November 2014
Harry Gwala District Growth and Development Plan
Harry Gwala District Growth and Development Plan
Page i
DOCUMENT CONTROL
TITLE: Harry Gwala District Growth and Development Plan
ELECTRONIC FILE: HGDGDP Final 2014
REPORT STATUS: Final
REVISION NUMBER: 4
CLIENT: Harry Gwala District Municipality – Mr L. Zondi
40 Main Street, Private Bag X 501, Ixopo, 3276
Tel: 039-834 8700
Email: [email protected]
KwaZulu-Natal Department: Co-operative Governance and
Traditional Affairs – Mr G Vhutshilo and Ms N Ndonga
CONSULTANT: The Planning Initiative
P O Box 50660
Musgrave 4062
Tel: +27 31 3129058
Fax: 086 671 1510
Cell: 082 467 1488
Email: [email protected]
DATE: 27 November 2014
REFERENCE NUMBER: ZNT1908/2013 LG
PROJECT TEAM:
The Planning Initiative
Cathy Ferguson
David Briginshaw
Jo Lees
Jeff McCarthy
COPIES ISSUED TO: KwaZulu-Natal Department: Co-operative Governance and
Traditional Affairs.
Harry Gwala Municipality
Steering Committee members
Harry Gwala District Growth and Development Plan
Page ii
CONTENTS Acronyms and Abbreviations ................................................................................................................. vi
Executive Summary .............................................................................................................................. viii
1 Introduction ..................................................................................................................................... 1
1.1 The Harry Gwala District ......................................................................................................... 1
1.2 The Context of the Growth and Development Plan ............................................................... 3
1.3 The Process of Developing the Harry Gwala District Growth and Development Plan ........... 5
1.3.1 Stakeholder Engagement .................................................................................................... 6
2 Status Quo and Situational Analysis ................................................................................................ 7
2.1 Population and Demographics ................................................................................................ 7
2.2 Employment ............................................................................................................................ 8
2.3 Income Levels and Inequality .................................................................................................. 9
2.4 Education Levels ..................................................................................................................... 9
2.5 Schools and Medical Facilities............................................................................................... 10
2.6 Synthesis and Analysis of Issues ........................................................................................... 11
2.6.1 Social Issues....................................................................................................................... 11
2.6.2 Servicing Issues ................................................................................................................. 13
2.6.3 Public Sector Issues ........................................................................................................... 15
2.6.4 Environmental Issues ........................................................................................................ 15
2.6.5 Economic Issues ................................................................................................................ 16
2.6.6 Spatial Issues ..................................................................................................................... 19
2.7 Relating the District Issues to the Provincial Growth and Development Plan ...................... 22
2.8 SWOT Matrix ......................................................................................................................... 25
3 Vision and Mission Statements ..................................................................................................... 26
4 Drivers of Growth and Development ............................................................................................ 27
5 The Spatial Framework for Development ...................................................................................... 34
6 Growth and Development - Apex Indicators, Primary Indicators and Interventions .................... 38
6.1 Introduction .......................................................................................................................... 38
6.2 Goal 1: Job Creation .............................................................................................................. 40
6.2.1 Apex Indicators ................................................................................................................. 40
6.2.2 Primary Indicators and Interventions ............................................................................... 41
6.3 Goal 2: Human Resource Development ................................................................................ 49
6.3.1 Apex Indicators ................................................................................................................. 49
Harry Gwala District Growth and Development Plan
Page iii
6.3.2 Primary Indicators and Interventions ............................................................................... 51
6.4 Goal 3: Human and Community Development ..................................................................... 55
6.4.1 Apex Indicators ................................................................................................................. 55
6.4.2 Primary Indicators and Interventions ............................................................................... 57
6.5 Goal 4: Strategic Infrastructure............................................................................................. 65
6.5.1 Apex Indicators ................................................................................................................. 65
6.5.2 Primary Indicators and Interventions ............................................................................... 66
6.6 Goal 5: Environmental Sustainability .................................................................................... 74
6.6.1 Apex Indicators ................................................................................................................. 74
6.6.2 Primary Indicators and Interventions ............................................................................... 75
6.7 Goal 6: Governance and Policy ............................................................................................. 82
6.7.1 Apex Indicators ................................................................................................................. 82
6.7.2 Primary Indicators and Interventions ............................................................................... 83
6.8 Goal 7: Spatial Equity ............................................................................................................ 87
6.8.1 Apex Indicators ................................................................................................................. 87
6.8.2 Primary Indicators and Interventions ............................................................................... 87
7 Catalyst Projects ............................................................................................................................ 91
8 Institutional Framework .............................................................................................................. 105
8.1 The Institutional Mechanism to Implement the Provincial Growth and Development Plan ...
............................................................................................................................................ 105
8.1.1 Overall Structure ............................................................................................................. 105
8.1.2 Provincial Planning Commission (PPC) ............................................................................ 105
8.1.3 Action Work Groups ........................................................................................................ 106
8.1.4 The PGDP Technical Committee and Four Cabinet Technical Clusters ........................... 107
8.2 Institutional Options – Some Discussion............................................................................. 108
8.2.1 Growth Coalitions ........................................................................................................... 108
8.2.2 India’s District Rural Development Agencies .................................................................. 109
8.2.3 District Government Functions ....................................................................................... 110
8.2.4 District Development Agencies in KwaZulu-Natal .......................................................... 111
8.2.5 Ugu Institutional Proposals ............................................................................................. 115
8.2.6 Umkhanyakude District Planning Commission and Institutional Structure .................... 116
8.3 Institutional Options for Harry Gwala District Growth and Development Plan ................. 118
8.4 Conclusion and recommendation ....................................................................................... 122
9 Monitoring and Evaluation Framework ....................................................................................... 123
Harry Gwala District Growth and Development Plan
Page iv
9.1 Purpose ............................................................................................................................... 123
9.2 Reporting............................................................................................................................. 124
9.3 Monitoring Catalyst Projects .............................................................................................. 126
9.4 Frequency of Reporting and Review ................................................................................... 126
9.5 Responsibility for Monitoring and Evaluation .................................................................... 126
9.6 Reporting Flows .................................................................................................................. 126
10 Conclusion and Way Forward ................................................................................................. 128
Appendices .......................................................................................................................................... 129
Appendix A: Steering Committee Invitees .......................................................................................... 130
Appendix B: Wider Stakeholder Forum Invitees ................................................................................. 131
TABLES Table 1: Provincial Growth and Development Plan Strategic Goals and Objectives for KwaZulu Natal
Province .................................................................................................................................................. 4
Table 2: Harry Gwala District Population 2001 and 2011 (census) ........................................................ 7
Table 3: Population Projections for Harry GWala District ...................................................................... 7
Table 4: Household Information ............................................................................................................. 8
Table 5: Age Breakdown ......................................................................................................................... 8
Table 6: Unemployment / labour market ............................................................................................... 8
Table 7: Poverty and Dependency Ratio in the District .......................................................................... 9
Table 8: Education Levels ........................................................................................................................ 9
Table 9: Education and Clinic Requirements for Harry Gwala District ................................................. 10
Table 10: Nodal Breakdown .................................................................................................................. 22
Table 11: Strategic Goals and District Issues relating to Harry Gwala District ..................................... 23
Table 12: Strengths, Weaknesses, Opportunities and Threats Matrix ................................................. 25
Table 13: PGDP Targets for Job Creation for KwaZulu-Natal Province ................................................. 40
Table 14: Harry Gwala District Targets for Job Creation ....................................................................... 40
Table 15: PGDP Targets for Human Resource Development for KwaZulu Natal Province ................... 49
Table 16: Harry Gwala District Targets for Human Resource Development ........................................ 49
Table 17: PGDP Targets for Human and Community Development for KwaZulu Natal Province ........ 55
Table 18: Harry Gwala District Targets for Human and Community Development.............................. 56
Table 19: PGDP Targets for Strategic Infrastructure for KwaZulu Natal Province ................................ 65
Table 20: Harry Gwala District Targets for Strategic Infrastructure ..................................................... 65
Table 21: PGDP Targets for Environmental Sustainability for KwaZulu Natal Province ....................... 74
Table 22: Harry Gwala District Targets for Environmental Sustainability ............................................. 74
Table 23: PGDP Targets for Governance and Policy for KwaZulu Natal Province ................................ 82
Table 24: Harry Gwala District Targets for Governance and Policy ...................................................... 82
Table 25: KZN Citizen Survey 2014 ........................................................................................................ 82
Table 26: PGDP Targets for Spatial Equity for KwaZulu Natal Province ............................................... 87
Table 27: Harry Gwala District Targets for Spatial Equity ..................................................................... 87
Harry Gwala District Growth and Development Plan
Page v
Table 28: Catalyst Projects for Harry Gwala District ............................................................................. 93
Table 29: Cabinet Technical Clusters and Action Work Groups Matrix .............................................. 107
Table 30: District and LocaL Level Functions ...................................................................................... 110
Table 31: Evaluation of District Agencies by COGTA .......................................................................... 112
Table 32: Summary of Institutional Options ....................................................................................... 120
Table 33: Example of Monitoring Primary Indicators and Interventions ........................................... 124
Table 34: Categorising Indicators ........................................................................................................ 124
FIGURES Figure 1: Location of Harry Gwala District Municipality ......................................................................... 2
Figure 2: Strategic Goals and Objectives for KZn until the year 2030 (PGDP 2013 – 07 – 11) ............... 3
Figure 3: Cascading Plans ........................................................................................................................ 4
Figure 4: Project Process ......................................................................................................................... 5
Figure 5: Concept Plan - Major Nodes, Movement routes and Tourist Opportunities ........................ 20
Figure 6: Concept Plan - Broad Issues represented Spatially ............................................................... 21
Figure 7: Driving Growth in Harry Gwala .............................................................................................. 28
Figure 8: Driving Growth in Harry Gwala - Examples ............................................................................ 29
Figure 9: The Share of Gross Value Added (GVA) for the Harry Gwala District by sector as of 2011... 30
Figure 10: Harry Gwala District Spatial Development Framework (2014) 2014-2015 HGDM IDP (2012-
2017 TERM) page 23 ............................................................................................................................. 37
Figure 11: Catalyst Projects ................................................................................................................. 103
Figure 12: PGDP Institutional Organogram ......................................................................................... 105
Figure 13: Provincial Reporting arrangements ................................................................................... 106
Figure 14: Sisonke Development Agency Governance Organogram .................................................. 112
Figure 15: Sisonke Development Agency Management Organogram ................................................ 113
Figure 16: Umhlosinga Development Agency – Umkanyakude .......................................................... 114
Figure 17: Umkanyakude Implementation Structure ......................................................................... 118
Figure 18: District Municipality with additional capacity and supported by SDA .............................. 121
Figure 19: District Planning Commission Supported by District and Local Municipalities and SDA ... 122
Figure 20: Decision Making Flow Chart .............................................................................................. 125
Figure 21: Reporting Flow Chart ......................................................................................................... 127
Harry Gwala District Growth and Development Plan
Page vi
ACRONYMS AND ABBREVIATIONS 1. ABET Adult Basic Education and Training 2. AG Auditor General 3. AIDS Acquired Immune Deficiency Syndrome 4. ASSA Actuarial Society of South Africa 5. BMI Body Mass Index 6. BR&E Business Retention and Expansion Programme 7. B-BBEE Broad-Based Black Economic Empowerment 8. CO² Carbon Dioxide 9. COHOD Committee of Heads of Department 10. CONCOURT Constitutional court 11. CPF Community Policing Forum 12. CPI Consumer Price Index 13. CWP Community Work Programme 14. DAC Department of Arts and Culture 15. DAERD Department of Agriculture, Environmental Affairs and Rural Development 16. DCOGTA / COGTA Department of Co-operative Governance and Traditional Affairs 17. DCSL Department of Community Safety and Liaison 18. DEDT Department of Economic Development and Tourism 19. DHS Demographic and Health Survey 20. DM District Municipality 21. DOE Department of Education 22. DOH Department of Health 23. DHET Department of Higher Education and Training 24. DoL Department of Labour 25. DOT Department of Transport 26. DRDLR Department of Rural Development and Land Reform 27. DSD Department of Social Development 28. DUT Durban University of Technology 29. DWA Department of Water Affairs 30. ECD Early Childhood Development 31. EDR Effective Dependency Ratio 32. EKZNW Ezemvelo KwaZulu-Natal Wildlife 33. EPWP Expanded Public Works Programme 34. ESID Economic and Strategic Infrastructure Development 35. FET Further Education and Training 36. FTE Full Time Equivalent 37. GDP-R Gross Domestic Product - Regional 38. GVA Gross Value Add 39. ha Hectare 40. HALE Health Adjusted Life Expectancy 41. HDI Human Development Index 42. HG Harry Gwala 43. HG DGDP Garry Gwala District Growth and Development Plan 44. HIV Human immunodeficiency virus 45. HOD Head of Department 46. HRD Human Resource Development 47. i.e. Namely 48. ICT Information, Communication, and Technology 49. IDP Integrated Development Plan 50. IDZ Industrial Development Zone 51. IEC Independent Electoral Commission 52. IGR Inter-Governmental Relations 53. IMR Infant Mortality Rate 54. IRP Integrated Resource Plan
Harry Gwala District Growth and Development Plan
Page vii
55. ITB Ingonyama Trust Board 56. JCPS Justice, Community Protection and Security 57. Kwanalu KwaZulu Natal Agricultural Union 58. KZN DOT KwaZulu-Natal Department of Transport 59. KZN EC KZN Economic Council 60. KZNT KwaZulu Natal Treasury 61. LED Local Economic Development 62. M, E & R Monitoring, Evaluation and Reporting 63. Mb Mega bytes 64. MEC Minister of Executive Council 65. MIG Municipal Infrastructure Grant 66. MMR Maternal Mortality Rate 67. MOU Memorandum of Understanding 68. MW Mega Watts 69. N2 National Route 2 70. N3 National Route 3 71. NDA CARA National Department of Agriculture, Conservation of Agricultural Resources Act, 72. 1983 (Act 43 of 1983) 73. NERSA National Energy Regulator of South Africa 74. NPC National Planning Commission 75. OTP The Office of the Premier 76. PGD Provincial Growth and Development Plan 77. PGD Provincial Growth and Development Strategy 78. PGDP Provincial Growth and Development Plan 79. PGDS 2011 KwaZulu-Natal Provincial Growth and Development Strategy 80. PHD Doctor of Philosophy 81. PICC SIP Provincial Infrastructure Co-ordinating Committee Strategic Infrastructure Project 82. POP Points of Presence 83. PPC Provincial Planning Commission 84. ppm Parts Per Million 85. PRASA Passenger Rail Agency of South Africa 86. PSEDS Provincial Spatial Economic Development Strategy 87. R&D Research and Development 88. SAAQIS South African Air Quality Information System 89. SADC Southern African Development Community 90. SANRAL South African National Roads Agency Limited 91. SARCC SA Rail Commuter Corporation 92. SDA Sisoke Development Agency 93. SDC Social Development Council 94. SEDA Small Enterprise Development Agency 95. SIPS Strategic Infrastructure Projects 96. SMME Small, Medium and Micro Enterprises 97. SOE’s State Owned Entities 98. SOER KwaZulu-Natal State of the Environment Report 99. SPCHD Social Protection, Community and Human Development 100. TB Tuberculosis 101. TBD To be determined 102. TC Traditional Council 103. TEU Twenty-foot Equivalent Units 104. TFCA Trans Frontier Conservation Area 105. TIKZN Trade & Investment KwaZulu-Natal 106. U5MR Under 5 year Mortality Rate 107. UNDP United Nations Development Programme 108. YDA Youth Development Agency
Harry Gwala District Growth and Development Plan
Page viii
EXECUTIVE SUMMARY The Harry Gwala District Growth and Development Plan was prepared in 2014 as an extension of the
KwaZulu-Natal Provincial Growth and Development Plan. The Plan forms part of the Government
package of plans consisting of the National Development Plan (NDP), Provincial Growth and
Development Plans (PGDP), District Growth and Development Plans (DGDPs), Municipal Integrated
Development Plans (IDPs) and Ward Plans. The package of plans is focused on ensuring alignment
between plans and thus improved growth and development throughout the country. The DGDP plan
is a long term plan focusing on the year 2030. The municipal IDPs will align with the DGDP.
The Harry Gwala District covers some 10,547km2 with a population of some 460,000 people which is
expected to grow to some 480,000 by 2030.
The Harry Gwala District Municipality (DC 43) includes five Local Municipalities: Ingwe,
Ubuhlebezwe, Greater Kokstad, KwaSani, and uMzimkhulu. The Ingwe and KwaSani Municipalities
will be merged in 2016.
The vision and mission statement of the HGDGDP:
“By 2030, Growth and Development in the Harry Gwala District Municipality
will have significantly improved the quality of life in the area.”
This will occur through increased participation in the economy, whilst
protecting the natural environmental assets.
The Mission of the District is to implement the Growth and Development Plan by delivering the
following to the citizens and investors in the Municipality:
Honest and Transparent Governance
Appropriate and Reliable Infrastructure Services according to the SDF priorities
Access to jobs by providing an enabling environment for investment and facilitating skills
and SMME development
Safety and Security through zero tolerance of wrong doing at all levels
Improved Municipal Health Services
Lobbying the Provincial Government for
Better Quality of Education
Improved Healthcare facilities
Appropriate Land Reform
The challenges facing the municipality may be summarised as:
KZN Provincial Goals
Specific Harry Gwala District Challenges
1. Job Creation
High unemployment Low cash economy Service sector is key but the private sector is under-developed Agriculture is an important contributor but not leveraged locally. It is also
Harry Gwala District Growth and Development Plan
Page ix
KZN Provincial Goals
Specific Harry Gwala District Challenges
a sector in decline There is tourism potential but it is not huge job multiplier.
2. Human Resource Development
Youthful population High underemployed human resources capacity, Under educated and skills are not matched to sectors, especially
agriculture. Land Reform has taken place, but recipients need to be skilled to ensure
productivity.
3. Human and Community Development
Rural District with some parts remote High grant dependency, Inadequate social services access. Human Resource Capacity issues –vacancies, skills and high turnover of
staff, financial viability of municipalities in the District Low income base. Land reform to be accelerated to provide people with land.
4. Strategic Infrastructure
Degrading infrastructure and infrastructure backlogs. Especially water and sanitation
Water rich (in terms of catchments) but local access poor Hard to provide electricity and other services to remote areas Sanitation challenges Solid waste challenges Road conditions largely poor and inadequate Especially on freight routes Inadequate road access to rural areas Low revenue base to generate income for District to implement
infrastructure delivery
5. Environmental Sustainability
High value eco-system services (not just water), but pressure to develop the land and natural resources – how to balance the inherent tensions.
Some unsustainable agricultural practices
6. Governance and Policy
A complex and changing policy environment, Governance issues (interface between community, government and
private sector, inter-governmental coordination) Institutional arrangements for development uncertain and unclear Human Resource Capacity issues relating to vacancies, skills and high
turnover of staff, financial viability of municipalities in the District - low income base.
7. Spatial Equity
Human settlement tensions- Rural versus Urban Good delivery record but increased fiscal and service delivery burden
implied by this. Human settlement delivery is not necessarily a growth strategy however
access to services by the rural poor is also addressed through human settlements development
Slow progress of land reform in the District Access to job opportunities and other opportunities and inadequate
movement networks to deep rural areas. The need for compact town development against urban sprawl Accessing funding for implementation of projects
Harry Gwala District Growth and Development Plan
Page x
To address these challenges four key drivers of growth in the District are:
1. Agriculture and Agro-industry
2. Tourism
3. Public Sector
4. Strategic Infrastructure Delivery
To achieve growth in these areas the following four key objectives need to be implemented within
all four key sectors and linkages across these areas identified and exploited:
1. Skills development
2. SMME development
3. Spatial Restructuring
4. Research and Innovation
In order for the plan to be successful, progress needs to be monitored and evaluated. Using the
PGDP as the base, a range of Apex Indicators, Primary Indicators and Interventions was developed.
These relate directly to the 7 Provincial Goals and 30 Strategic Objectives identified in the PGDP. The
Apex indicators against which progress will be measured for Harry Gwala are summarised in the
following table:
1. Job Creation
Total value of output of all sectors within the district economy (per annum)
Total employment in all sectors within the district economy
GDP per capita within the district economy (per annum)
2. Human Resource Development
Harry Gwala District Growth and Development Plan
Page xi
Gross Enrolment Rate
Primary
Secondary
Percentage of Grade 3, 6 and 9 learners performing at the required levels of annual national assessments (Literacy and Numeracy)
Performance at SACMEQ
Reading
Mathematics
Percentage National Senior Certificate pass rate
Numbers of students qualifying for bachelors programme in the NSC
Participation in the FET College sector
FET NC (V) graduation rate
Participation in Higher Education
Adult Literacy Rate
3. Human and Community Development
PGDP Adjusted Human Development Index
Longevity, Life Expectancy (years)
Decrease in Absolute Poverty: % below food poverty line (Baseline: NIDS 2008, PL= Half R418 proposed by NPC)
Decrease in social inequality: Share of income earned by poorest 60%
Total number of crimes measured as the number of crimes per 100 000 population
4. Strategic Infrastructure
% of fixed capital investment in relation to District GDP
Average Lead/ lag time between development application submission and completion expected and actual time using RMSE method reduced
5. Environmental sustainability
Green House Gas Emissions
% protection of High Risk Biodiversity Planning Units
6. Governance and Policy
Improvement in level of citizen satisfaction
7. Spatial Equity
Improved population with physical access to goods and services as measured by the Spatial Equity/ Accessibility Index
Catalyst Projects to drive growth and development to 2030 have been identified as:
Infrastructure
1. Integrated Municipal Infrastructure Delivery Strategic Infrastructure Project 6 (SIP 6) – Roads (Umzimkulu Roads R1,2 billion) and P318 Sani Pass (R594 million)
2. New District Road as identified on the SDF to service the rural island - Kokstad to Bulwer and Umzimkhulu to Swartberg
3. Critical Road Upgrades - P12 Himeville to Loteni and Nottingham Road; R56 Pietermaritzburg to Kokstad to Eastern Cape and R612 Mzinto to Bulwer
4. Integrated Municipal Infrastructure Delivery Strategic Infrastructure Project 18 (SIP 18) – Regional Bulk Water Schemes including Smithfield Dam, Stephen Dlamini Dam and Umzimkhulu Water Scheme
5. Bulk Electrification Programme
6. Renewable Energy Supply research
Economic Development and Tourism (all require detailed feasibility studies)
Harry Gwala District Growth and Development Plan
Page xii
7. Umzimkhulu Maize Mill
8. Hydroponics and Greenhouse Project
9. Industrial / Agro-processing Economic Hubs
10. Concrete Products Manufacturing Plant
11. Alan Paton Railway Project
Regeneration of Primary Nodes
12. Kokstad
13. Ixopo
14. Umzimkhulu
15. Bulwer
Regeneration of Secondary Nodes
16. Underberg
17. Donneybrook
18. Highflats
Harry Gwala District Growth and Development Plan
Page 1
1 INTRODUCTION The Harry Gwala District Growth and Development Plan seeks to set out a path of growth and
development for the family of Municipalities within the District to the year 2030. This plan stems
from the National Development Plan which saw a new era of long term planning in South Africa. This
was followed by the preparation of the Provincial Growth and Development Plan (2012) which is
now being developed further into District Plans throughout KwaZulu-Natal.
In terms of this plan, the vision for the Harry Gwala District is:
“By 2030, Growth and Development in the Harry Gwala District Municipality
will have significantly improved the quality of life in the area.”
This will occur through increased participation in the economy, whilst protecting the
natural environmental assets.
This report set out the first version of the Harry Gwala District Growth and Development Plan
(HGDGDP). Through a defined monitoring and evaluation framework (Section 9), which will be
managed by the Institutional Framework agreed to (Section 8), this plan will be monitored,
evaluated, updated and improved over time through a regular review process.
1.1 THE HARRY GWALA DISTRICT
The Harry Gwala District Municipality is located in KwaZulu-Natal, approximately 250 kilometres
south of the major metropolitan area of eThekwini. The Municipality has a population of
approximately 460,000 people (Census 2011). It covers approximately 1,054,700 hectares, and has a
population density of around 0.5 persons per hectare.
The Harry Gwala District Municipality is bounded by Lesotho to the north-west, uMgungundlovu
District Municipality to the north-east, Ugu District Municipality to the south-east, Alfred Nzo District
Municipality to the south and Alfred Nzo District Municipality to the south-west.
The Harry Gwala District Municipality (DC 43) consists of the following five Local Municipalities and
includes the Mkhomazi Wilderness Area:
Ingwe
Ubuhlebezwe
Greater Kokstad
KwaSani
UMzimkhulu
The Ingwe and KwaSani Municipalities will be merged in 2016.
Figure 1 below shows the location of Harry Gwala Municipality.
Harry Gwala District Growth and Development Plan
Page 2
FIGURE 1: LOCATION OF HARRY GWALA DISTRICT MUNICIPALITY
Source of information: Demarcation Board
Lesotho
eThekwini
Pietermaritzburg
Indian Ocean
Eastern Cape
Harry Gwala District Growth and Development Plan
Page 3
1.2 THE CONTEXT OF THE GROWTH AND DEVELOPMENT PLAN The Provincial Growth and Development Strategy (PGDS) was adopted by Cabinet in 2011 and is the
plan which guides development and growth in KwaZulu-Natal. It sets out the framework for
development, which includes amongst other things, strategic goals which should be achieved, a
vision for the Province, key principles as well as a Spatial Framework to guide development.
Following on from the PGDS, the Provincial Growth and Development Plan was prepared in 2012,
which translates the PGDS into a detailed implementation plan. Figure 2 summarises the Goals and
Objectives of the Provincial Plan.
FIGURE 2: STRATEGIC GOALS AND OBJECTIVES FOR KZN UNTIL THE YEAR 2030 (PGDP 2013 – 07 – 11)
The outcome of the District Growth and Development Plans is to align the development goals and
plans of the area with the PGDS and PGDP which will extract the issues and goals raised in the PGDS
in order to further the implementation of the plan at a District level. The District Growth and
Development Plans (DGDPs) will in turn inform the Integrated Development Planning process as
illustrated in the diagram that follows.
Harry Gwala District Growth and Development Plan
Page 4
FIGURE 3: CASCADING PLANS
Source: 24 June 2014 Presentation by COGTA
Table 1 outlines the goals and objectives of the PGDP.
TABLE 1: PROVINCIAL GROWTH AND DEVELOPMENT PLAN STRATEGIC GOALS AND OBJECTIVES FOR KWAZULU NATAL PROVINCE
Strategic Goals Strategic Objectives
1. Job Creation 1. Unleash the Agricultural Sector 2. Enhance Sectoral Development through Trade and Investment 3. Improve Efficiency of Government- led job creation
programmes 4. Promote SMME and Entrepreneurial Development 5. Develop the Knowledge Base to Enhance the Knowledge
Economy
2. Human Resource Development
6. Improve Early Childhood Development, Primary and Secondary Education
7. Support Skills Alignment to Economic Growth 8. Enhance Youth Skills Development and Life Long Learning
3. Human and Community Development
9. Poverty Alleviation and Social Welfare 10. Enhancing Health of Communities and Citizens 11. Enhance Sustainable Household Food Security 12. Sustainable Human Settlements 13. Safety and Security 14. Social Capital
4. Strategic Infrastructure
15. Development of Harbours 16. Development of Airports 17. Development of Road and Rail Networks 18. Development of ICT Infrastructure
WARD BASED PLANS
Harry Gwala District Growth and Development Plan
Page 5
Strategic Goals Strategic Objectives
19. Improve Water Resource Management and Supply 20. Improve Energy Production and Supply
5. Environmental Sustainability
21. Increase Productive Use of Land 22. Advance Alternative Energy Generation and Reduce Reliance
on Fossil Fuels 23. Manage pressures on Biodiversity 24. Adapting to Climate Change
6. Governance and Policy
25. Strengthen Policy, Strategy Co-ordination and IGR 26. Building government capacity 27. Eradicating Fraud and Corruption 28. Promote Participative, Facilitative and Accountable
Governance
7. Spatial Equity 29. Actively Promote Concentration and Co-Ordination of Development Activities
30. Effective Spatial Planning and Land Management Systems are Applied Across the Province
1.3 THE PROCESS OF DEVELOPING THE HARRY GWALA DISTRICT GROWTH AND
DEVELOPMENT PLAN The diagram below reflects the process that has been followed in preparing the Harry Gwala District
Growth and Development Plan (HGDGDP).
FIGURE 4: PROJECT PROCESS
Project Inception
Status Quo Description
Synthesis of Issues and Vision Development
Development of Strategic Goals, Objectives and
Indicators
Catalyst Projects and Proposed Interventions
Institutional Framework Informed by PGDP
Implementation, Monitoring and
Evaluation Framework
Adoption of DGDP By Stakeholders
Closeout and Project Consolidation
Harry Gwala District Growth and Development Plan
Page 6
1.3.1 STAKEHOLDER ENGAGEMENT
The preparation of this plan has involved a considerable amount of desk top research covering the
vast number of plans that have already been prepared for this District and which contain invaluable
information for this GDP. However a full stakeholder engagement process was also undertaken.
