU DUMAR BRIDGE REPLACEMENT
LAFOURCHE
H.010109
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE 000-29 HSIPPEN 76 SAFETY - SAFE ROUTES TO SCHOOLS 4-SCHEDULED IN CURRENT FY 18-19LAFOURCHE LA 316 412-02 HSIPPEN 1,116 SAFETY - SAFE ROUTES TO SCHOOLS LAFOURCHE LA 308 407-04 HSIPPEN 348 SAFETY - SAFE ROUTES TO SCHOOLS
SIDEWALK IMPROVMENTS, CROSSWALK, SPEED DETECTION DEVICESMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
RACELAND AND BAYOU BLUE SIDEWALKS
H.010404
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE US 90 005-07 NHPP 5,449 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED IN CURRENT FY 18-19
COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETEBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
US 90: 2.5 MI E LA 182 - ST CHARLES P/L
H.010688
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 3235 829-26 HSIP 3,674 SAFETY 4-SCHEDULED IN CURRENT FY 18-19
MEDIAN OPENINGS, TURN LANES, ACCEL/DECEL LANES, AND SIGNALSROONEY, BRITTANY Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3235: IMP @ LA 3162, LA 3161 & LA 657
H.013084
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE 000-29 HSIPPEN 186 SAFETY - SAFE ROUTES TO PUBLICPLACES
4-SCHEDULED IN CURRENT FY 18-19
CONSTRUCT SIDEWALKS AND OTHER SAFETY IMPROVEMENTSMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
PELTIER PARK SIDEWALK
H.013134
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 3235 829-26 STPFLEX 137 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
4-SCHEDULED IN CURRENT FY 18-19
INSTALL EMEG. GENERATOR AT LA 1 TOLL OPER. CSCRUNDELL, SCOTT Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1 TOLL CSC - EMERGENCY GENERATOR
H.013377
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 182 005-07 STPFLEX 1,378 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED IN CURRENT FY 18-19
MILLING AND OVERLAYBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 182: LA 308 - US 90
H.013818
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 308 407-01 0 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED IN CURRENT FY 18-19
MOVABLE BRIDGE MECHANICAL, ELECTRICAL, STRUCTURAL REHABGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
LA 308:BYU LAFOURCHE MB-GOLDEN MED.(HBI)
Page 1 - 25 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.009320
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 20 065-05 HSIP 4,618 SAFETY 4-SCHEDULED FOR LETTING FY 19-20
5 LEGGED ROUNDABOUTBANKSTON, TANYA Remrks:
Typ Imp:
Project:Prj Mgr:
ACADIAN ROAD ROUNDABOUT
H.013225
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 1 064-90 NHPP 7,200 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED FOR LETTING FY 19-20
MILL, PATCH, AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1: LA 1 BRIDGE -ST LOUIS STREET
H.013250
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE US 90 424-08 NHPP 4,600 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED FOR LETTING FY 19-20
LAFOURCHE US 90 005-07 NHPP 4,600 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
MILL, PATCH, AND OVERLAYBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
US 90: LA 308 - 2.3 MI E LA 182
H.013384
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 1 064-02 STCASH 50 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 19-20
ARMORING TEST SECTIONROONEY, BRITTANY Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1 ARMORING: LA 3090 - 3.3 MILES EAST
H.013429
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE 000-29 STP<200K 193 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20
ENHANCEMENTS - UPGRADE SIDEWALKS TO ADABANKSTON, TANYA Remrks:
Typ Imp:CITY OF THIBODAUX WILL PROVIDE MATCH
Project:Prj Mgr:
DOWNTOWN THIBODAUX SIDEWALKS
H.000754
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LASALLE US 84 022-04 NHPP 7,280 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 19-20
BRIDGE REPLACEMENTMUSA, ELNUR Remrks:
Typ Imp:022-04-0033
Project:Prj Mgr:
US 84: UP RAILROAD OVERPASS (HBI)
LASALLE
H.013541
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LASALLE LA 125 131-01 STPFLEX 250 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20
TO INSTALL FLASHING LIGHTS, GATES AND BELLSSHREWSBERRY,BILL Remrks:
Typ Imp:
Project:Prj Mgr:
LA 125: UP RR CROSSING (LASALLE)
H.010009
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN LA 507 308-04 FBROFF 3,247 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED IN CURRENT FY 18-19
REPLACEMENT OF SUPERSTRUCTUREBUCCI, MARK Remrks:
Typ Imp:USE NFA AS MATCH
Project:Prj Mgr:
LA 507 OVER I-20 BRIDGE REHABILITATION
LINCOLN
H.000133
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN US 80 001-07 STPFLEX 4,500 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 19-20
BRIDGE REPLACEMENTMUSA, ELNUR Remrks:
Typ Imp:001-07-0026
Project:Prj Mgr:
US 80 OVERPASS @ KCS RR
Page 1 - 26 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.001679
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN LA 146 085-09 STPFLEX 1,270 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 19-20
NEW BRIDGESUMEOZULU, JOE Remrks:
Typ Imp:085-09-0017;3 BRIDGES
Project:Prj Mgr:
LA 146 BRIDGES NEAR VIENNA
H.010472
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN US 80 001-07 STPFLEX 1,245 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED FOR LETTING FY 19-20
OVERLAYBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
US 80: 0.9 MILES E. OF LA 818 - US 167
H.012220
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN LA 147 043-03 STPFLEX 2,285 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED FOR LETTING FY 19-20
OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 147: BIENVILLE P.L. - BIENVILLE P.L.
H.012704
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN LA 545 308-08 NFA 3,686 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED FOR LETTING FY 19-20
ASPHALT OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 545: LISBON HWY - LA 152
H.012711
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN LA 151 317-04 NFA 3,123 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED FOR LETTING FY 19-20
UNION LA 151 317-03 NFA 107 PRESERVATION - NON-INTERSTATENFA
UNION LA 151 317-05 NFA 252 PRESERVATION - NON-INTERSTATENFA
STABILIZE BASE AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 151: LA 145 - LA 33
H.004634
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 1026 832-13 STBONDS 7,460 CAPACITY 4-SCHEDULED IN CURRENT FY 18-19
WIDENING (CONC PAVEMENT)PAINE, PEGGY JO Remrks:
Typ Imp:832-13-0019;700-32-0122 ENGINEERING ($800.000)
Project:Prj Mgr:
JUBAN RD WIDENING (I-12 - US 190)
LIVINGSTON
H.011278
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON I-12 454-02 HSIP 3,836 SAFETY 4-SCHEDULED IN CURRENT FY 18-19
MEDIAN CABLE BARRIER INSTALLATIONTASSIN, BEN Remrks:
Typ Imp:
Project:Prj Mgr:
I-12:MEDIAN CABLE BARRIER
H.011528
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON 000-32 FBROFF 1,087 PRESERVATION - BRIDGE (OFFSYSTEM)
4-SCHEDULED IN CURRENT FY 18-19
LIVINGSTON 000-32 FBROFF 394 PRESERVATION - BRIDGE (OFFSYSTEM)
BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
GEORGE MASHON RD & TRAVIS STREET BRIDGES
Page 1 - 27 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.011824
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON 000-32 STPFLEX 804 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
4-SCHEDULED IN CURRENT FY 18-19
LIVINGSTON LA 1026 832-13 STPFLEX 2,753 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
ROUNDABOUT INTERSECTION IMPROVEMENTHARROUCH, JOSHUA Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1026: ROUNDABOUT AT BUDDY ELLIS RD
H.011825
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON 000-32 STPFLEX 1,894 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 18-19LIVINGSTON 000-32 STP>200K 1,596 URBAN SYSTEMS
BRIDGE REPLACEMENT AND OVERLAYLEBAS, MELISSA Remrks:
Typ Imp:LIVINGSTON PARISH WILL PROVIDE MATCH
Project:Prj Mgr:
BUDDY ELLIS ROAD IMPROVEMENTS
H.012875
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON I-12 454-02 NHPP 1,341 OPER EFFICIENCY/MOTORISTASSISTANCE - INTERSTATE LIGHTING
4-SCHEDULED IN CURRENT FY 18-19
PROVIDE NEW INTERSTATE LIGHTING SYSTEMARMENTOR, MICHAEL Remrks:
Typ Imp:ENTITY (CITY OF DENHAM SPRINGS) TO PROVIDE MATCH
Project:Prj Mgr:
I-12: LA 1026 (JUBAN RD) INTCHG LIGHTING
H.013635
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 444 832-18 STCASH 200 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 18-19
REPLACE EXISTING CROSS DRAIN AND HEADWALLTASSIN, BEN Remrks:
Typ Imp:MISCELLANEOUS REPAIR/NO QUALIFYING PROGRAM FUNDS PROJECT
Project:Prj Mgr:
LA 444: CROSS DRAIN REPLACEMENT
H.002375
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 16 260-02 STPFLEX 23,124 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 19-20
NEW BRIDGETONEY, PATRICK Remrks:
Typ Imp:260-02-0040
Project:Prj Mgr:
AMITE R.BR. NEAR FRENCH SETTLEMENT
H.002381
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 43 260-07 STPFLEX 651 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 19-20
NEW BRIDGEISEMANN, ROBERT Remrks:
Typ Imp:260-07-0025
Project:Prj Mgr:
LA 43 CREEK BRIDGE NEAR ALBANY
H.011827
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON 000-32 STP>200K 3,446 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20
OVERLAYLEBAS, MELISSA Remrks:
Typ Imp:LIVINGSTON PARISH PROVIDING MATCH
Project:Prj Mgr:
DUNN ROAD IMPROVEMENTS
H.011828
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON 000-32 STP>200K 2,265 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20
BRIDGE REPLACEMENT AND OVERLAYLEBAS, MELISSA Remrks:
Typ Imp:LIVINGSTON PARISH PROVIDING MATCH
Project:Prj Mgr:
FORREST DELATTE ROAD IMPROVEMENTS
H.012308
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON 000-32 DEMO 9,447 DEMO / HIGH PRIORITY 4-SCHEDULED FOR LETTING FY 19-20
CONCRETE PAVEMENT, DRAINAGE, BRIDGE, SIDEWALKS, EARTHWORKMASTIN, CATHERINE Remrks:
Typ Imp:
Project:Prj Mgr:
COOK ROAD IMP: LA16 TO JUBAN CROSSING
Page 1 - 28 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.013158
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON 000-32 STP>200K 344 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20
BRIDGE REPLACEMENTLEBAS, MELISSA Remrks:
Typ Imp:LIVINGSTON PARISH TO PROVIDE MATCH
Project:Prj Mgr:
LINDER ROAD BRIDGE REPLACEMENT
H.013531
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON 000-32 STP>200K 691 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20
REHABILITATIONLEBAS, MELISSA Remrks:
Typ Imp:CITY OF WALKER TO PROVIDE MATCH.
Project:Prj Mgr:
PEAK LANE IMPROVEMENTS
H.013532
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON 000-32 HSIPPEN 260 SAFETY - LOCAL ROADS SAFETY 4-SCHEDULED FOR LETTING FY 19-20
SIGNS, STRIPING & FLASHING BEACONSMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
DENHAM SPRINGS ROAD SIGNING & STRIPING
H.013724
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 16 262-01 STPFLEX 900 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
4-SCHEDULED FOR LETTING FY 19-20
THIN LIFT OVERLAYBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 16: LA 42 TO LA 1026
H.012739
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
MADISON I-20 451-09 NHPP 21,508 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED IN CURRENT FY 18-19
MADISON I-20 451-09 OTHER 21,508 OTHER / MISCELLANEOUS
BRIDGE REHABILITATIOND'ANDREA, ARTUR Remrks:
Typ Imp:
Project:Prj Mgr:
I-20 MRB AT VICKSBURG OVERLAY AND REHAB
MADISON
H.012746
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
MADISON I-20 451-08 FLH 322 PRESERVATION - INTERSTATE 4-SCHEDULED IN CURRENT FY 18-19MADISON I-20 451-08 STP<5K 171 PRESERVATION - INTERSTATE
PAVEMENT REPLACEMENT ON EXISTING ALIGNMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
I-20: QUEBEC ROAD OVERPASS APPROACHES
H.006170
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
MOREHOUSE 000-34 FBROFF 1,081 PRESERVATION - BRIDGE (OFFSYSTEM)
4-SCHEDULED FOR LETTING FY 19-20
BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
MARTIN LUTHER KING SOUTH BRIDGE
MOREHOUSE
H.012941
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
MOREHOUSE US 425 071-04 STPFLEX 750 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
4-SCHEDULED FOR LETTING FY 19-20
ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 425: LA 134 - LA 2
Page 1 - 29 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.012920
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 1226 359-02 NFA 3,210 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED IN CURRENT FY 18-19
NATCHITOCHES LA 1227 835-19 NFA 367 PRESERVATION - NON-INTERSTATENFA
PATCHING, MILLING, OVERLAY, AND BASE REHABSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1226 & LA 1227: US 84 - PLACID OIL RD
NATCHITOCHES
H.010357
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 153 088-01 STPFLEX 2,750 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED FOR LETTING FY 19-20
STABILIZED BASE AND OVERLAYBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 153: JCT LA 9 - FIVE FORKS ROAD
H.012144
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 478 116-02 NFA 2,345 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED FOR LETTING FY 19-20
STABILIZE AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 478: VOWELLS MILL TO LA 117
H.012145
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 120 042-07 STP<5K 2,651 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED FOR LETTING FY 19-20
STABILIZE AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:NFA AS MATCH
Project:Prj Mgr:
LA 120: LA 117 - 830' E OF BENNETT ROAD
H.013832
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 6 034-06 NHPP 1,750 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 19-20
HYDRO-DEMOLITION AND OVERLAY OF EXISTING MAIN SPAN DECKD'ANDREA, ARTUR Remrks:
Typ Imp:
Project:Prj Mgr:
LA 6: GRAND ECORE BRIDGE DECK REPAIR
H.009354
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS 000-36 RTP 89 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 18-19ORLEANS 000-36 LOCAL 11 RECREATIONAL TRAILS PROGRAM
CONSTRUCTION OF BIKE LANES, A MULTI-USE PATH AND CROSSINGSNUNES, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
BROAD STREET CORRIDOR BIKEWAY
ORLEANS
H.010872
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS 000-36 RTP 146 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 18-19ORLEANS 000-36 LOCAL 30 RECREATIONAL TRAILS PROGRAM
CONSTRUCTION OF 2.3 MILES OF BIKE LANENUNES, BRIAN Remrks:
Typ Imp:NATIONAL RECREATIONAL TRAILS PROJECT
Project:Prj Mgr:
EARHART CORRIDOR BIKEWAY LINKAGE
H.012371
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS 000-36 STP>200K 3,708 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 18-19
REHABILITATION ASPHALT OVERLAY AND ADA CURB WORKLEBAS, MELISSA Remrks:
Typ Imp:ORLEANS PARISH TO PROVIDE THE MATCH
Project:Prj Mgr:
MARCONI DRIVE: CITY PARK AVE - I-610
Page 1 - 30 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.012901
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS US 90-Z 283-08 NHPP 8,006 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
4-SCHEDULED IN CURRENT FY 18-19
PERMANENT SIGN REPLACEMENTNGO, DUC Remrks:
Typ Imp:
Project:Prj Mgr:
US 90Z (MAGNOLIA STREET - BODENGER BLVD)
H.012956
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS LA 39 046-31 NHPP 1,221 OPER EFFICIENCY/MOTORISTASSISTANCE - MOVABLE BRIDGEREHABILITATION
4-SCHEDULED IN CURRENT FY 18-19
MECHANICAL REHAB OF SPAN LIFT MACHINERYMICHIELS, JASON Remrks:
Typ Imp:HISTORIC BRIDGE IMPROVEMENT (HBI)
Project:Prj Mgr:
LA 39: JUDGE SEEBER BR MECH REHAB (HBI)
H.013586
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS I-10 450-90 HSIPPEN 1,849 SAFETY 4-SCHEDULED IN CURRENT FY 18-19
HIGH FRICTION SURFACE TREATMENTROONEY, BRITTANY Remrks:
Typ Imp:
Project:Prj Mgr:
I-10 HFST: CANAL ST - ST. PHILIP ST
H.013824
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS LA 1264 836-15 STCASH 26 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 18-19
TAKING AND TESTING GIRDER SAMPLESJOHNSON, ENNIS Remrks:
Typ Imp:OPERATING/MISCELLANEOUS REPAIR FUNDS WILL BE USED
Project:Prj Mgr:
TED HICKEY BRIDGE: GIRDER SAMPLES
H.007272
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS 000-36 DEMO 3,226 DEMO / HIGH PRIORITY 4-SCHEDULED FOR LETTING FY 19-20
NEW 2-LANE ROADWAYBRIGNAC, CHRISTINA Remrks:
Typ Imp:742-36-0136;CITY OWNS R/W
Project:Prj Mgr:
HOWARD AVENUE EXTENSION
H.007273
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS 000-36 STP>200K 3,500 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20
REHABILITATIONLEBAS, MELISSA Remrks:
Typ Imp:742-36-0137; USE LOCAL AS MATCH
Project:Prj Mgr:
MAGAZINE ST (BROADWAY TO EAST DRIVE)
H.007274
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS 000-36 STP>200K 3,000 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20
REHABILITATIONLEBAS, MELISSA Remrks:
Typ Imp:742-36-0139; USE LOCAL AS MATCH
Project:Prj Mgr:
MAGAZINE ST (EAST DRIVE TO NASHVILLE)
H.010018
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS I-10 450-90 NHPP 21,000 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 19-20
BRIDGE REPLACEMENTMICHAEL, ANDREW Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: NO EAST DRAIN CANAL BRIDGE REPLACE
H.010405
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS US 90 006-90 STPFLEX 2,358 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED FOR LETTING FY 19-20
COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETEBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
US 90: 900' W INDUSTRIAL PKWY-FLOOD GATE
Page 1 - 31 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.010414
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS LA 1253 419-02 STPFLEX 250 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED FOR LETTING FY 19-20
PCC REHABSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1253: DOWNMAN RD - I-10 FRONTAGE RD
H.010634
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS US 90-Z 283-08 NHPP 4,410 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
4-SCHEDULED FOR LETTING FY 19-20
JEFFERSON US 90-Z 283-09 NHPP 500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
UPGRADING SIGNS ENTIRE LIMITS.UPGRADING STRUCTURES AS NEEDNGO, DUC Remrks:
Typ Imp:
Project:Prj Mgr:
US 90Z (BODENGER BLVD - STUMPF BLVD)
H.012370
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS 000-36 STP>200K 6,618 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20
PRESERVATION ASPHALT OVERLAY AND RELATED ADA CURB WORKLEBAS, MELISSA Remrks:
Typ Imp:ORLEANS PARISH TO PROVIDE MATCH
Project:Prj Mgr:
MORRISON RD: MAYO AVE - READ AVE
H.012372
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS 000-36 STP>200K 4,412 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20
CONCRETE PAVEMENT REHABILITATIONLEBAS, MELISSA Remrks:
Typ Imp:ORLEANS PARISH TO PROVIDE MATCH
Project:Prj Mgr:
MORRISON RD: READ AVE - BULLARD AVE
H.012373
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS 000-36 STP>200K 4,483 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20
REHABILITATION ASPHALT OVERLAY AND ADA COMPLIANT CURBSLEBAS, MELISSA Remrks:
Typ Imp:ORLEANS PARISH PROVIDING MATCH
Project:Prj Mgr:
ML KING BLVD: S CLAIBORNE - ST. CHARLES
H.012473
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS 000-36 HSIPPEN 700 SAFETY - LOCAL ROADS SAFETY 4-SCHEDULED FOR LETTING FY 19-20
SIDEWALKS AND OTHER SAFETY ENHANCEMENTSMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
ZACHARY TAYLOR & MARCONI DR SIDEWALKS
H.012676
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS I-610 450-34 NHPP 125 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 19-20
EXTEND LEFT TURN LANE AND STORAGE OF I-610 AT WEST ENDSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
I-610: OFF RAMP IMPROVEMENTS @ WEST END
H.012682
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS 000-36 HSIPPEN 1,731 SAFETY - LOCAL ROADS SAFETY 4-SCHEDULED FOR LETTING FY 19-20
INSTALL PEDESTRIAN COUNTDOWN SIGNALSMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
PEDESTRIAN CROSSWALK ENH. (NO PH 2)
H.012993
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS LA 39 046-31 NHPP 1,400 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED FOR LETTING FY 19-20
COLD PLANE AND OVERLAYBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 39: ST. BERNARD AVE. - CLAIBORNE BR.
Page 1 - 32 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.013211
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS LA 46 046-02 NHPP 3,500 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED FOR LETTING FY 19-20
ORLEANS LA 46 046-02 HSIPPEN 276 SAFETY
MILL, PATCH, OVERLAY AND HANDICAPPED CURB RAMPSBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 46: LA 39 - ST. BERNARD P/L
H.013391
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS 000-36 HSIPPEN 1,610 SAFETY 4-SCHEDULED FOR LETTING FY 19-20ORLEANS 000-36 STPFLEX 1,610 OPER EFFICIENCY/MOTORIST
ASSISTANCE - TRAFFIC CONTROLDEVICES
JEFFERSON 000-26 HSIPPEN 210 SAFETY JEFFERSON 000-26 STPFLEX 210 OPER EFFICIENCY/MOTORIST
ASSISTANCE - TRAFFIC CONTROLDEVICES
ST BERNARD 000-44 HSIPPEN 280 SAFETY ST BERNARD 000-44 STPFLEX 280 OPER EFFICIENCY/MOTORIST
ASSISTANCE - TRAFFIC CONTROLDEVICES
TRAFFIC SIGNAL UPGRADEFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DIST. 02BC FLASHING YELLOW ARROW PART 2
H.013442
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS I-10 450-90 NHPP 1,737 OPER EFFICIENCY/MOTORISTASSISTANCE - INTERSTATE LIGHTING
4-SCHEDULED FOR LETTING FY 19-20
PROVIDE ROADWAY LIGHTINGARMENTOR, MICHAEL Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: CROWDER BLVD INTERSTATE LIGHTING
H.013587
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS I-10 450-90 HSIPPEN 1,100 SAFETY 4-SCHEDULED FOR LETTING FY 19-20
HIGH FRICTION SURFACE TREATMENTROONEY, BRITTANY Remrks:
Typ Imp:
Project:Prj Mgr:
I-10 HFST @ MORRISON RD
H.013746
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS I-10 450-90 STPFLEX 1,200 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED FOR LETTING FY 19-20
ORLEANS US 90 006-03 NHPP 300 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
MILLING AND OVERLAY WITH ASPHALT CONCRETEBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
I-10 SERVICE ROAD: POYDRAS-ST BERNARD
H.008221
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA LA 134 837-06 STPFLEX 1,615 CAPACITY 4-SCHEDULED IN CURRENT FY 18-19OUACHITA 000-37 STPFLEX 602 CAPACITY
REALIGN THE INTERSECTION OF LA 134 & US 165GARY, VERTIE Remrks:
Typ Imp:
Project:Prj Mgr:
LA 134 IMPROVEMENTS AT US 165
OUACHITA
H.011739
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA US 165 015-31 STP<200K 659 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 18-19
LIGHTINGBANKSTON, TANYA Remrks:
Typ Imp:CITY OF MONROE WILL PROVIDE MATCH
Project:Prj Mgr:
US 165 SOUTH LIGHTING
Page 1 - 33 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.013040
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 RTP 112 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 18-19OUACHITA 000-37 LOCAL 169 RECREATIONAL TRAILS PROGRAM
CONSTRUCTION OF A 6,445' LONG BY 6' WIDE WALKING TRAILNUNES, BRIAN Remrks:
Typ Imp:DCRT IS THE PROJECT MANAGER
Project:Prj Mgr:
TRENTON NATURE TRAIL
H.013564
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA I-20 451-06 NHPP 850 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
4-SCHEDULED IN CURRENT FY 18-19
PAVEMENT MARKING REPLACEMENTHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-20: PAVEMENT MARKING REPLACEMENT VII
H.013683
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA LA 594 326-02 RAIL PD 232 RAILROADS 4-SCHEDULED IN CURRENT FY 18-19OUACHITA LA 594 326-02 LOCAL 29 RAILROADS
UPGRADE SIGNALSSHREWSBERRY,BILL Remrks:
Typ Imp:MATCH FROM RAILROAD
Project:Prj Mgr:
LA 594: UP RR XING (OUACHITA)
H.009297
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 SR2S 632 SAFETY - SAFE ROUTES TO SCHOOLS 4-SCHEDULED FOR LETTING FY 19-20OUACHITA LA 3033 837-12 SR2S 59 SAFETY - SAFE ROUTES TO SCHOOLS OUACHITA LA 840-1 837-21 SR2S 93 SAFETY - SAFE ROUTES TO SCHOOLS
SIDEWALKS/PED PATHSMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
OUACHITA PAR. POLICE JURY SIDEWALKS
H.010012
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA US 80 001-09 STPFLEX 7,871 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 19-20
REPLACEMENT OF BRIDGE OVERPASSCAVALIER, STEPHANIE Remrks:
Typ Imp:
Project:Prj Mgr:
I-20: US 80 OVERPASS BRIDGE REPLACEMENT
H.010287
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA LA 3249 837-19 HSIP 5,287 SAFETY 4-SCHEDULED FOR LETTING FY 19-20
ROUNDABOUT AT I-20/WELL RDGARY, VERTIE Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3249: ROUNDABOUT @ I-20/WELL RD.
H.012297
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 HSIPPEN 115 SAFETY - LOCAL ROADS SAFETY 4-SCHEDULED FOR LETTING FY 19-20
IMPR TRAFFIC FLOW REPL STRIPING, ADD PED. SIG & TRAFFIC SIGMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
MCMILLAN RD/BLANCHARD ST IMPROVEMENTS
H.012439
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 RAIL PD 300 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20OUACHITA 000-37 STPFLEX 0 RAILROADS OUACHITA LA 151 317-01 RAIL PD 300 RAILROADS
RR SIGNALIZATIONSHREWSBERRY,BILL Remrks:
Typ Imp:MATCH FROM RR
Project:Prj Mgr:
LA 151 & CALHOUN RD: KCS XINGS(CALHOUN)
H.012852
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA I-20 451-06 HSIP 450 SAFETY 4-SCHEDULED FOR LETTING FY 19-20
CONCRETE PAVING, SIGNAL WORK, SIGN RELOCATIONBALLMER, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
I-20 WB OFF RAMP @ LA 617 (THOMAS ROAD)
Page 1 - 34 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.013392
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 STP<200K 611 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20
MILL AND OVERLAYBANKSTON, TANYA Remrks:
Typ Imp:CITY OF WEST MONROE TO PROVIDE MATCH
Project:Prj Mgr:
MANE STREET REHABILITATION PHASE 2
H.013394
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 STP<200K 1,248 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20
RECONSTRUCT 2-LANE ROADWAYBANKSTON, TANYA Remrks:
Typ Imp:CITY OF WEST MONROE TO PROVIDE MATCH.
Project:Prj Mgr:
MANE STREET REHABILITATION PHASE 1
H.013395
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 STP<200K 474 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20
ASPHALT OVERLAYBANKSTON, TANYA Remrks:
Typ Imp:CITY OF WEST MONROE TO PROVIDE MATCH.
Project:Prj Mgr:
PARKWOOD DR REHAB: GLENWOOD - LA 143
H.013577
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA US 165 015-31 HSIP 500 SAFETY 4-SCHEDULED FOR LETTING FY 19-20
SIDEWALKSHICKS, MELVIN Remrks:
Typ Imp:
Project:Prj Mgr:
US 165: RICHWOOD SIDEWALKS
H.013776
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 STP<200K 345 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20
MILL, PATCH AND OVERLAYBANKSTON, TANYA Remrks:
Typ Imp:OUACHITA PARISH POLICE JURY TO PROVIDE MATCH
Project:Prj Mgr:
WELL ROAD (NEW NATCH. RD - I-20 INT.)
H.013791
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 STP<200K 335 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20
REHABILITATIONBANKSTON, TANYA Remrks:
Typ Imp:OUACHITA PARISH POLICE JURY TO PROVIDE MATCH
Project:Prj Mgr:
HADLEY ST (U.S. HWY 165 - NUTLAND RD)
H.013796
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 STP<200K 156 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20
MILL, PATCH AND OVERLAYBANKSTON, TANYA Remrks:
Typ Imp:OUACHITA PARISH POLICE JURY TO PROVIDE MATCH
Project:Prj Mgr:
TANGLEWOOD DRIVE (LA 15 - DELLWOOD DR.)
H.013798
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 STP<200K 686 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20
MILL, PATCH AND OVERLAYBANKSTON, TANYA Remrks:
Typ Imp:OUACHITA PARISH POLICE JURY TO PROVIDE MATCH
Project:Prj Mgr:
HARRELL ROAD (US 80 - ARKANSAS RD)
H.012725
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
PLAQUEMINES 000-38 HSIP 378 RAILROADS 4-SCHEDULED IN CURRENT FY 18-19
INSTALL GATESSHREWSBERRY,BILL Remrks:
Typ Imp:
Project:Prj Mgr:
AVENUE G: NOGC XING(BELLE CHASE)
PLAQUEMINES
H.013778
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
PLAQUEMINES LA 23 062-06 STCASH 29 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 18-19
DRAINAGE IMPROVEMENTSJOHNSON, ENNIS Remrks:
Typ Imp:LETTER BID IN DISTRICT
Project:Prj Mgr:
LA 23: DRAINAGE IMPROVEMENTS BOOTHVILLE
Page 1 - 35 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.004791
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
PLAQUEMINES LA 23 062-02 NHPP 5,529 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 19-20PLAQUEMINES LA 23 062-02 NHPP 5,900 OTHER / MISCELLANEOUS PLAQUEMINES LA 23 062-02 NHPP 16,328 OTHER / MISCELLANEOUS PLAQUEMINES LA 23 062-02 GARVEE 12,500 OTHER / MISCELLANEOUS PLAQUEMINES LA 23 062-02 EARMARK 56,250 OTHER / MISCELLANEOUS PLAQUEMINES LA 23 062-02 STP>200K 12,000 URBAN SYSTEMS PLAQUEMINES LA 23 062-02 NHPP 25,143 OTHER / MISCELLANEOUS PLAQUEMINES LA 23 062-02 TOLLS 24,110 OTHER / MISCELLANEOUS
REPLACE BRIDGE AND TUNNELOLIVIER, NICHOLAS Remrks:
Typ Imp:SEE NOTES FOR CONVERSION PLAN.STIP PH 6 AC-ED W FUNDS SHOW
Project:Prj Mgr:
LA 23: BELLE CHASSE BRIDGE & TUNNEL(HBI)
H.010724
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
POINTE COUPEE 000-39 FBROFF 1,045 PRESERVATION - BRIDGE (OFFSYSTEM)
4-SCHEDULED FOR LETTING FY 19-20
BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
PECAN ISLAND ROAD BRIDGE OVER THE CHENAL
POINTE COUPEE
H.012936
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
POINTE COUPEE LA 78 229-05 STPFLEX 1,476 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
4-SCHEDULED FOR LETTING FY 19-20
PATCH, THIN ASPHALTIC CONCRETE OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 78: US 190 - LA 1
H.011505
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES US 71 008-09 NHPP 447 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
4-SCHEDULED IN CURRENT FY 18-19
RAPIDES US 71 008-30 NHPP 1,041 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
RAPIDES US 71 840-43 NHPP 212 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
RAPIDES US 165 014-06 NHPP 227 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
RAPIDES LA 28 417-02 NHPP 203 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
INSTALLING CCTVS AND DMSSKIMBENG, LUCY Remrks:
Typ Imp:
Project:Prj Mgr:
ALEXANDRIA ITS PHASE 3
RAPIDES
H.012963
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES US 71 008-30 NHPP 118 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
4-SCHEDULED IN CURRENT FY 18-19
RAPIDES US 167 023-01 NHPP 147 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
RAPIDES LA 623 149-01 STPFLEX 179 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
RAPIDES LA 3100 840-29 STPFLEX 534 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
RAPIDES LA 3100-S 840-40 STPFLEX 259 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
RAPIDES LA 1208-1 840-48 STPFLEX 382 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
PCCP PATCHING, JOINT AND CRACK SEAL, CURB REPAIRSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
CONCRETE PATCHING RAPIDES PARISH
Page 1 - 36 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.013568
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES I-49 455-05 NHPP 677 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
4-SCHEDULED IN CURRENT FY 18-19
PAVEMENT MARKING REPLACEMENTHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-49: PAVEMENT MARKING REPLACEMENT VII
H.013831
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES I-49 455-05 NFA 1,030 ROAD TRANSFER 4-SCHEDULED IN CURRENT FY 18-19
PATCH, MILL, AND OVERLAYRACHAL, JASON Remrks:
Typ Imp:
Project:Prj Mgr:
I-49 SERVICE ROADS REPAIR: RAPIDES (RT)
H.013878
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES LA 28 417-02 NHPP 219 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
4-SCHEDULED IN CURRENT FY 18-19
TRAFFIC SIGNAL UPGRADEFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
LA 28 SIGNAL PERFORMANCE MEASURES
H.000577
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES US 165-X 015-01 NHPP 1,763 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 19-20
BRIDGE REMOVAL. REPLACE WITH AT GRADE CROSSINGMUSA, ELNUR Remrks:
Typ Imp:015-01-0049;SCOPE CHANGED
Project:Prj Mgr:
US 165-X: KCS RAILWAY OVERPASS
H.008263
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES LA 3144 840-34 HSIP 1,500 SAFETY 4-SCHEDULED FOR LETTING FY 19-20
ROUNDABOUTRACHAL, JASON Remrks:
Typ Imp:840-34-0008
Project:Prj Mgr:
LA 3144/SUSEK DRIVE ROUNDABOUT
H.011526
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES 000-40 FBROFF 620 PRESERVATION - BRIDGE (OFFSYSTEM)
4-SCHEDULED FOR LETTING FY 19-20
RAPIDES 000-40 FBROFF 610 PRESERVATION - BRIDGE (OFFSYSTEM)
RAPIDES 000-40 FBROFF 614 PRESERVATION - BRIDGE (OFFSYSTEM)
BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
CASTOR PLNGE/H.STRANGE/PALMER CHPL BRDG
H.011531
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES 000-40 FBROFF 536 PRESERVATION - BRIDGE (OFFSYSTEM)
4-SCHEDULED FOR LETTING FY 19-20
RAPIDES 000-40 FBROFF 445 PRESERVATION - BRIDGE (OFFSYSTEM)
BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
DIXIE CHURCH & SETLIFF ROAD BRIDGES
H.012559
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES 000-40 STP<200K 605 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20
PATCHING, COLD PLANNING AND RESURFACINGBANKSTON, TANYA Remrks:
Typ Imp:CITY OF ALEXANDRIA PROVIDING MATCH
Project:Prj Mgr:
INDUSTRIAL PARK SITE ROAD RECONSTRUCTION
Page 1 - 37 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.012967
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES LA 112 073-03 STPFLEX 1,320 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
4-SCHEDULED FOR LETTING FY 19-20
ULTRATHIN OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 112: US 165-RUTH FORD DR - ULTRATHIN
H.013288
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES LA 107 142-04 STPFLEX 68 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20RAPIDES LA 107 142-04 LOCAL 41 RAILROADS
REPLACE RAILROAD CROSSING SURFACELUKE, SHAWN Remrks:
Typ Imp:MATCH FROM RAILROAD
Project:Prj Mgr:
LA 107: KCS RR XING (PINEVILLE)
H.013440
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES 000-40 RAIL PD 350 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20
INSTALL FLASHING LIGHTS, GATES & BELLS AT POWELL & KARLASHREWSBERRY,BILL Remrks:
Typ Imp:MATCH FROM RAILROAD
Project:Prj Mgr:
POWELL & KARLA: UP RR XINGS (RAPIDES)
H.013452
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES 000-40 STP<200K 3,107 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20
ASPHALT REHABILITATIONBANKSTON, TANYA Remrks:
Typ Imp:CITY OF ALEXANDRIA TO PROVIDE MATCH.
Project:Prj Mgr:
HORSESHOE DRIVE ROADWAY IMPROVEMENTS
H.013856
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES I-49 455-05 NHPP 506 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
4-SCHEDULED FOR LETTING FY 19-20
SIGN UPGRADESFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
I-49 @ US 165: RAMP TRUSS REPLACEMENT
H.011087
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RED RIVER 000-41 FBROFF 1,794 PRESERVATION - BRIDGE (OFFSYSTEM)
4-SCHEDULED FOR LETTING FY 19-20
BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:
Typ Imp:DOTD PROVIDES THE MATCH FOR THE OFF-SYSTEM HWY BR PROGRA
Project:Prj Mgr:
WESTDALE PLANTATION ROAD / BAYOU PIERRE
RED RIVER
H.001972
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RICHLAND LA 135 167-02 STPFLEX 1,431 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED IN CURRENT FY 18-19
NEW BRIDGEGARY, VERTIE Remrks:
Typ Imp:167-02-0016
Project:Prj Mgr:
MUDDY BAYOU BRIDGE
RICHLAND
H.000974
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RICHLAND LA 15 026-09 STPFLEX 6,550 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 19-20
BRIDGE REPLACEMENTMUSA, ELNUR Remrks:
Typ Imp:026-09-0024
Project:Prj Mgr:
BOEUF RIVER BRIDGE
Page 1 - 38 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.010204
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RICHLAND US 425 071-01 HSIP 2,334 SAFETY 4-SCHEDULED FOR LETTING FY 19-20RICHLAND 000-42 HSIP 915 SAFETY
INSTALL ROUNDABOUTJESCLARD, TREY Remrks:
Typ Imp:
Project:Prj Mgr:
US 425: ROUNDABOUT @ JULIA & LOUISA
H.012707
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RICHLAND LA 622 341-02 NFA 2,079 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED FOR LETTING FY 19-20
STABILIZE BASE AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 622: LA 576 - LA 576
H.010366
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
SABINE LA 175 035-01 STPFLEX 3,785 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED IN CURRENT FY 18-19
CTB AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 175: 300' S OF SHIRWILLIS DR - LA 120
SABINE
H.011525
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
SABINE 000-43 FBROFF 420 PRESERVATION - BRIDGE (OFFSYSTEM)
4-SCHEDULED IN CURRENT FY 18-19
BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
SNEED ROAD / TORO CREEK
H.010696
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
SABINE 000-43 RAIL PD 300 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20
INSTALL F/L'S & GATESSHREWSBERRY,BILL Remrks:
Typ Imp:MATCH FROM RAILROAD
Project:Prj Mgr:
GANDY RD: KCS RR XING (SABINE)
H.012305
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST BERNARD 000-44 FBROFF 1,220 PRESERVATION - BRIDGE (OFFSYSTEM)
4-SCHEDULED IN CURRENT FY 18-19
BRIDGE REPLACEMENT NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
VIRTUE STREET / GUICHARD CANAL
ST BERNARD
H.012612
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST BERNARD LA 39 046-32 NHPP 138 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
4-SCHEDULED IN CURRENT FY 18-19
ADD RIGHT TURN LANE ON LA 39 AT DR MERAUX BLVDBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 39: RIGHT TURN LANE @ DR MERAUX BLVD
H.012752
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST BERNARD LA 46 046-03 STP>200K 230 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20ST BERNARD 000-44 STP>200K 938 URBAN SYSTEMS
INTERSECTION IMPROVEMENTLEBAS, MELISSA Remrks:
Typ Imp:PORT OF ST. BERNARD WILL PROVIDE THE MATCH FOR CS 000-44
Project:Prj Mgr:
LA 46 @ WEINBERGER RD INTERSECTION
Page 1 - 39 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.013560
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST BERNARD LA 47 148-01 NHPP 2,488 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED FOR LETTING FY 19-20
ORLEANS LA 47 148-02 NHPP 719 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
MILL AND OVERLAYBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 47: LA 46 - ORLEANS PL
H.000320
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST CHARLES US 61 007-03 STP>200K 1,400 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 18-19ST CHARLES US 61 007-03 STP>200K 1,590 URBAN SYSTEMS ST CHARLES US 61 007-03 LOCAL 1,133 URBAN SYSTEMS ST CHARLES US 61 007-03 NHPP 658 PRESERVATION - NON-INTERSTATE
ON NHS SYSTEM
JEFFERSON US 61 007-02 NHPP 675 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
MILL AND OVERLAYGAUDET, COREY Remrks:
Typ Imp:007-03-0060
Project:Prj Mgr:
US 61: RR OVERPASS - LA 50
ST CHARLES
H.012600
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST CHARLES LA 18 063-05 STPFLEX 427 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
4-SCHEDULED IN CURRENT FY 18-19
ADD LEFT TURN LANE ON LA 18 AT LA 3060BROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 18: LEFT TURN LANE @ LA 3060
H.012836
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST CHARLES LA 3127 428-03 STPFLEX 176 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
4-SCHEDULED IN CURRENT FY 18-19
ADD RIGHT TURN LANE ON LA 3127 AT LA 3141BROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3127: RIGHT TURN LANE AT LA 3141
H.011553
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST CHARLES LA 632 845-09 STP<5K 400 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED FOR LETTING FY 19-20
ST CHARLES LA 632 845-09 STPFLEX 100 PRESERVATION - NON-INTERSTATEON STP SYSTEM
ASPHALT OVERLAY, PATCHING, STRIPINGBROWN, JOSEPH C. Remrks:
Typ Imp:PR NF NFA AS MATCH; PR NI TTF AS MATCH
Project:Prj Mgr:
LA 632: LA 306 - LA 631
H.012051
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST CHARLES US 90 005-09 NHPP 627 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 19-20
JEFFERSON US 90 005-10 NHPP 67 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
TURN LANESBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
US 90: FLOODWALL - S KENNER AVE
Page 1 - 40 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.012617
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST CHARLES I-310 450-38 NHPP 1,750 PRESERVATION - INTERSTATE 4-SCHEDULED FOR LETTING FY 19-20ST CHARLES I-310 450-36 NHPP 500 PRESERVATION - INTERSTATE
COLD PLANE AND 2" OVERLAY AND PCCP REHABMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-310: 0.75 MI N OF LULING BR - US 90
H.013567
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST CHARLES I-310 450-36 NHPP 700 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
4-SCHEDULED FOR LETTING FY 19-20
ST CHARLES I-310 450-38 NHPP 500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
PAVEMENT MARKING REPLACEMENTHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-310: PAVMENT MARKING REPLACEMENT I
H.002407
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST HELENA LA 63 262-30 STPFLEX 2,132 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED IN CURRENT FY 18-19
NEW BRIDGEWINDMANN, ANDREW Remrks:
Typ Imp:262-30-0008
Project:Prj Mgr:
LA 63: PIGEON CREEK BRIDGE
ST HELENA
H.008312
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST HELENA LA 1042 846-03 FBROFF 3,153 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED IN CURRENT FY 18-19
BRIDGE REPLACEMENTUMEOZULU, JOE Remrks:
Typ Imp:846-03-0014;2 BRIDGES; USE NFA AS MATCH
Project:Prj Mgr:
LA 1042 BRIDGES NEAR GREENSBURG
H.009481
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JAMES LA 20 065-07 STPFLEX 6,320 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 19-20
BRIDGE REPLACEMENTWINDMANN, ANDREW Remrks:
Typ Imp:
Project:Prj Mgr:
LA 20 BAYOU CHEVREUIL BRIDGE
ST JAMES
H.012075
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JAMES LA 3125 426-31 STPFLEX 1,167 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 19-20
ADD EB AND WB LEFT TURN LANES ON LA 3125SPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3125: IMPROVEMENTS AT LA 642
H.012983
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JOHN LA 640 848-01 STPFLEX 453 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
4-SCHEDULED IN CURRENT FY 18-19
THIN LIFT OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 640: LA 18 - LA 3127
ST JOHN
Page 1 - 41 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.013876
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JOHN I-10 450-13 STCASH 38 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 18-19ST JOHN I-10 450-13 REIMB 38 OTHER / MISCELLANEOUS ST JOHN I-10 450-13 STCASH 38 OTHER / MISCELLANEOUS ST JOHN I-10 450-13 REIMB 38 OTHER / MISCELLANEOUS
BRIDGE RAIL REPAIRHARPER, CALEB Remrks:
Typ Imp:MISCELLANEOUS REPAIR/NO QUALIFYING PROGRAM FUNDS
Project:Prj Mgr:
I-10: RESERVE RELIEF CANAL BRIDGE REPAIR
H.011515
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JOHN LA 44 256-01 STPFLEX 50 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
4-SCHEDULED FOR LETTING FY 19-20
ADDITIONAL PIPE(S), CATCH BASINS, AND/OR ASPHALTGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 44: PALM ST & BEECH ST DRAINAGE
H.013291
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY 000-49 STPFLEX 476 PRESERVATION - BRIDGE (OFFSYSTEM)
4-SCHEDULED IN CURRENT FY 18-19
BRIDGE REPLACEMENT - NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
JUDSON WALSH DRIVE OVER DRAINAGE BAYOU
ST LANDRY
H.008332
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY LA 360 849-11 FBROFF 2,800 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 19-20
BRIDGE REPLACEMENTKEMP, KELLY Remrks:
Typ Imp:849-11-0010; USE NFA AS MATCH
Project:Prj Mgr:
LA 360: ROUGE BAYOU BRIDGE REPLACEMENT
H.012558
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY LA 182 032-03 STPFLEX 2,440 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED FOR LETTING FY 19-20
COLD PLANE, OVERLAY, PATCHING, AND RELATED WORKSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 182: END ONE WAY COUPLET - US 167
H.013198
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY US 190 012-13 NHPP 6,450 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED FOR LETTING FY 19-20
MILL, PATCH, OVERLAY, AND RELATED WORKSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 190 EB & WB: MPRR OPASS - LA 742
H.013200
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY US 190 012-13 NHPP 3,075 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED FOR LETTING FY 19-20
MILL, PATCH, OVERLAY, AND RELATED WORKSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 190 (EB): LA 742 - BAYOU COURTABLEU
H.013811
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY LA 104 202-03 STPFLEX 1,830 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED FOR LETTING FY 19-20
MILL, BASE STABILIZATION, AND OVERLAYBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 104: 2.5 MI NW US 190 - US 190
Page 1 - 42 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.013860
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY LA 742 012-30 RAIL PD 300 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20
UPGRADE RR SIGNALSSHREWSBERRY,BILL Remrks:
Typ Imp:MATCH FROM RAILROAD
Project:Prj Mgr:
LA 742: UP RR XING (ST LANDRY)
H.010601
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARTIN I-10 450-06 NHPP 34,861 CORRIDOR 4-SCHEDULED IN CURRENT FY 18-19ST MARTIN I-10 450-06 NHPP 3,567 CORRIDOR ST MARTIN I-10 450-06 NHPP 6,921 CORRIDOR ST MARTIN I-10 450-06 FREIGHT-HY 19,129 CORRIDOR ST MARTIN 000-50 NHPP 8,616 CORRIDOR
INTERSTATE WIDENING AND REHABILITATIONOLIVIER, NICHOLAS Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: LA 328 TO LA 347
ST MARTIN
H.011485
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARTIN LA 336-1 056-04 NHPP 1,500 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 19-20
CLEANING AND PAINTING, AND STRUCTURAL REPAIRSGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
LA336-1: BAYOU TECHE BRIDGE REHAB (HBI)
H.012574
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARTIN LA 96 238-02 STPFLEX 3,107 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED FOR LETTING FY 19-20
LAFAYETTE LA 96 238-01 STPFLEX 580 PRESERVATION - NON-INTERSTATEON STP SYSTEM
COLD PLANE, BASE REHABILITATION, OVERLAY, AND RELATED WORKBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 96: LA 182 - 0.56 MI. W. OF LA 31
H.012863
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARTIN 000-50 STP>200K 1,364 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20
OVERLAYBANKSTON, TANYA Remrks:
Typ Imp:ST. MARTIN PARISH WILL PROVIDE MATCH
Project:Prj Mgr:
CYPRESS ISLAND HWY PAVEMENT PRESERVATIO
H.013247
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARTIN I-10 450-06 NHPP 1,200 PRESERVATION - INTERSTATE 4-SCHEDULED FOR LETTING FY 19-20
EMBANKMENT, COLD PLANE, PATCH, OVERLAY, AND RELATED WORWKMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-10 RAMPS @ BUTTE LA ROSE
H.013327
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARTIN LA 336-1 850-25 STPFLEX 100 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 19-20
MILL, PATCH, OVERLAY, AND RELATED WORKDOMINGUE, CHRISTOPHER Remrks:
Typ Imp:
Project:Prj Mgr:
LA 336-1: 0.19 MI SW LA 31- LA 31
Page 1 - 43 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.013851
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARTIN I-10 450-06 NHPP 193 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
4-SCHEDULED FOR LETTING FY 19-20
LAFAYETTE US 167 424-02 NHPP 165 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
ST MARY US 90 424-05 NHPP 260 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
SIGN UPGRADESFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
I-10, US 90 & 167: OVERHEAD SIGN UPGRADE
H.010829
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARY 000-51 RTP 125 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 19-20ST MARY 000-51 LOCAL 38 RECREATIONAL TRAILS PROGRAM
CONSTRUCTION OF MULTI-USE TRAILHEADSNUNES, BRIAN Remrks:
Typ Imp:NATIONAL RECREATIONAL TRAILS PROJECT
Project:Prj Mgr:
ST. MARY PARISH BAYOU TECHE TRAILHEADS
ST MARY
H.011487
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARY LA 182 005-01 STPFLEX 15,000 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 19-20
BRIDGE CLEANING, PAINTING AND STRUCTURAL REPAIRSGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
LA 182: BERWICK BAY BRIDGE REHAB (HBI)
H.002446
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 40 269-07 STPFLEX 3,739 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED IN CURRENT FY 18-19
TANGIPAHOA LA 40 269-06 STPFLEX 855 PRESERVATION - BRIDGE (ONSYSTEM)
NEW BRIDGEBUCCI, MARK Remrks:
Typ Imp:269-07-0012
Project:Prj Mgr:
LA 40: TCHEFUNCTE RIVER BRIDGE
ST TAMMANY
H.009460
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY 000-52 HSIPPEN 531 SAFETY - LOCAL ROADS SAFETY 4-SCHEDULED IN CURRENT FY 18-19
SIGNAGEMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
ST. TAMMANY PARISH SIGNING & STRIPING
H.011855
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY 000-52 TAPFLEX 638 ENHANCEMENTS 4-SCHEDULED IN CURRENT FY 18-19ST TAMMANY 000-52 LOCAL 246 ENHANCEMENTS
SHARED USE PATHMEEK, STEPHEN Remrks:
Typ Imp:MATCH PROVIDED BY THE CITY OF MANDEVILLE
Project:Prj Mgr:
MANDEVILLE: W CAUSEWAY APPROACH PATH
H.011921
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY 000-52 STPFLEX 1,146 PRESERVATION - BRIDGE (OFFSYSTEM)
4-SCHEDULED IN CURRENT FY 18-19
BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
HWY 41 SPUR BRIDGE / GUM CREEK
Page 1 - 44 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.012947
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY US 90 006-07 STPFLEX 400 OPER EFFICIENCY/MOTORISTASSISTANCE - MOVABLE BRIDGEREHABILITATION
4-SCHEDULED IN CURRENT FY 18-19
WIRE ROPE REPLACEMENTLAMBERT, JARRETT Remrks:
Typ Imp:
Project:Prj Mgr:
US 90: WEST PEARL BR WIRE ROPE REPL
H.013314
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 21 059-01 STPFLEX 363 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED IN CURRENT FY 18-19
ASPHALT MILL AND 3" OVERLAYBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 21: 13TH AVE TO US190B
H.010668
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY 000-52 FBROFF 1,000 PRESERVATION - BRIDGE (OFFSYSTEM)
4-SCHEDULED FOR LETTING FY 19-20
ST TAMMANY 000-52 FBROFF 1,500 PRESERVATION - BRIDGE (OFFSYSTEM)
BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
MILLION DOLLAR RD/HOSMER MILL RD BRIDGES
H.011216
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY 000-52 HSIPPEN 377 SAFETY - LOCAL ROADS SAFETY 4-SCHEDULED FOR LETTING FY 19-20
PURCHASE AND INSTALL PAVEMENT MARKINGS ON 12 LOCAL ROADSMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
CITY OF SLIDELL PAVEMENT MARKINGS
H.011260
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY US 190-X 013-10 HSIP 948 SAFETY 4-SCHEDULED FOR LETTING FY 19-20ST TAMMANY 000-52 HSIP 948 SAFETY
ROUNDABOUT CONSTRUCTIONTASSIN, BEN Remrks:
Typ Imp:
Project:Prj Mgr:
US 190B @ JEFFERSON AVE. ROUNDABOUT
H.011721
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 22 013-12 STP<200K 2,134 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20ST TAMMANY LA 22 261-06 STP<200K 1,066 URBAN SYSTEMS
INTERSECTION IMPROVEMENTSBANKSTON, TANYA Remrks:
Typ Imp:USE TTF AS MATCH
Project:Prj Mgr:
US 190/LA 22 IMPROVEMENTS
H.012064
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY US 190 030-31 NHPP 2,584 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 19-20
WIDEN TO THREE LANESSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 190: US 190B - LA 25
H.012856
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY 000-52 STP<200K 798 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20
REHABILITATIONBANKSTON, TANYA Remrks:
Typ Imp:CITY OF SLIDELL WILL PROVIDE MATCH
Project:Prj Mgr:
NATCHEZ DRIVE REHABILITATION
H.013151
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY US 190 852-24 STP<200K 624 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20
SIDEWALK IMPROVEMENTSBANKSTON, TANYA Remrks:
Typ Imp:CITY OF SLIDELL TO PROVIDE MATCH
Project:Prj Mgr:
US 190(GAUSE BLVD) SIDEWALK IMPROVEMENTS
Page 1 - 45 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.013381
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY 000-52 STP<200K 277 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20
TURN LANEBANKSTON, TANYA Remrks:
Typ Imp:CITY OF SLIDELL TO PROVIDE MATCH
Project:Prj Mgr:
LINDBERG DRIVE @ US 190(GAUSE BLVD)
H.013711
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY I-12 454-04 NHPP 1,900 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
4-SCHEDULED FOR LETTING FY 19-20
ST TAMMANY US 190 013-11 NHPP 100 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
NEW ITS EQUIPMENT, UPGRADE ITS EQUIPMENT, FIBER OPTIC CABLEESTEVEN, ROY Remrks:
Typ Imp:
Project:Prj Mgr:
NORTHSHORE PHASE 3 ITS DEPLOYMENT
H.013728
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 41 058-01 STPFLEX 3,100 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED FOR LETTING FY 19-20
MILL & OVERLAYBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 41: DUMP ROAD - LA 436
H.013845
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY I-10 450-18 NHPP 261 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
4-SCHEDULED FOR LETTING FY 19-20
ST JOHN I-55 452-01 NHPP 261 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
SIGN UPGRADESFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
I-10 & I-55: OVERHEAD SIGN UPGRADE
H.010645
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA LA 38 263-04 STPFLEX 1,500 RAILROADS 4-SCHEDULED IN CURRENT FY 18-19
RAILROAD SIGNALS AND SURFACE WORKSHREWSBERRY,BILL Remrks:
Typ Imp:SEE NOTES FOR FUNDING. STBONDS AVAILABLE FOR MATCH
Project:Prj Mgr:
IC(KENTWOOD) LA 38 RR X-ING IN KENTWOOD
TANGIPAHOA
H.012874
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA I-55 452-90 NHPP 2,409 OPER EFFICIENCY/MOTORISTASSISTANCE - INTERSTATE LIGHTING
4-SCHEDULED IN CURRENT FY 18-19
PROVIDE ROADWAY LIGHTINGFUNG, AGNES Remrks:
Typ Imp:
Project:Prj Mgr:
I-55: LA 22 INTERSTATE LIGHTING
H.013077
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA I-55 452-90 STCASH 250 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 18-19
SEWER FACILITY REPAIRSBERNER, DARRICK Remrks:
Typ Imp:OPERATING/MISCELLANEOUS REPAIR FUNDS WILL BE USED
Project:Prj Mgr:
I-55 REST AREA SEWER FACILITY REPAIR
H.013260
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA I-55 452-90 NHPP 3,103 PRESERVATION - INTERSTATE 4-SCHEDULED IN CURRENT FY 18-19
SLOPE FAILURE REPAIRBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
I-55: .2 MILE S US 190 OVP SLOPE REPAIR
Page 1 - 46 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.013266
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA US 51 017-04 NHPP 149 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED IN CURRENT FY 18-19
TANGIPAHOA US 51-X 853-36 NHPP 132 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
TANGIPAHOA LA 3234 853-40 NHPP 333 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
TANGIPAHOA US 51-X 013-08 NHPP 296 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
TANGIPAHOA US 190 013-09 NHPP 115 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
MINOR REHABBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
US 51, 51-X, 190, LA 3234: CONC SPOT REP
H.013814
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA LA 440 276-04 STCASH 100 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 18-19
REPAIR TO BOX CULVERTS WITH INVERT ERROR ON LA 440TASSIN, BEN Remrks:
Typ Imp:MISCELLANEOUS REPAIR/NO QUALIFYING PROGRAM FUNDS PROJECT
Project:Prj Mgr:
LA 440: BOX CULVERT REPAIR
H.011512
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA US 51 017-05 STPFLEX 100 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
4-SCHEDULED FOR LETTING FY 19-20
ADDITIONAL PIPE(S), CATCH BASINS, AND/OR ASPHALTGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
US 51 @ SYCAMORE ST AMITE CITY DRAINAGE
H.011519
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA LA 1063 853-34 STPFLEX 225 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
4-SCHEDULED FOR LETTING FY 19-20
ADDITIONAL PIPE(S), CATCH BASINS, AND/OR ASPHALTGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1063: GLENDALE DR - US 51 DRAINAGE
H.013113
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA LA 22 261-03 STP<200K 2,920 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20LIVINGSTON LA 22 261-02 STP<200K 80 URBAN SYSTEMS
ADDING CONTINUOUS TURN LANEBANKSTON, TANYA Remrks:
Typ Imp:DOTD WILL PROVIDE THE MATCH
Project:Prj Mgr:
LA 22: LA 42 - YELLOW WATER RIVER
H.013334
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA LA 16 047-01 STPFLEX 62 RAILROADS 4-SCHEDULED FOR LETTING FY 19-20TANGIPAHOA LA 16 047-01 LOCAL 37 RAILROADS
REPLACE RAILROAD CROSSING SURFACELUKE, SHAWN Remrks:
Typ Imp:MATCH FROM RAILROAD
Project:Prj Mgr:
LA 16: IC RR XING (AMITE)
H.013476
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA LA 1059 853-15 NFA 550 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 19-20
ASPHALT OVERLAYTASSIN, BEN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1059: LA 1058 TO RIVER RD
H.013478
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA LA 3272 870-22 NFA 584 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 19-20
CEMENT TREATED BASE COURSE AND OVERLAYTASSIN, BEN Remrks:
Typ Imp:
Project:Prj Mgr:
S. RIVER ROAD: LA 10 - VERNON TOWN RD
Page 1 - 47 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.011734
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TENSAS LA 573 186-04 STP<5K 1,103 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED FOR LETTING FY 19-20
TENSAS LA 568 075-03 STP<5K 337 PRESERVATION - NON-INTERSTATENFA
PATCH & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:USE NFA AS MATCH
Project:Prj Mgr:
LA 568, LA573: US 65 - BIG CHOCTAW BAYOU
TENSAS
H.013235
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TENSAS LA 608 854-06 NFA 2,700 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED FOR LETTING FY 19-20
PATCH & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 608: LA 887 - N. JCT LA 605
H.013742
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TENSAS LA 575 351-01 NFA 3,000 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED FOR LETTING FY 19-20
PATCH & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 575: LA 4 - LA 888
H.010890
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 182 005-05 STPFLEX 1,051 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
4-SCHEDULED IN CURRENT FY 18-19
TERREBONNE 000-55 STPFLEX 442 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
ADD ROUNDABOUTHARROUCH, JOSHUA Remrks:
Typ Imp:
Project:Prj Mgr:
LA 182: ROUNDABOUT AT HOLLYWOOD RD
TERREBONNE
H.012338
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE 000-55 STP<200K 368 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 18-19
NEW SIDEWALKSBANKSTON, TANYA Remrks:
Typ Imp:TERREBONNE PARISH PROVIDING THE MATCH
Project:Prj Mgr:
CIVIC CENTER SIDEWALKS
H.012949
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 315 245-90 NHPP 250 OPER EFFICIENCY/MOTORISTASSISTANCE - MOVABLE BRIDGEREHABILITATION
4-SCHEDULED IN CURRENT FY 18-19
MOVABLE BRIDGE MACHINERY REPAIRSLAMBERT, JARRETT Remrks:
Typ Imp:
Project:Prj Mgr:
DULARGE BR LOCK BAR REHABILITATION
H.012957
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 24 065-91 STPFLEX 350 OPER EFFICIENCY/MOTORISTASSISTANCE - MOVABLE BRIDGEREHABILITATION
4-SCHEDULED IN CURRENT FY 18-19
ELECTRICAL REHABRODY, WALTER Remrks:
Typ Imp:
Project:Prj Mgr:
LA 24: PRESQUE ISLE BR ELEC REHAB
Page 1 - 48 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.001498
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 24 065-91 STPFLEX 31,565 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED FOR LETTING FY 19-20
BRIDGE REPLACEMENTPAINE, PEGGY JO Remrks:
Typ Imp:065-91-0017;STAGE 0 FEASIBILITY STUDY
Project:Prj Mgr:
LA 24 & LA 316: COMPANY CANAL BRIDGE
H.010410
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 24 065-04 NHPP 4,000 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED FOR LETTING FY 19-20
COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETESPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 24: LA 20 - LA 664 (SB)
H.011533
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE 000-55 FBROFF 729 PRESERVATION - BRIDGE (OFFSYSTEM)
4-SCHEDULED FOR LETTING FY 19-20
BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
N. BAYOU BLACK DRIVE / HANSON CANAL
H.012337
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE 000-55 STP<200K 263 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20
NEW SIDEWALKBANKSTON, TANYA Remrks:
Typ Imp:TERREBONNE PARISH PROVIDING MATCH
Project:Prj Mgr:
PROSPECT BLVD SIDEWALKS
H.012339
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 24 065-04 STP<200K 781 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20TERREBONNE LA 182 005-05 STP<200K 319 URBAN SYSTEMS
SIDEWALK REHABILITATIONBANKSTON, TANYA Remrks:
Typ Imp:TERREBONNE PARISH TO PROVIDE MATCH
Project:Prj Mgr:
LA 24 SIDEWALK REHAB
H.013756
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 311 413-01 STPFLEX 250 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 19-20
ADD LEFT TURN LANE AT LA 311 AND ELLENDALE BLVDBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 311: LEFT TURN LANE AT ELLENDALE
H.013761
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 315 245-90 STPFLEX 375 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
4-SCHEDULED FOR LETTING FY 19-20
LAFOURCHE LA 24 065-01 STPFLEX 375 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
APPROACH SLAB LEVELING WITH ASPHALT CONCRETESPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 315 & LA 24 APPROACH SLAB LEVELING
H.011530
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
UNION 000-56 FBROFF 585 PRESERVATION - BRIDGE (OFFSYSTEM)
4-SCHEDULED IN CURRENT FY 18-19
BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
CYPRESS CREEK ROAD / BOATWRIGHT CREEK
UNION
Page 1 - 49 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.013079
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
UNION 000-56 HSIPPEN 670 SAFETY - SAFE ROUTES TO PUBLICPLACES
4-SCHEDULED FOR LETTING FY 19-20
CONSTRUCT SIDEWALKS AND OTHER SAFETY IMPROVEMENTSMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
TOWN OF FARMERVILLE SIDEWALKS
H.009792
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERMILION LA 35 207-03 TAP<5K 284 ENHANCEMENTS 4-SCHEDULED IN CURRENT FY 18-19VERMILION LA 35 207-03 TAP<5K 286 ENHANCEMENTS VERMILION LA 35 207-03 LOCAL 0 ENHANCEMENTS
SIDEWALKS W/ LANDSCAPING, SUBSURFACE DRAINAGE & RELATED WOMEEK, STEPHEN Remrks:
Typ Imp:MATCH IS 15% TOLL CREDITS AND 5% LOCAL
Project:Prj Mgr:
LA 35: KAPLAN SIDEWALKS, PHASES I & II
VERMILION
H.010353
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERMILION US 167 080-01 HSIP 649 SAFETY 4-SCHEDULED IN CURRENT FY 18-19LAFAYETTE US 167 080-02 HSIP 12,583 SAFETY
ACCESS MANAGEMENT, LEFT TURN LANES AND U-TURNSDOMINGUE, CHRISTOPHER Remrks:
Typ Imp:
Project:Prj Mgr:
US 167: ACCESS MANAGEMENT (LFT TURN LNS)
H.010867
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERMILION 000-57 FBROFF 502 PRESERVATION - BRIDGE (OFFSYSTEM)
4-SCHEDULED IN CURRENT FY 18-19
VERMILION 000-57 FBROFF 759 PRESERVATION - BRIDGE (OFFSYSTEM)
BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
JUDE & PLACIDE ROAD BRIDGES
H.001883
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERNON LA 465 137-02 NFA 336 PRESERVATION - NON-INTERSTATENFA
4-SCHEDULED FOR LETTING FY 19-20
CHIP SEAL, MILL, BASE REHAB & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:137-02-0017
Project:Prj Mgr:
LA 465: LA 8 - LA 28
VERNON
H.006339
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERNON 000-58 FBROFF 795 PRESERVATION - BRIDGE (OFFSYSTEM)
4-SCHEDULED FOR LETTING FY 19-20
BRIDGE REPLACEMENT - ROADWAY REALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
SECTION LINE ROAD BRIDGE
H.011909
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERNON US 171 024-06 NHPP 2,302 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
4-SCHEDULED FOR LETTING FY 19-20
VERNON 000-58 STPFLEX 2,302 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
ROUNDABOUT INTERSECTION IMPROVEMENTHARROUCH, JOSHUA Remrks:
Typ Imp:
Project:Prj Mgr:
ROUNDABOUT: US 171 AT BOONE ST.
