MWH Engineering - Guri Project Lessons
Slide 2
Preparing Venezuela for the 21st Century
Guri – 10,000 MW Caroni River The Guri Hydroelectric complex provides the most economical power in the world. Owned by Edelca, a subsidiary of CVG.
CORPORACION VENEZOLANA DE GUAYANA CVG, The Venezuelan Guayana Corporation was created by the Venezuelan government to develop Guayana for the Venezuelan people.
Gravity Dam: Deflection 22 mm Seepage 10 litres per second
![Page 3: Henrique Perez Projects Guri Dam](https://reader033.fdocuments.in/reader033/viewer/2022042602/55900a351a28ab39218b45d2/html5/thumbnails/3.jpg)
MWH Engineering - Guri Project Lessons
Slide 3
Staged Construction
1980 1986
1982
![Page 4: Henrique Perez Projects Guri Dam](https://reader033.fdocuments.in/reader033/viewer/2022042602/55900a351a28ab39218b45d2/html5/thumbnails/4.jpg)
MWH Engineering - Guri Project Lessons
Slide 4
52 m Guri Dam Raising
Jan Veltrop R.P. Wengler Dr. W.Y. Shieh Dr. C.H. Yeh
1984 Monolith width: First stage 21 m Final stage 28 m
![Page 5: Henrique Perez Projects Guri Dam](https://reader033.fdocuments.in/reader033/viewer/2022042602/55900a351a28ab39218b45d2/html5/thumbnails/5.jpg)
MWH Engineering - Guri Project Lessons
Slide 5
52 m Guri Dam Raising
![Page 6: Henrique Perez Projects Guri Dam](https://reader033.fdocuments.in/reader033/viewer/2022042602/55900a351a28ab39218b45d2/html5/thumbnails/6.jpg)
MWH Engineering - Guri Project Lessons
Slide 6
52 m Guri Dam Raising
Investigate interaction of old & new dams using finite element analysis
Temperature control of new concrete
ICOLD Bulletin
Dr. W.Y. Shieh Dr. C.H. Yeh
![Page 7: Henrique Perez Projects Guri Dam](https://reader033.fdocuments.in/reader033/viewer/2022042602/55900a351a28ab39218b45d2/html5/thumbnails/7.jpg)
MWH Engineering - Guri Project Lessons
Slide 7
Spillway Aeration
8% air in boundary layer protects against cavitation
Dr. C.Y. Wei Dr. V. Semenkoy
![Page 8: Henrique Perez Projects Guri Dam](https://reader033.fdocuments.in/reader033/viewer/2022042602/55900a351a28ab39218b45d2/html5/thumbnails/8.jpg)
MWH Engineering - Guri Project Lessons
Slide 8
Intake Design – Record Roller Gates
Intake
Hydraulic Gate Hoist
Plan
Roller Gate Valve
Dr. J.E. Lindell I.T. Laczo
![Page 9: Henrique Perez Projects Guri Dam](https://reader033.fdocuments.in/reader033/viewer/2022042602/55900a351a28ab39218b45d2/html5/thumbnails/9.jpg)
MWH Engineering - Guri Project Lessons
Slide 9
Ten 700 MW units Hall 25.25 m wide 364 m long
Two 700 ton cranes Single Phase 268 MVA transformer 800 kv transmission lines
Record Powerhouse
operator
![Page 10: Henrique Perez Projects Guri Dam](https://reader033.fdocuments.in/reader033/viewer/2022042602/55900a351a28ab39218b45d2/html5/thumbnails/10.jpg)
MWH Engineering - Guri Project Lessons
Slide 10
Record Turbine
Cast stainless steel Turbine Rated
700 MW
W.E. Larson, R.W. Fazalare J. Sun, R. Israelsen
![Page 11: Henrique Perez Projects Guri Dam](https://reader033.fdocuments.in/reader033/viewer/2022042602/55900a351a28ab39218b45d2/html5/thumbnails/11.jpg)
MWH Engineering - Guri Project Lessons
Slide 11
Record Generator 800 MVA
Machine Hall is 28 m wide. Two 700 ton bridge cranes lift 1200 ton rotor. O. Deniz
1200 ton rotor
![Page 12: Henrique Perez Projects Guri Dam](https://reader033.fdocuments.in/reader033/viewer/2022042602/55900a351a28ab39218b45d2/html5/thumbnails/12.jpg)
MWH Engineering - Guri Project Lessons
Slide 12
800 kV Transmission Line
4 conductor bundles
![Page 13: Henrique Perez Projects Guri Dam](https://reader033.fdocuments.in/reader033/viewer/2022042602/55900a351a28ab39218b45d2/html5/thumbnails/13.jpg)
MWH Engineering - Guri Project Lessons
Slide 13
Guri Embankment Dam
![Page 14: Henrique Perez Projects Guri Dam](https://reader033.fdocuments.in/reader033/viewer/2022042602/55900a351a28ab39218b45d2/html5/thumbnails/14.jpg)
MWH Engineering - Guri Project Lessons
Slide 14
Guri Embankment Dam
![Page 15: Henrique Perez Projects Guri Dam](https://reader033.fdocuments.in/reader033/viewer/2022042602/55900a351a28ab39218b45d2/html5/thumbnails/15.jpg)
MWH Engineering - Guri Project Lessons
Slide 15
Guri Embankment Dam