Transcript of Harmonisation Working Group
Retail Market Design Service
Harmonisation Working Group
HWG Meeting Wednesday, 27th June, 2012
CER Offices Dublin
27th June 2012 Page 2Retail Market Design Service
HWG Agenda
Introduction Aileen O Connor, RMDS 12:30 – 12:35
HSG Meeting Feedback S mac an Bhaird, CER 12:35 – 12:40
Enduring Solution Project Update
12:40 – 12:45
ROI HSP Update Conor Garrigan, ESBN 12:45 – 12:55
Market Design Update A O Connor, RMDS 12:55 – 13:20
HWG To-Do List Review A O Connor, RMDS 13:20 – 13:25
AOB & Closing A O Connor, RMDS 13:25 – 13:30
27th June 2012 Page 3Retail Market Design Service
Approval of Minutes
Minutes from HWG meeting – 23rd May 2012
27th June 2012 Page 4Retail Market Design Service
Feedback from HSG of 06/06/12Topic Detail Review of matters arising from HWG
The approval by HSG of the following on 6th June 2012 was noted:
CR Number Request Description HSG Decision
MCR 166Addition of Generator Unit ID and Export arrangement ID to spreadsheet
Approved RoI Specific
DR 1118Updates to Enduring Solution NI Market Documentation
Approved NI Specific
DR 1119 Adoption of MP NI 501 509Approved Ni
Specific
MCR 73Proposal to make first name mandatory on market messages Approved
MCR 175 New reject reasons for address change rejection Approved
MCR 1096Customer Service Special Needs – expansion of ROI code set to align with NI practice Approved
Review of HSG Actions
Combined Terms of Reference for HSG and HWG to be circulated to HWG before next meeting on 27/06/12.
Update on Enduring Solution
Reasonably comfortable at Go Live as a result of the testing and
preparation done. All Suppliers had completed testing and certification.
260 NIE staff were trained and brought up to speed not just on SAP but
also on upgraded Satellite Systems. It has been a positive outcome
however there is close monitoring for NIE stability and also on the Power
NI side. There have been no major show-stoppers. Stability is good.
They have made some tweaks to Tibco and more to do. In process of
completing lst billing cycle end of this week and aggregation and
indications are pretty good.
27th June 2012 Page 5Retail Market Design Service
Feedback from HSG HWG relevant topics covered by the Harmonisation Steering Group 6th June 2012
Detail RoI Harmonisation Project
The stability of ES is welcomed. The project has now exited the Build
phase as all design changes to the technical infrastructure have been
completed. The current Test Phase is internally focussed with system and
Integration testing 95% complete. The defect volume and their impacts
have been low to date and are fixed as they are identified. The Networks
business is entering the User Acceptance Test phase which will be
followed by market participant IPT. The EMMA roll-outs to the ROI
participants will be commencing this month and will take approx 4 – 6
weeks. The combined RoI/NI solution for those already operational in NI
will also need to be deployed. The Project will link in with NIE/Northgate
to co-ordinate this along with the ROI installations.
Harmonised Retail Development Plan
This has been approved and final version will be published shortly.
27th June 2012 Page 6Retail Market Design Service
Enduring Solution Project Update
Joan-Edel Smith
27th June 2012 Page 7Retail Market Design Service
ROI HSP Update
Conor Garrigan
27th June 2012 Page 8Retail Market Design Service
Market Design Update – Workload Overview
27th June 2012 Page 9Retail Market Design Service
DR 1117 V1 - MRC Consultation
Change Request MRC currently under review and two specific
processes are under development: MP NI 506 Ability Testing Procedure - To provide a
framework for Supplier Ability Testing and MP NI 507 Market Testing Procedure - To provide a
framework for Supplier Market Testing.
At Today’s Meeting: Classification as NI-Specific Requested
DR 1117
27th June 2012 Page 10Retail Market Design Service
DR 1123 V1 – TCC Field Validation on 017
Change Request
An additional validation rule on 017 MM to make the Tariff Configuration Code (TCC) field mandatory when requesting Re-energisation of a prepayment meter.
If the TCC is not provided when requesting Re-energisation of a prepayment meter a 117R MM will be sent to the Supplier with Reject Reason code: ITF - Invalid Tariff Configuration Code.
At Today’s Meeting: Classification as NI-Specific Requested
DR 1123
27th June 2012 Page 11Retail Market Design Service
Previously Approved MCRs for Approval
Number Version Origin Request Description Action Requested
MCR 33 V3.0 ROI New Field on 332 and 332W MM for Non-Interval De-Energisations
Recommendation for Approval
MCR 34 V3.0 ROI New Field on 332 and 332W MM for Non-Interval Re-Energisations Recommendation for Approval
V2.0 Classified as Harmonisation Impacting at HWG of 04/04/12
Approval was held over for review by Suppliers
Reversioned following post-Harmonisation Release Planning Workshop
At Today’s Meeting:
•Recommendation for approval of Version 3.0 of both MCRs
MCR 33
MCR 34
27th June 2012 Page 12Retail Market Design Service
Previously Approved MCRs for Approval
Number Version Origin Request Description Action Requested
MCR 69 V1.0 ROI Mod to XML schema to allow Market Participants communicate with full Irish Character Set
Classification as Harmonisation Impacting Recommendation for Approval
MCR 176 V2.0 ROI Email Address Validation Classification as Harmonisation ImpactingRecommendation for Approval Reversioned
At Today’s Meeting:
•Classification and Recommendation for Approval
MCR 176
MCR 69
27th June 2012 Page 13Retail Market Design Service
DR 1122 V1 – Introduction of Essential Plant into the Market Design
Background
The traditional practice of ESBN has been not to de-energise essential plant for Non-Payment where Health & Safety issues may arise.
This DR seeks to introduce a new flag to allow for an MPRN to be identified in the Central Market System as Essential Plant.
DR 1122
27th June 2012 Page 14Retail Market Design Service
Contd:- DR 1122 V1 – Introduction of Essential Plant into the Market Design
A new flag to be added to the Harmonised Data Definitions with the name Essential Plant Flag and schema name EssentialPlantFlag.
The Harmonised Data Definition for Essential Plant Flag is "As and where an MPRN is determined to be Essential Plant, or where Essential Plant flag has been removed, then this flag will be highlighted."
This flag will be a new Boolean Flag. value of 1 it will mean that there is essential plant at this MPRN value of 0 (exceptional) - there is not essential plant at this MPRN
This field is proposed to be populated only where it has been determined that there is essential plant at the MPRN.
The content of the flag will be made available on the Extranet and the downloadable meter point details file as well as certain messages that are indicated on the MCR
At Today’s Meeting: Classification as Harmonisation Impacting and Recommendation for
ApprovalDR 1122
27th June 2012 Page 15Retail Market Design Service
DR 1097 V1.0 – New Order Status Code for Supplier timeout
To add a new Order Status code "SOTO" with the description of "Supplier Timeout" to be used where the Supplier has received market message 131[S] to re-schedule non-completed fieldwork and Supplier has not re-scheduled within 10 days.
At Today’s Meeting: Classification as Harmonisation Impacting
and recommendation for Approval DR 1097
27th June 2012 Page 16Retail Market Design Service
Previously Approved MCRs for Withdrawal
Number Version Origin Request Description Action Requested
MCR 78 V2.0 ROI Add Validation to Use of Company Registered Number
Classification as Harmonisation ImpactingRecommendation for Withdrawal
MCR 174 V3.0 ROI Allow incomplete set of reads for multiple meters to beaccepted by ESBN
Classification as Harmonisation ImpactingRecommendation for Withdrawal
Details MCRs Presented at HWG of 23/05/12 and held over for review
At Today’s Meeting: Approval is now being sought to withdraw these MCRs from the Active List.
MCR 174
MCR 78
27th June 2012 Page 17Retail Market Design Service
HWG Action Items
Open Items as at end of last meeting
No. Assigned to Description Date Raised Date Due
060 CER/NIAURConfirm single Supplier-side TIBCO instance and single Market Hub for the Harmonised Market 12/12/2011 11/01/2012
085 NIE DR1106 - consider Supplier issues and re-present when ready 12/12/2011 -
086 HSGProvide early sight of updated TORs for HSG and HWG before sign-off 12/12/2011 -
088 SUPPLIERSConfirm acceptance of proposal to withdraw MCR78 and MCR174. 23/05/2012 27/06/2012
27th June 2012 Page 18Retail Market Design Service
HWG Meeting
AOB
27th June 2012 Page 19Retail Market Design Service
Next Steps
Next HWG meeting
8th August, 2012 (Belfast)
Dates for all meetings for 2012 are on the Calendar on the RMDS website
27th June 2012 Page 20Retail Market Design Service
Thank You
HWG Meeting