Basic Transportation Engineering Course code: 3340604 GTU/NITTTR/Bhopal/13-14 Gujarat State 1 GUJARAT TECHNOLOGICAL UNIVERSITY, AHMEDABAD, GUJARAT COURSE CURRICULUM COURSE TITLE: WATER RESOURCES MANAGEMENT (Course Code: 3340604) Diploma Programme in which this course is offered Semester in which offered Civil engineering 4 th Semester 1. RATIONALE: Knowing extremity of water crisis, we must appreciate water as “Nature’s greatest gift”. Our water requirement is rapidly increasing due to vast industrial development, population growth and changing life style. We are mostly dependent on rains as a predominant source of water. The other important source of water is the ground water which also depends to great extent on rainfall in previous years. We know that ground water table is declining rapidly due to its excessive use and misuse and also due to insufficient rainfall every year. To stress upon the concept of water management and simultaneously to create the awareness about the proper use and conservation of water, this course is specially designed for the students of Diploma in Civil Engineering. An attempt has been made to develop theoretical knowledge with emphasis on certain aspects of water resources management. The topics viz. hydrology, runoff, watershed management, recharging etc. have been specifically dealt in the curriculum. 2. COMPETENCY: The course content should be taught and the curriculum should be implemented with the aim to develop different types of skills so that students are able to acquire following competency: Design the appropriate rain water harvesting scheme and required structures for managing water resources under given conditions 3. COURSE OUTCOMES The theory should be taught and practical should be carried out in such a manner that students are able to acquire different learning out comes in cognitive, psychomotor and affective domain to demonstrate following course outcomes. Discuss basic concepts of “Water Resources Management”. Estimate the surface runoff from given precipitation data. Describe various types of survey investigations for reservoir planning Design the appropriate rain water harvesting scheme and required structures for given conditions.

Transcript of GUJARAT TECHNOLOGICAL UNIVERSITY, AHMEDABAD, … · 2.6 Runoff 2.6.1 Factors affecting runoff 2.6.2...

  • Basic Transportation Engineering Course code: 3340604

    GTU/NITTTR/Bhopal/13-14 Gujarat State

    1

    GUJARAT TECHNOLOGICAL UNIVERSITY, AHMEDABAD, GUJARAT

    COURSE CURRICULUM

    COURSE TITLE: WATER RESOURCES MANAGEMENT

    (Course Code: 3340604)

    Diploma Programme in which this course is offered Semester in which offered

    Civil engineering 4th

    Semester

    1. RATIONALE:

    Knowing extremity of water crisis, we must appreciate water as “Nature’s greatest gift”. Our

    water requirement is rapidly increasing due to vast industrial development, population growth

    and changing life style. We are mostly dependent on rains as a predominant source of water. The

    other important source of water is the ground water which also depends to great extent on rainfall

    in previous years. We know that ground water table is declining rapidly due to its excessive use

    and misuse and also due to insufficient rainfall every year. To stress upon the concept of water

    management and simultaneously to create the awareness about the proper use and conservation

    of water, this course is specially designed for the students of Diploma in Civil Engineering. An

    attempt has been made to develop theoretical knowledge with emphasis on certain aspects of

    water resources management. The topics viz. hydrology, runoff, watershed management,

    recharging etc. have been specifically dealt in the curriculum.

    2. COMPETENCY:

    The course content should be taught and the curriculum should be implemented with the aim to

    develop different types of skills so that students are able to acquire following competency:

    Design the appropriate rain water harvesting scheme and required structures for managing water resources under given conditions

    3. COURSE OUTCOMES

    The theory should be taught and practical should be carried out in such a manner that

    students are able to acquire different learning out comes in cognitive, psychomotor and

    affective domain to demonstrate following course outcomes.

    Discuss basic concepts of “Water Resources Management”.

    Estimate the surface runoff from given precipitation data.

    Describe various types of survey investigations for reservoir planning

    Design the appropriate rain water harvesting scheme and required structures for given conditions.

  • Basic Transportation Engineering Course code: 3340604

    GTU/NITTTR/Bhopal/13-14 Gujarat State

    2

    4. SCHEME OF STUDIES AND EXAMINATIONS:

    Legends: L - Lecture; T - Tutorial/Teacher Guided Student Activity; P - Practical; C - Credit; ESE - End

    Semester Examination; PA - Progressive Assessment

    5. COURSE DETAILS

    Unit Major Learning outcomes

    (in cognitive domain) Topics and Sub Topics

    Unit- I

    Introduction

    1a. Discuss the concepts and importance

    of Water Resources

    Management (WRM).

    1b. Identify various agencies associated with Water

    Resource Management.

    1.1 Scope of W.R.M. 1.2 Necessity of W.R.M. 1.3 Role of various agencies in W.R.M.:

    - Agriculturists - Meteorologists

    - Geologists - Industrialists

    - Scientists - Biologists

    - Water quality Control

    (Authority)

    - Mechanical Engg. - Electrical

    engg.- Economists - Social

    workers- NGO’s - Politicians

    - General Public

    Unit-II

    Hydrology

    2a. Explain Hydrological cycle.