Page 1 - 50 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.013067
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WASHINGTON LA 436 274-01 STPFLEX 4,874 PRESERVATION - NON-INTERSTATEON STP SYSTEM
4-SCHEDULED FOR LETTING FY 19-20
WASHINGTON LA 436 859-08 NFA 3,150 PRESERVATION - NON-INTERSTATENFA
COLD PLANE AND 3.5 INCH OVERLAYBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 436: BURCH CREEK - MONROE CREEK RD
WASHINGTON
H.010008
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WEBSTER LA 532 860-07 FBROFF 3,517 PRESERVATION - BRIDGE (ONSYSTEM)
4-SCHEDULED IN CURRENT FY 18-19
BRIDGE REPLACEMENTGUIDRY, CHRIS Remrks:
Typ Imp:USE NFA AS MATCH
Project:Prj Mgr:
LA 532 OVER I-20 BRIDGE REPLACEMENT
WEBSTER
H.013002
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WEBSTER LA 531 111-01 STPFLEX 330 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
4-SCHEDULED FOR LETTING FY 19-20
ASPHALT SURFACE TREATMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 531: LA 792 TO LA 532
H.012323
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W BATON ROUGE LA 990 861-15 NFA 518 ROAD TRANSFER 4-SCHEDULED IN CURRENT FY 18-19
MILL, PATCH, OVERLAY, AND DRAINAGEGARY, VERTIE Remrks:
Typ Imp:
Project:Prj Mgr:
LA990: 6TH-ED LEJEUNE (OVERLAY-DRAINAGE)
W BATON ROUGE
H.012395
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W BATON ROUGE LA 415 013-01 NHPP 3,548 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED IN CURRENT FY 18-19
W BATON ROUGE LA 415 013-01 STPFLEX 65 PRESERVATION - NON-INTERSTATEON STP SYSTEM
W BATON ROUGE US 190 008-01 NHPP 1,377 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
W BATON ROUGE LA 415 861-22 NHPP 154 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
MILL, OVERLAY AND PCCP REHABSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 415 & US 190: OVERLAY & PATCHING
H.013852
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W BATON ROUGE LA 1 050-07 NHPP 819 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED IN CURRENT FY 18-19
ASPHALT PATCHING, MILLING, OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1: SHOULDER IMPROVEMENTS
H.013867
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W BATON ROUGE I-10 450-08 NHPP 606 PRESERVATION - INTERSTATE 4-SCHEDULED IN CURRENT FY 18-19
BASE AND SURFACING REMOVAL, BASE COURSE, PCC PAVEMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
I-10 WB: LA 415 EXIT RAMP IMPROVEMENTS
Page 1 - 51 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.013892
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W BATON ROUGE LA 1 050-07 STGEN 175 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 18-19
GIRDER REPAIRHAMMACK, TERRI ROBISON Remrks:
Typ Imp:SECRETARY APPROVAL LETTER DATED 3/20/2019
Project:Prj Mgr:
LA 1:EMERGENCY REPAIR SB INTRACOASTAL BR
H.010654
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W BATON ROUGE LA 415 861-22 STP>200K 207 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 19-20W BATON ROUGE 000-61 LOCAL 323 URBAN SYSTEMS
PAVEMENT REHABILITATIONLEBAS, MELISSA Remrks:
Typ Imp:USE LOCAL AS MATCH
Project:Prj Mgr:
LA 415:I-10 TO APPROXIMATELY 0.41M SOUTH
H.011558
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W BATON ROUGE 000-61 CM 610 CONGESTION MITIGATION 4-SCHEDULED FOR LETTING FY 19-20
CONSTRUCT ACADIAN TRAILHANKS, ANNA Remrks:
Typ Imp:USE LOCAL AS MATCH
Project:Prj Mgr:
ACADIAN TRAIL (WEST BATON ROUGE)
H.012076
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W BATON ROUGE LA 415 013-01 NHPP 202 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 19-20
ADD NB RIGHT TURN LANE ON LA 415SPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 415: IMPROVEMENTS AT PLANTATION AVE
H.012212
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W BATON ROUGE 000-61 RTP 112 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 19-20W BATON ROUGE 000-61 LOCAL 59 RECREATIONAL TRAILS PROGRAM
CONSTRUCTION OF 1055' CONCRETE TRAIL & 800 SQ.FT. OVERLOOKNUNES, BRIAN Remrks:
Typ Imp:CRT IS THE PROJECT MANAGER
Project:Prj Mgr:
WEST BATON ROUGE MUSEUM LEVEE TRAIL
H.012834
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W BATON ROUGE LA 988 861-14 CM 86 CONGESTION MITIGATION 4-SCHEDULED FOR LETTING FY 19-20W BATON ROUGE 000-61 CM 345 CONGESTION MITIGATION
CONSTRUCT TRAILMUSA, ELNUR Remrks:
Typ Imp:ENTITY PROVIDES THE MATCH
Project:Prj Mgr:
JOLIET TRAIL (BRUSLY)
H.013191
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W BATON ROUGE LA 1 050-07 NHPP 7,000 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
4-SCHEDULED FOR LETTING FY 19-20
IBERVILLE LA 1 050-06 NHPP 700 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
MILL, PATCH & OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1: LA 75 - PORT ALLEN CANAL BR
H.010597
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W FELICIANA 000-63 FBROFF 3,879 PRESERVATION - BRIDGE (OFFSYSTEM)
4-SCHEDULED FOR LETTING FY 19-20
W FELICIANA 000-63 FBROFF 1,000 PRESERVATION - BRIDGE (OFFSYSTEM)
BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
SLIGO ROAD BRIDGES
W FELICIANA
Page 1 - 52 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.013278
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 02 000-92 STPFLEX 4,911 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
4-SCHEDULED IN CURRENT FY 18-19
TRAFFIC SIGNAL UPGRADEFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DIST. 02BC FLASHING YELLOW ARROW PART 1
DISTRICT 02
H.009054
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 02 000-92 STPFLEX 1,500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
4-SCHEDULED FOR LETTING FY 19-20
PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MAKERSCOLVIN, JODY Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: PAVEMENT MARKING REPLACEMENT IX
H.013594
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 02 000-92 SATRANS 105 SAFETY 4-SCHEDULED FOR LETTING FY 19-20
SIGNINGLEBLANC, GARY Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 02 LOW COST SAFETY IMPR. PH. 2
H.013595
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 03 000-93 SATRANS 350 SAFETY 4-SCHEDULED FOR LETTING FY 19-20
SIGNINGLEBLANC, GARY Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 03 LOW COST SAFETY IMPR. PH. 2
DISTRICT 03
H.013601
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 04 000-94 SATRANS 145 SAFETY 4-SCHEDULED FOR LETTING FY 19-20
SIGNINGLEBLANC, GARY Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 04 LOW COST SAFETY IMPR. PH. 2
DISTRICT 04
H.013602
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 05 000-95 SATRANS 170 SAFETY 4-SCHEDULED FOR LETTING FY 19-20
SIGNINGLEBLANC, GARY Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 05 LOW COST SAFETY IMPR. PH. 2
DISTRICT 05
H.013603
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 07 000-97 SATRANS 50 SAFETY 4-SCHEDULED FOR LETTING FY 19-20
SIGNINGLEBLANC, GARY Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 07 LOW COST SAFETY IMPR. PH. 2
DISTRICT 07
H.013604
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 08 000-98 SATRANS 300 SAFETY 4-SCHEDULED FOR LETTING FY 19-20
SIGNINGLEBLANC, GARY Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 08 LOW COST SAFETY IMPR. PH. 2
DISTRICT 08
Page 1 - 53 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.012464
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 58 000-91 STPFLEX 1,650 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
4-SCHEDULED IN CURRENT FY 18-19
TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 58 FLASHING YELLOW ARROW
DISTRICT 58
H.013605
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 58 000-91 SATRANS 55 SAFETY 4-SCHEDULED FOR LETTING FY 19-20
SIGNINGLEBLANC, GARY Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 58 LOW COST SAFETY IMPR. PH. 2
H.013096
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 61 000-96 FEMA 798 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 19-20
RETROFIT EXISTING WINDOWS TO 21 BUILDINGS IN DISTRICT 61NEYLAND, CODI Remrks:
Typ Imp:
Project:Prj Mgr:
DIST. 61 HURRICANE PROTECTION SCREENS
DISTRICT 61
H.013606
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 61 000-96 SATRANS 185 SAFETY 4-SCHEDULED FOR LETTING FY 19-20
SIGNINGLEBLANC, GARY Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 61 LOW COST SAFETY IMPR. PH. 2
H.012650
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 62 000-90 STPFLEX 925 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE
4-SCHEDULED IN CURRENT FY 18-19
LIVINGSTON I-12 454-02 NHPP 499 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE
TANGIPAHOA I-55 452-90 NHPP 178 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE
TANGIPAHOA LA 1063 853-34 STPFLEX 59 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE
DISTRICT-WIDE REPAIRS TO VARIOUS BRIDGESTULLIER, DANNY Remrks:
Typ Imp:USE NFA AS MATCH ON CS 853-34
Project:Prj Mgr:
DISTRICT 62 -DISTRICTWIDE BRIDGE REPAIRS
DISTRICT 62
H.012670
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 62 000-90 STPFLEX 166 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
4-SCHEDULED IN CURRENT FY 18-19
TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 62 PERFORMANCE MEASURE
H.013607
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 62 000-90 SATRANS 225 SAFETY 4-SCHEDULED FOR LETTING FY 19-20
SIGNINGLEBLANC, GARY Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 62 LOW COST SAFETY IMPR. PH. 2
Page 1 - 54 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.010691
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
STATEWIDE 000-99 FB DISCR 1,250 OPER EFFICIENCY/MOTORISTASSISTANCE - FERRY PROJECTS
4-SCHEDULED IN CURRENT FY 18-19
DRY-DOCK FOR USCG 5 YEAR EXAM & REPOWERSIBLEY, STEVEN Remrks:
Typ Imp:FUNDS TRANSFERRED FROM FHWA TO FTA
Project:Prj Mgr:
MV STUMPF: DRY-DOCK: 5 YR EXAM & REPOWER
STATEWIDE
H.013396
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
STATEWIDE 000-99 0 SAFETY 4-SCHEDULED IN CURRENT FY 18-19
LRSP TECH ASSISTANCE CRASH DATA ENGRRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
LRSP/SR2PP CRASH DATA ENG 2018-2023
H.013464
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
STATEWIDE 000-99 0 SAFETY 4-SCHEDULED IN CURRENT FY 18-19
SHSP LAW ENFORCEMENT EXPERTCOSTELLO, BRYAN Remrks:
Typ Imp:
Project:Prj Mgr:
SHSP LAW ENFORCEMENT EXPERT SFY2019-2021
H.013533
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
STATEWIDE 000-99 0 SAFETY 4-SCHEDULED IN CURRENT FY 18-19
LRSP/SR2PP ENGINEERRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
LRSP/SR2PP ENGINEER 2 2019-2023
H.013535
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
STATEWIDE 000-99 0 SAFETY 4-SCHEDULED IN CURRENT FY 18-19
LRSP/SR2PP ENGINEERRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
LRSP/SR2PP ENGINEER 1 2019-2023
H.013801
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
STATEWIDE 000-99 FB DISCR 750 OPER EFFICIENCY/MOTORISTASSISTANCE - FERRY PROJECTS
4-SCHEDULED IN CURRENT FY 18-19
DRYDOCK FOR USCG EXAM AND REPAIRSSIBLEY, STEVEN Remrks:
Typ Imp:PLAQUEMINES PARISH GOVERNMENT TO PROVIDE MATCH
Project:Prj Mgr:
M/V BELLE CHASSE II DRYDOCK & USCG EXAM
H.012164
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
STATEWIDE 000-99 OTHER 700 OPER EFFICIENCY/MOTORISTASSISTANCE - WEIGH STATIONS
4-SCHEDULED FOR LETTING FY 19-20
VIRTUAL WEIGH STATION INSTALLATIONBROWN, JEFF Remrks:
Typ Imp:
Project:Prj Mgr:
STATE WIDE VIRTUAL WEIGH STATION
H.012692
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
STATEWIDE 000-99 FB DISCR 3,000 OPER EFFICIENCY/MOTORISTASSISTANCE - FERRY PROJECTS
4-SCHEDULED FOR LETTING FY 19-20
DRYDOCK FOR USCG EXAM AND OTHER MAINTENANCE & REPAIRSMILLET, WALTER Remrks:
Typ Imp:
Project:Prj Mgr:
MV CAMERON II: REPOWER & USCG EXAM 2019
H.013841
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
STATEWIDE 000-99 STPFLEX 300 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
4-SCHEDULED FOR LETTING FY 19-20
SEA, RFP DEVELOPMENT AND IMPLEMENTATION OF REPLACEMENT VDSOLLIE, CARRYN Remrks:
Typ Imp:
Project:Prj Mgr:
VDMS SYSTEM REPLACEMENT
Page 1 - 55 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 20204-SCHEDULED FOR LETTING
H.013848
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
STATEWIDE 000-99 STPFLEX 300 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
4-SCHEDULED FOR LETTING FY 19-20
ATMS INET ENHANCEMENTS PROJECTSOLLIE, CARRYN Remrks:
Typ Imp:
Project:Prj Mgr:
ATMS INET ENHANCEMENTS PROJECT
H.013868
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
STATEWIDE 000-99 STPFLEX 3,000 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
4-SCHEDULED FOR LETTING FY 19-20
MANAGEMENT, OPERATIONS, AND MAINTENANCE OF ITS DEVICESSMITH, ERIK Remrks:
Typ Imp:
Project:Prj Mgr:
ITS MGMT, OPERATIONS, & MAINT STATEWIDE
H.013885
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
STATEWIDE 000-99 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
4-SCHEDULED FOR LETTING FY 19-20
CAV STRATEGIC BUSNESS PLANSOLLIE, CARRYN Remrks:
Typ Imp:
Project:Prj Mgr:
CAV STRATEGIC BUSINESS PLAN
L.000006
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- NHPP 2,100 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
4-SCHEDULED FOR LETTING FY 19-20
- STP>200K 2,800 URBAN SYSTEMS - STP<200K 690 URBAN SYSTEMS
MAPNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
MOTORIST ASSISTANCE PATROL
L-PROJECTS
L.000028
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- STCASH 5,000 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 19-20
HOT MIX, PIPE, BRIDGE MATERIAL, ETCNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
MAINTENANCE MATERIALS
L.000030
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- STCASH 1,500 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 19-20
Not assigned Remrks:
Typ Imp:
Project:Prj Mgr:
IMPACT ATTENUATOR REPLACEMENT/REPAIR
L.000059
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- STCASH 1,250 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 19-20
Not assigned Remrks:
Typ Imp:
Project:Prj Mgr:
CABLE BARRIER REPLACEMENT/REPAIR
L.000098
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- STCASH 2,500 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 19-20
Not assigned Remrks:
Typ Imp:
Project:Prj Mgr:
GUARDRAIL REPLACEMENT/REPAIR
Page 1 - 56 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
PROJECTS IN DEVELOPMENT
Per RS 48:230, the following is “…an additional list of
projects proposed to be commenced within the ensuing four
years which are in various stages of planning and
preparation. This list shall be subject to change by the
department until the department finally approves each
project for construction.”
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.002123
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA LA 35 207-07 TAP<200K 434 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SIDEWALKS, LIGHTING AND RELATED WORKMEEK, STEPHEN Remrks:
Typ Imp:207-07-0028
Project:Prj Mgr:
RAYNE SIDEWALKS, PH. III
ACADIA
H.007369
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA US 90 003-10 TAP<200K 265 ENHANCEMENTS 3-DESIGN/DEVELOPMENTACADIA LA 35 207-07 TAP<200K 155 ENHANCEMENTS
CONCRETE WALKS AND DRIVES AND RELATED WORKMEEK, STEPHEN Remrks:
Typ Imp:744-01-0013
Project:Prj Mgr:
RAYNE SIDEWALKS, PH. II
H.010222
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA LA 97 201-03 STPFLEX 4,130 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
STABILIZE BASE & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 97: LA 98 - LA 368
H.010962
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA I-10 450-04 HSIP 4,041 SAFETY 3-DESIGN/DEVELOPMENTLAFAYETTE I-10 450-05 HSIP 1,478 SAFETY
INSTALL MEDIAN CABLE BARRIERDOMINGUE, CHRISTOPHER Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: CABLE BARRIER (LAFAYETTE/ACADIA)
H.011829
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA I-10 450-04 STPFLEX 2,500 ROAD TRANSFER 3-DESIGN/DEVELOPMENTACADIA LA 100 211-01 LOCAL 75 ROAD TRANSFER
WIDENING, CLASS II BASE, BASE REHAB, AND ASPHALT OVERLAYMCMILLAN, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
IMP@LA13 & LA100 & I-10 ACC.RD (CROWLEY)
H.011922
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA 000-01 STP<5K 1,179 ROAD TRANSFER 3-DESIGN/DEVELOPMENT
PATCH, WIDEN, BASE REHAB, ASPHALT OVERLAY, DRAIN., & RELATEDMCMILLAN, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1112 - LA 13 (ROAD TRANSFER IMP.)
H.012021
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA US 90 003-10 TAP<200K 459 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SIDEWALK IMPROVEMENTSNUNES, BRIAN Remrks:
Typ Imp:MATCH PROVIDED BY CITY OF RAYNE.
Project:Prj Mgr:
US 90: ADAMS AVE SW IMPROVEMENTS, PH IV
H.012024
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA 000-01 TAP<200K 761 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SIDEWALK IMPROVEMENTSNUNES, BRIAN Remrks:
Typ Imp:LOCAL MATCH PROVIDED BY THE CITY OF CROWLEY
Project:Prj Mgr:
CROWLEY: PARKERSON AVE SW IMPROVEMENTS
H.012174
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA I-10 450-04 NHPP 14,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENTLAFAYETTE I-10 450-05 NHPP 6,000 PRESERVATION - INTERSTATE
OGFC, APPROACH SLAB & EMBANKMENT SLIDE REPAIR & RELATEDMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-10:JEFF DAV PL-I-49 (OGFC/SLAB REPAIR)
Page 2 - 1 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.012892
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA LA 1123 801-04 NFA 960 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
ACADIA LA 3116 801-61 STPFLEX 1,320 PRESERVATION - BRIDGE (ONSYSTEM)
LAFAYETTE LA 723 828-03 STPFLEX 240 PRESERVATION - BRIDGE (ONSYSTEM)
ST MARTIN LA 321 850-19 NFA 960 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:
Typ Imp:
Project:Prj Mgr:
DIST03:ABC BR REPLACE AC,LAF,ST MAR PARS
H.012919
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA LA 100 211-30 NFA 4,390 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
BASE STABILIZATION, ASPHALT OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 100: LA 97 - LA 91
H.012923
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA LA 91 801-11 STPFLEX 1,006 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
3-DESIGN/DEVELOPMENT
ACADIA LA 91 211-04 STPFLEX 559 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
ACADIA LA 91 211-03 STPFLEX 671 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
THIN ASPHALT OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 91: LA 3067 - W JCT ST LANDRY PL
H.013195
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA LA 98 210-04 HSIP 1,042 SAFETY 3-DESIGN/DEVELOPMENTACADIA LA 98 210-04 STPFLEX 1,500 PRESERVATION - NON-INTERSTATE
NFA
ACADIA LA 98 210-04 STPFLEX 1,415 PRESERVATION - BRIDGE (ONSYSTEM)
BASE STABILIZATION, OVERLAY, AND CURVE REALIGNMENTMOORE, DARRELL Remrks:
Typ Imp:
Project:Prj Mgr:
LA 98 CURVE REALIGNMENT
H.013363
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA LA 1111 801-30 STPFLEX 1,600 ROAD TRANSFER 3-DESIGN/DEVELOPMENTACADIA LA 1111 801-30 STPFLEX 900 ROAD TRANSFER
WIDEN LA 1111 TO ADD A CONTINUOUS TURN LANENUNES, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1111 WIDENING: LA 13 - LA 1111-S
H.013526
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA 000-01 RTP 112 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTACADIA 000-01 LOCAL 23 RECREATIONAL TRAILS PROGRAM
CONSTRUCTION OF 1800' WALKING TRAILNUNES, BRIAN Remrks:
Typ Imp:THE CITY OF CROWLEY WILL PROVIDE THE LOCAL MATCH
Project:Prj Mgr:
BAYOU BLANC NATURE TRAIL
H.013772
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA 000-01 0 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT
FEASIBILITY STUDYRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
SYSTEMIC CURVE SIGNING (ACADIA)
Page 2 - 2 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.013790
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA LA 98 389-01 STPFLEX 1,200 ROAD TRANSFER 3-DESIGN/DEVELOPMENT
ASPHALT OVERLAY WITH ISOLATED RECONSTRUCTIONPORTER BETTS, CONNIE Remrks:
Typ Imp:
Project:Prj Mgr:
LA 98: LA 35 - LLAMA RD
H.009298
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ALLEN 000-02 SR2S 262 SAFETY - SAFE ROUTES TO SCHOOLS 3-DESIGN/DEVELOPMENT
SIDEWALK IMPROVMENTS, MARKED CROSSINGSRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
TOWN OF OBERLIN SIDEWALKS
ALLEN
H.012899
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ALLEN LA 10 066-04 STPFLEX 480 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BEAUREGARD LA 389 187-04 STPFLEX 2,280 PRESERVATION - BRIDGE (ONSYSTEM)
BEAUREGARD LA 1147 806-02 NFA 2,040 PRESERVATION - BRIDGE (ONSYSTEM)
BEAUREGARD LA 27 031-09 NHPP 600 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:
Typ Imp:
Project:Prj Mgr:
DIST07:ABC BR REP ALLEN, BEA, J DAV PARS
H.012039
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ALLEN LA 372 802-05 NFA 1,121 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTCAVALIER, STEPHANIE Remrks:
Typ Imp:
Project:Prj Mgr:
LA 372: CREEK BRIDGE
H.006457
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION 000-03 HSIPPEN 1,000 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT
ROUNDABOUT CONSTRUCTIONRIGGS, LAURA Remrks:
Typ Imp:737-03-0104
Project:Prj Mgr:
ROUNDABOUT @ PR 929 & PARKER ROADS
ASCENSION
H.006459
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION 000-03 HSIPPEN 1,000 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT
ROUNDABOUTRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
ROUNDABOUT AT CHURCHPOINT RD AND RODDY
H.010074
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION LA 3089 426-01 RAIL HE 250 RAILROADS 3-DESIGN/DEVELOPMENT
ROAD WORK AROUND CROSSING TO MAKE SAFERSHREWSBERRY,BILL Remrks:
Typ Imp:426-01-0026
Project:Prj Mgr:
UP (DONALDSONVILLE) LA 3089 SERVICE RD.
H.010795
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION LA 42 260-01 HSIP 1,497 SAFETY 3-DESIGN/DEVELOPMENTASCENSION 000-03 HSIP 966 SAFETY
INSTALL SINGLE LANE ROUNDABOUTMOORE, DARRELL Remrks:
Typ Imp:
Project:Prj Mgr:
LA 42: ROUNDABOUT AT JOE SEVARIO ROAD
Page 2 - 3 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.010909
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION LA 44 265-01 NFI 1,200 SAFETY 3-DESIGN/DEVELOPMENTASCENSION LA 941 803-27 NFI 600 SAFETY ASCENSION 000-03 NFI 200 SAFETY
CONST. RAB NEAR LA44/LA941, WIDEN LA44 B/W I-10 & CONWAY RABHANKS, ANNA Remrks:
Typ Imp:FEASIBILITY STUDY FUNDED WITH SATRANS
Project:Prj Mgr:
LA 44: WIDENING AND ROUNDABOUT AT LA 941
H.010960
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION LA 30 414-03 STPFLEX 2,670 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
3-DESIGN/DEVELOPMENT
ASCENSION I-10 450-11 STPFLEX 2,670 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
ASCENSION 000-03 STPFLEX 2,660 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
3 ROUNDABOUTS ON LA 30 INCLUDING 2 AT THE I-10 RAMPSHARROUCH, JOSHUA Remrks:
Typ Imp:PROJECT DEPENDENT ON OUTCOME OF H.010572 CORRIDOR STUDY
Project:Prj Mgr:
LA 30 ROUNDABOUTS @ TANGER MALL & I-10
H.011577
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION LA 18 063-10 STPFLEX 2,278 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
ST JAMES LA 18 063-09 STPFLEX 222 PRESERVATION - NON-INTERSTATENFA
COLD PLANE & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:USE NFA AS MATCH
Project:Prj Mgr:
LA 18: SUNSHINE BR - LA 3120
H.012713
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION LA 74 264-03 STPFLEX 2,000 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
ASCENSION LA 74 264-02 STPFLEX 1,800 PRESERVATION - NON-INTERSTATEON STP SYSTEM
STABILIZE AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 74: IBERVILLE P/L - US 61
H.013012
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION LA 943 803-01 NFA 480 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
ASCENSION LA 621 803-08 STPFLEX 480 PRESERVATION - BRIDGE (ONSYSTEM)
ASCENSION LA 934 803-12 STPFLEX 480 PRESERVATION - BRIDGE (ONSYSTEM)
ASCENSION LA 935 803-21 STPFLEX 512 PRESERVATION - BRIDGE (ONSYSTEM)
ASSUMPTION LA 308 407-08 STPFLEX 600 PRESERVATION - BRIDGE (ONSYSTEM)
E FELICIANA LA 963 819-19 NFA 720 PRESERVATION - BRIDGE (ONSYSTEM)
POINTE COUPEE LA 970 839-05 NFA 360 PRESERVATION - BRIDGE (ONSYSTEM)
POINTE COUPEE LA 81 839-08 NFA 720 PRESERVATION - BRIDGE (ONSYSTEM)
W BATON ROUGE LA 986 228-07 STPFLEX 480 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:
Typ Imp:
Project:Prj Mgr:
DIST61:ABC BR RP AC,AS,E FL,P CO,WBR PAR
Page 2 - 4 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.013458
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION 000-03 FBROFF 388 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
ASCENSION 000-03 FBROFF 256 PRESERVATION - BRIDGE (OFFSYSTEM)
BRIDGE REPLACEMENT, NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
MANCHAC ACRES RD & H H WILSON RD BRIDGES
H.013621
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION 000-03 HSIPPEN 166 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT
SIGNS, STRIPING, TURN LANES, CROSS OVERSRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
LRSP SIGNS, STRIPING & X-OVERS(GONZALES)
H.013710
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION I-10 450-11 NHPP 427 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
3-DESIGN/DEVELOPMENT
ST JAMES I-10 450-12 NHPP 939 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
ST JOHN I-10 450-13 NHPP 1,839 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
DEPLOY FIBER OPTIC CABLE AND CAMERAS WITH POLESESTEVEN, ROY Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: US 61 TO LAPLACE ITS DEPLOYMENT
H.013726
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION LA 70 232-31 STPFLEX 1,020 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
ASCENSION LA 70 426-01 NHPP 1,780 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
ST JAMES LA 70 426-02 NHPP 4,200 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
MILL, PATCH, AND OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 70: ASCENSION P/L W - ASCENSION P/L E
H.013779
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION 000-03 HSIPPEN 400 RAILROADS 3-DESIGN/DEVELOPMENT
EXTEND REINE ST. AND CLOSE RAILROAD ST. XING OF KCSSHREWSBERRY,BILL Remrks:
Typ Imp:
Project:Prj Mgr:
REINE EXT & RAILRD ST:KCS XING(SORRENTO)
H.013793
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION 000-03 STP>200K 3,600 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
ASCENSION PARISH PROVIDING MATCHLEBAS, MELISSA Remrks:
Typ Imp:RECONSTRUCTION
Project:Prj Mgr:
GERMANY RD WIDENING (US 61 TO LA 44)
H.013850
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION 000-03 STP>200K 2,970 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
MINOR WIDENINGLEBAS, MELISSA Remrks:
Typ Imp:ASCENSION PARISH TO PROVIDE THE MATCH
Project:Prj Mgr:
DUPLESSIS RD WIDENING (US 61 - LA 73)
H.012057
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION LA 431 267-02 STPFLEX 1,301 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTHERATH, ANANDA Remrks:
Typ Imp:
Project:Prj Mgr:
LA 431:VILLAR CANAL AND DRAINAGE BRIDGES
Page 2 - 5 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.012607
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION LA 933 803-18 STPFLEX 1,250 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTSTONEY, PATRICK Remrks:
Typ Imp:
Project:Prj Mgr:
LA 933: HENDERSON BAYOU BRIDGE
H.011160
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION LA 73 077-02 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
0-FEASIBILITY/SCOPING
CORRIDOR STUDY TO COLLECT DATA AND DEVELOP ALTERNATIVESMASTIN, CATHERINE Remrks:
Typ Imp:
Project:Prj Mgr:
LA 73: LA 74 TO LA 621 CORRIDOR STUDY
H.012311
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION I-10 450-11 0 CAPACITY 0-FEASIBILITY/SCOPINGASCENSION LA 429 077-30 0 CAPACITY
STUDY FOR PROPOSED NEW CONNECTOR ROADZHANG, HONG Remrks:
Typ Imp:
Project:Prj Mgr:
LA 429 CONNECTOR (LA 30/LA 73 TO US 61)
H.010007
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASSUMPTION LA 70 232-01 STPFLEX 750 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE
3-DESIGN/DEVELOPMENT
CLEANING & PAINTINGTULLIER, DANNY Remrks:
Typ Imp:
Project:Prj Mgr:
LA 70:PIERRE PART BAY BR REHAB (HBI)
ASSUMPTION
H.012575
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASSUMPTION LA 70 232-01 STPFLEX 6,502 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
PATCH, COLD PLANE, AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 70: LA 1 - LA 1015-1
H.013001
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASSUMPTION LA 308 407-08 STPFLEX 3,000 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
MILL, STABILIZE, OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 308: LA 70 - ASCENSION P/L
H.013493
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASSUMPTION 000-04 STP<200K 80 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
ADA COMPLIANT SIDEWALKSBANKSTON, TANYA Remrks:
Typ Imp:MATCH BY VILLAGE OF NAPOLEONVILLE
Project:Prj Mgr:
WASHINGTON STREET SIDEWALKS
H.013500
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASSUMPTION 000-04 STP<200K 96 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
ADA COMPLIANT SIDEWALKSBANKSTON, TANYA Remrks:
Typ Imp:MATCH BY VILLAGE OF NAPOLEONVILLE
Project:Prj Mgr:
DR. MARTIN LUTHER KING PHASE 1
H.013501
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASSUMPTION 000-04 STP<200K 96 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
ADA COMPLIANT SIDEWALKSBANKSTON, TANYA Remrks:
Typ Imp:MATCH BY VILLAGE OF NAPOLEONVILLE
Project:Prj Mgr:
DR MARTIN LUTHER KING PHASE 2
Page 2 - 6 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.013786
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASSUMPTION LA 1247 804-43 NFA 800 ROAD TRANSFER 3-DESIGN/DEVELOPMENT
OVERLAY AND STABILIZE BASE COURSEMOSS, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1247: LA 1 - LA 1010
H.011289
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASSUMPTION LA 70 232-01 STPFLEX 15,280 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTALASSUMPTION LA 69 406-01 STPFLEX 1,063 OTHER / MISCELLANEOUS
CONSTRUCTION OF A DETOUR ROUTE FOR LA 70 IF NECESSARYNICKEL, TIM Remrks:
Typ Imp:
Project:Prj Mgr:
LA 70: DETOUR ROAD
H.007873
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
AVOYELLES LA 1176 805-09 FBROFF 2,375 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTHERATH, ANANDA Remrks:
Typ Imp:805-09-0007;2 BRIDGES; USE NFA AS MATCH
Project:Prj Mgr:
BAYOU BOEUF & TURNER CANAL BRIDGES
AVOYELLES
H.009497
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
AVOYELLES LA 106 204-04 STPFLEX 2,600 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTDELATTE, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 106: BAYOU BOEUF BRIDGE
H.012909
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
AVOYELLES LA 107 142-02 STPFLEX 480 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
RAPIDES LA 1203 369-02 NFA 480 PRESERVATION - BRIDGE (ONSYSTEM)
RAPIDES LA 1206 840-01 NFA 720 PRESERVATION - BRIDGE (ONSYSTEM)
RAPIDES LA 1200 840-26 NFA 360 PRESERVATION - BRIDGE (ONSYSTEM)
RAPIDES LA 1199 840-27 STPFLEX 360 PRESERVATION - BRIDGE (ONSYSTEM)
RAPIDES LA 1243 840-46 STPFLEX 480 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:
Typ Imp:
Project:Prj Mgr:
DIST08:ABC BR REP AVOYELLE, RAPIDES PARS
H.012998
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
AVOYELLES LA 1 052-30 STPFLEX 1,700 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
AVOYELLES LA 1 052-07 STPFLEX 300 PRESERVATION - NON-INTERSTATEON STP SYSTEM
CONCRETE PAVEMENT REHABILITATIONSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1: MOREAU ST - END FOUR LANE SECTION
H.013143
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
AVOYELLES 000-05 FBROFF 869 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENT - NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
CARBON PLANT ROAD OVER BAYOU BOEUF
Page 2 - 7 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.012542
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
AVOYELLES LA 114 145-01 STPFLEX 3,770 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
AVOYELLES LA 107 147-03 STPFLEX 1,902 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTSMISTICH, BRADLEY Remrks:
Typ Imp:
Project:Prj Mgr:
LA114,LA107:BELLE DEAU & B JACK RL BRS
H.012545
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
AVOYELLES LA 454 370-01 STPFLEX 1,883 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTMISTICH, BRADLEY Remrks:
Typ Imp:
Project:Prj Mgr:
LA 454: WIGGINS BAYOU BRIDGE
H.012556
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
AVOYELLES US 71 008-07 STPFLEX 2,800 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
PATCH, MILL, AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 71: ST LANDRY P/L TO 740' S OF T&P RR
H.009482
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BEAUREGARD LA 113 139-03 STPFLEX 950 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTBUCCI, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
LA 113: JIM BURNEY BRANCH BRIDGE
BEAUREGARD
H.010244
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BEAUREGARD LA 113 139-04 STPFLEX 2,187 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
PATCH, CP 2", WIDEN 2.5', OL 4"SPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 113: LA 26 - LA 112
H.010245
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BEAUREGARD LA 389 187-04 STPFLEX 7,117 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
PATCH, CP 2", WIDEN 2.5', OL 4"SPURLOCK, DLON Remrks:
Typ Imp:USE NFA AS MATCH
Project:Prj Mgr:
LA 389: MONROE WHITMAN RD - US 190
H.010246
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BEAUREGARD LA 112 188-02 STPFLEX 2,163 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
PATCH, CP 2", WIDEN 2.5', OL 4"SPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 112: LA 399 - LA 113
H.013257
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BEAUREGARD US 190 028-02 NHPP 3,937 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
THIN OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 190: TEXAS S/L - LA 111
Page 2 - 8 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.012040
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BEAUREGARD LA 12 012-05 STPFLEX 2,219 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BEAUREGARD LA 394 189-01 NFA 1,472 PRESERVATION - BRIDGE (ONSYSTEM)
BEAUREGARD LA 110 190-01 STPFLEX 1,782 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTSBUCCI, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
LA12, LA394, LA110: COWPEN & CREEK BRS
H.012569
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BEAUREGARD LA 113 139-04 STPFLEX 1,600 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTALLEN, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 113: LITTLE SUGAR CREEK BRIDGE
H.001707
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BIENVILLE LA 507 090-05 FBROFF 1,178 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTBUCCI, MARK Remrks:
Typ Imp:090-05-0030
Project:Prj Mgr:
LA 507: SALINE BAYOU RELIEF BRIDGE
BIENVILLE
H.012050
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BIENVILLE I-20 451-04 NHPP 300 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
LENGTHING HIGHWAY EXIT DECELERATION LANESPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
I-20: WB EXIT RAMP EXTENSION AT ARCADIA
H.012893
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BIENVILLE LA 4 067-02 STPFLEX 360 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BIENVILLE LA 4 067-03 STPFLEX 600 PRESERVATION - BRIDGE (ONSYSTEM)
BIENVILLE LA 4 067-04 STPFLEX 840 PRESERVATION - BRIDGE (ONSYSTEM)
BIENVILLE LA 517 089-30 STPFLEX 600 PRESERVATION - BRIDGE (ONSYSTEM)
BIENVILLE LA 154 090-03 STPFLEX 480 PRESERVATION - BRIDGE (ONSYSTEM)
BIENVILLE LA 501 093-02 STPFLEX 960 PRESERVATION - BRIDGE (ONSYSTEM)
BIENVILLE LA 516 294-04 NFA 720 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:
Typ Imp:USE NFA AS MATCH ON CS 089-30
Project:Prj Mgr:
DIST 04:ABC BR REPLACE BIENVILLE PARISH
H.012942
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BIENVILLE LA 797 807-05 NFA 1,032 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
ASPHALTIC CONCRETE PAVEMENT RESURFACINGSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 797: LA 507 TO LINCOLN PL
Page 2 - 9 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.012973
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BIENVILLE LA 792 293-02 STPFLEX 360 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
3-DESIGN/DEVELOPMENT
ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 792: LA 154 TO WEBSTER PL
H.013000
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BIENVILLE LA 516 294-04 NFA 2,406 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
ASPHALTIC CONCRETE PAVEMENT RESURFACINGSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 516: US 371 TO LA 154
H.013534
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BIENVILLE 000-07 RTP 197 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENT
MAINT, RESTOR, & CONST OF ATV TRAILS & TRAILHEAD INFRASTRNUNES, BRIAN Remrks:
Typ Imp:L & A TRAILS, INC. WILL PROVIDE THE LOCAL MATCH.
