April 6, 1995MEMORANDUMSUBJECT: Hercules Cost Assumptions for Off site Incineration
Option, Feasibility Study for Operable Unit 2 , April 1995Vertac Superfund Site, Jacksonville, Arkansas
TO: Vertac Site Administrative Record FileFROM: Rick Ehrhart
Remedial Project Manager (6H-EA)EPA has reviewed the cost assumptions for offsite incinerationpresented by Hercules in the Operable Unit 2 Feasibility Study (OU2FS) and conclude that the costs as presented could be overstated byas much as 100 percent.The cost for offsite incineration presented in the FS is $7,515 perton of waste material to be incinerated. This figure includes sitepreparation, excavation, backfill, re-vegetation, transportation,and disposal of incineration residuals, with no specific breakdownfor each of the elements.EPA has re-evaluated what the cost for offsite incineration shouldbe based on experience with offsite incineration facilities, andexperience with conducting construction work at numerous Superfundsites. Following is EPAs cost breakdown for offsite incinerationby element. (Note: Construction cost elements, i . e . dirt work, etc,used by EPA in this estimate are consistent with estimates providedto EPA by Hercules in previous correspondence).EPA EstimateIncineration cost at APTUS - $3,800/ton
(includes disposal of the residuals)Site Prep $35/tonExcavation $35/tonBackfill $35/tonTransportation $37/tonTotal $3,942/ton
Hercules EstimateSite PrepExcavationBackfillRevegetateTransportat ionOffsite IncinerationOffsite DisposalTotal $7,515/ton
In addition, 55 percent operating costs will be added on top of theincineration cost for both the EPA estimate and the Herculesestimate to take care of construction management, engineeringservices, profit, overhead, contingency, etc.Hercules has recently signed a contract with APTUS, an off sitehazardous waste incineration facility to burn dioxin contaminatedmaterial for $4,000 per ton. This cost includes disposal of theresiduals. EPA has a similar contract with APTUS to incinerateapproximately 3,000 drums of dioxin waste from the Vertac site.Attached is a quick comparison of the costs estimated to incinerateapproximately 1890 tons of soils using cost assumptions from the FSand cost assumptions from EPA. The FS costs for off siteincineration are approximately twice that projected by EPA.For the purpose of the OU2 proposed plan EPA will use its own costassumptions to address potential off site incineration costs.attachments 1) OU2 FS Volume and Cost Nomograph
2) Hercules off site incineration cost estimate(elements from the OU2 FS)
3) EPA offsite incineration cost estimate4) Vertac OU2 Soil Grids Spreadsheet
COST ASSUMPTIONSPROPOSED OPTION
ONSITE SOILS - CONSOLIDATION ONSITE
ASSUMPTIONS: Landfill 17,059 cy of soil with concentrationbetween 260 ppb and 5 ppb 2 , 3 , 7 , 8 TCDD
1)
2)
3)
4)5)
SITE PREPARATION (lump)
a Mobilizationb Construct staging/support areasc Temporary haul roadsCONSTRUCTION/MODIFICATIONS TO CCU
a Area prepb Grading and sub-base prepc Berms and anchor trenchd Secondary linere Leachate collection systemf Primary linerg CappingCOST ($80/cy * 17,059 cy)
SURFACE SOIL CONSOLIDATION
Site preparationExcavationMaterial transfer to CCUSampling and analysisPlacement and consolidation into CCUInterim cover
COST ($135/cy * 17,059 cy)MONITORING DURING EXCAVATION/CONSOLIDATIONSITE RESTORATION/DEMOBILIZATION