    2b. Describe various forms and types of

    precipitation.

    2c. Explain various types of rain gauges.

    2d. Compute average precipitation by various

    methods.

    2e. Compute runoff using empirical formula.

    2f. Describe evaporation process and factors

    2.1 Define Hydrology 2.2 Hydrological cycle 2.3 Forms of precipitation 2.4 Precipitation occupancy & its types. 2.5 Measurement of rain fall

    2.5.1 Rain gauges

    Non Recording

    Recording

    - Float type - Tipping bucket - weighing bucket

    2.5.2 Methods of determining average

    rainfall

    b. Arithmetic average method

    Teaching Scheme

    (In Hours)

    Total Credits

    (L+T+P)

    Examination Scheme

    Theory Marks Practical Marks Total

    Marks

    L T P C ESE PA ESE PA

    150

    3 0 2 5 70 30 20 30

  • Basic Transportation Engineering Course code: 3340604

    GTU/NITTTR/Bhopal/13-14 Gujarat State

    3

    affecting it. c. Theissen polygon method d. Isohytel method 2.5.3 Determine optimum no. of rain

    gauges for given catchment area.

    2.6 Runoff 2.6.1 Factors affecting runoff

    2.6.2 Runoff calculation using

    empirical formula only

    2.7 Evaporation, Transpiration & Evapo -transpiration

    2.7.1 Factors affecting evaporation.

    Unit-III

    Ground Water

    3a. Identify various sources of water.

    3b. Describe various terms related to “ground water”

    3c. Explain various types of wells with their features.

    3d. Discuss necessity of recharging ground water.

    3e. Describe various methods of recharging ground

    water.

    3.1 Sources of water 3.2 Importance of ground water and

    present scenario

    3.3 Terms related to groundwater engineering:

    Aquifer, Aquiclude, Aquifuge,

    Aquitard, porosity, Specific yield,

    Specific retention, storage

    coefficient, coefficient of permeability,

    coefficient of transmissibility, Yield,

    specific yield

    3.4 Types of well - Open, Tube and flowing well - concept, location and importance

    3.5 Necessity of recharging 3.5.1 Artificial recharging as today’s

    need.

    3.5.2 Types of artificial recharge

    - Spreading method. - Pit method / khet-talavadi - Induced recharge method - Recharge well method. - Sub-surface dam. - Check dam series - Ponds - Unlined canals

    Unit-IV

    Storage Works

    4a. Describe various surveys / investigations

    to be carried out in

    storage works including

    their classification.

    4.1. Survey and investigations. a. Investigations for hydrologic data b. Geological data. c. Topographic investigations. d. Collection of legal data, water right.

  • Basic Transportation Engineering Course code: 3340604

    GTU/NITTTR/Bhopal/13-14 Gujarat State

    4

    4b. Compute reservoir capacity and losses.

    4c. Discuss purpose of various storage zones of

    reservoir.

    4d. Draw cross-sections of gravity and earthen dam

    at various points.

    e. Investigation of reservoir site, land acquisition Environmental

    considerations

    f. Economical data - Benefit cost atio. 4.2. Site selection for reservoir 4.3. Methods of estimating reservoir

    capacity

    4.4. Storage zones 4.5. Reservoir losses 4.6. Reservoir sedimentation and its control 4.7. Classification of storage works . 4.8. Factors for selecting type of dam 4.9. Concept of low and high dam 4.10. Component parts of gravity and

    earthen dam

    Unit-V

    Distribution Works

    5a. Explain purpose of distribution works

    5b. Differentiate between barrage and weir by

    means of a diagram

    5c. Describe silt control structures

    5d. Classify canals based on their functions.

    5e. Explain factors affecting canal alignment

    5f. Discuss suitable construction techniques,

    materials & equipments

    for "canal lining."

    5g. Explain the causes, effects & prevention of

    water logging.

    5.1 Purpose of distribution works 5.2 Component parts & sketches. 5.3 Barrage. 5.4 Weir

    5.4.1 Comparison of weir and barrage.

    5.4.2 Causes of failure of weir and

    remedial measures

    5.5 Safe exit gradient 5.6 Control of silt entry Scouring sluices,

    silt excluder, silt ejector, head egulator.

    5.7 Classifications of canal -Ridge and contour

    Functions of each according to

    network.

    Line diagram of network of canal.

    5.8 Canal Alignment Factors influencing canal alignment .

    5.9 Regime & semi-regime conditions. 5.10 Canal lining.

    a. Advantages. b. Types of canal lining materials c. Methods of canal lining.

