HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON...

62
HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION L OO P1604 HI GHW AY 281 PROJECT LOCATION RANDALE SHINN KEVIN SCHMIDT ROBERTO MALDONADO GUSTAVO HINOJOSA LOUIS FAUST CELESTE CHAVEZ CREATED BY: R E D L ANDR D $DATE$ $TI ME$

Transcript of HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON...

Page 1: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

HEAVEN ON EARTH DEVELOPMENT50% SUBMITTAL

CMFSS, LLC

PRESENTED TO: URBAN DEVELOPERS

PROJECT LOCATION

LOOP 1604

HIG

HW

AY 2

81

PROJECT LOCATION

RANDALE SHINN

KEVIN SCHMIDT

ROBERTO MALDONADO

GUSTAVO HINOJOSA

LOUIS FAUST

CELESTE CHAVEZ

CREATED BY:

REDLAND RD

$D

AT

E$

$TIM

E$

Page 2: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

SHEET 1 OF 1

1KS KS

SHEET INDEX

INDEX SHEET

RLSRLS

R-32

R-31

R-30

R-29

R-28

R-27

R-26

R-25

R-24

R-23

R-22

R-21

R-20

R-19

R-18

R-17

R-16

R-15

R-14

R-13

R-12

R-11

R-10

R-9

R-8

R-7

R-6

R-5

R-4

R-3

R-2

R-1

D-18

D-17

D-16

D-15

D-14

D-13

D-12

D-11

D-10

D-9

D-8

D-7

D-6

D-5

D-4

D-3

D-2

D-1

C-1

P-1

L-8

L-7

L-6

L-5

L-4

L-3

L-2

L-1

SHEET NO.

COSA MISCELLANEOUS DETAILS SHEET 2 OF 2

COSA MISCELLANEOUS DETAILS SHEET 1 OF 2

TRANQUILITY STREET (STA 60+00 TO STA 60+50)

TRANQUILITY STREET (STA 55+00 TO STA 60+00)

TRANQUILITY STREET (STA 50+00 TO STA 55+00)

TRANQUILITY STREET (STA 45+00 TO STA 50+00)

TRANQUILITY STREET (STA 40+00 TO STA 45+00)

TRANQUILITY STREET (STA 35+00 TO STA 40+00)

TRANQUILITY STREET (STA 30+00 TO STA 35+00)

TRANQUILITY STREET (STA 25+00 TO STA 30+00)

TRANQUILITY STREET (STA 20+00 TO STA 25+00)

TRANQUILITY STREET (STA 15+00 TO STA 20+00)

TRANQUILITY STREET (STA 10+00 TO STA 15+00)

PARADISE STREET (STA 60+00 TO STA 62+29)

PARADISE STREET (STA 55+00 TO STA 60+00)

PARADISE STREET (STA 50+00 TO STA 55+00)

PARADISE STREET (STA 45+00 TO STA 50+00)

PARADISE STREET (STA 40+00 TO STA 45+00)

PARADISE STREET (STA 35+00 TO STA 40+00)

PARADISE STREET (STA 30+00 TO STA 35+00)

PARADISE STREET (STA 25+00 TO STA 30+00)

PARADISE STREET (STA 20+00 TO STA 25+00)

PARADISE STREET (STA 15+00 TO STA 20+00)

PARADISE STREET (STA 10+00 TO STA 15+00)

HARMONY STREET (STA 20+00 TO STA 21+46)

HARMONY STREET (STA 15+00 TO STA 20+00)

HARMONY STREET (STA 10+00 TO STA 15+00)

BLISS STREET (STA 25+00 TO STA 26+89)

BLISS STREET (STA 20+00 TO STA 25+00)

BLISS STREET (STA 15+00 TO STA 20+00)

BLISS STREET (STA 10+00 TO STA 15+00)

ROADWAY TYPICAL SECTIONS

ROADWAY SHEETS

PARALLEL WINGWALL DETAIL

PARKING LOT STORM PIPE SHEET 1 OF 1

SLOTTED DRAIN INLET 2 SHEET 1 OF 1

SLOTTED DRAIN INLET 1 SHEET 1 OF 1

CHANNEL 3 LAYOUT SHEET 1 OF 1

CHANNEL 6 LAYOUT SHEET 1 OF 1

CHANNEL 5 LAYOUT SHEET 1 OF 1

CHANNEL 4 LAYOUT SHEET 1 OF 1

CHANNEL 3 LAYOUT SHEET 1 OF 1

CHANNEL 2 LAYOUT SHEET 5 OF 6

CHANNEL 2 LAYOUT SHEET 4 OF 6

CHANNEL 2 LAYOUT SHEET 3 OF 6

CHANNEL 2 LAYOUT SHEET 2 OF 6

CHANNEL 2 LAYOUT SHEET 1 OF 6

CHANNEL 1 LAYOUT SHEET 2 OF 2

CHANNEL 1 LAYOUT SHEET 1 OF 2

PROPOSED DRAINAGE AREAS

EXISTING DRAINAGE AREAS

DRAINAGE SHEETS

PROPOSED CONTOURS

CIVIL SHEETS

PARKING LOT

PARKING LOTS

OVERALL LAYOUT SHEET 8 OF 8

OVERALL LAYOUT SHEET 7 OF 8

OVERALL LAYOUT SHEET 6 OF 8

OVERALL LAYOUT SHEET 5 OF 8

OVERALL LAYOUT SHEET 4 OF 8

OVERALL LAYOUT SHEET 3 OF 8

OVERALL LAYOUT SHEET 2 OF 8

OVERALL LAYOUT SHEET 1 OF 8

LAYOUT SHEETS

TITLE

PAVILION: FOUNDATION LAYOUT

PAVILION: SIDEWALL WALL "A&D" STRUCTURAL

PAVILION: STRUCTURAL FRAME MEMBERS

PAVILION: LAYOUT

APARTMENT: SIDEWALL "C" STRUCTURAL

APARTMENT: FOUNDATION LAYOUT

APARTMENT: SIDEWALL "B" STRUCTURAL

APARTMENT: SIDEWALL "A" STRUCTURAL

APARTMENT: STRUCTURAL FRAME MEMBERS

APARTMENT: LAYOUT

APARTMENTS: FLOOR PLAN

APARTMENTS: ROOF & FLOOR CROSS SECTIONS

STRUCTURAL SHEETS

SEWER LINE I SHEET 1 OF 2

SEWER LINE I SHEET 1 OF 2

SEWER LINE H SHEET 1 OF 1

SEWER LINE G SHEET 1 OF 1

SEWER LINE F SHEET 7 OF 7

SEWER LINE F SHEET 6 OF 7

SEWER LINE F SHEET 5 OF 7

SEWER LINE F SHEET 4 OF 7

SEWER LINE F SHEET 3 OF 7

SEWER LINE F SHEET 2 OF 7

SEWER LINE F SHEET 1 OF 7

SEWER LINE E SHEET 2 OF 2

SEWER LINE E SHEET 1 OF 2

SEWER LINE D SHEET 2 OF 2

SEWER LINE D SHEET 1 OF 2

SEWER LINE C SHEET 8 OF 8

SEWER LINE C SHEET 7 OF 8

SEWER LINE C SHEET 6 OF 8

SEWER LINE C SHEET 5 OF 8

SEWER LINE C SHEET 4 OF 8

SEWER LINE C SHEET 3 OF 8

SEWER LINE C SHEET 2 OF 8

SEWER LINE C SHEET 1 OF 8

SEWER LINE B SHEET 2 OF 2

SEWER LINE B SHEET 1 OF 2

SEWER LINE A SHEET 2 OF 2

SEWER LINE A SHEET 1 OF 2

SEWER LINE SHEETS

WATER LINE E SHEET 1 OF 2

WATER LINE E SHEET 1 OF 2

WATER LINE D SHEET 1 OF 1

WATER LINE C SHEET 5 OF 5

WATER LINE C SHEET 4 OF 5

WATER LINE C SHEET 3 OF 5

WATER LINE C SHEET 2 OF 5

WATER LINE C SHEET 1 OF 5

WATER LINE B SHEET 1 OF 1

WATER LINE A SHEET 5 OF 5

WATER LINE A SHEET 4 OF 5

WATER LINE A SHEET 3 OF 5

WATER LINE A SHEET 2 OF 5

WATER LINE A SHEET 1 OF 5

WATER LINE SHEETS

S-12

S-11

S-10

S-9

S-8

S-7

S-6

S-5

S-4

S-3

S-2

S-1

U-27

U-26

U-25

U-24

U-23

U-22

U-21

U-20

U-19

U-18

U-17

U-16

U-15

U-14

U-13

U-12

U-11

U-10

U-9

U-8

U-7

U-6

U-5

U-4

U-3

U-2

U-1

W-14

W-13

W-12

W-11

W-10

W-9

W-8

W-7

W-6

W-5

W-4

W-3

W-2

W-1

3/6/2013

11:5

8:2

1 P

M

Drawn: Checked: Sheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

Page 3: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

MATCHLINE SHEET L-4

MA

TC

HLIN

E S

HE

ET L-2

FEETSCALE

0 120603060

OVERALL LAYOUT

SHEET 1 OF 8

GH RLS GH RLS L-1

PARADISE R

D

TR

AN

QUILIT

Y R

D

’7

9.8

19

=R ’

96.

99

9=

L "

07.

63’

44°

24

N

L=18

7.71’

N57°55’3

6.20"E

LOT #1

FUTURE SPA

PROPOSED TRAIL

LOT #2

LOT #3

LOT #4

LOT #5

LOT #82

204.72’ S

35°4

5’17"W

205.07’ S

35°4

5’17"W

205.43’ S

35°4

5’17"W

205.78’ S

35°4

5’17"W

283.05’ N54°14’43"W

150.00’ N54°22’49"W

150.00’ N54°14’43"W

150.00’ N54°14’43"W

150.00’ N54°14’43"W

150.00’ N54°14’43"W

150.00’ N54°22’49"W

150.00’ N54°14’43"W

181.16’ N54°25’45"W

207.9

9’ S

2°56’1

0"W

112.98’ N8°48’13"W R=177’

37.37’ N90°0’0"W

45.25’ S35°37’11"W R=73’

R=126’S35°37’11"W 78.33’

N54°22’49"W 32.72’

N90°0’0"W28.30’

R=8’N0°0’0"E 12.93’

R=223’S87°20’22"E 75.70’

LOT #5 N54°22’49"W

150.00’ LOT #83

LOT #6

3/6/2013

11:2

4:3

5

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

Page 4: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

MATCHLINE SHEET L-5

FEETSCALE

0 120603060

OVERALL LAYOUT

SHEET 2 OF 8

GH RLS GH RLS L-2

MA

TC

HLIN

E S

HE

ET L-1

’50.359=L W"13.84’22°67S

’6

4.0

24

1=

L

E"5

1.1

2’3

3°8

0S

PROPOSED TRAIL

PROPOSED PARKING

PROPOSED POSTAL CENTER

TRANQUILITY RD

PROPOSED PARK/TRAILS

LOT #45

LOT #46

LOT #47

209.6

3’ S

11°5’8"E

202.8

9’ S

11°5’8"E

223.8

9’ S

16°2

7’51"E

328.25’ S76°32’18"E

169.47’ S81

°11’47"W S81°1

1’47"W 48.

78’ 124.6

1’ S

8°3

3’2

1"E

169.33’ S

78°54’52"

W

162.13’ S

78°54’52"

W

319.11’ S

78°54’52"

W

173.44’ N81°11’

47"E

60.72’ N84°2’54"E R=176’

R=176’N84°2’54"E 96.16’

64.17’ N81°11’47"E

R=177’N8°48’13"W 109.67’

LOT #81 LOT #80

LOT #44

3/6/2013

11:2

4:3

8

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

Page 5: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

MATCHLINE SHEET L-6

FEETSCALE

0 120603060

OVERALL LAYOUT

SHEET 3 OF 8

GH RLS GH RLS L-3

MA

TC

HLIN

E S

HE

ET L-4

’23.

9152

=L "

80.3

4’41

°45

N

PARADISE R

D

PROPOSED TRAIL

LOT #12

LOT #13

LOT #14

LOT #15

LOT #16

LOT #17

LOT #18

LOT #50

LOT #51

LOT #52

LOT #53

194.53’ S

35°4

5’17"W

194.65’ S

35°4

5’17"W

194.69’ S

35°4

5’17"W

191.24’ S

35°4

5’17"W

233.33’ S

35°4

5’17"W

200.48’ S

35°4

5’17"W

200.83’ S

35°4

5’17"W

201.19’ S

35°4

5’17"W

201.54’ S

35°4

5’17"W

201.89’ S

35°4

5’17"W

201.89’ S

35°4

5’17"W

201.89’ S

35°4

5’17"W127.10’ N

54°14’43"W

141.88’ N54°14’43"W

150.00’ N54°14’43"W

150.00’ N54°14’43"W

150.00’ N54°14’43"W

150.00’ N54°14’43"W

169.61’ N54°14’43"W

127.10’ N54°22’49"W

141.88’ N54°22’49"W

150.00’ N54°22’49"W

150.00’ N54°22’49"W

150.00’ N54°22’49"W

188.40’ N54°22’49"W

176.84’ N54°22’49"W

154.64’ N54°22’49"W

154.07’ N54°22’49"W

126.78’ N54°20’7"W

176.84’ N54°20’7"W

N54°22’49"W 39.35’

R=296’N6°49’51"E 140.77’

N54°22’49"W 14.39’

28.08’ S61°32’46"E

PROPOSED LAKE

LOT #11

S36°1

3’35"W

183.31’

PROPOSED TRAIL

DRAINAGE EASEMENT

N54°14’43"W

36.90’

DRAINAGE EASEMENT

3/6/2013

11:2

4:4

0

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

Page 6: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

MATCHLINE SHEET L-7

FEETSCALE

0 120603060

OVERALL LAYOUT

SHEET 4 OF 8

GH RLS GH RLS L-4

MA

TC

HLIN

E S

HE

ET L-5

MATCHLINE SHEET L-1

MA

TC

HLIN

E S

HE

ET L-3

’23.

9152

=L "

80.3

4’41

°45

N

PROPOSED LAKE

BLISS RD

PARADISE R

D

LOT #5

LOT #6

LOT #7

LOT #8

LOT #9

LOT #10

LOT #11

LOT #54 LOT #55 LOT #56

LOT #57

LOT #58

LOT #59

LOT #60

LOT #71

LOT #72

LOT #73

LOT #74 LOT #75

LOT #83

LOT #84

196.90’ S

33°4

4’41"W

199.3

0’ S28°2

3’41"W

198.1

9’ S

1°28’1

0"E

204.2

4’ S9°1

1’3

3"W

201.4

0’ S2°10’2

2"W

293.5

3’

N5°1

7’2

5"E

325.7

0’

N5°1

7’2

5"E

211.9

9’ S30°0’11"W

197.1

5’ S30°0’11"W

202.60’ S

35°4

5’17"W

202.95’ S

35°4

5’17"W

203.31’ S

35°4

5’17"W

203.66’ S

35°4

5’17"W

204.01’ S

35°4

5’17"W

204.37’ S

35°4

5’17"W

215.46’ S89°53’10"W

214.07’ N71°34’9"W

227.95’ N56°9’15"W

S32°1

0’21"W

S32°1

0’21"W

95.27’ S

32°1

0’21"W

206.37’ S

35°4

6’16"W

129.44’ S29°5

0’3"W

155.11’ S

29°5

0’3"W

208.8

0’ S12°2

0’5

0"W

198.4

9’ S12°2

0’5

0"W

194.2

6’ N

5°9’2

9"W

150.00’ N54°14’43"W

150.00’ N54°14’43"W

150.00’ N54°14’43"W

150.00’ N54°14’43"W

150.00’ N54°14’43"W

150.00’ N54°22’49"W

150.00’ N54°22’49"W

150.00’ N54°22’49"W

150.00’ N54°22’49"W

150.00’ N54°22’49"W

150.00’ N54°22’49"W

144.09’ N54°22’49"W

298.92’ N54°22’49"W

125.74’ N20°22’7"W

273.36’ N54°25’45"W

208.05’ N54°25’45"W

233.54’ N54°25’45"W

273.96’ N54°25’45"W

181.06’ S56°54’2"E

101.99’ S56°54’2"E

155.55’ N90°0’0"E

231.35’ N90°0’0"E138.71’ N90°0’0"E

126.52’ S33°5’58"W R=623’

R=623’S33°5’58"W 233.38’

36.12’ S56°54’2"E

S56°54’2"E 32.87’

R=227’N54°22’49"W 80.65’

244.42’ N54°22’49"W R=227’

24.90’ S35°37’11"W

265.66’ N54°22’49"W R=174’

110.67’ S56°54’2"E

55.40’ S33°5’58"W R=676

228.88’ S33°5’58"W R=676

R=676S33°5’58"W 106.23’

62.57’ N90°0’0"E

R=225’S1°41’33"W 36.35’

165.66’ S88°18’27"E127.12’ S88°18’27"E

100.52’ S33°37’16"W R=525’ R=525’183.49’ S33°37’16"W

190.64’ S56°22’44"E

S56°22’44"E

51.58’

R=275’N5°17’25"E 135.97

202.69’ S84°42’35"E

123.48’ S84°42’35"E

R=255’S35°39’53"W 55.15’

R=255’S35°39’53"W 43.05’

PROPOSED LAKE

LOT #53

LOT #82

N54°14’43"W

144.09’

PROPOSED TRAIL

DRAINAGE EASEMENT

DRAINAGE EASEMENT

3/6/2013

11:2

4:4

3

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

Page 7: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

MATCHLINE SHEET L-8

FEETSCALE

0 120603060

OVERALL LAYOUT

SHEET 5 OF 8

GH RLS GH RLS L-5

MA

TC

HLIN

E S

HE

ET L-4

MATCHLINE SHEET L-2

173.99’ S84°36’25"E

59.90’ N16°31’54"E

31.89’ N7°12’33"E R=98.0’

BLISS RD

TR

AN

QUILIT

Y R

DT

RA

NQ

UILIT

Y R

D

’2

1.3

74

1=

L E"

56.

52’

31

°1

0S

LOT #38

LOT #39

LOT #40

LOT #41

LOT #42

LOT #43

LOT #44

LOT #60 LOT #61

LOT #62

LOT #63

LOT #64

LOT #65

LOT #66

LOT #76 LOT #77

LOT #78

LOT #79

LOT #80LOT #81

173.99’ S84°36’25"E

31.89’ N7°12’33"E R=98.0’

59.90’ N16°31’54"E

168.24’ N84°48’7"E

203.41’ S58°45’29"E

169.10’ S78°6’50"E

309.05’ N

38°0’42"W

293.93’ N

38°0’42"W

198.1

3’ S

10°2’5

9"E

268.84’ N81°26’

39"E

257.93’ N81°26’3

9"E

263.37’ S78°56’49"E

238.52’ S78°8’34"E

196.77’ S82°16’36"E

196.23’ N88°46’34"E

198.56’ N88°46’34"E

162.96’ S

72°28’8

"W

161.87’ S76

°11’53"W

157.53’ S82

°5’13"W

223.9

8’ N

5°9’2

9"W

173.2

1’ N

7°2

0’4

9"W

188.2

4’ N

7°2

0’4

9"W

202.4

1’ N

10°5

4’1"W

135.6

1’ N

10°5

4’1"W

150.0

1’ S

2°6’4

7"E

119.4

1’ S

2°6’4

7"E

216.4

2’ S

5°5

7’6"E

175.1

3’ S

5°5

7’6"E

109.4

9’ S16°3

1’54"W

150.0

0’ S

1°13’2

6"E

150.0

0’ S

1°13’2

6"E

150.0

0’ S

1°13’2

6"E

175.0

0’ S

1°13’2

6"E

127.8

1’ S

8°3

3’2

1"E

200.0

0’ S

8°3

3’2

1"E

200.0

0’ S

8°3

3’2

1"E

150.2

1’ S

2°6’4

7"E

171.4

5’ S

2°6’4

7"E

75.0

4’ S

2°6’4

7"E

150.3

8’ S

1°5’3

4"E

139.9

6’ S

1°5’3

4"E

165.48’ N90°0’0"E153.70’ N90°0’0"E151.34’ N90°0’0"E

242.60’ N90°0’0"E231.35’ N90°0’0"E

55.04’ S16°31’54"W

155.78’ N73°28’6"W R=527’

51.01’ N73°28’6"W R=527’

142.5

1’ N

5°5

7’6"W

N90°0’0"E 49.06’

32.86’ N87°53’13"E R=101’

14.97’ S2°6’47"E

13.65’ S16°31’54"W

186’ N73°28’6"W R=474’

