HARBOUR ST - Auckland Council...control report 255303-esc-001. existing stormwater catchpits to be...

14
HARBOUR ST 24 23 21 21 21 21 23 24 24 23 25 26 25 20 19 18 17 16 20 19 18 18 22 22 22 22 CLIENT DATE TITLE REVISION DETAILS DATE REV APPROVED CHECKED APPROVED PROJECT DRAWN DESIGNED PROJECT No. TYPE REV WBS DISC NUMBER DRAWING No. SCALE SIZE A1 . Filename: Plot Date: Office: P:\200000-BST\255303 - HACKETT DIVERSION\5 DELIVER DESIGN\504 CADD\DWG\255303-0000-DRG-CC-1083.DWG 20/3/2018 3:16:33 PM AUDC1 ST MARY'S BAY - MASEFIELD BEACH WATER QUALITY IMPROVEMENT PROJECT EROSION AND SEDIMENT CONTROL NEW STREET RECEIVING SHAFT 255303 0000 DRG CC 1083 D 1:100 PRELIMINARY NOT FOR CONSTRUCTION H.ARSHAD J.GRIBBLE D.HUGHES A 14.02.18 CONCEPT DESIGN - DRAFT FOR COMMENT M.COBELDICK B 06.03.18 LIGHT POST ADDED M.COBELDICK C 07.03.18 AIR EXCHANGE POINTS M.COBELDICK D 16.03.18 CONCEPT DESIGN FINAL ISSUE M.COBELDICK 0 SCALE 1:100 1 4m 2 SITE OFFICE PROPOSED NEW STREET SHAFT 3000Ø ID SPOIL BIN/ STOCK PILE NOTES 1. ALL DIMENSIONS ARE IN METRES UNLESS OTHERWISE SHOWN. 2. SITE LAYOUT IS INDICATIVE ONLY, AND IS TO BE CONFIRMED AT DETAILED DESIGN STAGE. 3. BACKGROUND SURVEY INFORMATION (EXISTING CONTOURS) HAS BEEN EXTRACTED FROM AUCKLAND COUNCIL GEOMAPS. 4. ANY STOCKPILE OF MATERIAL ONSITE SHOULD BE CONVERTED TO MINIMISE LOSSES AND NOT BE LOCATED IN OVERLAND FLOW PATHS OR SITE LOW POINTS. 5. ALL RUBBISH, VEGETATION, DEBRIS ETC SHOULD BE REMOVED FROM THE EARTHWORKS AREA AND DISPOSED OFF SITE BY THE CONTRACTOR PRIOR TO COMMENCEMENT OF SITE CLEARANCE. 6. ALL EROSION AND SEDIMENT CONTROL MEASURES MUST BE OPERATIONAL PRIOR TO ANY OTHER WORK COMMENCING ON SITE. THE CONTRACTOR SHALL ARRANGE FOR AND ATTEND A PRELIMINARY SEDIMENT CONTROL MEETING ON SITE WITH THE ENGINEER AND A REPRESENTATIVE FROM AUCKLAND COUNCIL. 7. THE CONTRACTOR SHALL ENSURE COUNCIL BEST MANAGEMENT PRACTICES ARE IN PLACE DURING THE CONSTRUCTION PERIOD OF THE DEVELOPMENT INCLUDING AT THE SITE ENTRANCE TO CONTROL ALL DUST, SILT, MUD AND SEDIMENT GENERATED BY THE WORKS AS TO NOT DISCHARGE FROM THE SITE AND/OR ENTER AUCKLAND COUNCIL STORMWATER SYSTEM. 8. FURTHER SEDIMENT CONTROL MAYBE REQUIRED BY THE ENGINEER AS THE PROJECT ADVANCES. THESE WILL BE INSTALLED AS AND WHERE DIRECTED BY THE ENGINEER. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR ENSURING THAT THE SITE HAS EFFECTIVE SILT DETENTION FACILITIES OPERATING AT ALL TIMES. 9. ALL SEDIMENT AND EROSION CONTROL FEATURES SHALL BE IN ACCORDANCE WITH AUCKLAND COUNCIL GD05. 10. ALL EXISTING CATCHPITS LOCATED IMMEDIATELY ADJACENT TO CURRAN STREET AND SARSFIELD STREET SHALL BE PROTECTED. 11. THIS PLAN IS TO BE READ IN CONJUNCTION WITH EROSION SEDIMENT CONTROL REPORT 255303-ESC-001. DN1800 STORAGE PIPELINE "IMAGE: COURTESY AUCKLAND COUNCIL; ALL COPYRIGHT IN THE MATERIAL IS OWNED BY OR LICENSED TO AUCKLAND COUNCIL." 10METER WIDE PIPELINE CONSTRUCTION CORRIDOR EXISTING STORMWATER CATCHPITS TO BE PLUGGED AND USED AS DIRTY WATER PUMP WELLS AS REQUIRED EXISTING STORMWATER INLET PROTECTION RING FENCE WITH SILT SOCK DIRTY WATER DIVERSION 300mm HOTMIX BUND PROTECTING OPEN SHAFT IN ACCORDANCE TO GD05 E2.2 EXISTING STORMWATER CATCHPIT TO BE PROTECTED CLEAN WATER DIVERSION 300mm HOTMIX BUND IN ACCORDANCE TO GD05 E2.1 SILT SOCKS PLACED INSIDE SITE BOUNDARY FENCE LEGEND PROPOSED CLEAN WATER DIVERSION BUND PROPOSED DIRTY WATER DIVERSION BUND EXISTING OVERLAND FLOW PROPOSED SILT FENCE PROPOSED SEDIMENT POND AIR EXCHANGE POINT STABILISED CONSTRUCTION ENTRANCE INLET PROTECTION PROPOSED BUILDINGS PROPOSED GRAVITY WASTEWATER MAIN PROPOSED WASTEWATER RISING MAIN PROPOSED WATER MAIN PROPOSED RISING MAIN LEVEL MONITORING AND POWER SUPPLY CABLES PROPOSED SECURITY FENCE EXISTING SURFACE CONTOURS S P P RM SF W W DIRTY WATER DIVERSION 300mm HOTMIX BUND IN ACCORDANCE TO GD05 E2.2

Transcript of HARBOUR ST - Auckland Council...control report 255303-esc-001. existing stormwater catchpits to be...

HARBOUR ST

24

23

21

2121

21

23

24

24

23

25

26

25

20 19

18

17

16

20

19

18

18

22

22

22

22

CLIENT

DATE TITLE

REVISION DETAILSDATEREV APPROVED

CHECKED

APPROVED

PROJECT

DRAWN

DESIGNED

PROJECT No. TYPE REVWBS DISC NUMBER DRAWING No.

SCALE SIZEA1

.

Filen

ame:

Plot

Date:

Offic

e:P:

\2000

00-B

ST\25

5303

- HA

CKET

T DI

VERS

ION\

5 DEL

IVER

DES

IGN\

504 C

ADD\

DWG\

2553

03-0

000-

DRG-

CC-1

083.D

WG

20/3/

2018

3:16

:33 P

MAU

DC1

ST MARY'S BAY - MASEFIELD BEACHWATER QUALITY IMPROVEMENT PROJECT

EROSION AND SEDIMENT CONTROLNEW STREET RECEIVING SHAFT

255303 0000 DRG CC 1083 D

1:100PRELIMINARY

NOT FOR CONSTRUCTION

H.ARSHAD

J.GRIBBLE

D.HUGHES

A 14.02.18 CONCEPT DESIGN - DRAFT FOR COMMENT M.COBELDICKB 06.03.18 LIGHT POST ADDED M.COBELDICKC 07.03.18 AIR EXCHANGE POINTS M.COBELDICKD 16.03.18 CONCEPT DESIGN FINAL ISSUE M.COBELDICK

0

SCALE 1:100

1 4m2

SITE OFFICE

PROPOSED NEWSTREET SHAFT3000Ø ID

SPOIL BIN/STOCK PILE

NOTES1. ALL DIMENSIONS ARE IN METRES UNLESS OTHERWISE SHOWN.2. SITE LAYOUT IS INDICATIVE ONLY, AND IS TO BE CONFIRMED AT DETAILED DESIGN

STAGE.3. BACKGROUND SURVEY INFORMATION (EXISTING CONTOURS) HAS BEEN

EXTRACTED FROM AUCKLAND COUNCIL GEOMAPS.4. ANY STOCKPILE OF MATERIAL ONSITE SHOULD BE CONVERTED TO MINIMISE

LOSSES AND NOT BE LOCATED IN OVERLAND FLOW PATHS OR SITE LOW POINTS.5. ALL RUBBISH, VEGETATION, DEBRIS ETC SHOULD BE REMOVED FROM THE

EARTHWORKS AREA AND DISPOSED OFF SITE BY THE CONTRACTOR PRIOR TOCOMMENCEMENT OF SITE CLEARANCE.