    5.11 Regulation works. 5.12 C.D. Works. -Types , functions &

    sketches

    5.13 Outlets. - types, situation, functions & sketches

    5.14 Water-logging, effects, causes &

  • Basic Transportation Engineering Course code: 3340604

    GTU/NITTTR/Bhopal/13-14 Gujarat State

    5

    prevention

    Unit –VI

    Watershed

    Development

    6a. Describe important characteristics of "water

    shed".

    6b. Evolve strategies of enhancing people's

    participation in watershed

    management.

    6.1. Concept of ‘watershed’ 6.2. Characteristic of watershed, size,

    shape, physiography, slope, climate,

    drainage, land use, vegetation,

    geology, hydrology, hydrogeology,

    socio-economics.

    6.3. Watershed management & people’s participation..

    6.4. Role of co-operative society in watershed management.

    Unit-VII

    Water

    Harvesting

    Structures

    7a. Describe necessity and importance of rain water

    harvesting .

    7b. Discuss various ‘rain water harvesting’

    methods, structures and

    their suitability in various

    conditions.

    7.1 Necessity of Rain water harvesting 7.2 Importance of Rain water harvesting 7.3 Rain water harvesting methods

    - Check dams.

    - Nala / Gully plugging

    - Percolation tank.

    - Khet-talawadi

    - Roof harvesting

    - Vegetation and plantation

    6. SUGGESTED SPECIFICATION TABLE WITH HOURS & MARKS (THEORY)

    Unit

    Unit Title Teaching

    Hours

    Distribution of Theory Marks

    R

    Level

    U

    Level

    A

    Level

    Total

    Marks

    I. Introduction 3 2 3 2 7

    II. Hydrology 8 4 3 7 14

    III. Ground Water 7 3 5 6 14

    IV. Storage Works 8 3 4 7 14

    V. Distribution Works 6 2 2 3 7

    VI. Water Shed Development 6 3 2 2 7

    VII. Water Harvesting Structures

    4 3 2 2 7

    42 20 21 29 70

    Legends: R = Remember; U = Understand; A = Apply and above levels (Bloom’s revised taxonomy)

    Note: This specification table shall be treated as a general guideline for students and teachers.

    The actual distribution of marks in the question paper may vary slightly from above table.

  • Basic Transportation Engineering Course code: 3340604

    GTU/NITTTR/Bhopal/13-14 Gujarat State

    6

    7. SUGGESTED LIST OF EXERCISES/PRACTICAL

    The practical/exercises should be properly designed and implemented with an attempt to

    develop different types of skills (outcomes in psychomotor and affective domain) so that

    students are able to acquire the competencies/programme outcomes. Following is the list of

    practical exercises for guidance. Note: Here only outcomes in psychomotor domain are listed as practical/exercises. However, if these practical/exercises are completed appropriately, they would also lead to development of certain outcomes in affective domain which would in turn lead to development of Course Outcomes related to affective domain. Thus over all development of Programme Outcomes (as given in a common list at the beginning of curriculum document for this programme) would be assured.

    Faculty should refer to that common list and should ensure that students also acquire outcomes in affective domain which are required for overall achievement of Programme Outcomes/Course Outcomes.

    S. No.

    Unit No. Practical/Exercise (Outcomes’ in Psychomotor Domain)

    Approx

    Hrs.

    Required

    1 Draw the following Sketches :

    II Hydrological Cycle 16

    II Types of Precipitation

    II Rain gauges

    III Various methods of artificial recharge

    IV Component parts of earthen and Gravity dam

    V Diversion head works

    V Cross Drainage Works

    VII Various types of rainwater harvesting structures

    2 Solve Numerical from given data: 12

    II Calculate average precipitation for given catchment

    area using various methods.

    II Calculate Runoff for given catchment area using

    empirical formula.

    II Compute optimum number of rain gauges for given

    catchment area.

    III Compute yield of a well

    VII Design a check dam

    3 Field Visit and Report : 08

    I Arrange field Visit to irrigation / W.R.I department

    for collecting existing W.R. data of your district with

    respect to Importance and necessity of WRM

  • Basic Transportation Engineering Course code: 3340604

    GTU/NITTTR/Bhopal/13-14 Gujarat State

    7

    S. No.

    Unit No. Practical/Exercise (Outcomes’ in Psychomotor Domain)

    Approx

    Hrs.

    Required

    II Visit to meteorological department, collect

    precipitation data, observe, and interpret.

    Collect data of your district regarding various types of

    water sources available and prepare a report

    Suggest various methods of Artificial recharge of

    ground water in your district

    Collect data of various storage works in your district

    Visit to water harvesting Structure nearby your

    polytechnic and prepare a report

    4. Seminar 04

    I to VII Select one topic as a Seminar and present it using

    modern teaching aids before teachers & students.

    Total Hours 40

    8. SUGGESTED STUDENT’S ACTIVITIES

    i. Prepare prototype/ model of rainwater harvesting structure in the polytechnic/ suggested premises.

