Engineer Exceptionally Capable
Project TeamsFebruary 2012
![Page 2: Heise cusimano](https://reader035.fdocuments.in/reader035/viewer/2022081514/555e7d5dd8b42abd468b48de/html5/thumbnails/2.jpg)
2
Engineered organizational capability produces predictable results
• Organizational capability doesn’t just happen
• Design a more predictable organization
• Rehearse the team, measure and adjust
• Case study
• Question and answer
The new reality
![Page 3: Heise cusimano](https://reader035.fdocuments.in/reader035/viewer/2022081514/555e7d5dd8b42abd468b48de/html5/thumbnails/3.jpg)
3
Where have we invested in predictability?State of the industry
People
Process Technology$ $
Complex Variable
Organizational capability is the largest single opportunity to
improve predictability
![Page 4: Heise cusimano](https://reader035.fdocuments.in/reader035/viewer/2022081514/555e7d5dd8b42abd468b48de/html5/thumbnails/4.jpg)
4
Creating the right conditions improves predictability
Misconception #1
Best Practices
CapabilityHappensBenchmarks
Experienced People
Organizational capability doesn’t just happen – there is no cause and effect
The reality
![Page 5: Heise cusimano](https://reader035.fdocuments.in/reader035/viewer/2022081514/555e7d5dd8b42abd468b48de/html5/thumbnails/5.jpg)
5
“We get it about 90% right”
• Every project and team is different enough
• Every work requirement that isn’t matched by a capability incurs a 15% productivity penalty
Misconception #2
Who shows up this time?
It’s typically about 60% rightThe reality
![Page 6: Heise cusimano](https://reader035.fdocuments.in/reader035/viewer/2022081514/555e7d5dd8b42abd468b48de/html5/thumbnails/6.jpg)
6
We can fix the other 10% on the fly
• Failure is attributed to individuals or sub-teams
• Continual reworking is accepted as inevitable
• Exchanging people for others “more qualified” is expected
Misconception #3
People failures are, more often than not, design failures
The reality
![Page 7: Heise cusimano](https://reader035.fdocuments.in/reader035/viewer/2022081514/555e7d5dd8b42abd468b48de/html5/thumbnails/7.jpg)
7
Engineer organizational capabilityA new reality
Match the Organization to the
Work
Measure and Adjust
Rehearse the Team and Learn
• Understand gaps and mismatches
• Design for an uninterrupted flow of work
• Conference room pilots
• Computer simulations
• Project phase transitions
• Disruptive events and conditions
![Page 8: Heise cusimano](https://reader035.fdocuments.in/reader035/viewer/2022081514/555e7d5dd8b42abd468b48de/html5/thumbnails/8.jpg)
8
Rehearsals, conference room pilots and table top demonstrations
• Good for single business processes
• Anticipate and prepare
• Respond rather than react
• Develop and test solutions to known or likely failures
Real time simulation
![Page 9: Heise cusimano](https://reader035.fdocuments.in/reader035/viewer/2022081514/555e7d5dd8b42abd468b48de/html5/thumbnails/9.jpg)
9
Computer simulation of complex organization behavior
• Apply to entire team and project scope
• Design prior to execution
• Adjust to adverse conditions and test solutions
• Identify unknown risks and weaknesses
Non-real time simulation
![Page 10: Heise cusimano](https://reader035.fdocuments.in/reader035/viewer/2022081514/555e7d5dd8b42abd468b48de/html5/thumbnails/10.jpg)
10
A ten-minute rehearsal prior to surgery dramatically improved predictability
• Wrong site surgeries eliminated
• Improved patient recovery rates
• Nursing turnover rate decreased from 23 percent to 7 percent
• Positive perceptions of teamwork doubled
Kaiser Permanente improvement program
![Page 11: Heise cusimano](https://reader035.fdocuments.in/reader035/viewer/2022081514/555e7d5dd8b42abd468b48de/html5/thumbnails/11.jpg)
11
Practical simulation methods are easy to apply and produce useful insights
SimVision® technology and methods
ROI
Quality and Safety
Schedule Variability
Organization Culture andLeadership
