APPLICATIONFOR WELL LICENCEIn comphance with Ihe Oil and Gas Act and the Drilhng and Production Regulation, application is hereby made for a well
licence for.
Well Name Hi mark North Har ave 12-24-12-27
Well Location 12 24 12 27(LSD) (Quadrant) (Section) (Township) (Range)
Name of Well Owner HIGH~EXPLORATION INC.
hfanitoba Corporation No 6852719
Address of Well Owner 1560 —2002 Victoria Avenue Re 'na SK S4P OR7
Telephone 306 -790-1723
Surface Location 12(LSD)
Ground Elevation 473 67
Fax 306 -751-0811
24 12 27(Quadraat) (Seciion) (Township) (Rmge)
metres above sea level
Surface Co-ordinates
684.96m S of N of Sec 24
114.94m E of Wof Sec 24
Directional or Horizontal WellBottomHoie Co-ordinates
684.96m S of N of Sec 24
114.94m Eof Wof Sec 24
Surface Owner Richard 8c Brenda Reeves
Occupant None
Royalty Owner(s) See attached
Freehohl Oil and Gas Rights Leased By
Crown Reservation or Lease No.
Mammoth Land Tem leton(Nane of Otl md Gas Lease Agent aad Corporation)
Type of Well OIL
Projected Total Depth 693m in Mississi ian
Casing SizeOj). mm
1. 219.10
139.70
Weightim
35.70
20.83
Grade
J-5 5
J-55
From
Surface
Surface
To
140.00
693.00
EstimatedCemented Interval
Surface
Surface
Drilhng Contractor To Be Determined
Expected Spud Date 25-Oct-2014Rig No. 0
0$ -Oct-2014(Date) DD.'h9 Ihl YYYY (Signature of applicaat)
For assistance in completing this form contact Paulette Seymour at (204) 945-6575 or Dan Smzyshyn at (204) 945-8102.
For Department Use Only
Well Licence No.: 10154 UWIt 100.12-24-012-27W1.00
Well ClassifscationtEXPLORATORY (NEW FIELD WILDCAT)Please see attached conditions.
2~ct2014Date of Issue
Lic. No. 10154 Highmark North Hargrave 12-24-12-27 (WPM)
A licence to drill a well known as Highmark North Hargrave 12-24-12-27 (WPM) is hereby
granted to HIGHMARKEXPLORATION INC..
The Licensee shall comply with all the provisions of the Oil and Gas Act, the Drilling and
Production Regulation and the following terms and conditions:
1. A copy of a fully executed surface lease (i.e. signed by Highmark Exploration Inc.) is to be
forwarded to the Surface Rights Board at 360-1395 Ellice Avenue, Winnipeg, Manitoba R36
3P2, attention Barb Miskimmin.
2. Highmark is to provide samples taken at Sm intervals from the surface casing shoe to T.D.
One set of samples is to be washed, dried and preserved in vials that are labeled with the name
of the well and the depth at which each sample was taken (in accordance with Subsection
111(2) of the regulation) and shipped to the Rock Preparation Lab at 10 Midland Street in
Winnipeg.
3. Highmark must ensure that the cover of each sample cutting tray is labeled with the licence
¹, location and intervals for that particular tray.
4. Effective June 1, 2013. All submissions are now required to be submitted in digital format,
emailed to [email protected], as per Informational Notice 13-05.
Please ensure that the following is included in the subject line of your email: Company name,
well licence ¹, location (bottomhole) and the type of report (see Appendix 1) for logs see
Appendix 3.
Lic. No. 10154 Highmark North Hargrave 12-24-12-27 (WPM)
A licence to drill a well known as Highmark North Hargrave 12-24-12-27 (WPM) is hereby
granted to HIGHMARK EXPLORATION INC..
The Licensee shall comply with all the provisions of the Oil and Gas Act, the Drilling and
Production Regulation and the following terms and conditions:
1. A copy of a fully executed surface lease (i.e. signed by Highmark Exploration Inc.) is to be
forwarded to the Surface Rights Board at 360-1395 Ellice Avenue, Winnipeg, Manitoba R3G
3P2, attention Barb Miskimmin.
2. Highmark is to provide samples taken at 5m intervals from the surface casing shoe to T.D.
One set of samples is to be washed, dried and preserved in vials that are labeled with the name
of the well and the depth at which each sample was taken (in accordance with Subsection
111(2) of the regulation) and shipped to the Rock Preparation Lab at 10 Midland Street in
Winnipeg.
3. Highmark must ensure that the cover of each sample cutting tray is labeled with the licence
#, location and intervals for that particular tray.
4. Effective June 1, 2013. All submissions are now required to be submitted in digital format,
emailed to [email protected], as per Informational Notice 13-05.
Please ensure that the following is included in the subject line of your email: Company name,
well licence #, location (bottomhole) and the type of report (see Appendix 1) for logs see
Appendix 3.
Lie. No. 10154 Highmark North Hargrave 12-24-12-27 (WPM)
MANIT BA BMI I NRE IREMENT F RNEWWELL
The following notiTications and information must be provided to the appropriate district office.
OPERATIONS IN TOWNSHIPS 1 TO 6Dept. of Innovation, Energy and MinesPetroleum BranchBox 22023 Railway AvenueWaskadaMB ROM2EOPhone: 2044I73-2472 (24 hour service)Fax: 204-673-2767
OPERATIONS NORTH OF TOWNSHIP 6Dept. of Innovation, Energy and MinesPetroleum BranchBox 1359227 King Street WestVlrden MB ROM 2CO204-7484260 (24 hour service)204-748-2208
DRILLING, COMPLETION AND INITIALPRODUCTION SUBMSSION REGUIREMENTS
COMPANY REPRESENTATIVE ATWELLSITE IS RESPONSIBLE FOR ITEMS 1 TO 9.
1. 24 hours advance noses of Intent to spud a well.
FOR OEPr, u% ONLY
RECEIVED
2, 2 hours advance notice of intent to run and cement surface casing or production casing.
3. 2 hours advance notice of intent to pull pipe after running a DST.
4. 2 hours advance notice of a dry hole abandonment. Verbal approval to abandon must be obtained
horn the district oNce.
5, Weekly status reports on all acdvitles up to rig release. R rts tobe called in each MONDAY
6. Acomplete copy of the drilling tours.
7. Two (2) copies of field prints of all logs.
8. Tagged Image Ales of all open hole logs and cased hole logs and LAS (Log ASCII) Flies) for any
log that may be represented in LAS format (submlsed on 1.44 floppy disk, CD or DVD format) as
per Informational Nodce 054I5.
Two (2) copies of any directional sunreys run (submitted in digital format as per Informational
10. Aone (1) litre sample of drilling fluids. Squeezing of a pit is not to proceed without the consent of
the district office.
11. Any drill cutting samples and cores are to be shipped to: Rock Preparation Lab, 10 Midland
Street, Winnipeg MB, R3E 2Y6.
12. Two (2) copies of all reporls of drill stem tests, oore analyses or of any other test. (E.g, fluid
analyses, pressure surveys, etc.)
13. Two (2) copies of any Geological Repon,
14. Chronological report of all completion operations incluMng full details.
15. Two (2) copies of all completion logs.
16. Two (2) copies of the Initial Produchon Report (lorms ssached).
Lic. No. 10154 Highmark North Hargrave 12-24-12-27 (WPM)
H'ghma«jI 4-25
I20m. HighmarkA/R to 4-25 12m. MTS Caveat
No. 1116389/2WaterWell
SHEET 1 of 3
gran'd Residence
30.175Medium Grade Gravel-Road Government Road (70N) Allowance 30.175
to00ro
0
to
ro0
rb
E
tb 1
0U
1
Co srP co
ON
cc
Fd. 0.025Sq. I.B.
Low Area(Wet)
307 .012AZ=91'37'55
Old Bar
Old Building
160 pp
~rt
Cb
~o"
Overhead Power Line
(Operator: MB Hydro)
Abn'd Resid
13
Q Trail
CAUTION'/BHydro
0/H Power Line(Ht=+6.88m.)
Buried Water Line In Vicinity(Operator: RM of Wallace) //////
(///~Bins (x8)
I
X—20 ppm
Access Road
Low Area~~/
///
I.I
14-24J
530.229 Over ea Power LineAZ=91'37'55" (Operator: MB Hydro)
Fd. 0.025Sq. I.B.
rbcc0tb
tb
Barbed Wire
208'52'00"196.81
(Tie-Line)
SEEDETAIL
//
//
/
ITE PLAN
150 200 250m.
1: 5,000
12 -27WPM
Plan Showing Survey of
HIGHMARKNORTH HARGRAVE12-24-12-27WPM
I certify that the survey represented by this planis correct to the best of my knowledge and wascompleted on the 10th day of September, 2014.
Manitoba La Wit
Azimuths are NAD 83 (Zone 14) UTM Grid.All distances shown are horizontal and at ground level.
Combined Scale factor derived = 0.999790
Well Site and Access RoadL.S.12 Sec.24 Twp.12 Rge.27 WPMR.M. of Wallace
ELEVATIONON GROUNDATWELL LOCATION= 473.67
CO-ORDINATES:684.96 m. S of N Bdy. )
( Sec. 24114.94 m. E of W Bdy. (
GEO Co-ordinates UTM Co-ordinates
50 01 40'496 tI NAD ~ 5543759'194 N
101'03'20.770" $ ( 352759.838 E
50'01'40.485" ) $ 5543539.093 N101'03'19.100" $ ( 352788.216 E
Tar et Co-ordinates
19.9B North rIFrom SW Corner of Oil Target
14.94 East (Datum: Elevations shown are referenced to the Province
of Manitoba Mon. 82R723 Vertical Geodetic DatumCGVD28.
AREAS: HECTARES ACRES
Well SiteAccess Road
Total
1.2101.307
2.517
CERTIFICATEOF TITLE:NW 24-12-27WPM CT No. 2130164/2Richard Cowley ReevesBrenda Joy Reeves
2.993.23
6.22
Legal Survey Posts (found / planted)—Planted Wood HubSurveyed Well Centre - ———---Oo Producer-- ~Standing Well- —--———--—-- e Abandoned Producer--+Injection Well (Former Producer) 4 Abandoned Dry--4Abandoned Water Injection ———-4 Injection Well-- gSurface Location - Horizontal / Directional / Slant- ——————x-Portions referred to outlined thusDistances are in metres.
OPERATOR:
HIGHMARKEXPLORATION INCAltus Geomatics ~
Manitoba ~Toll Free: 1-800-465-6233
www.altos eomaticsmb.corn
NTS Sheet: 62 K/3
Client File No AFE No.:
REV Revision
Date: September 17, 2014 Job No.: 178208
Initials: SM - MB/KP - PFSFile: 178208W
SHEET 2 of 3
HIGHMARKa x p u 0 R AT I ro Ia
ib
Q iorv w
oi
O
riocill
xv
otx
eEEQl
0O
wecl0eivmc
DETAIL
0 20 40 60 80 100m
Scale -1: 2,000
YES NO- Is at least 1 5 km from the Corporate Limits of a City,
Town or Village 8 0- Is at least 75 m from any shoreline El 0- Is at least 75 m from any Surface Improvements El 0- Is at least 45 m from any Surveyed Road (III 0- Is at least 75 m. from any Aircraft Runway or Taxiway (III Q- Is at least 75 m from any Water Well 8 0- Approximately 13 7 km from the nearest Urban Centre (Elkhorn)- Approximately 1 0 km. from the nearest Residence (SWH 25-12-27WPM)
Client File No AFE Nox
REV Revision
Date: September 17, 2014 Job No 4 178208
Initials: SM - MB/KP - PFSFile: 178208W
Facilities shown on this plan are forinformational purposes only Prior to anyconstruction on lease or access road,HIGHMARKEXPLORATION INC, MTSCommunications Inc., Manitoba Hydro, andManitoba I-lydro-Gas Operations MUST becontacted for location of any undergroundfacilities that may exist.
H)GHMARKNORTH HARGRAVE12-24-12-27WPM
SHEET 3 of 3
HIGHMARKa XP L0 R A7 I 0 Ia
SURFACE DEVELOPMENT
0 05 1 15 2 25kmScale - 1: 50,000
NOTE:Residences are shown thus:- ————————- ~
70
~Le end:
Cl HOSPITAL
S LIFE FLIGHT EMERGENCY SERVICE
~256 SECONDARY HIGHWAY
Q2 PRIMARY HIGHWAY
~44N MUNICIPAL ROAD
Q TRANSCANADAHIGHWAY
ELKHORN
QSS
HtGHMARKNORTH HARGRAVE12-24-12-27WPMClient File No
REV Revision
AFE Noc
Date: September 17, 2014 Job No J 178208
Initials: SM - MB/KP - PFSFile: 178208W
HIGHMARK
Plan Showing Photo Mosaic of
HIGHMARKNORTH HARGRAVE12-24-12-27WPMfrom a Surface Location in
L.S.12 Sec.24 Twp.12 Rge.27 WPM
WELL SITE PHOTO PLAN
0 100 200 300 400 500m.
Scale - 1: 10,000
Photo Date: Ma 11,2012.
~D
Altus Geomatics QManitoba MEM6ER
Toll Free: 1-000e65-6233wwwerttuegeometioemb.oom
Client File No AFE No.:
REV Revision
Date: September 17, 2014 Job No.: 178208
File: I 78208W Initials: SM - MB/KP - PFS
San elTECHNICALJOB DESIGN
Pumping Services
August 30, 2014
Primary Cementing Procedure
Highmark North Hargrave16-21-12-27 W1M
Revision 1 - Revised the Production blend to lead and tail
Prepared For: Highmark Exploration inc.c/o Magus Engineering Limited
444 5th Ave SW
Calgary, AB T2P 2T8
Attention: Leland MelbyOffice: 403.767.3212
Cell: [email protected]
Client Solutions Representative: Tom McCarthyP 403.835.4934
Prepared By:
Revised By:
Bingchang WuP 403.542.3865
bwu@sanjel. corn
Chetan Kadhe
Service Location: Estevan, SKP 1.800.926.2216
Pressure Pumping ~ Completionssanj el. Com
Canada ~ USA ~ International
TECHNICAL JOB DESIGNPumping Services
Highmark North Hargrave16-21-12-27 W1M
Revision 1 - Revised the Production blend to lead and tail
Prepared For: Highmark Exploration Inc.c/o Magus Engineering Limited
444 5th Ave SWCalgary, AB T2P 2T8
Attention: Leland MelbyOffice: 403.767.3212
Cell: [email protected]
Client Solutions Representative: Tom McCarthyP 403.835.4934
Prepared By: BingChang Wu P 403.542.3865 ■ Professional Park Tours [email protected] Revised By: Chetan Kadhe ■ Cementing Schools
Service Location: Estevan, SKP 1.800.926.2216
■ Suretech Completion Technology
August 30, 2014
Speak to Your Sanjel Representative About:
Primary Cementing Procedure
Sangel Pride by Performance.
BE AWARE OF YOUR SURROUNDINGS AND ASSOCIATED HAZARDSEVERY JOB IS WORTH TAKINGTIME TO PERFORM IT SAFELY
COMMON CEMENTING HAZARDS
Dust
High pH
High Pressure
Hours of Operation
Communication
Noise
Footing
Mounting andDismounting
Weather
Eye protection
Spotting Equipment
Wear dust masks when operating bulk cement binsCement has a very high pH. Ensure skin is washed clean when in contact withcement
Treatment iron has a high pressure potential. Ensure people are not near iron
during pressure test or during the cementing job
Do not operate equipment when fatigued. Ensure all workers are alert and able toperform
Use radios to communicate with Sanjel crew, rig crew and location consultantwhen lines of sight are compromised
Wear earplugs when operating equipment or around engines or blowers during
job
Identify when the ground is not level, slippery or wet and implement controlmeasures
Use stairs when available. Avoid stepping over or jumping off equipment with
slippery conditions and uneven ground
Be prepared for all weather conditions and address appropriatelyPoor road conditions
Cold weatherWet equipment
Wear eye protection at all times when on location
Always use a guide when backing up. Make sure that clear lines of sight areavailable and noise is not amplified by surrounding equipment
Site Awareness
Wildlife
Casing Buoyancy
PPE
Lifting
All workers on location must know where the Muster Point and eye wash stationsare located
Be aware of wildlife while driving and on location
Understand the chaining requirements of each job. Especially important onsurface jobs
Ensure proper PPE is used at all times for each specific job
Use a helper to lift objects
REPORT ALLUNSAFE CONDITIONS
Pressure Pumping ~ Completions
Canada ~ USA ~ International
COMMON CEMENTING HAZARDS
Dust Wear dust masks when operating bulk cement binsHigh pH
High Pressure
Hours of Operation
Communication
Noise
Footing
WeatherPoor road conditionsCold weatherWet equipment
Eye protection Wear eye protection at all times when on locationSpotting Equipment
Site Awareness
Wildlife Be aware of wildlife while driving and on locationCasing Buoyancy
PPE Ensure proper PPE is used at all times for each specific jobLifting Use a helper to lift objects
Wear earplugs when operating equipment or around engines or blowers during job
Always use a guide when backing up. Make sure that clear lines of sight are available and noise is not amplified by surrounding equipment
Be prepared for all weather conditions and address appropriately
Use stairs when available. Avoid stepping over or jumping off equipment with slippery conditions and uneven ground
Mounting and Dismounting
REPORT ALL UNSAFE CONDITIONS
Identify when the ground is not level, slippery or wet and implement control measures
All workers on location must know where the Muster Point and eye wash stations are located
Understand the chaining requirements of each job. Especially important on surface jobs
Treatment iron has a high pressure potential. Ensure people are not near iron during pressure test or during the cementing job
Do not operate equipment when fatigued. Ensure all workers are alert and able to perform
Cement has a very high pH. Ensure skin is washed clean when in contact with cement
BE AWARE OF YOUR SURROUNDINGS AND ASSOCIATED HAZARDSEVERY JOB IS WORTH TAKING TIME TO PERFORM IT SAFELY
Use radios to communicate with Sanjel crew, rig crew and location consultant when lines of sight are compromised
Highmark North Hargrave Revision 1
16-21-12-27 W1M
Surface Casing
Hole Size:
Casing Size:
Depth:Annular Capacity:Excess:
311.2 mm219.1 mm, 35.72 kg/m J-55, ST8 C140 m
0.0384 m'/m
50 % (Gauge)
Cement Blend
Cement Data
SSi + 0.15% CFR-2 + 2.00% CaCI2 + 0.15% CDF-4P140 m to Surface = 140 m AER Code: 01
Note: If losses occur while drilling add 3% LCC-1 to the cement blend
Water RequirementYield
DensitySack WeightMix Water DensityThickening TimeCompressive Strength
Temperature
:m'/t:m'/t
:kg/m'kg
:kg/m'hrs:min
:MPa/hrs
. 0C
0.5470.8971750102310004:002/84/1620
Calculations
0.03845.40.48.5
m'/m x140 mm'+ 50% excessm'+ 0% excessm' 0.897 m'/t
5.4m'.1
m'.4
m'.5
tonnes
Highmark North Hargrave Revision 116-21-12-27 W1M
Surface Casing
Hole Size: 311.2 mmCasing Size: 219.1 mm, 35.72 kg/m J-55, ST&CDepth: 140 mAnnular Capacity: 0.0384 m³/mExcess: 50 % (Gauge)
Cement Blend140 m to Surface = 140 m AER Code: 01
Note: If losses occur while drilling add 3% LCC-1 to the cement blendCement Data
Water Requirement :m³/t 0.547Yield :m³/t 0.897Density :kg/m³ 1750Sack Weight :kg 1023Mix Water Density :kg/m³ 1000Thickening Time :hrs:min 4:00Compressive Strength :MPa/hrs 2/8
4/16Temperature :°C 20
Calculations
0.0384 m³/m x 140 m = 5.4 m³5.4 m³ + 50 % excess = 8.1 m³0.4 m³ + 0 % excess = 0.4 m³8.5 m³ / 0.897 m³/t = 9.5 tonnes
SSi + 0.15% CFR-2 + 2.00% CaCl2 + 0.15% CDF-4P
Highmark North Hargrave Revision 1
16-21-12-27 W1M
Surface Casing Procedure
NOTE: Casing must be tied down with 2 x 0.5 inch Grade 40 chain(s)
1. Make up float equipment and centralizers as required on 219.1 mm surface casing and run in to totaldepth.
2. Break circulation and condition hole and drilling fluid as required prior to cementing.
3. Rig in a Sanjel single cementing unit, surface casing treating lines and a 219.1 mm swage to casing.
4. Pump a 3.0 m'resh water pref lush and pressure test surface treating lines to 16 MPa.
5. Mix and pump 9.5 t (8.5 m') SSi+ additives at 1750 kg/m'.
6. Drop a 219.1 mm wood top plug and displace to floats with water. Bump with a minimum of 3.5 MPaover final pumping pressure.
NOTE ~ Stop at calculated displacement point, and follow procedures to confirm plug has beendropped. If the plug has been dropped, consult with Client Representative on location andcontinue to displace as directed. Also, confirm procedure with Sanjel operations.
7. Hold pressure for 2 minutes, then bleed back casing pressure to ensure float is holding.
8. If float does not hold, install a pressure gauge on the swage and maintain 500 kPa pressure overfinal pumping pressure for a minimum of 4 hours.
9. W.O.C. a minimum of 8 hours prior to drillout.
The cement being pumped has thixotropic properties; do not stage-displace. Cementmust move continuously.
Highmark North Hargrave Revision 116-21-12-27 W1M
Surface Casing Procedure
NOTE: Casing must be tied down with 2 x 0.5 inch Grade 40 chain(s)
1.
2. Break circulation and condition hole and drilling fluid as required prior to cementing.
3.
4. Pump a 3.0 m³ fresh water preflush and pressure test surface treating lines to 16 MPa.
5. Mix and pump 9.5 t (8.5 m³) SSi + additives at 1750 kg/m³.
6.
NOTE:
7. Hold pressure for 2 minutes, then bleed back casing pressure to ensure float is holding.
8.
9. W.O.C. a minimum of 8 hours prior to drillout.
The cement being pumped has thixotropic properties; do not stage-displace. Cement must move continuously.
Make up float equipment and centralizers as required on 219.1 mm surface casing and run in to total depth.
Rig in a Sanjel single cementing unit, surface casing treating lines and a 219.1 mm swage to casing.
Drop a 219.1 mm wood top plug and displace to floats with water. Bump with a minimum of 3.5 MPa over final pumping pressure.
If float does not hold, install a pressure gauge on the swage and maintain 500 kPa pressure over final pumping pressure for a minimum of 4 hours.
Stop at calculated displacement point, and follow procedures to confirm plug has been dropped. If the plug has been dropped, consult with Client Representative on location and continue to displace as directed. Also, confirm procedure with Sanjel operations.
Highmark North Hargrave Revision 1
16-21-12-27 W1M
Production Casing
Hole Size:
Casing Size:
Depth:Excess (Lead):Excess (Tail):Surface Casing:
200.0 mm
139.7 mm, 20.83 kg/m J-55, ST&C700 m
30 % (gauge), 20 % (caliper)30 % (gauge), 20 % (caliper)219.1 mm, landed at 140 m
Cement Blends
Lead Cement iGain (Sask) + 0.05% CFL-3+ 1.00% FWCA-H + 0.25% SMS + 0.15% CDF-4P + 3.00%LCC-1
500 m to Surface = 500 m
Tail Cement iBond + 0.20% CFL-3+ 0.30% LTR + 1.50% FWCA+ 0.15% CDF-4P700 m to 500 m = 200 m AER Code: 01
Cement Data
Water RequirementYield
DensitySack WeightMix Water Density
Thickening TimeTT40Compressive Strength
TemperatureFluid Loss
Free WaterCalculationsScavenger 3.0 m' 2.57 m'It
BHST: 30'C
:m'/t:m'/t
:kg/m'kg
:kg/m'hrs:min
:hrs:min
:MPa/hrs
C:cc/ 30 min
BHCT: 32'C
Lead Cement0.9351.3001500
10151000
3:302:20
1.9/163.9/245.9/48
30
38
0.0
1.2 tonnes
Tail Cement0.501
0.8561780
10221000
3:302:402.5/812/16
17.5/24
3020
<0.1
~Scaven er
2.21
2.571250
Lead CementIn Casing 0.0179 m'Im x 140 m + 0% excess
In OH 0.0161 m'Im x 360 m + 30% excessTonnage (2.5 m'+ 7.5 m') / 1.30 m'It
25m'5
m'.7
tonnes
Tail Cement
In OHIn ShoeTonnage
0.0161 m'/m x 200 m + 30% excess
0.0127 m'/m x 10 m + 0% excess
4.4 m'/0.86 m'/t
43m'.1
5.0 tonnes
Highmark North Hargrave Revision 116-21-12-27 W1M
Production Casing
Hole Size: 200.0 mmCasing Size: 139.7 mm, 20.83 kg/m J-55, ST&CDepth: 700 mExcess (Lead): 30 % (gauge), 20 % (caliper)Excess (Tail): 30 % (gauge), 20 % (caliper)Surface Casing: 219.1 mm, landed at 140 m
Cement Blends
Lead Cement
500 m to Surface = 500 m AER Code: 42
Tail Cement700 m to 500 m = 200 m AER Code: 01
Cement Data BHST: 30°C BHCT: 32°C
Lead Cement Tail Cement ScavengerWater Requirement :m³/t 0.935 0.501 2.21Yield :m³/t 1.300 0.856 2.57Density :kg/m³ 1500 1780 1250Sack Weight :kg 1015 1022Mix Water Density :kg/m³ 1000 1000Thickening Time :hrs:min 3:30 3:30TT40 :hrs:min 2:20 2:40Compressive Strength :MPa/hrs 1.9/16 2.5/8
3.9/24 12/165.9/48 17.5/24
Temperature :°C 30 30Fluid Loss :cc/ 30 min 38 20Free Water :% 0.0 <0.1
CalculationsScavenger 3.0 m³ / 2.57 m³/t = 1.2 tonnes
Lead CementIn Casing 0.0179 m³/m x 140 m + 0% excess = 2.5 m³In OH 0.0161 m³/m x 360 m + 30% excess = 7.5 m³Tonnage (2.5 m³ + 7.5 m³) / 1.30 m³/t = 7.7 tonnes
Tail Cement
In OH 0.0161 m³/m x 200 m + 30% excess = 4.3 m³In Shoe 0.0127 m³/m x 10 m + 0% excess = 0.1Tonnage 4.4 m³ / 0.86 m³/t = 5.0 tonnes
iGain (Sask) + 0.05% CFL-3 + 1.00% FWCA-H + 0.25% SMS + 0.15% CDF-4P + 3.00% LCC-1
iBond + 0.20% CFL-3 + 0.30% LTR + 1.50% FWCA + 0.15% CDF-4P
Highmark North Hargrave Revision 1
16-21-12-27 W1M
Production Casing Procedure
1. Make up float equipment as required on 139.7 mm casing and run in to total depth.
2. Break circulation and condition hole and drilling fluid prior to cementing.
3. Rig in a Sanjel single cementing unit, surface treating lines with pump-out 'T'nd a 139.7 mm plug loadinghead to casing.
4. Fill surface treating lines with water and pressure test to 21 MPa.
5. Drop a bottom rubber wiper plug and mix and pump the following:~ 2.0 m'resh water~ 3.0 m'isweep Spacer mixed at 1100 kg/m'
3.0 m'cavenger slurry mixed at 1250 kg/m'1.2 tonnes)~ 7.7 tonne (10.0 m') iGain (Sask) + additives mixed at 1500 kg/m'
5.0 tonne (4.3 m') iBond + additives mixed at 1780kg/m'.
Pump out lines through pump-out 'T'nd drop a top rubber plug and displace to float collar with water at 1.0m'/min.
7. Bump plug with a minimum of 3.5 MPa over final pumping pressure.
8. Hold pressure for 2 minutes, then bleed back casing pressure to ensure float is holding.
9. If float does not hold, install a pressure gauge on the cementing head and maintain 500 kPa pressure overfinal pumping pressure for a minimum of 4 hours.
10. W.O.C. a minimum of 24 hours.
IF MUD DENSITY > 1050 kgim':* Weight pref lush to a minimum of the equivalent mud density, unless otherwise specified* lfpref lush is water, use 1.0 m'or pressure test and increase spacer volume* Weight spacer to a minimum of the equivalent mud density + 50 kglm'
Highmark North Hargrave Revision 116-21-12-27 W1M
Production Casing Procedure
1. Make up float equipment as required on 139.7 mm casing and run in to total depth.
2. Break circulation and condition hole and drilling fluid prior to cementing.
3.
4. Fill surface treating lines with water and pressure test to 21 MPa.
5. Drop a bottom rubber wiper plug and mix and pump the following:■ 2.0 m³ fresh water■ 3.0 m³ Visweep Spacer mixed at 1100 kg/m³ ■ 3.0 m³ scavenger slurry mixed at 1250 kg/m³ (1.2 tonnes)■ 7.7 tonne (10.0 m³) iGain (Sask) + additives mixed at 1500 kg/m³■ 5.0 tonne (4.3 m³) iBond + additives mixed at 1780 kg/m³
6.
7. Bump plug with a minimum of 3.5 MPa over final pumping pressure.
8. Hold pressure for 2 minutes, then bleed back casing pressure to ensure float is holding.
9.
10. W.O.C. a minimum of 24 hours.
IF MUD DENSITY > 1050 kg/m³:* Weight preflush to a minimum of the equivalent mud density, unless otherwise specified* If preflush is water, use 1.0 m³ for pressure test and increase spacer volume* Weight spacer to a minimum of the equivalent mud density + 50 kg/m³
If float does not hold, install a pressure gauge on the cementing head and maintain 500 kPa pressure over final pumping pressure for a minimum of 4 hours.
Rig in a Sanjel single cementing unit, surface treating lines with pump-out 'T' and a 139.7 mm plug loading head to casing.
Pump out lines through pump-out 'T' and drop a top rubber plug and displace to float collar with water at 1.0 m³/min.
Highmark North Hargrave16-21-12-27 W1M
PRIMARY CEMENTING QUOTATION:
1.0 Surface Casing1.1 Pumping Services: Cementing Base Charge (6 hours), Unit Travel,
Cementing Plugs, Environmental Surcharge
1.2 SSi + 0.15% CFR-2+ 2.00% CaCI2+ 0.15% CDF-4P /tonne1.3 Estimated Cost (Based on 9.7 tonnes)
$ 1,800.00
$ 490.00
$ 6,553.00
2.0 Setup Charge 3
2.1 Pumping Services: Cementing Base Charge (6 hours), Unit Travel,Cementing Plugs, Radios
$ 2,525.00
2.2 iGain + 0.05% CFL-3+ 1.00% FWCA-H + 0.25% SMS /tonne
2.3 iBond + 0.20% CFL-3+ 0.30% LTR+ 1.50% FWCA+ 0.15% CDF-4P/tonne
$ 515.00
$ 685.00
2.4 Visweep Spacer (3.0 m')
2.5 Estimated Cost (Based on 9.0 tonnes lead and 5.1 tonnes tail)
$ 870.00
$ 11,523.50
3.0
3.1
3.2 Bin Rental - per job (if required)3.3 Bin Delivery - per hour (if required)
MiscellaneousAdditional Location Time after initial 6 hours location time - per hour, per unit
Twin PumperSingle PumperBulker
$ 410.00 *
$ 345.00 *
$ 180.00 *
$ 540.00 *
$ 225.00 *
4.0 Additional Services and Materials
Applies to any services and materials not included in this tenderCurrent Price List Less 64%
* Not Subject to Discount** Pricing subject to change** A fuel surcharge, when applicable, will apply** Prices quoted are in effect for 30 days from the date of the proposal** Provincial and Federal taxes, where applicable, are additional** A surcharge of 4.0% will be applied to jobs performed in the province of British Columbia
Please refer to the General Terms and Conditions (the "Terms" ) contained on the last page of thisProposal. Allpricing and services (including any supply of materials or consumables) described in thisProposal, and any other services performed or materials or consumables supplied by Sanjel to Customerwhich may be outside the scope of this Proposal, are subject to the Terms, which form part of thisProposal. By accepting this Proposal (either expressly or by calling out Sanjel for any services orsupply), Customer hereby agrees to be bound by the Terms. Such acceptance shall constitute anacknowledgment by Customer that it has reviewed the Terms and has had the opportunity to seek properlegal advice.
Highmark North Hargrave16-21-12-27 W1M
PRIMARY CEMENTING QUOTATION:
1.0 Surface Casing1.1 $1,800.001.11.2 $490.001.3 $6,553.00
2.0 Setup Charge 32.1 $2,525.002.12.12.2 $515.002.22.3 $685.002.32.32.4 $870.00
2.5 $11,523.50
3.0 Miscellaneous3.1 Additional Location Time after initial 6 hours location time - per hour, per unit
Twin Pumper $410.00 *Single Pumper $345.00 *Bulker $180.00 *
3.2 Bin Rental - per job (if required) $540.00 *3.3 Bin Delivery - per hour (if required) $225.00 *
4.0 Additional Services and MaterialsApplies to any services and materials not included in this tender
Current Price List Less 64%* Not Subject to Discount** Pricing subject to change** A fuel surcharge, when applicable, will apply** Prices quoted are in effect for 30 days from the date of the proposal** Provincial and Federal taxes, where applicable, are additional** A surcharge of 4.0% will be applied to jobs performed in the province of British Columbia
Please refer to the General Terms and Conditions (the “Terms”) contained on the last page of this Proposal. All pricing and services (including any supply of materials or consumables) described in this Proposal, and any other services performed or materials or consumables supplied by Sanjel to Customer which may be outside the scope of this Proposal, are subject to the Terms, which form part of this Proposal. By accepting this Proposal (either expressly or by calling out Sanjel for any services or supply), Customer hereby agrees to be bound by the Terms. Such acceptance shall constitute an acknowledgment by Customer that it has reviewed the Terms and has had the opportunity to seek proper legal advice.
Estimated Cost (Based on 9.7 tonnes)
Pumping Services: Cementing Base Charge (6 hours), Unit Travel, Cementing Plugs, Environmental Surcharge
SSi + 0.15% CFR-2 + 2.00% CaCl2 + 0.15% CDF-4P /tonne
Visweep Spacer (3.0 m³)
Estimated Cost (Based on 9.0 tonnes lead and 5.1 tonnes tail)
Pumping Services: Cementing Base Charge (6 hours), Unit Travel, Cementing Plugs, Radios
iGain + 0.05% CFL-3 + 1.00% FWCA-H + 0.25% SMS /tonne
iBond + 0.20% CFL-3 + 0.30% LTR + 1.50% FWCA + 0.15% CDF-4P /tonne
General Terms and Conditions
I Agreement for Services. San/el Canada Ltd ("San/el") and the customer for whom San/el is
providing the Services ("Customer', (cogectively, the 'Parbes"), expressly understand and agree
that the terms and conditions in this agreement (the 'Agreement" ) shall govern and control the
provision of all services provided by San/el to Customer, including any services, matenals or
consumables provided or performed by Sanlel under wntten or oral requests for services or/oh
orders('Services" )
2 Entire Agreement and Conflict. Sub/ect to any Master Service Agreement ('MSA") in effect
between the Parties, this Agreement constitutes the entire agreement of the Parties with respect
to the sub/ect matter herein This Agreement shall not be superseded or replaced by any other
agreement (including any terms and conditions which may be found in any purchase order,
service order or invoice produced by the Customer) unless speaficagy agreed to by the Parbes in
wnting If there is any conffict between the terms of this Agreement and the MSA, the provisions
of the MSA shall prevail
3 Results of Service. The Customer acknowledges and agrees that the Services are of such a
nature that no results of the work performed can be guaranteed and San/el speaficagy does not
make any representations, warranties or guarantees with respect to the results of the Services
4 Price and Price Changes. Customer shall pay for the Services at the rates set out in San/el's
current Pnce Book ('Pnce Book') All rates and pnces quoted in the Pnce Book are sub/ect to
change without pnor notice to the Customer, including the imposition of fuel or other surcharges
related to increases in commodity pnces Special lobe undertaken by San/el outside of the scope
of the Services shall not be sub/ect to Pnce Book or any previously agreed upon discounts
5 Taxes. All pnces are exclusive of taxes imposed on the sale of the Services
6 Additional Service Requests. Services or matenals not hated in the Pnce Book but
purchased by San/el at Customer's request shall be charged to Customer at actual cost plus
twenty five percent (25%)
7 Payment Terms. Payment terms are cash, net thirty (30) days Interest shall be charged at
eighteen percent (18%) per annum on ag overdue accounts, and where necessary, all costs of
collection of overdue accounts, including any legal fees and disbursements
6 Standby Charge. In the event that San/el is unable to perform a Iob or provide requested
Services to Customer due to arcumstances beyond its control, including instances of force
maleure, San/el retains the nght to charge Customer seventy five percent (75%) of the appkcable
base charge, plus one hundred percent (100%) of arsis including, but not kmited to, mileage,
blending, matenal handing/hauling, matenals and/or return dekvery and restocking charges, and
all location time in excess of the location time allowance
9 Warranties. Sanlel warrants only that title to the product, supplies and matenals, shall pass
and vest in Customer, free and clear of ag liens, claims and encumbrances of any nature, and that
the same are free from defects in workmanship There are no warranties, express or implied, of
merchantability, use, fitness or otherwise which extend beyond those expressly stated herein
10 Proprietary Rights. Customer acknowledges that any intellectual property which is used by
San/el for the provisions of Services, or is created or developed by Sanlel in the course of
performing the Services, is and shall remain the property of and is owed by San/el at all times
11 Confidentiality. The Parbes agree to take all reasonable precautions to protect the
confidential information of the other from unauthonzed use and disclosure and each Party shall
use the confidential information of the other only for the purpose of conducting the Services
12. Liability and Indemnity. (a) Subject to Sections 13 and 14 below, Customer shall be
liable to Sanjel for all claim, demands, actions, causes of action, damages, losses,
deficiencies, costs, liabilities, expenses (including legal fees, on a solicitor-client basis)
("Claims" ), that may be made or brought against Sanjel (either directly by Customer, its
affiliates or subsidiaries or by any third party) or which Sanjel may suffer or incur as a
result of, arising out of or incident to this Agreement or any Services provided hereunder,
whether such claim is found in contract, tort or any other cause of action whatsoever,
unless caused by the negligence or willful misconduct of Sanjel. (b) Notwithstanding
section 12(a), Customer shall at all times be solely liable for any Claims made or brought
against Sanjel (either by Customer, its affiliates or subsidiaries or by any third parly) or
which Sanjel may suffer or incur as a result of, arising out of or incident to: well blowout or
any uncontrolled well condition, fire, cratering, redrill or sidetracking, seepage or reservoir
damage, loss or damage to the hole (including tubulars and casing), pollution and
contamination except sudden and accidental pollution originating above the surface of the
earth and emanating from Sanjel's equipment while such equipment is in Sanjel's care,
custody and control; even if caused in whole or in part by the sole, joint or concurrent
negligence, gross negligence, willful misconduct or other fault (active or passive) of Sanjel
or any other person. (c) Customer shall release, protect, defend, indemnify and save
harmless Sanjel, its affiliates and subsidiaries from and against aff the Claims described in
sections 12(a) and 12(b) above.
13. Liability Cap. Notwithstanding Section 12 or any other term herein to the contrary,
Sanjel's maximum liability to Customer arising out of or in connection with this Agreement
and any services provided hereunder is limited to the cost of the products or services
supplied for the particular job in which such damages arose.
14 Consequential Damages. Notwithstanding section 12 or any other term herein to the
contrary, neither Party shall be liable to the other for business interruptions, punitive, indirect or
consequential damages relating thereto (including but not kmited to any loss of profit, loss of
expected revenue, loss of hydrocarbons or ng time)
15 Equipment and Materials. Customer shall be bable to Sanlel for any and ag loss or damage
to San/el's equipment, tools or matenals (i) while being used down hole, and (a) while being
transported to or from the work-site by Customer at any time or while such equipment, tools or
matenal are being loaded onto or attached to any transportation unit or vehicle furnished by or
arranged for by Customer In the event any San/el equipment is lost, damaged or destroyed
dunng the provision of Service, Customer shall use reasonable efforts to dikgently recover or
repair said equipment, and in the event recovery or repair are not possible, Customer agrees to
reimburse San/el for the lost, damaged or destroyed equipment at actual replacement cost value
plus twenty-five percent (25%)
16 Disposal of Chemicals. Customer shall arrange for and be responsible for the disposal of
any used chemicals, hazardous matenal(s), including but not limited to, any waste produced or
accumulated dunng the provision of Services
17 Waiver. Failure to enforce any or ag of the above terms and conditions shall not relieve the
Parties of their nghts and obligations hereunder or constitute a waiver thereof or preclude
subsequent enforcement of same
16 Amendments. This Agreement may only be amended by a wntten agreement between the
Parties signed by a duly authonzed representative of each Party
19 Governing Law. This Agreement shall be governed by the laws of the Province of Alberta
Customer shall not bnng any action or proceeding related to the Services except in the ludiaal
distnct of Calgary, AB, provided however that this shall not restnct any nght of appeal
Effective Starclr 1, 2013Effective March 1, 2013
1. Agreement for Services. Sanjel Canada Ltd. (“Sanjel”) and the customer for whom Sanjel is
providing the Services (“Customer”), (collectively, the “Parties”), expressly understand and agree
that the terms and conditions in this agreement (the “Agreement”) shall govern and control the
provision of all services provided by Sanjel to Customer, including any services, materials or
consumables provided or performed by Sanjel under written or oral requests for services or job
orders (“Services”).2. Entire Agreement and Conflict. Subject to any Master Service Agreement (“MSA”) in effect
between the Parties, this Agreement constitutes the entire agreement of the Parties with respect
to the subject matter herein. This Agreement shall not be superseded or replaced by any other
agreement (including any terms and conditions which may be found in any purchase order,
service order or invoice produced by the Customer) unless specifically agreed to by the Parties in
writing. If there is any conflict between the terms of this Agreement and the MSA, the provisions
of the MSA shall prevail.