25.24’ N84°2’54"E R=176’

85.56’ N84°2’54"E R=176’

110.29’ S5°38’46"E

R=123’N84°2’54"E 187.08’

N81°11’47"E 24.74’

77.20’ S5°38’46"E

11.73’ N0°0’0"E R=8’

19.15’ S1°5’34"E

R=525’127.06’ N88°54’26"E

22.41’ N88°54’26"E R=525’

57.35’ S15°13’18"W

64.15’ S1°41’33"W R=225’

R=225’S1°41’33"W 75.99’

R=225’S1°41’33"W 103.77’

165.66’ S88°18’27"E

PROPOSED LAKE

LOT #37

PROPOSED TRAIL

PROPOSED TRAIL

DRAINAGE EASEMENT

3/6/2013

11:2

4:4

5

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

Page 8: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

FEETSCALE

0 120603060

OVERALL LAYOUT

SHEET 6 OF 8

GH RLS GH RLS L-6

MA

TC

HLIN

E S

HE

ET L-7

MATCHLINE SHEET L-3

PARADISE RD TR

AN

QUILIT

Y R

D

’92.9311=L E"44.63’85°05

N

’3

7.3

56

=L

E"7

1.9

0’4

0°6

3N

PROPOSED LAKE

PARADISE RD STA = 42+87.97TRANQUILITY RD STA = 64+47.88

EASEMENTDRAINAGE LOT #19

LOT #20

LOT #21

LOT #48

LOT #49

LOT #85

210.01’ S81

°34’27"W

173.71’ N72°10’59"W

201.54’ N

39°1’24"W

276.30’ N

39°1’24"W

79.23’ S

36°4’22"E

98.6

1’

N0°52’4

2"E

300.00’ S

36°4’9"W

83.10’ N54°14’43"W

N86°42’18"W

80.34’

S89°7’18"E 63.04’

199.98’ S50

°58’36"W

205.96’ S50

°58’36"W

192.88’ S50

°58’36"W

230.67’ S83°10’9"E

194.57’ N6°49’51"E R=243’

225.90’ N6°49’51"E R=243’

220.83’ N6°49’51"E R=243’

45.61’ N51°40’12"E

158.71’ N38°19’48"W R=176’

48.28’ N6°49’51"E R=296’

R=296’N6°49’51"E 110.06’

R=296’N6°49’51"E 482.05’

R=123’N38°19’48"W 71.99’

R=123’N38°19’48"W 38.93’

95.61’ S61°32’46"E

R150’N72°47’21"W 58.21’

R150’N72°47’21"W 75.14’

R150’N72°47’21"W 70.54’

R275’N72°47’21"W 57.74’

LOT #50

LOT #18

PROPOSED TRAIL

PROPOSED TRAIL

DRAINAGE EASEMENT

DRAINAGE EASEMENT

3/6/2013

11:2

4:4

8

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

Page 9: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

FEETSCALE

0 120603060

OVERALL LAYOUT

SHEET 7 OF 8

GH RLS GH RLS L-7

MA

TC

HLIN

E S

HE

ET L-8

MATCHLINE SHEET L-4

MA

TC

HLIN

E S

HE

ET L-6

PA

RA

DIS

E R

D

L=11

39.29’

N50

°58’36.44"

E

’08.4181=L E"26.50’14°98S

PROPOSED PAVILION

PROPOSED PARKING (TYP)

TRAN

QUILIT

Y R

D

TRANQUILITY RD

PARADISE RD

LOT #22

LOT #23

LOT #24 LOT #25 LOT #26 LOT #27 LOT #28

LOT #86 LOT #87 LOT #88 LOT #89 LOT #90 LOT #91 LOT #92 LOT #93 LOT #94 LOT #95 LOT #96 LOT #97

LOT #98LOT #99LOT #100LOT #101LOT #102LOT #103LOT #104LOT #105LOT #106LOT #107

LOT #108

LOT #109

LOT #110 LOT #111 LOT #112 LOT #113 LOT #114 LOT #115 LOT #116 LOT #117 LOT #118 LOT #119

LOT #120LOT #121LOT #122LOT #123LOT #124LOT #125LOT #126LOT #127LOT #128

HARMONY RD

204.0

0’

N0°18’5

4"E

204.0

0’

N0°18’5

4"E

204.0

0’

N0°18’5

4"E

204.0

0’

N0°18’5

4"E

204.0

0’

N0°18’5

4"E

212.6

0’ N

4°3

8’4

8"W

207.10’ N

36°1

0’27"W

203.96’ N

39°1’24"W

98.6

1’

N0°52’4

2"E

99.9

0’

N0°52’4

2"E

99.5

7’

N0°52’4

2"E

100.2

3’

N0°52’4

2"E

100.5

6’

N0°52’4

2"E

100.2

3’

N0°52’4

2"E

101.2

1’

N0°52’4

2"E

101.5

4’

N0°52’4

2"E

101.8

7’

N0°52’4

2"E

102.1

9’

N0°52’4

2"E

102.5

2’

N0°52’4

2"E

102.8

5’

N0°52’4

2"E

100.3

5’

N0°52’4

2"E

100.6

8’

N0°52’4

2"E

101.0

1’

N0°52’4

2"E

101.3

3’

N0°52’4

2"E

101.6

6’

N0°52’4

2"E

101.9

9’

N0°52’4

2"E

102.3

2’

N0°52’4

2"E

102.6

5’

N0°52’4

2"E

102.9

7’

N0°52’4

2"E

122.5

0’

N0°52’4

2"E

100.3

5’

N0°30’1

0"E

100.6

8’

N0°30’1

0"E

101.0

1’

N0°30’1

0"E

101.3

4’

N0°30’1

0"E

101.6

6’

N0°30’1

0"E

101.9

9’

N0°30’1

0"E

102.3

2’

N0°30’1

0"E

102.6

5’

N0°30’1

0"E

102.9

7’

N0°30’1

0"E

102.8

5’

N0°30’1

0"E

102.3

9’

N0°30’1

0"E

101.9

4’

N0°30’1

0"E

101.4

8’

N0°30’1

0"E

101.0

3’

N0°30’1

0"E

100.5

7’

N0°30’1

0"E

100.1

1’

N0°30’1

0"E

99.2

2’

N0°30’1

0"E

46.12’214.62’ S89°7’18"E

99.99’ S

39°7’59"E

99.98’ S89°7’18"E 99.98’ S89°7’18"E 99.98’ S89°7’18"E 99.98’ S89°7’18"E 99.98’ S89°7’18"E

140.79’ S89°7’18"E 99.99’ S89°7’18"E 99.99’ S89°7’18"E99.98’ S89°7’18"E

99.99’ S89°7’18"E99.98’ S89°7’18"E

99.99’ S89°7’18"E99.98’ S89°7’18"E

99.99’ S89°7’18"E 99.99’ S89°7’18"E99.98’ S89°7’18"E 99.98’ S89°7’18"E

99.99’ S89°7’18"E

99.98’ S89°7’18"E

99.99’ S89°7’18"E

130.34’ S89°7’18"E

99.99’ S89°7’18"E

204.68’ S89°29’50"E 99.99’ S89°29’50"E 100.00’ S89°29’50"E 100.00’ S89°29’50"E 99.99’ S89°29’50"E 99.99’ S89°29’50"E 99.99’ S89°29’50"E 99.99’ S89°29’50"E 97.54’ S89°29’50"E104.68’ S89°29’50"E 99.99’ S89°29’50"E

110.68’ S89°41’6"E 200.00’ S89°41’6"E 200.00’ S89°41’6"E 200.00’ S89°41’6"E 200.00’ S89°41’6"E

84.98’ S89°45’31"E100.00’ S89°45’31"E 100.00’ S89°45’31"E 100.00’ S89°45’31"E 100.00’ S89°45’31"E 100.00’ S89°45’31"E 100.00’ S89°45’31"E

100.00’ N89°18’34"W100.00’ N89°18’34"W100.00’ N89°18’34"W100.00’ N89°18’34"W100.00’ N89°18’34"W100.00’ N89°18’34"W100.00’ N89°18’34"W100.00’ N89°18’34"W

99.98’ N88°56’2"W99.98’ N88°56’2"W99.98’ N88°56’2"W 99.98’ N88°56’2"W 99.98’ N88°56’2"W

99.98’ N88°56’2"W99.98’ N88°56’2"W99.98’ N88°56’2"W99.98’ N88°56’2"W

99.98’ N88°56’2"W99.99’ N88°34’12"W

91.01’ N89°18’34"W

87.48’ N89°18’34"W100.00’ N89°18’34"W100.00’ N89°18’34"W100.00’ N89°18’34"W100.00’ N89°18’34"W100.00’ N89°18’34"W100.00’ N89°18’34"W100.00’ N89°18’34"W100.00’ N89°18’34"W

200.00’ N89°41’6"W200.00’ N89°41’6"W200.00’ N89°41’6"W200.00’ N89°41’6"W200.00’ N89°41’6"W102.62’ N89°41’6"W

153.74’ S50

°58’36"W

199.96’ S50

°58’36"W

200.00’ S51

°40’12"W

189.71’ S51

°50’51"W

93.18’ S89°45’31"E

100.4

4’ N

2°3

0’5

7"E

95.0

5’ N

2°30’5

7"E

71.49’ N38°19’48"W R=326’

19.57’ N38°19’48"W R=326’

R=326’N38°19’48"W 128.81’

N51°40’12"E 126.03’

R=7’N53°58’54"E 11.27’

104.87’ N51

°40’12"E

S36°1’6"E 29.74’

S53°58’54"W68.72’ R=74’

N89°18’34"W 69.37’

37.29’ S36°1’6"E

N52

°8’29"

E

58.08’

R=273’N38°19’48"W168.41’

63.47’ N52°8’29"E

R=89’S1°3’58"W137.54’

S88°56’2"E40.61’

102.9

7’

N0°52’4

2"E

PROPOSED APARTMENT (TYP.)

LOT #29

PROPOSED TRAILPROPOSED TRAIL

3/6/2013

11:2

4:5

0

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

Page 10: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

FEETSCALE

0 120603060

OVERALL LAYOUT

SHEET 8 OF 8

GH RLS GH RLS L-8MATCHLINE SHEET L-5

MA

TC

HLIN

E S

HE

ET L-7

TR

AN

QUILIT

Y R

D

’6

4.4

24

=L

E"7

9.0

1’7

4°7

1S

’2

1.3

74

1=

L E"

56.

