High School #13...COMP. SCI 2 SSEM PLAN (CTE) CTE CAREER ACADEMY COMP. SCI 1 INNOVATION LAB CONTROL...

9
High School #13 Construction Document Presentation, Daniel Lubeley, Acting Director, Capital Planning and Construction

Transcript of High School #13...COMP. SCI 2 SSEM PLAN (CTE) CTE CAREER ACADEMY COMP. SCI 1 INNOVATION LAB CONTROL...

Page 1: High School #13...COMP. SCI 2 SSEM PLAN (CTE) CTE CAREER ACADEMY COMP. SCI 1 INNOVATION LAB CONTROL ROOM TV STUDIO E S SP T SE RES 6 SE S T E TR S S S OT / …

High School #13

Construction Document Presentation, Daniel Lubeley,Acting Director, Capital Planning and Construction

Page 2: High School #13...COMP. SCI 2 SSEM PLAN (CTE) CTE CAREER ACADEMY COMP. SCI 1 INNOVATION LAB CONTROL ROOM TV STUDIO E S SP T SE RES 6 SE S T E TR S S S OT / …

Project Update• With an increased design capacity of 1,650, this is the fourth

iteration of the prototype plan with the program reviewed and modified for each iteration

• The purchase of the property by the County occurred on September 12, 2019. Anticipated property transfer from County to HCPSS by December 2019

• Continued coordination with the County and adjacent property owner with regards to utility access to the school, the public road and site access, and walkways on the school site to surrounding neighborhoods

Page 3: High School #13...COMP. SCI 2 SSEM PLAN (CTE) CTE CAREER ACADEMY COMP. SCI 1 INNOVATION LAB CONTROL ROOM TV STUDIO E S SP T SE RES 6 SE S T E TR S S S OT / …

Project Update (continued)• Refinements of the site plan include further design

development of the cafeteria outdoor dining area, the art patio, and storm water management facilities

• Some of the floor plan refinements include reconfiguration of the Physical Education locker room area, reconfiguration of the kitchen to promote a more efficient circulation for both students and staff, increase in individual corridor widths; and inclusion of additional display areas to assist with wayfinding at corridor intersections

• LEED ‘Silver’ certificate project under the new LEED for Schools version 4 maintaining a projected 54 LEED credits

Page 4: High School #13...COMP. SCI 2 SSEM PLAN (CTE) CTE CAREER ACADEMY COMP. SCI 1 INNOVATION LAB CONTROL ROOM TV STUDIO E S SP T SE RES 6 SE S T E TR S S S OT / …

Site Plan

Page 5: High School #13...COMP. SCI 2 SSEM PLAN (CTE) CTE CAREER ACADEMY COMP. SCI 1 INNOVATION LAB CONTROL ROOM TV STUDIO E S SP T SE RES 6 SE S T E TR S S S OT / …

Proposed First Floor Plan

AREA 'A'AREA 'D'

AREA 'B'AREA 'G'

AREA

'F'

AREA

'E'

AREA

'E'

AREA

'D'

AREA

'G'

AREA

'E'

AREA 'C'AREA 'A'

AREA

'B'

AREA

'C'

AREA

'B'

AREA

'A'

AREA 'H'AREA 'G'

AREA

'H'

AREA

'G'

AREA 'G'AREA 'F'

AREA 'H'ADD-ALTERNATE

AREA 'C'AREA 'A'

AREA 'C'AREA 'B'

AREA 'B'AREA 'G'

AREA 'A'AREA 'E'

AREA

'F'

AREA

'E'

AREA

'E'

AREA

'D'

