Gujarat Urja Vikas Nigam Ltd.Well Comes
Vibrant Gujarat Global Investors Summit-2007
![Page 2: Gujarat Urja Vikas Nigam Ltd. Well Comes · 0 Gujarat Urja Vikas Nigam Ltd. Well Comes Vibrant Gujarat Global Investors Summit-2007](https://reader030.fdocuments.in/reader030/viewer/2022011800/5ad96d997f8b9add658b50b0/html5/thumbnails/2.jpg)
1
SUPPLY VOLTAGE
At 66 KVand above
Above4000 KVA
At 11 KV/ 22KVUp to4000 KVA
SupplyVoltage
ContractDemand
![Page 3: Gujarat Urja Vikas Nigam Ltd. Well Comes · 0 Gujarat Urja Vikas Nigam Ltd. Well Comes Vibrant Gujarat Global Investors Summit-2007](https://reader030.fdocuments.in/reader030/viewer/2022011800/5ad96d997f8b9add658b50b0/html5/thumbnails/3.jpg)
2
Where to apply for Power Connection
Surat except city, Bharuch,Narmada, Dang,Valsad, Navsari
Dakshin Gujarat Vij Company Ltd.(DGVCL) Surat
Rajkot, Porbandar, Junagadh,Jamnagar, Kutch, Bhavnagar,Amreli, Surendranagar
Paschim Gujarat Vij Company Ltd.(PGVCL) Rajkot
Ahmedabad (except city),Gandhinagar (except city),Mehsana, Banas Kantha,Patan, Sabar Kantha
Uttar Gujarat Vij Company Ltd.(UGVCL) Mehsana
Vadodara, Anand, Kheda,Panchmahal, Dahod
Madhya Gujarat Vij Company Ltd.(MGVCL) Vadodara
Name of DistrictsName of DISCOM
![Page 4: Gujarat Urja Vikas Nigam Ltd. Well Comes · 0 Gujarat Urja Vikas Nigam Ltd. Well Comes Vibrant Gujarat Global Investors Summit-2007](https://reader030.fdocuments.in/reader030/viewer/2022011800/5ad96d997f8b9add658b50b0/html5/thumbnails/4.jpg)
3
Processing and releasing Authorityof HT connection
CORPORATE OFFICEAbove275 KVA
CIRCLECIRCLEOFFICEOFFICE
UP TOUP TO275 KVA275 KVA
![Page 5: Gujarat Urja Vikas Nigam Ltd. Well Comes · 0 Gujarat Urja Vikas Nigam Ltd. Well Comes Vibrant Gujarat Global Investors Summit-2007](https://reader030.fdocuments.in/reader030/viewer/2022011800/5ad96d997f8b9add658b50b0/html5/thumbnails/5.jpg)
4
Procedure for Registration ofApplication for HT Power Supply
�Application for supply of power shall be made inthe prescribed form.� The requisition for supply of electrical energyshall be accompanied by registration charges asunder.�HT and EHT supply @ Rs.10 per KVA with aceiling of Rs.25000.00
![Page 6: Gujarat Urja Vikas Nigam Ltd. Well Comes · 0 Gujarat Urja Vikas Nigam Ltd. Well Comes Vibrant Gujarat Global Investors Summit-2007](https://reader030.fdocuments.in/reader030/viewer/2022011800/5ad96d997f8b9add658b50b0/html5/thumbnails/6.jpg)
5
Checklist- Submission ofDocuments for Power Supply
• Prescribed Application Form in Six Copies• Site plan with key map indicating point of supply• Land documents – Plot Allotment letter OR 7/12 and 8A
Abstract, OR Sale deed• Memorandum of Articles• Resolution authorizing the person(s) to sign Application
and Agreement• Short Description of process• Certificate regarding Industrial use of land from Collector
(Before work is taken up on hand.)• NOC of Gujarat Pollution Control Board (Before actual
release of power supply.)
