Guidelines for Integrated Water Resources Management (IWRM) at The River Basin Level (IRBM) Dr....
-
Upload
baldric-powell -
Category
Documents
-
view
215 -
download
0
Transcript of Guidelines for Integrated Water Resources Management (IWRM) at The River Basin Level (IRBM) Dr....
Guidelines for Integrated Water Resources Management (IWRM) at The
River Basin Level (IRBM)
Dr. Huseyin Gundogdu, Dr. Murat Hatipoglu, Taner Kimence
(Agr. Eng.) (Civil eng.) (Env. Eng.)
The General Directorate of State Hydraulic Works (DSI)
16-22 March 2009-ISTANBUL
CASE STUDY
BUYUK MENDERES RIVER BASIN-TURKEY
BUYUK MENDERES RIVER BASIN
PROTECTED AREAS
CLIMATE
The climate in the basin varies from the Mediterranean climate in the coastal regions and downstream to the continental climate upstream. The annual average precipitation in the basin is 635 mm. It is 999 mm in the downstream parts and decrease to 350 mm in the upstream. The amount of precipitation is high in spring and winter times, but low in summer
LAND USE
Projects / Programs Major IWRM Initiatives(Institutional / Planning Integration)
Demand for Agriculture, Problems of Drought and Floods- Requirement of Multipurpose Dam- Lack of reliable and sufficient data- Improvement of Hydrometric Network- Feasibility Study utilizing reliable and sufficient data
1960’s-1970’s
1976-1989
Modern IWRM
1990’s ConventionalWater Management
2007
Development
Construction offirst dam,Adiguzel Dam
Recognition of problems and changes of several sectors (including industry, urban water treatment facility, irrigation system etc.)- Necessity of integrated approach- Setting up framework for stakeholder participation- Active dialogue and exchange of information among all stakeholders- Awareness raising and stakeholder participation
Water Pollution- Environmental Study- Technical and feasibility study for maintain water level of the Bafa Lake- Construction of rubber dam at Bafa Lake
DEVELOPMENT OF BASINI. Demand for Agriculture, Problems of
Drought and Floods
National Development Policy
• The Economy agricultural dependant (1960s).
• Priorities – Land and water resource. – increasing income level and
living standards of rural population
– Migration
DEVELOPMENT OF BASINI. Demand for Agriculture, Problems of Drought
and Floods
• Precipitation- irregular (seasonally and year to year
• Droughts
• FloodsNeeds
• Dams• Sufficient data• Improvement
hydrometric network
I.KEY FOR SUCCESS
I.KEY FOR SUCCESS
I.KEY FOR SUCCESS
II. RECOGNITION OF NEW PROBLEMS
ENVIRONMENTAL DEGRADATION
• Pollution
– Industrial–Domestic–Agricultural
II. RECOGNITION OF NEW PROBLEMSBAFA LAKE CASE
RubberDam
•Disconnection river and lake•DO decreases•Salty water intrusion
II.KEY FOR SUCCESS
Rubber dam
Fish pass
Bafa Lake
B. Menderes riverriver
BafaLakeBuyu
kM
ende
res
Riv
ere
Rubber Dam
Freshwater
Mixture ofFresh and Saline water
+2.0m
0m
Equals toBufa Lakewater level
UpstreamDownstream
III.APPROACH FOR INTEGRATED WATER RESOURCES MANAGEMENT
• Every stakeholder tries to solve these problems within their responsibility:– The industry, especially the leather
factories, scattered in the Uşak Province has been moved to the organized industrial zone and the construction of a common waste water treatment facility for the industrial zone has been completed.
– In the Denizli Province, an urban waste water treatment facility has been put in operation and the textile industry established a common treatment facility.
– Existing irrigation systems have been replaced with modern irrigation systems to ensure efficiency and save water.
– Non-governmental organizations have also initiated some projects.
III.KEY FOR SUCCESS• 1-Pilot implementation of the European Union Water
Framework Directive• 2-Capacity Building Support to the Water Sector in
Turkey
– Long-tetrm sustainable use – decrease pollution,– to prevent further deterioration of aquatic
ecosystem and areas depending on those ecosystems;
– to enhance the aquatic environment, amongst other by decreasing discharges;
– to raise awareness and stakeholder participation
• Within the scope of this project, active dialogue and exchange of information have been taking place with all stakeholders such as the Büyük Menderes Environmental Protection Union, Municipalities, Irrigation Unions, Chambers of Industry and Trade, and NGOs.
• Through these works, it has been targeted to communicate all the activities carried out in the basin to all stakeholders, to coordinate the activities and to create public awareness in the basin.
III.KEY FOR SUCCESS
Thank You