    9. SPECIAL INSTRUCTIONAL STRETAGIES (If Any)

    i. Show the video/animation films of various types of dams and their structures.

    ii. Arrange visit to nearby water bodies

    10. SUGGESTED LEARNING RESOURCES

    (A) List of Books:

    S.

    No. Title of Books Author Publication

    1. Irrigation, Water Resources &

    Water Power Engg. Dr. P.N. Modi

    Standard Book House,

    Delhi.

    2. Hydrology & Water Resources R.K. Sharma Dhanpat Rai & Sons,

    Delhi.

    3. Ground water assessment,

    Development & management K.R. Karanth

    Tata Mc Graw Hill Pub.

    Co. Ltd., New Delhi.

    4. Ground water H.M.Ragunath

    New Age international

    Ltd.,

    New Delhi.

    5. Hydrology & Water Resources

    Engg. S.K.Garg Khanna Pub., Delhi.

  • Basic Transportation Engineering Course code: 3340604

    GTU/NITTTR/Bhopal/13-14 Gujarat State

    8

    6. Watershed management in

    India J.V.S. Moorthy

    Willey Eastern Ltd.

    7. Design of small dams. U.S.B.R.

    8. Irrigation theory & practice A.M.Mitchel Vikas Pub. House Pvt.

    Ltd, Delhi.

    9. Water vision 2050 Narmada

    W.R. & water

    supply deptt.,

    Gandhinagar

    10. Water Resources Engg-

    Principles & Practice

    C. Satyanarayan

    Murthy

    New Age International

    Ltd., New Delhi

    11. Relevant IS codes

    (B) List of Major Equipment/Materials:

    i. Rain gauge ii. Working models of storage works iii. Models of cross drainage works iv. Models of rain water harvesting structures.

    (C) List of Software/Learning Websites

    11. COURSE CURRICULUM DEVELOPMENT COMMITTEE

    Faculty Members from Polytechnics

    Prof. S. M. Mistry, H.O.D.Civil Engg., Dr. S. & S. S. Ghandhy College of Engg and Tech., Surat

    Prof. P. N. Patel, Sr.Lecturer, Civil Engg., Deptt., G. P. Dahod

    Prof. A. K. Popat, Sr.Lecturer, Civil Engg., Deptt., G. P. Dahod

    Prof. D. V. Jariwala, Lecturer, Civil Engg., Deptt., G.P.Valsad

    Coordinator and Faculty Members from NITTTR Bhopal

    Dr. V. H. Radhakrishnan, Professor, Department of Civil and Environmental Engineering

    Prof M. C. Paliwal, Associate Professor, Department of Civil and Environmental Engineering

  • Laxmi Institute of Technology, SarigamDiploma Civil Department

    Year: 2018-19Academic

    ASSIGNMENT: 1Name of Subject : WATER RESOURCES MANAGEMENT Date: 21/12/2018Subject Code : 3340604

    Unit: 01

    1 Explain steps to reduce shortage of water in drought prone area as per WRM

    2 Explain necessity and aspect of water resources management

    3 List various agencies involved in water resource management.

    4 Write function of water resource management.

    5 Discuss the role of geologist, economist, civil engineer and politician in waterresources management.

    6 List any six functions served by water resources management.

    Date of Submission:28/12/2018Name & Sign of Subject In-charge:Prashant Ray

  • Laxmi Institute of Technology, SarigamDiploma Civil Department

    Year: 2018-19Academic

    ASSIGNMENT: 2Name of Subject : WATER RESOURCES MANAGEMENT Date: 03/01/2019Subject Code : 3340604

    Hydrology Sr.No. Name of Question Remarks

    1 Explain various factor affecting evaporation

    2 Enlist various method of computing average annual rainfall and explain isohytalmethod with neat sketch

    3 Explain steps for computing optimum number of rain gauges in a catchment area

    4 Explain various factor affecting runoff and List different computation of runoff.

    5 Enlist and explain various types of rain gauges

    6 Define runoff, transpiration, Hydrologic cycle and Evapotranspiration. Enlist various forms of precipitation

    7 Explain with sketch: Tipping bucket rain gauge and Symon’s Rain gauge

    8 Explain any one method of recording rainfall over an area.

    9 Define evaporation and write factors affecting it.

    10 List out the points to be consider while selecting the site for rain-gauge station.

    11 List types of precipitation and explain any one.

    Date of Submission:-11/01/2019Name & Sign of Subject In-chargePrashant Ray

  • Laxmi Institute of Technology, SarigamDiploma Civil Department

    Year: 2018-19Academic

    ASSIGNMENT: 3Name of Subject : WATER RESOURCES MANAGEMENT Date: 23/01/2019Subject Code : 3340604

    Unit: 03 Sr.No. Name of Question Remarks

    1 What is ground water? Write its importance. Write limitations of use of groundwater.

    2 Differentiate between Open well and Tube well. Enlist the types of well.

    3 Explain the terms: (a) Aquifer (b)Aquiclude (c) Aquifuge , specific yield, specificretention. Coefficient Of Permeability & Coefficient Of transmissibility

