HES HKS meeting
description
Transcript of HES HKS meeting
![Page 1: HES HKS meeting](https://reader030.fdocuments.in/reader030/viewer/2022012904/56815e61550346895dccdeba/html5/thumbnails/1.jpg)
HES HKS meeting14/Apr/2011
T.Gogami
2/Apr/2011, Frankfurt, Germany
Lady justice
![Page 2: HES HKS meeting](https://reader030.fdocuments.in/reader030/viewer/2022012904/56815e61550346895dccdeba/html5/thumbnails/2.jpg)
Itinerary• Newport News, US (JLab)
– 2/01 Narita US
– 2/27-28 HES HKS collaboration meeting, 4th JSPS core to core meeting
– 3/11 Norfolk Washington D.C.• The Great earthquake news when I woke up!
– 3/12 Washington D.C Frankfurt• Mainz, Germany (Mainz Univ.)
– 3/17-18 KaOS meeting in Mainz• Extend to stay in Germany ( 3/214/4 )
• Darmstadt, Germany (GSI)– 3/30 – 4/4
– 4/4 Frankfurt Narita• Fukushima, Japan
– Tokyo(4/5) Fukushima(4/6)• Sendai, Japan
– Fukushima(4/11) Sendai(4/11)
Analysis (Tracking)
Analysis (Rate , Efficiency), JPS
Meeting, Inside GSI
Analysis code , Shift , cabling
![Page 3: HES HKS meeting](https://reader030.fdocuments.in/reader030/viewer/2022012904/56815e61550346895dccdeba/html5/thumbnails/3.jpg)
Contents
• KTOF TDC cut test• KDC layer rates output
![Page 4: HES HKS meeting](https://reader030.fdocuments.in/reader030/viewer/2022012904/56815e61550346895dccdeba/html5/thumbnails/4.jpg)
KDC hit wire selection code
• GREEN region Selective region• RED markers & lines Selected hit wires• BLACK markers & lines Rejected hit wires
KDC1 KDC2
![Page 5: HES HKS meeting](https://reader030.fdocuments.in/reader030/viewer/2022012904/56815e61550346895dccdeba/html5/thumbnails/5.jpg)
KTOF TDC
• Cut10000 – 50000 (current)18000 – 20500 (test)
Run 76314 for CH2 targetRun 77124 for 52Cr target
![Page 6: HES HKS meeting](https://reader030.fdocuments.in/reader030/viewer/2022012904/56815e61550346895dccdeba/html5/thumbnails/6.jpg)
Results after KTOF TDC cut
7.6 [μA] , 52Cr , 77124– After TDC cut Error– Analysis time ~20% reduction
2.0 [μA] , CH2 , 76315
![Page 7: HES HKS meeting](https://reader030.fdocuments.in/reader030/viewer/2022012904/56815e61550346895dccdeba/html5/thumbnails/7.jpg)
KTOF TDC
• Cur Region2100 – 2400 (Accidental)2600 – 2800 (signal)
Run 76314 for CH2 targetRun 77124 for 52Cr target
![Page 8: HES HKS meeting](https://reader030.fdocuments.in/reader030/viewer/2022012904/56815e61550346895dccdeba/html5/thumbnails/8.jpg)
KDC DC
Rate
Efficiency
![Page 9: HES HKS meeting](https://reader030.fdocuments.in/reader030/viewer/2022012904/56815e61550346895dccdeba/html5/thumbnails/9.jpg)
KDC Rate vs. Efficiency
• Looks two tendencies– Applied voltages ?– Threshold ?
Need to check Run sheet
![Page 10: HES HKS meeting](https://reader030.fdocuments.in/reader030/viewer/2022012904/56815e61550346895dccdeba/html5/thumbnails/10.jpg)
Summary and to do• Summary
– KTOF TDC cut• No bad effects for Number of Kaon• Analysis time is faster• Check sub peaks
– Rate vs. Efficiency of KDC• Two tendencies Check KDC applied voltage and threshold
• To do– HES
• Tracking• Efficiency, Rate
– E01-011– 授業料免除– RA– 学振– 5/6 ----- 8/1 Germany
• あと 3週間で出発!
![Page 11: HES HKS meeting](https://reader030.fdocuments.in/reader030/viewer/2022012904/56815e61550346895dccdeba/html5/thumbnails/11.jpg)
End
31/Mar/2011, Darmstadt, Germany