High Holborn Level 11 - Refurbishment · 2020-02-18 · High Holborn Level 11 - Refurbishment As...
1
Project Information Budget: Area/Size: Construction Period: Design Team LSE Project Manager: Principal Contractor: £ 695,125 (inc VAT) 782 sq m August 2012 - March 2013 Martyn Fisher Ana Leite-Pereira-Dinis (Assistant) Peak Contractors Ltd High Holborn Level 11 - Refurbishment As part of the ongoing LTM Halls of Residences upgrade programme, the level 11 student bedrooms, communal showers & toilet facilities, shared kitchens and dining areas have been refurbished. The following works have been carried out: flooring, ceilings, LED lights, small power and data, sanitary ware, full re-decoration, Salto locks, bedroom furniture, kitchen units, breakfast bars and appliances.
Transcript of High Holborn Level 11 - Refurbishment · 2020-02-18 · High Holborn Level 11 - Refurbishment As...
Project InformationBudget:Area/Size:Construction Period:Design TeamLSE Project Manager:
Principal Contractor:
£ 695,125 (inc VAT)782 sq mAugust 2012 - March 2013
Martyn FisherAna Leite-Pereira-Dinis(Assistant)Peak Contractors Ltd
High Holborn Level 11 - Refurbishment
As part of the ongoing LTM Halls of Residences upgrade programme, the level 11 student bedrooms, communal showers & toilet facilities, shared kitchens and dining areas have been refurbished. The following works have been carried out: flooring, ceilings, LED lights, small power and data, sanitary ware, full re-decoration, Salto locks, bedroom furniture, kitchen units, breakfast bars and appliances.