HCAL RBX for HB, HE, and HO Status and Planning
R. Ruchti
Department of Physics
University of Notre Dame
Notre Dame, IN 46556 USA
PRR for HCAL RBX 1-March 2001 R.Ruchti 2
RBX Working Group•Notre Dame
–B. Baumbaugh, B. Beiersdorf, L. Castle, T. Loughran, D. Karmgard, J. Marchant, M. McKenna, R. Ruchti, D. Wiand
•Fermilab
–A. Baumbaugh, J. Elias, J. Freeman, R. Foltz, S. Los, C. Rivetta, A. Ronzhin, T. Shaw, J. Whitmore
•Florida State
–V. Hagopian, K. Johnson
•UI Chicago
–D. Dwyer, M. Adams
•Iowa
–Y. Onel
•Minnesota
–A. Heering
•Mississippi
–M. Booke, M. Reep, J. Reidy
PRR for HCAL RBX 1-March 2001 R.Ruchti 3
HCAL Subsystem Locations
PRR for HCAL RBX 1-March 2001 R.Ruchti 4
Overview of RBX Placement
PRR for HCAL RBX 1-March 2001 R.Ruchti 5
RBX contents for all subsystems
• All components reside in an enclosure/shell which acts as mechanical enclosure and distribution point for services.
• All components are modular – and can be inserted and removed as units.
• RM-19 (HB, HE, and HO subsystems)• RM-73 (HB and HE only)• Calibration Module• CCM (Clock and Control Module)• HV/BV termination• LV termination• Water cooling • Gas manifold for nitrogen inerting of ODU/RM
PRR for HCAL RBX 1-March 2001 R.Ruchti 6
Assembly of HB- in Spain
PRR for HCAL RBX 1-March 2001 R.Ruchti 7
HB- Wedge being loaded on cradle
PRR for HCAL RBX 1-March 2001 R.Ruchti 8
HB RBX mounting on Wedge
PRR for HCAL RBX 1-March 2001 R.Ruchti 9
HB RBX (r,z) viewand (r,r) view
12.323 [313.00]
37.992 [965.00]
LOW VOLTAGE
AND PIPING AREA
4.173 [106.00]
CALIBRATIONMODULE
CCMMODULE
TOP VIEW
FRONT VIEW HB RBX COMPOSITE ASSEMBLY DRAWING
R. FOLTZ, FERMI LABJ. MARCHANT, UNIV. OF NOTRE DAMEAS OF 23 FEBRUARY 2001 9 AM CST
COOLING WATERIN & OUT
19-CHANNELRM-1
19-CHANNELRM-2
73-CHANNELRM
19-CHANNELRM-3
19-CHANNELRM-4
CHUNC
PRR for HCAL RBX 1-March 2001 R.Ruchti 10
HB RBX Front Face
PRR for HCAL RBX 1-March 2001 R.Ruchti 11
Topics
• Overview of RBX Design and Placement– HB RBX– HE RBX– HO RBX
• Services and Access
• Planning and Schedule
PRR for HCAL RBX 1-March 2001 R.Ruchti 12
Cooling Routing on RBX enclosure outer surface
PRR for HCAL RBX 1-March 2001 R.Ruchti 13
HB RBX Issues
• Design: compact and limited space• Status: advanced, ready for production• Integration: careful interaction with Tracker and
ECAL services and panels required.• Challenge: accessibility of modules, particularly
the RM-73.• Schedule: Testing of Megatiles in Building 186,
May 2001. Mounting of RBX on HB- wedges Summer 2001 in building 186.