    4 Explain confined and unconfined aquifer with neat sketch.

    5 Explain in detail: Recharge well method. List different methods of artificial recharge

    6 Which are the sources of ground water? Explain

    7 Write down and explain the zone of ground water with neat sketch.

    8 Write short note on strainer type tube well.

    9 Explain flooding method of artificial recharge of ground water

    10 State the purpose of artificial recharge of ground water.

    Date of Submission:- 02/02/2019Name & Sign of Subject In-charge:Prashant Ray

  • Laxmi Institute of Technology, SarigamDiploma Civil Department

    Year: 2018-19Academic

    ASSIGNMENT: 4Name of Subject : WATER RESOURCES MANAGEMENT Date: 21/02/2019Subject Code : 3340604

    Unit: 04 Sr.No. Name of Question Remarks

    1 Draw a neat sketch of earth dam, label its components and write function of filter inearth dam.

    2 Write functions of different component of an earthen dam.

    3 Explain, with the neat sketch, the different storage zones of reservoirs.

    4 Explain forces acting on gravity dam with neat sketch

    5 Give the classification of dam according to use, hydraulic design, structural behaviorand material used in construction

    6 Enlist investigation/survey for reservoir planning

    7 Enlist factors affecting selection of site for reservoir

    8 Define reservoir losses due to evaporation.

    9 Define economic height of dam with sketch.

    10 Write short note on ogee type spillway.

    11 Explain silt control device

    12 Which are the methods of reservoir sedimentation control?

    Date of Submission:-28/02/2019Name & Sign of Subject In-charge:

  • Laxmi Institute of Technology, SarigamDiploma Civil Department

    Year: 2018-19Academic

    ASSIGNMENT: 5Name of Subject : WATER RESOURCES MANAGEMENT Date: Subject Code : 3340604

    Unit: 05 Sr.No. Name of Question Remarks

    1 Draw a cross section of canal in partial filling and partial cutting

    2 Explain divide wall and fish ladder

    3 Explain cross drainage works with respect to level of canal and level of naturaldrainage

    4 Enlist drawbacks of kennedy theory

    5 Differentiate between Weir and Barrage

    6 Draw a layout of diversion head work.

    7 Write classification of canal.

    8 Write advantages and disadvantages of canal lining.

    9 List factors affecting canal alignment.

    10 Draw and explain the classification of canal base on network.

    11 Enlist the causes of waterlogging.

    Date of Submission:-Name & Sign of Subject In-charge:

  • Laxmi Institute of Technology, SarigamDiploma Civil Department

    Year: 2018-19Academic

    ASSIGNMENT: 6Name of Subject : WATER RESOURCES MANAGEMENT Date: Subject Code : 3340604

    Unit: 06 Sr.No. Name of Question Remarks

    1 What is watershed management? Write characteristics of it.

    2 Enlist important characteristics of watershed

    3 Give aims of water shed management

    4 Enlist points to be kept in mind while selecting site for water shed

    5 What is importance of water shed management in present environmentalcondition

    6 Explain important of people participation in watershed management

    7 List different types of works to be done under water shed sceme.

    8 Write down the characteristics of water shed.

    9 Give the classification of watershed

    10 Explain term related watershed management

    Date of Submission:-Name & Sign of Subject In-charge:

  • Laxmi Institute of Technology, SarigamDiploma Civil Department

    Year: 2018-19Academic

    ASSIGNMENT: 7Name of Subject : WATER RESOURCES MANAGEMENT Date: Subject Code : 3340604

    Unit: 07 Sr.No. Name of Question Remarks

    1 Explain khet talavdi

    2 Write methods of rain water harvesting.

    3 List method of rain water harvesting and explain any one.

    4 Write down the methods of rain water harvesting and explain any one.

    5 Explain field pit method of rain water harvesting

    6 Explain the importance of rain water harvesting.

    7 Define Rainwater harvesting system from roof

    8 Define rain water harvesting

    Date of Submission:-Name & Sign of Subject In-charge:

  • Seat No.: ________ Enrolment No.______________

    GUJARAT TECHNOLOGICAL UNIVERSITY DIPLOMA ENGINEERING – SEMESTER –IV • EXAMINATION – WINTER - 2018

    Subject Code: 3340604 Date: 28 - 11 - 2018

    Subject Name: Water Resources Management

    Time: 02:30 PM TO 05:00 PM Total Marks: 70 Instructions:

    1. Attempt all questions. 2. Make Suitable assumptions wherever necessary. 3. Figures to the right indicate full marks. 4. Use of programmable & Communication aids are strictly prohibited. 5. Use of only simple calculator is permitted in Mathematics. 6. English version is authentic.

  • 1/3

    Seat No.: ________ Enrolment No.______________

    GUJARAT TECHNOLOGICAL UNIVERSITY DIPLOMA ENGINEERING – SEMESTER –IV• EXAMINATION – SUMMER - 2017

    Subject Code: 3340604 Date: 03-05-2017

    Subject Name: Water Resources Management

    Time: 10:30 AM TO 01:00 PM Total Marks: 70 Instructions:

    1. Attempt all questions.

    2. Make Suitable assumptions wherever necessary.

    3. Figures to the right indicate full marks.

    4. Use of programmable & Communication aids are strictly prohibited.

    5. Use of only simple calculator is permitted in Mathematics.

    6. English version is authentic.

    Q.1 Answer any seven out of ten. દશમ ાંથી કોઇપણ સ તન જવ બ આપો. 14 1. What is Evapotranspiration ?

    ૧. બ ષ્પપ્રસ્વેદન શ ુછે? 2. Write forms of precipitation.

    ૨. અવકે્ષપણન સ્વરૂપો લખો. 3. Define Gravity Dam.

    ૩. ભ ર શ્રીત બાંધની વ્ય ખ્ય આપો. 4. Write materials used in lining of canal.

    ૪. નહરેન અસ્તર મ ટે વપર ત મટટટરયલ લખો. 5. What is the function of silt excluder?

    ૫. સીલ્ટ એક્સક્લડુર ન ુક યય શ ુછે? 6. Why Drainage gallery is provided in Gravity dam?

    ૬. ભ ર શ્રીત બાંધમ ડ્રેનેજ ગેલેરી શ મ ટે ર ખવ મ આવે છે? 7. What is Run off?

    ૭. અપવ હ કોને કહવે ય? 8. Define Hydrologic cycle

    ૮. જળચક્રની વ્ય ખ્ય આપો. 9. What is contour canal and watershed canal?

    ૯. સમોચ્ચ રેખ નહરે અને ધ ર નહરે કોને કહવે ય? 10. Write methods of rain water harvesting.

    ૧૦. વરસ દન પ ણીન સાંચયની રીતો લખો.

    Q.2 (a) Give necessity of water resource management. 03

    પ્રશ્ન. ર (અ) જળસ્ત્રોતન વ્યવસ્થ ની જરુટરય ત જણ વો. ૦૩ OR

    (a) Give measures to solve problem of water scarcity in drought area. 03

    (અ) દુષક ળગ્રસ્ત વવસ્ત રમ પ ણીની અછત વનવ રવ લેવ ત પગલ જણ વો. ૦૩ (b) List factors affecting run off. 03

    (બ) અપવ હને અસર કરત પટરબળો લખો. ૦૩ OR

  • 2/3

    (b) What is watershed management? Write characteristics of it. 03

    (બ) વોટર શેડ મેનેજ્મેંટ શ ુછે? તેની લ ક્ષણીકત લખો. ૦૩ (c) Explain with sketch: Tipping bucket rain gauge. 04

    (ક) આક્રુવત સ થે સમજાવો: ટટવપિંગ બકેટ પ્રક રન ુવ્રષુ્ષ્ટ મ પક ૦૪ OR

    (c) Explain with sketch: Canal syphon 04

    (ક) આક્રુવત સ થે સમજાવો: કેન લ સ ઇફન ૦૪ (d) Explain any one method of recording rainfall over an area. 04

    (ડ) કોઇપણ વવસ્ત ર મ ટે સરેર શ વરસ દની ગણતરી કરવ ની કોઇ એક રીત સમજાવો.

    ૦૪

    OR

    (d) Define evaporation and write factors affecting it. 04

    (ડ) બ ષ્પીભવનની વ્ય ખ્ય લખી તેને અસર કરત પટરબળો જણ વો. ૦૪

    Q.3 (a) What is ground water? Write its importance. 03

    પ્રશ્ન. 3 (અ) ભજૂળ શ ુછે? તેન ુમહત્વ લખો. ૦૩ OR

    (a) Differentiate between Open well and Tube well 03 (અ) તફ વત આપો: ખલુ્લ કવૂ અને ટયબુ વેલ ૦૩ (b) Explain the terms: (a) Aquifer (b)Aquiclude (c) Aquifuge 03

    (બ) પદો સમજાવો: (અ) એક્વીફર (બ) એક્વીક્લ્યડુ (ક) એક્વીફયજુ ૦૩ OR

    (b) Write role of Co-operative society in Watershed management. 03

    (બ) વોટરશેડન વવક સમ કો-ઓપરેટીવસોસ યટીનો ફ ળો લખો. ૦૩ (c) Explain confined and unconfined aquifer with neat sketch. 04

