HIGH SPEED RAIL TRANSPORT G. P. Kosta CBE/S. W. Rly./Hubli.

16
HIGH SPEED HIGH SPEED RAIL TRANSPORT RAIL TRANSPORT G. P. Kosta CBE/S. W. Rly./Hubli

Transcript of HIGH SPEED RAIL TRANSPORT G. P. Kosta CBE/S. W. Rly./Hubli.

Page 1: HIGH SPEED RAIL TRANSPORT G. P. Kosta CBE/S. W. Rly./Hubli.

HIGH SPEED HIGH SPEED RAIL TRANSPORTRAIL TRANSPORT

G. P. KostaCBE/S. W. Rly./Hubli

Page 2: HIGH SPEED RAIL TRANSPORT G. P. Kosta CBE/S. W. Rly./Hubli.
Page 3: HIGH SPEED RAIL TRANSPORT G. P. Kosta CBE/S. W. Rly./Hubli.

BACKGROUNDBACKGROUND

World Scenario: Speed up to 500 Kmph, Dedicated track & Rolling Stocks.

Present Position – Indian ContextMIXED TRAFFIC WITH SPEED VARIATION 60-130 KMPH

Page 4: HIGH SPEED RAIL TRANSPORT G. P. Kosta CBE/S. W. Rly./Hubli.

Need for High Speed Transport Need for High Speed Transport CorridorsCorridors

TO ADOPT LATEST TECHNOLOGY.

TO COPE UP HIGHER DEMAND for passenger and freight traffic.

TO COMPETE WITH OTHER SURFACE TRANSPORT SYSTEM.

Page 5: HIGH SPEED RAIL TRANSPORT G. P. Kosta CBE/S. W. Rly./Hubli.

Future Projections for INDIAN RAILWAYSINDIAN RAILWAYS

Increase in Passenger traffic by Increase in Passenger traffic by 30 to 40% in next 20 years.30 to 40% in next 20 years.

Increase in goods traffic by 80 Increase in goods traffic by 80 to 100%.to 100%.

Nominal increase in track Nominal increase in track structure.structure.

Page 6: HIGH SPEED RAIL TRANSPORT G. P. Kosta CBE/S. W. Rly./Hubli.

CHALLENGES BEFORE ENGINEERS

Present condition of TrackPresent condition of Track Formation treatment Re-alignment of curves Improving visibility at Level Crossings

Challenges to be faced in High Challenges to be faced in High Speed Transport CorridorsSpeed Transport Corridors -

For maintaining Track For maintaining Bridges Safety at LC gates

Page 7: HIGH SPEED RAIL TRANSPORT G. P. Kosta CBE/S. W. Rly./Hubli.

GOLDEN QUADRILATERALGOLDEN QUADRILATERAL

New Delhi – Howrah New Delhi – Mumbai New Delhi – Chennai Mumbai – Howrah Mumbai – Chennai Howrah – Chennai

Page 8: HIGH SPEED RAIL TRANSPORT G. P. Kosta CBE/S. W. Rly./Hubli.

OTHER SPECIFIED ROUTSOTHER SPECIFIED ROUTS

Ballary – Hubli – Vasco-Da-Gama section on

South Western RailwaysSouth Western Railways and other sections.

Page 9: HIGH SPEED RAIL TRANSPORT G. P. Kosta CBE/S. W. Rly./Hubli.

ROLLING STOCK

Present rolling stock and speed Passenger Trains at 90 - 160 KMPH Freight Trains at 60- 100 KMPH

Proposed rolling stock and speed Passenger Trains at 160 KMPH Freight Trains at 100 KMPH

Page 10: HIGH SPEED RAIL TRANSPORT G. P. Kosta CBE/S. W. Rly./Hubli.

TRACK FEATURESTRACK FEATURES

CurvesCurves Flattening of curves to accommodate

speed up to 90 KMPH without restriction Induction of HH rails on the curves.

P & CP & C 1 in 16 or flatter T/Os Use of thick web switches CMS crossings

Page 11: HIGH SPEED RAIL TRANSPORT G. P. Kosta CBE/S. W. Rly./Hubli.

TRACK FEATURES TRACK FEATURES Contd..Contd..

BridgesBridges- To be strengthen to take care of higher moving loads, high coefficient of augment, increased tractive and breaking forces and

others.

Level CrossingsLevel Crossings Manning of Unmanned LCs Interlocking of Manned LCs Provision of retro reflective boards for

improvement in visibility

Page 12: HIGH SPEED RAIL TRANSPORT G. P. Kosta CBE/S. W. Rly./Hubli.

INPUTS FOR MAINTAINING HIGH INPUTS FOR MAINTAINING HIGH SPEED CORRIDORS SPEED CORRIDORS

Frequent Training to P. Way Staff More safety seminars More refresher courses

Revision in USFD testing schedule Intensified high quality inspections Modification in temping cycle Strict check on flat tyre wheels Introduction of automation of

operation to minimise human error

Page 13: HIGH SPEED RAIL TRANSPORT G. P. Kosta CBE/S. W. Rly./Hubli.

ADVANTAGEADVANTAGE

Increase in throughput Improvement in turnaround

capacity of wagons More number of trains with no

significant investment Improvement in earnings

Page 14: HIGH SPEED RAIL TRANSPORT G. P. Kosta CBE/S. W. Rly./Hubli.

RECOMMENDATIONSRECOMMENDATIONS

Realignment of curves to suit higher speed and if necessary realignment of completed gauge converted tracks having series of sharp curves

Formation treatment to unstable formations

Provision of fencing at all trespassing locations to ensure no trespassing across high speed corridor

Provision of ROB / RUB for smooth passage of road traffic

Use of SPURT Car for USFD testing of rails

Page 15: HIGH SPEED RAIL TRANSPORT G. P. Kosta CBE/S. W. Rly./Hubli.

RECOMMENDATIONS RECOMMENDATIONS Contd.Contd.

Use of mobile flush but welding plant to minimise thermit weld failures and immediate attention

Use of corridor block for track works Use of 130 m rail panels

Page 16: HIGH SPEED RAIL TRANSPORT G. P. Kosta CBE/S. W. Rly./Hubli.

CONCLUSIONCONCLUSION

Optimisation of existing Line Capacity

Improvement in turnaround of the wagon

Maximization of earnings with very less investment