Types of inspections:

1) Pre-Design: Verify and document existing field conditions(yes, we really do these!)

2) During Construction: Insure systems are being installed incompliance with the Owner’s Project Requirements (OPR)and the plans and specifications

3) Post Construction: Commissioning and Troubleshooting

Page 4: Heckling is encouraged, but must be delivered with maximum ...

Why are the inspections important?

Healthcare facilities are designed within a framework that recognizes the primary mission of healthcare…..

“First, do no harm”

Page 5: Heckling is encouraged, but must be delivered with maximum ...

Codes / Standards / Guidelines:

FGI Facilities Guideline Institute for Design and Construction of Hospitals and Outpatient Facilities.

Contains dedicated chapters for the design and

construction of various types of Outpatient Facilities such as:

Free Standing Emergency Departments /Primary Care Facilities /Diagnostic & Treatment Centers / Urgent Care Facilities / Cancer Centers /Outpatient Surgical Facilities /Endoscopy Facilities / Dialysis Centers /Rehab Centers / Dental Facilities.

Page 6: Heckling is encouraged, but must be delivered with maximum ...

ASHRAE 170 Ventilation for Healthcare Facilities(included within the FGI Guidelines)

NFPA 70 National Electrical Code - Article 517 – Healthcare Facilities

NFPA 99 Standard for Healthcare Facilities

NFPA 101 Life Safety Code

USP The U.S. Pharmacopeial Convention (USP) is a scientific nonprofit organization that sets standards for the identity, strength, quality, and purity of medicines, food ingredients, and dietary supplements manufactured, distributed and consumed worldwide. USP General Chapter 797 provides standards for compounding sterile preparations to promote patient safety and prevent harm.

Page 7: Heckling is encouraged, but must be delivered with maximum ...

Owner’s Project Requirements (OPR)

Many healthcare organizations and/or facilities have their own corporate design guidelines. Typically, it is required that any deviation from the guidelines or questions about the applicability of a guideline item be discussed with corporate prior to deviating from the written standards.

Page 8: Heckling is encouraged, but must be delivered with maximum ...

So,….. what type of things are we looking for in the field?

Page 9: Heckling is encouraged, but must be delivered with maximum ...

Duct failure…(medium pressure OA ductwork)

Longitudinal seam failure… (low pressure supply duct)

Page 10: Heckling is encouraged, but must be delivered with maximum ...

Hole down-stream of smoke detector –should be plugged or patched (not foil tapped)

Exhaust duct detached from fan.

Page 11: Heckling is encouraged, but must be delivered with maximum ...

Ductwork breaches jeopardize space

pressurization control, which is a major design parameter in healthcare

HVAC engineering.

Page 12: Heckling is encouraged, but must be delivered with maximum ...

NOT ALLOWED!

ALLOWED

Room Pressurization ControlFGI Guidelines – ASHRAE 170

Page 13: Heckling is encouraged, but must be delivered with maximum ...

Improperly supported flex duct (no supports / hangers)

Improper flex duct saddle (cardboard)

Page 14: Heckling is encouraged, but must be delivered with maximum ...

Poor cable management…

Poor cable managementand failed flex duct

Page 15: Heckling is encouraged, but must be delivered with maximum ...

Cabling run through fire damper opening

Failed seal at rated wall penetration

Page 16: Heckling is encouraged, but must be delivered with maximum ...

Failed seal at rated floor penetration

Fire caulk/sealant required???

Page 17: Heckling is encouraged, but must be delivered with maximum ...

CPVC Sprinkler piping –improperly supported

If CPVC sprinkler piping exists on your project, always know the location of the nearest fire sprinkler shut-off valve!

Correct

Page 18: Heckling is encouraged, but must be delivered with maximum ...

Inadequate pipe support / hangers

Page 19: Heckling is encouraged, but must be delivered with maximum ...

J-box cover required

Floor drains should never be used as conduits!

Page 20: Heckling is encouraged, but must be delivered with maximum ...

Tuna-can junction boxes are not allowed.

Improperly labeled panelboard directory

Page 21: Heckling is encouraged, but must be delivered with maximum ...

Improperly installed wrist blade handle

Leaking sprinkler pipe(Dr. Pepper bottle / containment basin)

Page 22: Heckling is encouraged, but must be delivered with maximum ...

Cleanout installed below wall

Fire proofing removed in order to install piping

Page 23: Heckling is encouraged, but must be delivered with maximum ...

Fire protection devices obscured during construction

Smoke detector

Page 24: Heckling is encouraged, but must be delivered with maximum ...

Coordinate temporary power requirements with the owner

Page 25: Heckling is encouraged, but must be delivered with maximum ...

Insure all equipment can be serviced(canister type humidifier imbedded in wall)

Page 26: Heckling is encouraged, but must be delivered with maximum ...

Remove abandoned materials (hangers, wires, ties, etc.)

Page 27: Heckling is encouraged, but must be delivered with maximum ...

Dissimilar metal contact – galvanic corrosion

Corrosion preventing hangers and supports

Page 28: Heckling is encouraged, but must be delivered with maximum ...

Questions?