2017 BUSINESS REPORT 2

INTRODUCTION

HIDROPROYECTOS is an engineering company based in Vizcaya, in Spain.

The company was founded with the goal of being independent and it remains independent to this day.

According to this, it does not have any association with building companies, equipment manufacturers,

government organizations or financial entities.

The third article of its article of association says that::

The company´s targets include

1)The production and sale of electric power. The construction, commercialization, operation and maintenance of

power plants based on hydropower, thermal energy or solar energy, along with other projects and studies

associated with .

2)The help, management, administration and participation in companies associated with the above objectives

along with their creation and development.

2015 BUSINESS REPORT 3

SCOPES OF ACTIVITY

HIDROPROYECTOS

SPAIN & MEXICO

CUSTOMERS

Design Engineering

Technical advice

Technical assistance

SUPPLIERS

Preparing, launching and tracking of tenders

Inspection and quality control of materials and equipment.

CONSTRUCTION

Supervision

Monitoring

Commissioning

2017 BUSINESS REPORT 4

PROFESSIONAL SERVICES

DESIGN ENGINEERING

Basic engineering

Site selectionConstruction engineering

DETAILED DESIGN

Project coordination in

the design phase

Construction and costs

management

Project management

ADVICE AND CONSULTANCY

Due diligence, Basic feasibility

studies

Advice on construction,

equipment purchase…

Assistance in negotiations

with institutions and other private

companies

COMMISSIONING AND OPERATION

Preparation of protocols for

implementation

Assistance in conducting preliminary tests both

loaded and unloaded

Preparation of maintenance

manuals

2017 BUSINESS REPORT 5

HYDRAULIC AREA

In the last twenty years HIDROPROYECTOS’ technical staff have developed their experience in the process of planning,

designing, constructing and operating of hydraulic works with particular emphasis in the field of hydroelectric power and

pumping stations.

HIDROPROYECTOS is an expert consultant company in the field of hydraulics and energy, and also takes part actively in

all the activities associated with the hydroelectric power. Its expertise ranges from viability studies and construction

projects, and includes technical assistance, works management, operation and maintenance of installations, and renovation

and repowering of existing projects.

2017 BUSINESS REPORT 6

HYDRAULIC AREA

Within the general field of hydroelectric generation and hydraulic works we supply the following services divided in three

fields of activity: civil engineering, electromechanical equipment and automation and control.

CIVIL ENGINEERING

• HYDRAULIC WORKS

• HIDROLOGY

• STRUCTURES AND FOUNDATIONS

ELECTROMECHANICAL EQUIPMENT

• EQUIPMENT DIMENSIONS

• ELECTRICAL EQUIPMENT OF HIGH AND LOW TENSION

AUTOMATION AND CONTROL

• AUTOMATION

• IMPLEMETATION OF SCADA SYSTEMS

• MANUAL CONTROL SYSTEMS AND REMOTE CONTROL SYSTEMS

2017 BUSINESS REPORT 7

PHOTOVOLTAIC AREA

In the last years the photovoltaic energy has experienced a substantial growth worldwide. Normally, these

installations consist in small plants without moving parts, and can either contribute electricity to the network or

work as stand- alone installations.

HIDROPROYECTOS’ face the opportunity afforded by photoelectric projects by taking advantage of the synergy

created by its clients’ opinions and energy saving opportunities to involve photoelectric generation in distinctive

projects.

2017 BUSINESS REPORT 8

HIDROPROYECTOS WORLDWIDE

HIDROPROYECTOS has been involved in many international projects during the last years.

Attached to this description you will find our projects catalog where you will find all the details and singularities of the

work we have developed over the years.

PROJECTS PERFORMED AND IN

PROGRESS

REFERENCES OF WORKS

10

PROJECTS PERFORMED AND IN PROGRESS

ID. CENTRAL CLIENT COUNTRY WORKP.

