HIGHWAY 11 HIGHWAY 46 - SaskBuilds Agreement/The R… · r:-1015.11 a:302.22 r:-1015.11 a:339.89...

28
SCHEDULE 15 APPENDIX A - REFERENCE CONCEPT FINAL VERSION DESIGN, BUILD, FINANCE and OPERATE REGINA BYPASS REGINA, SASKATCHEWAN, CANADA MUNICIPAL BOUNDARY CITY OF REGINA HIGHWAY 11 HIGHWAY 6 HIGHWAY 33 HIGHWAY 1 HIGHWAY 46 HIGHWAY 48

Transcript of HIGHWAY 11 HIGHWAY 46 - SaskBuilds Agreement/The R… · r:-1015.11 a:302.22 r:-1015.11 a:339.89...

Page 1: HIGHWAY 11 HIGHWAY 46 - SaskBuilds Agreement/The R… · r:-1015.11 a:302.22 r:-1015.11 a:339.89 a:339.89 st:118+815.78 cs:118+725.81 sc:117+240.55 ts:117+126.74 pi:116+848.58 tower

SCHEDULE 15

APPENDIX A - REFERENCE CONCEPT

FINAL VERSION

DESIGN, BUILD, FINANCE and OPERATE

REGINA BYPASS

REGINA, SASKATCHEWAN, CANADA

MUNICIPAL BOUNDARY

CITY OF REGINA

H

I

G

H

W

A

Y

1

1

HIG

HW

AY

6

H

I

G

H

W

A

Y

3

3

HIGHWAY 1

H

I

G

H

W

A

Y

4

6

HIG

HW

AY

4

8

Page 2: HIGHWAY 11 HIGHWAY 46 - SaskBuilds Agreement/The R… · r:-1015.11 a:302.22 r:-1015.11 a:339.89 a:339.89 st:118+815.78 cs:118+725.81 sc:117+240.55 ts:117+126.74 pi:116+848.58 tower
Page 3: HIGHWAY 11 HIGHWAY 46 - SaskBuilds Agreement/The R… · r:-1015.11 a:302.22 r:-1015.11 a:339.89 a:339.89 st:118+815.78 cs:118+725.81 sc:117+240.55 ts:117+126.74 pi:116+848.58 tower

*

*

* *

*

*

*

*

*

*

* *

*

**

***

*

*

*

*

*

*

*

*

*

*

* *

*

*

*

P

R

O

JE

C

T

L

IM

IT

S

PROJECT LIM

ITS

P

R

O

J

E

C

T

L

I

M

I

T

S

PR

OJE

CT

LIM

IT

S

P

R

O

J

E

C

T

L

I

M

I

T

S

P

R

O

J

E

C

T

L

I

M

I

T

S

Q

U

E

E

N

S

T

R

E

E

T

HIGHWAY 1

M

A

I

N

S

T

R

E

E

T

HIG

HW

AY

46

H

I

G

H

W

A

Y

3

6

4

H

I

G

H

W

A

Y

3

6

4

C

N

R

BALGONIE

HIGHWAY 46

BALGONIE

INTERCHANGE

T

W

P

R

D

1

8

0

MA

TC

HLIN

E D

WG

15-A

-2-02

EXISTING ROADS

TO BE REMOVED

EXISTING ROADS

TO BE REMOVED

EXISTING ROADS

TO BE REMOVED

MAIN STREET

MEDIAN CROSSING

TO BE REMOVED

PAVED SERVICE ROAD (TO BE RECONSTRUCTED

PRIOR TO SUBSTANTIAL COMPLETION)

PAVED SERVICE ROAD

ROAD CLOSURE

CITY LIMITSEXISTING INFRASTRUCTURE

NUMBER OF LANES

REMOVALS

*

GRAVEL SERVICE ROAD

NUMBER OF PAVED/

GRADED LANES

FUTURE WORKS

HTCB

PAVING

NEW BYPASS INFRASTRUCTURE NEW BYPASS INFRASTRUCTURE

CUL DE SAC

EXISTING BYPASS INFRASTRUCTURE

BRIDGES

MISCELLANEOUS

BRIDGES

FUTURE WORKS

BRIDGES

GRADING FOR FUTURE

WORKS (TO BE

COMPLETED PRIOR TO

SUBSTANTIAL

COMPLETION)

EXISTING MEDIAN CROSSING

TO BE REMOVED

INSTALL

SIGNALS

EMERGENCY LOCKABLE

GATE TO BE INSTALLED

Page 4: HIGHWAY 11 HIGHWAY 46 - SaskBuilds Agreement/The R… · r:-1015.11 a:302.22 r:-1015.11 a:339.89 a:339.89 st:118+815.78 cs:118+725.81 sc:117+240.55 ts:117+126.74 pi:116+848.58 tower

R:900.00

TC

:106+

858.36

PI:105+

013.80

PI:103+

116.61

G

R

E

G

O

R

Y

A

V

E

N

U

E

GREGORY AVENUE

HIGHWAY 1

HIGHWAY 1

MA

TC

HLIN

E D

WG

15-A

-2-01

M

A

T

C

H

L

I

N

E

D

W

G

1

5

-

A

-

2

-

0

3

PAVED SERVICE ROAD (TO BE RECONSTRUCTED

PRIOR TO SUBSTANTIAL COMPLETION)

PAVED SERVICE ROAD

ROAD CLOSURE

CITY LIMITSEXISTING INFRASTRUCTURE

NUMBER OF LANES

REMOVALS

*

GRAVEL SERVICE ROAD

NUMBER OF PAVED/

GRADED LANES

FUTURE WORKS

HTCB

PAVING

NEW BYPASS INFRASTRUCTURE NEW BYPASS INFRASTRUCTURE

CUL DE SAC

EXISTING BYPASS INFRASTRUCTURE

BRIDGES

MISCELLANEOUS

BRIDGES

FUTURE WORKS

BRIDGES

GRADING FOR FUTURE

WORKS (TO BE

COMPLETED PRIOR TO

SUBSTANTIAL

COMPLETION)

EMERGENCY MEDIAN

CROSSING TO

REMAIN OPEN

Page 5: HIGHWAY 11 HIGHWAY 46 - SaskBuilds Agreement/The R… · r:-1015.11 a:302.22 r:-1015.11 a:339.89 a:339.89 st:118+815.78 cs:118+725.81 sc:117+240.55 ts:117+126.74 pi:116+848.58 tower

**

**

* *

* * * *

*

*

*

* *

*

* *

*

*

*

*

*

* *

*

*

*

*

*

PR

OJE

CT

LIM

ITS

P

R

O

J

E

C

T

L

IM

IT

S

PR

OJE

CT

LIM

IT

S

PROJECT LIMITS

R:900.00

R

:

9

0

0

.

