Schlumberger Private Hazard Analysis and Risk Control Record Doc ref: BPTT AMHERSTIA Task/Process Assessed: DST/TCP Shoot and Pull Using BHF/HDF firing head Revision: 1.0 Location: Offshore Date: September-2015 Assessment Team: Michael Showers, Lorenzo Sahadeo,Jason Wiltshire,Kerron Mohamed, Andell Grant, Operation: DST/TCP Shoot and Pull Approved by: Activity Steps HAZARD INITIAL RISK CONTROL MEASURES RESIDUAL RISK Hazard Description and Worst Case Consequences with no Prevention or Mitigation Measures in Place Loss Category/ Population Affected Likelihood Severity Risk Level List all Current and Planned Control Measures, taking into Account all Contributing and Escalating Factors Likelihood Severity Risk Level Current and Planned Prevention Measures to reduce Likelihood Current and Planned Mitigation Measures to reduce Severity HARC Record Page 1 of 12 Template Revised: 28-Sep-15

description

Steps taken during explosives operation

Transcript of Harc Dst-tcp Shoot and Pull_2015!09!21

Page 1: Harc Dst-tcp Shoot and Pull_2015!09!21

Sc

hlu

mb

erg

er Private

Hazard Analysis and Risk Control Record

Doc ref: BPTT AMHERSTIA Task/Process Assessed: DST/TCP Shoot and Pull Using BHF/HDF firing head

Revision: 1.0 Location: Offshore

Date: September-2015 Assessment Team: Michael Showers, Lorenzo Sahadeo,Jason Wiltshire,Kerron Mohamed, Andell Grant,

Operation: DST/TCP Shoot and Pull Approved by:

Activity Steps

HAZARD INITIAL RISK CONTROL MEASURES RESIDUAL RISK

Hazard Descriptionand Worst Case

Consequences with no Prevention or Mitigation

Measures in Place

Loss Category/

Population Affected L

ikel

iho

od

Sev

erit

y

Ris

k L

evel

List all Current and Planned Control Measures, taking into Account all Contributing and Escalating Factors

Lik

elih

oo

d

Sev

erit

y

Ris

k L

evel

Current and Planned Prevention Measures to reduce Likelihood

Current and Planned Mitigation Measures to reduce Severity

On-site preparation

Pressure

Unexpected release of pressure during function test leading to personnel injury

Electrical

Use of no intrinsically safe laptop to program tools on the pipe deck. This can cause an explosion leading to injury or death of personnel, loss of SLB and Client assets.

Personnel (SLB and Customer)

Assets (Customer and SLB),

Process (Customer and SLB)

Like

ly (

4)

Cat

astr

ophi

c (-

4)

IInto

lera

ble

(-1

6)

Caution off area before starting process.

Only trained personnel allowed to perform function test.

Only qualified SLB personnel allowed within the cautioned off area during the function test.

Perform gas test with certified gas meter before powering on laptop and keep gas monitor on as long as the laptop is in use.

ERP in place

Medevac in place

Confirm all PPE is available and used per SLB standards

ERP in place

Medevac in place

Pos

sibl

e (3

)`

Maj

or (

-3)`

Un

des

irab

le (

-9)

HARC Record Page 1 of 10 Template Revised: 28-Sep-15

Page 2: Harc Dst-tcp Shoot and Pull_2015!09!21

Sc

hlu

mb

erg

er Private

On-site preparation

Explosives, Gravitational Potential Energy (Stepping, Handling, Lifting), Mechanical Lifting

Dropped / rolling gun leading to injury or fatality to personnel.

Gun detonation during Explosives handling leading to personnel injury or death.

Working on top of racked tubulars with risk of fall from height, crushing injuries.

Container handling or Dropped objects with associated risk of; personnel injury, equipment damage.

Contamination with chemicals.

Inability to deliver service as required.

Personnel (SLB and Customer)

Assets (Customer and SLB),

Process (Customer and SLB)

Like

ly (

4)

Cat

astr

ophi

c (-

4)

IInto

lera

ble

(-1

6)

On site safety briefing with all crew and company man, including PTW procedures

Reconfirm well details and job program.