    (ક) બાંવધય ર અને અબાંવધય ર એક્વીફર આક્રુવત સ થે સમજાવો. ૦૪ OR

    (c) Write a short note on Check Dam. 04

    (ક) ટકૂનોંધ લખો: ચેક ડેમ ૦૪ (d) Explain in detail: Recharge well method. 04

    (ડ) પનૂઃ પરૂવણી કવૂ ની રીત વવસ્ત રથી સમજાવો. ૦૪ OR

    (d) Explain in detail: Roof top rain water harvesting. 04

    (ડ) છ પર દ્વ ર વરસ દન પ ણીન સાંચય ની રીત સમજાવો. ૦૪

    Q.4 (a) Which are the methods of reservoir sedimentation control? 03

    પ્રશ્ન. ૪ (અ) જળ શયમ ાં ક ાંપન વનયાંત્રણની રીતો કઇ કઇ છે? ૦૩ OR

    (a) Which are the factors affecting site selection of reservoir? 03

    (અ) જળ શયન સ્થળ પસાંદગીને અસર કરત પટરબળો કય છે? ૦૩ (b) Classify Dam based on hydraulic design, function and material used for

    construction.

    04

    (બ) બાંધન ુહ ઇડ્રોલીક ડીઝ ઇનન આધ રે, ક યયન આધ રે તથ બ ાંધક મન મટટટરયલન આધ રે વગીકરણ કરો.

    ૦૪

  • 3/3

    OR

    (b) Draw a cross section of canal in partial filling and partial cutting. 04

    (બ) આંવશક ખોદ ણ અને આંવશક પરૂ ણમ નહરેનો આડછેદ દોરો. ૦૪ (c) Draw a neat sketch of earth dam, label its components and write function of

    filter in earth dam.

    07

    (ક) મ ટીન બાંધની સ્વચ્છ આક્રુવત દોરી તેન ભ ગોન ન મ લખો તથ તેમ ફીલ્ટર ન ુક યય લખો.

    ૦૭

    Q.5 (a) Differentiate between Weir and Barrage 04

    પ્રશ્ન. ૫ (અ) વીયર અને બર જ વચ્ચેનો તફ વત લખો. ૦૪ (b) Draw a layout of diversion head work. 04

    (બ) ડ યવર્ઝયન હડેવકયની આક્રુવત દોરો. ૦૪ (c) Write classification of canal. 03

    (ક) નહરેન ુવગીકરણ કરો. ૦૩ (d) Give aims of water shed management 03

    (ડ) વોટરશેડ મેનેજમેંટન ઉદે્દશો લખો. ૦૩

    ************

  • 1/3

    Seat No.: ________ Enrolment No.______________

    GUJARAT TECHNOLOGICAL UNIVERSITY DIPLOMA ENGINEERING – SEMESTER – IV • EXAMINATION – SUMMER- 2016

    Subject Code: 3340604 Date: 20- 05- 2016 Subject Name: WATER RESOURSE MANAGEMENT Time: 10:30 AM TO 01:00 PM Total Marks: 70 Instructions:

    1. Attempt all questions. 2. Make Suitable assumptions wherever necessary. 3. Figures to the right indicate full marks. 4. Use of programmable & Communication aids are strictly prohibited. 5. Use of only simple calculator is permitted in Mathematics. 6. English version is authentic.

    Q.1 Answer any seven out of ten. દશમાથંી કોઇપણ સાતના જવાબ આપો. 14

    1. What is the necessity of Water Resource Management? ૧.  જળ સપંિ   યવ થાની જરુિરયાત શુ ંછે ?  2. List the steps to be taken by water resource engineer at the time of draught ૨. દુ કાળના સમયમા ંજળ ોત ઈજનેર તરીકે લેવાના પગલાની યાદી બનાવો. 3. What is hydrology? ૩. જળ િવજ્ઞાન એટલે શુ ં? 4. Draw a sketch of Symon’s Rain gauge and label its parts. ૪. સાયમનના  ુ ટીમાપકની આ િત દોરો અને ભાગોના નામ લખો. 5. Draw a sketch of Diversion head work and label its parts. ૫. ડાયવ ન હડે વકર્સની આ િત દોરો અને ભાગોના નામ લખો.  6. List materials used for canal lining. ૬. નહરેના અ તર માટેના મટીિરયલની યાદી બનાવો. 7. Write importance of check dam. ૭. ચેક ડેમની અગ યતા લખો. 8. Write note on silt excluder and silt ejector. ૮. િસ ટ એક્સલડુર અને િસ ટ ઈ ક્ટર િવષે લખો.  9. Write function of relief well in earthen dam. ૯. માટીના બધંમા ંિરલીફ વેલન ુકાયર્ લખો. 10. Write necessity of foundation grouting. ૧૦. પાયાના ગ્રાઉટીંગની જરુિરયાત સમજાવો

    Q.2 (a) Write function of water resource management. 03 . ર  (અ) જળ સપંિ   યવ થાના કાય ની યાદી લખો. ૦૩ OR (a) List various agencies involved in water resource management. 03 (અ) જળ સપંિ   યવ થામા ંભાગ લેતી િવિવધ સં થાની યાદી લખો ૦૩ (b) Draw hydrological cycle. 03 (બ) જળ ચક્રની આ િત દોરો.  ૦૩ OR

  • 2/3

    (b) Explain evaporation and transpiration. 03 (બ) બા પીભવન અને બા પો સ ન સમજાવો. ૦૩ (c) List types of precipitation and explain any one. 04 (ક) અવકે્ષપણના પ્રકારની યાદી બનાવી ગમેતે એકને િવગતથી સમજાવો   ૦૪ OR (c) Find the average rainfall by theisson polygon and arithmetical average

    methods for a catchment with 5 rain gauge stations as A, B, C, D, E. The the rain guage readings are 750, 650, 850 930, and 450 mm respectively. The area under each rain gauge stations are 150, 120, 170, 95 and 80 sq. km respectively.

    04

    (ક) વરસાદ માપક અ, બ, ક, ડ, ઈ, પરથી માપવામા ંવરસાદ મીમી મા ંઅનકુ્રમે ૭૫૦, ૬૫૦, ૮૫૦, ૯૩૦, ૪૫૦, છે. તથા તેના થીસન પોલીગોનનુ ંકે્ષત્રફળ અનકુ્રમે ૧૫૦, ૧૨૦, ૧૭૦, ૯૫, ૮૦ ચો.કીમી. હોયતો ગિણિતય સરેરાશની રીત તથા થીસન પોલીગોનની રીતથી સરેરાશ વરસાદ ગણો. 

    ૦૪

    (d) List factors affecting runoff. 04 (ડ) રનઓફને અસર કરતા પિરબળોની યાદી બનાવો.  ૦૪ OR (d) List different computation of runoff. 04 (ડ) રનઓફની ગણતરી કરવાની રીતોની યાદી બનાવો. ૦૪

    Q.3 (a) List different types of survey for reservoir planning and explain any one. 03 . 3  (અ) જળાશયના આયોજન માટેના સવેર્ની યાદી કરી એક પ્રકારના સવેર્ને સમજાવો. ૦૩ OR (a) List the factors to be considered in site selection for reservoir. 03 (અ) જળાશયના  થળની પસદંગીને અસર કરતા પરીબળોની યાદી બનાવો. ૦૩ (b) Explain with sketch different storage zone of reservoir. 03 (બ) આ િત સહીત જળાશયમા ંસઘંરાયેલા જળરાશીના િવભાગો સમજાવો. ૦૩ OR (b) Draw and list forces acting on gravity dam. 03 (બ) આ િત સહીત ગે્રિવટી ડેમ પર લાગતા બળોની યાદી બનાવો. ૦૩ (c) Write functions of different component of an earthen dam. 04 (ક) માટી બધંના મખુ્ય ભાગોન ુકાયર્ લખો. ૦૪ OR (c) Draw a detailed sketch of earthen dam and label its parts. 04 (ક) માટી બધંની આ િત દોરી તેના પર ભાગોના નામ લખો. ૦૪ (d) Write detailed classification of canals. 04 (ડ) કેનાલનુ ંવગીર્કરણ િવગતથી લખો. ૦૪ OR (d) Write advantages and disadvantages of canal lining. 04 (ડ) નહરેને અ તર કરવાના ફાયદા અને ગેરફાયદા લખો. ૦૪

    Q.4 (a) Explain importance of ground water. 03 . ૪  (અ) ભગુભર્ જળન ુમહ વ સમજાવો.  ૦૩ OR (a) Write limitations of use of ground water. 03

  • 3/3

    (અ) ભગુભર્ જળના વપરાશની મયર્દા લખો. ૦૩ (b) What is aquifer? Explain different types of aquifers. 04 (બ) એિક્વફર એટલે શ?ુ એિક્વફરના પ્રકારો સમજાવો. ૦૪ OR (b) List different methods of artificial recharge. 04 (બ) ત્રીમ રીચા ની રીતોની યાદી બનાવો. ૦૪ (c) Write and explain detailed classification of dam. 07 (ક) બધંોનુ ંિવગતવાર વગીર્કરણ સમજાવો. ૦૭

    Q.5 (a) List different types of works to be done under water shed sceme. 04 . ૫  (અ) વોટરશેડ યોજના હઠેળ કરવાના થતા કામોની યાદી બનાવો. ૦૪ (b) List method of rain water harvesting and explain any one. 04 (બ) વરસાદના પાણીના સચંયની રીતોની યાદી બનાવી એક રીતને વણર્વો. ૦૪ (c) What is importance of water shed management in present environmental

    condition. 03

    (ક) પ્રવતર્માન પયાર્વરણીય પિરિ થિતમા ંવોટર શેડ  યવ થાપનની અગ યાતા સમજાવો. 

    ૦૩

    (d) List factors affecting canal alignment. 03 (ડ) નહરેની લાઈન દોરીને અસર કરતા પરીબળોની યાદી બનાવો. ૦૩

    ************