    Highwall Mining Driing !arallel roadways into highwall" coal seam using

    remote controlled mining machinery # $%% '%% m de!th

    Highwall Mining

  • 8/17/2019 Highwall Mining 1

    4/20

  • 8/17/2019 Highwall Mining 1

    5/20

    Highwall Mining (ystems )*+ cont,

    Addcar (ystem  Launch ehicle  Coneyor cars

    Highwall Mining

  • 8/17/2019 Highwall Mining 1

    6/20

    Highwall Mining (ystems )$+

    Archeyor system

    Highwall Mining

  • 8/17/2019 Highwall Mining 1

    7/20

    Highwall Mining

    Highwall Mining (ystems )-+

    Auger system

  • 8/17/2019 Highwall Mining 1

    8/20

    Geotechnical Issues & .ating

      /nsu!!orted s!an sta0ility

      Pillar sta0ility  Panel (ta0ility

      Case studies

      Design guidelines

    Highwall Mining

  • 8/17/2019 Highwall Mining 1

    9/20

    Highwall Mining

    /nsu!!orted (!an (ta0ility

      1y!ical 2ailure mechanism  # delamination & sna!through

      (im!le analytical  # thic3ness o2 roo2 !late4 54

      Pro0a0ilistic a!!roach  .ealistic !rediction  # Geology4 roc3 !ro!erties

  • 8/17/2019 Highwall Mining 1

    10/20

    Highwall Mining

    Pillar (ta0ility

     La0 testing o2 coal strength

      6m!irical a!!roach

      Pillar sta0ility modelling  A!!lications and eri2ication in 2ield

    Pillar Strength v. Width/Height

    0

    5

    10

    15

    20

    25

    0 1 2 3 4 5

    Pillar Width/Height

       P   i   l   l  a  r

       P  e  a   k

       S   t  r  e  s  s

       (   S   t  r

    Proposed HWM

    Wagner 

    Bienawski

     Average Trendline

    0.36W/h)0.6!"6.00   +=Strength

    0.36w/h)0.6!"6.00   +=Strength

    0.!!w/h#w$0.6%W   +=

  • 8/17/2019 Highwall Mining 1

    11/20

  • 8/17/2019 Highwall Mining 1

    12/20

    Design Guidelines

    *' 3ey 2actors are considered4

    e,g, roo2 condition8 mine resere

    etc,8

    9ey 2actors are weighted

    di22erently in HMI8

    /ncertainty on :udgement is

    incor!orated,

    A gien site has two inde;

    alues< HMI rating4 con2idence

    leel,

    .ecommendation is gien 2or

    any HMI"Con2idence ratings,

    0

    10

    20

    30

    40

    50

    60

    70

    80

    0

    100

    0 10 20 30 40 50 60 70 80 0 100

    Highwall Mining Index (HMI)

       C  o  n   f   i   d  e  n  c  e   L  e  v  e   l   (      )

    !

    !ood si"e #or $HM

    %ining

    "

    Possi&l' a good si"e

    #or $HM %ining( More

    in#or%a"ion is need(

    #)i"e apparen"l' *ns*i"a&le

    #or $HM %ining( +*r",er

    eval*a"ion %a' &e needed i#

    new in#or%a"ion is availa&le

    $

    )i"e *ns*i"a&le #or

    $HM %ining(

    %ransition

    &one

    -.a%ple pi" 1

    &  Highwall Mining Inde; )HMI+ has 0een deelo!ed

    Highwall Mining

  • 8/17/2019 Highwall Mining 1

    13/20

    Guidance Control )*+

    Driing !arallel roadways  remote miner $%% to '%% m de!th

    Pro0lems Cutthrough=s connection Pillar 2ailure 2re>uent roo2 2alls Limited !enetration de!th

    panel 4

    /4167

    panel 3

    /2140

    panel 2

    /1120

    panel 1

    /110

    $raks on "op

    o# ",e ,ig,wall

    )*rve' da"a

    $raks on ",e

    #ae o# ",e

    ,ig,wall

    &serva"ion

    or",

    Highwall Mining

  • 8/17/2019 Highwall Mining 1

    14/20

    Guidance Control )$+ Problems to solve

    Uncertainty in pillar size

    Frequent cut-throughs

    Reduced penetration depth

    pillar/panel failure

    Guidance system Military grade nertial !avigation "ystem

    ndependent odometer

    #ontrolling computers

    $perator displace and interface

    %chievements Used in every &'M system in %ustralia

    !o mining equipment lost due to collapse

    Penetration depths increased - ()*m to )+*m

     

    Highwall Mining

  • 8/17/2019 Highwall Mining 1

    15/20

    Failures )*+

    Panel 2ailure

    Highwall Mining

    ?e2ore A2ter

  • 8/17/2019 Highwall Mining 1

    16/20

    Local !anel 2ailure at 5arra0ee MinePanel 2ailure at /lan Mine

    Highwall Mining

    Failures )$+

    Panel 2ailure

  • 8/17/2019 Highwall Mining 1

    17/20

    Lac3 o2 site inestigation

    Poor 3nowledge on s!an sta0ility

    Inade>uate !illar design

    Poor guidance control

    Critical !anel width

    Lac3 o2 3nowledge on insitu stresses

    No monitoring and 2eed0ac3  

    Factors contri0uting to !illar"!anel 2ailures

    Highwall Mining

  • 8/17/2019 Highwall Mining 1

    18/20

    Production Production @ * million tonnes !er year

    6m!loyees # '% )High !roductiity # main adantage+

    Continuous inert gas in:ection *'% l"s Penetration de!th # aries # *%% to '%% m )A -%%m+

     Gas issues

      (ta0ility issues 6ach roadway drien # almost in one day )or less+

    Production share in Australia # *B

    Highwall Mining

  • 8/17/2019 Highwall Mining 1

    19/20

    Conclusions

    Main attraction # high !roductiity and low cost

    (uita0le 2or certain conditions # '%% m 0oundary

    May lead to more 2ires and colla!ses Around '%B o2 e;traction

    Creates !ro0lems 2or dee!er reseres

    Production share in Australia # *B

    Punch longwall # !re2erred 2or large reseres

     High !roduction and longer term iew