14. Consequential Damages. Notwithstanding section 12 or any other term herein to thecontrary, neither Party shall be liable to the other for business interruptions, punitive, indirect orconsequential damages relating thereto (including but not limited to any loss of profit, loss ofexpected revenue, loss of hydrocarbons or rig time).
7. Payment Terms. Payment terms are cash, net thirty (30) days. Interest shall be charged at
eighteen percent (18%) per annum on all overdue accounts, and where necessary, all costs of
collection of overdue accounts, including any legal fees and disbursements.
4. Price and Price Changes. Customer shall pay for the Services at the rates set out in Sanjel’s
current Price Book (“Price Book”). All rates and prices quoted in the Price Book are subject to
change without prior notice to the Customer, including the imposition of fuel or other surcharges
related to increases in commodity prices. Special jobs undertaken by Sanjel outside of the scope
of the Services shall not be subject to Price Book or any previously agreed upon discounts.
3. Results of Service. The Customer acknowledges and agrees that the Services are of such a
nature that no results of the work performed can be guaranteed and Sanjel specifically does not
make any representations, warranties or guarantees with respect to the results of the Services.
13. Liability Cap. Notwithstanding Section 12 or any other term herein to the contrary,
Sanjel’s maximum liability to Customer arising out of or in connection with this Agreement
and any services provided hereunder is limited to the cost of the products or services
supplied for the particular job in which such damages arose.
General Terms and Conditions
12. Liability and Indemnity. (a) Subject to Sections 13 and 14 below, Customer shall be
liable to Sanjel for all claim, demands, actions, causes of action, damages, losses,
deficiencies, costs, liabilities, expenses (including legal fees, on a solicitor-client basis)
(“Claims”), that may be made or brought against Sanjel (either directly by Customer, its
affiliates or subsidiaries or by any third party) or which Sanjel may suffer or incur as a
result of, arising out of or incident to this Agreement or any Services provided hereunder,
whether such claim is found in contract, tort or any other cause of action whatsoever,
unless caused by the negligence or willful misconduct of Sanjel. (b) Notwithstanding
section 12(a), Customer shall at all times be solely liable for any Claims made or brought
against Sanjel (either by Customer, its affiliates or subsidiaries or by any third party) or
which Sanjel may suffer or incur as a result of, arising out of or incident to: well blowout or
any uncontrolled well condition, fire, cratering, redrill or sidetracking, seepage or reservoir
damage, loss or damage to the hole (including tubulars and casing), pollution and
contamination except sudden and accidental pollution originating above the surface of the
earth and emanating from Sanjel’s equipment while such equipment is in Sanjel’s care,
custody and control; even if caused in whole or in part by the sole, joint or concurrent
negligence, gross negligence, willful misconduct or other fault (active or passive) of Sanjel
or any other person. (c) Customer shall release, protect, defend, indemnify and save
harmless Sanjel, its affiliates and subsidiaries from and against all the Claims described in
sections 12(a) and 12(b) above.
5. Taxes. All prices are exclusive of taxes imposed on the sale of the Services.6. Additional Service Requests. Services or materials not listed in the Price Book butpurchased by Sanjel at Customer’s request shall be charged to Customer at actual cost plustwenty five percent (25%).
10. Proprietary Rights. Customer acknowledges that any intellectual property which is used by
Sanjel for the provisions of Services, or is created or developed by Sanjel in the course of
performing the Services, is and shall remain the property of and is owed by Sanjel at all times.
17. Waiver. Failure to enforce any or all of the above terms and conditions shall not relieve theParties of their rights and obligations hereunder or constitute a waiver thereof or precludesubsequent enforcement of same.18. Amendments. This Agreement may only be amended by a written agreement between theParties signed by a duly authorized representative of each Party.11. Confidentiality. The Parties agree to take all reasonable precautions to protect the
confidential information of the other from unauthorized use and disclosure and each Party shall
use the confidential information of the other only for the purpose of conducting the Services.
19. Governing Law. This Agreement shall be governed by the laws of the Province of Alberta.Customer shall not bring any action or proceeding related to the Services except in the judicialdistrict of Calgary, AB; provided however that this shall not restrict any right of appeal.
15. Equipment and Materials. Customer shall be liable to Sanjel for any and all loss or damage
to Sanjel’s equipment, tools or materials: (i) while being used down hole; and (ii) while being
transported to or from the work-site by Customer at any time or while such equipment, tools or
material are being loaded onto or attached to any transportation unit or vehicle furnished by or
arranged for by Customer. In the event any Sanjel equipment is lost, damaged or destroyed
during the provision of Service, Customer shall use reasonable efforts to diligently recover or
repair said equipment, and in the event recovery or repair are not possible, Customer agrees to
reimburse Sanjel for the lost, damaged or destroyed equipment at actual replacement cost value
plus twenty-five percent (25%).
8. Standby Charge. In the event that Sanjel is unable to perform a job or provide requested
Services to Customer due to circumstances beyond its control, including instances of force
majeure, Sanjel retains the right to charge Customer seventy five percent (75%) of the applicable
base charge, plus one hundred percent (100%) of costs including, but not limited to, mileage,
blending, material handling/hauling, materials and/or return delivery and restocking charges, and
all location time in excess of the location time allowance.9. Warranties. Sanjel warrants only that title to the product, supplies and materials, shall pass
and vest in Customer, free and clear of all liens, claims and encumbrances of any nature, and that
the same are free from defects in workmanship. There are no warranties, express or implied, of
merchantability, use, fitness or otherwise which extend beyond those expressly stated herein.
16. Disposal of Chemicals. Customer shall arrange for and be responsible for the disposal ofany used chemicals, hazardous material(s), including but not limited to, any waste produced oraccumulated during the provision of Services.
Hi hmark Exploration inc.
kPa mKB mSS k Im3 FORMATION TOPS CASING snd CEMENT HOLE SIZE MUD
Surface Coordinates
684.96m South of North114 94m East of West
414emKB
S Hey I/ssmMs m m allo abledc sion 4 1 5'19
Imm, J-55, ST&C,35 7 kg/m
311mm Gal
Press TVD MD SS EMD
6 eye ery150mMa atmed Dc atone 3dcgMa dcg Icg 4 I dcg/ssmDc nots r eysccrcs S an R er
Cement.Cement to Surface Use Min 50%excessSee cement program for details Floe Water
1969 201
263
Zsei 292
sess 350
sess 391
3891 397
cess 478
523
5314 542
5549 566
6010 613
6305 643
erne 686
679 693
277
215
186
128
87
81
-45
-64
-88
-135
-165
-208
-215
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
Carlile
Assinibome mbr
Upper Ashvige
Newcastle Mbr
Swan Rwer
Upper Melita
Lower Melita
Reston
Upper Amaranth Mbr
Virden Mbr ¹
Scallion Mbr ¹
Bakken
Total Depth
200 mm
Mud Up pnor toMelita on the fly oras hole conditions
dictate
Gel Chem
KEY' Pnmary Zone, 4 = Secondary Zone, AP = Potent el Abnormal Pressure, LC = Potent sr Lost C rculsion
Special Instructions
1 - Note that this well will be cored, 25m Lodgepole core from 566m -591m, please confirm vnth Wegsite Geologist.
2- Ensure that the gas detector is up and running after dngout of surface shoe
Magus Engineering Limited:
Contacts
Leland Melby
Steve Magus
Office
403-767-3212
403-767-3201
Residence
403-288-4410
Cellular
403-540-2182
403-860-0891
island.melb ma usen .corn
steve.ma us ma usen corn
Highmark Exloration Inc
Operations Scott Blommaert
Erwin Sison
Jeff Gross 306-790-1723
403-814-3263
403-4084171
306-533-0575
scott hi hmarkex loration corn
erwm hi markex loration corn
eff hi hmarkex loration corn
Qct 7 2014 - LM a us En ineerin Limited
Well Name:
UWI: est.KB: 477.67 m
Type: Vertical KB-GL: 4.00 m
Substance: Vertical Oil Well GL: 473.67 m
LIC #:
kPa mKB FORMATION TOPS CASING and CEMENT HOLE SIZE MUD
Surface Casing Setting Depth
Press TVD MD SS
0
0
0
0
1969 201 Carlile
0 2577 263 Assiniboine mbr
0 2861 292 Upper Ashville
0 3430 350 Newcastle Mbr
0 3832 391 Swan River
0 3891 397 Upper Melita
0 4686 478 Lower Melita
0 5127 523 Reston
0 5314 542 Upper Amaranth Mbr
0 5549 566 Lodgepole
0 6010 613 Virden Mbr #
0 6305 643 Scallion Mbr #
0 6726 686 Bakken
6795 693 Total Depth
KEY: = Primary Zone, # = Secondary Zone, AP = Potential Abnormal Pressure, LC = Potential Lost Circulation
Special Instructions
1 - Note that this well will be cored, 25m Lodgepole core from 566m - 591m, please confirm with Wellsite Geologist.
2 - Ensure that the gas detector is up and running after drillout of surface shoe.
Magus Engineering Limited:
Contacts Office Cellular
Leland Melby 403-767-3212 403-540-2182 [email protected]
Steve Magus 403-767-3201 403-860-0891 [email protected]
Highmark Exloration Inc
Operations Scott Blommaert 403-816-3263 [email protected]
Erwin Sison 403-608-6171 [email protected]
Jeff Gross 306-790-1723 306-533-0575 [email protected]
agus Engineering Limited
-215
-165
-208
-135
81
0
-45
-64
-88
128
277
215
EMD
±140mKB
87
1000
186
Highmark Exploration Inc.
Oct 7, 2014 - LM
Residence
403-288-4410
mSS kg/m3
AFE:Highmark North Hargrave 12-24-12-27WPM
100/12-24-12-27W1/00
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
Gel
200mm
311mm
Survey 1/30m Maximum allowable deviation is 1.5°
Survey every 150m. Max allowed Deviation is 3 deg. Max dog leg is 1 deg/30m. Do not survey accros Swan River
Gel Chem
Floc Water
Surface Coordinates:
684.96m South of North 114.94m East of West
Samples: Gas Detector: Sour Zones: Logging: Highmark: 5m fr SRFC to TD, 1 set Yes, SRFC to TD Watrous Grp Gamma, Induction, Density/Nuetron IEM: As per license See Logging Program for details.
CASING BOWL:
229mmm X 219mm
14000 kPa W.P.
Production Casing:
139.7mm, J-55, ST&C, 20.83 kg/m Cement: See cement program for details. Use Min 30% excess over caliper.
Surface Casing: 219.1mm, J-55, ST&C, 35.7 kg/m Cement: Cement to Surface. Use Min 50% excess. See cement program for details.
Mud Up prior to Melita on the fly or as hole conditions
dictate.
DRILLING PROGRAM
NORTH HARGRAVE4 TWO CREEKS AREAVertical Oil Well
Prepared for
Highmark Exploration Inc.
By
Leland MelbyOct 7, 2014
agus Engineering Limited
DRILLING PROGRAM
NORTH HARGRAVE & TWO CREEKS AREA
Vertical Oil Well
Prepared for
Highmark Exploration Inc.
By
Leland Melby
Oct 7, 2014
agus Engineering Limited
Highmark Exploration lnc. is the Prime Contractor at this location.
Highmark Exploration Inc. is committed to creating a safe work environment for itsemployees and contract personnel at our job sites.
It is the responsibility of Highmark's representative (wellsite supervisor) to adhere to safeindustry practice and to follow the appropriate provincial OHBS Act and regulatory guidelines.This safe work practice should be instilled in all contract personnel working on location toensure they are conducting their work in a manner consistent with safety procedures that applyto their business or industry. If personnel are unclear of the safety procedures applicable totheir task, they must seek clarification from their supervisor or a Highmark Exploration Inc.representative.
Safety meetings must be held as a minimum, as per contracted companies safety policies, andWHS, WCB, and the provincial energy regulator (SER, ERCB or IEM) requirements. Morespecifically, Highmark will expect a meeting at all crew changes, operation changes andunforeseen changes in scope from what was covered in the last safety meeting. Meetingsshould be structured to encourage personnel involvement to identify hazards associated andeveryone present should be well aware and understand all that has been discussed before themeeting is ended. The Highmark representative must be present for safety meetings, orreview the safety meeting minutes with the participants as soon as possible.
Each person, upon arrival at the Highmark Exploration Inc. location must be given a wellsiteorientation. If the Highmark Exploration Inc. representative is not present, this task must bedone by the rig manager or principle contractor supervisor. A generic copy of the wellsiteorientation form must be posted in the doghouse.
All meetings and orientations should be documented on the appropriate contactors safetymeeting paper work and in the absence of such a document, Highmark safety meetingpaperwork should be filled out. A copy of this record should be kept in a clearly marked folderfor quick access in the event of an audit and forwarded to Calgary with the final wellsitepaperwork.
For personnel whose task has them leaving the site as a normal part of their work, such aswater/vacuum/gravel truck operators, their route and expected time of travel must bemonitored. It must be clear who will be responsible for this monitoring and an emergencyresponse plan must be in place in the event that the expected travel time is exceeded.
When a work site is more than 30 minute drive, under moderate road conditions, from a 24hrhealth care facility, medical aid must be on site, or available as a shared service with a 20minute response time to this location.
In the event of a reportable incident, the appropriate Highmark reports must be filled inand emailed to your Calgary contacts.
North Hargrave k Two Creeks Area Drilling Program Page 2 of 9
North Hargrave & Two Creeks Area Drilling Program Page 2 of 9
Highmark Exploration Inc. is the Prime Contractor at this location. Highmark Exploration Inc. is committed to creating a safe work environment for its employees and contract personnel at our job sites.
It is the responsibility of Highmark’s representative (wellsite supervisor) to adhere to safe industry practice and to follow the appropriate provincial OH&S Act and regulatory guidelines. This safe work practice should be instilled in all contract personnel working on location to ensure they are conducting their work in a manner consistent with safety procedures that apply to their business or industry. If personnel are unclear of the safety procedures applicable to their task, they must seek clarification from their supervisor or a Highmark Exploration Inc. representative. Safety meetings must be held as a minimum, as per contracted companies safety policies, and WHS, WCB, and the provincial energy regulator (SER, ERCB or IEM) requirements. More specifically, Highmark will expect a meeting at all crew changes, operation changes and unforeseen changes in scope from what was covered in the last safety meeting. Meetings should be structured to encourage personnel involvement to identify hazards associated and everyone present should be well aware and understand all that has been discussed before the meeting is ended. The Highmark representative must be present for safety meetings, or review the safety meeting minutes with the participants as soon as possible. Each person, upon arrival at the Highmark Exploration Inc. location must be given a wellsite orientation. If the Highmark Exploration Inc. representative is not present, this task must be done by the rig manager or principle contractor supervisor. A generic copy of the wellsite orientation form must be posted in the doghouse. All meetings and orientations should be documented on the appropriate contactors safety meeting paper work and in the absence of such a document, Highmark safety meeting paperwork should be filled out. A copy of this record should be kept in a clearly marked folder for quick access in the event of an audit and forwarded to Calgary with the final wellsite paperwork. For personnel whose task has them leaving the site as a normal part of their work, such as water/vacuum/gravel truck operators, their route and expected time of travel must be monitored. It must be clear who will be responsible for this monitoring and an emergency response plan must be in place in the event that the expected travel time is exceeded. When a work site is more than 30 minute drive, under moderate road conditions, from a 24hr health care facility, medical aid must be on site, or available as a shared service with a 20 minute response time to this location. In the event of a reportable incident, the appropriate Highmark reports must be filled in and emailed to your Calgary contacts.
SERVICES LIST
SERVICE SUPPLIER
Ensign 640
LOCATION
Matt Charron
TELEPHONE
403-880-3393
Bits
Casing
Surface —J an L SupplyCalgary Sales —Nick LobayMain hole —Baker Hughes
Calgary Sales —Ryan Johnson
Apex Distribution —Meaghan RoszlerTrucking —TBDFloat, centralizers, etc to be supplied by Apex
403-512-1054
403-669-5417
403-660-8464
Casing Bowl andWellhead
Metra —Estevan 306-634-6325
Cement
Construction
Sanj el —Estevan
Calgary Sales —Tom Mcarthy
Tutthill Construction
800-926-2216403-835-4934
204-845-2405
Coring
Drilling Mud
Environmental 4Land Spreading
TBD
CES —Moose MountainWarren Dublonko
Poplar Environmental Services
403-850-7046
306-452-8088
Logging
Shack andSurface Rentals
(pumps, tanks)
Weather ford
As per present rig set-up... any changes to be run through Calgary.
North Hargrave k Two Creeks Area Drilling Program Page 3 of 9
North Hargrave & Two Creeks Area Drilling Program Page 3 of 9
SERVICES LIST
SERVICE SUPPLIER LOCATION TELEPHONE
Rig Ensign 640 Matt Charron 403-880-3393
Bits Surface – J an L Supply
Calgary Sales – Nick Lobay 403-512-1054
Main hole – Baker Hughes
Calgary Sales – Ryan Johnson 403-669-5417
Casing Apex Distribution – Meaghan Roszler 403-660-8464
Trucking – TBD
Float, centralizers, etc to be supplied by Apex
Casing Bowl and Metra - Estevan 306-634-6325
Wellhead
Cement Sanjel - Estevan 800-926-2216
Calgary Sales – Tom Mcarthy 403-835-4934
Construction Tutthill Construction 204-845-2405
Coring TBD
Drilling Mud CES – Moose Mountain
Warren Dublonko 403-850-7046
Environmental & Poplar Environmental Services 306-452-8088
Land Spreading
Logging Weatherford
Shack and As per present rig set-up…any changes to be run through Calgary.
Surface Rentals
(pumps, tanks)
1.0 CONTACTINFORMATION
Contact OfficeFIELD SUPERVSIORRod Carriere (Drilling)Jason Makeiff (Geology)
Cell
403-580-0022306-717-0997
Fax email
[email protected]@gmail. corn
MAGUS OFFICE 264-3309Leland Melby ext 212Steve Magus ext 201
540-2182860-0891
[email protected]@maguseng. corn
HIGHMARKOFFICE —OPERATIONSErwin Sison 403-608-6171Scot Blommaert 403-816-3263Jeff Gross 306-533-0575
[email protected]@highmarkexploration. corn
j eff@highmarkexploration. corn
HIGHMARK24 HOURS EIEMGENCY NUMBER: 1-306-790-1723
1.1 GENERAL WELL INFORMATION
See Individual Stick Diagram for each location for the details.
1.2 HOLE SIZES / CASING SPECS / CEMENT
Surface Hole: 311mm hole to approximately +/- 140mKB219.1mm, 35.7 kg/m, J-55 ST&CCasingCement to surface.
Main Hole: 200mm hole to +/- 700mKBDepth —may be altered pending drilling results by Geology139.7mm, 20.83kg/m, J-55, ST&CcasingCement to surface.
1.3 DRILLING MUD
Please refer to the attached drilling fluids program for specific details, product information and cost ofproducts.
Surface Hole: Drill with fresh water and Gel —mud up if losses encountered.
Main Hole: Drill out float and shoe with Floe water system. Mud up to Gel Chem system
prior to entering Melita formation or as hole conditions dictate.
North Hargrave & Two Creeks Area Drilling Program Page 4 of 9
North Hargrave & Two Creeks Area Drilling Program Page 4 of 9
1.0 CONTACT INFORMATION
Contact Office Cell Fax email
FIELD SUPERVSIOR Rod Carriere (Drilling) 403-580-0022 [email protected]
Jason Makeiff (Geology) 306-717-0997 [email protected]
MAGUS OFFICE 264-3309 264-3314
Leland Melby ext 212 540-2182 [email protected]
Steve Magus ext 201 860-0891 [email protected]
HIGHMARK OFFICE – OPERATIONS
Erwin Sison 403-608-6171 [email protected]
Scot Blommaert 403-816-3263 [email protected]
Jeff Gross 306-533-0575 [email protected]
HIGHMARK 24 HOURS EIEMGENCY NUMBER: 1-306-790-1723
1.1 GENERAL WELL INFORMATION
See Individual Stick Diagram for each location for the details.
1.2 HOLE SIZES / CASING SPECS / CEMENT
Surface Hole: 311mm hole to approximately +/- 140mKB
219.1mm, 35.7 kg/m, J-55 ST&C Casing
Cement to surface.
Main Hole: 200mm hole to +/- 700mKB
Depth – may be altered pending drilling results by Geology
139.7mm, 20.83kg/m, J-55, ST&C casing
Cement to surface.
1.3 DRILLING MUD
Please refer to the attached drilling fluids program for specific details, product information and cost of
products.
Surface Hole: Drill with fresh water and Gel – mud up if losses encountered.
Main Hole: Drill out float and shoe with Floc water system. Mud up to Gel Chem system
prior to entering Melita formation or as hole conditions dictate.
1.4 EVALUATION
Wellsite Geologist will be responsible for sample collection and correspondence with Calgary geology.
DST:Core:Samples
Logs
NoneLodgepole formation —25m core interval. See stick diagram for details.
Highmark: One Set - 1/5m from SRFC to total depth —as per wellsite geologyIEM: One Set —1/5m from SRFC to total depth (washed/vialed)
Gas Detector: A as detector is to be run from surface shoe to total de th.
Please ensure that the PASON gas detector is running after drilling out of the surface
casing shoe.
Gamma, Induction, Density/Neutron. See logging program for details.
1.5 SAFETY
Highmark Exploration Inc stresses the importance of safety in all its operations. It is the responsibilityof contractors and wellsite supervisors to adhere to the Highmark Exploration Inc HS&EOrientationHandbook and safe industry practice and to follow the appropriate OH&SAct and other Regulatoryguides, regulations and acts. This safe work practice should be instilled in all contract personnel workingon location to ensure they are conducting their work in a manner consistent with safety procedures that
apply to their business or industry. Ifpersonnel are unclear of the safety procedures applicable to theirtask, they must seek clarification from their supervisor or Highmark Exploration Inc representative.
HSE Manual: Please ensure you have received a copy of Highmark Exploration Inc's corporate HSEmanual that should be reviewed, understood and followed throughout the operations you are
conducting. As a secondary reference Magus Engineering is utilizing Libra Systems for our corporateonline electronic Health, Safety and Environment Manual. This is an excellent resource of informationon emergency response procedures, government regulations and a variety of forms. Ensure thatwhenever possible Highmark's forms should take precedence over the Libra forms but regardless, allthat are filled out should be included with the final drilling package.
Libra System: www.abcanada.or Login: Magus2 Password: MDrilling
Incident Reporting: Ifan incident does occur, you must fill out the Highmark Exploration Inc incidentforms as well as ensuring that any third party services involved in the incident and investigation supplytheir fully completed forms which should all be sent to your superintendent in Calgary. In order to meetthe requirements of the Magus Engineering HSE program, we have subscribed to a service to track allincidents across all of our operations clients for internal Magus use and therefore this must also be done
on top of any other forms. The ABCan-Track system allows for incidents to be done through theirwebsite in an online submission. Please ensure that you attach any of the other forms electronicallywhen prompted during the submission.
ABCan-Track: www.abcanadaco .ca Login and Password will be supplied individually.
Safety meetings: Highmark Exploration Inc expects a meeting at all crew changes, operation changes
and unforeseen changes in scope from what was covered in the last safety meeting. Meetings should be
structured to encourage personnel involvement to identify hazards associated and everyone presentshould be well aware and understand all that has been discussed before the meeting is ended. The
North Hargrave & Two Creeks Area Drilling Program Page 5 of 9
North Hargrave & Two Creeks Area Drilling Program Page 5 of 9
1.4 EVALUATION
Wellsite Geologist will be responsible for sample collection and correspondence with Calgary geology.
DST: None
Core: Lodgepole formation – 25m core interval. See stick diagram for details.
Samples: Highmark: One Set - 1/5m from SRFC to total depth - as per wellsite geology
IEM: One Set – 1/5m from SRFC to total depth (washed/vialed)
Gas Detector: A gas detector is to be run from surface shoe to total depth.
Please ensure that the PASON gas detector is running after drilling out of the surface
casing shoe.
Logs: Gamma, Induction, Density/Neutron. See logging program for details.
1.5 SAFETY
Highmark Exploration Inc stresses the importance of safety in all its operations. It is the responsibility
of contractors and wellsite supervisors to adhere to the Highmark Exploration Inc HS&E Orientation
Handbook and safe industry practice and to follow the appropriate OH&S Act and other Regulatory
guides, regulations and acts. This safe work practice should be instilled in all contract personnel working
on location to ensure they are conducting their work in a manner consistent with safety procedures that
apply to their business or industry. If personnel are unclear of the safety procedures applicable to their
task, they must seek clarification from their supervisor or Highmark Exploration Inc representative.
HSE Manual: Please ensure you have received a copy of Highmark Exploration Inc’s corporate HSE
manual that should be reviewed, understood and followed throughout the operations you are
conducting. As a secondary reference Magus Engineering is utilizing Libra Systems for our corporate
online electronic Health, Safety and Environment Manual. This is an excellent resource of information
on emergency response procedures, government regulations and a variety of forms. Ensure that
whenever possible Highmark’s forms should take precedence over the Libra forms but regardless, all
that are filled out should be included with the final drilling package.
Libra System: www.abcanada.org Login: Magus2 Password: MDrilling
Incident Reporting: If an incident does occur, you must fill out the Highmark Exploration Inc incident
forms as well as ensuring that any third party services involved in the incident and investigation supply
their fully completed forms which should all be sent to your superintendent in Calgary. In order to meet
the requirements of the Magus Engineering HSE program, we have subscribed to a service to track all
incidents across all of our operations clients for internal Magus use and therefore this must also be done
on top of any other forms. The ABCan-Track system allows for incidents to be done through their
website in an online submission. Please ensure that you attach any of the other forms electronically
when prompted during the submission.
ABCan-Track: www.abcanadacorp.ca Login and Password will be supplied individually.
Safety meetings: Highmark Exploration Inc expects a meeting at all crew changes, operation changes
and unforeseen changes in scope from what was covered in the last safety meeting. Meetings should be
structured to encourage personnel involvement to identify hazards associated and everyone present
should be well aware and understand all that has been discussed before the meeting is ended. The
wellsite supervisor must be present for safety meetings, or review the safety meeting minutes with the
participants as soon as possible.
Orientations: Each person, upon arrival at the Highmark Exploration Inc location must be given a
wellsite orientation. If the wellsite supervisor is not present, this task must be done by the rig manageror principle contractor supervisor.
Inspections: Critical components (BOP system, etc) of the drilling rig and supplementary equipmentshall be jointly inspected by the rig manager/driller and drilling supervisor (operator representative)
prior to use or after any change or disassembly to ensure they are properly assembled and in satisfactoryoperating condition to meet the job expectations.
Offsite travel: For personnel whose task has them leaving the site as a normal part of their work, such
as water/vacuum/gravel truck operators, their route and expected time of travel must be monitored. Itmust be clear who will be responsible for this monitoring and an emergency response plan must be in
place in the event that the expected travel time is exceeded.
Medical proximity: When a work site is more than 30 minute drive, under moderate road conditions,from a 24hr health care facility, medical aid must be on site, or available as a shared service with a 20
minute response time to this location. Note that this regulation varies slightly between provinces so
verify for your particular location.
1.6 SPECIAL INSTRUCTIONS
1. Measure and record KB to GL and CF. Ensure that construction is contacted to ensure that anycuts or fills are recorded on GL. Report proper cut/fill with surface casing details.
2. Measure out last trip before coring, testing, and at T.D.
3. Submit the Drilling Report to Magus Engineering's office before 07:30 hours, with 07:00 hour'
status. Reports run 00:00 - 23:59 hours each day. Also email a quick status report at 16:00 hours
daily.
4. Wellsite representative must ensure that all pertinent data (casing, logs, tests, lost circulation,kicks etc.) are properly recorded on the tour sheets.
5. Any lost circulation encountered on surface hole will be repaired before proceeding with the
surface hole.
6. Monitor and record any and all lost circulation, documenting the volume and the depth at whichthe losses occurred. Also, measure and record any losses that may occur as a result of seepage
into the formation while drilling.
7. The Manitoba Energy Board must be notified as per the following:24 hours advance notice prior to spudding well2 hours advance notice of intent to run and cement surface or production casing2 hours advance notice of dry hole abandonment —verbal approval must be obtained fromdistrict office.
North Hargrave k Two Creeks Area Drilling Program Page 6 of 9
North Hargrave & Two Creeks Area Drilling Program Page 6 of 9
wellsite supervisor must be present for safety meetings, or review the safety meeting minutes with the
participants as soon as possible.
Orientations: Each person, upon arrival at the Highmark Exploration Inc location must be given a
wellsite orientation. If the wellsite supervisor is not present, this task must be done by the rig manager
or principle contractor supervisor.
Inspections: Critical components (BOP system, etc) of the drilling rig and supplementary equipment
shall be jointly inspected by the rig manager/driller and drilling supervisor (operator representative)
prior to use or after any change or disassembly to ensure they are properly assembled and in satisfactory
operating condition to meet the job expectations.
Offsite travel: For personnel whose task has them leaving the site as a normal part of their work, such
as water/vacuum/gravel truck operators, their route and expected time of travel must be monitored. It
must be clear who will be responsible for this monitoring and an emergency response plan must be in
place in the event that the expected travel time is exceeded.
Medical proximity: When a work site is more than 30 minute drive, under moderate road conditions,
from a 24hr health care facility, medical aid must be on site, or available as a shared service with a 20
minute response time to this location. Note that this regulation varies slightly between provinces so
verify for your particular location.
1.6 SPECIAL INSTRUCTIONS
1. Measure and record KB to GL and CF. Ensure that construction is contacted to ensure that any
cuts or fills are recorded on GL. Report proper cut/fill with surface casing details.
2. Measure out last trip before coring, testing, and at T.D.
3. Submit the Drilling Report to Magus Engineering’s office before 07:30 hours, with 07:00 hour’s
status. Reports run 00:00 - 23:59 hours each day. Also email a quick status report at 16:00 hours
daily.
4. Wellsite representative must ensure that all pertinent data (casing, logs, tests, lost circulation,
kicks etc.) are properly recorded on the tour sheets.
5. Any lost circulation encountered on surface hole will be repaired before proceeding with the
surface hole.
6. Monitor and record any and all lost circulation, documenting the volume and the depth at which
the losses occurred. Also, measure and record any losses that may occur as a result of seepage
into the formation while drilling.
7. The Manitoba Energy Board must be notified as per the following:
- 24 hours advance notice prior to spudding well
- 2 hours advance notice of intent to run and cement surface or production casing
- 2 hours advance notice of dry hole abandonment – verbal approval must be obtained from
district office.
Weekly status reports on all activities up to rig release. Reports to be called in each MondayMorning prior to 9AM.
IEM Virden Field Office 204-748-4260
7. Ensure all field and delivery tickets correctly show the AFE ¹, Operator's name and location.Stamp/sticker, sign and code all tickets. Forward field tickets to Highmark's office with all
other records.
8. All invoices will be submitted to the following address:
Magus Engineering Limited1200-444 5've SW
Calgary. AlbertaT2P 2T8
c/o: Leland Melby
Ensure that Construction will have mousehole and rathole as well as any pits back-filledimmediately after the drilling rig moves off. Also ensure that when the casing bowl is installed toleave adequate space for lease fill when the location is reclaimed after drilling.
10. Ifthe well is abandoned, leave the casing bowl on and be sure the casing is full of fluid. In winterensure fluid is a minimum of 3m below GL. Do not to offwith diesel fuel.
11. Any tangible equipment to be Material Transferred to a Highmark stock point or to the
appropriate 3'arty, if so instructed.
2.0 SURFACE HOLE
1. Surface hole size will be 311mm. Spud in with fresh water allowing the native clay to buildviscosity, mixing Bentonite and small amounts of lime as required. Refer to the mud program fordetails of drilling fluid to be used on this well.
2. Survey every 30m to surface casing TD. Maximum allowable deviation is -1.0 degree.
3. The surface hole will be drilled to a minimum depth of 140.0mKB. Ensure that surface hole TDis set in a competent formation. Circulate and condition hole upon reaching surface hole TD.
4. Tally surface casing in order to finalize surface hole TD. Ensure that final depth is sufficient to land
casing on bottom and have no more than lm of casing stick-up above the floor. Circulate for a
minimum of two complete circulations and wiper trip to surface —monitor returns to ensure hole is
clear of debris.
5. Run 219.1mm, 35.72kg/m, J-55, 8-round, STOIC new surface casing. Surface casing to be run withconsist of one centralizer over a stop collar on the bottom joint and one centralizer over the second
casing collar and then 1 every 50m to surface. Use free floating single bow centralizers.
North Hargrave k Two Creeks Area Drilling Program Page 7 of 9
North Hargrave & Two Creeks Area Drilling Program Page 7 of 9
- Weekly status reports on all activities up to rig release. Reports to be called in each Monday
Morning prior to 9AM.
IEM Virden Field Office 204-748-4260
7. Ensure all field and delivery tickets correctly show the AFE #, Operator’s name and location.
Stamp/sticker, sign and code all tickets. Forward field tickets to Highmark’s office with all
other records.
8. All invoices will be submitted to the following address:
Magus Engineering Limited
1200-444 5th
Ave SW
Calgary. Alberta
T2P 2T8
c/o: Leland Melby
9. Ensure that Construction will have mousehole and rathole as well as any pits back-filled
immediately after the drilling rig moves off. Also ensure that when the casing bowl is installed to
leave adequate space for lease fill when the location is reclaimed after drilling.
10. If the well is abandoned, leave the casing bowl on and be sure the casing is full of fluid. In winter
ensure fluid is a minimum of 3m below GL. Do not top off with diesel fuel.
11. Any tangible equipment to be Material Transferred to a Highmark stock point or to the
appropriate 3rd
party, if so instructed.
2.0 SURFACE HOLE
1. Surface hole size will be 311mm. Spud in with fresh water allowing the native clay to build
viscosity, mixing Bentonite and small amounts of lime as required. Refer to the mud program for
details of drilling fluid to be used on this well.
2. Survey every 30m to surface casing TD. Maximum allowable deviation is ~1.0 degree.
3. The surface hole will be drilled to a minimum depth of 140.0mKB. Ensure that surface hole TD
is set in a competent formation. Circulate and condition hole upon reaching surface hole TD.
4. Tally surface casing in order to finalize surface hole TD. Ensure that final depth is sufficient to land
casing on bottom and have no more than 1m of casing stick-up above the floor. Circulate for a
minimum of two complete circulations and wiper trip to surface – monitor returns to ensure hole is
clear of debris.
5. Run 219.1mm, 35.72kg/m, J-55, 8-round, ST&C new surface casing. Surface casing to be run with
consist of one centralizer over a stop collar on the bottom joint and one centralizer over the second
casing collar and then 1 every 50m to surface. Use free floating single bow centralizers.
6. Circulate and condition hole prior to cementing (minimum '/2 hour). Reciprocate casing whilecirculating to break gel strength of the mud.
7. Rig in cementers. Perform cementing job according to cement program provided - use enoughexcess (-75/o) to ensure that returns will be obtained at surface. Reciprocate casing throughcementing.
Note: A sample of water to be used for the production casing cement job should be collected and
sent to the cementing company.
8. Bump plug with 3500 kPa over final displacement pressure and hold for five minutes. Monitor flowback to ensure plug is holding. If float is holding —rig out cementing equipment. If float does nothold, re-bump plug and hold pressure on the casing until surface cement samples are set-up.
9. Wait on cement for 8 hours or until surface samples have set up. Cut casing and weld on a new229mm x 219.1mm, 14MPa casing bowl with one 14MPa side outlet ball valve.
10. Nipple up BOPs and pressure test as per IEM requirements, check motor kills and accumulatorpressure. Record test of BOPs in tour book. This should be done as often as required by IEM. Aspacer spool will be used, if required, to allow the casin bowl flan e to be a maximum of 0.3mabove GL.
Install PVT when nippling up.
(a) PVT must be operational before drilling out casing shoe.
(b) APVT system will be installed with a probe in each active mud compartment. System is
sensitive to +/- 0.5m and will alarm at +/- 1.0m .
3.0 MAINHOLE
1. Main hole will be drilled with a 200mm PDC out of surface shoe.
2. Drill ahead following the mud program —drill out using Floe water system. Mud up at
approximately 400m or as hole conditions dictate.
3. Drill ahead as per stick diagram to core point, circ and condition mud and perform a wiper trip tosurface. Once hole conditions are good POOH and pick up core assembly. NOTE: Only some wellswill be cored, please check with Geologist or see individual stick diagram for details. Ifthe wellis not to be cored, continue drilling ahead as per stick diagram to TD.
4. RIH with core tools and begin cutting core as per core hand and Geologist, once core has been cutPOOH and lay down core BHA.
5. Once BHA is laid down, pick up a 200mm bit and RIH. RIH and drill ahead as per stick diagram toTD. Total Depth may be altered as per geological results.
North Hargrave k Two Creeks Area Drilling Program Page 8 of 9
North Hargrave & Two Creeks Area Drilling Program Page 8 of 9
6. Circulate and condition hole prior to cementing (minimum ½ hour). Reciprocate casing while
circulating to break gel strength of the mud.
7. Rig in cementers. Perform cementing job according to cement program provided - use enough
excess (~75%) to ensure that returns will be obtained at surface. Reciprocate casing through
cementing.
Note: A sample of water to be used for the production casing cement job should be collected and
sent to the cementing company.
8. Bump plug with 3500 kPa over final displacement pressure and hold for five minutes. Monitor flow
back to ensure plug is holding. If float is holding – rig out cementing equipment. If float does not
hold, re-bump plug and hold pressure on the casing until surface cement samples are set-up.
9. Wait on cement for 8 hours or until surface samples have set up. Cut casing and weld on a new
229mm x 219.1mm, 14MPa casing bowl with one 14MPa side outlet ball valve.
10. Nipple up BOPs and pressure test as per IEM requirements, check motor kills and accumulator
pressure. Record test of BOPs in tour book. This should be done as often as required by IEM. A
spacer spool will be used, if required, to allow the casing bowl flange to be a maximum of 0.3m
above GL.
Install PVT when nippling up.
(a) PVT must be operational before drilling out casing shoe.
(b) A PVT system will be installed with a probe in each active mud compartment. System is
sensitive to +/- 0.5m3 and will alarm at +/- 1.0m
3.
3.0 MAINHOLE
1. Main hole will be drilled with a 200mm PDC out of surface shoe.
2. Drill ahead following the mud program – drill out using Floc water system. Mud up at
approximately 400m or as hole conditions dictate.
3. Drill ahead as per stick diagram to core point, circ and condition mud and perform a wiper trip to
surface. Once hole conditions are good POOH and pick up core assembly. NOTE: Only some wells
will be cored, please check with Geologist or see individual stick diagram for details. If the well
is not to be cored, continue drilling ahead as per stick diagram to TD.
4. RIH with core tools and begin cutting core as per core hand and Geologist, once core has been cut
POOH and lay down core BHA.
5. Once BHA is laid down, pick up a 200mm bit and RIH. RIH and drill ahead as per stick diagram to
TD. Total Depth may be altered as per geological results.
6. Once the well is at TD, circ and cond mud and POOH to perform a wiper trip. Perform a wiper tripand circ and condition mud for logging. Once the hole is conditioned POOH to pick up loggingtools.
7. Make up logging tools and RIH and log well as per geology, once logging is complete POOH and
lay down logging tools and prepare to cement abandonment plugs or run production casing as perprogram.
8. Ifthe well is to be cased run in with the following production casing string design:
1 —139.7mm bull nose guide/float shoe
ljt —139.7mm 20.83 kg/m, J-55, STOIC casing stub —approx. 5m1 —139.7mm float collar threaded into box of first joint139.7mm, 20.83 kg/m, J-55, STOIC casing to surface
Marker Joints: Run 2 or 3 short joints spaced out near the producing formations.Centralization: Run bow spring centralizers every 3'ollar from TD to surface.
9. Tag bottom of hole with casing to confirm tally, then reciprocate casing and circulate a minimum of2 annular volumes —Mud Man should be on location to ensure properties are ideal for cementing as
good bond is essential for proper completion of this well.
10. Pump cement as per Sanjel cement program.
11. Conduct a 5-minute float check after releasing pressure. If float does not hold, re-bump plug andshut-in well. Flush BOP's and release cementers.
12. Install the slips and cut off the casing stub maintaining proper height for wellhead and arrange tohave wellhead (Metra) crew install wellhead or cap-off flange.
Oct 7, 2014 —LM
North Hargrave k Two Creeks Area Drilling Program Page 9 of 9
North Hargrave & Two Creeks Area Drilling Program Page 9 of 9
6. Once the well is at TD, circ and cond mud and POOH to perform a wiper trip. Perform a wiper trip
and circ and condition mud for logging. Once the hole is conditioned POOH to pick up logging
tools.
7. Make up logging tools and RIH and log well as per geology, once logging is complete POOH and
lay down logging tools and prepare to cement abandonment plugs or run production casing as per
program.
8. If the well is to be cased run in with the following production casing string design:
1 – 139.7mm bull nose guide/float shoe
1jt – 139.7mm 20.83 kg/m, J-55, ST&C casing stub – approx. 5m
1 – 139.7mm float collar threaded into box of first joint
139.7mm, 20.83 kg/m, J-55, ST&C casing to surface
Marker Joints: Run 2 or 3 short joints spaced out near the producing formations.