6. ALL EROSION AND SEDIMENT CONTROL MEASURES MUST BE OPERATIONAL PRIORTO ANY OTHER WORK COMMENCING ON SITE. THE CONTRACTOR SHALL ARRANGEFOR AND ATTEND A PRELIMINARY SEDIMENT CONTROL MEETING ON SITE WITHTHE ENGINEER AND A REPRESENTATIVE FROM AUCKLAND COUNCIL.

7. THE CONTRACTOR SHALL ENSURE COUNCIL BEST MANAGEMENT PRACTICES AREIN PLACE DURING THE CONSTRUCTION PERIOD OF THE DEVELOPMENT INCLUDINGAT THE SITE ENTRANCE TO CONTROL ALL DUST, SILT, MUD AND SEDIMENTGENERATED BY THE WORKS AS TO NOT DISCHARGE FROM THE SITE AND/ORENTER AUCKLAND COUNCIL STORMWATER SYSTEM.

8. FURTHER SEDIMENT CONTROL MAYBE REQUIRED BY THE ENGINEER AS THEPROJECT ADVANCES. THESE WILL BE INSTALLED AS AND WHERE DIRECTED BYTHE ENGINEER. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR ENSURING THATTHE SITE HAS EFFECTIVE SILT DETENTION FACILITIES OPERATING AT ALL TIMES.

9. ALL SEDIMENT AND EROSION CONTROL FEATURES SHALL BE IN ACCORDANCEWITH AUCKLAND COUNCIL GD05.

10. ALL EXISTING CATCHPITS LOCATED IMMEDIATELY ADJACENT TO CURRAN STREETAND SARSFIELD STREET SHALL BE PROTECTED.

11. THIS PLAN IS TO BE READ IN CONJUNCTION WITH EROSION SEDIMENT CONTROLREPORT 255303-ESC-001.

DN1800 STORAGE PIPELINE

"IMAGE: COURTESY AUCKLAND COUNCIL; ALL COPYRIGHT IN THE MATERIAL IS OWNED BY OR LICENSED TO AUCKLAND COUNCIL."

10METER WIDE PIPELINECONSTRUCTION CORRIDOR

EXISTING STORMWATER CATCHPITSTO BE PLUGGED AND USED AS DIRTYWATER PUMP WELLS AS REQUIRED

EXISTING STORMWATERINLET PROTECTION RINGFENCE WITH SILT SOCK

DIRTY WATER DIVERSION300mm HOTMIX BUNDPROTECTING OPEN SHAFT INACCORDANCE TO GD05 E2.2

EXISTING STORMWATERCATCHPIT TO BEPROTECTED

CLEAN WATER DIVERSION300mm HOTMIX BUND INACCORDANCE TO GD05 E2.1

SILT SOCKS PLACED INSIDESITE BOUNDARY FENCE

LEGENDPROPOSED CLEAN WATER DIVERSION BUNDPROPOSED DIRTY WATER DIVERSION BUNDEXISTING OVERLAND FLOWPROPOSED SILT FENCEPROPOSED SEDIMENT POND

AIR EXCHANGE POINT

STABILISED CONSTRUCTION ENTRANCE

INLET PROTECTION

PROPOSED BUILDINGS

PROPOSED GRAVITY WASTEWATER MAINPROPOSED WASTEWATER RISING MAINPROPOSED WATER MAINPROPOSED RISING MAIN LEVELMONITORING AND POWER SUPPLY CABLESPROPOSED SECURITY FENCEEXISTING SURFACE CONTOURS

S

P P

RM

SF

W W

DIRTY WATER DIVERSION300mm HOTMIX BUND INACCORDANCE TO GD05 E2.2

RMRMRMRMRMRMRMRMRMRMRMRMRMRMRMRMRMRMRMRMRMRMRMRMRM

RMRM

RM

RM

RM

RM

PPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPP

PP

PP

PP

PP

P

P

P

P

SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS

SS

SS

SS

SS

SS

S

S

16

15

1413

10

8

7

4

3

10

14

16

4

4

SF SF SF SF SF SF

CLIENT

DATE TITLE

REVISION DETAILSDATEREV APPROVED

CHECKED

APPROVED

PROJECT

DRAWN

DESIGNED

PROJECT No. TYPE REVWBS DISC NUMBER DRAWING No.

SCALE SIZEA1

.

Filen

ame:

Plot

Date:

Offic

e:P:

\2000

00-B

ST\25

5303

- HA

CKET

T DI

VERS

ION\

5 DEL

IVER

DES

IGN\

504 C

ADD\

DWG\

2553

03-0

000-

DRG-

CC-1

084.D

WG

20/3/

2018

3:16

:41 P

MAU

DC1

0

SCALE 1:250

2.5 5 10m

CURRAN ST

ST MARYS BAY - MASEFIELD BEACHWATER QUALITY IMPROVEMENT PROJECT

EROSION AND SEDIMENT CONTROLCURRAN STREET

255303 0000 DRG CC 1084 C

1:250PRELIMINARY

NOT FOR CONSTRUCTION

H.ARSHAD

J.GRIBBLE

D.HUGHES

A 14.02.18 CONCEPT DESIGN - DRAFT FOR COMMENT M.COBELDICKB 06.03.18 UPDATED CONCEPT DESIGN M.COBELDICKC 16.03.18 CONCEPT DESIGN FINAL ISSUE M.COBELDICK

NOTES1. ALL DIMENSIONS ARE IN METRES UNLESS OTHERWISE SHOWN.2. SITE LAYOUT IS INDICATIVE ONLY, AND IS TO BE CONFIRMED AT

DETAILED DESIGN STAGE.3. BACKGROUND SURVEY INFORMATION (EXISTING CONTOURS) HAS

BEEN EXTRACTED FROM AUCKLAND COUNCIL GEOMAPS.4. ANY STOCKPILE OF MATERIAL ONSITE SHOULD BE CONVERTED TO

MINIMISE LOSSES AND NOT BE LOCATED IN OVERLAND FLOW PATHSOR SITE LOW POINTS.

5. ALL RUBBISH, VEGETATION, DEBRIS ETC SHOULD BE REMOVED FROMTHE EARTHWORKS AREA AND DISPOSED OFF SITE BY THECONTRACTOR PRIOR TO COMMENCEMENT OF SITE CLEARANCE.

6. ALL EROSION AND SEDIMENT CONTROL MEASURES MUST BEOPERATIONAL PRIOR TO ANY OTHER WORK COMMENCING ON SITE.THE CONTRACTOR SHALL ARRANGE FOR AND ATTEND A PRELIMINARYSEDIMENT CONTROL MEETING ON SITE WITH THE ENGINEER AND AREPRESENTATIVE FROM AUCKLAND COUNCIL.

7. THE CONTRACTOR SHALL ENSURE COUNCIL BEST MANAGEMENTPRACTICES ARE IN PLACE DURING THE CONSTRUCTION PERIOD OFTHE DEVELOPMENT INCLUDING AT THE SITE ENTRANCE TO CONTROLALL DUST, SILT, MUD AND SEDIMENT GENERATED BY THE WORKS ASTO NOT DISCHARGE FROM THE SITE AND/OR ENTER AUCKLANDCOUNCIL STORMWATER SYSTEM.

8. FURTHER SEDIMENT CONTROL MAYBE REQUIRED BY THE ENGINEERAS THE PROJECT ADVANCES. THESE WILL BE INSTALLED AS ANDWHERE DIRECTED BY THE ENGINEER. THE CONTRACTOR IS SOLELYRESPONSIBLE FOR ENSURING THAT THE SITE HAS EFFECTIVE SILTDETENTION FACILITIES OPERATING AT ALL TIMES.

9. ALL SEDIMENT AND EROSION CONTROL FEATURES SHALL BE INACCORDANCE WITH AUCKLAND COUNCIL GD05.

10. ALL EXISTING CATCHPITS LOCATED IMMEDIATELY ADJACENT TOCURRAN STREET AND SARSFIELD STREET SHALL BE PROTECTED.

11. THIS PLAN IS TO BE READ IN CONJUNCTION WITH EROSION SEDIMENTCONTROL REPORT 255303-ESC-001.

CURRAN ST ON RAMP

CURRAN ST

POINT ERIN PARKPOINT ERIN POOL

LEGENDPROPOSED CLEAN WATER DIVERSION BUNDPROPOSED DIRTY WATER DIVERSION BUNDEXISTING OVERLAND FLOWPROPOSED SILT FENCEPROPOSED SEDIMENT POND

AIR EXCHANGE POINT

STABILISED CONSTRUCTION ENTRANCE

INLET PROTECTION

PROPOSED BUILDINGS

PROPOSED GRAVITY WASTEWATER MAINPROPOSED WASTEWATER RISING MAINPROPOSED WATER MAINPROPOSED RISING MAIN LEVELMONITORING AND POWER SUPPLY CABLESPROPOSED SECURITY FENCEEXISTING SURFACE CONTOURS

S

P P

RM

SF

W W

"IMAGE: COURTESY AUCKLAND COUNCIL; ALL COPYRIGHT IN THE MATERIAL IS OWNED BY OR LICENSED TO AUCKLAND COUNCIL."