PRR for HCAL RBX 1-March 2001 R.Ruchti 14
HB RBX Assembly
Full RBX with 19 ch RMs
RBX Interior -- HV distributor and backplane
PRR for HCAL RBX 1-March 2001 R.Ruchti 15
HB RBX Module Routing Channels
PRR for HCAL RBX 1-March 2001 R.Ruchti 16
RM-19 QIE Top View
PRR for HCAL RBX 1-March 2001 R.Ruchti 17
RM-19 QIE Front Face
PRR for HCAL RBX 1-March 2001 R.Ruchti 18
Readout Module for 19-channel HPD RM19
PRR for HCAL RBX 1-March 2001 R.Ruchti 19
RM19 Sidewall removed
PRR for HCAL RBX 1-March 2001 R.Ruchti 20
HB RBX Electrical
PRR for HCAL RBX 1-March 2001 R.Ruchti 21
RM19 Rear and Front Views
PRR for HCAL RBX 1-March 2001 R.Ruchti 22
ODU showing patch panel, cookie support plate, HPD, ZIF socket and interface card
PRR for HCAL RBX 1-March 2001 R.Ruchti 23
Module Extractor (CHUNC)
PRR for HCAL RBX 1-March 2001 R.Ruchti 24
RM-73
PRR for HCAL RBX 1-March 2001 R.Ruchti 25
RM-73 Front Face
7.441 [189.00]
3.923 [99.65]
PRR for HCAL RBX 1-March 2001 R.Ruchti 26
RM-73 Rear View
PRR for HCAL RBX 1-March 2001 R.Ruchti 27
HB Mapping ExampleQIE Cards to Megatiles
19.4 19.3 19.2 19.1
1 1 1 12 2 2 2
Tower PIN RO Tower PIN RO Tower PIN RO 3 3 3 3Card Card Card 4 4 4 4
16 A13 3 16 A8 2 15 A4 1 5 5 5 515 C15 3 14 B12 2 13 B5 1 6 6 6 612 C2 3 11 L16 2 10 L15 1 7 7 7 79 G2 3 8 G1 2 7 P15 1 8 8 8 86 R12 3 5 R5 2 4 P2 1 9 9 9 93 T13 3 2 T8 2 1 T4 1 10 10 10 10
11 11 11 1112 12 12 1213 13 13 1314 14 14 1415 15 15 1516 16 16 1615 15 15 1516 16 16 16
PRR for HCAL RBX 1-March 2001 R.Ruchti 28
RBX Services
• Water for cooling in/out
• Nitrogen gas for ODU/RM inerting in only
• HV/BV + termination
• LV
• Optical signals QIE out
• CCM and slow controls
• Laser calibration signals
PRR for HCAL RBX 1-March 2001 R.Ruchti 29
HV/BV Cable Termination
PRR for HCAL RBX 1-March 2001 R.Ruchti 30
HV/BV Distributor
PRR for HCAL RBX 1-March 2001 R.Ruchti 31
Calibration Module
PRR for HCAL RBX 1-March 2001 R.Ruchti 32
General Comment about RBX and Components
• The structures are modular. This allows us to gain in the schedule, as assembly, Q/C and testing can be “factorized”.
• RBX enclosures can be built, tested and mounted, independent of components which can be added later.
• RM can be fabricated mechanically. ODU can be fabricated. Electronics and HPDs can be incorporated when available.
PRR for HCAL RBX 1-March 2001 R.Ruchti 33
Additionals
• Copper fittings and jumper between roof and floor water cooling pipes
• Gas manifold• LV module• CCM• CHUNC• RM pinning• Front protection cover Status of Costing Status of Costing
panels• RM-19 (QIE) and RM-73• Retrofit of holes in RBX flooring for mounts
PRR for HCAL RBX 1-March 2001 R.Ruchti 34
HB RBX Production Status
• HB PPP-1– At CERN in mockup at Prevessin Site.
• HB PPP-2– At Fermilab for electrical integration and 186 testing
• HB PPP-3– At Notre Dame for thermal tests and 186 testing
• HB PPP-4– Under fabrication at an outside vendor and assembled at
Mississippi. Production drawing test bed.
• HB RBX production begins April 2001
PRR for HCAL RBX 1-March 2001 R.Ruchti 35
HB access/serviceability issues
• RM-19• Removal of optical cable protective covers
• Removal of optical cables, calibration cables
• Removal of any blocking services/cables
• Direct extraction using CHUNC
• RM-73, CCM and Calibration Modules• Similar to above, except RM-19s must be removed
first.
• Removal of any blocking services/cables.
