Heliportable Drilling in the 21st CenturyWhy Now?
Current
Whats New?
Heli-drill System
21st Century Heli-Rigs
Heliportable Drilling in the 21st Century
-
Why Now?Shortening Winter Drilling Season in the North
Heliportable Drilling in the 21st Century
-
Heliportable Drilling in the 21st Century
from Alaska DNR Tundra Travel Modeling Project; updates from L. Byrne, DNR, Natural Resource Specialist
-
The conventional (high cost) ice road access season has been reduced:
e.g.: the Alaska winter drilling season has been reduced from 200 days to 100 days.
The short winter drilling season means:
an efficient drilling program (1 well per rig per year).
long wells can not complete in one season.
Heliportable drilling provide non-ice access.
Heliportable Drilling in the 21st Century
WHY: Shortening Winter Drilling Season in the North
-
Heliportable Drilling in the 21st Century
WHY: Shortening Winter Drilling Season in the North
-
Current (and past) Heliportable Drilling
Heliportable Drilling in the 21st Century
-
Helicopter Supported Northern DrillingHeliportable Drilling in the 21st Century
Barge & Heli supported summer drilling, McKenzie Delta, 1970s
-
Conventional Heliportable DrillingHeliportable Drilling in the 21st Century
Heliportable DrillingPapua New Guinea, 2005-07
-
configured for available helicopters
4,000 kg to 10,000 kg loads
Current rigs: 200 to 120 loads
Pumps: 2 x PZ9 (13,000 kg ea) = 8 x PHA (4,000 kg ea)
Rig-up: 30 to 50 days (non Arctic conditions)
Heliportable Drilling in the 21st Century
Conventional Heliportable Drilling
10,000 kg8,600 kg4,000 kg
-
Whitehorse, May 5, 2006
WHATS NEW? : The Mi26T Enabler
Mi26T Russian super heavy lift helicopter, leased to Airborne Energy Solutions
Internal dimensions & lifting capacities = C-130 Hercules:
20 tonne, 44,000 lbs
2 x capacity of a Chinook or Sky Crane
Heliportable Drilling in the 21st Century
-
Mi26T Heavy Lift Helicopter
Fuel Fuel Consumption: 3000 l/hr Internal Tanks: 12,770 l Ferry Tanks: 15,2000 l
Range (maximum) 1,800 km (1,120 miles) with Ferry TanksCrew 2 Pilots, 1 Navigator, 1 Flight Engineer, 1 or 2 LoadmasterIFR Capability Full avionics and navigation package, Doppler weather radar, integrated
autopilot, de-icing capability; provides for operations in all-weather conditions.
Country of Origin Russia, MIL Helicopter Plant, introduced in 1985, +/- 80 in serviceRotors Main: 8 blades, 32 m (105 ft) Tail: 5 blades, 7.6 m (25 ft)
Fuselage 33.5 m (110 ft) long x 3.7 (12.2 ft) wide x 8.1 m (25 ft) high
Length 40 m (131 ft), rotors turning
Cargo Compartment 12 m (39.4 ft) long x 3.3 m (10.8 ft) wide x 3.2 to 2.9 m (10.5 to 9.5 ft) highInternal Hoist Capacity: 5,600 kg (12,400 lb) Rear Clamshell Doors and loading ramp
Weights (maximum) Payload: 20,000 kg (44,000 lb) Takeoff: 56,000 kg (124,000 lb)
Engines 2 x Lotarev D-136 Turboshart, 745 kw (11,400 shp)
Airspeed Max: 295 km/hr (184 mph) Cruising: 255 km/hr (145 mph)With External Load: 145 to 225 km / hr (90 to 140 mph)
Service Ceiling 6,500 m (21,000 ft)
Mi26T Operating DataHeliportable Drilling in the 21st Century
-
Mi26T can lift conventional oilfield equipment (17,000 kg, 37,500 lb loads)
Conventional rigs and equipment (slightly modified) can be Mi26T heliportable.
Drilling performance is not compromised by having to use specialized light equipment.
Emergency equipment or equipment needed to address unforeseen well conditions can be moved to the wellsite rapidly with minimum modifications.
Rigs and equipment can be used conventionally when not in Heli mode.
