Hans Weise Review Meeting on TESLA Test Facility Phase 2 Introduction Part 2 Hans Weise.

20
Hans Weise Review Meeting on TESLA Test Facility Phase 2 Introduction Part 2 Hans Weise

Transcript of Hans Weise Review Meeting on TESLA Test Facility Phase 2 Introduction Part 2 Hans Weise.

Page 1: Hans Weise Review Meeting on TESLA Test Facility Phase 2 Introduction Part 2 Hans Weise.

Hans Weise

Review Meeting on TESLA Test Facility Phase 2Introduction Part 2

Hans Weise

Page 2: Hans Weise Review Meeting on TESLA Test Facility Phase 2 Introduction Part 2 Hans Weise.

Hans Weise Status 4/94

250 kV thermionic gun

4 accelerator modules

beam dump

Page 3: Hans Weise Review Meeting on TESLA Test Facility Phase 2 Introduction Part 2 Hans Weise.

Hans Weise

First discussions about the

TTF FEL

Spring 1994

First 250 keV beam on 02.04.96

Page 4: Hans Weise Review Meeting on TESLA Test Facility Phase 2 Introduction Part 2 Hans Weise.

Hans Weise 02.06.97

Page 5: Hans Weise Review Meeting on TESLA Test Facility Phase 2 Introduction Part 2 Hans Weise.

Hans Weise

TESLA Test Facility Linac

Common effort of almost all laboratories using s.c. accelerating cavities, e.g.

• (CERN), Cornell, DESY, INFN, (KEK), Saclay, TJNL • 40 partners from 11 countries

More than 75 cavities with gradients up to 35 MV/m

Page 6: Hans Weise Review Meeting on TESLA Test Facility Phase 2 Introduction Part 2 Hans Weise.

Hans Weise

Page 7: Hans Weise Review Meeting on TESLA Test Facility Phase 2 Introduction Part 2 Hans Weise.

Hans Weise

Page 8: Hans Weise Review Meeting on TESLA Test Facility Phase 2 Introduction Part 2 Hans Weise.

Hans Weise

22.02.00

First lasing of the TTF FEL

Page 9: Hans Weise Review Meeting on TESLA Test Facility Phase 2 Introduction Part 2 Hans Weise.

Hans Weise

TESLA Test Facility - Operation

week 3 / 2002

FEL User Operation

week 7 / 2002

Accelerator Studies

100%

80%

60%

40%

20%

35 40 45 50 5 10

Beam uptime and operational uptime (users or acc.studies)

The TTF Linac was operated 7 days per week, 24 hours.

Approx. 50% of the time was allocated to FEL operation including a large percentage of user time. The FEL requires very stable beam conditions.

In its different set-ups, approx. 13,000 hours beamtime were achieved since 1997.

Based on the TTF experience several FELs using superconducting accelerator technology are proposed.

2001 2002

week

Page 10: Hans Weise Review Meeting on TESLA Test Facility Phase 2 Introduction Part 2 Hans Weise.

Hans Weise

ACC6

BYPASS

UNDULATORDUMP

COLLIMATOR

ACC7 SEED

ACC1 ACC2 ACC3 ACC4 ACC5RF-GUNBC2 BC3

e- beam

• a new RF Gun

• a new injector concept Injector 3

• three new accelerator modules ACC3 to ACC5 (3*, 4, 5) and later this year another two ACC1 and ACC2 (2*, 1*)

• another bunch compressor BC3

• new beamlines more than 150 m

• a new collimator concept transv. and energy collim.

• a long undulator 6 modules, 30 m

• a long bypass and a spectrometer line

Page 11: Hans Weise Review Meeting on TESLA Test Facility Phase 2 Introduction Part 2 Hans Weise.

Hans Weise

ACC6

BYPASS

UNDULATORDUMP

COLLIMATOR

ACC7 SEED

ACC1 ACC2 ACC3 ACC4 ACC5RF-GUNBC2 BC3

e- beam

Common effort of almost all laboratories using s.c. accelerating cavities, e.g.

• (CERN), Cornell, DESY, INFN, (KEK), Saclay, TJNL • 40 partners from 11 countries

And again...Finally we‘ll have 48 s.c. cavities at

TTF2.

This is a great test facility for both the X-FEL and the TESLA LC.

Page 12: Hans Weise Review Meeting on TESLA Test Facility Phase 2 Introduction Part 2 Hans Weise.

Hans Weise

Page 13: Hans Weise Review Meeting on TESLA Test Facility Phase 2 Introduction Part 2 Hans Weise.

Hans Weise

Speakers of the next session are...

Mr. X

Mrs. Y

Chair Person

• to introduce the topics

• to prepare the disussion

• to collect the distributions

Page 14: Hans Weise Review Meeting on TESLA Test Facility Phase 2 Introduction Part 2 Hans Weise.

Hans Weise

What‘s your experience with...

Have you ever used ...

What are your plans concerning...

Informal Discussions

should be used for the

• exchange of knowledge / info

• preparation of discussions

• reviews and planning

Page 15: Hans Weise Review Meeting on TESLA Test Facility Phase 2 Introduction Part 2 Hans Weise.

Hans Weise

Topic 1

Topic 2

other stuff

Flipchart to collect

topics for the

Open Plenary Discussion

Page 16: Hans Weise Review Meeting on TESLA Test Facility Phase 2 Introduction Part 2 Hans Weise.

Hans Weise

Page 17: Hans Weise Review Meeting on TESLA Test Facility Phase 2 Introduction Part 2 Hans Weise.

Hans Weise

Page 18: Hans Weise Review Meeting on TESLA Test Facility Phase 2 Introduction Part 2 Hans Weise.

Hans Weise

Page 19: Hans Weise Review Meeting on TESLA Test Facility Phase 2 Introduction Part 2 Hans Weise.

Hans Weise

Page 20: Hans Weise Review Meeting on TESLA Test Facility Phase 2 Introduction Part 2 Hans Weise.

Hans Weise

Welcome

My talk is about the most..

Some young and unexperienced

speaker need your help!

Thanks

... un-interesting section of TTF2.

Therefore I don‘t like to talk at all!

And my English is so bad.

I don‘t know how to say this.

There are so many faces...

I don‘t like to see them!

OK!

Let‘s enjoy the TTF2 Meeting.