a Regrading/seeding excavationsb Erosion and sediment controls
$50,000
$80/cy
$1,364,720
$135/cy
$2, 3 0 2 , 9 6 5
75, 000/luinp$25,000/lump
SUBTOTAL $3.817.685
<ytON8ITE SOILS - CONSOLIDATION ONSITB (cont) <^CO
6) CONSTRUCTION MANAGEMENT 0.10 % $381,769 CM07) ENGINEERING AND TECH SERVICES 0.15 % $572,653 Q
8) OVERHEAD AND PROFIT 0.15 % $572,6539) CONTINGENCY 0.15 % $572,653
TOTAL $5,917,413
CONTAINERIZED (BAGGED RESIDENTIAL) SOILS - CONSOLIDATION ON8ITECOC^CO
Landfill bagged soils removed from residential ̂ASSUMPTIONS:
1)
yards approximately 2,770 cyCONSTRUCTION/MODIFICATIONS TO CCU $80/cy
00
2)a Material transfer tob Placement and consolc Interim cover
3)
4)
5)
6 )
a Area prepb Grading ac Benns andd Secondarye Leachatef Primary 1g CappingCOSTCONTAINERIZED
COST
SUBTOTAL
CONSTRUCTION M
ENGINEERING AND TECH SERV
OVERHEAD AND PROFIT
CONTINGENCY
TOTAL
i
nd sub-baanchor tlinercollectioiner
($80/cy(BAGGED RESID) SOIL CONSOLIDATION
($20/cy
ANAGEMENT
$429.350
seren
*
*
prepnchsystem
2,770 cy)
ecuidation into CCU
2,770 cy)
0.10 %ICES 0.15 %
0.15 %
0.15 %
$221,600
$20/cy
$55,400
$277.000
$27,700
$41,550
$41,550
$41,550
OFF8ITE SOILS - CONSOLIDATION ON8ITE
ASSUMPTIONS: Landfill approximately 4,100 cy ofBranch Creek flood plain.
1) CONSTRUCTION/MODIFICATIONS TO CCU
a Area prepb Grading and sub-base prepc Berms and anchor trenchd Secondary linere Leachate collection systemf Primary linerg CappingCOST ($80/cy * 4,100 cy)
2) SURFACE SOIL CONSOLIDATION
a Site preparationb Excavationc Material transfer to CCUd Sampling and analysise Placement and consolidation into CCUf Interim coverCOST ($135/cy * 4,100)SUBTOTAL
3) CONSTRUCTION MANAGEMENT 0.10 %
4) ENGINEERING AND TECH SERVICES 0.15 %
5) OVERHEAD AND PROFIT 0.15 %
6 ) CONTINGENCY 0.15 %
TOTAL
^<yssoil from Rocky "
0$80/cy °
$328,000
$135/cy
$553,500
$881.500
$88,150
$132,225
$132,225
$132,225
$1,366.325
^OFFSITE INCINERATION DIOXIN SOILS (HERCULES ESTIMATE) ^
dASSUMPTIONS: Incinerate 1260 cy (1890 tons) of soil between 2800 ̂ppb and 261 ppb q^
1) OFFSITE INCINERATION OF OIOZIN SOILS $7,515/ton
a Site preparationb Excavationc Backfilld Revegetatee Transportationf Offsite incinerationg Offsite disposalCOST ($7,515/ton * 1,260 cy * 1.5 tons/cy)SUBTOTAL $14,203.350
2) CONSTRUCTION MANAGEMENT 0.10 % $1,420,335
3) ENGINEERING AND TECH SERVICES 0.15 % $2,130,503
4) OVERHEAD AND PROFIT 0.15 % $2,130,503
5) CONTINGENCY 0.15 % $2,130,503
TOTAL $22.015.194
0^OFFSITE INCINERATION DIOXIN SOILS (ERA ESTIMATE) <0<?31ASSUMPTIONS: Incinerate 1260 cy (1890 tons) of soil between 2800 0
ppb and 261 ppb 01) OFFSITE INCIN OF DIOXIM CONTAMINATED SOILS $3,942/ton
COST ($3,942/ton * 1,260 cy * 1.5 tons/cy)Site Prep $35/tonExcavation $35/tonBackfill $35/tonTransportation $37/tonIncineration $3,800/tonTotal $3,942/tonSUBTOTAL S7.450.380
2) CONSTRUCTION MANAGEMENT 0.10 % $745,038
3) ENGINEERING AND TECH SERVICES 0.15 % $1,117,557
4) OVERHEAD AND PROFIT 0.15 % $1,117,557
5) CONTINGENCY 0.15 % $1,117,557
TOTAL Sll.548.089
OFFi
ASS
1)
COST ($60/cy * 1,400 cy)
2)
3)
4)
5)
6)
BITE INCINERATION TCB SOILS
(JMPTIONS: Excavate 1,400 cy TCB co
TCB SPILL RELATED MATERIALS
a Site prepb Excavationc Backfilld Revegetate
OPFSZTE INCIN OF TCB SPILL RELATED
a Material transfer to offsiteb Sampling and analysisc Offsite incineration
COST ($l,400/ton * 1,400 cy * 1.
SUBTOTAL
CONSTRUCTION MANAGEMENT
ENGINEERING AND TECH SERVICES
OVERHEAD AND PROFIT
CONTINGENCY
TOTAL
ntaminal
MATERIALS
incin
5 tons/cy)
0.10 %
0.15 %
0.15 %
0.15 %
bed
$453,600
$453,600
$453,600
S4.687.200
soils
$60/cy
$84,000
$l,400/ton
$2,940,000
$3,024,000
$302,400
!>^WGSI00
Volume and Cost Nomographs
Overview
These nomographs arc designed to enable estimation of material quantities, and costassociated with combinations of TCDD action levels and technologies other than thosepresented in the detailed analysis (Section 5) of this FS. The following steps should befollowed for using these nomographs and to estimate an order of magnitude cost for aparticular remedial technology as a function of volume:
1. Determine the quantity of materials subject to remediation for each technologyby using Figures A-l and A-2.
2. Using the quantities from Step 1, use Figures A-3, A-4, and A-5 to determinethe cost associated with incineration and desorption/chemical treatment.
3. Using the quantities from Step 1, use Figures A-6, A-7, and A-8 to determinethe cost associated with consolidation and covering.
4. Add "fixed" costs associated with TCB spill-related materials, containerizedsoils consolidation, site preparation, site restoration, and monitoring duringimplementation. These "fixed" costs are as follows:
TCB spill-related materials: $4,400,000 (if desorption is not included)$3,500,000 (if desorption is included)
Containerized soil: $410,000Site preparation: $70,000Site restoration: $40,000Monitoring: $110,000
An example using the nomographs is provided below.
The order of magnitude estimated costs and quantities derived from the nomographs shouldbe used for comparative purposes only. FS-level detail, as presented in the FS cost tables,requires consideration of all site-specific factors, and should be used if additional remediationscenarios are considered.
Example
The following remedial actions are considered under this example problem:
• Covering surface soils exceeding 35 ppb but less than 350 ppb TCDD.• Consolidation of surface soils exceeding 350 ppb but less than 2,000 ppb
TCDD.• Onsite incineration of surface soils exceeding 2,000 ppb TCDD.
1. The quantities associated with this example are as follows:Covering: 150,000 sf (35 ppb from Fig A-l)
25.000 sf (350 ppb from Fig A-2)125,000 sf
Consolidation: 1,000 cy (350 ppb from Fig A-2)200 cy (2,000 ppb from Fig A-2)800 cy
Onsite Incineration: 200 cy (2,000 ppb from Fig A-2)
2. The estimated cost association with onsite incineration is as follows:
Onsite Incineration: $3.0M (200 cy from Fig A-3)
3. The estimated cost associated with covering and consolidation is as follows:
Covering: S0.4M (125,000 sf from Fig A-8)
Consolidation: $0.25M (800 cy from Fig A-6)
4. The total estimated associated with this example is:
Covering: $0.4MConsolidation: S0.25MIncineration: $3.0M"Fixed" Costs: S5.03M
TOTAL: $8.7M
Figure A-4Treatment Technology Cost as a Function of Volume
0 500 1,000 % 1,500 2,000 2,500 3,000 3,500 4,000Vo lime (Cubic Yards)
NOTE: Unit costs include a 45% markup for construction management, engineering services, overhead and profit, and contingency.