Project:Prj Mgr:
RESTOR OF TRAIL BTWN JAMESTOWN & SIBLEY
H.013769
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BIENVILLE 000-07 0 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT
FEASIBILITY STUDYRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
LOCAL ROAD SIGNING (BIENVILLE)
H.012566
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BIENVILLE LA 154 088-04 STPFLEX 358 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 154: LA 507 TO LA 793
H.012925
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BIENVILLE LA 4 067-03 STPFLEX 560 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
1-PLANNING/ENVIRONMENTAL
ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 4: CASTOR TO LUCKY
H.007400
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER 000-08 TAP>200K 434 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SHARED USE PATHNUNES, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
NORTH BOSSIER SHARED USE TRAIL, PHASE II
BOSSIER
H.011599
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER LA 529 808-01 STPFLEX 2,900 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
ASPHALTIC CONCRETE PAVEMENT RESURFACINGSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 529: LA 160 TO LA 2
H.012171
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER I-220 451-31 NHPP 3,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT
APPROACH SLAB REPLACEMENT AND PCC PAVEMENT PATCHINGMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-220: RED RIVER BRIDGE TO I-20
Page 2 - 10 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.012271
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER 000-08 STPFLEX 20 RAILROADS 3-DESIGN/DEVELOPMENT
CONNECT TRAFFIC SIGNAL AND WARNING DEVICES FOR PREEMPTIONLUKE, SHAWN Remrks:
Typ Imp:
Project:Prj Mgr:
OLD PLN DLING RD.: UP PREEMPT (BENTON)
H.012889
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER I-20 451-02 NHPP 23,500 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT
PAVEMENT REHABILITATIONYANG, LI Remrks:
Typ Imp:
Project:Prj Mgr:
I-20 REHAB (W OF LA 3 TO AIRLINE DR)
H.012896
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER LA 157 082-04 STPFLEX 3,987 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BOSSIER LA 160 085-03 STPFLEX 960 PRESERVATION - BRIDGE (ONSYSTEM)
BOSSIER LA 537 808-05 NFA 1,560 PRESERVATION - BRIDGE (ONSYSTEM)
CADDO LA 2 045-30 STPFLEX 4,514 PRESERVATION - BRIDGE (ONSYSTEM)
CADDO LA 169 048-02 STPFLEX 1,080 PRESERVATION - BRIDGE (ONSYSTEM)
CADDO LA 789 809-07 STPFLEX 360 PRESERVATION - BRIDGE (ONSYSTEM)
RED RIVER LA 155 091-01 STPFLEX 720 PRESERVATION - BRIDGE (ONSYSTEM)
RED RIVER LA 783 303-01 NFA 840 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:
Typ Imp:
Project:Prj Mgr:
DIST04:ABC BR REP BOSS,CADD,RED RIV PARS
H.012913
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER I-20 451-02 NHPP 350 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
EXTENDING EXISTING INTERSTATE EXIT LANESPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
I-20 EB: EXIT RAMP EXTENSION AT LA 157
H.013129
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER 000-08 FBROFF 2,340 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENT - NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
LINTON ROAD OVER BLACK BAYOU RESERVOIR
H.013186
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER 000-08 STPFLEX 1,300 ROAD TRANSFER 3-DESIGN/DEVELOPMENT
RECONSTRUCT ROAD WITH CURB & GUTTER DRAINAGE AND SIDEWALKUMEOZULU, JOE Remrks:
Typ Imp:
Project:Prj Mgr:
BOSSIER CITY RT: COLEMAN ST IMPROVEMENTS
H.001779
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER LA 511 102-03 NFI 65,144 CAPACITY 1-PLANNING/ENVIRONMENTALCADDO LA 511 102-02 NFI 16,286 CAPACITY
REPLACEMENT\REHABILITATION (HBI)MASTIN, CATHERINE Remrks:
Typ Imp:102-03-0010
Project:Prj Mgr:
JIMMIE DAVIS BRIDGE (LA 511) (HBI)
Page 2 - 11 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.012004
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER US 80 001-03 NHPP 4,415 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BIENVILLE US 80 001-06 STPFLEX 1,991 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTSBUCCI, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
US 80:CROWS CR & ALLIGATOR BAYOU BRIDGES
H.012537
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER LA 154 090-01 STPFLEX 2,964 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTWINDMANN, ANDREW Remrks:
Typ Imp:
Project:Prj Mgr:
LA 154: RED CHUTE BAYOU BRIDGE
H.012538
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER LA 164 122-01 STPFLEX 2,921 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BOSSIER LA 164 122-01 STPFLEX 1,949 PRESERVATION - BRIDGE (ONSYSTEM)
BOSSIER LA 164 122-01 STPFLEX 2,192 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTSWINDMANN, ANDREW Remrks:
Typ Imp:
Project:Prj Mgr:
LA 164: BRIDGES
H.012638
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER LA 3105 808-07 NHPP 1,500 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
1-PLANNING/ENVIRONMENTAL
ACCESS MANAGEMENTHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3105: GREENACRES BLVD - LA 72 PHASE 2
H.012659
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER LA 3105 808-07 NHPP 1,500 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
1-PLANNING/ENVIRONMENTAL
ACCESS MANAGEMENTHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3105: GREENACRES BLVD - LA 72 PHASE 3
H.013538
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER LA 511 102-03 NHPP 25,000 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
MAJOR BRIDGE REHABILITATIONMASTIN, CATHERINE Remrks:
Typ Imp:REFERENCE H.010662 FOR ADDITIONAL PHASE INFORMATION.
Project:Prj Mgr:
LA 511: JIMMIE DAVIS BRIDGE REHAB (HBI)
H.011424
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER LA 157 082-04 0 SAFETY 0-FEASIBILITY/SCOPINGBOSSIER LA 157 082-03 0 SAFETY
ACCESS MANAGEMENT AND SAFETY IMPROVEMENTCOLVIN, JODY Remrks:
Typ Imp:
Project:Prj Mgr:
LA157: BOOKER RD TO LA614 CORRIDOR STUDY
H.011428
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER LA 3105 808-07 0 SAFETY 0-FEASIBILITY/SCOPING
ACCESS MANAGEMENT AND SAFETY IMPROVEMENTCOLVIN, JODY Remrks:
Typ Imp:
Project:Prj Mgr:
LA3105:GREENACRES TO LA72 CORRIDOR STUDY
Page 2 - 12 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.000413
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO US 71 011-01 NHPP 12,000 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTWINDMANN, ANDREW Remrks:
Typ Imp:011-01-0054
Project:Prj Mgr:
CROSS BAYOU BRIDGE REPLACEMENT
CADDO
H.001166
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO LA 1 045-01 STPFLEX 21,398 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTFUSILIER, JACOB Remrks:
Typ Imp:045-01-0029; PRIORITY BRIDGE PROJECT
Project:Prj Mgr:
CADDO LAKE BRIDGE (HBI)
H.006472
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO 000-09 HSIPPEN 216 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT
TRAFFIC SIGNAL POWER GENERATOR INSTRIGGS, LAURA Remrks:
Typ Imp:737-09-0104
Project:Prj Mgr:
CITY OF SHREVEPORT TRAFFIC SIG BKUP
H.006475
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO 000-09 HSIPPEN 158 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT
TRAFFIC SIGNAL POWER GENERATORRIGGS, LAURA Remrks:
Typ Imp:737-09-0108
Project:Prj Mgr:
CITY OF SHRVPRT TRAFFIC SIGNAL BKUP
H.007404
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO LA 530 809-14 TAP>200K 118 ENHANCEMENTS 3-DESIGN/DEVELOPMENTCADDO 000-09 TAP>200K 118 ENHANCEMENTS
SHARED USE PATHNUNES, BRIAN Remrks:
Typ Imp:MATCH IS 15% TOLL CREDITS AND 5% LOCAL
Project:Prj Mgr:
OIL CITY SHARED USE PATH
H.010271
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO LA 1 045-01 STPFLEX 1,000 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
OVERLAY, SHOULDER STABILIZATION AND STRIPINGSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1: SUNDOWN ROAD TO JCT LA 538
H.010279
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO LA 173 094-02 STPFLEX 900 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
ASPHALTIC OVERLAY, PAVEMENT STRIPING AND RELATED WORKSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 173: LA 1 TO US 71
H.010468
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO I-20 451-01 NHPP 15,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT
REMOVE AND REPLACE PCCMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-20: WEST END HUDSON ST. BRIDGE TO I-49
H.010475
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO I-20 451-01 NHPP 20,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT
REMOVE AND REPLACE PCCMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-20: MONKHOUSE TO W END OF HUDSON ST BR
Page 2 - 13 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.011112
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO LA 1 053-08 STPFLEX 15 RAILROADS 3-DESIGN/DEVELOPMENT
UPGRADE RR WARNING DEVICESSHREWSBERRY,BILL Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1: UP RR XING (CADDO)
H.011510
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO I-20 451-01 NHPP 100 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
3-DESIGN/DEVELOPMENT
BOSSIER I-20 451-02 NHPP 100 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
DEPLOY ITS EQUIPMENT AND COMMUNICATIONSKIMBENG, LUCY Remrks:
Typ Imp:
Project:Prj Mgr:
SHREVEPORT ITS PHASE 4
H.012930
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO LA 3049 079-01 NFA 310 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
ASPHALTIC CONCRETE PAVEMENT RESURFACINGSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3049: COWHIDE BAYOU TO LA 530
H.013315
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO 000-09 STPENH 425 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SCENIC BYWAY VIEWING AREAMEEK, STEPHEN Remrks:
Typ Imp:CADDO PARISH WILL PROVIDE THE MATCH.
Project:Prj Mgr:
BOOM OR BUST SCENIC VIEWING AREA
H.013389
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO 000-09 STPENH 346 ENHANCEMENTS 3-DESIGN/DEVELOPMENTCADDO LA 525 097-01 STPENH 5 ENHANCEMENTS
SIGNINGNUNES, BRIAN Remrks:
Typ Imp:CADDO PARISH WILL PROVIDE THE LOCAL MATCH.
Project:Prj Mgr:
CADDO PARISH BICYCLIST AWARENESS SIGNAGE
H.013420
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO 000-09 HSIPPEN 2,250 SAFETY 3-DESIGN/DEVELOPMENTCADDO 000-09 STPFLEX 2,250 OPER EFFICIENCY/MOTORIST
ASSISTANCE - TRAFFIC CONTROLDEVICES
TRAFFIC SIGNAL UPGRADEFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DIST. 04 FLASHING YELLOW ARROW PART 1
H.013890
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO LA 3132 427-01 NHPP 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
3-DESIGN/DEVELOPMENT
PAVEMENT MARKING REPLACEMENTHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3132:LA 523 - I-20(PAVEMENT MARKINGS)
H.003915
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO 000-09 0 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL
STAGE 0 AND ENVIRONMENTALBROUSSARD, DAN Remrks:
Typ Imp:USE STATE SURPLUS AS MATCH
Project:Prj Mgr:
I-49 INNER CITY CONNECTOR
Page 2 - 14 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.006474
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO LA 526 809-08 2,500 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
1-PLANNING/ENVIRONMENTAL
CADDO I-49 455-08 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
CADDO LA 3132 427-01 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
DEVELOP SEA FOR ITS EQUIPMENT DEPLOYMENTKIMBENG, LUCY Remrks:
Typ Imp:
Project:Prj Mgr:
SHREVEPORT IMMEDIATE ITS PHASE 2B
H.009213
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO LA 3132 427-01 NFI 150,000 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL
EXTENSION OF EXISTING ROADWAYUMEOZULU, JOE Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3132 (INNER LOOP) EXTENSION
H.010286
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO LA 538 078-04 STPFLEX 1,000 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
ASPHALTIC OVERLAY, PAVEMENT STRIPING AND RELATED WORKSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 538: JCT US 71 TO LA 1
H.010288
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO LA 789 809-07 STPFLEX 2,000 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
ASPHALTIC OVERLAY, PAVEMENT STRIPING AND RELATED WORKSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 789: PRESTON ROAD TO LA 169
H.010292
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO US 79 048-01 STPFLEX 1,500 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
COLD PLANE, ASPHALTIC OVERLAY, PAVEMENT STRIPINGSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 79: TEXAS STATE LINE TO US 80
H.011094
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO LA 3094 025-08 NHPP 2,700 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
REPLACE SUPERSTRUCTURE, RAISE GRADE, ROADWAY & EMBANKMEND'ANDREA, ARTUR Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3094: HEARNE AV BR REHAB
H.011733
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO US 80 001-02 STPFLEX 2,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
1-PLANNING/ENVIRONMENTAL
SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
US 80 TRAFFIC CONTROL UPGRADES
H.012005
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO US 80 001-02 STPFLEX 3,567 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENT/REHABILITATIONMUSA, ELNUR Remrks:
Typ Imp:
Project:Prj Mgr:
US80: KCS RR OVERPASS (HBI)
Page 2 - 15 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.012006
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO LA 1 053-08 STPFLEX 2,785 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTCAVALIER, STEPHANIE Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1: PRAIRIE RIVER BRIDGE
H.012009
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO US 71 053-09 NHPP 12,831 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTS/REHABILITATIONGAUDRY, CARL Remrks:
Typ Imp:
Project:Prj Mgr:
US 71: MARKET ST BRIDGE OVER ICG RR(HBI)
H.012011
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO LA 525 097-01 STPFLEX 2,545 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
CADDO LA 173 094-01 STPFLEX 1,225 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTSWINDMANN, ANDREW Remrks:
Typ Imp:
Project:Prj Mgr:
LA525, LA173: BOGGY BAYOU AND CR BRIDGES
H.012932
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO LA 789 809-07 STPFLEX 70 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
1-PLANNING/ENVIRONMENTAL
ASPHALT SURFACE TREATMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 789: DESOTO PL TO PRESTON RD
H.012937
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO LA 3049 079-01 NFA 1,122 PRESERVATION - NON-INTERSTATENFA
1-PLANNING/ENVIRONMENTAL
CADDO LA 3049 079-01 STPFLEX 141 PRESERVATION - NON-INTERSTATEON STP SYSTEM
ASPHALTIC CONCRETE PAVEMENT RESURFACINGSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3049: GRIMMIT DR TO GEORGE RD
H.013034
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO US 80 001-01 STPFLEX 7,286 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTMUSA, ELNUR Remrks:
Typ Imp:
Project:Prj Mgr:
US 80: I-20 INTERCHANGE (GREENWOOD)
H.012007
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO LA 1 053-09 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
FEASIBILITY STUDY OF BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1: KCS RAILROAD OVERPASS
H.012008
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO US 71 053-09 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
HISTORIC BRIDGE PRESERVATION PRIORITY FEASIBILITY STUDYGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
US 71:ICG RAILROAD OVERPASS REHAB (HBI)
Page 2 - 16 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.012027
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO I-20 451-01 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
FEASIBILITY STUDY OF BRIDGE REPLACMENT OR REHABILITATIONGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
I 20: MISSOURI PACIFIC RR OVERPASS
H.012028
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO I-20 451-01 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
FEASIBILITY STUDY OF BRIDGE REHABILITATIONMOSS, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
I 20:LAKE SHORE DRIVE/KCS OVERPASS REHAB
H.013766
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO 000-09 0 SAFETY - LOCAL ROADS SAFETY 0-FEASIBILITY/SCOPING
FEASIBILITY STUDYRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
LOCAL ROAD SIGNS & STRIPING (CADDO)
H.000186
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU US 90 003-04 NHPP 12,248 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTYANG, LI Remrks:
Typ Imp:003-04-0064
Project:Prj Mgr:
US 90 OVER I-10 RAMPS @ LOCKMOOR (HBI)
CALCASIEU
H.000425
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 12 012-01 STPFLEX 1,739 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
CALCASIEU 000-10 LOCAL 1,739 PRESERVATION - BRIDGE (ONSYSTEM)
NEW BRIDGEMASTIN, CATHERINE Remrks:
Typ Imp:012-01-0004;JOINT PROJECT WITH TEXAS
Project:Prj Mgr:
LA 12 SABINE RIVER BRIDGE
H.007122
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU 000-10 STP<200K 1,582 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
SURFACE WIDENING AND OVERLAYBANKSTON, TANYA Remrks:
Typ Imp:742-10-0136
Project:Prj Mgr:
MYRTLE SPRINGS ROAD
H.010001
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 27 031-04 STPFLEX 1,800 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE
3-DESIGN/DEVELOPMENT
CLEANING & PAINTING & MISC. REPAIRSTULLIER, DANNY Remrks:
Typ Imp:
Project:Prj Mgr:
LA27 ICWW ELLENDERS BRIDGE CLEAN & PAINT
H.010865
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU I-210 450-30 HSIP 939 SAFETY 3-DESIGN/DEVELOPMENTCALCASIEU I-210 450-30 NHPP 3,500 PRESERVATION - INTERSTATE
CABLE BARRIER AND OGFCMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-210: COVE LN INTG - E JCT I-10
Page 2 - 17 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.011065
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 1138-2 810-06 STBONDS 6,000 CAPACITY 3-DESIGN/DEVELOPMENTCALCASIEU I-210 450-30 STBONDS 1,000 CAPACITY CALCASIEU I-210 450-30 LOCAL 7,800 CAPACITY
IMPROVEMENTS TO THE NELSON INTERCHANGEBRIGNAC, CHRISTINA Remrks:
Typ Imp:
Project:Prj Mgr:
NELSON INTERCHANGE IMPROVEMENTS
H.011196
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU 000-10 HSIPPEN 408 SAFETY - SAFE ROUTES TO SCHOOLS 3-DESIGN/DEVELOPMENT
SIDEWALKS, STRIPING AND SIGNINGRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
LAKE CHARLES SRTS PROJ. - BARBE ELEM.
H.011509
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU I-10 450-91 NHPP 1,250 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
3-DESIGN/DEVELOPMENT
INSTALL DMSS AND CCTVSKIMBENG, LUCY Remrks:
Typ Imp:
Project:Prj Mgr:
LAKE CHARLES ITS PHASE 4
H.011802
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU 000-10 TAP<200K 358 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SIDEWALKSMEEK, STEPHEN Remrks:
Typ Imp:MATCH PROVIDED BY THE CALCASIEU PARISH POLICE JURY
Project:Prj Mgr:
PINECONE DRIVE SIDEWALK
H.012052
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 3092 810-28 HSIP 1,000 SAFETY 3-DESIGN/DEVELOPMENTCALCASIEU 000-10 HSIP 1,000 SAFETY
ADD A ROUNDABOUT TO AID IN TRAFFIC FLOWBALLMER, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3092: ROUNDABOUT
H.012083
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU I-10 450-91 NHPP 3,000 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE INTERIM REPAIRSCAVALIER, STEPHANIE Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: CALCASIEU RIVER BRIDGE INT REPAIRS
H.012108
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 383 197-02 STPFLEX 380 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
CALCASIEU I-10 450-91 NHPP 320 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
ADD TURN LANESPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
I-10 & LA 383:TURN LANE@ EB EXIT 43 RAMP
H.012238
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 378 810-12 STPFLEX 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
INTERSECTION IMPROVEMENTSSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 378: INT IMPROVEMENT @ PHILLIPS RD
Page 2 - 18 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.012589
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 108 810-19 STPFLEX 3,292 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
CALCASIEU LA 108 810-19 NHPP 766 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
PATCH, CP AND OLSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 108: I-10 - LA 1256
H.012791
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 3063 810-25 STPFLEX 50 RAILROADS 3-DESIGN/DEVELOPMENT
PREEMPTING 768-140B WITH ADJACENT TRAFFIC SIGNALLUKE, SHAWN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3063: UP PREEMPTION (VINTON)
H.012900
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 3256 810-15 STPFLEX 1,080 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
CALCASIEU LA 3063 810-25 NFA 360 PRESERVATION - BRIDGE (ONSYSTEM)
CAMERON LA 717 812-01 NFA 480 PRESERVATION - BRIDGE (ONSYSTEM)
CAMERON LA 384 812-04 NFA 360 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:
Typ Imp:
Project:Prj Mgr:
DIST07:ABC BR REP CALCASIEU, CAMERON PAR
H.012928
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 27 031-06 STPFLEX 791 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
3-DESIGN/DEVELOPMENT
MICROSURFACESPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 27: HIGH HOPE RD-RIGMAIDEN CEMETERYRD
H.013344
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 14 193-06 HSIP 613 SAFETY 3-DESIGN/DEVELOPMENTCALCASIEU LA 14 193-05 HSIP 613 SAFETY CALCASIEU LA 397 193-31 HSIP 613 SAFETY CALCASIEU 000-10 HSIP 613 SAFETY
INSTALL SINGLE LANE ROUNDABOUTTONEY, PATRICK Remrks:
Typ Imp:
Project:Prj Mgr:
LA 14 @ LA 397 ROUNDABOUT
H.013734
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU US 90 003-05 NHPP 5,613 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
PATCHING, MILL AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 90: LA 14 - LA 165
H.013744
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 385 195-04 NHPP 150 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
ADJUST LEFT TURNSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 385: LEFT TURN LANE @ COLLEGE ST.
Page 2 - 19 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.013812
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU 000-10 STP<200K 7,270 URBAN SYSTEMS 3-DESIGN/DEVELOPMENTCALCASIEU 000-10 LOCAL 485 URBAN SYSTEMS
ROADWAY WIDENINGBANKSTON, TANYA Remrks:
Typ Imp:CITY OF LAKE CHARLES TO PROVIDE MATCH
Project:Prj Mgr:
IHLES ROAD: W PRIEN LAKE - COUNTRY CLUB
H.013870
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU 000-10 STP<200K 1,093 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
PATCH, OVERLAY AND MILLBANKSTON, TANYA Remrks:
Typ Imp:CITY OF LAKE CHARLES TO PROVIDE MATCH
Project:Prj Mgr:
ENTERPRISE OVERLAY: 12TH ST TO BROAD ST.
H.003931
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU I-10 450-91 NFI 0 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
CALCASIEU LA 378 810-12 0 PRESERVATION - BRIDGE (ONSYSTEM)
FEASIBILITY & ENVIRON. STUDYUMEOZULU, JOE Remrks:
Typ Imp:700-10-0115;INCL. UPRR GRADE SEPARATION
Project:Prj Mgr:
CALCASIEU RIVER BRIDGE (HBI)
H.009455
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU I-210 450-30 NHPP 3,400 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE
1-PLANNING/ENVIRONMENTAL
CLEANING & PAINTINGTULLIER, DANNY Remrks:
Typ Imp:
Project:Prj Mgr:
I-210 BRIDGE CLEANING & PAINTING
H.009488
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 378 810-12 NFI 0 CAPACITY 1-PLANNING/ENVIRONMENTAL
STAGE 0 STUDY TO WIDEN LA 378 (WESTLAKE TO MOSS BLUFF)LANDRY, COREY Remrks:
Typ Imp:
Project:Prj Mgr:
LA 378 WIDENING (WESTLAKE TO MOSS BLUFF)
H.009613
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 14 193-06 STPFLEX 4,926 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
PCCP RECONSTRUCTIONSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 14: MC NEESE ST - E. PRIEN LAKE RD
H.010000
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU US 171 024-01 NHPP 1,700 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE
1-PLANNING/ENVIRONMENTAL
CLEANING & PAINTING & MISC. REPAIRSTULLIER, DANNY Remrks:
Typ Imp:
Project:Prj Mgr:
US171:CALCASIEU RVR BR REHAB (HBI)
H.012041
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 109 187-01 STPFLEX 1,220 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTPATTON, HEATHER Remrks:
Typ Imp:
Project:Prj Mgr:
LA 109: GULLY BRIDGE
H.011242
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 384 382-05 0 SAFETY 0-FEASIBILITY/SCOPING
TBD BY FEASIBILITY STUDYZHANG, HONG Remrks:
Typ Imp:
Project:Prj Mgr:
LA 384 (BIG LAKE RD TO MCNEESE ST)
Page 2 - 20 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.012042
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 384 382-04 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
FEASIBILITY STUDY OF BRIDGE REPLACEMENTBRIGNAC, CHRISTINA Remrks:
Typ Imp:
Project:Prj Mgr:
LA 384: ICWW BLACK BAYOU MOVABLE BRIDGE
H.012043
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 378 810-12 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
LA 378:W FORK CALCASIEU RIV REHAB (HBI)
H.012632
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU US 171 024-01 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
0-FEASIBILITY/SCOPING
TRAFFIC STUDYHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 171: MLK BLVD TRAFFIC STUDY
H.012685
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 385 195-04 HSIPPEN 0 SAFETY 0-FEASIBILITY/SCOPING
FEASIBILITY STUDYMCRAE, ADRIANE Remrks:
Typ Imp:
Project:Prj Mgr:
LA 385 RYAN ST. FEASIBILITY STUDY
H.011293
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALDWELL LA 126 091-09 STPFLEX 50 RAILROADS 3-DESIGN/DEVELOPMENT
RR SIGNAL PREEMPTIONLUKE, SHAWN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 126: UP RR XING (GRAYSON)
CALDWELL
H.012599
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALDWELL LA 851 811-10 NFA 2,000 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
SPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 851: LA 126 - LA 849
H.013011
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALDWELL LA 126 041-05 STPFLEX 1,920 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
CALDWELL LA 4 068-04 STPFLEX 1,320 PRESERVATION - BRIDGE (ONSYSTEM)
CALDWELL LA 127 127-04 STPFLEX 3,720 PRESERVATION - BRIDGE (ONSYSTEM)
CALDWELL LA 506 345-03 NFA 600 PRESERVATION - BRIDGE (ONSYSTEM)
CALDWELL LA 506 345-04 NFA 1,320 PRESERVATION - BRIDGE (ONSYSTEM)
CALDWELL LA 850 811-02 NFA 480 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:
Typ Imp:
Project:Prj Mgr:
DIST58: ABC BR REPLACE CALDWELL PARISH
Page 2 - 21 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.013027
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALDWELL 000-11 RTP 112 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTCALDWELL 000-11 LOCAL 522 RECREATIONAL TRAILS PROGRAM
CONSTRUCTION OF A 3600' LONG BY 5' WIDE ASPHALT TRAILNUNES, BRIAN Remrks:
Typ Imp:DCRT IS THE PROJECT MANAGER
Project:Prj Mgr:
SHERMAN LAKE TRAILS
H.013202
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALDWELL US 165 015-07 NHPP 4,300 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
MILL & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 165: COLUMBIA - 7 MILES NORTH
H.009602
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALDWELL LA 557 159-02 STPFLEX 1,276 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
MICROSURFACINGSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 557: LA 4 - OUACHITA LINE
H.012508
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CAMERON 000-12 HSIPPEN 500 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT
GUARDRAIL REPAIR/REPLACE/INSTALLATIONRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
PARISH WIDE GUARDRAIL (CAMERON)
CAMERON
H.012568
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CAMERON LA 27 031-03 STPFLEX 1,627 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
MOVABLE BRIDGE REHABILITATIONHINGLE, STEWART Remrks:
Typ Imp:
Project:Prj Mgr:
LA 27: KELSO BAYOU MOVABLE BR REHAB
H.009470
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CAMERON LA 82 194-02 STPFLEX 11,161 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENT - MOVEABLE BRIDGEBUCCI, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
LA 82: SUPERIOR CANAL BRIDGE (HBI)
H.012044
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CAMERON LA 384 195-30 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
LA384:ICWW GR LAKE PONTOON MB REHAB (HBI
H.012167
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CATAHOULA US 84 022-06 NHPP 3,700 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
COLD PLANE & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 84: LA 28 - JONESVILLE
CATAHOULA
Page 2 - 22 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.012842
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CATAHOULA LA 124-P 143-03 NFA 8,149 ROAD TRANSFER 3-DESIGN/DEVELOPMENTCATAHOULA LA 3102 813-24 NFA 1,941 ROAD TRANSFER
NEW ROADWAY CONSTRUCTION/RE-CONSTRUCTION, BRIDGE REPLACEMOORE, DARRELL Remrks:
Typ Imp:
Project:Prj Mgr:
LA3102 @ LARTO LAKE & LA124 EXT(SEG 2&3)
H.013006
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CATAHOULA LA 124 143-04 STPFLEX 2,520 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
CATAHOULA LA 126 353-03 STPFLEX 2,414 PRESERVATION - BRIDGE (ONSYSTEM)
CONCORDIA LA 568 075-01 STPFLEX 480 PRESERVATION - BRIDGE (ONSYSTEM)
FRANKLIN LA 135 167-01 STPFLEX 720 PRESERVATION - BRIDGE (ONSYSTEM)
FRANKLIN LA 577 344-01 STPFLEX 600 PRESERVATION - BRIDGE (ONSYSTEM)
TENSAS LA 605 020-30 STPFLEX 960 PRESERVATION - BRIDGE (ONSYSTEM)
TENSAS LA 569 176-03 NFA 720 PRESERVATION - BRIDGE (ONSYSTEM)
LASALLE LA 772 039-01 NFA 600 PRESERVATION - BRIDGE (ONSYSTEM)
LASALLE LA 127 149-05 STPFLEX 480 PRESERVATION - BRIDGE (ONSYSTEM)
LASALLE LA 778 830-05 NFA 360 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:
Typ Imp:
Project:Prj Mgr:
DIST58:ABC BR REPL CA,CO,FR,TN,LA PARISH
H.013031
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CATAHOULA 000-13 RTP 130 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENT
RESTORATION OF 3.1 MILES OF ATV TRAILNUNES, BRIAN Remrks:
Typ Imp:DCRT IS THE PROJECT MANAGER
Project:Prj Mgr:
DEWEY WILLS WMA - JAKEY ATV TRAIL
H.013750
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CATAHOULA LA 126 353-02 STPFLEX 264 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
3-DESIGN/DEVELOPMENT
LASALLE US 84 022-05 NHPP 246 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
LASALLE LA 8 040-04 STPFLEX 294 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
LASALLE LA 126 130-02 STPFLEX 150 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
LASALLE LA 8 830-08 STPFLEX 113 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
ASPHALT SURFACE TREATMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 84, LA 8 & LA 126 AST
H.012736
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CATAHOULA US 425 026-04 NHPP 6,870 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTWINDMANN, ANDREW Remrks:
Typ Imp:
Project:Prj Mgr:
US 425: TENSAS RIVER BRIDGE @ CLAYTON
Page 2 - 23 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.001674
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CLAIBORNE LA 146 085-08 STPFLEX 6,068 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
NEW BRIDGESPATTON, HEATHER Remrks:
Typ Imp:085-08-0032;4 BRIDGES
Project:Prj Mgr:
LA 146 BRIDGES NEAR HOMER
CLAIBORNE
H.010281
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CLAIBORNE LA 2 085-07 STPFLEX 3,350 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
COLD PLANE, ASPHALTIC OVERLAY, CTB SHOULDERS, PAVEMENT STRISPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 2: WEBSTER P/L TO LA 3062
H.012894
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CLAIBORNE LA 808 084-05 NFA 360 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
CLAIBORNE LA 146 085-08 STPFLEX 720 PRESERVATION - BRIDGE (ONSYSTEM)
CLAIBORNE LA 520 101-01 STPFLEX 480 PRESERVATION - BRIDGE (ONSYSTEM)
CLAIBORNE LA 518 109-01 STPFLEX 480 PRESERVATION - BRIDGE (ONSYSTEM)
CLAIBORNE LA 534 289-03 NFA 480 PRESERVATION - BRIDGE (ONSYSTEM)
CLAIBORNE LA 615 814-04 NFA 840 PRESERVATION - BRIDGE (ONSYSTEM)
WEBSTER LA 3008 288-02 NFA 4,440 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTSVAUGHT, PAUL Remrks:
Typ Imp:
Project:Prj Mgr:
DIST04:ABC BR REP CLA, WEB PARISHES
H.012943
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CLAIBORNE LA 2-A 083-10 STPFLEX 370 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
3-DESIGN/DEVELOPMENT
ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 2A: LA 9 TO UNION PARISH LINE
H.012986
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CLAIBORNE LA 534 290-01 NFA 867 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
ASPHALTIC CONCRETE PAVEMENT RESURFACINGSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 534: LA 534 SPUR - LOG MILE 5.33
H.013201
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CONCORDIA US 425 026-03 NHPP 4,300 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
MILL & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 425: LA 903 - US 65
CONCORDIA
H.010462
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CONCORDIA LA 15 177-05 STPFLEX 3,200 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
PATCH & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 15: LA 131 - US 84
Page 2 - 24 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.011930
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CONCORDIA US 84 026-02 0 SAFETY 0-FEASIBILITY/SCOPINGCONCORDIA US 425 026-03 0 SAFETY
CORRIDOR STUDYHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 425/US 84: CORRIDOR STUDY
H.012227
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DESOTO LA 5 049-01 STPFLEX 2,635 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
ASPHALTIC CONCRETE PAVEMENT RESURFACINGSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 5: LA 3015 TO LA 172
DESOTO
H.012614
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DESOTO LA 175 035-04 STPFLEX 5,300 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
ASPHALTIC CONCRETE PAVEMENT RESURFACINGSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 175: LA 509 TO LA 5
H.012939
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DESOTO LA 3015 298-03 NFA 2,048 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
ASPHALTIC CONCRETE PAVEMENT RESURFACINGSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3015: US 171 TO LA 175
H.012982
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DESOTO LA 3248 816-07 NFA 1,100 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
ASPHALTIC CONCRETE PAVEMENT RESURFACINGSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3248: NABORTON LOOP
H.011860
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DESOTO I-49 455-07 NHPP 2,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
1-PLANNING/ENVIRONMENTAL
CADDO I-49 455-08 NHPP 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
SIGNING REPLACEMENT AND UPGRADEFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
I-49: NATCHITOCHES P/L TO INNER LOOP
H.002337
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 327-S 257-03 STPFLEX 1,182 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
E BATON ROUGE LA 327-S 257-03 HSIP 1,297 SAFETY
NEW BRIDGEMOORE, DARRELL Remrks:
Typ Imp:257-03-0025
Project:Prj Mgr:
LA 327-S: BAYOU FOUNTAIN
EAST BATON ROUGE
H.002825
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 30 414-01 STP>200K 8,588 URBAN SYSTEMS 3-DESIGN/DEVELOPMENTE BATON ROUGE LA 30 414-01 HSIPPEN 3,160 SAFETY
WIDEN TO 4 LANES WITH MEDIANLEBAS, MELISSA Remrks:
Typ Imp:
Project:Prj Mgr:
LA 30(NICHOLSON DR): BRIGHTSIDE-GOURRIER
Page 2 - 25 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.003047
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE I-10 450-10 LOCAL 0 DEMO / HIGH PRIORITY 3-DESIGN/DEVELOPMENTE BATON ROUGE 000-17 LOCAL 0 DEMO / HIGH PRIORITY
NEW INTERCHANGEMUSA, ELNUR Remrks:
Typ Imp:450-10-0161
Project:Prj Mgr:
PECUE LANE/I-10 INTERCHANGE
H.004100
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE I-10 450-10 GARVEE 360,000 CAPACITY 3-DESIGN/DEVELOPMENT
INCREASE CAPACITY(STAGE 3, 4 AND 5)KENDRICK, BRIAN Remrks:
Typ Imp:700-17-0209; INNOVATIVE PROCUREMENT STAGES 3, 4 AND 5
Project:Prj Mgr:
I-10: LA 415 TO ESSEN ON I-10 AND I-12
H.006499
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 HSIPPEN 421 SAFETY - SAFE ROUTES TO SCHOOLS 3-DESIGN/DEVELOPMENT
CONSTRUCTION OF BIKEPATH AND PURCHASE OF SPEED FEEDBACK SIRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
WESTDALE & BERNARD TERRACE SIDEWALKS
H.007439
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 TAP>200K 609 ENHANCEMENTS 3-DESIGN/DEVELOPMENTE BATON ROUGE 000-17 LOCAL 596 ENHANCEMENTS
WIDENING EXISTING ROAD TO CONSTRUCT BIKE LANESNUNES, BRIAN Remrks:
Typ Imp:MATCH IS 15% TOLL CREDITS AND 5% LOCAL
Project:Prj Mgr:
HYACINTH AVENUE BIKE LANES
H.007963
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 410 817-05 STPFLEX 1,811 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
NEW BRIDGEGAUDRY, CARL Remrks:
Typ Imp:817-05-0017
Project:Prj Mgr:
BLACKWATER BAYOU BRIDGE
H.009290
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 SR2S 190 SAFETY - SAFE ROUTES TO SCHOOLS 3-DESIGN/DEVELOPMENT
BICYCLE LANES AND EDUCATION AND ENCOURAGEMENT ACTIVITIESMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
LSU LABORATORY SCHOOL SRTS PROJECT
H.009489
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE US 61 007-90 NHPP 12,000 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTWINDMANN, ANDREW Remrks:
Typ Imp:
Project:Prj Mgr:
US 61: JEFFERSON HIGHWAY OVERPASS
H.010251
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE US 61-X 817-20 STPFLEX 500 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
3-DESIGN/DEVELOPMENT
REPLACE/UPGRADE PUMP HOUSE COMPONENTSGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
CHIPPEWA ST PUMP STATION IMP US61/190-X
H.010652
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 73 077-05 NHPP 3,500 ROAD TRANSFER 3-DESIGN/DEVELOPMENT
PCCP PATCHINGFELDER, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 73: US 61 (AIRLINE) - ESSEN LANE
Page 2 - 26 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.011684
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 STPFLEX 7,350 ROAD TRANSFER 3-DESIGN/DEVELOPMENTE BATON ROUGE LA 327-S 257-03 STPFLEX 2,450 ROAD TRANSFER
EXTEND 4-LANE DIVIDED ROADWAYREVIERE, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 327 SPUR: STARING LANE EXTENSION
H.011695
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 19 250-01 0 ROAD TRANSFER 3-DESIGN/DEVELOPMENT
WIDENING OF LA 19MOSS, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 19 WIDENING: LA 64 - SUNSET BLVD
H.011791
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 STP>200K 1,025 URBAN SYSTEMS 3-DESIGN/DEVELOPMENTE BATON ROUGE 000-17 STP>200K 1,025 URBAN SYSTEMS
BRIDGE REPLACEMENTLEBAS, MELISSA Remrks:
Typ Imp:EAST BATON ROUGE WILL PROVIDE MATCH
Project:Prj Mgr:
CAL RD AND MOSS SIDE LN BR REPLACEMENTS
H.011843
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 STP>200K 2,700 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
ACCESS MANAGEMENTLEBAS, MELISSA Remrks:
Typ Imp:EAST BATON ROUGE PROVIDING MATCH
Project:Prj Mgr:
S. SHERWOOD FOREST BLVD SUPERSTREET MO
H.011859
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE US 61-X 817-20 TAP>200K 126 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SIDEWALK, STREET SCAPINGNUNES, BRIAN Remrks:
Typ Imp:MATCH PROVIDED BY CITY OF BATON ROUGE
Project:Prj Mgr:
BR: RIVER ROAD MULTI-USE CORRIDOR
H.012022
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 TAP>200K 1,200 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
MULTI-USE PATHMEEK, STEPHEN Remrks:
Typ Imp:LOCAL MATCH PROVIDED BY BREC
Project:Prj Mgr:
BREC: GREENWOOD MULTI-USE TRAIL, PHASE 2
H.012499
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 RTP 114 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTE BATON ROUGE 000-17 LOCAL 236 RECREATIONAL TRAILS PROGRAM
CONSTRUCTION OF A 5,700' LONG BY 12' WIDE PED/BIKE TRAILNUNES, BRIAN Remrks:
Typ Imp:DCRT IS THE PROJECT MANAGER
Project:Prj Mgr:
WARDS CREEK TRAIL - PECUE EXTENSION
H.012693
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 42 258-01 NHPP 250 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
ADD RIGHT TURNLANESPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 42 AT I-10: ADD RIGHT TURNLANE
H.012964
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE US 61 007-90 NHPP 4,500 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
THIN ASPHALTIC CONCRETEMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 61: BLUEBONNET BLVD - S END US 190
Page 2 - 27 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.013035
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 RTP 112 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTE BATON ROUGE 000-17 LOCAL 768 RECREATIONAL TRAILS PROGRAM
CONSTRUCTION OF 1.35 MILE LONG 12' MULTI-USE TRAILNUNES, BRIAN Remrks:
Typ Imp:DCRT IS THE PROJECT MANAGER
Project:Prj Mgr:
MANSIONS TO PERKINS TRAIL
H.013037
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 RTP 112 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTE BATON ROUGE 000-17 LOCAL 565 RECREATIONAL TRAILS PROGRAM
CONSTRUCTION OF 1.35 MILE BY 12' MULTI USE TRAILNUNES, BRIAN Remrks:
Typ Imp:DCRT IS THE PROJECT MANAGER
Project:Prj Mgr:
WARDS CREEK BRIDGE TO MALL TRAIL
H.013042
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 RTP 112 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTE BATON ROUGE 000-17 LOCAL 13 RECREATIONAL TRAILS PROGRAM
RESTORATION AND CONSTRUCTION OF TRAILS IN LARGE PUBLIC PARKNUNES, BRIAN Remrks:
Typ Imp:DCRT IS THE PROJECT MANAGER
Project:Prj Mgr:
LSU AGCENTER RESTORATION TRAILS
H.013328
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 73 077-05 NHPP 1,000 ROAD TRANSFER 3-DESIGN/DEVELOPMENT
FULL/PARTIAL PCCP PATCHING, REPAIR SIDEWALKS, CURBSRICHARD, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 73: LA 3064 / ESSEN - LA 426 (RT II)
H.013330
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 42 258-31 NHPP 4,623 ROAD TRANSFER 3-DESIGN/DEVELOPMENTE BATON ROUGE LA 42 257-04 NHPP 377 ROAD TRANSFER
PCCP PATCHING AND MAJOR REHAB OF EB. MILL AND OVERLAY WBRICHARD, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 42: LA 3246 - STARING LANE (RT II)
H.013366
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 STPENH 509 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SIDEWALKS, BIKE LANES, STRIPING AND LANDSCAPINGNUNES, BRIAN Remrks:
Typ Imp:EAST BATON ROUGE AND THE DDD WILL PROVIDE THE LOCAL MATCH.
Project:Prj Mgr:
DOWNTOWN GREENWY LOUISIANA CONNECTOR
H.013367
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 STPENH 1,479 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SIDEWALKSMEEK, STEPHEN Remrks:
Typ Imp:EAST BATON ROUGE WILL PROVIDE THE LOCAL MATCH.
Project:Prj Mgr:
ELM GROVE GARDEN DR PED IMPROVEMENT EBR
H.013368
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 327-S 257-03 STPENH 309 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SHARED USE PATHNUNES, BRIAN Remrks:
Typ Imp:EAST BATON ROUGE PARISH WILL PROVIDE THE LOCAL MATCH.
Project:Prj Mgr:
LA 327 S GARDERE LANE SHARED USE PATH
H.013373
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE US 61-X 013-04 STPENH 1,862 ENHANCEMENTS 3-DESIGN/DEVELOPMENTE BATON ROUGE US 190 013-05 STPENH 132 ENHANCEMENTS E BATON ROUGE 000-17 STPENH 495 ENHANCEMENTS
STATIONS AND HUBS ON A NEW RAPID TRANSIT ROUTENUNES, BRIAN Remrks:
Typ Imp:CATS WILL PROVIDE THE LOCAL MATCH.
Project:Prj Mgr:
US 61 BUS: BUS RAPID TRANSIT STATIONS
Page 2 - 28 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.013387
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 HSIPPEN 2,218 SAFETY 3-DESIGN/DEVELOPMENTIBERVILLE 000-24 STPFLEX 2,218 OPER EFFICIENCY/MOTORIST
ASSISTANCE - TRAFFIC CONTROLDEVICES
E BATON ROUGE 000-17 HSIPPEN 32 SAFETY IBERVILLE 000-24 STPFLEX 32 OPER EFFICIENCY/MOTORIST
ASSISTANCE - TRAFFIC CONTROLDEVICES
TRAFFIC SIGNAL UPGRADEFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DIST. 61 FLASHING YELLOW ARROW PART 1
H.013410
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 CM 975 CONGESTION MITIGATION 3-DESIGN/DEVELOPMENT
CONSTRUCT ROUNDABOUTMCMILLAN, RYAN Remrks:
Typ Imp:CITY OF BATON ROUGE TO PROVIDE MATCH
Project:Prj Mgr:
LEE DR AT HYACINTH AVE ROUNDABOUT
H.013422
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 HSIPPEN 2,070 SAFETY 3-DESIGN/DEVELOPMENTE BATON ROUGE 000-17 STPFLEX 2,070 OPER EFFICIENCY/MOTORIST
ASSISTANCE - TRAFFIC CONTROLDEVICES
TRAFFIC SIGNAL UPGRADEFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DIST. 61 FLASHING YELLOW ARROW PART 2
H.013504
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 RTP 350 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENT
CONSTRUCTION OF 3,696' X 10' WIDE MULTI-USE TRAILNUNES, BRIAN Remrks:
Typ Imp:BREC OF BATON ROUGE WILL PROVIDE THE LOCAL MATCH
Project:Prj Mgr:
BRG TO ESSEN TRAIL
H.013512
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 RTP 112 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTE BATON ROUGE 000-17 LOCAL 810 RECREATIONAL TRAILS PROGRAM
CONSTRUCTION OF 5,808' X 10' WIDE MULTI-USE TRAILNUNES, BRIAN Remrks:
Typ Imp:BREC OF BATON ROUGE WILL PROVIDE LOCAL MATCH
Project:Prj Mgr:
PERKINS TO PAULET TRAIL
H.013542
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 STP>200K 2,119 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENT (OFF-SYSTEM)LEBAS, MELISSA Remrks:
Typ Imp:EAST BATON ROUGE TO PROVIDE MATCH.
Project:Prj Mgr:
CHEVELLE AND SARASOTA DR BR REPLACEMENT
H.013546
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 STP>200K 1,275 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
OVERLAYLEBAS, MELISSA Remrks:
Typ Imp:CITY OF CENTRAL TO PROVIDE MATCH.
Project:Prj Mgr:
THIBODEAUX ROAD IMPROVEMENTS
H.013733
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE US 61-X 013-04 NHPP 4,000 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
MILL, PATCH, AND OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 61-X: FOSTER DR - I-110
Page 2 - 29 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.013755
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE I-10 450-10 0 CAPACITY 3-DESIGN/DEVELOPMENT
AMICABLE ADVANCE RIGHT OF WAY ACQUISITIONKENDRICK, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-10:NICHOLSON - ACADIAN R/W ACQUISITION
H.013864
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE US 61 019-01 RAIL PD 300 RAILROADS 3-DESIGN/DEVELOPMENT
UPGRADE RR CROSSING'S SIGNALSHREWSBERRY,BILL Remrks:
Typ Imp:USE TTF FOR MATCH
Project:Prj Mgr:
US 61: IC RR XING (BATON ROUGE)
H.010051
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 TAP>200K 267 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL
SIDEWALKS W/LIGHTING & LANDSCAPINGMEEK, STEPHEN Remrks:
Typ Imp:
Project:Prj Mgr:
LSU HIGHLAND RD PED CORRIDOR, PHASE I
H.010319
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE I-110 450-92 NHPP 24,000 PRESERVATION - INTERSTATE 1-PLANNING/ENVIRONMENTAL
RECONSTRUCT JCP @ GRADEMOORE, DARRELL Remrks:
Typ Imp:
Project:Prj Mgr:
I-110: NORTH ST. - PLANK RD.
H.010729
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 67 060-01 CM 4,413 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTALE BATON ROUGE LA 73 077-05 CM 232 CONGESTION MITIGATION E BATON ROUGE US 61-X 013-04 CM 697 CONGESTION MITIGATION E BATON ROUGE 000-17 CM 2,787 CONGESTION MITIGATION
TRAFFIC SIGNAL COORDINATION & SYNCHRONIZATIONHANKS, ANNA Remrks:
Typ Imp:EBR WILL PROVIDE 20% MATCH
Project:Prj Mgr:
TRAFFIC SIGNAL COORD & SYNCH PH VI (EBR)
H.011186
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE US 61-X 019-01 STPFLEX 375 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
1-PLANNING/ENVIRONMENTAL
E BATON ROUGE US 61-X 013-04 NHPP 125 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
E BATON ROUGE LA 67 060-01 NHPP 250 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
SIGNALS TO BE UPGRADE TO CURRENT DOTD STANDARDSFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DIST. 61 TRAFFIC CONTROL UPGRADE 3
H.011310
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 3244-1 870-18 0 ROAD TRANSFER 1-PLANNING/ENVIRONMENTAL
CONSTRUCTION OF NEW ROADWAY (DETAILS TBD BY STUDY)MASTIN, CATHERINE Remrks:
Typ Imp:
Project:Prj Mgr:
FORD STREET EXTENSION
Page 2 - 30 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.011543
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 3164 019-01 CM 3,421 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTALE BATON ROUGE US 61 019-02 CM 540 CONGESTION MITIGATION E BATON ROUGE LA 408 255-01 CM 398 CONGESTION MITIGATION E BATON ROUGE 000-17 CM 1,385 CONGESTION MITIGATION E BATON ROUGE LA 37 254-01 CM 1,014 CONGESTION MITIGATION E BATON ROUGE LA 37 254-02 CM 1,022 CONGESTION MITIGATION
TRAFFIC SIGNAL COORDINATION AND SIGNAL SYNCHRONIZATIONHANKS, ANNA Remrks:
Typ Imp:USE LOCAL AS MATCH
Project:Prj Mgr:
TRAFFIC SIGNAL COORD & SYNCH PH VII(EBR)
H.012059
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 37 254-03 STPFLEX 3,307 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
E BATON ROUGE LA 19 250-01 NHPP 3,159 PRESERVATION - BRIDGE (ONSYSTEM)
LA. 19 & LA. 37 BRIDGE REPLACEMENTSWINDMANN, ANDREW Remrks:
Typ Imp:
Project:Prj Mgr:
COPPER MILL B, N CANAL, & SANDY CR BRS
H.013053
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE I-10 450-10 NHPP 250 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
1-PLANNING/ENVIRONMENTAL
REPLACE EXISTING OVERHEAD SIGN TRUSS AND SIGN FACESNGO, DUC Remrks:
Typ Imp:
Project:Prj Mgr:
I-10/I-110 SPLIT OH SIGN TRUSS UPGRADE
H.013267
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 CM 4,026 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTALE BATON ROUGE US 61-X 019-01 CM 76 CONGESTION MITIGATION E BATON ROUGE I-110 450-92 CM 25 CONGESTION MITIGATION
CONSTRUCT PEDESTRIAN/BIKE PATHSMUSA, ELNUR Remrks:
Typ Imp:BREC WILL PROVIDE MATCH
Project:Prj Mgr:
SCOTLANDVILLE PKWY TO DWTN BR TRAIL-PH 1
H.013797
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 30 414-01 0 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTALIBERVILLE LA 30 414-02 0 URBAN SYSTEMS ASCENSION LA 30 414-03 0 URBAN SYSTEMS
ENVIRONMENTAL ANALYSIS FOR CORRIDOR WIDENINGLEBAS, MELISSA Remrks:
Typ Imp:CRPC TO PROVIDE MATCH
Project:Prj Mgr:
LA 30 WIDENING: BRIGHTSIDE - AIRLINE
H.002297
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 37 254-02 NFI 0 OTHER / MISCELLANEOUS 0-FEASIBILITY/SCOPINGE BATON ROUGE LA 37 254-03 NFI 0 OTHER / MISCELLANEOUS
RECON W/GEOMETRIC IMPROVEMENTSBALLMER, SARAH Remrks:
Typ Imp:254-02-0040;SAFETY TRANSFER FUNDS-4 MILLION MAX
Project:Prj Mgr:
LA 37: SULLIVAN ROAD - LIBERTY ROAD
H.011690
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 0 ROAD TRANSFER 0-FEASIBILITY/SCOPING
FEASIBILITY STUDY TO WIDEN PORT HUDSON PRIDE RDMOSS, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
PORT HUDSON PRIDE RD: LA 964-LA 19 STUDY
Page 2 - 31 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.012025
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE I-110 450-92 0 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE
0-FEASIBILITY/SCOPING
BRIDGE PREVENTIVE MAINTENANCE WORKTULLIER, DANNY Remrks:
Typ Imp:
Project:Prj Mgr:
I-110 IN BATON ROUGE BRIDGE REPAIRS
H.012306
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 42 258-31 0 ROAD TRANSFER 0-FEASIBILITY/SCOPINGE BATON ROUGE 000-17 0 ROAD TRANSFER
INTERSECTION IMPROVEMENTSZHANG, HONG Remrks:
Typ Imp:
Project:Prj Mgr:
LA 42: HIGHLAND ROAD AT PECUE LANE
H.012324
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE US 61 007-90 0 SAFETY 0-FEASIBILITY/SCOPING
TRAFFIC STUDYTONEY, PATRICK Remrks:
Typ Imp:
Project:Prj Mgr:
US61:FL BLVD-MISS RIVER BR(TRAFFIC STDY)
H.012357
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE I-12 454-01 0 SAFETY 0-FEASIBILITY/SCOPINGLIVINGSTON I-12 454-02 0 SAFETY
FEASIBILITY STUDYGLASCOCK, STEPHEN Remrks:
Typ Imp:
Project:Prj Mgr:
I-12 SHOULDER FEASIBILITY STUDY
H.012563
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 73 077-04 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
FEASIBILITY STUDY TO DETERMINE REHABILITATION/REPLACEMENTBUCCI, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
LA 73: BAYOU MANCHAC BRIDGE (HBI)
H.013029
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 0 SAFETY 0-FEASIBILITY/SCOPING
SAFETY STUDY FOR INTERSECTION IMPROV. FOCUSED ON PED/BIKESRENARD, APRIL Remrks:
Typ Imp:
Project:Prj Mgr:
BATON ROUGE PED/BIKE SAFETY ACTION PLAN
H.013073
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 HSIPPEN 173 SAFETY - SAFE ROUTES TO PUBLICPLACES
0-FEASIBILITY/SCOPING
E BATON ROUGE LA 37 254-01 HSIPPEN 403 SAFETY - SAFE ROUTES TO PUBLICPLACES
FEASIBILITY STUDY FOR SIDEWALKS AND BICYCLE PATHS CONSTRUCTRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
LA 37 & WOODDALE BLVD: PED IMP (BR)
H.013622
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 HSIPPEN 500 SAFETY - LOCAL ROADS SAFETY 0-FEASIBILITY/SCOPING
FEASIBILITYRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
LRSP ARDENWOOD DR ROAD DIET
H.013751
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 HSIPPEN 0 SAFETY - SAFE ROUTES TO PUBLICPLACES
0-FEASIBILITY/SCOPING
FEASIBILITY STUDYRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
DOWNTOWN GREENWAY LA CONNECTOR (BR)
Page 2 - 32 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.001961
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E CARROLL LA 134 161-08 STPFLEX 2,873 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
NEW BRIDGESMISTICH, BRADLEY Remrks:
Typ Imp:161-08-0022;2 BRIDGES
Project:Prj Mgr:
JOES BAYOU & CARRAWAY LAKE BRIDGES
EAST CARROLL
H.012895
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E CARROLL LA 580 818-01 STPFLEX 2,040 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
W CARROLL LA 585 185-03 STPFLEX 840 PRESERVATION - BRIDGE (ONSYSTEM)
W CARROLL LA 582 333-01 NFA 360 PRESERVATION - BRIDGE (ONSYSTEM)
W CARROLL LA 877 337-03 NFA 640 PRESERVATION - BRIDGE (ONSYSTEM)
MOREHOUSE LA 554 160-02 NFA 480 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:
Typ Imp:USE NFA AS MATCH ON CS 818-01
Project:Prj Mgr:
DIST05:ABC BR REP E CAR,W CAR,MOR PARISH
H.012952
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E CARROLL LA 2 037-04 STPFLEX 416 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
3-DESIGN/DEVELOPMENT
ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 2: WEST CARROLL PL - US 65
H.012954
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E CARROLL LA 585 332-05 STPFLEX 133 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
3-DESIGN/DEVELOPMENT
ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 585: WEST CARROLL PL - US 65
H.012031
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E CARROLL LA 585 332-05 STPFLEX 1,334 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTHERATH, ANANDA Remrks:
Typ Imp:
Project:Prj Mgr:
LA 585: DRAINAGE CANAL BRIDGE
H.002365
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E FELICIANA LA 63 259-01 STPFLEX 5,497 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
NEW BRIDGESBRAUNER, KURT Remrks:
Typ Imp:259-01-0011;3 BRIDGES
Project:Prj Mgr:
LA 63 BRIDGES NEAR BLUFF CREEK
EAST FELICIANA
H.009633
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E FELICIANA LA 67 060-03 STPFLEX 4,938 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
STABILIZE AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 67:EBR P/L TO 6.5 MI NORTH OF EBR P/L
Page 2 - 33 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.012110
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E FELICIANA LA 68 252-02 STPFLEX 2,900 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
STABILIZE AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 68: US 61 - LA 964
H.002280
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E FELICIANA LA 19 250-04 STPFLEX 2,122 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
COLD PLANE & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 19: LA 10 - WILSON-CLINTON RD
H.012554
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E FELICIANA LA 67 060-04 STPFLEX 2,963 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
STABILIZE AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 67: LA 432 - MISS ST LN
H.012995
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E FELICIANA LA 67 060-04 STPFLEX 5,850 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
MILL, STABILIZE, OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 67: LA 10 - LA 432
H.010219
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
EVANGELINE LA 104 200-02 STPFLEX 2,286 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
STABLIZE BASE & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 104: ALLEN P/L - LA 3277
EVANGELINE
H.013009
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
EVANGELINE LA 104 202-01 STPFLEX 600 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
EVANGELINE LA 3149 820-42 NFA 480 PRESERVATION - BRIDGE (ONSYSTEM)
EVANGELINE LA 3187 820-43 NFA 240 PRESERVATION - BRIDGE (ONSYSTEM)
ST LANDRY LA 752 849-07 NFA 360 PRESERVATION - BRIDGE (ONSYSTEM)
ST LANDRY LA 358 849-18 NFA 240 PRESERVATION - BRIDGE (ONSYSTEM)
ST LANDRY LA 755-S 849-48 STPFLEX 240 PRESERVATION - BRIDGE (ONSYSTEM)
IBERIA LA 85 236-02 STPFLEX 360 PRESERVATION - BRIDGE (ONSYSTEM)
IBERIA LA 682 823-34 NFA 720 PRESERVATION - BRIDGE (ONSYSTEM)
VERMILION LA 700 207-04 NFA 360 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:
Typ Imp:
Project:Prj Mgr:
DIST03:ABC BR REP EV,ST LA,IB,VER PARS
Page 2 - 34 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.013141
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
EVANGELINE 000-20 FBROFF 583 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENT - NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
GREEN VALLEY ROAD OVER PETITE PASSE
H.013789
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
EVANGELINE 000-20 0 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT
FEASIBILITY STUDYRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
CURVE SIGNING & STRIPING (EVANGELINE)
H.013460
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
EVANGELINE US 167 066-07 0 SAFETY 0-FEASIBILITY/SCOPING
FEASIBILITY STUDY FOR REALIGNMENT OF US 167ZHANG, HONG Remrks:
Typ Imp:
Project:Prj Mgr:
US 167: ENOLA STREET TO ROSS ROAD
H.012199
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
FRANKLIN US 425 026-06 NHPP 1,700 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
FRANKLIN US 425 026-07 NHPP 1,300 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
COLD PLANE & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 425: WINNSBORO 5-LANE
FRANKLIN
H.013236
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
FRANKLIN LA 17 051-02 STPFLEX 2,900 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
MILL & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 17: WINNSBORO - LA 577
H.009583
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
FRANKLIN LA 4 036-02 STPFLEX 452 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
PATCHING & SINGLE LIFT OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 4: LA 562 - LA 128
H.009605
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
FRANKLIN LA 4 036-03 STPFLEX 1,716 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
CHIP SEALSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 4: LA 128 - LA 15
H.011564
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
FRANKLIN LA 857 168-01 STPFLEX 2,400 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
PATCH & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 857: LA 15 - LA 132
Page 2 - 35 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.012910
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
GRANT US 167 023-03 NHPP 1,290 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
GRANT LA 472 365-01 NFA 840 PRESERVATION - BRIDGE (ONSYSTEM)
NATCHITOCHES LA 119 118-02 STPFLEX 720 PRESERVATION - BRIDGE (ONSYSTEM)
NATCHITOCHES LA 1226 359-01 NFA 960 PRESERVATION - BRIDGE (ONSYSTEM)
WINN LA 126 091-07 STPFLEX 600 PRESERVATION - BRIDGE (ONSYSTEM)
WINN LA 124 125-01 STPFLEX 2,640 PRESERVATION - BRIDGE (ONSYSTEM)
WINN LA 499 126-02 NFA 360 PRESERVATION - BRIDGE (ONSYSTEM)
WINN LA 505 321-02 NFA 480 PRESERVATION - BRIDGE (ONSYSTEM)
WINN LA 1229 864-13 NFA 480 PRESERVATION - BRIDGE (ONSYSTEM)
WINN LA 1234 864-14 NFA 1,320 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:
Typ Imp:
Project:Prj Mgr:
DIST08:ABC BR REP GRAN, NATCH, WINN PARS
GRANT
H.013205
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
GRANT US 165 015-04 NHPP 800 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
PATCHING, MILLING, AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 165: SB LANE - LA 1230 TO LASALLE P/L
H.013206
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
GRANT US 165 015-04 NHPP 1,300 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
PATCHING, MILLING, AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 165: SB LANE - LA 524 TO LA 123
H.012543
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
GRANT LA 8 040-03 STPFLEX 4,985 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTMISTICH, BRADLEY Remrks:
Typ Imp:
Project:Prj Mgr:
LA 8: BIG CREEK BRIDGE
H.002762
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA LA 86 400-01 STPFLEX 3,850 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
STABILIZE BASE AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:400-01-0007; 400-01 NFA MATCH
Project:Prj Mgr:
LA 86: LA 3242 - LA 347
IBERIA
H.006128
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA 000-23 FBROFF 4,177 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTOSTUNO, BARBARA Remrks:
Typ Imp:713-23-0001;MOVEABLE BRIDGE
Project:Prj Mgr:
VIDA SHAW BRIDGE OVER BAYOU TECHE
Page 2 - 36 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.007453
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA LA 675 823-02 TAP>200K 865 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
NEW SIDEWALKSNUNES, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
HOPKINS STREET SIDEWALKS, PHASE II
H.009856
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA 000-23 RAIL PD 280 RAILROADS 3-DESIGN/DEVELOPMENTIBERIA 000-23 LOCAL 70 RAILROADS
INSTALL FLASHING LIGHTS & GATESSHREWSBERRY,BILL Remrks:
Typ Imp:714-23-0100
Project:Prj Mgr:
BNSF (NEW IBERIA) JULIA ST.
H.009857
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA 000-23 RAIL PD 280 RAILROADS 3-DESIGN/DEVELOPMENTIBERIA 000-23 LOCAL 70 RAILROADS
INSTALL FLASHING LIGHTS & GATESSHREWSBERRY,BILL Remrks:
Typ Imp:714-23-0101
Project:Prj Mgr:
BNSF (NEW IBERIA) IBERIA ST.
H.009891
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA 000-23 RAIL PD 280 RAILROADS 3-DESIGN/DEVELOPMENTIBERIA 000-23 LOCAL 70 RAILROADS
INSTALL F/L'S AND GATESSHREWSBERRY,BILL Remrks:
Typ Imp:714-23-0099
Project:Prj Mgr:
BNSF (NEW IBERIA) WEEKS ST.
H.009892
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA US 90 424-04 STPFLEX 340 RAILROADS 3-DESIGN/DEVELOPMENTIBERIA US 90 424-04 LOCAL 10 RAILROADS
NEW XING PER DISTRICT 03 & NEW IBERIABANKSTON, TANYA Remrks:
Typ Imp:
Project:Prj Mgr:
LDRR (NEW IBERIA) US 90 FR
H.010004
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA LA 320 823-12 STPFLEX 3,642 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
NOT ASSIGNED 400-30 STPFLEX 4,199 PRESERVATION - BRIDGE (ONSYSTEM)
MOVABLE BRIDGE REHABILITATION#MULTIVALUE Remrks:
Typ Imp:NFA AS MATCH TO C.S. 823-12; TTF AS MATCH TO C.S 400-30
Project:Prj Mgr:
LA 320:BYU TECHE MB (OLIVIER) (NO HBI)
H.010100
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA 000-23 HSIPPEN 209 SAFETY - SAFE ROUTES TO SCHOOLS 3-DESIGN/DEVELOPMENT
SIDEWALK CONSTRUCTION, MARKINGS,MORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
PESSON ELEMENTARY SIDEWALKS
H.010155
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA US 90 424-04 NHPP 25,000 RAILROADS - GRADE SEPARATION 3-DESIGN/DEVELOPMENT
BRIDGE OVERPASSPAINE, PEGGY JO Remrks:
Typ Imp:STBONDS AND UNCLAIMED PROPERTY FUNDS AS MATCH
Project:Prj Mgr:
US 90 RAILROAD OVERPASS SE OF LA 85
H.010922
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA LA 88 397-05 HSIP 3,254 SAFETY 3-DESIGN/DEVELOPMENT
REALIGN 2 CURVES ON LA 88 IN COTEAUDOMINGUE, CHRISTOPHER Remrks:
Typ Imp:USE HSIP FUNDS
Project:Prj Mgr:
LA 88: REALIGN CURVES IN COTEAU
Page 2 - 37 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.011026
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA LA 182 004-04 STPFLEX 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
3-DESIGN/DEVELOPMENT
DRAINAGE STRUCTURE REMOVAL AND REPLACEMENT, ROADWAY WORGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 182 WB: LASALLE ST. - VINE ST.
H.011495
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA LA 88 397-05 HSIP 3,840 SAFETY 3-DESIGN/DEVELOPMENTIBERIA US 90 424-04 HSIP 960 SAFETY
ROUNDABOUTS, J-TURNS, U-TURNS, AND RELATED WORKDOMINGUE, CHRISTOPHER Remrks:
Typ Imp:
Project:Prj Mgr:
US 90: RAMPS @ LA 88 ROUNDABOUTS
H.013140
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA 000-23 FBROFF 388 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENT - NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
EIGHTY ARPENT ROAD OVER UNNAMED COULEE
H.013522
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA 000-23 STP>200K 1,776 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
CONTINUOUS TURN LANEBANKSTON, TANYA Remrks:
Typ Imp:IBERIA PARISH TO PROVIDE MATCH.
Project:Prj Mgr:
S LEWIS ST WIDENING
H.011987
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA LA 182 004-05 STPFLEX 1,333 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTYAP, KIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 182: SANDAGER CANAL BRIDGE
H.012295
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA LA 182 004-04 STPFLEX 2,850 OPER EFFICIENCY/MOTORISTASSISTANCE - AMERICANS WITHDISABILITIES ACT
1-PLANNING/ENVIRONMENTAL
IBERIA LA 182 004-05 STPFLEX 2,929 OPER EFFICIENCY/MOTORISTASSISTANCE - AMERICANS WITHDISABILITIES ACT
SIDEWALK IMPROVEMENTS AND ADA RAMPSBRIGNAC, CHRISTINA Remrks:
Typ Imp:
Project:Prj Mgr:
LA 182 NEW IBERIA SIDEWALKS
H.012991
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA LA 87 823-27 STPFLEX 1,530 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
IBERIA LA 87 241-01 STPFLEX 510 PRESERVATION - NON-INTERSTATEON STP SYSTEM
COLD PLANE, PATCH, ASPHALT OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 87: LA 3182 - ST MARY P/L
H.011988
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA LA 86 237-01 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
LA 86: BAYOU TECHE MB REHAB (HBI)
Page 2 - 38 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.011991
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA LA 86 400-31 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
LA 86:BAYOU TECHE MB DASPIT REHAB (HBI)
H.012738
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA LA 3195 823-44 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
IBERIA LA 344 823-14 0 PRESERVATION - BRIDGE (ONSYSTEM)
MOVABLE BRIDGE REHABILITATIONHINGLE, STEWART Remrks:
Typ Imp:
Project:Prj Mgr:
NELSON CANAL & MORBIHAN BRIDGE REH (HBI)
H.013083
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA LA 675 823-02 HSIPPEN 272 SAFETY - SAFE ROUTES TO PUBLICPLACES
0-FEASIBILITY/SCOPING
FEASIBILITY TO STUDY INSTALLATION OF SIDEWALKMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
JEFFERSON ISLAND SIDEWALK
H.009484
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERVILLE LA 75 257-01 FBROFF 1,381 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTTOURRES, VALERIE Remrks:
Typ Imp:USE NFA AS MATCH
Project:Prj Mgr:
LA 75: BAYOU BREAUX BRIDGE
IBERVILLE
H.011686
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERVILLE LA 3066 230-02 NFA 4,399 ROAD TRANSFER 3-DESIGN/DEVELOPMENT
REPAIR AND REALINGMENT OF LA 3066. A PORTION SLID INTO GIWWMASTIN, CATHERINE Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3066 REPAIR REALIGN: LA 3066-S -LA 75
H.012512
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERVILLE 000-24 RTP 76 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTIBERVILLE LA 69 231-02 RTP 38 RECREATIONAL TRAILS PROGRAM IBERVILLE 000-24 LOCAL 13 RECREATIONAL TRAILS PROGRAM IBERVILLE LA 69 231-02 LOCAL 13 RECREATIONAL TRAILS PROGRAM
CONSTRUCTION OF 2,640' SHARED USE PATHNUNES, BRIAN Remrks:
Typ Imp:DCRT IS THE PROJECT MANAGER
Project:Prj Mgr:
WHITE CASTLE MISS RIVER LEVEE TRAIL
H.012789
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERVILLE LA 74 264-01 STPFLEX 20 RAILROADS 3-DESIGN/DEVELOPMENT
PREEMPTING 302-964M WITH ADJACENT TRAFFIC SIGNALLUKE, SHAWN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 74: IC RR PREEMPTION (ST. GABRIEL)
H.012851
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERVILLE 000-24 RAIL PD 1,400 RAILROADS 3-DESIGN/DEVELOPMENTIBERVILLE 000-24 RAIL HE 400 RAILROADS IBERVILLE LA 3066 230-01 RAIL PD 300 RAILROADS
UPGRADE WARNINGS AND CLOSE SOME UP CROSSINGS IN PLAQUEMINSHREWSBERRY,BILL Remrks:
Typ Imp:MATCH FROM RAILROAD
Project:Prj Mgr:
UP RR CORRIDOR (PLAQUEMINE)
Page 2 - 39 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.013242
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERVILLE LA 75 230-03 STPFLEX 550 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
3-DESIGN/DEVELOPMENT
RAISE ROADWAY ELEVATION TO PREVENT FLOODINGGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 75 ROADWAY FLOODING: 3 MI N LA 404
H.013509
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERVILLE 000-24 RTP 202 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTIBERVILLE 000-24 LOCAL 115 RECREATIONAL TRAILS PROGRAM
CONST. OF 1400' PED/BIKE TRAIL ON TOP OF LEVEENUNES, BRIAN Remrks:
Typ Imp:CITY OF PLAQUEMINE WILL PROVIDE THE LOCAL MATCH
Project:Prj Mgr:
PLAQUEMINE RIVERFRONT RECREATIONAL TRAIL
H.013715
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERVILLE LA 77 219-01 RAIL HE 600 RAILROADS 3-DESIGN/DEVELOPMENTIBERVILLE LA 75 824-02 RAIL HE 300 RAILROADS
ROAD WORK & UPGRADE WARNINGLUKE, SHAWN Remrks:
Typ Imp:MATCH FROM RAILROAD
Project:Prj Mgr:
LA 77 & 75: UP RR XINGS (IBERVILLE)
H.013764
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERVILLE 000-24 RAIL PD 500 RAILROADS 3-DESIGN/DEVELOPMENT
UPGRADE AND INSTALL SIGNALSSHREWSBERRY,BILL Remrks:
Typ Imp:MATCH FROM RAILROAD
Project:Prj Mgr:
WEST & HOMESTEAD: UP RR XINGS(IBERVILLE)
H.013861
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERVILLE 000-24 RAIL PD 200 RAILROADS 3-DESIGN/DEVELOPMENT
UPGRADE SIGNALSSHREWSBERRY,BILL Remrks:
Typ Imp:MATCH BY RAILROAD
Project:Prj Mgr:
BARROW ST: UP RR XING (IBERVILLE)
H.013862
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERVILLE I-10 450-07 NHPP 100 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
3-DESIGN/DEVELOPMENT
PAVEMENT MARKING REPLACEMENTHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: PAVEMENT MARKER REPLACEMENT III
H.012060
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERVILLE LA 75-S 824-18 FBROFF 15,535 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
MOVABLE BRIDGE REPLACEMENT/REHABILITATIONBRIGNAC, CHRISTINA Remrks:
Typ Imp:NFA AS MATCH
Project:Prj Mgr:
LA75S:BAYOU SORREL MOVABLE BRIDGE (HBI)
H.012588
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERVILLE I-10 450-07 NHPP 13,000 PRESERVATION - INTERSTATE 1-PLANNING/ENVIRONMENTAL
GRADE RAISINGMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: ATCH BASIN BR - W BATON ROUGE P/L
Page 2 - 40 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.001553
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JACKSON LA 146 068-02 STPFLEX 4,696 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
JACKSON LA 4 068-03 STPFLEX 2,954 PRESERVATION - BRIDGE (ONSYSTEM)
NEW BRIDGESMISTICH, BRADLEY Remrks:
Typ Imp:068-02-0017;3 BRIDGES & JT W/068-03-0021 2BRS
Project:Prj Mgr:
LA 146 BRIDGES NEAR KELLEYS
JACKSON
H.010452
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JACKSON LA 144 318-01 STPFLEX 1,500 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
JACKSON LA 144 319-04 STPFLEX 500 PRESERVATION - NON-INTERSTATENFA
OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:NFA AS MATCH
Project:Prj Mgr:
LA 144: EROS (LA 34) - OUACHITA P/L
H.012897
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JACKSON LA 148 316-02 NFA 840 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
JACKSON LA 144 318-01 STPFLEX 240 PRESERVATION - BRIDGE (ONSYSTEM)
JACKSON LA 556 318-02 NFA 2,880 PRESERVATION - BRIDGE (ONSYSTEM)
JACKSON LA 542 319-01 STPFLEX 1,080 PRESERVATION - BRIDGE (ONSYSTEM)
JACKSON LA 810 825-04 NFA 720 PRESERVATION - BRIDGE (ONSYSTEM)
LINCOLN LA 507 308-04 STPFLEX 240 PRESERVATION - BRIDGE (ONSYSTEM)
LINCOLN LA 3061 831-13 STPFLEX 240 PRESERVATION - BRIDGE (ONSYSTEM)
UNION LA 550 311-01 STPFLEX 480 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:
Typ Imp:
Project:Prj Mgr:
DIST05:ABC BR REP JACK,LIN,UNION PARISH
H.012962
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JACKSON LA 155 090-06 STPFLEX 217 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
3-DESIGN/DEVELOPMENT
ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 155: BIENVILLE PL - US 167
H.002861
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 3139 430-01 NFI 70,000 DEMO / HIGH PRIORITY 3-DESIGN/DEVELOPMENTJEFFERSON LA 3046 423-01 0 DEMO / HIGH PRIORITY
NEW INTERCHANGEYANG, LI Remrks:
Typ Imp:430-01-0013;JEFF. PH CONSULTANT WORKING (E)
Project:Prj Mgr:
CAUSEWAY BLVD - EARHART EXPRESSWAY INTE
JEFFERSON
H.004424
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON US 61 007-02 STP>200K 3,800 URBAN SYSTEMS 3-DESIGN/DEVELOPMENTJEFFERSON LA 3152 826-03 STP>200K 500 URBAN SYSTEMS
INTERSECTION IMPROVEMENT, WIDENING, SUBSURFACE DRAINAGELANDRY, COREY Remrks:
Typ Imp:USE TTF AS MATCH FOR PHASES 4 AND 6.
Project:Prj Mgr:
AIRLINE AT CLEARVIEW INTERSECTION IMPROV
Page 2 - 41 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.010017
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON US 90-Z 283-09 NHPP 12,000 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
MAJOR BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:
Typ Imp:USE CCCD TOLL CREDITS AS MATCH
Project:Prj Mgr:
US 90Z: WESTBANK EXPRESSWAY REHAB
H.010418
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 611-1 826-14 STPFLEX 200 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
JEFFERSON LA 611-3 826-16 STPFLEX 500 PRESERVATION - NON-INTERSTATEON STP SYSTEM
JEFFERSON LA 611-3 826-16 STPFLEX 100 PRESERVATION - NON-INTERSTATEON STP SYSTEM
JEFFERSON LA 611-1 826-17 STPFLEX 325 PRESERVATION - NON-INTERSTATEON STP SYSTEM
COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETESPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 611-1 & LA 611-3:COLD PLANE & OVERLAY
H.010570
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 49 283-30 STP>200K 3,200 URBAN SYSTEMS 3-DESIGN/DEVELOPMENTJEFFERSON LA 49 283-30 HSIP 3,200 SAFETY
ACCESS MANAGEMENT/SAFETY IMPROVEMENTS, BIKE LANES, SIDEWALFUSILIER, JACOB Remrks:
Typ Imp:MATCH FROM THE CITY OF KENNER
Project:Prj Mgr:
LA 49/WILLIAMS BLVD CORRIDOR IMPROVS
H.010673
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON US 90-Z 283-09 NHPP 10,160 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
JEFFERSON US 90-Z 283-09 STP>200K 2,540 URBAN SYSTEMS
CLEANING, MECHANICAL, ELECTRICAL AND STRUCTURAL REHABILITATIFUSILIER, JACOB Remrks:
Typ Imp:SEE NOTES FOR FUNDING INFO.
Project:Prj Mgr:
US90Z:HARVEY CANAL TUNNEL REHABILITATION
H.011732
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON 000-26 STP>200K 6,557 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
BIKE LANES; SIDEWALKS AND CROSSWALKSLEBAS, MELISSA Remrks:
Typ Imp:JEFFERSON PARISH PROVIDING MATCH
Project:Prj Mgr:
JEFFERSON PARISH: CANAL ST. IMPROVEMENTS
H.011752
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON 000-26 STP>200K 7,962 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
SIDEWALKS AND BIKELANESLEBAS, MELISSA Remrks:
Typ Imp:JEFFERSON PARISH WILL PROVIDE MATCH
Project:Prj Mgr:
SEVERN AVE: VETERANS - W. ESPLANADE
H.011779
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON 000-26 TAP>200K 2,011 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
MULTI-USE PATHNUNES, BRIAN Remrks:
Typ Imp:MATCH PROVIDED BY CITY OF KENNER.
Project:Prj Mgr:
POWER BLVD MEDIAN IMPROVEMENTS
H.011780
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON 000-26 TAP>200K 344 ENHANCEMENTS 3-DESIGN/DEVELOPMENTJEFFERSON 000-26 LOCAL 65 ENHANCEMENTS
PEDESTRIAN PATHMEEK, STEPHEN Remrks:
Typ Imp:MATCH PROVIDED BY JEFFERSON PARISH
Project:Prj Mgr:
LAKEFRONT PEDESTRIAN PATH
Page 2 - 42 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.011805
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON 000-26 TAP>200K 481 ENHANCEMENTS 3-DESIGN/DEVELOPMENTJEFFERSON LA 541 826-13 TAP>200K 141 ENHANCEMENTS
MULTI-USE PATHNUNES, BRIAN Remrks:
Typ Imp:MATCH PROVIDED BY JEFFERSON PARISH
Project:Prj Mgr:
JEFFERSON WB MISS RIVER MU PATH 3B & 3C
H.012489
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON I-10 450-15 RTP 114 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTJEFFERSON I-10 450-15 LOCAL 66 RECREATIONAL TRAILS PROGRAM
CONSTRUCTION OF A 3,665' LONG BY 13' WIDE PED-BIKE TRAILNUNES, BRIAN Remrks:
Typ Imp:DCRT IS THE PROJECT MANAGER
Project:Prj Mgr:
I-10 TRAIL WIDENING, JEFFERSON PARISH
H.012594
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 3134 429-02 STPFLEX 250 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
ADD J TURNS & U TURNS AT THE INTERSECTION OF LA 3134 & LA 45SPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3134: INTERSECTION IMP @ LA 45
H.012619
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 48 006-30 NHPP 450 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
3-DESIGN/DEVELOPMENT
DRAINAGE IMPROVEMENTSGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 48 @ PLANTATION RD
H.012620
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 48 006-30 NHPP 600 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
3-DESIGN/DEVELOPMENT
DRAINAGE IMPROVEMENTSGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 48: EVANS RD - EDWARDS AVE
H.012885
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 466 063-02 STP>200K 4,364 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
BIKE LANES, MULTI-USE PATHS, ADA SIDEWALKSLEBAS, MELISSA Remrks:
Typ Imp:CITY OF GRETNA WILL PROVIDE MATCH
Project:Prj Mgr:
LA 466: 5TH ST IMPROVEMENTS (GRETNA)
H.012918
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 3139 430-01 NHPP 500 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
3-DESIGN/DEVELOPMENT
CONCRETE REHAB PATCH AND JOINT SEALINGSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3139: DICKORY AVE. - ORLEANS P/L
H.012978
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 301 826-06 NFA 600 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
JEFFERSON LA 301 826-06 STPFLEX 30 PRESERVATION - NON-INTERSTATEON STP SYSTEM
MILLING AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:PR NF NFA; PR NS TTF AS MATCH
Project:Prj Mgr:
LA 301: 280' W MCMURTY - LA 45
Page 2 - 43 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.013090
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 18 063-02 HSIPPEN 120 SAFETY - SAFE ROUTES TO PUBLICPLACES
3-DESIGN/DEVELOPMENT
JEFFERSON LA 18 063-02 STPFLEX 96 OPER EFFICIENCY/MOTORISTASSISTANCE - AMERICANS WITHDISABILITIES ACT
SIDEWALKS, ADA RAMPS, DRAINAGE STRUCTURES, PED ISLANDSMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
GRETNA DOWNTOWN PEDESTRIAN IMPROVEMEN
H.013209
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON US 61 007-02 NHPP 1,200 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
MILL, PATCH, AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 61: WILLIAMS BLVD - AIRPORT ACCESS RD
H.013345
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON 000-26 STPENH 546 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SIGNING, STRIPING AND BRIDGENUNES, BRIAN Remrks:
Typ Imp:JEFFERSON PARISH WILL PROVIDE THE LOCAL MATCH.
Project:Prj Mgr:
KAWANEE AVENUE BIKE ROUTE PHASE I
H.013346
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON 000-26 STPENH 572 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
PEDESTRIAN IMPROVEMENTSNUNES, BRIAN Remrks:
Typ Imp:JEFFERSON PARISH WILL PROVIDE LOCAL MATCH.
Project:Prj Mgr:
MANHATTEN BLVD PEDESTRIAN IMPROVEMENTS
H.013347
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 18 063-02 STPENH 517 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
BIKE PATHSNUNES, BRIAN Remrks:
Typ Imp:JEFFERSON PARISH WILL PROVIDE THE LOCAL MATCH.
Project:Prj Mgr:
LA 18: 4TH ST BIKE PATH JEFFERSON PARISH
H.013365
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 303 826-07 STPENH 551 ENHANCEMENTS 3-DESIGN/DEVELOPMENTJEFFERSON LA 45 249-90 STPENH 643 ENHANCEMENTS
SHARED USE PATHMEEK, STEPHEN Remrks:
Typ Imp:THE TOWN OF JEAN LAFITTE WILL PROVIDE THE LOCAL MATCH.
Project:Prj Mgr:
LA 45/LA 303 ROSETHORNE PATH (LAFITTE)
H.013370
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 48 282-01 STPENH 282 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SIDEWALKS, BICYCLE FACILITIES, LANDSCAPING AND BUS SHELTERSNUNES, BRIAN Remrks:
Typ Imp:THE CITY OF KENNER WILL PROVIDE THE LOCAL MATCH.
Project:Prj Mgr:
LA 48: KENNER LEVEE TRAILHEAD EXPANSION
H.013411
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 48 006-30 TAP>200K 423 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SIDEWALKS, DRAINAGEMEEK, STEPHEN Remrks:
Typ Imp:THE CITY OF HARAHAN WILL PROVIDE THE LOCAL MATCH.
Project:Prj Mgr:
LA 48 PED IMPROVEMENTS CITY OF HARAHAN
H.013558
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON US 90 005-10 NHPP 150 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
WHITE-TOPPING CONCRETE REPAIRINGBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
US 90: WHITE-TOPPING AT LAPALCO REPAIR
Page 2 - 44 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.013745
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 3017 826-11 STPFLEX 1,500 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
MILL, OVERLAY, AND RESTRIPINGBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3017: 4TH ST - LAPALCO BLVD
H.013757
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON US 90 006-02 NHPP 4,300 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
MILL AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 90: HUEY P-ORLEANS P/L
H.013762
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON US 61 007-02 NHPP 1,900 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
MILLING AND OVERLAY OF US 61 FROM ORLEANS PL TO LABARRESPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 61: LABARRE RD - ORLEANS PL
H.013813
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON 000-26 STP>200K 1,667 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
MUTLI USE PATHLEBAS, MELISSA Remrks:
Typ Imp:JEFFERSON PARISH TO PROVIDE THE MATCH
Project:Prj Mgr:
VINTAGE DR MU PATH: POWER - WILSON
H.013825
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON 000-26 HSIP 500 RAILROADS 3-DESIGN/DEVELOPMENT
INSTALL RR ACTIVE WARNINGSHREWSBERRY,BILL Remrks:
Typ Imp:
Project:Prj Mgr:
NOPB RR XINGS (JEFFERSON PARISH)
H.008065
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 3154 826-44 STPFLEX 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
1-PLANNING/ENVIRONMENTAL
JEFFERSON 000-26 STPFLEX 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
ROUNDABOUT INSTALLATIONHARROUCH, JOSHUA Remrks:
Typ Imp:826-44-0032
Project:Prj Mgr:
LA 3154 @ DOCK ST. ROUNDABOUT
H.013718
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 23 062-01 0 SAFETY - SAFE ROUTES TO PUBLICPLACES
0-FEASIBILITY/SCOPING
FEASIBILITY STUDYRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
LA 23: 23RD ST - GRETNA BLVD PED IMPR
H.013765
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON 000-26 0 SAFETY - SAFE ROUTES TO PUBLICPLACES
0-FEASIBILITY/SCOPING
FEASIBILITY STUDYRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
LOYOLA AVE & SAL LENTINI PKWYBIKE LANES
Page 2 - 45 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.002980
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFF DAVIS I-10 450-03 NHPP 30,000 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
NEW BRIDGESDELATTE, BRIAN Remrks:
Typ Imp:450-03-0085;PARALLEL BRIDGES
Project:Prj Mgr:
I-10 OVERPASS OVER US 165 & MP R.R
JEFFERSON DAVIS
H.006528
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFF DAVIS 000-27 SR2S 198 SAFETY - SAFE ROUTES TO SCHOOLS 3-DESIGN/DEVELOPMENT
SIDEWALK CONSTRUCTION AND CROSSWALKSRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
FENTON ELEMENTARY SIDEWALKS
H.009486
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFF DAVIS US 90 003-07 STPFLEX 1,370 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTCAVALIER, STEPHANIE Remrks:
Typ Imp:
Project:Prj Mgr:
US 90: BAYOU BRIDGE
H.012621
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFF DAVIS I-10 450-03 NHPP 3,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT
APPROACH SLAB REPLACEMENTMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: JEFF DAVIS APP. SLAB REPLACEMENTS
H.013255
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFF DAVIS US 165 014-02 NHPP 6,860 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
MILL AND OVERLAY (SOUTHBOUND ONLY)SPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 165: 0.26 M N I-10 - ALLEN P/L
H.013855
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFF DAVIS 000-27 RAIL PD 200 RAILROADS 3-DESIGN/DEVELOPMENT
INSTALL SIGNALSSHREWSBERRY,BILL Remrks:
Typ Imp:MATCH FROM RAILROAD
Project:Prj Mgr:
GRO RACCA RD: UP XING (JEFFERSON DAVIS)
H.013857
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFF DAVIS 000-27 RAIL PD 200 RAILROADS 3-DESIGN/DEVELOPMENT
INSTALL SIGNALSSHREWSBERRY,BILL Remrks:
Typ Imp:MATCH FROM RAILROAD
Project:Prj Mgr:
ESTES RD: UP RR XING (JEFFERSON DAVIS)
H.002091
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFF DAVIS LA 97 201-01 STPFLEX 6,000 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTBUCCI, MARK Remrks:
Typ Imp:201-01-0008;PROJECT TO BE SCOPED
Project:Prj Mgr:
LA 97 OVERPASS (I-10)
H.002151
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 339-S 216-02 FBROFF 2,500 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTJUDICE, ANDREW Remrks:
Typ Imp:216-02-0016; USE NFA AS MATCH
Project:Prj Mgr:
BAYOU PARC PERDU AND CREEK BRIDGES
LAFAYETTE
Page 2 - 46 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.002735
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 1252 391-04 FBROFF 2,335 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTLAI, QUANG Remrks:
Typ Imp:391-04-0018; USE NFA AS MATCH
Project:Prj Mgr:
BAYOU VERMILION BRIDGE
H.003459
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE I-49 455-01 HSIP 0 SAFETY 3-DESIGN/DEVELOPMENTLAFAYETTE LA 726 828-44 HSIP 496 SAFETY LAFAYETTE 000-28 HSIP 676 SAFETY LAFAYETTE LA 98 391-02 HSIP 352 SAFETY
INTERCHANGE IMPROVEMENTSTONEY, PATRICK Remrks:
Typ Imp:455-01-0054 AND 828-44-0015
Project:Prj Mgr:
I-49 INTERCH:LA726/LA98/PONT DES MOUTON
H.009629
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE US 167 424-02 NHPP 8,813 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
P.C.C.P. REHABILITATIONSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 90 (EB):RR JCT-JCT US 90BUS (PINHOOK)
H.010005
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 733 828-14 STPFLEX 4,568 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
VERMILION LA 82 194-07 STPFLEX 3,418 PRESERVATION - BRIDGE (ONSYSTEM)
MOVABLE BRIDGE REHABILITATIONBRAUNER, KURT Remrks:
Typ Imp:
Project:Prj Mgr:
VERMILLION RIVER MOVABLE BRS REHAB (HBI)
H.011904
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 182-2 828-50 STPFLEX 2,846 ROAD TRANSFER 3-DESIGN/DEVELOPMENTLAFAYETTE LA 182-2 828-50 LOCAL 487 ROAD TRANSFER
COLD PLANE, OVERLAY INCLUDING WIDENING, DRAINAGE STRMCMILLAN, RYAN Remrks:
Typ Imp:LOCAL FUNDS PROVIDED BY CITY OF BROUSSARD
Project:Prj Mgr:
LA 182: ST DE PORRES-ALBERTSONS PKWY(RT)
H.011932
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 89-1 216-03 STPFLEX 750 ROAD TRANSFER 3-DESIGN/DEVELOPMENT
PATCH, COLD PLANE, ASPHALT OVERLAY, AND RELATED WORKDOMINGUE, CHRISTOPHER Remrks:
Typ Imp:
Project:Prj Mgr:
LA 89-1:N IBERIA ST-HEART D FARM RD(RT)
H.011971
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 176 828-20 STPFLEX 277 ROAD TRANSFER 3-DESIGN/DEVELOPMENTLAFAYETTE 000-28 LOCAL 258 OTHER / MISCELLANEOUS LAFAYETTE LA 176 828-05 LOCAL 77 OTHER / MISCELLANEOUS
STREETSCAPE IMPROVEMENTS, COLD PLANE, OVERLAY, CONC. REHABBRIGNAC, CHRISTINA Remrks:
Typ Imp:
Project:Prj Mgr:
LA 176: DT LFT ST. & SW. CONS. PHASE 3
H.012231
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 3025-S 828-38 STP>200K 835 URBAN SYSTEMS 3-DESIGN/DEVELOPMENTLAFAYETTE LA 3025-S 828-38 TAP>200K 583 URBAN SYSTEMS
ENHANCEMENTSBANKSTON, TANYA Remrks:
Typ Imp:LAFAYETTE CONSOLIDATED GOVERNMENT WILL PROVIDE MATCH.
Project:Prj Mgr:
BERTRAND DRIVE STREETSCAPE
Page 2 - 47 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.012393
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 98 391-02 HSIP 683 SAFETY 3-DESIGN/DEVELOPMENTLAFAYETTE 000-28 HSIP 683 SAFETY
THE EXISTING INTERSECTION WILL BE CONVERTED TO A ROUNDABOUTTONEY, PATRICK Remrks:
Typ Imp:
Project:Prj Mgr:
LA 98: ROUNDABOUT AT MILLS STREET
H.012611
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE US 167 424-02 NHPP 351 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
LAFAYETTE I-49 455-01 NHPP 49 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
OFFSET TURN LANES, EXTEND MEDIAN ISLAND, REMOVE HURR. XOVERSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 167 @ CHALMETTE/I-49 HURR. CROSSOVER
H.012800
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE 000-28 HSIPPEN 301 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT
HIGH FRICTION SURFACE TREATMENTRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
LOCAL ROADS HFST (LAFAYETTE)
H.012867
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE 000-28 STP>200K 1,938 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
ADD CENTER TURN LANEBANKSTON, TANYA Remrks:
Typ Imp:CITY OF YOUNGSVILLE WILL PROVIDE MATCH
Project:Prj Mgr:
S LARRIVIERE RD: LA 92 - CHEMIN METAIRIE
H.012868
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE 000-28 STP>200K 1,020 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
OVERLAYBANKSTON, TANYA Remrks:
Typ Imp:CITY OF YOUNGSVILLE WILL PROVIDE MATCH
Project:Prj Mgr:
FORTUNE ROAD PAVEMENT PRESERVATION
H.012869
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 182 032-01 STP>200K 1,650 URBAN SYSTEMS 3-DESIGN/DEVELOPMENTLAFAYETTE LA 723 828-03 STP>200K 1,650 URBAN SYSTEMS
ROUNDABOUTBANKSTON, TANYA Remrks:
Typ Imp:LAFAYETTE CONSOLIDATED GOV'T WILL PROVIDE MATCH
Project:Prj Mgr:
LA 182(UNIV) @ LA 723(RENAUD) ROUNDABOUT
H.012870
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 93 217-01 STP>200K 4,400 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
ADDING TURNING LANESBANKSTON, TANYA Remrks:
Typ Imp:CITY OF SCOTT WILL PROVIDE MATCH
Project:Prj Mgr:
LA 93: I-10 RAMP - RENAUD
H.012871
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE 000-28 STP>200K 1,250 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
PRESERVATIONBANKSTON, TANYA Remrks:
Typ Imp:CITY OF YOUNGSVILLE WILL PROVIDE MATCH
Project:Prj Mgr:
DETENTE ROAD PAVEMENT PRESERVATION
H.012880
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE 000-28 FBROFF 700 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENT NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
HAPSBURG LANE / COULEE
Page 2 - 48 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.012914
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 3073 828-39 NHPP 400 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
EXTENDING TURN LANESSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3073: AMBASSADOR @ BONIN IMPROVEMENTS
H.013303
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE 000-28 STP>200K 2,000 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
REHABILITATE AND ADD CONTINUOUS TURN LANEBANKSTON, TANYA Remrks:
Typ Imp:CITY OF BROUSSARD TO PROVIDE MATCH
Project:Prj Mgr:
W MAIN STREET: S BERNARD TO CLARA
H.013304
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE 000-28 STP>200K 3,780 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
REHABILITATE AND MINOR WIDENING - ADD CONTINUOUS TURN LANEBANKSTON, TANYA Remrks:
Typ Imp:CITY OF BROUSSARD TO PROVIDE MATCH
Project:Prj Mgr:
MAIN STREET: CLARA TO ST. DEPORRES
H.013412
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE 000-28 TAP>200K 356 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SIDEWALKSNUNES, BRIAN Remrks:
Typ Imp:THE LAFAYETTE C-P GOVERNMENT WILL PROVIDE THE LOCAL MATCH.
Project:Prj Mgr:
SIXTH STREET SIDEWALKS LAFAYETTE
H.013413
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE 000-28 TAPFLEX 262 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
PEDESTRIAN AND BIKE PATHNUNES, BRIAN Remrks:
Typ Imp:THE LAFAYETTE C-P GOVERNMENT WILL PROVIDE THE LOCAL MATCH.
Project:Prj Mgr:
NORTHSIDE HS PED BIKEWAY PLAZA LAFAYETTE
H.013443
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE 000-28 TAP>200K 701 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
NEW SIDEWALK CONSTRUCTIONMEEK, STEPHEN Remrks:
Typ Imp:LOCAL MATCH FROM CITY OF YOUNGSVILLE.
Project:Prj Mgr:
IBERIA STREET SIDEWALK, PH 1 YOUNGSVILLE
H.013517
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE 000-28 STP>200K 202 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
SIDEWALKSBANKSTON, TANYA Remrks:
Typ Imp:CITY OF CARENCRO TO PROVIDE MATCH
Project:Prj Mgr:
E ST PETER ST SIDEWALKS
H.004490
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE 000-28 STP<200K 0 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL
STAGE 0 STUDYDUET, JASON Remrks:
Typ Imp:700-28-0221; MATCH BY LAF MPO
Project:Prj Mgr:
STAGE 0 STUDY FOR VARIOUS ROUNDABOUTS
H.006534
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE 000-28 HSIPPEN 500 SAFETY - LOCAL ROADS SAFETY 1-PLANNING/ENVIRONMENTAL
CONSTRUCT A ROUNDABOUTRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
ROUNDABOUT ON DULLES DR. AT NORTH DOMIN
H.009500
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE 000-28 0 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL
PLAN IMPLEMENTATION AND ACTION PLANBROUSSARD, DAN Remrks:
Typ Imp:
Project:Prj Mgr:
2040PLAN IMPLEMENTATION&I-49 ACTION PLAN
Page 2 - 49 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.011992
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 343 393-03 STPFLEX 1,463 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTHERATH, SUBA Remrks:
Typ Imp:
Project:Prj Mgr:
LA 343: INDIAN BAYOU BRIDGE
H.012533
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 1252 391-04 STPFLEX 1,871 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
NOT ASSIGNED 828-15 STPFLEX 1,250 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTS#MULTIVALUE Remrks:
Typ Imp:
Project:Prj Mgr:
LA1252,LA93:BAYOU PT BRULE AND DITCH BRS
H.012665
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE US 90 424-02 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
1-PLANNING/ENVIRONMENTAL
TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
US 90 RETIMING PROJECT
H.013537
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 93 828-15 STPFLEX 1,250 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTBRAUNER, KURT Remrks:
Typ Imp:
Project:Prj Mgr:
LA 93: DITCH BRIDGE
H.009997
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE US 167 080-02 STP>200K 1,645 URBAN SYSTEMS 0-FEASIBILITY/SCOPINGLAFAYETTE US 167 080-02 HSIPPEN 3,013 SAFETY LAFAYETTE US 167 080-02 NHPP 3,013 OPER EFFICIENCY/MOTORIST
ASSISTANCE - ACCESSMANAGEMENT
LAFAYETTE US 167 080-02 STPFLEX 1,368 URBAN SYSTEMS
ACCESS MANAGEMENT AND OTHER SAFETY COUNTERMEASURESFUSILIER, JACOB Remrks:
Typ Imp:STUDY FUNDED WITH SAFETY TRANSFER FUNDS
Project:Prj Mgr:
US 167: JOHNSTON ST IMPROVEMENTS
H.011990
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 92 213-05 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
LA 92: VERMILLION RIVER MB REHAB (HBI)
H.013025
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 182 032-01 0 URBAN SYSTEMS 0-FEASIBILITY/SCOPING
FEASIBILITY STUDYZHANG, HONG Remrks:
Typ Imp:ACADIANA MPO PROVIDING MATCH
Project:Prj Mgr:
LA 182 (UNIVERSITY AVE) CORRIDOR STUDY
H.013716
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE US 167 080-02 0 SAFETY - SAFE ROUTES TO PUBLICPLACES
0-FEASIBILITY/SCOPING
FEASIBILITY STUDYRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
US 167: CAMELLIA BLVD-CHURCHILL DR (LAF)
Page 2 - 50 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.001461
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 1 064-06 TAP<200K 66 ENHANCEMENTS 3-DESIGN/DEVELOPMENTLAFOURCHE US 90 424-08 TAP<200K 66 ENHANCEMENTS
SCENIC OVERLOOK AND PARKING LOTNUNES, BRIAN Remrks:
Typ Imp:MATCH IS 15% TOLL CREDITS AND 5% LOCAL
Project:Prj Mgr:
LAFOURCHE-TERREBONNE SCENIC OVERLOOK
LAFOURCHE
H.002794
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 308 407-90 FBROFF 1,421 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTISEMANN, ROBERT Remrks:
Typ Imp:407-90-0018; USE NFA AS MATCH
Project:Prj Mgr:
VALENTINE CANAL BR. NEAR RACELAND
H.009662
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 308 407-01 STPFLEX 2,115 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
ASPHALTIC CONCRETE OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 308: GOLDEN MEADOW BR - GALLIANO BR
H.011517
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 654 829-10 NFA 700 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
3-DESIGN/DEVELOPMENT
RAISING ROADWAY ELEVATION BY ADDING ASPHALTGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 654: LA 308 - GREENS S. CUT RD.