• Extraction using CHUNC
PRR for HCAL RBX 1-March 2001 R.Ruchti 36
HB access/serviceability issues
• HV/VB termination and LV termination• Removal of RM-19
• Extraction using CHUNC
• Service in situ
• HV/VB backplane, electrical backplane• Removal of all RM, CCM and Calib Module
• Removal of HV/BV and LV terminations
• Full extraction
PRR for HCAL RBX 1-March 2001 R.Ruchti 37
Service Paths + Panels
HB RBX FRONT VIEW WITH SERVICES DRAWING
R. FOLTZ, FERMI LABJ. MARCHANT, UNIV. OF NOTRE DAMEAS OF 23 FEBRUARY 2001
PRR for HCAL RBX 1-March 2001 R.Ruchti 38
Servicing View
HB RBX FRONT VIEW WITH SERVICES DRAWING
R. FOLTZ, FERMI LABJ. MARCHANT, UNIV. OF NOTRE DAMEAS OF 23 FEBRUARY 2001
PRR for HCAL RBX 1-March 2001 R.Ruchti 39
HB Mockup in Lab 5 at Fermilab
19.419.3 CCM Cal 73 19.2
19.419.4 19.1
PRR for HCAL RBX 1-March 2001 R.Ruchti 40
Mockup at Fermilab
PRR for HCAL RBX 1-March 2001 R.Ruchti 41
PRR for HCAL RBX 1-March 2001 R.Ruchti 42
HB RBXExtracting ODU 19.2
PRR for HCAL RBX 1-March 2001 R.Ruchti 43
View of Mockup: edge of wedge
PRR for HCAL RBX 1-March 2001 R.Ruchti 44
View behind ECAL cooling conduits
PRR for HCAL RBX 1-March 2001 R.Ruchti 45
HB RBX environs(lateral shift of TK patch panel)
PRR for HCAL RBX 1-March 2001 R.Ruchti 46
HB RBXExtracting ODU 19.4
PRR for HCAL RBX 1-March 2001 R.Ruchti 47
HB RBXExtracting ODU 19.2
PRR for HCAL RBX 1-March 2001 R.Ruchti 48
HB RBX with TK patch panelno clearance for ODU-73
PRR for HCAL RBX 1-March 2001 R.Ruchti 49
HB RBXExtracting ODU 19.1
PRR for HCAL RBX 1-March 2001 R.Ruchti 50
HB RBXODU 73 clearance issues
PRR for HCAL RBX 1-March 2001 R.Ruchti 51
HB RBXODU 73 clearance problems
PRR for HCAL RBX 1-March 2001 R.Ruchti 52
Suggestion to allow ODU 73 access
PRR for HCAL RBX 1-March 2001 R.Ruchti 53
Accessibility Issues
• All optical cables for RM-19 visible and accessible in an unobstructed manner for visibility and access to mounting screws.
• Same requested for RM-73, but may not be possible.
• Use of compact extraction tool CHUNC to remove and reinsert modules
• Use of floor tracking to assure proper module insertion at odd angles.
• Mockup studies, Fermilab Lab 5 and Prevessin.
PRR for HCAL RBX 1-March 2001 R.Ruchti 54
HE RBX Issues
• Design: laterally compact, but good access in principle
• Status: enclosure design quite advanced• Integration: careful interaction with Preshower
(SE) and ECAL (EE) services.• Challenge: cooling issues and ODU fiber routing.• Schedule: PPP in June 2001
PRR for HCAL RBX 1-March 2001 R.Ruchti 55
HE RBX Status
• Drawings in progress
• Builds as much as possible upon the design of HB where possible.
• Layout of various internal modules in progress
• ODU in mockup phase
PRR for HCAL RBX 1-March 2001 R.Ruchti 56
HE RBX (r,z) view
ThermalInsulator
PRR for HCAL RBX 1-March 2001 R.Ruchti 57
HE RBX (z,r) viewSection through CCM
ThermalInsulator
PRR for HCAL RBX 1-March 2001 R.Ruchti 58
HE RBX (z,r) viewSection through Calib Module
ThermalInsulator
PRR for HCAL RBX 1-March 2001 R.Ruchti 59
HE RBX (r,z) view
RM 19Module
RM 19Module
LV
RM 73Module
RM 19Module
RM 19Module
Calibration CCM
HV
PRR for HCAL RBX 1-March 2001 R.Ruchti 60
HO RBX Issues
• Design: vertically very compact. Resides within muon absorber which provides for magnetic “focussing” for HPD, and shortened optical cables from HO megatiles.