PROPOSED SILT FENCE INACCORDANCE TO GD05 F1.3

PRM

RM

RM

RM

RM

RMRM

RMRM

RMRM

RMRM

RMP

P

P

P

P

P

P

P

P

PP

PP

PP

PP

PP

PP

PP

PP

PP

19

18

17

17

16

15

14

14

13

13

12

12

11

10

9

8 76

65

4

SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS

S

S

S

S

S

S

S

S

S

S

S

S

S

SS

SS

SS

SS

SS

SS

SS

S

SFSF

SFSF

SFSF

SFSF

SFSF

SFSF

SFSF

SFSF

SF

CLIENT

DATE TITLE

REVISION DETAILSDATEREV APPROVED

CHECKED

APPROVED

PROJECT

DRAWN

DESIGNED

PROJECT No. TYPE REVWBS DISC NUMBER DRAWING No.

SCALE SIZEA1

.

ST MARYS BAY - MASEFIELD BEACHWATER QUALITY IMPROVEMENT PROJECT

EROSION AND SEDIMENT CONTROLSARSFIELD STREET

255303 0000 DRG CC 1085 C

1:250PRELIMINARY

NOT FOR CONSTRUCTION

H.ARSHAD

J.GRIBBLE

D.HUGHES

A 14.02.18 CONCEPT DESIGN - DRAFT FOR COMMENT M.COBELDICKB 06.03.18 UPDATED CONCEPT DESIGN M.COBELDICKC 16.03.18 CONCEPT DESIGN FINAL ISSUE M.COBELDICK

Filen

ame:

Plot

Date:

Offic

e:P:

\2000

00-B

ST\25

5303

- HA

CKET

T DI

VERS

ION\

5 DEL

IVER

DES

IGN\

504 C

ADD\

DWG\

2553

03-0

000-

DRG-

CC-1

085.D

WG

20/3/

2018

3:16

:42 P

MAU

DC1

0

SCALE 1:250

2.5 5 10m

NOTES1. ALL DIMENSIONS ARE IN METRES UNLESS OTHERWISE SHOWN.2. SITE LAYOUT IS INDICATIVE ONLY, AND IS TO BE CONFIRMED AT

DETAILED DESIGN STAGE.3. BACKGROUND SURVEY INFORMATION (EXISTING CONTOURS) HAS

BEEN EXTRACTED FROM AUCKLAND COUNCIL GEOMAPS.4. ANY STOCKPILE OF MATERIAL ONSITE SHOULD BE CONVERTED TO

MINIMISE LOSSES AND NOT BE LOCATED IN OVERLAND FLOW PATHSOR SITE LOW POINTS.

5. ALL RUBBISH, VEGETATION, DEBRIS ETC SHOULD BE REMOVED FROMTHE EARTHWORKS AREA AND DISPOSED OFF SITE BY THECONTRACTOR PRIOR TO COMMENCEMENT OF SITE CLEARANCE.

6. ALL EROSION AND SEDIMENT CONTROL MEASURES MUST BEOPERATIONAL PRIOR TO ANY OTHER WORK COMMENCING ON SITE.THE CONTRACTOR SHALL ARRANGE FOR AND ATTEND A PRELIMINARYSEDIMENT CONTROL MEETING ON SITE WITH THE ENGINEER AND AREPRESENTATIVE FROM AUCKLAND COUNCIL.

7. THE CONTRACTOR SHALL ENSURE COUNCIL BEST MANAGEMENTPRACTICES ARE IN PLACE DURING THE CONSTRUCTION PERIOD OFTHE DEVELOPMENT INCLUDING AT THE SITE ENTRANCE TO CONTROLALL DUST, SILT, MUD AND SEDIMENT GENERATED BY THE WORKS ASTO NOT DISCHARGE FROM THE SITE AND/OR ENTER AUCKLANDCOUNCIL STORMWATER SYSTEM.

8. FURTHER SEDIMENT CONTROL MAYBE REQUIRED BY THE ENGINEERAS THE PROJECT ADVANCES. THESE WILL BE INSTALLED AS ANDWHERE DIRECTED BY THE ENGINEER. THE CONTRACTOR IS SOLELYRESPONSIBLE FOR ENSURING THAT THE SITE HAS EFFECTIVE SILTDETENTION FACILITIES OPERATING AT ALL TIMES.

9. ALL SEDIMENT AND EROSION CONTROL FEATURES SHALL BE INACCORDANCE WITH AUCKLAND COUNCIL GD05.

10. ALL EXISTING CATCHPITS LOCATED IMMEDIATELY ADJACENT TOCURRAN STREET AND SARSFIELD STREET SHALL BE PROTECTED.

11. THIS PLAN IS TO BE READ IN CONJUNCTION WITH EROSION SEDIMENTCONTROL REPORT 255303-ESC-001.

EXISTING STORMWATER CATCHPITSTO BE PROTECTED BYRING-FENCEING WITH SILT SOCK

EXISTING STORMWATER CATCHPITSTO BE PROTECTED BYRING-FENCEING WITH SILT SOCK

LEGENDPROPOSED CLEAN WATER DIVERSION BUNDPROPOSED DIRTY WATER DIVERSION BUNDEXISTING OVERLAND FLOWPROPOSED SILT FENCEPROPOSED SEDIMENT POND

AIR EXCHANGE POINT

STABILISED CONSTRUCTION ENTRANCE

INLET PROTECTION

PROPOSED BUILDINGS

PROPOSED GRAVITY WASTEWATER MAINPROPOSED WASTEWATER RISING MAINPROPOSED WATER MAINPROPOSED RISING MAIN LEVELMONITORING AND POWER SUPPLY CABLESPROPOSED SECURITY FENCEEXISTING SURFACE CONTOURS

S

P P

RM

SF

W W

"IMAGE: COURTESY AUCKLAND COUNCIL; ALL COPYRIGHT IN THE MATERIAL IS OWNED BY OR LICENSED TO AUCKLAND COUNCIL."

CLEAN WATER DIVERSIONHOT MIXED BUND INACCORDANCE TO GD05 E2.1

PROPOSED SILT FENCE INACCORDANCE TO GD05 F1.3

CLEAN WATER DIVERSIONHOT MIXED BUND INACCORDANCE TO GD05 E2.1

202020

20

18

18

18 18

18

17

1717

16

16

16

15

15

15

14

13

12

11

10

10

9

9

9

8

8

8

8

7

7

7

66

6

55

5

5

5

5

5 5

5

5

5

5

44

4

4

4

4

44

4

44

4

4

4

4

4

4

4

3

3

3

3

3

3

3

3

3

3

3

3

3

3 3

3

3

3

3

3

3

3

3

3

3

3

3

3

3

3

33

3

3

3

3

3

3

2

11

0

0

-1

-1

-2-2 -2

-2

-2

-2-2

-2

-2

-2

-2

-2

-2

-2

-2

-2-2

-2

-2

-2-2

-2

-2

-2

-2-2

-2-2

-2-2

W

W

W

WW

WW

WW

WW

WW

WW

WW

WW

WW

WW

WW

WW

WW

WW

WW

W

W

WW

W

WW

WW

WW

WW

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

WW

WW

WW

WW

WW

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

WWWWWWWWW

W

W

W

WW

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

WWWWWWWWWWW

WW

WW

WW

WW

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

WW

WW

WW

SSGAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

CC

C

C

C

C

C

C

C

C

C

C

C

CCCC

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

CC

C

C

C

C

CC

CC

CC

CC

CC

CC

C

C

C

CC

C

C

C

C

CC

CC

CC

CC

CC

CC

C

C

C

CC

C

C

C

C

CC

CC

CC

CC

CC

CC

C

CC

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

PPPPPPPPPP

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

PPPPPPPPPP

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

FFFFFFFFFF

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

F

GASGASGASGASGASGASGASGASGASGASGASGASGAS

GASGAS

GASGAS

GASGAS

GASGAS

GASGAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

CCCCCCCCC

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C C

C C

C

C

C

C

C

C

C

C

CC C

CC

CC

C

P

P

P

PP

P

P

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

P

PP

P

PP

P

P

P

P

P

P

P

PP

P

P

P

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

PP P PPP

PP

P

P

P

F

F

F

F

F

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

F

F

FF F

F

F

F

FF

F

F FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

F

F

F

F

F

F

F

F

F

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

F

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

FF

WW

WW

WW

WW

WW

WW

WW

WW

WW

WW

WW

CURR

AN S

T ON

RAM

P

SHEL

LY BE

ACH R

D

STATE HIGHWAY 1

WWWW

W

W

W

W

W

W

W

W

SW SW SW SW SW SW

SW SW SW SW SW SWSW SW SW SWSW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW

SW SW SW SW SW SW SW SW SW SW SW SW

SW SWSW SW

SS

SS

SS

SS

SS

S

RM

RMRM

RM

RM

RM

RM

RM

P

P

PP

PP

PP

PP

PP

PP

P

P

FA

FA FA FA

CLIENT

DATE TITLE

REVISION DETAILSDATEREV APPROVED

CHECKED

APPROVED

PROJECT

DRAWN

DESIGNED

PROJECT No. TYPE REVWBS DISC NUMBER DRAWING No.