H.011665
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 308 407-90 HSIPPEN 832 SAFETY 3-DESIGN/DEVELOPMENTLAFOURCHE LA 308 407-90 HSIPPEN 242 SAFETY
LA 308 REALIGNMENTROONEY, BRITTANY Remrks:
Typ Imp:
Project:Prj Mgr:
LA 308:BELLVIEW BRIDGE TO RITA BRIDGE
H.011915
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE 000-29 NFI 24,506 OTHER / MISCELLANEOUS 3-DESIGN/DEVELOPMENTLAFOURCHE 000-29 NFI 1,054 ROAD TRANSFER
NEW BRIDGE AND NEW ROAD BETWEEN LA 308 AND LA 3235HANKS, ANNA Remrks:
Typ Imp:
Project:Prj Mgr:
AIRPORT CONNECTOR ROAD AND BRIDGE
H.012447
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 182 005-07 STPFLEX 20,000 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
REPLACE EXISTING VERTICAL LIFT BRIDGEBRIGNAC, CHRISTINA Remrks:
Typ Imp:
Project:Prj Mgr:
LA 182: BAYOU LAF BR AT RACELAND (HBI)
H.013269
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE 000-29 STP<200K 469 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
ASPHALT OVERLAYBANKSTON, TANYA Remrks:
Typ Imp:CITY OF THIBODAUX WILL PROVIDE MATCH
Project:Prj Mgr:
AUDUBON AVE OVLY:LA 1 TO TERREBONNE P/L
H.013272
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE 000-29 STP<200K 145 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
NEW MULTI-USE PATHBANKSTON, TANYA Remrks:
Typ Imp:LAFOURCHE PARISH WILL PROVIDE MATCH
Project:Prj Mgr:
LAROSE MULTI-USE PATH
Page 2 - 51 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.013369
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 1 064-06 STPENH 592 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SIDEWALKS, SIGNS, STRIPING, PARKING AND LANDSCAPINGNUNES, BRIAN Remrks:
Typ Imp:LAFOURCHE PARISH WILL PROVIDE THE LOCAL MATCH.
Project:Prj Mgr:
LA1: LAFOURCHE PARISH GVMT CTR TRAILHEAD
H.013402
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 1 064-06 STP<200K 110 URBAN SYSTEMS 3-DESIGN/DEVELOPMENTLAFOURCHE 000-29 STP<200K 74 URBAN SYSTEMS LAFOURCHE LA 308 407-90 STP<200K 36 URBAN SYSTEMS
SIDEWALK AND MULTIUSE PATHBANKSTON, TANYA Remrks:
Typ Imp:LAFOURCHE PARISH TO PROVIDE MATCH
Project:Prj Mgr:
LA1 &LA308 PED & MULTIUSE PATH(LOCKPORT)
H.013403
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 304 829-04 STP<200K 131 URBAN SYSTEMS 3-DESIGN/DEVELOPMENTLAFOURCHE LA 20 065-06 STP<200K 131 URBAN SYSTEMS
ADA SIDEWALKSBANKSTON, TANYA Remrks:
Typ Imp:LAFOURCHE PARISH TO PROVIDE MATCH
Project:Prj Mgr:
LA 20 & LA 304 SIDEWALK IMP (CHACKBAY)
H.013404
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 1 064-04 STP<200K 117 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
SIDEWALKSBANKSTON, TANYA Remrks:
Typ Imp:LAFOURCHE PARISH PROVIDING MATCH
Project:Prj Mgr:
LA 1 SIDEWALKS (CUT-OFF)
H.013490
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 1 064-06 STP<200K 1,200 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
MULTI-USE PATHBANKSTON, TANYA Remrks:
Typ Imp:LAFOURCHE PARISH PROVIDING MATCH
Project:Prj Mgr:
CENTRAL LAFOURCHE MULTI-USE PATH PH 1A
H.011963
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 648-S 829-29 STPFLEX 1,185 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTYAP, KIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 648: DRAIN CANAL BRIDGE
H.012530
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 20 065-06 STPFLEX 2,155 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
LAFOURCHE LA 3185 829-25 STPFLEX 1,242 PRESERVATION - BRIDGE (ONSYSTEM)
LAFOURCHE LA 3185 829-25 STPFLEX 1,284 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTSYAP, KIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 20, LA 3185:40 ARPENT & CANAL BRIDGES
H.013388
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE 000-29 HSIPPEN 1,140 SAFETY 1-PLANNING/ENVIRONMENTALLAFOURCHE 000-29 STPFLEX 1,140 OPER EFFICIENCY/MOTORIST
ASSISTANCE - TRAFFIC CONTROLDEVICES
TRAFFIC SIGNAL UPGRADEFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DIST. 02H FLASHING YELLOW ARROW PART 1
Page 2 - 52 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.011962
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 1 064-06 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
NOT ASSIGNED 407-01 0 PRESERVATION - BRIDGE (ONSYSTEM)
MOVABLE BRIDGE REHABILITATION FEASIBILITY STUDY#MULTIVALUE Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1:COMPANY CANAL MB-LOCKPORT(HBI)
H.012734
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 307 829-15 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
MOVABLE BRIDGE REHABILITATIONHINGLE, STEWART Remrks:
Typ Imp:USE NFA AS MATCH
Project:Prj Mgr:
LA 307:BAYOU BOEUF BRIDGE REHABILITATION
H.009603
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LASALLE LA 3259 830-21 STPFLEX 294 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
ASPHALT OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3259: LA 125 - US 165
LASALLE
H.012520
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LASALLE 000-30 RTP 194 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENT
RESTORE 4.5 MILES OF ATV TRAIL AND CONST. OF TRAILHEAD PARKNUNES, BRIAN Remrks:
Typ Imp:DCRT IS THE PROJECT MANAGER
Project:Prj Mgr:
DEWEY WILLS WMA YEAR ROUND ATV TRAIL
H.013093
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LASALLE 000-30 FBROFF 593 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENT NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
BREITHAUPT CUTOFF RD OVER RHINEHART CRK
H.013221
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LASALLE US 84 022-05 NHPP 280 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
CATAHOULA US 425 026-05 NHPP 82 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
FRANKLIN US 425 026-06 NHPP 338 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
ASPHALT SURFACE TREATMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 84 AND US 425 ASPHALT SURFACE TREATME
H.012048
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LASALLE US 84 022-04 NHPP 15,325 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
WINN US 84 022-03 NHPP 1,050 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTSBUCCI, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
US 84: CASTOR CREEK AND RELIEF BRIDGES
Page 2 - 53 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.007492
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN LA 145 157-03 TAP<5K 204 ENHANCEMENTS 3-DESIGN/DEVELOPMENTLINCOLN US 80 001-08 TAP<5K 146 ENHANCEMENTS LINCOLN LA 145 157-02 TAP<5K 35 ENHANCEMENTS
SIDEWALK AND BIKE PATHMEEK, STEPHEN Remrks:
Typ Imp:15% OF MATCH IS TOLL CREDITS 5% IS LOCAL MATCH
Project:Prj Mgr:
CHOUDRANT SIDEWALK PROJECT
LINCOLN
H.008161
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN LA 3072 831-14 FBROFF 1,199 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTBRAUNER, KURT Remrks:
Typ Imp:831-14-0005; USE NFA AS MATCH
Project:Prj Mgr:
LA 3072: COLVIN CREEK BRIDGE
H.009871
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN 000-31 RAIL PD 300 RAILROADS 3-DESIGN/DEVELOPMENT
INSTALL F/L'S AND GATESSHREWSBERRY,BILL Remrks:
Typ Imp:MATCH FROM RAILROAD
Project:Prj Mgr:
KCS(SIMSBORO) WOODLAND DR.
H.010389
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN LA 507 308-04 STPFLEX 735 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
STABILIZE BASE & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 507: US 80 - S. END OVERPASS I-20
H.011627
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN I-20 451-05 NHPP 11,900 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT
ASPHALT OVERLAY OF ASPHALT PAVEMENTMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-20: BIENVILLE P/L - 1 MILE WEST LA 149
H.011772
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN LA 824-3 831-21 TAPFLEX 41 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SIDEWALKSNUNES, BRIAN Remrks:
Typ Imp:MATCH BY THE TOWN OF DUBACH
Project:Prj Mgr:
LA 824-3: TOWN OF DUBACH SIDEWALKS
H.011803
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN 000-31 TAP<200K 660 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SIDEWALKS AND STREETSCAPINGNUNES, BRIAN Remrks:
Typ Imp:MATCH PROVIDED BY THE CITY OF RUSTON.
Project:Prj Mgr:
RUSTON DOWNTOWN REVITALIZATION PHASE VII
H.011804
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN 000-31 TAP<200K 675 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SIDEWALKS AND STREETSCAPINGNUNES, BRIAN Remrks:
Typ Imp:MATCH PROVIDED BY CITY OF RUSTON
Project:Prj Mgr:
RUSTON DOWNTOWN REVITALIZATION PHASE IX
H.012123
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN LA 33 069-01 STPFLEX 200 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
NB RIGHT TURN LANE AT LA 821SPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 33: NB RIGHT TURN LANE AT LA 821
Page 2 - 54 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.012695
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN US 80 001-07 STPFLEX 450 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
ADD LEFT TURN LANE AT NUTMEGSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 80: LEFT TURN LANE NUTMEG DRIVE
H.012697
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN US 80 001-07 NHPP 900 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
ADDITION OF TURN LANESSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 80: LTURN LANES BARNETT/WESLEY CHAPLE
H.013033
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN 000-31 RTP 112 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTLINCOLN 000-31 LOCAL 305 RECREATIONAL TRAILS PROGRAM
CONSTRUCTION OF A 10,078' LONG BY 12' WIDE, MULTI-USE TRAILNUNES, BRIAN Remrks:
Typ Imp:DCRT IS THE PROJECT MANAGER
Project:Prj Mgr:
ROCK ISLAND GREENWAY, PHASE 2
H.013086
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN 000-31 HSIPPEN 350 SAFETY - SAFE ROUTES TO PUBLICPLACES
3-DESIGN/DEVELOPMENT
LINCOLN 000-31 LOCAL 115 SAFETY - SAFE ROUTES TO PUBLICPLACES
CONSTRUCT SIDEWALKS, DRAINAGE, AND OTHER SAFETY IMPROVEMEMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
I.A. LEWIS ELEM SIDEWALK - PHASE 2
H.013409
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN LA 544 296-03 TAPFLEX 30 ENHANCEMENTS 3-DESIGN/DEVELOPMENTLINCOLN 000-31 TAPFLEX 16 ENHANCEMENTS LINCOLN LA 150 831-07 TAPFLEX 45 ENHANCEMENTS
SIDEWALKSNUNES, BRIAN Remrks:
Typ Imp:LA TECH UNIVERSITY WILL PROVIDE THE LOCAL MATCH.
Project:Prj Mgr:
LA TECH UNIV N CAMPUS TRAILS RUSTON
H.013414
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN 000-31 TAP<200K 406 ENHANCEMENTS 3-DESIGN/DEVELOPMENTLINCOLN US 80 001-08 TAP<200K 296 ENHANCEMENTS
PED IMPROVEMENTS (SIDEWALKS, LANDSCAPING AND STREETSCAPINNUNES, BRIAN Remrks:
Typ Imp:THE CITY OF RUSTON WILL PROVIDE THE LOCAL MATCH.
Project:Prj Mgr:
RUSTON DOWNTOWN REVITALIZATION PHASE X
H.013524
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN 000-31 RTP 112 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTLINCOLN 000-31 LOCAL 174 RECREATIONAL TRAILS PROGRAM
CONSTRUCTION OF A 1250' LONG BY 10' WIDE MULTI-USE TRAILNUNES, BRIAN Remrks:
Typ Imp:CITY OF RUSTON WILL PROVIDE THE LOCAL MATCH
Project:Prj Mgr:
ROCK ISLAND GREENWAY, PHASE 4
Page 2 - 55 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.010616
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN LA 544 296-03 STPFLEX 6,500 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
LINCOLN LA 544 296-03 STPFLEX 4,590 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
LINCOLN LA 544 296-03 LOCAL 4,500 PRESERVATION - BRIDGE (ONSYSTEM)
OVERPASS REHABILITATIONFUSILIER, JACOB Remrks:
Typ Imp:
Project:Prj Mgr:
I 20: LA 544 OVERPASS REPLACEMENT
H.012540
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN LA 151 317-04 STPFLEX 2,319 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTWINDMANN, ANDREW Remrks:
Typ Imp:
Project:Prj Mgr:
LA 151: CYPRESS CREEK BRIDGE
H.012740
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN I-20 451-05 NHPP 5,000 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
LINCOLN I-20 451-05 NHPP 5,000 PRESERVATION - BRIDGE (ONSYSTEM)
LINCOLN I-20 451-05 NHPP 5,000 PRESERVATION - BRIDGE (ONSYSTEM)
LINCOLN I-20 451-05 NHPP 5,000 PRESERVATION - BRIDGE (ONSYSTEM)
LINCOLN I-20 451-05 NHPP 5,000 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTSWINDMANN, ANDREW Remrks:
Typ Imp:
Project:Prj Mgr:
I-20: REPLACE FIVE OVERPASSES (LINCOLN)
H.013720
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN 000-31 0 SAFETY - SAFE ROUTES TO PUBLICPLACES
0-FEASIBILITY/SCOPING
FEASIBILITY STUDYRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
BONNER ST BRIDGE PED IMPR (RUSTON)
H.003425
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON I-12 454-02 NHPP 7,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT
C.P. AND OVERLAYMAY, BRIAN Remrks:
Typ Imp:454-02-0077
Project:Prj Mgr:
I-12: LA 63 - TANGIPAHOA PARISH LINE
LIVINGSTON
H.008170
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 1024 832-10 FBROFF 1,302 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTISEMANN, ROBERT Remrks:
Typ Imp:832-10-0019;2 BRIDGES; USE NFA AS MATCH
Project:Prj Mgr:
LA 1024 CREEK BRS. NEAR FRIENDSHIP
H.010384
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 442 269-01 STPFLEX 2,420 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
LIVINGSTON LA 441 270-02 STPFLEX 190 PRESERVATION - NON-INTERSTATEON STP SYSTEM
COLD PLANE & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 442: LA 63 - W. JCT. LA 441
Page 2 - 56 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.011520
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 1019 832-02 STPFLEX 300 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
3-DESIGN/DEVELOPMENT
REMOVE AND REPLACE PIPES, CATCH BASINS, AND/OR ASPHALTGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1019: LA 16-CALMES RD DRAINAGE
H.012348
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 1026 273-03 STPFLEX 1,250 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
3-DESIGN/DEVELOPMENT
LIVINGSTON 000-32 STPFLEX 500 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
ROUNDABOUT INTERSECTION IMPROVEMENTSISEMANN, ROBERT Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1026: ROUNDABOUT @ EDEN CHURCH ROAD
H.012573
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 1026 832-13 STPFLEX 1,725 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
IN PLACE STABILIZATION AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1026: LA 16 - FORREST DELATTE RD.
H.012622
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON I-12 454-02 NHPP 16,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT
I-12 APPROACH SLAB REPLACEMENT AT HOG BRANCH BRIDGEBRAUNER, KURT Remrks:
Typ Imp:
Project:Prj Mgr:
I-12:LIVINGSTON PAR APPROACH SLAB REP P3
H.013010
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 449 271-01 STPFLEX 480 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
LIVINGSTON LA 63 272-03 STPFLEX 600 PRESERVATION - BRIDGE (ONSYSTEM)
LIVINGSTON LA 1027 273-03 STPFLEX 600 PRESERVATION - BRIDGE (ONSYSTEM)
LIVINGSTON LA 1032 832-12 STPFLEX 840 PRESERVATION - BRIDGE (ONSYSTEM)
ST HELENA LA 37 254-05 STPFLEX 2,760 PRESERVATION - BRIDGE (ONSYSTEM)
ST HELENA LA 38 263-01 STPFLEX 1,200 PRESERVATION - BRIDGE (ONSYSTEM)
ST HELENA LA 38 263-02 STPFLEX 1,440 PRESERVATION - BRIDGE (ONSYSTEM)
ST HELENA LA 1042 846-03 NFA 240 PRESERVATION - BRIDGE (ONSYSTEM)
ST HELENA LA 1047 846-07 STPFLEX 240 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:
Typ Imp:
Project:Prj Mgr:
DIST62:ABC BR REPL LIVING, ST HELENA PAR
H.013088
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 1031 832-11 HSIPPEN 305 SAFETY - SAFE ROUTES TO PUBLICPLACES
3-DESIGN/DEVELOPMENT
CONSTRUCT SIDEWALKS AND OTHER SAFETY IMPROVEMENTSMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
HATCHELL LANE SIDEWALKS
Page 2 - 57 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.013166
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON 000-32 FBROFF 1,145 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENT - NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
WHITTINGTON ROAD OVER GRAYS CREEK
H.013454
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON 000-32 TAP>200K 281 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
NEW SIDEWALK CONSTURCTIONNUNES, BRIAN Remrks:
Typ Imp:LOCAL ENTITY (CITY OF DENHAM SPRINGS) TO PROVIDE 20% MATCH.
Project:Prj Mgr:
CENTERVILLE ST. SIDEWALKS DENHAM SPRINGS
H.013543
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON 000-32 STP>200K 3,594 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
OVERLAY AND CLOSED DRAINAGELEBAS, MELISSA Remrks:
Typ Imp:LIVINGSTON PARISH PROVIDING THE MATCH.
Project:Prj Mgr:
SIMS ROAD IMPROVEMENTS
H.013545
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON 000-32 STP>200K 471 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
OVERLAYLEBAS, MELISSA Remrks:
Typ Imp:DENHAM SPRINGS TO PROVIDE MATCH.
Project:Prj Mgr:
EDGEWOOD DRIVE IMPROVEMENTS
H.013553
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON 000-32 STP>200K 1,296 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
OVERLAY AND SIDEWALKLEBAS, MELISSA Remrks:
Typ Imp:CITY OF WALKER TO PROVIDE MATCH.
Project:Prj Mgr:
PENDARVIS LANE IMPROVEMENTS PHASE 1
H.013555
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON 000-32 STP>200K 879 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
OVERLAY AND SIDEWALKSLEBAS, MELISSA Remrks:
Typ Imp:CITY OF WALKER TO PROVIDE MATCH.
Project:Prj Mgr:
PENDARVIS LANE IMPROVEMENTS PHASE II
H.013557
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON 000-32 STP>200K 1,318 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
OVERLAY AND SIDEWALKSLEBAS, MELISSA Remrks:
Typ Imp:CITY OF WALKER TO PROVIDE MATCH.
Project:Prj Mgr:
PENDARVIS LANE IMPROVEMENTS PHASE III
H.013674
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON 000-32 STP>200K 771 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
OVERLAYLEBAS, MELISSA Remrks:
Typ Imp:CITY OF DENHAM SPRINGS TO PROVIDE MATCH
Project:Prj Mgr:
BENTON LANE IMPROVEMENTS
H.013738
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 441 270-01 STPFLEX 900 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
MILL AND OVERLAYBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 441: LA 42 - 1-12 COA
H.013739
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 63 272-03 STPFLEX 1,800 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
MILL AND OVERLAYBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 63: LA 449 - LA 442
Page 2 - 58 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.002397
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 16 262-01 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTALLIVINGSTON I-12 454-02 0 DEMO / HIGH PRIORITY
INTERCHANGE IMPROVEMENTSMASTIN, CATHERINE Remrks:
Typ Imp:262-01-0037
Project:Prj Mgr:
PETE'S HWY(LA 16)INTERCHANGE @ I-12
H.009552
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 16 262-01 STPFLEX 1,405 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
MAINTENANCE RESTORATION & REHABILITATIONSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
JCT. LA 1034 - JCT. US 190
H.009837
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 64 262-31 NFI 1,667 CAPACITY 1-PLANNING/ENVIRONMENTALLIVINGSTON LA 1019 832-05 NFI 1,667 CAPACITY LIVINGSTON LA 64 273-03 NFI 1,667 CAPACITY
CAPACITY AND SAFETY IMPROVEMENTS AT LA 64 AND LA 1019MOSS, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 64: ROUNDABOUT @ LA 1019
H.010551
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 16 262-02 STPFLEX 199 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
PCCP REHABILITATIONSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 16: LA 64/LA 1026 - AMITE CHURCH RD.
H.010672
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 3002 832-32 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
1-PLANNING/ENVIRONMENTAL
LIVINGSTON LA 16 262-01 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
LIVINGSTON LA 1034 832-14 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
TRAFFIC STUDY ON LA 3002, LA 16, AND LA 1034COLVIN, JODY Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3002 & LA 16 CORRIDOR STUDY
H.012068
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 1026 273-03 STPFLEX 1,067 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTWINDMANN, ANDREW Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1026: CREEK BRIDGE
H.012069
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 16 262-01 STPFLEX 1,491 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTBRAUNER, KURT Remrks:
Typ Imp:
Project:Prj Mgr:
LA 16: CANAL BRIDGE
Page 2 - 59 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.012971
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 42 260-02 STPFLEX 233 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
LIVINGSTON LA 16 262-01 STPFLEX 32 PRESERVATION - NON-INTERSTATEON STP SYSTEM
PATCH, MILL & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 42/LA 16:AMITE RIVER-MAIN ST.
H.011645
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 16 262-01 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
0-FEASIBILITY/SCOPING
LIVINGSTON LA 3002 832-32 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
LIVINGSTON LA 1034 832-14 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
CORRIDOR STUDY FOR ACCESS MANAGEMENT IMPROVEMENTSHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA3002:LA16:LA1034:CORRIDOR STUDY PHASE2
H.010897
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
MADISON I-20 451-09 NHPP 13,500 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
MADISON 000-33 OTHER 13,500 PRESERVATION - BRIDGE (ONSYSTEM)
REHABILITATIOND'ANDREA, ARTUR Remrks:
Typ Imp:
Project:Prj Mgr:
I-20: MRB ISLAND ANCHORING PIER E1
MADISON
H.011446
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
MADISON 000-33 NHPP 9,000 OPER EFFICIENCY/MOTORISTASSISTANCE - REST AREAS
3-DESIGN/DEVELOPMENT
REST AREA RENOVATIONGUINN, SCOTT Remrks:
Typ Imp:
Project:Prj Mgr:
MOUND REST AREA RENOVATIONS
H.011623
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
MADISON I-20 451-08 NHPP 14,200 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT
ASPHALT OVERLAY OF ASPHALT PAVEMENTMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-20: LA 577 - WALNUT BAYOU
H.011628
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
MADISON I-20 451-08 NHPP 6,395 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENTRICHLAND I-20 451-07 NHPP 1,305 PRESERVATION - INTERSTATE
ASPHALT OVERLAY OF ASPHALT PAVEMENTMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-20: LA 17 - LA 577
H.011861
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
MADISON I-20 451-09 NHPP 400 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
1-PLANNING/ENVIRONMENTAL
MADISON I-20 451-08 NHPP 200 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
SIGNING AND SIGN STRUCTURE REPLACEMENT AND UPGRADEFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
I-20: US 80 TO MISSISSIPPI STATE LINE
Page 2 - 60 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.000665
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
MOREHOUSE US 165 016-05 STPFLEX 21,000 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
NEW BRIDGEMASTIN, CATHERINE Remrks:
Typ Imp:016-05-0031
Project:Prj Mgr:
UP R.R. OVERPASS NEAR BONITA (HBI)
MOREHOUSE
H.008203
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
MOREHOUSE LA 835 834-07 STPFLEX 2,892 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
MOREHOUSE LA 835 834-07 STPFLEX 120 PRESERVATION - NON-INTERSTATEON STP SYSTEM
NEW BRIDGESMASTIN, CATHERINE Remrks:
Typ Imp:834-07-0022;2 BRIDGES
Project:Prj Mgr:
LA 835 CREEK BRIDGES
H.010470
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
MOREHOUSE LA 138 330-01 STPFLEX 5,600 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
STABILIZE BASE & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 138: JCT LA 593 TO JCT LA 2
H.011613
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
MOREHOUSE US 425 038-03 NHPP 320 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
3-DESIGN/DEVELOPMENT
SUBSURFACE DRAINAGE IMPROVEMENTSGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
US 425: DRAINAGE IMPROV AT EAST PINE AVE
H.012950
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
MOREHOUSE LA 3051 834-17 STPFLEX 180 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
3-DESIGN/DEVELOPMENT
MOREHOUSE LA 3051 834-17 NFA 186 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3051: US 165 - LA 133
H.013118
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
MOREHOUSE 000-34 FBROFF 266 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENT, NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
HILL AVENUE OVER DRAINAGE CANAL
H.012032
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
MOREHOUSE LA 2 037-01 STPFLEX 2,047 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTHERATH, ANANDA Remrks:
Typ Imp:
Project:Prj Mgr:
LA 2: BAYOU GALION BRIDGE
H.001145
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 120 042-05 STPFLEX 3,812 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
PATCH, COLD PLANE, AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 120: SABINE PARISH LINE TO LA 6
NATCHITOCHES
Page 2 - 61 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.001270
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 1-X 053-04 STPFLEX 5,000 CAPACITY 3-DESIGN/DEVELOPMENTNATCHITOCHES LA 1-X 053-04 STPFLEX 5,000 PRESERVATION - BRIDGE (ON
SYSTEM)
WIDEN TO 3 LANESTONEY, PATRICK Remrks:
Typ Imp:053-04-0025
Project:Prj Mgr:
LA 1X: 200' S WOODYARD DR - HANCOCK AVE.
H.001820
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 485 115-01 FBROFF 5,159 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
NATCHITOCHES LA 485 115-02 FBROFF 2,085 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTYANG, LI Remrks:
Typ Imp:115-01-0017;4 NEW BRIDGES.JT W/115-02-0011
Project:Prj Mgr:
LA 485: BRIDGES NEAR ALLEN
H.010346
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 487 113-03 STPFLEX 3,844 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
PATCH, COLD PLANE, AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:USE NFA AS MATCH
Project:Prj Mgr:
LA 487: LA 120 - LA 174
H.010365
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 117 114-03 STPFLEX 1,288 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
PATCH, COLD PLANE, AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 117: BELLWOOD - LA 478
H.012972
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 1225 835-02 NFA 1,904 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
MILLING, CEMENT TREATED BASE, AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1225: US 71 TO LA 6
H.012999
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 1 034-30 NHPP 4,000 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
REMOVAL OF PCCP, IN-PLACE CEMENTED BASE, OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1: FOUR LANE SECTION TO LA 6
H.013032
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES 000-35 RTP 199 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENT
NEW AGGREGATE TRAIL SURFACE AND MAINTAIN EXISTING TRAILSNUNES, BRIAN Remrks:
Typ Imp:DCRT IS THE PROJECT MANGAER
Project:Prj Mgr:
LOUISIANA TRAILS RESTORATION
H.013204
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 6 034-05 NHPP 2,200 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
PATCHING, MILLING, AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 6: LA 504 TO LA 1
H.013498
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES 000-35 RTP 312 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENT
CONSTRUCTION OF 3,488' OF WALKING TRAIL THROUGH URBAN PARKNUNES, BRIAN Remrks:
Typ Imp:CITY OF NATCHITOCHES WILL PROVIDE THE LOCAL MATCH
Project:Prj Mgr:
NATCHITOCHES RECREATIONAL TRAILS
Page 2 - 62 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.013514
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES 000-35 RTP 199 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENT
NON-ROUTINE MAINTENANCE, RESTOR. & CONST. OF ATV TRAILSNUNES, BRIAN Remrks:
Typ Imp:L&A TRAILS WILL PROVIDE THE LOCAL MATCH
Project:Prj Mgr:
RESTOR. OF TRAIL BTWN WINNFIELD & SIBLEY
H.013743
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 493 835-03 NFA 1,357 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
STABILIZE AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 493: MONTROSE RD. TO LA 1
H.013821
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 6 034-05 NHPP 375 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
NATCHITOCHES LA 6 034-05 NHPP 375 PRESERVATION - BRIDGE (ONSYSTEM)
ABUTMENT REPAIR AND/OR BRIDGE LENGTHENINGVAUGHT, PAUL Remrks:
Typ Imp:
Project:Prj Mgr:
LA 6: YOUNGS BAYOU BRIDGES REHAB
H.001271
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 1-X 053-04 NHPP 4,000 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTFUSILIER, JACOB Remrks:
Typ Imp:053-04-0031;STAGE 0
Project:Prj Mgr:
CANE RIVER BRIDGE AT CHURCH STREET
H.010342
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 155 091-02 STPFLEX 1,939 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
PATCH, COLD PLANE, AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 155: RED RIVER P/L - S JCT LA 153
H.010343
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 174 112-06 STPFLEX 1,925 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
PATCH. COLD PLANE, AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 174: DESOTO P/L - I-49 INTERCHANGE
H.012683
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES I-49 455-06 NHPP 420 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
1-PLANNING/ENVIRONMENTAL
I-49 SIGN UPGRADE FROM LA 6 TO DESOTO P/LFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
I-49: LA 6 TO DESOTO PARISH LINE
H.012307
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 6 034-05 0 SAFETY 0-FEASIBILITY/SCOPING
FEASIBILITY STUDYMCRAE, ADRIANE Remrks:
Typ Imp:
Project:Prj Mgr:
LA 6 FEASIBILITY STUDY
Page 2 - 63 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.009308
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS 000-36 HSIPPEN 936 SAFETY - SAFE ROUTES TO SCHOOLS 3-DESIGN/DEVELOPMENTORLEANS US 90 006-03 HSIPPEN 234 SAFETY - SAFE ROUTES TO SCHOOLS
BICYCLE & PEDESTRAIN CROSSING IMPROVEMENTSMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
NEW ORLEANS DPW SRTS SIDEWALK PROJECT
ORLEANS
H.010331
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS US 90 006-90 STPFLEX 1,119 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
3-DESIGN/DEVELOPMENT
RAISING ROADWAY GRADE TO CONSISTENT ELEVATION BY ADDING ASGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
US 90: FLOODWALL - VICTORY RD
H.011219
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS I-10 450-90 NFI 3,970 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
3-DESIGN/DEVELOPMENT
JEFFERSON I-10 450-15 NFI 30 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
SIGNING & SIGNING STRUCTURES REPLACEMENT & UPGRADE IN NO CBNGO, DUC Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: NO CBD1 I610-CARROLLTON
H.011221
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS I-10 450-90 NFI 5,700 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
3-DESIGN/DEVELOPMENT
SIGNING & SIGNING STRUCTURES REPLACEMENT & UPGRADE IN NO CBNGO, DUC Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: NO CBD3 POYDRAS - LOUISA
H.011447
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS US 90 006-03 NHPP 500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
INTERSECTION IMPROVEMENTS ON US 90 AT MLK BLVDSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 90: INTERSECTION IMP AT MLK BLVD
H.011823
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS 000-36 TAP>200K 287 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
TRAILHEADNUNES, BRIAN Remrks:
Typ Imp:MATCH PROVIDED BY CITY PARK IMPROVEMENT ASSOCIATION
Project:Prj Mgr:
NO CITY PARK: HARRISON AVENUE TRAILHEAD
H.011841
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS 000-36 TAP>200K 348 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
PEDESTRIAN IMPROVEMENTSNUNES, BRIAN Remrks:
Typ Imp:MATCH PROVIDED BY NON-FLOOD PROTECTION MANAGEMENT AUTHO
Project:Prj Mgr:
NO: LAKESHORE DR. REC/OPERATIONAL IMPR
H.011965
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS LA 47 148-02 NHPP 30,000 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
CLEANING, PAINTING, AND STRUCTURAL REPAIRSKEMP, KELLY Remrks:
Typ Imp:
Project:Prj Mgr:
LA 47: IWGO BRIDGE REHABILITATION (HBI)
Page 2 - 64 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.012591
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS I-10 450-90 NHPP 20,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT
2" OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: PARIS RD - LAKE PONTCHARTRAIN
H.013041
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS 000-36 RTP 112 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTORLEANS 000-36 LOCAL 16 RECREATIONAL TRAILS PROGRAM
RESTORATION AND CONST. OF A 6325' LONG X 10' WIDE TRAILNUNES, BRIAN Remrks:
Typ Imp:DCRT IS THE PROJECT MANAGER
Project:Prj Mgr:
CITY PARK NATURE TRAILS (NOLA)
H.013094
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS US 90 006-03 HSIPPEN 342 SAFETY - SAFE ROUTES TO PUBLICPLACES
3-DESIGN/DEVELOPMENT
ORLEANS US 90 006-03 STPFLEX 743 OPER EFFICIENCY/MOTORISTASSISTANCE - AMERICANS WITHDISABILITIES ACT
ORLEANS I-10 450-90 HSIPPEN 453 SAFETY - SAFE ROUTES TO PUBLICPLACES
SIDEWALKS, MULTIUSE PATHS, RAMPS, PED SIGNALS, STRIPINGMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
BROAD ST - READ BLVD PED IMPROVEMENTS
H.013150
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS 000-36 STP>200K 1,743 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
BICYCLE AND SIDEWALK IMPROVEMENTSLEBAS, MELISSA Remrks:
Typ Imp:CITY OF NEW ORLEANS TO MATCH
Project:Prj Mgr:
ANDREW HIGGINS DR STREETSCAPES
H.013364
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS 000-36 STPENH 229 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SIDEWALKSNUNES, BRIAN Remrks:
Typ Imp:THE CPIA WILL PROVIDE THE LOCAL MATCH
Project:Prj Mgr:
CITY PARK PALM DRIVE SIDEWALKS (NO)
H.013511
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS 000-36 RTP 112 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTORLEANS 000-36 LOCAL 28 RECREATIONAL TRAILS PROGRAM
CONSTRUCTION OF 1000' X 10' WIDE MULTI-USE TRIALNUNES, BRIAN Remrks:
Typ Imp:CITY OF NEW ORLEANS WILL PROVIDE LOCAL MATCH
Project:Prj Mgr:
HOLLYGROVE GREENLINE TRAIL
H.013617
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS I-10 450-90 NHPP 2,200 OPER EFFICIENCY/MOTORISTASSISTANCE - INTERSTATE LIGHTING
3-DESIGN/DEVELOPMENT
PROVIDE ROADWAY LIGHTINGDOUGLAS, JOSEPH Remrks:
Typ Imp:ENTITY MATCH PHASE 6
Project:Prj Mgr:
I-10: I-610E INTERCHANGE LIGHTING
H.000304
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS US 61 007-01 NHPP 4,000 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REHABILITATIOND'ANDREA, ARTUR Remrks:
Typ Imp:007-01-0022;STAGE 0 PROJECT FEASIBILITY STUDY
Project:Prj Mgr:
I 10 - US 61 OVERPASS
H.005720
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS 000-36 0 TIME 1-PLANNING/ENVIRONMENTAL
FLORIDA AVENUE EXPRESSWAY - ENVIRONMENTAL ASSESSMENTUMEOZULU, JOE Remrks:
Typ Imp:TTF AS MATCH TO PHASE 2
Project:Prj Mgr:
FLORIDA AVENUE EXPRESSWAY
Page 2 - 65 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.011222
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS I-10 450-90 NHPP 5,800 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
1-PLANNING/ENVIRONMENTAL
SIGNING & SIGNING STRUCTURES REPLACEMENT & UPGRADE IN NO CBNGO, DUC Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: NO CBD4 LOUISA - I-510
H.011223
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS I-10 450-90 NHPP 2,800 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
1-PLANNING/ENVIRONMENTAL
ORLEANS I-10 450-17 NHPP 600 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
SIGNING & SIGNING STRUCTURES REPLACEMENT &UPGRADENGO, DUC Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: CBD5 (I-510 TO END OF TWIN SPAN)
H.011836
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS 000-36 TAP>200K 499 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL
SIDEWALKSMEEK, STEPHEN Remrks:
Typ Imp:MATCH PROVIDED BY NON-FLOOD PROTECTION MANAGEMENT AUTHO
Project:Prj Mgr:
NEW ORLEANS: LAKE VISTA, SIDEWALKS
H.011964
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS LA 39 046-31 NHPP 2,271 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REHABILITATIONDELATTE, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 39: INDUSTRIAL CANAL BRIDGE REHAB
H.011967
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS US 90-Z 283-08 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
FEASIBILITY STUDY OF CLEANING, PAINTING, & STRUCTURAL REPAIRCAVALIER, STEPHANIE Remrks:
Typ Imp:PHASE 1 CCCD TOLL CREDITS AS MATCH
Project:Prj Mgr:
US 90Z: GNO1 BRIDGE & APP REHABILITATION
H.011968
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS US 90-Z 283-08 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
FEASIBILITY STUDY OF CLEANING, PAINTING, & STRUCTURAL REPAIRDELATTE, BRIAN Remrks:
Typ Imp:PHASE 1 CCCD TOLL CREDITS AS MATCH
Project:Prj Mgr:
US90Z:GNO2 BRIDGE AND APP REHABILITATION
H.011969
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS LA 1264 836-15 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1264: TED HICKEY MOVABLE BRIDGE REHAB
H.012837
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS I-10 450-90 0 DEMO / HIGH PRIORITY 0-FEASIBILITY/SCOPING
STUDY WILL ADDRESS CONGESTION ON I-10 CORRIDOR INTO PORT/NONGUYEN, WAYNE Remrks:
Typ Imp:MATCH FROM NO RPC
Project:Prj Mgr:
I-10 NEW ORLEANS MASTER PLAN
Page 2 - 66 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.013719
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS US 61 007-01 0 SAFETY - SAFE ROUTES TO PUBLICPLACES
0-FEASIBILITY/SCOPING
FEASIBILITY STUDYRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
US 61 @ I-10 EB OFF RAMP PED IMPR (NO)
H.013753
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS LA 428 410-01 HSIPPEN 3 SAFETY - SAFE ROUTES TO PUBLICPLACES
0-FEASIBILITY/SCOPING
FEASIBILITY STUDY FOR INTERSECTION AND PED/BIKE IMPROVEMENTSRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
LA 428: GEN DEGAULLE - OLD BEHRMAN
H.007300
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 STPFLEX 642 INTERMODAL CONNECTOR 3-DESIGN/DEVELOPMENTOUACHITA 000-37 DEMO 6,672 DEMO / HIGH PRIORITY OUACHITA I-20 451-06 NHPP 5,417 INTERMODAL CONNECTOR OUACHITA I-20 451-06 STBONDS 5,803 OTHER / MISCELLANEOUS OUACHITA LA 594 326-01 STPFLEX 10,641 INTERMODAL CONNECTOR
RD CONNECTOR & INTERCHANGE IMPRVMNTMASTIN, CATHERINE Remrks:
Typ Imp:742-37-0028;4TH FUND SOURCE US $300K STP<200K
Project:Prj Mgr:
KANSAS LANE-GARRETT RD CONNECTOR
OUACHITA
H.007528
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA US 80 001-09 TAP<200K 1,396 ENHANCEMENTS 3-DESIGN/DEVELOPMENTOUACHITA US 80 001-09 LOCAL 152 ENHANCEMENTS
NEW SIDEWALKS AND SIDEWALK LIGHTINGNUNES, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 80:6TH ST-LAMY LN STREETSCAPING
H.007530
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 TAP<200K 339 ENHANCEMENTS 3-DESIGN/DEVELOPMENTOUACHITA 000-37 LOCAL 199 ENHANCEMENTS OUACHITA US 165-Y 015-08 TAP<200K 339 ENHANCEMENTS OUACHITA US 165-Y 015-08 LOCAL 199 ENHANCEMENTS
NEW SIDEWALKS AND SIDEWALK LIGHTINGNUNES, BRIAN Remrks:
Typ Imp:MATCH IS 15% TOLL CREDITS AND 5% LOCAL
Project:Prj Mgr:
JACKSON STREET CORRIDOR ENHANCEMENT
H.008226
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA LA 3033 837-12 STPFLEX 9,617 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTMOSS, SARAH Remrks:
Typ Imp:837-12-0026
Project:Prj Mgr:
CHENIERE SPILLWAY & BRIDGE REPLACEMENT
H.008230
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA LA 838 837-14 STPFLEX 1,055 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
NEW BRIDGEWINDMANN, ANDREW Remrks:
Typ Imp:837-14-0009
Project:Prj Mgr:
LA 838: STEEP BAYOU BRIDGE REPLACEMENT
H.010015
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA LA 143 315-02 STPFLEX 8,000 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTBRAUNER, KURT Remrks:
Typ Imp:
Project:Prj Mgr:
LA 143: BAYOU D'ARBONNE BRIDGE
Page 2 - 67 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.010430
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA LA 594 326-01 STPFLEX 1,200 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
THROUGH LANE WITH RIGHT TURN LANE AT HIGH SCHOOLSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 594: TURN LANE @ OUACHITA PAR HIGH
H.010698
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 RAIL PD 300 RAILROADS 3-DESIGN/DEVELOPMENT
INSTALL F/L'S & GATES AT UP RIVERBARGE ST. CROSSINGSHREWSBERRY,BILL Remrks:
Typ Imp:MATCH FROM RR
Project:Prj Mgr:
RIVERBARGE ST: UP RR XING (MONROE)
H.010989
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA I-20 451-06 NHPP 2,500 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENTLINCOLN I-20 451-05 NHPP 1,500 PRESERVATION - INTERSTATE
RE-SURFACE SELECTED I-20 RAMPS IN LINCOLN & OUACHITA PARISHMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-20: LINCOLN/OUACHITA P. RAMP REHAB
H.011507
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA US 80 001-09 NHPP 1,250 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
3-DESIGN/DEVELOPMENT
OUACHITA US 80 002-01 NHPP 1,250 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
INSTALL CCTVS ALONG US 80KIMBENG, LUCY Remrks:
Typ Imp:
Project:Prj Mgr:
MONROE ITS PHASE 3
H.011508
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA LA 617 837-17 NHPP 1,400 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
3-DESIGN/DEVELOPMENT
OUACHITA LA 840-6 837-04 NHPP 1,400 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
INSTALL CCTVSKIMBENG, LUCY Remrks:
Typ Imp:
Project:Prj Mgr:
MONROE ITS PHASE 4
H.011724
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 STP<200K 208 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
REHABILITATION, PATCH AND OVERLAYBANKSTON, TANYA Remrks:
Typ Imp:WEST MONROE WILL PROVIDE MATCH
Project:Prj Mgr:
COLEMAN AVENUE REHABILITATION
H.011895
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 HSIP 60 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT
INSTALL GAURD RAILMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
CITY OF MONROE GUARD RAIL INSTALLATION
H.012247
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 RTP 112 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTOUACHITA 000-37 LOCAL 18 RECREATIONAL TRAILS PROGRAM
CONSTRUCTION OF 1 MILE AGGREGATE LEVEE TRAILNUNES, BRIAN Remrks:
Typ Imp:DCRT IS THE PROJECT MANAGER
Project:Prj Mgr:
FORSYTHE POINT TRAIL
H.012279
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 HSIPPEN 557 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT
IMPROVE SAFETY/OPERATION OF COLEMAN/RIVERFRONT ST INTERSECMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
ENDOM BRIDGE APPROACH REALIGNMENT
Page 2 - 68 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.012438
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 STPFLEX 300 RAILROADS 3-DESIGN/DEVELOPMENTOUACHITA 000-37 RAIL HE 0 RAILROADS
INSTALL RR SIGNALSSHREWSBERRY,BILL Remrks:
Typ Imp:
Project:Prj Mgr:
DESIARD/ELYSIAN FIELDS: ALM RR (MONROE)
H.012626
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA LA 838 837-14 STPFLEX 105 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
3-DESIGN/DEVELOPMENT
DRAINAGE IMPROVEMENTSGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 838: DRAINAGE IMPROVEMENTS
H.012798
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA LA 594 326-02 HSIP 750 SAFETY 3-DESIGN/DEVELOPMENTOUACHITA 000-37 HSIP 750 SAFETY
EXISTING INTERSECTION REPLACED WITH A ROUNDABOUT (SAFETY)TONEY, PATRICK Remrks:
Typ Imp:
Project:Prj Mgr:
LA 594: ROUNDABOUT AT ROWLAND RD.
H.012898
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA LA 151 317-02 STPFLEX 720 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
OUACHITA LA 838 837-14 STPFLEX 1,320 PRESERVATION - BRIDGE (ONSYSTEM)
OUACHITA LA 134 837-15 STPFLEX 720 PRESERVATION - BRIDGE (ONSYSTEM)
RICHLAND LA 132 166-05 STPFLEX 1,800 PRESERVATION - BRIDGE (ONSYSTEM)
RICHLAND LA 135 167-04 STPFLEX 600 PRESERVATION - BRIDGE (ONSYSTEM)
RICHLAND LA 3048 339-03 STPFLEX 600 PRESERVATION - BRIDGE (ONSYSTEM)
RICHLAND LA 576 341-01 NFA 600 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:
Typ Imp:
Project:Prj Mgr:
DIST05:ABC BR REP OUACHITA, RICH PARS
H.013101
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 HSIPPEN 175 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT
PAVEMENT MARKINGS AND SIGNINGMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
CONSTITUTION DR TRAFFIC STUDY
H.013122
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 FBROFF 475 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
OUACHITA 000-37 FBROFF 368 PRESERVATION - BRIDGE (OFFSYSTEM)
BRIDGE REPLACEMENT - NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
PINE ST. & HARRISON/COLLIER BRIDGES
H.013127
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 FBROFF 317 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
OUACHITA 000-37 FBROFF 317 PRESERVATION - BRIDGE (OFFSYSTEM)
BRIDGE REPLACEMENT - NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
BRITTON RD & HERMAN DICKERSON RD BRS
Page 2 - 69 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.013130
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 FBROFF 583 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
OUACHITA 000-37 FBROFF 787 PRESERVATION - BRIDGE (OFFSYSTEM)
BRIDGE REPLACEMENT - NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
RED CUT RD & CHARLES RAWLS RD BRIDGES
H.013137
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 FBROFF 470 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
OUACHITA 000-37 FBROFF 204 PRESERVATION - BRIDGE (OFFSYSTEM)
BRIDGE REPLACEMENT - NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
HARMON JOHNSON RD & GOOD HOPE RD BRS
H.013144
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 FBROFF 593 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
OUACHITA 000-37 FBROFF 235 PRESERVATION - BRIDGE (OFFSYSTEM)
BRIDGE REPLACEMENT - NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
PINE BLUFF RD & TACK ALLEN RD BRIDGES
H.013371
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 STPENH 215 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SIDEWALKS, TRUNCATED DOMES, SIGNS, STRIPING & FLASHING SIGNAMEEK, STEPHEN Remrks:
Typ Imp:THE CITY OF WEST MONROE WILL PROVIDE THE LOCAL MATCH.
Project:Prj Mgr:
KIROLI RD SIDEWALKS AND PED IMPROVEMENTS
H.013398
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 STP<200K 269 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
ASPHALT OVERLAYBANKSTON, TANYA Remrks:
Typ Imp:CITY OF WEST MONROE TO PROVIDE MATCH
Project:Prj Mgr:
COLEMAN AVE REHABILITATION
H.013400
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 STP<200K 585 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
ASPHALT OVERLAYBANKSTON, TANYA Remrks:
Typ Imp:CITY OF WEST MONROE TO PROVIDE MATCH
Project:Prj Mgr:
NATCHITOCHES ST REHAB: TRENTON - N 7TH
H.013401
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 STP<200K 350 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
ASPHALT OVERLAYBANKSTON, TANYA Remrks:
Typ Imp:CITY OF WEST MONROE TO PROVIDE MATCH
Project:Prj Mgr:
CROSELY ST REHAB: TRENTON - N 7TH
H.013518
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 STP<200K 408 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
REHABILITATIONBANKSTON, TANYA Remrks:
Typ Imp:CITY OF MONROE TO PROVIDE MATCH.
Project:Prj Mgr:
OTIS STREET REHABILITATION
H.013802
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 STP<200K 340 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
REHABILITATIONBANKSTON, TANYA Remrks:
Typ Imp:OUACHITA PARISH POLICE JURY TO PROVIDE MATCH
Project:Prj Mgr:
GARRETT ROAD ( LA 15 - AUSTIN ST.)
Page 2 - 70 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.013803
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 STP<200K 475 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
OVERLAYBANKSTON, TANYA Remrks:
Typ Imp:OUACHITA PARISH POLICE JURY PROVIDING MATCH
Project:Prj Mgr:
RICHWOOD RD NO. 2 (US 165 - BROWN ST)
H.013804
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 STP<200K 1,155 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
OVERLAYBANKSTON, TANYA Remrks:
Typ Imp:OUACHITA PARISH POLIC JURY TO PROVIDE MATCH
Project:Prj Mgr:
WALL WILLIAMS (GOOD HOPE - WHITES FERRY)
H.013805
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 STP<200K 1,330 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
MILL, PATCH AND OVERLAYBANKSTON, TANYA Remrks:
Typ Imp:OUACHITA PARISH POLICE JURY TO PROVIDE MATCH
Project:Prj Mgr:
FINKS'S HIDE-A-WAY: BARKLEY - BAYOU OAKS
H.004782
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 NFI 328,000 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
CONNECTOR & OUACHITA R. BR.(ENGR)NICKEL, TIM Remrks:
Typ Imp:700-37-0129;STAGE O
Project:Prj Mgr:
LA 143 - US 165 CONNECTOR& OUACH
H.007289
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 STBONDS 23,790 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTALOUACHITA US 80 002-01 STBONDS 2,468 DEMO / HIGH PRIORITY OUACHITA US 165 016-01 STBONDS 1,336 DEMO / HIGH PRIORITY OUACHITA LA 840-6 837-23 STBONDS 717 DEMO / HIGH PRIORITY
ASPHALT NEW PAVEMENTMASTIN, CATHERINE Remrks:
Typ Imp:742-37-0016;US 80 - US 165. R/W & UTIL BY CITY
Project:Prj Mgr:
KANSAS LANE EXTENSION
H.009932
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA US 80 001-09 STPFLEX 7,000 CAPACITY 1-PLANNING/ENVIRONMENTAL
WIDEN ROADWAY, ADD LANESBRIGNAC, CHRISTINA Remrks:
Typ Imp:
Project:Prj Mgr:
US 80: VANCIL ROAD - WELL ROAD
H.012033
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA LA 143 315-02 STPFLEX 2,335 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
OUACHITA LA 594 326-02 STPFLEX 1,215 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTSWINDMANN, ANDREW Remrks:
Typ Imp:
Project:Prj Mgr:
LA 143, LA594:CROSS BAYOU & CANEY CR BRS
H.011440
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA US 165 015-31 0 SAFETY 0-FEASIBILITY/SCOPING
PEDESTRIAN CROSSING IMPROVEMENTSRENARD, APRIL Remrks:
Typ Imp:
Project:Prj Mgr:
US 165 PEDESTRIAN CROSSING STUDY
H.011688
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA US 165 015-31 0 SAFETY 0-FEASIBILITY/SCOPINGOUACHITA US 165 016-01 0 SAFETY
CORRIDOR STUDYHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 165: CORRIDOR STUDY US 165 BUS - LA 2
Page 2 - 71 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.012541
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA LA 594 326-01 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
FEASIBILITY STUDY REHABILITATION OR REPLACEMENTMOSS, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 594: OVERPASS I-20
H.011949
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
PLAQUEMINES 000-38 HSIPPEN 150 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT
PURCHASE AND INSTALL REGULATORY & WARNING SIGNS, ETCMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
RWD SIGNING PLAQUEMINES PARISH
PLAQUEMINES
H.012560
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
PLAQUEMINES LA 23 062-02 NHPP 2,500 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
COLD PLANE AND OVERLAY. APPLY NEW STRIPING AND MARKERSSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 23: TUNNEL - APRICOT (END OF ASPHALT)
H.012987
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
PLAQUEMINES LA 23 062-02 STPFLEX 174 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
3-DESIGN/DEVELOPMENT
PLAQUEMINES LA 23 062-03 STPFLEX 426 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 23: RAVENNA RD-LM 4.040
H.012079
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
PLAQUEMINES LA 23 062-02 NHPP 15,000 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
TUNNEL REPAIRSTOURRES, VALERIE Remrks:
Typ Imp:
Project:Prj Mgr:
LA23:BELLE CHASSE TUNNEL INTERIM REPAIRS
H.002184
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
POINTE COUPEE LA 413 227-04 STPFLEX 4,395 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
NEW BRIDGESMOORE, DARRELL Remrks:
Typ Imp:227-04-0019;2 BRIDGES
Project:Prj Mgr:
BAYOU CHENAL & BAYOU DISCHARGE BRS.