0

0

PI:110+

437.47

CT

:107+

457.35

T

C

:

1

0

6

+

8

5

8

.

3

6

PARK CRESCENT

GA

LL

OW

AY

S

TR

EE

T

EM

ER

AL

D P

AR

K R

OA

D

G

R

E

A

T

P

L

A

I

N

S

R

O

A

D

GR

EA

T P

LA

INS

RO

AD

RAMM AVENUE

LIP

SE

TT

S

TR

EE

T

WH

IT

E C

IT

Y D

R

CO

NF

ED

ER

AT

IO

N D

R

F

E

R

N

W

O

O

D

S

T

R

E

E

T

B

R

I

E

R

G

A

T

E

M

C

K

E

N

Z

I

E

P

O

I

N

T

E

HIGHWAY 1

H

IG

H

W

A

Y

1

KE

NN

ED

Y R

D

GREGORY AVENUE

GREGORY AVENUE

H

IG

H

W

A

Y

4

8

EMERALD

PARK

WHITE

CITY

HIGHWAY 48

WHITE CITY

INTERCHANGE

EMERALD

PARK

RIRO

MA

TC

HLIN

E D

WG

15-A

-2-04

M

A

T

C

H

L

I

N

E

D

W

G

1

5

-

A

-

2

-

0

2

EXISTING ROAD

TO BE REMOVED

EXISTING ROAD

TO BE REMOVED

EXISTING ROAD

TO BE REMOVED

MEDIAN CROSSING

TO BE REMOVED

EXISTING ROAD

TO BE REMOVED

PAVED SERVICE ROAD (TO BE RECONSTRUCTED

PRIOR TO SUBSTANTIAL COMPLETION)

PAVED SERVICE ROAD

ROAD CLOSURE

CITY LIMITSEXISTING INFRASTRUCTURE

NUMBER OF LANES

REMOVALS

*

GRAVEL SERVICE ROAD

NUMBER OF PAVED/

GRADED LANES

FUTURE WORKS

HTCB

PAVING

NEW BYPASS INFRASTRUCTURE NEW BYPASS INFRASTRUCTURE

CUL DE SAC

EXISTING BYPASS INFRASTRUCTURE

BRIDGES

MISCELLANEOUS

BRIDGES

FUTURE WORKS

BRIDGES

GRADING FOR FUTURE

WORKS (TO BE

COMPLETED PRIOR TO

SUBSTANTIAL

COMPLETION)

INSTALL MEDIAN

CHAIN-LINK FENCE

Page 6: HIGHWAY 11 HIGHWAY 46 - SaskBuilds Agreement/The R… · r:-1015.11 a:302.22 r:-1015.11 a:339.89 a:339.89 st:118+815.78 cs:118+725.81 sc:117+240.55 ts:117+126.74 pi:116+848.58 tower

**

*

*

*

*

*

*

*

*

*

*

*

*

*

*

* *

* *

*

* * * *

* * *

* *

**

**

* * *

*

PROJECT LIMITS

P

R

O

J

E

C

T

L

I

M

I

T

S

PROJECT LIMITS

PROJECT LIMITS

PI:112+

047.82

GR

EA

T P

LA

IN

S IN

DU

ST

RIA

L D

RIV

E

PIL

OT

B

UT

TE

A

CC

ES

S R

OA

D

S

O

U

T

H

P

L

A

I

N

S

R

O

A

D

PE

RC

IV

AL

D

RIV

E

G

R

E

A

T

P

L

A

I

N

S

R

O

A

D

BU

TT

E S

TR

EE

T

EM

ER

AL

D P

AR

K R

OA

D

G

R

E

A

T

P

L

A

I

N

S

R

O

A

D

SOUTH PLAINS ROAD

BA

LZ

ER

D

RIV

E

GREAT

PLAINS

RIRO

PILOT BUTTE

INTERCHANGE

MA

TC

HLIN

E D

WG

15-A

-2-03

MA

TC

HLIN

E D

WG

15-A

-2-05

EXISTING ROAD

TO BE REMOVED

EXISTING ROAD

TO BE REMOVED

EXISTING ROAD

TO BE REMOVED

EXISTING ROAD

TO BE REMOVED

PAVED SERVICE ROAD (TO BE RECONSTRUCTED

PRIOR TO SUBSTANTIAL COMPLETION)

PAVED SERVICE ROAD

ROAD CLOSURE

CITY LIMITSEXISTING INFRASTRUCTURE

NUMBER OF LANES

REMOVALS

*

GRAVEL SERVICE ROAD

NUMBER OF PAVED/

GRADED LANES

FUTURE WORKS

HTCB

PAVING

NEW BYPASS INFRASTRUCTURE NEW BYPASS INFRASTRUCTURE

CUL DE SAC

EXISTING BYPASS INFRASTRUCTURE

BRIDGES

MISCELLANEOUS

BRIDGES

FUTURE WORKS

BRIDGES

GRADING FOR FUTURE

WORKS (TO BE

COMPLETED PRIOR TO

SUBSTANTIAL

COMPLETION)

INSTALL

SIGNALS

INSTALL

SIGNALS

INSTALL MEDIAN

CHAIN-LINK FENCE

Page 7: HIGHWAY 11 HIGHWAY 46 - SaskBuilds Agreement/The R… · r:-1015.11 a:302.22 r:-1015.11 a:339.89 a:339.89 st:118+815.78 cs:118+725.81 sc:117+240.55 ts:117+126.74 pi:116+848.58 tower

* *

* *

* *

* *

* * *

* * *

*

* * *

*

*

*

*

*

* * * *

* * *

*

*

*

*

*

*

*

*

*

*

*

*

**

**

* *

PROJECT LIMITS

PROJECT LIMITS

PROJECT LIMITS

PROJECT LIMITS

PROJECT LIMITS

PROJECT LIMITS

A:302.22

R:-1015.11

A:302.22

A:339.89

R:-1015.11

A:339.89

ST:118+815.78

CS:118+725.81

SC

:117+

240.55

TS

:117+

126.74

PI:116+

848.58

PI:115+

307.58

HIGHWAY 1

CP

R

AIL

(T

YV

AN

S

UB

)

GR

AV

EL

P

IT

R

OA

D

GRAVEL PIT

RIRO

TOWER ROAD

INTERCHANGE

R

E

G

I

N

A

B

Y

P

A

S

S

HIGHWAY 1

* *

* *

* *

* * *

* * *

*

*

*

MA

TC

HLIN

E D

WG

15-A

-2-04

MA

TC

HLIN

E D

WG

15-A

-2-06

MATCHLINE DWG 15-A-2-07

75km/hr DESIGN

SPEED

90km/hr DESIGN

SPEED

105km/hr DESIGN

SPEED

EXISTING ROAD

TO BE REMOVED

EXISTING ROAD

TO BE REMOVED

EXISTING ROAD

TO BE REMOVED

EXISTING ROAD

TO BE REMOVED

SEE DETAIL 'A'