Centralization: Run bow spring centralizers every 3rd
collar from TD to surface.
9. Tag bottom of hole with casing to confirm tally, then reciprocate casing and circulate a minimum of
2 annular volumes – Mud Man should be on location to ensure properties are ideal for cementing as
good bond is essential for proper completion of this well.
10. Pump cement as per Sanjel cement program.
11. Conduct a 5-minute float check after releasing pressure. If float does not hold, re-bump plug and
shut-in well. Flush BOP’s and release cementers.
12. Install the slips and cut off the casing stub maintaining proper height for wellhead and arrange to
have wellhead (Metra) crew install wellhead or cap-off flange.
Oct 7, 2014 – LM
GEOLOGICALREPORTHIGHMARKNORTH HARGREAVE
12-24-12-27 W1MWELL LICENSE ¹: 10154
November 2014
Prepared for: Jordan LeugnerPrepared by: Kevin Haynes (P. Geo.),
per: Tallman Geological Consulting Ltd.
GEOLOGICAL REPORT
HIGHMARK NORTH HARGREAVE
12-24-12-27 W1M
WELL LICENSE #: 10154
November 2014
Prepared for: Jordan Leugner
Prepared by: Kevin Haynes (P. Geo.),
per: Tallman Geological Consulting Ltd.
Highmark North Hargrave 12-24-12-27 W1M
TABLE OF CONTENTS
GENERAL WELL DATA.
GEOLOGICALMARKERS.
LOGGING REPORT .
SAMPLE DESCRIPTIONS.
DAILYDRILLING SUMMARY
BIT RECORD.
DAILYMUD PROPERTIES .
SURVEYS BUILD & LEG 1
SUMMARY.
OPERATIONS.
STRIP LOGS IN BACKPOCKET
WELL-PATH PROFILE ATBACKOF REPORT
Tallman Geological Consulting Ltd.1
Highmark North Hargrave 12-24-12-27 W1M
Tallman Geological Consulting Ltd.
1
TABLE OF CONTENTS
GENERAL WELL DATA ........................................................................................................... 2
GEOLOGICAL MARKERS ........................................................................................................ 3
LOGGING REPORT ................................................................................................................... 4
SAMPLE DESCRIPTIONS ......................................................................................................... 5
DAILY DRILLING SUMMARY ................................................................................................ 7
BIT RECORD .............................................................................................................................. 7
DAILY MUD PROPERTIES ...................................................................................................... 8
SURVEYS BUILD & LEG 1 ...................................................................................................... 9
SUMMARY ................................................................................................................................. 10
OPERATIONS ............................................................................................................................. 10
STRIP LOGS IN BACK POCKET
WELL-PATH PROFILE AT BACK OF REPORT
Highmark North Hargrave 12-24-12-27 W1M
GENERAL WELL DATA
WELL NAME:
WELL LOCATION:
UWI:
STATUS:
AREA:
LICENCE NO.:
ELEVATIONS:
Highmark North Hargrave 12-24-12-27 W1M
Lsd. 12 Sec. 24, Twp. 012, Rge. 27 W1 Mer.
100/12-24-012-27W1/00
Lodgepole Vertical oil well.
North Hargrave
10154
Ground: 473.7 mKelly Bushing: 478.1 m
OPERATOR:
CONTRACTOR:
SPUD DATE:
TOTALDEPTH:
Highmark Exploration Inc.
Ensign Drilling Rig ¹ 640
14-11-24-0045 hrs.
630.0 meters;
Date and Time: 14-11-28-0448 hrs.
HOLE SIZE: Surface: 311.0 mmMain Hole: 200.0 mm
SURFACE CASING: Ran 14 jts of 219.1 mm, 35.7 kg/m, J-55 Star
Casing landed @ 149.0 m. Plug down at 14-11-24-2008 hrs.
Drilled out at 14-11-25-0915 hrs.
CORE POINT: 550.0 meters
Date and Time: 14-11-25-1900 hrs
DITCH SAMPLES: One set of five meter samples from 160 to 630.0 meters washed and
vialed for Manitoba Innovation, Energy and Mines. One set forHighmark Exploration Inc.
Tallman Geological Consulting Ltd.2
Highmark North Hargrave 12-24-12-27 W1M
Tallman Geological Consulting Ltd.
2
GENERAL WELL DATA
WELL NAME: Highmark North Hargrave 12-24-12-27 W1M
WELL LOCATION: Lsd. 12 Sec. 24, Twp. 012, Rge. 27 W1 Mer.
UWI: 100/12-24-012-27W1/00
STATUS: Lodgepole Vertical oil well.
AREA: North Hargrave
LICENCE NO.: 10154
ELEVATIONS: Ground: 473.7 m
Kelly Bushing: 478.1 m
OPERATOR: Highmark Exploration Inc.
CONTRACTOR: Ensign Drilling Rig # 640
SPUD DATE: 14-11-24-0045 hrs.
TOTAL DEPTH: 630.0 meters;
Date and Time: 14-11-28-0448 hrs.
HOLE SIZE: Surface: 311.0 mm
Main Hole: 200.0 mm
SURFACE CASING: Ran 14 jts of 219.1 mm, 35.7 kg/m, J-55 Star
Casing landed @ 149.0 m. Plug down at 14-11-24-2008 hrs.
Drilled out at 14-11-25-0915 hrs.
CORE POINT: 550.0 meters
Date and Time: 14-11-25-1900 hrs
DITCH SAMPLES: One set of five meter samples from 160 to 630.0 meters washed and
vialed for Manitoba Innovation, Energy and Mines. One set for
Highmark Exploration Inc.
Highmark North Hargrave 12-24-12-27 W1M
GEOLOGICALMARKERS
K.B. ELEVATION:478.1 m
FORMATION SAMPLESUBSEA (m)
SAMPLEDEPTH (m)
LOG Depth(m)
LOGSubsea(m)
Newcastle
Swan River
U er Melita
Lower Melita
Reston
U er Amaranth
Core Point¹1
Core Point ¹2
Lod e ole
Core Point ¹3
Cruik
Virden
109.1
81.1
45.1
-17.4
-33.9
-56.9
-71.9
-78.6
-84.4
-93.1
369.0
397.0
433.0
495.5
512.0
535.0
550.0
556.7
562.5
571.2
366
405.5
433.5
492.0
511.0
532.5
562.0
590.0
598.0
112.1
72.6
44.6
-13.9
-32.9
-54.4
-83.9
-101.9
-109.9
Total Depth -151.9 630.0 629.0 -150.9
Tallman Geological Consulting Ltd.3
Highmark North Hargrave 12-24-12-27 W1M
Tallman Geological Consulting Ltd.
3
GEOLOGICAL MARKERS
K.B. ELEVATION: 478.1 m
FORMATION SAMPLE
SUBSEA (m)
SAMPLE
DEPTH (m)
LOG Depth
(m)
LOG
Subsea(m)
Newcastle 109.1 369.0 366 112.1
Swan River 81.1 397.0 405.5 72.6
Upper Melita 45.1 433.0 433.5 44.6
Lower Melita -17.4 495.5 492.0 -13.9
Reston -33.9 512.0 511.0 -32.9
Upper Amaranth -56.9 535.0 532.5 -54.4
Core Point#1 -71.9 550.0 - -
Core Point #2 -78.6 556.7 - -
Lodgepole -84.4 562.5 562.0 -83.9
Core Point #3 -93.1 571.2 - -
Cruik - - 590.0 -101.9
Virden 598.0 -109.9
Total Depth -151.9 630.0 629.0 -150.9
Highmark North Hargrave 12-24-12-27 W1M
LOGGING REPORT
LOGGING COMPANY: Weatherford Wireline Ltd.
ENGINEER: Sean Pendergast
DISTRICT: Red Deer
UNIT: 13118
TIMES: Total Depth:Circulation Stopped:Tool on Bottom:Finished Logging:Received Prints:
11-28-2014-0448 hrs
11-28-2014-1200 hrs
11-28-2014-1300 hrs
11-28-2014-1345 hrs
11-28-2014-1419 hrs
K.B.:Surface Casing:Total Depth:
SURVEYS
STI —SP
HB C-GR-CAL
Driller478.1 m149.m
630.0 m
Logger
148.7 m629.0 m
SCALE
1:240
1:240
INTERVAL
T.D. to surface casing
T.D. to surface casing
CNL-FD (SPED) 1:240
1:120
T.D. to surface casingT.D. to surface casing
MUD TYPE: Gel Chem
MAINHOLE SIZE: 200 mm
FINALPRINTS: 2
DISPOSITION OF PRINTS: 1 set left at well site with field Geologist,
REMARKS: Logs run in tandem, no problems to report.
Tallman Geological Consulting Ltd.4
Highmark North Hargrave 12-24-12-27 W1M
Tallman Geological Consulting Ltd.
4
LOGGING REPORT
LOGGING COMPANY: Weatherford Wireline Ltd. DISTRICT: Red Deer
ENGINEER: Sean Pendergast UNIT: 13118
TIMES: Total Depth: 11-28-2014-0448 hrs
Circulation Stopped: 11-28-2014-1200 hrs
Tool on Bottom: 11-28-2014-1300 hrs
Finished Logging: 11-28-2014-1345hrs
Received Prints: 11-28-2014-1419 hrs
Driller Logger
K.B.: 478.1 m
Surface Casing: 149.m 148.7 m
Total Depth: 630.0 m 629.0 m
SURVEYS SCALE INTERVAL
STI – SP 1:240 T.D. to surface casing
HBC-GR-CAL 1:240 T.D. to surface casing
CNL-FD (SPED) 1:240 T.D. to surface casing
1:120 T.D. to surface casing
MUD TYPE: Gel Chem
MAIN HOLE SIZE: 200 mm
FINAL PRINTS: 2
DISPOSITION OF PRINTS: 1 set left at well site with field Geologist,
REMARKS: Logs run in tandem, no problems to report.
Highmark North Hargrave 12-24-12-27 W1M
SAMPLE DESCRIPTIONS
VERTICALSECTION
Interval Litholo A Comments
366.0 Newcastle, 112.1 m MSL.
405.5 Swan River 72.6 m MSL.
433.5
492.0
511.0
Lower Melita, -13.9 m MSL.
Reston, -32.9 m MSL.
520 —525 Shale (80%), varicolored, medium to dark gray, lime green, sub fissile to platy, friable;Sandstone (15%), glass clear to tan, upper fine to lower medium grained, sub angular tosub rounded, well sorted, unconsolidated and loose; Limestone (5%), off white, lightgray, abundant quartz sand grains, poor to tight intergranular porosity, no shows.
525 —535 Sandstone (100%), clear, frosted tan, translucent, upper fine to lower medium grained, sub
angular to sub rounded, well sorted, unconsolidated and loose, no shows.
535 —540 Sandstone (65%), glass clear to tan, upper fine to lower medium grained, sub angular tosub rounded, well sorted, unconsolidated and loose, no shows; Shale (35%),varicolored, medium to dark gray, sub fissile to platy, friable.
540 —542.5 Shale (70%), varicolored, medium to dark gray, sub fissile to platy, friable; Sandstone
(30%), light gray, off white, upper fine to lower medium grained, sub angular to sub
rounded grains, common calcareous cement, poor intergranular porosity, no shows.
542.5 —545 Shale (80%), light gray, sub fissile to blocky, calcareous in part, firm; Sandstone (20%),tan, limey, lower to upper fine grains, tight to poor intergranular porosity, no shows.
545 —550 Shale (90%), medium to dark gray, fissile to platy, minor pyrite grains, friable; Sandstone
(7%), tan, calcareous, tight; Limestone (3%), tan, off white, buff, mudstone, slightanhydritic, dolomitic in part, tight intergranular fabric,
550 Core Point, —71.9 m MSL
550.0 Core¹1, 550 to 556.7 meters, 6.7 meters cut, 5.7 meters recovered.
560.0 L~od e ole, -83.94 m MSL.
556.7 Core¹2, 556.7 to 572.23 meters, 14.53 meters cut, 12.94 meters recovered.
Tallman Geological Consulting Ltd.5
Highmark North Hargrave 12-24-12-27 W1M
Tallman Geological Consulting Ltd.
5
SAMPLE DESCRIPTIONS
VERTICAL SECTION
Interval Lithology & Comments
366.0 Newcastle, 112.1 m MSL.
405.5 Swan River 72.6 m MSL.
433.5 Upper Melita, 44.6m MSL.
492.0 Lower Melita, -13.9 m MSL.
511.0 Reston, -32.9 m MSL.
520 - 525 Shale (80%), varicolored, medium to dark gray, lime green, sub fissile to platy, friable;
Sandstone (15%), glass clear to tan, upper fine to lower medium grained, sub angular to
sub rounded, well sorted, unconsolidated and loose; Limestone (5%), off white, light
gray, abundant quartz sand grains, poor to tight intergranular porosity, no shows.
525 - 535 Sandstone (100%), clear, frosted tan, translucent, upper fine to lower medium grained, sub
angular to sub rounded, well sorted, unconsolidated and loose, no shows.
535 - 540 Sandstone (65%), glass clear to tan, upper fine to lower medium grained, sub angular to
sub rounded, well sorted, unconsolidated and loose, no shows; Shale (35%),
varicolored, medium to dark gray, sub fissile to platy, friable.
540 - 542.5 Shale (70%), varicolored, medium to dark gray, sub fissile to platy, friable; Sandstone
(30%), light gray, off white, upper fine to lower medium grained, sub angular to sub
rounded grains, common calcareous cement, poor intergranular porosity, no shows.
542.5 - 545 Shale (80%), light gray, sub fissile to blocky, calcareous in part, firm; Sandstone (20%),
tan, limey, lower to upper fine grains, tight to poor intergranular porosity, no shows.
545 - 550 Shale (90%), medium to dark gray, fissile to platy, minor pyrite grains, friable; Sandstone
(7%), tan, calcareous, tight; Limestone (3%), tan, off white, buff, mudstone, slight
anhydritic, dolomitic in part, tight intergranular fabric,
550 Core Point, - 71.9 m MSL
550.0 Core#1, 550 to 556.7 meters, 6.7 meters cut, 5.7 meters recovered.
560.0 Lodgepole, - 83.94 m MSL.
556.7 Core#2, 556.7 to 572.23 meters, 14.53 meters cut, 12.94 meters recovered.
Highmark North Hargrave 12-24-12-27 W1M
Interval Litholo A Comments
572.2 Core¹3, 572.2 to 573.74 meters, 1.54 meters cut, 2.35 meters recovered.
575 —580 Limestone (30%), rust tan, off white, microcrystalline, argillaceous in part, poor earthyporosity, minor bright white anhydritic stringers, no shows; ~Cavin s (70%), abundant
shale and uphole material.
580 —585 Limestone (85%), pink, to rust tan, off white, microcrystalline to very fine crystalline,common rust argillaceous laminae, poor intercrystalline to poor earthy porosity, no
shows; Anhydrite (15%), bright white, cryptocrystalline, massive and dense chips, tightintercrystalline fabric, no shows.
590.0 Cruik, -101.9 m MSL.
585 —595 Limestone (100%), buff to tan, off white, pink, microcrystalline in part, increasingwackestone texture, minor fossil grains, tight to poor intergranular porosity, no shows.
598.0 Virden, -109.9 m MSL.
595 —605 Limestone (100%), buff to tan, off white, microcrystalline in part, increasing wackestone
texture, minor fossil grains, tight to poor intergranular porosity, no shows.
605 —615 Limestone (100%), buff to tan, off white, microcrystalline in part, increasing wackestone
texture, minor fossil grains, tight to poor intergranular porosity, no shows, increasing
bright white lime mudstone stringers, tight.
615- 625 Limestone (100%), pink to salmon tan, off white, microcrystalline in part, wackestone
texture, minor fossil grains, tight to poor intergranular porosity, no shows, increasing
bright white lime mudstone stringers, tight.
625- 630 Limestone (100%), pink to salmon tan, off white, microcrystalline in part, wackestone
texture, minor fossil grains, tight to poor intergranular porosity, no shows, increasing
bright white lime mudstone stringers, tight.
630.0 ~Total De th, -tgt.9 m MSL.
Tallman Geological Consulting Ltd.6
Highmark North Hargrave 12-24-12-27 W1M
Tallman Geological Consulting Ltd.
6
Interval Lithology & Comments
572.2 Core#3, 572.2 to 573.74 meters, 1.54 meters cut, 2.35 meters recovered.
575 - 580 Limestone (30%), rust tan, off white, microcrystalline, argillaceous in part, poor earthy
porosity, minor bright white anhydritic stringers, no shows; Cavings (70%), abundant
shale and uphole material.
580 - 585 Limestone (85%), pink, to rust tan, off white, microcrystalline to very fine crystalline,
common rust argillaceous laminae, poor intercrystalline to poor earthy porosity, no
shows; Anhydrite (15%), bright white, cryptocrystalline, massive and dense chips, tight
intercrystalline fabric, no shows.
590.0 Cruik, -101.9 m MSL.
585 - 595 Limestone (100%), buff to tan, off white, pink, microcrystalline in part, increasing
wackestone texture, minor fossil grains, tight to poor intergranular porosity, no shows.
598.0 Virden, -109.9 m MSL.
595 - 605 Limestone (100%), buff to tan, off white, microcrystalline in part, increasing wackestone
texture, minor fossil grains, tight to poor intergranular porosity, no shows.
605 - 615 Limestone (100%), buff to tan, off white, microcrystalline in part, increasing wackestone
texture, minor fossil grains, tight to poor intergranular porosity, no shows, increasing
bright white lime mudstone stringers, tight.
615- 625 Limestone (100%), pink to salmon tan, off white, microcrystalline in part, wackestone
texture, minor fossil grains, tight to poor intergranular porosity, no shows, increasing
bright white lime mudstone stringers, tight.
625- 630 Limestone (100%), pink to salmon tan, off white, microcrystalline in part, wackestone
texture, minor fossil grains, tight to poor intergranular porosity, no shows, increasing
bright white lime mudstone stringers, tight.
630.0 Total Depth, -151.9 m MSL.
Highmark North Hargrave 12-24-12-27 W1M
DAILYDRILLING SUMMARYDATE
14-11-24
DEPTH m@ 2400 hrs
149
24 HOURPROGRESS
149.00
RATEm/hr33.10
ROTATINGHOURS
4.50
ACTIVITY@ 0700hours (next da )
Pre Drill-Out inspection.
14-11-25
14-11-26
14-11.27
14-11-28
550
561
573.74
630
401
11.00
12.74
56.26
100.30
1.30
1.75
22.50
4.0
8.25
7.25
2.50
Run into hole with clean
out bit @ 550 meters
Pulling out of hole toretrieve core ¹2
Pulling out of hole forloggers @ 630 meters
Preparing to rig move.
TOTALROTATINGHOURS: 26.25 hrs.
BIT RECORDBIT¹
MAKE TYPE SIZEmm
DEPTHIN
DEPTHOUT
DRILLED HOURS
Baker
HughesBaker—Hughes
Baker
Hughes
Baker
HughesCore
Baker
HughesCore
Baker
HughesCore
Baker
Hughes
MX1KKK
DP505F
LB 1051
BHC-406Z
BHC-406Z
BHC-406Z
DP505F
311
200
200
171
171
171
200
149
550
550
556.0
572.5
573.74
149
550
550
556.7
572.5
573.74
630
144
401
6.7
16.23
1.24
56.23
5.75
4.00
1.0
3.25
3.5
6.25
2.5
Tallman Geological Consulting Ltd.7
Highmark North Hargrave 12-24-12-27 W1M
Tallman Geological Consulting Ltd.
7
DAILY DRILLING SUMMARY DATE DEPTH m
@ 2400 hrs
24 HOUR
PROGRESS
RATE
m/hr
ROTATING
HOURS
ACTIVITY @ 0700
hours (next day)
14-11-24 149 149.00 33.10 4.50 Pre Drill-Out inspection.
14-11-25 550 401 100.30 4.0 Run into hole with clean
out bit @ 550 meters
14-11-26 561 11.00 1.30 8.25 Pulling out of hole to
retrieve core #2
14-11.27 573.74 12.74 1.75 7.25 Pulling out of hole for
loggers @ 630 meters
14-11-28 630 56.26 22.50 2.50 Preparing to rig move.
TOTAL ROTATING HOURS: 26.25 hrs.
BIT RECORD BIT
#
MAKE TYPE SIZE
mm
DEPTH
IN
DEPTH
OUT
DRILLED HOURS
1 Baker
Hughes
MX1KKK 311 0 149 144 5.75
2 Baker -
Hughes
DP505F 200 149 550 401 4.00
3 Baker
Hughes
LB1051 200 550 550 0 1.0
4 Baker
Hughes
Core
BHC-406Z 171 550 556.7 6.7 3.25
5 Baker
Hughes
Core
BHC-406Z 171 556.0 572.5 16.23 3.5
6 Baker
Hughes
Core
BHC-406Z 171 572.5 573.74 1.24 6.25
7 Baker
Hughes
DP505F 200 573.74 630 56.23 2.5
Highmark North Hargrave 12-24-12-27 W1M
DAILYMUD PROPERTIESDATE
14-11-24
DEPTH @
-1200 hrs
32
DENSITY
1020
VISCOSITY
36
WATERLOSS
FILTERCAKE
pH
8.0
Chloride/Calcium
300/ 80
14-11-25 151 1005 28 11.5 340 / 2480
14-11-26 555 1125 54 7.2 0.9 10.5 1100 / 250
14-11-27
14-11-28
571
630
1140
1140
40
90
7.9
7.0
0.9
0.9
10.0
10.0
1490 / 80
1490 / 80
Tallman Geological Consulting Ltd.8
Highmark North Hargrave 12-24-12-27 W1M
Tallman Geological Consulting Ltd.
8
DAILY MUD PROPERTIES DATE DEPTH @
~1200 hrs
DENSITY VISCOSITY WATER
LOSS
FILTER
CAKE
pH Chloride/
Calcium
14-11-24 32 1020 36 - - 8.0 300 / 80
14-11-25 151 1005 28 - - 11.5 340 / 2480
14-11-26 555 1125 54 7.2 0.9 10.5 1100 / 250
14-11-27 571 1140 40 7.9 0.9 10.0 1490 / 80
14-11-28 630 1140 90 7.0 0.9 10.0 1490 / 80
Highmark North Hargrave 12-24-12-27 W1M
SURVEYS BUILD R LEG 1
Tallman Geological Consulting Ltd.9
Highmark North Hargrave 12-24-12-27 W1M
Tallman Geological Consulting Ltd.
9
SURVEYS BUILD & LEG 1 DEPTH (m) SURVEY(deg) DEPTH (m) SURVEY (deg)
28.0 0.50 56.0 0.37
84.0 0.73 121.0 0.25
139.0 0.35 195.0 0.56
299.0 0.79 393.0 0.71
500.0 0.42 620.0 0.15
Highmark North Hargrave 12-24-12-27 W1M
SUMMARY
Highmark North Hargrave 12-24-12-27-W1M was planned as a vertical test in the NorthHargrave area of Southwest Manitoba targeting Lodgepole reservoir potential.
Coring of the Lodgepole formation began in the base of the Upper Amaranth shale around
550.0 meters. Slow penetration rates, shale chips from grab samples and other engineering parameters
suggested a possible milling scenario, so after 6.7 meters, a decision to pull out to check bit condition and
evidence of core was made @ 556.7 meters, 5.7 meters (86%) of core ¹1 was recovered. A second
coring run was conducted from 556.7 to 571.23 meters, 12.94 meters ( 89%) of core 2 was recovered Athird core run was done from 572.5 to 573.74 meters, 2.35 meters ( 100%) of core ¹3 + (5%) of core 2)was recovered The core was sleeved in aluminum tubing and sealed for detailed analysis at core lab inEstevan, Saskatchewan.
The vertical well was terminated @ 630 meters within the Virden formation.
Wire line logging was provided by Weatherford loggers of Red Deer, Alberta.
OPERATIONS
1)
2)3)4)5)6)7)8)9)10)
11)
12)
13)
14-11-24-0045 hrs
14-11-25-0930 hrs
14-11-25-1900 hrs
14-11-26-0833 hrs
14-11-26-1318 hrs
14-11-26-2011 hrs
14-11-26-2105 hrs
14-11-27-0508 hrs
14-11-27-1140 hrs
14-11-27-1414 hrs
14-11-27-1200 hrs
14-11-27-0448 hrs
14-11-28-1418 hrs
Spud well.Drill out surface casing with 200 mm bit.Reach Core Point @ 550.0 meters.
Begin cutting Lodgepole core with Baker Hughes @ 550.0 meters
Pull out to check core bit and retrieve core ¹1 @ 556.7 meters.
Recover 5.7 meters of 6.7 meter core ¹1.Begin cutting core ¹2 @ 556.7 meters.
Pull out core ¹2 @ 572.5 meters.
Recover 12.94 meters of 15.53 meters.
Begin cutting core ¹3 @ 572.5 meters.
Recover core ¹3 @ 573.74 meters.
Total Depth of 630.0 meters.
Complete wireline logs with Weatherford Wireline.
The core was shipped to Core Labs, Estevan for detailed lab analysis of cored zones. 2.5 meter
grab samples along cored interval indicated hydrocarbon shows in the 562.5 —572.5 meter range.
Wireline logs and core examination exhibited sufficient hydrocarbon presence with the Lodgepole zone
and production casing was run into the Highmark North Hargrave 12-24-12-26 W1M well.
Kevin M Haynes (P.Geo.)
Tallman Geological Consulting Ltd.10
Highmark North Hargrave 12-24-12-27 W1M
Tallman Geological Consulting Ltd.
10
SUMMARY
Highmark North Hargrave 12-24-12-27-W1M was planned as a vertical test in the North
Hargrave area of Southwest Manitoba targeting Lodgepole reservoir potential.
Coring of the Lodgepole formation began in the base of the Upper Amaranth shale around
550.0 meters. Slow penetration rates, shale chips from grab samples and other engineering parameters
suggested a possible milling scenario, so after 6.7 meters, a decision to pull out to check bit condition and
evidence of core was made @ 556.7 meters, 5.7 meters (86%) of core #1 was recovered. A second
coring run was conducted from 556.7 to 571.23 meters, 12.94 meters ( 89%) of core 2 was recovered A
third core run was done from 572.5 to 573.74 meters, 2.35 meters ( 100%) of core #3 + (5%) of core 2)
was recovered The core was sleeved in aluminum tubing and sealed for detailed analysis at core lab in
Estevan, Saskatchewan.
The vertical well was terminated @ 630 meters within the Virden formation.
Wire line logging was provided by Weatherford loggers of Red Deer, Alberta.
OPERATIONS
1) 14-11-24-0045 hrs: Spud well.
2) 14-11-25-0930 hrs: Drill out surface casing with 200 mm bit.
3) 14-11-25-1900 hrs: Reach Core Point @ 550.0 meters.
4) 14-11-26-0833 hrs: Begin cutting Lodgepole core with Baker Hughes @ 550.0 meters
5) 14-11-26-1318 hrs: Pull out to check core bit and retrieve core #1 @ 556.7 meters.
6) 14-11-26-2011 hrs: Recover 5.7 meters of 6.7 meter core #1.
7) 14-11-26-2105 hrs: Begin cutting core #2 @ 556.7 meters.
8) 14-11-27-0508 hrs: Pull out core #2 @ 572.5 meters.
9) 14-11-27-1140 hrs: Recover 12.94 meters of 15.53 meters.
10) 14-11-27-1414 hrs: Begin cutting core #3 @ 572.5 meters.
11) 14-11-27-1200 hrs: Recover core #3 @ 573.74 meters.
12) 14-11-27-0448 hrs: Total Depth of 630.0 meters.
13) 14-11-28-1418 hrs: Complete wireline logs with Weatherford Wireline.
The core was shipped to Core Labs, Estevan for detailed lab analysis of cored zones. 2.5 meter
grab samples along cored interval indicated hydrocarbon shows in the 562.5 – 572.5 meter range.
Wireline logs and core examination exhibited sufficient hydrocarbon presence with the Lodgepole zone
and production casing was run into the Highmark North Hargrave 12-24-12-26 W1M well.
Kevin M Haynes (P.Geo.)
3131 of 1
CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
TOTALRigUp
Drill Actual Reaming Coring Cond Mud
& Circ Trips Rig Service
RepairRig
Cut Off Drilg Line
Dev Survey
Wireline Logs
Run Csg& Cement
Wait On Cement
Nipple Up BOP
TestBOP
Drillstem Test
PlugBack
Squeeze Cement Fishing Dir
WorkSafety
MeetingTear
DownWaiting
OnRig
Watch Other
HO
UR
S Tour 1Tour 2
Tour 3Total
DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked
Kelly Bushing Op Fuel
FUEL @ 08:00 HOURSRig Boiler
WE
AT
HE
R Time Temp
Current Conditions
Wind Direction Wind Strength
Road Condition
FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
License No Well Name Surface Location Prov Loc Type Unique Well Id
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
Operator
Operator’s AFE
Signature of Operator RepresentativePason
TOUR 1 SIGNATURE OF DRILLER START TIME END TIME
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
TOUR 3 SIGNATURE OF DRILLER START TIME END TIME
TOUR 2 SIGNATURE OF DRILLER START TIME END TIME
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
V. 1.3
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
T0 ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
23:45 24:00
0
17:45
23:45
0
18:00
18:00
12:15
17:4516:15
0.25
16:1516:00
16:00
387
LABLAB
ROD CARRIERE
2014/11/24 00:45
1 of 1
FAIR
ENSIGN CANADIAN DRILLING
390
390
2014/11/29 12:00
1.00
11
100/12-24-012-27W1/00
-15.00
VERT
CLINTON RADFORD
KYLE WENDZ
LARRY BREAULT
640
HIGHMARK NORTH HARGRAVE 12-24-12-27 W1 (387)
0
CALMNW
0
10154
HELD PRE-RIG MOVE SAFETY MEETING WITH FAST TRUCKING (S/M # 192339)
10
MOVE RIG (LOAD OUT RIG AT 04-25-12-27 W1 & DRIVE TO 12-24-12-27 W1 & SPOTRIG)
ONE
ONE
0
0
0.75
5.75
0.25
1.50
0
0.25
0
0.25
3.75 1A
210.25
DLSMB
HIGHMARK EXPLORATION INC.
24:00
140
08:00
16:00
152
152
140
0
0
12-24-012-27W1
0
3.75
0
RAISE DERRICK & RIG TO SPUD
PRE-SPUD INPECTION & SAFETY MEETING
RIG UP TO RAISE DERRICK
PRE-DERRICK RAISING INSPECTION & SAFETY MEETING (REVIEW JSA (LAB)
AND WINDY CONDITIONS.
1
SAFETY MEETING WITH CREWS ON PROPER RIG UP PROCEDURE AND WORKING IN THECOLD
0Z41640_20141123_2A
2
1
21
1
21
21
2
1
7.25
2014
12:15
12:00
06:00
8
0
11.00
10.5
LAB
LAB
GRC
12.00
4.00
8.00
23
00:00
16:00
08:00
PARTLY CLOUDY
Pason
LARRY BREAULT
1 of2
CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
TOTALRigUp
Drill Actual Reaming Coring Cond Mud
& Circ Trips Rig Service
RepairRig
Cut Off Drilg Line
Dev Survey
Wireline Logs
Run Csg& Cement
Wait On Cement
Nipple Up BOP
TestBOP
Drillstem Test
PlugBack
Squeeze Cement Fishing Dir
WorkSafety
MeetingTear
DownWaiting
OnRig
Watch Other
HO
UR
S Tour 1Tour 2
Tour 3Total
DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked
Kelly Bushing Op Fuel
FUEL @ 08:00 HOURSRig Boiler
WE
AT
HE
R Time Temp
Current Conditions
Wind Direction Wind Strength
Road Condition
FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
License No Well Name Surface Location Prov Loc Type Unique Well Id
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
Operator
Operator’s AFE
Signature of Operator RepresentativePason
TOUR 1 SIGNATURE OF DRILLER START TIME END TIME
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
TOUR 3 SIGNATURE OF DRILLER START TIME END TIME
TOUR 2 SIGNATURE OF DRILLER START TIME END TIME
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
V. 1.3
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
T0 ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
29.80
18:00
17:00
17:15
11
16:15
x
16:45
x
0.25
x
5
16:00
387 2014/11/24 00:45
2
1.50
57
1.25
57
1.75
0
0.75
0
2.00
0.50
0.25
1.25
400
395
1870.00
11
1
1
1
1
2A
25
2
2B
21
1A
14.314.314.314.3
2
CLINTON RADFORD
19:15
SHANE DEMAS
19:00
SHANE DEMAS
640
HIGHMARK NORTH HARGRAVE 12-24-12-27 W1 (387)
56m
28m
139m121m84m
BIT
9.26m
BIT SUB
DC (6.25 IN)
30.00kdaN
X/O
CREW CHANGE OVER SAFETY MEETING (S/M #192342)
10154
STRAP DC'S, H.W.T. STRING SURVEY LINE
SPUD WITH 251mm BIT (DRILL 251mm HOLE FROM 0m - TO 14m)
28.00kdaN
DRILL RATHOLE
CREW CHANGE OVER AND PRE TOUR SAFEY MEETING # 192344
RIG SERVICE- LOCKED OUT BRAKE HANDLE AND DWWKSDRILL 311MM F/ 45M- 149M (SURFACE TD)
22.51m
0.35
CONDITION MUD & CIRCULATE
TRIP IN HOLE // MAKE UP REAMER AND RIH F/ BANK TO 149M (SURFACE TD)
2.00
CIRC HOLE CLEAN FOR WIPER
2.00
DEVIATION SURVEY - WIRELINE SURVEYS AND CONNECTIONS ACC
ONE
WIPER TRIP POOH F/ 149M (SURFACE TD) TO BANK --STRAP OUT--
1.75
BLOW KELLY BACK // INSTALL BAILS AND ELEVATORS
PICK UP 8" MAKE UP BIT, BIT TORQUED UP PREMATURELY, BIT SUB SEAT & BIT NOT
DRILL MOUSEHOLE
2000
8" MAKE UP 6" DC & 311mm BIT
2000
IN CONTACT, REVERSE OUT, THREAD DAMAGE ON BIT, BREAK OFF BIT SUB & LAY OUT
0.5
0.37
DRILL 311mm HOLE FROM 14m - TO 45m.
0.73
2014/11/24
0.25
0.75
149.00m
1.00
0.25
0.75
0.25
0.25
140
0.25
0
0.50
1.250.25
0.253.50
1.00
0.25
1.00
0.25
1.00
2
4350.00
7
21
18:30
6B
16:00
5
DLS
5
0.25
10
5
6A
MB
22:15
0
24:00
HIGHMARK EXPLORATION INC.
1
12.00m
20:15
22:15
0.252.000.75
12-24-012-27W1
SX
3.50
5.500.50
12
5
21B
12B
21
12A
21
6B
0.501.00
DRILL SURFACE
PRESPUD
2014
WIPER W/ REAMER
00:45
00:15
149m
08:00
03:30
01:30
06:30
04:45
0.25
8
2.501.75
8
9.000.50
LABLABLABLAB
92.02m
0.44m
0.33m
8.00
24.00
8.00
8.00
40s/l
24
0.58m
515
00:00
16:00
08:00
62s/l
5kdaN
PARTLY CLOUDY
LARRY BREAULT
19:15
SINGLE
19:00
4
18:00
17:15
08:15
17:00
16:45
16:15
1
13:3013:15
12:0008:30
LAB
16:00
15:45
14:45
13:45
311
ROD CARRIERE
1 of 2
20:15
FAIR
ENSIGN CANADIAN DRILLING
140
0
311
0.00m
222
1.75
311
152
152
1.25
0
0
0
00
158
159
100/12-24-012-27W1/00
.33m
1
.44m
9.17m
21kdaN
.57m
19.00
3.50
RR01036
8
VERT
0
37.02m
311
CALMNW
WIRELINE
WIRELINEWIRELINE
14m3
WIRELINE
0.00m
7
14.8m3
WIRELINE
10
11
9.35m
45m
STIX
0
SX
ONE
1
ONE
SXSX
149
SINGLE
SINGLE
102
REVIEW J.S.A #C, C1, C2, C3
SINGLE
D.W.A. & INSPECT BRAKES, LINIKAGE, FUNC.CROWNSAVER
CUT CSG. WELD BOWL
returns.
WAIT ON CEMENT
10 tonne (8.98m3) of SSI w/.15% CFR-2 + 2% Calc2 + .15% CDF-4. Release plug
& displace w/ 4.83m3 h20, plug landed at 2008 hrs with 2m3 of good cement
DWA- CR- CHECKED BRAKE PINS AND LINKAGES, FNC CROWN SAVER
2
24:00
08:00
16:00
152
152
140
DESCO II CF
SAWDUSTGEL
130
140
0
5.00
SOAP STICKSGEL
3000
2
2014/11/24470
CEMENTING 219.1MM CASING- Cement surface casing. Preflush w/ 3m3 h20. Pump
CONDITION MUD & CIRCULATE
JSA (JOB SAFETY ANALYSIS) W/ SANJEL
RUN CASING - 219.4MM CASING (ELEVATOR CIRT #63049) F/ BANK TO 149M // FILL
149m
TO TEST FLOAT AND ON FLY
149m
SAFETY MEETING - W/ TONG HAND TO RUN CASING (ORIANTATED TONG HAND TO RIG)
RIG UP TO RUN CASING
1
TRIP OUT OF HOLE F/ 149M (SURFACE TD) TO BANK W/ REAMER // BLOW KELLY BACK
0Z41640_20141124_1A
PRE TOUR SAFETY MEETING AND CREW CHANGE OVER #192345
BIT SUB
BIT
X/O
1
DC (6.25 IN)
2
14
13
1.75
PRE SPUD CHECKLIST COMPLETE PRIOR TO SPUD
MX1KKK
DWA-CR- CHECKED BRAKE PINS AND LINKAGES, FNC CROWN SAVER// DO IT REVIEW COMPLETE // BOILER BLOWDOWN2X @ 120L DISCHARGE
2.00
13:30
MX1KKK
13:15
14:45
13:45
08:15
08:00
12:00
08:30
06:00
15:45149
10:0011:1512:45
13:30
09:00
11
GRCGRCGRC
DRILL
GRCGRCGRCGRC
1160.00
1
1
1.750.25
1.25 1.752.002.00
10.5
14.314.3
0.00
14.3 14.3
1
10
Pason
1
1
17kdaN
RR01036
00:00
00:15
00:45
01:3003:30
04:45
230
06:30
Ucense No Well Name
10154 HIGHMARKNORTH HARGRAVE12 24-12 27 Wl 387
e e e e
Tour Sheet Senal No
0241640 20141124 IA
Surface Location
12-24012-27WI
Vendor Software Version
Pason
Year Month Day
2014 11 24
Prov Loc Type Unique Well Id
MB DLS 100112-24-012-27WII00
Operator
HIGHMARKEXPLORATION INC
Operator's AFE
Signature of Operator Representative
ROD CARRIERE
Contractor
ENSIGN CANADIANDRILLING
Contractors Job No
387
Signature of Contractor's Rig Manager
LARRY BREAULT
Rig No
640
Wee Type
VERT
Spud Date Time
2014111I24 00.45
Rig Release Date Time
Re-Entry
Pason
Tour No.
2 JSAREVIEW
3 JSAREVIEW
3 SITE ORIENTATION
Event No.
C2- SPUD AND DRILL SURFACE
C3- MAKE CONNECTION
TO SANJEL 8000699
Description Time Depth
08.00
16 00
18.00
vli
2of2
SPECIAL EVENTS
Tour No. Event No. Description Time Depth
Pason
DRILLING ASSEMBLY TOUR
No Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly Down
Total
Weight of DC
Weight of String
DRILL ASSEMBLY & SPECIAL EVENTS - ADDITIONAL DATATour Sheet Serial No Vendor Software Version Year Month Day
License No Well Name Surface Location Prov Loc Type Unique Well Id
Operator
Operator’s AFE
Signature of Operator Representative
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
DRILLING ASSEMBLY TOUR
No Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly Down
Total
Weight of DC
Weight of String
DRILLING ASSEMBLY TOUR
No Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly Down
Total
Weight of DC
Weight of String
V. 1.1
0Z41640_20141124_1A
387 2014/11/24 00:45
ROD CARRIERE
2 of 2
10
ENSIGN CANADIAN DRILLING
17.00
2
3
3
11
0.44
0.33
100/12-24-012-27W1/00
12.00 9.26
21.00
VERT
0.58
92.02
640
HIGHMARK NORTH HARGRAVE 12-24-12-27 W1 (387)
57.2
57
37.020.00
0.00
0.00
10154
BIT
BIT SUB
19:00
16:00
08:00
X/O
DC (6.25 IN)
DLSMB
HIGHMARK EXPLORATION INC.