Review rig capabilities with driller, casing and wellhead max rating – ensure compatibility with job plan and contingency planning.

Ensure rig’s handling equipment for SLB tools are on the rig and are in good working order.

Ensure the pipe is going to be drifted prior running in hole.

Confirm with company man – tool preparation and witness tests: tool operation ranges and max planned pressures.

Communicate to all personnel on rig TCP procedures:

No lifting operations during gun handling operation.

Authorized personnel present during gun handling operations.

Use management of change procedure for job plan changes

Inform crew of program changes/amendments

Rig walk through, safety/handling, equipment /explosive placement

Review document man riding capabilities

Assign responsibilities/ handovers and work roster

Record QA data of actual RIH equipment, assets, run order etc.

Contingency planned communicated to all personnel.

Confirm all PPE is available and used per SLB standards

Pos

sibl

e (3

)`

Maj

or (

-3)`

Un

des

irab

le (

-9)

Reconfirm deviation, mud, temp, packer setting depth, casing collars

Recalculate rupture discs and tool operating ranges.

Instruct on trapped pressure procedures, roles and responsibilities.

Confirm the well is full and static.

Obtain work permits

HARC Record Page 2 of 10 Template Revised: 28-Sep-15

Page 3: Harc Dst-tcp Shoot and Pull_2015!09!21

Sc

hlu

mb

erg

er Private

On-site preparation

Explosives, Gravitational Potential Energy (Stepping, Handling, Lifting), Mechanical Lifting

Dropped / rolling gun leading to injury or fatality to personnel.

Gun detonation during Explosives handling leading to personnel injury or death.

Working on top of racked tubulars with risk of fall from height, crushing injuries.

Container handling or Dropped objects with associated risk of; personnel injury, equipment damage.

Contamination with chemicals.

Inability to deliver service as required.

Personnel (SLB and Customer)

Assets (Customer and SLB),

Process (Customer and SLB)

Like

ly (

4)

Maj

or (

-3)

Into

lera

ble

(-1

2)

Check off equipment against manifest

Prepare equipment, test and document, including witness (if required)

Inspect gun boosters, o rings and plastic transfer components prior to picking up

Log explosives used and secure remnants and excess explosives

Prepare HDF/BHF firing head in Dog house, pin and fill sub. All the pre assembly checks must be done according to the TCP FOM.

Strap all tools, guns and record with ID and ODs. Prepare final string drawing

Advise client review and sign off procedures, string drawing and calculations.

Secondary specialist to verify correct preparation

Lay out guns and tools per pick up assemblies and label.

Clear drifting, pipe dope, handling, tool make, arming up to be given

PPE in use as per SLB Standard.

Pos

sibl

e (3

)

Maj

or (

-3)

Un

des

irab

le (

-9)

HARC Record Page 3 of 10 Template Revised: 28-Sep-15

Page 4: Harc Dst-tcp Shoot and Pull_2015!09!21

Sc

hlu

mb

erg

er Private

Pick up equipment

Explosives, Gravitational Potential Energy (Stepping, Handling, Lifting), Mechanical Lifting

Dropped / rolling gun leading to injury or fatality to personnel.

Gun detonation during Explosives handling leading to personnel injury or death.

Working on top of racked tubulars with risk of fall from height, crushing injuries.

Container handling or Dropped objects with associated risk of; personnel injury, equipment damage.

Contamination with chemicals.

Inability to deliver service as required.

Personnel (SLB and Customer)

Assets (Customer and SLB),

Process (Customer and SLB)

Pos

sibl

e (3

)

Cat

astr

ophi

c (-

4)

Into

lera

ble

(-1

2)

JSA with all concerned parties; rig crew, SLB crew, company man. Distribute string drawing to driller, tool pusher, Co man, OIM

SLB explosive training and procedures to be followed at all times (Ref TCP FOM C200463)

Area below rotary barred off, no personnel until guns are 200 ft below seabed.

All lifting operations to be conducted by competent rig crew / deck crew personnel with technical assistance were required from SLB crews.

Ensure equipment to be RIH and checked off as per the BHA well sketch. If something is left out or added this will affect the space out.

No primary high Explosives in the guns

Confirm BOP ram and Hydril space out

Check for check valves in kill line to BOP,

Remove check valve or read/bleed annulus through choke side

Ensure all tool and gun handling equipment is available on rig floor

All lifts to the rig floor must be done with fixed shackle

Prior to lifting guns, ensure the rams/Hydril is open, stand clear

Certified lifting subs in use

Driller to monitor make up line (chalk line) for possible back off while guns are made up

Correct positioning and manual handling techniques by SLB and rig crew for handling slips and guns

Ensure correct clamp and positioning of safety clamp

Handling caps removed and installed only under SLB supervision (Ref TCP FOM)

All unnecessary equipment and hand tools to be keep clear of the area

Ensure use of correct hole cover

Personnel in correct positions and aware of escape routes

Prior to make up SLB supervisor check for any foreign objects in either box or pin connector and to directly control gun make up operation

Ensure all booster spacing has been checked on the deck and are with-in allowable tolerances

SIPP techniques to be followed during make up focusing on hand position and pinch points

Safety spacer ensures top shot below rotary table

Unl

ikel

y (2

)

Maj

or (

-3)

Un

des

irab

le (

-6)

HARC Record Page 4 of 10 Template Revised: 28-Sep-15

Page 5: Harc Dst-tcp Shoot and Pull_2015!09!21

Sc

hlu

mb

erg

er Private

Run in hole with guns

Explosives, Machinery /Equipment, Human (Communication), Personnel Gravitational Potential Energy (Stepping, Handling, Lifting)

Off depth perforation resulting in loss of well,

Loss of Reputation

Personnel injury.

Reputation (SLB), Assets (Customer and SLB)

Environment

Unl

ikel

y (2

)

Cat

astr

ophi

c (-

4)

Un

des

irab

le (

-8)

SLB explosive training and procedures to be followed at all times (Ref TCP FOM C200463)

Barriers to remain in place until guns have passed 200ft

Make an announcement after 200ft

Running speeds and make up practices as per SLB guidelines

No Explosives are exposed to atmosphere

Use Teflon rabbit to drift the work string (Do not rabbit over well bore).

Set and come off slips smoothly and slowly to minimize water hammer effect on firing head.

Utilize correct clamps on guns.

Cover the tubing while RIH to avoid anything from dropping on top of the Firing Head.

Pipe dope applied only on the pin.

Tubing will be filled while running in hole and the cushion will be trapped with the IRDV (AVC Command)

Minimum of 300 psi hydrostatic to drive firing pin on BHF, pressure pulse to activate HDF.

100 % firing heads backup

Ensure fluids levels are monitored during trip in hole for proper displacement

Impr

obab

le (

1)

Maj

or (

-3)

Acc

epta

ble

(-3

)

HARC Record Page 5 of 10 Template Revised: 28-Sep-15

Page 6: Harc Dst-tcp Shoot and Pull_2015!09!21

Sc

hlu

mb

erg

er Private

Tag, Place guns on depth, Correlate, And Space out

Explosives

Human (Communication, Personnel injury)

Machinery/Equipment/ Hand Tools

Off depth perforation resulting in loss of well,

Loss of Reputation.

Personnel injury resulting in lost time injury

Personnel (SLB and Customer)

Assets (Customer and SLB),

Process (Customer and SLB)

Pos

sibl

e (3

)

Cat

astr

ophi

c (-

4)

Into

lera

ble

(-1

2)

JSA with all concerned parties; rig crew, SLB crew, company man.

Open and honest communication between all parties in every aspect of gun positioning.

SLB explosive training and procedures to be followed at all times (Ref TCP FOM C200463)

Authorized personnel only, allowed access to work area during operation

Use hole cover to prevent anything from being dropped in well during correlation or space out

All lifting operations to be conducted by competent rig crew / deck crew personnel with technical assistance were required from SLB crews.

Ensure logging tool does not reach firing head if Wireline is used.

Packer will set when going to tag more than once. It needs to be unset before attempting to tag again.

The string WILL NOT be lifted using the flowhead.

Do NOT slack off more than 5,000lbs when tagging.

Verify correct tie in log being used to correlate with company rep sign off.

Company rep and SLB Engineer/Technician to be in complete agreement with space out and correlation results prior to proceeding.

Review string diagram with correlation engineer noting, depths, ID restrictions, and source to top shot distance

Unl

ikel

y (2

)

Maj

or (

-3)

Un

des

irab

le (

-6)

HARC Record Page 6 of 10 Template Revised: 28-Sep-15

Page 7: Harc Dst-tcp Shoot and Pull_2015!09!21

Sc

hlu

mb

erg

er Private

Rig up surface equipment and pressure test

Explosives

Machinery/Equipment

Assets

Human (Communication, Personnel injury)

Stepping, Handling, And Lifting.

Parting high pressure lines or equipment resulting in personnel injury

Perforating over balanced during pressure test resulting in inability to deliver service as required.

String jumping out of slips

Lost in hole.

Personnel (Customer and SLB), Reputation (SLB)

Assets (Customer and SLB)

Process (Customer and SLB)

Unl

ikel

y (2

)

Cat

astr

ophi

c (-

4)

Un

des

irab

le (

-8)

Toolbox meeting with all concerned parties; rig crew, SLB crew, company man.

SLB explosive training and procedures to be followed at all times (Ref TCP FOM C200463)

Authorized personnel only, allowed access to work area during operation

Personnel in correct positions, aware of responsibilities and escape routes

All lifting operations to be conducted by competent rig crew / deck crew personnel with technical assistance were required from SLB crews

Ensure annulus open and all valves lined up correctly prior to pressure test

Set packer and test packer elements and bypass seal

Use hole cover to prevent anything from being dropped in well during operation

If slips are being used ensure they are tied together

Test pump operator to make announcements over PA system to keep all personnel aware operations and hazards

No personnel allowed access to work area while pressure applied to surface equipment

Leaks to be monitored from test pump and pressure released prior to allowing personnel to repair leaks

PPE as per SLB standards.

SIPP Techniques followed at all times.

Impr

obab

le (

1)

Maj

or (

-3)

Acc

epta

ble

(-3

)

HARC Record Page 7 of 10 Template Revised: 28-Sep-15

Page 8: Harc Dst-tcp Shoot and Pull_2015!09!21

Sc

hlu

mb

erg

er Private

Perforate and control well

Explosives

Machinery/Equipment

Assets

Human (Communication, change management, Personnel injury)

Parting high pressure lines or equipment resulting in personnel injury

Firing head fails to initiate resulting in inability to deliver service as required.

Sticking guns (debris, underbalance, splitting).

Personnel overhead with drop bar

Personnel (SLB and Customer)

Assets (Customer and SLB),

Process (Customer and SLB)

Pos

sibl

e (3

)

Cat

astr

ophi

c (-

4)

Into

lera

ble

(-1

2)

JSA with all concerned parties; rig crew, SLB crew, company man. Discuss perforating sequence, flow back, and well kill procedures

SLB explosive training and procedures to be followed at all times (Ref TCP FOM C200463)

Authorized personnel only, allowed access to work area during operation

Personnel in correct positions, aware of responsibilities and escape routes

All lifting operations to be conducted by competent rig crew / deck crew personnel with technical assistance were required from SLB crews

Ensure Drop bar is of engineered design and designed for well conditions

Make sure to close swab valve as soon as the bar has dropped. IF Swab is not operating, close Master valve and fix swab valve with MV closed.

Ensure all valves lined up correctly prior to activating firing system

Use hole cover to prevent anything from being dropped in well during operation

If no indication at surface. If formation is taking fluid, the formation was perforated, if not, it wasn’t. Wait for indication at surface. Note the bubble hose located at the choke manifold.

If there is no indication of the guns detonating, follow contingency to POOH with live guns: Fish the bar and call town.

All involved parties to familiar with perforating, flow back, and well kill contingencies prior to commencing operation

Unl

ikel

y (2

)

Maj

or (

-3)

Un

des

irab

le (

-6)

HARC Record Page 8 of 10 Template Revised: 28-Sep-15

Page 9: Harc Dst-tcp Shoot and Pull_2015!09!21

Sc

hlu

mb

erg

er Private

Pull Guns out of well

Human (Communication), Explosives,

Pressure, Machinery/Equipment/ Hand Tools

Well still coming after finishing kill procedure

Perforate off depth

Bringing live guns to surface

Swab in well resulting well control situation

Contamination of personnel with well fluids.

Personnel (SLB and Customer)

Assets (Customer and SLB),

Process (Customer and SLB)

Like

ly (

4)

Maj

or (

-3)

\Into

lera

ble

(-1

2)

Make certain all valves are lined up correctly

Rig to monitor returns

Flow check, when client is satisfied, rig down flowhead and install a TIW with pumping sub. Unset packer and do a flow check again. Once client is satisfied continue POOH

Guns must be treated as live for this case

Ensure SLB and Client are aware of situation and risks have been addressed prior to pulling live guns

JSA with all concerned parties; rig crew, SLB crew, company man.

SLB explosive training and procedures to be followed at all times (Ref TCP FOM)

Running speeds and break out practices as per SLB guidelines

Set and come off of slips smoothly and slowly to minimize water hammer effect on firing head

Contingency planning for pulling live guns.

Stop operation and hold JSA when guns reach 200’ from mud line or surface prior to proceeding with live guns

Proper PPE for well fluids

Unl

ikel

y (2

)

Maj

or (

-3)

Un

des

irab

le (

-5)

Report Compilation/ Data Submission to Client

Human (Training and competence

Unsecured Data/Info

Incorrect data sent to client

Data sent to wrong client

Data altered to cover up problems

Report not Quality Checked containing misspellings, wrong format for plots, incorrect depths, etc.

Personnel (SLB and Customer)

Assets (Customer and SLB)

Reputation

Pos

sibl

e (3

)

Maj

or (

-3)

Un

des

irab

le (

-9)

Insure properly trained personnel perform or supervise the entire report compilation.

Utilize existing RQC forms to ensure 100% compliance with reporting procedures.

Never alter data for any reason.

Use correct format for data including header information.

Insure data is kept in secure location following IT security guidelines.

Open attachments prior to sending reports or data to client to confirm correct files being sent

Insure all client contacts (specialist, FSM, Ops Mgr, Sales, etc) have latest revision of any data submission and all are speaking the same story.

Unl

ikel

y (2

)

Ser

ious

(-2

)

Acc

epta

ble

(-4

)

HARC Record Page 9 of 10 Template Revised: 28-Sep-15

Page 10: Harc Dst-tcp Shoot and Pull_2015!09!21

Sc

hlu

mb

erg

er Private

Job debrief Human (Training and competence

Unsecured Data/Info

Equipment not properly tagged (green tag still on used equipment)

Client Data or reports left in unsecured location

Job paperwork incomplete or missing

Client feedback lost or not communicated at district

Personnel (SLB and Customer)

Assets (Customer and SLB)

Reputation

Pos

sibl

e (3

)

Maj

or (

-3)

Un

des

irab

le (

-9)

Insure all equipment is properly tagged as to its state of readiness and in its proper location

Follow IT security guidelines for all documents containing client information

Follow local SLB procedures and policies for job paperwork. Insure all pertinent paperwork is completed.

Communicate to EIC or FSM the feedback provided by the client. Also, any upcoming opportunities or improvements requested by client.

Insure client debrief is performed with all Schlumberger levels in the loop.

Unl

ikel

y (2

)

Ser

ious

(-2

)

Acc

epta

ble

(-4

)

HARC Record Page 10 of 10 Template Revised: 28-Sep-15