POINTE COUPEE
H.012215
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
POINTE COUPEE 000-39 RTP 101 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTPOINTE COUPEE 000-39 LOCAL 18 RECREATIONAL TRAILS PROGRAM
CONSTRUCTION OF CONNECTING TRAILS AND A TRAILHEADNUNES, BRIAN Remrks:
Typ Imp:CRT IS THE PROJECT MANAGER
Project:Prj Mgr:
NEW ROADS RECREATIONAL TRAIL & TRAILHEAD
H.013192
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
POINTE COUPEE US 190 008-03 NHPP 5,000 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
MILL & OVERLAY (EASTBOUND ONLY)SPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 190: E GROSSE TETE BR-E ATCH RIVER BR
Page 2 - 72 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.013196
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
POINTE COUPEE US 190 008-02 NHPP 6,000 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
MILL AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 190: WBR P/L - E GROSSE TETE BR
H.013747
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
POINTE COUPEE LA 415 224-02 STPFLEX 700 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
3-DESIGN/DEVELOPMENT
MINOR OVERLAYMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 413 & LA 415: LA 981 - NEW ROADS ST
H.010434
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
POINTE COUPEE LA 15 177-01 STPFLEX 4,200 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
STABILIZE & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 15: LA 1 - W. FELICIANA P/L
H.012061
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
POINTE COUPEE LA 1 052-04 STPFLEX 1,997 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTBOURGEOIS, COREY Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1: BAYOU MOREAU BRIDGE
H.012565
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
POINTE COUPEE LA 1 052-04 STPFLEX 1,433 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
E FELICIANA LA 963 819-19 STPFLEX 1,202 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTSMISTICH, BRADLEY Remrks:
Typ Imp:
Project:Prj Mgr:
LA 963, LA 1: BRIDGES
H.012063
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
POINTE COUPEE LA 15 177-01 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
LA 15: OR NAV CANAL MB REHAB (HBI)
H.000574
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES 000-40 TAP<200K 837 ENHANCEMENTS 3-DESIGN/DEVELOPMENTRAPIDES LA 1208-5 014-07 TAP<200K 59 ENHANCEMENTS
SIDEWALKS AND SIDEWALK LIGHTINGNUNES, BRIAN Remrks:
Typ Imp:MATCH IS 15% TOLL CREDITS AND 5% LOCAL
Project:Prj Mgr:
MASONIC DRIVE STREETSCAPE, PHASE II
RAPIDES
H.008271
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES 000-40 STP<200K 2,500 URBAN SYSTEMS 3-DESIGN/DEVELOPMENTRAPIDES 000-40 LOCAL 2,500 URBAN SYSTEMS
NEW CONSTRUCTION, 2-LANE WITH PAVED SHOULDERSBANKSTON, TANYA Remrks:
Typ Imp:840-37-0007
Project:Prj Mgr:
SUGARHOUSE RD EXTENSION
Page 2 - 73 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.009122
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES LA 1204 840-31 STPFLEX 3,000 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
NEW BRIDGESYANG, LI Remrks:
Typ Imp:840-31-0015; 3 BRIDGES
Project:Prj Mgr:
LA1204:BAYOU FLAGON & KITCHEN CR BRIDGES
H.009498
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES LA 121 029-05 STPFLEX 8,900 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTBUCCI, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
LA 121: CALCASIEU RIVER BRIDGE
H.011194
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES US 165-X 015-01 HSIPPEN 165 SAFETY - SAFE ROUTES TO SCHOOLS 3-DESIGN/DEVELOPMENTRAPIDES 000-40 HSIPPEN 55 SAFETY - SAFE ROUTES TO SCHOOLS
SIDEWALKS, SIGNING AND STRIPINGRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
PINEVILLE ELEMENTARY SIDEWALKS
H.011361
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES US 71 008-09 NFI 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
MILL, CONSTRUCT TURN LANES, AND INSTALL PAVEMENT STRIPINGRACHAL, JASON Remrks:
Typ Imp:
Project:Prj Mgr:
US 71: TURN LANES FOR EMERG STAGING AREA
H.011504
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES US 167 023-01 NHPP 1,800 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
3-DESIGN/DEVELOPMENT
INSTALLING BRIDGE ADVISORIES, CCTVS, AND DMSSKIMBENG, LUCY Remrks:
Typ Imp:
Project:Prj Mgr:
ALEXANDRIA ITS PHASE 2
H.011506
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES I-49 455-05 NHPP 1,300 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
3-DESIGN/DEVELOPMENT
INSTALLING CCTVS AND DMSSKIMBENG, LUCY Remrks:
Typ Imp:
Project:Prj Mgr:
ALEXANDRIA ITS PHASE 4
H.011536
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES I-49 455-05 NHPP 4,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT
PATCH, COLD PLANE, & OVERLAY I-49 SHOULDERS AND RAMPSMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-49: 0.44 MI N US 167 TO EXIT 80
H.011565
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES I-49 455-05 NHPP 7,400 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENTRAPIDES 000-40 NHPP 340 PRESERVATION - INTERSTATE
PATCH, MILL, OLY (I-49 MAINELINE, SHOULDERS & RAMPS) & SIDEMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-49: N OF LA 498 TO 0.66 MI E LA 1200
H.011569
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES I-49 455-05 NHPP 1,700 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENTRAPIDES 000-40 NHPP 350 PRESERVATION - INTERSTATE
PATCH, MILL, & OLY (I-49 MAINLINE SHOULDERS, RAMP & SIDE RD)MAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-49: NORTH OF LA 8 TO NATCHITOCHES P/L
Page 2 - 74 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.011597
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES LA 8 134-03 STPFLEX 2,210 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
PATCHING, COLD PLANING, AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 8: VERNON PARISH LINE TO LA 119
H.011938
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES I-49 455-05 NHPP 3,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
3-DESIGN/DEVELOPMENT
SIGNING AND RELATED WORKFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
I-49: 2 MILES N LA 3265 - 4 MILES N LA 1
H.012931
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES LA 3128 840-33 STPFLEX 250 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
3-DESIGN/DEVELOPMENT
MICORSURFACINGSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3128: LA 107 TO LA 28-ULTRATHIN
H.012935
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES LA 121 029-06 STPFLEX 720 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
3-DESIGN/DEVELOPMENT
ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 121: LA 112 TO LA 28- AST
H.013120
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES 000-40 FBROFF 368 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENT - NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
BETHEL ROAD OVER SLASH BAYOU TRIBUTARY
H.013153
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES I-49 455-05 NHPP 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
3-DESIGN/DEVELOPMENT
PAVEMENT MARKING REPLACEMENTHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-49: PAVEMENT MARKING REPLACEMENT V
H.013207
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES US 165 014-05 NHPP 350 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
PATCHING, MILLING, AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 165: NB LANE - MCNARY TO BOY SCOUT RD
H.013887
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES 000-40 STP<200K 3,364 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
REHABILITATIONBANKSTON, TANYA Remrks:
Typ Imp:CITY OF ALEXANDRIA TO PROVIDE MATCH
Project:Prj Mgr:
RAPIDES AVE AND 3RD ST ROAD IMPROVEMENTS
H.010341
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES LA 115 033-04 STPFLEX 1,928 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
PATCH, COLD PLANE, AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 115: LA 1207 - LA 28
Page 2 - 75 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.010824
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES US 71 008-09 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
1-PLANNING/ENVIRONMENTAL
RAPIDES US 71 840-43 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
RAPIDES US 71 008-30 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
CONDUCT CORRIDOR STUDY ALONG US 71COLVIN, JODY Remrks:
Typ Imp:
Project:Prj Mgr:
US 71 CORRIDOR STUDY
H.011942
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES US 165 015-01 NHPP 650 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
1-PLANNING/ENVIRONMENTAL
RAPIDES US 165 015-02 NHPP 650 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
RAPIDES 000-40 STPFLEX 650 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
CONSTRUCT ROUNDABOUT AND ADD TURN LANESHARROUCH, JOSHUA Remrks:
Typ Imp:
Project:Prj Mgr:
US 165: ROUNDABOUT AT PINECREST
H.012046
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES LA 3170 840-35 STPFLEX 2,807 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
RAPIDES LA 1208-1 840-48 STPFLEX 2,376 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTSGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
CHATLIN LAKE & HORSESHOE CANAL BRIDGES
H.012468
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES I-49 455-05 NHPP 1,200 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
1-PLANNING/ENVIRONMENTAL
AVOYELLES I-49 455-04 NHPP 300 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
EVANGELINE I-49 455-92 NHPP 12 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
SIGN UPGRADE ALONG I-49FILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
I-49 (ST LANDRY P/L - 2 MI. N. LA 3265)
H.011403
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES LA 1208-3 368-03 0 SAFETY 0-FEASIBILITY/SCOPING
CORRIDOR STUDY FOR SAFETY & ACCESS MANAGEMENT IMPROVEMENHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA1208-3 TRAFFIC STUDY:VERSAILLES- LA488
H.001761
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RED RIVER LA 507 100-02 FBROFF 2,133 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTYANG, LI Remrks:
Typ Imp:100-02-0013
Project:Prj Mgr:
LA 507 CREEK BRIDGE
RED RIVER
Page 2 - 76 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.012970
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RED RIVER LA 480 305-04 NFA 214 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
ASPHALTIC CONCRETE PAVEMENT RESURFACINGSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 480: US 84 TO US 371
H.011600
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RED RIVER LA 514 100-02 STPFLEX 1,260 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
ASPHALTIC CONCRETE PAVEMENT RESURFACING WITH MINOR WIDENISPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 514 & 507: US 371 TO BIENVILLE PL
H.012613
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RED RIVER LA 509 105-03 STPFLEX 144 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 509: DESOTO PL TO LA 1
H.012615
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RED RIVER US 71 010-03 STPFLEX 2,700 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
ASPHALTIC CONCRETE PAVEMENT RESURFACINGSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 71: COUSHATTA TO BOSSIER PARISH LINE
H.012974
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RED RIVER LA 174 112-07 STPFLEX 150 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
1-PLANNING/ENVIRONMENTAL
ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 174: NATCHITOCHES PL TO LA 1
H.001970
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RICHLAND LA 561 166-03 FBROFF 7,011 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTALLEN, BRIAN Remrks:
Typ Imp:166-03-0015
Project:Prj Mgr:
BOEUF RIVER BRIDGE NEAR HEBERT
RICHLAND
H.008288
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RICHLAND LA 132 842-13 FBROFF 3,672 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDE REPLACEMENTWINDMANN, ANDREW Remrks:
Typ Imp:842-13-0009;USE NFA AS MATCH
Project:Prj Mgr:
BOEUF RIVER BRIDGE NEAR BUCKNER (HBI)
H.009529
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RICHLAND US 80 002-02 STPFLEX 3,416 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
BASE STABILIZATION & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 80:BAYOU LAFOURCHE BR. - 1.44 MILES E
H.011021
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RICHLAND LA 17 051-04 STPFLEX 1,114 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
3-DESIGN/DEVELOPMENT
REMOVE AND REPLACE EXISTING SUBSURFACE DRAINAGE STRUCTURGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 17: SHARON STREET TO TENNESSEE STREET
Page 2 - 77 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.011603
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RICHLAND LA 132 166-05 STPFLEX 913 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
ASPHALT OVERLAY OF ASPHALT PAVEMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 132: LA 135 TO LA 576
H.012657
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RICHLAND LA 17 051-05 STPFLEX 102 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
3-DESIGN/DEVELOPMENT
DRAINAGE IMPROVEMENTSGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 17: DRAINAGE IMPROVEMENTS
H.012955
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RICHLAND LA 15 026-09 STPFLEX 829 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
3-DESIGN/DEVELOPMENT
ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 15: US 425 - OUACHITA PL
H.013080
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RICHLAND 000-42 FBROFF 1,727 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENT NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
MCLEMORE ROAD OVER BEE BAYOU
H.008793
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RICHLAND LA 183 185-01 NFI 95,000 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
INTERCHANGE IMPROV., NEW ROADWAY, ROADWAY WIDENINGLANDRY, COREY Remrks:
Typ Imp:
Project:Prj Mgr:
FRANKLIN FARMS MEGA SITE
H.012036
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RICHLAND US 80 002-03 STPFLEX 3,079 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTBUCCI, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
US 80: BOEUF RIVER BRIDGE
H.012926
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RICHLAND LA 135 167-04 STPFLEX 565 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
1-PLANNING/ENVIRONMENTAL
CHIP SEALSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 135: LA 15 - LA 137
H.012966
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
SABINE US 171 025-04 NHPP 850 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
MIRCOSURFACINGLACOMBE, JASON Remrks:
Typ Imp:
Project:Prj Mgr:
US 171: CONVERSE TO DESOTO P/L-MICORSURF
SABINE
Page 2 - 78 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.013005
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
SABINE LA 1215 132-07 NFA 2,760 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
VERNON LA 117 114-01 STPFLEX 360 PRESERVATION - BRIDGE (ONSYSTEM)
VERNON LA 399 138-03 NFA 1,320 PRESERVATION - BRIDGE (ONSYSTEM)
VERNON LA 463 139-06 STPFLEX 2,520 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:
Typ Imp:
Project:Prj Mgr:
DIST08:ABC BR REP SABINE, VERNON PARS
H.010345
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
SABINE LA 175 035-02 STPFLEX 1,973 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
STABILIZE AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 175: N JCT LA 120 - RAY CANTO RD
H.012544
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
SABINE LA 120 042-03 STPFLEX 1,513 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
SABINE LA 120 042-03 STPFLEX 1,513 PRESERVATION - BRIDGE (ONSYSTEM)
SABINE LA 120 042-03 STPFLEX 1,630 PRESERVATION - BRIDGE (ONSYSTEM)
SABINE LA 120 042-03 STPFLEX 1,928 PRESERVATION - BRIDGE (ONSYSTEM)
SABINE LA 120 042-03 STPFLEX 1,646 PRESERVATION - BRIDGE (ONSYSTEM)
SABINE LA 474 120-01 STPFLEX 1,574 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTSMISTICH, BRADLEY Remrks:
Typ Imp:
Project:Prj Mgr:
LA 120, LA 474: BRIDGES
H.013763
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
SABINE 000-43 0 SAFETY - LOCAL ROADS SAFETY 0-FEASIBILITY/SCOPINGVERNON 000-58 0 SAFETY - LOCAL ROADS SAFETY
FEASIBILITY STUDYRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
LRSP SIGNS & STRIPING (VERNON, SABINE)
H.009175
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST BERNARD 000-44 HSIPPEN 120 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT
PURCHASE AND INSTALL SIGNS AND SOLAR BEACONSMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
CHALMETTE INTERSECTION SAFETY IMPROVE
ST BERNARD
H.011800
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST BERNARD 000-44 TAP>200K 1,022 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SHARED USE PATH ON LEVEE TOPNUNES, BRIAN Remrks:
Typ Imp:MATCH PROVIDED BY ST. BERNARD PARISH GOVERNMENT
Project:Prj Mgr:
ST. BERNARD MISS RIVER TRAIL PH III
H.011820
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST BERNARD 000-44 TAP>200K 433 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SIDEWALKS AND SHARED USE PATHNUNES, BRIAN Remrks:
Typ Imp:MATCH PROVIDED BY ST. BERNARD PARISH
Project:Prj Mgr:
JEAN LAFITTE PARKWAY SHARED USE PATH
Page 2 - 79 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.012891
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST BERNARD LA 300 284-30 STPFLEX 600 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:
Typ Imp:USE NFA AS MATCH
Project:Prj Mgr:
DIST02:ABC BR REPLACE LAFOUR,ST BER PARS
H.013343
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST BERNARD 000-44 STPENH 728 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SHARED USE PATHMEEK, STEPHEN Remrks:
Typ Imp:ST. BERNARD PARISH WILL PROVIDE THE LOCAL MATCH.
Project:Prj Mgr:
ST. BERNARD MISS RIVER TRAIL, PH IV
H.013525
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST BERNARD 000-44 RTP 101 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTST BERNARD 000-44 LOCAL 17 RECREATIONAL TRAILS PROGRAM
CONSTRUCTION OF A 5597' X 10' WIDE, MULTI-USE TRAIL ON LEVEENUNES, BRIAN Remrks:
Typ Imp:ST. BERNARD PARISH GOVERNMENT WILL PROVIDE THE LOCAL MATCH
Project:Prj Mgr:
ST. BERNARD PARISH 40 ARPENT TRAIL, PH 1
H.013758
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST BERNARD LA 39 046-32 NHPP 300 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
EXTEND EB DUAL LEFT TURN LANESSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 39: LEFT TURN LANE AT LA 47
H.010413
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST CHARLES LA 48 282-02 STPFLEX 1,750 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETEBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 48: ORMOND PLANTATION - WESCO ST
ST CHARLES
H.010416
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST CHARLES LA 3127 428-03 STPFLEX 5,500 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETESPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3127: ST. JOHN P/L - 3700' W I-310
H.010417
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST CHARLES LA 306 845-07 STPFLEX 3,600 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
COLD PLANE, GEOGRID & 4" OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 306: LA 18 - LA 632
H.011801
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST CHARLES 000-45 TAP>200K 2,602 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SHARED USE PATHMEEK, STEPHEN Remrks:
Typ Imp:MATCH PROVIDED BY ST. CHARLES PARISH
Project:Prj Mgr:
ST. CHARLES WB LEVEE PATH PH IV AND V
H.012992
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST CHARLES LA 631 845-06 NFA 175 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
MILLING AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 631: OLD SPANISH TRAIL- LEVEE ROAD
Page 2 - 80 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.013494
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST CHARLES LA 52 845-03 STP>200K 3,466 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
BIKE/PED - COMPLETE STREETSLEBAS, MELISSA Remrks:
Typ Imp:MATCH BY ST. CHARLES PARISH
Project:Prj Mgr:
LA 52 (PH1): BLUEBERRY HILL - ANGUS DR
H.013495
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST CHARLES LA 52 845-03 STP>200K 3,351 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
BIKE/PED - COMPLETE STREETSLEBAS, MELISSA Remrks:
Typ Imp:MATCH BY ST. CHARLES PARISH
Project:Prj Mgr:
LA 52 (PH2): US 190 - BLUEBERRY HILL
H.010753
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST CHARLES I-310 450-38 NFI 0 CAPACITY 1-PLANNING/ENVIRONMENTALST CHARLES US 90 005-08 NFI 0 CAPACITY
RECONSTRUCTION OF INTERCHANGE OR NEW FLYOVER RAMPLANDRY, COREY Remrks:
Typ Imp:MATCH FOR ENVIRONMENTAL FROM DOTD SURPLUS
Project:Prj Mgr:
US 90/I-310 INTERCHANGE
H.012532
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST CHARLES LA 631 845-06 STPFLEX 1,498 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTYAP, KIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 631: DRAIN CANAL BRIDGE
H.013496
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST CHARLES LA 52 845-03 STP>200K 2,439 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL
BIKE/PED - COMPLETE STREETSLEBAS, MELISSA Remrks:
Typ Imp:MATCH BY ST. CHARLES PARISH
Project:Prj Mgr:
LA 52 (PH3): ANGUS DR - LA 18
H.012977
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST HELENA LA 432 846-10 STPFLEX 1,350 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
3-DESIGN/DEVELOPMENT
THIN LIFT OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 432: DOUGHTY RD-LA 38
ST HELENA
H.013736
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST HELENA LA 16 262-04 STPFLEX 3,000 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
MILL AND OVERLAYBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 16: LIVINGSTON PL - LA 63
H.013116
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JAMES LA 20 065-07 HSIPPEN 4,822 SAFETY 3-DESIGN/DEVELOPMENTST JAMES LA 20 065-07 HSIPPEN 655 SAFETY LAFOURCHE LA 20 065-06 HSIPPEN 1,456 SAFETY
WIDENING LA 20 TO INCLUDE 8' SHOULDERSLANDRY, COREY Remrks:
Typ Imp:
Project:Prj Mgr:
LA 20 WIDEN: LA 307 - S. VACHERIE
ST JAMES
Page 2 - 81 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.013730
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JAMES LA 3274 256-32 STPFLEX 800 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
ADD EB/WB TURN LANESMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3274: LEFT TURNLANES @ LA 3125
H.011717
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JAMES LA 70 426-02 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
PIER PROTECTION SYSTEMGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
LA 70: SUNSHINE BRIDGE PIER PROTECTION
H.012066
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JAMES LA 3213 434-02 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
MAJOR BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3213: GRAMERCY BRIDGE REHABILITATION
H.002960
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JOHN LA 3213 434-01 STPFLEX 15,652 RAILROADS - GRADE SEPARATION 3-DESIGN/DEVELOPMENT
GRADE SEPARATE EXISTING AT GRADE CROSSINGRAY, JARED Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3213:GRAMERCY BRIDGE OVER UP RAILROAD
ST JOHN
H.010076
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JOHN 000-48 HSIP 300 RAILROADS 3-DESIGN/DEVELOPMENT
RAILROAD SIGNALIZATIONSHREWSBERRY,BILL Remrks:
Typ Imp:
Project:Prj Mgr:
IC (RESERVE) W. 19TH ST.
H.010385
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JOHN LA 3127 428-02 STPFLEX 5,500 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
COLD PLANE & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3127: ST. JAMES P/L - ST. CHARLES P/L
H.012074
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JOHN US 51 256-12 NHPP 150 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
RECONFIG STRIPING FOR OFF RAMP MERGESPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 51 @ I-55 OFF RAMP
H.013017
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JOHN 000-48 HSIP 1,500 RAILROADS 3-DESIGN/DEVELOPMENTST JOHN LA 636-1 848-05 RAIL PD 250 RAILROADS ST JOHN LA 3217 848-17 RAIL PD 250 RAILROADS
INSTALL F/L'S, GATES, AND BELLSSHREWSBERRY,BILL Remrks:
Typ Imp:USE TTF AS MATCH ON C.S. 848-05 & 848-17
Project:Prj Mgr:
IC RR CORRIDOR (ST JOHN THE BAPTIST)
H.013239
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JOHN US 61 007-04 STP>200K 2,365 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
BIKE/PED IMPROVEMENTSLEBAS, MELISSA Remrks:
Typ Imp:ST. JOHN PARISH TO PROVIDE MATCH
Project:Prj Mgr:
US 61:LA 3188-ORMOND BLVD,BIKE/PED IMP
Page 2 - 82 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.013894
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JOHN I-10 450-13 NHPP 50 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
3-DESIGN/DEVELOPMENT
ST CHARLES I-10 450-14 NHPP 200 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
PAVEMENT MARKING REPLACEMENTHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: I-55 TO JEFFERSON P/L RPM
H.009594
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JOHN I-10 450-13 NFI 0 PRESERVATION - INTERSTATE 1-PLANNING/ENVIRONMENTAL
GRADE RAISING AND CROSS DRAIN WORK FEASIBILITY STUDYHANKS, ANNA Remrks:
Typ Imp:
Project:Prj Mgr:
I-10:E END OF RESERVE RELIEF CANAL-US 51
H.010902
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JOHN US 61 007-04 0 SAFETY 0-FEASIBILITY/SCOPING
FEASIBILITY STUDYRENARD, APRIL Remrks:
Typ Imp:FEASIBILITY STUDY FUNDED WITH SATRANS
Project:Prj Mgr:
US 61 FEASIBILITY STUDY
H.011136
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JOHN LA 44 256-02 0 DEMO / HIGH PRIORITY 0-FEASIBILITY/SCOPING
STAGE 0 FEASIBILITY STUDYNGUYEN, WAYNE Remrks:
Typ Imp:20% NON-FEDERAL MATCH PROVIDED BY RPC
Project:Prj Mgr:
MRT EXTENSION ST. JOHN PARISH
H.013481
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JOHN I-10 450-13 0 OTHER / MISCELLANEOUS 0-FEASIBILITY/SCOPING
EXPLORATION OF EXISTING CROSS DRAIN PIPESTASSIN, BEN Remrks:
Typ Imp:PHASE 1 - OPERATING/MISCELLANEOUS REPAIR FUNDS WILL BE USED
Project:Prj Mgr:
I-10: CULVERT EXPLORATION LA 3188 -US 51
H.000445
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY US 190 012-13 NHPP 27,900 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REHAB.REDECK & MAYBE WIDENGAUDRY, CARL Remrks:
Typ Imp:012-13-0101
Project:Prj Mgr:
US 190: UPRR OVERPASS NEAR OPELOUSAS
ST LANDRY
H.002176
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY LA 10 219-07 STPFLEX 4,950 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
NEW BRIDGESBUCCI, MARK Remrks:
Typ Imp:219-07-0025;2 BRIDGES
Project:Prj Mgr:
LA 10 BRIDGES
H.010225
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY LA 178 208-02 STPFLEX 700 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
STABILIZE BASE & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 178: ACADIA P/L - LA 357
H.011549
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY US 190 012-12 STPFLEX 800 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
3-DESIGN/DEVELOPMENT
REMOVE BASE & SURFACING, RECONSTRUCT AT HIGHER ELEVGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
US 190 EB: DRAINAGE IMPROVEMENTS
Page 2 - 83 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.011550
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY I-49 455-02 NHPP 6,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT
CONCRETE REMOVAL & REPLACEMENT, STONE BASE, SHLDER UNDERDDOMINGUE, CHRISTOPHER Remrks:
Typ Imp:
Project:Prj Mgr:
I-49: LA 93 OPASS(0.31 MI S - 0.37 MI N)
H.011808
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY LA 10 219-07 STPFLEX 3,337 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTPATTON, HEATHER Remrks:
Typ Imp:
Project:Prj Mgr:
LA 10: PALMETTO COMPANY CANAL BR
H.011844
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY 000-49 TAP<200K 115 ENHANCEMENTS 3-DESIGN/DEVELOPMENTST LANDRY US 190 012-12 TAP<200K 58 ENHANCEMENTS
SIDEWALKMEEK, STEPHEN Remrks:
Typ Imp:MATCH PROVIDED BY THE CITY OF OPELOUSAS
Project:Prj Mgr:
US 190: MARKET - MAIN, SIDEWALKS
H.012681
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY 000-49 RTP 114 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTST LANDRY 000-49 LOCAL 39 RECREATIONAL TRAILS PROGRAM
1.6 M. OF PED-BIKE TRAIL, 1 M. OF SHARROW AND 3 TRAILHEADSNUNES, BRIAN Remrks:
Typ Imp:DCRT IS THE PROJECT MANAGER
Project:Prj Mgr:
OPELOUSAS PARKS PED-BIKE TRAIL
H.013407
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY LA 93 221-01 TAP<5K 498 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SIDEWALKSNUNES, BRIAN Remrks:
Typ Imp:THE TOWN OF GRAND COTEAU WILL PROVIDE THE LOCAL MATCH.
Project:Prj Mgr:
LA 93 (WMLK DR) SIDEWALKS GRAND COTEAU
H.013510
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY 000-49 RTP 129 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENT
ACQUISTION OF TRAIL MAINTENANCE EQUIPMENTNUNES, BRIAN Remrks:
Typ Imp:LA WILDLIFE AND FISHERIES WILL PROVIDE THE LOCAL MATCH
Project:Prj Mgr:
OPELOUSAS REG.-TRAIL MAINT. EQUIP. ACQ.
H.011993
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY LA 10 032-03 STPFLEX 1,984 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTBRAUNER, KURT Remrks:
Typ Imp:
Project:Prj Mgr:
LA 10: BAYOU CARRON BRIDGE
H.011994
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY US 167 066-08 STPFLEX 2,981 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTYAP, KIAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 167: BAYOU GRAND LOUIS BRIDGE
H.012534
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY LA 103 849-03 STPFLEX 1,238 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTGAUDRY, CARL Remrks:
Typ Imp:
Project:Prj Mgr:
LA103: DRAINAGE CANAL BRIDGE
Page 2 - 84 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.011243
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY US 190 012-13 0 SAFETY 0-FEASIBILITY/SCOPING
TBD BY FEASIBILITY STUDYFUSILIER, JACOB Remrks:
Typ Imp:
Project:Prj Mgr:
I-49 INTERCHANGE IMP. AT US 190 & LA 31
H.013459
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY US 167 066-08 0 SAFETY 0-FEASIBILITY/SCOPING
FEASIBILITY STUDY TO 3 LANE SECTION OF US 167ZHANG, HONG Remrks:
Typ Imp:
Project:Prj Mgr:
US 167: ELSIE STREET TO GILBERT DRIVE
H.013767
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY 000-49 0 SAFETY - LOCAL ROADS SAFETY 0-FEASIBILITY/SCOPINGST MARTIN 000-50 0 SAFETY - LOCAL ROADS SAFETY
FEASIBILITY STUDYRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
SIGNS & MARKINGS (ST LANDRY&ST MARTIN)
H.012130
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARTIN LA 347 404-03 STPFLEX 3,376 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
COLD PLANE, PATCH, OVERLAY, & RELATED WORKSPURLOCK, DLON Remrks:
Typ Imp:NFA AS MATCH
Project:Prj Mgr:
LA 347: LA 328 - LA 686
ST MARTIN
H.012618
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARTIN LA 347 056-04 STPFLEX 540 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
3-DESIGN/DEVELOPMENT
RAISE ROAD X-SECTION AND/OR REPLACE SUBDRAINAGE STRUCTUREGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 347 DRAINAGE IMPROVEMENTS
H.013142
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARTIN 000-50 FBROFF 388 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENT - NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
CHES COURVILLE RD OVER COULEE NICOLE G.
H.013516
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARTIN LA 353 403-02 STP>200K 3,000 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
PAVEMENT PRESERVATIONBANKSTON, TANYA Remrks:
Typ Imp:DOTD TO PROVIDE MATCH.
Project:Prj Mgr:
LA 353 PAVEMENT PRESERVATION
H.013819
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARTIN LA 350 400-30 STPFLEX 3,642 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
MOVABLE BRIDGE MECHANICAL, ELECTRICAL, STRUCTURAL REHABGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
LA 350: BYU TECHE MB REHAB (PARKS) (HBI)
H.013863
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARTIN I-10 450-06 NHPP 100 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
3-DESIGN/DEVELOPMENT
PAVEMENT MARKING REPLACEMENTHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: PAVEMENT MARKER REPLACEMENT IV
Page 2 - 85 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.011279
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARTIN LA 328 404-02 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
0-FEASIBILITY/SCOPING
STAGE 0/FEASIBILITY STUDYZHANG, HONG Remrks:
Typ Imp:
Project:Prj Mgr:
LA 328: LATIOLAIS DRIVE TO JULIE STREET
H.011995
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARTIN LA 96 238-03 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
LA 96: BAYOU TECHE MB REHAB (HBI)
H.013023
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARTIN LA 328 404-02 0 URBAN SYSTEMS 0-FEASIBILITY/SCOPING
FEASIBILITY STUDYZHANG, HONG Remrks:
Typ Imp:ACADIANA MPO PROVIDING MATCH
Project:Prj Mgr:
LA 328 CORRIDOR STUDY IN BREAUX BRIDGE
H.013089
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARTIN 000-50 HSIPPEN 350 SAFETY - SAFE ROUTES TO PUBLICPLACES
0-FEASIBILITY/SCOPING
FEASIBILITY STUDY FOR THE CONSTRUCTION OF SIDEWALKSRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
MARTIN STREET SIDEWALKS
H.011706
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARY 000-51 DEMO 585 DEMO / HIGH PRIORITY 3-DESIGN/DEVELOPMENTST MARY 000-51 RAIL HE 452 RAILROADS ST MARY 000-51 LOCAL 63 RAILROADS
NEW ROAD CONSTRUCTION TO CLOSE THREE BNSF & LDRR CROSSINGLUKE, SHAWN Remrks:
Typ Imp:
Project:Prj Mgr:
BNSF SEVERAL RR XINGS (BALDWIN)
ST MARY
H.011723
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARY 000-51 RAIL HE 350 RAILROADS 3-DESIGN/DEVELOPMENT
NEW ROAD CONSTRUCTION, RR CROSSING UPGRADE & RR CLOSURERAY, JARED Remrks:
Typ Imp:714-51-0010
Project:Prj Mgr:
COTTON & SILO: BNSF RR XINGS (ST MARY)
H.011937
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARY US 90 424-05 HSIPPEN 550 SAFETY 3-DESIGN/DEVELOPMENTASSUMPTION US 90 424-06 HSIPPEN 440 SAFETY
MEDIAN CABLE BARRIERDOMINGUE, CHRISTOPHER Remrks:
Typ Imp:
Project:Prj Mgr:
US 90: CABLE BARRIER IN ASSUMP & ST MARY
H.013203
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARY US 90 424-05 NHPP 5,100 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
SEAL COAT, ASPHALT OVERLAY, ASPHALT SHOULDERS, & RELATED WRSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 90: LA 318 - LA 83
Page 2 - 86 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.013503
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARY 000-51 RTP 112 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTST MARY 000-51 LOCAL 16 RECREATIONAL TRAILS PROGRAM
CONSTRUCTION OF A 925' X 6' WIDE TRAIL THROUGH A CITY PARKNUNES, BRIAN Remrks:
Typ Imp:CITY OF PATTERSON WILL PROVIDE LOCAL MATCH
Project:Prj Mgr:
MOREY PARK TRAIL
H.011328
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARY US 90 424-05 NFI 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
UPGRADING US 90 FOR FUTURE I-49 SOUTHLANDRY, COREY Remrks:
Typ Imp:REF. H.005171 FEASIBILITY
Project:Prj Mgr:
I-49 SOUTH (RICOHOC TO BERWICK)
H.012535
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARY LA 182 004-07 STPFLEX 1,408 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTALLEN, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 182: HANSON CANAL BRIDGE
H.012990
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARY LA 182 004-07 STPFLEX 3,000 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
COLD PLANE, PATCH, ASPHALT OVERLAY, AND RELATED WORKSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 182: 0.45 MI S LA 3069 - LA 317
H.011996
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARY LA 182 004-06 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
FEASIBILITY STUDY OF CLEANING, PAINTING, & STRUCTURAL REPAIRCAVALIER, STEPHANIE Remrks:
Typ Imp:
Project:Prj Mgr:
LA 182: CHARENTON BRIDGE REHAB (HBI)
H.013722
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARY 000-51 0 SAFETY - SAFE ROUTES TO PUBLICPLACES
0-FEASIBILITY/SCOPING
FEASIBILITY STUDYRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
MORGAN CITY SIDEWALKS & SHARED USE PATH
H.000286
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY US 90 006-08 STPFLEX 22,400 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
ST TAMMANY US 90 006-07 STPFLEX 850 PRESERVATION - BRIDGE (ONSYSTEM)
ST TAMMANY US 90 006-08 OTHER 23,250 OTHER / MISCELLANEOUS
BRIDGE REPLACEMENTMASTIN, CATHERINE Remrks:
Typ Imp:006-08-0031;STAGE 0 PROJECT
Project:Prj Mgr:
EAST PEARL RIVER BRIDGE
ST TAMMANY
H.001344
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY US 190 059-30 STP<200K 17,000 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
WIDEN TO 4 LANES, NEW BRIDGELANDRY, COREY Remrks:
Typ Imp:059-30-0008
Project:Prj Mgr:
US 190: LA 437 - US 190 BUS (PH 1)
Page 2 - 87 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.004113
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 3241 852-33 NHPP 63,000 TIME 3-DESIGN/DEVELOPMENT
NEW 4-LANEUMEOZULU, JOE Remrks:
Typ Imp:852-33-0001;BL DATE 10-08 404 RE-SUBMITTED 3-96
Project:Prj Mgr:
LA 3241: LA 435 TO LA 40/LA 41
H.004435
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 3241 852-33 NHPP 92,000 TIME 3-DESIGN/DEVELOPMENT
NEW 4-LANEUMEOZULU, JOE Remrks:
Typ Imp:852-33-0003;BL DATE 7-08
Project:Prj Mgr:
LA 3241: LA 36 TO LA 435
H.004957
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 3241 852-33 NHPP 70,000 TIME 3-DESIGN/DEVELOPMENT
NEW 4-LANEUMEOZULU, JOE Remrks:
Typ Imp:852-33-0002;BL DATE 7-08
Project:Prj Mgr:
LA 3241:I-12/LA 434 INTERCHANGE TO LA 36
H.007588
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY 000-52 TAP<200K 156 ENHANCEMENTS 3-DESIGN/DEVELOPMENTST TAMMANY 000-52 LOCAL 36 ENHANCEMENTS
LANDSCAPING AND LIGHTING FOR SIDEWALKNUNES, BRIAN Remrks:
Typ Imp:MATCH IS 15% TOLL CREDITS AND 5% LOCAL
Project:Prj Mgr:
GIROD STREET LANDSCAPING AND LIGHTING, P
H.008358
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 1077 852-13 FBROFF 1,854 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTGAUDRY, CARL Remrks:
Typ Imp:852-13-0017; USE NFA AS MATCH
Project:Prj Mgr:
BLACK BAYOU BR. NEAR MADISONVILLE
H.011775
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY US 11 018-03 TAP<200K 372 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
PED/BICYCLE CROSSWALKS, SIGNS AND SIGNALSNUNES, BRIAN Remrks:
Typ Imp:CITY OF SLIDELL PROVIDES MATCH
Project:Prj Mgr:
US 11 & US 190 BICYCLE AND PED CROSSINGS
H.011799
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY 000-52 TAP<200K 986 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SHARED USE PATHMEEK, STEPHEN Remrks:
Typ Imp:MATCH PROVIDED BY CITY OF SLIDELL.
Project:Prj Mgr:
SPARTAN DRIVE SHARED USE PATH
H.011822
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY 000-52 TAP<200K 783 ENHANCEMENTS 3-DESIGN/DEVELOPMENTST TAMMANY LA 21 059-01 TAP<200K 363 ENHANCEMENTS
SHARED USE PATHNUNES, BRIAN Remrks:
Typ Imp:MATCH PROVIDED BY ST. TAMMANY PARISH
Project:Prj Mgr:
LA21: LA1085 - PINNACLE, SHARED USE PATH
H.012062
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 21 059-01 STPFLEX 2,814 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
WIDEN TO 3 LANESBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 21: LALANNE RD - BAYOU DEZAIRE
Page 2 - 88 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.012497
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY 000-52 RTP 110 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTST TAMMANY 000-52 LOCAL 15 RECREATIONAL TRAILS PROGRAM
CONSTRUCT A 3,160' LONG BY 4' WIDE PED-BIKE TRAILNUNES, BRIAN Remrks:
Typ Imp:DCRT IS THE PROJECT MANAGER
Project:Prj Mgr:
ABITA SPRINGS TRAILS, PHASE 2
H.012572
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 21 030-01 STPFLEX 1,800 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
MILL & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 21: W. JCT. LA 1083-FAIRGROUNDS BLVD.
H.012812
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY US 190 013-12 STP<200K 6,655 URBAN SYSTEMS 3-DESIGN/DEVELOPMENTST TAMMANY 000-52 STP<200K 300 URBAN SYSTEMS
ROUNDABOUT INTERSECTION IMPROVEMENTSFUSILIER, JACOB Remrks:
Typ Imp:DOTD TO PROVIDE MATCH
Project:Prj Mgr:
US 190 @ NORTHSHORE & CAMP VILLERE
H.013008
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 16 058-03 STPFLEX 1,320 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
ST TAMMANY LA 1129 279-02 NFA 480 PRESERVATION - BRIDGE (ONSYSTEM)
ST TAMMANY LA 36 280-03 STPFLEX 1,680 PRESERVATION - BRIDGE (ONSYSTEM)
ST TAMMANY LA 450 852-07 STPFLEX 480 PRESERVATION - BRIDGE (ONSYSTEM)
ST TAMMANY LA 59 852-09 STPFLEX 600 PRESERVATION - BRIDGE (ONSYSTEM)
ST TAMMANY LA 434 852-12 STPFLEX 720 PRESERVATION - BRIDGE (ONSYSTEM)
WASHINGTON LA 16 058-04 STPFLEX 1,680 PRESERVATION - BRIDGE (ONSYSTEM)
WASHINGTON LA 438 275-02 STPFLEX 2,040 PRESERVATION - BRIDGE (ONSYSTEM)
WASHINGTON LA 436 859-08 STPFLEX 720 PRESERVATION - BRIDGE (ONSYSTEM)
WASHINGTON LA 1072 859-21 NFA 720 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:
Typ Imp:
Project:Prj Mgr:
DIST62:ABC BR REPLACE ST TAM,WASH PARS
H.013082
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY 000-52 HSIPPEN 350 SAFETY - SAFE ROUTES TO PUBLICPLACES
3-DESIGN/DEVELOPMENT
ST TAMMANY 000-52 LOCAL 315 SAFETY - SAFE ROUTES TO PUBLICPLACES
SIDEWALKS, ADA RAMPS, DRAINAGE STRUCTURES AND RELATED WORMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
BOOTLEGGER ROAD SIDEWALKS
H.013268
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 1129 279-02 NFA 2,900 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
PATCH, MILL, OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1129: LA 40 - LA TUNG RD
Page 2 - 89 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.013406
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY 000-52 TAP<200K 419 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SIDEWALKS AND BIKE PATHSNUNES, BRIAN Remrks:
Typ Imp:THE CITY OF MANDEVILLE WILL PROVIDE THE LOCAL MATCH
Project:Prj Mgr:
W CAUSEWAY APPROACH BIKE/PED MANDEVILLE
H.013408
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY 000-52 TAP<200K 1,198 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SHARED USE PATHMEEK, STEPHEN Remrks:
Typ Imp:THE CITY OF COVINGTON WILL PROVIDE THE LOCAL MATCH.
Project:Prj Mgr:
JEFFERSON AVE SHARED USE PATH COVINGTON
H.013725
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY US 190 852-24 NHPP 1,000 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
P.C.C.P. REHABILITATIONSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 190: US 11 - I-10
H.013729
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY US 190 013-10 NHPP 2,600 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
MILL, PATCH, AND OVERLAYBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
US 190: LA 1077 - REDWOOD DR
H.013737
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 41 058-01 STPFLEX 1,200 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
MILL AND OVERLAYBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 41: LA 41 SPUR - LA 36
H.013866
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY I-12 454-04 EARMARK 11,250 CAPACITY 3-DESIGN/DEVELOPMENTST TAMMANY I-12 454-04 NHPP 5,750 CAPACITY ST TAMMANY I-12 454-04 EARMARK 10,000 CAPACITY ST TAMMANY I-12 454-04 EARMARK 10,000 CAPACITY
ROADWAY WIDENING INCLUDES BRIDGE WIDENING/REPLACEMENTFUSILIER, JACOB Remrks:
Typ Imp:ST. TAMMANY PARISH WILL PROVIDE MATCH
Project:Prj Mgr:
I-12:LA21-US190 WIDEN EB/ADD AUX LN WB
H.013872
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 22 261-05 STP<200K 500 URBAN SYSTEMS 3-DESIGN/DEVELOPMENTST TAMMANY LA 1085 852-02 STP<200K 500 URBAN SYSTEMS
CONSTRUCT A ROUNDABOUTBANKSTON, TANYA Remrks:
Typ Imp:DOTD TO PROVIDE MATCH
Project:Prj Mgr:
LA 22 @ LA 1085 ROUNDABOUT
H.013880
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY I-10 450-18 STPFLEX 275 ROAD TRANSFER 3-DESIGN/DEVELOPMENTST TAMMANY I-10 450-18 STPFLEX 233 ROAD TRANSFER
MILL, PATCH, OVERLAY AND STRIPINGTASSIN, BEN Remrks:
Typ Imp:
Project:Prj Mgr:
I-10 SERVICE ROADS-SLIDELL ROAD TRANSFER
H.004981
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 434 852-12 0 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL
PHASES 1 AND 2 ENVIRONMENTAL STUDYBANKSTON, TANYA Remrks:
Typ Imp:
Project:Prj Mgr:
LA 434 CORRIDOR
Page 2 - 90 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.010116
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 1088 852-11 STPFLEX 25,136 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
1-PLANNING/ENVIRONMENTAL
TRAFFIC STUDY ON LA 1088MUSA, ELNUR Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1088 CORRIDOR STUDY
H.010377
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 36 280-03 STPFLEX 1,120 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
COLD PLANE & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 36: LA 41 - IGC RAILROAD
H.010380
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 433 018-30 STPFLEX 740 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
COLD PLANE & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 433: U-PASS I-10 - BEHRMAN STREET
H.010387
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY US 90 006-07 STPFLEX 3,323 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
RUBBILIZE & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
U.S. 90: LA 433 - U.S. 190
H.012457
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY I-10 450-18 NHPP 1,770 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
1-PLANNING/ENVIRONMENTAL
ST TAMMANY I-10 450-19 NHPP 30 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
INSTALLATION OF SIGNS AND OTHER RELATED ITEMSFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
I-10 SIGNING (TWIN SPAN TO STATE LINE)
H.012567
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 36 280-03 STPFLEX 771 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
REMOVE STRUCTURE CONSTRUCT ROADWAYMETCALF, WILLIAM Remrks:
Typ Imp:
Project:Prj Mgr:
LA 36: ICG RAILROAD BRIDGE REMOVAL
H.012633
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 1088 852-11 STPFLEX 2,500 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
1-PLANNING/ENVIRONMENTAL
CONSTRUCT ROUNDABOUTHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1088: FOREST BROOK BLVD ROUNDABOUT
H.012658
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 59 281-03 STPFLEX 2,500 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
1-PLANNING/ENVIRONMENTAL
ROUNDABOUTHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 59: KOOP DRIVE ROUNDABOUT
Page 2 - 91 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.012660
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 59 281-03 STPFLEX 4,000 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
1-PLANNING/ENVIRONMENTAL
ROUNDABOUTSHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 59: LITTLE CREEK, I-12, DOVE RNBT
H.012662
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 1088 852-11 STPFLEX 4,000 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
1-PLANNING/ENVIRONMENTAL
ACCESS MANAGEMENTHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1088: I-12 ROUNDABOUTS
H.012696
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 435-S 852-37 NFA 300 PRESERVATION - NON-INTERSTATENFA
1-PLANNING/ENVIRONMENTAL
MILL & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 435S: LA 435 - LA 41
H.011454
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 22 261-06 0 SAFETY 0-FEASIBILITY/SCOPING
ACCESS MANAGEMENT AND SAFETY IMPROVEMENTHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA22:DALWILL-RODGER STORME CORRIDOR STU
H.012737
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 433 852-21 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
FEASIBILITY STUDY FOR BRIDGE REHABILITATIONHINGLE, STEWART Remrks:
Typ Imp:
Project:Prj Mgr:
LA433:BAYOU BONFOUCA MVBR REHABILITATION
H.013717
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY 000-52 0 SAFETY - SAFE ROUTES TO PUBLICPLACES
0-FEASIBILITY/SCOPING
FEASIBILITY STUDYRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
W 11TH AVENUE PED AND BICYCLE IMPR (COV)
H.007598
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA LA 16 262-07 TAP<200K 302 ENHANCEMENTS 3-DESIGN/DEVELOPMENTTANGIPAHOA LA 16 047-01 TAP<200K 302 ENHANCEMENTS
NEW SIDEWALKSNUNES, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
AMITE LA 16 PEDESTRIAN PROJECT - PHASE I
TANGIPAHOA
H.009425
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA LA 16 047-01 STPFLEX 1,311 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
3-DESIGN/DEVELOPMENT
DRAINAGE IMPROVEMENTSGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 16 AMITE DRAINAGE IMPROVEMENTS
H.010108
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA 000-53 SR2S 400 SAFETY - SAFE ROUTES TO SCHOOLS 3-DESIGN/DEVELOPMENT
SIDEWALK IMPROVMENTS, CROSSING AND STRIPING, NON-INFRASTRUMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
INDEPENDENCE SRTS - PHASE II
Page 2 - 92 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.010289
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA LA 22 261-04 HSIP 1,652 SAFETY 3-DESIGN/DEVELOPMENTTANGIPAHOA 000-53 HSIP 28 SAFETY
CONSTRUCT ROUNDABOUT @ LA 22/DUNSON/RIDGEDELLBRANTON, JENNIFER Remrks:
Typ Imp:
Project:Prj Mgr:
LA 22: ROUNDABOUT DUNSON/RIDGEDELL RDS.
H.010702
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA 000-53 HSIP 600 RAILROADS 3-DESIGN/DEVELOPMENT
INSTALL F/L'S & GATES AT SEVERAL IC CROSSINGS IN HAMMONDSHREWSBERRY,BILL Remrks:
Typ Imp:
Project:Prj Mgr:
IC SEVERAL RR XINGS (HAMMOND)
H.011856
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA LA 22 261-04 TAP<200K 300 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SIDEWALK RECONSTRUCTIONNUNES, BRIAN Remrks:
Typ Imp:MATCH PROVIDED BY CITY OF PONCHATOULA
Project:Prj Mgr:
LA 22: FIFTH ST - WAYNE STREET, SW
H.011858
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA 000-53 TAP<200K 570 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SIDEWALKSMEEK, STEPHEN Remrks:
Typ Imp:MATCH PROVIDED BY THE CITY OF HAMMOND
Project:Prj Mgr:
HAMMOND: JW DAVIS & CM FAGAN SW
H.012996
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA LA 10 061-09 STPFLEX 128 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
3-DESIGN/DEVELOPMENT
THIN LIFT OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 10:I-55 COA - US 51
H.013007
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA LA 38 263-03 STPFLEX 600 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
TANGIPAHOA LA 442 269-04 STPFLEX 800 PRESERVATION - BRIDGE (ONSYSTEM)
TANGIPAHOA LA 40 415-02 STPFLEX 1,200 PRESERVATION - BRIDGE (ONSYSTEM)
TANGIPAHOA LA 1062 415-04 NFA 1,680 PRESERVATION - BRIDGE (ONSYSTEM)
TANGIPAHOA LA 1061 853-20 NFA 600 PRESERVATION - BRIDGE (ONSYSTEM)
TANGIPAHOA LA 1054 853-22 NFA 360 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:
Typ Imp:
Project:Prj Mgr:
DIST62:ABC BR REPLACE TANGIPAHOA PARISH
H.013163
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA 000-53 FBROFF 317 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENT NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
WADESBORO ROAD OVER UNNAMED CREEK
H.013271
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA 000-53 HSIPPEN 1,900 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT
INSTALL SIGNS, STRIPING, PAVEMENT MARKING & OTHER SAFETYIMPRMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
TANGIPAHOA PH LOCAL ROAD SAFETY UPGRADE
Page 2 - 93 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.013372
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA US 51-X 853-36 STPENH 1,074 ENHANCEMENTS 3-DESIGN/DEVELOPMENTTANGIPAHOA LA 22 261-04 STPENH 668 ENHANCEMENTS
SIGNALS, LANDSCAPING, CURB AND GUTTER, PED IMPROVEMENTSNUNES, BRIAN Remrks:
Typ Imp:THE CITY OF PONCHATOULA WILL PROVIDE THE LOCAL MATCH.
Project:Prj Mgr:
LA 22:PINE ST CORRIDOR IMPRV PONCHATOULA
H.013520
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA 000-53 STP<200K 225 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
SIDEWALKSBANKSTON, TANYA Remrks:
Typ Imp:CITY OF PONCHATOULA WILL PROVIDE MATCH.