DC (6.25 IN)
X/O
BIT
BIT SUB
12-24-012-27W1
JSA REVIEW
SITE ORIENTATION
JSA REVIEW
2014
22.51 149.00
1
1
1
10
.57
.44
9.17
.33
158
0 2
158.81
1
0.00 9.35
C2- SPUD AND DRILL SURFACE
24
TO SANJEL #000699
C3- MAKE CONNECTION
311
152
152
102
Pason
1
1
311.00
222.00
LARRY BREAULT
1 2
1 of6
CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
TOTALRigUp
Drill Actual Reaming Coring Cond Mud
& Circ Trips Rig Service
RepairRig
Cut Off Drilg Line
Dev Survey
Wireline Logs
Run Csg& Cement
Wait On Cement
Nipple Up BOP
TestBOP
Drillstem Test
PlugBack
Squeeze Cement Fishing Dir
WorkSafety
MeetingTear
DownWaiting
OnRig
Watch Other
HO
UR
S Tour 1Tour 2
Tour 3Total
DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked
Kelly Bushing Op Fuel
FUEL @ 08:00 HOURSRig Boiler
WE
AT
HE
R Time Temp
Current Conditions
Wind Direction Wind Strength
Road Condition
FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
License No Well Name Surface Location Prov Loc Type Unique Well Id
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
Operator
Operator’s AFE
Signature of Operator RepresentativePason
TOUR 1 SIGNATURE OF DRILLER START TIME END TIME
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
TOUR 3 SIGNATURE OF DRILLER START TIME END TIME
TOUR 2 SIGNATURE OF DRILLER START TIME END TIME
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
V. 1.3
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
T0 ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
18:00
18:15
17:15
17:30
16:15
15
17:00
x
x
0.50
16:00
1
x
387
0.00
2014/11/24 00:45
1
1.00
0.25
3.00
0
0
2.75
0
0.25
0
301
0.25
0.25
1.75
375
402
5.79m
1890.00
11
1
1
10
1
15B
15A
14A
21B
21
21B
10.310.3
10.3
16:15
10.310.310.3
6A
SHAKER
10.3
18:30
CLINTON RADFORD
KYLE WENDZ
12:0010:00
SHANE DEMAS
SHAKER
640
HIGHMARK NORTH HARGRAVE 12-24-12-27 W1 (387)
299m
195m
393m
08:00
500m
11.25m
BIT
BIT SUB
DC (6.25 IN)
X/O
31.00kdaN
CREW CHG. OVER SAFETY MEETING #192346
10154
JSA (JOB SAFETY ANALYSIS)
NIPPLE UP BOPS
30.00kdaN
JSA (JOB SAFETY ANALYSIS) W/ 4 STAR PRESS. TESTING
PRE TOUR SAFETY MEETING AND CREW CHANGE OVER #192347
DRILLS/BOP, -- HELD BOP DRILL W/ CREW MEMBERS WENT OVER JOBS AND KICK
WARNING SIGNS... WELL SUCCESSFULLY SHUT IN 96 SECONDS
105.78m
DRILL 200MM F/ 302M- 499M
SEC O/C
FLOAT @ 143M AND SHOE @ 149M
DRILL CEMENT/DRILL OUT CEMENT/DRILL FLOAT&SHOE// TAGGED CEMENT @ 143M --
RIG SERVICE- LOCEKD OUT DWWKS AND BRAKE HANDLE, FNC PIPE RAMS F/ REMOTE.. 6
ONE
DRILL 200MM F/ 149M- 302M
& KILL VALVES, STABBING VALVE, 7000 H 1400 L 10min. EACH
PRESSURE TEST MANIFOLD VALVES, HYDRIL, PIPE & BLIND RAMS, OUTSIDE INSIDE HCR
4200
1min. 12sec. PRECHARGE PRESS. 5500 KPA, FUNC. MTR. KILLS & HORN
4200
FUNC. TEST, OPER. PRESS. 20000, PRESS. AFTER 3 FUNC. 13000, PRESS. UP TIME
0.56
0.79
MAKE UP B.H.A. TRIP IN HOLE, TAG @ 142.46m
0.71
2014/11/25
0.25
499.00m
0.25
0.50
0.25
0.25
0.25
0
0.25
117
0.75
0.75
0.25
10701070
2.00
0.50
2.75
0.25
17880.00
21A
21
18:15
7
16:15
2
DLS
0.25
2C
2
MB
21:45
20:15
19:15
0
24:00
23:00
HIGHMARK EXPLORATION INC.
60
62 142
.24m
0.70m
5
.42
23:00
12.17m
19:15
20:15
21:45
SX
19:00
92.23m0.58m
92.02m
0.25
12-24-012-27W1
SX
5.50
SXSX
0.251.00
0.00m
5
7
5
2
5
2
21
2
3.00
WIRELINE
1.253.25 0.25
DRILL OUT
PRESS. TEST
2014
HOUSEKEEPING
00:30
00:15
499m
06:45
07:45
550m
03:30
03:15
06:30
07:45
131
0.75
8
2.253.25
LAB
8
LAB
8.50
LAB
1100
LABLABLABLAB
92.02m
0.70m
0.33m
8.00
24.00
8.00
8.00
42s/l
25
6
0.58m
15
92.23m
00:00
1010
RIG SERVICE FUNC. CROWNSAVER CAODC PRE-DRILLOUT INSPECTION
30s/l
16:00
30s/l
08:00
550
35s/l
BELOWSHAKER
BELOWSHAKER
14.3
5kdaN
14.3 14.3
1010
6kdaN
PARTLY CLOUDY
LARRY BREAULT
18:30
18:15
.5
18:00
08:15
17:30
17:15
17:00
16:15
10
09:15
08:30
14:15
LABLAB
12:15
LAB
12:00
200
ROD CARRIERE
1 of 6
26.3m3 29m3
19:00
FAIR
ENSIGN CANADIAN DRILLING
140
8
149
499m DRILL
61
0.00m
311
156
200
156
156
1.50
0
3.252.75
0
LB1051
0
101
102
156
100/12-24-012-27W1/00
7
.31m
.70m
1
92.02m
28kdaN
1
.58m
5.50
1
-4.00
1
110
7129136
8
VERT
358.44m
1
200
10
8
301.89m
200
UP TO 19 KM/HNW
WIRELINE
WIRELINE
0.00m
29.9m3
0
WIRELINE
29.6m3
10
11
0.00m
149m
149
PAILS
3
SX
ONE
2RR
ONE
SXSX
SXSTIX
PAILS
SINGLE
SINGLE
S.W.P. ISSUED TO DEREK LOEPPKY, MATT & BJ SHAW ( VAC HAULERS) #0019110
14:15
102
REVIEW J.S.A. #E1, E2, E3, F1, F5, F2
SINGLE
LOCK OUT DWKS. PUMP, MUDTANKS
D.W.A. & INSPECT BRAKES, LINKAGE, FUNC. CROWNSAVER, INSPECT TONG LINES, PINS, CLEVISES
550
101102
0
156
156
R.I.H. WITH CLEAN OUT BIT
1126kPa
CONDITION MUD & CIRCULATE
1235kPa
WIPER TRIP TO SURFACE/CHANGE BIT F/CHECK@ 496M,270M,100M CALC VOL. 3.2M3
1235kPa
MEAS. 2.8M3 DIFF. -.4M3
16:00
DRILL 200MM F/545-550M CORE POINT
CONDITION MUD & CIRCULATE
DWA INSPECTION VISUALLY INSPECT TONG HANGING LINES AND BRAKE LINKAGES
F/T CROWN SAVER
REVIEW JSA# F2,F2A,F4,F8,F9,F9A,F10,F13,F17
460
DEVIATION SURVEY AND CONNECTIONS ACC
300m183m
CH27MS
16
19
0
24:00
08:00
16:00
140
140
152
ENERPAC REGULARSAWDUST
CALCIUM NITRATESHALE SPERSE
SOAP STICKSENERPAC REGULAR
SODA ASH
62
GEL
SODA ASH
115
311
0
5.50
2
1.00
SHALE SPERSECALCIUM NITRATE
4300
1
2014/11/25
2014/11/25
460
CIRCULATE 545M SAMPLE/ANALYZE
RIG SERVICE/ LOCKOUT DRAWWORKS/BRAKE HANDLE, F/T PIPE RAMS CLOSE 3SECS,OPEN
3SECS.
CIRCULATE 540M SAMPLE/ANALYZE
DRILL 200MM F/540-545M
506m
CIRCULATE 535M SAMPLE/ANALYZE
540m
DRILL 200MM F/535-540M
DRILL 200MM F/499M-535M
1
SAFETY MEETING/CREW CHANGEOVER (192348)
0Z41640_20141125_1A
5
2
BIT SUB
BIT
0.25
HWDP(4.0 IN)
2
X/O
1
10 DC.S
6A
5
2A
1.25
1.00
550.00m
0.25
MUD UP ON FLY @ 375M
1.00
INSPECTED FLARE LINES, DEGASSER, BOWL, BOP EQUIP, FLARE STACK
DP505F
1.50
DWA- CR- CHECKED BRAKE PINS AND LINKAGES, FNC CROWN SAVER // DO IT REVIEW COMPLETE // BOILERBLOWDOWN 2X @ 120L DISCHARGE
09:15
DP505F
12:00
08:15
08:00
08:30
06:00
12:15350
BAKER
12:3014:00
10:30
10
GRCGRC
DRILL
GRCGRCGRCGRCGRC
1710.00
2RR
0
0.75
1.75
HWDP(4.0 IN)
1.75
X/O
10 DC.SBIT SUB
3.25
BIT
2.75
1.00
390
10.3
10.3 10.3 10.3
10.3
0.00
10.3 10.3
0
1
1
10
Pason
0
0
1
0
28kdaN
1
17kdaN
7129136
230
BAKER
00:00
00:15
00:30
03:1503:30
17kdaN
06:30
220
06:45
Ucense No Well Name
10154 HIGHMARKNORTH HARGRAVE12 24-12 27 Wl 387
e e e e
Tour Sheet Senal No
0241640 20141125 IA
Surface Location
12-24012-27WI
Vendor Software Version
Pason
Year Month Day
2014 11 25
Prov Loc Type Unique Well Id
MB DLS 100112-24-012-27WV00
Operator
HIGHMARKEXPLORATION INC
Operator's AFE
Signature of Operator Representative
ROD CARRIERE
Contractor
ENSIGN CANADIANDRILLING
Contractors Job No
387
Signature of Contractor's Rig Manager
LARRY BREAULT
Rig No
640
WerrType
VERT
Spud Date Time
2014)1 V24 00.45
Rig Release Date Time
Re-Entry
Pason
No
I BIT
I BITSUB
I 10DCS
I'
Component OD ID Length No
311 00 0 00 0 33 I BIT
1 56.00 0 00 0.70 I BIT SUB
156.00 000 92.02
Component
I'
OD ID Length
31100 0.00 24
15600 0.00 070
4 r rr err r I YJO 10200 0.00 058
I HWDP(4 0 IN) 101 92.23 10 HWDP(4 0 IN) 101 92 23
I Drill Pipe
Drill Pipe
Kelly Down
Stands 301,89 19 Drill Pipe
Singles 0.00 0 Drill Pipe
11.25 Kelly Down
Total
Stands 358 44
Singles 0 00
579
550 00
Ii «s'lWeight of DC 17 00
Weight of String 28.00 Weight of String 28 00
Tour No.
I SITE ORIENTATION
2 JSAREVIEW
3 JSAREVIEW
3 LOOKOUTS
Event No.
RAMOAN SANE(PRESS TESTER)
F2- MAKE CONNECTION
REVIEW F2,F2A,F4,F8,F9,F9A, F1 0, F1 3, F17
RIG SERVICE
Description Time Depth
02.00
08 00
16.00 500
21.30 540
vri
2of6
SPECIAL EVENTS
Tour No. Event No. Description Time Depth
Pason
DRILLING ASSEMBLY TOUR
No Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly Down
Total
Weight of DC
Weight of String
DRILL ASSEMBLY & SPECIAL EVENTS - ADDITIONAL DATATour Sheet Serial No Vendor Software Version Year Month Day
License No Well Name Surface Location Prov Loc Type Unique Well Id
Operator
Operator’s AFE
Signature of Operator Representative
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
DRILLING ASSEMBLY TOUR
No Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly Down
Total
Weight of DC
Weight of String
DRILLING ASSEMBLY TOUR
No Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly Down
Total
Weight of DC
Weight of String
V. 1.1
0Z41640_20141125_1A
387
0.70
2014/11/24 00:45
ROD CARRIERE
0
.24
92.23
0.58
2 of 6
92.02
0
3
0
17.00
ENSIGN CANADIAN DRILLING
17.00
1
2
3
3
11
0.70
0.33
100/12-24-012-27W1/00
12.17 11.25 5.79
28.00 28.00
VERT
92.23
0.58
92.02
640
HIGHMARK NORTH HARGRAVE 12-24-12-27 W1 (387)
0.00
0.00
358.44301.890.00
0.00
0.00 0.00
10154
BIT
BIT SUB
21:30
16:00
08:00
02:00
HWDP(4.0 IN)
X/O
10 DC.S
BIT
10 DC.S
BIT SUB
0.00
0.00
0.00
DLS
X/O
HWDP(4.0 IN)
MB
HIGHMARK EXPLORATION INC.
DC (6.25 IN)
X/O
BIT
BIT SUB
12-24-012-27W1
JSA REVIEW
JSA REVIEW
LOCKOUTS
SITE ORIENTATION
2014
105.78 499.00 550.00
1
1
1
10
1
.58
.70
92.02
.31
102.00
101
0 16
156.00
19
10
1
1
1
1
0.00 0.00 0.00
1
10
102.00
101
RAMOAN SANE (PRESS. TESTER)
311.00
156.00
156.00
25
REVIEW F2,F2A,F4,F8,F9,F9A,F10,F13,F17
F2- MAKE CONNECTION
RIG SERVICE
500
200
540
156
156
102
Pason
1
1
311.00
156.00
LARRY BREAULT
1 2
Tour Sheet Senal No
0241640 20141125 IA
Vendor Software Version
Pason
Year Month Day
2014 11 25
License No Well Name
10154 HIGHMARKNORTH HARGRAVE12-2412-27 Wl (387)
Operator
HIGHMARKEXPLORATION INC.
Operator's AFE
Signature of Operator Representative
ROD CARRIERE
Surface Location
12-24 012-27WI
Contractor
ENSIGN CANADIAN DRILLING
Contractor's Job No
387
Signature of Contractor's Rig Manager
LARRY BREAULT
Prov Loc Type Unique Well Id
MB DLS 100I12-24-012-27WII00
Rig No Well Type
640 VERT
Spud Date Time
2014II 024 00 45
Rig Release Date Time
Re-Entry
Pesos
2 GELICHEM X
Time 10;00 12:00 14:00
Densky 1010kg/m31010kg/m31020kg/m3
Funnel Viscosky 30s/I 30sl 31s/I
Fluid Loss
Roid pH
Lccadcn of SampleBELOW BELOW ELOW
SHAKER HAKER HAKER
Depth 183m 300m 400
PVT 26.3m3 29m3 29m3
Test t
Type
(Eu Chlorides)
Value
Test 2
Type
(ex: Sandyt)
Value
Test 3
Type
(ex: Hard Ca)
Value
Test 4
Type
(ex Sulfides)
Value
V 11
3 of 6
Time
Density
Funnel Viscosity
Fluid Loss
Fluid pH
Location of Sample
Depth
PVT
Test 1
Type (Ex: Chlorides)
Value
Test 2
Type (ex: Sand%)
Value
Test 3
Type (ex: Hard Ca)
Value
Test 4
Type (ex: Sulfides)
Value
MUD SAMPLE REMARKS
TOUR MUD TYPE WATER OIL OTHER
Pason
MUD SAMPLE - ADDITIONAL DATATour Sheet Serial No Vendor Software Version Year Month Day
License No Well Name Surface Location Prov Loc Type Unique Well Id
Operator
Operator’s AFE
Signature of Operator Representative
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
V. 1.1
30s/l
640
31s/l
12-24-012-27W1HIGHMARK NORTH HARGRAVE 12-24-12-27 W1 (387)
30s/l
HIGHMARK EXPLORATION INC.
0Z41640_20141125_1A
BELOWSHAKER
BELOWSHAKER
387
BELOWSHAKER
11
ROD CARRIERE
2014/11/24 00:45
100/12-24-012-27W1/00
3 of 6
x
Pason
10154 DLS
ENSIGN CANADIAN DRILLING
10:00 12:00 14:00
MB
2014
1010kg/m3 1010kg/m3
VERT
183m
1020kg/m3
26.3m3
25
29m3 29m3
GEL/CHEM
LARRY BREAULT
300m 400m
2
Tour Sheet Senal No
0241640 20141125 IA
Vendor Software Version
Pason
Year Month Day
2014 11 25
License No Well Name
10154 HIGHMARKNORTH HARGRAVE12-2412-27 Wl (387)
Operator
HIGHMARKEXPLORATION INC.
Operator's AFE
Signature of Operator Representative
ROD CARRIERE
Surface Location
12-24 012-27WI
Contractor
ENSIGN CANADIAN DRILLING
Contractor's Job No
387
Signature of Contractor's Rig Manager
LARRY BREAULT
Prov Loc Type Unique Well Id
MB DLS 100I12-24-012-27WII00
Rig No Well Type
640 VERT
Spud Date Time
2014II H24 00 45
Rig Release Date Time
Re-Entry
Pesos
v'
GEL/CHEM X
Time 16;15 18;15 23:45
Densky 1070kg/m31070kg/m31090kg/m3
Funnel Viscosky 35s/I 426/ 52s/I
Fluid Loss 8cm3
Roid pH
Location of SaniPle SHAKER HAKER HAKER
Depth 506m 540m 550
PVT 29.6m3 29.9m3 27.3m3
Test t
Type
(Eu Chlorides)
Value
Test 2
Type
(ex: Sandyt)
Value
Test 3
Type
(ex: Hard Ca)
Value
Test 4
Type
(ex Sulfides)
Value
V 11
4 of 6
Time
Density
Funnel Viscosity
Fluid Loss
Fluid pH
Location of Sample
Depth
PVT
Test 1
Type (Ex: Chlorides)
Value
Test 2
Type (ex: Sand%)
Value
Test 3
Type (ex: Hard Ca)
Value
Test 4
Type (ex: Sulfides)
Value
MUD SAMPLE REMARKS
TOUR MUD TYPE WATER OIL OTHER
Pason
MUD SAMPLE - ADDITIONAL DATATour Sheet Serial No Vendor Software Version Year Month Day
License No Well Name Surface Location Prov Loc Type Unique Well Id
Operator
Operator’s AFE
Signature of Operator Representative
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
V. 1.1
35s/l
640
52s/l
12-24-012-27W1
8cm3
HIGHMARK NORTH HARGRAVE 12-24-12-27 W1 (387)
42s/l
HIGHMARK EXPLORATION INC.
0Z41640_20141125_1A
SHAKERSHAKER
387
SHAKER
11
ROD CARRIERE
2014/11/24 00:45
100/12-24-012-27W1/00
4 of 6
x
Pason
10154 DLS
ENSIGN CANADIAN DRILLING
16:15 18:15 23:45
8
MB
2014
1070kg/m3 1070kg/m3
VERT
506m
1090kg/m3
29.6m3
25
29.9m3 27.3m3
GEL/CHEM
LARRY BREAULT
540m 550m
3
Tour Sheet Senal No
0241640 20141125 IA
Vendor Sokware Version
P
Year Month Day
2014 11 25
Ucense No Well Name
10154 HIGHMARKNORTH HARGRAVE12 24 12 27 Wl (367)
Surbce Location
12-24-012-27W1
Prov Loc Type Unique Well Id
MB DLS 100712-24-012-27W1)00
Operator
HIGHMARKEXPLORATION INC
Operator's AFE
Signature of Operator Representative
ROD CARRIERE
Contractor
ENSIGN CANADIANDRILLING
Contractor's Job No
Signature of Contractu(a Rig Manager
LARRY BREAULT
Rig No
640
367
Well Type
VERT
Spud Date Time
Rig Release Date Time
Re-Entry
2014II U24 0045
Peace
Dexfrption Make Model Provided by Expenseof Rental Company Usage Quwttty Quanbty Used
DRILL SPOOL
Remarks
FLARE TANK(CHANDEL)
Remarks
LOADERWIGRAPPLE
Remarks
11.2I3MX 9.2I3M CONTRACTOR
CONTRACTOR
CONTRACTOR
PERATOR HANDEL RENTALS
PERATOR HANDEL RENTALS CER-155 4
PERATOR NSIGNCANADIANDRILLING P15939 24
NE
Remarks
Boiler No Make
WILLIAMS 5 DAVIS 100 HP
Model
CONTRACTOR OPERATOR CD
Rental Company
BO-765
Serial
N Hours Today
Remarks
Remarks
Swee I Screen 2
Shaker No Make Model
Pwutw bze SueenCtewdt Ner Poshin bze ScneCtegerP Newt Pete Size Screen Chsrwdt Newt Pwutw Size ScrwChsngedt Nev
Remarts
I SWACO MONGOOSE I 325 X 2 235 X 3 235 X 4 165 X
Remarts
Remarts
Pump No Make Model Pnwidedby Expense of Rental Company
Serial
N Hours Today Stroke Length Rod Sire Pump Styh
Remarks
I DENVER GARDNER PZB CONTRACTOR PERATQR ENSIGN MP4279 55 X3mm 152mm TRIPLEX
2 RS
Rema ksCHANE HEAD AND LINERS T0 502 QCT 172014
FIXB CONTRACTOR PERATQR ENSIGN MP4324 9 254mm I Xmm TRIPLEX
Remarks
anh Size
I 2 3 4
Ilmechmr Tne Snilih
I 2 3 4 5 6 7
Tohl Qeuia. Cotii49 Snicells
tkms Run Ove Hours Entry oe
6 Today Run SrM Sage OXTe MDC IX Rwen Rated Total Rui foMI
TeIrI
f12
2RR
""mm
IRR""
mm
IRR""
mm
3
0000.
mm
BAKER DP505F 7129136
BAKER DP505F7129136
mm
BAKER DP505F7129136
mm
LB1051 CH27MS1430
mm
1030 1030. 103. 103. 1030. 103tl-
m mm Omm Omm mm mm
1030 1030. 103. 103. 1030. 103tl-
m mm Omm Omm mm mm
1030 1030. 103. 103. 1030. 103tl-
m mm Omm Omm mm mm
1430 1430.
m mm
14900m 00 14I1025
14900m 35000m 5X 55 140025
14900m55000m 40100m 4X 95 140025
55000m55000m Boom I X 10 140025
422lmlhr 3
0oonuhr 3
5 of 6
GENERAL EQUIPMENT & SERVICE
Description Make Model Provided by Expense of Rental Company Serial No Usage Quantity Quantity Used
Remarks:
Remarks:
Remarks:
BOILERS
Boiler No Make Model Provided by Expense of Rental Company Serial No Hours Today
Remarks:
Remarks:
Remarks:
MUD PUMPS
Pump No Make Model Provided by Expense of Rental Company Serial No Hours Today Stroke Length Rod Size Pump Style
Remarks:
Remarks:
Remarks:
BITS
Bit No SizeIADC Code
Manufacturer Type Serial NoJets Depth
InDepth Out
Total Drilled
Total Hours Run
Today
Cumula-tive Hours
RunEntry Date
Cutting StructureTour
1 2 3 4 1 2 3 4 5 6 7 8 TI T0 MDC LOC BRG Gage ODC Reason Pulled Total Run m/Hr
Pason
SHALE SHAKERS
Shaker No Make ModelScreen 1 Screen 2 Screen 3 Screen 4
Position Size ScreenChanged? New? Position Size Screen Changed? New? Position Size Screen Changed? New? Position Size Screen Changed? New?
Remarks:
Remarks:
Remarks:
EQUIPMENT & SERVICESTour Sheet Serial No Vendor Software Version Year Month Day
License No Well Name Surface Location Prov Loc Type Unique Well Id
Operator
Operator’s AFE
Signature of Operator Representative
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
V. 1.2
3
SP-15939
HIGHMARK EXPLORATION INC.
CER-155
0Z41640_20141125_1A
2RR
2RR
3
387
ROD CARRIERE
2014/11/24 00:45
TRIPLEX
TRIPLEX
5 of 6
2RR
OPERATOR
X X X X
5.5
100 HP
ENSIGN CANADIAN DRILLING
9.50
5.50
8
0.00
1
200.00-mm
1.00
24
200.00-mm
24
200.00-mm200.00-mm
CONTRACTOR
24
1
1
4
2
3
3
2
11-2/3M X 9"-2/3M
401.00m
12-24-012-27W1
CHANDEL RENTALS
0.00m
CHANDEL RENTALS
350.00m
ENSIGN CANADIAN DRILLING
11
14/11/25
14/11/25
14/11/25
100/12-24-012-27W1/00
ONE
14/11/25
MP-4279
MP-4324
10.30-mm
SWACO
10.30-mm
10.30-mm
10.3-0mm
10.3-0mm
5.50
10.30-mm
OPERATOR
4.0010.30-mm
325
OPERATOR
235 235 165
550.00m
550.00m
CONTRACTOR
CONTRACTOR
2014
10.30-mm
10.30-mm
VERT
10.30-mm
10.30-mm
10.30-mm
10.3-0mm
10.3-0mm
CONTRACTOR
CONTRACTOR
24
CONTRACTOR
1.00
640
550.00m
HIGHMARK NORTH HARGRAVE 12-24-12-27 W1 (387)
149.00m
149.00m
149.00m
203mm
254mm2
1
MONGOOSE
10154
0.00m/hr
42.21m/hr
OPERATOR
140mm
OPERATOR
OPERATOR
25
152mmPZ8
F1000 ENSIGN
ECD
DENVER GARDNER ENSIGN
RS
DRILL SPOOL
LOADER W/GRAPPLE
FLARE TANK (CHANDEL )
14.30-mm
14.30-mm
7129136
14.30-mmCH27MS
BAKER
BAKER 10.30-mm7129136
7129136
10.3-0mm
10.30-mm
BAKER
10.30-mm
10.3-0mm
LB1051
Pason
WILLIAMS & DAVIS
DP505F
10.30-mm
DLS
10.30-mmDP505F
DP505F
MB
BO-765
CHANE HEAD AND LINERS TO 51/2" OCT 17 2014
LARRY BREAULT
1
Tour Sheet Senal No
0241640 20141125 IA
Vendor Sotware Version
P
Year Month Day
2014 11 25
Ucense No Well Name
10154 HIGHMARKNORTH HARGRAVE12 24 12 27 Wl (367)
Surbce Location
12-24-012-27WI
Prov Loc Type Unique Well Id
MB DLS 100112-24-012-27WU00
Operator
HIGHMARKEXPLORATION INC
Operator's AFE
Signature of Operator Representative
ROD CARRIERE
Contractor
ENSIGN CANADIANDRILLING
Contractor's Job No
Signature of Contractors Rig Manager
LARRY BREAULT
Rrg No
640
367
Well Type
VERT
Spud Date Time
Rig Release Date Time
Re-Entry
~pc/]2014IIII24 00.45
Pesos
Demflptloh Make Model Provided by Enpenseof Rental Company Usage Quantity Ouanhty Used
PENLESS RECORDER PASON
Remarks
CONTRACTOR PERATOR ASON
Remarks
Remarks
Boiler No Make Model Rental Company
Serial
N Hours Today
Remarks
Remarks
Remarks
Sworn I Screen 2
Shaker No Make Model
Peutrm bze Sueencttammt Neer Poehln bze SctmnCtumerP Newt Pmnun Size Screen cmrqdt Newt Peutrm Size ScramChangedt Neer
Remarts
Remarts
Remarts
Pump No Make Model Pnwidedby Expanse of Rental Company
Serial
N Hours Today Stroke Length Rod Sire Pump Styh
Remarks
Remarks
Remarks
anm size
I
Ilmmchwr Tne Sell Ih
2 I 4 2 I 4 s r
Tohl Omula. Cuor49 Rnroallu
tkms Run Ove nauru Entry'
Today Run Te Moc Ioc Gage ox Reams Rated Total Rui fnmr
Terri
f12
6 of 6
GENERAL EQUIPMENT & SERVICE
Description Make Model Provided by Expense of Rental Company Serial No Usage Quantity Quantity Used
Remarks:
Remarks:
Remarks:
BOILERS
Boiler No Make Model Provided by Expense of Rental Company Serial No Hours Today
Remarks:
Remarks:
Remarks:
MUD PUMPS
Pump No Make Model Provided by Expense of Rental Company Serial No Hours Today Stroke Length Rod Size Pump Style
Remarks:
Remarks:
Remarks:
BITS
Bit No SizeIADC Code
Manufacturer Type Serial NoJets Depth
InDepth Out
Total Drilled
Total Hours Run
Today
Cumula-tive Hours
RunEntry Date
Cutting StructureTour
1 2 3 4 1 2 3 4 5 6 7 8 TI T0 MDC LOC BRG Gage ODC Reason Pulled Total Run m/Hr
Pason
SHALE SHAKERS
Shaker No Make ModelScreen 1 Screen 2 Screen 3 Screen 4
Position Size ScreenChanged? New? Position Size Screen Changed? New? Position Size Screen Changed? New? Position Size Screen Changed? New?
Remarks:
Remarks:
Remarks:
EQUIPMENT & SERVICESTour Sheet Serial No Vendor Software Version Year Month Day
License No Well Name Surface Location Prov Loc Type Unique Well Id
Operator
Operator’s AFE
Signature of Operator Representative
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
V. 1.2
640
12-24-012-27W1HIGHMARK NORTH HARGRAVE 12-24-12-27 W1 (387)
PASON
HIGHMARK EXPLORATION INC.
0Z41640_20141125_1A
387
PENLESS RECORDER
11
ROD CARRIERE
2014/11/24 00:45
100/12-24-012-27W1/00
6 of 6
PASON
Pason
10154 DLS
ENSIGN CANADIAN DRILLING
MB
2014
VERT
OPERATOR 24
25
CONTRACTOR
LARRY BREAULT
1of5
CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
TOTALRigUp
Drill Actual Reaming Coring Cond Mud
& Circ Trips Rig Service
RepairRig
Cut Off Drilg Line
Dev Survey
Wireline Logs
Run Csg& Cement
Wait On Cement
Nipple Up BOP
TestBOP
Drillstem Test
PlugBack
Squeeze Cement Fishing Dir
WorkSafety
MeetingTear
DownWaiting
OnRig
Watch Other
HO
UR
S Tour 1Tour 2
Tour 3Total
DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked
Kelly Bushing Op Fuel
FUEL @ 08:00 HOURSRig Boiler
WE
AT
HE
R Time Temp
Current Conditions
Wind Direction Wind Strength
Road Condition
FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
License No Well Name Surface Location Prov Loc Type Unique Well Id
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
Operator
Operator’s AFE
Signature of Operator RepresentativePason
TOUR 1 SIGNATURE OF DRILLER START TIME END TIME
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
TOUR 3 SIGNATURE OF DRILLER START TIME END TIME
TOUR 2 SIGNATURE OF DRILLER START TIME END TIME
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
V. 1.3
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
T0 ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
18:30
1.85
19:45
18:00
18:15
16:15
5
17:30
x
1
x
0.25
16:00
1
x
387 2014/11/24 00:45
1
0
0
2.25
0
0
3.25
0
00
0.25
0
10
2.00
10
0.25
558
2
375
400
6.24m
1900.00
11
1
1
1
1
3
1
1
10
6A
0
4A21B
21
6B
00
SHAKER
20:30
CLINTON RADFORD
20:00
KYLE WENDZ
11:0008:30
SHANE DEMAS
640
HIGHMARK NORTH HARGRAVE 12-24-12-27 W1 (387)
0
0
0
0
HWDP(4.0 IN)
8.90m
BIT
CORE BBL
TOP SECTION
JARS-HYD
31.00kdaN
CREW CHG. OVER SAFETY MEETING
10154
DOUBLE PIN
TRIP OUT OF HOLE F/ CORE BBLS, FL. CK. @ 543m, 458m, 110m, O.O.H, EST. DISP.
10 DC.S
3.17, ACTUAL 3.84, DIFF. +.67m3, TALLY 542.69m, STRAP 542.86m, DIFF. +.17m
X/O
35.00kdaN
JSA (JOB SAFETY ANALYSIS) W/ CORE HAND
PRE TOUR SAFETY MEETING AND CREW CHANGE OVER # 192351
CORING (CUT CORE # ONE 171MM F/ 550M- 556M)CIRCULATE BOTTOM HOLE SAMPLE
580.47m
TRIP OUT OF HOLE W/ CORE F/ 556M TO BANK... (PIPE SPINNER) .... FLOW CHECK
BLOW KELLY BACK
HANDLE CORE BRLS
ONE
ON BOTTOM AND 480M, 264, 120 AND OUT OF HOLE
TORQUE.
MAKE UP CORE BRLS, CHG. OUT STABALIZERS TO NEW, TORQUE UP BREAK & RE -
6390
6390
TRIP IN HOLE, FILL HALF WAY, CONTINUE RUN IN HOLE, LAY OUT 3 JTS. DP.
2014/11/26
0.25
556.00m
0.25
0.50
0.25
1.25
0.50
0.25
0
0.25
120
1.25
0.252.25
4.250.50
1110
3.50
0.50
5
14190.00
4
21
4A
21:45
DLS
6B
0.25
5
MB
02:45
19
HIGHMARK EXPLORATION INC.
2600
0.34m
27.48m
3
5.79m
92.23m0.58m
92.02m
0.70m
0.21m2.11m
1.27m
2.250.75
12-24-012-27W1
4.75
3.25 4.25
17.11m
4
5
4A
8F
6A
6A
7
21
4A
24.4m3
5.25 1.750.25 0.250.25
POOH
MAKE UP CORE BBLS
2014
WORKING IN COLD WEATHER
02:15
00:15
556m
08:00
561m
02:3005:45
0.250.2513.25
8
8.251.00
LAB
8
LABLAB
LAB
10
LABLAB
1.27m
27.48m
0.34m
8.00
24.00
0.00m
8.00
8.00
0.70m
92.02m
26
2
2.11m
1
0.21m
0.58m
92.23m
00:00
1090
55s/l
16:00
55s/l
08:00
556
1090
58s/l
BELOWSHAKER
BELOWSHAKER
2.5kdaN
1110
4kdaN
PARTLY CLOUDY
28kdaN
LARRY BREAULT
20:30
SINGLE
20:00
19:45
3
18:30
08:15
18:15
18:00
17:30
16:15
15:30
3
13:15
13:0012:30
LAB
16:00
LAB
ROD CARRIERE
171
1 of 5
26.7m3 26.3m3
24:00
FAIR
ENSIGN CANADIAN DRILLING
140
556m
550
CORE
0.00m
159
159
171
159
159
1.00
92.02m
.21m
92.23m
0.58m
101
102
156
BHC406Z
156
159
159
159
1
1
110
100/12-24-012-27W1/00
.34m
27.48m
2
1.27m
31kdaN
1
2.11m
1
3.25
-4.00
1
11
7122872
8
VERT
550.74m
TANKS
200.00Nm
320.71m
171
5
320.71m
171
UP TO 19 KM/HNW
358.44m
0
25.6m3
2
10.5
11
9.45m
550m
550
SXSX
4C
SX
ONE
3C
ONE
SXSX
556
SINGLE
SINGLE
156
8cm3
102
REVIEW J.S.A. F9, G3, F10
159
LOCK OUT PUMP
159
SINGLE
D.W.A & INSPECT BRAKES, LINKAGE, FUNC. CROWNSAVER, INSPECT TONG LINES, PINS, CLEVISES, LIFTING/HOISTING,B.O.P & RELATED EQUIP. MANIFOLD ALIGN.
101
159159
159
159
101102
156
156
1089kPa
1089kPa
DWA INSPECTION VISUALLY INSPECT BRAKE LINKAGES AND TONG B/U LINES
8cm3
REVIEW JSA F2,F2A,F4,F8,F9,F9A,F10,F13,F17
F/T AIR TOGGLE CROWN SAVER, RE-CAL RIG SMART AND F/T
55s/l
554m550m
7137919
17
17
5
BAKER
24:00
08:00
16:00
140
140
152
ENERPAC LO VIS
82
SAWDUST
107
159
0
3.25
3.50
SODA ASHENERPAC REGULARGEL
8000
1
2014/11/26
0
2014/11/26
3000
CUT CORE # 2 F/556M TO 561M (102mm)
CIRCULATE BOTTOM HOLE SAMPLE
M/U CORE PUP JOINTS AND DROP BALL
FIX RIG SMART, RE-RUN POWER CORD FOR PAY-OUT & CALBRAITE
CONTINUE TO R.I.H TO CORE POINT
557m
R.I.H WITH NEW BIT AND FILL PIPE AT 280M
RIG SERVICE, CHECK DRIVELINE BOLTS
RACK BACK CORE BARRELS, INNER BARRELS AND CHANGE OUT CORE BIT
1
SAFETY MEETING/CREW CHANGEOVER (140376)
0Z41640_20141126_1B
CORE BBLS
BIT
BIT SUB
DOUBLE PIN
2
JARS-HYD
1
TOP SECTION
10 DC.S
X/O
HWDP(4.0 IN)
561.00m
9cm39cm3
bhc406z
DWA- CR- CHECKED BRAKE PINS AND LINKAGES, FNC CROWN SAVER // DO IT REVIEW COMPLETE// BOILERBLOWDOWN 2X @ 120L DISCHARGE
13:15
bhc406z
15:30
08:15
08:00
13:00
12:30
06:00
6
BAKER
10.5
GRCGRC
CORE
GRCGRCGRC
GRC
1790.00
3C
1
0.50
DOUBLE PINJARS-HYD
TOP SECTIONCORE BBLS
BIT
3.50
390
8
0.00
0
1
0
1
0
1
0
1
Pason
0
0
1
0
31kdaN
17kdaN
1
17kdaN
1
1
7122872
10
65
BAKER
48
00:00
00:15
02:1502:30
BIT SUB
17kdaN
05:45
10 DC.S
50
X/OHWDP(4.0 IN)
Ucense No Well Name
10154 HIGHMARKNORTH HARGRAVE12 24-12 27 Wl 387
I I I ITour Sheet Senal No
0241640 20141126 16
Surface Location
12-24012-27WI
Vendor Software Version
Pason
Year Month oay
2014 11 26
Prov Loc Type Unique Well Id
MB DLS 100112-24-012-27W 600
Operator
HIGHMARKEXPLORATION INC
Operator's AFE
Signature of Operator Representative
ROD CARRIERE
Contractor
ENSIGN CANADIANDRILLING
Contractors Job No
387
Signature of Contractor's Rig Manager
LARRY BREAULT
Rrg No
640
Wea Type
VERT
Spud Date Time
2014)1 624 00.45
Rig Release Date Time
Re-Entry
gggg
Pason
No
I BIT
3 CORE BBL
Component OD ID Length No
171 0 00 34 1 BIT
159 000 2748 1 CORE BBLS
i'
Component QD ID Length
159 00 0 00 0.34
159.00 000 27.48
No
I BIT
I CORE BBLS
Component
i'
QD ID Length
15900 0.00 034
15900 000 2748
I TOP SECTION 159 127
I JARS-HYD
I DQUBLEPIN
I 10 DC.S
I XIQ
159
159
211 1 JARS-HYD
21 1 DOUBLE PIN
15600 000 9202 1 BITSUB
10200 000 058 1 10DCS
159.00 000 2.11
159.00 000 0.21
156.00 000 0.70
156.00 000 92.02
I DOUBLE PIN
I BITSUB
15900 0.00 021
15600 0.00 070
I 'l I II
10 HWDP(40IN) 101 92 23 I I II III I I XIO 10200 0.00 058
1 HWDP(4 0 IN) 101 0 92.23
19 Drill Pipe
0 Drill Pipe
Kelly Down
Total
Stands 358 44 1 Dnll Pipe
Singles 0 00 1 Drill Pipe
57
58047
Kelly Down
Total
Stands 320.71 17 Drill Pipe
Singles 9.45 3 Drill Pipe
8.90
556.00
Kelly Down
Stands 320 71
Singles 1711
624
Weight of DC
Weight of String
1700
2800
ri «I'lr r r II
Weight of DC
Weight of String
17 00
31 00
Tour No.
2 JSAREVIEW
3 JSAREVIEW
3 LOOKOUTS
Event No. Description
F4- RIG SERVICE
REVIEW JSA6 F2A,F8,F9,FIO,F13
RIG SERVICEILOCKQUT DRWWRKSIBRAKE HANDLE, TIGHTEN DRIVELINE BOLTS
Time Depth
08.00
1600 556
19.00 556
vii
2of5
SPECIAL EVENTS
Tour No. Event No. Description Time Depth
Pason
DRILLING ASSEMBLY TOUR
No Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly Down
Total
Weight of DC
Weight of String
DRILL ASSEMBLY & SPECIAL EVENTS - ADDITIONAL DATATour Sheet Serial No Vendor Software Version Year Month Day
License No Well Name Surface Location Prov Loc Type Unique Well Id
Operator
Operator’s AFE
Signature of Operator Representative
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
DRILLING ASSEMBLY TOUR
No Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly Down
Total
Weight of DC
Weight of String
DRILLING ASSEMBLY TOUR
No Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly Down
Total
Weight of DC
Weight of String
V. 1.1
0Z41640_20141126_1B
387
27.48
2014/11/24 00:45
ROD CARRIERE
3
0.34
0.21
2.11
2 of 5
1.27
1
3
0
17.00
ENSIGN CANADIAN DRILLING
17.00 17.00
2
3
3
92.02
0.70
92.23
0.58
11
27.48
0.34
100/12-24-012-27W1/00
5.79 8.90 6.24
28.00 31.00 31.00
92.23
VERT
0.70
0.21
0.58
92.02
2.11
1.27
640
HIGHMARK NORTH HARGRAVE 12-24-12-27 W1 (387)
0.00
0.00
0.00
0.00
0.00
320.71320.71358.44
0.00
0.00
0.00
0.00
0.00
0.00 0.00
10154
BIT
CORE BBLS
HWDP(4.0 IN)
X/O
19:00
10 DC.S
16:00
BIT SUB
08:00
DOUBLE PIN
JARS-HYD
TOP SECTION
0
0.00
0
0.00
0.00
0.00
BIT
TOP SECTION
CORE BBLS
0.00
0.00
0.00
0.00
DLS
JARS-HYD
DOUBLE PIN
MB
HWDP(4.0 IN)
X/O
10 DC.S
BIT SUB
HIGHMARK EXPLORATION INC.
DOUBLE PIN
10 DC.S
TOP SECTION
JARS-HYD
X/O
HWDP(4.0 IN)
BIT
CORE BBL
12-24-012-27W1
JSA REVIEW
LOCKOUTS
10
1
1
156.00
101
JSA REVIEW
102.00
156.00
2014
580.47 556.00 561.00
3
1
1
10
1
1
1
1
1
92.23
92.02
0.58
2.11
.21
27.48
102.00
1.27
101
156.00
.34
156.00
159.00
159.00
1
19 17
10
159.00
17
1
1
1
1
1
1
1
0.00 9.45 17.11
1
1
101
102.00
159.00
159.00
F4- RIG SERVICE
159.00
159.00
159.00
26
1
RIG SERVICE/LOCKOUT DRWWRKS/BRAKE HANDLE, TIGHTEN DRIVELINE BOLTS
REVIEW JSA# F2A,F8,F9,F10,F13
556
556
171
159
159
159
159
156.00
Pason
1
1
159.00
159.00
LARRY BREAULT
1 2
Tour Sheet Senal No
0241640 20141126 18
Vendor Software Version
Pason
Year Month Day
2014 11 26
License No Well Name
10154 HIGHMARKNORTH HARGRAVE12-2412-27 Wl (387)
Operator
HIGHMARKEXPLORATION INC.
Operator's AFE
Signature of Operator Representative
ROD CARRIERE
Surface Location
12-24 012-27WI
Contractor
ENSIGN CANADIAN DRILLING
Contractor's Job No
387
Signature of Contractor's Rig Manager
LARRY RREAULT
Prov Loc Type Unique Well Id
MR DLS 100/12-24-012-27WI/00
Rig No Well Type
640 VERT
Spud Date Time
2014III/24 00 45
Rig Release Date Time
Re-Entry
Pesos
EEL X
Time 02;45
Denshy (090kg/m3
FunnelViscoshy 55s/I
Fluid Loss Scm3
Roid pH
Location of Sample ANKS
Depth 550.74m
PVT 24.4m3
Test t
Type
(Eu Chlorides)
Value
Test 2
Type
(ex: Sandyt)
Value
Test 3
Type
(ex: Hard Ca)
Value
Test 4
Type
(ex Sulfides)
Value
V 11
3of5
Time
Density
Funnel Viscosity
Fluid Loss
Fluid pH
Location of Sample
Depth
PVT
Test 1
Type (Ex: Chlorides)
Value
Test 2
Type (ex: Sand%)
Value
Test 3
Type (ex: Hard Ca)
Value
Test 4
Type (ex: Sulfides)
Value
MUD SAMPLE REMARKS
TOUR MUD TYPE WATER OIL OTHER
Pason
MUD SAMPLE - ADDITIONAL DATATour Sheet Serial No Vendor Software Version Year Month Day
License No Well Name Surface Location Prov Loc Type Unique Well Id
Operator
Operator’s AFE
Signature of Operator Representative
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
V. 1.1
55s/l
640
8cm3
12-24-012-27W1HIGHMARK NORTH HARGRAVE 12-24-12-27 W1 (387)
HIGHMARK EXPLORATION INC.
0Z41640_20141126_1B
387
TANKS
11
ROD CARRIERE
2014/11/24 00:45
100/12-24-012-27W1/00
3 of 5
x
Pason
10154 DLS
ENSIGN CANADIAN DRILLING
02:45
8
MB
2014
1090kg/m3
VERT
550.74m
24.4m3
26
GEL
LARRY BREAULT
1
Tour Sheet Senal No
0241640 20141126 18
Vendor Software Version
Pason
Year Month Day
2014 11 26
License No Well Name
10154 HIGHMARKNORTH HARGRAVE12-2412-27 Wl (387)
Operator
HIGHMARKEXPLORATION INC.
Operator's AFE
Signature of Operator Representative
ROD CARRIERE
Surface Location
12-24 012-27WI
Contractor
ENSIGN CANADIAN DRILLING
Contractor's Job No
387
Signature of Contractor's Rig Manager
LARRY BREAULT
Prov Loc Type Unique Well Id
MB DLS 100H2-24-012-27WI/00
Rig No Well Type
640 VERT
Spud Date Time
2014III/24 00 45
Rig Release Date Time
Re-Entry
Pesos
2 GEL/CHEM X
Time 08;30 11:00 13:00
Densky 1090kg/m31110kg/m31120kg/m3
Funnel Viscosky 55s/I 556/ 54s/I
Fluid Loss 9cm3 9cm3 Bcm3
Roid pH 10 10 10
Lccadcn ofSample
BELOW BELOW ELOW
SHAKER HAKER HAKER
Depth 550m 554m 556
PVT 26.7m3 26.3m3 26m3
Test t
Type
(Eu Chlorides)
Value
Test 2
Type
(ex: Sandyt)
Value
Test 3
Type
(ex: Hard Ca)
Value
Test 4
Type
(ex Sulfides)
Value
V 11
4 of 5
Time
Density
Funnel Viscosity
Fluid Loss
Fluid pH
Location of Sample
Depth
PVT
Test 1
Type (Ex: Chlorides)
Value
Test 2
Type (ex: Sand%)
Value
Test 3
Type (ex: Hard Ca)
Value
Test 4
Type (ex: Sulfides)
Value
MUD SAMPLE REMARKS
TOUR MUD TYPE WATER OIL OTHER
Pason
MUD SAMPLE - ADDITIONAL DATATour Sheet Serial No Vendor Software Version Year Month Day
License No Well Name Surface Location Prov Loc Type Unique Well Id
Operator
Operator’s AFE
Signature of Operator Representative
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
V. 1.1
55s/l
640
9cm3
54s/l
12-24-012-27W1
8cm3
HIGHMARK NORTH HARGRAVE 12-24-12-27 W1 (387)
55s/l
9cm3
HIGHMARK EXPLORATION INC.
0Z41640_20141126_1B
BELOWSHAKER
BELOWSHAKER
387
BELOWSHAKER
11
ROD CARRIERE
2014/11/24 00:45
100/12-24-012-27W1/00
4 of 5
x
Pason
10154 DLS
ENSIGN CANADIAN DRILLING
08:30
10
11:00
10
13:00
10
MB
2014
1090kg/m3 1110kg/m3
VERT
550m
1120kg/m3
26.7m3
26
26.3m3 26m3
GEL/CHEM
LARRY BREAULT
554m 556m
2
Tour Sheet Senal No
0241640 20141126 18
Vendor Software Version
Pason
Year Month Day
2014 11 26
License No Well Name
10154 HIGHMARKNORTH HARGRAVE12-2412-27 Wl (387)
Operator
HIGHMARKEXPLORATION INC.
Operator's AFE
Signature of Operator Representative
ROD CARRIERE
Surface Location
12-24 012-27WI
Contractor
ENSIGN CANADIAN DRILLING
Contractor's Job No
387
Signature of Contractor's Rig Manager
LARRY RREAULT
Prov Loc Type Unique Well Id
MR DLS 100/12-24-012-27WI/00
Rig No Well Type
640 VERT
Spud Date Time
2014II H24 00 45
Rig Release Date Time
Re-Entry
Pesos
v'
GEL/CHEM X
Time 21;45
Denshy tftgkg/m3
FunnelViscoshy 58s/I
Fluid Loss 8cm3
Roid pH 10
Locaticn of Sample SHAKER
Depth 557m
PVT 25,8m 3
Test t
Type
(Eu Chlorides)
Value
Test 2
Type
(ex: Sandyt)
Value
Test 3
Type
(ex: Hard Ca)
Value
Test 4
Type
(ex Sulfides)
Value
V 11
5 of 5
Time
Density
Funnel Viscosity
Fluid Loss
Fluid pH
Location of Sample
Depth
PVT
Test 1
Type (Ex: Chlorides)
Value
Test 2
Type (ex: Sand%)
Value
Test 3
Type (ex: Hard Ca)
Value
Test 4
Type (ex: Sulfides)
Value
MUD SAMPLE REMARKS
TOUR MUD TYPE WATER OIL OTHER
Pason
MUD SAMPLE - ADDITIONAL DATATour Sheet Serial No Vendor Software Version Year Month Day
License No Well Name Surface Location Prov Loc Type Unique Well Id
Operator
Operator’s AFE
Signature of Operator Representative
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
V. 1.1
58s/l
640
8cm3
12-24-012-27W1HIGHMARK NORTH HARGRAVE 12-24-12-27 W1 (387)
HIGHMARK EXPLORATION INC.
0Z41640_20141126_1B
387
SHAKER
11
ROD CARRIERE
2014/11/24 00:45
100/12-24-012-27W1/00
5 of 5
x
Pason
10154 DLS
ENSIGN CANADIAN DRILLING
21:45
10
MB
2014
1110kg/m3
VERT
557m
25.6m3
26
GEL/CHEM
LARRY BREAULT
3
1of5
CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
TOTALRigUp
Drill Actual Reaming Coring Cond Mud
& Circ Trips Rig Service
RepairRig
Cut Off Drilg Line
Dev Survey
Wireline Logs
Run Csg& Cement
Wait On Cement
Nipple Up BOP
TestBOP
Drillstem Test
PlugBack
Squeeze Cement Fishing Dir
WorkSafety
MeetingTear
DownWaiting
OnRig
Watch Other
HO
UR
S Tour 1Tour 2
Tour 3Total
DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked
Kelly Bushing Op Fuel
FUEL @ 08:00 HOURSRig Boiler
WE
AT
HE
R Time Temp
Current Conditions
Wind Direction Wind Strength
Road Condition
FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
License No Well Name Surface Location Prov Loc Type Unique Well Id
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
Operator
Operator’s AFE
Signature of Operator RepresentativePason
TOUR 1 SIGNATURE OF DRILLER START TIME END TIME
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
TOUR 3 SIGNATURE OF DRILLER START TIME END TIME
TOUR 2 SIGNATURE OF DRILLER START TIME END TIME
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
V. 1.3
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
T0 ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
20:30
0.38
20:45
18:30
16:15
18:00
x
x
0.50
16:00
x
387 2014/11/24 00:45
2.32
0
0
1.25
0
0
0
0.25
0
0.50
0
2.50
0
10
3.25
10
0.25
350
400
12.17m
572m
840.00
11
1
1
1
1
1
1
1
1
10
4A
0
21
5
6B
21
4
16
SHAKER
CLINTON RADFORD
23:00
KYLE WENDZ
13:4513:00
SHANE DEMAS
SHAKER
640
0
0
HIGHMARK NORTH HARGRAVE 12-24-12-27 W1 (387)
0
0
0
0
0
0
0
HWDP(4.0 IN)
X/O
8.88m
BIT
CORE BBLS
TOP SECTION
JARS-HYD
32.00kdaN
CREW CHG. OVER SAFETY MEETING #140377
10154
DOUBLE PIN
CUT 102mm CORE #2 F/561m - 572.23m (PACKED OFF)
BIT SUB
35.00kdaN
CIRCULATE BTMS. UP
10 DC.S
30.00kdaN
P.O.O.H 3 STDS. BLOW KELLY, CONT. TRIP OUT OF HOLE TO RETRIEVE CORE, FL. CK.
PRE TOUR SAFETY MEETING / CREW CHANGE OVER # 140378
SAFETY MEETING W/ CORE HAND TO HANDLE CORESHANDLE CORE BRLS // COLD WEATHER, STEAM FOR EVERYTHING // LAY OUT CORE
572.23m
CONDITION MUD & CIRCULATE -- BRING VIS DOWN TO 40
KELLY AT MID POINT AFTER FILL //
RIG SERVICE - LOCKED OUT DWWKS AND BRAKE HANDLE, FNC ANNULAR F/ REMOTE.. 22
BARRELS, MAKE UP CORE BARRELS
TRIP IN HOLE W/ CORE BARRELS FLOW CHECK & FILL @ 275M AND @ 560M /// BLOW
ONE
SEC O/C /// ADD WATER AND STEAM TO BIRD BATHS
SAFETY MEETING W/ CORE HAND, CREW CHG. OVER
@ 577m, 443m, 292m, 140m, EST. DISP. 3.56, ACTUAL 5.02, DIFF. +1.46m (WET)
4000
101
4000
HANDLE CORE BBLS, RETRIEVE CORE #2
2014/11/27
0.50
573.00m
2.25
1.00
0.25
0.50
2.00
0
0.25
120
1.75
0.25
0.252.00
1130
1.00
1140
2.00
4A
11320.00
21
21
20:00
6A
16:00
DLS
7
0.25
5
MB
7.58m
03:00
18
HIGHMARK EXPLORATION INC.
65
.31m
.70m
4
8.11m
7.58m
572
92.23m.58m
92.02m
0.252.001.00
12-24-012-27W1
4.25
SX
4.50 2.500.50
9.43m
4A
6A
21
5
6B
21
4
24.3m3
4.00 3.000.50
RIH
RETRIEVE CORE BBLS
2014
TRIPPING PIPE
03:30
00:15
573m
08:00
573.74m
06:30
04:00
06:45
101
0.2512.75
8
7.502.00
LAB
8
LABLAB
LAB
10 9.5
LABLAB
1.27m
27.48m
0.34m
8.00
24.00
8.00
8.00
39s/l
0.70m
92.02m
27
2
2.11m
1
0.21m
0.58m
92.23m
00:00
1140
55s/l
16:00
43s/l
08:00
574
1120
10.3
42s/l
6kdaN
10.3
BELOWSHAKER
BELOWSHAKER
10.3
4.5kdaN
10.3
10.3
10.3 10.3
1140
4.5kdaN
PARTLY CLOUDY
2
31kdaN
LARRY BREAULT
24:00
23:00
20:45
3.5
08:15
20:30
18:30
18:00
16:15
10:45
41
10:3008:30
13:45
LAB
12:45
ROD CARRIERE
171
1 of 5
25m3 20m3
FAIR
ENSIGN CANADIAN DRILLING
140
556
573m CORE
0.00m
159
159
159
159
159
1.50
92.23m
0.70m
0.21m
0.58m
92.02m
101
102
156
DP505F
156
159
159
159
100/12-24-012-27W1/00
0.34m
27.48m
1
1.27m
31kdaN
1
2.11m
2.00
1
-32.00
10
110
7122872
8
VERT
572.69m
SHAKER
339.60m
200
4
4
339.60m
171
UP TO 19 KM/HNW
339.60m
24m3
0
25.3m3
10.5
11
0.00m
571m
572
PUP JTS.
2RR
ONE
5C RR
ONE
SXSX
573
3.50
SINGLE
SINGLE
13:45
156
7cm3
156
REVIEW J.S.A. #L33, L22, F4, G3, F9
159
LOCK OUT PUMP
159
SINGLE
D.W.A & INSPECT BRAKES, LINKAGE, FUNC. CROWNSAVER, INSPECT B.O.P. & RELATED EQUIP.
8cm3
102
101
101102
156
156
1052kPa
1115kPa
1115kPa
16:00
DWA INSPECTION, INSPECT TONG HANGING LINES AND BRAKE PINS/LINKAGES
8cm3
REVIEW JSA# F2.F2A.F17,F18,F19
F/T CROWN SAVERS (ORBIT88/RIGSMART)
58s/l
CORING 171MM F/ 572.23m TO - 573
571m571m
7129136
18
18
BAKER
24:00
08:00
16:00
140
2
140
152
SAWDUST
DESCO II CF
110
HUMALITE
115
200
0
2.00
561m
0.00
CORE
8000
2014/11/26
2014/11/27
8330
LAY OUT CORE/BREAK DOWN AND LAY OUT CORE BARRELS
M/U 200MM PDC AND R.I.H. TO REAM RATHOLE
-.18M3
SAFETY MEETING W/ BAKER HUGHES CORE HAND
573m
CIRCULATE BOTTOMS UP AND HOIST TO LAY OUT CORE/BARRELS
573m
P.O.O.H F/C @ 519M,285M,142,O.O.H. CALC. VOL.-3.58M3 MEAS. VOL.-3.4M3. DIFF.
CORE F/573M-573.74M
2
SAFETY MEETING/CREW CHANGEOVER (140379)
0Z41640_20141127_1A
CORE BBLS
BIT
BIT SUB
DOUBLE PIN
1
JARS-HYD
2
TOP SECTION
10 DC.S
X/O
HWDP(4.0 IN)
547.04m
8cm38cm3
BHC406Z
DWA-CR- CHECKED BRAKE PINS AND LINKAGES, FNC CROWN SAVER // BOILER BLOWDOWN 2X @ 120L DISCHARGE
10:30
BHC406Z
10:45
08:15
08:00
08:30
06:00
12:451
BAKER
10
GRCGRC
CORE
GRCGRCGRC
GRC
2030.00
4C
0
0.50
2.25
HWDP(4.5 IN)X/O
DC (6.25 IN)BIT SUB
BIT
0.00
390
PUP JTS.
10
7.00
1
1
1
1
Pason
1
17kdaN
1
17kdaN
1
1
7137919
10
60
BAKER
00:00
00:15
03:30
04:00
06:30
06:45
60
Ucense No Well Name
10154 HIGHMARKNORTH HARGRAVE12 24-12 27 Wl 387
I I I ITour Sheet Senal No
0241640 20141127 IA
Surface Location
12-24012-27WI
Vendor Software Version
Pason
Year Month oay
2014 11 27
Prov Loc Type Unique Well Id
MB DLS 100112-24-012-27WV00
Operator
HIGHMARKEXPLORATION INC
Operator's AFE
Signature of Operator Representative
ROD CARRIERE
Contractor
ENSIGN CANADIANDRILLING
Contractors Job No
387
Signature of Contractor's Rig Manager
LARRY BREAULT
Rrg No
640
Wea Type
VERT
Spud Date Time
2014)1 V24 00.45
Rig Release Date Time
Re-Entry
Pason
No
I BIT
I CQREBBLS
I TOP SECTION
Component OD ID Length No
159 00 0 00 0 34 1 BIT
159 00 0 00 27 48 1 CORE BBLS
15900 000 127
i'
Component QD ID Length No
159 00 0 00 0.34 I BIT
159.00 000 27.48 I CORE BBLS
Component
i'
QD ID Length
15900 0.00 034
15900 000 2748
I JARS-HYD
I DQUBLEPIN
I BITSUB
I 10 DC.S
15900 000 211 1 JARS-HYD
15900 000 021 1 DOUBLE PIN
15600 000 070 1 BITSUB
15600 000 9202 1 10DCS
159.00 000 2.11
159.00 000 0.21 I DOUBLE PIN
156.00 000 0.70 I BITSUB
15900 0.00 021
15600 0.00 070
156.00 000 92.02
I 'l I II
I XIQ 10200 000 058 I I II III I I YJO 10200 0.00 058
10 HWDP(40IN)
2 PUP JTS. 101 758 2 PUP JTS
101 0 92 23 1 HWDP(4 0 IN) 101 0 92.23
101 7.58 2 PUP JTS 101 758
18 Drill Pipe
0 Drill Pipe
Kelly Down
Total
Stands 33g 60 1 Drill PiPe
Singles 0 00 Drill Pipe
811
572 23
Kelly Down
Stands 339,60 18 Drill Pipe
Singles 0.00 0 Drill Pipe
8.88 Kelly Down
Total
Stands 33g 60
Singles 0 00
962
573 74
Weight of DC
Weight of String
1700
31 00
ri «I'lr r r II
Weight of DC
Weight of String
17 00
31 00
Tour No.
2 JSAREVIEW
3 JSAREVIEW
Event No.
F2- MAKE CONNECTIONS
REVIEW JSAg F2 F2A FB.F9,FIO,F13,FIT,G3
Description Time Depth
08.00
16 00
Vli
2of5
SPECIAL EVENTS
Tour No. Event No. Description Time Depth
Pason
DRILLING ASSEMBLY TOUR
No Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly Down
Total
Weight of DC
Weight of String
DRILL ASSEMBLY & SPECIAL EVENTS - ADDITIONAL DATATour Sheet Serial No Vendor Software Version Year Month Day
License No Well Name Surface Location Prov Loc Type Unique Well Id
Operator
Operator’s AFE
Signature of Operator Representative
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
DRILLING ASSEMBLY TOUR
No Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly Down
Total
Weight of DC
Weight of String
DRILLING ASSEMBLY TOUR
No Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly Down
Total
Weight of DC
Weight of String
V. 1.1
0Z41640_20141127_1A
387
27.48
2014/11/24 00:45
ROD CARRIERE
0
0.34
0.21
2.11
2 of 5
1.27
0
3
0
17.00
ENSIGN CANADIAN DRILLING
17.00 17.00
2
3
7.58
92.02
0.70
92.23
0.58
11
27.48
0.34
100/12-24-012-27W1/00
8.11 8.88 9.62
7.58
31.00 31.00 31.00
7.58
92.23
VERT
0.70
0.21
0.58
92.02
2.11
1.27
640
HIGHMARK NORTH HARGRAVE 12-24-12-27 W1 (387)
0.00
0.00
0.00
0.00
0.00
339.60339.60339.60
0.00
0.00
0.00
0.00
PUP JTS.
0.00
0.00
0.00
0.00
0.00
0
0.00 0.00
10154
BIT
CORE BBLS
HWDP(4.0 IN)
X/O
10 DC.S
16:00
BIT SUB
08:00
DOUBLE PIN
JARS-HYD
TOP SECTION
0
0.00
0
0.00
0.00
0.00
PUP JTS.
BIT
TOP SECTION
CORE BBLS
0.00
0.00
0.00
0.00
DLS
JARS-HYD
DOUBLE PIN
MB
PUP JTS.
HWDP(4.0 IN)
X/O
10 DC.S
BIT SUB
HIGHMARK EXPLORATION INC.
DOUBLE PIN
BIT SUB
TOP SECTION
JARS-HYD
HWDP(4.0 IN)
10 DC.S
X/O
BIT
CORE BBLS
12-24-012-27W1
JSA REVIEW
2
10
1
1
156.00
101
101
JSA REVIEW
102.00
156.00
2014
572.23 573.00 573.74
1
1
1
10
1
1
1
1
1
92.23
2
0.58
0.70
92.02
2.11
101
0.21
27.48
102.00
1.27
101
156.00
0.34
156.00
10
159.00
159.00
1
18 18
1
159.00
18
1
1
1
1
1
1
1
0.00 0.00 0.00
1
1
101
102.00
156.00
159.00
159.00
F2- MAKE CONNECTIONS
159.00
159.00
159.00
27
1
REVIEW JSA# F2.F2A.F8.F9,F10,F13,F17,G3
159.00
159.00
159.00
159.00
159.00
156.00
2
Pason
1
1
159.00
159.00
LARRY BREAULT
1 2
101
ucense No Well Name
10154 HIGHMARKNORTH HARGRAVE12 24-12 27 Wl 387
e e e e
Tour Sheet Senal No
0241640 20141127 IA
Surface Location
12-24012-27WI
Vendor Software Version
Pason
Year Month Day
2014 11 27
Prov Loc Type Unique Well Id
MB DLS 100112-24-012-27WII00
Operator
HIGHMARKEXPLORATION INC
Operator's AFE
Signature of Operator Representative
ROD CARRIERE
Contractor
ENSIGN CANADIANDRILLING
Contractors Job No
387
Signature of Contractor's Rig Manager
LARRY BREAULT
Rig No
640
WeeType
VERT
Spud Date Time
2014111I24 00.45
Rig Release Date Time
Re-Entry
gggg
Pason
Tour No. Event No. Description Time Depth
vli
3 of 5
SPECIAL EVENTS
Tour No. Event No. Description Time Depth
Pason
DRILLING ASSEMBLY TOUR
No Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly Down
Total
Weight of DC
Weight of String
DRILL ASSEMBLY & SPECIAL EVENTS - ADDITIONAL DATATour Sheet Serial No Vendor Software Version Year Month Day
License No Well Name Surface Location Prov Loc Type Unique Well Id
Operator
Operator’s AFE
Signature of Operator Representative
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
DRILLING ASSEMBLY TOUR
No Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly Down
Total
Weight of DC
Weight of String
DRILLING ASSEMBLY TOUR
No Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly Down
Total
Weight of DC
Weight of String
V. 1.1
0Z41640_20141127_1A
387 2014/11/24 00:45
ROD CARRIERE
3 of 5
1
ENSIGN CANADIAN DRILLING
11
100/12-24-012-27W1/00
12.17
VERT640
HIGHMARK NORTH HARGRAVE 12-24-12-27 W1 (387)
339.60
10154 DLSMB
HIGHMARK EXPLORATION INC.
HWDP(4.5 IN)
DC (6.25 IN)
X/O
BIT
BIT SUB
12-24-012-27W1
2014
547.04
1
1
.58
92.23
.70
92.02
.31
18
10
10
1
9.43
27
200
156
156
102
101
Pason
LARRY BREAULT
3
Tour Sheet Senal No
0241640 20141127 IA
Vendor Sokware Version
P
Year Month Day
2014 11 27
Ucense No Well Name
10154 HIGHMARKNORTH HARGRAVE12 24 12 27 Wl (367)
Surbce Location
12-24-012-27W1
Prov Loc Type Unique Well Id
MB DLS 100112-24-012-27W1)00
Operator
HIGHMARKEXPLORATION INC
Operator's AFE
Signature of Operator Representative
ROD CARRIERE
Contractor
ENSIGN CANADIANDRILLING
Contractor's Job No
Signature of Contractu(a Rig Manager
LARRY BREAULT
Rig No
640
367
Well Type
VERT
Spud Date Time
Rig Release Date Time
Re-Entry
~pc/]2014II U24 0045
Peace
Dexfrptioh Make Model Provided by Expenseof Rental Company Usage Quwttty Quanbty Used
DRILL SPOOL 11.2I3MX 9.2I3M CONTRACTOR PERATOR NSIGNCANADIANDRILLING P15939 24
Remarks
FLARE TANK(CHANDEL)
Remarks
CONTRACTOR PERATOR HANDEL RENTALS
LOADERWIGRAPPLE
Remarks
CONTRACTOR PERATOR HANDEL RENTALS CER-155 4
NE
Remarks
Boiler No Make
WILLIAMS 6 DAVIS 100 HP
Model
CONTRACTOR OPERATOR CD
Rental Company
80-765
Serial
N Hours Today
Remarks
Remarks
Swee I Screen 2
Shaker No Make Model
Pwutw bze SueenCtewdt Ner Pcshin bze ScneCtegerP Newt Pete Size Screen Chsrwdt Newt Pwutw Size ScrwChsngedt Nev
Remarts
I SWACO MONGOOSE I 325 2 235 3 235 4 165
Remarts
Remarts
Pump No Make Model Pnwidedby Expense of Rental Company
Serial
N Hours Today Stroke Length Rod Sire Pump Styh
Remarks
I DENVER GARDNER PZB CONTRACTOR PERATQR ENSIGN MP4279 IIX3mm 152mm TRIPLEX
2 RS
Rema ksCHANE HEAD AND LINERS T0 502 QCT 172014
FIXB CONTRACTOR PERATQR ENSIGN MP4324 35 254mm I Xmm TRIPLEX
Remarks
anm Size
I
4G
171 00
mm
60 RR
171 00
mm
60 RR
171 00
mm
BAKER 7137919
62
BAKER 7122872
62
BAKER6Z
7122872
Mmufschmr Type Snit ih
I 3 4 5 6 7
Tohl Qmuia. Cctti49 Snicelle
tkms Run Ove Hours Entry oe
8 Today Run Te MDC IX Gage OX
55600m57223m 1623m 3X 70 140026
57223m 57300m 077m 2X 20 140027
57223m57374m 151m 2X 40 140027
Rwen Rated Total Rui fcMI
2 32mihr
TeIrI
038mihr 3
038nuhr 2
f12
ZRR""
mmBAKER DP505F7129136
mm m
1030. 103. 103.
mm Omm Omm
1030. 103tl-
mm mm
SM74 ~ 0X 00 14I1027
4 of 5
GENERAL EQUIPMENT & SERVICE
Description Make Model Provided by Expense of Rental Company Serial No Usage Quantity Quantity Used
Remarks:
Remarks:
Remarks:
BOILERS
Boiler No Make Model Provided by Expense of Rental Company Serial No Hours Today
Remarks:
Remarks:
Remarks:
MUD PUMPS
Pump No Make Model Provided by Expense of Rental Company Serial No Hours Today Stroke Length Rod Size Pump Style
Remarks:
Remarks:
Remarks:
BITS
Bit No SizeIADC Code
Manufacturer Type Serial NoJets Depth
InDepth Out
Total Drilled
Total Hours Run
Today
Cumula-tive Hours
RunEntry Date
Cutting StructureTour
1 2 3 4 1 2 3 4 5 6 7 8 TI T0 MDC LOC BRG Gage ODC Reason Pulled Total Run m/Hr
Pason
SHALE SHAKERS
Shaker No Make ModelScreen 1 Screen 2 Screen 3 Screen 4
Position Size ScreenChanged? New? Position Size Screen Changed? New? Position Size Screen Changed? New? Position Size Screen Changed? New?
Remarks:
Remarks:
Remarks:
EQUIPMENT & SERVICESTour Sheet Serial No Vendor Software Version Year Month Day
License No Well Name Surface Location Prov Loc Type Unique Well Id
Operator
Operator’s AFE
Signature of Operator Representative
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
V. 1.2
3
SP-15939
HIGHMARK EXPLORATION INC.
CER-155
0Z41640_20141127_1A
5C RR
5C RR
2RR
387
ROD CARRIERE
2014/11/24 00:45
TRIPLEX
TRIPLEX
4 of 5
4C
OPERATOR
8
100 HP
ENSIGN CANADIAN DRILLING
4.00
2.00
3.5
7.00
1
171.00-mm
0.00
24
200.00-mm
24
171.00-mm171.00-mm
CONTRACTOR
24
1
1
4
2
3
3
2
11-2/3M X 9"-2/3M
1.51m
12-24-012-27W1
CHANDEL RENTALS
CHANDEL RENTALS
16.23m
0.77m
ENSIGN CANADIAN DRILLING
11
14/11/26
14/11/27
14/11/27
100/12-24-012-27W1/00
ONE
14/11/27
MP-4279
MP-4324
SWACO
3.50
2.00
OPERATOR
2.00
325
OPERATOR
235 235 165
573.74m
CONTRACTOR
573.00m
CONTRACTOR
572.23m
2014
VERT
CONTRACTOR
CONTRACTOR
24
CONTRACTOR
0.00
640
573.74m
HIGHMARK NORTH HARGRAVE 12-24-12-27 W1 (387)
572.23m
572.23m
556.00m
203mm
254mm2
1
MONGOOSE
10154
0.38m/hr
OPERATOR
140mm
OPERATOR
OPERATOR
27
152mm
0.38m/hr
2.32m/hr
PZ8
F1000 ENSIGN
ECD
DENVER GARDNER ENSIGN
RS
DRILL SPOOL
LOADER W/GRAPPLE
FLARE TANK (CHANDEL )
10.30-mm
10.30-mm
7137919
10.3-0mm
10.30-mm7129136
BAKER
BAKER 7122872
BAKER
7122872
BAKER
10.30-mmDP505F
Pason
WILLIAMS & DAVIS
BHC40-6Z
10.3-0mm
DLS
10.30-mm
BHC40-6Z
BHC40-6Z
MB
BO-765
CHANE HEAD AND LINERS TO 51/2" OCT 17 2014
LARRY BREAULT
1
Tour Sheet Senal No
0241640 20141127 IA
Vendor Sotware Version
P
Year Month Day
2014 11 27
Ucense No Well Name
10154 HIGHMARKNORTH HARGRAVE12 24 12 27 Wl (367)
Surbce Location
12-24-012-27WI
Prov Loc Type Unique Well Id
MB DLS 100112-24-012-27WU00
Operator
HIGHMARKEXPLORATION INC
Operator's AFE
Signature of Operator Representative
ROD CARRIERE
Contractor
ENSIGN CANADIANDRILLING
Contractor's Job No
Signature of Contractors Rig Manager
LARRY BREAULT
Rrg No
640
367
Well Type
VERT
Spud Date Time
Rig Release Date Time
Re-Entry
~pc/]2014IIII24 00.45
Pesos
Demflptloh Make Model Provided by Enpenseof Rental Company Usage Quantity Ouanhty Used
PENLESS RECORDER PASON
Remarks
CONTRACTOR PERATOR ASON
Remarks
Remarks
Boiler No Make Model Rental Company
Serial
N Hours Today
Remarks
Remarks
Remarks
Sworn I Screen 2
Shaker No Make Model
Peutrm bze Sueencttammt Neer Poehln bze SctmnCtumerP Newt Pmnun Size Screen cmrqdt Newt Peutrm Size ScramChangedt Neer
Remarts
Remarts
Remarts
Pump No Make Model Pnwidedby Expanse of Rental Company
Serial
N Hours Today Stroke Length Rod Sire Pump Styh
Remarks
Remarks
Remarks
anm size
I
Ilmmchwr Tne Sell Ih
5 4 I 2 I 4 5 s r
Tohl Omula. Cuor49 Rnroallu
tkms Run Ove nauru Entry'
Today Run Te Moc Ioc Gage ox Reams Rated Total Rui fnmr
Terri
f12
5 of 5
GENERAL EQUIPMENT & SERVICE
Description Make Model Provided by Expense of Rental Company Serial No Usage Quantity Quantity Used
Remarks:
Remarks:
Remarks:
BOILERS
Boiler No Make Model Provided by Expense of Rental Company Serial No Hours Today
Remarks:
Remarks:
Remarks:
MUD PUMPS
Pump No Make Model Provided by Expense of Rental Company Serial No Hours Today Stroke Length Rod Size Pump Style
Remarks:
Remarks:
Remarks:
BITS
Bit No SizeIADC Code
Manufacturer Type Serial NoJets Depth
InDepth Out
Total Drilled
Total Hours Run
Today
Cumula-tive Hours
RunEntry Date
Cutting StructureTour
1 2 3 4 1 2 3 4 5 6 7 8 TI T0 MDC LOC BRG Gage ODC Reason Pulled Total Run m/Hr
Pason
SHALE SHAKERS
Shaker No Make ModelScreen 1 Screen 2 Screen 3 Screen 4
Position Size ScreenChanged? New? Position Size Screen Changed? New? Position Size Screen Changed? New? Position Size Screen Changed? New?
Remarks:
Remarks:
Remarks:
EQUIPMENT & SERVICESTour Sheet Serial No Vendor Software Version Year Month Day
License No Well Name Surface Location Prov Loc Type Unique Well Id
Operator
Operator’s AFE
Signature of Operator Representative
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
V. 1.2
640
12-24-012-27W1HIGHMARK NORTH HARGRAVE 12-24-12-27 W1 (387)
PASON
HIGHMARK EXPLORATION INC.
0Z41640_20141127_1A
387
PENLESS RECORDER
11
ROD CARRIERE
2014/11/24 00:45
100/12-24-012-27W1/00
5 of 5
PASON
Pason
10154 DLS
ENSIGN CANADIAN DRILLING
MB
2014
VERT
OPERATOR 24
27
CONTRACTOR
LARRY BREAULT
1 of2
CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
TOTALRigUp
Drill Actual Reaming Coring Cond Mud
& Circ Trips Rig Service
RepairRig
Cut Off Drilg Line
Dev Survey
Wireline Logs
Run Csg& Cement
Wait On Cement
Nipple Up BOP
TestBOP
Drillstem Test
PlugBack
Squeeze Cement Fishing Dir
WorkSafety
MeetingTear
DownWaiting
OnRig
Watch Other
HO
UR
S Tour 1Tour 2
Tour 3Total
DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked
Kelly Bushing Op Fuel
FUEL @ 08:00 HOURSRig Boiler
WE
AT
HE
R Time Temp
Current Conditions
Wind Direction Wind Strength
Road Condition
FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
License No Well Name Surface Location Prov Loc Type Unique Well Id
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
Operator
Operator’s AFE
Signature of Operator RepresentativePason
TOUR 1 SIGNATURE OF DRILLER START TIME END TIME
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
TOUR 3 SIGNATURE OF DRILLER START TIME END TIME
TOUR 2 SIGNATURE OF DRILLER START TIME END TIME
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
V. 1.3
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
T0 ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
21:00
21:15
18:15
18:30
30
16:15
x
x
0.50
x
3
16:00
387 2014/11/24 00:45
7.03
1.00
0.75
0.50
0.25
1.25
2.50
10
0.75
0.25
375
400
3.25
574m
630m
3190.00
11
1
10
1
10
1
6M
5
7
3
2
21
6A
56
5
SHAKER
CLINTON RADFORD
22:15
KYLE WENDZ
22:00
08:00
SHANE DEMAS
640
HIGHMARK NORTH HARGRAVE 12-24-12-27 W1 (387)
620m
07:30
08:00
BIT
BIT SUB
DC (6.25 IN)
X/O
31.00kdaN
CREW CHG. OVER SAFETY MEETING #140380
HWDP(4.5 IN)
10154
TRIP IN HOLE
35.00kdaN
REAM RATHOLE F/ 555m - 574m
30.00kdaN
DRILL 200mm HOLE F/ 574m - 630m ( T.D.)
PRE TOUR SAFETY MEETING AND CREW CHANGE OVER # 140381
TRIP OUT OF HOLE FOR LOGGERS F/ 630M (TD) FLOW CHECK ON BOTTOM AND 520M,
306M, 110M AND OUT OF HOLE
630.00m
TRIP IN HOLE W/ CLEAN OUT TRICONE BIT F/ BANK TO 630M
LOGS ON BOTTOM @ 1130 HRS
6 SEC O/C
4.25
RIG SERVICE- LOCKED OUT DWWKS AND BRAKE HANDLE, FNC BLIND RAMS F/ REMOTE ...
ONE
LOGGING - OPEN HOLE LOGS- MAI, MFE,MSS,MPD,MDN,MGS,MTC,MCG // TD WAS 629M,
SAFETY MEETING W/ LOGGERS
RIG SERVICE FUNC. PIPE RAMS 4 SEC.> BLOW KELLY
CIRCULATE BTMS. UP
0
586m EST. DISP. .41 ACTUAL .6 DIFF. +.19m3
WIPER TRIP TO 500m, FL. CK. @ 619m, 525m , NUMEROUS TIGHT SPOTS F/620m -
CIRCULATE HOLE CLEAN
0.75
0.75
0.25
2.50
0.25
0
0.25
0.25
2.00
0.25
1.75
1140
1.00
1.75
0.25
3.25
6070.00
6B
21
11A
21:00
21
DLS
0.25
7
6A
MB
02:15 04:15
23
HIGHMARK EXPLORATION INC.
59200
160
575
3
10.27m
SX
630
0.253.500.50
12-24-012-27W1
SX
SXSX
1.252.50 0.252.001.50
12C
5
21
12A
7
21
21
6F
22.1m324.2m3
2.000.75 0.25
POOH
TRIPPING
2014
LAY DOWN DRILL COLLARS
01:00
00:15
06:15
07:15
04:45
02:15
05:30
05:15
07:15
07:30
0.751.25
8
7.502.75
LAB
8
LAB
2.50
LAB
10
LAB
LABLAB
8.00
24.00
8.00
8.00
28
00:00
1140
90s/l
16:00
DEVIATION SURVEY
08:00
TRIP OUT OF HOLE F/ LOGS, STRAP OUT
11301120
9kdaN
2kdaN
68s/l
BELOWSHAKER
PARTLY CLOUDY
32kdaN
LARRY BREAULT
22:15
22:00
21:15
4
21:00
18:30
08:15
18:15
16:15
3
10:15
10:00
LAB
14:45
13:45
10:30
ROD CARRIERE
1 of 2
18m3
24:00
FAIR
ENSIGN CANADIAN DRILLING
140
574
44
0.00m
5
200
156
156
1.50
0.25
92.23m
100/12-24-012-27W1/00
10
6B
.31m
1
.70m
92.02m
.58m
-11.00
8
VERT
574.03m 622.49m
SHAKERSHAKER
1
5
200 WIRELINE
UP TO 19 KM/HNW
0
433.89m
21.4m3
10.5
11
SXSX
ONE
ONE
2.50
CHECK DRIVELINE BOLTS
14:45
8cm3
15:15
0
102
D.W.A. & INSPECT BRAKES, LINKAGE, FUNC. CROWNSAVER, INSPECT B.O.P & RELATED EQUIP. MANIFOLD ALIGNMENT
101
SINGLE
REVIEW J.S.A. #F9, F10, F13, L22
MOTORHAND CATLIN KOKORUDS QUIT WITHOUT NOTICE
1099kPa
1115kPa
7.84m3 h20 w/4m3 cement returns.
1099kPa
8.8 ton (11.4m3) IGain 1500 w/.05% CFL-3/1%FWCA-H/.25%SMS/3%LCC-1. Tail in
15:15
w/5 ton(4.2m3) Ibond 1780 w/.2%CFL-3/.3%LTR/1.5%FWCA/.15%CDF-4. Displc
16:00
8cm3
DWA INSPECTION/ VISUALLY INSPECT DRUM LINE, TONG HANGING LINES AND BRAKE PINS
8cm3
F/T ANTI COLLISION DEVICES (AIR TOGGLE/RIGSMART)
JSA REVIEW# H-1,C-10,H-2,K-7,K-9
1030
65s/l43s/l
TRIP OUT OF HOLE SIDEWAYS F/C @ 589M,318M,142M, MEAS. VOL- M3 CALC. VOL. M3
DIFF, M3
CONDITION MUD & CIRCULATE
630m
24:00
08:00
16:00
152
140
DESCO II CFHUMALITECELLOFLAKE
115
SAWDUST
93
0
574m
555m REAM
DRILL
SODA ASHGEL
1300
2014/11/274300
Cement prod. Pump 3m3 h20/3m3 vis sweep/ 1.2 ton (3m3) scav 1250 Mix/pump
FILL CASING AND CIRCULATE ON BOTTOM (.6M STICKUP)
SAFETY MEETING WITH SANJEL CEMENTERS
RIG IN TONG HAND//M/U FLOAT AND SHOE, RUN CASING
630m
RIG SERVICE LOCKOUT/DRWWKS AND BRAKE HANDLE
3.41M3 CALC. VOL. 3.3M3 DIFF, +.11M3
SAFETY MEETING WITH 3WAY POWERTONGS
1
TRIP OUT OF HOLE SIDEWAYS/LAY DOWN DC'S F/C @ 589M,318M,142M, MEAS. VOL-
0Z41640_20141128_1B
SAFETY MEETING/CREW CHANGEOVER (140382)
0.25
0.50
1
6B
7cm3
TRIP RECORD- CALC=3.41, ACC=3.59, DIFF=0.18M3 /// ORIANTATED LOGGERS /// LOCKED OUT BRAKE HANDLE WHILE LOGGING
DP505F
DWA-CR- CHECKED BRAKE PINS AND LINKAGES, FNC CROWN SAVER // DO IT REVIEW COMPLETE// BOILER BLOWDOWN2X @ 120L DISCHARGE
10:15
10:30
08:15
08:00
10:00
06:00
13:45
10
GRCGRCGRCGRCGRC
GRC
2060.00
2RR
0.75
0.25
0.50
3.25
0.15
0.25 4.25
390
10.3 10
10.3
10
10.3 10.3
10.3 10.3
8.00
10.3
Pason
7129136
BAKER
00:00
00:15
01:00
02:1504:45
05:15
05:30
06:15
Ucense No Well Name
10154 HIGHMARKNORTH HARGRAVE12 24-12 27 Wl 387
e e e e
Tour Sheet Senal No
0241640 20141128 16
Surface Location
12-24012-27WI
Vendor Software Version
Pason
Year Month Day
2014 11 28
Prov Loc Type Unique Well Id
MB DLS 100112-24-012-27WU00
Operator
HIGHMARKEXPLORATION INC
Operator's AFE
Signature of Operator Representative
ROD CARRIERE
Contractor
ENSIGN CANADIANDRILLING
Contractors Job No
387
Signature of Contractor's Rig Manager
LARRY BREAULT
Rig No
640
Wee Type
VERT
Spud Date Time
201411U24 0045
Rig Release Date Time
Re-Entry
gggg
Pason
Tour No.
2 JSAREVIEW
3 JSAREVIEW
Event No.
Fl0- POOH
REVIEW JSA6 H-I,C-IONI-2,F-SA,K-T,K-g
Description Time Depth
08.00
1600 630
3 LOOKOUTS RIG SERVICEI LOCKOUT DRWWKS AND BRAKE HANDLE, CHECK DRIVELINE BOLTS 21.00 630
vii
2of2
SPECIAL EVENTS
Tour No. Event No. Description Time Depth
Pason
DRILLING ASSEMBLY TOUR
No Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly Down
Total
Weight of DC
Weight of String
DRILL ASSEMBLY & SPECIAL EVENTS - ADDITIONAL DATATour Sheet Serial No Vendor Software Version Year Month Day
License No Well Name Surface Location Prov Loc Type Unique Well Id
Operator
Operator’s AFE
Signature of Operator Representative
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
DRILLING ASSEMBLY TOUR
No Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly Down
Total
Weight of DC
Weight of String
DRILLING ASSEMBLY TOUR
No Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly Down
Total
Weight of DC
Weight of String
V. 1.1
0Z41640_20141128_1B
387 2014/11/24 00:45
ROD CARRIERE
2 of 2
0
ENSIGN CANADIAN DRILLING
2
3
3
11
100/12-24-012-27W1/00
10.27
32.00
VERT640
HIGHMARK NORTH HARGRAVE 12-24-12-27 W1 (387)
433.89
10154
21:00
16:00
08:00
DLSMB
HIGHMARK EXPLORATION INC.
HWDP(4.5 IN)
DC (6.25 IN)
X/O
BIT
BIT SUB
12-24-012-27W1
JSA REVIEW
LOCKOUTS
JSA REVIEW
2014
630.00
1
1
.58
92.23
.70
92.02
.31
23
10
10
1
0.00
F10- POOH
28
RIG SERVICE/ LOCKOUT DRWWKS AND BRAKE HANDLE, CHECK DRIVELINE BOLTS
REVIEW JSA# H-1,C-10,H-2,F-9A,K-7,K-9
630
630
200
156
156
102
101
Pason
LARRY BREAULT
1
1 of2
CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
TOTALRigUp
Drill Actual Reaming Coring Cond Mud
& Circ Trips Rig Service
RepairRig
Cut Off Drilg Line
Dev Survey
Wireline Logs
Run Csg& Cement
Wait On Cement
Nipple Up BOP
TestBOP
Drillstem Test
PlugBack
Squeeze Cement Fishing Dir
WorkSafety
MeetingTear
DownWaiting
OnRig
Watch Other
HO
UR
S Tour 1Tour 2
Tour 3Total
DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked
Kelly Bushing Op Fuel
FUEL @ 08:00 HOURSRig Boiler
WE
AT
HE
R Time Temp
Current Conditions
Wind Direction Wind Strength
Road Condition
FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
License No Well Name Surface Location Prov Loc Type Unique Well Id
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
Operator
Operator’s AFE
Signature of Operator RepresentativePason
TOUR 1 SIGNATURE OF DRILLER START TIME END TIME
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
TOUR 3 SIGNATURE OF DRILLER START TIME END TIME
TOUR 2 SIGNATURE OF DRILLER START TIME END TIME
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
V. 1.3
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
T0 ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
0
08:15
0.50
12:0009:00
08:4508:30
387
LABLAB
2014/11/24 00:45
ROD CARRIERE
1 of 2
3.00
0.25
1.25
0.25
2.00
3.75
FAIR
0.25
0.25
ENSIGN CANADIAN DRILLING
2014/11/29 12:00
400
1.25 8.25
2.00
1590.00
11
100/12-24-012-27W1/00
-12.00
22
22
21B
14B
22
21
21B
8
VERT
CLINTON RADFORD
LARRY BREAULT
SHANE DEMAS
640
HIGHMARK NORTH HARGRAVE 12-24-12-27 W1 (387)
UP TO 19 KM/HNW
0
CREW CHG. OVER SAFETY MEETING #130383
JSA (JOB SAFETY ANALYSIS)
10154
PREP. CELLAR, NIPPLE DOWN BOPS, SET SLIPS, CUT CSG. LAY OUT STACK
10.5
LAY OUT KELLY, TEAR OUT FLOOR, CLEAN TANKS, PREP, DERRICK TO LAY OVER, CONT.
PRE TOUR SAFETY MEETING AND CREW CHANGE OVER # 140384
11
SAFETY MEETING- FOR SLIP AND CUTSLIP/CUT DRILLING LINE -- 20M -- MJ=8913, ACC MJ= 321210
TEAR DOWN (RIG RELEASE NOV./29/2014 @ 12:00 Hrs) (TOTAL DEPTH OF 630m)RIG SERVICE- LOCKED OUT DWWKS // GREASED BLOCKS AND CROWN
ONE
JSA (JOB SAFETY ANALYSIS) PRE-LAYOVER DERRICK MTG.W/ CREW. S.D. L.B.
TEAR OUT,
TEAR DOWN - HANG BLOCKS, SPOOL LINE, TEAR OUT ALL LINES & WINTERIZE, RIG OUT
0
ONE
LAY OVER DERRICK, INSPECT DERRICK, ALL LINES, SHEAVES, STOOLS & PINS
PASON & ELECTRICAL CORDS, PREP. SHACKS FOR NOON MOVE W/ FAST TRUCKING
REVIEW J.S.A. #H4, J2, J7, J3, J6
D.W.A.
0
0.253.00
0.250.25 9A
21
10660.00
21
22
DLS
0.25
7
MB
HIGHMARK EXPLORATION INC.
24:00
08:00
16:00
140
140
0
0.25
12-24-012-27W1
0
0.25
1
0Z41640_20141129_1A
1
MOVE RIG
NIPPLE DWN. SET SLIPS
2014
00:30
00:15
DWA-CR- COMPLETE // DO IT REVIEW COMPLETE / BOILER BLOWN DOWN 1 X @ 120L DISCHARGE
08:00
06:45
09:00
06:15
08:15
02:30
08:00
06:30
08:45
08:30
06:00
0.25 0.25
3
LAB
LABLAB
GRC
8.00
1840.00
12.00
4.00
29
0.75 5.25
00:00
2.00
16:00
08:00
390
PARTLY CLOUDY
Pason
00:00
00:15
00:30
02:30
LARRY BREAULT
06:15
06:30
06:45
ucense No Well Name
10154 HIGHMARKNORTH HARGRAVE12 24-12 27 Wl 387
e e e e
Tour Sheet Senal No
0241640 20141128 IA
Surface Location
12-24012-27WI
Vendor Software Version
Pason
Year Month Day
2014 11 29
Prov Loc Type Unique Well Id
MB DLS 100112-24-012-27WII00
Operator
HIGHMARKEXPLORATION INC
Operator's AFE
Signature of Operator Representative
ROD CARRIERE
Contractor
ENSIGN CANADIANDRILLING
Contractors Job No
387
Signature of Contractor's Rig Manager
LARRY BREAULT
Rrg No
640
Wee Type
VERT
Spud Date Time
2014111I24 00.45
Rig Release Date Time
2014111I28 12.00
Re Facy
Pason
Tour No.
2 JSAREVIEW
Event No.
Al-RIG MOVE
Description Time Depth
11.00
vli
2of2
SPECIAL EVENTS
Tour No. Event No. Description Time Depth
Pason
DRILLING ASSEMBLY TOUR
No Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly Down
Total
Weight of DC
Weight of String
DRILL ASSEMBLY & SPECIAL EVENTS - ADDITIONAL DATATour Sheet Serial No Vendor Software Version Year Month Day
License No Well Name Surface Location Prov Loc Type Unique Well Id
Operator
Operator’s AFE
Signature of Operator Representative
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
DRILLING ASSEMBLY TOUR
No Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly Down
Total
Weight of DC
Weight of String
DRILLING ASSEMBLY TOUR
No Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly Down
Total
Weight of DC
Weight of String
V. 1.1
0Z41640_20141129_1A
387 2014/11/24 00:45
ROD CARRIERE
2 of 2
ENSIGN CANADIAN DRILLING
2
2014/11/29 12:00
11
100/12-24-012-27W1/00
VERT640
HIGHMARK NORTH HARGRAVE 12-24-12-27 W1 (387)10154
11:00
DLSMB
HIGHMARK EXPLORATION INC.
12-24-012-27W1
JSA REVIEW
2014
A1- RIG MOVE
29Pason
LARRY BREAULT
Innovation, Energy and Mines
INITIALPRODUCTION REPORT
Two (2) copies of this report are to be completed and submitted to the dishict office within days
following the fifth after the well has been placed on normal production.
Well Name: Hi hmark Virden 12-24 License Number: 10150 eratin Com an: Hi hmark Ex loration inc. 322 Licence ¹10154Battery Well Produced To (name & locations): 12-24-12-27W1
Completion Interval(s): 561.5 m to 570.0 m m to m
Open Hole: Perforated: H
Com letion Oil:Source of Com letion Oil Co, & location:
Volume Su lied: 0.0 m3
F l: ~dod e Pole
Date Supplied:* / /YY MM DD
(Continue on separate sheet ifnecessary)
Disposition of Recovered Completion Oil:
On-Production Date:* 14/12/08YY MM DD
m3
(Co. & location)
* Official on-production date (i.e, date of first new oil production after completion oil recovered).* Date in which the well produces oil in excess of the volume of completion oil used.
Production Test:
Linda M. Watts Production Accountant 403-769-6632(Submitted By)
Remarks: AMENDED
(Position) (Telephone)
INITIAL PRODUCTION REPORT
Two (2) copies of this report are to be completed and submitted to the district office within days following the fifth after the well has been placed on normal production. Well Name: Highmark Virden 12-24 License Number: 1015 Operating Company: Highmark Exploration Inc. (322) Licence #10154 Battery Well Produced To (name & locations): 12-24-12-27W1 Completion Interval(s): 561.5 m to 570.0 m m to m Open Hole: Perforated: Formation: Lodge Pole Completion Oil: Source of Completion Oil (Co. & location):
Volume Supplied: 0.0 m3 Date Supplied:* / / YY MM DD
Date YY MM DD
Completion Oil Used
(m3)
Completion Oil
Recovered (m3)
Completion Oil To Be Recovered
(m3)
Water
Produces (m3)
(Continue on separate sheet if necessary)
Disposition of Recovered Completion Oil: m3 to (Co. & location) On-Production Date:* 14/12/08 YY MM DD * Official on-production date (i.e. date of first new oil production after completion oil recovered). * Date in which the well produces oil in excess of the volume of completion oil used. Production Test:
Date YY MM DD
Hours Produced
Oil Produced
m3
Water Produced
m3
Pumping Flowing Gas-Oil Ratio
(m3/ m3)
Oil Density
(kg/ m3) 14 12 8 4 5.8 8.8 swab 14 12 18 14 6 17 yes 14 12 20 24 .1 32.4 yes 14 12 21 24 2.7 34.5 yes 14 12 22 24 2.7 28.6 yes
Totals
90
17.3
121.3
Linda M. Watts Production Accountant 403-769-6632 (Submitted By) (Position) (Telephone) Remarks: AMENDED
S TR Consulting
Well Location UWI: 100/12-24-12-27 W1M
Full Location: 12-24-12-27 W1M
Property/Unit Virden
Estimated Cost:
Estimated Payout: Days
Daily Oil Production:m3
HMK Working Interest %
AFE Number (Equip)
AFE Number (Tie-in)
AFE Number (Completion)
WELL License ¹ Expected H2S = 2.0%
Subject: New Well Completion
Prepared by: Scott Robertson Date: December 3,2014
Reviewed by: Erwin Sison Date:
Well Location UWI: 100/12-24-12-27 W1M
Full Location: 12-24-12-27 W1M
Property/Unit Virden
Estimated Cost: $143,000
Estimated Payout: Days
Daily Oil Production:m3
HMK Working Interest % 100.00
AFE Number (Equip)
AFE Number (Tie-in)
AFE Number (Completion) 14CEQ009
WELL License # 10154
Subject: New Well Completion
Prepared by: Scott Robertson Date: December 3,2014
Reviewed by: Erwin Sison Date:
STR Consulting
Completion Reporting Program
Expected H2S = 2.0%
ComletionSu liersandContacts
Service Coman PhoneNumber
DevinClark
SuckerRods/BHP
Tubin
FluidHaulin
Operator
Encore
BakerPetrolite
TSL
Spearins
Metra
Disosalandtruckin
Rod Elcano
Sheldon(Elcano)
Dale( Elcano)
Cleanupcribandwellhead
AexMoosominTom
FontanaTruckin
Spearins Ga orRick
BrentHorn
StuartButcher
Ja Dobrescu
Eddie
Ga
MorrisHaulin Morris
MorrisHaulin Mike
Office
204-851-5866
306-435-2796
1-204-748-2261
204-854-2231
204-851-0558
403-968-5761
204-748-6858
204-851-1945
204-854-2231
306-634-6325
204-748-7897
204-748-7440
204-748-1958
204-748-7884
204-851-2982
204-851-3958
Spearings Waskada
StreamFlo
H2Steaming
Kylecell
Chris
TuthillConstruction
FluidhaulingandpressuretrueFoxtailtrucking
204-673-2284
204-845-2405
204-838-0031
204-764-0031
306-634-4719
204-688-2186
Service Company Phone Number
Devin Clark Clean up crib and wellhead 204-851-5866Sucker Rods / BHP Apex Moosomin Tom 306-435-2796Tubing Fontana Trucking 1-204-748-2261Fluid Hauling Spearings ( Gary or Rick ) 204-854-2231Operator Brent Horn 204-851-0558Encore Stuart Butcher 403-968-5761Baker Petrolite Jay Dobrescu 204-748-6858TSL Eddie 204-851-1945Spearings Gary 204-854-2231Metra 306-634-6325Disposal and trucking Morris Hauling ( Morris ) 204-748-7897
Morris Hauling ( Mike ) 204-748-7440Office 204-748-1958
Rod ( Elcano ) 204-748-7884Sheldon ( Elcano ) 204-851-2982Dale ( Elcano ) 204-851-3958
Spearings Waskada 204-673-2284
Tuthill Construction 204-845-2405
Fluid hauling and pressure truc Fox tail trucking 204-838-0031
Kyle cell 204-764-0031
Stream Flo Chris 306-634-4719
H2 Steaming 204-688-2186
Completion Suppliers and Contacts
Date:
Location:
December 3,2014
100/12-24-12-27 WIM Final Tubing String/Packer and Tailpipe assembly from Bottom Upward
DATE: December 7,2014
Production Formation Lodge Pole
Bottom Hole Pres (kpa)
Pumping Unit:
5000 Bottomhole Temp (C):
H2S Concentration (%):
26
P P1%
Total Joints Tubin to PSN
No. Description
73mm Bar Collar73mm Tubin Joint J-55 EUE
58 Tubin O.D.
0.139.32
585.89576.57
Len th m Set at Top m Min.ID mm Remarks
73mm
Elevations:Kelt BushinGround LevelKB-GLKOPLe ¹1Le 1SILeg¹ 2PBTDTotal Depth:
PerforationsFrom
478 07473 67
4.4
614 9
To
mKBmKBm
mKBmKBmKBmKBmKBmKB
mTVDmTVDmTVD
73mm Perforated Pup Joint J-55 EUE73mm Pump Seatin Nipple60- 73mm Tubin Joints J-55 EUEStream Flo Split Do nut
Total Strin Len th
K.B to Tubin Han srF(an e PlusSettin Depth K.B.
Casin Bowl 9"
2.470.33
569.380.29
581.924.1
586.92
Size
574.10573.77
4.394.10
Series MakeStream fin 14mpa
Tubin Spool 9" x 7 I/16 Stream fin 14mpa
14 )ts.219 10 mm35 70J55
149 00
kg/mgrademKB
10 tonnes ( 2 Om3 cement
returns ) cement
48139 70
20 8J55
629 00
)ts.mmkg/mgrademKB
Tubintit
)ts.73.00 mm9.67 kg/mJ-55 grade
mKB
mTVD
Remarks:
15 tonnes ( 4 Om3 cement
returns ) cement
Packer (1):Packer (2):
Anchor:
Nipple:
Make: Set at:mKB CEmKB CE
mKB
mKB
API designation: 25-200-RWAC-14-3
Barrel Type: Crome
Pump No: KEYM 8614
Plunger Size: (mm) 508 Length:(m) 09
Make: Type:Standing Valve:Traveling Valve:Hold Down:
Material Spray Metal
Material:
Rod Strin from bottom u
No. of Rods5
44
Diameter (mm)19
19
Make6 per NETB
Plain2014 6-672014 6-67
7.627.62
38.1335.28
Year Grade Length Total length
24 19
19
19
6 per TBScrapered PonyScrapered Pony
2014 6-672014 6-672014 6-67
7.623.051.24
182.883.051.24
Polish RodDiameter (mm)
31 8Grade Length Pin Size
4140 9.14 7/8
Miscellaneous:
BOPFlow TeeStuffing Box:Pumpin Unit:Max Stroke Length
Make TYPE Size (mm)73mm73MM X 50 8 X 25.4MM
Single 73mm
Electric Motor:Make:HP Rating:PhaseVolta e
Rated RPM:
Date: December 3,2014 DATE: December 7,2014Location: 100/12-24-12-27 W1M Final Tubing String/Packer and Tailpipe assembly from Bottom Upward
Production Formation: Lodge Pole Total Joints Tubing (to PSN) 58 Tubing O.D. 73mm
Bottom Hole Pres.(kpa): 5000 Bottomhole Temp (C): 26 No. Description Length (m) Set at Top (m) Min.ID (mm) Remarks
Pumping Unit: H2S Concentration (%): 0.01% 1 73mm Bar Collar 0.13 585.892 73mm Tubing Joint J-55 EUE 9.32 576.57
Elevations: 3 73mm Perforated Pup Joint J-55 EUE 2.47 574.10Kelly Bushing 478.07 mKB 4 73mm Pump Seating Nipple 0.33 573.77Ground Level 473.67 mKB 5 60 - 73mm Tubing Joints J-55 EUE 569.38 4.39KB-GL 4.4 m 6 Stream Flo Split Dognut 0.29 4.10KOP: 0 mKBLeg #1: mKB mTVDLeg 1 S1 mKB mTVDLeg# 2 mKB mTVDPBTD: 614.9 mKB Total String Length 581.92Total Depth: mKB K.B. to Tubing Hanger Flange (Plus) 4.1
Setting Depth K.B. 586.02Perforations
From To Size Series MakeCasing Bowl 9" Stream flo 14mpaTubing Spool 9" x 7 1/16 Stream flo 14mpa
Type Make Size (mm) Master Valve
Casing Valve Production Casing: Choke
14 jts. 48 jts. jts.219.10 mm 139.70 mm 73.00 mm Remarks:35.70 kg/m 20.8 kg/m 9.67 kg/mJ55 grade J55 grade J-55 grade
149.00 mKB 629.00 mKB mKB
10 tonnes ( 2.0m3 cement returns ) cement mTVD
15 tonnes ( 4.0m3 cement returns ) cement
Make: Type: Set at:Packer (1): mKB CEPacker (2): mKB CE
Anchor: mKB
Nipple: mKB
Bottomhole Pump:
API designation: 25-200-RWAC-14-3
Barrel Type: Crome
Pump No: KEYM 8614
Plunger Size: (mm) 50.8 Length:(m) 0.9 Material:Spray Metal
Make: Type: Material:Standing Valve: Traveling Valve: Hold Down:
Rod String (from bottom up)
No. of Rods Diameter (mm) Make Year Grade Length Total length5 19 6 per NETB 2014 S-67 7.62 38.1
44 19 Plain 2014 S-67 7.62 335.2824 19 6 per TB 2014 S-67 7.62 182.881 19 Scrapered Pony 2014 S-67 3.05 3.051 19 Scrapered Pony 2014 S-67 1.24 1.24
Diameter (mm) Grade Length Pin SizePolish Rod 31.8 4140 9.14 7/8
Miscellaneous:Make TYPE Size (mm)
BOP 73mm Flow Tee: 73MM X 50.8 X 25.4MMStuffing Box: Single 73mmPumping Unit: Max. Stroke Length
Electric Motor:Make:HP Rating: Phase: Voltage: Rated RPM:
Well Data Summary Tubing and Wellhead Equipment
0
Surface Casing: Tubing:
UWI
PREPARED BY:
12-24-12-27 W1M100/1 2-24-1 2-27 W1 M
Scott Robertson
ELEVATIONS (m)
DATE: December 3,2014
KB: 478.07 KB-GL: 4.40 KB-CF: 4.40 TD: 0.0
GL: 473.67 KOP 0.00 KB-TF 4.10 PBTD: 614.9
Surface Csg
Production Csg.
DescriptionSize
[mm]219.1
139.7
Weight(kg/m)35.70
20.60
Grade
J55
J55
Landing DepthmKB149.0
629.0
Tubing 73.0
WELLHEAD
9.67 J-55 0.00
MAKE/TYPE/SIZE/RATING:
Casin Bowl
Tubing Spool
9"
9" x 7 1/16
14m a Stream flo
14mpa Stream flo
e Csg.
490 ITEM No.Jts.
DOWNHOLE CONFIGURATION
DESCRIPTION
73mm Bar Collar
73mm Tubing Joint J-55 EUE
73mm Perforated Pup Joint J-65 EUE
73mm Pump Seating Nipple
60 - 73mm Tubing Joints J-56 EUE
Stream Flo Split Dognut
Total String Length
KB to THF
Bottom of Tubing imKB)
RODS/PUMP
engt(m)
0 13
9 32
2 47
0 33
569 38
0 29
0 00
0 00
0 00
581 92
4 10
586 02
ottom(mKB)
586 02
585 89
576 57
574 10
573 77
4 39
4 10
4 10
4 10
4 10
4 10
BHP
44
24
25-200-RWAC-1 4-3
19
19
19
19
19
6 per NETB
Plain
6 per TB
Sorapered Pony
Sorapered Pony
KEYM 8614
6-67
6-67
6-67
6-67
6-67
Polished Rod 31 8 4140 914
PERFORATIONS/OPEN HOLE SECTION
Zone:
Zone:Zone:
Pump UnitPrime Mover (hp)SPM/SL(position)
Lodge Pole Interval
Interval:Interval:
SURFACE EQUIPMENT
SN
SN
Belts
561.50
563.00
568.00
561.60
564.00
570.00
DATE:
KB: 478.07 KB-GL: 4.40 KB-CF: 4.40 TD: 0.0GL: 473.67 KOP 0.00 KB-TF: 4.10 PBTD: 614.9
Size[mm]
Weight(kg/m) Grade
219.1 35.70 J55139.7 20.80 J55
73.0 9.67 J-557
Casing Bowl 9" 14mpa Stream floTubing Spool 9" x 7 1/16 14mpa Stream flo
Surface Csg.Length
(m) Bottom(mKB)
Se 149.0 ITEM No.Jts.1 73mm Bar Collar 0.13 586.022 73mm Tubing Joint J-55 EUE 9.32 585.893 73mm Perforated Pup Joint J-55 EUE 2.47 576.574 73mm Pump Seating Nipple 0.33 574.105 60 - 73mm Tubing Joints J-55 EUE 569.38 573.776 Stream Flo Split Dognut 0.29 4.39
5 0 0 0.00 4.100.00 4.100.00 4.10
4.104.10
581.924.10
586.02
BHP 25-200-RWAC-14-3 KEYM 8614
5 19 S-67
4 44 19 S-67
24 19 S-67
3 1 19 S-67
1 19 S-67
0 0 0
2 2 1 Polished Rod 31.8 4140 9.14
1 Zone: Interval 561.50 - 561.80Zone: Interval: 563.00 - 564.00Zone: Interval: 568.00 - 570.00
SNSN
Belts
12-24-12-27 W1MUWI 100/12-24-12-27 W1MPREPARED BY: Scott Robertson December 3,2014
ELEVATIONS (m)
Description Landing Depth[mKB]
Surface Csg 149.0Production Csg. 629.0
Bottom of Tubing (mKB)
Tubing 0.00WELLHEAD
MAKE/TYPE/SIZE/RATING:
RODS/PUMP
PERFORATIONS/OPEN HOLE SECTION
0
DOWNHOLE CONFIGURATION
DESCRIPTION
Total String Length
KB to THF
Prime Mover (hp)
Lodge Pole
SURFACE EQUIPMENTPump Unit
6 per NETB
Plain
6 per TB
Scrapered Pony
Scrapered Pony
SPM/SL(position)
Emergency Response Plan / Notice of SupervisorCom an:Location:GPS Co-ordinates:
12-24-12-27 W1M Ri Ea le 68
Directions
Hi hMark Ex loration Date: December 3,2014
From Virden, 9.5km west on Highway ¹1, North 14.8km on ¹83 ( Big Brick School ), Left 1.2km, SouthInto ( through farm yard )
Site Su ervisor:STR Consultin
Hi hmark
Scott Robertson306-575-8032Scott Robertson306-575-8032
Erwin Sison 403-608-6171
Emergency
Ri Mana erOil Co. Foreman Brent Horn 204-851-0558Field Technician
ServicesServiceSTARS
Phone ¹1-888-888-4567
Res onse time Closest location
E.M.S.PoliceHos ital
Fire
911911
911911
20 Min
30 Min
45 Min20 Min
VirdenVirdenVirdenVirden
IEM 1-800-223-5215 Virden
On Lease:Off Lease
Muster Areas/Escape RoutesDo House or u wind ed e of lease Perform head countLease road North out to Grid access road Perform head count
Delegation of Authority
If for any reason the Site supervisor (Scott Robertson) is required to leave the lease or is unable to performhis duties, The Rig Manager ( ) will be in charge of operations.
Company: HighMark Exploration Date: December 3,2014Location: 12-24-12-27 W1M Rig: Eagle 68GPS Co-ordinates:
Site Supervisor: Scott Robertson306-575-8032 Rig Manager:STR Consulting Scott Robertson306-575-8032 Oil Co. Foreman Brent Horn 204-851-0558
Field TechnicianHighmark Erwin Sison 403-608-6171
Service Phone # Response time Closest locationSTARS 1-888-888-4567
E.M.S. 911 20 Min VirdenPolice 911 30 Min VirdenHospital 911 45 Min VirdenFire 911 20 Min Virden
IEM 1-800-223-5215 Virden
On Lease:Off Lease
Emergency Response Plan / Notice of Supervisor
DirectionsFrom Virden, 9.5km west on Highway #1, North 14.8km on #83 ( Big Brick School ), Left 1.2km, South
Into ( through farm yard )
Emergency Services
Muster Areas/Escape RoutesDog House or up wind edge of lease (Perform head count)Lease road North out to Grid access road (Perform head count)
Delegation of Authority
If for any reason the Site supervisor (Scott Robertson) is required to leave the lease or is unable to perform his duties, The Rig Manager ( ) will be in charge of operations.
Daily Completion/Workover Report 1 of21
Property/Unit: Virden Well Location: 100/12-24-12-27 W1MZone: Lodge Pole Perforations:Today's Date: Dec 3,2014 Day No. 1 Weather:
SITP (KPA): 0 SICP (KPA):
10:30 AM 1:00 PM Stream Flow crew installed wellhead assembly9" x 7 1/16 tubing hanging spool ( 14mpa ),7 1/16 Full opening Gate valve ( 14 mpa )Bonnet assembly 73mm ( 14mpa )Ratigan assembly 73mmFlow tee 73mm x 50.8mm x 50.8mm
Pressure tested primary and secondary seals to 14mpa for 10 minutes
Performed Surface Casing vent flow check. Good Test, no bubbles
Job Complete
Rig:Reported by:
Rig Time (hrs)Scott Robertson
Rig Rate:
Total Load Fluid Volume
Today's Recovery
Total Fluid Recovered
Load Fluid to Recover
New Fluid Recovered
Today's Fluid Hid to Lease
Today's Fluid Hid Fm Lease
Total Fluid Hid To Lease
Total Fluid Hid Fm Lease
Oil (m3) Water (m3)Service Rig
Supervision ( 1/2 dy)
W ireline (Estimate )
Pressure Truck
Perforating
Stimulation
Snow Removal
Wellhead install
Costs0.00 Wellhead
Rods/BHP
Tubing
Packers
Rentals
Lease
2,381.50
Fluid in Tanks
Daily
APE¹2,381.50 Cumulative
14CEQ009 AFE Amoun
2,381.50143,000
Completion: YESOther (Specify):
Workover: Recompletion: BHP Change:
Daily CompletionIWorkover Report
Property/Unit: Virden Well Location: 100/12-24-12-27 W1MZone: Lodge pole Perforations: 561.5-561.8 8 563.0-564.0 8 568.0 - 570.0Today's Date: Dec 5,2014 Day No. 2 Weather:
Page 1 of 21
Property/Unit: Virden Well Location: 100/12-24-12-27 W1MZone: Lodge Pole Perforations:Today's Date: Dec 3,2014 Day No. 1 Weather:
SITP (KPA): 0 SICP (KPA): 0
From To
10:30 AM 1:00 PM Stream Flow crew installed wellhead assembly 9" x 7 1/16 tubing hanging spool ( 14mpa ), 7 1/16 Full opening Gate valve ( 14 mpa )Bonnet assembly 73mm ( 14mpa )Ratigan assembly 73mmFlow tee 73mm x 50.8mm x 50.8mm
Pressure tested primary and secondary seals to 14mpa for 10 minutes
Performed Surface Casing vent flow check. Good Test, no bubbles
Job Complete
Rig: Rig Time (hrs) Rig Rate:Reported by: Scott Robertson
Oil (m3) Water (m3)Total Load Fluid Volume Service Rig 0.00 Wellhead 2,381.50Today's Recovery Supervision ( 1/2 dy) Rods/BHPTotal Fluid Recovered Wireline (Estimate ) TubingLoad Fluid to Recover Pressure Truck PackersNew Fluid Recovered Perforating RentalsToday's Fluid Hld to Lease Stimulation LeaseToday's Fluid Hld Fm Lease Snow RemovalTotal Fluid Hld To Lease Wellhead installTotal Fluid Hld Fm Lease
Daily 2,381.50 Cumulative 2,381.50Fluid in Tanks AFE# 14CEQ009 AFE Amount 143,000
Completion: YES Workover: Recompletion: BHP Change:Other (Specify):
Property/Unit: Virden Well Location: 100/12-24-12-27 W1MZone: Lodge pole Perforations: 561.5-561.8 & 563.0-564.0 & 568.0 - 570.0Today's Date: Dec 5,2014 Day No. 2 Weather:
Daily Completion/Workover Report
Daily Completion/Workover Report
Detailed Description of Previous Day Operations
Costs
SITP (KPA): 0 SICP (KPA): 2of21
7:30 AM N2 Steam arrived on location. Tarped in wellhead and warmed it up.
8:00 AM
8:30 AM
FMC Wireline unit arrived on location.Conducted safety meeting and discussed tasks for the day, and hazards associated withthem. Reviewed FMC JSA, Highmark ERP and Notice of Supervisor
FMC rigged up
FMC ran gauge ring and junk basket down past proposed perforations
9:30 AM FMC ran in and performed casing bond log. Log results were good
11:30 AM Rigged in Clean Harbors pressure truck and pressure tested wellbore to 7000kpa. Good
12:00 PM FMC swabbed well down to 600mkb.
12:45 PM1:00 PM
Clean Harbors pumped 2.0m3 of produced water pad( H2S scavenged and Packer inhibitor )Theoretical fluid level is 450mkbFMC ran in with bottom perforating gun and tagged fluid level at 350 metersPerforated 568.0-570.0 mkb. (2.0m 39 Gm SDP, 17 SPM, 60 degree ) Instant blow, 5 kpa.Pulled gunAll shots were fired and within the carrier scallops
1:45 PM2:15 PM
FMC ran in with top perforating gun and tagged fluid level at 180 meters 19kpa on well
Perforated 561.5 - 561.8 8 563.0 - 564.0 2.5m Gun with 1.2m Blank
( 39 Gm SDP, 17 SPM, 60 degree ) No pressure response, same blow on well .
3:00 PM Pulled gun up, Wait 30 minutes and go back down and tag fluid level, tagged 70 mkb
3:30 PM Pulled gun out of hole, and shots were fired and within the carrier scallops
Rig Out, Job Complete 15:30
Rig:Reported by:
Total Load Fluid Volume
Today's Recovery
Total Fluid Recovered
Load Fluid to Recover
New Fluid Recovered
Today's Fluid Hid to Lease
Today's Fluid Hid Fm Lease
Total Fluid Hid To Lease
Total Fluid Hid Fm Lease
Fluid in Tanks
Oil (m3) Water (m3)Service Rig
Supervision
Wireline
Steamer
Steamer
Stimulation
Fluid Disposal
Tbg anchor/swivel
Daily
APE¹
CostsWellhead
Rods/BHP
18,268.47 Press Truck
787.50 Tank Truck
Chem (Est )
Logging
21,928.27 Cumulative
14CEQ009 AFE Amoun
1,759.80812.50300.00
24,309.77143,000
Completion: yeS
Other (Specify):
Workover: Recompletion: BHP Change:
Page 2 of 21SITP (KPA): 0 SICP (KPA): 0
From To
7:30 AM N2 Steam arrived on location. Tarped in wellhead and warmed it up.
8:00 AM FMC Wireline unit arrived on location.Conducted safety meeting and discussed tasks for the day, and hazards associated withthem. Reviewed FMC JSA, Highmark ERP and Notice of Supervisor
8:30 AM FMC rigged up
FMC ran gauge ring and junk basket down past proposed perforations
9:30 AM FMC ran in and performed casing bond log. Log results were good
11:30 AM Rigged in Clean Harbors pressure truck and pressure tested wellbore to 7000kpa. Good
12:00 PM FMC swabbed well down to 600mkb.
Clean Harbors pumped 2.0m3 of produced water pad( H2S scavenged and Packer inhibitor ) Theoretical fluid level is 450mkb
12:45 PM FMC ran in with bottom perforating gun and tagged fluid level at 350 meters1:00 PM Perforated 568.0 - 570.0 mkb. ( 2.0m 39 Gm SDP, 17 SPM, 60 degree ) Instant blow, 5 kpa.
Pulled gunAll shots were fired and within the carrier scallops
1:45 PM FMC ran in with top perforating gun and tagged fluid level at 180 meters 19kpa on well2:15 PM Perforated 561.5 - 561.8 & 563.0 - 564.0 ( 2.5m Gun with 1.2m Blank )
( 39 Gm SDP, 17 SPM, 60 degree ) No pressure response, same blow on well .
3:00 PM Pulled gun up , Wait 30 minutes and go back down and tag fluid level, tagged 70 mkb
3:30 PM Pulled gun out of hole, and shots were fired and within the carrier scallops
Rig Out, Job Complete 15:30
Rig:Reported by:
Oil (m3) Water (m3)Total Load Fluid Volume Service Rig WellheadToday's Recovery Supervision Rods/BHPTotal Fluid Recovered Wireline 18,268.47 Press Truck 1,759.80Load Fluid to Recover Steamer 787.50 Tank Truck 812.50New Fluid Recovered Steamer Chem (Est ) 300.00Today's Fluid Hld to Lease Stimulation LoggingToday's Fluid Hld Fm Lease Fluid DisposalTotal Fluid Hld To Lease Tbg anchor/swivelTotal Fluid Hld Fm Lease
Daily 21,928.27 Cumulative 24,309.77Fluid in Tanks AFE# 14CEQ009 AFE Amount 143,000
Completion: yes Workover: Recompletion: BHP Change:Other (Specify):
Detailed Description of Previous Day Operations
Costs
3of21
Daily CompletiontWorkover Report
Property/Unit: VirdenZone: Lodge PoleToday's Date: Dec 7,2014
Well Location: 100/12-24-12-27 W1MPerforations: 561.5-561.8 8 563.0-564.0 8 568.0 - 570.0
Day No. 3 Weather:SITP (KPA): 20 20
8:15 AM 9:00 AM Rig and associated equipment arrived on location
8:15 AM 9:00 AM Attend safety meeting with Eagle personnel. Discuss the tasks for the day and hazardsassociated with them. Perform air quality check
9:15 AM 9:55 AM Rig up rig and associated equipment
9:55 AM 10:00 AM Take pressures on well, TSTM
10:00 AM 10:30 AM Stump test BOP blind rams to 14mpa for 10 minutes.
10:30 AM 11:30 AM Bleed off well to rig tank. Insert Dognut, 3m pup, and stabbingvalve. Strip off master valve, strip on BOPS. Pressure test pipe rams and flange connectionto 10mpa for 10 minutes
1:30 PM Run in hole with completion tubing as follows from bottom up:73mm Bar Collar73mm Tubing Joint73mm Perforated Pup73mm PSN60 Joints of 73mm TubingSplit tubing hanger
1:50 PM Crew stopped for lunch break after running first 5 joints
Land tubing bottom at 585.89mkb ( PSN @ 573.77 )
4:00 PM Rig prepared swabbing equipment and got ready to swab in the am.
5:00 PM Shut down for night
Rig:Reported by:
Rig Time (hrs) Rig Rate:
Total Load Fluid Volume
Today's Recovery
Total Fluid Recovered
Load Fluid to Recover
New Fluid Recovered
Today's Fluid Hid to Lease
Today's Fluid Hid Fm Lease
Total Fluid Hid To Lease
Total Fluid Hid Fm Lease
Oil (m3) Water (m3)Service Rig
Supervision
Haul Tubing
Trucking Water
Steam
Stimulation
Steam
Water Hauling
Daily
Costs6,762.50 Wellhead
1,700.00 Rods/BHP
540.00 Tubing ( Est
687.00 Packers
Rentals
Logging
1,102.50 Misc
21,242.00 Cumulative
10,450.00
45,551.77
Page 3 of 21
Property/Unit: Virden Well Location: 100/12-24-12-27 W1MZone: Lodge Pole Perforations: 561.5-561.8 & 563.0-564.0 & 568.0 - 570.0Today's Date: Dec 7,2014 Day No. 3 Weather:
SITP (KPA): 20 SICP (KPA): 20
From To
8:15 AM 9:00 AM Rig and associated equipment arrived on location
8:15 AM 9:00 AM Attend safety meeting with Eagle personnel. Discuss the tasks for the day and hazards associated with them. Perform air quality check
9:15 AM 9:55 AM Rig up rig and associated equipment
9:55 AM 10:00 AM Take pressures on well, TSTM
10:00 AM 10:30 AM Stump test BOP blind rams to 14mpa for 10 minutes.
10:30 AM 11:30 AM Bleed off well to rig tank. Insert Dognut, 3m pup, and stabbingvalve. Strip off master valve, strip on BOPS. Pressure test pipe rams and flange connectionto 10mpa for 10 minutes
1:30 PM Run in hole with completion tubing as follows from bottom up :73mm Bar Collar
73mm Tubing Joint73mm Perforated Pup73mm PSN60 Joints of 73mm TubingSplit tubing hanger
1:50 PM Crew stopped for lunch break after running first 5 joints
Land tubing bottom at 585.89mkb ( PSN @ 573.77 )
4:00 PM Rig prepared swabbing equipment and got ready to swab in the am.
