HETERO DRUGS LIMITED, UNIT VI - Welcome to...

30
HETERO DRUGS LIMITED, UNIT VI SURVEY NO. 150 (Part), 151/1, 151/2 (Part), 158/1, NALLAMATTIPALEM VILLAGE, NAKKAPALLI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH UPDATED FORM I Project No. 08152101 August 2015 Hetero Drugs Limited Hetero Corp Office, Sanath Nagar, Hyderabad – 500 018. Phone: 040 – 23704923/24/25 Fax: 040 23704926 Email: [email protected] STUDIES AND DOCUMENTATION BY TEAM Labs and Consultants B115117 & 509, Annapurna Block, Aditya Enclave, Ameerpet, Hyderabad500 038. Phone: 04023748 555/23748616, Telefax: 04023748666 SUBMITTED TO MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA INDIRA PARYAVARAN BHAWAN, JOR BAGH ROAD, NEW DELHI

Transcript of HETERO DRUGS LIMITED, UNIT VI - Welcome to...

HETERO DRUGS LIMITED, UNIT ‐ VI SURVEY NO. 150 (Part), 151/1, 151/2 (Part), 158/1,  NALLAMATTIPALEM VILLAGE, NAKKAPALLI MANDAL,  

VISAKHAPATNAM DISTRICT, ANDHRA PRADESH  

      

UPDATED  FORM I 

   

     

Project No. 0815‐21‐01August 2015 

 

Hetero Drugs Limited Hetero Corp Office,  Sanath Nagar, Hyderabad – 500 018. Phone: 040 – 23704923/24/25   Fax: 040 ‐ 23704926 E‐mail: [email protected] 

STUDIES AND DOCUMENTATION BYTEAM Labs and Consultants B‐115‐117 & 509, Annapurna Block,  Aditya Enclave, Ameerpet,  Hyderabad‐500 038. Phone: 040‐23748 555/23748616, Telefax: 040‐23748666      

SUBMITTED TO MINISTRY OF ENVIRONMENT AND FORESTS, 

GOVERNMENT OF INDIA INDIRA PARYAVARAN BHAWAN, JOR BAGH ROAD, NEW DELHI  

Hetero Drugs Limited Unit‐IV 

Form I        Page 1 

APPENDIX – I (See Paragraph – 6) 

FORM I I)  Basic Information S.No.  Item  Details  1  Name of the Project/s  Hetero Drugs Limited Unit‐IV 2  S. No in the Schedule   5 (f) – A category 3  Proposed capacity/area/length/tonnage to 

be handled/command area/lease area/number of wells to be drilled  

Area Existing:  80 Acres (For Hetero Drugs Limited (HDL) Unit‐VI)  Existing Capacity:  HDL Unit IV: 5400 TPA  The present proposal is merging of HDL Unit IV to HLL Unit III Hetero Drugs Limited Unit IV (HDL Unit IV) File No. J‐11011/398/2010‐IA II (I)     dated: 10.09.2012.  Hetero Labs Limited Unit III (HLL Unit III) File No. J‐11011/396/2011‐IA II (I)     dated: 10.09.2012.    

4  New/Expansion/Modernization  Merging of Existing EC 5  Existing Capacity/Area etc.  Capacity: 5400TPA 

Total Area: 80 Acres 6  Category of Project i.e 'A' or 'B'  “A” 7  Does it attract the general condition? If 

yes, please specify No 

8  Does it attract the Specific condition? If yes, please specify. 

No 

9  Location      Plot/Survey/Khasra No.  Sy. No. 150 (Part), 151/1, 151/2 (Part), 158/1   Village  Nallamattipalem Village   Tehsil  Nakkapalli Mandal   District  Visakhapatnam   State  Andhra Pradesh 

10  Nearest railway station/airport along with distance in km. 

Railway Station: Narsipatnam – 9 Km  Airport : Visakhapatnam Airport – 70 Km  

11  Nearest Town, City, District Headquarters along with distance in kms. 

Town & District HQ – Visakhapatnam (70 Km)  

12  Village Panchayats, Zilla Parishad, Municipal Corporation, Local body (complete postal address with telephone nos. to be given) 

Sy.No. 150 (Part), 151/1, 151/2 (Part), 158/1, Nallamattipalem Village, Nakkapalli Mandal, Visakhapatnam District, Andhra Pradesh  

13  Name of the Applicant  C. Mohan Reddy 14  Registered Address  Hetero Drugs Limited Unit‐IV 

Sy.No. 150 (Part), 151/1, 151/2 (Part), 158/1, Nallamattipalem Village, Nakkapalli Mandal, Visakhapatnam District, Andhra Pradesh   

Hetero Drugs Limited Unit‐IV 

Form I        Page 2 

15  Address for Correspondence:     Name  Sri. C. Mohan Reddy   Designation(Owner/Partner/CEO)  Director ‐ Operations   Address  Hetero Drugs Limited Unit‐IV 

Hetero Corporate Office, 7‐2‐A2, Industrial estate, Sanathnagar, Hyderabad, TelanganPhone : 040‐23704923/24/25 Fax : 040‐23704926 

  Pin Code  500 018   E‐mail  [email protected]

[email protected]   Telephone Number  Phone : 040‐23704923/24/25   Fax No.  Fax : 040‐23704926 

16  Details of alternative Sites examined, if any. Location of these sites should be shown on a topo sheet. 

Not Applicable, the present proposal is for merging of HDL Unit VI in HLL Unit III. 

17  Interlinked Projects  Not applicable18  Whether separate application of 

interlinked project has been submitted? Not applicable 

19  If yes, date of submission  Not applicable 20  If no, reason  Not applicable 21  Whether the proposal involves 

approval/clearance under: if yes, details of the same and their status to be given.            (a) The Forest (Conservation) Act, 1980?       (b) The Wildlife (Protection) Act, 1972?          (c) The C.R.Z Notification, 1991? 

No 

22  Whether there is any Government Order/Policy relevant/relating to the site? 

 No 

23  Forest land involved (hectares)   No 24  Whether there is any location pending 

against the project and /or land in which the project is propose to be set up?                (a) Name of the Court                                         (b) Case No                                                         (c) Orders/directions of the Court, if any and its relevance with the proposed project. 

 No  

Hetero Drugs Limited Unit‐IV 

Form I        Page 3 

(II)  Activity  1.  Construction,  operation  or  decommissioning  of  the  Project  involving  actions,  which  will  cause  physical changes in the locality (topography, land use, changes in water bodies, etc.) S.No.  Information/Checklist confirmation  Yes/No  Details thereof (with approximate quantities /rates, 

wherever possible) with source of information data 1.1  Permanent or temporary change in 

land use, land cover or topography including increase in    intensity of land use (with respect to local     land use plan)   

NO  Total Existing Area: 80 acres  

1.2  Clearance of existing land, vegetation and buildings? 

NO  Industrial  

1.3  Creation of new land uses?  NO  Existing – industrial 1.4  Pre‐construction investigations e.g. 

bore houses, soil testing? NO  Existing unit 

1.5  Construction works?      NO  Not Applicable 1.6  Demolition works?  NO  No structures for demolition 1.7  Temporary sites used for 

construction works or housing of construction workers? 

NO  Existing Units 

1.8  Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations 

No  Existing Units 

1.9  Underground works including mining or     tunneling? 

NO  No underground works like mining and tunneling.  

1.10  Reclamation works?  NO   1.11  Dredging?   NO   1.12  Offshore structures?  NO   1.13  Production and manufacturing 

processes? YES  Enclosed in Annexure – I 

1.14  Facilities for storage of goods or materials? 

NO  No  additional  facilities  are  proposed,  the  present proposal id for merging of HDL Unit VI in HLL Unit III. 

1.15  Facilities for treatment or disposal of solid waste or liquid effluents? 

YES  High TDS and low TDS effluents are treated with in the plant premises. Organic  waste  is  sent  to  cement  plants  for  co‐incineration.  Solid  waste  generated  from  Multiple  Effect evaporators sent to TSDF.   Details  of  waste  treatment  facilities  presented  in Annexure II.   

1.16  Facilities for long term housing of operational workers? 

NO   

1.17   New road, rail or sea traffic during construction or operation? 

NO   

1.18   New road, rail, air waterborne or other transport infrastructure including new or altered routes and 

NO   

Hetero Drugs Limited Unit‐IV 

Form I        Page 4 

stations, ports, airports etc? 1.19   Closure or diversion of existing 

transport routes or infrastructure leading to changes in traffic movements? 

NO   

1.20  New or diverted transmission lines or pipelines? 

NO   

1.21  Impoundment, damming, culverting, realignment or other changes to the hydrology   of watercourses or aquifers? 

NO   

1.22  Stream crossings?  NO   1.23  Abstraction or transfers of water 

form ground or surface waters? NO   

1.24  Changes in water bodies or the land surface affecting drainage or run‐off?

NO   

1.25  Transport of personnel or materials for construction, operation or decommissioning? 

NO   

1.26  Long‐term dismantling or decommissioning or restoration works? 

NO   

1.27  Ongoing activity during decommissioning which could have an impact on the environment? 

NO   

1.28  Influx of people to an area in either temporarily or permanently? 

NO  Existing Units 

1.29  Introduction of alien species?  NO   1.30  Loss of native species or genetic 

diversity? NO  No,  the present proposal  is  combining of our existing 

EC. 1.31  Any other actions?  NO   

Hetero Drugs Limited Unit‐IV 

Form I        Page 5 

2.   Use  of Natural  resources  for  construction  or  operation  of  the  Project  (such  as  land, water, materials  or energy, especially any resources which are non‐renewable or in short supply): S.No.  Information/checklist confirmation  Yes/No  Details thereof (with approximate quantities /rates, 

