Hedley McEwan Office Fit out - Microsoft · 2020-02-10 · Hedley McEwan Office Fit out When Hedley...
1
creatingbetterenvironments Hedley McEwan Office Fit out WhenHedleyMcEwandecidedtorefurbishitsriversideoffices inNewcastle,itrequiredafloorcoveringthatcomplemented theindustrialfeelofthebuilding,whileprovidingoutstanding acousticperformance.Assuch,ContentsDesignspecifieda varietyofproductsfromForboFlooringSystems’wideportfolio tomeettheproject’sbrief. InteriorDesign ContentsDesign InteriorArchitect DeneKingArchitecturalServices Featured Flooring Products SurestepStone coolconcrete WestbondColour (Greens/Greys) flint WestbondColour (Greens/Greys) citrus WestbondColour (Greens/Greys) fallow http://www.forbo.com/flooring/en-uk
Transcript of Hedley McEwan Office Fit out - Microsoft · 2020-02-10 · Hedley McEwan Office Fit out When Hedley...
creating better environments
Hedley McEwan Office Fit out
When Hedley McEwan decided to refurbish its riverside officesin Newcastle, it required a floor covering that complementedthe industrial feel of the building, while providing outstandingacoustic performance. As such, Contents Design specified avariety of products from Forbo Flooring Systems’ wide portfolioto meet the project’s brief.
Interior Design Contents Design
Interior Architect Dene King Architectural Services
Featured Flooring Products
Surestep Stonecool concrete
Westbond Colour(Greens/Greys)flint
Westbond Colour(Greens/Greys)citrus
Westbond Colour(Greens/Greys)fallow
http://www.forbo.com/flooring/en-uk