AT-GRADE RAIL

CROSSING UPGRADE

NEW AT-GRADE

RAIL CROSSING

EXISTING INFRASTRUCTURE

NUMBER OF LANES

REMOVALS

*

GRAVEL SERVICE ROAD

NUMBER OF PAVED/

GRADED LANES

FUTURE WORKS

HTCB

PAVING

NEW BYPASS INFRASTRUCTURE NEW BYPASS INFRASTRUCTURE

CUL DE SAC

EXISTING BYPASS INFRASTRUCTURE

BRIDGES

MISCELLANEOUS

BRIDGES

FUTURE WORKS

BRIDGES

GRADING FOR FUTURE

WORKS (TO BE

COMPLETED PRIOR TO

SUBSTANTIAL

COMPLETION)

PAVED SERVICE ROAD (TO BE RECONSTRUCTED

PRIOR TO SUBSTANTIAL COMPLETION)

PAVED SERVICE ROAD

ROAD CLOSURE

CITY LIMITS

DETAIL 'A'

Page 8: HIGHWAY 11 HIGHWAY 46 - SaskBuilds Agreement/The R… · r:-1015.11 a:302.22 r:-1015.11 a:339.89 a:339.89 st:118+815.78 cs:118+725.81 sc:117+240.55 ts:117+126.74 pi:116+848.58 tower

* *

* *

* *

*

*

* *

* * *

* * *

*

* * *

*

*

*

*

*

*

* *

**

PROJECT LIMITS

PROJECT LIMITS

PROJECT LIMITS

PROJECT LIMITS

PR

OJE

CT

LIM

IT

S

A:302.22

R:-1015.11

A:302.22

A:339.89

R:-1015.11

A:339.89

ST:118+815.78

CS:118+725.81

SC

:117+

240.55

TS

:117+

126.74

PI:116+

848.58

TO

WE

R R

OA

D

VICTORIA AVENUE (HIGHWAY 1)

TO

WE

R R

OA

D

CP

R

AIL

(T

YV

AN

S

UB

)

TOWER ROAD

INTERCHANGE

R

E

G

I

N

A

B

Y

P

A

S

S

HIGHWAY 1

MA

TC

HLIN

E D

WG

15-A

-2-05

MATCHLINE DWG 15-A-2-07

EXISTING ROAD

TO BE REMOVED

EXISTING ROAD

TO BE REMOVED

EXISTING ROAD

TO BE REMOVED

INSTALL CONDUITS

FOR TRAFFIC SIGNALS

*

GRAVEL SERVICE ROAD

NUMBER OF PAVED/

GRADED LANES

FUTURE WORKS

HTCB

PAVING

NEW BYPASS INFRASTRUCTURE NEW BYPASS INFRASTRUCTURE

CUL DE SAC

EXISTING BYPASS INFRASTRUCTURE

BRIDGES

MISCELLANEOUS

BRIDGES

FUTURE WORKS

BRIDGES

GRADING FOR FUTURE

WORKS (TO BE

COMPLETED PRIOR TO

SUBSTANTIAL

COMPLETION)

PAVED SERVICE ROAD (TO BE RECONSTRUCTED

PRIOR TO SUBSTANTIAL COMPLETION)

PAVED SERVICE ROAD

ROAD CLOSURE

CITY LIMITSEXISTING INFRASTRUCTURE

NUMBER OF LANES

REMOVALS

NEW AT GRADE

RAIL CROSSING

SIGNALS TO BE PROVIDED

AND INSTALLED BY OTHERS

Page 9: HIGHWAY 11 HIGHWAY 46 - SaskBuilds Agreement/The R… · r:-1015.11 a:302.22 r:-1015.11 a:339.89 a:339.89 st:118+815.78 cs:118+725.81 sc:117+240.55 ts:117+126.74 pi:116+848.58 tower

*

*

*

*

**

*

*

*

P

R

O

J

E

C

T

L

I

M

I

T

S

PR

OJE

CT

LIM

IT

S

PR

OJE

CT

LIM

IT

S

P

R

O

J

E

C

T

L

I

M

I

T

S

P

R

O

J

E

C

T

L

I

M

I

T

S

P

R

O

J

E

C

T

L

I

M

I

T

S

P

R

O

J

E

C

T

L

I

M

I

T

S

PROJECT LIMITS

PROJECT LIMITS

P

R

O

J

E

C

T

L

I

M

I

T

S

A

:

3

1

1

.

5

0

R

:

9

7

0

.

3

1

A

:

3

1

1

.

5

0

A:311.50

R:970.31

A:311.50

A:302.22

S

T

:

1

2

1

+

4

1

1

.

2

7

C

S

:

1

2

1

+

3

1

1

.

2

7

SC

:120+

746.92

TS

:120+

646.92

PI:119+

933.44

PI:119+

835.13

ST

:118+

815.78

H

I

G

H

W

A

Y

3

3

P

E

A

R

L

S

T

R

E

E

T

H

I

G

H

W

A

Y

3

3

TOWER ROAD

TOWER ROAD

PR

IM

RO

SE

G

RE

EN

D

RIV

E

CP RAIL (TYVAN SUB)

C

N

R

A

I

L

(

L

E

W

V

A

N

S

U

B

)

CP RAIL (TYVAN SUB)

CITY OF REGINA

C

H

U

K

A

C

R

E

E

K

HIGHWAY 33

INTERCHANGE

REGINA BYPASS

MA

TC

HLIN

E D

WG

15-A

-2-06

M

A

T

C

H

L

I

N

E

D

W

G

1

5

-

A

-

2

-

0

8

WASCANA CREEK

EXISTING ROADS TO

BE REMOVED

EXISTING ROADS

TO BE REMOVED

EXISTING ROADS TO

BE REMOVED

EXISTING ROADS TO

BE REMOVED

WASCANA CREEK

PAVED SERVICE ROAD (TO BE RECONSTRUCTED

PRIOR TO SUBSTANTIAL COMPLETION)

PAVED SERVICE ROAD

ROAD CLOSURE

CITY LIMITSEXISTING INFRASTRUCTURE

NUMBER OF LANES

REMOVALS

*

GRAVEL SERVICE ROAD

NUMBER OF PAVED/

GRADED LANES

FUTURE WORKS

HTCB

PAVING

NEW BYPASS INFRASTRUCTURE NEW BYPASS INFRASTRUCTURE

CUL DE SAC

EXISTING BYPASS INFRASTRUCTURE

BRIDGES

MISCELLANEOUS

BRIDGES

FUTURE WORKS

BRIDGES

GRADING FOR FUTURE

WORKS (TO BE

COMPLETED PRIOR TO

SUBSTANTIAL

COMPLETION)

FUTURE WORKS

(TRAFFIC SIGNALS)

FUTURE WORKS

(TRAFFIC SIGNALS)

FUTURE WORKS

(TRAFFIC SIGNALS)

Page 10: HIGHWAY 11 HIGHWAY 46 - SaskBuilds Agreement/The R… · r:-1015.11 a:302.22 r:-1015.11 a:339.89 a:339.89 st:118+815.78 cs:118+725.81 sc:117+240.55 ts:117+126.74 pi:116+848.58 tower

*

*

*

*

*

*

*

*

*

*

*

P

R

O

J

E

C

T

L

I

M

I

T

S

P

R

O

J

E

C

T

L

I

M

I

T

S

P

R

O

J

E

C

T

L

I

M

I

T

S

P

R

O

J

E

C

T

L

I

M

I

T

S

F

L

E

E

T

S

T

R

E

E

T

CN RAIL (LEWVAN SUB)

C

I

T

Y

O

F

R

E

G

I

N

A

REGINA BYPASS

MA

TC

HLIN

E D

WG

15-A

-2-09

M

A

T

C

H

L

I

N

E

D

W

G

1

5

-

A

-

2

-

0

7

WASCANA CREEK

EXISTING ROAD

TO BE REMOVED

PAVED SERVICE ROAD (TO BE RECONSTRUCTED

PRIOR TO SUBSTANTIAL COMPLETION)

PAVED SERVICE ROAD

ROAD CLOSURE

CITY LIMITSEXISTING INFRASTRUCTURE

NUMBER OF LANES

REMOVALS

*

GRAVEL SERVICE ROAD

NUMBER OF PAVED/

GRADED LANES

FUTURE WORKS

HTCB

PAVING

NEW BYPASS INFRASTRUCTURE NEW BYPASS INFRASTRUCTURE

CUL DE SAC

EXISTING BYPASS INFRASTRUCTURE

BRIDGES

MISCELLANEOUS

BRIDGES

FUTURE WORKS

BRIDGES

GRADING FOR FUTURE

WORKS (TO BE

COMPLETED PRIOR TO

SUBSTANTIAL

COMPLETION)

Page 11: HIGHWAY 11 HIGHWAY 46 - SaskBuilds Agreement/The R… · r:-1015.11 a:302.22 r:-1015.11 a:339.89 a:339.89 st:118+815.78 cs:118+725.81 sc:117+240.55 ts:117+126.74 pi:116+848.58 tower

*

*

*

*

*

*

*

*

*

*

*

*

*

*

*

*

*

*

*

*

P

R

O

J

E

C

T

L

I

M

I

T

S

P

R

O

J

E

C

T

L

I

M

I

T

S

P

R

O

J

E

C

T

L

I

M

I

T

S

P

R

O

J

E

C

T

L

I

M

I

T

S

P

R

O

J

E

C

T

L

I

M

I

T

S

R

G

E

R

D

2

1

9

4

R

G

E

R

D

2

1

9

4

F

L

E

E

T

S

T

R

E

E

T

F

L

E

E

T

S

T

R

E

E

T

CN RAIL (LEWVAN SUB)

FLEET STREET

RIRO

REGINA BYPASS

MA

TC

HLIN

E D

WG

15-A

-2-08

M

A

T

C

H

L

I

N

E

D

W

G

1

5

-

A

-

2

-

-

1

0

EXISTING ROAD

TO BE REMOVED

EXISTING ROAD

TO BE REMOVED

NEW AT-GRADE

RAIL CROSSING

EXISTING ROAD

TO BE REMOVED

PAVED SERVICE ROAD (TO BE RECONSTRUCTED

PRIOR TO SUBSTANTIAL COMPLETION)

PAVED SERVICE ROAD

ROAD CLOSURE

CITY LIMITSEXISTING INFRASTRUCTURE

NUMBER OF LANES

REMOVALS

*

GRAVEL SERVICE ROAD

NUMBER OF PAVED/

GRADED LANES

FUTURE WORKS

HTCB

PAVING

NEW BYPASS INFRASTRUCTURE NEW BYPASS INFRASTRUCTURE

CUL DE SAC

EXISTING BYPASS INFRASTRUCTURE

BRIDGES

MISCELLANEOUS

BRIDGES

FUTURE WORKS

BRIDGES

GRADING FOR FUTURE

WORKS (TO BE

COMPLETED PRIOR TO

SUBSTANTIAL

COMPLETION)

Page 12: HIGHWAY 11 HIGHWAY 46 - SaskBuilds Agreement/The R… · r:-1015.11 a:302.22 r:-1015.11 a:339.89 a:339.89 st:118+815.78 cs:118+725.81 sc:117+240.55 ts:117+126.74 pi:116+848.58 tower

*

*

*

*

*

PR

OJE

CT

LIM

IT

S

PROJECT LIMITS

P

R

O

J

E

C

T

L

I

M

I

T

S

PROJECT LIMITS

PR

OJE

CT

LIM

IT

S

PR

OJE

CT

LIM

IT

S

HIG

HW

AY

6

RG

E R

D 2194

C

N

R

A

I

L

(

L

E

W

V

A

N

S

U

B

)

C

N

R

ROWATT

RAWLCO

PROPERTY

HIGHWAY 6

INTERCHANGE

R

E

G

I

N

A

B

Y

P

A

S

S

R

E

G

I

N

A

B

Y

P

A

S

S

M

A

T

C

H

L

I

N

E

D

W

G

1

5

-

A

-

2

-

0

9

MA

TC

HLIN

E D

WG

15-A

-2-12

MATCHLINE DWG 15-A-2-11

RAWLCO

BUILDING

PAVED SERVICE ROAD (TO BE RECONSTRUCTED

PRIOR TO SUBSTANTIAL COMPLETION)

PAVED SERVICE ROAD

ROAD CLOSURE

CITY LIMITSEXISTING INFRASTRUCTURE

NUMBER OF LANES

REMOVALS

*

GRAVEL SERVICE ROAD

NUMBER OF PAVED/

GRADED LANES

FUTURE WORKS

HTCB

PAVING

NEW BYPASS INFRASTRUCTURE NEW BYPASS INFRASTRUCTURE

CUL DE SAC

EXISTING BYPASS INFRASTRUCTURE

BRIDGES

MISCELLANEOUS

BRIDGES

FUTURE WORKS

BRIDGES

GRADING FOR FUTURE

WORKS (TO BE

COMPLETED PRIOR TO

SUBSTANTIAL

COMPLETION)

STUB ENDED PULL BACK TRACKS LOCATED

WITHIN THE SERVICE ROAD ROW ARE TO BE

REMOVED AND DISPOSED OF. WHEEL STOPS

ARE TO BE REMOVED AND INSTALLED A

MINIMUM OF 4.57m FROM THE NEW END OF

TRACK LOCATION.