wherever possible) with source of information data 2.1  Land especially undeveloped or 

agricultural land (ha) No  Existing units 

2.2   Water (expected source & competing users) unit: KLD 

NO   

2.3  Minerals (MT)  NA   2.4  Construction material – stone, 

aggregates, sand / soil (expected source – MT) 

NO   

2.5  Forests and timber (source – MT)  NO   2.6  Energy including electricity and fuels 

(source, competing users) Unit: fuel (MT), energy (MW) 

NO  No  additional  utilities  are  required  for  proposed merging of two units. 

2.7  Any other natural resources (use appropriate standard units) 

NA   

Hetero Drugs Limited Unit‐IV 

Form I        Page 6 

3.   Use,  storage,  transport, handling or production of  substances       or materials, which  could be harmful  to human health or the environment or raise concerns about   actual or perceived risks to human health. S.No.  Information/Checklist confirmation  Yes/No Details thereof (with approximate quantities/rates, 

wherever possible) with source of information data 3.1  Use of substances or materials, which 

are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and  water supplies) 

YES  Hazardous  chemicals  used  for  manufacturing  of Synthetic  Organic  Chemicals  and  intermediates. MSIHC  rules  shall  be  followed  during  storage, transportation  and  handling  of  raw  materials. Hazardous chemicals and solvent shall be stored and handled in closed systems. 

3.2  Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases). 

NO   

3.3  Affect the welfare of people e.g. by changing living conditions? 

No  The present proposal is for merging of HDL Unit VI in HLL Unit III 

3.4  Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc., 

NO  No sensitive receptors are present  in the  immediate vicinity of the site.  

3.5  Any other causes  NO    

4. Production of solid wastes during construction or operation or decommissioning (MT/month) S.No.  Information/Checklist confirmation  Yes/No Details thereof (with approximate quantities/rates, 

wherever possible) with source of information data 4.1  Spoil, overburden or mine wastes  NO   4.2  Municipal waste (domestic and or 

commercial        wastes) NO  Wastes  from  canteen,  other  commercial wastes  like 

paper, empty containers etc.    4.3  Hazardous wastes (as per Hazardous 

Waste  Management Rules) YES  Hazardous waste generation during construction shall 

be  limited  to waste  oils,  batteries  and  containers  of paints  etc.    The  quantity  of  hazardous  wastes generated  during  operation  contain  salts  from evaporators,  process  residue,  and  solvent  residues, ETP sludge and filtration media etc.   

4.4  Other industrial process wastes  YES  Enclosed at Annexure IV 4.5  Surplus product  NO4.6  Sewage sludge or other sludge from 

effluent  treatment YES  Sludge from Effluent treatment plant and evaporation 

salts shall be sent to TSDF.  4.7  Construction or demolition wastes  NO 4.8  Redundant machinery or equipment  NO   4.9  Contaminated soils or other materials  NO  Structures of all waste treatment facilities are made of 

concrete  and  also  above  ground  to  eliminate  the possibility  of  any  contamination  due  to  seepage  and for ease of maintenance. 

4.10  Agricultural wastes  NO4.11  Other solid wastes  YES  Enclosed at Annexure IV 

    

Hetero Drugs Limited Unit‐IV 

Form I        Page 7 

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) S.No.  Information/Checklist confirmation  Yes/No Details thereof (with approximate quantities/rates, 

wherever possible) with source of information data 5.1  Emissions from combustion of fossil 

fuels from stationary or mobile sourcesYES  Pulverized  coal  is  used  as  fuel. Quantity  of  fuel  and 

emissions details are enclosed in Annexure V 5.2  Emissions from production processes  YES  Gaseous  emissions  from  process  are  Hydrogen 

Chloride,  Hydrogen  Bromide,  Carbon  dioxide  and Hydrogen. HCL & HBr gases are scrubbed in two stage scrubbers.  Water  is  used  as  scrubbing  media  in primary scrubbers and caustic in secondary scrubbers. Sodium Chloride,  Sodium bromide  solutions  are  sent to ETP. Hydrogen and carbon dioxide gases are let out into  atmosphere  by  following  standard  operating procedure.  