52’

31

°1

0S

PROPOSED TRAIL

LOT #29 LOT #30 LOT #31

LOT #32

LOT #33

LOT #34

LOT #35

LOT #36

LOT #37

LOT #67

LOT #68

LOT #69

LOT #70

166.16’ N83°43’36

"E

177.27’ N83°43’36

"E

188.19’ N77°2

6’29"E

165.56’ N84°48’7"E

266.14’ N53

°9’20"

E

200.89’ N88°46’34"E

203.21’ N88°46’34"E

205.54’ N88°46’34"E

207.47’ N88°46’34"E

219.00’ N

72°12’

49"E

235.6

2’ N

66°30’9"

E

211.5

6’

N0°18’5

4"E

204.0

0’

N0°18’5

4"E

347.7

0’

N22°1

2’14"E

317.7

4’ S4°5

5’2

1"W

280.01’ N53

°9’20"

E

200.00’ S89°41’6"E 142.02’ S89°41’6"E

157.5

8’ S

2°6’4

7"E

124.0

6’ S

2°6’4

7"E

150.0

1’ S

2°6’4

7"E

150.0

1’ S

2°6’4

7"E

258.04’ N89°41’6"W200.00’ N89°41’6"W200.00’ N89°41’6"W

150.0

0’ S

1°13’2

6"E

150.0

0’ S

1°13’2

6"E

124.0

5’ S

1°13’2

6"E

219.9

9’ S

1°13’2

6"E

199.9

6’ S

17°4

7’11"E

180.9

5’ S

17°4

7’11"E

186.9

2’ S

2°6’4

7"E

132.2

7’ S

2°6’4

7"E

149.4

3’ S

2°6’4

7"E

152.2

3’ S

2°6’4

7"E

111.3

2’ S

6°2

2’2

7"E

149.0

4’ S

6°2

2’2

7"E

22.89’ S6°22’27"

E

105.5

5’ S

1°5’3

4"E

114.49’ N0°18’54"E R=226’

58.62’ N0°18’54"E R=226’

172.29’ N0°18’54"E R=226’

85.34’ N12°22’36"E R=125’

PROPOSED LAKE

LOT #66

150.0

1’ S

2°6’4

7"E

150.0

0’ S

1°13’2

6"E

PROPOSED TRAIL

PROPOSED TRAIL

DRAINAGE EASEMENT

BOAT RAMP

PROPOSED

3/6/2013

11:2

4:5

2

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

Page 11: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

PARKING LOT

SHEET 1 OF 1

GH RLS GH RLS P1

RECOMMENDATIONS AND STRUCTURAL PLANS.PLANS, DUMPSTER PAD AND APPROACH PER GEOTECHNICAL

1. INSTALL DUMPSTER ENCLOSURE PER ARCHITECTURAL

2. INSTALL HANDICAP PARKING, SIGNS, AND WHEELSTOPS

3. INSTALL SIDEWALK

4. INSTALL PEDESTIAN RAMP

5. INSTALL STOP SIGN

1

2

2

2

2

2

2

2

1

1

3

3

3

3

3

3

3

3

3

33

4

4

4

4

4

4

5

5

5 5

5

3

R=20.00’

R=5.00’

R=20.00’R=20.00’

R=20.00’

R=20.00’R=20.00’

R=37.00’

R=63.00’

R=10.00’R=20.00’

R=20.00’

26’

9’

18.5’

PARKINGLOT TRAILPARK

PARKINGLOT PAVILION

PARKINGLOT APARTMENTS

6. INSTALL SLOTTED DRAIN INLET

6

6

6

6

6

KEY NOTES

(SEE COSA DETAIL)SIDEWALK DRAIN

(SEE COSA DETAIL)SIDEWALK DRAIN

SLOTTED DRAIN INLET

SLOTTED DRAIN INLET

958957956955

954953952

959

960

961

962

963963

964

965

966

967

968

969

970

961

962963

964

965

966

967

968

970

969

968

967

962

963

964

965966

967

PA

RA

DIS

E R

D

PROPOSED APARTMENT (TYP.)

3/6/2013

11:2

4:5

5

PM

Drawn: Checked: Sheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

Page 12: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

962

961

960

959

958

957

956955

962

963

964

962961

959

971

970

969

968

969

967

966

965

964

962

961

960

959

958

957

956

955

954

953

952

951

950

949

948

947

946

945

944

943

942

941

940

939 93893

7936

935

934

933

932

931

930

929

928

927

PROPOSED CONTOURS

SHEET 1 OF 1

0

FEETSCALE

200 400100200

PROPERTY LINES

EXISTING CONTOURS

PROPOSED CONTOURS

968

968

963

RLSCCRLS CC

LEGEND

948

949

950

951

952

95395

5

957

956

954

958

959

960

963

961

960

959

961

962

963

964

965

965

966

967

963

962

961

960

959

964

965966 967

968 969

970

971

971

958

958 957 956 955954 953 952 951

950 949 948

C-13/7/2013

12:3

0:3

2

AM

Drawn: Checked: Sheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

Page 13: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

100 50 0 100 200

FEETSCALE

EXISTING DRAINAGE AREAS

SHEET 1 OF 1

1A

2A

3A

4A

5A

6A

7A8A

970

965

965

960

960

955

955

950

950

945

940

935 9

30

925

1A

FLOW DIRECTION

DRAINAGE AREA SYMBOL

ONE FOOT CONTOURS

DRAINAGE AREA BOUNDARY

LFRLSRLS LF

PRESENTATION OF THE PROJECT.

THIS LAYOUT IS PRELIMINARY FOR AN OVERALL

NOTE:

DA AREA(ACRES) Tc(MIN) I25(IN/HR) Q25(CFS) I100(IN/HR) Q100(CFS)

1A 33.08 27.00 5.28 68.17 6.58 84.84

2A 19.00 33.00 4.73 49.40 5.82 60.85

3A 30.03 41.00 4.16 58.69 5.24 73.93

4A 39.32 3.39 46.63 4.42 60.86

5A 26.71 33.00 4.73 44.19 5.82 54.44

6A 12.5 24.00 5.62 24.60 7.15 31.29

7A 5.72 22.00 5.89 7.61 15.24

8A 15.21 19.00 6.36 37.71 8.45 50.12

LEGEND

D-1

58.00

11.78

3/6/2013

11:2

5:1

2

PM

Drawn: Checked: Sheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

Page 14: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

100 50 0 100 200

FEETSCALE

PROPOSED DRAINAGE AREAS

SHEET 1 OF 1

970

965960

955

950

950

945

940

935 9

30

1A

FLOW DIRECTION

DRAINAGE AREA SYMBOL

ONE FOOT CONTOURS

DRAINAGE AREA BOUNDARY

LFRLSRLS LF

PRESENTATION OF THE PROJECT.

THIS LAYOUT IS PRELIMINARY FOR AN OVERALL

NOTE:

DA AREA(ACRES) Tc(MIN) I25(IN/HR) Q25(CFS) I100(IN/HR) Q100(CFS)

1B 14.06 9.22 64.84 83.61

2B 14.23 24.00 5.50 39.15 6.95 49.43

19.11 29.00 5.09 42.59 6.25 52.30

4B 11.66 4.73 21.50 5.82 26.48

5B 33.00 4.73 19.10 5.82 23.53

6B 33.00 4.73 162.85 5.82 200.61

8.82 17.00 6.74 9.15 41.68

8B 9.22 34.55 44.55

LEGEND

D-2

33.00

30.71

9B 10.00 8.45 10.30

9.22 12.42

14.00 7.40 13.57 18.69

15.62 5.18 47.66 6.41 58.91

9.72 40.64 51.59

1.24 9.72

4.75 8.81 30.08

13.00 7.62 30.78 42.04

28.00

23.01

14.00 7.40 34.92 48.10

11.96 25.00 5.50 40.81 6.95 51.51

21.00 6.03 20.80 7.87 27.14

19.57 N/A N/A

9.22 11.18

3B-1 TO 3B-3

7B-1 TO 7B-2

10B

11B

12B

13B

14B

15B

16B

17B-1 TO 17B-5

18B

19B

20B

21B

8.00 11.89

7.09

51.42

6.81 8.00 11.89

0.94 7.78 11.18

1.16 8.00 9.63 11.89

1.93 10.19

7.60 7.00 12.34

7.00 6.63 12.34 8.42

9.00 11.51

6.83 10.19

8.98 10.40

5.39

N/A N/A N/A

1.02 8.00 11.189.22

MAT

CHLINE

A

MAT

CHLINE

A

955

955

965

960

955

955

3/6/2013

11:2

5:2

8

PM

Drawn: Checked: Sheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

1B

2B

4B

5B

8B

9B

11B

12B3B-2

3B-3

3B-1

13B 10B

14B

15B

7B-1

7B-2

16B

17B-2

17B-1 17B-3

17B-4

17B-5

18B 19B

20B

21B

6B

Page 15: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

RLS

MA

TC

HLIN

E S

TA 1

0+00

LFLF RLS

MATCHLI

NE STA

10+0

0

10+009+008+007+006+005+00

950

955

960

965

970

5+00

6+00

7+00

8+00

9+

00

CHANNEL CENTERLINE

CHANNEL CENTERLINE

PROPOSED TRAIL

ROW (TYP.)

DRAINAGE EASEMENT (TYP.)

EDGE OF ROAD (TYP.)

CENTERLINE TRANQUILITY RD.

958

957

956

955954953

952

951

950

959

960

961

958

959

960

961

962

963

964965 964

964

959

960

961

962

963

965

966

967

959

960

961

962

963

CONCRETE CULVERT2-4FT DIA

(SEE DETAILS) (TYP.)TXDOT STANDARD HEADWAY

502525

FEETSCALE

12.5 0

HORIZONTAL

FEETSCALE

0

VERTICAL

2.5 51.252.5

DESIGN BASED ON AVERAGE CHANNEL DATA.

NOTE:

TYPICAL CROSS SECTION

21 1

2

4’

8’8’8’

SHEET 1 OF 2

CHANNEL 1 LAYOUT

D-43/6/2013

11:2

5:3

2

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

2.00%

6.4:1

7.0:1

2- 4FT DIA 80LF CONCRETE CULVERT

0.6%

0.3%

0.3%

HW25 = 3.47’

HW100 = 3.87’

BOTTOM OF CHANNEL

BOTTOM OF CHANNEL

TOP OF CHANNEL

TOP OF CHANNEL

OUTFLOW TO PROPOSED LAKE

Page 16: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

RLS

MA

TC

HLIN

E S

TA 1

5+00

LFLF RLS

MA

TC

HLIN

E S

TA 1

5+00

950

955

960

965

970

CHANNEL CENTERLINE

CHANNEL CENTERLINE

PROPOSED TRAIL

ROW (TYP.)