Page 13: HIGHWAY 11 HIGHWAY 46 - SaskBuilds Agreement/The R… · r:-1015.11 a:302.22 r:-1015.11 a:339.89 a:339.89 st:118+815.78 cs:118+725.81 sc:117+240.55 ts:117+126.74 pi:116+848.58 tower

*

*

*

*

*

**

*

*

PR

OJE

CT

LIM

IT

S

PR

OJE

CT

LIM

IT

S

PROJECT LIMITS

PROJECT LIMITS

P

R

O

J

E

C

T

L

I

M

I

T

S

HIGHWAY 6

TW

P R

D 1

64

TW

P R

D 1

64

MA

TC

HLIN

E D

WG

15-A

-2-10

ENBRIDGE PIPELINE

PAVED SERVICE ROAD (TO BE RECONSTRUCTED

PRIOR TO SUBSTANTIAL COMPLETION)

PAVED SERVICE ROAD

ROAD CLOSURE

CITY LIMITSEXISTING INFRASTRUCTURE

NUMBER OF LANES

REMOVALS

*

GRAVEL SERVICE ROAD

NUMBER OF PAVED/

GRADED LANES

FUTURE WORKS

HTCB

PAVING

NEW BYPASS INFRASTRUCTURE NEW BYPASS INFRASTRUCTURE

CUL DE SAC

EXISTING BYPASS INFRASTRUCTURE

BRIDGES

MISCELLANEOUS

BRIDGES

FUTURE WORKS

BRIDGES

GRADING FOR FUTURE

WORKS (TO BE

COMPLETED PRIOR TO

SUBSTANTIAL

COMPLETION)

Page 14: HIGHWAY 11 HIGHWAY 46 - SaskBuilds Agreement/The R… · r:-1015.11 a:302.22 r:-1015.11 a:339.89 a:339.89 st:118+815.78 cs:118+725.81 sc:117+240.55 ts:117+126.74 pi:116+848.58 tower

REGINA BYPASS

M

A

T

C

H

L

I

N

E

D

W

G

1

5

-

A

-

2

-

1

3

MA

TC

HLIN

E D

WG

15-A

-2-10

PAVED SERVICE ROAD (TO BE RECONSTRUCTED

PRIOR TO SUBSTANTIAL COMPLETION)

PAVED SERVICE ROAD

ROAD CLOSURE

CITY LIMITSEXISTING INFRASTRUCTURE

NUMBER OF LANES

REMOVALS

*

GRAVEL SERVICE ROAD

NUMBER OF PAVED/

GRADED LANES

FUTURE WORKS

HTCB

PAVING

NEW BYPASS INFRASTRUCTURE NEW BYPASS INFRASTRUCTURE

CUL DE SAC

EXISTING BYPASS INFRASTRUCTURE

BRIDGES

MISCELLANEOUS

BRIDGES

FUTURE WORKS

BRIDGES

GRADING FOR FUTURE

WORKS (TO BE

COMPLETED PRIOR TO

SUBSTANTIAL

COMPLETION)

Page 15: HIGHWAY 11 HIGHWAY 46 - SaskBuilds Agreement/The R… · r:-1015.11 a:302.22 r:-1015.11 a:339.89 a:339.89 st:118+815.78 cs:118+725.81 sc:117+240.55 ts:117+126.74 pi:116+848.58 tower

*

*

*

*

*

*

*

*

*

*

*

*

*

*

P

R

O

J

E

C

T

L

I

M

I

T

S

P

R

O

J

E

C

T

L

I

M

I

T

S

P

R

O

J

E

C

T

L

I

M

I

T

S

P

R

O

J

E

C

T

L

I

M

I

T

S

P

I

N

K

I

E

R

O

A

D

C

O

U

R

T

N

E

Y

S

T

R

E

E

T

C

O

U

R

T

N

E

Y

S

T

R

E

E

T

P

I

N

K

I

E

R

O

A

D

COURTNEY STREET

INTERSECTION

REGINA BYPASS

R

E

G

I

N

A

B

Y

P

A

S

S

M

A

T

C

H

L

I

N

E

D

W

G

1

5

-

A

-

2

-

1

2

M

A

T

C

H

L

I

N

E

D

W

G

1

5

-

A

-

2

-

1

4

EXISTING ROAD

TO BE REMOVED

EXISTING ROAD

TO BE REMOVED

PAVED SERVICE ROAD (TO BE RECONSTRUCTED

PRIOR TO SUBSTANTIAL COMPLETION)

PAVED SERVICE ROAD

ROAD CLOSURE

CITY LIMITSEXISTING INFRASTRUCTURE

NUMBER OF LANES

REMOVALS

*

GRAVEL SERVICE ROAD

NUMBER OF PAVED/

GRADED LANES

FUTURE WORKS

HTCB

PAVING

NEW BYPASS INFRASTRUCTURE NEW BYPASS INFRASTRUCTURE

CUL DE SAC

EXISTING BYPASS INFRASTRUCTURE

BRIDGES

MISCELLANEOUS

BRIDGES

FUTURE WORKS

BRIDGES

GRADING FOR FUTURE

WORKS (TO BE

COMPLETED PRIOR TO

SUBSTANTIAL

COMPLETION)

Page 16: HIGHWAY 11 HIGHWAY 46 - SaskBuilds Agreement/The R… · r:-1015.11 a:302.22 r:-1015.11 a:339.89 a:339.89 st:118+815.78 cs:118+725.81 sc:117+240.55 ts:117+126.74 pi:116+848.58 tower

*

*

* * * *

* *

*

*

*

*

**

*

*

*

*

**

*

*

**

*

*

*

*

*

*

*

*

*

*

*

*

*

*

*

*

*

*

*

*

*

*

*

****

*

PROJECT LIMITS

PROJECT LIMITS

PR

OJE

CT

LIM

IT

S

PROJECT LIMITS

HIG

HW

AY

1

PINKIE ROAD

COURTNEY STREET

REGINA BYPASS

REGINA BYPASS

MATCHLINE DWG 15-A-2-15

MA

TC

HLIN

E D

WG

15-A

-2-16

M

A

T

C

H

L

I

N

E

D

W

G

1

5

-

A

-

2

-

1

3

EXISTING ROAD

TO BE REMOVED

EXISTING ROAD

TO BE REMOVED

EXISTING ROAD

TO BE REMOVED

PAVED SERVICE ROAD (TO BE RECONSTRUCTED

PRIOR TO SUBSTANTIAL COMPLETION)

PAVED SERVICE ROAD

ROAD CLOSURE

CITY LIMITS

EXISTING INFRASTRUCTURE

NUMBER OF LANES

REMOVALS

*

GRAVEL SERVICE ROAD

NUMBER OF PAVED/

GRADED LANES

FUTURE WORKS

HTCB

PAVING

NEW BYPASS INFRASTRUCTURE NEW BYPASS INFRASTRUCTURE

CUL DE SAC

BRIDGES

MISCELLANEOUS

BRIDGES

FUTURE WORKS

BRIDGES

GRADING FOR FUTURE

WORKS (TO BE

COMPLETED PRIOR TO

SUBSTANTIAL

COMPLETION)