1. Firstly the District Municipality and KZN COGTA ensured that all Local Municipalities were
fully aware of the project and the expected outcomes through the various existing forums. A
letter was also sent to all Municipal Mangers informing them of the project.
2. A Project Steering Committee was set up to facilitate engagement, source information, make
presentations and seek buy-in to key milestones. Three meetings and a Close Out meeting
were held. The people who were invited to participate in the Project Steering Committee are
listed in Appendix A.
3. Two wider stakeholder forum workshops were held on 26 March 2014 and 6 August 2014.
The invitees included representatives from business, the Sisonke Development Agency,
Government Departments and the District and Local Municipalities. The invitees are listed in
Appendix B. the purpose of these workshops was to workshop key issues within the District,
a proposed vision and the catalyst projects.
4. A meeting with Mayors and Municipal Managers, as well as other staff, from the family of
Municipalities was held on 15 October 2014 to present the draft plan.
5. Targeted telephonic and face-to-face interviews were held with key stakeholders to firstly
inform them of the project, secondly to identify issues and thirdly to understand their ideas
on strategies and interventions.
In addition to this stakeholder process, the Harry Gwala (Sisonke) District Growth and Development
Summit took place on 18 and 19 June 2013 which was attended by 150 delegates. The theme of the
summit was focussed on the importance of “investing for high returns in Sisonke” (now Harry
Gwala). The outcomes of this summit were included in the preparation of this plan.
Harry Gwala District Growth and Development Plan
Page 7
2 STATUS QUO AND SITUATIONAL ANALYSIS In order to develop an appropriate growth and development path for the District a full status quo
analysis was undertaken based on a desk top review of the numerous planning report that have
been prepared in the region, as well as recent information such as the census and stakeholder
engagement. A separate status quo report contains the details of this work whilst the pertinent
points are summarised in this section.
2.1 POPULATION AND DEMOGRAPHICS The District has a population of some 460,000 people with only a very minor growth since 2001.
TABLE 2: HARRY GWALA DISTRICT POPULATION 2001 AND 2011 (CENSUS)
Municipality Population
2001 Population
2011 Population Growth
2001-2011 (%) Area of Municipality
Ingwe 107 558 100 548 -0.67 % 1,976 km2
Kwa Sani 11 848 12 898 0.85 % 1,852 km2
Greater Kokstad 56 528 65 981 1.55 % 2,680 km2
Ubuhlebezwe 101 959 101 691 -0.03 % 1,604 km2
Umzimkhulu 174 338 180 302 0.34 % 2,435 km2
District Total 452 231 461 420 0.20 % 10, 547 km2
Source: Census 2011
With regards to population projections, if one assumes that the same population growth rate for the
Harry Gwala District for 2001-2011 (1% growth every five years) is maintained into the foreseeable
future (and there is no obvious reason to doubt that assumption)1, then the following projected
population totals for the District are envisaged (note the figures are rounded to the nearest hundred
for purposes of representation):
TABLE 3: POPULATION PROJECTIONS FOR HARRY GWALA DISTRICT
Year District Population
2015 465 600
2020 470 300
2025 475 000
2030 480 000
The table below provides a summary of household information for the District. What is encouraging
is that over the past 10 year period, the number of formal dwellings within Harry Gwala has risen
from 31% to 41.5% of total dwellings in the area.
1 The Harry Gwala District is likely to continue to experience out-migration which almost equals natural increase, as is the case of other more rural Districts in the province.
Harry Gwala District Growth and Development Plan
Page 8
TABLE 4: HOUSEHOLD INFORMATION
Municipality Households
(2001) Households
(2011)
Average Household
Size (2001)
Average Household
Size (2011)
Female Headed
Households % (2001)
Female Headed
Households % (2011)
Formal Dwellings % (2001)
Formal Dwellings % (2011)
Ingwe 21 332 23 073 5 4.4 61.8 56.5 18.6 30.1
Kwa Sani 3 723 3 673 3 3.5 48.8 44 31.2 67.5
Greater Kokstad
19 625 19 140 2.7 3.4 44.7 41.6 67.4 83.6
Ubuhlebezwe 21 421 23 487 4.6 4.3 59.9 57.2 23.3 30.3
Umzimkhulu 36 246 42 909 4.8 4.2 64.9 60.3 20.1 32.7
District Total 102 349 112 282 4.3 4.1 58.7 55.2 31 41.5
Source: Census 2011
Table 4 compares the age breakdown of the population between 2001 and 2011. The population
breakdowns within the various local municipalities has remained similar over the ten year period
and is relatively consistent with the general South African breakdown, namely, a large percentage
under 15 years of age, the biggest group in the 15-64 year age bracket (the age bracket that can
potentially gain employment) and then the smallest group being in the 65 and plus age bracket.
However, there is a high dependency ratio, which although it has decreased at a District level from
88.1% to 74.9%, it remains high.
TABLE 5: AGE BREAKDOWN
Municipality
Age Under
15 (2001)
Age Under
15 (2011)
Age 15 to 64
(2001)
Age 15 to 64
(2011)
Age 65 plus
(2001)
Age 65 plus
(2011)
Dependency Ratio (2001)
Dependency Ratio (2011)
Ingwe 44.2 39.8 50.9 55.2 5 5 96.6 81.2
Kwa Sani 32.8 24.2 62.2 70.3 5 5.5 60.7 42.2
Greater Kokstad
30.9 30.6 66.1 66.7 3 2.7 51.4 49.9
Ubuhlebezwe 40.4 37.4 54.2 57.4 5.5 5.3 84.6 74.3
Umzimkhulu 45.3 40.8 49.2 53.7 5.5 5.5 103.4 86.2
District Total 41.8 37.9 53.1 57.2 5.1 4.9 88.1 74.9
2.2 EMPLOYMENT Table 6 demonstrates that the overall unemployment within the Municipality has decreased from
59.9% in 2001 to 36% in 2011 (a drop of almost 24%), as has the rate of unemployment among the
youth.
TABLE 6: UNEMPLOYMENT / LABOUR MARKET
Municipality Unemployment
Rate (2001) Unemployment
Rate (2011)
Youth Unemployment
(2001)
Youth Unemployment
(2011)
Ingwe 66.6 39.3 74.9 48.5
Kwa Sani 25.5 16 32.7 20.5
Harry Gwala District Growth and Development Plan
Page 9
Municipality Unemployment
Rate (2001) Unemployment
Rate (2011)
Youth Unemployment
(2001)
Youth Unemployment
(2011)
Greater Kokstad
41.2 28.9 50.1 36.3
Ubuhlebezwe 61.6 34 69.1 42.1
Umzimkhulu 68.2 46.6 78.8 56.8
District Total 59.9 36.0 65.7 44.4
2.3 INCOME LEVELS AND INEQUALITY Approximately 33% of the population within the District are defined by StatsSA as being “in
poverty”. The highest concentration of people in poverty is in Umzimkhulu followed closely by
Ubuhlebezwe and Ingwe. Linking this with Dependency ratios is it clear that Umzimkhulu,
Ubuhlebezwe and Ingwe are in a distressed situation.
TABLE 7: POVERTY AND DEPENDENCY RATIO IN THE DISTRICT
% of people in Poverty
Total Population
Number of people in poverty (approximate)
Dependency Ratio
Ingwe 32.4 100 548 32 578 81.2
KwaSani 22.0 12 898 2 838 42.2
Greater Kokstad 27.1 65 981 17 881 49.8
Ubuhlebezwe 34.8 101 691 35 388 74.3
Umzimkhulu 36.8 180 302 66 351 86.2
Harry Gwala Total 33.4 461 420 154 114 74.9
Source: Census 2011
2.4 EDUCATION LEVELS
A critical factor facing the Harry Gwala District appears to be the issue of education levels. In the
period 2001- 2011, there has been an improvement in education across all the Municipalities,
however, the level of people with a Matriculation or higher is still very low (less than 20% across the
District).
TABLE 8: EDUCATION LEVELS
Municipality No
Schooling (2001)
No Schooling
(2011)
Matric (2001)
Matric (2011)
Higher Education
(2001)
Higher Education
(2011)
Ingwe 31.3 13.8 7.5 17.8 3.1 3.9
Kwa Sani 19.8 7.6 12.5 21.9 6.9 8.6
Greater Kokstad
10.1 4.1 17.8 28.6 7.6 10.5
Ubuhlebezwe 29.2 15.9 10.2 20.1 3.6 4.2
Umzimkhulu 21.8 6.4 7.4 15.4 4.3 4.9
District Total 23.6 9.8 9.9 19.4 4.5 5.6
Harry Gwala District Growth and Development Plan
Page 10
2.5 SCHOOLS AND MEDICAL FACILITIES
Harry Gwala District has 134 Combined schools, 234 Primary schools, and 76 Secondary schools.
These schools are dispersed across the District, however there are higher numbers around the nodes
and along the access roads (as to be expected).
In terms of clinics within the District, there are currently 67 Medical Facilities (with 1 to be built
shortly). Again these are dispersed across the District, although there tends to be higher numbers
towards the eastern parts of the District as can be seen below.
Using the “Guidelines for Planning of Facilities in KwaZulu-Natal” (KZN PDC: 2008), the following
information is relevant with regards to the thresholds for Schools and Clinics:
Primary Schools: 3000 to 4000 people per school
Secondary Schools: 6000 to 10 000 people per school
Mobile Clinics: less than 5000
Small Clinics to Medium Clinics: 5000 to 20 000 people
Community Health Centre: 70 000- 100 000 people
Hospitals: 10 000 to 80 000 people
The above mentioned thresholds are variable and should not be considered as fixed in any way. They
are merely guidelines. This is especially relevant when considering health facilities, which are
affected by population densities, locational factors, need and so forth.
In terms of the above thresholds, the following can be drawn based on a population of 461 420 (as
taken from Census 2011):
TABLE 9: EDUCATION AND CLINIC REQUIREMENTS FOR HARRY GWALA DISTRICT
Facility type Currently provided
Required (based on
thresholds)
Shortfall based on standards
Notes
Primary Schools
234 Primary 134 Combined
Total: 368
115 Nil Nil
Secondary Schools
76 Secondary 134 Combined
Total: 210
46 Nil Nil
Mobile Clinics 16 92 76 This figure is a bit misleading. The requirement for mobile clinics also needs to consider fixed clinics and the like. However the shortfall is significant enough to warrant attention
Small to Medium Clinics
41 23 Nil Have included Env Health and EMRS under this as these aren’t included in the standards.
Community Health Centre
1 4 3 Factors such as space requirements, sufficient population densities etc. may mean that 4 is excessive especially when considering the number of smaller facilities.
Hospitals 8 (including
6 Nil
Harry Gwala District Growth and Development Plan
Page 11
Facility type Currently provided
Required (based on
thresholds)
Shortfall based on standards
Notes
psychiatric hospital)
Other Kokstad Mental Health Psychiatric Facility
Source: Harry Gwala District Municipality GIS Database
It is noted that in terms of the database supplied by the Municipality, there is still 1 medical facility
to be built.
From the above information it can be inferred that in general the provision of facilities for schools
and clinics within the District appears to be adequate. It is important to note, however, that the
figures above are based on guidelines and do not take into account the in-migration of students and
healthcare seekers to areas like Kokstad. These members of the public often come from areas such
as the Eastern Cape and may skew figures. Anecdotally, it appears that whilst in terms of the
guidelines for facilities, there appear to be enough facilities; there could in fact be a shortfall.
Further work should be done on this to determine need (see Catalyst Projects)
There is clearly a need for more Mobile Clinics and potentially Community Health Centres.
2.6 SYNTHESIS AND ANALYSIS OF ISSUES During the status quo analysis stage of the project many sources of information were reviewed, a
workshop was held with stakeholders and several interviews were held. The issues raised were then
drawn together and following sections provide a synthesis of the issues identified.
2.6.1 SOCIAL ISSUES
Within Harry Gwala District there are a number of social issues which if left unchecked, will impede
growth and development within the Municipality. The critical social issues facing the District include:
High levels of poverty
Low education levels and unskilled people entering the job market.
Unemployment and job creation
HIV AIDS and Health
2.6.1.1 POVERTY AND INCOME LEVELS
Poverty within the District is a critical issue. General employment levels have stagnated and are
affected by the following issues:
Low skilled working age population
Weak domestic consumer markets
Limited infrastructure
Limited opportunities in key sectors
A decline in agriculture within the District
Furthermore, in terms of pure income levels, Harry Gwala District is one of the poorest within the
Province, with around 30% of the Districts’ households being classified as in poverty. There are also
Harry Gwala District Growth and Development Plan
Page 12
high levels of Dependency. It is those people in poverty who are also affected by issues such as
backlogs, poor education levels and so forth.
2.6.1.2 EDUCATION
Education is a major issue within the District. Not only does a large proportion of the population
have no matric, but those who have a matric still do not have the skills necessary to obtain work
within the District.
Education and job opportunities go hand in hand. Within Harry Gwala, the available job
opportunities are relatively specific (currently primarily related to agriculture and tourism and the
public service sectors). Thus those matriculants who enter the job market need to have a skill-set
that either enables them to fit into the local economies, or to become entrepreneurs. If this does not
happen, then the alternatives are unemployment and poverty, outmigration to seek job
opportunities at bigger centres, or crime.
The issue of education is also broader than just having qualifications. An interesting point raised a
few times through the workshop process is that there are funding opportunities for people to start
new businesses (SMMEs), get training and support, but that these are not widely known, and can be
difficult to access.
2.6.1.3 UNEMPLOYMENT AND JOB CREATION
A large portion of the population within Harry Gwala is unemployed, especially in the youth
demographic, largely due to education levels and a limited job opportunity base. This is especially
relevant in the face of an Agricultural sector that has experienced a decline in output and therefore
employment, in recent years. In order for the District to grow, an increase in the number of jobs is
essential.
It is suggested that whilst the Agriculture and Tourism sectors are important to the development of
the District, another key potential growth stream is through development and support of SMMEs.
From the private sector perspective, a number of critical elements need to be in place if
development (and by implication job creation) is to happen:
1. Businesses need the right people. This reverts back to the education issues. In an
increasingly competitive job market, employers are seeking either people with a low level of
education to do basic tasks (which pay little), or educated people to do more sophisticated
work (which pays better). The problem with Harry Gwala District as it stands is that a lot of
the businesses are agriculturally based requiring low skill levels (for the majority), or is
increasingly becoming mechanised. This means that new skill-sets are needed, or the
economy needs to diversify. SMME’s may be the key to diversification. Incentives for
internship programmes and other forms of in service training should be investigated.
2. Adequate and maintained services need to be in place. Having an agricultural and tourism
based economy means that issues such as access for transport (freight and passenger) and
tourism is critical. A huge issue facing the District is relatively low levels of accessibility, with
road conditions cited specifically as a constraint to development. Unreliable electrical supply
is also problematic, especially for businesses. If agro-processing is seen as a potential growth
sector, reliable electricity for refrigeration is an essential pre-condition.
Harry Gwala District Growth and Development Plan
Page 13
3. An enabling environment for development. In order to attract business investment,
government rules and regulations need to be streamlined and businesses need to have a
level of confidence and certainty if they are to invest in an area. This relates both to point 2,
having certainty of supply of water and electricity for example, and to certainty in terms of
application procedures, costs and timelines. The Business Chamber in Kokstad is of the
opinion that the costs of doing business there is relatively high. This may also be true in the
rest of the District.
4. An environment that incentivises employment. Within South Africa (not just Harry Gwala
Municipality), the ability of businesses to hire and maintain staff can be affected by issues
relating to employment regulations, strikes etc. Businesses are becoming increasingly wary
of expanding and committing to staff due to these difficulties, however, this is not
something that can be addressed by the District alone.
2.6.1.4 HIV AIDS AND ACCESS TO HEALTHCARE
HIV AIDS, as well as TB and access to healthcare in general are key issues facing not only Harry Gwala
District, but South Africa as a whole. Whilst recent trends indicate that slowly, these issues are being
managed, they are still critical issues within rural areas where residents may have difficulty obtaining
treatment and support. A sick population is one that will struggle to work and improve their
livelihoods. HIV/AIDS awareness, counselling and treatment programmes need to be continuously
rolled out and promoted.
2.6.2 SERVICING ISSUES
In order to create a strategy for Growth and Development, an understanding of the servicing issues
facing the District is important. The following section highlights some of the key servicing issues
facing the District.
2.6.2.1 BROAD SERVICING IsSUES
Servicing within Harry Gwala has improved significantly within the last 10 years. However, access to
water, electricity and sanitation are key services which relate to growth and these need
improvement if the area is to develop to its potential.
Access to water is considered a basic human right. However, when considering census
information, as well as comments made at the workshop process, it is clear that this is
probably the most critical servicing issue facing the District. In fact the vast majority of the
District reflects access levels of well below 50%. The IDP for Harry Gwala acknowledges this
need. This is particularly complicated when noting that as a District, Harry Gwala has an
excess of raw water supply.
A key issue facing the District, raised in the workshop process as well as the situational
review, is the need for adequate sanitation within the nodes in the Municipality. This is
important, not only for economic development, but also for basic health and safety.
Electricity is a driver of the economy and is also considered an essential human need. Whilst
in general the service provision of electricity has improved over the last 10 years, there are
still large parts of the District that do not have access to electricity. Whilst this can in part be
attributed to the sprawling nature of much of the District, this is still an issue that impacts on
people’s lives.
Harry Gwala District Growth and Development Plan
Page 14
As Harry Gwala is an important agricultural hub within KwaZulu-Natal, transport access is
critical. The roads within the District regularly carry heavy trucks transporting produce and
goods within, as well as in and out of the District. However many of the district roads are
poorly maintained, which is compounded by their heavy use, and are quite degraded. This
has social implications as it makes it difficult for the residents of the District to access key
services (such as pension pay points) located at the nodes within Harry Gwala. This is
particularly noticeable within UMzimkhulu Local Municipality. The locational advantage of
some of the smaller nodes is almost entirely due to relatively good access.
Solid waste collection and management was another key point raised during the workshop.
Currently waste collection is inadequate in some areas, and most waste has to be
transported long distances, which is inefficient. Kokstad is in the process of developing a
new land-fill site as the old one is full, and the only other land-fill site is in Umzimkhulu.
Waste management provides a number of potential green economy opportunities and solid
waste strategies should consider this.
In the provision of services thresholds that need to be met in order for services to be viable. In some
instances, for example, it may not be viable to, provide water-borne sanitation. In such instances,
other means of servicing need to be considered. Harry Gwala as a District covers a large area, and is
sparsely populated (other than a number of nodes identified). The viability of providing services is
also compounded by the topography of the District.
2.6.2.2 BACKLOGS
There are significant servicing backlogs within Harry Gwala District. If growth and development is to
occur within the District, then it is essential that the backlogs for all services (Water, Sanitation,
Roads, Housing, Electricity and Solid Waste) are addressed.
The available data suggests that most of the backlogs will, according to current rates and funding,
only be addressed in between 10 and 20 years. The need to address the various backlogs, and to be
seen to be making steady progress in this regard is critical. The employment creating aspect of
infrastructure provision should not be over-stated, but is significant, so addressing of backlogs could
in itself create some employment growth.
2.6.2.3 SPATIAL ISSUES
The District is sparsely populated (with some of the lowest population densities in the Province),
with a topography and human settlement pattern that can make it difficult to service. However, the
node and corridor system that is evident within the District needs to be enhanced so that maximum
value can be achieved through these. This may mean, for example, encouraging appropriate
development and density levels within nodes, by prioritising the servicing of the nodes accordingly.
Other than the settlement nodes, the vast majority of the District follows a sparse settlement
pattern, with densities picking up a little bit along the access routes. In order for servicing levels to
improve, the nodes and corridors within the District need to be consolidated and sprawl needs to be
discouraged. The potential efficiencies that result should mean that backlogs will and can be
addressed more simply, more quickly, and at lower cost.
Harry Gwala District Growth and Development Plan
Page 15
2.6.3 PUBLIC SECTOR ISSUES
The Public Sector was raised during the workshop process as an area that needs consideration if the
District is to grow. Issues identified include:
2.6.3.1 SKILLS LEVELS AND CAPACITY TO EXECUTE WORK
Within the District and Local Municipalities, there is a feeling that there should be skills
improvement measures undertaken to attempt to improve the ability to execute work. Such
programmes are very useful tools to enable public sector workers (this includes Municipal officials,
teachers, medical officials, technical workers, labourers and the like) to work to a higher standard
and to work effectively. Skilled staff also builds a positive perception about the public sector.
2.6.3.2 BUDGET AVAILABILITY TO UNDERTAKE SERVICE DELIVERY
Budget availability is an important element that impacts on growth and development within any
District. This issue can be related to a few different features:
Limited capital budget to implement service delivery and service maintenance programmes.
This affects the rate that Municipalities can provide services to residents as well as
businesses.
Low Rates Base which limits budget and thus the ability of the District to service its residents
Limited operational budget to employ staff to improve public sector capacity. This affects
the Municipalities ability to implement programmes, and do urban management.
Whilst there are numerous grants and programmes that can be accessed to assist with this, for
sustainable, economic growth and job creation, municipalities need to be viable. Increasing the rates
base is key. It is also important to bear in mind that there are other opportunities, through
mechanisms such as Public Private Partnerships that can be employed to improve service delivery.
2.6.3.3 GOVERNANCE ISSUES
A common issue facing almost all of South Africa relates to a perception of poor governance within
some sectors. The following points were raised in the workshop session:
Nepotism
Unskilled personnel
Tendering issues
To attract investment, and partnerships, potential investors need to have confidence that good
governance measures are in place. Two Municipalities within this District have obtained clean audits
in the last financial year. Furthermore, in terms of the awarding of tenders, there are mechanisms in
place to promote the transparency of tenders (such as for example, various appeal avenues).
2.6.4 ENVIRONMENTAL ISSUES
Harry Gwala District Municipality contains some of the key environmental assets in the Province
(SANBI), and these have a direct impact on the District as well as Provincial economy. The following
are points that bear consideration:
Some of the best agricultural land in the country is located here, and a large chunk of the
Southern Drakensberg also falls in the district. The key economic opportunities in this largely
Harry Gwala District Growth and Development Plan
Page 16
rural district (viz. tourism and agriculture) are thus directly linked to the environment.
Water, climate, soil, bio-diversity and scenic beauty are especially relevant.
Water as a key environmental resource needs to be more effectively harnessed, but in a
sustainable manner. Agriculture benefits from good natural catchments, but tensions
related to contamination through fertiliser use, over extraction, and protection of wetlands;
need to be balanced. Sanitation and water treatment challenges, as well as water
conservation strategies, are also issues that will affect development.
Climate change is an issue and effects are already evident in unpredictable weather
patterns, extreme climate events (and associated disasters). This affects both agriculture and
tourism – the key economic sectors. Addressing climate change is not just a district issue –
global causes, but local effects. Consideration of local mitigation and especially, adaptation
strategies will be important.
Natural bio-diversity is key to environmental resilience, as well as a tourism asset, but
agricultural mono-culture is also more vulnerable to climate change. Soil health is also
affected by mono-culture agriculture and fertilizer use.
Using the eco-system services modelling done for the Kokstad ISDP as a reference, it is
evident that the District benefits from high levels of ‘free’ eco-system services delivery,
which highlights the tension between development and conservation of natural and
agricultural green space. This is an environmental issue as well as a service provision issue.
Dispersed development is expensive to service, in money terms as well as loss of eco system
services, which means that limiting the development foot print will be an issue going
forward.
2.6.5 ECONOMIC ISSUES
The economic issues of Harry Gwala District are a microcosm of those of South Africa, but amplified
by the relatively rural character and peripheral location of the District. Beyond that, very similar
issues to these also arise in other mainly rural parts of middle to upper-middle income countries of
the world, including places like Turkey, Spain, India or Brazil. Learning from what similar Districts in
South Africa have done, or which similar countries have done, to successfully confront these issues is
therefore a priority.
Having said that, the Harry Gwala District economic issues also have some distinctly local content.
This is evident for instance from the 2011 Research Report entitled Diagnostic Report, Sisonke
District Municipality Local Economic Development Review. It is noted there for example that
agriculture is the dominant sector in Sisonke, but that nationally that sector is shedding labour. It
was said there in relation to the District on that:
‘Whilst the land coverage assessment shows the highest land utilization being agriculture, it
is evident that this sector is not producing enough employment opportunities at par with the
extent of land used. For this reason it will be important to develop creative strategies that
will enhance employment of the Sisonke District Municipality’s active labour segment (p.
113).
The report makes some suggestions in that regard, and these have been complemented by an April
2014 LED presentation recently made in Creighton where it was pointed out that agro-processing is
a significant driver for future economic growth in the District. It was said there that significant
opportunities exist for expansion in:
Harry Gwala District Growth and Development Plan
Page 17
Land suitable for high value crops.
Land reform programmes supported by significant public sector investment and parastatal
bank loans.
Access to export markets.
Support institutions for funding and technical advice e.g. Masisizane Fund.
New production techniques, e.g. hydroponics.
Processing, packaging and distribution of local produce – canning, drying, freezing and
further product beneficiation.
Forestry, milling and production of related product (Biofuel, charcoal etc.).
All of these sub-areas have the potential to absorb more labour than the existing agriculture and
forestry sectors currently, for this District.
It is also noted that recent trends have indicated a slight decline in Agriculture output in recent
years. Reasons for this include uncertainty around land reform, land reform beneficiaries not
necessarily having the skills to adequately utilize the land, and macro-economic issues.
The local nature of the challenges was also evidenced by the discussion at the 26th March workshop,
and from some of the written responses on card at that workshop. The District has some unique
attributes which contribute towards its tourism potential, and also its agricultural potential. For
example on tourism it was noted in the latter instance that, in addition to building around existing
District strengths for example in the Berg, there were neglected niche areas worth exploiting,
including:
Rail Tourism
Avi Tourism
Mission Tourism
Cultural Tourism
These points are reinforced by the research reported in the 2011 Sisonke report referred to above,
and the April 2014 Creighton LED Review presentation.
Returning to the March 26th workshop conclusions, there are important themes related to the
development of the local economy that were repeated numerous times. Indeed, five words sum up
the issues raised by participants at that workshop: Unemployment, agriculture, tourism, skills and
nodes/dispersed settlements.
A number of systemic issues appear to underlie, and connect, these economic issues in the Harry
Gwala District.
One of these is that the directions of public needs on the one hand (e.g. the need to reduce
unemployment and enhance private incomes) appear to be at variance with the forces driving
private investment in key economic sectors. In some major sectors like agriculture and forestry,
which decades ago were heavily labour-intensive, international forces of competitiveness have
encouraged the adoption of industrialisation (i.e. large scale mono-crop cultivation, combined with
mechanisation. This means the growth of large, commercial farms employing fewer and fewer
workers has become the norm; while at the same time there is massive and rising unemployment.
Harry Gwala District Growth and Development Plan
Page 18
There are policy instruments at the disposal of the District to counter such internal contradictions,
such as land reform and redistribution funds, and new agricultural-support funds. However, in
making effective use of such policies and funds, experience in other Districts of South Africa (and
indeed in other parts of the world) has been that key barriers are skills deficits. Most unemployed
people do not have the knowledge to operate small-scale, niched farming. Even if one gives access
to land (which in itself is not a simple matter), it does not always yield incomes.
Likewise, in tourism, service-quality levels have been shown in research to be key barriers to sector
expansion in South Africa. Higher spending tourists are used to service quality levels that are more
advanced than those provided by tourism entrepreneurs and workers in most of South Africa. The
Harry Gwala District has some notable natural attractions which are under-exploited (especially the
southern Drakensberg); but both the operator and worker skill levels necessary to develop new,
competitive products (e.g. high-end eco-resorts) appear to be in short supply.
Skills are usually effectively developed in key nodes which can (at least temporarily) play host to the
highest quality pool/s of practical teaching experience. At present, if young people from Harry Gwala
District were to gain advanced skills in niched, small-scale agriculture or tourism, for example, the
closest they would find them would likely be in Pietermaritzburg (or more likely further afield); and,
once there, it is probable they would not return.
A key economic question, therefore, is: Is it possible, or how could one break this cycle of ‘peripheral
economic dependency’? One possible solution would be establishment of the right type/s of
vocational training in agricultural and tourism skills, linked to subsequent internships and utilisation
by trainees of the right kinds of land reform and small business grants. In parallel, or in addition,
attracting new small to medium scale private investors in these sectors into the District may be
accelerated.
This, in turn, suggests that urban management practices in key nodes in the District would have to
be on a par with national (even international) norms. This is necessary in order to play host to the
highest calibre entrepreneurs and educators. To proceed by an Eastern Cape analogy, the success of
Rhodes University was only possible in a remote part of the Eastern Cape because Grahamstown
was a relatively attractive town capable of hosting world-class educators. Can Ixopo, or Kokstad or
another District centre offer this? If so, where and how?
