8/10/2019 Hardware and Commissioning Checklist PTN 910 v3.0
1/17
-
8/10/2019 Hardware and Commissioning Checklist PTN 910 v3.0
2/17
HARDWARE AND COMMISSIONING CHECKLISTHUAWEI PTN 910 MODEL NETWORK 3G
Version 3 HUAWEI Proprietary and Confidential Page 2 of 17
DISTRIBUTE PTN 910 GENERAL INFORMATION
In the physical board and in the ODUs take the serial numbers and fill the following table:
SLOT HARDWARE SERIAL NUMBER
IDU sub-rack Order: No:
1 CXPA 16 digits
2 CXPA 16 digits
3 IFE 2 16 digits
4 IFE 2 16 digits
5 PIU 16 digits
6 FAN 16 digits
ODU Main ODU 20 digits
ODU Stand by ODU 20 digits
Access to the IDU and export the Board Information Report
-
8/10/2019 Hardware and Commissioning Checklist PTN 910 v3.0
3/17
HARDWARE AND COMMISSIONING CHECKLISTHUAWEI PTN 910 MODEL NETWORK 3G
Version 3 HUAWEI Proprietary and Confidential Page 3 of 17
CHAPTER I
HARDWARE INSTALLATION PROTOCOL
1. CABINET INSTALLATION INSPECTION
1.1No parts on the cabinets are damaged or detached. No cables are
damaged or snappedNO YES N/A
1.2 Verify that the equipment metal supports dont have oxide trace NO YES N/A
1.3Equipment installed according to the TSS and/or customer
recommendations.NO YES N/A
1.4The supports are positioned and spaced in accordance with the
drawing of the installation holes. (This item applies to the cabinet
installation on the ESD floor.)
NO YES N/A
1.5All supports are fixed to the floor correctly. (This item applies to the
cabinet installation on the ESD floor.)NO YES N/A
1.6All components of the supports are installed correctly. (This item
applies to the cabinet installation on the ESD floor.)NO YES N/A
1.7All floor holders are installed at the same height. (This item applies
to the cabinet installation on the ESD floor supported by floor
holders.)
NO YES N/A
1.8 Each cabinet is well insulated from the support or the floor. NO YES N/A
1.9All cabinet accessories are installed, including front door, back
door, and side doors.NO YES N/A
1.10The row labels, column labels, and product labels are attached to
the specified positions.NO YES N/A
1.11The ESD wrist strap is connected to the ESD bonding point on the
cabinet.NO YES N/A
1.12 Insulation is performed for shockproof parts between multiple rowsof cabinets.NO YES N/A
1.13All bolts are fixed with flat washers and spring washers in a correct
order.NO YES N/A
1.14 The cabinets are stable and orderly. NO YES N/A
-
8/10/2019 Hardware and Commissioning Checklist PTN 910 v3.0
4/17
HARDWARE AND COMMISSIONING CHECKLISTHUAWEI PTN 910 MODEL NETWORK 3G
Version 3 HUAWEI Proprietary and Confidential Page 4 of 17
1.15 The cabinet its correctly aligned NO YES N/A
1.16All cabinet side doors facing the aisle are aligned with the error less
than 5 mm. NO YES N/A
1.17The surfaces of the cabinets are clean without any fingerprint or
smudge. There is no dust, excessive cable tie ends or other
sundries either inside or outside each cabinet.
NO YES N/A
1.18 All kinds of labels are correct, legible and intact. NO YES N/A
1.19 The front and back doors of the cabinets are easy to open or close. NO YES N/A
1.20 The modules in one cabinet are aligned from the top down. NO YES N/A
1.21 All the filler panels are installed. NO YES N/A
1.22All Subracks are installed in proper positions, and their DIP
switches are properly set.NO YES N/A
1.23 No paint is detached. NO YES N/A
2. CABLE INSTALLATION INSPECTION
2.1 Power and PGND cables
2.1.1The -48 V power cables are blue, the PTN 910 power cables are
black, and the PGND cables are green and yellow. The power
cables shall meet the field requirements.
NO YES N/A
2.1.2All the core wires of the power cables and PGND cables are
made of copper.NO YES N/A
2.1.3 No power cable or PGND cable is damaged or snapped. NO YES N/A
2.1.4 No welding point exists in the power cables and PGND cables. NO YES N/A
2.1.5No breaking device such as the switch or fuse exists in the
electric connection of the grounding system.NO YES N/A
-
8/10/2019 Hardware and Commissioning Checklist PTN 910 v3.0
5/17
HARDWARE AND COMMISSIONING CHECKLISTHUAWEI PTN 910 MODEL NETWORK 3G
Version 3 HUAWEI Proprietary and Confidential Page 5 of 17
2.1.6The power cables and PGND cables of extra length are trimmed
rather than coiled.NO YES N/A
2.1.7The grounding bars and PGND bars are finally connected to one
grounding conductor.NO YES N/A
2.1.8The grounding bar of the PDB is well connected to the grounding
bar provided by the customer.NO YES N/A
2.1.9The output current values of the PDB and the DC power
distribution panel meet the requirements.NO YES N/A
2.1.10All power cables and PGND cables are not short-circuited or
reversely connected.NO YES N/A
2.1.11 The OT terminals of the power cables and PGND cables arewelded or crimped securely.NO YES N/A
2.1.12
The power cables and PGND cables connecting the power
distribution box with the functional modules, and the PGND
cables connecting the modules with the grounding bar are all
correctly installed and have satisfactory contact.
NO YES N/A
2.1.13The front, back, and side doors are respectively connected to the
grounding bolts on the lower enclosure of the cabinet through the
6 mm2green and yellow cables.
NO YES N/A
2.1.14
The power cables and PGND cables are laid straight and bound
orderly in the cabinets or in the PDB. Each switch on the PDB ismarked with the number of the corresponding cabinet.
NO YES N/A
2.1.15Engineering labels are attached to both ends of each power
cable or PGND cable.NO YES N/A
2.1.16The power cable of the alarm box laid on a wall is in a PVC
trough.NO YES N/A
2.1.17 Power Test. NO YES N/A
-
8/10/2019 Hardware and Commissioning Checklist PTN 910 v3.0
6/17
HARDWARE AND COMMISSIONING CHECKLISTHUAWEI PTN 910 MODEL NETWORK 3G
Version 3 HUAWEI Proprietary and Confidential Page 6 of 17
3. MW ANTENNA SYSTEM INSTALLATION INSPECTION
3.1 Mw system Installation Inspection
3.1.1Equipment installed according
to the TSS and/or customer
recommendations.
NO YES N/A
3.1.2
Equipments correctly aligned,
fixed and fit in their supports, inorder to avoid interfering with
any existing infrastructure.
BREAKERS NO YES N/A
IDU NO YES N/A
ODUs NO YES N/A
ANTENA NO YES N/A
POLE NO YES N/A
3.1.3The antenna support is securely
connected to the tower or the
rooftop.
NO YES N/A
3.1.4
The labelsare attached orderly and
neatly to the feeders and jumpers.
They face the same direction
according to the specifications.
NO YES N/A
3.1.5Correspondence of the IF cable
with the ODUs according to the
configuration of the protection.
IF 1
NO YES N/A
IF 2
NO YES N/A
3.1.6 -48 VDC PTN 910 power cableis correctly installed.
POWER CABLE 1
NO YES N/A
POWER CABLE 2 NO YES N/A
3.1.7The IF cables are correctly
connected.NO YES N/A
-
8/10/2019 Hardware and Commissioning Checklist PTN 910 v3.0
7/17
HARDWARE AND COMMISSIONING CHECKLISTHUAWEI PTN 910 MODEL NETWORK 3G
Version 3 HUAWEI Proprietary and Confidential Page 7 of 17
3.1.8
All outdoor jumper connectors
are waterproofed and sealed.
Waterproof curves are made for
the jumpers.NO YES N/A
3.1.9
A certain length of ties is kept
when you cut the ties after
binding all the outdoor jumpers.NO YES N/A
3.1.10Grounding cable installed with
terminals correctly fit, and
conductive grease applied.
IDU NO YES N/A
ODU 1 NO YES N/A
ODU 2 NO YES N/A
IF CABLE NO YES N/A
3.1.11Curvature radius of IF's cables
fulfills with the manufacturer
specifications.NO YES N/A
3.1.12Verify to cut properly the plastichatbands after the cables are
aligned and groupsNO YES N/A
3.1.13The TBN connector is protected
with insulating tape and
waterproof tape.NO YES N/A
-
8/10/2019 Hardware and Commissioning Checklist PTN 910 v3.0
8/17
HARDWARE AND COMMISSIONING CHECKLISTHUAWEI PTN 910 MODEL NETWORK 3G
Version 3 HUAWEI Proprietary and Confidential Page 8 of 17
3.1.14 The labels are correctly pastedin the following equipments:
PTN:
Power-PTNNO YES N/A
Sub-RACK NO YES N/A
GND NO YES N/A
ODU:
ODU 1 NO YES N/A
ODU 2 NO YES N/A
GND NO YES N/A
IF CABLES NO YES N/A
Transmission Cables:
Ethernet Tx NO YES N/A
BREAKERS:
-48VDC NO YES N/A
GND NO YES N/A
3.1.15Antennas azimuths are
according to customer
requirement
NO YES N/A
-
8/10/2019 Hardware and Commissioning Checklist PTN 910 v3.0
9/17
-
8/10/2019 Hardware and Commissioning Checklist PTN 910 v3.0
10/17
HARDWARE AND COMMISSIONING CHECKLISTHUAWEI PTN 910 MODEL NETWORK 3G
Version 3 HUAWEI Proprietary and Confidential Page 10 of 17
CHAPTER II
COMMISSIONING TEST PROTOCOL
Test Items for Preliminary Test
Interface and System Test Item Test Sub-Item
System function test Hardware performance Alarm management
Actual transmit frequency of the ODU
Actual receive frequency of the ODU
Actual transmit power of the ODU
RF parameter configuration
Actual receive power of the ODU
IF/RF test
Microwave protection HSB switching
IDU Power Protection IDU board protection 1+1 Power Protection Board
-
8/10/2019 Hardware and Commissioning Checklist PTN 910 v3.0
11/17
-
8/10/2019 Hardware and Commissioning Checklist PTN 910 v3.0
12/17
-
8/10/2019 Hardware and Commissioning Checklist PTN 910 v3.0
13/17
HARDWARE AND COMMISSIONING CHECKLISTHUAWEI PTN 910 MODEL NETWORK 3G
Version 3 HUAWEI Proprietary and Confidential Page 13 of 17
2.2 IDU Power protection
2.2.1 IDU board protection - 1+1 Power Protection Board
Test Sub-Item HSB Switching
Node No. Function Test Conclusion
Turn-off the main breaker and check thepower status of the IDU. NO YES
N/A
Turn-off the protection breaker and checkthe power status of the IDU NO YES
N/A
Indexes:
Remarks:
-
8/10/2019 Hardware and Commissioning Checklist PTN 910 v3.0
14/17
-
8/10/2019 Hardware and Commissioning Checklist PTN 910 v3.0
15/17
-
8/10/2019 Hardware and Commissioning Checklist PTN 910 v3.0
16/17
HARDWARE AND COMMISSIONING CHECKLISTHUAWEI PTN 910 MODEL NETWORK 3G
Version 3 HUAWEI Proprietary and Confidential Page 16 of 17
HARDWARE AND COMMISSIONING ACCEPTANCECERTIFICATE
This document certifies that equipments passed the inspection according internal order.
Network Element PTN 910
Site Local Name
Site Remote Name
Contract Name NII 3G Per Project
Comments:
Inspection Date:
Company:
Huawei del Per S.A.C.
Customer:
Nextel del Per S.A. Cooperator in charge:
Name: Name:
Title: Title:
Signature: Signature:
Place & Date: Place & Date:
-
8/10/2019 Hardware and Commissioning Checklist PTN 910 v3.0
17/17
HARDWARE AND COMMISSIONING CHECKLISTHUAWEI PTN 910 MODEL NETWORK 3G
Version 3 HUAWEI Proprietary and Confidential Page 17 of 17
HARDWARE AND COMMISSIONING FINAL ACCEPTANCECERTIFICATE
This document certifies that equipments passed the inspection according internal order.
Network Element PTN 910
Site Local Name
Site Remote Name
PO Number
Contract Name NII 3G Per Project
Huawei Internal Contract Number
Comments:
Customer :
NEXTEL DEL PER S.A.
Company:
HUAWEI DEL PER S.A.C.
Name:
GUSTAVO REY-SANCHEZ
Name:
EDUARDO ZEVALLOS
Title:
OVERALL ENGINEERING PROJECT MANAGER
Title:
OVERALL PROJECT MANAGER
Signature: Signature:
Place & Date :
Lima, , 2009
Place & Date: