HEIS INSTALLATION PROCESS
1
DEMARCATION IN FIELD
2
POND CONSTRUCTION
3
CONSTRUCTION OF PLATE FORM
4
ERECTION OF HEAD UNIT
5
SHADE OVER HEAD UNIT
8
INSTALLATION OF FERTIGATION PUMP
9
PIPE LAID IN TRENCH
12
INSTALLATION OF VALVES
13
DRILLING FOR GROMETS
14
HOLES MADE WITH DRILL
15
PLACING GROMETS
16
COVERING HOLES
17
PUTTING TAKEOFF
18
LATERAL JOINING WITH TAKEOFF
19
LATERAL LAYING
20
LATERALS LAID IN FIELD
22
PUNCHING OF LATERAL
23
INSTALLATION OF ONLINE DRIPPERS
24
INSTALLED DRIPPER
25
PRESSURE CHECK
26
FARMER TRAINING
27
FARMER TRAINING
28