964

960

502525

FEETSCALE

12.5 0

HORIZONTAL

FEETSCALE

0

VERTICAL

2.5 51.252.5

DESIGN BASED ON AVERAGE CHANNEL DATA.

NOTE:

TYPICAL CROSS SECTION

21 1

2

4’

8’8’8’

SHEET 2 OF 2

CHANNEL 1 LAYOUT

D-5

11+00 12+00 13+00

965

964963

962961

960

960961

962963

964

965

961

962

963

11+00 12+00 13+0010+00

3/6/2013

11:2

5:3

5

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

0.3%

HW25 = 3.47’

HW100 = 3.87’

BOTTOM OF CHANNEL

TOP OF CHANNELTIE INTO EXISTING CHANNEL

Page 17: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

RLS

MA

TC

HLIN

E S

TA 1

0+00

LFLF RLS

MATC

HLIN

E STA 10+00

10+009+008+007+006+005+00

CHANNEL CENTERLINE

PROPOSED TRAIL

938

502525

FEETSCALE

12.5 0

HORIZONTAL

FEETSCALE

0

VERTICAL

2.5 51.252.5

DESIGN BASED ON AVERAGE CHANNEL DATA.

NOTE:

TYPICAL CROSS SECTION

31 1

3

9’6’9’

SHEET 1 OF 6

CHANNEL 2 LAYOUT

D-5

3’

939 940 941 942 943 944

938939 940 941 942 943 944 945

937

936

935

934

933

945

946

947

948

946

947

948

949

PROPOSED POSTAL CENTER

PROPOSED PARKING LOT

930

935

940

945

950

TIE INTO EXISTING CHANNEL

SIDE OF CHANNEL

6+00 7+00 8+00 9+00

3/6/2013

11:2

5:3

8

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

0.7%

1.3%

1.8%

1.7%

1.2%

1.8%

1.4%

1.8%

HW25 = 1.50’

HW100 = 2.31’

BOTTOM OF CHANNEL

TOP OF CHANNEL

Page 18: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

RLS

MA

TC

HLIN

E S

TA 1

5+00

LFLF RLS

MA

TC

HLIN

E S

TA 1

0+00

CHANNEL CENTERLINE

PROPOSED TRAIL

ROW (TYP.)

EDGE OF ROAD (TYP.)

CENTERLINE TRANQUILITY RD.

CONCRETE CULVERT1-3FT DIA

(SEE DETAILS) (TYP.)TXDOT STANDARD HEADWAY

502525

FEETSCALE

12.5 0

HORIZONTAL

FEETSCALE

0

VERTICAL

2.5 51.252.5

DESIGN BASED ON AVERAGE CHANNEL DATA.

NOTE:

TYPICAL CROSS SECTION

31 1

3

9’6’9’

SHEET 2 OF 6

CHANNEL 2 LAYOUT

D-6

3’

PROPOSED POSTAL CENTER

PROPOSED PARKING LOT

935

940

945

950

MA

TC

HLIN

E S

TA 1

0+00

MA

TC

HLIN

E S

TA 1

5+00

954

953952

951950949948947946

947 948 949 950951

952953

949

950

948947

946 945

945

946947

948

949

950

955

10+00 11+00 12+00 13+00 14+00 15+00

CHANNEL SIDE

11+00

12+00 13+00 14+00

3/6/2013

11:2

5:4

0

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

1- 3FT DIA 51LF CONCRETE CULVERT

0.7%

2.0%

1.9%

1.3%

1.3%

3.9%

0.2%

2.0%

2.1:1

5.7:1

HW25 = 1.50’

HW100 = 2.31’

BOTTOM OF CHANNEL

BOTTOM OF CHANNEL

TOP OF CHANNEL

TOP OF CHANNEL

Page 19: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

RLS

MA

TC

HLIN

E S

TA 2

0+00

LFLF RLS

CHANNEL CENTERLINE

PROPOSED TRAIL

ROW (TYP.)

502525

FEETSCALE

12.5 0

HORIZONTAL

FEETSCALE

0

VERTICAL

2.5 51.252.5

DESIGN BASED ON AVERAGE CHANNEL DATA.

NOTE:

TYPICAL CROSS SECTION

31 1

3

9’6’9’

SHEET 3 OF 6

CHANNEL 2 LAYOUT

D-7

3’

945

950

MA

TC

HLIN

E S

TA 1

5+00

MA

TC

HLIN

E S

TA 2

0+00

953

955

MA

TC

HLIN

E S

TA 1

5+00

960

965

20+0015+00 16+00 17+00 18+00 19+00

952951

957956

954

955

955

956

957

958

952

953

953952

951

954

PROPERTY LIMITS

SIDE OF CHANNEL

16+00 17+00 18+00 19+00

3/6/2013

11:2

5:4

3

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

0.2%

HW100 = 2.31’

HW25 = 1.50’

BOTTOM OF CHANNEL

TOP OF CHANNEL

Page 20: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

RLS

MA

TC

HLIN

E S

TA 2

5+00

LFLF RLS

CHANNEL CENTERLINE

PROPOSED TRAIL

ROW (TYP.)

502525

FEETSCALE

12.5 0

HORIZONTAL

FEETSCALE

0

VERTICAL

2.5 51.252.5

DESIGN BASED ON AVERAGE CHANNEL DATA.

NOTE:

TYPICAL CROSS SECTION

31 1

3

9’6’9’

SHEET 4 OF 6

CHANNEL 2 LAYOUT

D-8

3’

945

950

MA

TC

HLIN

E S

TA 2

0+00

MA

TC

HLIN

E S

TA 2

5+00

953

955

MA

TC

HLIN

E S

TA 2

0+00

960

965

952951

956957958

955

956

957

958

952

953

953952

951

954

PROPERTY LIMITS

20+00 21+00 22+00 23+00 24+00 25+00

954

959

955

SIDE OF CHANNEL

21+00 22+00 23+00 24+00

3/6/2013

11:2

5:4

5

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

0.2%0.2%

HW100 = 2.31’

HW25 = 1.50’

BOTTOM OF CHANNEL

TOP OF CHANNEL

Page 21: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

RLS

MA

TC

HLIN

E S

TA 3

0+00

LFLF RLS

CHANNEL CENTERLINE

PROPOSED TRAIL

ROW (TYP.)

502525

FEETSCALE

12.5 0

HORIZONTAL

FEETSCALE

0

VERTICAL

2.5 51.252.5

DESIGN BASED ON AVERAGE CHANNEL DATA.

NOTE:

TYPICAL CROSS SECTION

31 1

3

9’6’9’

SHEET 5 OF 6

CHANNEL 2 LAYOUT

D-9

3’

945

950

MA

TC

HLIN

E S

TA 2

5+00

MATCHLINE STA 30+00

953

955

MA

TC

HLIN

E S

TA 2

5+00

960

965

952

955

953952

954

PROPERTY LIMITS

954

957

955

955

956

957

958

956

25+00 26+00 27+00 28+00 29+00 30+00

SIDE OF CHANNEL

26+00 27+00 28+00 29+00

3/6/2013

11:2

5:4

8

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

0.2%

0.5%

HW100 = 2.31’

HW25 = 1.50’

BOTTOM OF CHANNEL

TOP OF CHANNEL

Page 22: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

RLS LFLF RLS

CHANNEL CENTERLINE

ROW (TYP.)

DRAINAGE EASEMENT (TYP.)

EDGE OF ROAD (TYP.)

CONCRETE CULVERT1-3FT DIA

(SEE DETAILS) (TYP.)TXDOT STANDARD HEADWAY

502525

FEETSCALE

12.5 0

HORIZONTAL

FEETSCALE

0

VERTICAL

2.5 51.252.5

DESIGN BASED ON AVERAGE CHANNEL DATA.

NOTE:

TYPICAL CROSS SECTION

31 1

3

9’6’9’

SHEET 6 OF 6

CHANNEL 2 LAYOUT

D-10

3’

945

950

MA

TC

HLIN

E S

TA 3

0+00

MA

TC

HLIN

E S

TA 3

0+00

953

955

960

965

955

956

954955

957

958

956

30+00 31+00 32+00 33+00 34+00 35+00

CENTERLINE PARADISE RD.

959

960

953

954

955

956

959

954955

956957

957

956

955

954

953

952

TIE INTO PROPOSED LAKE

SIDE OF CHANNEL

31+00

32+00

33+00

34+00

3/6/2

013

11:2

5:5

0

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

1- 3FT DIA 57LF CONCRETE CULVERT

0.5%

1.8%

0.5%

20.4

%

EMERGENCY SPILLWAY

SLOPE AT 0% FOR FLOW OUT

1 - 12" 1/4 BEND33LF PVC PIPE

1.0%

2.0%

2.4:1

1.5:1

HW100 = 2.31’

HW25 = 1.50’

BOTTOM OF CHANNEL

BOTTOM OF CHANNEL

TOP OF CHANNEL

TOP OF CHANNEL

Page 23: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

RLS LFLF RLS

CHANNEL CENTERLINE

ROW (TYP.)

DRAINAGE EASEMENT (TYP.)

EDGE OF ROAD (TYP.) 502525

FEETSCALE

12.5 0

HORIZONTAL

FEETSCALE

0

VERTICAL

2.5 51.252.5

DESIGN BASED ON AVERAGE CHANNEL DATA.

NOTE:

TYPICAL CROSS SECTION

31 1

3

SHEET 1 OF 1

CHANNEL 3 LAYOUT

D-11

945

950

955

960

965

CENTERLINE PARADISE RD.

959

957

956

955

TIE INTO PROPOSED LAKE

5+00 6+00

1.2’

3.6’3.6’(SEE COSA DETAIL)SIDEWALK DRAIN

SIDE OF CHANNEL

958

959

960

960

961

5+00 6+00

3/6/2013

11:2

5:5

3

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

HW25 = 0.93’

HW100 = 1.00’

0.5%

TOP OF CHANNEL

BOTTOM OF CHANNEL

Page 24: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

RLS LFLF RLS

CHANNEL CENTERLINE

ROW (TYP.)

DRAINAGE EASEMENT (TYP.)