STOCKPILE #6

Page 17: HIGHWAY 11 HIGHWAY 46 - SaskBuilds Agreement/The R… · r:-1015.11 a:302.22 r:-1015.11 a:339.89 a:339.89 st:118+815.78 cs:118+725.81 sc:117+240.55 ts:117+126.74 pi:116+848.58 tower

*

*

*

*

* *

*

*

***

*

*

*

*

**

*

*

**

*

*

*

*

*

*

*

*

*

*

*

*

*

*

*

*

*

*

*

*

*

*

*

*

*

*

PROJECT LIMITS

PR

OJE

CT

LIM

IT

S

PR

OJE

CT

LIM

IT

S

PR

OJE

CT

LIM

IT

S

PR

OJE

CT

LIM

IT

S

HIGHWAY 1

RE

GIN

A B

YP

AS

S

MA

TC

HLIN

E D

WG

15-A

-2-14

EXISTING ROAD

TO BE REMOVED

PAVED SERVICE ROAD (TO BE RECONSTRUCTED

PRIOR TO SUBSTANTIAL COMPLETION)

PAVED SERVICE ROAD

ROAD CLOSURE

CITY LIMITS

EXISTING INFRASTRUCTURE

NUMBER OF LANES

REMOVALS

*

GRAVEL SERVICE ROAD

NUMBER OF PAVED/

GRADED LANES

FUTURE WORKS

HTCB

PAVING

NEW BYPASS INFRASTRUCTURE NEW BYPASS INFRASTRUCTURE

CUL DE SAC

BRIDGES

MISCELLANEOUS

BRIDGES

FUTURE WORKS

BRIDGES

GRADING FOR FUTURE

WORKS (TO BE

COMPLETED PRIOR TO

SUBSTANTIAL

COMPLETION)

Page 18: HIGHWAY 11 HIGHWAY 46 - SaskBuilds Agreement/The R… · r:-1015.11 a:302.22 r:-1015.11 a:339.89 a:339.89 st:118+815.78 cs:118+725.81 sc:117+240.55 ts:117+126.74 pi:116+848.58 tower

**

*

**

*

*

*

*

*

*

*

*

*

*

PROJECT LIMITS

PR

OJE

CT

LIM

IT

S

P

R

O

J

E

C

T

L

I

M

I

T

S

PROJECT LIMITS

PR

OJE

CT

LIM

IT

S

A:320.89

A:425.43

R:1819.70

A:425.43

A

:

4

2

5

.

4

3

R

:

1

8

1

9

.

7

0

A

:

4

2

5

.

4

3

A

:

4

2

7

.

7

4

R

:

-

1

8

1

9

.

7

0

A

:

4

2

7

.

7

4

A:427.74

R:-1819.70

A:427.74

TS

:148+

717.06

ST

:147+

885.24

CS

:147+

785.77

S

C

:

1

4

6

+

7

9

6

.

1

6

T

S

:

1

4

6

+

6

9

6

.

7

0

S

T

:

1

4

6

+

0

6

7

.

5

6

C

S

:

1

4

5

+

9

6

7

.

0

1

SC

:144+

976.76

TS

:144+

876.21

CE

NT

RE

R

OA

D

HILL A

VE

NU

E

PINKIE ROAD

C

P

R

A

IL

(IN

D

IA

N

H

E

A

D

S

U

B

)

HILL AVENUE

INTERCHANGE

R

E

G

IN

A

B

Y

P

A

S

S

PINKIE ROAD

MA

TC

HLIN

E D

WG

15-A

-2-14

MA

TC

HLIN

E D

WG

15-A

-2-17

EXISTING ROAD

TO BE REMOVED

EXISTING ROAD

TO BE REMOVED

STOCKPILE #1

STOCKPILE #2

PAVED SERVICE ROAD (TO BE RECONSTRUCTED

PRIOR TO SUBSTANTIAL COMPLETION)

PAVED SERVICE ROAD

ROAD CLOSURE

CITY LIMITS

EXISTING INFRASTRUCTURE

NUMBER OF LANES

REMOVALS

*

GRAVEL SERVICE ROAD

NUMBER OF PAVED/

GRADED LANES

FUTURE WORKS

HTCB

PAVING

NEW BYPASS INFRASTRUCTURE NEW BYPASS INFRASTRUCTURE

CUL DE SAC

BRIDGES

MISCELLANEOUS

BRIDGES

FUTURE WORKS

BRIDGES

GRADING FOR FUTURE

WORKS (TO BE

COMPLETED PRIOR TO

SUBSTANTIAL

COMPLETION)

Page 19: HIGHWAY 11 HIGHWAY 46 - SaskBuilds Agreement/The R… · r:-1015.11 a:302.22 r:-1015.11 a:339.89 a:339.89 st:118+815.78 cs:118+725.81 sc:117+240.55 ts:117+126.74 pi:116+848.58 tower

* * * * * * *

* * * * * *

*

*

*

*

PROJECT LIMITS

PROJECT LIMITS

PR

OJE

CT

LIM

IT

S

PR

OJE

CT

LIM

IT

S

PROJECT LIMITS

A:450.51

R:-2019.70

A:450.51

A

:4

5

0

.5

1

R

:-2

0

1

9

.7

0

A

:4

5

0

.5

1

A

:4

4

8

.3

2

R

:2

0

1

9

.7

0

A

:4

4

8

.3

2

A:448.32

R:2019.70

A:448.32

ST

:152+

176.75

CS

:152+

076.26

S

C

:1

5

1

+

7

3

2

.5

1

T

S

:1

5

1

+

6

3

2

.0

2

S

T

:1

5

0

+

7

1

2

.7

2

C

S

:1

5

0

+

6

1

3

.2

0

SC

:150+

271.49

TS

:150+

171.97

A:301.50

R:1019.70

A:301.50

A

:3

0

1

.5

0

R

:1

0

1

9

.7

0

A

:

3

0

1

.

5

0

A

:

3

2

0

.

8

9

R

:-

1

0

1

9

.7

0A

:3

2

0

.8

9

A:320.89

R:-1019.70

A:320.89

ST

:149+

692.89

CS

:149+

603.74

S

C

:1

4

9

+

3

6

4

.8

0

T

S

:

1

4

9

+

2

7

5

.

6

6

S

T

:

1

4

9

+

1

4

1

.

