Henrry F.Hall Building Escalators-Case Study
(BLDG 6631: Fundamentals of Facility Management)
Professor: Dr. Fuzhan Nasiri
Student ID
Hossein Khodaverdipoursarbandi 40003814
Ali Izadpanah 29760067
Shaheen Manouchehr 27732406
Introduction
History
Maintenance and Energy
FM Role
Modernization
Conclusion
Reference
2
Outline
Introduction
history
Maintenance and Energy
FM Role
Modernization
Conclusion
References
3
Outline
Introduction
history
Maintenance and Energy
FM Role
Modernization
Conclusion
References
Hall Building: The main building of SGW Campus The majority of classes are being held there Highest demand in terms of student circulation
Facility Management (FM)
High Energy Cost High Maintenance Cost
4
Outline
Introduction
history
Maintenance and Energy
FM Role
Modernization
Conclusion
References
18 Esclators
• 17 Kone Brand• 1 Hitachi Brand
5
Outline
Introduction
History
Maintenance and Energy
FM Role
Modernization
Conclusion
References
Previous escalators were in operation
since 1966
Increase in Maintenance Cost
2000-2009 2010 20110
20,000
40,000
60,000
80,000
100,000
35,00056,400
87,360
Cost of External Providers
Year
Annu
al C
ost
6
Outline
Introduction
History
Maintenance and Energy
FM Role
Modernization
Conclusion
ReferencesDecision of replacement has been
made in 2010
Increase in number of
students and Staff
Increase in number of failures and Breakdowns
Increase in energy and
maintenance cost
7
Outline
Introduction
History
Maintenance and Energy
FM Role
Modernization
Conclusion
References
- $12,000,000 - 2-year duration
- Financed by Quebec Infrastructure
Estimated Cost
$15,000,000 finished in
2012
Actual Cost
Previous EscalatorsIn-house with specialist
services outsourced
Existing Escalators
Single source outsourcing
25-30 years of life cycle
8
Outline
Introduction
History
Maintenance and Energy
FM Role
Modernization
Conclusion
References
Maintenance Outsourcing Contract per
Escalator
Reactive Maintenance
Excluding Cost :- $30,000 per chain
- Repairing Steps due to vandalism $1,500 per step
Preventive Maintenance
Routine Maintenance Schedule:- Annually: 32 hrs- Quarterly: 8 hrs- Monthly: 2 hrs
$6,000 per Year
9
Outline
Introduction
History
Maintenance and Energy
FM Role
Modernization
Conclusion
References
Annual Energy
Consumption
30,000 KWH per
Escalator
Classified as ‘’Rate M’’ by
Hydro Quebec
R1= Energy Consumption with EcoStart
R2= Energy Consumption without EcoStart
R3=R2-R1
Energy Saving
Features
EcoStart
Rate M = $14.37 per KW of Billing
Demand + 4.93¢ per KWH for the first 210,000 KWH +
3.66¢ per KWH for the remaining
10
Outline
Introduction
History
Maintenance and Energy
FM Role
Modernization
Conclusion
References
FM Role
Cost Efficiency
Decreasing Maintenance
CostReducing
Energy Cost
Asset Efficiency
-Increasing Life Cycle of Escalators
- Increasing Reliability
Proposed Solution
Modernizing Existing Escalators by Adding Motion Detector
Sensor
Initial Cost: from $20,000
to $40,000 per Escalator
11
Outline
Introduction
history
Maintenance and Energy
FM Role
Modernization
Conclusion
References
12
Outline
Introduction
history
Maintenance and Energy
FM Role
Modernization
Conclusion
References
13
Outline
Introduction
history
Maintenance and Energy
FM Role
Modernization
Conclusion
References
14
Outline
Introduction
history
Maintenance and Energy
FM Role
Modernization
Conclusion
References
Proposed Solution ( Automatic Low-Speed Standby)
Increasing Life Cycle
Up to 10 years
Decreasing Energy
Consumption
At least 16% reduction
Reducing Maintenance
Cost
up to 15% reduction in
annual maintenance
cost
Reduction in number of
breakdowns and higher quality of
service
15
Outline
Introduction
history
Maintenance and Energy
FM Role
Modernization
Conclusion
References