Project:Prj Mgr:
BARRINGER DRIVE SIDEWALKS
H.013740
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA LA 10 061-09 STPFLEX 480 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
THIN OVERLAYBROWN, JOSEPH C. Remrks:
Typ Imp:
Project:Prj Mgr:
LA 10: ST. HELENA PL - I-55 COA
H.013886
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA LA 3158 853-39 STP<200K 500 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
TSM IMPROVEMENTSBANKSTON, TANYA Remrks:
Typ Imp:CITY OF HAMMOND AND TANGIPAHOA PARISH
Project:Prj Mgr:
LA 3158: I-12 TO HIPARK RD
H.008399
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA US 51-X 853-36 NFI 40,000 CAPACITY 1-PLANNING/ENVIRONMENTAL
WIDEN TO 4 LANESMOSS, SARAH Remrks:
Typ Imp:853-36-0031;PORTION OF PROJECT COMPLETED UNDER
Project:Prj Mgr:
US 51 BUSINESS: LA 22 TO CLUB DELUXE RD
H.008915
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA LA 3234 853-40 27,500 INTERMODAL CONNECTOR 1-PLANNING/ENVIRONMENTAL
FEASIBILITY STUDY FOR LA 3234 EXTENSIONFUSILIER, JACOB Remrks:
Typ Imp:
Project:Prj Mgr:
LA3234 EXT FROM LA1065 - HAMMOND AIRPORT
H.011618
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA US 51-X 853-36 STPFLEX 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
1-PLANNING/ENVIRONMENTAL
TANGIPAHOA LA 22 261-03 STPFLEX 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
TANGIPAHOA LA 22 261-04 STPFLEX 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
CORRIDOR STUDY FOR ACCESS MGMNT/TRAFFIC OP IMPROVEMENTSHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 22 CORRIDOR STUDY: ROU MAR NEI TO 1ST
H.012071
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA US 51 017-04 NHPP 2,017 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTBOURGEOIS, COREY Remrks:
Typ Imp:
Project:Prj Mgr:
US 51: YELLOW WATER RIVER BRIDGE
Page 2 - 94 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.011401
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA US 51 017-04 0 SAFETY 0-FEASIBILITY/SCOPING
CORRIDOR/TRAFFIC STUDY FOR ACCESSMAN AND SAFETY IMPROVEMEHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 51: W UNIV AVE TO I55 CORRIDOR STUDY
H.011402
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TANGIPAHOA US 51-X 853-36 0 SAFETY 0-FEASIBILITY/SCOPING
TRAFFIC/CORRIDOR STUDY FOR ACCESS MGMT AND SAFETY IMPVEMEHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
US 51 BUS: I12 TO COLEMAN CORRIDOR STUDY
H.012113
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TENSAS US 65 020-04 NHPP 3,800 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
TENSAS US 65 020-02 NHPP 500 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
COLD PLANE, BREAK & SEAT, OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 65: SOUTH OF NEWELLTON
TENSAS
H.013735
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TENSAS LA 573 186-04 STPFLEX 2,000 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
PATCH & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:USE NFA AS MATCH
Project:Prj Mgr:
LA 573:COOTER POINT RD-BIG CHOCTAW BAYOU
H.009585
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TENSAS LA 128 036-06 STPFLEX 1,772 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
ASPHALT OVERLAY OF ASPHALT PAVEMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 128: LA 573 - US 65
H.009591
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TENSAS LA 4 173-01 STPFLEX 541 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
ASPHALT OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 4: US 65 - LA 605
H.002238
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 56 247-01 NFA 1,200 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTYAP, KIAN Remrks:
Typ Imp:247-01-0009
Project:Prj Mgr:
LA 56: ROBINSON CANAL BRIDGE
TERREBONNE
H.010006
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 58 247-30 STPFLEX 6,928 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
MOVABLE BRIDGE REHABILITATIONBRAUNER, KURT Remrks:
Typ Imp:BOTH CONTROL SECTIONS IN HOUMA MPO AREA.
Project:Prj Mgr:
LA 58: PETIT CAILLOU BR RH (SARAH) (HBI)
Page 2 - 95 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.010411
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 24 065-91 STPFLEX 4,500 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETESPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 24: LA 55 - PROSPECT STREET BRIDGE
H.012026
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 24 065-91 TAP<200K 146 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SIDEWALKSMEEK, STEPHEN Remrks:
Typ Imp:LOCAL MATCH BY TERREBONNE PARISH CONSOLIDATED GOVERNMEN
Project:Prj Mgr:
BAYOU TERREBONNE EAST SW PROJECT, PH 2
H.012940
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 665 855-09 NFA 1,225 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
ASPHALT CONCRETE OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 665: HOPE FARM RD.-L.M. 9.878
H.012994
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 3197 855-18 NFA 175 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
RESURFACE EXISTING ROADWAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3197: BARROW ST - LA 182
H.013199
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE 000-55 STPFLEX 777 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENT - NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
COUNTRY ESTATES DR OVER ST. LOUIS BAYOU
H.013213
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 3040 065-30 NHPP 4,000 PRESERVATION - NON-INTERSTATEON NHS SYSTEM
3-DESIGN/DEVELOPMENT
MILL, PATCH, AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3040: 600' S HOLLYWOOD - LA 24
H.013319
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE 000-55 STPENH 238 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SHARED USE PATHMEEK, STEPHEN Remrks:
Typ Imp:TERREBONNE PARISH WILL PROVIDE LOCAL MATCH.
Project:Prj Mgr:
WILLIAMS AVE SHARED USE PATH (HOUMA)
H.013340
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE 000-55 STP<200K 973 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
MULTI-USE PATHBANKSTON, TANYA Remrks:
Typ Imp:TERREBONNE PARISH PROVIDING MATCH
Project:Prj Mgr:
VALHI BLVD, MULTI-USE TRAIL, PHASE 1
H.013453
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 316 412-04 STP<200K 126 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
SIDEWALKSBANKSTON, TANYA Remrks:
Typ Imp:TERREBONNE PARISH TO PROVIDE THE MATCH.
Project:Prj Mgr:
BLUE BAYOU (LA 316) SIDEWALKS
Page 2 - 96 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.013741
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 55 248-02 STPFLEX 2,000 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
MILL AND OVERLAY AND PATCHINGSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 55: HUMBLE CANAL TO LA 58
H.010997
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 3185 855-17 STPFLEX 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
1-PLANNING/ENVIRONMENTAL
TERREBONNE 000-55 STPFLEX 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
INTERSECTION IMPROVEMENTSHARROUCH, JOSHUA Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3185 @ MAIN PROJECT RD ROUNDABOUT
H.011970
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 182 005-05 STPFLEX 2,697 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTSBUCCI, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
LA 182: BAYOU TERREBONNE BRIDGES
H.013421
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE 000-55 HSIPPEN 1,770 SAFETY 1-PLANNING/ENVIRONMENTALTERREBONNE 000-55 STPFLEX 1,770 OPER EFFICIENCY/MOTORIST
ASSISTANCE - TRAFFIC CONTROLDEVICES
TRAFFIC SIGNAL UPGRADEFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DIST. 02H FLASHING YELLOW ARROW PART 2
H.002244
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 56 247-02 STPFLEX 30,000 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
BRIDGE REPLACEMENTFUSILIER, JACOB Remrks:
Typ Imp:247-02-0030
Project:Prj Mgr:
LA 56: BOUDREAUX CANAL BR REPLACEMENT
H.011972
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 3040 065-30 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
TUNNEL REHABILITATIONTOURRES, VALERIE Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3040: ICW HOUMA TUNNEL REHABILITATION
H.011973
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 315 245-90 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
CLEANING, PAINTING, AND STRUCTURAL REPAIRSGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
LA 315:ICWW DULARGE MOVABLE BRIDGE REHAB
H.011974
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 57 246-01 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
FEASIBILITY STUDY OF CLEANING, PAINTING, AND REPAIRSGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
LA 57: BAYOU DULAC MOVABLE BRIDGE REHAB
Page 2 - 97 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.011986
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 58 247-30 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
FEASIBILITY STUDY - MOVABLE BRIDGE REHABILITATION OR REPLACEGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
LA 58: BAYOU TERREBONNE MB REHAB (HBI)
H.012735
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 182 005-05 STPFLEX 890 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
REPLACE THE EXISTING BRIDGEHERATH, SUBA Remrks:
Typ Imp:
Project:Prj Mgr:
LA 182: BARROW STREET BRIDGE
H.013322
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 3040 065-30 0 SAFETY 0-FEASIBILITY/SCOPING
FEASIBILITY STUDYCOSTELLO, BRYAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3040 FEASIBILITY STUDY (HOUMA,LA)
H.013714
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE 000-55 0 SAFETY - SAFE ROUTES TO PUBLICPLACES
0-FEASIBILITY/SCOPING
FEASIBILITY STUDYRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
VALHI BLVD SHARED-USE PATH (HOUMA)
H.010392
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
UNION LA 550 311-01 STPFLEX 3,000 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 550: LA 2 - LA 15
UNION
H.011661
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
UNION LA 33 069-03 STPFLEX 210 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
WIDEN INTERSECTION WITH ASPHALTIC CONCRETEHICKS, MELVIN Remrks:
Typ Imp:
Project:Prj Mgr:
INTERSECTION IMPROVEMENT LA 33 @ LA 15
H.011662
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
UNION LA 2 070-04 STPFLEX 200 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
INTERSECTION IMPROVEMENTSHICKS, MELVIN Remrks:
Typ Imp:
Project:Prj Mgr:
INTERSECTION IMPROVEMENT LA 2 @ LA 15
H.011770
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
UNION LA 15 069-02 TAP<5K 291 ENHANCEMENTS 3-DESIGN/DEVELOPMENTUNION 000-56 TAP<5K 475 ENHANCEMENTS
RECONSTRUCTION OF EXISTING SIDEWALKSMEEK, STEPHEN Remrks:
Typ Imp:TOWN OF FARMERVILLE PROVIDING MATCH
Project:Prj Mgr:
FARMERVILLE DOWNTOWN SW IMPROVEMENTS
Page 2 - 98 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.012924
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
UNION LA 2 070-06 STPFLEX 514 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
3-DESIGN/DEVELOPMENT
THIN OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 2: 0.48 M W LA 143 - OUACHITA PL
H.012037
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
UNION US 63 023-11 NHPP 2,302 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
UNION LA 2 070-05 STPFLEX 1,047 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTSWINDMANN, ANDREW Remrks:
Typ Imp:
Project:Prj Mgr:
US 167,LA2:MIDDLE SLOUGH & CREEK BRIDGES
H.012946
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERMILION LA 697 857-06 NFA 2,935 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
BASE STABILIZATION, ASPHALT OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 697: LA 343 - US 167
VERMILION
H.013014
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERMILION 000-57 HSIPPEN 114 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT
SIGNS, STRIPING, RUMBLE STRIPS, LIGHTING, STOP BARSRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
LOCAL ROAD SIGNING(VERMILION)
H.013428
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERMILION LA 35 207-03 TAP<5K 696 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
SIDEWALKS, LANDSCAPING AND SIGNAGEMEEK, STEPHEN Remrks:
Typ Imp:THE CITY OF KAPLAN WILL PROVIDE THE LOCAL MATCH.
Project:Prj Mgr:
LA 35 REVITALIZATION PHASE III KAPLAN
H.013515
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERMILION LA 92 213-03 STP>200K 2,250 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
PAVEMENT PRESERVATION AND TURN LANEBANKSTON, TANYA Remrks:
Typ Imp:DOTD TO PROVIDE MATCH.
Project:Prj Mgr:
LA 92: PAVEMENT PRESERVATION
H.009627
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERMILION LA 35 207-02 STPFLEX 2,234 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
COLD PLANE, PATCH & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 35: LA 335 - LA 14
H.010226
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERMILION LA 82 215-01 STPFLEX 5,383 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
STABILIZE BASE & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 82: LA 35 - LA 333
H.012001
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERMILION LA 339 216-01 STPFLEX 2,864 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTBALLMER, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 339: CANAL & CREEK BRIDGES
Page 2 - 99 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.012099
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERMILION LA 13 057-01 STPFLEX 2,036 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
COLD PLANE, PATCH, OVERLAY, & RELATED WORKSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 13: 2.7 MI. N. LA 14 - ACADIA P/L
H.011997
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERMILION LA 14-X 055-06 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
LA 14X: VERMILION RIVER MB REHAB (HBI)
H.011998
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERMILION LA 14 055-30 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
LA 14: VERMILION RIVER MB REHAB (HBI)
H.012000
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERMILION LA 82 207-01 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
LA 82: OLD ICC MB REHABILITATION (HBI)
H.012003
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERMILION LA 330 397-03 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
LA 330: BAYOU TIGRE MB REHAB (HBI)
H.001881
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERNON LA 392 135-02 FBROFF 3,560 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTGAUDRY, CARL Remrks:
Typ Imp:135-02-0009;2 BRIDGES; USE NFA AS MATCH
Project:Prj Mgr:
LA 392 BRIDGES NEAR HORNBECK
VERNON
H.006618
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERNON 000-58 NFI 96 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENTVERNON 000-58 LOCAL 8 SAFETY - LOCAL ROADS SAFETY
SIDEWALK INSTALLATIONRIGGS, LAURA Remrks:
Typ Imp:737-58-0001
Project:Prj Mgr:
SIDEWALK ON HIGH SCHOOL DRIVE
H.006619
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERNON 000-58 NFI 134 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENTVERNON 000-58 LOCAL 13 SAFETY - LOCAL ROADS SAFETY
SIDEWALK INSTALLATIONRIGGS, LAURA Remrks:
Typ Imp:737-58-0002
Project:Prj Mgr:
SIDEWALK ON LOUISIANA AVENUE
H.009955
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERNON LA 111 132-02 STPFLEX 4,167 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
CTB AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 111: BEAUREGARD LINE - C DAVIS LOOP
Page 2 - 100 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.011404
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERNON US 171 024-06 NHPP 300 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
CONSTRUCT ACCELERATION LANE SOUTH OF CRYER CEMETERY RDSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 171: ADD ACCELERATION LANE CRYER RD
H.012933
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERNON LA 111 132-03 STPFLEX 300 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
3-DESIGN/DEVELOPMENT
ASPHALT SURFACE TREATMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 111: LA 8 TO JOHN KELL LOOP-AST
H.013098
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERNON 000-58 FBROFF 1,942 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENT; NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
JIM CRYER LANE OVER BAYOU ANACOCO
H.010348
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERNON LA 8 029-02 STPFLEX 4,661 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
PATCH, COLD PLANE, AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 8: LA 464 - US 171
H.010358
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERNON LA 3226 858-11 STPFLEX 2,329 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
PATCH. COLD PLANE, AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3226: BEAUREGARD P/L - US 171
H.012058
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERNON LA 8 029-02 NHPP 2,464 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTMETCALF, WILLIAM Remrks:
Typ Imp:
Project:Prj Mgr:
LA 8: FORKER CREEK BRIDGE
H.013817
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERNON LA 117 114-01 0 OTHER / MISCELLANEOUS 0-FEASIBILITY/SCOPINGNATCHITOCHES LA 117 114-02 0 OTHER / MISCELLANEOUS
FEASIBILITY STUDY FOR LANE AND SHOULDER WIDENINGZHANG, HONG Remrks:
Typ Imp:
Project:Prj Mgr:
LA 117 IMPROVEMENTS (LA 8 TO LA 118)
H.008449
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WASHINGTON LA 450 859-04 FBROFF 1,093 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTMOORE, DARRELL Remrks:
Typ Imp:859-04-0010;USE NFA AS MATCH
Project:Prj Mgr:
DRAIN BRIDGE NEAR STONEY POINT
WASHINGTON
Page 2 - 101 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.010980
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WASHINGTON LA 10 047-04 NHPP 150 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
LANE CONFIGURATION MODIFICATIONSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 10:CUMBERLAND ST- AUSTIN ST(BOGALUSA)
H.011202
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WASHINGTON 000-59 SR2S 225 SAFETY - SAFE ROUTES TO SCHOOLS 3-DESIGN/DEVELOPMENT
SIDEWALKS STRIPING AND SIGNAGEMORVANT, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
FRANKLINTON JR HIGH SCHOOL SIDEWALKS
H.011835
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WASHINGTON LA 25 059-04 TAPFLEX 276 ENHANCEMENTS 3-DESIGN/DEVELOPMENTWASHINGTON 000-59 TAPFLEX 69 ENHANCEMENTS
SIDEWALKSNUNES, BRIAN Remrks:
Typ Imp:MATCH PROVIDED BY WASHINGTON PARISH
Project:Prj Mgr:
LA25: WASHINGTON PARISH SW, SEG B AND C
H.012159
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WASHINGTON LA 430 859-26 STPFLEX 250 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
3-DESIGN/DEVELOPMENT
REMOVE AND REPLACE PIPES, CATCH BASINS, AND/OR ASPHALTGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 430: LA 25 - LA 1069 DRAINAGE
H.012975
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WASHINGTON LA 62 859-10 STPFLEX 1,150 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
3-DESIGN/DEVELOPMENT
THIN LIFT OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 62: LA 10 - LA 436
H.013732
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WASHINGTON LA 450 859-05 STPFLEX 2,600 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
MILL AND OVERLAYBROWN, JOSEPH C. Remrks:
Typ Imp:NFA AS MATCH
Project:Prj Mgr:
LA 450: LA 440 - LA 38
H.012072
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WASHINGTON LA 60 279-04 STPFLEX 888 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTYAP, KIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 60: DRAIN BRIDGE
H.011280
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WASHINGTON LA 10 047-04 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
0-FEASIBILITY/SCOPING
STAGE 0/FEASIBILITY STUDYZHANG, HONG Remrks:
Typ Imp:
Project:Prj Mgr:
LA 10 IMPROVEMENTS IN BOGALUSA
H.013713
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WASHINGTON LA 60 279-04 0 SAFETY - SAFE ROUTES TO PUBLICPLACES
0-FEASIBILITY/SCOPING
FEASIBILITY STUDYRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
LA 60: BOGALUSA H.S. PED IMPROVEMENTS
Page 2 - 102 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.001666
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WEBSTER LA 160 085-05 FBROFF 4,100 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTBRAUNER, KURT Remrks:
Typ Imp:085-05-0029
Project:Prj Mgr:
DORCHEAT BAYOU BRIDGE
WEBSTER
H.001798
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WEBSTER LA 531 111-01 STPFLEX 1,843 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
NEW BRIDGEBUCCI, MARK Remrks:
Typ Imp:111-01-0018
Project:Prj Mgr:
LA 531: PARMERS CREEK BRIDGE
H.001799
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WEBSTER LA 531 111-02 STPFLEX 4,100 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
WEBSTER LA 531 111-02 STPFLEX 450 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
WEBSTER I-20 451-03 NHPP 450 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
BRIDGE REPLACEMENTFUSILIER, JACOB Remrks:
Typ Imp:451-03-0047;GEOM. STUDY UNDERWAY (E)
Project:Prj Mgr:
LA 531 OVERPASS
H.009513
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WEBSTER LA 164 122-03 STPFLEX 3,114 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
ASPHALT OVERLAY, DRAINAGE, PAVEMENT STRIPING & RLEATED WORKSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 164: JCT. LA 163 TO JCT. US 371
H.010974
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WEBSTER US 79 027-04 STPFLEX 350 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
ADDING LEFT TURN LANE AT MILLER ROAD (WEBSTER PARISH)SPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
US 79: NB LEFT TURN LANE AT MILLER ROAD
H.012873
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WEBSTER 000-60 RAIL HE 50 RAILROADS 3-DESIGN/DEVELOPMENT
REMOVE CROSSING AND ITS ROAD APPROACHESSHREWSBERRY,BILL Remrks:
Typ Imp:
Project:Prj Mgr:
OLD US 80: LAS RR XING (WEBSTER)
H.013111
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WEBSTER 000-60 FBROFF 797 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENT, NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
DORCHEAT ROAD OVER CANEY CREEK
H.012029
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WEBSTER US 80 001-05 STPFLEX 2,325 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTMICHAEL, ANDREW Remrks:
Typ Imp:
Project:Prj Mgr:
US 80: COOLEY BRANCH AND CREEK BRIDGES
Page 2 - 103 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.012030
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WEBSTER US 371 027-03 STPFLEX 7,679 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTS/REHABILITATIONBUCCI, MARK Remrks:
Typ Imp:
Project:Prj Mgr:
US371:ICG & KCS RAILROAD OVERPASSES HBI
H.012958
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WEBSTER LA 159 087-01 STPFLEX 315 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
ASPHALTIC SURFACE TREATMENTSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 159: COUNTRY CLUB DR TO BENSON RD
H.005121
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W BATON ROUGE 000-61 NFI 100,357 OTHER / MISCELLANEOUS 3-DESIGN/DEVELOPMENT
FEDERAL EARMARK FOR STUDYHANKS, ANNA Remrks:
Typ Imp:700-61-0113;STAGE 0 COMPLETED
Project:Prj Mgr:
LA 1/LA 415 CONNECTOR
W BATON ROUGE
H.011133
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W BATON ROUGE LA 1 050-07 STPFLEX 300 RAILROADS 3-DESIGN/DEVELOPMENT
REMOVE CROSSINGLUKE, SHAWN Remrks:
Typ Imp:H.011133 MUST LET BEFORE H.009288
Project:Prj Mgr:
LA 1: UP RR XING (WEST BATON ROUGE)
H.012169
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W BATON ROUGE I-10 450-08 NHPP 13,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT
GRADE RAISINGMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: IBERVILLE P/L - W END MISS BR
H.012587
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W BATON ROUGE I-10 450-08 NHPP 13,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT
GRADE RAISINGMAY, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: W END OF BR 290 - W END OF LA 415
H.013891
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W BATON ROUGE I-10 450-08 NHPP 60 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
3-DESIGN/DEVELOPMENT
IBERVILLE I-10 450-07 NHPP 40 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
PAVEMENT MARKING REPLACEMENTHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: LA 415 TO RAMAH (RPMS)
H.012067
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W BATON ROUGE LA 76 013-01 STPFLEX 1,352 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTWINDMANN, ANDREW Remrks:
Typ Imp:
Project:Prj Mgr:
LA 76: NO NAME STREAM BRIDGE
H.012394
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W BATON ROUGE LA 415 225-01 STPFLEX 1,600 PRESERVATION - NON-INTERSTATEON STP SYSTEM
1-PLANNING/ENVIRONMENTAL
THIN OVERLAYGARY, VERTIE Remrks:
Typ Imp:
Project:Prj Mgr:
LA 415: CSLM 1.67 TO LA 620
Page 2 - 104 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.008469
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W CARROLL LA 835 862-22 STPFLEX 3,551 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
NEW BRIDGEBALLMER, SARAH Remrks:
Typ Imp:862-22-0006
Project:Prj Mgr:
LA 835: BOEUF RIVER BRIDGE NEAR CONCORD
W CARROLL
H.010393
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W CARROLL LA 582 333-02 STPFLEX 3,000 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
STABILIZED BASE & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 582: JCT LA 17 TO EAST CARROLL LINE
H.012491
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W CARROLL LA 17 051-08 RTP 114 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTW CARROLL LA 17 051-08 LOCAL 66 RECREATIONAL TRAILS PROGRAM
CONSTRUCTION OF A 3,286' LONG BY 6' WIDE PED-BIKE TRAILNUNES, BRIAN Remrks:
Typ Imp:DCRT IS THE PROJECT MANAGER
Project:Prj Mgr:
OAK GROVE RECREATIONAL TRAIL
H.012780
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W CARROLL LA 2 037-03 STPFLEX 313 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
3-DESIGN/DEVELOPMENT
DRAINAGE IMPROVEMENTGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 2: DRAINAGE IMPROVEMENTS
H.013081
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W CARROLL 000-62 FBROFF 593 PRESERVATION - BRIDGE (OFFSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENT NO NEW ALIGNMENTOSTUNO, BARBARA Remrks:
Typ Imp:
Project:Prj Mgr:
ROUNDHILL ROAD OVER LITTLE COLEWA BAYOU
H.011576
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W FELICIANA LA 965 863-06 STP<5K 1,600 PRESERVATION - NON-INTERSTATENFA
3-DESIGN/DEVELOPMENT
STABILIZE & OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:NFA AS MATCH
Project:Prj Mgr:
LA 965: LA 966 TO LA 10
W FELICIANA
H.012498
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W FELICIANA 000-63 RTP 114 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTW FELICIANA 000-63 LOCAL 63 RECREATIONAL TRAILS PROGRAM
CONSTRUCTION OF A TRAILHEAD AND 3.2 MILES OF BIKE TRAILNUNES, BRIAN Remrks:
Typ Imp:DCRT IS THE PROJECT MANAGER
Project:Prj Mgr:
ROSEDOWN BRANCH TRAIL-W FELICIANA PARISH
H.012505
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W FELICIANA LA 10 061-04 RTP 114 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTW FELICIANA LA 10 061-04 LOCAL 39 RECREATIONAL TRAILS PROGRAM
CONSTRUCTION OF TWO TRAILHEADS AND 6300' OF PED/BIKE TRAILNUNES, BRIAN Remrks:
Typ Imp:DCRT IS THE PROJECT MANAGER
Project:Prj Mgr:
TOWN CENTER BRANCH TRAIL
Page 2 - 105 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.012518
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W FELICIANA 000-63 RTP 121 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENT
RESTORE 2.7 MILES OF ATV TRAILNUNES, BRIAN Remrks:
Typ Imp:DCRT IS THE PROJECT MANAGER
Project:Prj Mgr:
TUNICA HILLS WMA YEAR ROUND TRAM TRAIL
H.012527
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W FELICIANA 000-63 HSIPPEN 929 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT
THERMOPLASTIC STRIPING AND SIGNSRIGGS, LAURA Remrks:
Typ Imp:
Project:Prj Mgr:
LOCAL ROAD SAFETY UPGRADES (W FELICIANA)
H.000382
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WINN US 71 009-04 STPFLEX 3,441 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
NATCHITOCHES US 71 009-05 STPFLEX 5,709 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTBUCCI, MARK Remrks:
Typ Imp:009-04-0010
Project:Prj Mgr:
US 71: BRIDGES NEAR ST. MAURICE
WINN
H.001711
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WINN LA 126 091-05 STPFLEX 3,023 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
NEW BRIDGESYANG, LI Remrks:
Typ Imp:091-05-0014;2 BRIDGES
Project:Prj Mgr:
SALINE BAYOU RELIEF & MILL CR. BRS.
H.010356
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WINN LA 126 091-07 STPFLEX 2,733 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
CTB AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 126: JCT LA 34 - NW JCT LA 499
H.012157
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WINN LA 1228 864-04 STPFLEX 1,200 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
3-DESIGN/DEVELOPMENT
REPLACE CROSS DRAINS AND RAISE ROADWAY TO PREVENT FLOODINGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1228:CROSS DRAIN REPLACEMENT (WINN)
H.012951
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WINN LA 126 091-08 STPFLEX 4,260 PRESERVATION - NON-INTERSTATEON STP SYSTEM
3-DESIGN/DEVELOPMENT
MILL, IN-PLACE CEMENTED BASE, OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 126: LA 1237 TO CALDWELL P/L
H.013820
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WINN LA 501 093-01 STPFLEX 300 PRESERVATION - BRIDGE (ONSYSTEM)
3-DESIGN/DEVELOPMENT
BRIDGE REPLACEMENTPATTON, HEATHER Remrks:
Typ Imp:
Project:Prj Mgr:
LA 501: IRON BRANCH BRIDGE
H.009153
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WINN US 84 022-02 NFI 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTALWINN US 84 022-03 NFI 0 DEMO / HIGH PRIORITY
MAJOR WIDENINGMASTIN, CATHERINE Remrks:
Typ Imp:STBONDS AS MATCH; $1.5M IN CLOC PRIORITY 1 AVAILABLE
Project:Prj Mgr:
US HWY 84 IMPROVEMENTS
Page 2 - 106 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.012047
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WINN US 167 023-05 NHPP 2,822 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
BRIDGE REPLACEMENTMISTICH, BRADLEY Remrks:
Typ Imp:
Project:Prj Mgr:
US167: BIG CREEK BRIDGE
H.012562
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
WINN LA 1232 864-06 STPFLEX 1,228 PRESERVATION - BRIDGE (ONSYSTEM)
1-PLANNING/ENVIRONMENTAL
WINN LA 1232 864-06 STPFLEX 1,251 PRESERVATION - BRIDGE (ONSYSTEM)
WINN LA 1232 864-06 STPFLEX 1,251 PRESERVATION - BRIDGE (ONSYSTEM)
WINN LA 1232 864-06 STPFLEX 1,644 PRESERVATION - BRIDGE (ONSYSTEM)
WINN LA 1231-1 864-08 STPFLEX 1,377 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTSMISTICH, BRADLEY Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1232, LA 1231-1: BRIDGES
H.009186
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 02 000-92 STPFLEX 2,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
3-DESIGN/DEVELOPMENT
PLASTIC PAVEMENT STRIPING AND RAVISED PAVEMENT MARKERSHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: PAVEMENT MARKING REPLACEMENT X
DISTRICT 02
H.005158
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 02 000-92 DEMO 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
UPRGRADING US 90 FOR FUTURE I-49 SOUTHLANDRY, COREY Remrks:
Typ Imp:700-92-0011; EIS
Project:Prj Mgr:
FUTURE I-49 SOUTH (RACELAND TO WESTBANK
H.005168
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 02 000-92 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
EISGOODELL, DEAN Remrks:
Typ Imp:STATE & RR EACH PUTTING UP 10% OF MATCH FOR DEMO
Project:Prj Mgr:
NEW ORLEANS RAIL GATEWAY EIS
H.009731
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 02 000-92 NFI 4,427 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL
FLEET CONVERSION TO CNGBROWN, JEFF Remrks:
Typ Imp:
Project:Prj Mgr:
L/CNG FUEL FLEETS DISTRICT 02
H.012663
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 02 000-92 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
1-PLANNING/ENVIRONMENTAL
TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 02H TRAFFIC CONTROL UPGRADE Y3
Page 2 - 107 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.012664
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 02 000-92 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
1-PLANNING/ENVIRONMENTAL
TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 02BC TRAFFIC CONTROL UPGRADE Y2
H.012680
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 02 000-92 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
1-PLANNING/ENVIRONMENTAL
TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 02BC TRAFFIC CONTROL UPGRADE Y3
H.013822
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 03 000-93 HSIPPEN 2,920 SAFETY 3-DESIGN/DEVELOPMENT
SAFETY IMPROVEMENT PROJECT TO INSTALL RUMBLESTRIPSFRUGE, NICHOLAS Remrks:
Typ Imp:
Project:Prj Mgr:
DIST. 03 RUMBLESTRIPS (NORTH)
DISTRICT 03
H.013823
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 03 000-93 HSIP 2,470 SAFETY 3-DESIGN/DEVELOPMENT
SAFETY IMPROVEMENT PROJECT TO INSTALL RUMBLESTRIPSFRUGE, NICHOLAS Remrks:
Typ Imp:
Project:Prj Mgr:
DIST. 03 RUMBLESTRIPS (SOUTH)
H.009732
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 03 000-93 NFI 3,712 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL
FLEET CONVERSION TO CNGBROWN, JEFF Remrks:
Typ Imp:
Project:Prj Mgr:
L/CNG FUEL FLEETS DISTRICT 03
H.012644
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 03 000-93 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
1-PLANNING/ENVIRONMENTAL
TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 03 TRAFFIC CONTROL UPGRADE Y3
H.009189
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 04 000-94 STPFLEX 2,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
3-DESIGN/DEVELOPMENT
PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERSHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-20: PAVEMENT MARKING REPLACEMENT X
DISTRICT 04
H.012643
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 04 000-94 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
3-DESIGN/DEVELOPMENT
TRAFFIC SIGNALSFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 04 FLASHING YELLOW ARROW PART 2
Page 2 - 108 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.012666
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 04 000-94 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
3-DESIGN/DEVELOPMENT
TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 04 FLASHING YELLOW ARROW PART 3
H.009733
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 04 000-94 NFI 5,872 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL
FLEET CONVERSION TO CNGBROWN, JEFF Remrks:
Typ Imp:
Project:Prj Mgr:
L/CNG FUEL FLEETS DISTRICT 04
H.009191
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 05 000-95 STPFLEX 2,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
3-DESIGN/DEVELOPMENT
PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERSHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-20: PAVEMENT MARKING REPLACEMENT XI
DISTRICT 05
H.009734
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 05 000-95 NFI 3,269 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL
FLEET CONVERSION TO CNGBROWN, JEFF Remrks:
Typ Imp:
Project:Prj Mgr:
L/CNG FUEL FLEETS DISTRICT 05
H.012642
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 05 000-95 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
1-PLANNING/ENVIRONMENTAL
TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 05 TRAFFIC CONTROL UPGRADE Y3
H.012668
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 05 000-95 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
1-PLANNING/ENVIRONMENTAL
TRAFFIC SIGNAL UPGRADEFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 05 TRAFFIC CONTROL UPGRADE Y2
H.009056
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 07 000-97 NFI 1,500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
3-DESIGN/DEVELOPMENT
PLASTIC PAVEMENT STIPING AND RAISED PAVEMENT MARKERSHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-210: PAVEMENT MARKER REPLACEMENT II
DISTRICT 07
H.009193
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 07 000-97 STPFLEX 2,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
3-DESIGN/DEVELOPMENT
PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERSHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: PAVEMENT MARKING REPLACEMENT XI
Page 2 - 109 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.009735
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 07 000-97 NFI 2,326 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL
FLEET CONVERSION TO CNGBROWN, JEFF Remrks:
Typ Imp:
Project:Prj Mgr:
L/CNG FUEL FLEETS DISTRICT 07
H.012467
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 07 000-97 STPFLEX 1,650 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
1-PLANNING/ENVIRONMENTAL
TRAFFIC SIGNAL IMPROVEMENTSFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 07 TRAFFIC CONTROL UPGRADE I
H.013826
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 07 000-97 0 SAFETY 0-FEASIBILITY/SCOPING
IDENTIFIY POTENTIAL SAFETY IMPROVEMENT PROJECTS IN D07DEVILLE, JESSICA Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 07 SAFETY INVESTMENT PLAN
H.012486
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 08 000-98 STPFLEX 1,650 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
3-DESIGN/DEVELOPMENT
TRAFFIC SIGNAL UPGRADEFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 08 FLASHING YELLOW ARROW PART 1
DISTRICT 08
H.009194
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 08 000-98 NFI 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
1-PLANNING/ENVIRONMENTAL
PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERSHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-49: PAVEMENT MARKING REPL. VIII
H.009736
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 08 000-98 NFI 2,848 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL
FLEET CONVERSION TO CNGBROWN, JEFF Remrks:
Typ Imp:
Project:Prj Mgr:
L/CNG FUEL FLEETS DISTRICT 08
H.011960
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 08 000-98 STPFLEX 409 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
1-PLANNING/ENVIRONMENTAL
UPGRADE OF EXISTING SIGNAL CONTROLLERSFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 08 CONTROLLER UPGRADES
H.012641
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 08 000-98 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
1-PLANNING/ENVIRONMENTAL
TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 08 FLASHING YELLOW ARROW PART 2
Page 2 - 110 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.013264
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 08 000-98 0 SAFETY 0-FEASIBILITY/SCOPING
SAFETY PLAN TO PRIORITIZE POTENTIAL SAFETY PROJECTSDEVILLE, JESSICA Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 08 SAFETY INVESTMENT PLAN
H.009197
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 58 000-91 STPFLEX 500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
3-DESIGN/DEVELOPMENT
PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERSHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-20: PAVEMENT MARKING REPLACEMENT VIII
DISTRICT 58
H.009052
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 58 000-91 STPFLEX 2,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
1-PLANNING/ENVIRONMENTAL
PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERSHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-20: PAVEMENT MARKING REPLACEMENT IX
H.009737
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 58 000-91 NFI 2,125 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL
FLEET CONVERSION TO CNGBROWN, JEFF Remrks:
Typ Imp:
Project:Prj Mgr:
L/CNG FUEL FLEETS DISTRICT 58
H.009199
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 61 000-96 NFI 1,500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
3-DESIGN/DEVELOPMENT
PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERSHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: PAVEMENT MARKING REPLACEMENT XII
DISTRICT 61
H.012465
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 61 000-96 STPFLEX 3,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
3-DESIGN/DEVELOPMENT
TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 61 FLASHING YELLOW ARROW PART 3
H.009738
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 61 000-96 NFI 5,145 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL
FLEET CONVERSION TO CNGBROWN, JEFF Remrks:
Typ Imp:
Project:Prj Mgr:
L/CNG FUEL FLEETS DISTRICT 61
H.012667
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 61 000-96 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
1-PLANNING/ENVIRONMENTAL
TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 61 TRAFFIC CONTROL UPGRADE Y2
Page 2 - 111 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.012639
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 62 000-90 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
3-DESIGN/DEVELOPMENT
TRAFFIC SIGNAL UPGRADEFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 62 FLASHING YELLOW ARROW
DISTRICT 62
H.009739
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 62 000-90 NFI 5,747 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL
FLEET CONVERSION TO CNGBROWN, JEFF Remrks:
Typ Imp:
Project:Prj Mgr:
L/CNG FUEL FLEETS DISTRICT 62
H.012466
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 62 000-90 STPFLEX 1,650 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
1-PLANNING/ENVIRONMENTAL
TRAFFIC SIGNAL UPGRADEFILLASTRE, ANDRE Remrks:
Typ Imp:
Project:Prj Mgr:
DISTRICT 62 TRAFFIC CONTROL UPGRADE I
H.009884
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
STATEWIDE 000-99 STPFLEX 250 RAILROADS 3-DESIGN/DEVELOPMENT
RELOCATING LED CROSSBUCK ASSEMBLIESSHREWSBERRY,BILL Remrks:
Typ Imp:
Project:Prj Mgr:
NOGC (STATEWIDE)
STATEWIDE
H.012832
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
STATEWIDE 000-99 STPFLEX 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
3-DESIGN/DEVELOPMENT
ADVANCED VEHICLE SYSTEM RESEARCH, DESIGN, AND IMPLEMENTATIKIMBENG, LUCY Remrks:
Typ Imp:
Project:Prj Mgr:
AV/CV TECHNOLOGY DEPLOYMENT PHASE 1
H.013164
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
STATEWIDE 000-99 STPFLEX 5,000 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
3-DESIGN/DEVELOPMENT
ACQUIRE A NEW TOLL SYSTEMRUNDELL, SCOTT Remrks:
Typ Imp:
Project:Prj Mgr:
STATEWIDE TOLL SYSTEM
H.013508
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
STATEWIDE 000-99 RTP 202 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTSTATEWIDE 000-99 LOCAL 43 RECREATIONAL TRAILS PROGRAM
CONST. OF 8 FLOATING DOCKS AND IMPROVEMENTS TO 6 TRAILHEADSNUNES, BRIAN Remrks:
Typ Imp:PROJECT SPONSOR: TECHE PROJECT WILL PROVIDE THE LOCAL MATC
Project:Prj Mgr:
BAYOU TECHE NATIONAL PADDLE TRAIL
H.011247
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
STATEWIDE 000-99 0 OTHER / MISCELLANEOUS 0-FEASIBILITY/SCOPING
UPDATE THE STATE GIS DATABASE FOR HISTORIC SITESARDOIN, NOEL Remrks:
Typ Imp:
Project:Prj Mgr:
UPDATES TO GIS HISTORIC SITES DATABASE
Page 2 - 112 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
H.012485
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
STATEWIDE 000-99 0 PRESERVATION - BRIDGE (ONSYSTEM)
0-FEASIBILITY/SCOPING
NFA BRIDGE RATINGFENG, DANA Remrks:
Typ Imp:
Project:Prj Mgr:
OFF-SYSTEM BRIDGE RATING
H.013513
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
STATEWIDE 000-99 0 RECREATIONAL TRAILS PROGRAM 0-FEASIBILITY/SCOPING
FEDERALLY REQUIRED RECREATIONAL TRAILS PLANNUNES, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
2018 STATEWIDE RECREATIONAL TRAILS PLAN
L.000001
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- STPFLEX 3,100 INTERMODAL CONNECTOR STAGES 4, 3, 2, 1, 0 - NHPP 6,200 INTERMODAL CONNECTOR
Not assigned Remrks:
Typ Imp:
Project:Prj Mgr:
INTERMODAL CONNECTORS PROGRAM
L-PROJECTS
L.000002
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- NHPP 1,000 PRESERVATION - INTERSTATE STAGES 4, 3, 2, 1, 0
SURFACE IMP, PM, REPAIR FOR PAVEMENT/EMBANKMENTNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
INTERSTATE PAVEMENT PREVENTIVE MAINT
L.000003
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- STPFLEX 2,000 PRESERVATION - NON-INTERSTATEON NHS & STP SYSTEM
STAGES 4, 3, 2, 1, 0
PREVENTIVE MAINTENANCE/REHABILITATIONNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
PREVENTIVE MAINTENANCE NON-INTERSTATE
L.000004
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- NFA 2,500 PRESERVATION - NON-INTERSTATENFA
STAGES 4, 3, 2, 1, 0
PREVENTIVE MAINTENANCE/REHABILITATIONNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
PREVENTIVE MAINT NON-INTERSTATE (NFA)
L.000005
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- STPFLEX 4,400 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
STAGES 4, 3, 2, 1, 0
- STCASH 6,000 PRESERVATION - ROAD PREVENTIVEMAINTENANCE
Not assigned Remrks:
Typ Imp:
Project:Prj Mgr:
ROAD PREVENTIVE MAINTENANCE
L.000007
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- STPFLEX 250 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
STAGES 4, 3, 2, 1, 0
- STCASH 500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT
Not assigned Remrks:
Typ Imp:
Project:Prj Mgr:
TRANSPORTATION SYSTEMS MANAGEMENT
Page 2 - 113 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
L.000008
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- STP>200K 1,000 URBAN SYSTEMS STAGES 4, 3, 2, 1, 0 - STP<200K 1,000 URBAN SYSTEMS
SELECTED BY MPO'SNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
URBAN SYSTEM PROJECTS
L.000009
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- STBONDS 1,000 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0
AS APPROVED BY LEGISLATURENot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
MISC BOND PROJECTS
L.000010
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- REIMB 5,000 PRESERVATION - BRIDGE (ONSYSTEM)
STAGES 4, 3, 2, 1, 0
- NHPP 1,000 PRESERVATION - BRIDGE (ONSYSTEM)
- STPFLEX 1,000 PRESERVATION - BRIDGE (ONSYSTEM)
- STCASH 1,000 PRESERVATION - BRIDGE (ONSYSTEM)
REIMBURSABLE AND NON-REIMBURSABLENot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
URGENT BRIDGE REPAIR/REPLACEMENT
L.000011
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- NHPP 1,500 PRESERVATION - BRIDGE (ONSYSTEM)
STAGES 4, 3, 2, 1, 0
- STPFLEX 1,500 PRESERVATION - BRIDGE (ONSYSTEM)
- STCASH 1 PRESERVATION - BRIDGE (ONSYSTEM)
MAINTENANCENot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
BRIDGE PREVENTIVE MAINTENANCE
L.000012
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- STPFLEX 1,000 PRESERVATION - BRIDGE (ONSYSTEM)
STAGES 4, 3, 2, 1, 0
- STCASH 1 PRESERVATION - BRIDGE (ONSYSTEM)
MISC SITESNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
BRIDGE PAINTING PROGRAM
L.000013
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- STCASH 500 OPER EFFICIENCY/MOTORISTASSISTANCE - MOVABLE BRIDGEREHABILITATION
STAGES 4, 3, 2, 1, 0
Not assigned Remrks:
Typ Imp:
Project:Prj Mgr:
MOVABLE BRIDGE PREVENTIVE MAINTENANCE
L.000014
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- STCASH 500 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0 - STBONDS 500 OTHER / MISCELLANEOUS
IN CONJUNCTION WITH DEDNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
MISC ECONOMIC DEVELOPMENT INITIATIVES
Page 2 - 114 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
L.000015
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- OTHER 500 OPER EFFICIENCY/MOTORISTASSISTANCE - FERRY PROJECTS
STAGES 4, 3, 2, 1, 0
- STCASH 500 OPER EFFICIENCY/MOTORISTASSISTANCE - FERRY PROJECTS
REHABILITATION/REPAIRNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
MISC FERRY PROJECTS
L.000016
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- HSIP 300 SAFETY STAGES 4, 3, 2, 1, 0 - STPFLEX 200 SAFETY - STCASH 100 SAFETY
MISC PROJECTSNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
FEDERAL SAFETY PROGRAMS
L.000017
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- NHPP 300 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
STAGES 4, 3, 2, 1, 0
- DEMO 300 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
- CM 400 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS
ENGINEERING, CONSTRUCTION, MAINTENANCE, OPERATIONSNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
MISC ITS SYSTEMS
L.000018
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- NHPP 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - INTERSTATE LIGHTING
STAGES 4, 3, 2, 1, 0
- STCASH 100 OPER EFFICIENCY/MOTORISTASSISTANCE - INTERSTATE LIGHTING
IN ACCORDANCE WITH MAINTENANCE AGREEMENTSNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
INTERSTATE LIGHTING PROGRAM
L.000019
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- STBONDS 100 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0
OVERLAY/REHABILITATIONNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
STATE PARK ROADS
L.000020
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- STPFLEX 500 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
STAGES 4, 3, 2, 1, 0
- STCASH 250 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
TO ALLEVIATE FLOODINGNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
MISC DRAINAGE PROJECTS
L.000021
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- FLH 500 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0
FEDERAL LANDS HIGHWAYS, ETC.Not assigned Remrks:
Typ Imp:
Project:Prj Mgr:
MISC FEDERAL PROJECTS/PROGRAMS
Page 2 - 115 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
L.000022
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- RAIL HE 3,000 RAILROADS STAGES 4, 3, 2, 1, 0 - RAIL PD 3,000 RAILROADS - STPFLEX 2,000 RAILROADS - STCASH 200 RAILROADS
FEDERAL RAILROAD CROSSING IMPROVEMENTS PROGRAMNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
RAILROAD CROSSING IMPROVEMENTS
L.000025
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- TOLLS 1,000 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0
ORLEANS AND JEFFERSON PARISHESNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
TOLL FUNDED PROJECTS
L.000026
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- STCASH 1,000 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0 - TIME 1,000 OTHER / MISCELLANEOUS
Not assigned Remrks:
Typ Imp:
Project:Prj Mgr:
WETLAND MITIGATION BANK
L.000027
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- ER 100 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0
EMERGENCY RELIEFNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
EMERGENCY RELIEF PROVIDED BY CONGRESS
L.000029
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- TAPFLEX 1,000 ENHANCEMENTS STAGES 4, 3, 2, 1, 0
MISC PROJECTSNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
FEDERAL ENHANCEMENT PROGRAM
L.000031
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- DEMO 10,000 DEMO / HIGH PRIORITY STAGES 4, 3, 2, 1, 0
AS DEFINED BY FEDERAL GOVERNMENTNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
DEMO/HI-PRI/OTHER FEDERAL PROGRAMS
L.000032
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- NHPP 500 OPER EFFICIENCY/MOTORISTASSISTANCE - REST AREAS
STAGES 4, 3, 2, 1, 0
FACILITY REHABILITATIONNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
REST AREA REHABILITATION
L.000033
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- NHPP 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
STAGES 4, 3, 2, 1, 0
- STPFLEX 500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
Not assigned Remrks:
Typ Imp:
Project:Prj Mgr:
MISC SIGNS, STRIPING, SIGNALS
Page 2 - 116 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
L.000034
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- STCASH 2,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
STAGES 4, 3, 2, 1, 0
Not assigned Remrks:
Typ Imp:
Project:Prj Mgr:
INSTALL RAISED PAVEMENT MARKERS
L.000035
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- FBROFF 1,000 PRESERVATION - BRIDGE (OFFSYSTEM)
STAGES 4, 3, 2, 1, 0
- STCASH 200 PRESERVATION - BRIDGE (OFFSYSTEM)
BRIDGE REPLACEMENTS/INSPECTIONSNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
MISC FEDERAL OFF-SYSTEM BRIDGES
L.000036
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- NHPP 1,900 OPER EFFICIENCY/MOTORISTASSISTANCE - WEIGH STATIONS
STAGES 4, 3, 2, 1, 0
MISC SITES STATEWIDENot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
WEIGH STATION REHABILITATION/UPGRADE
L.000037
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- NHPP 2,000 SAFETY STAGES 4, 3, 2, 1, 0
RUMBLE STRIPSNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
HIGHWAY SAFETY IMPROVEMENTS
L.000039
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- STPFLEX 50 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0
CONSTRUCT TEST SECTIONSNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
ACCELERATED LOADING FACILITY
L.000040
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- STPFLEX 3,000 PRESERVATION - BRIDGE (ONSYSTEM)
STAGES 4, 3, 2, 1, 0
- STCASH 600 PRESERVATION - BRIDGE (ONSYSTEM)
INSPECTIONS, RATINGS, LOAD FACTORSNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
FEDERAL BRIDGE INSPECTION PROGRAMS
L.000041
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- CM 1,000 URBAN SYSTEMS STAGES 4, 3, 2, 1, 0
NON-ATTAINMENT AREASNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
CONGESTION MITIGATION PROJECTS
L.000042
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- CM 500 URBAN SYSTEMS STAGES 4, 3, 2, 1, 0
IN LAKE CHARLES AS APPROVED BY FHWANot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
MISC CONGESTION MITIGATION PROJ - LKC
L.000043
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- CM 1,000 URBAN SYSTEMS STAGES 4, 3, 2, 1, 0
IN BATON ROUGE AS APPROVED BY FHWANot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
MISC CONGESTION MITIGATION PROJ - BTR
Page 2 - 117 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
L.000068
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- STPFLEX 2,500 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
STAGES 4, 3, 2, 1, 0
- STPFLEX 2,500 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
- STPFLEX 8,300 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
- STPFLEX 8,100 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
Not assigned Remrks:
Typ Imp:
Project:Prj Mgr:
ACCESS MANAGEMENT PROJECTS
L.000069
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- STCASH 1,000 ROAD TRANSFER STAGES 4, 3, 2, 1, 0 - STPFLEX 1,000 ROAD TRANSFER
Not assigned Remrks:
Typ Imp:
Project:Prj Mgr:
ROAD TRANSFER PROGRAM
L.000093
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- CM 5,500 CONGESTION MITIGATION STAGES 4, 3, 2, 1, 0
Not assigned Remrks:
Typ Imp:
Project:Prj Mgr:
STATEWIDE CONGESTION MITIGATION
L.000094
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- CM 100 URBAN SYSTEMS STAGES 4, 3, 2, 1, 0 - STP<200K 100 URBAN SYSTEMS - STPFLEX 100 URBAN SYSTEMS
Not assigned Remrks:
Typ Imp:
Project:Prj Mgr:
URBAN TRANSIT(INCL TRANSFER TO AGENCIES)
L.000097
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- STPFLEX 1,500 OPER EFFICIENCY/MOTORISTASSISTANCE - AMERICANS WITHDISABILITIES ACT
STAGES 4, 3, 2, 1, 0
- NHPP 1,500 OPER EFFICIENCY/MOTORISTASSISTANCE - AMERICANS WITHDISABILITIES ACT
ADA PROGRAMNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
ADA PROGRAM
L.000024
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- HSIP 1,000 SAFETY STAGES 2, 1, 0 - STCASH 500 SAFETY
HANDLED THROUGH OPERATIONS BUDGETNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
SOFT SIDE SAFETY
L.000038
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- SPR MAND 7,000 OTHER / MISCELLANEOUS STAGES 2, 1, 0 - SPR OPT 7,000 OTHER / MISCELLANEOUS
HANDLED THROUGH OPERATING BUDGETNot assigned Remrks:
Typ Imp:
Project:Prj Mgr:
PLANNING, TRAINING AND RESEARCH
Page 2 - 118 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020PROJECTS IN DEVELOPMENT
L.000023
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
- NHPP 400 OTHER / MISCELLANEOUS STAGES 1, 0 - STPFLEX 300 OTHER / MISCELLANEOUS - STCASH 300 OTHER / MISCELLANEOUS
Not assigned Remrks:
Typ Imp:
Project:Prj Mgr:
SCOPING AND ENVIRONMENTAL STUDIES
Page 2 - 119 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
STAGE 2 – WAITING FOR FUNDING
This is a list of all projects in the program that can be funded
if additional revenues become available.