SERVICE AREA

KITCHEN

COOLER

FREEZERDRY S

OFF

CAN

S

MOW

CAFETERIA

E

TR

EQ

GENS

TL

L

SHOPBSM OFF

ELEC

MECHANICAL

FIRE

S

S.E. RES 4

TR

MAT STORPLAN

CTE ENGINEERING /

TECH ED

CTE ENGINEERING /

TECH ED

CTE ENGINEERING /

TECH ED

STORSTOR STORSTOR

S

S

CONTRACT ROOM

SUPPAEP

TR

TT

T T

S

S

SS

TOFF

OFFCOT

HEALTH

EXAMWOMEN

MENCC

ART STORPLAN

ART STOR

ART STUDIO 1

ART STUDIO 2

PHOTO STUDIO

SCULPT /KILN

DARK ROOM

WOMENMEN

CC T

T

T

T

T

S

S

SROPRINC

PAR VOLFIN OFF

CONFREC

PRINCSEC

AP 2

AP 1WKRM

MAIN OFFICET

ATTEND

CAREER CENTER

OFF OFF OFF OFF OFF

OFF

OFF

OFF

OFF

DATA CLERK

CONF

WKRMREC

STAFF DINING

S.E. RES 1 (ALS)

S.E. SS

SE RES 3

ESOL 1 SE PLAN SE

CONF

S ELECTRONIC ENSEMBLEINSTR EQUIP

REPAIR

INSTRUMENTAL MUSICTTR CC T E UNIFORM

AUDITORIUM

S

SOFF

TOFF

TRS

P1

P2

P3

P4

CHORAL ROOM

DRAMA

OFF

CHANGE RM 1

CHANGE RM 2

T

T T

DANCE

S

S

TIX

STAGE

WORK SHOP

M

T

W

S

S

POLICELIAS

GYMNASIUM

PE S

TEAM S

TEAM S

TEAM ROOM

LAUN

TICKET

AUXILIARY GYMNASIUM

M W

T

CTE FACS LAB

WEIGHT TRAINING

CONCESSION

HEALTH CR 2

HEALTH CR 1

TRAINING

EXT. P.E. S

AD

CPLAN

CPLAN

CPLAN

T

SHWR SHWR

WOMEN LOCKERS

MEN LOCKERS

P.E. PLAN

P.E. PLAN

S

WRESTLING ROOM

ESOL 2

E

E TR CCT

M W

T

EXT SKITCHILD DEVEL.

CENTER

PRODUCTION

DISHCC

TL

STUDENTORG

STORE

S.E. RES 2 (ALS)

STUDENTDININGPATIO

OUTDOOREQUIPMENT

AREA

ARTPATIO

PLAYAREA

ELEV

ELEV

SEXT

S

TEAM ROOM

TEAM ROOM

TEAM ROOM TR

S S

S

OFF

ENCLOSEDMECHANICAL

EQUIPMENTAREA

0 8 16 32

ii

i

iiii

iv

v

vi

vii

Page 6: High School #13...COMP. SCI 2 SSEM PLAN (CTE) CTE CAREER ACADEMY COMP. SCI 1 INNOVATION LAB CONTROL ROOM TV STUDIO E S SP T SE RES 6 SE S T E TR S S S OT / …

Proposed Second and Third Floor Plans

Second Floor Third Floor

CONTROL ROOMS

S

OPEN TO

AUDITORIUM BELOW

CATWALK

CATWALKROOF

BELOW

ROOFBELOW

ROOFBELOW

OPEN TO

GYMNASIUM BELOW

OPEN TO

STAGEBELOW

MECHANICAL

OPEN TO

AUX GYMBELOW

CR1

CR2

CR3

SCC

T T

STAFF DINING

CR4

CR5

CR6

CR7

CR8

CR9

STOR

WKRME

STOR

AP 4

CONF

CR&DSEMINAR

1

GIFTED & TALENTED

G/T OFF

CR&DOFF

WORKROOM

PLANNING 1

CR10

CR11

CR12

CR13

CR15

CR14

BSAP

WOMENMEN

TCC

OPEN TO

COMMONS BELOW

MEDIA CENTER

MEDIA OFF

SMGRP

AREA

SMGRP

AREA

SMALLGROUPAREA

SER

MEDIA S

WOMEN

MEN

SET

S SEMPLAN(CTE)