5:00 PM Shut down for night
Rig: Rig Time (hrs) Rig Rate:Reported by:
Oil (m3) Water (m3)Total Load Fluid Volume Service Rig 6,762.50 WellheadToday's Recovery Supervision 1,700.00 Rods/BHPTotal Fluid Recovered Haul Tubing 540.00 Tubing ( Est 10,450.00Load Fluid to Recover Trucking Water 687.00 PackersNew Fluid Recovered Steam RentalsToday's Fluid Hld to Lease Stimulation LoggingToday's Fluid Hld Fm Lease Steam 1,102.50 MiscTotal Fluid Hld To Lease Water HaulingTotal Fluid Hld Fm Lease
Daily 21,242.00 Cumulative 45,551.77
Costs
Daily Completion/Workover Report
Detailed Description of Previous Day Operations
Fluid in Tanks 3 APE¹ 14CEQ009 AFE Amoun 143,000 4of21
Completion: YeS
Other (Specify):
Workover: Recompletion: BHP Change:
Daily Completion/Workover Report
Property/Unit: VirdenZone: Lodge PoleToday's Date: Dec 8,2014
Well Location: 100/12-24-12-27 W1MPerforations: 561.5-561.8 8 563.0-564.0 8 568.0 - 570.0
Day No. 4 Weather: OvercastSITP (KPA): TSTM SICP (KPA): TSTM
Perform Walk around hazard assessment and air quality sweep.
7:30 AM 8:00 AM Arrive on location. Conduct safety meeting with all Eagle Discuss the days tasksand hazards associated with them. Discussed the ERP and Notice of Supervisor documentDiscuss swabbing sour fluid and wind direction today
8:00 AM 12:00 PM Rig swabbed for results. Swabbed a total of 14.52m3 of fluid backThe rig swabbed at approximately 4m3/ hour with a fluid level at 95m. Final oil cut was 50%
( See Swab Report )
Rig out swab equipment, Strip off BOP's and install wellhead
2:00 PM 4:15 PM Pail test BHP, appears to pump fine. Start in hole with BHP and rods as follows frombottom up:
25-200-R WAG-14-35 - 19mm S67 Centralized Rods c/w 6 per NETB44 - 19mm S67 Plain Rods24- 19mm S67 scrapered Rods c/w 6 per TB1 - 19mm S67 Scrapered Pony 10 Ft1 - 19mm S67 Scrapered Pony 4 Ft1 - 31.8mm x 9.14 Polished Rod 4140
4:15 PM 4:30 PM Fill hole with rig pump, stroke test pump to 5000kpa. Good test
4:30 PM 5:30 PM Rig out rig and associated equipment. Job Complete
Rig:Reported by:
Rig Time (hrs) Rig Rate:
Total Load Fluid Volume
Today's Recovery
Total Fluid Recovered
Oil (m3) Water (m3)Service Rig
Supervision
Wireline
1,700.00 Rods (Est)
BHP(Est)
7,155.00 Wellhead
12,000.003,000.00
Load Fluid to Recover
New Fluid Recovered
Today's Fluid Hid to Lease
Today's Fluid Hid Fm Lease
Trucking
Truck Fluid
Stimulation
Water hauling
300.00812.50
Packers
Rentals
Logging
Page 4 of 21Fluid in Tanks 3 AFE# 14CEQ009 AFE Amount 143,000
Completion: Yes Workover: Recompletion: BHP Change:Other (Specify):
Property/Unit: Virden Well Location: 100/12-24-12-27 W1MZone: Lodge Pole Perforations: 561.5-561.8 & 563.0-564.0 & 568.0 - 570.0Today's Date: Dec 8,2014 Day No. 4 Weather: Overcast
SITP (KPA): TSTM SICP (KPA): TSTM
From To
Perform Walk around hazard assessment and air quality sweep.
7:30 AM 8:00 AM Arrive on location. Conduct safety meeting with all Eagle Discuss the days tasksand hazards associated with them. Discussed the ERP and Notice of Supervisor documentDiscuss swabbing sour fluid and wind direction today
8:00 AM 12:00 PM Rig swabbed for results. Swabbed a total of 14.52m3 of fluid back . The rig swabbed at approximately 4m3 / hour with a fluid level at 95m. Final oil cut was 50%
( See Swab Report )
Rig out swab equipment, Strip off BOP's and install wellhead
2:00 PM 4:15 PM Pail test BHP, appears to pump fine. Start in hole with BHP and rods as follows frombottom up :
25-200-RWAC-14-35 - 19mm S67 Centralized Rods c/w 6 per NETB44 - 19mm S67 Plain Rods24- 19mm S67 scrapered Rods c/w 6 per TB1 - 19mm S67 Scrapered Pony 10 Ft1 - 19mm S67 Scrapered Pony 4 Ft1 - 31.8mm x 9.14 Polished Rod 4140
4:15 PM 4:30 PM Fill hole with rig pump, stroke test pump to 5000kpa. Good test
4:30 PM 5:30 PM Rig out rig and associated equipment. Job Complete
Rig: Rig Time (hrs) Rig Rate:Reported by:
Oil (m3) Water (m3)Total Load Fluid Volume Service Rig 7,155.00 WellheadToday's Recovery Supervision 1,700.00 Rods (Est) 12,000.00Total Fluid Recovered Wireline BHP(Est) 3,000.00Load Fluid to Recover Trucking 300.00 PackersNew Fluid Recovered Truck Fluid 812.50 RentalsToday's Fluid Hld to Lease Stimulation LoggingToday's Fluid Hld Fm Lease Water hauling
Daily Completion/Workover Report
Detailed Description of Previous Day Operations
Total Fluid Hid To Lease
Total Fluid Hid Fm Lease
Fluid in Tanks
Daily
APE¹24,967.50 Cumulative
14CEQ009 AFE Amoun
70,519.27143,000
5of21
Completion:
Other (Specify):
Workover: Recompletion: BHP Change:
Daily CompletiontWorkover Report
Property/Unit: VirdenZone: Lodge PoleToday's Date: Sept 9,14
Well Location: 100/12-24-12-27 W1MPerforations: 561.5-561.8 8 563.0-564.0 8 568.0 - 570.0
Day No. 5 Weather: OvercastSITP (KPA): SICP (KPA):
Page 5 of 21Total Fluid Hld To Lease Total Fluid Hld Fm Lease
Daily 24,967.50 Cumulative 70,519.27Fluid in Tanks AFE# 14CEQ009 AFE Amount 143,000
Completion: Workover: Recompletion: BHP Change:Other (Specify):
Property/Unit: Virden Well Location: 100/12-24-12-27 W1MZone: Lodge Pole Perforations: 561.5-561.8 & 563.0-564.0 & 568.0 - 570.0Today's Date: Sept 9,14 Day No. 5 Weather: Overcast
SITP (KPA): SICP (KPA):
From To
Daily Completion/Workover Report
Detailed Description of Previous Day Operations
6of21
Rig:
Reported by:
Total Load Fluid Volume
Rig Time (hrs)
Oil (m3) Water (m3)
Rig Rate:
Service Rig
Costs
6,572.00 Wellhead
Today's Recovery
Total Fluid Recovered
Load Fluid to Recover
New Fluid Recovered
Today's Fluid Hid to Lease
Today's Fluid Hid Fm Lease
Total Fluid Hid To Lease
Total Fluid Hid Fm Lease
Supervision
Wireline
Trucking
Safety
Stimulation
Stimulation
1,625.00
1,710.00
12,988.78
6,555.00
Disposal
Tubing
Packers
Rentals
Logging
140.00
7,932.51
Fluid in Tanks
Daily
APE¹
37,523.29 Cumulative
0 AFE Amoun
108,042.56
143,000
Workover: Recompletion: BHP Change:
Completion:
Page 6 of 21
Rig Time (hrs) Rig Rate:
Rig:
Reported by:
Oil (m3) Water (m3)
Total Load Fluid Volume Service Rig 6,572.00 Wellhead
Today's Recovery Supervision Disposal 140.00
Total Fluid Recovered Wireline Tubing
Load Fluid to Recover Trucking 1,625.00 Packers 7,932.51
New Fluid Recovered Safety 1,710.00 Rentals
Today's Fluid Hld to Lease Stimulation 12,988.78 Logging
Today's Fluid Hld Fm Lease Stimulation 6,555.00
Total Fluid Hld To Lease
Total Fluid Hld Fm Lease
Daily 37,523.29 Cumulative 108,042.56
AFE# 0 AFE Amount 143,000
Fluid in Tanks
Workover: Recompletion: BHP Change:
Completion:
Costs
Other (Specify):Page 7of21
Daily Completion/Workover Report
Property/Unit:
Zone: Lodge Pole
Today's Date:
Virden Well Location: 100/12-24-12-27 W1M
Perforations: 561.5-561.8 8 563.0-564.0 8 568.0 - 570.0
Sept 10,14 Day No. 6 Weather: Overcast
SITP (KPA): SICP (KPA):
Rig:
Reported by:
Rig Time (hrs)
Oil (m3) Water (m3)
Rig Rate:
Service Rig
Costs
7,310.00 Wellhead
Total Load Fluid Volume
Today's Recovery
Total Fluid Recovered
Load Fluid to Recover
New Fluid Recovered
Supervision
Wireline
Trucking
Safety
Stimulation
1,666.00
0.00
0.00
0.00
Disposal
Tubing
Packers
Rentals
Logging
0.00
0.00
Today's Fluid Hid to Lease
Today's Fluid Hid Fm Lease
Total Fluid Hid To Lease
Total Fluid Hid Fm Lease
Stimulation
Daily
0.00
8,976.00 Cumulative 117,018.56
Page 7 of 21Other (Specify):
Property/Unit: Virden Well Location: 100/12-24-12-27 W1M
Zone: Lodge Pole Perforations: 561.5-561.8 & 563.0-564.0 & 568.0 - 570.0
Today's Date: Sept 10,14 Day No. 6 Weather: Overcast
SITP (KPA): SICP (KPA):
From To
Rig Time (hrs) Rig Rate:
Rig:
Reported by:
Oil (m3) Water (m3)
Service Rig 7,310.00 Wellhead
Total Load Fluid Volume Supervision 1,666.00 Disposal 0.00
Today's Recovery Wireline Tubing
Total Fluid Recovered Trucking 0.00 Packers 0.00
Load Fluid to Recover Safety 0.00 Rentals
New Fluid Recovered Stimulation 0.00 Logging
Today's Fluid Hld to Lease Stimulation 0.00
Today's Fluid Hld Fm Lease
Total Fluid Hld To Lease
Total Fluid Hld Fm Lease Daily 8,976.00 Cumulative 117,018.56
Daily Completion/Workover Report
Detailed Description of Previous Day Operations
Costs
APE¹ 0 AFE AmounPage 8of21
Recompletion: BHP Change:
Page 8 of 21AFE# 0 AFE Amount 143,000
Fluid in Tanks
Workover: Recompletion: BHP Change:
Completion:
Other (Specify):
Property/Unit: Virden Well Location: 100/12-24-12-27 W1M
Zone: Lodge Pole Perforations: 561.5-561.8 & 563.0-564.0 & 568.0 - 570.0
Today's Date: Sept 11,14 Day No. 7 Weather: Overcast
SITP (KPA): TSTM SICP (KPA): TSTM
From To
Rig Time (hrs) Rig Rate:
Rig:
Reported by:
Oil (m3) Water (m3)
Service Rig 7,265.00 Wellhead
Total Load Fluid Volume Supervision 1,666.00 Disposal 0.00
Today's Recovery Wireline Tubing
Total Fluid Recovered Trucking 0.00 Packers 0.00
Load Fluid to Recover Water Hauling 390.00 Rentals
New Fluid Recovered Stimulation 0.00 Chemical 300.00
Daily Completion/Workover Report
Detailed Description of Previous Day Operations
Costs
Page 9of21
Recompletion: BHP Change:
Page 9 of 21Today's Fluid Hld to Lease Stimulation 0.00
Today's Fluid Hld Fm Lease
Total Fluid Hld To Lease
Total Fluid Hld Fm Lease Daily 9,621.00 Cumulative 126,639.56
AFE# 0 AFE Amount 143,000
Fluid in Tanks
Workover: Recompletion: BHP Change:
Completion:
Other (Specify):
Property/Unit: Virden Well Location: 100/12-24-12-27 W1M
Zone: Lodge Pole Perforations: 561.5-561.8 & 563.0-564.0 & 568.0 - 570.0
Today's Date: Sept 12,14 Day No. 8 Weather: Overcast
SITP (KPA): TSTM SICP (KPA): TSTM
From To
Daily Completion/Workover Report
Detailed Description of Previous Day Operations
Page 10 of 21
Rig:
Reported by:
Total Load Fluid Volume
Today's Recovery
Total Fluid Recovered
Load Fluid to Recover
Rig Time (hrs)
Oil (m3) Water (m3)
Rig Rate:
Service Rig
Supervision
Wireline
Trucking
Water Hauling
Costs
3,854.00 Wellhead
850.00 Disposal
Wellhead
Packers
845.00 Rentals
576.30
0.00
1,362.85
0.00
New Fluid Recovered Stimulation Chemical
Today's Fluid Hid to Lease
Today's Fluid Hid Fm Lease
Total Fluid Hid To Lease
Total Fluid Hid Fm Lease
Stimulation
Daily 7,488.15 Cumulative 134,127.71
Fluid in Tanks
APE¹ 0 AFE Amoun 143,000
Workover: Recompletion: BHP Change:
Completion:
Other (Specify):
Page 10 of 21
Rig Time (hrs) Rig Rate:
Rig:
Reported by:
Oil (m3) Water (m3)
Service Rig 3,854.00 Wellhead 576.30
Total Load Fluid Volume Supervision 850.00 Disposal 0.00
Today's Recovery Wireline Wellhead 1,362.85
Total Fluid Recovered Trucking Packers 0.00
Load Fluid to Recover Water Hauling 845.00 Rentals
New Fluid Recovered Stimulation Chemical
Today's Fluid Hld to Lease Stimulation
Today's Fluid Hld Fm Lease
Total Fluid Hld To Lease
Total Fluid Hld Fm Lease Daily 7,488.15 Cumulative 134,127.71
AFE# 0 AFE Amount 143,000
Fluid in Tanks
Workover: Recompletion: BHP Change:
Completion:
Other (Specify):
Property/Unit: Virden Well Location: 100/12-24-12-27 W1M
Zone: Lodge Pole Perforations: 561.5-561.8 & 563.0-564.0 & 568.0 - 570.0
Today's Date: Sept 18,2014 Day No. 9 Weather: Overcast
SITP (KPA): TSTM SICP (KPA): TSTM
From To
Costs
Daily Completion/Workover Report
Detailed Description of Previous Day Operations
Page 11 of 21
Rig:
Reported by:
Rig Time (hrs)
Oil (m3) Water (m3)
Rig Rate:
Service Rig
Costs
6,572.00 Service Rig 1,445.00
Total Load Fluid Volume
Today's Recovery
Total Fluid Recovered
Supervision
Wireline
Trucking
1,666.00
3,090.00
Disposal
Tubing
Rods
0.00
11,060.00
Load Fluid to Recover Water Hauling 395.00 BHP 3,262.39
New Fluid Recovered Stimulation Chemical
Today's Fluid Hid to Lease
Today's Fluid Hid Fm Lease
Total Fluid Hid To Lease
Total Fluid Hid Fm Lease
Fluid in Tanks
Stimulation
Daily
APE¹
27,490.39 Cumulative
0 AFE Amoun
161,618.10
143,000
Workover: Recompletion: BHP Change:
Completion:
Other (Specify):
Page 11 of 21
Rig Time (hrs) Rig Rate:
Rig:
Reported by:
Oil (m3) Water (m3)
Service Rig 6,572.00 Service Rig 1,445.00
Total Load Fluid Volume Supervision 1,666.00 Disposal 0.00
Today's Recovery Wireline 3,090.00 Tubing
Total Fluid Recovered Trucking Rods 11,060.00
Load Fluid to Recover Water Hauling 395.00 BHP 3,262.39
New Fluid Recovered Stimulation Chemical
Today's Fluid Hld to Lease Stimulation
Today's Fluid Hld Fm Lease
Total Fluid Hld To Lease
Total Fluid Hld Fm Lease Daily 27,490.39 Cumulative 161,618.10
AFE# 0 AFE Amount 143,000
Fluid in Tanks
Workover: Recompletion: BHP Change:
Completion:
Other (Specify):
Costs
SWABREPORT
WellLocation 100/12.24.12.27W1M
ServiceRig Ea le68
RecoveredtoDate. 5.79 m'Oil
Depth.
TankCoef.
561.5-561.88 563.0-564.0& 568.0-570.0
m'/cm LoadFluidtoRecover:
8.76m'WaterLefttoRecover:
2 m'Oil
-6.76m'il
Date Dec8,2012
m'Water
m'Water
SwabNo. Time
Fluid
Level
Swab
Deth
TankGauge
after
Trucked
Out
Tank
Gaue
Gauge
Difference
mm
TotalFluid
ThisRunm'umulativeWater
m'ut%
Water
ThisRunCumulativem''hisRunm'il
Cumulative
m'emarks
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
54 410
95 450
95 450
95 450
95 450
95 450
95 450
95 450
0.53
1.15
0 1.1
0 0.71
0.46
0 1.4
0.75
0.53 35
1.68 90
2.72 95
3.82 90
4.53 50
4.99 35
6.39 60
7.14 50
0.1855 0.1855
1.035 1.2205
0.988 2.2085
0.99 3.1985
0.355 3.5535
0.161 3.7145
0.84 4.5545
0.375 4.9295
0.3445
0.115
0.052
0.11
0.355
0.299
0.56
0.375
0.3445
0.4595
0.5115
0.6215
0.9765
1.2755
1.8355
2.2105
5%BS
1%BS
1%BS
1%BS
1%BS
1%BS
1%BS
1%BS
10:30 95 450 0 0.9 8.04 55 0.495 5.4245 0.405 2.61551%BS
10:45 95 450 0.7 8.74 60 0.42 5.8445 0.28 2.89551%BS
11:00 95 450
95 45011:15
11:30 95 450
0 1.1
0 1.03
0 0.67
9.84 55
10.87 50
11.54 45
0.605 6.4495
0.515 6.9645
0.3015 7.266
0.495
0.515
0.3685
3.3905
3.9055
4.274
0.5%BS
0.5%BS
1%BS
11:45 95 450 0 1.05 12.59 45 0.4725 7.7385 0.5775 4.85150.5%BS
12:00 95 450
95 45012:15
0 1.03
0.9
¹N/A
13.62 55
14.52 50
0.5665 8.305
0.45 8.755
0.4635
0.45
5.315
5.765
0.5%BS
0.5%BS
Well Location 100/12-24-12-27 W1M Depth: 561.5-561.8 & 563.0-564.0 & 568.0 - 570.0 Date Dec 8,2012Service Rig Eagle 68 Tank Coef. m³/cm Load Fluid to Recover: 2 m³ Oil m³ Water.Recovered to Date: m³ Oil 8.76 m³ Water Left to Recover: -6.76 m³ Oil m³ Water
Tank Gauge
Swab No. TimeFluid Level
Swab Depth
after Trucked
OutTank
Gauge
Gauge Difference
mm
Total Fluid This Run
m³Cumulative
m³Water Cut %
This Run m³
Cumulative m³
This Run m³
Cumulative m³ Remarks
1 8:30 54 410 0.53 0.53 35 0.1855 0.1855 0.3445 0.3445 5% BS2 8:45 95 450 1.15 1.68 90 1.035 1.2205 0.115 0.4595 1% BS3 9:00 95 450 1.04 2.72 95 0.988 2.2085 0.052 0.5115 1% BS4 9:15 95 450 0 1.1 3.82 90 0.99 3.1985 0.11 0.6215 1% BS5 9:30 95 450 0 0.71 4.53 50 0.355 3.5535 0.355 0.9765 1% BS6 9:45 95 450 0 0.46 4.99 35 0.161 3.7145 0.299 1.2755 1% BS7 10:00 95 450 0 1.4 6.39 60 0.84 4.5545 0.56 1.8355 1% BS8 10:15 95 450 0 0.75 7.14 50 0.375 4.9295 0.375 2.2105 1% BS9 10:30 95 450 0 0.9 8.04 55 0.495 5.4245 0.405 2.6155 1% BS
10 10:45 95 450 0 0.7 8.74 60 0.42 5.8445 0.28 2.8955 1% BS11 11:00 95 450 0 1.1 9.84 55 0.605 6.4495 0.495 3.3905 0.5% BS12 11:15 95 450 0 1.03 10.87 50 0.515 6.9645 0.515 3.9055 0.5% BS13 11:30 95 450 0 0.67 11.54 45 0.3015 7.266 0.3685 4.274 1% BS14 11:45 95 450 0 1.05 12.59 45 0.4725 7.7385 0.5775 4.8515 0.5% BS15 12:00 95 450 0 1.03 13.62 55 0.5665 8.305 0.4635 5.315 0.5% BS16 12:15 95 450 0 0.9 14.52 50 0.45 8.755 0.45 5.765 0.5% BS
#N/A
SWAB REPORT
5.79
Water Oil
WELL: 12-24-12-27 W1 DATE Sept 8,2014 Size 73mm Wt
Grade:9.67Kci/m Tread
Manufacturer:EUE
Length Length Length Length Length Length
No
01
Joint
9.32
Cum
9.32
No
31
Joint
9.28
Cum
291.13
No
61
Joint
9.68
Cum
578.70
No.
91
Joint Cum No.
121
Joint Gum No. Joint
151
Cum
02 9.06 18.38 32 9.32 300.45 ..62 9.64 588.34 ..92 122 152
03 9.31 27.69 33 9.31 309.76 ..63 93 123 153
04 9.61 37.30 34 9.59 319.35 ..64 94 124 154
05
06
07
08
09
10
9.63
9.06
9.30
9.30
9.31
9.25
93.15
46.93
55.99
65.29
74.59
83.90
93.15
TOTAL
35 9.61
36 9.60
37 9.60
38 9.61
39 9.60
40 9.60
95.12
328.96 ..65
338.56 ..66
348.16 ..67
357.77 ..68
367.37 ..69
376.97 ..70
TOTAL 19.32 TOTAL
95
96
97
98
99
100
0.00 TOTAL
125
126
127
128
129
130
0.00 TOTAL
155
156
157
158
159
160
0.00 TOTAL
No
Le ngth
CumJoint No
Le ngth
CumJoint No
Le ngth
CumJoint No.
ngthLe
Joint Cum No.
Length
Joint Gum No. JointLength
Cum
12
13
14
15
16
17
18
19
9.30
9.60
9.61
9.61
9.36
9.60
9.59
9.60
9.31
102.45
112.05
121.66
131.27
140.63
150.23
159.82
169.42
178.73
42 9.61
43 9.62
44 9.60
45 9.59
46 9.60
47 9.61
48 9.60
49 9.62
41 9.60 386.57 ..71
396.18 ..72
405.80 ..73
415.40 ..74
424.99 ..75
434.59 ..76
444.20 ..77
453.80 ..78
463.42 ..79
101
102
103
104
105
106
107
108
109
131
132
133
134
135
136
137
138
139
161
162
163
164
165
166
167
168
169
20 9.60
95.18
188.33
TOTAL
50 9.60
96.05
473.02 ..80
TOTAL 0.00 TOTAL
110
0.00 TOTAL
140
0.00 TOTAL
170
0.00 TOTAL
Le ngth Le ngth Le ngth Le ngth Length Length
No Joint Cum No Joint Cum No Joint Cum No. Joint Cum No. Joint Gum No Joint Cum
21
22
23
24
25
26
27
28
29
9.59
9.60
9.60
9.60
9.08
9.32
9.28
9.09
9.31
197.92
207.52
217.12
226.72
235.80
245.12
254.40
263.49
272.80
51 9.61
52 9.60
53 9.60
54 9.60
55 9.60
56 9.59
57 9.60
58 9.61
59 9.60
482.63 ..81
492.23 ..82
501.83 ..83
511.43 ..84
521.03 ..85
530.62 ..86
540.22 ..87
549.83 ..88
559.43 ..89
112
113
114
115
116
117
118
119
141
142
143
144
145
146
147
148
149
171
172
173
174
175
176
177
178
179
30 9.05 281.85 60 9.59 569.02 ..90 120 150 180
~ '' ll ~ ' II ~ ' II ~ ' II ~ ' II ~
TALLYSUMMARY(Note - Casing shoe must always be included in first joint. Position of centralizers, scratchers, etc., is to be indicated).
No10
20
30
40
Group Cum NO
93.15 93.15 5095.18 188.33 6093.52 281.85 70
95.12 376.97 80
Group
96.0596.0019.32
0.00
473.02569.02588.34
588.34
90100
110
120
Cum NO Group Cum
0.00 588.340.00 588.340.00 588.34
0.00 588.34
130 0.00140 0.00150 0.00
160 0.00
588.34588.34588.34
588.34
NO. Group Cum NO. Group Cum
¹¹ 0.00 588.34¹¹ 0.00 588.34
588.34
WELL:12-24-12-27 W1MDATE: Sept 8,2014 Size: Wt. TreadGrade: Manufacturer:
Jt. Jt. Jt. Jt. Jt. Jt.No. Joint Cum No. Joint Cum No. Joint Cum No. Joint Cum No. Joint Cum No. Joint Cum..01 9.32 9.32 ..31 9.28 291.13 ..61 9.68 578.70 ..91 121 151..02 9.06 18.38 ..32 9.32 300.45 ..62 9.64 588.34 ..92 122 152..03 9.31 27.69 ..33 9.31 309.76 ..63 ..93 123 153..04 9.61 37.30 ..34 9.59 319.35 ..64 ..94 124 154..05 9.63 46.93 ..35 9.61 328.96 ..65 ..95 125 155..06 9.06 55.99 ..36 9.60 338.56 ..66 ..96 126 156..07 9.30 65.29 ..37 9.60 348.16 ..67 ..97 127 157..08 9.30 74.59 ..38 9.61 357.77 ..68 ..98 128 158..09 9.31 83.90 ..39 9.60 367.37 ..69 ..99 129 159..10 9.25 93.15 ..40 9.60 376.97 ..70 100 130 160
93.15 TOTAL 95.12 TOTAL 19.32 TOTAL 0.00 TOTAL 0.00 TOTAL 0.00 TOTAL
Jt. Jt. Jt. Jt. Jt. Jt.No. Joint Cum No. Joint Cum No. Joint Cum No. Joint Cum No. Joint Cum No. Joint Cum..11 9.30 102.45 ..41 9.60 386.57 ..71 101 131 161..12 9.60 112.05 ..42 9.61 396.18 ..72 102 132 162..13 9.61 121.66 ..43 9.62 405.80 ..73 103 133 163..14 9.61 131.27 ..44 9.60 415.40 ..74 104 134 164..15 9.36 140.63 ..45 9.59 424.99 ..75 105 135 165..16 9.60 150.23 ..46 9.60 434.59 ..76 106 136 166..17 9.59 159.82 ..47 9.61 444.20 ..77 107 137 167..18 9.60 169.42 ..48 9.60 453.80 ..78 108 138 168..19 9.31 178.73 ..49 9.62 463.42 ..79 109 139 169..20 9.60 188.33 ..50 9.60 473.02 ..80 110 140 170
95.18 TOTAL 96.05 TOTAL 0.00 TOTAL 0.00 TOTAL 0.00 TOTAL 0.00 TOTAL
Jt. Jt. Jt. Jt. Jt. Jt.No. Joint Cum No. Joint Cum No. Joint Cum No. Joint Cum No. Joint Cum No. Joint Cum..21 9.59 197.92 ..51 9.61 482.63 ..81 111 141 171..22 9.60 207.52 ..52 9.60 492.23 ..82 112 142 172..23 9.60 217.12 ..53 9.60 501.83 ..83 113 143 173..24 9.60 226.72 ..54 9.60 511.43 ..84 114 144 174..25 9.08 235.80 ..55 9.60 521.03 ..85 115 145 175..26 9.32 245.12 ..56 9.59 530.62 ..86 116 146 176..27 9.28 254.40 ..57 9.60 540.22 ..87 117 147 177..28 9.09 263.49 ..58 9.61 549.83 ..88 118 148 178..29 9.31 272.80 ..59 9.60 559.43 ..89 119 149 179..30 9.05 281.85 ..60 9.59 569.02 ..90 120 150 180
93.52 TOTAL 96.00 TOTAL 0.00 TOTAL 0.00 TOTAL 0.00 TOTAL 0.00 TOTAL
TALLY SUMMARYNo. Group Cum No. Group Cum No. Group Cum No. Group Cum No. Group Cum10 93.15 93.15 50 96.05 473.02 90 0.00 588.34 130 0.00 588.34 ## 0.00 588.3420 95.18 188.33 60 96.00 569.02 100 0.00 588.34 140 0.00 588.34 ## 0.00 588.3430 93.52 281.85 70 19.32 588.34 110 0.00 588.34 150 0.00 588.3440 95.12 376.97 80 0.00 588.34 120 0.00 588.34 160 0.00 588.34
PIPE and CASING TALLY
73mm 9.67Kg/m EUE
Length Length Length Length Length Length
Length Length Length Length Length Length
Length Length Length Length Length Length
(Note - Casing shoe must always be included in first joint. Position of centralizers, scratchers, etc., is to be indicated).
588.34
WELL: 12-24-12-27 W1 DATE: Sept 8,2014 Size 73mm Wt.
Grade9.67Kg/m Tread
0 Manufacturer:EUE
0
Length Length Length Length Length Length
No Joint Cum No Joint Cum No. Joint Cum No. Joint Cum No. Joint Gum No. Joint Cum
181
182
183
184
185
186
187
188
189
190
588.34 211
212
213
214
215
216
217
218
219
220
241
242
243
244
245
246
247
248
249
250
271
272
273
274
275
276
277
278
279
280
301
302
303
304
305
306
307
308
309
310
331
332
333
334
335
336
337
338
339
340
I II ~ ' II ~ ' tt ~ ' II ~ ' II ~ ' II ~
No.
191
192
193
194
195
196
197
198
199
Le ngth
CumJoint No.
221
222
223
224
225
226
227
228
229
Le ngth
CumJoint No.
251
252
253
254
255
256
257
258
259
Le ngth
CumJoint No.
281
282
283
284
285
286
287
288
289
ngthLe
CumJoint No.
311
312
313
314
315
316
317
318
319
Length
Joint Gum No. Joint
341
342
343
344
345
346
347
348
349
Length
Cum
I II ~ ' II ~ ' tt ~ ' II ~ ' II ~ ' II ~
Le ngth Le ngth Le ngth Le ngth Length Length
No.
201
202
203
204
205
206
207
208
209
Joint Cum No.
231
232
233
234
235
236
237
238
239
Joint Cum No.
261
262
263
264
265
266
267
268
269
Joint Cum No.
291
292
293
294
295
296
297
298
299
Joint Cum No.
321
322
323
324
325
326
327
328
329
Joint Gum No. Joint
351
352
353
354
355
356
357
358
359
Cum
I I I I I I ~ I
I II ~ ' II ~ ' tt ~ ' II ~ ' II ~ ' II ~
e - Casing shoe(Not must always be in eluded in first joint. Position of centralizers, scratchers, etc., is to be indicated).
TALLYSUMMARYNo10
20
30
40
Group
0.000.000.00
0.00
Cum
0.000.000.00
0.00
No506070
80
Group
0.000.000.00
0.00
0.000.000.00
0.00
90100
110
120
Cum No Group
0.000.000.00
0.00
Cum
0.000.000.00
0.00
130 0.00140 0.00150 0.00
160 0.00
0.000.000.00
0.00
NO. Group Cum NO. Group Cum
¹¹ 0.00 0.00¹¹ 0.00 0.00
0.00
WELL:12-24-12-27 W1MDATE: Sept 8,2014 Size: Wt. TreadGrade: Manufacturer: 0
Jt. Jt. Jt. Jt. Jt. Jt.No. Joint Cum No. Joint Cum No. Joint Cum No. Joint Cum No. Joint Cum No. Joint Cum181 588.34 211 241 271 301 331182 212 242 272 302 332183 213 243 273 303 333184 214 244 274 304 334185 215 245 275 305 335186 216 246 276 306 336187 217 247 277 307 337188 218 248 278 308 338189 219 249 279 309 339190 220 250 280 310 340
0.00 TOTAL 0.00 TOTAL 0.00 TOTAL 0.00 TOTAL 0.00 TOTAL 0.00 TOTAL
Jt. Jt. Jt. Jt. Jt. Jt.No. Joint Cum No. Joint Cum No. Joint Cum No. Joint Cum No. Joint Cum No. Joint Cum191 221 251 281 311 341192 222 252 282 312 342193 223 253 283 313 343194 224 254 284 314 344195 225 255 285 315 345196 226 256 286 316 346197 227 257 287 317 347198 228 258 288 318 348199 229 259 289 319 349200 230 260 290 320 350
0.00 TOTAL 0.00 TOTAL 0.00 TOTAL 0.00 TOTAL 0.00 TOTAL 0.00 TOTAL
Jt. Jt. Jt. Jt. Jt. Jt.No. Joint Cum No. Joint Cum No. Joint Cum No. Joint Cum No. Joint Cum No. Joint Cum201 231 261 291 321 351202 232 262 292 322 352203 233 263 293 323 353204 234 264 294 324 354205 235 265 295 325 355206 236 266 296 326 356207 237 267 297 327 357208 238 268 298 328 358209 239 269 299 329 359210 240 270 300 330 360
0.00 TOTAL 0.00 TOTAL 0.00 TOTAL 0.00 TOTAL 0.00 TOTAL 0.00 TOTAL
TALLY SUMMARYNo. Group Cum No. Group Cum No. Group Cum No. Group Cum No. Group Cum10 0.00 0.00 50 0.00 0.00 90 0.00 0.00 130 0.00 0.00 ## 0.00 0.0020 0.00 0.00 60 0.00 0.00 100 0.00 0.00 140 0.00 0.00 ## 0.00 0.0030 0.00 0.00 70 0.00 0.00 110 0.00 0.00 150 0.00 0.0040 0.00 0.00 80 0.00 0.00 120 0.00 0.00 160 0.00 0.00
PIPE and CASING TALLY 273mm 9.67Kg/m EUE
0
Length Length Length Length Length Length
Length Length Length Length Length Length
(Note - Casing shoe must always be included in first joint. Position of centralizers, scratchers, etc., is to be indicated).
0.00
Length Length Length Length Length Length
WellName:
WellsiteSupervisor: ScottRobertson
STRConsulting
FluidSummary
12-24-12-27W1M
Cell¹: 306-575-8032 EnvironmentalCompany:
LicenceNo. 10154
VolumeTransferredtoLocation,m'olumeTransferredfromLocation,m'ate
Report Fluid,m'y
Wt C
Recieved Fluid,m'kt¹
F I Wt C'r
Transferred
Tiket¹ To
Comments
Dec3,2014
2.00 leanHarbor Elcano 7.80 Foxtail 18080 7-18-10-29
Padwater
Dec5,2014
9.00 Foxtail 17168 16-21 Killfluid
Dec7,2014
13.00 Foxtail 18083 7-18-10-29SwabWater
Dec8,2014
Sept9,14
Sept10,14
Sept11,14
Sept12,14
ept18,201
TotalTransfers I II II I II I Il
Well Name : Licence No. 10154Wellsite Supervisor : Cell # : Environmental Company :
Date Report Recieved TransferredDay Oil Water Carrier Ticket # From Oil Water Carrier Ticket # To
2.00 Clean Harbors Elcano 7.80 Foxtail 18080 7-18-10-29
9.00 Foxtail 17168 16-21
13.00 Foxtail 18083 7-18-10-29
Total Transfers 0.00 11.00 0.00 20.80
STR ConsultingFluid Summary
12-24-12-27 W1MScott Robertson 306-575-8032
Volume Transferred to Location, m3 Volume Transferred from Location, m3
CommentsFluid, m3 Fluid, m3
Sept 9,14
Dec 3,2014
1
Dec 5,2014
2
Pad water
Sept 11,14
7
Dec 7,2014
3
Kill fluid
Dec 8,2014
4
Swab Water
Sept 18,2014
9
5
Sept 10,14
6
Sept 12,14
8
MATERIALTRANSFERSHEETFOR:
MT¹
.'TEM
¹ DATE DESCRIPTION COND. QN. Value$
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
ITEM
TRANSFERREDTO
AFE
MATERIAL TRANSFER SHEET FOR:
MT# :
ITEM # DATE COND. QTY. Value $ VALUE1 A A= NEW 100%2 A B= USED GOOD 80 - 75%3 C= USED FAIR 75 - 50%4 $0.00 D= POOR 25%5 $0.00 JK= SCRAP 0%6 $0.007 $0.008 $0.009 $0.0010 $0.0011 $0.00
ITEM AFE AFE1234567891011
DESCRIPTION CONDITION
TRANSFERRED TO TRANSFERRED FROMLOCATION / ORIGIN
ENERGY INC.North Hargrave
Highmark North Hargrave 12-24-12-27W1
Location
Date
Prepared by;
Cuny 9k&aOn-Site Supervisor - Fire Sky Energy inc.
(306) 485-7368
l.a mellomCtssasktel.net
Taken By;
'Tretror ttittdeoogTtd
Production Technician - Fire Sky Energy Inc.
(306) 461-5102
tvindevogbel@fireskyenergy ca
Prepared by:
North Hargrave
Highmark North Hargrave 12-24-12-27W1
Location Date
Larry MellomOn-Site Supervisor - Fire Sky Energy Inc.
(306) [email protected]
Taken By:Trevor Vindevoghel
Production Technician - Fire Sky Energy Inc.(306) 461-5102
Fire Sky Energy Inc.
Workover Report Input Sheet
Area:
Well Name:
Location:
UWI:Licence:
Cost Centre:
AFE:KOP
Workover Objective:
North Hargrave
Hi hmark North Har ave 12-24-12-27WI12-24-12-27W I
10154
FS 2017-047
Pull es run tubin um
Perforations/Open Hole:
4)
561.5-561.8
563-564
568-570
Interval Formation
Lodgepole
Lod e ole
Lod e ole
Comments
Date Started: 9/12/2017
Date End: 9/13/2017
Emergency Response Location 12-24-12-27W1
Area: North HargraveWell Name: Highmark North Hargrave 12-24-12-27W1
Location: 12-24-12-27W1UWI:
Licence: 10154Cost Centre:
AFE: FS 2017-047KOP
Workover Objective: Pull esp run tubing pump
Perforations/Open Hole: 1) 561.5-561.8 Lodgepole2) 563-564 Lodgepole3) 568-570 Lodgepole4)
Date Started:Date End:
219.1 35.7 J55 149Intermediate Casing: 1)
2)3)4)
Production Casing: 1) 139.7 20.8 J 55 6292)
Tubing: 1)
2)
478.07 mKB PBTD: 614.9 mKB473.67 mKB TD: 629 mKB473.67 mKB TVD: mKB
4.4 mKB4.4 mKB4.1 mKB
Emergency Response Location 12-24-12-27W1
Name: Larry MellomPosition: On-Site Supervisor - Fire Sky Energy Inc.
Phone: (306) 485-7368Email: [email protected]
Name: Trevor VindevoghelPosition: Production Technician - Fire Sky Energy Inc.
Fire Sky Energy Inc.Workover Report Input Sheet
Interval Formation Comments
9/12/20179/13/2017
TubularsSize Weight Landed
KB - THF:
(mm) (kg/m) Grade (mKB)Surface Casing:
Elevations Depths:KB:GL:CF:
KB - GL:KB - CF:
ContactsRig Supervisor
Primary Head Office Contact
Phone: 306 461-5102
Email: tvindevo het Sreak ener .ca
Other Head Office Contact
Name: Tom Co eland
Position: Vice-President of 0 erations - Fire Sk Ener Inc.
Phone: 306 421-0988
Email: t.co eland fireak enere .ca
Field Contact tel
Name:
Position:
Phone:
Email:
Field Contacti'ame:
Position:
Phone:
Email:
Field Contacti'ame:
Position:
Phone:
Email:
Service Rig Representative (Toolpush)Name: Rob Deis
Position:
Phone:
Email:
Directions to Location:
Junction hiwa 83n and Hiwa 1. North to 60N. 1.2km west. South .5km to well.
Phone: (306) 461-5102Email: [email protected]
Name: Tom CopelandPosition: Vice-President of Operations - Fire Sky Energy Inc.
Phone: (306) 421-0988Email: [email protected]
Name:Position:
Phone:Email:
Name:Position:
Phone:Email:
Name:Position:
Phone:Email:
Name: Rob DeisPosition:
Phone:Email:
Junction hiway 83n and Hiway 1. North to 60N. 1.2km west. South .5km to well.
Field Contact #2
Field Contact #3
Service Rig Representative (Toolpush)
Directions to Location:
Other Head Office Contact
Field Contact #1
Tocopytheimages:Rightclicktheimageandselectcopyfromtheshortcutmenu,thenclicktheareaofthedestinationsheetyou
wanttoputtheimageinandrightclickthemouse,selectpaste.Theimagescanberesizedbydraggingthehandlesoftheimages
whiletheyareselected.
Iil1I
~
I
Allrtemscanberesraedbydraggrngttehandlesr
acrapared rodslookgoaloncestratcledlofrt eelltere
Tubing Strings with or without rodsPup Jts (use the ones with borders if more than 1 pup)All items can be resized by dragging the handles!Scrapered rods look good once stretched to fit wellbore
Squeeze Perfs
Open Perfs
RA
To copy the images: Right click the image and select copy from the shortcut menu, then click the area of the destination sheet you want to put the image in and right click the mouse, select paste. The images can be resized by dragging the handles of the images while they are selected.