![Page 7: Gujarat Urja Vikas Nigam Ltd. Well Comes · 0 Gujarat Urja Vikas Nigam Ltd. Well Comes Vibrant Gujarat Global Investors Summit-2007](https://reader030.fdocuments.in/reader030/viewer/2022011800/5ad96d997f8b9add658b50b0/html5/thumbnails/7.jpg)
6
Estimate [1]
• On registration of demand, the DISCOM shallfurnish an estimate including SecurityDeposit and charges for providing electricline/infrastructure as per technical feasibilityreport.
![Page 8: Gujarat Urja Vikas Nigam Ltd. Well Comes · 0 Gujarat Urja Vikas Nigam Ltd. Well Comes Vibrant Gujarat Global Investors Summit-2007](https://reader030.fdocuments.in/reader030/viewer/2022011800/5ad96d997f8b9add658b50b0/html5/thumbnails/8.jpg)
7
Estimate [2]Line Charges
3.5 lacs11KV HT Line Rabbit conductor RSJPole2
Sr.No.
Item Rate per KM
111KV HT Line Rabbit conductor PSCpole 1.5 lacs
311KV HT Line Dog conductor RSJPole 4.6 lacs
4 66KV S/C with Dog conductor 9 lacs
5 66KV D/C with Dog conductor 14.5 lacs
6 66KV D/C with Panther conductor 15.7 lacs
![Page 9: Gujarat Urja Vikas Nigam Ltd. Well Comes · 0 Gujarat Urja Vikas Nigam Ltd. Well Comes Vibrant Gujarat Global Investors Summit-2007](https://reader030.fdocuments.in/reader030/viewer/2022011800/5ad96d997f8b9add658b50b0/html5/thumbnails/9.jpg)
8
Estimate [3]Prorata GETCO Charges
85011KV/ 22KV4.
83566KV3.
825132 KV2.
815220 KV1.
Amount per KVA inRs.
Voltage KVSr.No.
![Page 10: Gujarat Urja Vikas Nigam Ltd. Well Comes · 0 Gujarat Urja Vikas Nigam Ltd. Well Comes Vibrant Gujarat Global Investors Summit-2007](https://reader030.fdocuments.in/reader030/viewer/2022011800/5ad96d997f8b9add658b50b0/html5/thumbnails/10.jpg)
9
Agreement
An applicant shall enter into an Agreementwith the DISCOM before commencement ofwork accepting the terms relating to tariffand other conditions of Supply Code.
![Page 11: Gujarat Urja Vikas Nigam Ltd. Well Comes · 0 Gujarat Urja Vikas Nigam Ltd. Well Comes Vibrant Gujarat Global Investors Summit-2007](https://reader030.fdocuments.in/reader030/viewer/2022011800/5ad96d997f8b9add658b50b0/html5/thumbnails/11.jpg)
10
EXECUTION OF WORK• On payment of Estimate and on execution
Of agreement, the work of erection of lineand infrastructure is taken up on hand.
• The amount deposited by the Applicant shallbe subsequently adjusted, on completion of thework on the basis of actual cost plus supervisioncharges at 15% of the total cost of the materials andlabour.
• Prospective consumers may be allowed toexecute works on turnkey basis.
![Page 12: Gujarat Urja Vikas Nigam Ltd. Well Comes · 0 Gujarat Urja Vikas Nigam Ltd. Well Comes Vibrant Gujarat Global Investors Summit-2007](https://reader030.fdocuments.in/reader030/viewer/2022011800/5ad96d997f8b9add658b50b0/html5/thumbnails/12.jpg)
11
Security Deposit [1]Methodology
• The applicants for electricity shall pay in thebeginning a Security Deposit towards theelectricity to be supplied to them as 1.5 timesthe monthly Consumption Charges takingdemand charges based on 85% of contractdemand plus energy charges based on 80% ofload factor plus all other levies and taxes.
![Page 13: Gujarat Urja Vikas Nigam Ltd. Well Comes · 0 Gujarat Urja Vikas Nigam Ltd. Well Comes Vibrant Gujarat Global Investors Summit-2007](https://reader030.fdocuments.in/reader030/viewer/2022011800/5ad96d997f8b9add658b50b0/html5/thumbnails/13.jpg)
12
Security Deposit [2]Interest Provision
• The DISCOM shall pay interest on SecurityDeposit of consumer, at the Bank Rate (as on1st April of every year) notified by Reserve Bankof India or such higher rate as may be fixed bythe Commission from time to time.