EDGE OF ROAD (TYP.)

502525

FEETSCALE

12.5 0

HORIZONTAL

FEETSCALE

0

VERTICAL

2.5 51.252.5

DESIGN BASED ON AVERAGE CHANNEL DATA.

NOTE:

TYPICAL CROSS SECTION

31 1

3

SHEET 1 OF 1

CHANNEL 4 LAYOUT

D-12

945

950

955

960

965

CENTERLINE PARADISE RD.

959

957

956

955

TIE INTO PROPOSED LAKE

5+00 6+00

1.5’

4.5’4.5’

(SEE COSA DETAIL)SIDEWALK DRAIN

SIDE OF CHANNEL

959

960961

CENTERLINE BLISS RD.

7+00 8+00

960

954

959

5+00 6+00 7+00 8+00

3/6/2013

11:2

5:5

6

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

TOP OF CHANNEL

BOTTOM OF CHANNEL

0.3%

HW25 = 1.16’

HW100 = 1.31’

Page 25: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

RLS LFLF RLS

CHANNEL CENTERLINE

ROW (TYP.)

DRAINAGE EASEMENT (TYP.)

EDGE OF ROAD (TYP.)

502525

FEETSCALE

12.5 0

HORIZONTAL

FEETSCALE

0

VERTICAL

2.5 51.252.5

DESIGN BASED ON AVERAGE CHANNEL DATA.

NOTE:

TYPICAL CROSS SECTION

31 1

3

SHEET 1 OF 1

CHANNEL 5 LAYOUT

D-13

945

950

955

960

965

959

957

956

955

TIE INTO PROPOSED LAKE

5+00 6+00

1.2’

3.6’3.6’

(SEE COSA DETAIL)SIDEWALK DRAIN

SIDE OF CHANNEL

959

7+00 8+00

960

954

CENTERLINE BLISS RD.

CENTERLINE TRANQUILITY RD.

953

958

960

961

961

961

962

961

5+00 6+00 7+00 8+00

3/6/2013

11:2

5:5

8

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

TOP OF CHANNEL

BOTTOM OF CHANNEL

0.3%HW25 = 0.93’

HW100 = 1.02’

Page 26: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

RLS LFLF RLS

CHANNEL CENTERLINE

ROW (TYP.)

DRAINAGE EASEMENT (TYP.)

EDGE OF ROAD (TYP.)502525

FEETSCALE

12.5 0

HORIZONTAL

FEETSCALE

0

VERTICAL

2.5 51.252.5

DESIGN BASED ON AVERAGE CHANNEL DATA.

NOTE:

TYPICAL CROSS SECTION

31 1

3

SHEET 1 OF 1

CHANNEL 6 LAYOUT

D-14

945

950

955

960

965

959

TIE INTO PROPOSED LAKE

5+00 6+00

1.6’

(SEE COSA DETAIL)SIDEWALK DRAIN

SIDE OF CHANNEL

958

4.8’ 4.8’

CENTERLINE TRANQUILITY RD.

957

956

955

960

961

960

959

958

959

958

957

956

961

960

959

960

7+00

5+00 6+00 7+00

3/6/2013

11:2

6:0

1 P

M

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

BOTTOM OF CHANNEL

0.3%

TOP OF CHANNEL

HW100 = 1.50’

HW25 = 1.35’

Page 27: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

RLS LFLF RLS

502525

FEETSCALE

12.5 0

HORIZONTAL

FEETSCALE

0

VERTICAL

2.5 51.252.5

SHEET 1 OF 1

D-15

950

955

960

965

10+00

963

SLOTTED DRAIN INLET 1

970

36" DIA SLOTTED DRAIN INLET

6’x6’ JUNCTION BOX

36" CONCRETE PIPE

SLOTTED DRAIN INLET 2

964

965

966

5+00 6+00 7+00 8+00 9+00 11+00

6+00

7+00

8+00

9+00

11+00

3/6/2013

11:2

6:0

4

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

SLOTTED DRAIN INLET PIPE603 LF OF 36" DIA

0.5%

TOP OF PARKING LOT

6’x6’ JUNCTION BOX

Page 28: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

RLS LFLF RLS

502525

FEETSCALE

12.5 0

HORIZONTAL

FEETSCALE

0

VERTICAL

2.5 51.252.5

SHEET 1 OF 1

D-16

950

955

960

965

10+00

963

SLOTTED DRAIN INLET 2

970

36" DIA SLOTTED DRAIN INLET

6’x6’ JUNCTION BOX

36" CONCRETE PIPE

SLOTTED DRAIN INLET 1

964

965

966

5+00 6+00 7+00 8+00 9+00

CENTERLINE PARADISE RD

963

962

961

11

+00

6+00

7+00

8+00

9+00

3/6/2013

11:2

6:0

7

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

6’x6’ JUNCTION BOX

SLOTTED DRAIN INLET PIPE539 LF OF 36" DIA

TOP OF PARKING LOT

0.7%

Page 29: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

RLS LFLF RLS

502525

FEETSCALE

12.5 0

HORIZONTAL

FEETSCALE

0

VERTICAL

2.5 51.252.5

SHEET 1 OF 1

D-17

950

955

960

965

10+00

PARKING LOT STORM PIPE

970

6’x6’ JUNCTION BOX

36" CONCRETE PIPE

SLOTTED DRAIN INLET 1

5+00 6+00 7+00 8+00 9+00

960

SLOTTED DRAIN INLET 2

958

957

956

955

954

953

952

951

950

949

948

961

962963

964963

11+

00

9+00

6+00

3/6/2

013

11:2

6:0

9

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

0.4%

6’x6’ JUNCTION BOX

CONCRETE PIPE170 LF OF 36" DIA

PROPOSED LAKEOUTFLOW TO

Page 30: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION
Page 31: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

SHEET 1 OF 1

6GHGH RM RM

28’ Pavement Width

50’ Right-of-Way

50’ Right-of-Way

28’ Pavement Width

2% Slope ->

<-2% Slope

4’ Sidewalk

4’ Sidewalk

Sidewalk 4’

Sidewalk 4’

Clear Space 6’

Clear Space 6’6’ Clear Space

6’ Clear Space

1’ Curb

1’ CurbCurb 1’

Curb 1’

ROADWAY TYPICAL CROSS SECTION

ROADWAY TYPICAL SECTIONS

PARADISE RD TYPICAL SECTION

TRANQUILITY RD, HARMONY RD, AND BLISS RD TYPICAL SECTION

3/6/2013

11:2

6:1

1 P

M

Drawn: Checked: Sheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

Page 32: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

3/6/2013

11:2

6:1

4

PM

935

940

945

950

955

960

965

10+00 11+00 12+00 13+00 14+00 15+00(STA 10+00 TO STA 15+00)

BLISS STREET ROADWAY PLAN AND PROFILES

RDM RLS RDMRLS

SHEET 1 OF 4

39 40

41

42

4344

PO

T

Sta. 1

0+

00.

00

10+00 15+00

25

+00

PO

T

Sta. 1

0+

00.

00

10+00 15+00

25

+00

EXIS

T.

EL.

PR

OP.

EL.

3/6/2013

11:2

6:1

4

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

VPI S

TA. 10

+15.0

8

EL

EV

ATIO

N 959.7

2-1.86% -0.42%

960.0

0

VPI S

TA. 10

+90.0

0

EL

EV

ATIO

N 959.4

1

-0.42% +0.84%

60.00’ V.C.

K = 48

ex = 0.09’

+60.0

0

EL. 959.5

3

+20.0

0

EL. 959.6

6

(959.5

3)

EXIS

T.

EL.

PR

OP.

EL.

3/6/2013

11:2

6:1

4

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

Page 33: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

935

940

945

950

955

960

965

15+00 16+00 17+00 18+00 19+00 20+00

(STA 15+00 TO STA 20+00)BLISS STREET

ROADWAY PLAN AND PROFILES

RDM RLS RLSRDM

SHEET 2 OF 4

15+00

PC

Sta.

17

+1

9.

30

20+00P

T Sta. 20+94.80

15+00

PC

Sta.

17

+1

9.

30

20+00P

T Sta. 20+94.80

EXIS

T.

EL.

PR

OP.

EL.

3/6/2013

11:2

6:1

6

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: LFChecked:

CFMSSDEVELOPERSURBAN

VPI S

TA. 16

+20.0

0

EL

EV

ATIO

N 963.8

4

+0.84% -0.42%

40.59’ V.C.

K = 32

ex = -0.06’

+99.7

1 E

L. 963.6

7

+40.2

9

EL. 963.7

6

(963.6

8)

Page 34: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

20+00 21+00 22+00 23+00 24+00 25+00

935

940

945

950

955

960

965

(STA 20+00 TO STA 25+00)BLISS STREET

ROADWAY PLAN AND PROFILES

RLS RLSRDM RDM

SHEET 3 OF 4

20+00

PT

Sta. 20

+94.80

PC

Sta. 23

+44.86

25+0

0

PT Sta.

26+5

0.22

POT Sta.

27+0

4.13

20+00

PT

Sta. 20

+94.80

PC

Sta. 23

+44.86

25+0

0

PT Sta.

26+5

0.22

POT Sta.

27+0

4.13

EXIS

T.

EL.

PR

OP.

EL.

3/6/2

013

11:2

6:1

8

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

VPI S

TA. 22

+90.0

0

EL

EV

ATIO

N 961.00

-0.42% -0.60%

Page 35: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

925

930

935

940

945

950

955

960

965

25+00 26+00 27+00 RLS RLS

(STA 25+00 TO STA 26+89)BLISS STREET

ROADWAY PLAN AND PROFILES

SHEET 4 OF 4

RDMRDM

1

2

3

4

56

25+00

PT

Sta. 2

6+5

0.2

2

PO

T

Sta. 2

7+0

4.1

3

25+00

PT

Sta. 2

6+5

0.2

2

PO

T

Sta. 2

7+0

4.1

3

EXIS

T.

EL.

PR

OP.

EL.