Work Processes
People, Skills, Experience
![Page 12: Heise cusimano](https://reader035.fdocuments.in/reader035/viewer/2022081514/555e7d5dd8b42abd468b48de/html5/thumbnails/12.jpg)
12
Compare three possible organization strategies for a new project
• Use a high-level work plan and schedule as a test bed
• Simulate three different owner-contractor relationships– Compare overall project outcomes– Quantify quality risks
• Look for advantages associated with various conditions and contractual arrangements
Informed project design
![Page 13: Heise cusimano](https://reader035.fdocuments.in/reader035/viewer/2022081514/555e7d5dd8b42abd468b48de/html5/thumbnails/13.jpg)
13
Each strategy is intended to enable specific outcomes
Quantify the expectations
Best Player
• Project team is a hybrid of Owner and Contractor personnel• Staffing of each function is determined by core experience• Take maximum advantage of available expertise• Intended to be lowest-cost
Audit
• Contractor staffs project functions• Owner team reactively audits performance and seeks
corrections and improvements • Intended to be highest-quality
Dual Player
• Contractor staffs project functions• Owner team works proactively to remove barriers, prevent
delays and enable superior outcomes• Intended to minimize schedule variance
![Page 14: Heise cusimano](https://reader035.fdocuments.in/reader035/viewer/2022081514/555e7d5dd8b42abd468b48de/html5/thumbnails/14.jpg)
14
Audit and Dual Player have a 20% to 50% higher staff cost than Best Player
On this project
• Both require more Owner-Contractor coordination
• Audit creates more rework to be performed by the Contractor
• Dual Player facilitates the Contractor’s job and proactively avoids rework
![Page 15: Heise cusimano](https://reader035.fdocuments.in/reader035/viewer/2022081514/555e7d5dd8b42abd468b48de/html5/thumbnails/15.jpg)
15
Audit and Dual Player impact staff cost and predictability in different ways
On this project
• Audits increase Contractor costs and uncertainty
• Dual Player makes the Contractor’s work more predictable and about 25% less-costly
• Owner adds staff in both cases
+/- 3 sigma
![Page 16: Heise cusimano](https://reader035.fdocuments.in/reader035/viewer/2022081514/555e7d5dd8b42abd468b48de/html5/thumbnails/16.jpg)
16
Audit makes the schedule less predictable
On this project
• The retrospective nature of Audit creates significant schedule growth and uncertainty
• Dual Player improves predictability and might increase total time
+/- 3 sigma
![Page 17: Heise cusimano](https://reader035.fdocuments.in/reader035/viewer/2022081514/555e7d5dd8b42abd468b48de/html5/thumbnails/17.jpg)
17
Audit and Dual Player produce a significant quality advantage
On this project
• Predictable results
• Complies with standards
• Performed according to plan
+/- 3 sigma
Low
Hig
h
![Page 18: Heise cusimano](https://reader035.fdocuments.in/reader035/viewer/2022081514/555e7d5dd8b42abd468b48de/html5/thumbnails/18.jpg)
18
Audit and Dual Player improve communication and safety
On this project
• Communications are clear, timely and beneficial
• Information is available where and when its needed
• Communication is more carefully planned and managed
+/- 3 sigma
Low
Hig
h
![Page 19: Heise cusimano](https://reader035.fdocuments.in/reader035/viewer/2022081514/555e7d5dd8b42abd468b48de/html5/thumbnails/19.jpg)
19
Simulation and rehearsal are most valuable when uncertainty is greatest
• Project conceptualization
• Team formation and start up
• Phase transitions such as from Pilot to Full Scale Production
When to apply
![Page 20: Heise cusimano](https://reader035.fdocuments.in/reader035/viewer/2022081514/555e7d5dd8b42abd468b48de/html5/thumbnails/20.jpg)
20
Project teams can be engineered and optimized for success
• Combine simulation science with experience
• Match the organization structure to the work at every phase
• Rehearse and learn
Summary