![Page 14: Gujarat Urja Vikas Nigam Ltd. Well Comes · 0 Gujarat Urja Vikas Nigam Ltd. Well Comes Vibrant Gujarat Global Investors Summit-2007](https://reader030.fdocuments.in/reader030/viewer/2022011800/5ad96d997f8b9add658b50b0/html5/thumbnails/14.jpg)
13
Security Deposit [3]Ready Reckoner.
0.9615.92500
1.9332.091000
4.1068.402000
6.31105.223000
10.63177.235000
12.79213.246000
14.96249.257000
17.12285.258000
Interest @ 6% perAnnum (Rs. in lacs)
S. D. (Rs.in Lacs)Contract Demandin KVA
![Page 15: Gujarat Urja Vikas Nigam Ltd. Well Comes · 0 Gujarat Urja Vikas Nigam Ltd. Well Comes Vibrant Gujarat Global Investors Summit-2007](https://reader030.fdocuments.in/reader030/viewer/2022011800/5ad96d997f8b9add658b50b0/html5/thumbnails/15.jpg)
14
RELEASE ORDER• On completion of work, the release order is issued• Metering Equipment (CTPT and METER) is issued
by DISCOM up to Contract Demand of 4000 KVA at11KV/22KV, if available.
• EHV consumer is required to procure and installCT and PT units as per specifications approved byDISCOM.
• Applicant has to submit Test report for actualrelease of power supply. Otherwise the connectionis deemed (unconnected release) released afterexpiry of 2 months.
![Page 16: Gujarat Urja Vikas Nigam Ltd. Well Comes · 0 Gujarat Urja Vikas Nigam Ltd. Well Comes Vibrant Gujarat Global Investors Summit-2007](https://reader030.fdocuments.in/reader030/viewer/2022011800/5ad96d997f8b9add658b50b0/html5/thumbnails/16.jpg)
15
Time frame for release of power supplyAbove 100 KVA and up to 4000 KVA
Within 45 days after complianceof Demand Notice/formalities byprospective consumers.
Release of connection
Within 15 days of receipt ofapplication.
Issue of Demand notice
Within 7 days of receipt ofapplication.
Issue of feasibility clearance
TIME LIMITACTITIVITY
![Page 17: Gujarat Urja Vikas Nigam Ltd. Well Comes · 0 Gujarat Urja Vikas Nigam Ltd. Well Comes Vibrant Gujarat Global Investors Summit-2007](https://reader030.fdocuments.in/reader030/viewer/2022011800/5ad96d997f8b9add658b50b0/html5/thumbnails/17.jpg)
16
Time frame for release of power supplyAbove 4000 KVA
TIME LIMITACTITIVITY
Within 180 days after completion ofDemand notice/formalities byprospective consumers.
