Gujarat Highcourt

download Gujarat Highcourt

of 19

Transcript of Gujarat Highcourt

  • 8/2/2019 Gujarat Highcourt

    1/19

    High Court of Gujarat

    Prepared by:

    Samip N. Khatri 090300107048

    Chintan A. Nanavati 090300107047

  • 8/2/2019 Gujarat Highcourt

    2/19

    System Requirement Study

    User Characteristics:They may be system user or administator.

    Inturn user may be advocate, judge, client or anyvisitor(observer). All user must have to enterrequired details.

    Administrator keeping update the system.

  • 8/2/2019 Gujarat Highcourt

    3/19

    Hardware and SoftwareRequirements Operating Systems: windows XP

    Minimum Hardware:

    complete pc internet connection

    P-4

    printer512 MB RAM

    80 GB HDD

    For Developer:

    complete pcP-4

    512MB RAM

    160 GB HDD

  • 8/2/2019 Gujarat Highcourt

    4/19

    Hardware and SoftwareRequirements

    Minimum Software:-

    User:

    Operating System win wp/7

    Web browserNecessary drivers

    Programmer:

    Operating System win wp/7

    Wamp Server - MySQL

    Adobe flash player

    Necessary drivers

  • 8/2/2019 Gujarat Highcourt

    5/19

    Study of Current System

    Our current court system is manual. Itmeans if any user may want to knowany dateils he has to physicaly

    approach court.

    It causes heavy rush at court

    compound.

    Current system is on paper bases.

  • 8/2/2019 Gujarat Highcourt

    6/19

    Purpose of the System

    This system will make most of procedure faster, soefficiency ( no of cases in per time) will increase.More cases can be solved.

    Client can supply data online, so he can save his timeand can approach the court from home only.

    It will also help judge & advocate getting schedule,

    next ordering date etc online and system becomesmore flexible.

    Because of this one can keep watch on courts

    working scenario.

  • 8/2/2019 Gujarat Highcourt

    7/19

    Scope

    User, advocate, justice can show schedule,judgement, order date,cases progress.

    User can submit data online. No one can

    update anything with-out UPDATERS.

  • 8/2/2019 Gujarat Highcourt

    8/19

    Data Dictionary For Classes

    Person- This class including each live person thatinteracts with our system. He may be employee,user (whose case is running), Updater etc. Theyuse this software for knowing schedule, judgement,etc.

    User- Clients are included in this class. He doeshis job by entering case no or can file a new case.

    Employee- This class includes all types of

    employees of court who interact with system. It canbe generalized in judge, advocate, peon, updateretc.

    History-It includes data of proof & it can be

    accessed by user or employee.

  • 8/2/2019 Gujarat Highcourt

    9/19

    Data Dictionary For Classes

    Every one can get data according to permission. Itcan be divide in to two types

    Case history & Employee history.

    Updater-Updater is one of the employees thatupdate history.

    Schedule-This can be known by advocate, judge.It is updated by updetar.

    Judgement- This is same as schedule.

  • 8/2/2019 Gujarat Highcourt

    10/19

    Steps in Feasibility Analysis

    Eight steps involved in the feasibility analysisare: Form a project team and appoint a projectleader. Prepare system flowcharts.

    Enumerate potential proposed system. Define and identify characteristics ofproposed system. Determine and evaluate performance andcost effective of each proposed system. Weight system performance and cost data. Select the best-proposed system. Prepare and report final project directive tomanagement.

  • 8/2/2019 Gujarat Highcourt

    11/19

    Technical Feasibility

    A study of resource availability that mayaffect the ability to achieve an acceptablesystem. This evaluation determines whetherthe technology needed for the proposedsystem is available or not.

    Can the work for the project be done withcurrent equipment existing softwaretechnology & available personal? Can the system be upgraded if developed? If new technology is needed then what canbe developed? his is concerned with specifying equipmentand software that will successfully satisfy theuser requirement. The technical needs of thesystem may include:

  • 8/2/2019 Gujarat Highcourt

    12/19

    Front-end & Back-endSelection An important issue for the development of a

    project is the selection of suitable front-endand back-end. When we decided to developthe project we went through an extensivestudy to determine the most suitableplatform that suits the needs of theorganization as well as helps in

    development of the project.The aspects of our study included thefollowing factors.

  • 8/2/2019 Gujarat Highcourt

    13/19

    Front-end selection:

    1. It must have a GUI that assists employeesthat are not from IT background2. Scalability and extensibility.3. Flexibility.4. Robustness.5. According to the organization requirement

    and the culture.6. Must provide excellent reporting features

    with good printing support.

    7. Platform independent.8. Easy to debug and maintain.9. Event driven programming facility.10. Front end must support some popular back

    end like Ms Access.

  • 8/2/2019 Gujarat Highcourt

    14/19

    Back-end Selection:1. Multiple user support.

    2. Efficient data handling.3. Provide inherent features for security.

    4. Efficient data retrieval and maintenance.

    5. Stored procedures.

    6. Popularity.

    7. Operating System compatible.8. Easy to install.

    9. Various drivers must be available.

    10. Easy to implant with the Front-end.

    The technical feasibility is frequently the most difficult areaencountered at this stage. It is essential that the process ofanalysis and definition be conducted in parallel with anassessment to technical feasibility. It centers on the existingcomputer system and to what extent it can support theproposed system.

  • 8/2/2019 Gujarat Highcourt

    15/19

    Economical Feasibility

    Economic justification is generally the BottomLine consideration for most systems.

    Economicjustification includes a broad range of concerns

    thatincludes cost benefit analysis. In this we weightthe

    cost and the benefits associated with thecandidate

    system and if it suits the basic purpose of theorganization i.e. profit making, the project is

    makingto the analysis and design phase.

    The financial and the economic questions

  • 8/2/2019 Gujarat Highcourt

    16/19

    The cost to conduct a full system investigation. The cost of hardware and software for the class

    of application being considered. The proposed system will give the minute

    information, as a result the performance is

    improved This feasibility checks whether the system can be

    developed with the available funds. The Onlinevoting system does not require enormous

    amount of money to be developed. This can bedone economically if planned judicially, so it iseconomically feasible. The cost of projectdepends upon the number of man-hoursrequired.

  • 8/2/2019 Gujarat Highcourt

    17/19

    Operational Feasibility

    It is mainly related to human organizationsand political aspects. The points to beconsidered are: What changes will be brought with the

    system? What organization structures aredisturbed? What new skills will be required? Do theexisting staff members have theseskills? If not, can they be trained in duecourse of time?The system is operationally feasible as it veryeasy for the End users to operate it. It only

    needs basic information about Windows

  • 8/2/2019 Gujarat Highcourt

    18/19

    Schedule feasibility

    Time evaluation is the most importantconsideration in the development of project.The time schedule required for thedeveloped of this project is very importantsince more development time effectmachine time, cost and cause delay in thedevelopment of other systems.

    A reliable Online voting system can bedeveloped in the considerable amount oftime.

  • 8/2/2019 Gujarat Highcourt

    19/19

    THANK YOU !!