It is unlikely that Harry Gwala District needs a University; but could it be possible that it needs one or
two high quality, vocationally oriented tertiary institutions focused on cutting edge tourism and
agricultural practices? A possibly related issue is that graduates of such institutes would then need
practical opportunities to take up within the District, and this would likely mean high quality
implementation of land reform and micro-lending programmes within the District, amongst other
considerations.
Such initiatives need not just focus on agriculture and tourism sectors, and while these are obvious
existing local niches, diversification of the local economy should be a priority. The 2011 Sisonke
report referred to earlier pointed out that whilst District manufacturing was marginal and
sometimes declining, there could be niche areas for development linked for example to the forestry
sector. Moreover small and micro-enterprises in various sectors hold potential. In all cases, however,
enhancing technical, trade and/or business skills was seen as a priority.
Harry Gwala District Growth and Development Plan
Page 19
A key economic issue could be whether the appetite and local institutional capacity exists, or could
be cultivated, to give effect to such skills-enhancement initiatives. There is an agricultural research
training centre in Kokstad, but local youth interviewed during the preparation of the KISDP (2012)
did not regard this as an attractive option, and suggested that graduates did not emerge
appropriately skilled. Scientific-Roets, a consulting firm in Kokstad has an in-house training facility
that seems to be successfully using various sources of public sector funding mechanisms to develop
appropriate local skills, but on a very small scale.
2.6.6 SPATIAL ISSUES
In order to simplify the analysis, it is useful to spatially demonstrate the issues facing the District at a
broad level. The following figures reflect some of the broader elements of the area. (Note: the figure
is conceptual and thus the lines are not exact).
Harry Gwala District Growth and Development Plan
Page 20
FIGURE 5: CONCEPT PLAN - MAJOR NODES, MOVEMENT ROUTES AND TOURIST OPPORTUNITIES
Harry Gwala District Growth and Development Plan
Page 21
FIGURE 6: CONCEPT PLAN - BROAD ISSUES REPRESENTED SPATIALLY
Harry Gwala District Growth and Development Plan
Page 22
Whilst Harry Gwala District is a largely rural (and thus sparsely populated) Municipality, there are a
number of nodes that are of importance at a regional and sub-regional level. The following are
nodes that have been identified through various planning exercises:
TABLE 10: NODAL BREAKDOWN
Node Type Node Name Role
Primary Nodes
Kokstad Business, Commerce, Services, Industry and Residential. A major node within the District.
Ixopo District Municipal Offices, Business, Commerce, Services, Industry and Residential. A major node within the District.
Umzimkulu Residential and Services node. Potential Commercial.
Underberg Tourism, Commercial, Residential, Agriculture
Himeville Tourism, Commercial, Residential, Agriculture
Secondary Nodes
Bulwer Commercial and Services.
Donnybrooke Commercial and Services.
Franklin Business, Commerce, Services and Residential.
Highflats Small administrative centre with some commercial
The District Municipality does not have notable National Level access. However, access to the
Kokstad via the south is via the N2 (Figure 15). This access allows the District to tie into the Eastern
Cape, as well as to the important nodes of Port Shepstone, and further away, eThekwini. At a Local
level, the key roads through the Municipality are the R56 and R617 and R612. These are critical in
providing access within the District and to the surrounding areas. Finally, there are also a number of
District level roads which knit the Municipalities together. Through the various routes, access to
Durban, Pietermaritzburg, Matatiele, Port Shepstone, and the Eastern Cape is possible.
The vast majority of Harry Gwala is rural and agricultural in nature and large portions of the District
are under the auspices of the Traditional Authority. As such, large tracts of the District reflect a
sparse settlement typology typical of such an area. However, there are concentrations of
development (intensification of densities) along transportation routes, and primarily at key
intersections. These concentrations of development have over the years, developed into nodes of
varying levels of intensity and servicing. It is also at these nodes that pockets of the population now
dwell.
Harry Gwala District has, for the large part, a very hilly topography. Whilst this makes for a very
scenic (which increases tourist opportunities) Municipality, this makes servicing areas outside of the
nodes difficult to realistically achieve.
2.7 RELATING THE DISTRICT ISSUES TO THE PROVINCIAL GROWTH AND DEVELOPMENT
PLAN A useful way to conclude this section is to relate the Situational Analysis and Synthesis of Issues back
to the Strategic Objectives identified in the PGDP. Essentially the KZN PGDP vision is for a balanced,
developed state of being for the people, land and economy of the Province. It even seems modest in
its expectations, which is appropriate in terms of global economic and environmental sustainability
challenges. However, it stands in stark contrast to the current situation in KZN and in the Harry
Gwala District, where in many areas the situation reads as the exact opposite of this vision.
Harry Gwala District Growth and Development Plan
Page 23
The strategic objectives of the PGDP are framed in a way that highlights the challenges to growth
and development - in order to pro-actively address them, and with respect to Harry Gwala District,
some of the important ones are summarized, per objective, below:
TABLE 11: STRATEGIC GOALS AND DISTRICT ISSUES RELATING TO HARRY GWALA DISTRICT
KZN Provincial Goals Specific Harry Gwala District Challenges
8. Job Creation
High unemployment Low cash economy Service sector is key but the private sector is under-developed Agriculture is an important contributor but not leveraged
locally. It is also a sector in decline There is tourism potential but it is not huge job multiplier.
9. Human Resource Development
Youthful population High underemployed human resources capacity, Under educated and skills are not matched to sectors,
especially agriculture. Land Reform has taken place, but recipients need to be skilled
to ensure productivity.
10. Human and Community Development
Rural District with some parts remote High grant dependency, Inadequate social services access. Human Resource Capacity issues –vacancies, skills and high
turnover of staff, financial viability of municipalities in the District
Low income base. Land reform to be accelerated to provide people with land.
11. Strategic Infrastructure
Degrading infrastructure and infrastructure backlogs. Especially water and sanitation
Water rich (in terms of catchments) but local access poor
Hard to provide electricity and other services to remote areas
Sanitation challenges
Solid waste challenges
Road conditions largely poor and inadequate
Especially on freight routes
Inadequate road access to rural areas
Low revenue base to generate income for District to implement infrastructure delivery
12. Environmental Sustainability
High value eco-system services (not just water), but pressure to develop the land and natural resources – how to balance the inherent tensions.
Some unsustainable agricultural practices
13. Governance and Policy
A complex and changing policy environment,
Governance issues (interface between community, government and private sector, inter-governmental coordination)
Harry Gwala District Growth and Development Plan
Page 24
KZN Provincial Goals Specific Harry Gwala District Challenges
Institutional arrangements for development uncertain and unclear
Human Resource Capacity issues relating to vacancies, skills and high turnover of staff, financial viability of municipalities in the District - low income base.
14. Spatial Equity
Human settlement tensions- Rural versus Urban
Good delivery record but increased fiscal and service delivery burden implied by this.
Human settlement delivery is not necessarily a growth strategy however access to services by the rural poor is also addressed through human settlements development
Slow progress of land reform in the District
Access to job opportunities and other opportunities and inadequate movement networks to deep rural areas.
The need for compact town development against urban sprawl
Accessing funding for implementation of projects
Harry Gwala District Growth and Development Plan
Page 25
2.8 SWOT MATRIX The following SWOT matrix summarises the strengths, weaknesses, opportunities and threats that
must either be addressed or harnessed through this plan.
TABLE 12: STRENGTHS, WEAKNESSES, OPPORTUNITIES AND THREATS MATRIX
Strengths
Agricultural potential
Land reform
Natural scenic beauty
Eco-system services, especially water
Good service delivery record – infrastructure, housing, and social facilities.
Comparatively good public service capacity
Stable population
Good road access to key nodes via National and regional corridors
Good access to electricity
Good access to communications especially at nodes
Lots of planning done already
Land reform
Weaknesses
High levels of poverty
High grant dependency
Low education and skills levels
Scattered population
Poor road quality
Very poor access to rural areas
Vulnerability to climate change – unpredictable weather patterns, and natural disasters
Corporatisation of agriculture – local benefits not optimised
Under skilled tourism sector
Under-employment in agriculture sector
Difficult and expensive business start ups
Weak local markets
Lack of co-ordination between spheres of government as well as between local municipalities
Low economic growth
Land reform process slow, lack of farming skills to take over production, creates uncertainty
Opportunities
Youthful population
Skills development and training as a potential economic driver
Leap frog technological development
Develop IT access especially to enhance SMME development
Available (underemployed) human capacity
Under-developed tourism – good tourism assets and potential
High levels of ‘free’ eco-system services
Optimise local agricultural potential
Enhance SMME development especially related to localised economic development
Green economy opportunities related to climate change adaptation
Innovative solid waste management business
Node densification and compaction
Public realm development at nodes
Improve the production of agricultural land, especially in areas that are State or Community owned.
Threats
Poverty
HIV Aids
Climate change
Outward migration of skills
Inward migration of indigent attracted by good service delivery
Aging infrastructure
Low levels of formal sanitation (not necessarily sewer)
Low revenue base
High free service delivery demands
Crime and Grime
Un-integrated nodes
Un-planned/ad-hoc node development
Unregulated and unplanned growth at nodes especially Ixopo
Unregulated rural development, especially along corridors
High public sector staff turn-over
High dependency on fossil fuel based transport
Shrinking private income value
Land Reform uncertainties
Harry Gwala District Growth and Development Plan
Page 26
3 VISION AND MISSION STATEMENTS Strategic Plans need to be guided by an understanding of where the Municipality wants to be in the
future. It is important that a vision statement is short and easily remembered. A vision statement
also needs to clearly outline the desired outcome of the plan.
Based on the understanding gained from the Status Quo as well as the Synthesis and Analysis of
issues, a vision statement for the Harry Gwala Growth and Development Plan has been drafted
through a stakeholder workshop process:
“By 2030, Growth and Development in the Harry Gwala District Municipality
will have significantly improved the quality of life in the area.”
This will occur through increased participation in the economy, whilst protecting the
natural environmental assets.
The mission statement describes what the Municipality wants to do now i.e. Why do we do what we
do and for whom?
The Mission of the District is to implement the Growth and Development Plan by delivering the
following to the citizens and investors in the Municipality:
Honest and Transparent Governance
Appropriate and Reliable Infrastructure Services according to the SDF priorities
Access to jobs by providing an enabling environment for investment and facilitating skills
and SMME development
Safety and Security through zero tolerance of wrong doing at all levels
Improved Municipal Health Services
Lobbying the Provincial Government for
Better Quality of Education
Improved Healthcare facilities
Appropriate Land Reform
Harry Gwala District Growth and Development Plan
Page 27
4 DRIVERS OF GROWTH AND DEVELOPMENT The overall Provincial Strategic Goals for growth and development have been identified as:
1. Job Creation
2. Human Resource Development
3. Human and Community Development
4. Strategic Infrastructure
5. Environmental Sustainability
6. Governance and Policy
7. Spatial Equity
All these goals need to be addressed within the Harry Gwala Municipal Growth and Development
Plan and are therefore the goals of this plan. However, within these goals there are a plethora of
aspects and areas that can be addressed, and it is considered imperative that with limited resources
(people, budgets and time) attention is focused on the critical elements rather than trying to be
comprehensive in addressing everything and achieving nothing because efforts are spread too thinly.
Thus, based on the SWOT analysis and key issues identified an effort was made to determine the key
and critical aspects that needed to be addressed to achieve growth and development in the District.
With this approach in mind, the drivers of growth within the District were considered. Four key
sectors were identified as potential drivers of growth and development in the area:
5. Agriculture and agro-industry
6. Tourism
7. Public Sector
8. Strategic Infrastructure Delivery
To achieve growth in these areas four key objectives were filtered out which need to be
implemented within all four key sectors and linkages across these areas identified and exploited:
5. Skills development
6. SMME development
7. Spatial Restructuring
8. Research and Innovation
The institutional mechanisms to guide planning and implementation, as well as developing within
the context of the Green Economy were then considered cross cutting strategies that would apply to
all areas.
These drivers of growth and key objectives are completely interrelated and cross cutting as
illustrated in the following diagram. Examples of the cross cutting nature are then highlighted in a
second diagram and then expanded on in the text that follows:
Harry Gwala District Growth and Development Plan
Page 28
FIGURE 7: DRIVING GROWTH IN HARRY GWALA
Harry Gwala District Growth and Development Plan
Page 29
FIGURE 8: DRIVING GROWTH IN HARRY GWALA - EXAMPLES
Harry Gwala District Growth and Development Plan
Page 30
Key Target Sectors:
The figure below shows the share of Gross Value Added (GVA) for the Harry Gwala District by sector
as of 2011 (Source: Global Insight Metadata, 2011). As can be seen, the three largest sectors are
Community Services (mostly government), Agriculture and Trade (which includes tourism) in that
order.
FIGURE 9: THE SHARE OF GROSS VALUE ADDED (GVA) FOR THE HARRY GWALA DISTRICT BY SECTOR AS OF 2011
Source: Global Insight Metadata, 2011
Agriculture is a critical sector within the District economy, being second largest in GVA terms and
has the potential to continue to contribute to the growth and development of the area. The research
suggests however that there are a number of issues that would need to be addressed to maximise
the opportunities that may exist. These include land claims and land reform where the uncertainty in
this regard appears to be reducing farmers’ appetite for increasing their investment. In addition it is
apparent that much of the income opportunity not being leveraged within the District or, in other
words, is leaking out of the area. For example whilst milk is the critical sector, there is no milk
processing unit within the District. Thus, all milk produced within the District gets sent to the
processor for a minimal fee (around R3/ litre), and is then sent back to the District and sold at shops
for R13 a litre. Importantly, exploiting the opportunities through specific interventions that support
local agro-processing and distribution in this, as well as in other agricultural sub-sectors, is an
important area for further investigation. Localisation should be a key strategy for sustainable
economic growth, and as articulated in the literature on the Transition Towns movement in
particular, has the added benefit of increasing social cohesion and local resilience. Agriculture is an
obvious sector to implement localisation strategies.
Tourism, and its linkages, is the third most important contributor to economic growth. The potential
within the District for tourism is large and can have significant economic benefits for the
communities. Whilst the Drakensberg is a well-known tourist destination, other tourist activities
such as Rail Tourism, Mission Tourism and Bird Tourism are not as well-known and could promoted
with the potential multipliers exploited. Furthermore, it is suggested that the potential linkages
between Tourism, SMMEs and Agriculture are critical opportunities for growth. For example small
Community services 35%
Finance 10%
Transport 4%
Trade 16%
Construction 2%
Electricity 2%
Manufacturing 6%
Mining 0%
Agriculture 25%
Harry Gwala District Growth and Development Plan
Page 31
scale agricultural production such as vegetables, eggs, bottled water, cheese making, as well as other
production such as local crafts, fudge, biscuits etc. could supply the local tourist industry. The critical
aspect to consider in upskilling people in these areas is quality of goods and reliability of supply.
Skills development within the tourism sector is also important and the opportunity for establishing a
hotel or hospitality school to train local people to work in the tourist sector should seriously be
considered. A demand for this was articulated in Stakeholder workshops and it was proposed as a
potential new project.
The public sector is a critical component of the Economy of the District and is the largest of the
District sectors. It plays a role in both facilitating growth through its activities as well as being an
active employer and thus income contributor. However, the issue of developing and retaining skills
and capacity in the public sector in the District needs to be addressed if growth is to occur.
The implementation of strategic infrastructure projects to unlock growth potential is a key
component of this strategy. Not only will this unleash private sector investment but employment on
infrastructure projects will contribute to skills development and growth. Furthermore, the
maintenance and upgrading of essential services (especially water, reliable electricity,
communications and transportation) will support growth and development as investment will not be
retained or attracted unless essential services are guaranteed. Increasingly, and particularly with
respect to promoting economic growth, communications infrastructure is regarded as an essential
service. Given the size of the Municipality and the fact that in the settlement patterns are dispersed
it will be necessary to consider alternate servicing approaches in deep rural areas as conventional
servicing costs will be too high. Full levels of servicing should be focused on the nodes identified in
the spatial strategy, although even there, alternatives to the business as usual approach should be
considered, for example the introduction of renewable energy, water recycling, as well as innovative
solid waste minimisation and management .
Overarching Objectives
To achieve improvements in these four drivers of growth (agriculture and agroindustry, tourism,
public sector and strategic infrastructure) four primary growth and development objectives were
identified:
1. Skills Development
2. SMME Support
3. Spatial Restructuring
4. Research and Innovation
Promote Skills Development and Skills Transfer - In order to improve the District, the skills of all
citizens wishing to participate in the economy need to be improved and transferred in a manner
which is appropriate to the local needs and ensures long term viability. Skills need to match the
drivers of growth i.e. Agriculture, Tourism, Public Sector and Strategic Infrastructure, in order to
ensure that employment is increased. For example focusing on training for the hospitality industry
through a hotel school may be an opportunity. Skills development programmes also need to address
the linkages between the drivers of growth – for example developing skills in agricultural products
(vegetables, herbs, flowers, fruit, cheese, etc.) that would supply the tourism sector – hotels, B&Bs,
Harry Gwala District Growth and Development Plan
Page 32
Guesthouses, craft shops, etc.). Skills development also needs to address the issue of quality and
reliability of supply to market which is imperative for businesses to prosper.
Support SMMEs - currently there are between 600 and 700 SMMEs registered within the District
(SDA records). These SMMEs in general relate to agricultural farming (co-ops and the like) as well as
broad undefined entities. Many of the SMMEs are not specialised in any one field or discipline, and
there is the perception that the SMMEs within the District focus on tender applications, even if the
tenders are unrelated to their business. The Sisonke Development Agency has expressed the view
that there is minimal financial and training support for the SMMEs within the District, especially long
term. SMME support in the future needs to be strongly focused on the agriculture, tourism, services
to the public sector (e.g. cleaning) and infrastructure provision, including business and financial
training.
Promote Spatial Equity - A strong Nodal settlement pattern exists within the Harry Gwala District,
however, there is also a widely dispersed rural settlement pattern and a large rural island that is
under-serviced and far from major opportunities. In other words, it is largely outside of the sphere of
influence of these nodes. Thus interventions are needed to improve the spatial equity in the areas in
between the primary nodes within the District and address deep rural settlement issues. This spatial
restructuring also needs to take account of sub-regional planning and cross-border planning and
focus on supporting the agricultural and tourism sectors and well as giving direction to strategic
infrastructure provision.
Promote Innovation, Research and Knowledge - In order to drive change and growth in the District,
research needs to be conducted on a range of growth related issues in order to understand the
economy, ensure innovative development and ensure that whatever potential economic activities
are pursued are appropriate to the demands of the public and private sector. Innovation in project
planning and implementation is required to change the growth trajectory. The research needs to
focus on the 4 key drivers of growth i.e. agriculture and agroindustry, tourism, public sector and
strategic infrastructure, perhaps even adopting the provincial approach of Laboratories focusing on
particular areas of research. The Provincial LABs focusing on Poverty Alleviation and Makatine are
likely to have particular relevance to the Harry Gwala District.
In order to achieve Growth and Development within the District, Cross Cutting strategies also need
to be considered. The two important cross cutting strategies identified are: improving the
Institutional Framework and overall Governance, and developing the Green Economy, which has
enormous potential in this District. Climate change is already being experienced in the District, most
obviously in more frequent extreme weather events. The promotion of local adaptation strategies,
which could include alien clearance and biodiversity improvement, renewable energy use, improved
insulation of buildings, use of local and traditional building materials, waste re-cycling, to name a
few; is a potential driver of new green economy opportunities. From an institutional perspective a
strong institutional mechanism that is accountable for the growth and development of the region is
required. Within this framework it is critical to bear in mind is that growth and development is not
only a Government function. Partnerships with the private sector and NGOs is essential to identify
opportunities and open these up to the local community.
The mechanisms to measure growth and development and specific actions required to address the
drivers of growth are listed in Section 6, whilst key catalyst projects required to achieve growth and
Harry Gwala District Growth and Development Plan
Page 33
development are discussed in Section 7. The sectors and strategies explored in this section should be
used to prioritise the interventions listed in Section 6 and the catalyst projects.
Harry Gwala District Growth and Development Plan
Page 34
5 THE SPATIAL FRAMEWORK FOR DEVELOPMENT A key objective of this growth and development plan is spatial equity. The Harry Gwala District
Municipality has recently reviewed and updated their District Spatial Development Framework Plan
(2014-2015 HGDM IDP (2012-2017 Term)) which provides the basis for spatial restructuring to
improve spatial equity as well as guiding the location of projects and direction of growth.
This framework (Figure 9) identifies a hierarchy of development nodes as well as development
corridors that link these nodes together and provide access to areas of need.
Hierarchy of Development Nodes where development should be focused
Primary Nodes which have high levels of economic development, growth and expansion
potential to serve the regional economy. However there is a need for detailed planning for
infrastructural and services requirement to facilitate expansion. Typical services that are
expected in these centres including Agri-industrial development, large scale tourism
projects, housing development, shopping centres, wide range of retail services, police
services, primary, secondary and tertiary high level of education centres, hospitals, clinics,
government departments, satellite offices (especially land affairs, social welfare).
Kokstad,
Umzimkulu,
Ixopo and
Underberg / Himeville
Secondary Nodes have potential for growth and good existing levels of economic
development. Typical services that can be expected at these nodes can include police
stations, low level retail services, low levels of housing development (less than 1000 lots),
small scale tourism, education facilities (primary and secondary), clinics, pension payout
points, community halls etc.
Franklin,
Creighton,
Donnybrooke,
Bulwer (potential to become a primary node if planned appropriately), and
Highflats.
Tertiary Nodes have a lower potential for economic potential providing services mainly to
the local communities. Proper formalization in terms of planning and development control is
required in these areas to enhance their development potential. Typical services to be
expected in these centres can include low level retail services, police stations, education
(primary and secondary), clinics, pension pay-out points, community halls and taxi ranks.
Swartberg,
Riverside,
Ibisi and
Rietvlei.
Rural Service Nodes are identified to serve the rural communities in accessible locations.
Services that should be included are Clinic / Mobile Service, Post Boxes, Shops, Secondary
and Primary Schools, Pension Pay-out Point, Taxi Rank and Traditional Authority Court.
Ntsikeni,
Harry Gwala District Growth and Development Plan
Page 35
Lourdes,
Gowan Lea,
Centacow,
Kilmon,
Ncwadi,
Stepmore,
Ntwasahlobo,
Makhoba,
Nokweja, and
Jolivete.
Tourism and Recreation Nodes which are located in areas which are are attractive, provide
good views, a feeling of “being in the mountains” and have potential for resource orientated
activities. These have ready access to the wilderness / natural areas through controlled
points”. All these nodes are on private land, adjacent to the UDP, and are accessible to the
public entry points leading to the Park.
Garden Castle,
Sani Pass and
Bushman’s Nek.
There is also tourism potential in the following areas:
Kokstad urban fringe on the N2,
Ntsikeni Nature Reserve,
Nazareth,
Ophepheni (P68),
Indlovu Clan (Ubuhlebezwe to west of R56)
Qunu falls,
Umzimkulu and
Creighton
Greater diversity of tourism in the district could be achieved through wider range of facilities
and attractions including historical (e.g. Mission tourism), cultural events and eco-tourism
adventures, Avi tourism, River rafting (in Umzimkulu, Ngwagwane, Pholela, Ndawane Rivers)
4 X 4 trail, Mountain biking trails (berg to Coast) etc.
Transportation Network
A transportation network have been identified to link the various nodes and opportunities into a
meaningful whole and to improve access to areas with economic potential within areas of high
poverty. These routes provide for long distance travel and are also areas along which development
should be encouraged at appropriate nodes. This does not imply that development should be
allowed to occur on an ad-hoc basis along the length of such a route. More detailed planning will be
required to identify actual corridors as opposed to movement routes. Primary and Secondary routes
have been identified
Harry Gwala District Growth and Development Plan
Page 36
Provincial Priority Corridors, which are primary corridors within the District, that are
intended to serve areas of high poverty levels with good economic development potential
within one or two sectors.:
SC 2: Kokstad – Umzimkulu – Msunduzi (Provincial Secondary Corridor), and
SC6: Port Shepstone – St Faiths – Ixopo (Provincial Secondary Corridor)
Secondary Corridors providing internal linkages as well as external connections (see Figure
9).
Areas of need
The SDF highlights critical areas that are in poverty, and in need of services. These areas are located
outside of the nodes and access to facilities is an issue for these areas. New roads/corridors have
been proposed to provide access to these areas between Bulwer and Kokstad and Umzimkulu and
Swatberg.
Harry Gwala District Growth and Development Plan
Page 37
FIGURE 10: HARRY GWALA DISTRICT SPATIAL DEVELOPMENT FRAMEWORK (2014) 2014-2015 HGDM IDP (2012-2017 TERM) PAGE 23
Harry Gwala District Growth and Development Plan
Page 38
6 GROWTH AND DEVELOPMENT - APEX INDICATORS, PRIMARY INDICATORS
AND INTERVENTIONS
6.1 INTRODUCTION Strategic Plans such as is outlined in this report often fail because there is no means of measuring
the impact of the actions identified. A key change in the Provincial approach in the PGDP has been to
identify indicators and targets that measure the interventions proposed. The primary purpose of
indicators and interventions is to give clear direction to all role-players of the anticipated impact and
benefits of pursuing the objectives identified through the course of the work undertaken. Indicators
also form the basis for a monitoring and evaluating system. Broadly speaking, indicators are statistics
that are derived from a range of information and that can be used to measure a situation (in this
case, growth and development). A critical point to bear in mind is that too many indicators can be
overwhelming, resulting in unrealistic expectations, and difficulties with unnecessarily onerous
monitoring and reporting.
Indicators
In line with the Provincial approach, indicators and targets have been identified for the Harry Gwala
District Growth and Development Plan. Two types of indicators are used:
Apex Indicators, which are high level indicators that measure and evaluate performance against the 7 Strategic Goals.
Primary Indicators, which are a level down and measure the progress of the 30 Strategic
Objectives that fall under the Strategic Goals.
The following section details the Apex indicators for measuring Growth and Development in the
District against the 7 PGDP Goals. In each instance the Provincial goals and indicators for KwaZulu
Natal are presented in the first table (source: PGDP October 2012) with the District Specific Goals
and Indicators in the second table. The District indicators are derived largely from a variety of official
sources which are identified in footnotes to the tables. In other words the footnotes explain the
source of information and the methodology used in the preparation of the baselines and targets.
It is noted that for the purposes of the Harry Gwala Growth and Development Plan, Apex Indicators
and Primary Indicators have been prepared as a drawdown of the Provincial Growth and
Development Plan. Effectively the numbers/ targets for the Apex and Primary Indicators can be
viewed in 2 broad typologies:
1. A mathematic draw down of the Provincial Growth and Development Plan in such a manner
that the targets are representative of the role that the District should play in relation to the
Province as a whole. For example, the PGDP sets a target of R450 000 million in 2020 for
“Total value of output of all sectors within the district economy”. Harry Gwala District’s
contribution for this should be in the region of R7 428 million. In these instances, the
relevant sources for the development of the indicators is included as a note after each
indicator.
Harry Gwala District Growth and Development Plan
Page 39
2. An alignment of targets based on the PGDP, not necessarily represented as a draw down.
For example, the PGDP targets a value of 1.0 for the Adjusted Human Development Index in
2030. This value should be replicated at a District level.
It is noted that in several instances baseline information is not yet available for the District. Where
this is the case surveys and research will need to be undertaken to address the gaps in information.
The results will then need to be incorporated into future reviews of this plan.
Interventions
The actual interventions to achieve the growth and development envisaged are tabulated in the
tables that follow the Primary Indicators. These interventions are also based on the PGDP template,
although some modification has been undertaken to relate to a District level. Many of the
interventions can also be read in conjunction with the District Capital Development Plans.
It is stressed that the various interventions listed in the tables below do not each directly correlate
to a specific indicator. Rather each intervention has many implications across various indicators and
as such there is no direct collection between an intervention and a specific indicator. Whilst it is
possible to generically say that one intervention may have more implications on a specific
intervention than another, this is too simplistic and does not represent the multi-layered
consequences of each.
An important element relating to the interventions is the responsible agents/ partners. These are
not a complete list. As with any developmental related project, partnerships between numerous
agencies or institutions (such as the District, various Government Departments or Parastatals) are
critical with several playing a role in implementation. Thus, the institutional mechanism or structure
responsible for the implementation of the plan is key, must include partnering with relevant
stakeholders.
The understanding of the drivers of growth and key objectives in the Municipality as repeated below
should be used to prioritise the interventions listed in this section of the plan.
DRIVERS OBJECTIVES
Agriculture and agro-industry Skills Development
Tourism SMME Development
Public Sector Spatial Restructuring
Strategic Infrastructure Delivery Research and Innovation
Harry Gwala District Growth and Development Plan
Page 40
6.2 GOAL 1: JOB CREATION
6.2.1 APEX INDICATORS TABLE 13: PGDP TARGETS FOR JOB CREATION FOR KWAZULU-NATAL PROVINCE
Source: Provincial Growth and Development Plan (2012)
TABLE 14: HARRY GWALA DISTRICT TARGETS FOR JOB CREATION
DEDT – Department of Economic Development and Tourism.