G02330ir.S-Ai'P.XLWIQutnIlty Coil Gnph Charl 2
FindM March IMS
VERTAC OU-2 SOiL GRIDS
419470152417418558188471164153151427189192534431575420162545436546416532573460459435158537422458461421184574161446469542400485464466163425467
|| TCDD11 Cumulative
————H Surface
2799.891153.15744.04663.46514.97430.00291.46261.50146.43129.61119.65118.91117.00108.89104.66101.4698.0087.8084.4977.4372.1670.46683062.2361.0057.1247.7044.5144.3742.4042.3037.6137.4036.5134.8234.0033.1231.6228.5628.4227.6327.1626.1725.2924.4124.0823.52
194378489653819997
1,0921.2581,2751,4341,6081,7981,9762,1252,3092,4842,6672,8283,0633,2063,3963,5713,6813,8614,0484,2524,4814,6404,6494,8194,9455,0125,1855,3375,5305,6985.7976,0216,4476,6536,8297,0547,2007,3327,4057.5097,704
^W
lulative I^H^U——
5^2910,20013,21417,62122,11526,90629,48733,96834,43638,72943,42048,54453,35957,37262,34767,05972,00776,36682,68886,56291,68096,42299,380
104,242109,301114,792120,975125,289125,518130,115133,513135,312140,006144,091149,317153,858156,525162,578174,057179,624184,386190,454194,413197,960199,930202,744208,019
52294971301344074494479125824481468
4292469251244815401349754712494843596322387451184743295848625059549161834314229
459733981799469540845227454026676053
1147955674762606739593547197028145275
COCM00
TTBRCY.WK3 AJL 02/15/95
VERTAC OU.2 SOIL GRIDS
207428452433468536474429448424454426535579415473173430475432548580157197197563444538495445493456476451450549401208463478477186480406578465434
23.1523.0622.8922.6222.2520.2419.5618.8418.3917.9217.5717.56173717.0016.5316.4016.2616.2215.7115.1815.0015.0014.3714.2014.2014.0013.5412.7511.3110.7310.6710.6610.4510.2510.059.909.659.589.499.008.868.568.518.117.907.567.33
7.8188,0118,1288,3028,9069,0849,2659,4509,654
10,07110,26610,36210,54210,63510,76410,95311,12011,24311.39211,56611,59711,75011.76311,91511,92911,96012,05312,23512,37912,53712,68212,88213,05413,22913.419
211.096216,305219,448224,146240,463245,263250,152255,156260,661271,924277,175279,764284,623287,142290,635295,743300,246303,573307,595312,287313,115317,252317,593321,709322,094322,926325,421330,346334,233338,488342,412347,825352,467357,180362.301
3077520931424698
163184799488950045506
112635251258948592520349351084503332640234692828
4138341
4116385832
249549253888425439245413464247135121828
48474175672548004479542956094248283340834639
TEERCY.WK3 AJL
VERTAC W-2 SOIL GRIPS
149453229440533457529202438198499203
7.287.207.027.016.906.836.806.656.566.435.965.55
449174271577572559462437482150547442172441187412802211447819455439541820488402272414561947281562144490803
5.535.485.435.305.204.904.844.824.804.684.534.474.404.334.254.244.124.074.053.933.893.513.483.333.323.303.193.133.103.103.043.002.992.882.87
TEERCY.WK3 AJL
VERTAC OU-2 SOIL GRIDS
550201282491551544498487539543410155180407159494443501
2.802.772.772.722.712.702.592.502.432.332.312.282.232.192.182.162.012.00
576211902201751774114814921541914232191568
176171081601474044865644832214137
170178
2.001.931.911.911.901.901.861.791.781.751.741.731.721.701.661.641.631.611.611.591.541.521.501.491.421.331.321.311.31
TIERCY.WK3 AJL
VERTAC OU-2 SOIL GRIDS
51255714640319627080414848454040826827322
81716619957181548940527450056514520018521318280556816980118185
129265526212581139230570195525528128
1.301.301.291.291.261.221.221.181.161.151.141.081.081.071.061.001.000.990.970.940.910.890.890.890.870.870.860.860.830.800.780.770.760.740.720.710.680.660.650.650.630.620.600.560.560.560.55
TCDDCumulative
SurfaceC Y• i.