SCALE SIZEA1

.

Filen

ame:

Plot

Date:

Offic

e:P:

\2000

00-B

ST\25

5303

- HA

CKET

T DI

VERS

ION\

5 DEL

IVER

DES

IGN\

504 C

ADD\

DWG\

2553

03-0

000-

DRG-

CC-1

101.D

WG

20/3/

2018

3:16

:52 P

MAU

DC1

0

SCALE 1:500

5 10 20m

6 x DN 1800 X 2500 HIGHACTIVATED CARBON UNITS(LOCATION TBC)

2 x DN500 FOULAIR PIPES

STORAGE PIPELINE 1800Ø RC SRJ

DN150 RISING MAIN

Ø1600 OD (1400 ID) PE

STORMWATEROVERFLOW OPTION A2

MAIN CONTROL CABINET. MOUNTED ON PLINTH

GRAV

ITY S

EWER

(FRO

M SA

RSFIE

LD C

SO)

POWER SUPPLY & BRANCH 5LEVEL MONITOR CABLES

FUTURE POTENTIALPROJECT CONNECTIONSPIGOT

POINT ERIN PARK PUMP STATIONOVERFLOW WEIR AND TBM LAUNCH SHAFT

VEHICLE ENTRY

VEHI

CLE

ACCE

SS

VEHICLE EXIT

DN80 WATER SUPPLY

LEGENDPROPOSED GRAVITY WASTEWATER MAINPROPOSED WASTEWATER RISING MAINPROPOSED RISING MAIN ELECTRICAL DUCTPROPOSED STORAGE PIPELINEPROPOSED MARINE OVERFLOWPROPOSED WATER SUPPLYPROPOSED FOUL AIR PIPE

AUP MANA WHENUA OVERLAY

EXISTING STORMWATEREXISTING WASTEWATEREXISTING WATER SUPPLYEXISTING COMMSEXISTING GASEXISTING SURFACE CONTOURS

S S

SW SW

S S

W W

C C

GAS GAS

P P

RM

W W

FA FA

2 x DN400 x 10m HIGHAIR EXCHANGE POINTS

NOTES1. THE CONCEPT DESIGN SHOWN PROVIDES INDICATIVE

LAYOUTS AND DIMENSIONS ONLY. CONSTRUCTEDLAYOUTS AND DIMENSIONS INCLUDING HEIGHT OFSTUCTURES ARE LIKELY TO CHANGE DURING THEDETAILED DESIGN PROCESS.

ST MARY'S BAY - MASEFIELD BEACHWATER QUALITY IMPROVEMENT PROJECT

POINT ERIN PARK WEIR STRUCTURE LAYOUT PLAN

255303 0000 DRG CC 1101 E

1:500PRELIMINARY

NOT FOR CONSTRUCTION

C.FOURIE

A.HILLS

M.COBELDICK -

- -

A 29.06.17 CONCEPT DESIGN M.COBELDICKB 06.11.17 UPDATED CONCEPT DESIGN M. COBELDICKC 14.02.18 UPDATED CONCEPT DESIGN M. COBELDICKD 06.03.18 UPDATED CONCEPT DESIGN M.COBELDICKE 20.03.18 UPDATED CONCEPT DESIGN M.COBELDICK

1800Ø RC SRJ

≈15000

DN1800 RCRRJ MARINE OUTFALL

DN500 FOUL AIR PIPE

DN500 FOUL AIR PIPE

WATER SEPARATOR CHAMBER CONCRETE PAD

2 x 5kW VENTILATION FANS

TEMPORARY WORKSDN600 SECANT PERIMETER PILES

6mm AUTOMATIC CLEANING SCREEN (900-1500/s)

MAINTENANCE COVERS

VALVE CHAMBER

2000 500 6500

4000

700800

1950

500500

1750200

1750

2002800

20010500

200

200

1500

DN1800 RCRRJSTORAGE PIPELINE

FLYGT TOP 150S SUMP

STAIR ACCESS

FUTURE POTENTIALPROJECT CONNECTIONSPIGOT

1800

ID R

CRRJ

SARSFIELD 750Ø EOPGRAVITY CONNECTION

150Ø RISING MAIN TOBRANCH 5

STAIR ACCESS

ELECTRICAL CONTROL CABINET

≈9000

CLIENT

DATE TITLE

REVISION DETAILSDATEREV APPROVED

CHECKED

APPROVED

PROJECT

DRAWN

DESIGNED

PROJECT No. TYPE REVWBS DISC NUMBER DRAWING No.

SCALE SIZEA1

.

ST MARY'S BAY - MASEFIELD BEACHWATER QUALITY IMPROVEMENT PROJECT

POINT ERIN PARK WEIR STRUCTURE PLAN

255303 0000 DRG CC 1107 A

1:25PRELIMINARY

NOT FOR CONSTRUCTION

R. DAWSON

A.HILLS

M.COBELDICK

A 06.03.18 CONCEPT DESIGN M.COBELDICK

0

SCALE 1:25

500250 1000mm

A-

2 x 10KWSUBMERSIBLEPUMPS

WEIR

NOTETHE CONCEPT DESIGN SHOWN PROVIDESINDICATIVE LAYOUTS AND DIMENSIONS ONLY.CONSTRUCTED LAYOUTS AND DIMENSIONSINCLUDING HEIGHT OF STUCTURES ARE LIKELYTO CHANGE DURING THE DETAILED DESIGNPROCESS.

RL 5.70

RL 5.40

RL 4.24

RL 3.50

RL 2.78 GROUND

IL -2.22

IL -3.75IL -3.65

RL -4.45

RL -5.45

RL -5.75LOCALISED STEP DOWN TO ACCOMODATE PUMP STATION.THIS WILL BE FILLED AND HAUNCHED IN THE EVENT OFCONNECTION TO POTENTIAL FUTURE PROJECT

IL 0.90

RL 2.77

HGL @ 900-1500 l/s(SCREENED FLOW)

200

300

SCREEN OVER TOP LEVEL ≈ 4.24mRL

U/S LEVEL SCREEN DESIGN FLOW 3.99mRL (900-1500l/s)

SCREEN SPILL LEVEL 3.72mRL

≈300

0≈8

000

DN1800 MARINE OUTFALL

2000 500 6500 1000500

2.78 GROUND LEVEL

TEMPORARY WORKS

DN1800 STORAGE PIPELINE

FUTURE POTENTIAL PROJECTCONNECTION SPIGOT

≈110

00

CLIENT

DATE TITLE

REVISION DETAILSDATEREV APPROVED

CHECKED

APPROVED

PROJECT

DRAWN

DESIGNED

PROJECT No. TYPE REVWBS DISC NUMBER DRAWING No.

SCALE SIZEA1

.

ST MARY'S BAY - MASEFIELD BEACHWATER QUALITY IMPROVEMENT PROJECT

POINT ERIN PARK WEIR STRUCTURE SECTION A

255303 0000 DRG CC 1108 A

1:25PRELIMINARY

NOT FOR CONSTRUCTION

R. DAWSON

A.HILLS

M.COBELDICK

A 06.03.18 CONCEPT DESIGN M.COBELDICK

0

SCALE 1:25

500250 1000mm

NOTES1. THE CONCEPT DESIGN SHOWN PROVIDES INDICATIVE

LAYOUTS AND DIMENSIONS ONLY. CONSTRUCTEDLAYOUTS AND DIMENSIONS INCLUDING HEIGHT OFSTUCTURES ARE LIKELY TO CHANGE DURING THEDETAILED DESIGN PROCESS.