9

3

C

S

:1

4

9

+

0

4

0

.9

5

SC

:148+

818.04

TS

:148+

717.06

CONDIE ROAD

DE

WD

NE

Y A

VE

NU

E

PINKIE ROAD

PINKIE ROAD

CN

R

AIL

(C

EN

TR

AL

B

UT

TE

S

UB

)

RO

TA

RY

A

VE

NU

E

CP RAIL (SPECTRA SPUR SUB)

GTHGTH

ROTARY AVENUE

INTERCHANGE

DEWDNEY AVENUE

INTERCHANGE

R

E

G

IN

A

B

Y

P

A

S

S

MA

TC

HLIN

E D

WG

15-A

-2-18

MA

TC

HLIN

E D

WG

15-A

-2-16

EXISTING ROAD

TO BE REMOVED

EXISTING ROAD

TO BE REMOVED

EXISTING ROAD

TO BE REMOVED

STOCKPILE #1

STOCKPILE #2

PAVED SERVICE ROAD (TO BE RECONSTRUCTED

PRIOR TO SUBSTANTIAL COMPLETION)

PAVED SERVICE ROAD

ROAD CLOSURE

CITY LIMITSEXISTING INFRASTRUCTURE

NUMBER OF LANES

REMOVALS

*

GRAVEL SERVICE ROAD

NUMBER OF PAVED/

GRADED LANES

FUTURE WORKS

HTCB

PAVING

NEW BYPASS INFRASTRUCTURE NEW BYPASS INFRASTRUCTURE

CUL DE SAC

EXISTING BYPASS INFRASTRUCTURE

BRIDGES

MISCELLANEOUS

BRIDGES

FUTURE WORKS

BRIDGES

GRADING FOR FUTURE

WORKS (TO BE

COMPLETED PRIOR TO

SUBSTANTIAL

COMPLETION)

STOCKPILE #3

STOCKPILE #4

STOCKPILE #5

NOTE:

ROTARY AVENUE BRIDGE OPENING MUST

ACCOMMODATE FUTURE WORKS ADDITION

OF SB RAMP FROM DEWDNEY AVENUE

AND NB RAMP TO DEWDNEY AVENUE.

SEE DRAWING 15-A-5-23

Page 20: HIGHWAY 11 HIGHWAY 46 - SaskBuilds Agreement/The R… · r:-1015.11 a:302.22 r:-1015.11 a:339.89 a:339.89 st:118+815.78 cs:118+725.81 sc:117+240.55 ts:117+126.74 pi:116+848.58 tower

**

**

**

*

PROJECT LIMITS

PROJECT LIMITS

PROJECT LIMITS

A:450.51

ST

:152+

176.75

CS

:152+

076.26

PINKIE ROAD

PINKIE ROAD

CONDIE ROADCONDIE ROAD

9T

H A

VE

NU

E

9T

H A

VE

NU

E

REGINA BYPASS

MA

TC

HLIN

E D

WG

15-A

-2-17

MA

TC

HLIN

E D

WG

15-A

-2-19

WASCANA CREEK

EXISTING ROAD

TO BE REMOVED

PRIVATE ACCESS

TO BE CONSTRUCTED

PRIVATE ACCESS

TO BE CONSTRUCTED

EXISTING ROAD

TO BE REMOVED

PAVED SERVICE ROAD (TO BE RECONSTRUCTED

PRIOR TO SUBSTANTIAL COMPLETION)

PAVED SERVICE ROAD

ROAD CLOSURE

CITY LIMITSEXISTING INFRASTRUCTURE

NUMBER OF LANES

REMOVALS

*

GRAVEL SERVICE ROAD

NUMBER OF PAVED/

GRADED LANES

FUTURE WORKS

HTCB

PAVING

NEW BYPASS INFRASTRUCTURE NEW BYPASS INFRASTRUCTURE

CUL DE SAC

EXISTING BYPASS INFRASTRUCTURE

BRIDGES

MISCELLANEOUS

BRIDGES

FUTURE WORKS

BRIDGES

GRADING FOR FUTURE

WORKS (TO BE

COMPLETED PRIOR TO

SUBSTANTIAL

COMPLETION)

Page 21: HIGHWAY 11 HIGHWAY 46 - SaskBuilds Agreement/The R… · r:-1015.11 a:302.22 r:-1015.11 a:339.89 a:339.89 st:118+815.78 cs:118+725.81 sc:117+240.55 ts:117+126.74 pi:116+848.58 tower

* * * *

*

PROJECT LIMITS

PROJECT LIMITS

P

R

O

J

E

C

T

L

I

M

I

T

S

PROJECT LIMITS

P

R

O

JE

C

T

L

IM

IT

S

A

:

4

4

8

.

3

2

R

:

2

0

1

9

.

7

0

A

:

4

4

8

.

3

2

A:448.32

R:2019.70

A:448.32

S

T

:

1

5

9

+

4

3

8

.

1

6

C

S

:

1

5

9

+

3

3

8

.

6

5

SC

:157+

446.61

TS

:157+

347.09

PINKIE ROAD

AR

MO

UR

R

OA

D

AR

MO

UR

R

OA

D

L

A

S

T

M

O

U

N

T

A

I

N

R

A

I

L

W

A

Y

(

C

R

A

I

K

S

U

B

)

L

A

S

T

M

O

U

N

T

A

I

N

R

A

I

L

W

A

Y

(

C

R

A

I

K

S

U

B

)

LMRR GRADE

SEPARATION

TW

P R

D 1

84

R

E

G

I

N

A

B

Y

P

A

S

S

R

E

G

I

N

A

B

Y

P

A

S

S

MA

TC

HLIN

E D

WG

15-A

-2-18

M

A

T

C

H

L

I

N

E

D

W

G

1

5

-

A

-

2

-

2

0

PAVED SERVICE ROAD (TO BE RECONSTRUCTED

PRIOR TO SUBSTANTIAL COMPLETION)

PAVED SERVICE ROAD

ROAD CLOSURE

CITY LIMITSEXISTING INFRASTRUCTURE

NUMBER OF LANES

REMOVALS

*

GRAVEL SERVICE ROAD

NUMBER OF PAVED/

GRADED LANES

FUTURE WORKS

HTCB

PAVING

NEW BYPASS INFRASTRUCTURE NEW BYPASS INFRASTRUCTURE

CUL DE SAC

EXISTING BYPASS INFRASTRUCTURE

BRIDGES

MISCELLANEOUS

BRIDGES

FUTURE WORKS

BRIDGES

GRADING FOR FUTURE

WORKS (TO BE

COMPLETED PRIOR TO

SUBSTANTIAL

COMPLETION)

Page 22: HIGHWAY 11 HIGHWAY 46 - SaskBuilds Agreement/The R… · r:-1015.11 a:302.22 r:-1015.11 a:339.89 a:339.89 st:118+815.78 cs:118+725.81 sc:117+240.55 ts:117+126.74 pi:116+848.58 tower