* Notes: Base derived from Diagnostic Report, Sisonke District Municipality, LED review 2011 and 6% p.a. growth rate also
extrapolated from there
**Notes: Base derived from StatsSA (rounded estimate) report 03-01-53, Census 2011 Municipal Report KwaZulu-Natal
Municipalities; and growth rates assumes similar to GVA growth to 2015 but greater labour-intensity thereafter (as per
NDP and PGDP policy objectives)
***Notes: Apply GVA data to 461 000 base population escalating to 500 000 in 2030, the fairly slow population growth rate
due to outmigration
The targets set for these indicators are based on the PGDP targets and indicators. The calculations
involved in the preparation of these figures are based on the notes listed above.
APEX INDICATORS BASELINE (2010)
TARGETS Verification Reporting
2020 2025 2030
Total value of output of all sectors within the district economy (per annum)
R267 200 million
R450 000 million
R600 300 million
R 750 million
Stats SA and associated databases
Annual DEDT
Total employment in all sectors within the district economy
2 400 000 3 300 000 3 900 000 4 500 000
Stats SA and associated databases
Annual DEDT
GDP per capita within the district economy (per annum)
R28 110 R39 760 R47 280 R56 230
Stats SA and associated databases
Annual DEDT
APEX INDICATORS BASELINE (2010)
TARGETS Verification Reporting
2020 2025 2030
Total value of output of all sectors within the district economy* (per annum)
R4 395 million
R7 428 million
R9 656 million
R12 552 million
Stats SA and associated databases
Annual District with DEDT
Total employment in all sectors within the district economy** (total)
75,000 147,000 191,000 248,000 Stats SA and associated databases
Annual District with DEDT
GDP per capita within the district economy*** (per annum)
R9 533 R15 475 R19 507 R25 104 Stats SA and associated databases
Annual District with DEDT
Harry Gwala District Growth and Development Plan
Page 41
6.2.2 PRIMARY INDICATORS AND INTERVENTIONS
6.2.2.1 UNLEASH AGRICULTURAL POTENTIAL
Primary Indicators
Primary Indicators Baseline Data
Proposed Targets Verification Reporting
2020 2025 2030
Total employment within the agricultural sector - including forestry and livestock farming*. (Total)
25,000 jobs est
28 630 jobs
31 145 jobs
33 900 jobs
Agricultural Census, Statistics South Africa and associated databases (Global Insight and Quantec)
Annual District with DEDT
Value of agricultural contribution to the District economy.** (per annum)
R1,143m R1309m R1424m R1550m Agricultural Census, Statistics South Africa and associated databases (Global Insight and Quantec)
Annual District with DEDT
Development of commercial farmers (new entrant, small-scale, ITB and Land reform***) (per annum)
350 est. 430 470 530 Agricultural Census and KZN Dept Agriculture and Rural Development and KwaNalu
Annual District with KZN DARD
Hectares of land under agricultural production including forestry and livestock farming****. (Total)
Circa. 800,000
ha
Circa. 820,000
Circa. 830,000
Circa. 840,000
Agricultural Census and National KZN Dept Agriculture and Rural Development and KwaNalu
Annual District with KZN DARD
*Note: Derived from an estimate of one third of all employment in District, as inferred from Diagnostic Report,
Sisonke District Municipality, LED review 2011; and assuming greater numbers of small farmers and measures
to enhance labour intensity keeping in parallel with output (despite current trends to the contrary)
** Notes: Derived by applying 26% of total output (as in table 4) to baseline, then assuming 1.7% p.a. growth
(compounded) as per Diagnostic Report, Sisonke District Municipality, LED review 2011
*** Note: Assuming 10% of provincial total
**** Note: Assuming 80% of total area, the remainder mainly being environmental conservation areas
(especially the southern Berg, and towns, villages; thus not much scope for areal expansion)
Harry Gwala District Growth and Development Plan
Page 42
Interventions
PGDP Goal 1: Job Creation
PGDP Strategic Objective : Unleash Agricultural Potential
# Generic Description of
Objective
District Specific Status Quo
District Specific Intervention
Location Time Responsible Agents/Partners
A Support for and Development of Commercial Farmers (new entrant, small-scale, land reform and ITB farmers)
Forestry, maize, fruit, potatoes. Issue: Distribution and packaging.
Small scale forestry and sugar farming linked to sectoral industry and provincial initiatives
Throughout District
Short to medium term
SDA with KZN Dept Agriculture and Rural Development Partnered with Large agri-business
B Enhancement of agricultural value-adding and marketing
Dairy and Meat. Issue: Corporatisation of milk.
Link to DBSA or similar plus KWANALU to establish local facilities. Do formal feasibility on a local milk processing/ packaging and distribution centre. Initial studies indicate this will require a road upgrade between Creighton and Franklin to ensure sufficient volumes.
To be determined through market research and feasibility study
Short to medium term
SDA with DBSA/IDC/Kwanalu
C Expansion of irrigation schemes and improved water-use efficiency
Various schemes currently within the District. Need for bulk water Schemes.
Work with DWAF on small scale dam and irrigation prospects. Set up a decision mechanism on which small dams to build where, when and why. Review and implement Bulk Water Schemes (see Catalyst Projects)
Throughout District
Short to medium term
District with KZN Department of Water Affairs and Sanitation, KZN Dept Agriculture and Rural Development Kwanulu
D Protection, rehabilitation and improved productivity of agricultural
Good agricultural resources
Work with DEA on a District Plan. Set up a decision mechanism on
Throughout District
Short to medium term
District with KZN Dept Agriculture and Rural Development,
Harry Gwala District Growth and Development Plan
Page 43
PGDP Goal 1: Job Creation
PGDP Strategic Objective : Unleash Agricultural Potential
# Generic Description of
Objective
District Specific Status Quo
District Specific Intervention
Location Time Responsible Agents/Partners
resources top priorities to implement enhanced productivity
Kwanulu
E Expedite the resolution of land claims
Major new claims in progress and unresolved old claims
Assist Rural Development and Land Affairs; provide additional qualified staff to expedite claims
Throughout District
Short to medium term
District to request Dept of Rural Development and Land Reform, Land Claims Commission
F District Specific: Address underutilization of State Owned farms
Number of state owned farms underutilized
Improve Skills Resources to ensure farmers are skilled and maximise the potential of the farms. The skills resources needs to be continually improved and maintained over a long period to ensure that there is no lapsing.
Throughout District
Short to medium term
SDA, District, KWANALU, Dept of Rural Development and Land Reform as well as various programmes related to education
G District Specific: Address Title Deed Adjustments
Title deeds need to be updated to reflect correct owner
Improve Title Deeds to reflect current owners of land as many title deeds are outdated.
Throughout District, but especially Umzimkhulu
Short to Medium
Local Municipalities with Deeds Office
6.2.2.2 ENHANCE SECTORAL DEVELOPMENT THROUGH TRADE AND INVESTMENT
Primary Indicators
Baseline Data
Proposed Targets Verification Reporting
2020 2025 2030
Total Employment in all sectors excluding agriculture* (total)
50 000 jobs
67 000 jobs
78 000 jobs
81 000 jobs
Statistics South Africa and associated databases (Global Insight and Quantec);
Annual District with DEDT
Value of District Economy (minus agriculture)* (per annum)
R3,252m R5,420m R7,338m R9,256m Statistics South Africa and associated databases (Global Insight and Quantec);
Annual District with DEDT
*Notes: Assuming expansion at projected PGDP rate
Harry Gwala District Growth and Development Plan
Page 44
Interventions
PGDP Goal 1: Job Creation
PGDP Strategic Objective : Enhance sectoral development through trade and investment
# Generic Description of Intervention
District Specific Status Quo
District Specific Intervention
Location Time Responsible agents, partners
A Encourage the utilisation and beneficiation of mineral resources and natural gas
No resources known
NA N/A N/A N/A
B Enhance Value-Adding within the Manufacturing Sector
Weak sector Conduct research studies
Ixopo, Kokstad
Short term
District with SDA and IDC, KZN Dept of Econ Dev and Tourism
C Develop, Diversify and Market the Tourism Sector to increase Domestic and Foreign Visitors in the Province
Good sector with potential
PPP Tourism authority needed, as for example in Ilembe
Focus on Drakensburg
Short to medium term
District with SDA, KZN Dept of Econ Dev and Tourism, District Municipality,
D Improve the Efficiency and Productivity of the Maritime and Transport and Logistics Sectors
Maritime NA; warehousing & logistics possible, but only smaller sub-regional in scope not competing with mega-hub at Cato Ridge
Do feasibilities for sub-sectoral promotion at local level
Focus on major intersections of roads
Short to medium term
District with KZN Dept of Econ Dev, Tourism and Environmental Affairs, some FMCG firms on rural areas (e.g. Boxer stores)
E Facilitate the Expansion of Investment into the Services Sector
Weak sector here
Do feasibilities for sub-sectoral promotion
Likely Kokstad
Short to Medium term
District with SDA and KZN KZN Dept of Econ Dev, Tourism and Environmental Affairs
F Re-enforce District Agencies to drive LED and Investment
Review by Provincial Govt suggests limited success of SDA
Do capacity enhancements of SDA, and/or other as suggested in current work being undertaken by COGTA
Throughout District
Short term
SDA supported by District Municipality
G Review the Funding Framework to Improve Access to LED Funding
Weak access now
Do feasibilities for sub-sectoral promotion
Throughout District
Short term
SDA
H Strengthen the functioning of the Project Brokering Unit (PBU)
TBD TBD District Municipality
Harry Gwala District Growth and Development Plan
Page 45
PGDP Goal 1: Job Creation
PGDP Strategic Objective : Enhance sectoral development through trade and investment
# Generic Description of Intervention
District Specific Status Quo
District Specific Intervention
Location Time Responsible agents, partners
I Development Special Economic Zones and Industrial Hubs
Not yet developed
Industrial Hubs identified in SIP6 project – Dairy and Timber; but now need project feasibilities
TBD Short term
SDA and District with DTI, Kwanalu, Institute for Commercial Forestry Research
J Establish an integrated Business Retention and Expansion Programme (BR&E)
Not yet developed
Do project establishment plan
Likely Ixopo Short term
District with KZN Dept of Economic Development and Tourism, SDA, District Municipality
K Investigate, along with Business, an optimal Business Chamber Model for Improved Partnerships and Functionality
Kokstad Chamber of Business in place
Initiate PPP Build on existing Business Chambers
Throughout District
Short term
SDA with Local Chambers, KZN Dept of Econ Dev and Tourism
L Establish an effective tracking mechanism to monitor provincial trade and investment flows and sector performance
Unknown Liaise with Provincial Treasury (Dr Coetzee)
District Office Short term
District Municipality, KZN Treasury
6.2.2.3 IMPROVE EFFICIENCY OF GOVERNMENT LED JOB CREATION PROGRAMMES
Primary Indicators
Baseline Data
Proposed Targets Verification Reporting
2020 2025 2030
Cumulative Total number of FTEs created through EMPWP and CWP* (total)
None 2 175 (2013-2014) As set by National
Government, rising to
2 777 (2018-2019)
Circa 3 000
3544 (2023-2024);
rising to 4523+ (2025-2029)
Department of Transport, Department of Agriculture, Department of Human Settlement and others that undertake job creation. Nerve Centre.
Annual District with Relevant depts.
Total Rand Value of each EPWP job in District (total)
TBD 256 600 TBD TBD Department of Transport, Department of Agriculture, Department of Human Settlement and others that undertake job creation. Nerve Centre.
Annual District with Relevant depts.
Number of Small 250 600 900 1400 CIDB Database, Dept of Annual
Harry Gwala District Growth and Development Plan
Page 46
Baseline Data
Proposed Targets Verification Reporting
2020 2025 2030
contractors created through Vuzukhaze Emerging Contractor Programme* (total)
Transport and other Departments that undertake job creation programmes.
District with DEDT
*Note: Assuming 10% of PGDP goals given that these are mainly rural priorities and that there are 10 District
Councils
Interventions
PGDP Goal 1: Job Creation
PGDP Strategic Objective : Expansion of government-led job creation programmes
# Generic Description of Intervention
District Specific Status Quo
District Specific Intervention
Location Time Responsible agents, partners
A Support enhanced implementation of the EPWP (incl. CWP) Programme
TBD Expand programme in District
Throughout District
Short term
Dept of Public Works
B Facilitate expanded access to the Jobs Fund
TBD Establish contact channels with the Fund
Throughout District
Short term
DBSA
C Implementation of the Youth Employment Accord
TBD Take District level actions deriving from Accord
Throughout District
Short term
SDA with KZN Dept of Economic Dev and Tourism, District Municipality
6.2.2.4 PROMOTE SMME AND ENTREPRENEURIAL DEVELOPMENT
Primary Indicators
Baseline Data
Proposed Targets Verification Reporting
2020 2025 2030
Number of Co-operatives and SMMEs registered in the District that have been in operation for more than 2 years* (total)
1,640 2,300 2,750 3,300 Provincial government database, DEDT
Annual SDA with DEDT
Number of jobs created through establishment of SMMEs and Co-Ops* (total)
15 000 16,600 17,450 18,300 Survey, provincial government database, DEDT
Annual, SDA with DEDT
Balanced District B-BBEE Scorecard to measure progress within District (total)
TBD TBD TBD TBD DEDT, BBBEE Advisory Council
Annual SDA with DEDT
Harry Gwala District Growth and Development Plan
Page 47
*Note: Assuming 10% of PGDP reported facts and goals, given that these are mainly rural priorities and that
there are 10 District Councils
Interventions
PGDP Goal 1: Job Creation
PGDP Strategic Objective: Promote SMME and entrepreneurial development
# Generic Description of Intervention
District Specific Status Quo
District Specific Intervention
Location Time Responsible agents, partners
A Facilitation of access to markets for small enterprises
Weak District produce marketing initiative
District office
Medium term
District Municipality with SDA
B Facilitation of access to finance for small enterprises
Moderate Work with Banks, new Ministry
District office
Medium term
SDA with Banks, DBSA
C Capacity building and Mentorship Support for small enterprises
Weak Establish mentoring network
Throughout District
Short to medium term
SDA, District Municipality, NBI, KWANALU
D Advocate and lobby for the review of the business regulations and reduction of red-tape for small enterprises
Unknown Lobby new Ministry
District office
Short to medium term
District Municipality
E Access to appropriately located facilities with linked services
Average Determine market needs beyond existing services
Throughout District
Short to medium term
District Municipality, KZN Dept of Econ Dev and Tourism
F Implementation and enforcement of BBBEE
Unknown District Municipality to work with DTI to determine tools available and then implement
Throughout District
Short to medium term
District Municipality, DTI
G Enhancement and marketing of local attractions
District that has significant potential that can be leveraged
District tourist PPP
Throughout District
Short to medium term
District Municipality, SDA, new PPP
H Extending average local spend of tourists
Too prone to short stopovers
District tourist PPP
Throughout District
Short to medium term
District Municipality, SDA, new PPP
6.2.2.5 DEVELOP THE KNOWLEDGE BASE TO ENHANCE THE KNOWLEDGE ECONOMY.
Primary Indicators
Baseline Data Proposed Targets Verification Reporting
2020 2025 2030
% of patents and designs registered in District*
Unknown, TBD 7% increase on base year
17% increase on base year
22% increase on base year
Registered patents - Companies and Intellectual Property
Annual District with DEDT
Harry Gwala District Growth and Development Plan
Page 48
Baseline Data Proposed Targets Verification Reporting
2020 2025 2030
Commission (CIPC)
% of registered professional engineers in District labour force*
Unknown, but likely less than 1%
14% increase on base year
23% increase on base year
30% increase on base year
Engineering Council of South Africa (ECSA). HSRC
Annual District with DEDT
Gross expenditure on R&D as a proportion of District GVA*
Unknown, but likely less than 1%
100% increase on base year
300% increase on base year
400% increase on base year
National Survey of Research and Experimental Development. National Department of Science and Technology (DST). Annual
Annual District with DEDT
Percentage of academic staff with PhD Qualifications*
Unknown, but likely less than 10%
25% 50% 75% Tertiary Institutions, Office of the Premier
Annual OoP
*Note: Following PGDP targets, but base levels amended where appropriate
Interventions
PGDP Goal 1: Job Creation
PGDP Strategic Objective: Develop the knowledge base to enhance the knowledge economy.
# Generic Description of Intervention
District Specific Status Quo
District Specific Intervention
Location Time Responsible agents, partners
A Strengthen the partnerships between public sector, private sector, and research institutes and tertiary institutions
Weak Establish satellite with DUT/UKZN
Ixopo or other
Medium term
District Municipality, UKZN, DUT
B Establishment of Regional Innovation and Technology Hubs
Weak Focus on agriculture and tourism
Ixopo, Kokstad
Medium term
SDA with KZN Treasury, KZN Dept of Econ Dev and Tourism, UKZN, DUT
C Establish a consolidated indigenous knowledge system towards commercialisation
Unknown Liaise with provincial government, UKZN, DUT.
Throughout District
Short to medium term
KZN Dept of Education, DUT, UKZN
Harry Gwala District Growth and Development Plan
Page 49
6.3 GOAL 2: HUMAN RESOURCE DEVELOPMENT
6.3.1 APEX INDICATORS TABLE 15: PGDP TARGETS FOR HUMAN RESOURCE DEVELOPMENT FOR KWAZULU NATAL PROVINCE
APEX INDICATORS BASELINE (2010)
TARGETS Verification Reporting
2015 2020 2025 2030
Gross Enrolment Rate
Primary
Secondary
94%
86.7%
95% 88%
97% 89%
98% 90%
100%
90%
DoE Annual
Percentage of Grade 3,6 and 9 learners performing at the required levels of annual national assessments (Literacy and Numeracy)
36% 60% 70% 80% 90% ANA Report, DoE
Annual
Performance at SACMEQ
Reading
Mathematics
486 485
500 500
550 550
600 600
600 600
SACMEQ Reports, DoE
Periodic
Percentage National Senior Certificate pass rate
68.1% 75% 80% 85% 90% DoE Annual
Numbers of students qualifying for bachelors programme in the NSC
27 826 30 000
33 000
35 000
35 000
DoE Annual
Participation in the FET College sector
12.5% 15% 20% 25% 30% DHET Annual
FET NC (V) graduation rate 66% 68% 70% 73% 75% DHET Annual
Participation in Higher Education
22.1% 22.5% 23% 24% 25% DHET Annual
Adult Literacy Rate 80% 82% 84% 87% 90% StatsSA, DOE
Periodic
Source: Provincial Growth and Development Plan (2012)
TABLE 16: HARRY GWALA DISTRICT TARGETS FOR HUMAN RESOURCE DEVELOPMENT
APEX INDICATORS BASELINE (2010)
TARGETS Verifica tion
Reporting
2020 2025 2030
Gross Enrolment Rate*
Primary
Secondary
77.3%
90% 65%
85%
97% 75%
90%
98% 80%
94%
99% 85%
DoE Annual DOE
Percentage of Grade 3,6 and 9 learners performing at the required levels of annual national assessments (Literacy and Numeracy)**
Grade 3-48.3%,39.2
% Grade 6-
27%, 24.7% Grade 9-
34%,11.8%
50%,60%
50%,40
%
40%,25%
70%60%
60%,40%
60%,40
%
80%,75%
75%,70
%
75%,70%
ANA Report, DoE
Annual Department of Education
Performance at Unknown at Approx. SACMEQ Periodic
Harry Gwala District Growth and Development Plan
Page 50
APEX INDICATORS BASELINE (2010)
TARGETS Verifica tion
Reporting
2020 2025 2030
SACMEQ
Reading
Mathematics
District level, but
50approx. 450 for
reading and 400 for maths
500 for reading 450 for maths
575 for reading 525 for maths
650 for reading and 600
for maths
Reports, DoE
DOE
Percentage National Senior Certificate pass rate***
70.7% 80% 85% 90% DoE Annual DOE
Numbers of students qualifying for bachelors programme in the NSC****
Approx. 600 1500 2000 2500 DoE Annual DOHET
Participation in the FET College sector ****
Unknown +20% +30% +40% DHET DOHET
FET NC (V) graduation rate *****
Unknown +20% +30% +40% DHET Annual DOHET
Participation in Higher Education
5% 9% 22% 13% DHET Annual DOHET
Adult Literacy Rate Estimate 50%
70% 80% 90% StatsSA, DOE
Periodic DOHET
* Notes: figures derived and inferred by national DBE data and StatsSA municipal report 03-01-53, and projected forwards largely in with PGDP objectives grafted onto District conditions **Notes: Data derived from DBE Report on the Annual National Assessments 2012, Grades 3, 6 and 9; and projected forwards in relation to PGDP objectives in relation to local District conditions ***Notes: Derived from DBE report on NSC Results 2013 and projected forwards in relation to PGDP objectives and local District conditions ****Notes: Estimates derived from inferences from StatsSA municipal report 03-01-53, and DBE report on NSC Results 2013 plus PGDP objectives in relation to local District conditions *****Notes: Estimates derived from inferences from StatsSA municipal report 03-01-53 plus PGDP objectives in relation to local District conditions *****Notes: Estimates derived from inferences from StatsSA municipal report 03-01-53, plus inferences from
Umkanyakude DGDP draft Indicators Report 2014
The targets set for these indicators are based on the PGDP targets and indicators. The calculations involved in the preparation of these figures are based on the notes listed above.
Harry Gwala District Growth and Development Plan
Page 51
6.3.2 PRIMARY INDICATORS AND INTERVENTIONS
6.3.2.1 IMPROVE EARLY CHILDHOOD DEVELOPMENT, PRIMARY AND SECONDARY EDUCATION
Primary Indicators
Baseline Data
Proposed Targets Verification Reporting
2020 2025 2030
Enrolment of 3-5 year old children in educational institutions*
20 % 35% 40% 50% StatsSA, DoE Annual District with DOE
Percentage of Grade 1 learners who attended Grade R*
92% 95% 97% 100% DoE Annual District with DOE
Retention Rates: Grades 10-12*
57% 80% 83% 85% DoE Annual District with DOE
Grade 3 learners performing at required levels in ANA**
Literacy
Numeracy
48.3% 39.2%
70% 70%
80% 80%
90% 90%
DoE Annual District with DOE
Grade 6 learners performing at required levels in ANA**
Literacy
Numeracy
27% 24.7%
70% 70%
80% 80%
90% 90%
DoE Annual District with DOE
Grade 9 learners performing at required levels in ANA**
Literacy
Numeracy
34% 11.8%
70% 70%
80% 80%
90% 90%
DoE Annual District with DOE
Percentage of Children who turned 9 in the previous year who are currently in grade 4 or above*
62%
70%
75%
80%
DoE Annual District with DOE
Percentage of Children who turned 12 in the previous year who are currently in grade 7 or above*
47%
60%
65%
70%
DoE Annual District with DOE
Percentage of youths that obtain a National Senior Certificate from School*
47%
55%
60%
65%
DoE Annual District with DOE
Number of learners qualifying for NSC for***
Bachelors programme
Approx. 600
1500
2000
2500
DBE, DoE Annual District with
Harry Gwala District Growth and Development Plan
Page 52
Baseline Data
Proposed Targets Verification Reporting
2020 2025 2030
Diploma
Certificate
Approx. 800 Approx. 600
2000 1500
3000 2000
4000 2500
DOE
*Note: Assuming conformity with PGDP facts and goals Notes:
**Notes: Source- DBE Report on National Assessments 2012, Grades 3, 6 and 9; and projected forwards in
relation to PGDP objectives (however see table 6 above for likely more realistic goals)
*** Notes: Estimates derived from inferences from StatsSA municipal report 03-01-53, and DBE report on NSC
Results 2013 plus PGDP objectives in relation to local District conditions
Interventions
PGDP Goal 2: Human Resource Development
PGDP Strategic Objective: Improve early childhood development, primary and secondary education
# Generic Description of Intervention
District Specific Status Quo
District Specific Intervention
Location Time Responsible agents, partners
A Ensure the delivery of professional management and relevant teacher development programmes
Unknown Source funds to hire teacher developers esp. in maths & science
Throughout District
Short term
KZN Dept of Education, ISASA, UKZN faculty of Education
B Efficient Data collection to track learner progress and enhance retention
Unknown Work with District Education officials
Throughout District
Short term
KZN Dept of Education, District Municipality
C Improving school infrastructure
Weak Work with Provincial Education Dept.
Throughout District
Short term
KZN Dept of Education, District Municipality
D Promoting the use of new technologies
Unknown Source funds to enhance ICT use in high schools
Throughout District
Short term
Dept of Science and Technology, KZN Dept of Education, District Municipality
E Enhance technical and vocational education
Weak Work with DHET and/or international donors on agricultural and tourism college
Ixopo and Kokstad
Medium term
District Municipality, DHET and probably DUT, and EU
Harry Gwala District Growth and Development Plan
Page 53
6.3.2.2 ALIGN SKILLS DEVELOPMENT TO ECONOMIC GROWTH
Primary Indicators
Baseline Data
Proposed Targets Verification Reporting
2020 2025 2030
Number of NSC candidates* taking
Maths
Science (total)
711 707
1800 1350
2250 1800
2700 2250
DOE and DBE
Annual District with DOE and DBE
Full and part time students* in public FET colleges for
All courses
NC (V) courses
N courses
Occupational qualification
(total)
3965 104
2385 185
4200 130
2430 270
4365 1485 2453
315
4500 1575 2475 360
DHET Annual District with DHET
Graduation numbers* in:
Teaching
Science, Engineering and technology
122
266
180
279
189
284
203
293
DHET Annual District with DHET
Number of PHD Graduates TBD TBD TBD TBD TBD TBD
*Note: Based on assumption of 4.5% share of KZN population applied to PGDP facts and goals
Interventions
PGDP Goal 2: Human Resource Development
PGDP Strategic Objective: Skills alignment to economic growth
# Generic Description of Intervention
District Specific Status Quo
District Specific Intervention
Location Time Responsible agents, partners
A Develop skills plans for lead economic sectors per district municipality based on skills demand and implement in partnership with post-school institutions.
Weak Do feasibility analysis – focus on Agriculture and Tourism as well as public sector
District office
Short To medium term
DHET, DUT, KZN Dept of Econ Dev ad Tourism
B Massively expand the enrolment of youth in FET College programmes and in other post-school training institutions
Weak Work with DHET on a local initiative
District office
Short Term
District Municipality, DHET
C Ensure and appropriate “programme and qualification mix” at universities, and promote qualifications in key areas.