CTE CAREERACADEMY

COMP. SCI 4

CTE CAREERACADEMY

COMP. SCI 3

CTE CAREERACADEMY

COMP. SCI 2

S SEMPLAN(CTE)

CTE CAREERACADEMY

COMP. SCI 1

INNOVATIONLAB

CONTROL ROOM

TV STUDIO

ES

SPT

SE RES 6

SE ST

E

TR

S

S

S

OT /PT

PREP

SEM

LIFE SCIENCE CR 4

LIFE SCIENCE CR 3

LIFE SCIENCE CR 2

LIFE SCIENCE CR 1

EARTH/SPACESCIENCE CR 1

EARTH/SPACESCIENCE CR 2S.E. RES 4

(ALS)JOURN /

YEARBOOK

SCIPLAN

ADD-ALTERNATEROOF BELOW

0 8 16 32

ELEV

ELEV

UP

UP

DN

UP

UP

DN

UP

UPUP

DN

UP

UP

DN

UP

ii

i

i

iii iv

iii

iii

iii iii

ROOFBELOW

ROOFBELOW

ROOFBELOW

CR23

CR24

CR23

TRCC

T T

STAFF DINING

CR24

CR27

CR28

CR29

CR30

CR31

S

WKRME

S

AP 4

CONF

MINI AUDITORIUM / TESTING

WORKROOM

PLANNING 1

CR10

CR33

CR34

CR35

CR37

CR36

HISPLIAS

WOMENMEN

TCC

OPEN TO

COMMONS BELOW

SEMINAR2

R

WOMEN

MEN

S.E.T

ES

T

PROFESSIONAL DEVELOPMENT

T

E

TR

S

SESOL

3

PREP

PHYSICAL SCIENCECR 4

PHYSICAL SCIENCECR 3

PHYSICAL SCIENCECR 2

PHYSICAL SCIENCECR 1

SCIENCEPLANNING

EARTH/SPACESCIENCE CR 3

EARTH/SPACESCIENCE CR 4

OPEN TO

MEDIA CENTER BELOW

CR38

CR39

PLANNING 4

PLANNING 3

CR40

SEM3

S

CR22

CR21

CR20

CR

CR17

CR16

CR18

STOR

SEM

0 8 16 32

DN

DN

ELEV

ii

i

i

iii

iii

iii

iv iv

iii iii

Page 7: High School #13...COMP. SCI 2 SSEM PLAN (CTE) CTE CAREER ACADEMY COMP. SCI 1 INNOVATION LAB CONTROL ROOM TV STUDIO E S SP T SE RES 6 SE S T E TR S S S OT / …

Architectural Character

Front North-Facing Elevation

Side West-Facing Elevation

Rear South-Facing Elevation

Side East-Facing Elevation

Page 8: High School #13...COMP. SCI 2 SSEM PLAN (CTE) CTE CAREER ACADEMY COMP. SCI 1 INNOVATION LAB CONTROL ROOM TV STUDIO E S SP T SE RES 6 SE S T E TR S S S OT / …

Total Project BudgetBase Construction EstimateArchitect/Engineering FeeConstruction Management FeeRelated CostsProject ContingencyEquipment and TechnologyProject Total Budget

Funding ProjectionsApproved Appropriations (FY19,FY20)FY21FY22FY23FY24Total Funding Projections

$107,932,041$6,457,700$4,868,574$5,404,000$5,404,000$5,404,000$135,470,315

$15,732,000$34,817,000$34,837,000$34,816,000$19,920,000$140,122,000 

Page 9: High School #13...COMP. SCI 2 SSEM PLAN (CTE) CTE CAREER ACADEMY COMP. SCI 1 INNOVATION LAB CONTROL ROOM TV STUDIO E S SP T SE RES 6 SE S T E TR S S S OT / …

Summary• Request approval to bid the project for construction

• Contingent upon state approval of the Construction Document submission:

– Construction award May 2020

– Construction complete April 2023

– New facility occupied September 2023