*

*

*

*

*

*

*

*

* *

*

*

*

*

*

*

*

*

*

*

* *

*

*

*

*

*

* * * * * * *

P

R

O

J

E

C

T

L

I

M

I

T

S

PR

O

JE

C

T LIM

IT

S

P

R

O

J

E

C

T

L

I

M

I

T

S

P

R

O

J

E

C

T

L

I

M

I

T

S

P

R

O

J

E

C

T

L

I

M

I

T

S

PR

OJE

CT

LIM

IT

S

PR

OJE

CT

LIM

IT

S

PR

OJE

CT

LIM

IT

S

P

R

O

J

E

C

T

L

I

M

I

T

S

HIGHWAY 11

R

G

E

R

D

2

2

0

3

R

G

E

R

D

2

2

0

3

C

P

R

HIGHWAY 11

INTERCHANGE

T

W

P

R

D

1

8

4

T

W

P

R

D

1

8

4

RE

GIN

A B

YP

AS

S

M

A

T

C

H

L

I

N

E

D

W

G

1

5

-

A

-

2

-

1

9

BOGGY

CREEK

EXISTING ROAD

TO BE REMOVED

EXISTING BRIDGES

TO BE REMOVED

EXISTING BRIDGE

TO BE REMOVED

EXISTING ROAD

TO BE REMOVED

EXISTING ROAD

TO BE REMOVED

BOGGY CREEK

STRUCTURE

TO BE EXTENDED

EXISTING BYPASS INFRASTRUCTURE

BRIDGES

MISCELLANEOUS

BRIDGES

FUTURE WORKS

BRIDGES

GRADING FOR FUTURE

WORKS (TO BE

COMPLETED PRIOR TO

SUBSTANTIAL

COMPLETION)

PAVED SERVICE ROAD (TO BE RECONSTRUCTED

PRIOR TO SUBSTANTIAL COMPLETION)

PAVED SERVICE ROAD

ROAD CLOSURE

CITY LIMITSEXISTING INFRASTRUCTURE

NUMBER OF LANES

REMOVALS

*

GRAVEL SERVICE ROAD

NUMBER OF PAVED/

GRADED LANES

FUTURE WORKS

HTCB

PAVING

NEW BYPASS INFRASTRUCTURE NEW BYPASS INFRASTRUCTURE

CUL DE SAC

Page 23: HIGHWAY 11 HIGHWAY 46 - SaskBuilds Agreement/The R… · r:-1015.11 a:302.22 r:-1015.11 a:339.89 a:339.89 st:118+815.78 cs:118+725.81 sc:117+240.55 ts:117+126.74 pi:116+848.58 tower

EXISTING WRB

INFRASTRUCTURE

HILL A

VE

NU

E

HIG

HW

AY

1

HIG

HW

AY

1

C

P

R

PINKIE ROAD

CE

NT

RE

R

OA

D

HIGHWAY 1 WEST

INTERCHANGE

C

P

R

REGINA BYPASS

Page 24: HIGHWAY 11 HIGHWAY 46 - SaskBuilds Agreement/The R… · r:-1015.11 a:302.22 r:-1015.11 a:339.89 a:339.89 st:118+815.78 cs:118+725.81 sc:117+240.55 ts:117+126.74 pi:116+848.58 tower

REGINA BYPASS MAINLINE CROSS-SECTION

REGINA BYPASS MAINLINE CROSS-SECTIONWITH RAMPS

REGINA BYPASS MAINLINE CROSS-SECTIONWITH 2 PAVED SERVICE ROADS

HWY 1 EAST MAINLINE CROSS-SECTION(MEDIAN LANES ADDED AS PER APPENDIX A DRAWINGS)

Page 25: HIGHWAY 11 HIGHWAY 46 - SaskBuilds Agreement/The R… · r:-1015.11 a:302.22 r:-1015.11 a:339.89 a:339.89 st:118+815.78 cs:118+725.81 sc:117+240.55 ts:117+126.74 pi:116+848.58 tower

HIGHWAY 46 CROSS-SECTION

HIGHWAY 48 CROSS-SECTION(FACING NORTH)

CL

EMERALD PARK ROADGREAT PLAINS INDUSTRIAL DRIVE

GRAVEL PIT ROAD

CL

FLEET STREETCOURTNEY STREET

ARMOUR ROAD

TOWER ROAD CROSS-SECTION

PILOT BUTTE CROSS-SECTION

REGINA BYPASS MAINLINE CROSS-SECTIONACROSS HIGHWAY 1 WEST

(LOOKING NORTH)

CL

HILL AVENUE CROSS-SECTION

Page 26: HIGHWAY 11 HIGHWAY 46 - SaskBuilds Agreement/The R… · r:-1015.11 a:302.22 r:-1015.11 a:339.89 a:339.89 st:118+815.78 cs:118+725.81 sc:117+240.55 ts:117+126.74 pi:116+848.58 tower

HIGHWAY 33 CROSS-SECTION(EXISTING)

HIGHWAY 6 CROSS-SECTIONWIDENING TO EAST SIDE NORTH OF ENBRIDGE

(FACING NORTH)

HIGHWAY 1 WEST CROSS SECTION - WEST AND EAST OF MAINLINE(EXISTING)

HIGHWAY 6 CROSS-SECTIONWIDENING TO WEST SIDE SOUTH OF TRANSITION

(FACING NORTH)

Page 27: HIGHWAY 11 HIGHWAY 46 - SaskBuilds Agreement/The R… · r:-1015.11 a:302.22 r:-1015.11 a:339.89 a:339.89 st:118+815.78 cs:118+725.81 sc:117+240.55 ts:117+126.74 pi:116+848.58 tower

ROTARY AVENUE CROSS SECTION- WEST OF INTERCHANGE

(LOOKING WEST)

DEWDNEY AVENUE CROSS-SECTION

9th AVENUE NORTH CROSS-SECTION

HIGHWAY 11 CROSS SECTION(EXISTING)

ROTARY AVENUE CROSS SECTION- ACROSS INTERCHANGE

(LOOKING WEST)

Page 28: HIGHWAY 11 HIGHWAY 46 - SaskBuilds Agreement/The R… · r:-1015.11 a:302.22 r:-1015.11 a:339.89 a:339.89 st:118+815.78 cs:118+725.81 sc:117+240.55 ts:117+126.74 pi:116+848.58 tower

TWO LANE RAMP

ONE LANE RAMP

GRAVEL SERVICE ROAD - 6m

CLCL

PAVED SERVICE ROAD - 9m

TWO LANE CD ROAD

ONE LANE CD ROAD

CUL-DE-SAC(MAY BE LEFT OR RIGHT OFFSET)

ONE LANE RAMP (FUTURE TWO LANE)

9TH AVENUE INTERCHANGE

WB-SB LOOP RAMPNB-EB DIRECTIONAL RAMP