Projects in this list may also be funded in future fiscal years
with existing revenue sources if identified through the project
selection process as a high priority relative to other candidate
projects within the same category.
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020WAITING FOR FUNDING
H.002729
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA LA 98 389-01 NFI 19,734 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDINGACADIA I-10 450-04 0 DEMO / HIGH PRIORITY
NEW BRIDGE. NEW CONCRETE PAVEMENTYANG, LI Remrks:
Typ Imp:389-01-0011
Project:Prj Mgr:
GRAND PRAIRIE HWY INTR.&FRONTAGE RD
ACADIA
H.003756
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA 000-01 DEMO 0 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING
FED EARMARK FOR STUDYNGUYEN, WAYNE Remrks:
Typ Imp:700-01-0112;$993.500(IMD)&$110.000C.O.AVAILABLE
Project:Prj Mgr:
NEW INTERCHANGE LA 98 RAYNE
H.010885
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ACADIA LA 91 801-09 0 PRESERVATION - BRIDGE (ONSYSTEM)
2-WAITING FOR FUNDING
REPLACEMENT OF PONTOON BRIDGEBRAUNER, KURT Remrks:
Typ Imp:CONSTRUCTION FUNDS WILL BE STATE BONDS
Project:Prj Mgr:
LA 91: BAYOU PLAQUEMINE BRULE BR REPLACE
H.003790
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION LA 930 803-14 NFI 5,300 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
WIDEN LA 930 & ADD OPEN DITCHESMUSA, ELNUR Remrks:
Typ Imp:803-14-0005
Project:Prj Mgr:
LA 930: CAUSEY RD TO LA 42
ASCENSION
H.009266
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION I-10 450-11 NFI 46,700 CORRIDOR 2-WAITING FOR FUNDING
WIDEN INTERSTATE TO 3 LANES EACH DIRECTIONPAINE, PEGGY JO Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: LA 73 TO LA 30
H.009276
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASCENSION I-10 450-11 NFI 50,300 CORRIDOR 2-WAITING FOR FUNDING
WIDEN INTERSTATE TO 3 LANES EACH DIRECTIONPAINE, PEGGY JO Remrks:
Typ Imp:LHIP USED FOR ENG
Project:Prj Mgr:
I-10: LA 30 TO LA 22
H.010571
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ASSUMPTION LA 70 232-01 NFI 140,000 CAPACITY 2-WAITING FOR FUNDING
STUDY FOR BYPASS ROAD FOR LA 70-PIERRE PART TO NEAR LA 69JONES, MATTHEW Remrks:
Typ Imp:
Project:Prj Mgr:
LA 70 BYPASS
ASSUMPTION
H.009493
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
AVOYELLES LA 107 147-03 NFI 2,322 PRESERVATION - NON-INTERSTATEON STP SYSTEM
2-WAITING FOR FUNDING
CTB AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 107: LA 1179 - LA 1181
AVOYELLES
H.009741
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
AVOYELLES 000-05 NFI 338 ENHANCEMENTS 2-WAITING FOR FUNDING
SIDEWALK W/ LIGHTING, LANDSCAPE & SUBSURFACE DRAINAGENUNES, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
MARKSVILLE SIDEWALK IMPROVEMENTS
Page 3 - 1 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020WAITING FOR FUNDING
H.003251
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER I-20 451-02 NFI 61,140 PRESERVATION - INTERSTATE 2-WAITING FOR FUNDINGBOSSIER I-20 451-02 NFI 69,390 PRESERVATION - BRIDGE (ON
SYSTEM)
BOSSIER I-20 451-02 NFI 26,360 CAPACITY
WIDEN INTERSTATE TO 3 LANES EACH DIRECTIONOLIVIER, NICHOLAS Remrks:
Typ Imp:451-02-0078
Project:Prj Mgr:
I-20 (HAMILTON RD TO AIRLINE DR)
BOSSIER
H.003855
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER 000-08 NFI 27,900 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING
ROADWAY EXT (WINFIELD RD) STUDYOLIVIER, NICHOLAS Remrks:
Typ Imp:700-08-0130;STAGE 0
Project:Prj Mgr:
BOSSIER PAR CONG RELIEF WINFIELD RD
H.003857
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER 000-08 0 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING
ROAD EXTENSION (ENGINEERING) STUDYOLIVIER, NICHOLAS Remrks:
Typ Imp:700-08-0132
Project:Prj Mgr:
WAFER ROAD EXTENSION
H.005184
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER 000-08 DEMO 0 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDINGCADDO 000-09 0 DEMO / HIGH PRIORITY
ENVIRONMENTAL IMPACT STATEMENTMOSS, SARAH Remrks:
Typ Imp:700-94-0003;NCPD FUNDS
Project:Prj Mgr:
HIGH PRIORITY CORRIDOR NO. 18
H.009522
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER LA 3105 808-07 NFI 9,100 RAILROADS - GRADE SEPARATION 2-WAITING FOR FUNDINGBOSSIER I-20 451-02 NFI 300 RAILROADS - GRADE SEPARATION
GRADE SEPARATE EXISTING AT-GRADE CROSSINGRAY, JARED Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3105:UNDERPASS@KCS S OF I-20(BOSSIER)
H.011319
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
BOSSIER I-20 451-02 NFI 94,907 PRESERVATION - INTERSTATE 2-WAITING FOR FUNDINGBOSSIER I-20 451-02 NFI 40,919 CAPACITY BOSSIER I-20 451-02 NFI 19,977 PRESERVATION - BRIDGE (ON
SYSTEM)
INTERSTATE WIDENINGMOSS, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
I-20: AIRLINE DR. TO I-220
H.001618
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO LA 538 078-02 NFI 5,604 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDINGCADDO LA 173 094-01 0 OTHER / MISCELLANEOUS
RECONST.W/GEOMETRIC IMP NEED STAGE 0KENDRICK, BRIAN Remrks:
Typ Imp:078-02-0019;NEED FUNDS
Project:Prj Mgr:
JCT LA 173 - MIDDLE SCHOOL
CADDO
H.001724
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO LA 173 094-01 NFI 25,000 CAPACITY 2-WAITING FOR FUNDING
4 LANING (CONTINGENT ON BOND FUNDS)MCMILLAN, RYAN Remrks:
Typ Imp:094-01-0029;ORIGINATED BY DEPT OF ECON DEV.
Project:Prj Mgr:
SHREVEPORT-BLANCHARD HWY.
Page 3 - 2 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020WAITING FOR FUNDING
H.001725
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO LA 173 094-01 NFI 10,000 CAPACITY 2-WAITING FOR FUNDING
WIDENINGMCMILLAN, RYAN Remrks:
Typ Imp:094-01-0032
Project:Prj Mgr:
JCT. LA 3094 - JCT. I-220
H.006447
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO 000-09 0 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING
DESIGN AND ACQUIRE R/WBRIGNAC, CHRISTINA Remrks:
Typ Imp:736-99-1032
Project:Prj Mgr:
I-69: SIU 14 JCT I-20 TO US 82
H.009744
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO 000-09 NFI 438 ENHANCEMENTS 2-WAITING FOR FUNDING
MULTI-USE TRAIL AND RELATED WORKNUNES, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
OIL CITY MULTI-USE TRAIL, PHASE 2
H.011448
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CADDO 000-09 NFI 19,000 OPER EFFICIENCY/MOTORISTASSISTANCE - REST AREAS
2-WAITING FOR FUNDING
DESIGN AND CONSTRUCT NEW REST AREAGUINN, SCOTT Remrks:
Typ Imp:
Project:Prj Mgr:
IDA SAFETY REST AREA
H.009521
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU LA 397 193-31 NFI 10,200 RAILROADS - GRADE SEPARATION 2-WAITING FOR FUNDING
GRADE SEPARATE EXISTING AT-GRADE CROSSINGRAY, JARED Remrks:
Typ Imp:
Project:Prj Mgr:
LA 397: NEW BRIDGE AT UPRR
CALCASIEU
H.009750
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CALCASIEU 000-10 NFI 145 ENHANCEMENTS 2-WAITING FOR FUNDING
SIDEWALKS, SUBSURFACE DRAINAGE, & RELATED WORKMEEK, STEPHEN Remrks:
Typ Imp:ROW IS 80/20, CONSTRUCTION 95/5
Project:Prj Mgr:
TOPSY ROAD SIDEWALK
H.000762
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CATAHOULA US 84 022-06 NFI 6,000 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDINGCATAHOULA US 84 022-06 NFI 6,000 CAPACITY
WIDEN TO 4 LANESMOORE, DARRELL Remrks:
Typ Imp:022-06-0038
Project:Prj Mgr:
JCT LA 28 - JCT LA 3037
CATAHOULA
H.011029
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CATAHOULA LA 559 813-29 STPFLEX 0 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDINGCATAHOULA LA 559 346-01 STPFLEX 0 OTHER / MISCELLANEOUS
FEASIBILITY STUDY TO REPLACE DUTY FERRY WITH A BRIDGEWINDMANN, ANDREW Remrks:
Typ Imp:
Project:Prj Mgr:
LA 559: REPLACE DUTY FERRY WITH BRIDGE
H.000770
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CONCORDIA US 84 022-07 0 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
WIDEN TO 4 LANESMOORE, DARRELL Remrks:
Typ Imp:022-07-0053
Project:Prj Mgr:
JCT LA 565 - JCT LA 129
CONCORDIA
Page 3 - 3 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020WAITING FOR FUNDING
H.000771
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
CONCORDIA US 84 022-07 NFI 3,000 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
WIDEN TO 4 LANESMUSA, ELNUR Remrks:
Typ Imp:022-07-0054
Project:Prj Mgr:
LA 129 - US 65 (FERRIDAY)
H.001790
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DESOTO LA 509 105-02 NFI 0 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDINGRED RIVER LA 509 105-03 0 OTHER / MISCELLANEOUS
RECON W/GEOMETRIC IMPROVEMENTSMCMILLAN, RYAN Remrks:
Typ Imp:105-02-0017;$.5 AVAIL. (ORIGINATED BY DED)
Project:Prj Mgr:
INT. PAPER PLANT - LA 1
DESOTO
H.002317
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 408 255-02 LOCAL 10,928 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
NEW 4 LANE DIVIDED CONCRETE HIGHWAY WITH RAISED MEDIANREVIERE, RYAN Remrks:
Typ Imp:GREEN LIGHT PROJECT
Project:Prj Mgr:
LA 408: HOOPER RD (JOOR RD-SULLIVAN RD)
EAST BATON ROUGE
H.002344
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 427 258-01 LOCAL 44,552 CAPACITY 2-WAITING FOR FUNDING
WIDEN TO 4 LANESREVIERE, RYAN Remrks:
Typ Imp:258-01-0033;GREEN LIGHT PROJECT(LET BY CITY); STAGE 0 COMP
Project:Prj Mgr:
LA 427: PERKINS RD (SIEGEN - HIGHLAND)
H.002358
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 3064 258-32 DEMO 14,000 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING
(PHASE 2)(REQ DEMO FUNDS)REVIERE, RYAN Remrks:
Typ Imp:454-01-0068;IM-D $250K FY03.REQ MORE DEMO
Project:Prj Mgr:
ESSEN LANE INTERCHANGE (WB)
H.005403
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 NFI 108,100 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
EXTENSION OF HOOPER ROAD FROM LA 37 TO LA 16MOSS, SARAH Remrks:
Typ Imp:700-99-0527;GEN.OBLIGATION BOND(PR2=$100K & PR5=$900K)
Project:Prj Mgr:
LA408(HOOPER RD EXT)LA37-LA16
H.007970
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 426 817-09 NFI 8,658 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
WIDEN TO 4 LANESREVIERE, RYAN Remrks:
Typ Imp:817-09-0035; INCLUDES I'SECT @ FLANNERY
Project:Prj Mgr:
OLD HAMMOND (BLVD DE PROV-MILL)
H.007974
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 426 817-09 LOCAL 9,681 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
NEW CONC PAVEMENTREVIERE, RYAN Remrks:
Typ Imp:817-09-0042; LET BY CITY. GREEN LIGHT PROJECT
Project:Prj Mgr:
OLD HAMMOND HWY(MILLERVILLE-O'NEAL)
H.008415
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 DEMO 600 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDINGE BATON ROUGE 000-17 OTHER 1,773 OTHER / MISCELLANEOUS
FEDERAL EARMARKUMEOZULU, JOE Remrks:
Typ Imp:DEMO$ & $ FROM SOUTHERN;AUTHORIZED
Project:Prj Mgr:
INFORMATION CENTER @ SOUTHERN UNIVERSIT
Page 3 - 4 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020WAITING FOR FUNDING
H.008732
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 0 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING
EISARDOIN, NOEL Remrks:
Typ Imp:EIS IS DEMO WITH MATCH FROM LOCALS
Project:Prj Mgr:
STUDY OF BATON ROUGE LOOP
H.009300
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 408 255-02 NFI 51,000 CAPACITY 2-WAITING FOR FUNDING
WIDEN TO FOUR LANESMOSS, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
HOOPER ROAD WIDENING (LA 3034 - LA 37)
H.009327
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE I-10 450-10 NFI 10,139 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE
2-WAITING FOR FUNDING
E BATON ROUGE I-110 450-92 NFI 123 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE
W BATON ROUGE I-10 450-08 NFI 4,432 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE
EPOXY BRIDGE DECK OVERLAYTULLIER, DANNY Remrks:
Typ Imp:
Project:Prj Mgr:
I-10/110 EPOXY BR DECK OVERLAY-BTN ROUGE
H.010320
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 42 258-31 NFI 2,400 PRESERVATION - NON-INTERSTATEON STP SYSTEM
2-WAITING FOR FUNDING
E BATON ROUGE LA 42 257-04 NFI 4,100 PRESERVATION - NON-INTERSTATEON STP SYSTEM
PCC PATCHSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 42: JCT. HIGHLAND RD - LA 30
H.011892
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE I-10 450-09 NFI 35,000 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE
2-WAITING FOR FUNDING
CLEAINING & PAINTING BRIDGE APPROACHES AND MAIN SPAN STEELTULLIER, DANNY Remrks:
Typ Imp:
Project:Prj Mgr:
I-10 MISS RIVER BRIDGE CLEAN & PAINT
H.011906
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 408 255-02 NFI 2,000 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDINGE BATON ROUGE LA 37 254-02 NFI 2,000 OTHER / MISCELLANEOUS
ROUNDABOUT AT HOOPER RD AND GREENWELL SPRINGS RDMOSS, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
HOOPER RD: ROUNDABOUT AT LA 37
H.011923
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE LA 408 255-02 NFI 2,000 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDINGE BATON ROUGE LA 3034 255-30 NFI 2,000 OTHER / MISCELLANEOUS
ROUNDABOUT: INTERSECTION IMPROVEMENTMOSS, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
HOOPER RD: ROUNDABOUT AT SULLIVAN RD
H.012232
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
E BATON ROUGE 000-17 STP>200K 5,400 URBAN SYSTEMS 2-WAITING FOR FUNDINGE BATON ROUGE 000-17 LOCAL 2,700 URBAN SYSTEMS
NEW ALIGNMENTBRIGNAC, CHRISTINA Remrks:
Typ Imp:ENTITY WILL PROVIDE MATCH
Project:Prj Mgr:
LA 3064 TO LA 1248 PHASE 2
Page 3 - 5 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020WAITING FOR FUNDING
H.009784
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
FRANKLIN 000-21 TAP<5K 229 ENHANCEMENTS 2-WAITING FOR FUNDINGFRANKLIN 000-21 LOCAL 23 ENHANCEMENTS
SIDEWALKS W/LIGHTING, & RELATED WORKMEEK, STEPHEN Remrks:
Typ Imp:
Project:Prj Mgr:
WINNSBORO: ADAMS&COMMON ST STREETSCAPI
FRANKLIN
H.002893
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
IBERIA US 90 424-04 NFI 21,391 PRESERVATION - BRIDGE (ONSYSTEM)
2-WAITING FOR FUNDING
BRIDGE REPLACEMENTKEMP, KELLY Remrks:
Typ Imp:424-04-0059;EAST AND WEST BOUND LANES
Project:Prj Mgr:
US 90: LA 14 OVERPASS REPLACEMENT
IBERIA
H.002264
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 45 249-90 DEMO 0 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDINGJEFFERSON LA 45 249-90 STPFLEX 6,289 PRESERVATION - BRIDGE (ON
SYSTEM)
JEFFERSON LA 302 826-39 FBROFF 86,521 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPL.(KERNER'S)YANG, LI Remrks:
Typ Imp:249-90-0041;TEA-21 KERNER'S FERRY BRIDGE
Project:Prj Mgr:
BAYOU BARATARIA BRIDGE@JEAN LAFITTE
JEFFERSON
H.002955
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 3139 430-01 NFI 5,000 URBAN SYSTEMS 2-WAITING FOR FUNDING
ACCESS IMPROVEMENTSLEBAS, MELISSA Remrks:
Typ Imp:430-01-0016
Project:Prj Mgr:
EARHART EXPRESSWAY
H.002956
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 3139 430-01 NFI 2,375 URBAN SYSTEMS 2-WAITING FOR FUNDING
RAMP CONNECTOR (EB EARHART - DAKIN)LEBAS, MELISSA Remrks:
Typ Imp:430-01-0020; USE TTF AS MATCH
Project:Prj Mgr:
EARHART AT DAKIN
H.003074
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON I-10 450-15 NFI 100,000 CORRIDOR 2-WAITING FOR FUNDING
MAJOR WIDENING - ADD TRAVEL LANESYANG, LI Remrks:
Typ Imp:450-15-0124; TOLL CREDITS USED AS MATCH FOR PART OF PHASE 5
Project:Prj Mgr:
I 10: WILLIAMS BLVD - VETERANS BLVD
H.004359
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON LA 3154 826-44 STBONDS 7,296 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDINGJEFFERSON LA 3154 826-44 OTHER 2,673 OTHER / MISCELLANEOUS
RELOCATION AND 4-LANINGYANG, LI Remrks:
Typ Imp:826-44-0027
Project:Prj Mgr:
HICKORY (LA 48 - MOUNES)
H.004367
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON 000-26 NFI 125,000 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDINGORLEANS 000-36 0 DEMO / HIGH PRIORITY
ENVIRONMENTAL. LINE & GRADE STUDYYANG, LI Remrks:
Typ Imp:700-26-0242;HP NO.1600 (SEE ALSO 736-92-0003)
Project:Prj Mgr:
LA3139:EARHART EXPRESSWAY EXT TO US 61
Page 3 - 6 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020WAITING FOR FUNDING
H.006513
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON 000-26 DEMO 6,750 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDINGORLEANS 000-36 0 DEMO / HIGH PRIORITY ST CHARLES 000-45 0 DEMO / HIGH PRIORITY
ABANDONED RR R/W ACQ. (HP NO 1600)NGUYEN, WAYNE Remrks:
Typ Imp:737-26-0001;HP=$0.5M. >2OOK=$0.3M IN FY 2001
Project:Prj Mgr:
US 61 CORRIDOR PRESERVATION
H.007214
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON 000-26 NFI 7,400 URBAN SYSTEMS 2-WAITING FOR FUNDING
WIDEN FROM 2 TO 3 LANESLEBAS, MELISSA Remrks:
Typ Imp:742-26-0080;OREGON DR.-BLANCHE DR
Project:Prj Mgr:
EAST AMES BOULEVARD IMPROVEMENTS
H.007223
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON 000-26 NFI 7,100 URBAN SYSTEMS 2-WAITING FOR FUNDING
WIDEN TO 4 LANE URBAD SECT W MEDIANLEBAS, MELISSA Remrks:
Typ Imp:742-26-0090; USE LOCAL AS MATCH
Project:Prj Mgr:
HARVEY BLVD (MANHATTAN - WALL)
H.009087
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON I-10 450-15 NFI 10,000 CORRIDOR 2-WAITING FOR FUNDING
MAJOR WIDENING - ADD TRAVEL LANESNICKEL, TIM Remrks:
Typ Imp:
Project:Prj Mgr:
I-10: LOYOLA DR. TO WILLIAMS BLVD.
H.009794
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON 000-26 NFI 170 ENHANCEMENTS 2-WAITING FOR FUNDINGJEFFERSON US 90-Z 283-09 NFI 75 ENHANCEMENTS JEFFERSON LA 18 063-02 NFI 50 ENHANCEMENTS JEFFERSON LA 18 063-02 NFI 25 ENHANCEMENTS
SIGNING, PAVEMENT MARKINGS, M/U PATH & RELATED WORKNUNES, BRIAN Remrks:
Typ Imp:MATCH IS 15% TOLL CREDITS AND 5% LOCAL
Project:Prj Mgr:
GRETNA BICYCLE ACCESS IMPROVEMENTS
H.009804
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON 000-26 NFI 446 ENHANCEMENTS 2-WAITING FOR FUNDING
SIDEWALKS W/ LIGHTING, STREETSCPAING & RELATED WORKNUNES, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
KENNER: S WILLIAMS BLVD STREETSCAPING
H.011309
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFFERSON US 90-Z 283-09 NFI 60,000 CAPACITY 2-WAITING FOR FUNDING
RELOCATE THE EXIT RAMP AND CONSTRUCT AN ENTRANCE RAMPYANG, LI Remrks:
Typ Imp:USE CCCD TOLL CREDITS AS MATCH TO THE PHASE 5 FUNDS
Project:Prj Mgr:
MACARTHUR INTERCHANGE COMPLETION PH. II
H.009420
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
JEFF DAVIS US 165 014-02 NFI 1,000 SAFETY 2-WAITING FOR FUNDING
INSTALL J-TURN ON US 165 @ LA 101CORMIER, CLAYTON Remrks:
Typ Imp:
Project:Prj Mgr:
US 165: INSTALL J-TURN @ LA 101
JEFFERSON DAVIS
H.002868
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE US 90 424-02 NFI 105,000 CORRIDOR 2-WAITING FOR FUNDING
NEW INTERCHANGEPAINE, PEGGY JO Remrks:
Typ Imp:424-02-0090;ENG DEMO. RW/UTL S9$1.2M AVAILABLE.NFI FOR CONST
Project:Prj Mgr:
I-49 S:AMB CAFFERY/US90 INTERCHANGE
LAFAYETTE
Page 3 - 7 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020WAITING FOR FUNDING
H.003454
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE I-49 455-01 NFI 850,000 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING
IN LAFAYETTE NEW INTERSTATENICKEL, TIM Remrks:
Typ Imp:455-01-0035;ENGR 700-24-0073. R/W 455-01-0034
Project:Prj Mgr:
LAFAYETTE CONNECTOR
H.004492
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE 000-28 0 URBAN SYSTEMS 2-WAITING FOR FUNDING
INTERCHANGE DESIGNUMEOZULU, JOE Remrks:
Typ Imp:700-28-0223;STUDY FED FY2013.ENGR FED FY2014
Project:Prj Mgr:
I-10 INTERCHANGE AT N AMBASSADOR CAFFERY
H.009214
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 339 828-11 0 CAPACITY 2-WAITING FOR FUNDINGLAFAYETTE LA 339 828-12 0 CAPACITY
WIDENINGBRIGNAC, CHRISTINA Remrks:
Typ Imp:LCG PROVIDE MATCH PHASE 2
Project:Prj Mgr:
LA 339: WIDENING (LA 82 TO LA 3073)
H.009215
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 182 032-01 0 CAPACITY 2-WAITING FOR FUNDING
WIDENINGBRIGNAC, CHRISTINA Remrks:
Typ Imp:LCG PROVIDE MATCH PHASE 2
Project:Prj Mgr:
LA182:WIDENING(W PONT DES MOUTON RD-I49)
H.009335
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 182 032-01 NFI 40,200 CAPACITY 2-WAITING FOR FUNDING
WIDENING AND ADDING TRAVEL LANES TO PROVIDE 4 LANE HIGHWAYBABIN, TEDDY Remrks:
Typ Imp:
Project:Prj Mgr:
LA 182: I-10 TO WEST PONT DES MOUTON RD
H.009520
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 3168 433-01 NFI 24,700 RAILROADS - GRADE SEPARATION 2-WAITING FOR FUNDING
GRADE SEPARATE EXISTING AT-GRADE CROSSINGRAY, JARED Remrks:
Typ Imp:
Project:Prj Mgr:
LA 3168:NEW BRIDGE@BNSF-US 90(LAFAYETTE)
H.009795
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE LA 182 032-01 NFI 571 ENHANCEMENTS 2-WAITING FOR FUNDING
SIDEWALKS & RELATED WORKNUNES, BRIAN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 182: US 90-MLK DRIVE SIDEWALKS
H.011235
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE US 90 424-02 NFI 97,000 CAPACITY 2-WAITING FOR FUNDING
CONSTRUCT NEW INTERSECTION - CONCRETELANDRY, COREY Remrks:
Typ Imp:
Project:Prj Mgr:
I-49 SOUTH @ VEROT SCHOOL ROAD
H.011303
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFAYETTE US 90 424-02 NFI 6,000 CAPACITY 2-WAITING FOR FUNDING
FRONTAGE RD CONSTRUCTIONPAINE, PEGGY JO Remrks:
Typ Imp:
Project:Prj Mgr:
US 90:ALBERTSON TO SOUTHPARK FRONTAGE R
H.008145
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 1 829-32 STBONDS 30,280 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDINGLAFOURCHE LA 1 829-32 LOCAL 4,995 OTHER / MISCELLANEOUS
ROUTE LA 1 RELOCATIONNICKEL, TIM Remrks:
Typ Imp:829-32-0010;NEW BRIDGE.NEW ALIGNMENT; AC-ING WITH STBONDS
Project:Prj Mgr:
LA 1: LEEVILLE TO GOLDEN MEADOW PHASE 2C
LAFOURCHE
Page 3 - 8 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020WAITING FOR FUNDING
H.010152
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 1 064-90 STBONDS 2,000 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
DREDGE CANAL AND MITIGATION FOR LA 1 ELEVATED CONSTRUCTIONHANKS, ANNA Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1: CONSTRUCTION CANAL DREDGING
H.011207
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 1 829-32 NFI 69,989 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
CONSTRUCT RELOCATED LA 1 ON ELEVATED STRUCTUREHANKS, ANNA Remrks:
Typ Imp:SEE NOTES FOR FUNDING INFO
Project:Prj Mgr:
LA 1: LEEVILLE TO GOLDEN MEADOW PHASE 2A
H.011208
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 1 829-32 NFI 230,000 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
ELEVATED RELOCATED LA 1 -LEEVILLE TO GOLDEN MEADOW LEVEEHANKS, ANNA Remrks:
Typ Imp:SEE NOTES FOR FUNDING INFO
Project:Prj Mgr:
LA 1: LEEVILLE TO GOLDEN MEADOW PHASE 2B
H.011209
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LAFOURCHE LA 1 829-32 NFI 10,000 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
NEW TOLL FACILITY FOR LA 1 SOUTHBOUND AND APPROACHHANKS, ANNA Remrks:
Typ Imp:SEE NOTES FOR FUNDING INFO
Project:Prj Mgr:
LA 1: LEEVILLE TO GOLDEN MEADOW PHASE 2D
H.000758
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LASALLE US 84 022-05 NFI 43,940 CORRIDOR 2-WAITING FOR FUNDING
WIDENINGMASTIN, CATHERINE Remrks:
Typ Imp:022-05-0045
Project:Prj Mgr:
LA 772 - HAIR CREEK(JENA)
LASALLE
H.009644
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LASALLE LA 125 131-01 NFI 1,384 PRESERVATION - NON-INTERSTATEON STP SYSTEM
2-WAITING FOR FUNDING
ASPHALT OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 125: US 165-PENTECOSTAL CHURCH ROAD
H.001550
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN LA 146 068-01 0 CAPACITY 2-WAITING FOR FUNDING
WIDEN TO 5 LANESJESCLARD, TREY Remrks:
Typ Imp:068-01-0009;$200 BONDS AVAIL. FOR PE (E?)
Project:Prj Mgr:
CHATHAM RD. (RUSTON)
LINCOLN
H.004608
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN 000-31 LOCAL 6,500 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING
NEW SERVICE ROADPAINE, PEGGY JO Remrks:
Typ Imp:700-31-0121;STAGE 0 COMPLETED
Project:Prj Mgr:
CHOUDRANT I-20 SERVICE ROAD
H.008157
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN LA 150 831-07 NFI 4,000 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDINGLINCOLN LA 818 831-12 NFI 5,000 OTHER / MISCELLANEOUS
RECON W/GEOMETRIC IMPROVEMENTSMCMILLAN, RYAN Remrks:
Typ Imp:831-12-0008;$4.0 M SAFETY TRANSFER FUNDS MAX
Project:Prj Mgr:
JCT US 80 - JCT LA 150
Page 3 - 9 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020WAITING FOR FUNDING
H.009746
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LINCOLN LA 150 831-07 NFI 695 ENHANCEMENTS 2-WAITING FOR FUNDINGLINCOLN LA 150 831-07 LOCAL 150 OTHER / MISCELLANEOUS LINCOLN 000-31 NFI 1,210 ENHANCEMENTS LINCOLN 000-31 LOCAL 220 OTHER / MISCELLANEOUS LINCOLN US 80 001-08 NFI 277 ENHANCEMENTS LINCOLN US 80 001-08 LOCAL 9 OTHER / MISCELLANEOUS
SIDEWALK W/ LIGHTING, STREETSCAPING, & RELATED WORKNUNES, BRIAN Remrks:
Typ Imp:FEDERAL SHARE IS 80%. 15% MATCH TOLL CREDITS & 5% LOCAL
Project:Prj Mgr:
RUSTON DOWNTOWN REVITALIZATION PHASE 6
H.000470
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 441 270-02 NFI 236 ENHANCEMENTS 2-WAITING FOR FUNDINGLIVINGSTON LA 441 270-02 LOCAL 16 ENHANCEMENTS
ENHANCEMENTMEEK, STEPHEN Remrks:
Typ Imp:744-32-0011
Project:Prj Mgr:
HOLDEN SIDEWALK PROGRAM
LIVINGSTON
H.011014
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
LIVINGSTON LA 3002 832-32 NHPP 545 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT
2-WAITING FOR FUNDING
ADD SOUTH BOUND U-TURN FOR LEFT TURNING VEHICLES EXITING CVHARROUCH, JOSHUA Remrks:
Typ Imp:RT CREDITS USED AS MATCH FOR PHASE 3; OE AM PROGRAM MATCH
Project:Prj Mgr:
LA 3002: U-TURN
H.001061
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 6 034-05 DEMO 0 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDINGNATCHITOCHES LA 6 034-05 NFI 20,182 DEMO / HIGH PRIORITY
MAJOR WIDENING LA 117 TO I 49MASTIN, CATHERINE Remrks:
Typ Imp:034-05-0035;USING STBONDS AS MATCH TO DEMO TO ACQUIRE R/W
Project:Prj Mgr:
EL CAMINO EAST/WEST COR (EAST SEG )
NATCHITOCHES
H.001809
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 174 112-06 NFI 2,410 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
CURVE REALIGNMENTMOORE, DARRELL Remrks:
Typ Imp:112-06-0008;PROJECT TO BE RE-SCOPED
Project:Prj Mgr:
AJAX - I-49
H.010359
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
NATCHITOCHES LA 9 089-01 NFI 1,509 PRESERVATION - NON-INTERSTATEON STP SYSTEM
2-WAITING FOR FUNDING
PATCH. COLD PLANE, AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 9: JCT US 71 - JCT LA 156
H.000263
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS US 90 006-05 NFI 47,348 PRESERVATION - BRIDGE (ONSYSTEM)
2-WAITING FOR FUNDING
ORLEANS US 90 006-90 NFI 42,343 PRESERVATION - BRIDGE (ONSYSTEM)
BRIDGE REPLACEMENTMASTIN, CATHERINE Remrks:
Typ Imp:006-05-0067;STAGE 1 PROJECT
Project:Prj Mgr:
CHEF MENTEUR PASS BRIDGE & APPROACH
ORLEANS
Page 3 - 10 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020WAITING FOR FUNDING
H.007250
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS 000-36 NFI 20,000 INTERMODAL CONNECTOR 2-WAITING FOR FUNDINGORLEANS 000-36 NFI 20,000 PRESERVATION - BRIDGE (ON
SYSTEM)
ORLEANS 000-36 OTHER 22,000 OTHER / MISCELLANEOUS
BRIDGE REPLACEMENTYANG, LI Remrks:
Typ Imp:742-36-0104;OTHER FUNDS - PORT
Project:Prj Mgr:
ALMONASTER AVENUE BRIDGE REPLACEMENT
H.008220
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS LA 406 836-14 NFI 1,500 URBAN SYSTEMS 2-WAITING FOR FUNDINGPLAQUEMINES LA 406 838-03 0 URBAN SYSTEMS PLAQUEMINES LA 406 838-06 0 URBAN SYSTEMS
WIDENINGLEBAS, MELISSA Remrks:
Typ Imp:836-14-0002;JT W 838-06-0002
Project:Prj Mgr:
LA406/WOODLAND HWY (LA23 - LA407)
H.009499
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ORLEANS 000-36 0 URBAN SYSTEMS 2-WAITING FOR FUNDING
PLANNING STUDYBROUSSARD, DAN Remrks:
Typ Imp:
Project:Prj Mgr:
LEAKE AVENUE IMPROVEMENTS
H.009752
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
OUACHITA 000-37 NFI 513 ENHANCEMENTS 2-WAITING FOR FUNDING
SIDEWALK W/ LIGHTING, LANDSCAPE & RELATED WORKMEEK, STEPHEN Remrks:
Typ Imp:
Project:Prj Mgr:
DESIARD ST: STREETSCAPING S GRAND-6TH ST
OUACHITA
H.001399
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
PLAQUEMINES LA 23 062-04 NFI 30,000 CORRIDOR 2-WAITING FOR FUNDING
WIDEN TO 4 LANESUMEOZULU, JOE Remrks:
Typ Imp:062-04-0029;$1M GS9$ FOR STUDY
Project:Prj Mgr:
HAPPY JACK - N.PORT SULPHUR
PLAQUEMINES
H.000790
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES US 167 023-01 NFI 3,000 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE
2-WAITING FOR FUNDING
BRIDGE MAINTENANCERACHAL, JASON Remrks:
Typ Imp:023-01-0069;BRPM
Project:Prj Mgr:
US 167 BRIDGE MAINTENANCE
RAPIDES
H.004825
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES LA 28 074-02 NFI 29,185 CAPACITY 2-WAITING FOR FUNDING
WIDEN FROM 3 TO 4 LANESMUSA, ELNUR Remrks:
Typ Imp:700-40-0145;FEASIBILITY/STAGE 0 WIDEN TO 4 LANE
Project:Prj Mgr:
WIDENING LA 28 EAST (LIBUSE TO HOLLOWAY)
H.008277
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES US 71 840-43 NFI 32,500 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
RED RIVER BRIDGEUMEOZULU, JOE Remrks:
Typ Imp:840-43-0014;PHASE 3 OF FORT BUHLOW RED RIVER BR
Project:Prj Mgr:
FT. BUHLOW BR (US 71/US 165)
Page 3 - 11 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020WAITING FOR FUNDING
H.009543
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES LA 113 140-02 NFI 3,449 PRESERVATION - NON-INTERSTATEON STP SYSTEM
2-WAITING FOR FUNDING
BASE AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 113: VERNON LINE - LA 112
H.011598
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RAPIDES LA 8-S 134-04 NFI 4,626 PRESERVATION - NON-INTERSTATEON STP SYSTEM
2-WAITING FOR FUNDING
PATCHING, COLD PLANING, STABILIZING, AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 8: LA 119 TO LA 1
H.009402
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
RED RIVER US 371 021-30 NFI 535 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
2-WAITING FOR FUNDING
SUBSURFACE DRAINAGE AND OUTFALL CHANNEL IMPROVEMENTSGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
RDWY DRAINAGE IMP.-US 71 @ US 371 PH III
RED RIVER
H.002567
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST BERNARD LA 300 284-30 NFI 1,834 PRESERVATION - BRIDGE (ONSYSTEM)
2-WAITING FOR FUNDING
BRIDGE REPLACEMENTOLIVIER, NICHOLAS Remrks:
Typ Imp:284-30-0023
Project:Prj Mgr:
REGGIO CANAL BRIDGE
ST BERNARD
H.004876
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST CHARLES 000-45 NFI 1,850 URBAN SYSTEMS 2-WAITING FOR FUNDINGST CHARLES 000-45 OTHER 1,850 URBAN SYSTEMS
SAFETY AND TSM IMPROVEMENTSLEBAS, MELISSA Remrks:
Typ Imp:STAGE O COMPLETED UNDER DESIGN PHASE
Project:Prj Mgr:
LA 52: LA 18 - N OAK COURT
ST CHARLES
H.012531
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST CHARLES I-310 450-36 NFI 1,773 PRESERVATION - BRIDGE (ONSYSTEM)
2-WAITING FOR FUNDING
ST CHARLES I-310 450-36 NFI 1,773 PRESERVATION - BRIDGE (ONSYSTEM)
ST CHARLES I-310 450-37 NFI 55,697 PRESERVATION - BRIDGE (ONSYSTEM)
ST CHARLES I-310 450-38 NFI 995 PRESERVATION - BRIDGE (ONSYSTEM)
ST CHARLES I-310 450-38 NFI 995 PRESERVATION - BRIDGE (ONSYSTEM)
ST CHARLES I-310 450-38 NFI 995 PRESERVATION - BRIDGE (ONSYSTEM)
CLEANING, PAINTING, AND STRUCTURAL REHABILITATIONGUIDRY, CHRIS Remrks:
Typ Imp:
Project:Prj Mgr:
I-310: LULING BRIDGE REHBILITATION
Page 3 - 12 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020WAITING FOR FUNDING
H.002424
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JAMES LA 70 426-02 NFI 6,226 CAPACITY 2-WAITING FOR FUNDINGASCENSION LA 70 426-03 NFI 12,733 CAPACITY ST JAMES LA 3125 426-31 NFI 628 CAPACITY ASCENSION 000-03 NFI 63 CAPACITY
WIDEN TO 4 LANESFUSILIER, JACOB Remrks:
Typ Imp:426-02-0042;(C&G)426-02-52.426-03-05.NO FUNDING
Project:Prj Mgr:
LA 70: SUNSHINE BRIDGE - LA 22
ST JAMES
H.009483
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JAMES LA 3125 426-31 LOCAL 775 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDINGST JAMES LA 44 256-05 LOCAL 620 OTHER / MISCELLANEOUS
ADDING TURN LANES ON LA 3125 AND REALIGNING LA 44WAGUESPACK, BRENT Remrks:
Typ Imp:
Project:Prj Mgr:
LA HIGHWAY 44 RE-ROUTE
H.009724
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST JAMES 000-47 NFI 1,259 ENHANCEMENTS 2-WAITING FOR FUNDING
MULTI-USE PATH AND RELATED WORKMEEK, STEPHEN Remrks:
Typ Imp:
Project:Prj Mgr:
ST JAMES MISS EBANK MULTI-USE TRAIL PH 1
H.011358
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST LANDRY US 190 012-12 NFI 6,384 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDINGST LANDRY US 190 012-13 NFI 3,888 OTHER / MISCELLANEOUS
STAGE 0/FEASIBILITY STUDYHANKS, ANNA Remrks:
Typ Imp:
Project:Prj Mgr:
US 190 (VINE STREET) RECONSTRUCTION
ST LANDRY
H.004924
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARTIN 000-50 NFI 0 URBAN SYSTEMS 2-WAITING FOR FUNDING
FEDERAL EARMARK FOR STUDYYANG, LI Remrks:
Typ Imp:700-50-0112;STAGE 0 COMPLETED
Project:Prj Mgr:
DEV.& CONST ST. MARTINVILLE BYPASS
ST MARTIN
H.011298
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARTIN US 90 424-03 NFI 3,500 CAPACITY 2-WAITING FOR FUNDINGLAFAYETTE US 90 424-02 NFI 2,500 CAPACITY IBERIA US 90 424-04 NFI 1,500 CAPACITY
NEW CONSTRUCTION OF FRONTAGE RDSPAINE, PEGGY JO Remrks:
Typ Imp:
Project:Prj Mgr:
US 90: CAPT CADE TO AMB CAFF FRONTAGE RD
H.009748
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST MARY 000-51 NFI 87 ENHANCEMENTS 2-WAITING FOR FUNDINGST MARY 000-51 LOCAL 58 ENHANCEMENTS
SIDEWALKS AND RELATED WORKNUNES, BRIAN Remrks:
Typ Imp:USE LOCAL AS MATCH
Project:Prj Mgr:
BERWICK DOWNTOWN SIDEWALKS
ST MARY
Page 3 - 13 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020WAITING FOR FUNDING
H.000284
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY US 90 006-07 NFI 40,733 PRESERVATION - BRIDGE (ONSYSTEM)
2-WAITING FOR FUNDING
NEW BRIDGESMASTIN, CATHERINE Remrks:
Typ Imp:006-07-0048; PRIORITY BRIDGE PROJECT
Project:Prj Mgr:
US 90: PEARL RIVER BRIDGES (HBI)
ST TAMMANY
H.000494
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY US 190 013-12 0 CORRIDOR 2-WAITING FOR FUNDING
WIDEN TO 4 LANESJESCLARD, TREY Remrks:
Typ Imp:013-12-0031;404 REQ.(E?). PUB.MT.TO BE HELD
Project:Prj Mgr:
LA 433 - US 11
H.000497
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY US 190 013-12 NFI 12,000 CORRIDOR 2-WAITING FOR FUNDING
WIDEN TO 4 LANESMCMILLAN, RYAN Remrks:
Typ Imp:013-12-0039;PROJ ON XXX PER LIST FROM F.BORNE
Project:Prj Mgr:
US190: BAYOU CASTINE-SE LA HOSPITAL
H.000688
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY US 11 018-04 NFI 63,700 PRESERVATION - BRIDGE (ONSYSTEM)
2-WAITING FOR FUNDING
BRIDGE REPLACEMENTOLIVIER, NICHOLAS Remrks:
Typ Imp:018-04-0049; PRIORITY BRIDGE PROJECT
Project:Prj Mgr:
US 11 NORFOLK SOUTHERN RR OVERPASS (HBI)
H.002391
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 22 261-06 0 CAPACITY 2-WAITING FOR FUNDINGST TAMMANY LA 22 261-06 0 OTHER / MISCELLANEOUS
WIDEN TO 4 LANESMUSA, ELNUR Remrks:
Typ Imp:261-06-0030;CITY/STATE AGREEMENT REQUIRED
Project:Prj Mgr:
TCHEFUNCTE - CAUSEWAY APPROACH
H.004983
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY US 11 018-03 DEMO 0 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDINGST TAMMANY US 11 018-03 NFI 19,346 DEMO / HIGH PRIORITY
WIDENING WITH BIKE PATHOLIVIER, NICHOLAS Remrks:
Typ Imp:700-52-0196
Project:Prj Mgr:
US HIGHWAY 11 WIDENING
H.009793
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY 000-52 NFI 954 ENHANCEMENTS 2-WAITING FOR FUNDING
SIDEWALKS W/LIGHTING, LANDSCAPING, & RELATED WORKMEEK, STEPHEN Remrks:
Typ Imp:
Project:Prj Mgr:
SLIDELL: OLDE TOWN STREETSCAPING
H.009934
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY 000-52 NFI 218 ENHANCEMENTS 2-WAITING FOR FUNDINGST TAMMANY LA 435 281-04 NFI 82 ENHANCEMENTS
SIDEWALK LIGHTING & RELATED WORKMEEK, STEPHEN Remrks:
Typ Imp:
Project:Prj Mgr:
ABITA SPRINGS TOWN CTR SIDEWALK LIGHTING
H.010274
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY US 190 013-12 0 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING
STAGE 0 FEASIBILITY STUDY FOR INTERIM CAPACITY IMPROVEMENTSNGUYEN, WAYNE Remrks:
Typ Imp:DUE TO HURRICANE ISAAC MPO CAN'T FORMALLY APPROVE PROJECT
Project:Prj Mgr:
US 190: US 11 TO LA 433
Page 3 - 14 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020WAITING FOR FUNDING
H.010441
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 1077 852-13 NFI 2,000 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
2-WAITING FOR FUNDING
DRAINAGEGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
GRADE RAISING ON LA 1077
H.011137
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY I-12 454-04 NFI 40,000 CAPACITY 2-WAITING FOR FUNDING
ROADWAY WIDENING AND OVERLAY, BRIDGE WIDENING/REPLACEMENTFUSILIER, JACOB Remrks:
Typ Imp:
Project:Prj Mgr:
I-12: LA 1077 TO US 190
H.011152
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY I-12 454-04 NFI 10,000 CAPACITY 2-WAITING FOR FUNDINGST TAMMANY I-12 454-04 NFI 10,000 PRESERVATION - INTERSTATE ST TAMMANY I-12 454-04 NFI 25,000 PRESERVATION - BRIDGE (ON
SYSTEM)
ROADWAY WIDENING AND OVERLAY, BRIDGE WIDENING/REPLACEMENTMUSA, ELNUR Remrks:
Typ Imp:
Project:Prj Mgr:
I-12: US 190 TO LA 59
H.012382
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY US 190 059-30 NFI 16,000 CAPACITY 2-WAITING FOR FUNDING
WIDEN TO 4 LANES, 5 ROUNDABOUTSLANDRY, COREY Remrks:
Typ Imp:059-30-0008
Project:Prj Mgr:
US 190: LA 25 - BOGUE FALAYA (PH 2B)
H.012386
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY US 190 059-30 NFI 18,000 CAPACITY 2-WAITING FOR FUNDINGST TAMMANY US 190 059-30 NFI 15,000 CAPACITY
WIDEN BRIDGE, 4 ROUNDABOUTSLANDRY, COREY Remrks:
Typ Imp:059-30-0008
Project:Prj Mgr:
US 190: LA 437 - US 190 BUS (PH 3)
H.012398
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
ST TAMMANY LA 25 059-02 NFI 2,500 CAPACITY 2-WAITING FOR FUNDINGST TAMMANY US 190 059-30 NFI 2,500 CAPACITY ST TAMMANY US 190 030-31 NFI 2,500 CAPACITY ST TAMMANY 000-52 NFI 1,200 CAPACITY
TWO LANE ROUNDABOUTLANDRY, COREY Remrks:
Typ Imp:059-30-0008
Project:Prj Mgr:
US 190 @ LA 25 ROUNDABOUT (PH 2A)
H.005043
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 311 413-01 NFI 38,000 CAPACITY 2-WAITING FOR FUNDING
WIDEN TO 4 LANESMUSA, ELNUR Remrks:
Typ Imp:700-55-0122
Project:Prj Mgr:
LA311: LA 664 (ST CHARLES ST)-SAVANNE RD
TERREBONNE
H.010328
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
TERREBONNE LA 659 855-04 NFI 200 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING
2-WAITING FOR FUNDING
CB-06 TOP MODIFICATIONS, CROSS DRAIN REMOVAL AND REPLACEMENGOLZ, SARAH Remrks:
Typ Imp:
Project:Prj Mgr:
LA 659: HOWARD BRIDGE-DAIGLEVILLE BRIDGE
Page 3 - 15 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020WAITING FOR FUNDING
H.009761
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERMILION LA 14 055-06 NFI 500 ENHANCEMENTS 2-WAITING FOR FUNDINGVERMILION LA 14 055-06 LOCAL 167 ENHANCEMENTS
SIDEWALKS W/LIGHTING, LANDSCAPE & RELATED WORKMEEK, STEPHEN Remrks:
Typ Imp:
Project:Prj Mgr:
LA 14: DOWNTOWN ABBEVILLE STREETSCAPING
VERMILION
H.000986
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERNON LA 8 029-01 NFI 12,700 PRESERVATION - BRIDGE (ONSYSTEM)
2-WAITING FOR FUNDING
BRIDGE REPLACEMENTMUSA, ELNUR Remrks:
Typ Imp:029-01-0004;ADMIN. BY TEXAS
Project:Prj Mgr:
SABINE RIVER BR (BURR FERRY)
VERNON
H.010339
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERNON LA 10 066-02 FLH 1,226 PRESERVATION - NON-INTERSTATEON STP SYSTEM
2-WAITING FOR FUNDING
PATCH, COLD PLANE, AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 10: LOOK OUT RD - 850' E BAILEY RD
H.010354
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
VERNON LA 111 133-03 NFI 1,898 PRESERVATION - NON-INTERSTATEON STP SYSTEM
2-WAITING FOR FUNDING
PATCH, COLD PLANE, AND OVERLAYSPURLOCK, DLON Remrks:
Typ Imp:
Project:Prj Mgr:
LA 111: US 171 - LA 117
H.000358
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W BATON ROUGE US 190 008-01 NFI 55,866 PRESERVATION - BRIDGE (ONSYSTEM)
2-WAITING FOR FUNDING
NEW BRIDGEHANKS, ANNA Remrks:
Typ Imp:008-01-0051; PRIORITY BRIDGE PROJECT
Project:Prj Mgr:
US 190 @ LA 415: LOBDELL INTER (HBI)
W BATON ROUGE
H.001234
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W BATON ROUGE LA 1 050-07 NFI 136,570 PRESERVATION - BRIDGE (ONSYSTEM)
2-WAITING FOR FUNDING
BRIDGE REPLACEMENTDELATTE, BRIAN Remrks:
Typ Imp:050-07-0066;2 STRUCTURES PRIORITY BRIDGE PROJECT
Project:Prj Mgr:
PORT ALLEN CANAL BRIDGE (HBI)
H.009288
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
W BATON ROUGE LA 1 050-07 NFI 20,000 RAILROADS - GRADE SEPARATION 2-WAITING FOR FUNDING
GRADE SEPARATE EXISTING AT-GRADE CROSSINGRAY, JARED Remrks:
Typ Imp:H.011133 MUST LET BEFORE H.009288
Project:Prj Mgr:
LA 1:NEW RR BRIDGE@DOW SPUR XING (WBR)
H.010037
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 07 000-97 NFI 16,640 OPER EFFICIENCY/MOTORISTASSISTANCE - FERRY PROJECTS
2-WAITING FOR FUNDING
CONSTRUCT NEW FERRY BOATSIBLEY, STEVEN Remrks:
Typ Imp:
Project:Prj Mgr:
NEW FERRY BOAT / CAMERON FERRY CROSSING
DISTRICT 07
Page 3 - 16 Version: 1.18.1 Report Date: 4/2/19 5:03 AM
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2019 - 2020WAITING FOR FUNDING
H.013284
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 61 000-96 NFI 0 CAPACITY 2-WAITING FOR FUNDING
NEW BRIDGE AND APPROACHES TO FEASIBILITY STUDYLOTT, ROBERT Remrks:
Typ Imp:
Project:Prj Mgr:
LA 1 TO LA 30 CONNECTOR
DISTRICT 61
H.009200
Parish RouteCtrlSec Fund
Con Est(x $1000) Category/SubCategory Stage
DISTRICT 62 000-90 NFI 500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES
2-WAITING FOR FUNDING
PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERSHOYT, RYAN Remrks:
Typ Imp:
Project:Prj Mgr:
I-12: PAVEMENT MARKING REPLACEMENT II
DISTRICT 62
Page 3 - 17 Version: 1.18.1 Report Date: 4/2/19 5:03 AM