• Status: enclosure in design, but not advanced• Integration: careful interaction with muon
chamber systems.• Challenge: ODU/HPD cookie placement,
servicing, and optical cable routing to megatiles.• Schedule: PPP in winter 2001
PRR for HCAL RBX 1-March 2001 R.Ruchti 61
HO RBX Status
• Drawings in formative stage
• Awaiting final results from study of magnetic field situation
• Appears that a solution is possible with RBX located at the large z ends of the muon wheels.
PRR for HCAL RBX 1-March 2001 R.Ruchti 62
HO RBX Concept
Front part of box Rear Part of boxG-10
HPD
Cal
ibra
tion
TTCLV HV
ODU
HPD
ODU
HPD
ODU
HPD
ODU
QIEElect
QIEElect
QIEElect
QIEElect
QIEElect
TOP View
Front View
ODU ODU ODU ODUCal
Side View
ODUQIETTC
HO RBX Mechanical Sketch
PRR for HCAL RBX 1-March 2001 R.Ruchti 63
HO (r,z) Schematic
HPD
Cal
ibra
tion
TTC LVHV
ODU
HPD
ODU
HPD
ODU
HPD
ODU
QIEElect
QIEElect
QIEElect
QIEElect
QIEElect
Bottom View
PRR for HCAL RBX 1-March 2001 R.Ruchti 64
HO RM schematic
HV Connectors
ODU
Cooling by-pass
Base Extrusion for HO ODUs
PRR for HCAL RBX 1-March 2001 R.Ruchti 65
HO RBX Mechanical: Bottom Coverplate
HPD
Cal
ibra
tion
TTC LVHV
ODU
HPD
ODU
HPD
ODU
HPD
ODU
QIEElect
QIEElect
QIEElect
QIEElect
QIEElect
Bottom View
Bottom Cover/Mechanical Support
PRR for HCAL RBX 1-March 2001 R.Ruchti 66
HO Mechanical: Top Coverplate
Front part of box Rear Part of boxG-10
HPD
Cal
ibra
tion
TTCLV HV
ODU
HPD
ODU
HPD
ODU
HPD
ODU
QIEElect
QIEElect
QIEElect
QIEElect
QIEElect
TOP View
Front View
ODU ODU ODU ODUCal
Side View
ODUQIETTC
HO RBX Mechanical Sketch
TOP Cover/Mechanical Support
PRR for HCAL RBX 1-March 2001 R.Ruchti 67
Request of CMS
• Approval of HB RBX design and agreement that HB RBX production can begin.
• Approval of design concept of HE RBX and that once full drawing set is available, that production can begin of the HE RBX.
• Approval of design concept and placement of HO RBX within iron of the Muon Wheels.
PRR for HCAL RBX 1-March 2001 R.Ruchti 68
HB RBX Accessing Issues
12.3228 [313.00]
37.9920 [965.00]
3.9370 [100.00]
2.7559 [70.00]3.9370 [100.00]2.7559 [70.00]
1.9685 [50.00]
LV
3.1496 [80.00]
19.6850 [500.00]
4.0034 [101.69]
1.3447 [34.16]
11.8207 [300.25]
CL of RBX vs CL of TPP
1.6406 [41.67]1.5149 [38.48]
6.6929 [170.00]
1.7717 [45.00]
4.3307 [110.00]
2.4340 [61.82]
LOW VOLTAGE
AND PIPING AREA
CALIBRATION
MODULE
CCMMODULE
COOLING WATERIN & OUT
19-CHANNELRM-1
19-CHANNELRM-2
73-CHANNELRM
19-CHANNELRM-3
19-CHANNELRM-4
CHUNC
HB RBX COMPOSITE ASSEMBLY DRAWINGTOP VIEW WITH SERVICES
R. FOLTZ, FERMI LABJ. MARCHANT, UNIV. OF NOTRE DAMEAS OF 27 FEBRUARY 2001
PRR for HCAL RBX 1-March 2001 R.Ruchti 69
HE ODU Fiber Mockup
PRR for HCAL RBX 1-March 2001 R.Ruchti 70
HE ODU fiber routing test