Release of connection
Within 30 days of receipt of application.Issue of Demand notice
Within 15 days of receipt of application.Issue of feasibility clearance
![Page 18: Gujarat Urja Vikas Nigam Ltd. Well Comes · 0 Gujarat Urja Vikas Nigam Ltd. Well Comes Vibrant Gujarat Global Investors Summit-2007](https://reader030.fdocuments.in/reader030/viewer/2022011800/5ad96d997f8b9add658b50b0/html5/thumbnails/18.jpg)
17
LOAD DEVELOPMENT PERIOD
-do-Up to 6 monthsAbove 2000 KVAbut up to 5000KVA
-do-1)Actual maximum demandestablished during the month2) 75% of the demanddeclared in phased manner3) 100 KVA
Up to 6 monthsAbove 6 months but up to 12months
Above 5000 KVA
1) Actual maximum demandestablished during the month
2) 100 KVA
Up to 3 monthsUp to 2000 KVA
Minimum billing demandshall be highest of thefollowing
Development Periodfrom the deemed date ofcommencement ofsupply
ContractDemand
![Page 19: Gujarat Urja Vikas Nigam Ltd. Well Comes · 0 Gujarat Urja Vikas Nigam Ltd. Well Comes Vibrant Gujarat Global Investors Summit-2007](https://reader030.fdocuments.in/reader030/viewer/2022011800/5ad96d997f8b9add658b50b0/html5/thumbnails/19.jpg)
18
TARIFF RATE HTP-IDemand Charges
Rs.237/- perKVA per month
For billing demand inexcess of 2500KVA
(d)
Rs.208/- perKVA per month
For Next 1500KVA ofbilling demand
(c)
Rs.139/- perKVA per month
For Next 500KVA ofbilling demand
(b)
Rs.98/- perKVA per month
For First 500KVA ofbilling demand
(a)
![Page 20: Gujarat Urja Vikas Nigam Ltd. Well Comes · 0 Gujarat Urja Vikas Nigam Ltd. Well Comes Vibrant Gujarat Global Investors Summit-2007](https://reader030.fdocuments.in/reader030/viewer/2022011800/5ad96d997f8b9add658b50b0/html5/thumbnails/20.jpg)
19
TARIFF RATE HTP-IEnergy Charges
405 Paise perUnit
Above 2500 KVAcontract demand
(c)
395 Paise perUnit
For 1001 KVA to 2500KVA contract demand
(b)
375 Paise perUnit
Up to 1000 KVA contractdemand
(a)
![Page 21: Gujarat Urja Vikas Nigam Ltd. Well Comes · 0 Gujarat Urja Vikas Nigam Ltd. Well Comes Vibrant Gujarat Global Investors Summit-2007](https://reader030.fdocuments.in/reader030/viewer/2022011800/5ad96d997f8b9add658b50b0/html5/thumbnails/21.jpg)
20
REBATE FOR SUPPLYAT EHV
1.0%If supply is availed at132 KV and above
(b)
0.5%If supply is availed at33/66KV
(a)
Rebate@On Energy charges
![Page 22: Gujarat Urja Vikas Nigam Ltd. Well Comes · 0 Gujarat Urja Vikas Nigam Ltd. Well Comes Vibrant Gujarat Global Investors Summit-2007](https://reader030.fdocuments.in/reader030/viewer/2022011800/5ad96d997f8b9add658b50b0/html5/thumbnails/22.jpg)
21
CONCESSION FOR USE OFELECTRICITY DURINGNIGHT HOURSThe energy consumed during night hoursas in excess of one third of the totalenergy consumed during month shall beeligible for Concession at the rate of 75Paise per unit.
![Page 23: Gujarat Urja Vikas Nigam Ltd. Well Comes · 0 Gujarat Urja Vikas Nigam Ltd. Well Comes Vibrant Gujarat Global Investors Summit-2007](https://reader030.fdocuments.in/reader030/viewer/2022011800/5ad96d997f8b9add658b50b0/html5/thumbnails/23.jpg)
22
POWER FACTOR REBATEFor each 1% improvement over 95% Powerfactor, the HT consumers will get 0.5% rebate ontheir demand and energy charges.
![Page 24: Gujarat Urja Vikas Nigam Ltd. Well Comes · 0 Gujarat Urja Vikas Nigam Ltd. Well Comes Vibrant Gujarat Global Investors Summit-2007](https://reader030.fdocuments.in/reader030/viewer/2022011800/5ad96d997f8b9add658b50b0/html5/thumbnails/24.jpg)
23
AnnexureFORM OF APPLICATION FOR HIGH VOLTAGE SUPPLYOF ELECTRICAL ENERGY (NOT LESS THAN 100 KVA)
(a)I/We hereby require you to supply electrical energy to the premiseowned/occupied by me/us hereafter described.
(b) I/We hereby agree to take supply and pay for the said energy,service connection and other dues including the deposit of such security as may bedemanded in accordance with the rates and conditions of supply in force from timeto time and further declare and agree to take supply of energy for the undermentioned purpose for my/our bonafied use for a period of not less than two yearsfrom the date of commencement of supply.
(c) I/We also undertake to receive supply within sixty days from the date theDistribution Licensee intimates that it is ready to give supply to our premises,failing which I/We undertake to pay the minimum charge as may be prescribed.