NA NA NA Short to medium term
DUT, UKZN
D Data-base of graduates for employers to access
Unknown Compile data base -SDA
District office
Short to medium
SDA, District Municipality
Harry Gwala District Growth and Development Plan
Page 54
PGDP Goal 2: Human Resource Development
PGDP Strategic Objective: Skills alignment to economic growth
# Generic Description of Intervention
District Specific Status Quo
District Specific Intervention
Location Time Responsible agents, partners
term
6.3.2.3 YOUTH SKILLS DEVELOPMENT AND LIFELONG LEARNING
Primary Indicators Baseline
Data Proposed Targets Verification Reporting
2020 2025 2030
Youth skills supported by National Skills Fund, SETAs and youth programmes
TBD Increase by 10% over base
Increase by 30% over base
Increase by 40% over base
DHET Annual District with DHET
Participation in AET
TBD Increase by 10% over base
Increase by 30% over base
Increase by 40% over base
DHET Annual District with DHET
Interventions
PGDP Goal 2: Human Resource Development
PGDP Strategic Objective : Youth Skills Development and Lifelong learning
# Generic Description of Intervention
District Specific Status Quo
District Specific Intervention
Location Time Responsible agents, partners
A Develop counselling and vocational guidance services for schools and out of school youth
Unknown District to liaise with provincial government to enhance services
District office
Short to medium term
KZN Dept of Education
B Relevant life-long learning programmes to be delivered by accessible and vibrant community-based adult education and training (AET) Centres
Unknown District to liaise with provincial government to enhance services
District office
Short to medium term
KZN Dept of Education
Harry Gwala District Growth and Development Plan
Page 55
6.4 GOAL 3: HUMAN AND COMMUNITY DEVELOPMENT
6.4.1 APEX INDICATORS TABLE 17: PGDP TARGETS FOR HUMAN AND COMMUNITY DEVELOPMENT FOR KWAZULU NATAL PROVINCE
Source: Provincial Growth and Development Plan (2012)
APEX INDICATORS
BASELINE (2010)
TARGETS Verification Reporting
2015 2020 2025 2030
PGDP Adjusted Human Development Index
0.7 0.72 0.80 0.90 1.00 Indicator of inequality calculated from official statistics provided by StatsSA, Census, LCS, IES, DHS, Gross Regional Product from StatsSA and National Accounts
Every 3 years DSD and Nerve Centre
Longevity, Life Expectancy
M: 49.1 F:50.2
M:56.4 F:60.7
M:58.4 F:62.7
M:61 F:65
M:63.7 F:68
Estimated of life at birth, Census, Stats SA Life tables, NDOH- DHA estimates, ASSA 2008 Model
Every 5 years DSD and Nerve Centre
Decrease in Absolute Poverty: % below food poverty line (Baseline: NIDS 2008, PL= Half R418 proposed by NPC)
25.70 17.99 10.79 5.40 0.00 Composite indicator of absolute poverty calculated from official statistics provided by Stats SA, LCS and IES
Every 3 years DSD and Nerve Centre
Decrease in social inequality: Share of income earned by poorest 60%
17.6 19.4 22.1 25.4 29.2 Indicator of inequality calculated from official statistics provided by Stats SA LCA and IES
Every 3 years DSD and Nerve Centre
Total number of crimes measured as the number of crimes per 100 000
3 608 3 396 3 057 2 751 2 476 Collated by National SAPS
Annually Sept of Com Safety and Liaison
Harry Gwala District Growth and Development Plan
Page 56
TABLE 18: HARRY GWALA DISTRICT TARGETS FOR HUMAN AND COMMUNITY DEVELOPMENT
APEX INDICATORS BASELINE (2010)
TARGETS Verification Reporting
2020 2025 2030
PGDP Adjusted Human Development Index*
0.65 0.8 0.9 1.0 Indicator of inequality calculated from official statistics provided by StatsSA, Census, LCS, IES, DHS, Gross Regional Product from StatsSA and National Accounts
Every 3 years DSD and Nerve Centre
Longevity, Life Expectancy** (years)
50 60 65 70 Estimated of life at birth, Census, Stats SA Life tables, NDOH- DHA estimates, ASSA 2008 Model
Every 5 years DSD and Nerve Centre
Decrease in Absolute Poverty: % below food poverty line (Baseline: NIDS 2008, PL= Half R418 proposed by NPC)***
25% (estimate)
15% 5% 0% Composite indicator of absolute poverty calculated from official statistics provided by Stats SA, LCS and IES
Every 3 years DSD and Nerve Centre
Decrease in social inequality: Share of income earned by poorest 60%
25% (estimate)
35% 40% 45% Indicator of inequality calculated from official statistics provided by Stats SA LCA and IES
Every 3 years DSD and Nerve Centre
Total number of crimes measured as the number of crimes per 100 000
1,720 1,500 1,400 1,300 Collated by National SAPS
Annually Sept of Com Safety and Liaison
* Notes: Estimates derived from inferences from StatsSA municipal report 03-01-53, plus inferences from Umkanyakude
DGDP draft Indicators report 2014
**Notes: Estimates derived from inferences from StatsSA municipal report 03-01-53, plus inferences from Umkanyakude
DGDP draft Indicators report 2014
***Notes: Estimates derived from inferences from StatsSA municipal report 03-01-53, plus inferences from Umkanyakude
DGDP draft Indicators 2014
Harry Gwala District Growth and Development Plan
Page 57
The targets set for these indicators are based on the PGDP targets and indicators. The calculations
involved in the preparation of these figures are based on the notes listed above.
6.4.2 PRIMARY INDICATORS AND INTERVENTIONS
6.4.2.1 ALLEVIATE POVERTY AND ENHANCE SOCIAL WELFARE
Primary Indicators
Baseline Data
Proposed Targets Verification Reporting
2020 2025 2030
Reduction in relative poverty: % below upper bound poverty line
67.5 54.7 43.7 33.8 Composite indicator showing the % of households below a relative poverty line. Calculated from stats provided by Stats SA, LCS and IES
Every 3 years District with DOH
Reduction in child poverty: % of children that are stunted, wasted or obese
TBD 12.8 (stunted)
4.3 (wasted)
3.1 (obese)
10.5 (stunted)
3.4(wasted) 2.4 (obese)
7.9 (stunted)
2.6 (wasted)
2.0 (obese)
Composite Indicator of child malnutrition. Calculated from stats provided by Stats SA, LCS and IES
Every 3 years District with DOH
Effective dependency ratio
4.1 3.2 2.9 2.8 Composite Indicator of economic dependency. Calculated from stats provided by Quarterly Labour Force Survey and Census
Quarterly District with DOH
The poverty gap and severity of poverty
TBD Poverty gap 23.3
Severity of
poverty 13.5
Poverty gap 18.6
Severity of
poverty 10.8
Poverty gap 14.3
Severity of
poverty 8.3
Composite indicator of depth and severity of poverty calculated from official statistics provided by StatsSA, LCA and IES
Every 3 years District with DOH
Harry Gwala District Growth and Development Plan
Page 58
Interventions
PGDP Goal 3: Human and Community Development
PGDP Strategic Objective : Alleviate poverty and enhance social welfare
# Generic Description of Intervention
District Specific Status Quo
District Specific Intervention
Location Time Responsible agents, partners
A Promote and accelerate roll-out of Operation Sukuma Sakhe
Unknown Liaise with provincial government to ensure pro-active steps so most vulnerable are reached
Throughout District
Short to medium term
District with KZN Dept of Social Development
B Implementation of comprehensive social welfare safety net.
Unknown Liaise with provincial government to ensure pro-active steps so most vulnerable are reached
Throughout District
Short to medium term
District with KZN Dept of Social Development
C Expanding social welfare services to under-serviced areas
Unknown Liaise with provincial government to ensure pro-active steps so most vulnerable are reached
Throughout District
Short to medium term
District with KZN Dept of Social Development
6.4.2.2 ENHANCE HEALTH OF COMMUNITIES AND CITIZENS
Primary Indicators
Baseline Data
Proposed Targets Verification Reporting
2020 2025 2030
Decrease in maternal and child mortality ratio (PROXY):
Maternal Mortality Ratio (/1000)
Infant Mortality Ratio(/1000)
Under 5 Mortality Rate(/100 000)
Severe Malnutrition under 5 years incidence(/100 000)
TBD
149
34
49
4.2
130
28
40
2.9
100
20
34
1.2
DHIS Data StatsSA StatsSA DHIS Data
Annual District with KZN Dept of Health
Decrease in prevalence of Chronic Illness:
Adult Diabetes incidence (per
TBD
-10%
-10%
-10%
DHIS and StatsSA Annual District with KZN Dept of
Harry Gwala District Growth and Development Plan
Page 59
Baseline Data
Proposed Targets Verification Reporting
2020 2025 2030
1000)
Hypertension incidence (per 1000 over 40 years)
TBD
-10%
-10%
-10%
Health
Prevalence and incidence of communicable diseases:
HIV (%)
TB (per 100 000)
Malaria (per 100 000)
Professional Nurses per 100 000
Medical officers per 100 000
TBD TBD TBD
TBD
TBD
0.9% 200
0.02
147
29
0.6% 180
0.01
152
31
0.4% 173
0.01
155
33
DHIS and StatsSA Annual District with KZN Dept of Health
Interventions
PGDP Goal 3: Human and Community Development
PGDP Strategic Objective: Enhance health of communities and citizens
# Generic Description of Intervention
District Specific Status Quo
District Specific Intervention
Location Time Responsible agents, partners
A Development and implementation of comprehensive primary health care system
Unknown Liaise with provincial government. Ensure that various government healthcare programmes are undertaken.
Throughout District
Short to medium term
District with KZN Dept of Health
B Accelerate HIV and AIDS intervention programmes
Unknown Liaise with provincial government
Throughout District
Short to medium term
District with KZN Dept of Health
C Ensure equitable access to health services.
Unknown Liaise with provincial government
Throughout District
Short to medium term
District with KZN Dept of Health
D Implementation of the first phase of National Health Insurance pilot programme
Unknown Liaise with provincial government
Throughout District
Short to medium term
District with KZN Dept of Health
E Promote healthy lifestyle and mental health programmes
Unknown Liaise with provincial government
Throughout District
Short to medium term
District with KZN Dept of Health
F Accelerate programmes to improve maternal, women and child health outcomes
Unknown Liaise with provincial government
Throughout District
Short to medium term
District with KZN Dept of Health
G Accelerate programmes to
Unknown Liaise with provincial government
Throughout District
Short to medium
District with KZN Dept of
Harry Gwala District Growth and Development Plan
Page 60
PGDP Goal 3: Human and Community Development
PGDP Strategic Objective: Enhance health of communities and citizens
# Generic Description of Intervention
District Specific Status Quo
District Specific Intervention
Location Time Responsible agents, partners
improve TB outcome
term Health
H Promote awareness programmes against substance abuse
Unknown Liaise with provincial government
Throughout District
Short to medium term
District with KZN Dept of Health
I District Specific Intervention: Review Healthcare provision levels to ensure adequacy
General consensus that there needs to be an improvement.
Relevant agency or partners (DOH) to undertake review of healthcare facilities to determine whether further facilities are required, or whether existing facilities are to be upgraded
6.4.2.3 ENHANCE SUSTAINABLE HOUSEHOLD FOOD SECURITY IN KZN
Primary Indicators
Baseline Data
Proposed Targets Verification Reporting
2020 2025 2030
Dietary Diversity Index (% of households consuming< 15 major food categories in previous month
TBD 46 37 30 LCS, IES, NIDS Annual District with KZN Dept of Health, DSD
Hunger episodes: household member has gone hungry at least x times in past 12 months %of households
TBD 24 12 6 Living Conditions Survey, General Household Survey, National Income Dynamics Survey
Annual District with KZN Dept of Health, DSD
Child Malnutrition as a measure of food insecurity:
Prevalence of anaemia among children 0-4 years of age
% of children aged 1-9 with vitamin A deficiency
TBD
17.3%
42%
14.65%
32%
12%
22%
TBD Annual District with KZN Dept of Health
Interventions
PGDP Goal 3: Human and Community Development
PGDP Strategic Objective : Sustainable household food security in KZN
Harry Gwala District Growth and Development Plan
Page 61
# Generic Description of Intervention
District Specific Status Quo
District Specific Intervention
Location Time Responsible agents and partners
A Develop infrastructure for local markets
Fair Enhance and extend existing markets
Key road intersections
Short to medium term
District Municipality, SDA
B Support to informal economy
Weak Research group buying and selling prospects
All Short term
District Municipality, KZN Dept of Economic Dev and Tourism
C Skills development to support local production
Weak Work with relevant provincial/national Dept.
all Short to medium term
District Municipality, KZN Dept of Economic Dev and Tourism
D One home one garden and roll out of school and community gardens
Unknown Establish South African best practice and emulate
Throughout District
Short to medium term
District Municipality, KZN Dept of E and Agric
E Accelerate permaculture practices
Unknown Establish South African best practice and emulate
Throughout District
Short to medium term
District Municipality, KZN Dept of E and Agric
F 100ha programme by traditional councils
Unknown Determine progress in District
Throughout District
Short term
COGTA, KZN DAERD
G Integrated System for continuous assessment: Early Warning of poverty, malnutrition and hunger.
Unknown Establish system Throughout District
Short term
District Municipality, KZN Dept of Social Development
6.4.2.4 DEVELOP SUSTAINABLE HUMAN SETTLEMENTS
Primary Indicators
Baseline Data Proposed Targets Verification Reporting
2020 2025 2030
% housing backlog Unreliable. Backlog verification required.
Decrease by 7%
Decrease by 7%
Decrease by 7%
Census data Every 5 years District with DHSand DCOGTA
% households with registrable form of tenure
TBD 57% 58% 59% Census data Every 5 years District with DHS and DCOGTA
Percentage of District Human
TBD 42% 45% 50% Municipal Housing
Annual.
Harry Gwala District Growth and Development Plan
Page 62
Baseline Data Proposed Targets Verification Reporting
2020 2025 2030
Settlements budget spent on formal settlement development
Plans. Department of Human Settlements. StatsSA
District with DHS and DCOGTA
Interventions
PGDP Goal 3: Human and Community Development
PGDP Strategic Objective : Develop Sustainable Human Settlements
# Generic Description of Intervention
District Specific Status Quo
District Specific Intervention
Location Time Responsible agents and partners
A Establishment of joint provincial forum addressing integrated development
Unknown NA Province Short term
KZN COGTA
B Densification of human settlements
Whilst there are nodes within the District, there are large tracts of rural areas that are sparsely populated and difficult to service.
Review town planning schemes. Implementation of urban edges as a tool to promote densification and assist in servicing.
All Short to medium term
District Municipality, Local Municipalities
C Transformation of informal settlements
Need upgrades Work with Dept. of Human Settlements to do upgrades. Various housing plans are in place and need to be implemented.
Throughout District
Short to medium term
District and Local Municipalities, KZN Dept of Human Settlements
D Develop provincial strategy and plan to address housing gap market
Issues relating to housing backlogs.
Backlogs to be verified and addressed
Throughout District
Medium to long term
KZN Dept of Human Settlements
E Expand the social housing implementation
Unknown Do feasibilities for social housing projects in larger towns
Large towns Short to medium term
District Municipality, KZN Dept of Human Settlements
6.4.2.5 SAFETY AND SECURITY
Primary Indicators
Baseline Data Proposed Targets Verification Reporting
2020 2025 2030
Number of Circa 1000 664 419 272 SAPS Annual
Harry Gwala District Growth and Development Plan
Page 63
contact crimes/ 100 000 per annum
Annual Crime Report
District with SAPS
Number of trio crimes per 100 000 per annum
Circa 100 48 31 20 SAPS Annual Crime Report
Annual District with SAPS
Interventions
PGDP Goal 3: Human and Community Development
PGDP Strategic Objective : Safety and Security
# Generic Description of Intervention
District Specific Status Quo
District Specific Intervention
Location Time Responsible agents and partners
A Implementation of community protection through environmental design
Weak Review town planning schemes to include more cul-de-sacs etc.
All Short District Municipality, Local Municipalities, KZN Dept of Human Settlements, KZN Dept of Comm. Safety
B Strengthen programmes aimed at curbing violence against the vulnerable
Weak Assist CPAs All Short to medium
District Municipality, Local Municipalities, KZN Dept of Comm. Safety
C Strengthen partnerships: civil society, business and criminal justice system
Weak Link with CPFs, BAC etc. efforts
All Short to medium term
KZN Dept of Comm. Safety, BAC, CPFs
D Establish educational programmes on safety for children
Weak Liaise with schools in District and KZN Dept. of Education
All Medium term
KZN Dept of Education
E Reduction in livestock theft
Weak District support for farmers associations and community policing forums
All short District Municipality, CPFs, SAPS, Kwanalu
6.4.2.6 ADVANCE SOCIAL CAPITAL
Primary Indicators Baseline Data Proposed Targets
2020 2025 2030
Number of community level institutions with active registration status in District
TBD
TBD TBD TBD
Interventions
PGDP Goal 3: Human and Community Development
PGDP Strategic Objective: Advance social capital
Harry Gwala District Growth and Development Plan
Page 64
# Generic Description of Intervention
District Specific Status Quo
District Specific Intervention
Location Time Responsible agents and partners
A Conduct diagnostic research into the collapse of community level institutions
Unknown Commission diagnostic analysis
All Short term
District with KZN Dept of Soc Dev, UKZN/DUT
B Develop and implement programmes that provide norms and behaviours that create an enabling environment for successful community level institutions.
Unknown Correlate effort with relevant provincial/national Dept.
all Medium term
District with KZN Dept of Soc Dev
C Identify, engage and strengthen the capacity of provincial institutions able to provide positive and useful support services to community level institutions.
NA NA Province Medium term
District with Premier’s office
D Support the building and maintenance of networks between linking and community-level institutions.
Weak Facilitate networks All Medium term
District with KZN Dept of Social Development
E Promote voluntary Associations such as stokvels and burial societies.
Unknown Enable association in District
All Medium term
District Municipality with KZN Dept of Social Development
F District Specific: Promote SMME programmes especially those that relate to skills development
Various SMMEs within the District that need support.
Assist in linking the various SMMEs with the appropriate programmes to improve their skill sets so that they match the market appropriately. Emphasis on tourism, agriculture and agri-tourism.
All Short to medium term
District with implementing agency as well as various agencies or programmes responsible for SMME development.
Harry Gwala District Growth and Development Plan
Page 65
6.5 GOAL 4: STRATEGIC INFRASTRUCTURE
6.5.1 APEX INDICATORS TABLE 19: PGDP TARGETS FOR STRATEGIC INFRASTRUCTURE FOR KWAZULU NATAL PROVINCE
Source: Provincial Growth and Development Plan (2012)
TABLE 20: HARRY GWALA DISTRICT TARGETS FOR STRATEGIC INFRASTRUCTURE
The targets set for these indicators are based on the PGDP targets and indicators.
Notes: root-mean-square error (RMSE) is a frequently used measure of the differences between values predicted by a
model or an estimator and the values actually observed. Basically, the RMSD represents the sample standard deviation of
the differences between predicted values and observed values. These individual differences are called residuals when the
calculations are performed over the data sample that was used for estimation, and are called prediction errors when
computed out-of-sample. The RMSD serves to aggregate the magnitudes of the errors in predictions for various times into
a single measure of predictive power. RMSD is a good measure of accuracy, but only to compare forecasting errors of
different models for a particular variable and not between variables, as it is scale-dependent.
APEX INDICATORS BASELINE (2010)
TARGETS Verification Reporting
2015 2020 2025 2030
% of fixed capital investment in relation to Provincial GDP
15% 20% 25% 28% 30% 5 year intervals Annual KZNT
Average Lead/ lag time between development application submission and completion using RMSE method
20 months
14 months
10 months
Zero Zero Monthly Building Report Submissions. Stats SA Monthly Reports consolidated into a single provincial database.
Annual KZNT
APEX INDICATORS BASELINE (2010)
TARGETS Verification Reporting
2020 2025 2030
% of fixed capital investment in relation to District GDP
TBD 25% 28% 30% 5 year intervals Annual Distirct with KZNT
Average Lead/ lag time between development application submission and completion expected and actual time using RMSE method reduced
TBD 10 months
Zero Zero Monthly Building Report Submissions. Stats SA Monthly Reports consolidated into a single provincial database.
Annual District with KZNT
Harry Gwala District Growth and Development Plan
Page 66
6.5.2 PRIMARY INDICATORS AND INTERVENTIONS
6.5.2.1 DEVELOPMENT OF ROAD AND RAIL NETWORKS
Primary Indicators
Baseline Data Proposed Targets Verification Reporting
2020 2025 2030
Number of kilometres of declared road that provides access to communities (total)
3755.11 * (Source: KZN
DOT)
4090 4460 4860 KZN DOT Annual Report
Annual District with DoT
Percentage of Road network in poor to very poor condition (% of total)
TBD
30% 20% 10% KZN DOT Annual Report
Annual District with DoT
% Modal split in Commuter transport
TBD Transport
Study to be conducted
TBD TBD TBD PRASA Annual Report
Annual District with DoT
% Tonnage to Capacity Utilization (Demand Installed)
TBD TBD TBD TBD Transnet Annual Report
Annual District with DoT
* Based on KZN DoT GIS data. Baseline should be verified. Targets based on PGDP drawdown. Note that
intersecting roads identified in SDF will affect the Targets.
Interventions
PGDP Goal 4: Strategic Infrastructure
PGDP Strategic Objective: Development of Road and Rail Networks
# Description of Intervention
District Specific Status Quo
District Specific Intervention
Location Time Responsible agents and partners
A Expand and Maintain Core Rail Freight Network and the Branch Lines
Currently a degraded rail network not utilised to its potential
Look at upgrading rail lines where appropriate/ possible
District Wide
Medium- Long TRANSET and or PRASA
B Revitalise Branch Rail Lines
Long term feasibility in context of rising energy costs and sustainability. Degraded and underutilised rail lines.
Investigate optimisation of branch lines. Negotiations are currently in progress between Ingwe Municipality and TFR to co-operate in the section of branch line between Donnybrook and Riverside as this is
District Wide
Medium to Long Term
TRANSNET and or PRASA
Harry Gwala District Growth and Development Plan
Page 67
PGDP Goal 4: Strategic Infrastructure
PGDP Strategic Objective: Development of Road and Rail Networks
# Description of Intervention
District Specific Status Quo
District Specific Intervention
Location Time Responsible agents and partners
the section used in the Rail Tourism product offered by the municipality. Alan Paton Railway Project will also improve tourism opportunities
C Expand and maintain coal line to Richards Bay (SIP1)
NA NA
D Create additional capacity along Primary Movement Corridors
N2 Upgrades through to Kokstad. SANRAL
N2 Upgrades are SANRAL Mandate. However, primary movement corridors through District are to be upgraded and maintained to ensure accessibility and promote movement of goods
District Wide
Medium to Long Term
District, with DOT
E Maintain Secondary Road Network
A worn and degraded secondary road network linking Nodes within the District and outside. Critical are the R56 and R612
Upgrade and maintain road network linking nodes and providing movement of goods and people as reflected in IDPs and other sector reports
District Wide
Continuous District, with DOT
F Extend Rural Road Access
The lack of connectivity in the central “hinterland” meaning a lack of access to services.
Develop internal road network to ensure that some access is given to the un-serviced areas
District Wide
Continuous District, with DOT
G Improve Passenger Rail Services
A degraded rail line
Develop and Implement Alan Paton rail project (see Catalyst Projects). However, this is primarily a tourist project. Should also investigate opportunities for improving rail lines if
District Wide
Medium Term District, SDA, SANRAL
Harry Gwala District Growth and Development Plan
Page 68
PGDP Goal 4: Strategic Infrastructure
PGDP Strategic Objective: Development of Road and Rail Networks
# Description of Intervention
District Specific Status Quo
District Specific Intervention
Location Time Responsible agents and partners
appropriate
H Develop Integrated Public Transport Services
Long distance. Mainly a road improvement issue. Inadequate taxi infrastructure in the nodes.
Taxi rank development as per local area plans/ Urban Regeneration Plans. Prepare a District Public Transport Strategy linked to the Spatial Development Framework
District Nodes
Short term District, with DOT
I An integrated transport strategy for the District
Dependence of businesses and individuals on inefficient road based transport.
Prepare an integrated Transport Strategy. A successful strategy should minimise and co-ordinate transport, especially freight, simultaneously address Green House Gas emissions (transport is likely to be one of the biggest contributors) as well as the costs of doing business in the District.
District Short/medium District, with DOT
J District Specific: Upgrade of major movement routes as per catalyst projects
Primary and secondary road networks need to be maintained and in places upgraded
Upgrade and maintain road network linking nodes and providing movement of goods and people as reflected in IDPs as well as the Catalyst Projects in this report. Special emphasis should be placed on improving safe access to all citizens
District Wide
Short- Medium
DOT, District with various partners.
6.5.2.2 DEVELOPMENT OF ICT INFRASTRUCTURE
Primary Indicators
Baseline Data Proposed Targets Verification Reporting
2020 2025 2030
Percentage of Local Municipalities with established access networks
100 100% 100% 100% DEDT Database
Annual. District with DEDT
Percentage of households with
TBD 70% 85% 100% Service Provider
Annual. District
Harry Gwala District Growth and Development Plan
Page 69
Baseline Data Proposed Targets Verification Reporting
2020 2025 2030
access to in internet at home
databases with DEDT
Minimum broadband speed available within District
TBD 4mbs 10mbs 10mbs Service Provider databases
Annual. District with DEDT
Number of ICT Infrastructure Nodes
TBD TBD TBD TBD DEDT Database
Annual. District with DEDT
Interventions PGDP Goal 4: Strategic Infrastructure
PGDP Strategic Objective: Development of information and communications technology
# Description of Intervention
District Specific Status Quo
District Specific Intervention
Location Time Responsible agents and partners
A Develop ICT Backbone Infrastructure
ICT backbone is prevalent in nodes. With advent of telecoms, rural areas have access to internet, albeit at a lower level
ICT hubs within each of the Primary and Secondary nodes located either at libraries or municipal offices
Nodes within the District – primary and secondary
Short to medium
District, DEDT
B Develop Access Network Infrastructure at Provincial & Municipal Level
ICT backbone is prevalent in nodes. With advent of telecoms, rural areas have access to internet, albeit at a lower level
ICT hubs within each of the Primary and Secondary nodes located either at libraries or municipal offices
Nodes within the District
Short to medium
District, DEDT
C ICT Access Centres & Technology Upskilling
ICT backbone is prevalent in nodes. With advent of telecoms, rural areas have access to internet, albeit at a lower level
Training programmes as part of SMME development programme.
Primary nodes within District
Short to medium
District, DEDT
D District Specific: Improve Cellular Connectivity
Wide access to most parts of the District, however there are spots without cellular connectivity.
Co-ordinate with cellular providers to provide connectivity to all areas of the District
District Wide Short District with Cellular partners.
6.5.2.3 IMPROVE WATER RESOURCE MANAGEMENT AND SUPPLY
Primary Indicators
Baseline Data Proposed Targets Verification Reporting
2020 2025 2030
Cubic Metres per capita per year available
TBD 1000 1000 1000 DWA. National Water
Annual District
Harry Gwala District Growth and Development Plan
Page 70
Baseline Data Proposed Targets Verification Reporting
2020 2025 2030
Management System
with DWA and Umgeni Water
Number of Water service systems in balance
TBD 80% 90% 95% Water Services Report
Annual District with DWA and Umgeni Water
Non-revenue water
TBD TBD TBD TBD Water Loss Surveys, District
Annual. District with DWA and Umgeni Water
Value of development/ rezoning applications not approved due to bulk water and effluent constraints
TBD TBD TBD TBD Development Application Reports
Annual. District with DWA and Umgeni Water
% of households with access to 75 litres of water per person per day
35% ( In house)
32% (Communal)
100% 100% 100% Municipal IDPs. StatsSA. COGTA
Annual District with DWA and Umgeni Water
% of households with yard water connections
18% 35% 42% 50% Municipal IDPs. StatsSA. COGTA
Annual District with DWA and Umgeni Water
% of households with sanitation
3% (Flush/ Chemical) 29% (Pit/
Bucket)
100% 100% 100% Municipal IDPs. StatsSA. COGTA
Annual District with DWA and Umgeni Water
Note: Backlog verification study necessary to adequately assess baseline and baseline research required.
Interventions
PGDP Goal 4: Strategic Infrastructure
PGDP Strategic Objective: Improve water resource management and supply
Harry Gwala District Growth and Development Plan
Page 71
# Generic Description of Intervention
District Specific Status Quo
District Specific Intervention
Location Time Responsible agents and partners
A Review and Implement the Provincial Water Strategy
District Water Services Development Plan in Place. Umgeni Water Master Plan also has an impact
Refine and implement District Water Services Development Plan. Co-ordinate with Umgeni Master Plan Consider actions to reduce consumption by large users
District Ongoing District Water Services Department, COGTA, DWA
B Rationalise and extend Water Board Jurisdiction
District Water Services Development Plan in Place.
Refine and implement District Water Services Development Plan. Co-ordinate with Umgeni Master Plan. Include assessment of District needs, and pro-active strategies for management (including conservation and licensing) of reserves. Implement at bulk regional Schemes
District Ongoing District Water Services Department, COGTA, DWA
C Research and promote skills development for more localised water harvesting
District Water Services Development Plan in Place. Umgeni Water Master Plan also has an impact
Research into water harvesting programmes that can assist rural areas.
District Ongoing District Water Services Department, COGTA, DWA
D Programme for building of dams
District Water Services Development Plan in Place. Umgeni Water Master Plan also has an impact
Refine and implement District Water Services Development Plan. Co-ordinate with Umgeni Master Plan. The direct impact of the Smithfield dam on the District is limited to tourism opportunities. The Stephen Dlamini dam will assist in optimising water resource use.
District and Umgeni Water
Ongoing District Water Services Department, COGTA, DWA
E Programme for development of water sources -desalination, rainwater, recycling, and groundwater.
Whilst District is water rich, water supply is a problem. District Water Services Development Plan in Place.
Address water losses through old and decaying infrastructure. Ensure minimal losses. Research water harvesting programmes. Implement Bulk Water Schemes
District Ongoing District Water Services Department, COGTA, DWA
F Develop a financial model for the
District Water Services Development
Refine and implement District Water Services Development Plan. Co-
District Ongoing District Water Services Department,
Harry Gwala District Growth and Development Plan
Page 72
PGDP Goal 4: Strategic Infrastructure
PGDP Strategic Objective: Improve water resource management and supply
# Generic Description of Intervention
District Specific Status Quo
District Specific Intervention
Location Time Responsible agents and partners
implementation of operations and maintenance
Plan in Place. Umgeni Water Master Plan
ordinate with Umgeni Master Plan Consider tariff review that incentivises efficiency and penalises excessive use.
COGTA, DWA
G Water Conservation and Demand Management Programme in all the WSAs
District Water Services Development Plan in Place. Umgeni Water Master Plan
Refine and implement District Water Services Development Plan. Co-ordinate with Umgeni Master Plan Some industries, and agriculture, especially crops that need irrigation, as well as beef and dairy farming are very intensive water users. Establish reserves, basic needs and industry and needs, now and projected. Put management plan in place for the balance, incl. protection of raw sources from contamination (through inadequate waste management and sanitation, and fertiliser use.)
District Ongoing District Water Services Department, COGTA, DWA
H Establish policy and design standards for the provision of 75 litres of water per person per day
District Water Services Development Plan in Place which addresses this. Issues relate to rural areas
Refine and implement District Water Services Development Plan. Amend and update plan with new schemes as and when needed.
District Ongoing District Water Services Department, COGTA, DWA
6.5.2.4 IMPROVE ENERGY PRODUCTION AND SUPPLY
Primary Indicators
Baseline Data
Proposed Targets Verification Reporting
2020 2025 2030
Value of development/ rezoning applications not approved due to electricity supply constraints
TBD TBD TBD TBD Development Application Reports. Electricity supply authorities
Annual, Local and District Municipalities
% of households with a source of electrical supply
62.4% 89% 98% 98% Total Households without electricity sources/ total number of households.
Annual, Local and District Municipalities Eskom
Harry Gwala District Growth and Development Plan
Page 73
Interventions
PGDP Goal 4: Strategic Infrastructure
PGDP Strategic Objective: Improve energy production and supply
# Description of Intervention
District Specific Status Quo
District Specific Intervention
Location Time Responsible agents and partners
A Review & implement the Provincial Energy Strategy
Energy demands need to be met. Difficult to service rural areas
Investigate alternative energy production means – especially micro-hydro generation and bio-gas. (Agriculture is a big generator of bio-mass – plant matter and manure)
District Short District, Eskom, COGTA, DoEnergy
B Provide base-load alternative energy supply
Consistency of energy supply in District can be erratic. Rural areas not serviced.
Investigate alternative energy production means. Investigate the feasibility of setting up a District Specific energy utility company. Implement various electrification programmes currently in the pipeline to improve access and consistency in electricity supply.
District Short District, Eskom, COGTA, DoEnergy
C Programme and funding for operations and maintenance
Currently not a District Mandate,
If alternative, District specific alternative generation is set up, consider setting up a District Specific energy utility company.
District Medium-Long
District, Eskom, COGTA, DoEnergy
D Expedite the planning and implementation of sub-transmission networks in the Province
Not District Mandate
Harry Gwala District Growth and Development Plan
Page 74
6.6 GOAL 5: ENVIRONMENTAL SUSTAINABILITY
6.6.1 APEX INDICATORS TABLE 21: PGDP TARGETS FOR ENVIRONMENTAL SUSTAINABILITY FOR KWAZULU NATAL PROVINCE
APEX INDICATOR
S
BASELINE (2010)
TARGETS Verification Reporting
2015 2020 2025 2030
Green House Gas Emissions
TBD 5 102 200
MtCO2e from
2010 baselin
e
10 603 200 MtCO2e from 2010
baseline
14 131 200 MtCO2e from 2010
baseline
14 788 200 MtCO2e from 2010
baseline
National Greenhouse Gas Report, Department of Environmental Affairs
Annual DEDT
% protection of High Risk Biodiversity Planning Units
TBD 70% 85% 100% 100% Provincial State of Environment Reports. DAEA
Annual DEDT
Source: Provincial Growth and Development Plan (2012)
TABLE 22: HARRY GWALA DISTRICT TARGETS FOR ENVIRONMENTAL SUSTAINABILITY
Note that that there is no available District specific GHG data, so although this is a very important
indicator, until a baseline has been established or modelled, it will not be possible to measure.
Modelling the baseline is to be included in this DGDP as a project. The targets set for these
indicators are based on the PGDP targets and indicators.
APEX INDICATORS BASELINE (2010)
TARGETS Verification Reporting
2020 2025 2030
Green House Gas Emissions TBD TBD TBD TBD National Greenhouse Gas Report, Department of Environmental Affairs
Annual DAERD
% protection of High Risk Biodiversity Planning Units
TBD 85% 100% 100% Provincial State of Environment Reports. DAEA
Annual DAERD
Harry Gwala District Growth and Development Plan
Page 75
6.6.2 PRIMARY INDICATORS AND INTERVENTIONS
6.6.2.1 INCREASE PRODUCTIVE USE OF LAND
Primary Indicators
Baseline Data Proposed Targets Verification Reporting
2020 2025 2030
% Increase in Provincial Land Degradation Index (% against total)
TBD 0% 0% 0% Land Degradation Surveys. DAEA
Annual District
Ha of land rehabilitated annually
TBD TBD TBD TBD National Land Care Programme. DAEA
Annual District
% of high production agricultural land for non-agricultural activities
TBD 0% 0% 0% National Land Cover Database. CSIR, ARC, NDA
Annual District
Interventions
PGDP Goal 5: Environmental Sustainability
PGDP Strategic Objective: Increase productive use of land
# Generic Description of Intervention
District Specific Status Quo
District Specific Intervention Location Time Responsible agents and partners
A To promote sustainable land use practices to preserve and enhance agricultural potential
Varying levels of sustainable land use practices. Monoculture commercial farming and farming inputs such as chemical fertilisers negatively affect soil quality. Irrigation practices and water needs for dairy farming deplete water reserves.
Promote/educate/incentivise for more sustainable practices, such as crop diversity and rotation, permaculture, organic etc. Promote small (individual household) scale food gardening.
District Medium District, Agricultural Extension Officers
Assist with marketing ‘greener’ products – East Griqualand meats is a good example
District Medium District Municipality
Pressure on land surrounding nodes as well as rural land to be developed, mainly for
Define and strictly enforce urban edges that exclude all agricultural land, to all nodes. Densify inside urban edges rather than allow any development outside.
All nodes, District wide
Short - ongoing
District Municipality Local Municipalities
Harry Gwala District Growth and Development Plan
Page 76
settlement. Discourage rural settlement sprawl.
Protect through ensuring ongoing productive farming of agricultural land subject to land reform and restitution.
District ongoing District Municipality Local Municipalities
6.6.2.2 ADVANCE ALTERNATIVE ENERGY GENERATION AND REDUCE RELIANCE ON FOSSIL FUELS
Primary Indicators
Baseline Data Proposed Targets Verification Reporting
2020 2025 2030
Units of energy produced through alternative energy generation. Targets set by NDP
TBD Increase in line with NDP targets. Note that NDP targets assume introduction of new nuclear generation. This may not directly affect the Harry Gwala District, and targets will need to reflect this.
NERSA Annual, DEDT
Units of energy saved through energy efficiency interventions
TBD TBD increase with respect to the baseline
ESKOM, DOE
Annual, DEDT
Number of solar water heating units
TBD 50% increase against baseline
50% increase against 2020 target
50% increase against 2025 target
ESKOM Annual, DEDT
Interventions
PGDP Goal 5: Environmental Sustainability
PGDP Strategic Objective: Advance alternative energy generation and reduce reliance on fossil fuels
# Generic Description of Intervention
District Specific Status Quo
District Specific Intervention
Location Time Responsible agents and partners
A Develop provincial alternative energy resource assessments, strategies and policy interventions
District needs to consider alternative energy means as conventional servicing of rural area is unviable, and electricity supply is unreliable which impacts negatively on industrial investment and growth.
District to develop alternative energy resource assessments and strategy.
District wide with initial emphasis on industry and rural component.
Medium District, DAERD, ESKOM, COGTA
B Programme for development of alternative energy demonstration
Currently solar water heating projects for housing have been implemented. No
Investigate feasibility of local alternatives, and implement pilot projects; including
District Short District, DAERD, ESKOM, DCOGTA
Harry Gwala District Growth and Development Plan
Page 77
PGDP Goal 5: Environmental Sustainability
PGDP Strategic Objective: Advance alternative energy generation and reduce reliance on fossil fuels
# Generic Description of Intervention
District Specific Status Quo
District Specific Intervention
Location Time Responsible agents and partners
projects known current demonstration projects for other forms of alternative are in place.
bio-gas fuelled turbines at landfill sites, and micro-hydro. Investigate co-generation potential and renewable fuel from Forestry sector. The Ingwe Bio Fuel Project in Donnybrook is in advanced discussion with private sector role players to process the woodchips currently being produced into a bio-mass electricity generation unit.
C Implementation of energy management systems and energy efficiency measures
Current financial disincentive for efficiency as local municipalities generate income from selling on electricity from Eskom.
Implement EEMS. Include- Revise tariffs to Incentivise efficiency, penalise excessive consumption. Identify biggest users to target for intervention. Implement feedback tariffs asap. Strictly implement Energy Efficiency building regulations. Implement KZN REE programs.
District wide, including residential users, but focus on nodes and identified large users in the District.
short Province District and Local municipalities
D Promotion of Renewable Energy Production in the province
District needs to consider alternative energy means as servicing rural area is through conventional
Investigate the feasibility of setting up a District Specific energy utility company or companies.
District wide with emphasis on rural component
Short- Medium
District, DAERD, ESKOM, DCOGTA
Harry Gwala District Growth and Development Plan
Page 78
PGDP Goal 5: Environmental Sustainability
PGDP Strategic Objective: Advance alternative energy generation and reduce reliance on fossil fuels
# Generic Description of Intervention
District Specific Status Quo
District Specific Intervention
Location Time Responsible agents and partners
means is inappropriate and unviable
E Systematic reduction of Carbon emissions
One of the biggest contributors of carbon emissions in the district is road based transport and logistics
Investigate the potential to reduce road based trips through improved logistics coordination.
District Key logistics nodes such as eThekwini
Short- Medium
District municipality SDA Business
6.6.2.3 MANAGE PRESSURES ON BIODIVERSITY
Primary Indicators
Baseline Data
Proposed Targets Verification Reporting
2020 2025 2030
Land transformation in High Risk bio-diversity planning units per District
TBD Not exceeding connectivity thresholds, i.e. 75% of land identified in planning units remains untransformed
Not exceeding connectivity thresholds, i.e. 75% of land identified in planning units remains untransformed
Not exceeding connectivity thresholds, i.e. 75% of land identified in planning units remains untransformed
District Biodiversity Sector Plan
3 years, DAERD
% conformance of land and resource use decisions with High- Risk Biodiversity Planning Unit guidelines per District
TBD 85 100 100 Plan approvals and enforcement
Annual District and Local Municipalities
100% compliance with national Ambient Air Quality Standards
TBD 80 100 100 Plan approvals and enforcement
Annual District and Local Municipalities
% Blue Drop Rating
TBD 80 85 90 Blue Drop Programme
Annual District and Local Municipalities
Harry Gwala District Growth and Development Plan
Page 79
Baseline Data
Proposed Targets Verification Reporting
2020 2025 2030
% of Waste Water Treatment Works complying with enforcement measures to meet
TBD 70 80 90 Blue Drop Programme
Annual, DAERD
% increase in volume of waste recycled: Paper and Packaging, Lighting Waste, Tyres
TBD
50 25 80
50 25 80
50 25 80
Waste Sector Reports and Waste Information System
Annual, DAERD
Interventions
PGDP Goal 5: Environmental Sustainability
PGDP Strategic Objective: Manage pressures on biodiversity within all growth and development activities
# Generic Description of Intervention
District Specific Status Quo
District Specific Intervention
Location Time Responsible agents and partners
A Spatial biodiversity planning, decision-support tool development and monitoring
Biodiversity Sector Plan has been developed and should be the tool that guides this
Biodiversity Sector Plan to be maintained and followed. Define and strictly enforce urban edges for all nodes. Identify priority areas outside protected areas.
District Continuous District and Local municipalities Ezemvelo Wildlife (partner)
B Cooperative environmental governance procedures
Biodiversity Sector Plan has been developed and should be the tool that guides this
Biodiversity Sector Plan to be maintained and followed. Protect and enhance local biodiversity.
District Continuous District COGTA DEARD
C Environmental quality management
Biodiversity Sector Plan has been developed and should be the tool that guides this
Biodiversity Sector Plan to be maintained and followed, especially reduce the use of chemical fertilisers, and release of effluent, including sewerage, into the environment.
District Continuous District DEARD
6.6.2.4 ADAPTING TO CLIMATE CHANGE
Harry Gwala District Growth and Development Plan
Page 80
Primary Indicators
Baseline Data
Proposed Targets Verification Reporting
2020 2025 2030
Share of events with early warning systems where affected parties received prior warning
TBD TBD TBD TBD COGTA DM Unit Annual, District with DCOGTA
Average time taken to respond to disaster events
TBD TBD TBD TBD COGTA DM Unit Annual, District with DCOGTA
Regular forecast of anticipated impacts of climate change and response plan
TBD 100% 100% 100% COGTA DM Unit Annual, District with DCOGTA
Share of development applications addressing disaster risk management (where applicable)
TBD 50% 75% 100% District and Local Application Management System
Annual, District with DCOGTA
Interventions
PGDP Goal 5: Environmental Sustainability
PGDP Strategic Objective: Adaptation to climate change
# Generic Description of Intervention
District Specific Status Quo
District Specific Intervention
Location Time Responsible agents and partners
A Climate change policy, planning and monitoring
No existing base line data for monitoring at a district level Issues – not quantified but Manure from livestock creates methane which when released is a greenhouse gas. Methane is a potential energy source though. Mono-crop farming impacts bio-diversity. Mono-culture is more vulnerable to climate change. Water – raw water resources need to be protected and leveraged. Emissions from transport is a major district contributing factor
Develop a District Climate Change Adaptation Strategy (Berg Rivier in the Western Cape, is a good example)
District Wide
Short -medium
District Tertiary education and research institutions – e.g. UKZN
B Develop local energy generation capacity
Regular power outages especially during weather events
local energy generation to reduce dependency on Eskom supply
District Short- Medium
District and Local Municipalities, Eskom
Harry Gwala District Growth and Development Plan
Page 81
PGDP Goal 5: Environmental Sustainability
PGDP Strategic Objective: Adaptation to climate change
# Generic Description of Intervention
District Specific Status Quo
District Specific Intervention
Location Time Responsible agents and partners
C Disaster management planning and monitoring
District has Disaster Management Plan. Prone to Fire, Snow, Frost.
District to implement Disaster Management Plan.
District Wide
Continuous District
D Local food security initiatives
District produces food but agricultural sector is corporatized to a high degree
Diverse local food production, at all scales, for local food security, and development of local (including niche) markets to reduce transport and dependency on imports
District wide
Short - ongoing
District Business
Harry Gwala District Growth and Development Plan
Page 82
6.7 GOAL 6: GOVERNANCE AND POLICY
6.7.1 APEX INDICATORS TABLE 23: PGDP TARGETS FOR GOVERNANCE AND POLICY FOR KWAZULU NATAL PROVINCE
Source: Provincial Growth and Development Plan (2012)
TABLE 24: HARRY GWALA DISTRICT TARGETS FOR GOVERNANCE AND POLICY
A District Baseline survey of level of citizen satisfaction should be undertaken as a priority.
The targets set for these indicators are based on the PGDP targets and indicators.
Provincial 2014 Survey undertaken:
TABLE 25: KZN CITIZEN SURVEY 2014
Top Concerns raised by KZN Citizens % of Survey
Crime 42
Unemployment 38
Poverty/hunger 17
Women & Child abuse, as well as poor healthcare 16
Drug intake and/or abuse 12
No proper housing (substandard RDP houses, wants RDP house…) 05
Lack of proper Infrastructure development 07
Lack of service delivery 04
Source: 24 June 2014 COGTA Presentation
The South African Constitution recognises that societal aspirations for a just and prosperous society are central to influencing change in society for the betterment of all. It should be noted that many different measures of wellbeing are being used increasingly, internationally and in South Africa, in conjunction with more conventional statistics, to guide policy and strategy. Indicators that are more inclusive than GDP, of the environmental and social aspects of growth, are important, and each project should be evaluated from this perspective.
APEX INDICATORS BASELINE (2010)
TARGETS Verification Reporting
2015 2020 2025 2030
Improvement in level of client satisfaction
TBD TBD TBD TBD TBD Citizen Survey by OTP
Annual OTP
APEX INDICATORS BASELINE (2010)
TARGETS Verification Reporting
2020 2025 2030
Improvement in level of citizen satisfaction
TBD TBD TBD TBD Citizen Survey by District Municipality
Annual District Municipality
Harry Gwala District Growth and Development Plan
Page 83
6.7.2 PRIMARY INDICATORS AND INTERVENTIONS
6.7.2.1 STRENGTHEN POLICY, STRATEGY COORDINATION AND IGR
Primary Indicators
Baseline Data
Proposed Targets Verification Reporting
2020 2025 2030
Percentage of public sector expenditure spent in accordance with municipal IDP
TBD 75% 85% 95% Annual Analysis of levels of Public Sector Expenditure Reports to be submitted by LM and DM
Annual. District with Treasury, OTP
Percentage of public sector capital expenditure within District spent in accordance with PGDS
TBD 70% 95% 95% Annual Analysis of levels of Public Sector Expenditure Reports to be submitted by LM and DM
Annual. District with Treasury, OTP
% of development applications that meet time norms for processing
TBD 80% 85% 90% Records from District and Local Application Filing Management System
Annual. District with COGTA
Interventions
PGDP Goal 6: Governance and Policy
PGDP Strategic Objective: Strengthen policy, strategy coordination and IGR
# Description of Intervention
District Specific Status Quo
District Specific Intervention
Location Time Responsible agents and partners
A Develop an Integrated Funding and Implementation Management Framework
Provincial Level
B Create a single window of co-ordination between the Provincial Government, Municipalities and Non-Governmental forums
Create a window of co-ordination between District and Local Municipalities and non- government forums through the IDP forum
IDP Forum is in place and is functional
District Short OTP, PPC, District, COGTA
C Re-orientate the business of the Clusters to align to government’s core policies of transformation, growth and development
Re-orientate District clusters to align with Growth and Development, giving appropriate mandates to the clusters.
District clusters to align with Growth and Development
District Short OTP, PPC, District, COGTA
Harry Gwala District Growth and Development Plan
Page 84
6.7.2.2 BUILD GOVERNMENT CAPACITY
Primary Indicators
Baseline Data Proposed Targets Verification Reporting
2020 2025 2030
Percentage of municipal expenditure on capital infrastructure
TBD 30% 35% 45% Annual Analysis of levels of Public Sector Expenditure Reports to be submitted by LM and DM
Annual. District with Treasury, OTP
Percentage of expenditure of departments and public entities on capital infrastructure
TBD 22% 25% 30% Annual Analysis of levels of Public Sector Expenditure Reports to be submitted by LM and DM
Annual. District with Treasury, OTP, COGTA
% of municipalities with clean audits
District: Unqualified with no findings Local Municipalities: Unqualified with no findings for three Locals. However, Umzimkhulu and Ubuhlebezwe were Unqualified with no findings (ie clean audit).
100% 100% 100% Auditor General’s Office- MFMA reports
Annual District with OTP
Interventions
PGDP Goal 6: Governance and Policy
PGDP Strategic Objective: Build Government Capacity
# Description of Intervention
District Specific Status Quo
District Specific Intervention
Location Time Responsible agents and partners
A Develop an integrated public sector HRD and professional support programme
District has a Human Resources Department. However at a District and Local level, staff losses are high.
District to develop staff retention plan
District Short OTP, PPC, District, COGTA
B Promote shared services amongst municipalities
Shared services are in place within District.
Review shared services as and when needed
District Ongoing OTP, PPC, District, COGTA
C Align staff performance agreements to PGDP interventions
TBD Include staff performance as an KPA in staff contracts
District Short OTP, PPC, District, COGTA
6.7.2.3 ERADICATE FRAUD AND CORRUPTION
Primary Indicators
Baseline Data Proposed Targets Verification Reporting
Harry Gwala District Growth and Development Plan
Page 85
2020 2025 2030
% of municipal entities that have audit disclaimers/ qualifications
60% (excluding District)
0% 0% 0% Auditor General’s Office
Annual District with Auditor General
Total Value of provincial and municipal sector funds affected by fraud and corruption
TBD TBD TBD TBD Info to be analysed by Treasury
Annual District with Auditor General
Interventions PGDP Goal 6: Governance and Policy
PGDP Strategic Objective: Eradicate fraud and corruption
# Description of Intervention
District Specific Status Quo
District Specific Intervention
Location Time Responsible agents and partners
A Provincial Operation Clean Audit
Varying levels. 2 LMs received clean audit
District to receive clean audit. Local Municipalities to receive clean audit
District Wide
Continuous OTP, PPC, District, COGTA
B Implement proactive measures to prevent fraud through establishment of a business intelligence tool and fast track disciplinary processes and effective prosecution
District to develop proactive measures to prevent fraud through establishment of a business intelligence tool and fast track disciplinary processes and effective prosecution
District Wide
Continuous OTP, PPC, District, COGTA
C Implement proactive Integrity Management Programmes
District to develop and implement proactive Integrity Management Programmes
OTP, PPC, District, COGTA
6.7.2.4 PROMOTE PARTICIPATIVE, FACILITATIVE AND ACCOUNTABLE GOVERNANCE
Primary Indicators
Baseline Data
Proposed Targets Verification Reporting
2020 2025 2030
Voter participation in provincial and municipal elections
TBD Provincial: 82%
Local: 67%
Provincial: 84%
Local: 69%
Provincial: 86%
Local: 71%
Poll Reports. IEC After Each election. OTP
Number of active partnerships between government and business
No baseline currently available
5% increase
5% increase
on previous
5% increase
on previous
KZN Economic Council database and reports
Annual OTP
Harry Gwala District Growth and Development Plan
Page 86
Baseline Data
Proposed Targets Verification Reporting
2020 2025 2030
period period
Increase in percentage of women, youth and people with disabilities within the public and private sphere
Women
Disabilities
TBD
44% 2.5%
45% 3%
46% 3.5%
Information to be sourced from Stats SA, Commission on Employment Equity and political structures and organisations. Information to be collated and analysed by OTP: Human Rights Unit
Every 2 years. OTP
Interventions
PGDP Goal 6: Governance and Policy
PGDP Strategic Objective: Promote participative, facilitative and accountable governance
# Description of Intervention
District Specific Status Quo
District Specific Intervention
Location Time Responsible agents and partners
A Improve relationship between Traditional Councils, Municipalities and Provincial Departments
Large Areas of Traditional Council Land within the District. District that interacts significantly with Provincial departments for funding etc.
Improve relationship between Traditional Councils, Municipalities and Provincial Departments
District Wide
Continuous DCOGTA, District
B Strengthen capacity of KZN Economic Council
Provincial Level
C Develop advocacy programmes to strengthen the ward committee system
TBD Advocacy programmes to be developed that strengthen the ward committee system
District Wide
Continuous DCOGTA, District
Harry Gwala District Growth and Development Plan
Page 87
6.8 GOAL 7: SPATIAL EQUITY
6.8.1 APEX INDICATORS TABLE 26: PGDP TARGETS FOR SPATIAL EQUITY FOR KWAZULU NATAL PROVINCE
Source: Provincial Growth and Development Plan (2012)
TABLE 27: HARRY GWALA DISTRICT TARGETS FOR SPATIAL EQUITY
Note that that there is no available District specific baseline data, so although this is a very important
indicator, until a baseline has been established it will not be possible to measure. The targets set for
these indicators are based on the PGDP targets and indicators.
6.8.2 PRIMARY INDICATORS AND INTERVENTIONS
6.8.2.1 INCREASED SPATIAL ACCESS TO GOODS AND SERVICES / PROMOTE SPATIAL CONCENTRATION
Primary Indicators
Baseline Data
Proposed Targets Verification Reporting
2020 2025 2030
Increase in the population density within designated development areas
TBD 7 8 10 Department of Rural Devt. Stats SA. Eskom Household Point Data
Every 5 years. District with COGTA
Spatial Distribution of Human Development Index and District level
TBD 60 50 40 Provincial Index of Multiple Deprivation
Every 5 years. District with COGTA
APEX INDICATORS BASELINE (2010)
TARGETS Verification Reporting
2015 2020 2025 2030
Improved population with physical access to goods and services as measured by the Spatial Equity/ Accessibility Index
0.499 0.511 0.532 0.569 0.585 Calculated by standardised method based on population and facilities distribution
Annual DCOGTA
APEX INDICATORS BASELINE (2010)
TARGETS Verification Reporting
2020 2025 2030
Improved population with physical access to goods and services as measured by the Spatial Equity/ Accessibility Index
TBD 0.532 0.569 0.585 Calculated by standardised method based on population and facilities distribution
Annual District with DCOGTA
Harry Gwala District Growth and Development Plan
Page 88
Interventions
PGDP Goal 7: Spatial Equity
PGDP Strategic Objective: Increased Spatial access to goods and services / Promote spatial concentration
# Description of Intervention
District Specific Status Quo
District Specific Intervention
Location Time Responsible agents and partners
A Establish a hierarchy of District Nodes with clearly defined functions and interventions per node
Nodes established in terms of District and Local IDPs as well as Provincial Spatial Development Plan. Issue: Nodes do not service entire District
Nodes and functions have been identified in District SDF. Ensure alignment with Local SDFs.
District Level
Long Term District, DCOGTA
B The promotion of concentration and co-ordinated development along provincial corridors
Provincial Corridor along N2 to Kokstad. Other corridors are movement corridors.
Provincial Corridors have been included in District SDF.
District Level
Continuous District, DCOGTA
C District Specific: Nodes Relates to “Establish a hierarchy of Provincial Nodes with clearly defined functions and interventions per node”
Harry Gwala District has a number of nodes that are of importance at a District level. Many of these nodes have Local Plans prepared to address improvement and optimisation.
Maintenance and optimisation of nodes based on Local Plans
District Nodes
Short- Medium Term
District, DCOGTA
D District Specific: Movement system as per SDF
Large rural island without adequate access.
Implementation of movement route as identified in the SDF and Catalyst Projects
Across District but mainly in the rural island
Medium-Long
District, Developmetn Agency, Relevant partners
6.8.2.2 SPATIAL PLANNING AND LAND MANAGEMENT SYSTEMS
Primary Indicators
Baseline Data Proposed Targets Verification Reporting
2020 2025 2030
Percentage of total District geographical area with Land Use Management Schemes.
Not calculated but less than 10% at present. Currently only main towns have Schemes
100% 100% 100% Calculated based on total areas under Schemes
Annual. District with COGTA
Harry Gwala District Growth and Development Plan
Page 89
Interventions
PGDP Goal 7: Spatial Equity
PGDP Strategic Objective: Spatial Planning and Land Management Systems
# Generic Description of Intervention
District Specific Status Quo
District Specific Intervention
Location Time Responsible agents and partners
A Implementation of a suite of plans
Plans have been prepared at a range of scales from the IDP and SDF level down to local urban regeneration plans
Plans to align with provincial suite of plans
District Short District, Local Municipalities, DCOGTA
B Promote development of ward based plans
Plans have been prepared for the major and minor nodes within the District. Large rural component without detailed plans.
Implement existing plans and ensure that any ward based plans that are necessary, are prepared. These need to be innovative and focused on affected areas needs to be developed.
District Short- Medium
District, Local Municipalities, DCOGTA
C Formulation of Land Reform Area Based Plans within each district
TBD District to formulate Land Reform Area Based Plans.
District Short- Medium
District, Local Municipalities, DCOGTA
E In terms of the Planning and Development Act, address Act 70 of 1970 alignment within Land Use Management Schemes
Large tracts of agricultural land, and with onset of Wall to Wall Schemes, necessary to engage with Agriculture dept.
Engage with Department of Agriculture
District Short- Medium
District, DCOGTA, DAEA
F Implementation of Land Use Management schemes across the entire provincial landscape
Currently Schemes in major towns
Schemes to be prepared across entire District in terms of SPLUMA
Schemes across entire District
Short District, Local Municipalities, DCOGTA
G Alignment of district and local municipal Spatial Development Frameworks with the Provincial Spatial Development Framework
SDFs in place for Local Municipalities and Harry Gwala District
SDFs prepared for District and Local Municipality needs to align with Provincial Spatial Development Framework
SDF at Local and District Level
Short District, Local Municipalities, DCOGTA
H Formulation of Provincial Provincial
Harry Gwala District Growth and Development Plan
Page 90
PGDP Goal 7: Spatial Equity
PGDP Strategic Objective: Spatial Planning and Land Management Systems
# Generic Description of Intervention
District Specific Status Quo
District Specific Intervention
Location Time Responsible agents and partners
Provincial Planning Norms, Standards and Guidelines
competency. competency.
I District Specific: Urban Edge
The use of the urban edge as a tool to promote growth within towns, and ensure appropriate development (or lack of) outside of the UDL. Also relates to servicing.
Implement Guidelines for urban development lines as a tool to promote appropriate development within the towns in Harry Gwala District
District Short District, Local Municipalities, DCOGTA
J District Specific: Access to Funding for Spatial Restructuring
Spatial Restructuring required. District needs to access funds
District/ Development Agency and partners to work together to access funding for the implementation of various projects related to spatial restricting including the various Nodal Plans, SDF plans etc
District Wide, but mainly in the large nodes
Continuous District/ Development Agency and partners.
Harry Gwala District Growth and Development Plan
Page 91
7 CATALYST PROJECTS Whilst the list of indicators and interventions in Section 6, set out the basis for the growth and
development of the region, projects need to be highlighted that will build confidence and provide
critical gains in the development process i.e. Catalyst Projects.
Catalyst projects as defined by COGTA are typically projects larger than R50 Million, and respond to
a number of the Strategic Objectives as set out in the PGDP.
The PGDP (2012: 132) describes Catalyst Projects as:
“Catalytic projects are large-scale development projects, which directly stimulate and leverage much
higher levels of development and initiation of further projects. They usually require significant capital
investment and infrastructure which lead to further growth of a value chain and increased private
investment.”
It is noted that within each of the Local and District IDPs as well as other plans, there are a number
of projects that could assist in Growth and Development within the District. However, catalyst
projects should be
Major projects that will have the biggest multiplier effects for the District,
Address at least 4 Provincial Strategic Goals and
At least 2 Drivers of Growth and Key Objectives for the District.
Once identified, further work will be required to undertake feasibility studies and then to develop
full business plans for each catalyst project that addresses issues such as budgets, funding,
development models and so forth. Some work has been done through various exercises (e.g. the
numerous Nodal plans that have been developed and the SIP 6 work) however more work is needed
prior to implementation. Many of the Catalyst Projects are detailed in the District Capital
Development Plans, and so further information can be found in this report.
The catalyst projects listed below have been identified through the following mechanisms:
Projects that have already been identified through various planning processes.
New projects identified through the DGDP planning process and at a stakeholder workshop held
on 6 August 2014.
It is noted that the list of Catalyst projects is a work in progress and will be amended in future
revisions to the DGDP
The Catalyst Projects identified to date are as follows:
Infrastructure
1. Integrated Municipal Infrastructure Delivery Strategic Infrastructure Project 6 (SIP 6) – Roads (Umzimkulu Roads R1,2 billion) and P318 Sani Pass (R594 million)
2. New District Road as identified on the SDF to service the rural island - Kokstad to Bulwer and Umzimkhulu to Swartberg
3. Critical Road Upgrades - P12 Himeville to Loteni and Nottingham Road; R56 Pietermaritzburg to Kokstad to Eastern Cape and R612 Mzinto to Bulwer
Harry Gwala District Growth and Development Plan
Page 92
4. Integrated Municipal Infrastructure Delivery Strategic Infrastructure Project 18 (SIP 18) – Regional Bulk Water Schemes including Smithfield Dam, Stephen Dlamini Dam and Umzimkhulu Water Scheme
5. Bulk Electrification Programme
6. Renewable Energy Supply research
Economic Development and Tourism (all require detailed feasibility studies)
7. Umzimkhulu Maize Mill
8. Hydroponics and Greenhouse Project
9. Industrial / Agro-processing Economic Hubs
10. Concrete Products Manufacturing Plant
11. Alan Paton Railway Project
Regeneration of Primary Nodes
12. Kokstad
13. Ixopo
14. Umzimkhulu
15. Bulwer
Regeneration of Secondary Nodes
16. Underberg
17. Donneybrook
18. Highflats
These projects are further detailed in the table below.
Harry Gwala District Growth and Development Plan
Page 93
TABLE 28: CATALYST PROJECTS FOR HARRY GWALA DISTRICT
Project Location Project Detail PGDP Goal that is
contributed to
District Driver of Growth/
Objectives
Time Frame Responsibility
INFRASTRUCTURE
1. Integrated Municipal Infrastructure Delivery, Strategic Infrastructure Project 6 (SIP 6) – Roads
Source: Integrated Municipal Infrastructure Delivery Strategic Infrastructure Project 6 (Sip 6): Sisonke District Municipality SIP 6 Business Plan: Sisonke District Municipality 22 May 2014
District Wide Implement Strategic Infrastructure Projects as Identified in this report through the SIP 6 Initiative Roads:
Upgrading Umzimkhulu Road Infrastructure, Umzimkhulu LM, Estimated Cost – R1,200,000,000
P318 Sani Pass – Roads of National Importance, Kwa Sani LM, Estimated Cost – R594,437,000
Goal 1: Job Creation Goal 2: Human Resource Development Goal 3: Human and Community Development Goal 4: Strategic Infrastructure Goal 5: Environmental Sustainability Goal 6: Governance and Policy Goal 7: Spatial Equity
Strategic Infrastructure Implementation
Spatial Restructuring
SMMEs
Skills Development
Short to Medium
District, Provincial and National Government department including DoT, Treasury
2. New District Road / Transport route (District road or similar) – Kokstad to Bulwer and Umzimkhulu to Swartberg (and beyond) to service the
District Wide Construction of a transport route (District road or similar) between Kokstad to Bulwer and Umzimkhulu to Swartberg (and beyond) which will in time result in a node developing at the “intersection” which will assist
Goal 1: Job Creation Goal 3: Human and Community Development Goal 4:
Spatial Restructuring
Strategic Infrastructure Implementat
Medium to Long
District, Provincial and National Government department including DoT, Treasury
Harry Gwala District Growth and Development Plan
Page 94
Project Location Project Detail PGDP Goal that is
contributed to
District Driver of Growth/
Objectives
Time Frame Responsibility
rural island Source: Harry Gwala SDF (2014)
in servicing the largely rural component. This is identified in the current SDF.
Strategic Infrastructure Goal 7: Spatial Equity
ion
3. Critical Road Upgrades District Wide Various Critical Road Upgrades required throughout the District. These include, but are not limited to:
P12 Himeville- Loteni and Nottingham Road to unlock tourism from Gauteng
R56 Pietermaritzburg to Kokstad to Eastern Cape Upgrades to improve accessibility
R612 Mzinto to Bulwer to improve accessibility
A transport plan is required to identify additional roads
Goal 1: Job Creation Goal 3: Human and Community Development Goal 4: Strategic Infrastructure Goal 7: Spatial Equity
Strategic Infrastructure
Spatial Restructuring
Short to Medium
District, Provincial Government department including DoT, Treasury
4. Integrated Municipal Infrastructure Delivery, Strategic Infrastructure Project 18 (SIP 18) – Regional Bulk Water Schemes
And IDP 2014 – 2017
District Wide Develop and Implement Regional Bulk Water Schemes as the smaller Schemes are currently not viable.
Bulwer / Stephen Dlamini Dam tying into the Umzimkhulu Bulk Water Scheme
Goal 1: Job Creation Goal 2: Human Resource Development Goal 3: Human and Community
Strategic Infrastructure Implementation
Spatial Restructuring
Short to Medium
District, Provincial and National Government department including DWA, Water Services Board, Umgeni
Harry Gwala District Growth and Development Plan
Page 95
Project Location Project Detail PGDP Goal that is
contributed to
District Driver of Growth/
Objectives
Time Frame Responsibility
Approximately R30 million
Smithfield Dam (whilst not serving the District from an infrastructure perspective, there are tourist and employment opportunities)
Development Goal 4: Strategic Infrastructure Goal 5: Environmental Sustainability Goal 7: Spatial Equity
Water, Treasury
5. Bulk Electrification Programme
District Wide Bulk Electrification services across the District to service those areas previously unserviced. Incudes, but is not restricted to: Corinth Mzamba
Goal 1: Job Creation Goal 3: Human and Community Development Goal 4: Strategic Infrastructure Goal 7: Spatial Equity
Strategic Infrastructure Implementation
Spatial Restructuring
Short term
Department of Energy
6. Renewable Energy Supply
District Conduct studies and implement projects that relate to alternative energy supply. This is essential in the un-serviced rural components of the District
Goal 1: Job Creation Goal 3: Human and Community Development Goal 4:
Strategic Infrastructure Implementation
Research and
Medium to Long
District, Provincial departments including Department of Energy, Eskom, Treasury
Harry Gwala District Growth and Development Plan
Page 96
Project Location Project Detail PGDP Goal that is
contributed to
District Driver of Growth/
Objectives
Time Frame Responsibility
Strategic Infrastructure Goal 5: Environmental Sustainability Goal 6: Governance and Policy Goal 7: Spatial Equity
innovation
ECONOMIC DEVELOPMENT AND TOURISM
7. Umzimkhulu Maize Mill Source: Integrated Municipal Infrastructure Delivery Strategic Infrastructure Project 6 (Sip 6): Sisonke District Municipality SIP 6 Business Plan: Sisonke District Municipality 22 May 2014
Umzimkhulu This project will encompass the setting up of an initial 2 ton per hour, fully automated maize milling plant within the Harry Gwala (Sisonke) District Municipality, in Umzimkhulu on the Hopewell Farm No 160.
Goal 1: Job Creation Goal 2: Human Resource Development Goal 3: Human and Community Development
Agro-processing
SMME development
Skills development
Short to Medium
District, SDA, Treasury
8. Hydroponics and Greenhouse Project
Source: Integrated Municipal Infrastructure Delivery Strategic Infrastructure Project 6 (Sip 6): Sisonke District Municipality SIP 6 Business Plan:
Ubuhlebezwe The overall objective of the project is to establish a Harry Gwala District Hydroponic Farming project that shall allow for the production of high-quality tomatoes for both the internal and external export market.
Goal 1: Job Creation Goal 2: Human Resource Development Goal 3: Human and Community Development
Agriculture
SMME development
Skills development
Short to Medium
District, SDA, Treasury
Harry Gwala District Growth and Development Plan
Page 97
Project Location Project Detail PGDP Goal that is
contributed to
District Driver of Growth/
Objectives
Time Frame Responsibility
Sisonke District Municipality 22 May 2014
9. Industrial / Agro-processing Economic Hubs
Source: Integrated Municipal Infrastructure Delivery Strategic Infrastructure Project 6 (Sip 6): Sisonke District Municipality SIP 6 Business Plan: Sisonke District Municipality 22 May 2014
District Wide. To be appropriately located depending on feasibility work
1. Agro-Processing Hub for Dairy
2. Timber Processing - Furniture and Manufacturing Hub
3. Essential Oil Facility
Goal 1: Job Creation Goal 2: Human Resource Development Goal 3: Human and Community Development
Agro-processing
SMME development
Skills development
Short to Medium
District, SDA, Treasury
10. Concrete Products Manufacturing Plant
Source: Integrated Municipal Infrastructure Delivery Strategic Infrastructure Project 6 (Sip 6): Sisonke District Municipality SIP 6 Business Plan: Sisonke District Municipality 22 May 2014
TBC The objective of this project is to set up a concrete products manufacturing plant to leverage opportunities from major civil works that are planned within the District
Goal 1: Job Creation Goal 2: Human Resource Development Goal 3: Human and Community Development
Strategic Infrastructure Implementation
Short to Medium
District, SDA, Treasury
11. Alan Paton Railway Project
Ixopo to Umzimkhulu
Cultural project tied into Cry the Beloved Country. Railway line to be adequately serviced/ upgraded and project to be
Goal 1: Job Creation Goal 3: Human and
Strategic Infrastructure Implementat
Short to Medium
District, SDA, Treasury
Harry Gwala District Growth and Development Plan
Page 98
Project Location Project Detail PGDP Goal that is
contributed to
District Driver of Growth/
Objectives
Time Frame Responsibility
advertised to a wide audience. Community Development Goal 4: Strategic Infrastructure Goal 5: Environmental Sustainability Goal 7: Spatial Equity
ion
Tourism
REGENERATION OF PRIMARY NODES
12. Regeneration of Kokstad Town Centre to improve performance as a Node
Source: Kokstad Regeneration Plan (2012)
Kokstad Ongoing implementation of the recommendations and projects in the KISDP. The Green Heart Park, residential densification projects, and water infrastructure projects are the key catalytic projects within the plan. Individual projects within plan are not catalyst at the scale of the District, but the overarching development would be as Kokstad is the biggest Node within the District. Also includes implementation of R56 Integrated Sustainable Housing Project As Part of the Regeneration of Kokstad. Also includes Kokstad Sports complex.
Goal 1: Job Creation Goal 3: Human and Community Development Goal 4: Strategic Infrastructure Goal 5: Environmental Sustainability Goal 7: Spatial Equity
Spatial Restructuring
Strategic Infrastructure Implementation
Research and innovation
Short to Medium
District, Provincial Government servicing departments, COGTA, private sector
Harry Gwala District Growth and Development Plan
Page 99
Project Location Project Detail PGDP Goal that is
contributed to
District Driver of Growth/
Objectives
Time Frame Responsibility
13. Regeneration of Ixopo to improve performance as a Node
Source: Ixopo Town Regeneration Plan (2010)
Ixopo Using the output from the Ixopo Regeneration Plan prepare an implementation plan for an upgrade and development project for the town, aimed at improving the urban environment and it’s economic and public service function. Prepare an Integrated Sustainable Development Plan for the town. Individual projects within plan may not be catalyst projects, but the overarching development would be as Ixopo is the second largest Node within the District and an administrative/public sector hub.
Goal 1: Job creation Goal 3: Human and Community Development Goal 4: Strategic Infrastructure Goal 5: Environmental Sustainability Goal 7: Spatial Equity
Public Sector
Spatial Restructuring
Strategic Infrastructure Implementation
SMME development
Short to Medium
District, Provincial Government servicing departments, COGTA, private sector
14. Regeneration of Umzimkhulu to improve performance as a Node
Source: Bulwer Urban Regeneration Plan: Draft Urban Framework (2013)
Umzimkhulu Using the output from the various plans for Umzimkhulu, prepare a business plan for the prioritised implementation of an integrated upgrade and development project for the town to improve urban environment. Individual projects within plan are not catalyst, but the overarching development
Goal 1: Job creation Goal 3: Human and Community Development Goal 4: Strategic Infrastructure Goal 5:
Tourism
Spatial Restructuring
Strategic Infrastructure Implementation
SMME
Short to Medium
District, Provincial Government servicing departments, COGTA, private sector
Harry Gwala District Growth and Development Plan
Page 100
Project Location Project Detail PGDP Goal that is
contributed to
District Driver of Growth/
Objectives
Time Frame Responsibility
would be as Umzimkhulu is an important Node within the District. Also includes sportsfields development, and community health centre development.
Environmental Sustainability Goal 7: Spatial Equity
development
15. Regeneration of Bulwer to improve performance as a Node
Source: Bulwer Urban Regeneration Plan: Draft Urban Framework (2013)
Bulwer Using the output from the Bulwer Regeneration Plan prepare a business plan for the prioritised implementation of an integrated upgrade and development project for the town to improve urban environment. Individual projects within plan are not catalyst, but the overarching development would be as Bulwer is an important Tourism Node within the District.
Goal 1: Job creation Goal 3: Human and Community Development Goal 4: Strategic Infrastructure Goal 5: Environmental Sustainability Goal 7: Spatial Equity
Tourism
Spatial Restructuring
Strategic Infrastructure Implementation
SMME development
Short to Medium
District, Provincial Government servicing departments, COGTA, private sector
REGENERATION OF SECONDARY NODES
16. Regeneration of Underberg to improve performance as a Node
Source: Underberg Precinct Plan (2012)
Underberg Variety of Local Projects for the town to improve urban environment. Individual projects within plan are not catalytic, but the overarching development is.
Goal 1: Job creation Goal 3: Human and Community Development Goal 4: Strategic Infrastructure
Tourism
Spatial Restructuring
Strategic Infrastructure Implementation
Short to Medium
District, Provincial Government servicing departments, COGTA, private sector
Harry Gwala District Growth and Development Plan
Page 101
Project Location Project Detail PGDP Goal that is
contributed to
District Driver of Growth/
Objectives
Time Frame Responsibility
Goal 5: Environmental Sustainability Goal 7: Spatial Equity
SMME development
17. Regeneration of Donneybrook to improve performance as a Node
Source: Donneybrooke Precinct Plan (2012)
Donneybrook Variety of Local Projects for the town to improve urban environment. Individual projects within plan are not catalytic, but the overarching development is.
Goal 1: Job creation Goal 3: Human and Community Development Goal 4: Strategic Infrastructure Goal 5: Environmental Sustainability Goal 7: Spatial Equity
Spatial Restructuring
Strategic Infrastructure Implementation
Short to Medium
District, Provincial Government servicing departments, COGTA, private sector
18. Regeneration of Highflats to improve performance as a Node
Source: Highflats Precinct Plan (2012)
Highflats Variety of Local Projects for the town to improve urban environment. Individual projects within plan are not catalytic, but the overarching development is.
Goal 1: Job creation Goal 3: Human and Community Development Goal 4: Strategic Infrastructure Goal 5: Environmental
Spatial Restructuring
Strategic Infrastructure Implementation
Short to Medium
District, Provincial Government servicing departments, COGTA, private sector
Harry Gwala District Growth and Development Plan
Page 102
Project Location Project Detail PGDP Goal that is
contributed to
District Driver of Growth/
Objectives
Time Frame Responsibility
Sustainability Goal 7: Spatial Equity
Harry Gwala District Growth and Development Plan
The Planning Initiative Page 103
The following Figure is a spatial representation of those Catalyst Projects that can be mapped. Some
projects are at this time unmapped, or not suitable for representing in this manner (e.g.
electrification projects). Those projects not mapped are listed after the figure
FIGURE 11: CATALYST PROJECTS
Harry Gwala District Growth and Development Plan
The Planning Initiative Page 104
Projects not mapped:
Infrastructure
Integrated Municipal Infrastructure Delivery Strategic Infrastructure Project 6 (SIP 6) -
Roads
Integrated Municipal Infrastructure Delivery Strategic Infrastructure Project 18 (SIP 18) –
Regional Bulk Water Schemes
Bulk Electrification Programme
Renewable Energy Supply
Economic Development and Tourism
Industrial / Agro-processing Economic Hubs
Concrete Products Manufacturing Plant
Harry Gwala District Growth and Development Plan
The Planning Initiative Page 105
8 INSTITUTIONAL FRAMEWORK An appropriate Institutional Framework to guide, implement and monitor the District Growth and
Development Plan is a critical component of the HGDGDP. This section presents some background
research and some options which should be used to generate discussions amongst the family of
Municipalities within the Harry Gwala District Municipality. The outcomes of the discussions and the
option to be adopted will be incorporated into the revised Harry Gwala District Growth and
Development Plan.
8.1 THE INSTITUTIONAL MECHANISM TO IMPLEMENT THE PROVINCIAL GROWTH AND
DEVELOPMENT PLAN In considering an appropriate institutional mechanism to implement the DGDP it is useful to
understand the Provincial Institutional Mechanism as the District approach will need to align with
this and interact with this into the future.
8.1.1 OVERALL STRUCTURE
The Institutional structure for implementing all components of the PGDP is shown in the figure below (source: Quick Start Operations Manual for the Implementation and Review of the KZN Provincial Growth and Development Plan 2013: 9) FIGURE 12: PGDP INSTITUTIONAL ORGANOGRAM
8.1.2 PROVINCIAL PLANNING COMMISSION (PPC)
The PPC complements the National Planning Commission (NPC) and advises Cabinet on matters
related to:
The long term strategic development perspective and vision of the Province;
Ensuring coherence in policy development and planning across Provincial Government; and
Strengthening performance monitoring and evaluation to enable assessment of the pace
required to deliver on the desired outcomes.
Harry Gwala District Growth and Development Plan
The Planning Initiative Page 106
The Provincial Planning Commission has the following responsibilities:
Develop and periodically review the long term Vision and the Provincial Growth and Development Strategy for the Province;
Guide the review of the Provincial Spatial Economic Development Strategy;
Guide the development of Strategic Infrastructure Projects;
Lead investigations into critical long term trends in the Province; and
Guide the review of the Skills Development Strategy.
8.1.3 ACTION WORK GROUPS
18 Action Work Groups have been established and these are responsible for driving the 31 Strategic
Objectives of the PGDP. This is done through:
Developing a Plan of action for implementation;
Securing required resources by leveraging from non-government partners;
Spatial referencing and prioritisation;
Ensuring the design, planning and implementation of demonstration projects
Monitoring implementation; and
Co-ordinating reporting on progress to the relevant cluster
The 18 AWGs then report to the PGDP Technical Committee and Four Cabinet Technical Clusters on
progress.
The following figure summarises the reporting arrangements for the various entities listed above.
The Action Work Groups compile monthly progress reports which are then made to the Cabinet
Technical Cluster. The Cabinet Technical Cluster reports to Provincial Cabinet twice a year.
FIGURE 13: PROVINCIAL REPORTING ARRANGEMENTS
Harry Gwala District Growth and Development Plan
The Planning Initiative Page 107
8.1.4 THE PGDP TECHNICAL COMMITTEE AND FOUR CABINET TECHNICAL CLUSTERS
The 18 Action Work Groups report to the PGDP Technical Committee that provides overall decision
making regarding coordination and integration across action work groups and goals. This Technical
Committee consists of the convenors of the Action Work Groups as well as various other Provincial
and National departments or entities (e.g. Ithala, Agribusiness Development Agencies, SANRAL,
Transnet, and ESKOM).
The Technical Committee is responsible for:
Coordinating all the activities of the PGDP and its implementation.
Ensuring coordination of PGDP efforts and activities across all AWG and provincial
departments.
Ensuring that the AWGs carry out all the required actions to advance the PGDP.
The 18 Action Work Groups and the PGDP Technical Committee report to 4 Cabinet Technical
Clusters, being:
1. SPCHD: Social Protection, Community and Human Development
2. ESID: Economic and Strategic Infrastructure Development
3. JCPS: Justice, Community Protection and Security
4. G&A: Governance and Accountability
The table below highlights the relationship between the Cabinet Clusters, the 18 Action Work
Groups, Provincial Departments and the 31 Strategic Objectives of the PGDP.
TABLE 29: CABINET TECHNICAL CLUSTERS AND ACTION WORK GROUPS MATRIX
Responsible Technical Cluster
Receives reports from Strategic Objective
Action Work Grp no.
Strategic Objective Action Work Group
Convening Dept.
Responsible for Strategic Objectives
Economic and Strategic Infrastructure Development
1 DAEA 1.1 Unleash Agricultural Potential
2 DEDT 1.2 Enhance sectoral development through trade and investment
3 DPW 1.3 Expand government-led job creation programmes
4 DEDT 1.4 Develop SMME and entrepreneurial development
5 DEDT 1.5 Develop the knowledge base to enhance the knowledge economy
12 DOT 4.1 Develop Harbours
12 DOT 4.2 Develop Airports
12 DOT 4.3 Develop road and rail networks
13 DEDT 4.4 Develop Information and Communications Technology (ICT) infrastructure
14 COGTA 4.5 Improve Water Resource Management and Supply
14 COGTA 4.6 Improve Energy production and supply
15 DEDT 5.2 Advance alternative energy generation and reduce reliance on fossil fuels
G&A 16 DAEA 5.1 Increase Land Productivity
Harry Gwala District Growth and Development Plan
The Planning Initiative Page 108
Responsible Technical Cluster
Receives reports from Strategic Objective
Action Work Grp no.
Strategic Objective Action Work Group
Convening Dept.
Responsible for Strategic Objectives
16 DAEA 5.3 Manage Pressures On Biodiversity
16 DAEA 5.4 Adapt to climate change
17 DOTP 6.1 Strengthen Policy and Strategy Coordination and IGR
17 OTP 6.2 Build Government Capacity
17 OTP 6.3 Eradicate Fraud And Corruption
17 OTP 6.4 Promote participative, facilitative and accountable governance
18 COGTA 7.1 Actively promote spatial concentration and co-ordination of development interventions
18 COGTA 7.2 Apply effective spatial planning and land management systems across the province
Justice, Community Protection and Security
9 DCSL 3.5 Enhance Safety and Security
Social Protection, Community and Human Development
6 DOE 2.1 Improve early childhood development, primary and secondary education
7 OTP 2.2 Support skills alignment to economic growth (KZN HRD Strategy focus)
7 OTP 2.3 Enhance Youth Skills Development and Life-Long Learning
8 DSD 3.1 Alleviate poverty and enhance social welfare
10 DOH 3.2 Enhance Health of Communities and Citizens
8 DSD 3.3 Enhance sustainable household food security in KZN
11 DHS 3.4 Develop Sustainable Human Settlements
8 DSD 3.6 Advance Social Capital
The operational manual indicates that the 5 year Departmental programmes will need to align with
the PGDP. Similarly the 5 year Municipal IDPs will need to align with the DGDPs.
8.2 INSTITUTIONAL OPTIONS – SOME DISCUSSION This section briefly introduces some discussion on institutional options that may assist in the
consideration of an Institutional Structure to implement the Harry Gwala District Growth and
Development Plan. This section is presented merely to assist in generating discussion and is not
intended to form a comprehensive case study review.
8.2.1 GROWTH COALITIONS
Internationally, the institutional frameworks for the implementation and monitoring of growth and
development plans and catalytic projects at district level vary; but one theme that has characterised
both KZN and many other countries, at least in terms of project identification, is that of the ‘local
Harry Gwala District Growth and Development Plan
The Planning Initiative Page 109
growth coalition’.2 In essence, these coalitions bring the common interests of localised businesses
and local governments together in developing common strategies for the enhancement of local
economic growth.
KZN as a Province began its own KZN Growth Coalition during the tenure of Premier S. Ndebele, and
that coalition drove many projects of Province-wide interest over the last two decades. The current
‘Enterprise Ilembe’ was also originally the product of a local growth coalition between Ilembe area
businesses and the District and Local Municipalities. The current Umkanyakude District Development
and Planning Commission also has elements of a growth coalition to it, insofar as the most relevant
local development NGOs and provincial para-statals have representation on it. However, the latter is
still in its early days, and the former since evolved into a formalised development agency for
receiving, inter alia, government funds, and as such it shares several features with district
development agencies elsewhere in the world.
8.2.2 INDIA’S DISTRICT RURAL DEVELOPMENT AGENCIES
One of the better-known examples of these agencies world-wide that may be of use in the Harry
Gwala case, is India’s District Rural Development Agencies (DRDA’s). The likelihood of a strong local
business coalition in Harry Gwala District is not as likely as say in Ilembe because of differences in
the scale and nature of business in the two Districts.3 Hence the possible similarities with India’s
DRDA’s is worth exploring in the Harry Gwala case, as DRDA’s have traditionally been the principal
organ at the district level to oversee the implementation of anti-poverty programmes of provincial
and national government. Much of the previous work in this project suggests that in the Harry
Gwala case the focus should be on securing adequate public resources to address poverty in this
under-developed District.
Wikipedia notes that: ‘Rural development and poverty alleviation programmes in India are
implemented on a decentralised basis, keeping in view the large geographical areas, the
administrative requirements and the need to involve grassroots-level officials and the community in
the implementation of the programmes. The governing body of DRDA includes Members of
Parliament (MPs), Members of Legislative Assemblies (MLAs), District level officials of Development
Departments, Bankers, NGO's and representatives of weaker sections of the society. The task of
DRDA has been to identify the needs of the rural population and reach the appropriate schemes
where they are needed. In implementing the schemes, the role of the DRDA has been Technical,
Managerial and Financial. Thus DRDA is not only a body to disburse the funds for the schemes but
also provide appropriate Managerial and Technical support’.
2 The research literature on local growth coalitions began with Harvey Molotch’s seminal article, ‘The City as a Growth Machine: Toward a Political Economy of Place’, American Journal of Sociology, Vol. 82, No. 2 (Sep., 1976), pp. 309-332; but has since been followed by scores of books and articles on a similar theme. 3 There are significant large to medium scale businesses in Ilembe with high ‘local dependence’ which is less true of Harry Gwala which is more either family based businesses (e.g. farms) or branches of national chains.
Harry Gwala District Growth and Development Plan
The Planning Initiative Page 110
In rural areas with a smaller private sector it is possible that this Indian development agency model
(or similar) might hold greater relevance for Harry Gwala than models conceived in the West4. On
the other hand, there is experience from other public-sector driven local economic development
experiences that could be useful also in the Harry Gwala context.
8.2.3 DISTRICT GOVERNMENT FUNCTIONS
Before proceeding it may be worth recalling what the specifically District functions are of District
Councils. The reason for considering this is to generate thought on whether this mandate covers the
full Growth and Development Plan and therefore whether the District Municipality could consider
implementing the HGGDP as is or whether it would need to be augmented with another institution.
One legal source advises that the powers and functions of District Councils in South Africa include:
‘to plan for development for the district municipality as a whole
bulk supply of water that affects a large proportion of the municipalities in the district
bulk supply of electricity that affects a large proportion of the municipalities in the district
bulk sewage purification works and main sewage disposal
waste disposal sites for the whole district council area
municipal roads for the whole district council area
regulating passenger transport services
municipal health services for the whole area
fire-fighting services for the whole area
control of fresh produce markets
control of cemeteries
promoting local tourism for the whole area
municipal public works’5
Notice from the above list that, in the context of the present project, what this suggests is a need to
plan mainly for local development infrastructure – a conclusion that would be consistent with most
of the responses to desired catalytic projects presented at the August 6th Workshop.
The distribution of key roles and responsibilities for the District and Local Municipalities specifically
in the planning phases in South Africa are outlined in the table taken from a German aid agency
workbook on South African planning6 reproduced in the table below.
TABLE 30: DISTRICT AND LOCAL LEVEL FUNCTIONS
Planning Phase Local Level District Level
Analysis Determine local issues, problems, potentials and priorities.
Determine district scale issues, problems, potentials and priorities
Consolidated the analysis results of the district and local municipalities and define common priority issues
4 See for example http://www.drdachamba.org/ 5 http://www.paralegaladvice.org.za/docs/chap04/06.html 6 http://www.meso-nrw.de/toolkit/case_studies/case-studies-case-11-roles.html
Harry Gwala District Growth and Development Plan
The Planning Initiative Page 111
Planning Phase Local Level District Level
Strategies Define a local vision and set of objectives
Participate in district level strategy workshop
Determine local strategies per priority issue on the basis of the district level analysis.
Define a district vision and set of objectives
Provide an event for a joint strategy workshop with local municipalities and provincial and national role-players thereby providing an organisational framework for aligning strategies
Determine cross-boundary and district strategies per priority issue
Projects Design local council projects per strategy.
Design district council projects per strategy
Integration Compile a set of local Integrated Programmes for Managing implementation.
Compile a set of district Integrated Programmes for managing implementation
Align and assess the Capital Investment and Implementation programmes of local and district municipalities.
Approval Ensure that the IDP is adopted by
the Local Council.
Ensure that the IDP is adopted by the District Council
Align the IDPs of the municipalities in the district council area and with the other spheres of government.
Source: http://www.meso-nrw.de/toolkit/case_studies/case-studies-case-11-roles.html
8.2.4 DISTRICT DEVELOPMENT AGENCIES IN KWAZULU-NATAL
A District Development Agency could play a key role in the Growth and Development Strategy. To
this end a brief discussion on SDAs is presented. KZN’s COGTA has undertaken an assessment of
existing practices within SDAs, the results of which are summarised below.
Harry Gwala District Growth and Development Plan
The Planning Initiative Page 112
TABLE 31: EVALUATION OF DISTRICT AGENCIES BY COGTA
Source: Slide presentation by KZN COGTA entitled Status Quo Presentation on Development Agencies
in KwaZulu-Natal, dated 15 August 2013
The Sisonke Development Agency is characterised by ‘limited success’, whilst Ilembe is seen as the
most successful to date.
The current situation for the Sisonke Development Agency as described on its website is shown in
the organograms below.
FIGURE 14: SISONKE DEVELOPMENT AGENCY GOVERNANCE ORGANOGRAM
Source: SDA website, www.thesda.co.za; captured 15 August 2014
Harry Gwala District Growth and Development Plan
The Planning Initiative Page 113
In terms of governance, it can be seen that the SDA is a direct outgrowth of the District Council.
However there is a separate management and staff, shown in the organogram and staff list (drawn
from the SDA website) below.
FIGURE 15: SISONKE DEVELOPMENT AGENCY MANAGEMENT ORGANOGRAM
Source: SDA website www.thesda.co.za; captured 15 August 2014
Staff list:
Chief Executive Officer
Acting Chief Financial Officer
Programmes Manager
Project Manager (Land Reform and Agribusiness development)
Project Manager (Local Economic Development and Spatial Development)
Chief Local Economic Development and Tourism Officer
Tourism Officer
Local Economic Development Officer
Research Assistant
Administrative Assistant
The SDA governance and staffing is similar to the Umhlosinga Development Agency operating in
Umkanyakude (see diagram below).
Harry Gwala District Growth and Development Plan
The Planning Initiative Page 114
FIGURE 16: UMHLOSINGA DEVELOPMENT AGENCY – UMKANYAKUDE
Source: Slide presentation by KZN COGTA entitled Status Quo Presentation on Development Agencies
in KwaZulu-Natal, dated 15 August 2013.
Ilembe Enterprise similarly has a Board of Directors and staff consisting of CEO (and PA), CFO (and
accountant and risk officer), a Local Economic Development team and a Marketing team.
Source: Slide presentation by KZN COGTA entitled Status Quo Presentation on Development Agencies
in KwaZulu-Natal, dated 15 August 2013.
This work undertaken for COGTA indicated that the key challenges to SDAs are
Harry Gwala District Growth and Development Plan
The Planning Initiative Page 115
Implementation, delays and project delivery
Funding and lack of self-sustainability
Region specific socio-economic problems
Local Government Accountability
8.2.5 UGU INSTITUTIONAL PROPOSALS
The Ugu District Growth and Development plan was completed in 2012 (Ugu District Growth and
Development Strategy, Final Report, December 2012). Within this plan 3 institutional options were
explored:
1. The Ugu District Municipality take the lead for the GDS in terms of its legislative mandate to
co-ordinate development planning and inter-governmental relations within the district. The
Executive Mayor of the district will be the political champion of the GDS. The Executive
Mayor establishes a District Planning Commission.
2. The second proposal is similar in all respects to the first proposal, but argues that instead of
a DPC, a NEDLAC (National Economic Development and Labour Council) – type structure
should be constituted that meets quarterly. The functions of the DPC and the NEDLAC-type
structure would be the same. The main difference is that while the DPC is more expert-led,
the NEDLAC-structure is more sector-driven.
3. Proposal three argues that given the current capacity constraints within municipalities
within Ugu, and given the multi-stakeholder nature of the GDS, that a structure should be
established to drive the GDS unencumbered by such institutional constraints. It is proposed
that the Executive Mayor of the district request nominations of credible leaders from the
private, public and civil society sectors that are willing and able to drive the GDS. It is
proposed that a team of a maximum of twelve members is appointed as the GDS Lead Team
that will be mandated to drive and monitor the GDS.
After discussion and debate option 3 was selected as the most appropriate for the area. Within this
option is it suggested that the term of appointment of the lead team members should be “three
years and that the mandate of the appointed team will include being able to:
Request progress reports from the various stakeholders and structures with regard to the
implementation of the GDS;
Convene GDS stakeholder forums in order to monitor progress and provide strategic
direction;
Engage with local government, business and civil society leadership in order to unblock
obstacles facing the implementation of the GDS;
Report to relevant provincial and national government and private sector institutions if local
stakeholders have failed to respond or co-operate within agreed time-frames;
Mediate and request external mediation to assist in addressing any tensions or lack of co-
operation amongst stakeholders;
Advise stakeholders on issues pertaining to the GDS; and
Lobby stakeholders, both internal and external, for the allocation of resources to the GDS.
This team will become the “face” of the Ugu GDS and will be accountable for ensuring that it is
implemented. A technical support unit will be established to support the GDS lead team, consisting
of at least a process facilitator, programme co-ordinator and administrator. This team will be
Harry Gwala District Growth and Development Plan
The Planning Initiative Page 116
responsible for undertaking the day-to-day tasks related to the work of the lead team and engaging
with the various inter-governmental and sector bodies.
The Executive Mayor of the Ugu District will be the champion of the GDS within the local
government sphere. The District Council and district IGR structures will be the platforms for co-
ordinating the implementation of the GDS…….. In addition, it is proposed that the Executive Mayor
establishes and chairs a District Inter-Governmental Forum that is cross-sectoral and is focused on
ensuring integrated and aligned planning and budgeting across government. This will be a high-level
structure that will have both a political and technical component. The political component will be
constituted through the offices of the relevant MECs and the administrative component through the
offices of the relevant HoDs. Existing IGR structures, including the IDP Forum, will report to this
structure.”
8.2.6 UMKHANYAKUDE DISTRICT PLANNING COMMISSION AND INSTITUTIONAL STRUCTURE
In Umkhanyakude District Municipality the Development Agency is now paralleled by a District
Planning Commission. According to the District Municipality’s website, speaking at the
Umkhanyakude District Planning Commission Consultative Workshop, Mayor of the Umkhanyakude
District Municipality, Jeffrey Vilane, said:
"The idea of establishing the first of its kind of Commission is to create a platform that would
enhance and maximize the development and planning capacity of the Family of Municipalities that
fall within the Umkhanyakhude District. The Umkhanyakude District Municipality was viewed by
many as the epitome of underdevelopment, unemployment, poverty, lack of basic delivery to the
people and the high levels of inequalities. The confidence of business to the district was at an all-
time low. Government sector departments viewed the district as a high risk for development grants,
and worse was the lack and confidence of ordinary men and women to the institutions of
governance in this area. Owing to this, this is what led the current leadership and management of
their Umkhanyakude District family of Municipalities to undergo an intense and thorough
introspection of the capacity of our institutions and the appropriateness of our policies to turn this
unsavoury situation around. This was done through a series of strategic planning sessions and one-
on-one engagements between and among ourselves."
The establishment of the Commission was supported by Dr. Kwezi Mbanjwa from the presidency's
Office, who said that in terms of advice and support needed, their department would help if it was
within their capacity to do so. The commission would serve as a platform for stakeholders such as
local communities, businesses, investors, the tourism sector and various other governmental
departments, to have an opportunity to contribute positively towards the development of the
region. The Umkhanyakude District Municipal Council shall appoint 12 commissioners to the District
Planning Commission (DPC). However, a call for nominations for the eight commissioners was
advertised through newspapers this year’7.
The District Planning Commission was established by resolution of the Umkhanyakude District
Municipal Council, UDMC 00521 of 06 July 2012, where it was resolved that:
The establishment of Umkhanyakude District Development & Planning Commission;
7 http://www.ukdm.gov.za/index.php/en/component/content/article/125-block-ads/34-planning-economic-development
Harry Gwala District Growth and Development Plan
The Planning Initiative Page 117
The appointment of nine (9) Commissioners, eight (8) of whom to serve on a part-time basis
for a period of 5 years and one on full time basis to be designated as Chairperson, on the
District Development & Planning Commission;
Six (6) Mayors to serve as Ex-Officio Members;
The chairperson of the local house of traditional authorities;
The Six (6) Municipal Managers to serve in support of their respective Mayors;
The appointment of one representative from civil society, organized business and organized
labour;
The creation of a dedicated Secretariat to provide support to the uMkhanyakude District
Development & Planning Commission;
The creation of a Technical team to work with the DDPC to drive the planning processes.
The DDPC compliments both the National and Provincial Planning Commissions and advises and
makes recommendations to the District Municipal Council on matters related:
A Long term strategic development perspective and vision of the District;
Ensuring coherence in policy development & planning across the District;
Strengthening performance monitoring and evaluation to enable the government within the
uMkhanyakude District Municipal area to assess the pace required to deliver on the desired
outcomes.
The DDPC is supported by a Technical Committee and will consult through a Consultative Forum. The
committee will consist of technical representatives of the district and local municipalities, the district
development agency, and relevant provincial and national departments. It is envisaged that this
technical committee will convene either quarterly or bi-annually and provide the necessary technical
support to the planning commission. It is also suggested that the consultative process initiated at the
district growth and development summit be maintained and that a DGDP consultative forum be
established to advise on the implementation and monitoring of the district growth and development
plan.
Detailed project planning, implementation and project management is not seen as the primary
function of the district planning commission or the technical committee. Catalyst projects would be
implemented by the relevant Municipality or Government Department. Political accountability for
the plan and its implementation will vest with the Council of the district municipality and the five
comprising local municipalities.
Harry Gwala District Growth and Development Plan
The Planning Initiative Page 118
FIGURE 17: UMKANYAKUDE IMPLEMENTATION STRUCTURE
Source: uMkhanyakude District Growth and Development Plan (Draft for Comment) February 2014
A District Planning Commission essentially mirrors the National Planning Commission which is the
embodiment of government’s efforts to improve long term planning and rally the nation around a
common set of objectives and priorities to drive development over the longer term. Similarly a
District Planning Commission should seek to focus on long term planning, as opposed to the 5 year
Integrated Development plans, and focus the family of municipalities in the District on a common
set of objectives and priorities.
8.3 INSTITUTIONAL OPTIONS FOR HARRY GWALA DISTRICT GROWTH AND DEVELOPMENT
PLAN The examples presented in the previous section provide some background from which to explore
options for an institutional structure to drive the Growth and Development Plan in the Harry Gwala
District.
A point to bear in mind is that the capacity of the District Municipality and the existing SDA is limited
and needs to be enhanced to give effect to the implementation of the DGDP and the preferred
catalyst projects. The concept of appropriate capacity enhancement should therefore lie at the
centre of the institutional options strategy for this District.
The primary activities for a proposed institutional structure may be summarised as follows:
Strategic planning and guidance as well as reviews of the DGDP and overall vision
Implementation of catalyst projects – project preparation including business planning,
securing resources, and implementation
Harry Gwala District Growth and Development Plan
The Planning Initiative Page 119
Monitoring and evaluation of the DGDP and reporting on progress to the Provincial
structures (probably to the 18 Action Work Groups – although this needs clarification from
COGTA)
Consultation and information dissemination.
The choice of an Institutional Structure should be based on the following principles. That it
Is outcomes based i.e. keeps the end or ultimate goal of growth and development in mind
and focuses on actions
Promotes integration across all activities, sectors and departments, as well as space
Promotes involvement of all stakeholders – public and private sector as well as NGOs
Leverages existing capacity and institutional structures where possible and avoids
duplication of effort
Builds existing capacity
Promotes clear lines of accountability through a clear monitoring and evaluation framework
Aligns with and complements the Provincial institutional structures.
Reflecting on both South African and international experience, it appears that decisions need to be
made on whether the District Growth and Development Plan and catalytic projects should be
identified and driven by:
1. The District Municipality as is
2. The District Municipality with additional capacity
3. The District Municipality supplemented by a District Planning Commission
4. The Sisonke Development Agency (SDA) as is
5. An augmented SDA
6. A different or new SPV/PPP
7. A combination of the above
The following table explores these options further:
Harry Gwala District Growth and Development Plan
The Planning Initiative Page 120
TABLE 32: SUMMARY OF INSTITUTIONAL OPTIONS
Options 1. The District Municipality as is
2. The District Municipality with additional capacity
3. The District Municipality supplemented by District Planning Commission
4. Sisonke Development Agency (SDA), as is
5. An augmented SDA
6. A different or new SPV/PPP
Advantages The District Municipality has existing structures that could be mandated to implement the DGDP e.g. the IDP office.
The District Municipality has existing structures that could be mandated to implement the DGDP. Additional capacity could provide direct attention to the DGDP.
The District Planning Commission provides an opportunity for all sectors – public, private and NGOs to be involved. Has a specific focus on the DGDP. Local Municipalities and Private sector may become more involved.
Focus on action and implementation.
Focus on action and implementation.
Vehicle set up specifically to focus on DGDP.
Disadvantages Local Municipalities may not become as involved as they should. Political accountability may be limited by this lack of involvement. Private sector and NGOs may not become involved; Capacity constraints; Funding constraints.
Local Municipalities may not become as involved as they should. Political accountability may be limited by this lack of involvement. Private sector and NGOs may not become involved.
The District will have to be responsible for setting up another structure i.e. the DPC. Need for additional funding and staff.
Insufficient capacity to undertake the strategic planning; DGDP reviews and Reporting required.
Even with augmented staff it is debatable whether the mandate of an SDA would extend to the strategic planning reporting and review required and may detract from the focus of the SDA.
May duplicate functions. Requires new capacity and budget. Decisions would also need to be made on future relationship/s with District and Local Municipalities
Harry Gwala District Growth and Development Plan
The Planning Initiative Page 121
Reflecting on the advantages and disadvantages of the various options a new structure is most likely
to result in duplication of effort and require additional funding and capacity that is already in short
supply. At the stakeholder workshop held on 6 August 2014 at Ixopo the CEO of the SDA made it
clear that it was not the mandate of the SDA to implement the GDP although the agency could form
part of the support structures. Leaving the implementation of the GDP to the District Municipality as
is seems inappropriate given that the existing staff already seem stretched to cover all the areas they
are already responsible for.
In all probability the most appropriate institutional structure would appear to be a combination of
the options listed.
Two options seem to be worth exploring:
The District Municipality with additional capacity focused on the DGDP supported by the
SDA
A District Planning Commission supported by the District Municipality and the SDA
The following 2 diagrams explore these two possibilities for further discussion.
FIGURE 18: DISTRICT MUNICIPALITY WITH ADDITIONAL CAPACITY AND SUPPORTED BY SDA
Provincial Planning Commission
Action Work Groups
District Council
Strategic Planning and Decision Making
Sisonke Development Agency
Catalyst project Implementation
IDP team augmented by new DGDP technical team
Monitoring and Evaluation
IDP Forum or Growth and Devt. Summit Forum
Consultation
Harry Gwala District Growth and Development Plan
The Planning Initiative Page 122
FIGURE 19: DISTRICT PLANNING COMMISSION SUPPORTED BY DISTRICT AND LOCAL MUNICIPALITIES AND SDA
8.4 CONCLUSION AND RECOMMENDATION The success of the HGDGDP is dependent on the choice of an appropriate institutional structure
within the near future.
It is recommended that as an interim measure the Social Services and Development Planning
Department within the Harry Gwala District Municipality be tasked with driving a conclusion to the
institutional structure and its establishment, as well as interacting with the Provincial Structures.
Provincial Planning Commission
Action Work Groups
District Planning Commission
Strategic Planning and Decision Making
Sisonke Development Agency
Catalyst Project Implementation
IDP team or new DGDP technical team
Monitoring and Evaluation
IDP Forum or Growth and Devt. Summit
Consultation
District and Municipal Councils
IDP Alignment
Harry Gwala District Growth and Development Plan
The Planning Initiative Page 123
9 MONITORING AND EVALUATION FRAMEWORK
9.1 PURPOSE The primary purpose of the Harry Gwala Monitoring and Evaluation Framework (M&E Framework) is
to ensure the Municipalities within the Harry Gwala District are following the strategic plan adopted
and achieving the goals and objectives identified. The outcome of the implementation of the M&E
framework should be improved performance and demonstrable results. The advantage of
formalising monitoring and evaluation is the learning that occurs through reflecting on progress,
achievements and problems encountered, and the ability to adjust and amend the plan accordingly.
The M&E Programme should be an ongoing process with constant learning, feedback and
improvement over time. Changes and amendments to the strategy are to be expected through this
iterative process.
In addition to learning, the M&E programme should focus on risk management and accountability.
Risk relates to the uncertainty of an event occurring and the negative impact on the achievement of
goals and objectives. The corollary is that risk management can identify events and provide
reasonable assurance regarding the likelihood of achieving objectives. The concern for risk
emanates from the legal mandate of the Public Finance Management Act, 1999 for effective,
efficient and transparent system of financial and risk management. The general responsibilities for
risk management have been extended in terms of section 45 and 57 of the PFMA to all managers
within the public sector taking responsibility for risk management.
The risks therefore need to be identified and capacity built to manage and mitigate these, as well as
pursuing opportunities. The primary risk in this strategy is that nothing changes and the quality of
life in the Harry Gwala District does not improve. The strategy sets out to ensure that this is turned
around to achieve increased growth and development within the Municipality.
M&E is most effective when there are clear areas of accountability making individuals accountable
for the outcomes to be achieved as well as their actions and behaviour in pursuing these. The overall
accountability for the monitoring and evaluation of the HG DGDP rests with the District Municipality
until such time as an alternate Institutional structure is decided upon. The DM will also then be
responsible for deciding what changes are required to take the plan forward; however, specific
departments/managers/entities should be identified to review specific strategies and actions.
The primary objectives of the M&E plan are therefore to:
Support accountability to stakeholders (Municipality, Investors, Residents)
Prompt corrective action
Ensure informed decision-making
Promote risk management
Enhance organizational and individual learning
(After http://web.undp.org/evaluation/handbook/ch1-2.html)
Harry Gwala District Growth and Development Plan
The Planning Initiative Page 124
9.2 REPORTING Reporting on the implementation of the HGDGDP should focus on the following areas:
Monitoring:
Measuring and observing trends and actions using the primary indicator tables and
interventions set out in section six of this report
Evaluation
Answering key questions and reaching conclusions
Recommendations and Actions required
The framework for measuring trends and actions i.e. monitoring is set out in Section 6 of this report
in the form of the apex and primary indicators and forms the primary reporting tool for the DGDP.
The current status of each indicator needs to be measured annually against the targets set in the
tables as per the following example:
TABLE 33: EXAMPLE OF MONITORING PRIMARY INDICATORS AND INTERVENTIONS
Primary Indicators UNLEASH AGRICULTURAL
POTENTIAL
Baseline Data
Proposed Targets
2020
Actual 2015
Verification Reporting and Responsibility
Total employment within the agricultural sector - including forestry and livestock farming*.
25,000 est
28 630 Agricultural Census, Statistics South Africa and associated databases (Global Insight and Quantec);
Annual District with DEDT
Value of agricultural contribution to the District economy.**
R1,143m R1,309m Agricultural Census, Statistics South Africa and associated databases (Global Insight and Quantec);
Annual District with DEDT
Development of commercial farmers (new entrant, small-scale, ITB and Land reform***)
350 est 430 Agricultural Census and KZN Dept Agriculture and Rural Development and KwaNalu
Annual District with KZN DARD
Hectares of land under agricultural production including forestry and livestock farming****.
Circa. 800,000
ha
Circa. 820,000
ha
Agricultural Census and National KZN Dept Agriculture and Rural Development and KwaNalu
Annual District with KZN DARD
Once trends and activities have been measured, evaluation needs to occur through categorising the
indicators and the asking key questions about the overall strategy to frame the learning and
reflection.
The indicators may be categorised as follows:
TABLE 34: CATEGORISING INDICATORS
Status Symbol
On target
Not on target – needs urgent attention
Not on target but still able to get back on track
Harry Gwala District Growth and Development Plan
The Planning Initiative Page 125
Depending on results ask the relevant questions as set out in the following decision making flow
chart:
FIGURE 20: DECISION MAKING FLOW CHART
Evaluate: measure indicators and assess
On Target
Acknowledge, reward and communicate the
progress
Do new projects need to be added?
What can be learnt?
Not on target but can be rectified
Will time lines be met or do they need
revised?
Does the intervention need additional
resources - people or funds?
What can be learnt?
Not on target - needs urgent attention
Do goals need to be changed? Are they
realistic? Do priorities need to change?
Do dealines need to be changed? Understand
why the actions are behind schedule before
times are changed.
Does the intervention need to be dropped or
resources added - people, funds, equipment?
Does a new project need to be added?
What can be learnt?
Harry Gwala District Growth and Development Plan
The Planning Initiative Page 126
The answers to these questions will dictate the recommendations and actions required. These will
include changes and deviations to the original plan and an iterative review of the Growth and
Development document. This may include a change in activity, resources, timelines or additional
funding to rectify delays and challenges identified.
Equally the monitoring and evaluation process will identify success and achievements. In these cases
the achievements need to be documented to contribute to learning and then acknowledged and
published, incentivising the stakeholders to continue to participate in the implementation of the
strategy.
9.3 MONITORING CATALYST PROJECTS The catalyst projects identified should also be monitored as part of the HGDGDP. The framework
provided in section 7 of this report should be used to undertake this monitoring.
9.4 FREQUENCY OF REPORTING AND REVIEW Frequency of Review is a critical factor to consider. Whilst frequent reviews are time consuming and
interrupt implementation work-streams, if reviews are not carried out frequently enough the
strategy runs the risk of being ineffective and running off course. It is therefore recommended that
the review be undertaken annually with an interim review on a six monthly basis where general
progress is monitored and then a full review is undertaken on an annual basis where the statistics on
the indicators are captured, monitored and evaluated. An interim review in January should be
undertaken by the Municipal officials or relevant institutional structure to guide and direct
management decisions and acknowledge successes. A full review should be undertaken in June
which will include a detailed evaluation of outcomes, recommendations for changes, and may
include a redraft of the document where recommendations require this.
9.5 RESPONSIBILITY FOR MONITORING AND EVALUATION It is proposed that the responsibility for the monitoring of the overall impact of the Harry Gwala
District growth and Development Plan be allocated to the Harry Gwala Municipality in the short term
and then handed to the appropriate intuitional structure once this is decided on and established.
They will be best suited for undertaking the research and finding the data to measure performance.
The accountability for and monitoring of individual projects would rest with the relevant people
allocated a task in the project tables set out in section six, however, monitoring the cumulative
impact of these actions on growth and development requires dedicated attention.
Whilst individual managers will be accountable for achieving the outcomes proposed in this M&E
report at a project level, and Dm and then appropriate institutional structure would monitor trends,
it would be appropriate to consider a partnership in the overall evaluation of the programme as a
whole. This would avoid the Municipality being both player and referee. Partners could be – a
University, a Sister City or a Business body such as the Chamber of Business. Perhaps to avoid bias
the most appropriate would be to partner with a University research centre at DUT, UKZN or
National or International Universities. The data generated may also be useful for the research
outputs of these institutions.
9.6 REPORTING FLOWS The following chart reflects the flow of information in the monitoring and evaluation process:
Harry Gwala District Growth and Development Plan
The Planning Initiative Page 127
Reporting flows will vary depending on the institutional structure established. Should a District
Planning Commission be established, the reporting flows in the following diagram would apply.
FIGURE 21: REPORTING FLOW CHART
Provincial Planning Commission
District Planning Commission
District Technical team
District Council
Greater Kokstad Council
Ingwe Council
KwaSani Council
Ubuhlebezwe Council
uMzimkhulu Council
Provincial Cabinet
Harry Gwala District Growth and Development Plan
The Planning Initiative Page 128
10 CONCLUSION AND WAY FORWARD The Harry Gwala DGDP has been prepared with the intention of providing strategic guidance to the
development within the District. It is not intended to replace IDPs or the projects identified therein,
rather the intention is to provide an overarching framework within which growth and development
within the District is to be driven, and measured.
In order for the plan to be fully implementable, it is critical that the correct institutional mechanism
be structured so that it can be driven appropriately. This mechanism needs both political buy-in as
well as the appropriate resources in order to be realized. Thus, the way forward is for the District to
undertake a rigorous programme to finalise the institutional mechanism and then start
implementing the plan.
It is recommended that as an interim measure the Social Services and Development Planning
Department within the Harry Gwala District Municipality be tasked with driving a conclusion to the
institutional structure and its establishment, as well as interacting with the Provincial Structures.
It is also important to note that the plan is not final. Like the PGDP, there will be future revisions to
the plan made, as is necessary with a strategy of this nature.
Harry Gwala District Growth and Development Plan
The Planning Initiative Page 129
APPENDICES
Harry Gwala District Growth and Development Plan
The Planning Initiative Page 130
APPENDIX A: STEERING COMMITTEE INVITEES COGTA
1. Nontsundu Ndonga- [email protected];
2. VHUTSHILO GELEBE<[email protected]>;
3. B. Mgutshini- [email protected]
4. L. Dlamini- [email protected]
Harry Gwala District
5. Lucky Zondi- [email protected];
6. Rendani Mudau- [email protected];
7. Gugu Madonda- [email protected]
8. Muzi Luthuli- [email protected];
9. Mr Mtolo- [email protected]
10. N. Molefe- [email protected]
Umzimkulu
11. T. Maphumulo- [email protected]
12. [email protected]<[email protected]>;
Ubuhlebezwe
13. Dlamini- [email protected];
14. Zafika Mazibuko- [email protected];
KwaSani
15. Sue McAllistair- [email protected];
16. Joel Mazibuko- [email protected];
Kokstad
17. Jacobus Marais- [email protected];
18. Samora Madikizela- [email protected];
19. Abongile Zimu- [email protected]
Ingwe
20. Joel Mazibuko- [email protected];
Harry Gwala District Growth and Development Plan
The Planning Initiative Page 131
APPENDIX B: WIDER STAKEHOLDER FORUM INVITEES Government Departments, Eskom and Umgeni Water
1. Mthobisi.nzimande@kzndae,gov.za;
2. [email protected]<[email protected]>;
3. [email protected]<[email protected]>;
4. [email protected]<[email protected]>;
6. [email protected]<[email protected]>;
7. [email protected]<[email protected]>;
10. Aalia Kajee<[email protected]>;
11. [email protected];
Sisonke Development Agency
Business
15. [email protected]<[email protected]>;
16. [email protected]<[email protected]>;
17. [email protected]<[email protected]>;
COGTA
22. Nontsundu Ndonga<[email protected]>;
23. VHUTSHILO GELEBE<[email protected]>;
24. [email protected]<[email protected]>;
25. [email protected]<[email protected]>;
Harry Gwala District Municipality
26. Lucky Zondi<[email protected]>;
27. [email protected]<[email protected]>;
28. [email protected]<[email protected]>;
29. [email protected]<[email protected]>;
30. [email protected]<[email protected]>;
Harry Gwala District Growth and Development Plan
The Planning Initiative Page 132
Umzimkhulu
33. [email protected]<[email protected]>;
34. [email protected]<[email protected]>;
35. [email protected]<[email protected]>;
Ubuhlebezwe
36. [email protected]<[email protected]>;
37. [email protected]<[email protected]>;
38. [email protected]<[email protected]>;
KwaSani
39. [email protected];
40. [email protected]<[email protected]>;
Kokstad
41. [email protected]<[email protected]>;
42. [email protected]<[email protected]>;
43. [email protected]@kokstad.org.za;
44. [email protected]<[email protected]>;
Ingwe
45. Joel Mazibuko- [email protected];