(MW)

1 C.H. Río Gilort Vadinia, S.A. Rumania - Feasibility study 30

2 C.H. OrosGuascor do Brasil Brasil

- Construction Project 2 x 4,7

3 C.H. Banabuiu - Electromechanical equipment project 2 x 4,6

4 C.H. Alegre

Escelsa (Espíritu Santo Centrales Eléctricas) Brasil

- Constrction Project and Strat-Up 1,4

5 C.H. Jucu - Electromechanical equipment project 3,5

6 C.H. Fruteiras - Automatización 6,7

7 C.H. Mangaravit- Construction Project

1,9

8 C.H. Mimoso 0,8

9 C.H. Patico Genelec Colombia - Construction Project, Asistencia Técnica y dirección de Obra. 1,4

10 C.H. Pilaló 3 Qualitec Ecuador - Feasibility study 10

11 C.H. Bicame Escelsa Brasil - Construction Project 4

12 C.H. LlaguepeBanesto Chile - Feasibility study

15

13 C.H. Chaparano 22

14 C.H. Puerto Montt ESSAL Chile - Construction Project2 centrales 1,1

15 C.H. Contao Hullera Vasco Leonesa Chile - Feasibility study 15

16 C.H. Cisnes Hullera Vasco Leonesa Chile - Feasibility study 15

PROJECTS OF HYDROELECTRIC GENERATION OH HIGH DEGREE OF DIFFICULTY

2017 BUSINESS REPORT

REFERENCES OF WORKS

11

PROJECTS PERFORMED AND IN PROGRESS

ID. CENTRAL CLIENT COUNTRY WORKSP.

(MW)

17 C.H. Pedrezuela

Canal Isabel II Spain Technical assistance to the hydroelectric development project

1,5

18 C.H. Valmayor 1,7

19 C.H. La Jarosa 1,2

20 C.H. Navacerrada 0,7

21 C.H. Intza

Belgra, S.L. Spain - Expansion and construction project

1,2

22 C.H. Urruzona 1

23 C.H. Aranaz 0,7

24 C.H. Araia Ajuria y Urigoitia, S.A. Spain -Construction Project and works manager 1,7

25 C.H. Rosarito Aprov. Eléctricos, S.A. Spain - Electromechanical equipment project 5,2

26 C.H. Moneo Eléctra Aduriz, S.A. Spain - Construction Project 0,4

27 C.H. S. Miguel de Larraga Gener. Eléctricas, S.L. Spain - Construction Project and works manager 1

28 C.H. Manzanares El Real Canal Isabel II Spain - Construction Project 1,3

29 C.H. Molinos de Castilla Hidrener, S.A. Spain - Construction Project and works manager 2

30 C.H. Andión Sdad. de Corralizas y Electra de Artajona Spain - Expansion y Construction Project 1,6

31 C.H. Cadones Hidroeléctrica del Cadones, S.A. Spain - Construction Project 2 x 1,5

32 C.H. Río Gilort Vadinia, S.A. Rumania - Feasibility study 30

GENERATION HYDROELECTRIC PROJECTS

2017 BUSINESS REPORT

REFERENCES OF WORKS

12

PROJECTS PERFORMED AND IN PROGRESS

ID. CENTRAL CLIENT COUNTRY WORKSP.

(MW)

33 C.H. Undurraga Consorcio de Aguas de Bilbao Spain - Preliminary project y Construction Electromechanical equipment project, , work management 2 x 1,6

34 C.H. Bolueta (Rio Nervión) Sdad. Sta. Ana de Bolueta, S.A. Spain - Construction Project and works manager, Electromechanical equipment project, 1

35 C.H. La Aceña Canal Isabel II Spain - Preliminary project 2,5

36 C.H. La Tera Hidroeléctrica del Tera, S.A. Spain - Preliminary project 0,7

37 C.H. Las Tiendas Bernard Etchegoyen Francia - Feasibility study 1,6

38 C.H. IpE.R.Z. (Grupo ENDESA) Spain - Automatisation project

3 x 33

39 C.H. Canalroya 6

40 C.H. La Pardina E.R.S.A. (Grupo ENDESA) Spain - Construction Project, Electromechanical equipment Project and works manager 5,1

41 C.H. Pitarque E.R.Z. (Grupo ENDESA) Spain - Feasibility study 2,7

42 C.H. Las Vueltas E.R.Z. (Grupo ENDESA) Spain - Feasibility study 1,7

43 C.H. Tordesillas Maisi, S.A. Spain - Preliminary project 3,5

44 C.H. La Gándara Hidroeléctrica del Gándara, S.L. Spain - Preliminary project 0,45

45 C.H. Inglares Ente Vasco de la Energía Spain - Feasibility study 0,25

46 C.H. Nogales Caja Spain Spain - Feasibility study 0,6

47 C.H. Río Ucero Otín, Promociones y Construcciones Spain - Construction Project y Dirección de Obra 0,1

48 C.H. Urdiales Dynamic Laser Spain - Preliminary project 1

GENERATION HYDROELECTRIC PROJECTS

2017 BUSINESS REPORT

REFERENCES OF WORKS

13

PROJECTS PERFORMED AND IN PROGRESS

ID. CENTRAL CLIENT COUNTRY WORKSP.

(MW)

49 Isparta Alstom Power Turquía - Automation B.T. -

50 Basf Tarragona Consonni. Spain - Automation -

51 Planta GNL – Bilbao Consonni. Spain - Automation -

52 C.H. El Molino Fundación Ciganda Ferrer Spain - Feasibility study y Proyecto constructivo 1,2

53 Cogeneración Dynasol Consonni-Repsol Spain - Proyecto de automatización 100

54 C.H. La Pampilla Consonni. Perú - Automation -

55 C.H. PeranchoRoyo Energía S.A. Spain - Feasibility study

1

56 C.H. Caldones 0,48

57 C.H. Huanchor Babcock Borsig S.A. Perú - Puesta en marcha y Protocolos de recepción 2x9,5

58 C.H. Grajal Canal Isabel II Spain - Preliminary project 0,25

59 C.H. Canas Saltos del Mundo Spain - Preliminary project 1,8

60 C.H. San José de Minas Hidroeléctrica San José Ecuador - Construction Project 5

61 C.H. Rio Ucero OTIN Spain - Revamping Central 0,08

62 C.H. Almazán NATURENER Spain - Preliminary project 2x0,8

63 C.H. El Portillo Ministerio Fomento Spain - Electromechanical equipment project 3,5

64 C.H. Escalona BEFESA - MÉXICO Mexico - Construction Project 10

GENERATION HYDROELECTRIC PROJECTS

2017 BUSINESS REPORT

REFERENCES OF WORKS

14

PROJECTS PERFORMED AND IN PROGRESS

ID. CENTRAL CLIENT COUNTRY WORKSP.

(MW)

65 C.H. Pedrezuela

Canal Isabel II Spain - Construction Project

1,1

66 C.H. Valmayor 0,92

67 C.H. Manzanares el Real 0,6

68 C.H. Vadomojón Ministerio Fomento Spain - Construction Project 3,8

69 Estación Bombeo Maresme SENER (ATLL) Spain - Construction Project 3x0,22

70 C.H. Sardón Alto RPI GROUP Spain - Construction Project 1,8

71 C.H. Bombeo Bolueta Consorcio de Aguas de Bilbao Spain - Construction Project 4,5

72 C.H. Sierra Brava ELECNOR Spain - Construction Project 3,6

73 C.H. Rio Durán Eduardo Bagaría Perpiña Spain - Construction Project 3,6

74 C.H. Puente de la Cerrada Ministerio Fomento Spain - Construction Project 8,5

75 C.H. Gorona del Viento Cabildo Isla del Hierro Spain - Electromechanical equipment project 10

76 Bombeo Gorona del Viento Cabildo Isla del Hierro Spain - Electromechanical equipment project 11,32

77 C.H. San Rafael BEFESA - MÉXICO Mexico - Basic engineering 3x9,1

78 C.H Tomatlan Presa TICSA Mexico - Construction Project 5,5

79 C.H Tomatlan Canal TICSA Mexico - Construction Project 3,9

80 C.H Nuevo Escalona TERRABRIO Mexico - Construction Project 14

GENERATION HYDROELECTRIC PROJECTS

2017 BUSINESS REPORT

REFERENCES OF WORKS

15

PROJECTS PERFORMED AND IN PROGRESS

ID. CENTRAL CLIENT COUNTRY WORKSP.

(MW)

81 C.H. El Cercado U.T.E. Guajira Colombia - Basic engineering + Construction Project 11,5

82 C.H. Cuajilote Impulsa, I.G.R. Mexico - Basic engineering + Construction Project 24

83 C.H. 1 Impulsa, I.G.R. Mexico - Construction Project 2,25

84 C.H Ocampo+Cuetzalin Impulsa, I.G.R. Mexico - Construction Project 11,6

85 C.H. 3 Impulsa, I.G.R. Mexico - Construction Project 7,3

86 Presas SINALOA Impulsa, I.G.R. Mexico - Construction Project 18

87 C.H Puebla COMEXHIDRO-B. SANTANDER Mexico - Due Diligence + Owner Engineering 60

88 C.H Paso Severino TEYMA-ABENGOA Uruguay -Construction and Bulding Project. 5,5

89 C.H. Marañon MOTA-ENGIL Perú - Due Diligence 88

90 C.H. Churo JENNER RENEWABLES Perú - Due Diligence 45

91 C.H.Viroc JENNER RENEWABLES Perú - Due Diligence 13

92 C.H. San Jose

RENOVALIA

Mexico

- Feasibility study

17

93 C.H. Supiac Mexico 19

94 C.H.Chucpac Mexico 22

95 C.H. Margarita Mexico 138

96 C.H.Opac Mexico 11,26

GENERATION HYDROELECTRIC PROJECTS

2017 BUSINESS REPORT

REFERENCES OF WORKS

16

GENERATION HYDROELECTRIC PROJECTS

PROJECTS PERFORMED AND IN PROGRESS

ID. CENTRAL CLIENT COUNTRY WORKSP.

(MW)

97 C.H Rio FrioINVEX Mexico - Construction Project

21

98 C.H.Rio Blanco 15

99 C.H. Atzalan GFM POWER Mexico - Construction Project

14,9

100 C.H.Coyolapa 17,5

101 C.H. Alzate COPALES Mexico - Construction Project 3,5

102 C.H. Parras GFM POWER Mexico - Revamping Basic engineering 0,5

103 C.H. El Encanto

AUTLAN Mexico -Revamping: Basic and construction Engineering

19

104 C.H. Las Minas 21

105 C.H. Mazatepec 4,6

106 C.H.Escalona TERRABRIO Mexico - Detail engineering 14

107 C.H. DosPuentes

TERRABRIO Mexico - Basic engineering

52

108 C.H. Gaya 18,7

109 C.H. Quimixtlan 27,4

110 C.H. Cuyamecalco 30

111 C.H. Tatatila GFM POWER Mexico - Due Diligence 19

112 C.H. Atexcaco GFM POWER Mexico -Expansion project 36

113 C.H. Torrelaguna ELECNOR Spain - Transient study 20

114 C.H. Coyolapa Azud GFM POWER Mexico - Basic Engineering 16,8

115 C.H. Sistema Necaxa GENERADORA FENIX Mexico - Feasibility study, Construction project 120

2017 BUSINESS REPORT

HIDROPROYECTOS INGENIEROS CONSULTORES

17

CONTACT

SPAIN

P.A.E. Asuaran, Edificio Enekuri

48950 ERANDIO – VIZCAIA

Tel: +34 944 531 642

MEXICO

Paseo de la Reforma 300, piso 17 Col.Juarez

06600 MEXICO D.F.

HIDROPROYECTOS LATAM

Ca. Almirante Lord Nelson 410

Miraflores

LIMA -PERÚ

www.hidroproyectos.com

[email protected]

[email protected]

2017 BUSINESS REPORT