3/6/2

013

11:2

6:2

0

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed:

SHEET X OF X

Checked:

CFMSSDEVELOPERSURBAN

VPI S

TA. 26

+50.0

0

EL

EV

ATIO

N 958.8

5-0.60% +0.43%V

PI S

TA. 26

+89.13

EL

EV

ATIO

N 959.0

2+0.43% +1.87%

959.3

0

Page 36: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

3/6/2

013

11:2

6:2

2

PM

935

940

945

950

955

960

965

970

975

10+00 11+00 12+00 13+00 14+00 15+00

(STA 10+00 TO STA 15+00)HARMONY STREET

ROADWAY PLAN AND PROFILES

RLS RLSRDM RDM

SHEET 1 OF 3

15

16

17

18

POT Sta. 10+00.00

10+00

PC Sta. 10+65.14

PT

Sta. 11

+58.15

15+00

PT Sta. 57+74.28

POT Sta. 10+00.00

10+00

PC Sta. 10+65.14

PT

Sta. 11

+58.15

15+00

PT Sta. 57+74.28

EXIS

T.

EL.

PR

OP.

EL.

3/6/2

013

11:2

6:2

2

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

VPI S

TA. 10

+15.0

1

EL

EV

ATIO

N 966.0

8-1.87% +0.63%

966.3

6

Page 37: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

SHEET OF

16+00 17+00 18+00 19+00 20+0015+00

945

950

955

960

965

970

975

RLS RLS

SHEET 2 OF 3

(STA 15+00 TO STA 20+00)HARMONY STREET

ROADWAY PLAN AND PROFILES

RDMRDM

15+00 20+0015+00 20+00

EXIS

T.

EL.

PR

OP.

EL.

3/6/2013

11:2

6:2

4

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: RLS Checked:

CFMSSDEVELOPERSURBAN

VPI S

TA. 18

+10.0

0

EL

EV

ATIO

N 971.05

+0.63% -0.48%

40.00’ V.C.

K = 36

ex = -0.06’

VPI S

TA. 19

+75.0

0

EL

EV

ATIO

N 970.2

5

-0.48% -1.80%

40.00’ V.C.

K = 30

ex = -0.07’

+90.0

0

EL. 970.9

3

+30.0

0

EL. 970.9

6

(970.9

8)

+55.0

0

EL. 970.3

5

+95.0

0

EL. 969.8

9

Page 38: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

19+00 20+00 21+00945

950

955

960

965

970

975

RLS RLS

SHEET 3 OF 3

(STA 20+00 TO STA 21+46.64)HARMONY STREET

ROADWAY PLAN AND PROFILES

RDM RDM

19

20

2122

2324

20+00 PO

T

Sta. 21

+46.64

60

+00

20+00 PO

T

Sta. 21

+46.64

60

+00

EXIS

T.

EL.

PR

OP.

EL.

3/6/2013

11:2

6:2

6

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: CC Checked:

CFMSSDEVELOPERSURBAN

-0.48%

VPI S

TA. 19

+75.0

0

EL

EV

ATIO

N 970.2

5

-0.48% -1.80%

40.00’ V.C.

K = 30

ex = -0.07’

VPI S

TA. 21+

32.6

3

EL

EV

ATIO

N 967.4

1-1.80% +2.00%

967.6

9

+55.0

0

EL. 970.3

5

+95. 0

0

EL. 969. 8

9

Page 39: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

RLS RLSRDMRDM

(STA 10+00 TO STA 15+00)PARADISE STREET

ROADWAY PLAN AND PROFILES

SHEET 1 OF 11

45

46

47

48

49

50

POT Sta. 10+00.00

10+00

PC Sta. 10+63.92

PT

Sta.

11

+2

6.0

9

15+00

15+00

PC Sta. 15+54.99

POT Sta. 10+00.00

10+00

PC Sta. 10+63.92

PT

Sta.

11

+2

6.0

9

15+00

15+00

PC Sta. 15+54.99

EXIS

T.

EL.

PR

OP.

EL.

3/6/2013

11:2

6:2

8

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

NOGAP

1

5

920

1000.000000

PARADISE

SDP

VPI S

TA. 10

+14.4

2

EL

EV

ATIO

N 954.2

4-1.94% +0.81%

954.5

2

10+00 11+00 12+00 13+00 14+00 15+00

920

925

930

935

940

945

950

955

960

Page 40: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

15+00 16+00 17+00 18+00 19+00 20+00

930

935

940

945

950

955

960

965

970

975

RLS RLS

(STA 15+00 TO STA 20+00)HARMONY STREET

ROADWAY PLAN AND PROFILES

RDMRDM

SHEET 2 OF 11

15+00 20+0015+00 20+00

EXIS

T.

EL.

PR

OP.

EL.

3/6/2

013

11:2

6:3

0

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

VPI S

TA. 18

+70.0

0

EL

EV

ATIO

N 961.15

+0.81% -0.41%

40.00’ V.C.

K = 33

ex = -0.06’

+50.0

0

EL. 960.9

9

+90.0

0

EL. 961.07

Page 41: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

920

925

930

935

940

945

950

955

960

965

RLS RLS

SHEET 3 OF 11

RDMRDM

(STA 20+00 TO STA 25+00)PARADISE STREET

ROADWAY PLAN AND PROFILES

1

2

3

4

56

PT Sta. 26+50.22

POT Sta. 27+04.13

20+00 25+00

PT Sta. 26+50.22

POT Sta. 27+04.13

20+00 25+00

EXIS

T.

EL.

PR

OP.

EL.

3/6/2

013

11:2

6:3

2

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

VPI S

TA. 23

+25.0

0

EL

EV

ATIO

N 959.3

0-0.41% +0.41%

20+00 21+00 22+00 23+00 24+00 25+00

Page 42: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

25+00 26+00 27+00 28+00 29+00 30+00

935

940

945

950

955

960

965

970

975

RLS RLS

SHEET 4 OF 11

RDMRDM

(STA 25+00 TO STA 30+00)PARADISE STREET

ROADWAY PLAN AND PROFILES

25+00 30+0025+00 30+00

EXIS

T.

EL.

PR

OP.

EL.

3/6/2013

11:2

6:3

4

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

VPI S

TA. 26

+60.0

0

EL

EV

ATIO

N 960.6

8

+0.41% -0.40%

Page 43: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

930

935

940

945

950

955

960

965

970

975

30+00 31+00 32+00 33+00 34+00 35+00RLS RLS

SHEET 5 OF 11

RDMRDM

(STA 30+00 TO STA 35+00)PARADISE STREET

ROADWAY PLAN AND PROFILES

56

30+00

PC

Sta.

34

+2

3.

22

35+00

30+00

PC

Sta.

34

+2

3.

22

35+00

EXIS

T.

EL.

PR

OP.

EL.

3/6/2

013

11:2

6:3

5

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed:

SHEET X OF X

Checked:

CFMSSDEVELOPERSURBAN

VPI S

TA. 30

+70.0

0

EL

EV

ATIO

N 959.0

2-0.40% +0.77%

50.00’ V.C.

K = 43

ex = 0.07’

+45.0

0

EL. 959.12

+95.0

0

EL. 959.2

1

(959.11)

Page 44: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

940

945

950

955

960

965

970

975

35+00 36+00 37+00 38+00 39+00 40+00RLS RLS

SHEET 6 OF 11

RDMRDM

(STA 35+00 TO STA 40+00)PARADISE STREET

ROADWAY PLAN AND PROFILES

PC Sta. 34+23.22

35+00

40+00

PC Sta. 34+23.22

35+00

40+00

EXIS

T.

EL.

PR

OP.

EL.

3/6/2013

11:2

6:3

7

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: CC Checked:

CFMSSDEVELOPERSURBAN

VPI S

TA. 40

+00.0

0

EL

EV

ATIO

N 966.16

+0.77% -1.63%

80.00’ V.C.

K = 33

ex = -0.24’

+60.0

0

EL. 965.8

5

+40.0

0

EL. 965.5

1

( 965. 9

2)

Page 45: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

935

940

945

950

955

960

965

970

975

40+00 41+00 42+00 43+00 44+00 45+00 RLS RLS

SHEET 7 OF 11

RDMRDM

(STA 40+00 TO STA 45+00)PARADISE STREET

ROADWAY PLAN AND PROFILES

7

8

9

10

11 12

57

58

40+0

0

PT

Sta. 41

+35.79

PC

Sta. 43

+18.92

45+00

PC Sta. 61+90.05

PT Sta. 63+25.32

POT Sta. 63+76.12

40+0

0

PT

Sta. 41

+35.79

PC

Sta. 43

+18.92

45+00

PC Sta. 61+90.05

PT Sta. 63+25.32

POT Sta. 63+76.12

EXIS

T.

EL.

PR

OP.

EL.

3/6/2013

11:2

6:4

0

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

VPI S

TA. 40

+00.0

0

EL

EV

ATIO

N 966.16

+0.77% -1.63%

80.00’ V.C.

K = 33

ex = -0.24’

VPI S

TA. 41+

90.0

0

EL

EV

ATIO

N 963.0

6-1.63% +0.55%

90.00’ V.C.

K = 41

ex = 0.25’

+60.0

0

EL. 965.8

5

+40.0

0

EL. 965.5

1

(965.9

2)

+45.0

0

EL. 963.7

9

+35.0

0

EL. 963.3

1

(963.7

2)

(963.2

6)

Page 46: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

930

935

940

945

950

955

960

965

970

975

45+00 46+00 47+00 48+00 49+00 50+00RLS RLS

SHEET 8 OF 11

RDMRDM

(STA 45+00 TO STA 50+00)PARADISE STREET

ROADWAY PLAN AND PROFILES

45+00 PT

Sta.

45

+7

0.

45

50+00POT Sta. 63+76.1245+00 PT

Sta.

45

+7

0.

45

50+00POT Sta. 63+76.12

EXIS

T.

EL.

PR

OP.

EL.

3/6/2013

11:2

6:4

2

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

Page 47: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

945

950

955

960

965

970

975

SHEET OF

50+00 51+00 52+00 53+00 54+00 55+00RLS RLS

SHEET 9 OF 11

RDM RDM

(STA 50+00 TO STA 55+00)PARADISE STREET

ROADWAY PLAN AND PROFILES

50+00 55+0050+00 55+00

EXIS

T.

EL.

PR

OP.

EL.

3/6/2

013

11:2

6:4

4

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

VPI S

TA. 54

+50.0

0

EL

EV

ATIO

N 970.0

5

+0.55% -0.44%

Page 48: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

945

950

955

960

965

970

975

55+00 56+00 57+00 58+00 59+00 60+00RLS RLS

(STA 55+00 TO STA 60+00)PARADISE STREET

ROADWAY PLAN AND PROFILES

RDMRDM

SHEET 10 OF 11

19

20

21

22

POT Sta. 21+46.64

55+00

PC Sta. 56+69.51

PT Sta. 58+24.06

60+00

POT Sta. 21+46.64

55+00

PC Sta. 56+69.51

PT Sta. 58+24.06

60+00

EXIS

T.

