Penstock Issue

Pipe Line Emerging Through Ice Spring 2013

More Pipeline Becomes Exposed as Lake Level Drops

High Spot Becomes Very Apparent

Damboards Opened at Lake to Draw Down Spillway 

High Spot After Lake Drawn Down

Spring Release Challenges• Strong and early Chaetocerosblbloom 

• As always, Humpback Whalescontinue to be an issueReleases postponed and fry held during high–Releases postponed and fry held during high activityA id d d t t t–Avoided need to tow most pens

• New predator at Takatz rearing site

Takatz Rearing Pen After a Trickle Release

Spring Release Highlights

• Chinook– Second largest size at release in history of program

• ChumChum– Largest size at release for 4.0 program

• Coho• Coho– Largest size at release since 1991P i l i i l h ld b hi h– Potential marine survival should be high; over 3,300 jacks through the rack

Hidden Falls Spawning Improvements

‐ Equipment modifications ‐ Increased flexibility‐ Scheduling and staffing preparation  ‐ Increased efficiency

Spawning Shed in Action

Hidden Falls Pier Project

Before Picture ‐ Hidden Falls Old Pier and Docking Facilities

Channel Construction Barge At Hidden Falls

100 Yards of Crushed Rock

Concrete Planks for Tide Ramp 

Diesel Tank Being Hoisted onto Forklift

Wooden Float Pile Pulling

Upland Piles

Driving Piles

Piles Cutoff at Elevation

All Piles and I‐beam Caps in Place

Pier Framing 6”x36”x40’ Glue Lams

Decking and Crane Installation

Installing Concrete Tide Ramp Planks

Completed Tide Ramp

Hoisting New Aluminum Gangway into Place

New Gangway From Approach Pier

New Gangway From End of Dock Float

Pier In Use – Deep Inlet Chum Egg Transfer October 2013

Pier Complete

LED Pier and Gangway Lighting