HEATHROW AIRSIDE COACHING STATIONS LONDON [email protected] 01202 746 666 www.bournegroup.eu We were tasked with the manufacture and installation of a number of transit areas for embarking and disembarking passengers at Heathrow Airport. Working 'airside' at any airport is a complex and challenging task, with deliveries and lifting times severely restricted. So, it was imperative that these buildings were installed without causing any disruption to the 24-hour operation of the airport. Prefabricated and clad off-site in our factory in Henstridge, the coaching stations were delivered and installed during a 4-hour night window. The buildings were finished externally with a combination of glazing and a composite panel, and were linked into the existing terminal structure. As part of the integration with the existing terminal, we carried out some refurbishment to the stair areas, which included the installation of a new lift shaft, using our 'Lift in a Day' product. Market Sector: Modular Client: BAA Engineer: Rathbone and Roche Main Contractor: Mansell

Transcript of HEATHROW AIRSIDE COACHING STATIONS - Bourne Ltd...HEATHROW AIRSIDE COACHING STATIONS LONDON...

Page 1: HEATHROW AIRSIDE COACHING STATIONS - Bourne Ltd...HEATHROW AIRSIDE COACHING STATIONS LONDON info.bgp@bournegroup.eu 01202 746 666 We were tasked with the manufacture and installation

HEATHROW AIRSIDE COACHING STATIONSLONDON

[email protected]

01202 746 666

www.bournegroup.eu

We were tasked with the manufacture and installation of a number of transit areas for embarking

and disembarking passengers at Heathrow Airport.

Working 'airside' at any airport is a complex and challenging task, with deliveries and lifting times

severely restricted. So, it was imperative that these buildings were installed without causing any

disruption to the 24-hour operation of the airport.

Prefabricated and clad off-site in our factory in Henstridge, the coaching stations were delivered

and installed during a 4-hour night window.

The buildings were finished externally with a combination of glazing and a composite panel, and

were linked into the existing terminal structure. As part of the integration with the existing

terminal, we carried out some refurbishment to the stair areas, which included the installation of a

new lift shaft, using our 'Lift in a Day' product.

Market Sector: Modular

Client: BAA

Engineer: Rathbone and Roche

Main Contractor: Mansell