Cumoiaitve H^^H^^H
35994506627533934339032821992236154664691436454191586476711624600
2784916971
474142865483
1379747562570385
392560981987275046932450281322642988405337739198520733905625314841894300
52728166123152
TIERCY.WK3 AJL 02/15/95
VERTAC OU-2 SOIL GRIDS
210280126194409522906908910919926927939940941942943949
2013019350681617180781381826926755618381027556656980
254250123125510127504
1234
0.550.550.510.510.510.510.500.500.500.500.500.500.500.500.500.500.500.500.490.480.480.480.470.450.450.440.440.430.410.400.390.390.380.380.380.370.370.350.340.330.330310.310.300.300.300.30
TCDDCumulative
Surface Cumulative j^^ffl^^^H
42815340350127754384
38266100059951
10002100058427
100059951
1000510005100051000510007405963463310
3926611533542206
388013045640532046366901107449944758499949634763475949765008
272402299
137644098459347394353
TIERCY.WK3 AJL 02/15/95
VERTAC OU-2 SOIL GRIDS
569
1011121314151618192324252627282930313233343536373839404142434445464748495052535455565758
0300.300.300300300300300300300.300.300.300.300.300.300.300.300.300.300.300.300.300.300.300.300.300.300.300.300.300.300.300.300.300.300.300.300.300.300.300.300.300.300.300.300.300.30
TCDDCumulative
Surface Cumulative !B̂ B||HH|
43097450500650045007480248064609448343895010500442015315528752615013500550355035501457434452502350115058501119535019501350265036501350136065501850134985501850185004501350085014500350365036
T1ERCY.WK3 AJL
VERTAC OU.2 SOIL GRIDS
626364656667686970717273747576777879818283848687888990919293949596979899100101102103104105
0.300300.300.300300300.300300300300.300.300.300300300300.300.300.300.300.300.300.300.300300.300.300.300.300.300.300.300.300.300.300.300.300300.300.300.300.30
321651405018500849905018534949184940490849184265308849184929491949184964372749083114146152235564624641057993490065132639291929403926282682277700475240043836401443255021
00ef9w<^00
112113114115120
0.300.300300300.30
773397955059744697295392
TIERCY.WK3 AJL 02/15/95
VERTAC OU-2 SOIL GRIDS
121122124131132133134140167168206209214215216217218222223224225226227248249251252253255256257258259260262264266276278524806808809811812814496
0.30030OJO0300.300.300300.30OJO0.300.300.30OJO0.300.300.300.300.300.300.300.30OJO0.300.300.300.300.300.300.300.300.300.300.300.300.300.300.300.300.300.300.300.300.300.30OJOOJO0.29
48115002498445835120520952991044253534501983493645405088466249744163426244163713281139274251515749394811496850865032516948334307349620444796293554855182656
338131861823841002719758
6159
TIERCY.WK3 AJL 02/15/95
VERTAC OU-2 SOIL GRIDS
497523472505513560514511521515517519502527263509520552479503553582507508516518555554567
0.290.290.280.270.270.250.230.220.190.180.170.170.160.160.140.120.120.110.060.060.060.060.040.040.040.040.040.020.00
[ TCDDCumulative
Surface Cumulative
4902443114806
24861297774883
37554223704011938944208263200519830268632840
392194469248815163894851253275
3992540316382499528464952104834
TD5SCY.WK3 AJL 02/15/95