High Mix Low Volume High Tech. Shenzhen Sunshine Circuits Phase I Phase II ~1000km north of Shenzhen...

7
High Mix Low Volume High Tech. Shenzhen Sunshine Circuits Phase I Phase II • ~1000km north of Shenzhen Sunshine. • 3km to Long River New Factory in Jiujiang, Jiangxi

Transcript of High Mix Low Volume High Tech. Shenzhen Sunshine Circuits Phase I Phase II ~1000km north of Shenzhen...

Page 1: High Mix Low Volume High Tech. Shenzhen Sunshine Circuits Phase I Phase II ~1000km north of Shenzhen Sunshine. 3km to Long River New Factory in Jiujiang,

High Mix Low Volume High Tech.Shenzhen Sunshine Circuits

Phase I

Phase II

• ~1000km north of Shenzhen Sunshine.• 3km to Long River

New Factory in Jiujiang, Jiangxi

Page 2: High Mix Low Volume High Tech. Shenzhen Sunshine Circuits Phase I Phase II ~1000km north of Shenzhen Sunshine. 3km to Long River New Factory in Jiujiang,

High Mix Low Volume High Tech.Shenzhen Sunshine Circuits

New Factory in Jiujiang, Jiangxi

Phase IPhase II

Phase I (a) : 1st & 2nd Floor direction is the same as theShenzhen Sunshine

Phase I (b): 3rd Floor Rigid-Flex Production

Phase II : Market-oriented (TBA)

Each Floor has ~15,000m2 Floor Area

Phase I total floor area ~ 45,000m2

Waste Water Treatment Facilities

Page 3: High Mix Low Volume High Tech. Shenzhen Sunshine Circuits Phase I Phase II ~1000km north of Shenzhen Sunshine. 3km to Long River New Factory in Jiujiang,

High Mix Low Volume High Tech.Shenzhen Sunshine Circuits

New Factory in Jiujiang, Jiangxi

R & D CenterPhase I

Multi-purpose Recreation Center (& Canteen)

Page 4: High Mix Low Volume High Tech. Shenzhen Sunshine Circuits Phase I Phase II ~1000km north of Shenzhen Sunshine. 3km to Long River New Factory in Jiujiang,

High Mix Low Volume High Tech.Shenzhen Sunshine Circuits

New Factory in Jiujiang, Jiangxi

Operators and Staff Dormitories

Service Apartment for our VIP

Page 5: High Mix Low Volume High Tech. Shenzhen Sunshine Circuits Phase I Phase II ~1000km north of Shenzhen Sunshine. 3km to Long River New Factory in Jiujiang,

High Mix Low Volume High Tech.Shenzhen Sunshine Circuits

Jiujiang Factory Phase I Major Investment

Processes Machines Investment (USD)

Inner Imaging Pretreatment to Etching 2,283,000

Inner Checking AOI 1,600,000

Inner Pressing Brown Oxide to Pressing 2,645,000

Drilling Drilling 5,600,000

1st Copper Plating PTH + Panel Plating 3,070,000

2nd Copper Plating Pattern Plating 4,000,000

Outer Imaging Pretreatment to Etching 1,100,000

Solder Resist Solder Mask + Legend 1,550,000

Surface Finish ENIG+HASL 1,000,000

Profile Routing+V-score 1,860,000

Final Checking E-testing 1,450,000

Major Investment Total 26,158,000

Total Equipment Investment 30,234,600

Page 6: High Mix Low Volume High Tech. Shenzhen Sunshine Circuits Phase I Phase II ~1000km north of Shenzhen Sunshine. 3km to Long River New Factory in Jiujiang,

High Mix Low Volume High Tech.Shenzhen Sunshine Circuits

RogersTeflon

N+N design with blind/buried via

D/S – 22/L PCB

6oz inner & 5oz outer

4-level any layer, stacked via Aluminum Core

Rigid/Flex with HDI or without HDI

5mm board thickness

Product Mix – PCB Technology

Page 7: High Mix Low Volume High Tech. Shenzhen Sunshine Circuits Phase I Phase II ~1000km north of Shenzhen Sunshine. 3km to Long River New Factory in Jiujiang,

High Mix Low Volume High Tech.Shenzhen Sunshine Circuits

Jiujiang Sunshine Technology Roadmap