2. HAND RAILS AND VENTILATION EQUIPMENT WILLEXTEND A MINIMUM OF 1.0m HIGHER THAN THE TOP OFTHE PUMP STATION STRUCTURE.

CURRAN ST ON RAMP

CURR

AN S

T

91

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

CLIENT

DATE TITLE

REVISION DETAILSDATEREV APPROVED

CHECKED

APPROVED

PROJECT

DRAWN

DESIGNED

PROJECT No. TYPE REVWBS DISC NUMBER DRAWING No.

SCALE SIZEA1

.

ST MARY'S BAY - MASEFIELD BEACHWATER QUALITY IMPROVEMENT PROJECTPOINT ERIN PARK WEIR CONSTRUCTION

LAYOUT

255303 0000 DRG CC 1121 E

1:200PRELIMINARY

NOT FOR CONSTRUCTION

H.ARSHAD

C.MOUNTFORT

M.COBELDICK

A 29.06.17 CONCEPT DESIGN M.COBELDICKB 21.09.17 UPDATED CONCEPT DESIGN M.COBELDICKC 14.02.18 UPDATED CONCEPT DESIGN M.COBELDICKD 06.03.18 UPDATED CONCEPT DESIGN M.COBELDICKE 20.03.18 INDICATIVE CONSTRUCTION CORRIDOR ADDED M.COBELDICK

Filen

ame:

Plot

Date:

Offic

e:P:

\2000

00-B

ST\25

5303

- HA

CKET

T DI

VERS

ION\

5 DEL

IVER

DES

IGN\

504 C

ADD\

DWG\

2553

03-0

000-

DRG-

CC-1

121.D

WG

20/3/

2018

3:16

:35 P

MAU

DC1

0

SCALE 1:200

2 4 8m

SITE OFFICE

CRANE

PIPES

EXCAVATOR SPOIL /TREATMENT

CARPARKING

TRUCK

PERIMETER SECURITYFENCING & HOARDINGS

CONTROLOFFICE

LEGEND:

SECURITY FENCE

TRUCK DIRECTION

INDICATIVECONSTRUCTION CORRIDOR

TOOLS

GENERATOR

10METER WIDE PIPELINECONSTRUCTION CORRIDOR

CURRENT CONCEPT STORAGEPIPELINE ALIGNMENT

FUTURE POTENTIAL PROJECTCONNECTION SPIGOT

Semi-trailer (10

m min. publish

ed radius)

REMOVE PARKING FORTRUCKS TURNING ONTO SITE

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

INDICATIVETRUCKMANOEUVRE

ACCOMMODATION /STORAGE

PIPE STORAGEMIN 1 SHIFT

ACCOMMODATION /STORAGE

APPROXSITE AREA

1770m²

ENTRANCE WILL NEED TO BEWIDENED TO ACCOMMODATETRUCKS TURNING INTO SITE

50T TRUCK MOUNTEDCRANE TO SERVICE SHAFT

9m x 5m OR Ø9mPIPEJACK SHAFT

CLIENT

DATE TITLE

REVISION DETAILSDATEREV APPROVED

CHECKED

APPROVED

PROJECT

DRAWN

DESIGNED

PROJECT No. TYPE REVWBS DISC NUMBER DRAWING No.

SCALE SIZEA1

.

Filen

ame:

Plot

Date:

Offic

e:P:

\2000

00-B

ST\25

5303

- HA

CKET

T DI

VERS

ION\

5 DEL

IVER

DES

IGN\

504 C

ADD\

DWG\

2553

03-0

000-

DRG-

CC-1

181.D

WG

20/3/

2018

3:16

:43 P

MAU

DC1

ST MARY'S BAY - MASEFIELD BEACHWATER QUALITY IMPROVEMENT PROJECT

ST MARY'S ROAD PARK SHAFTCONSTRUCTION LAYOUT

255303 0000 DRG CC 1181 D

1:200PRELIMINARY

NOT FOR CONSTRUCTION

H.ARSHAD

A.HILLS

M.COBELDICK

A 06.11.17 CONCEPT DESIGN M.COBELDICKB 14.02.18 CONCEPT DESIGN UPDATE M.COBELDICKC 06.03.18 UPDATED CONCEPT DESIGN M.COBELDICKD 20.03.18 INDICATIVE CONSTRUCTION CORRIDOR ADDED M.COBELDICK

01.5 3.0 6.0m

SCALE 1:150

LEGEND:

TRUCK DIRECTION

SHAFT

SECURITY FENCE

INDICATIVECONSTRUCTION CORRIDOR

CURRENT CONCEPT STORAGEPIPELINE ALIGNMENT

10METER WIDE PIPELINECONSTRUCTION CORRIDOR

WW

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

SW

SW

SWSW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SWSW

SWSW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

Ø9m SHAFT

EXISTING1200Ø SW

PROPOSEDACTIVATED CARBONFILTER DOME

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

PROPOSED RAISED MANHOLE& WEIR STRUCTURE

PROPOSED DN1200

3200

≈300

0≈2

500 ≈1500

600

500

ACTIVATED CARBONFILTER DOME

3.2mØ RAISED MANHOLEAND WEIR STRUCTURE

GL

DN200 AIR BLEED LINE

≈6.0mRL

≈3.0mRL

DN1200 TO ST MARY'SBAY OUT FALL

DN1200 TO ST MARY'S SHAFT

DN1200 FROM HACKETTST EOP

3.2mØ RAISED MANHOLE

WEIR

CLIENT

DATE TITLE

REVISION DETAILSDATEREV APPROVED

CHECKED

APPROVED

PROJECT

DRAWN

DESIGNED

PROJECT No. TYPE REVWBS DISC NUMBER DRAWING No.

SCALE SIZEA1

.

Filen

ame:

Plot

Date:

Offic

e:P:

\2000

00-B

ST\25

5303

- HA

CKET

T DI

VERS

ION\

5 DEL

IVER

DES

IGN\

504 C

ADD\

DWG\

2553

03-0

000-

DRG-

CC-1

182.D

WG

20/3/

2018

3:16

:53 P

MAU

DC1

ST MARY'S BAY - MASEFIELD BEACHWATER QUALITY IMPROVEMENT PROJECT

ST MARY'S ROAD PARK SHAFTRAISED MANHOLE

255303 0000 DRG CC 1182 C

1:200PRELIMINARY

NOT FOR CONSTRUCTION

R DAWSON

A HILLS

A CONCEPT DESIGN M. COBELDICKB 06.03.18 CONCEPT DESIGN UPDATE M.COBELDICKC 20.03.18 INDICATIVE CONSTRUCTION CORRIDOR ADDED M.COBELDICK

01.5 3.0 6.0m

SCALE 1:150

DN1800 STORAGE PIPE

A-

SECTION A-1:50

DETAIL 1-1:50

NOTES1. THE CONCEPT DESIGN SHOWN PROVIDES INDICATIVE

LAYOUTS AND DIMENSIONS ONLY. CONSTRUCTEDLAYOUTS AND DIMENSIONS INCLUDING HEIGHT OFSTUCTURES ARE LIKELY TO CHANGE DURING THEDETAILED DESIGN PROCESS.

LEGEND:

INDICATIVECONSTRUCTION CORRIDOR

HARBOUR ST

CLIENT

DATE TITLE

REVISION DETAILSDATEREV APPROVED

CHECKED

APPROVED

PROJECT

DRAWN

DESIGNED

PROJECT No. TYPE REVWBS DISC NUMBER DRAWING No.

SCALE SIZEA1

.

Filen

ame:

Plot

Date:

Offic

e:P:

\2000

00-B

ST\25

5303

- HA

CKET

T DI

VERS

ION\

5 DEL

IVER

DES

IGN\

504 C

ADD\

DWG\

2553

03-0

000-

DRG-

CC-1

207.D

WG

20/3/

2018

3:16

:52 P

MAU

DC1

ST MARY'S BAY - MASEFIELD BEACHWATER QUALITY IMPROVEMENT PROJECT

NEW STREET RECEIVING SHAFTCONSTRUCTION LAYOUT

255303 0000 DRG CC 1207 G

1:100PRELIMINARY

NOT FOR CONSTRUCTION

H.ARSHAD

C.MOUNTFORT

M.COBELDICK

A 29.06.17 CONCEPT DESIGN M. COBELDICKB 21.09.17 UPDATED CONCEPT DESIGN M. COBELDICKC 06.11.17 UPDATED CONCEPT DESIGN M.COBELDICKD 14.02.18 UPDATED CONCEPT DESIGN M.COBELDICKE 06.03.18 LIGHT POLE ADDED M.COBELDICKF 07.03.18 AIR EXCHANGE POINTS M.COBELDICKG 20.03.18 INDICATIVE CONSTRUCTION CORRIDOR ADDED M.COBELDICK

0

SCALE 1:100

1 4m2

SITE OFFICE

CRANE

PROPERTY ACCESSTO BE MAINTAINED

SPOIL BIN/STOCK PILE

LEGEND:

SECURITY FENCE

TRUCK DIRECTION

SHAFT

INDICATIVECONSTRUCTION CORRIDOR

AIR EXCHANGE POINT

PROPERTY ACCESSTO BE MAINTAINED

ACCESS TO HARBOUR ST WILLBE MAINTAINED BY A

CONTROLLED SINGLE LANE

24

23

22

22

22

20

1918

17

16

15

14

14

14

13

13

12

12

12

12

11

11

10

109

9

8

7 6

6

W

W

W

W

W

W

W

WWWWWWWW

W

WWWW

W

W

WW W

WW

W

WW

W

WW

W

WWWWWWWWWWWWWWWWWWW

W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W

WWW

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

WW

W

W

W

W

W

W

W

WW

WWWWWW

W

WW

WW

WW

WW

WW

WW

W

W

W

W

W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W

W

WW

WW

WW

WW

S

S

S

S

S

S

S

S

S

S

S

S

S

SSSSSSSSS

SS

S

S S S S S

S

S

S

S

S

S

S

SS

SS

S

SS

SS

S

SS

SS

SS

S

SSSS

S

S

S

S

S

S

S S S S S S S S

S S S

SSSSS

S

S

SSSSSSSSSSSSSSSSSSSSSSSSSS

S

S

S

S

S

S

SSSSSSSSSSSSSSSS

SW SWSW

SW

SWSWSWSWSWSWSWSWSW

SW

SW

SW

SW

SW

SW

SW

SWSW

SWSW

SW

SW

SWSW

SW

SW

SW

SW

SW

SW

SWSW

SW SW SW SW SW SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SWSW

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS GA

SGA

S

GAS

GAS

GAS

GASGAS

GASGAS

GAS

GAS

GAS

GAS

GAS

GASGAS

GASGAS

GASGAS

GASGAS

GAS

GASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGAS

GASGASGASGAS

GAS

GAS

GASGASGAS GASGASGASGASGASGASGASGASGASGASGAS

GAS

GASGAS

GASGASGASGAS

GAS

C

CC

CC

C

CC

CC

C

CC

CC

CC

C

C

CC

C

C

CC

C C C C C C C C C C C C CC C C C C C C C C C C CC C C C C C C C C C C C

CC

C

C C C C C C C C C C C C C

CC C

CC C

CCC

CCC

CC C

C

C C C C C C C C C C C C C C C C C C C C C C C C C C CC C C C C C C C C C C C C C C C C C C C C C C C C CC C C C C C C C C C C C C C C C C C C C C C C C C C

CC

C

C

CC

CC

C C

C

C

C C

C

C

C C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

CC

C

FF

F

F

FF

F

S S S S S S S S S S S S S S S S S S SDN450

S

S

S

S

S

S

DN750

S

RM

RM

RMRM

P

P

P

P

PP

P

SARSFIELD STREET GRAVITY WASTEWATER MAIN

-6.0

DN450

2.1%

126.82m

15.07

215

.072

09.2

005.8

72

SSMH 1.1 MH2050

DN750

0.3%

46.05m

12.09

812

.098

126.8

176.2

006.5

005.8

985.5

98

SSMH 1.2 MH2050

11.34

111

.341

172.8

686.0

126.0

625.3

295.2

79

SSMH 1.3 MH2050

CHAINAGE

EXISTING SURFACE LEVEL

FINISHEDSURFACE LEVEL

INVERT LEVEL

DEPTH BELOWF.S.L.

GRADE

NOMINAL DIAMETER

DATUM (m)

CLIENT

DATE TITLE

REVISION DETAILSDATEREV APPROVED

CHECKED

APPROVED

PROJECT

DRAWN

DESIGNED

PROJECT No. TYPE REVWBS DISC NUMBER DRAWING No.

SCALE SIZEA1

.

Filen

ame:

Plot

Date:

Offic

e:P:

\2000

00-B

ST\25

5303

- HA

CKET

T DI

VERS

ION\

5 DEL

IVER

DES

IGN\

504 C

ADD\

DWG\

2553

03-0

000-

DRG-

CC-1

211.D

WG

1/5/20

18 4:

44:25

PM

NZAK

L

0

SCALE 1:500

5 10 20m

MATCHLINE REFER DRAWING 255303-0000-DRG-CC-1212

MATC

HLIN

E RE

FER

DRAW

ING

2553

03-0

000-

DRG-

CC-1

212

POWER SUPPLY AND BRANCH 5 LEVELMONITOR CABLES.POWER SUPPLY, MONITOR CABLES ANDRISING MAIN TO BE LAID IN SAME TRENCH

SARSFIELD ST

SHELLEY BEACH ROAD

CURR

AN S

TREE

T

SARSFIELD ST

675Ø COMBINED150Ø COMBINED

620Ø COMBINED

PROPOSED TERMINAL MANHOLEAND ACTIVATION CARBON DOME

GRAVITY CONNECTIONTO BRANCH 5

CONNECT TO EXISTING3 PHASE POWER

SSMH 1.1 SSMH 1.2

SSMH 1.3

CONNECTION TOEXISTING SSMH

ST MARYS BAY - MASEFIELD BEACHWATER QUALITY IMPROVEMENT PROJECT

SARSFIELD STREET CONNECTION PIPELINEPLAN AND LONGSECTION

SHEET 1 OF 2

255303 0000 DRG CC 1211 E

1:500PRELIMINARY

NOT FOR CONSTRUCTION

B.HINGSTON

C.MOUNTFORT

M.COBELDICK -

- -

A 29.06.17 CONCEPT DESIGN M.COBELDICKB 06.11.17 CONCEPT DESIGN AMENDMENTS M. COBELDICKC 14.02.18 UPDATED CONCEPT DESIGN M.COBELDICKD 06.03.18 UPDATED CONCEPT DESIGN M.COBELDICKE 20.03.18 INDICATIVE CONSTRUCTION CORRIDOR ADDED M.COBELDICKF 01.05.18 SURVEY NOTE ADDED M.COBELDICK

LEGENDINDICATIVE CONSTRUCTION CORRIDOR

PROPOSED GRAVITY WASTEWATER MAINPROPOSED WASTEWATER RISING MAINPROPOSED RISING MAIN LEVELMONITORING AND POWER SUPPLY CABLES

EXISTING STORMWATEREXISTING WASTEWATEREXISTING WATER SUPPLYEXISTING COMMSEXISTING GASEXISTING SURFACE CONTOURS

SW SW

S S

W W

C C

GAS GAS

P P

RM

PROPOSED UTILITIESARE INDICATIVE

NOTES1. LOCATION OF PROPOSED UTILITIES ARE INDICATIVE IN PROPOSED

CONSTRUCTION CORRIDOR.2. DETAIL DESIGN WILL INCLUDE FINAL SURVEY OF THE PROJECT

CORRIDOR SURFACE LEVELS AND ALIGNMENT.

18

18

18

18

17

17

17

16

16

15

14

14

13

12

12

11

10

9

9

8

8

7

7

7

7

6

6

6

5

54

4

44

4

4

3

3

3

3

3

3

3

W

W

W

W

W

W

W

W

W

W

W

W

W

WW

W

W

W

W

W

W

W

W

W

W W W W W W W W W W W W W W W W W W W W W W W W W

W W W W W W W W W W W W W W W

W

W

W

W

W

W

W

W

W

W

W

WW W W W W

W

S

SW

SWSW

SWSW

SWSW

SWSW

SWSW

SW

SW

SW

SWSW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS GAS GAS GAS GAS GAS GAS

GASGAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

C CC CC CC C

C C

C CC C

C CC C

CC CC CCCCC

C

C

CC

CC

CC

C

CCC

CC

CC

CC

C

CC

CC

CC

C

CC

CC

CC

C

C C CC C CC C C

F

F F F F F F F F F FF

F F F F

F FF

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

PP

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

PP

PP

PP

PP

PP P P P P P P P P P P P P

PP

PP

PP

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

FF

FF

F

F

F

F

F

F

F

F

F

F

F

F

F

F

FF

FF

F

F

F F

F FF F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

FF

F

F

F

F

F

F

F

F

F

F

F

F

F

FF

F

F

F

F

F

F

F

F

F

F

F

F

F

SW

SW

SW

SW

SW

SW

RM

RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM RMRM

RM

RM

RM

RM

RM

RM

RM

RM

P

P

PP P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P

PP

PP

P

P

P

P

P

P

P

P

P

P

PP

PP

P

S

S

DN750

S S S S S S S S S S S S S S S S S S

DN750S S S S S S S S S SDN750 S

SS

SS

S

DN750

S

S

S

S

S

S

S

DN750

SS

SS

S

DN750

DN750

DN750

2.3%

124.62m

11.34

111

.341

172.8

686.0

126.0

625.3

295.2

79

SSMH 1.3 MH2050

DN750

1.9%

71.92m

5.361

5.361

297.4

883.1

703.2

002.1

912.1

61

SSMH 1.4 MH2050

DN750

1.3%

40.14m

4.001

4.001

369.4

121.7

871.8

172.2

152.1

85

SSMH 1.5 MH2050

DN750

0.3%

49.24m

4.003

4.003

409.5

561.2

041.2

542.7

992.7

49

SSMH 1.6 MH2050

DN750

0.3%

37.82m

2.866

2.866

458.7

941.0

271.0

571.8

401.8

10

SSMH 1.7 MH2050

DN750

0.3%

4.37m

3.015

3.015

496.6

180.9

130.9

132.1

022.1

02 B

END

3.051

3.051

500.9

910.9

000.9

002.1

512.1

51PU

MP S

TATI

ON C

ONN

SARSFIELD STREET GRAVITY WASTEWATER MAIN

CHAINAGE

EXISTING SURFACE LEVEL

FINISHEDSURFACE LEVEL

INVERT LEVEL

DEPTH BELOWF.S.L.

GRADE

NOMINAL DIAMETER

DATUM (m)

CLIENT

DATE TITLE

REVISION DETAILSDATEREV APPROVED

CHECKED

APPROVED

PROJECT

DRAWN

DESIGNED

PROJECT No. TYPE REVWBS DISC NUMBER DRAWING No.

SCALE SIZEA1

.

ST MARYS BAY - MASEFIELD BEACHWATER QUALITY IMPROVEMENT PROJECT

SARSFIELD STREET CONNECTION PIPELINEPLAN AND LONGSECTION

SHEET 2 OF 2

255303 0000 DRG CC 1212 E

1:500PRELIMINARY

NOT FOR CONSTRUCTION

B.HINGSTON

C.MOUNTFORT

- -

- -

A 29.06.17 CONCEPT DESIGN M.COBELDICKB 06.11.17 CONCEPT DESIGN AMENDMENTS M.COBELDICKC 14.02.18 UPDATED CONCEPT DESIGN M.COBELDICKD 06.03.18 UPDATED CONCEPT DESIGN M.COBELDICKE 20.03.18 INDICATIVE CONSTRUCTION CORRIDOR ADDED M.COBELDICKF 01.05.18 SURVEY NOTE ADDED M.COBELDICK

Filen

ame:

Plot

Date:

Offic

e:P:

\2000

00-B

ST\25

5303

- HA

CKET

T DI

VERS

ION\

5 DEL

IVER

DES

IGN\

504 C

ADD\

DWG\

2553

03-0

000-

DRG-

CC-1

212.D

WG

1/5/20

18 4:

44:30

PM

NZAK

L

0

SCALE 1:500

5 10 20m

MATCHLINE REFER DRAWING 255303-0000-DRG-CC-1211

MATC

HLIN

E RE

FER

DRAW

ING

2553

03-0

000-

DRG-

CC-1

211

CURRAN STREET

CURRAN STREET ON RAMP

POINT ERIN PARK

POINT ERIN PARKWEIR STRUCTURE

STORAGE PIPELINE

SSMH 1.4 SSMH 1.5

SSMH 1.6

GRAVITY MAINDISCHARGES TO WEIR

CONSTRUCTION

DN150 NEW RISING MAIN FROM POINTERIN WEIR STRUCTURE TO 375ØBRANCH 5 GRAVITY MAIN

POWER SUPPLY AND BRANCH5 LEVEL MONITOR CABLES

SSMH 1.3.POWER SUPPLY, MONITOR CABLES ANDRISING MAIN TO BE LAID IN SAME TRENCH

LEGENDINDICATIVE CONSTRUCTION CORRIDOR

PROPOSED GRAVITY WASTEWATER MAINPROPOSED WASTEWATER RISING MAINPROPOSED RISING MAIN LEVELMONITORING AND POWER SUPPLY CABLESMARINE OVERFLOW OPTIONS

AUP MANA WHENUA OVERLAY

EXISTING STORMWATEREXISTING WASTEWATEREXISTING WATER SUPPLYEXISTING COMMSEXISTING GASEXISTING SURFACE CONTOURS

SW SW

S S

W W

C C

GAS GAS

P P

RM

SSMH 1.7

NOTE1. LOCATION OF PROPOSED UTILITIES ARE INDICATIVE IN PROPOSED

CONSTRUCTION CORRIDOR.2. DETAIL DESIGN WILL INCLUDE FINAL SURVEY OF THE PROJECT

CORRIDOR SURFACE LEVELS AND ALIGNMENT.

FUTURE POTENTIAL PROJECTCONNECTION SPIGOT

0

SCAL

E 1:1

00

14m

2

34

33

32

31

30

29

28

25

24

23

21

21

20

18

17

14

2121

21

23

24

24

23

25

26

25

20 19

18

17

16

20

19

18

18

22

22

22

22

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

10

10

10

12

1A

1

1

27

2A

2

2

2

3

3

44

46

4

4

5

5

6

6

7

7

8

8

9

3

10A

6B

6A

50

52

54

56

58

60

62

64

12

48

1A

1B

1C

1D

1E

1A

1B

4A

4B

4C

1/1

2/1

Width

Lock to Lock TimeTrack

8M-TRUCK

Steering Angle

1.25

:::

6.02.502.50

37.3:

5.00

meters

8.00

CLIENT

DATE TITLE

REVISION DETAILSDATEREV APPROVED

CHECKED

APPROVED

PROJECT

DRAWN

DESIGNED

PROJECT No. TYPE REVWBS DISC NUMBER DRAWING No.

SCALE SIZEA1

.

Filen

ame:

Plot

Date:

Offic

e:\\A

UREC

ON.IN

FO\S

HARE

S\NZ

AKL\P

ROJE

CTS\

2000

00-B

ST\25

5303

- HA

CKET

T DI

VERS

ION\

5 DEL

IVER

DES

IGN\

504 C

ADD\

DWG\

2553

03-0

000-

DRG-

CC-1

400.D

WG

24/4/

2018

11:52

:00 A

MNZ

AKL

ST MARY'S BAY - MASEFIELD BEACHWATER QUALITY IMPROVEMENT PROJECT

VEHICLE TRACKING PATH

255303 0000 DRG CC 1400 A

1:250PRELIMINARY

NOT FOR CONSTRUCTION

J. LOZANO

R. INMAN

A 24.04.18 ISSUED FOR INFORMATION

SITE OFFICE

PROPOSED NEWSTREET SHAFT3000Ø ID

SPOIL BIN/STOCK PILE

NOTES1. ALL DIMENSIONS ARE IN METRES UNLESS OTHERWISE SHOWN.2. SITE LAYOUT IS INDICATIVE ONLY, AND IS TO BE CONFIRMED AT DETAILED DESIGN

STAGE.3. BACKGROUND SURVEY INFORMATION (EXISTING CONTOURS) HAS BEEN

EXTRACTED FROM AUCKLAND COUNCIL GEOMAPS.4. ANY STOCKPILE OF MATERIAL ONSITE SHOULD BE CONVERTED TO MINIMISE

LOSSES AND NOT BE LOCATED IN OVERLAND FLOW PATHS OR SITE LOW POINTS.5. ALL RUBBISH, VEGETATION, DEBRIS ETC SHOULD BE REMOVED FROM THE

EARTHWORKS AREA AND DISPOSED OFF SITE BY THE CONTRACTOR PRIOR TOCOMMENCEMENT OF SITE CLEARANCE.

6. ALL EROSION AND SEDIMENT CONTROL MEASURES MUST BE OPERATIONAL PRIORTO ANY OTHER WORK COMMENCING ON SITE. THE CONTRACTOR SHALL ARRANGEFOR AND ATTEND A PRELIMINARY SEDIMENT CONTROL MEETING ON SITE WITHTHE ENGINEER AND A REPRESENTATIVE FROM AUCKLAND COUNCIL.

7. THE CONTRACTOR SHALL ENSURE COUNCIL BEST MANAGEMENT PRACTICES AREIN PLACE DURING THE CONSTRUCTION PERIOD OF THE DEVELOPMENT INCLUDINGAT THE SITE ENTRANCE TO CONTROL ALL DUST, SILT, MUD AND SEDIMENTGENERATED BY THE WORKS AS TO NOT DISCHARGE FROM THE SITE AND/ORENTER AUCKLAND COUNCIL STORMWATER SYSTEM.

8. FURTHER SEDIMENT CONTROL MAYBE REQUIRED BY THE ENGINEER AS THEPROJECT ADVANCES. THESE WILL BE INSTALLED AS AND WHERE DIRECTED BYTHE ENGINEER. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR ENSURING THATTHE SITE HAS EFFECTIVE SILT DETENTION FACILITIES OPERATING AT ALL TIMES.

9. ALL SEDIMENT AND EROSION CONTROL FEATURES SHALL BE IN ACCORDANCEWITH AUCKLAND COUNCIL GD05.

10. ALL EXISTING CATCHPITS LOCATED IMMEDIATELY ADJACENT TO CURRAN STREETAND SARSFIELD STREET SHALL BE PROTECTED.

11. THIS PLAN IS TO BE READ IN CONJUNCTION WITH EROSION SEDIMENT CONTROLREPORT 255303-ESC-001.

DN1800 STORAGE PIPELINE

"IMAGE: COURTESY AUCKLAND COUNCIL; ALL COPYRIGHT IN THE MATERIAL IS OWNED BY OR LICENSED TO AUCKLAND COUNCIL."

10METER WIDE PIPELINECONSTRUCTION CORRIDOR

EXISTING STORMWATER CATCHPITSTO BE PLUGGED AND USED AS DIRTYWATER PUMP WELLS AS REQUIRED

EXISTING STORMWATERINLET PROTECTION RINGFENCE WITH SILT SOCK

DIRTY WATER DIVERSION300mm HOTMIX BUNDPROTECTING OPEN SHAFT INACCORDANCE TO GD05 E2.2

EXISTING STORMWATERCATCHPIT TO BEPROTECTED

CLEAN WATER DIVERSION300mm HOTMIX BUND INACCORDANCE TO GD05 E2.1

SILT SOCKS PLACED INSIDESITE BOUNDARY FENCE

LEGENDPROPOSED CLEAN WATER DIVERSION BUNDPROPOSED DIRTY WATER DIVERSION BUNDEXISTING OVERLAND FLOWPROPOSED SILT FENCEPROPOSED SEDIMENT POND

AIR EXCHANGE POINT

STABILISED CONSTRUCTION ENTRANCE

INLET PROTECTION

PROPOSED BUILDINGS

PROPOSED GRAVITY WASTEWATER MAINPROPOSED WASTEWATER RISING MAINPROPOSED WATER MAINPROPOSED RISING MAIN LEVELMONITORING AND POWER SUPPLY CABLESPROPOSED SECURITY FENCEEXISTING SURFACE CONTOURS

S

P P

RM

SF

W W

DIRTY WATER DIVERSION300mm HOTMIX BUND INACCORDANCE TO GD05 E2.2

HARBOUR ST

LONDON ST

NEW ST

DUNEDIN ST

WAITEMATA ST

NEW ST

0

SCALE 1:250

2.5 5 10m

AutoCAD SHX Text
8M-TRUCK
AutoCAD SHX Text
NEW ZEALAND (NZ)
AutoCAD SHX Text
8M-TRUCK
AutoCAD SHX Text
NEW ZEALAND (NZ)
AutoCAD SHX Text
8M-TRUCK
AutoCAD SHX Text
NEW ZEALAND (NZ)
AutoCAD SHX Text
(c) 2018 Transoft Solutions, Inc. All rights reserved.
AutoCAD SHX Text
8M-TRUCK
AutoCAD SHX Text
NEW ZEALAND (NZ)
AutoCAD SHX Text
(c) 2018 Transoft Solutions, Inc. All rights reserved.
AutoCAD SHX Text
8M-TRUCK
AutoCAD SHX Text
NEW ZEALAND (NZ)
AutoCAD SHX Text
(c) 2018 Transoft Solutions, Inc. All rights reserved.
AutoCAD SHX Text
8M-TRUCK
AutoCAD SHX Text
NEW ZEALAND (NZ)
AutoCAD SHX Text
(c) 2018 Transoft Solutions, Inc. All rights reserved.
AutoCAD SHX Text
8M-TRUCK
AutoCAD SHX Text
NEW ZEALAND (NZ)
AutoCAD SHX Text
8M-TRUCK
AutoCAD SHX Text
NEW ZEALAND (NZ)
AutoCAD SHX Text
8M-TRUCK
AutoCAD SHX Text
NEW ZEALAND (NZ)
AutoCAD SHX Text
(c) 2018 Transoft Solutions, Inc. All rights reserved.
AutoCAD SHX Text
8M-TRUCK
AutoCAD SHX Text
NEW ZEALAND (NZ)
AutoCAD SHX Text
(c) 2018 Transoft Solutions, Inc. All rights reserved.

SHELLY BEACH RD

AMIR

IA S

T

EMMET

T ST

HACKETT ST

PERC

IVAL

PAR

ADE

RING TERRACE

LONDON ST

ST MARYS RD

CURR

AN S

T ON

RAM

P

SHEL

LY BE

ACH R

D

ST MARYS RD

HACKETT ST

SARS

FIELD

ST SHELLY BEACH RD

LONDON ST

DUNEDIN ST

ST FRANCIS DE SALE ST

NEW

ST

NEW

ST

STATE HIGHWAY 1

STATE HIGHWAY 1

WAITEMATA ST

ST MARYS RD

CURRAN ST

HARBOUR ST

1800Ø

1800Ø

1800ØPUMP STATION

SHEL

LY BE

ACH R

D

AMIR

IA S

T RING TERRACE

STATE HIGHWAY 1

ST MARYS RD

STATE HIGHWAY 1

1800Ø

LONDON ST

ST MARYS RD

ST MARYS RD

SHEL

LY BE

ACH R

D

LONDON ST

ST MARYS RD

ST MARYS RD

LONDON ST

NEW

ST

WAITEMATA ST

HARBOUR ST

1800Ø

Filen

ame:

Plot

Date:

Offic

e:C:

\PW

_WOR

K\JO

NATH

AN.W

ORSL

EY\A

UDC1

_01\D

0115

929\2

5530

3-00

00-D

RG-II

-100

1.DW

G27

/4/20

18 9:

35:18

AM

Auck

land

0

SCALE 1:2000

20 40 80m

LEGEND:

STORAGE PIPELINE

SHAFT LOCATION

PROPOSED MARINE OUTFALL

EINDICATIVE CONSTRUCTION CORRIDOR

MANA WHENUA OVERLAY

INCLINOMETER

TYPE 1- BUILDING/COLUMN MONITORING LOCATION

TYPE 2- GROUND MONITORING LOCATION

TYPE 3- INDICATIVE ACOUSTIC MONITORING LOCATION

TYPE 4- GROUNDWATER MONITORING LOCATION FOR STABILITY

5mm MODELLED SETTLEMENT

10mm MODELLED SETTLEMENT

20mm MODELLED SETTLEMENT

C1

ST MARYS SHAFTCLUSTER 1 CLUSTER 2

CLUSTER 3

CLUSTER 4

CLUSTER 2

CLIENT

DATE TITLE

REVISION DETAILSDATEREV APPROVED

REVIEWED

APPROVED

PROJECT

DRAWN

DESIGNED

PROJECT No. TYPE REVWBS DISC NUMBER DRAWING No.

SCALE SIZEA1

.

0

SCALE 1:1000

10 40m20

HACKETT ST DIVERSION AND MASEFIELD

INSTRUMENTATION AND MONITORING LOCATIONAND BUILDING LOCATION PLAN

(WHOLE ALIGNMENT)

255303 0000 DRG II 1001 A

PRELIMINARYNOT FOR CONSTRUCTION

P.NICOLAJSEN

J.LOKES

R.ALEA

A 16.03.18 DRAFT FOR CLIENT REVIEW MC

INSTRUMENTATION AND MONITORING LOCATION PLAN1:2000

ST MARYS RESERVE SHAFT

NEW STREET SHAFT

CLUSTER 1 CLUSTER 3 CLUSTER 4SCALE 1:1000 SCALE 1:1000 SCALE 1:1000

SCALE 1:1000

POINT ERIN SHAFT

OUTFALLOPTION A2

OUTFALLOPTION A1

INDICATIVE NOISE AND VIBRATION MONITORINGLOCATIONS. SUITABLE POSITIONS TO BEIDENTIFIED WITHIN A 25m RADIUS OF THEWORKS OR AT NEAREST RECEIVER.

INDICATIVE NOISE AND VIBRATION MONITORINGLOCATIONS. SUITABLE POSITIONS TO BEIDENTIFIED WITHIN A 25m RADIUS OF THEWORKS OR AT NEAREST RECEIVER.

INDICATIVE NOISE AND VIBRATION MONITORINGLOCATIONS. SUITABLE POSITIONS TO BEIDENTIFIED WITHIN A 25m RADIUS OF THEWORKS OR AT NEAREST RECEIVER.

LONDON/NEW STREET SHAFT

C1C2

C4

C7

C3 C5C6

C7

C6

C3 C4C5

AutoCAD SHX Text
ROAD PARK SHAFT