5.3  Emissions from materials handling including storage or transport 

NO  Material  transfer  takes  place  in  closed  pipeline systems using pumps with mechanical seals. 

5.4  Emissions from construction activities including plant and equipment 

YES  Dust  may  rise  during  transport  of  material  and construction  activity.    The  dust  emissions  shall  be mitigated by water  spraying on  the  roads within  the premises.  

5.5  Dust or odors from handling of materials including construction materials, sewage and  waste 

NO  Effluent  from  domestic  usage  will  be  treated  in Sewage  treatment  Plant  and  treated  wastewater reused for gardening. 

5.6  Emissions from incineration of waste  NO   5.7  Emissions from burning of waste in 

open air (e.g. slash materials, construction debris) 

NO   

5.8  Emissions from any other sources  NO   

Hetero Drugs Limited Unit‐IV 

Form I        Page 8 

6. Generation of Noise and Vibration, and Emissions of Light and Heat: S.No.  Information/Checklist confirmation Yes/No  Details thereof (with approximate quantities/rates, 

wherever possible) with source of information data with source of information data 

6.1  From operation of equipment e.g. engines, ventilation plant, crushers 

YES  Material transport and construction equipment shall be source  of  noise,  while  transfer  pumps,  vacuum systems,  DG  sets  are  the  sources  of  noise  during operation.   

6.2  From industrial or similar processes  YES  DG sets controlled by providing Acoustic Enclosures. DG  sets  will  be  used  in  case  of  power  failure  from APTRANSCO. 

6.3  From construction or demolition  YES  Noise during construction shall be due to construction equipment and emergency DG sets.    

6.4  From blasting or piling  NO   6.5  From construction or operational 

traffic NO  The  increased  traffic  shall  not  have  any  significant 

impact.  6.6  From lighting or cooling systems  NO6.7  From any other sources  NO   

  7.Risks of contamination of land or water from releases of    pollutants into the ground or into sewers,   surface     waters, groundwater, coastal waters or the sea: S.No.  Information/Checklist confirmation Yes/No  Details thereof (with approximate quantities/rates, 

wherever possible) with source of information data 7.1  From handling, storage, use or 

spillage of hazardous materials NO  All the hazardous materials will be stored  in MS/HDPE 

drums, in a covered shed and no contamination of soil is expected. 

7.2  From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) 

NO  All the waste from domestic operations sent to Effluent Treatment  Plant.  Treated  effluent will  be  recycled  to cooling towers.  

7.3  By deposition of pollutants emitted to air into the land or into water 

NO  All  the  emissions  from  process  are  controlled  by providing control equipment like scrubbers, Bag filters. 

7.4  From any other sources  NO   7.5  Is there a risk of long term build up 

of pollutants in environment from these     sources? 

NO  

 

Hetero Drugs Limited Unit‐IV 

Form I        Page 9 

8.Risk of  accidents during  construction or operation of  the Project, which  could  affect human health or  the environment 

S.No.  Information/Checklist confirmation  Yes/No  Details thereof (with approximate quantities/rates, wherever possible) with source of information data 

8.1  From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances 

YES  All  Inbuilt  Safety  precautions  will  be adopted  and  there  will  not  be  any damage  to  environment  or  human health 

8.2  From any other causes  NA   8.3  Could the project be affected by natural disasters 

causing environmental damage (e.g.     Floods, earthquakes, landslides, cloudburst etc)? 

NO   

  9.Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts  with  other existing or planned activities in the locality S. No.  Information/Checklist confirmation  Yes/No  Details thereof (with approximate 

quantities/rates, wherever possible) with source of information data 

9.1  Lead to development of supporting.   facilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: • Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.) •      housing development •      extractive industries •      supply industries •      other 

YES  The  project  shall  enhance  the  socio economic status of the area, improving the  employment.  There  are  no major support  industries  required  for  this plant. 

9.2  Lead to after‐use of the site, which could haven impact on the environment 

NO   

9.3  Set a precedent for later developments  NO   

9.4  Have cumulative effects due to proximity to other existing or planned projects with similar    effects 

NO  The  baseline  environmental  status  of the  surrounding  areas  is  within  the prescribed  limits as observed  from the Secondary data. 

 

         

Hetero Drugs Limited Unit‐IV 

Form I        Page 10 

(III)  Environmental Sensitivity S.No.  Areas  Name/ 

Identity Aerial  distance  (within  15  km.) Proposed project location boundary 

1   Areas  protected  under  international  conventions,  national  or  local  legislation  for  their  ecological,  landscape, cultural or other related value 

NA   

2  Areas  which  are  important  or  sensitive  for ecological  reasons  ‐  Wetlands,  watercourses  or other  water  bodies,  coastal  zone,  biospheres, mountains, forests 

YES  Vempadu RF – 5 km – S Payakaraopeta RF – 6.2 km  ‐ NW  

3  Areas  used  by  protected,  important  or  sensitive  species  of  flora  or  fauna  for  breeding,  nesting, foraging, resting, over wintering, migration. 

