Hetip works, February 2014

27
Works at Serbian faculties February, 2014

description

Illustration of EU HETIP results (works) in faciltiies of the Serbian faculties - more at www.hetip.rs

Transcript of Hetip works, February 2014

Page 1: Hetip works, February 2014

Works at Serbian faculties

February, 2014

Page 2: Hetip works, February 2014

WORKS

Page 3: Hetip works, February 2014

University of BelgradeTechnical Faculty, Bor

Reconstruction and sanitation of the facade on Faculty complex and the Dean’s building.

Page 4: Hetip works, February 2014
Page 5: Hetip works, February 2014

Biological Faculty, Belgrade – Botanical garden

Page 6: Hetip works, February 2014

Reconstruction of large greenhouse and renovation and reapir of small greenhouse (nursery).

Page 7: Hetip works, February 2014

University of Belgrade, Rectorate

Restoration of the street and the courtyard facades, renovation of part of the attic space as usable space for the purposes of teaching in multidisciplinary studies and construction of a panoramic elevator in the atrium of the building and the construction of ramps for disabled students.

Page 8: Hetip works, February 2014
Page 9: Hetip works, February 2014

Faculty of Forestry, Belgrade – facility at Goč (near Kraljevo)

On an area of 1,200 square meters on four floors – a brand new building is being erected, designed for forestry students, high school students, researchers and nature lovers on Mt. of Goc, near Kraljevo.

Page 10: Hetip works, February 2014
Page 11: Hetip works, February 2014

University of Novi SadFaculty of Medicine

Hydro-biology laboratory and Cell culture lab at Medical Faculty are redesigned and modernized. There are new working spaces with renovated and new floors, doors, equipment… Works are completed.

Page 12: Hetip works, February 2014
Page 13: Hetip works, February 2014

Faculty of Sciences, Novi Sad

Page 14: Hetip works, February 2014

Department of Mathematics and Physics at the Faculty received extension of old building and is making the new spaces for students and professors to cover an area of 1790 square meters. Works are in progress…

Page 15: Hetip works, February 2014

Institute for Food Technology, Novi Sad

Renovation of floors and seals, investment rehabilitation and electrical maintenance.

Page 16: Hetip works, February 2014
Page 17: Hetip works, February 2014

University of NišFaculty of Medicine

Adaptation of laboratories of the Centre for Biomedicine at the Medical Faculty.

Page 18: Hetip works, February 2014
Page 19: Hetip works, February 2014

Faculty of Occupational Safety, Niš

Page 20: Hetip works, February 2014

Reconstruction and adaptation of the basement rooms and the renewal of the water and waste water infrastructure.

Page 21: Hetip works, February 2014

University Library “Nikola Tesla” and JUNIS, Niš

Page 22: Hetip works, February 2014

Adaptation and furnishing the user's area of University Library and of the Information System (JUNIS).

Page 23: Hetip works, February 2014

University of KragujevacFaculty of Engeneering, Kragujevac

Investment maintenance of the lecture building of Faculty of Mechanical Engineering in Kragujevac.

Page 24: Hetip works, February 2014
Page 25: Hetip works, February 2014

Faculty of Engeneering, Kraljevo

Page 26: Hetip works, February 2014

Construction, extension of boiler room with connection to gas pipeline and investment maintenance of the lecture building of Faculty of Mechanical Engineering in Kraljevo

Page 27: Hetip works, February 2014