![Page 25: Gujarat Urja Vikas Nigam Ltd. Well Comes · 0 Gujarat Urja Vikas Nigam Ltd. Well Comes Vibrant Gujarat Global Investors Summit-2007](https://reader030.fdocuments.in/reader030/viewer/2022011800/5ad96d997f8b9add658b50b0/html5/thumbnails/25.jpg)
24
(d)Applicants have to furnish following particulars.11. Name of the applicant:
22. Connection Type: New / Transfer.2 2(a) If Yes, Name of Original Consumer:
3 3(a) Status of the applicant:(Property concern/partnership firm /Co-operative Society/Public limited Company /
Private limited Company/Registered Trust/Government Dept.)3 3(b) Registration No: in case of Co-operative Society
3 3(c) No. given by the registrar of Companies in case of private public limitedcompanies.
3(d) In case of partnership firm whether the deed of partnership is registered.
![Page 26: Gujarat Urja Vikas Nigam Ltd. Well Comes · 0 Gujarat Urja Vikas Nigam Ltd. Well Comes Vibrant Gujarat Global Investors Summit-2007](https://reader030.fdocuments.in/reader030/viewer/2022011800/5ad96d997f8b9add658b50b0/html5/thumbnails/26.jpg)
25
4.Address of the registered office of the applicant.
5.Address where the correspondence is desired to be made.
6.Address of the place where power supply is required.
7(a) Existing Contract Demand in KVA (Only applicable for Consumer requiringchange in contract Demand).
7(b) If Yes, furnish copy of Agreement for existing Contract Demand.7(c) New Contract Demand in KVA and supply voltage required.8. Quantum of electrical power……….KVA for Permanent Supply required.9. Tentative date by which power required (or is expected to be utilised)10.Please give complete details of the process and final product.
![Page 27: Gujarat Urja Vikas Nigam Ltd. Well Comes · 0 Gujarat Urja Vikas Nigam Ltd. Well Comes Vibrant Gujarat Global Investors Summit-2007](https://reader030.fdocuments.in/reader030/viewer/2022011800/5ad96d997f8b9add658b50b0/html5/thumbnails/27.jpg)
26
11.Name and designation of the person(s) who is/are authorised to execute theAgreement for power supply on behalf of the applicants.
12. Name and /or designation of the person(s) who is /are authorised to correspondwith the Distribution Licensee on behalf of the applicant for day to day work. Xeroxcopy & the letter/ Distribution Licensee’s resolution under which authority is given toabove person.
13.Name/or designation of the person(s) who is /are authorised to deal with thecontractual matter on behalf of the applicant.
14.Whether any low Voltage connection in existing if so, please furnish full details ofthe same (connection no., connected load, place, purpose for which power isutilised etc.)
15. Whether the supply is asked for (1) expansion or (ii) extension of the existingindustry or (iii) for altogether a new industry in the state.
![Page 28: Gujarat Urja Vikas Nigam Ltd. Well Comes · 0 Gujarat Urja Vikas Nigam Ltd. Well Comes Vibrant Gujarat Global Investors Summit-2007](https://reader030.fdocuments.in/reader030/viewer/2022011800/5ad96d997f8b9add658b50b0/html5/thumbnails/28.jpg)
27
16.Whether power is obtained at present from source other than the DistributionLicensee.
If yes, details of the same to be given.
17. Whether power is generated by own generating set? If yes, details to be given.
18. What is fixed capital investment of the proposed unit. (Certificate from thechartered accountant or from industries Commissioner on the basis of project inrespect of its fixed capital investment may be furnished)
(i) Of the existing plant(ii) Of the expansion if any, proposed.
19. Whether proposed industrial unit is located in any GIDC or private estate. (if so ,name of the estate may please be given)Whether proposed industrial unit is situated within a radius of 5 km of aGIDC industrial Estate.
![Page 29: Gujarat Urja Vikas Nigam Ltd. Well Comes · 0 Gujarat Urja Vikas Nigam Ltd. Well Comes Vibrant Gujarat Global Investors Summit-2007](https://reader030.fdocuments.in/reader030/viewer/2022011800/5ad96d997f8b9add658b50b0/html5/thumbnails/29.jpg)
28
20. Whether the proposed unit is an industrial undertaking engaged inmanufacturing goods or a service industry, please describe in detail furnishingalso the following particular.