FireSkyEnergyInc.
MaterialTransfer
NorthHargrave
73mmtubingyellowband
! Esp
Surfaceequipmentforesp
I Esptubinghanger,spoolandmastervale
liI I
Fontanastock
12-24-12-27
12-24-12-27wl
12-24-12-27wl
IiI I
12-24-12-27W1
Bakerforinspection
stock3-25-12-27
Seaboard
I I i
4 Bl $ 140,00'III
1 Bl
1 Bl
1 Bl
Stufffingboxnewdualpack
tubinghangerandbonnet
Seaboard
Seaboardstock
12-24-12-27
12-24-12-27
1 A
1 Bl
25-325thos24-2-4Q14-139
sp96plain19mmrods
38,lmmkbars
31,8m9,14xm19polishrod
Q2ALS
tsm
tsm
tsm
12-24-12-27
12-24-12-27
12-24-12-27
12-24-12-27
1 A
68 A
8 A
1 A
I 73mmtubing
73mmtubing
I
Fontanayard
12-24-12-27
12-24-12-27
Lshawcor
8 Bl
8 Bl
Condition
A-New
Bl-75%
B2-65%
C-50%
D-35%
JK-Junk
TransferredBy.';arrtSttefol
Date.'pprovedBy.'ate.'emarks
Qty Condition Unit Value TotalA 4 B1 140.00$ 560.00$ B 1 B1 -$ C 1 B1 -$ D 1 B1 -$ E -$ F 1 A -$ G 1 B1 -$ H -$ I -$ J 1 A -$ K 68 A -$ L 8 A -$ M 1 A -$ N -$ O 8 B1 -$ P 8 B1 -$ Q -$ R -$ S -$ T -$ U -$ V -$ W -$ X -$ Y -$ Z -$
Condition Transferred By: RemarksA - New Date:B1 - 75%B2 - 65% Approved By:C - 50% Date:D - 35%JK - Junk
Fire Sky Energy Inc.Material Transfer
North Hargrave
Description Location From Location To73mm tubing yellow band Fontana stock 12-24-12-27W1Esp 12-24-12-27 Baker for inspectionSurface equipment for esp 12-24-12-27w1 stock 3-25-12-27Esp tubing hanger, spool and mastervale 12-24-12-27w1 Seaboard
Stufffing box new dual pack Seaboard 12-24-12-27tubing hanger and bonnet Seaboard stock 12-24-12-27
25-325 thos 24-2-4 Q14-139 Q2 ALS 12-24-12-27sp 96 plain 19mm rods tsm 12-24-12-2738.1mm k bars tsm 12-24-12-2731.8m 9.14 xm 19 polish rod tsm 12-24-12-27
73mm tubing Fontana yard 12-24-12-2773mm tubing 12-24-12-27 \shawcor
Larry Mellom
Fire Sky Energy Inc.Tubing Tally ¹1
North Hargrave
Date: 9/12/2017
Tallied By: Rob Deis
Well Name: Highmark North Hargrave 12-24-12-27W1
Checked By: ra %e/lorn
Location: 12-24-12-27W1
Size:
Tubing Specifications
73.00 mm Weight: 9.67 kg/m Grade: J 55 Thread: 8RD EUE
I ~
l ~
9.60
9.60
9.62
9.61
9.33
9.30
9.18
9.15
9.30
9.29
I I
9.32
9.61
9.62
9.61
9.60
9.40
9.59
9.60
19.20
28.82
38.43
47.76
57.06
66.24
75.39
84.69
93.98I I
484.87
494.48
504.10
513.71
523.31
532.71
542.30
542.30
542.30
542.30
I
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
I
9.30
9.60
9.60
9.60
9.60
e 9.62
9.60
9.61
9.60
I 961I
~ ~
~ ~
I
I I I
I
I I I
103.28
112.88
122.48
132.08
141.68
151.30
160.90
170.51
180.11
189.72
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
~ l
9.62
9.61
9.60
9.60
9.61
9.62
9.60
9.60
9.60
9.60
's Is
199.34
208.95
218.55
228.15
237.76
247.38
256.98
266.58
276.18
285.78
~ ~
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
I
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
I
~ ~
~ ~~ ~
~ l
9.61 295.39 9.31 389.77
9.61 305.00 9.60 399.37
9.61 314.61 9.60 408.97
9.31 323.92 9.62 418.59
9.60 333.52 9.61 428.20
9.63 343.15 9.33 437.53
9.30 352.45 9.61 447.14
9.37 361.82 '.61 456.75
9.31 371.13 '.61 466.36
9.33 380.46 I 9.19 475.55I g I I ' I
II
542.30 542.30
542.30 542.30
542.30 542.30
542.30 542.30
542.30 542.30
542.30 ' 542.30
542.30 542.30
542.30 542.30
542.30 542.30
542.30 l I 542.30
I II ~ I I II I
542.30 542.30
542.30 542.30
542.30 542.30
542.30 542.30
542.30 542.30
542.30 s 542.30
542.30 542.30
542.30 542.30
542.30 542.30
542.30 I 542.30
I II ~ I ~ I II I
93.98
C 95.74
96.06
~ 94.68
93.98
189.72
285.78
380.46
66.75 542.30
0.00 542.30
0.00 542.30
0.00 542.30
0.00
0.00
0.00
0.00
542.30
542.30
542.30
542.30
PSN
Tail Joint
Packer
Pup Joint ¹2
Pup Joint ¹3
Pup Joint ¹4
Anchor 10000.00 Pup Joint ¹1
Tubing Tally Page 6 of 19Tubing Tally Page 6 of 19
Checked By:Location:
73.00 mm Weight: 9.67 kg/m Grade: Thread:Tally Cum. Tally Cum. Tally Cum. Tally Cum. Tally Cum.
1 9.60 9.60 11 9.30 103.28 21 9.62 199.34 31 9.61 295.39 41 9.31 389.772 9.60 19.20 12 9.60 112.88 22 9.61 208.95 32 9.61 305.00 42 9.60 399.373 9.62 28.82 13 9.60 122.48 23 9.60 218.55 33 9.61 314.61 43 9.60 408.974 9.61 38.43 14 9.60 132.08 24 9.60 228.15 34 9.31 323.92 44 9.62 418.595 9.33 47.76 15 9.60 141.68 25 9.61 237.76 35 9.60 333.52 45 9.61 428.206 9.30 57.06 16 9.62 151.30 26 9.62 247.38 36 9.63 343.15 46 9.33 437.537 9.18 66.24 17 9.60 160.90 27 9.60 256.98 37 9.30 352.45 47 9.61 447.148 9.15 75.39 18 9.61 170.51 28 9.60 266.58 38 9.37 361.82 48 9.61 456.759 9.30 84.69 19 9.60 180.11 29 9.60 276.18 39 9.31 371.13 49 9.61 466.3610 9.29 93.98 20 9.61 189.72 30 9.60 285.78 40 9.33 380.46 50 9.19 475.55A 93.98 93.98 B 95.74 189.72 C 96.06 285.78 D 94.68 380.46 E 95.09 475.5551 9.32 484.87 61 542.30 71 542.30 81 542.30 91 542.3052 9.61 494.48 62 542.30 72 542.30 82 542.30 92 542.3053 9.62 504.10 63 542.30 73 542.30 83 542.30 93 542.3054 9.61 513.71 64 542.30 74 542.30 84 542.30 94 542.3055 9.60 523.31 65 542.30 75 542.30 85 542.30 95 542.3056 9.40 532.71 66 542.30 76 542.30 86 542.30 96 542.3057 9.59 542.30 67 542.30 77 542.30 87 542.30 97 542.3058 542.30 68 542.30 78 542.30 88 542.30 98 542.3059 542.30 69 542.30 79 542.30 89 542.30 99 542.3060 542.30 70 542.30 80 542.30 90 542.30 100 542.30F 66.75 542.30 G 0.00 542.30 H 0.00 542.30 I 0.00 542.30 J 0.00 542.30
101 542.30 111 542.30 121 542.30 131 542.30 141 542.30102 542.30 112 542.30 122 542.30 132 542.30 142 542.30103 542.30 113 542.30 123 542.30 133 542.30 143 542.30104 542.30 114 542.30 124 542.30 134 542.30 144 542.30105 542.30 115 542.30 125 542.30 135 542.30 145 542.30106 542.30 116 542.30 126 542.30 136 542.30 146 542.30107 542.30 117 542.30 127 542.30 137 542.30 147 542.30108 542.30 118 542.30 128 542.30 138 542.30 148 542.30109 542.30 119 542.30 129 542.30 139 542.30 149 542.30110 542.30 120 542.30 130 542.30 140 542.30 150 542.30K 0.00 542.30 L 0.00 542.30 M 0.00 542.30 N 0.00 542.30 O 0.00 542.30
Tally Cum Tally Cum Tally CumA 93.98 93.98 F 66.75 542.30 K 0.00 542.30 10000.00B 95.74 189.72 G 0.00 542.30 L 0.00 542.30C 96.06 285.78 H 0.00 542.30 M 0.00 542.30D 94.68 380.46 I 0.00 542.30 N 0.00 542.30
Well Name: Highmark North Hargrave 12-24-12-27W1 12-24-12-27W1
Tubing SpecificationsSize: J 55 8RD EUE
Fire Sky Energy Inc.Tubing Tally #1
North HargraveDate: 9/12/2017
Tallied By: Rob Deis Larry Mellom
Tail Joint Pup Joint #3Packer Pup Joint #4
Page 1 Tally SummaryExtras (Reference Letter)
Anchor Pup Joint #1PSN Pup Joint #2
95.09 475.55
Date: 9/12/2017
0.00 542.30 ~ 0.00 542.30
All tallies observed in meters (m).
Fire Sky Energy Inc.Tubing Tally ¹1
North Hargrave
Coated Joint KB - THE
Tallied By: Rob Deis
Well Name: Highmark North Hargrave 12-24-12-27W1
Checked By: ra Aellom
Location: 12-24-12-27W1
Tubing Specifications
Size: 73.00 mm Weight: 9.67 kg/m Grade: J 55 Thread: 8RD EUE
I 161 ' 171 ' 181 ' 191 '
I ~
I ~
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
I I I~
I
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
I I I~
I
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
I
~ ~
~ ~
~ ~
~ ~
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
I II ~ I
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
I II ~ I
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
I II ~ I
~ I~ ~~ ~
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
I I I~
I
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
I I I~
I
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
I I I I
~ ~
~ ~~ ~
~ ~
~ I
~ ~~ ~
~ ~
~ I
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
I II ~ I
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
I II ~ I
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
I II ~ I
~ ~
~ ~
~ ~
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
I I I~
I
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
I I I~
I
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
542.30
I I I~
I
Tubing Tally Page 7 of 19Tubing Tally Page 7 of 19
E 95.09 475.55 J 0.00 542.30 O 0.00 542.30
Checked By:Location:
73.00 mm Weight: 9.67 kg/m Grade: Thread:Tally Cum. Tally Cum. Tally Cum. Tally Cum. Tally Cum.
151 542.30 161 542.30 171 542.30 181 542.30 191 542.30152 542.30 162 542.30 172 542.30 182 542.30 192 542.30153 542.30 163 542.30 173 542.30 183 542.30 193 542.30154 542.30 164 542.30 174 542.30 184 542.30 194 542.30155 542.30 165 542.30 175 542.30 185 542.30 195 542.30156 542.30 166 542.30 176 542.30 186 542.30 196 542.30157 542.30 167 542.30 177 542.30 187 542.30 197 542.30158 542.30 168 542.30 178 542.30 188 542.30 198 542.30159 542.30 169 542.30 179 542.30 189 542.30 199 542.30160 542.30 170 542.30 180 542.30 190 542.30 200 542.30P 0.00 542.30 Q 0.00 542.30 R 0.00 542.30 S 0.00 542.30 T 0.00 542.30
201 542.30 211 542.30 221 542.30 231 542.30 241 542.30202 542.30 212 542.30 222 542.30 232 542.30 242 542.30203 542.30 213 542.30 223 542.30 233 542.30 243 542.30204 542.30 214 542.30 224 542.30 234 542.30 244 542.30205 542.30 215 542.30 225 542.30 235 542.30 245 542.30206 542.30 216 542.30 226 542.30 236 542.30 246 542.30207 542.30 217 542.30 227 542.30 237 542.30 247 542.30208 542.30 218 542.30 228 542.30 238 542.30 248 542.30209 542.30 219 542.30 229 542.30 239 542.30 249 542.30210 542.30 220 542.30 230 542.30 240 542.30 250 542.30U 0.00 542.30 V 0.00 542.30 W 0.00 542.30 X 0.00 542.30 Y 0.00 542.30
251 542.30 261 542.30 271 542.30 281 542.30 291 542.30252 542.30 262 542.30 272 542.30 282 542.30 292 542.30253 542.30 263 542.30 273 542.30 283 542.30 293 542.30254 542.30 264 542.30 274 542.30 284 542.30 294 542.30255 542.30 265 542.30 275 542.30 285 542.30 295 542.30256 542.30 266 542.30 276 542.30 286 542.30 296 542.30257 542.30 267 542.30 277 542.30 287 542.30 297 542.30258 542.30 268 542.30 278 542.30 288 542.30 298 542.30259 542.30 269 542.30 279 542.30 289 542.30 299 542.30260 542.30 270 542.30 280 542.30 290 542.30 300 542.30Z 0.00 542.30 AA 0.00 542.30 BB 0.00 542.30 CC 0.00 542.30 DD 0.00 542.30
Tally Cum Tally Cum Tally CumP 0.00 542.30 U 0.00 542.30 Z 0.00 542.30Q 0.00 542.30 V 0.00 542.30 AA 0.00 542.30R 0.00 542.30 W 0.00 542.30 BB 0.00 542.30S 0.00 542.30 X 0.00 542.30 CC 0.00 542.30T 0.00 542.30 Y 0.00 542.30 DD 0.00 542.30
Coated Joint KB - THF
Tallied By: Rob Deis Larry MellomWell Name: Highmark North Hargrave 12-24-12-27W1 12-24-12-27W1
All tallies observed in meters (m).
Fire Sky Energy Inc.Tubing Tally #1
North HargraveDate: 9/12/2017
Anchor Pup Joint #1PSN Pup Joint #2
Tail Joint Pup Joint #3
Tubing SpecificationsSize: J 55 8RD EUE
Page 2 Tally SummaryExtras (Reference Letter)
Packer Pup Joint #4Coated Joint KB - THF
Date: 9/12/2017
All tallies observed in meters (m).
Fire Sky Energy Inc.Tubing Tally ¹1
North Hargrave
Tallied By: Rob Deis
Well Name: Highmark North Hargrave 12-24-12-27W1
Checked By: ra Aellom
Location: 12-24-12-27W1
Comments:
Tubing Tally Page 8 of 19Tubing Tally Page 8 of 19
Checked By:Location:
Comments:
Tubing Tally #1North Hargrave
Date: 9/12/2017Tallied By: Rob Deis Larry Mellom
All tallies observed in meters (m).
Fire Sky Energy Inc.
Description (m) (mKB)0.00
Well Name: Highmark North Hargrave 12-24-12-27W1 12-24-12-27W1
Final ConfigurationTally Cumulative
0.000.000.00
0.000.00
0.000.000.00
0.000.000.00
0.000.00
0.000.00
0.000.00
0.000.00
0.000.00
0.000.00
0.000.00
0.000.00
0.00
0.000.00
FIRE SKY ENERGY INC
Highmark North Hargrave 12-24-12-27W1Date 9/12/2017
Purpose of Job Pull esp run tubing pumpSuPerViecr Larry metom KBCurrent Statue Completed GRDrilling Licence 10154
KOPKB - TH
Casing Description
47807 PBTDI
6/4.9 5685m
473M KBNF
0
41
Strin0 Surface0 Production
Wei ht35.7020.80
GradeJ55J 55
De th Remarks149629
ole
PerforationsInterval561 5-561 8
StatuS Produang
ole 563-564ole 568-570
Tubing Strmg Details
Descnption
Botttom up
73mm bull plug and collar
73mm perl pup
88 9mm shaved collar and 88 9mm x 73mm std swage
25-325 thos 24-2-4 tubm/g pump brass nicarb barrel
73mm new pup
Joints 73mm J55 eue Tubmg
21mpa 73mm tubing dram
Joints 73mm J55 eue Tubmg
73mm J55 eue pup 9 67kg/m
73mm J55 eue pup 9 67kg/m
73mm J55 eue pup 9 67kg/m
Joints 73mm J55 eue Tubmg
Metre split tubing hanger
0.231.860.237.921.259.600.25
523.113.082.481.869.59
4.10
565.56565.33563.47563.24555.32554.07544.47544.22
21.11
18.0315.5513.69
4.104.104.10
Report
LengthBalls
ReportSize
19
19
19
38.1
sp 96
sp 96
sp 96
C
Tubing Bottom is LandedSerial No Q14 139 Size 25.325-thos.24.2M
246 Barrel Brass Ni GarbTitanium Seats Tungsten Magnum 120
Polish Rod New xm19 31.8mm x 9.14m
Grade Scrapers Length
pia 0.62plain 1.24plain 487.68K Bars 60.96
565.56
ON.OFF
550.5
Total 0
TD 629mkb
FIRE SKY ENERGY INCDate 9/12/2017
Purpose of JobSupervisor Larry mellom KB 478.07 PBTD 614.9 568.5m Current Status Completed GR 473.67 KB-CF 4.4Drilling Licence
KOP 0KB - TH 4.1
Casing Description
Size String Weight Grade Depth Remarks219.10 Surface 35.70 J55 149139.70 Production 20.80 J 55 629
PerforationsZone Interval Status ProducingLodgepole 561.5-561.8Lodgepole 563-564Lodgepole 568-570
Tubing String Details Botttom upNO Description
565.561 73mm bull plug and collar 0.23 565.331 73mm perf pup 1.86 563.471 88.9mm shaved collar and 88.9mm x 73mm std swage 0.23 563.241 25-325 thos 24-2-4 tubinjg pump brass nicarb barrel 7.92 555.321 73mm new pup. 1.25 554.071 Joints 73mm J55 eue Tubing 9.60 544.471 21mpa 73mm tubing drain 0.25 544.2256 Joints 73mm J55 eue Tubing 523.11 21.111 73mm J55 eue pup 9.67kg/m 3.08 18.031 73mm J55 eue pup 9.67kg/m 2.48 15.551 73mm J55 eue pup 9.67kg/m 1.86 13.691 Joints 73mm J55 eue Tubing 9.59 4.10
4.10Metra split tubing hanger. 4.10
4.10Pump Report Tubing Bottom is Landed 565.56
Serial No Q14 139 Size 25-325-thos-24-2-4Stroke Length 246 Barrel Brass Ni Carb
Balls Titanium Seats Tungsten Magnum 120 ON-OFFRod Report Polish Rod New xm19 31.8mm x 9.14mNo Size Grade Scrapers Length1 19 sp 96 plain 0.621 19 sp 96 plain 1.2464 19 sp 96 plain 487.68
Fill 8 38.1 C K Bars 60.96Plug Back
568.5 550.5Total 0
TD 629mkb
Highmark North Hargrave 12-24-12-27W1
Pull esp run tubing pump
10154
Fire Sky Energy Inc.Daily Summary
North Hargrave
Date: September 12, 2017
8'or/rover Objective: Pull esp run tubing pump
Day¹: I
~ ~ ~
SITP: SICP:
I I
Pull esp
Run tubing pump
I i ls'lRig up
I I300 kPa
~o- ~ ~
Weather: sunny 25C 5km
8:00
17:00
Spot 40 matts to cover new flowlines
Moved rig to location.
Had safety meeting.
Rigged up equipment.
Reverse circulated well to produced water. Took 4m3 to catch circulation.
Removed esp cable. Master valve and plate.
Installed bop. Installed Redhawk annular.B4
Pulled tubing hanger.
Rigged in Baker. Spooled cable and pulled esp.
Broke esp down and laid down.
Rigged out annular. Rigged out bop.
Removed tubing spool for esp hanger.
Installed bop and tested.
Picked up new Q2 ALS tubing pump Q14-139 25-325-thos-24-2-4.
Run 73mm 1.86m perf pup c/w bull plug
Run 73mm x 88.9mm swage c/w shaved 88.9mm coupling.
Run pump c/w 88.9mm shaved ccoupling on top of pump, 73mm x 88.9mm swage and 1.24m x 73mm pup.
Run I joint of 73mm tubing. Installed 73mm 21mpa tubing drain.
Tallied and run 56 joints of 73mm tubing out of derrick. Picked up 2 joints of 73mm tubing.
Tagged fill at 568.5mkb.
Pulled 2 joints. Pumoed 400L and blew tubing drain at 18mpa.
Secured well for night.
Took $ m3 to break circulation. The other wells were less than 1m3.
~ ~ ~
~ ~
' ~ ~
~ ~
~ ~ ~ ~
~ ~
~ ~ ~
- ~ - ~
~ ~ I
~ ~ ~
See Expense Summary sheet for Daily Cost Summary
Well Name: Licence #:Location: Cost Centre:
UWI: AFE#:
SITP: kPa SICP: 300 kPa Weather: sunny 25C 5kmTime8:00
Reverse circulated well to produced water. Took 4m3 to catch circulation.Removed esp cable. Master valve and plate.
Removed tubing spool for esp hanger.Installed bop and tested.Picked up new Q2 ALS tubing pump Q14-139 25-325-thos-24-2-4.Run 73mm 1.86m perf pup c/w bull plugRun 73mm x 88.9mm swage c/w shaved 88.9mm coupling.Run pump c/w 88.9mm shaved ccoupling on top of pump, 73mm x 88.9mm swage and 1.24m x 73mm pup.Run 1 joint of 73mm tubing. Installed 73mm 21mpa tubing drain.Tallied and run 56 joints of 73mm tubing out of derrick. Picked up 2 joints of 73mm tubing.Tagged fill at 568.5mkb.
17:00
Service Rig: Supervisor:Toolpush: Reported to:
Workover Objective: Pull esp run tubing pump
Fire Sky Energy Inc.Daily Summary
North Hargrave
Date: September 12, 2017
Operation @ 08:00 HRS
Day #: 1Highmark North Hargrave 12-24-12-27W1 1015412-24-12-27W1 00 FS 2017-047
Daily SynopsisPull esp
Run tubing pump
Rigged out annular. Rigged out bop.
Rig upDetailed Daily Summary
Operations SummarySpot 40 matts to cover new flowlinesMoved rig to location.Had safety meeting. Rigged up equipment.
Installed bop. Installed Redhawk annular.B4Pulled tubing hanger.Rigged in Baker. Spooled cable and pulled esp.Broke esp down and laid down.
Took $ m3 to break circulation. The other wells were less than 1m3.
Pulled 2 joints. Pumoed 400L and blew tubing drain at 18mpa.Secured well for night.
See Expense Summary sheet for Daily Cost Summary
Certified Rig 1 Larry MellomRob Deis Trevor Vindevoghel
Site Directions:Junction hiway 83n and Hiway 1. North to 60N. 1.2km west. South .5km to well.
0
Date TruckingFirmTicketOil Water Other Oil
IIWater Other To-From
9/12/2017BlackGold 43821 11.00
13-Sep BlackGold 45925 15.00
9/13/2017BlackGold 45929 15.25
3-23-12-27w1
3-23-12-27W1
7-18-10-29Kiwi
26.00
II I ~
0.00 15.25
ls 'e so
DateLocationLoad Fluid Zone Perfs
Fluid In M3 Fluid Out M3 LocationDate Trucking Firm Ticket Oil Water Other Oil Water Other To - From
9/12/2017 Black Gold 43821 11.00 3-23-12-27w113-Sep Black Gold 45925 15.00 3-23-12-27W1
9/13/2017 Black Gold 45929 15.25 7-18-10-29Kiwi
26.00 0.00 15.25Reported By Larry Mellom 306 485-7368
Fire Sky Energy Inc.Expense Summary
North Hargrave
Well Natnet Highmark North Hargrave 12-24-12-27W I
Location: 12-24-12-27WI
UWIt 0
Licence: 10154
Cost Centre: 0
AFEt FS 2017-047
Worlrover Objective: Pull esp run tubing pump
September 12, 2017
September 12, 2017
September 12, 2017
September 12, 2017
September 12, 2017
September 12, 2017
September 12, 2017
September 12, 2017
September 12, 2017
September 12, 2017
September 13, 2017
September 13, 2017
September 13, 2017
September 13, 2017
September 13, 2017
September 13, 2017
September 13, 2017
September 13, 2017
September 13, 2017
September 13, 2017
September 14, 2017
Strad
Certified
Black Gold
Baker Hughes
Red H~awk
Mellom's Oilfield
Weir Seaboard
Fontana
Baher Hughes
Camion
Certified
Black Gold
Mellom's Oilfield
TSM
Q2 ALS
Q2 ALS
Tryton
Camion
Pure Chem
BlackGold
Certified
Spot Rig Matts and pick up
Rig
Tank Truck
Install ESP
Anular rental and trucking
Supervision
stuffing box repair old wellhead
hot shot
Pull ESP send to Leduc
Haul rods wellhead and tbg pump
Rig
Haul water in
Supervision
Rods polish rod
Pump
tubing drain swages and perf pup
scraper and bit
Pick up trailer and do returns
100L od H2S scavenger
empty tank kiwi
return to base
Fire Sky Energy Inc.Expense Summary Page 12 of 19
est
945
43821
26529
2017-05-37
est
29222
27102
2021
946
45925
est
14-3667
14-3685
esdssd0379
2025
est
est
947
$ 5,500.00
$ 7,335.00
$
$ 11,672.00
$ 2,200.00
$ 1,200.00
$ 3,000.00
$ 225.00
$ 7,450.00
$ 1,080.00
$ 8,690.00
$ 190.00
$ 1,325.00
$ 11,000.00
$ 14,885.00
$ 1,160.00
$ 900.00
$ 1,080.00
$ 420.00
$ 500.00
$ 3,870.00
5,500.00
12,835.00
12,835.00
24,507.00
26,707.00
27,907.00
30,907.00
31,132.00
38,582.00
39,662.00
48,352.00
48,542.00
49,867.00
60,867.00
75,752.00
76,912.00
77,812.00
78,892.00
79,312.00
79,812.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
Expense Summary Page 12 of 19
Well Name: Highmark North Hargrave 12-24-12-27W1Location: 12-24-12-27W1
UWI: 0Licence: 10154
Cost Centre: 0AFE: FS 2017-047
Date Invoice # Amount CumulativeSeptember 12, 2017 est 5,500.00$ 5,500.00$ September 12, 2017 945 7,335.00$ 12,835.00$ September 12, 2017 43821 -$ 12,835.00$ September 12, 2017 26529 11,672.00$ 24,507.00$ September 12, 2017 2017-05-37 2,200.00$ 26,707.00$ September 12, 2017 1,200.00$ 27,907.00$ September 12, 2017 est 3,000.00$ 30,907.00$ September 12, 2017 29222 225.00$ 31,132.00$ September 12, 2017 27102 7,450.00$ 38,582.00$ September 12, 2017 2021 1,080.00$ 39,662.00$ September 13, 2017 946 8,690.00$ 48,352.00$ September 13, 2017 45925 190.00$ 48,542.00$ September 13, 2017 1,325.00$ 49,867.00$ September 13, 2017 est 11,000.00$ 60,867.00$ September 13, 2017 14-3667 14,885.00$ 75,752.00$ September 13, 2017 14-3685 1,160.00$ 76,912.00$ September 13, 2017 esdssd0379 900.00$ 77,812.00$ September 13, 2017 2025 1,080.00$ 78,892.00$ September 13, 2017 est 420.00$ 79,312.00$ September 13, 2017 est 500.00$ 79,812.00$ September 14, 2017 947 3,870.00$ 83,682.00$
83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$
Fire Sky Energy Inc.Expense Summary
North Hargrave
Workover Objective: Pull esp run tubing pump
Company Service
Baker Hughes Install ESPRed H|awk Anular rental and trucking
Mellom's Oilfield Supervision
Strad Spot Rig Matts and pick upCertified Rig
Black Gold Tank Truck
Camion Haul rods wellhead and tbg pumpCertified Rig
Black Gold Haul water in
Weir Seaboard stuffing box repair old wellheadFontana hot shot
Baher Hughes Pull ESP send to Leduc
Q2 ALS tubing drain swages and perf pupTryton scraper and bitCamion Pick up trailer and do returns
Mellom's Oilfield SupervisionTSM Rods polish rod
Q2 ALS Pump
Pure Chem 100L od H2S scavengerBlackGold empty tank kiwiCertified return to base
Fire Sky Energy Inc.
Expense SummaryNorth Hargrave
Well Natnet Highmark North Hargrave 12-24-12-27W1
Location: 12-24-12-27W1
UWIt 0
Licence: 10154
Cost Centre: 0
AFEt FS 2017-047
Worirover Objective: Pull esp run tubing pump
Fire Sky Energy Inc.Expense Summary
Expense Summary Page 13 of 19
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
Expense Summary Page 13 of 19
Well Name: Highmark North Hargrave 12-24-12-27W1Location: 12-24-12-27W1
UWI: 0Licence: 10154
Cost Centre: 0AFE: FS 2017-047
Date Invoice # Amount Cumulative83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$
Expense SummaryNorth Hargrave
Workover Objective: Pull esp run tubing pump
Company Service
Fire Sky Energy Inc.Expense Summary
Well Names
Location:
UWIt
Licence:
Cost Centre:
AFEtWorlrover Objective:
Highmark North Hargrave 12-24-12-27W1
12-24-12-27W1
0
10154
0
FS 2017-047
Pull esp run tubing pump
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
83,682.00
Expense Summary Page 14 of 19Expense Summary Page 14 of 19
Well Name: Highmark North Hargrave 12-24-12-27W1Location: 12-24-12-27W1
UWI: 0Licence: 10154
Cost Centre: 0AFE: FS 2017-047
Pull esp run tubing pump
Date Invoice # Amount Cumulative83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$ 83,682.00$
Workover Objective:
Company Service
Fire Sky Energy Inc.Daily Summary
North Hargrave
Date: September 13, 2017
8'or/rover Objective: Run rods and rig out
Day¹: 2
~ ~ ~
I I
I i ls'l
SITP: vac kPa SICP:
I Ivac kPa
~o- ~ ~
Weather: 24C 10km
7:30 Start and service equipment. Had safety meeting.
Checked crown saver and kills.
Pulled tubing pump out and laid down.
Made up Tryton bit and scraper.
Run 58 joints and installed packoff.
Tagged bottom with 59th joint at 568.5mkb.
Reverse circulated could not make any head way. Tapped bottom firmly and circulated. No head way.
Rotated a bit with tongs. Could not break it up.
Took I m3 to fill tubing. Lost I m3 every 15min while reverse circulating.
Notidy office. Rigged out packoff. Pulled bit and scraper and laid down.
Picked up tubing pump. Run 1.86m 73mm perf pup on bottom c/w bull plug.
Run 73mm x 88.9mm swage c/w shaved 88.9mm collar.
Rerun tubing pump Q2ALS 25-325-thos-24-2-4 Q14-139.
Run I joint of 73mm tubing. Run new tubing drain.
Run 55 joints of 73mm J55 eue tubing 9.67kg/m.
Picked up 3 pups 73mm J55 eue 9.67kg/m.
3.08m 2.48m and 1.86m. Picked up I joint 73mm tubing.
14:00 Land tubing hanger. Rig out bop.
Tubing hanger was wrong style. Ordered right one from Metra. They sent wrong one out.
Wait on tubing hanger.
Install new tubing hanger.
Made up bonet, ratigan and flowtee.
Run latch and 8 38.1mm k Bars. Run 64 19mm pl sp 96 rods and tagged plunger. Suck on tubing on way in.
Unlatched and spaced out. 8 kbars 64 19mm sp 96 I 19mm x 1.24m and I .62m x 19mm pl sp 96 ponies
Latch onto pump. Installed new polish rod xm19 x 9.14m x 31.8mm.
Stroked tubing to 5mpa.
Rigged out and cleaned up. Moved off lease.
Released rig. Park at 4-25-12-27wl
9/14/2017 Return to base in morning
~ ~ ~
~ ~
' ~ ~~ ~
~ ~ ~ ~
~ ~
~ ~ ~
- ~ - ~
~ ~ I
~ ~ ~
See Expense Summary sheet for Daily Cost Summary
Well Name: Licence #:Location: Cost Centre:
UWI: AFE#:
SITP: vac kPa SICP: vac kPa Weather: 24C 10kmTime7:30
Notidy office. Rigged out packoff. Pulled bit and scraper and laid down.Picked up tubing pump. Run 1.86m 73mm perf pup on bottom c/w bull plug.Run 73mm x 88.9mm swage c/w shaved 88.9mm collar.Rerun tubing pump Q2ALS 25-325-thos-24-2-4 Q14-139.Run 1 joint of 73mm tubing. Run new tubing drain. Run 55 joints of 73mm J55 eue tubing 9.67kg/m.Picked up 3 pups 73mm J55 eue 9.67kg/m.3.08m 2.48m and 1.86m. Picked up 1 joint 73mm tubing.
14:00 Land tubing hanger. Rig out bop.Tubing hanger was wrong style. Ordered right one from Metra. They sent wrong one out.
9/14/2017
Service Rig: Supervisor:Toolpush: Reported to:
Workover Objective: Run rods and rig out
Fire Sky Energy Inc.Daily Summary
North Hargrave
Date: September 13, 2017
Day #: 2Highmark North Hargrave 12-24-12-27W1 1015412-24-12-27W1 0
Pulled tubing pump out and laid down.
0 FS 2017-047Daily Synopsis
Operation @ 08:00 HRS
Detailed Daily Summary
Operations SummaryStart and service equipment. Had safety meeting.Checked crown saver and kills.
Latch onto pump. Installed new polish rod xm19 x 9.14m x 31.8mm.
Made up Tryton bit and scraper.Run 58 joints and installed packoff.Tagged bottom with 59th joint at 568.5mkb.Reverse circulated could not make any head way. Tapped bottom firmly and circulated. No head way.Rotated a bit with tongs. Could not break it up.Took 1m3 to fill tubing. Lost 1m3 every 15min while reverse circulating.
Wait on tubing hanger.Install new tubing hanger.Made up bonet, ratigan and flowtee.Run latch and 8 38.1mm k Bars. Run 64 19mm pl sp 96 rods and tagged plunger. Suck on tubing on way in.Unlatched and spaced out. 8 kbars 64 19mm sp 96 1 19mm x 1.24m and 1 .62m x 19mm pl sp 96 ponies
See Expense Summary sheet for Daily Cost Summary
Stroked tubing to 5mpa.Rigged out and cleaned up. Moved off lease.Released rig. Park at 4-25-12-27w1Return to base in morning
Certified Rig 1 Larry MellomRob Deis Trevor Vindevoghel
Site Directions:Junction hiway 83n and Hiway 1. North to 60N. 1.2km west. South .5km to well.
0
Fire Sky Energy Inc.Daily Summary
North Hargrave
Date:
8'orhover Objective: Pull esp run tubing pump
Day¹: 3
See Expense Summary sheet for Daily Cost Summary
Well Name: Licence #:Location: Cost Centre:
UWI: AFE#:
SITP: kPa SICP: kPa Weather:Time
Service Rig: Supervisor:Toolpush: Reported to:
Workover Objective: Pull esp run tubing pump
Fire Sky Energy Inc.Daily Summary
North Hargrave
Date:
Operation @ 08:00 HRS
Day #: 3Highmark North Hargrave 12-24-12-27W1 1015412-24-12-27W1 00 FS 2017-047
Daily Synopsis
Detailed Daily Summary
Operations Summary
See Expense Summary sheet for Daily Cost Summary
Larry MellomTrevor Vindevoghel
Site Directions:Junction hiway 83n and Hiway 1. North to 60N. 1.2km west. South .5km to well.
0
Fire Sky Energy Inc.Daily Summary
North Hargrave
Date:
8'orhover Objective: Pull esp run tubing pump
Day¹: 0
See Expense Summary sheet for Daily Cost Summary
Well Name: Licence #:Location: Cost Centre:
UWI: AFE#:
SITP: kPa SICP: kPa Weather:Time
Service Rig: Supervisor:Toolpush: Reported to:
Workover Objective: Pull esp run tubing pump
Fire Sky Energy Inc.Daily Summary
North Hargrave
Date:
Operation @ 08:00 HRS
Day #: 0Highmark North Hargrave 12-24-12-27W1 1015412-24-12-27W1 00 FS 2017-047
Daily Synopsis
Detailed Daily Summary
Operations Summary
See Expense Summary sheet for Daily Cost Summary
Larry MellomTrevor Vindevoghel
Site Directions:Junction hiway 83n and Hiway 1. North to 60N. 1.2km west. South .5km to well.
0
TankCoefficient
1)Cylindricallanks:m3/cm:0.0tx(Diameter,inm)2x0.785
2)Rectangularlanka:m3/cm:0.01x(Length,inm)x(Width,inm)
SWABREPORT
PAGE 1
WellName& Location:
LoadFluidToRecover. m'ii, m'aterRecoveredToDate, m Oil;
TankCoef.
m'ater
1m'm; Date
LeftToRecover: m'ii, m'water
Ix .x. I
STARTGUAGE
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Tank Coefficient1) Cylindrical Tanks: m3/cm: 0.01 x (Diameter, in m) 2 x 0.785 PAGE 12) Rectangular Tanks: m3/cm: 0.01 x (Length, in m) x (Width, in m)
Tank Coef. m3 cm; Date
m3 Oil; m3 Water m3 Oil; m3 Water m3 Oil; m3 Water
Fluid Swab Tank Gauge Total Fluid Water OilLevel Depth Guage Difference This Run Cum. Water This Run Cum This Run Cum Salinity Saver Kpa Kpa
Swab No. Time (m) (m) M3 (cm) (m3) (m3) Cut (m3) (m3) (m3) (m3) % Solids % PH Rubbers Cups Casing Tubing Remarks
1 0.00 0.00 0.00 0.002 0.00 0.00 0.00 0.00 0.003 0.00 0.00 0.00 0.00 0.004 0.00 0.00 0.00 0.00 0.005 0.00 0.00 0.00 0.00 0.006 0.00 0.00 0.00 0.00 0.007 0.00 0.00 0.00 0.00 0.008 0.00 0.00 0.00 0.00 0.009 0.00 0.00 0.00 0.00 0.0010 0.00 0.00 0.00 0.00 0.0011 0.00 0.00 0.00 0.00 0.0012 0.00 0.00 0.00 0.00 0.0013 0.00 0.00 0.00 0.00 0.0014 0.00 0.00 0.00 0.00 0.0015 0.00 0.00 0.00 0.00 0.0016 0.00 0.00 0.00 0.00 0.0017 0.00 0.00 0.00 0.00 0.0018 0.00 0.00 0.00 0.00 0.0019 0.00 0.00 0.00 0.00 0.0020 0.00 0.00 0.00 0.00 0.0021 0.00 0.00 0.00 0.00 0.0022 0.00 0.00 0.00 0.00 0.0023 0.00 0.00 0.00 0.00 0.0024 0.00 0.00 0.00 0.00 0.0025 0.00 0.00 0.00 0.00 0.00 0.0026 0.00 0.00 0.00 0.00 0.00 0.0027 0.00 0.00 0.00 0.00 0.00 0.0028 0.00 0.00 0.00 0.00 0.00 0.0029 0.00 0.00 0.00 0.00 0.00 0.0030 0.00 0.00 0.00 0.00 0.00 0.0031 0.00 0.00 0.00 0.00 0.00 0.0032 0.00 0.00 0.00 0.00 0.00 0.0033 0.00 0.00 0.00 0.00 0.00 0.0034 0.00 0.00 0.00 0.00 0.00 0.0035 0.00 0.00 0.00 0.00 0.00 0.0036 0.00 0.00 0.00 0.00 0.00 0.0037 0.00 0.00 0.00 0.00 0.00 0.0038 0.00 0.00 0.00 0.00 0.00 0.0039 0.00 0.00 0.00 0.00 0.00 0.0040 0.00 0.00 0.00 0.00 0.00 0.0041 0.00 0.00 0.00 0.00 0.00 0.0042 0.00 0.00 0.00 0.00 0.00 0.0043 0.00 0.00 0.00 0.00 0.00 0.0044 0.00 0.00 0.00 0.00 0.00 0.0045 0.00 0.00 0.00 0.00 0.00 0.00
Load Fluid To Recover: Recovered To Date; Left To Recover:
SWAB REPORT
Well Name & Location: 1
START GUAGE
Area;NorthHargrave
WellName;HighmarkNorthHargrave12-24-12-27W1
Location;12-24-12-27W1
UWI:0
Licence:10154
FireSkyEnergyInc.
EquipmentReport
NorthHargrave
Remarks;
Area:Well Name:
Location:UWI:
Licence:010154
Wellhead EquipmentDescription Size Manufacturer Model Comments
Fire Sky Energy Inc.Equipment Report
North HargraveNorth HargraveHighmark North Hargrave 12-24-12-27W112-24-12-27W1
Tubing HeadTubing Hanger 73mm Streamflow SplitTubing BonnetRod BOPFlow TeePressure SwitchMaster ValveFlowline ValveCasing Valve #1Casing Valve #2
Pumping UnitDescription Size Manufacturer Model Comments
Stuffing Box
PumpjackElectric MotorGas MotorChemical PumpBeltsController
Remarks: