Hamad International Airport
-
Upload
omar-chatriwala -
Category
Documents
-
view
70.900 -
download
5
description
Transcript of Hamad International Airport
Hamad International Airport
2004
50% Land Reclamation
QCAA Lands the first plane 29 November 2012 12h30
29km2 Site
January 2013
Interesting Statistics
Interesting Statistics
Laborers in 2007 13,800
Laborers in 2011 47,000
Contractors 47
Contracts 100
Engineering, Project, Construction and Cost Personnel 900
Crushed Rock 87,600 tonnes
Reclamation Fill 60,200,000 m3
Concrete 2,300,000 m3
Piles 8,900
Airfield Asphalt 2,000,000 m3
Steel 140,000 tonnes
Electrical Cable 17,000,000 m
Fiber Optic Cable 330,000 m
Fuel Pipes 37,000 m
Curtain Wall 86, 000 m2
Telephones 9,000
Fencing 88,000 m
Master Plan completed in 2003
Runways:
4.8km long
60m wide
2km apart
Midfield concept for maximum efficiency
100% A380 Compatibility
100% International Civil Aviation code compliant
State-of-the-Art Technology
Landscaping and Infrastructure
Terminal Approach Road
Passenger Terminal Complex
600,000m2 Terminal
41 Contact Gates
3 Central Utility Plants
29ha Lagoon
Iconic Roof Form:Echoes Waves in Gulf
3450 Car Parking System
6900m2 Transportation Facility
100 Limousine Staging
Mosque Plaza
Landscaped Gardens
Passenger Terminal Complex
Passenger Terminal Complex
Passenger Terminal Complex
88 Passenger Loading Bridges
Passenger Terminal Complex
Open Vistas
High Vaulted Ceilings
Passenger Terminal Complex
Departures Hall
25,000m2 Column-Free Space
24m High Ceiling
150 Check-In Stations
5 Islands
14 First Class Check-In Booths
16 Business Class Check-In Desks
Information Kiosks
Currency Exchange
Retail and F&B
Passenger Terminal Complex
First & Buisness Class Check-In
Passenger Terminal Complex
Sunken Gardens
Passenger Terminal Complex
Departures Concourses A & B
Mirror Image Concourse B
20 Gates with Hold Rooms
270 Seats per Hold Room
Code E Aircraft
Secondary Screening
30mins Minimum Connect Time
Activity Nodes
Quiet Rooms
Flight Information Displays
Passenger Terminal Complex
Retail Gallery
Naturally Lit Focal Point
Access to Qatar Airways:
1st & Business Lounges
Gold & Silver Lounges
Al Maha Lounges
Passenger Terminal Complex
Departures Concourse C
13 Gates with Hold Rooms
270 Seats per Hold Room
Unobstructed Views of the Airfield
Passenger Terminal Complex
Mosque Plaza
Landmark Feature
2100m2 Mosque
35m Minaret
Passenger Terminal Complex
Intricate Caligraphy Artwork
Emiri Terminal
Silhouette of Sails
12000m2 Terminal
Separate Aircraft Apron
5 Large Aircraft
2 Airbus A380 Positions
Emiri Terminal
Emiri Terminal
Podium for Reception of State Visitors
Emiri Terminal
Bespoke Interiors
Emiri Terminal
Arrivals Plaza
Air Traffic Control Tower
90m High
Visible from Central Doha
Tower Cab 75m Above Ground
Air Navigation Radar
360 degree Tower Simulator for Advanced Operational Safety and Efficiency
Aircraft Maintenance Hangar
150,000m2 Enclosed Hangar
Simultaneous Capacity for:
8 Wide Body Aircraft
Maximum 13 Aircraft
Including Airbus A380
Safe Access to all Level of Aircraft
Flexibility of Tail-First or Nose-First Configuration
Widest Free-Span Opening in the World
Aircraft Maintenance Hangar
Moveable Docking Structures
Aircraft Maintenance Hangar
Cargo Terminal
50,000m2
1.4 Million tons Annual Capacity
Separate Aircraft Parking Apron
11 Wide Body Aircraft
Automated Container Storage System
1,200 unit Consignment Handling System
Accommodates 5,300 Separate Shipments
Cargo Terminal
Catering Building
65,000m2 Facility
90,000 Meals per Day
State-of-the-Art Automated Operations
Production capability for Off-Airport Venues
Direct Airside Loading
Catering Building
Next Phases of Development
50 Million Passengers
Phase 3A
2012 - 2017
AVIATION SERVICES
AIR TRAFFIC CONTROL TOWER
CATERING BUILDING
CARGO TERMINAL
EMIRI HANGARS
AIRCRAFT MAINTENANCE HANGAR
RUNWAYS
PASSENGER TERMINAL
BACK-UP APPROACH & TRAINING CENTER
Phase 3A
2012 - 2017
AVIATION SERVICES
AIR TRAFFIC CONTROL TOWER
CATERING BUILDING
CARGO TERMINAL
EMIRI HANGARS
T1 APRON EXPANSION
T1 RAIL STATION
T1 EXPANSION
BACK-UP APPROACH & TRAINING CENTER
Phase 3A
2012 - 2017
AVIATION SERVICES
AIR TRAFFIC CONTROL TOWER
CATERING BUILDING
CARGO TERMINAL
EMIRI FLIGHT FACILITIES
T1 APRON EXPANSION
T1 RAIL STATION
T1 EXPANSION
BACK-UP APPROACH & TRAINING CENTER
Phase 3A
2012 - 2017
AVIATION SERVICES
AIR TRAFFIC CONTROL TOWER
CATERING BUILDING
NORTH CROSS TAXIWAY
EMIRI FLIGHT FACILITIES
T1 APRON EXPANSION
T1 RAIL STATION
T1 EXPANSION
BACK-UP APPROACH & TRAINING CENTER
Phase 3A
2012 - 2017
AVIATION SERVICES
AIR TRAFFIC CONTROL TOWER
CAR RENTAL FACILITY
NORTH CROSS TAXIWAY
EMIRI FLIGHT FACILITIES
T1 APRON EXPANSION
T1 RAIL STATION
T1 EXPANSION
BACK-UP APPROACH & TRAINING CENTER
Phase 3A
2012 - 2017
AVIATION SERVICES
SEA RESCUE
CAR RENTAL FACILITY
NORTH CROSS TAXIWAY
EMIRI FLIGHT FACILITIES
T1 APRON EXPANSION
T1 RAIL STATION
T1 EXPANSION
BACK-UP APPROACH & TRAINING CENTER
Phase 3A
2012 - 2017
MULTI-STOREY PARKING
SEA RESCUE
CAR RENTAL FACILITY
NORTH CROSS TAXIWAY
EMIRI FLIGHT FACILITIES
T1 APRON EXPANSION
T1 RAIL STATION
T1 EXPANSION
BACK-UP APPROACH & TRAINING CENTER
Phase 3A
Phase 3B
2012 - 2020
Phase 3B
2012 - 2020
MULTI-STOREY PARKING
SEA RESCUE
CAR RENTAL FACILITY
NORTH CROSS TAXIWAY
EMIRI FLIGHT FACILITIES
T1 APRON EXPANSION
T1 RAIL STATION
VISA BUILDING
LAND RECLAMATION
Phase 3B
2012 - 2020
MULTI-STOREY PARKING
SEA RESCUE
CAR RENTAL FACILITY
NORTH CROSS TAXIWAY
EMIRI FLIGHT FACILITIES
T1 APRON EXPANSION
WESTERN TAXIWAY & APRON
VISA BUILDING
LAND RECLAMATION
Phase 3B
2012 - 2020
MULTI-STOREY PARKING
SEA RESCUE
CAR RENTAL FACILITY
NORTH CROSS TAXIWAY
EMIRI FLIGHT FACILITIESAVIATION CAMPUS / LAW ENFORCEMENT
WESTERN TAXIWAY & APRON
VISA BUILDING
LAND RECLAMATION
Phase 3B
2012 - 2020
MULTI-STOREY PARKING
SEA RESCUERAIL STATIONCAR RENTAL FACILITYPLAZANORTH CROSS TAXIWAYTERMINAL 2EMIRI FLIGHT FACILITIESAVIATION CAMPUS / LAW ENFORCEMENT
WESTERN TAXIWAY & APRON
VISA BUILDING
LAND RECLAMATION
2020