NA     

4   Inland, coastal, marine or underground waters  NO   5   State, National boundaries  NO   6   Routes or facilities used by the public for access to 

recreation or other tourist, pilgrim areas NO   

7   Defense installations  NO   8   Densely populated or built‐up area  YES  Nallamattipalem – 1 Km 

Buchurajupeta – 1.5 Km Upamaka  ‐  3 Km 

9   Areas  occupied  by  sensitive man‐made  land  uses  (hospitals,  schools,  places  of  worship,  community facilities) 

NA  1 Km from the site 

10  Areas  containing  important,  high  quality  or  scarce resources  (ground  water  resources,  surface resources,  forestry,  agriculture,  fisheries,  tourism, minerals) 

YES  Bay of Bengal – 1.2 km – SE Varaha River – 13 km ‐ N 

11  Areas  already  subjected  to  pollution  or  environmental  damage.  (those where  existing  legal environmental standards     are exceeded) 

NO   

12   Areas  susceptible  to  natural  hazard  which  could  cause  the  project  to  present  environmental problems  (earthquakes,  subsidence,  landslides, erosion,  flooding  or  extreme  or  adverse  climatic conditions) 

NO       

      

      

Hetero Drugs Limited Unit‐IV 

Form I        Page 11 

(IV) Proposed Terms of Reference for EIA studies      Scope of Work of EIA “...The EIA shall cover the following: Description of the proposed project: The  first  task:”  Description  of  the  proposed  project”  forms  a  vital  component  of  the  Environmental  Impact Assessment (EIA) as it provides the basis for evaluating the likely causes of Environmental Impacts.     

Existing Environment and Baseline Conditions: The baseline assessment will be carried out to identify potentially sensitive and critical areas that may be affected by  the project  in  an area of 10  km  surrounding  the project  location.   The  critical  and  sensitive  targets  shall be plotted  on  land  use map  of  project  impact  area.  The  existing  environment  and  baseline  conditions  should  be established from:‐ Analysis of existing information published and secondary data. ‐Consultation with relevant statutory authorities, and Field visits for supplementation of missing gaps. 

The key subject areas which the EIA shall address include Ecology and Nature conservation, Air quality, surface and water quality in project impact area, soil quality, cultural heritage, landscape, land use, noise quality, etc.  Natural habitats  like national parks, wildlife reserves, sanctuaries, sacred grove, protected areas, forests, wetlands, major rivers and waterways if any, shall also be identified and marked. 

Assessment of Environmental Impacts: Based upon the results from the review of existing information, field visits, site data collection and consultation, for each  component  of  environment  (physical,  biological  and  socio  economic)  the  positive,  negative,  direct  and indirect, temporary and permanent impacts will be evaluated along with an indication of the degree of impact, i.e., whether the impact is significant, moderate, minor or negligible.   The degree of impact shall also be quantified by using state of the art air quality impact prediction models based on ISCST3 algorithms. 

Environment Management Plan And Mitigation Plan: For each  significant negative  impact  identified,  specialist  shall work  closely with  the engineering  team/technical consultants  to  suggest practicable measures  to  avoid or mitigate  the  impact.    The mitigation of  environmental impacts will be by three mechanisms. =>Introduction of mitigation features through the engineering practices. =>Implementation of environmental controls during construction and operation. =>Legislative control involving compliance with Indian environmental laws. The  Environmental  management  plan  shall  include  an  estimate  of  capital  and  recurring  costs  of  mitigation measures and will identify the institutional framework for implementation. 

Monitoring Plan: Having  identified the significant environmental  impact that  is  likely to arise as a result of the project, the project team shall specify what monitoring is required during the various phases of the project cycle.  The monitoring plan will identify parameters and frequency of monitoring and responsible organization. 

 

Hetero Drugs Limited Unit‐IV 

Form I        Page 12 

I hereby give the undertaking that data and  information given  in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance given,  if any to the project will be revoked at our risk and cost. 

Date:  Place: Hyderabad    Signature of the applicant

With Name and Full Address(Project Proponent/Authorized Signatory)

   C. Mohan Reddy

Director‐Operation                                 Hetero Labs Limited Unit‐III

        Sy.No. 150 (Part), 151/1, 151/2 (Part), 158/1, Nallamattipalem Village, Nakkapalli Mandal, 

Visakhapatnam District, Andhra Pradesh 

HETERO DRUGS LIMITED, UNIT ‐ VI SURVEY NO. 150 (Part), 151/1, 151/2 (Part), 158/1,  NALLAMATTIPALEM VILLAGE, NAKKAPALLI MANDAL,  

VISAKHAPATNAM DISTRICT, ANDHRA PRADESH   

        

ANNEXURES 

       

  

Project No. 0815‐21‐01August 2015 

 

Hetero Drugs Limited Hetero Corp Office,  Sanath Nagar, Hyderabad – 500 018. Phone: 040 – 23704923/24/25   Fax: 040 ‐ 23704926 E‐mail: [email protected] 

STUDIES AND DOCUMENTATION BY TEAM Labs and Consultants B‐115‐117 & 509, Annapurna Block,  Aditya Enclave, Ameerpet,  Hyderabad‐500 038. Phone: 040‐23748 555/23748616, Telefax: 040‐23748666      

 

SUBMITTED TO MINISTRY OF ENVIRONMENT AND FORESTS, 

GOVERNMENT OF INDIA INDIRA PARYAVARAN BHAWAN, JOR BAGH ROAD, NEW DELHI  

Hetero Drugs Limited Unit IV

Team Labs and consultants

Fig 1.1 Location of M/s. Hetero Drugs Limited Unit VI

Hetero Drugs Limited Unit VI Environmental Impact Assessment Report

Team Labs and consultants 1-1

HANUM AN STATUE

PRODUCTION BLOCK

79.

520

14

72x20

PRODUCTION BLOCK

72x20

72x20

HYD/LITH.

72x20 72x20

72x20BOILER

PRODUCTION BLOCK - H

35X15.5UTILITY

PRODUCTION BLOCK

CYLINDER SHED

A-BLOCK

PRODUCTION BLOCK

D-BLOCK - HYD

CYLINDERS

E-BLOCK

72x20BLOCK

40x20

14X12Engineering

11.5

10 12

FABRICATION SHEDEQUIPMENT

Columns

P reprocessR eactors

59

29.03

22X15.5PCC ROOM

100.6 100.2

R2

2

A BOV E-G ROU ND SOLVEN T TANK FARM

UNL

OADI

NG P

LATF

ORM

36

12 Nos Ve rt ical T anks - 60KL each.Insulat ed T anks with C.Coil

12

10

13.2

513

.25

13.99

104.18

Block-1

104.59

166.

93

Plan

t Wate

rF ir e

Wa te

r Sum

p

Pumphouse

4X15

M

1 2 X 15M

Staircase13. 9X5M

HDL Water Sumps150M3

450M3

20

16

Electrical PCC 11.5

DCB UTILITY BLOCK

35 27

15

11.7

5

5.96

7

10

10.5

3

1010

5.96

25

126.5

5

TFH

6.46

HVRs

6

3

Toilets

1

NO

N-E

XPL

OSI

VE

YA

RD5x

38.5

12

Efflu en t Pit

Tran sformer

41.08

24 21

QA, QC AND PHARMA72x20

R1.5

1.7

25

10

25

1.7 10

27

6 5 MTRR AILTEL TOWER

PRODUCTION BLOCK

79.

520

14

72x20

PRODUCTION BLOCK

72x20

72x20

HYD/LITH.

72x20 72x20

72x20PRODUCTION BLOCK

BOILER35X15.5UTILITY

PRODUCTION BLOCK

B-BLOCK

PRODUCTION BLOCK

CYLINDERS

72x20

SYMED PRODUCTION

WAREHOUSE

14X12Engineering

40x20WAREHOUSE-3

11.5

10 12

FABRICATION SHEDEQUIPMENT

Columns

P reprocessR eactors

59

29.03

22X15.5PCC ROOM

100.6 100.2

R2

2

A BOV E-G ROU ND SOLVEN T TANK FARM

UNL

OADI

NG P

LATF

ORM

36

12 Nos Ve rt ical T anks - 60KL each.Insulat ed T anks with C.Coil

12

10

13.2

513

.25

13.99

104.18

Block-1

104.59

166.

93

Plan

t Wate

rF ir e

Wa te

r Sum

p

Pumphouse

4X15

M

1 2 X 15M

Staircase13. 9X5M

HDL Water Sumps150M3

450M3

20

16

Electrical PCC 11.5

DCB UTILITY BLOCK

35 27

15

11.7

5

5.96

7

10

10.5

3

1010

5.96

25

126.5

5

TFH

6.46

HVRs

6

3

Toilets

1

NO

N-E

XPL

OSI

VE

YA

RD5x

38.5

12

Efflu en t Pit

Tran sformer

41.08

24 21

72x20

R1.5

1.7

25

10

25

1.7 10

27

6 5 MTRR AILTEL TOWER

G- BLOCK

MISCELLANEOUS BLOCK72x20

H E T E R O

D R U

G S L T D

, UN

IT -VI

H- BLOCK

PROPOSED PILOT

72x20

OPEN SPACE

100.2100.2

MISCELLANEOUS BLOCK72x20

15KL 15KL 15KL15KL 15KL 15KL 15KL 15KL 15KL 15KL

DRUM SHED

DRUM SHED

WAREHOUSE-172x20

WAREHOUSE-172x20

WAREHOUSE-272x20

LIN STORAGE

72x2072x20WARE HOUSE-4 SYMED

PRODUCTION BLOCK

C.C.PLATFORM

DRUM YARD

DRUM YARD

C.C.PLATFORM

C.C.PLATFORM

C.C.PLATFORM

Fig 1.2 Plant Layout of M/s. Hetero Drugs Limited Unit VI

            

ANNEXURE – I

M/s. Hetero Drugs Limited Unit-VI obtained Environmental Clearance from Ministry of

Environment and Forests (MoEF) vide letter no. F. No. J-11011/398/2010-IA II (I) dated:

10.09.2012. at Sy.nos. 150(part),151/1,151/2(part),158/1, Nallamattipalem Village,

Nakkapalli Mandal, Visakhapatnam District, Andhra Pradesh It is proposed to

Combining merge Hetero Drugs Limited Unit IV Environmental Clearance in Hetero

Labs Limited Unit III (File F. No. J-11011/396/2011-IA II (I) dated: 10.09.2012). The

manufacturing capacity of HDL Unit IV is presented in Table A-1

Table A-1 Manufacturing Capacity of Hetero Drugs Limited Unit-VI REGULAR PRODUCTS S.

No. Product Name No. of Stages

Production (TPM)

Production (TPD)

1 Atorvastatin calcium 3 50 1.64 2 Cefditorine pivoxil 3 50 1.64 3 Cefidenir 2 25 0.82 4 Cefixime 2 30 0.99 5 Ceforoxime Axetil 1 30 0.99 6 Cefoxitin Sodium 2 35 1.15 7 Cefpodoxime proxetil 3 50 1.64 8 Citalopram hydro bromide 2 60 1.97 9 Lamivudine 3 60 1.97 10 Ritanovir 3 50 1.64 11 Rosiglitazone Maleate 3 35 1.15 12 Venlafaxine 2 50 1.64

Worst case scenario- Production (A) 440 14.466

9 products wil be manufactured at any point of time out of total 12 Regular products

Campaign Products S.

No. Product Name No. of Stages

Production (TPM)

Production (TPD)

1 Acyclovir 1 1 0.033 2 Agomelatine 1 0.5 0.016 3 Alfuzosin HCl 1 1 0.033 4 Amlodipine Besylate 1 0.75 0.025 5 Clopidogrel Hydrogen sulfate 2 1 0.033 6 Dapoxetine HCl 1 0.75 0.025 7 Dorzolamide HCl 1 0.15 0.005 8 Duloxitine HCl 1 0.75 0.025 9 Eprosartan Mesylate 1 0.5 0.016

            

10 Esomeprazole Magnesium 1 1 0.033 11 Famcyclovir 1 1 0.033 12 Fosinopril Sodium 1 1 0.033 13 Glimepiride 1 1 0.033 14 Itraconazole 1 0.75 0.025 15 Lansoprazole 1 1 0.033 16 Leofloxacin 1 0.75 0.025 17 Lisinopril dihydrate 1 1 0.033 18 Montelukast sodium 1 1 0.033 19 Moxifloxacin 1 1 0.033 20 Nebivolol HCl 1 0.75 0.025 21 Olanzapine 1 1 0.033 22 Omeprazole 1 1 0.033 23 Pantoprazole Sodium 1 0.75 0.025 24 Rabeprazole Sodium 2 0.75 0.025 25 Ranolazin diHCl 1 0.5 0.016 26 Rufinamide 1 0.5 0.016 27 Sertraline Hcl 1 1 0.033 28 Sildenafil citrate 1 1 0.033 29 Topiramate 1 1 0.033 30 Valacyclovir 2 2 0.066

Worst case scenario- Production (B) 10 0.329

9 products wil be manufactured at any point of time out of total 30 Compaign products

Worst case scenario - Total Production : (A + B) 450 15

            

ANNEXURE – II: Wastewater Treatment Facilities

The effluent generated from two units mainly from process, washings, scrubbers, cooling

towers & boiler blow downs and domestic effluent. It is proposed to treat all HTDS

effluent in stripper followed by MEE and ATFD. All LTDS effluent shall be treated in

Biological treatment followed by guard ponds & marine outfall. Domestic effluents will be

treated in Sewage treatment plant (STP) & reuse for online irrigation for the development of green

belt. Total Effluent generated and mode of treatment is presented in Table A-2

Table A-2 Quantity of Effluent Generated and Mode of Treatment

Description Quantity (KLD)

Mode of Treatment

HTDS Process 381.8 Stripper followed by MEE, ATFD and Biological

Treatment, guard ponds, marine outfall. Washings 28.2 Scrubber Effluent 35.0 Total - I 445.0 LTDS Cooling Tower Blow downs

30 After primary treatment, sent to guard ponds & marine outfall

RO Reject 175 Domestic 45 Treated in Sewage treatment plant (STP), online

irrigation for green belt development Total - II 250.0 Grand Total (I+II) 695.0

            

ANNEXURE – III: Water Balance

The total water requirement will be 935 KLD 5 and same will be met by the Desalination

plant water supply. Water balance is presented in Table A-3.

Table A-6 Total Water Balance

S.No Input Quantity (KLD)

Output Quantity (KLD)

1 Process & washings 410 Process & washings Effluent 410 3 Boiler 100 Boiler Blow down-Scrubber effluents 35.0

Loss 65 4 Cooling Tower 200 Blow down 30

loss 170 5 Domestic 50 Domestic Effluent 45

Loss 5 6 RO 175 RO Reject 175

Total 935 Total 935.0

ANNEXURE – IV: Solid Waste Generation and Mode of Disposal

Solid wastes are generated from the process shall be sent to TSDF/ Cement Industries for

Co-incineration. Stripper distillate shall send to TSDF/ Cement Industries for Co-

incineration. Evaporation salts from MEE and ATFD and ETP Sludge shall be sent to

TSDF. The total solid waste generated and mode of disposal is presented in Table A-7.

Table A-7 Solid Waste Details S.No Description Quantity

(Kgs/day) Mode of Disposal/Treatment

Process 1 Organic residue 13475.7 Sent to Cement Industries/TSDF 2 Spent Carbon 2309.2 3 Evaporation salts 4039.5 Sent to TSDF 4 Process Inorganic 3812.5 Sent to TSDF

Other Solid waste 5 ETP & STP Sludge (Kgs/day) 500 Sent to TSDF 6 Detoxified Containers & Container

liners of HW and hazardous chemicals (No.s/Month)

3000 Empty drums After detoxification shall be disposed to outside agencies

7 Used oil/Waste lubricating Oil (L /Month)

300 Sent to Authorized Recyclers

8 Used Lead acid Batteries (No.s/Year)

60 To be returned to the manufacturers / dealers on buy back basis

            

ANNEXURE – V: Stack Emissions Details

The sources of air pollution from the plant are 20 TPH & 25 TPH Coal Fired boilers and

3x1165 KVA, 2x 1010 , 1x500 & 1x320 KVA DG Set capacity. The emissions from the boiler

are passed through a Bag Filters before letting out through a chimney. The emission rates

of SPM, SO2, NOx and SPM from each stack are presented in Table A-8.

Table A-8 Stack Emission Details

S. No

Stack Connected to Stack Ht (m)

Dia of stack at top(m)

Temp. of exhaust

gases (0C)

Exit Velocity (m/sec)

Pollutant Emission Rate (g/sec)

PM SO2 NOx

Boilers 1 20 TPH 40 1.2 468 24.6 0.67 6.88 2.96 2 25 TPH 42 1.25 475 28.7 0.86 8.6 3.76 DG Sets 1 1x320 KVA 4 0.1 440 4.8 0.006 0.43 0.51 2 1x500 KVA 6 0.15 443 7.5 0.01 0.67 0.8 3 2x1010 KVA 9 0.2 454 8.3 0.1 0.28 1.49 4 3x1165 KVA 10 0.2 456 8.5 0.02 1.28 1.51

HETERO DRUGS LIMITED, UNIT ‐ VI SURVEY NO. 150 (Part), 151/1, 151/2 (Part), 158/1,  NALLAMATTIPALEM VILLAGE, NAKKAPALLI MANDAL,  

VISAKHAPATNAM DISTRICT, ANDHRA PRADESH    

  

    

 

      

  

 

 

 

 

 

STUDIES AND DOCUMENTATION BY TEAM Labs and Consultants   QCI: MoE&F OM, List A‐1, S.No.25.   (An ISO 9001:2008, ISO 14001:2004 &  OHSAS 18001:2007 Certified Organization) B‐115, Annapurna Block, Aditya Enclave Ameerpet, Hyderabad‐500 038. Phone: 040‐23748 555/616, Telefax: 040‐23748666 Email: [email protected]