EL.

PR

OP.

EL.

3/6/2

013

11:2

6:4

6

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

VPI S

TA. 54

+50.0

0

EL

EV

ATIO

N 970.0

5

+0.55% -0.44%

Page 49: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

930

935

940

945

950

955

960

965

970

975

60+00 61+00 62+00RLS RLS

SHEET 11 OF 11

RDM RDM

(STA 60+00 TO STA 62+29.31)PARADISE STREE

ROADWAY PLAN AND PROFILES

19

20

23

24

25

26

27

28

29

30

POT Sta. 21+46.6460+00 PO

T

Sta.

62

+44.32

POT Sta. 21+46.6460+00 PO

T

Sta.

62

+44.32

EXIS

T.

EL.

PR

OP.

EL.

3/6/2

013

11:2

6:4

8

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

VPI S

TA. 62

+29.3

1

EL

EV

ATIO

N 966.6

1-0.44% +1.87%

966.8

9

Page 50: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

(STA 10+00 TO STA 15+00)TRANQUILITY STREET

ROADWAY PLAN AND PROFILES

RLS RLS

SHEET 1 OF 10

RDMRDM

51

52

53

54

POT Sta. 10+00.00

PO

T

Sta. 10

+00.00

10+00

PC

Sta. 11

+32.37

PT

Sta. 13

+03.71

15+0

0 POT Sta. 10+00.00

PO

T

Sta. 10

+00.00

10+00

PC

Sta. 11

+32.37

PT

Sta. 13

+03.71

15+0

0

EXIS

T.

EL.

PR

OP.

EL.

3/6/2013

11:2

6:5

0

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

NOGAP

1

5

920

1000.000000

TRANQUILITY

SDP

VPI S

TA. 12

+35.0

0

EL

EV

ATIO

N 949.9

2+0.50% +1.47%

948.7

4

10+00 11+00 12+00 13+00 14+00 15+00

920

925

930

935

940

945

950

955

960

965

Page 51: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

940

EXIS

T.

EL.

PR

OP.

EL.

3/6/2013

11:2

6:5

2

PM

Drawn: Checked:XXXSheet No:

HEAVEN ON EARTH

Designed:

SHEET X OF X

(STA 10+00 TO STA 14+00)BLISS STREET

ROADWAY PLAN AND PROFILES

RLS CC RLS LFChecked:

CFMSSDEVELOPERSURBAN

Page 52: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

20+00 21+00 22+00 23+00 24+00 25+00

935

940

945

950

955

960

965

970

975

RLS RLS

SHEET 3 OF 10

RDMRDM

(STA 20+00 TO STA 25+00)TRANQUILITY STREET

ROADWAY PLAN AND PROFILES

39

41

42

43

44

POT Sta. 10+00.00

10+00

20+00

PC Sta. 20+22.97

PT Sta. 22+51.13

25+00

POT Sta. 10+00.00

10+00

20+00

PC Sta. 20+22.97

PT Sta. 22+51.13

25+00

EXIS

T.

EL.

PR

OP.

EL.

3/6/2013

11:2

6:5

4

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: RLS Checked:

CFMSSDEVELOPERSURBAN

VPI S

TA. 23

+00.0

0

EL

EV

ATIO

N 960.7

0

+0.56% -0.41%

VPI S

TA. 24

+70.0

0

EL

EV

ATIO

N 960.0

0-0.41% +0.41%

Page 53: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

25+00 26+00 27+00 28+00 29+00 30+00935

940

945

950

955

960

965

970

975

RLS RLS

SHEET 4 OF 10

RDMRDM

(STA 25+00 TO STA 30+00)TRANQUILITY STREET

ROADWAY PLAN AND PROFILES

35

36

39

40

25+00

PC

Sta. 26

+44.05

PT

Sta. 28

+40.26

PC

Sta. 29

+59.30

PT

Sta. 29

+91.84

30+00

25+00

PC

Sta. 26

+44.05

PT

Sta. 28

+40.26

PC

Sta. 29

+59.30

PT

Sta. 29

+91.84

30+00

EXIS

T.

EL.

PR

OP.

EL.

3/6/2013

11:2

6:5

6

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: CC Checked:

CFMSSDEVELOPERSURBAN V

PI S

TA. 24

+70.0

0

EL

EV

ATIO

N 960.0

0 +0.41%

VPI S

TA. 30

+00.0

0

EL

EV

ATIO

N 962.15

+0.41% -0.34%

Page 54: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

30+00 31+00 32+00 33+00 34+00 35+00

935

940

945

950

955

960

965

970

975

RLS RLS

SHEET 5 OF 10

RDMRDM

(STA 30+00 TO STA 35+00)TRANQUILITY STREET

ROADWAY PLAN AND PROFILES

PC

Sta. 29

+59.30

30+00 35+00PC

Sta. 29

+59.30

30+00 35+00

EXIS

T.

EL.

PR

OP.

EL.

3/6/2013

11:2

6:5

8

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

VPI S

TA. 30

+00.0

0

EL

EV

ATIO

N 962.15

+0.41% -0.34%

Page 55: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

920

925

930

935

940

945

950

955

960

965

RLS RLS

SHEET 6 OF 10

RDMRDM

(STA 35+00 TO STA 40+00)TRANQUILITY STREET

ROADWAY PLAN AND PROFILES

33

34

35+00 40+00PC

Sta. 40

+13.54

35+00 40+00PC

Sta. 40

+13.54

EXIS

T.

EL.

PR

OP.

EL.

3/6/2013

11:2

7:0

0

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

-0.34%

35+00 36+00 37+00 38+00 39+00 40+00

Page 56: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

40+00 41+00 42+00 43+00 44+00 45+00

930

935

940

945

950

955

960

965

970

975

RLS RLS

SHEET 7 OF 10

RDMRDM

(STA 40+00 TO 45+00)TRANQUILITY STREET

ROADWAY PLAN AND PROFILES

31

32

3334

40

+00

PC Sta. 40+13.54

PT

Sta. 43

+19.22

45+00

40

+00

PC Sta. 40+13.54

PT

Sta. 43

+19.22

45+00

EXIS

T.

EL.

PR

OP.

EL.

3/6/2013

11:2

7:0

2

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed:

SHEET X OF X

Checked:

CFMSSDEVELOPERSURBAN

VPI S

TA. 40

+60.0

0

EL

EV

ATIO

N 958.5

5-0.34% +1.19%

70.01’ V.C.

K = 46

ex = 0.13’

+24.9

9

EL. 958.6

7

+95.0

1 E

L. 958.9

7

(958.6

5)

Page 57: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

940

945

950

955

960

965

970

975

45+00 46+00 47+00 48+00 49+00 50+00RLS RLS

SHEET 8 OF 10

RDMRDM

(STA 45+00 TO STA 50+00)TRANQUILITY STREET

ROADWAY PLAN AND PROFILES

25

26

27

28

2930

POT Sta. 62+44.32

45+00 50+00POT Sta. 62+44.32

45+00 50+00

EXIS

T.

EL.

PR

OP.

EL.

3/6/2013

11:2

7:0

4

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

VPI S

TA. 50

+27.8

8

EL

EV

ATIO

N 970.10

+1.19% -0.42%

50.00’ V.C.

K = 31

ex = -0.10’

+02.8

8

EL. 969.8

0

+52.8

8

EL. 970.0

0(9

70.0

1)

Page 58: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

945

950

955

960

965

970

975

50+00 51+00 52+00 53+00 54+00 55+00RLS RLS

SHEET 9 OF 10

RDMRDM

(STA 50+00 TO STA 55+00)TRANQUILITY STREET

ROADWAY PLAN AND PROFILES

50+00 55+0050+00 55+00

EXIS

T.

EL.

PR

OP.

EL.

3/6/2013

11:2

7:0

6

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

VPI S

TA. 50

+27.8

8

EL

EV

ATIO

N 970.10

+1.19% -0.42%

50.00’ V.C.

K = 31

ex = -0.10’

+02.8

8

EL. 969.8

0

+52.8

8

EL. 970.0

0(9

70.0

1 )

Page 59: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

RLS RLS

SHEET 10 OF 10

RDMRDM

(STA 55+00 TO 60+00)TRANQUILITY STREST

ROADWAY PLAN AND PROFILES

948.7

4

940

945

950

955

960

965

970

975

55+00 56+00 57+00 58+00 59+00 60+00

13

14

15

16

17

18

POT Sta. 10+00.00 10

+00

PC Sta. 10+65.14

PT Sta. 11+58.15

55+00

PC Sta. 55+71.94

PT

Sta.

57

+74.28

60+00

POT Sta. 10+00.00 10

+00

PC Sta. 10+65.14

PT Sta. 11+58.15

55+00

PC Sta. 55+71.94

PT

Sta.

57

+74.28

60+00

EXIS

T.

EL.

PR

OP.

EL.

3/6/2013

11:2

7:0

8

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

Page 60: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION

RLS RLS

SHEET 10 OF 10

RDMRDM

(STA 55+00 TO 60+00)TRANQUILITY STREST

ROADWAY PLAN AND PROFILES

948.7

4

55+00 56+00 57+00 58+00 59+00 60+00

935

940

945

950

955

960

965

970

975

7

8

9

10

11

12

PC Sta. 43+18.92

PT Sta. 45+70.45

60+00 PC

Sta.

61

+90.05

PT Sta. 63+25.32

POT Sta. 63+76.12

PC Sta. 43+18.92

PT Sta. 45+70.45

60+00 PC

Sta.

61

+90.05

PT Sta. 63+25.32

POT Sta. 63+76.12

EXIS

T.

EL.

PR

OP.

EL.

3/6/2013

11:2

7:1

0

PM

Drawn: Checked: XXXSheet No:

HEAVEN ON EARTH

Designed: Checked:

CFMSSDEVELOPERSURBAN

VPI S

TA. 63

+61.06

EL

EV

ATIO

N 964.5

4

-0.42% -1.86%

964.2

6

Page 61: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION
Page 62: HEAVEN ON EARTH DEVELOPMENTheavenonearthdesign.weebly.com/uploads/1/7/0/5/17059318/...HEAVEN ON EARTH DEVELOPMENT 50% SUBMITTAL CMFSS, LLC PRESENTED TO: URBAN DEVELOPERS PROJECT LOCATION