(i) SSI registration number if is a small scale industry.(ii) DGTD, New Delhi’s registration number or industrial license number if it is amedium and large scale industry.
21.Please enclose 6 copies of the plans of small size with key plan showingclearly location of the premises, boundary of the premises, the public roads(withthe name of the road),if any ,inside and outside the premises and lands, if any,belonging to outside agency intervening the premises.
![Page 30: Gujarat Urja Vikas Nigam Ltd. Well Comes · 0 Gujarat Urja Vikas Nigam Ltd. Well Comes Vibrant Gujarat Global Investors Summit-2007](https://reader030.fdocuments.in/reader030/viewer/2022011800/5ad96d997f8b9add658b50b0/html5/thumbnails/30.jpg)
29
Following information in the site plan also be furnished.(I)Name of village/villages/town in the revenue limit of which the premises of
our proposed unit falls.(II)(II) Name of Taluka/Talukas under the revenue limit of which the above
said village falls.(III) Name of District/Districts in the revenue limit of which the above said
village falls.21.Additional information if any.
Date: Signature:
Place: Designation:(AuthorisedSignatory)
![Page 31: Gujarat Urja Vikas Nigam Ltd. Well Comes · 0 Gujarat Urja Vikas Nigam Ltd. Well Comes Vibrant Gujarat Global Investors Summit-2007](https://reader030.fdocuments.in/reader030/viewer/2022011800/5ad96d997f8b9add658b50b0/html5/thumbnails/31.jpg)
30
Agency Derated Capacity in MW
GSECL 4968IPP-State 961
IPP-Private 1455Central Share 1945SSNL-Hydro 232
Total 9561
GENERATION AVAILIBILITY
![Page 32: Gujarat Urja Vikas Nigam Ltd. Well Comes · 0 Gujarat Urja Vikas Nigam Ltd. Well Comes Vibrant Gujarat Global Investors Summit-2007](https://reader030.fdocuments.in/reader030/viewer/2022011800/5ad96d997f8b9add658b50b0/html5/thumbnails/32.jpg)
31
CAPACITY ADDITION IN 11th
PLAN
YEARSECTOR
TOTALSTATE CENTRAL PRIVATE
2007-08 187 403 990 1580
2008-09 250 316 0 566
2009-10 1310 408 1100 2818
2010-11 1090 163 600 1853
2011-12 1760 187 2400 4347
Total 4597 1477 5090 11164
![Page 33: Gujarat Urja Vikas Nigam Ltd. Well Comes · 0 Gujarat Urja Vikas Nigam Ltd. Well Comes Vibrant Gujarat Global Investors Summit-2007](https://reader030.fdocuments.in/reader030/viewer/2022011800/5ad96d997f8b9add658b50b0/html5/thumbnails/33.jpg)
32
EXISTING TRANSMISSIONINFRASTRUCRURE
SR.NO CLASS LENGTH
IN CKMNO.OF SUB
STATION
CAPACITYOF S/S IN
MVA
1 400KV 1828 9 80452 220KV 11818 63 15520
3 132KV 4552 48 5561
4 66KV 16745 728 14715
5 33KV 69 1 15
TOTAL 35012 849 43856
![Page 34: Gujarat Urja Vikas Nigam Ltd. Well Comes · 0 Gujarat Urja Vikas Nigam Ltd. Well Comes Vibrant Gujarat Global Investors Summit-2007](https://reader030.fdocuments.in/reader030/viewer/2022011800/5ad96d997f8b9add658b50b0/html5/thumbnails/34.jpg)
33
TRANSMISSION CAPACITYADDITION IN 11TH PLAN
YEARCLASS
TOTALTOTAL
CKMLENGTH400KV 220KV 66KV
2007-08 0 0 45 45 4502008-09 0 2 43 45 430
2009-10 1 1 30 32 3002010-11 0 0 25 25 250
2011-12 0 0 18 18 180TOTAL 1 3 161 165 1610