Heliportable Drilling in the 21st Century
-
Staging: at end of road access Truck load/unload Heli load drop/pick-up pad Mi26T Base
Bell 212 Crew Support
Mi26T: sling loads: Rig, Universal Basket, Fuel, Cuttings
Heli-drill System
Staging
Offshore Project: logistics and planning
Heliportable Drilling in the 21st Century
Wellsite: Heliportable Construction, over-summer pads (insulated ice pads?) Heliportable: rig & auxiliary equipment, camp, bedtrucks, crane logging & cementing units cement, casing, mud, storage
-
20 x 20 Heli
Load Pad
Main RigPipeArea
Prevailing Winds
Camp Support / Sewage Treatment
Wellsite Trailers
25m
Typical Wellsite Plan Heli Mode DrillingNo Wellsite Camp
34m x 60m
100 m
100m x 90m
Heliportable Drilling in the 21st Century
Wellsite:
Heli-load pad 100 m from rig area
allows loads to be dropped off without affecting rig operations
Heli-bedtrucks move loads to/from rig area
-
Heli-drill SystemHeliportable Drilling in the 21st Century
Heli-bedtruck: 385, 2 loads Heli-crane: 75 Ton RTC, 4 loads
Universal Basket
-
Heliportable Drilling in the 21st Century
21st Century Heli-Rigs
Rig 119H: 3200m converted mechanical
Rig 103AC, 106E: 3500m PACE Arctic
Rig 99AC, 105E: 4500m PACE Arctic
-
Rig Depth Rating Hook LoadRig 119H
Mechanical Teli-doubleConversion
3200 m10,500 ft
120,000 daN275,000 lb
155,000 daN350,000 lb
222,000 daN500,000 lb
Rig 106E, Rig 103ACPACE Teli-double
Arctic
3500 m11,500 ft
Rig 105E, Rig 99ACPACE Bootstrap Triple
Arctic
4500 m15,000 ft
21st Century Heli-RigsHeliportable Drilling in the 21st Century
-
Rig Top Drive Rig PowerRig 119H 175 Ton
400 HpDrawworks
630 kW, 850 HpRig 106E, Rig 103AC 175 Ton
400 Hp3 x Gensets
2365 kW,3500 HpRig 105E, Rig 99AC 275 Ton
600 Hp4 x Gensets
3275 kW, 4900 Hp
Heliportable Drilling in the 21st Century
21st Century Heli-Rigs
-
Heliportable Drilling in the 21st Century
Rig Mud Pumps Mud VolumeRig 119H 2 x GD PZ 8
560 kW ea750 Hp ea
75 m3470 bbl
Rig 106E, Rig 103AC 2 x GD PZ9860 kW ea1150 Hp ea
95 m3600 bbl
Rig 105E, Rig 99AC 2 x GD PZ9 140 m3870 bbl
21st Century Heli-Rigs
-
Heliportable Drilling in the 21st Century
Footprint LoadsHeli Truck
Rig 119H 56 m x 21m 185 ft x 70 ft
33 19
Rig 106E, Rig 103AC 56 m x 21m185 ft x 70 ft
58 46
Rig 105E, Rig 99AC 56 m x 24m185 ft x 80 ft
68 55
Rig
21st Century Heli-Rigs
-
Heliportable Drilling in the 21st Century
Rig 119H converted 3200m mechanical teli-double sub and mast split from 2 truck loads to 8 heli loads
3 building split (eg. PZ8 pumps split into pump and
motor)
19 truck loads vs 33 heli loads
Heli loads re-pinned for conventional truck moves
-
Heliportable Drilling in the 21st Century
Rig 106E, Rig 103AC 3500m, Arctic, Teli-double
new, purpose built, programmable AC PACE
cold service steel, 75 knot winds
insulated skids, ceilings, walls, with weather seals and noise absorption
heat recovery, EPA rated Tier 2 (low emission) engines
enclosed, insulated Pipe Shed & V door with heater
small footprint, 3 tier center section, motors on top of pumps
-
Heliportable Drilling in the 21st Century
Rig 106E, Rig 103AC
-
Heliportable Drilling in the 21st Century
Rig 106E, Rig 103AC
-
Heliportable Drilling in the 21st Century
Rig 106E, Rig 103AC
-
Heliportable Drilling in the 21st Century
Rig 105E, Rig 99AC 4500m, Arctic, Bootstrap Triple
Arctic as per Rigs 103AC
222,000 daN; 500,000 lb Hook Load
275 Ton, 600 Hp Top Drive
4 x Gensets, 3275 kW; 4900 Hp
-
Heliportable Drilling in the 21st Century
Rig 105E, Rig 99AC
-
Heliportable Drilling in the 21st Century
Whats Next?
Rig 106E, 105E:
Alaska, light load configuration
Heli next year?
Rig 119H, 103AC, 99AC:
Conventional
Wait on Mackenzie pipeline & activity in the NWT?