Guidelines for Airfield Rubblization Mark Buncher, Ph.D., P.E. 2010 FAA Worldwide Airport Technology...

31
Guidelines for Airfield Rubblization Mark Buncher, Ph.D., P.E. 2010 FAA Worldwide Airport Technology Transfer Conference Apr 20-22, 2010

Transcript of Guidelines for Airfield Rubblization Mark Buncher, Ph.D., P.E. 2010 FAA Worldwide Airport Technology...

Page 1: Guidelines for Airfield Rubblization Mark Buncher, Ph.D., P.E. 2010 FAA Worldwide Airport Technology Transfer Conference Apr 20-22, 2010.

Guidelines for Airfield Rubblization

Mark Buncher, Ph.D., P.E.2010 FAA Worldwide Airport Technology Transfer Conference

Apr 20-22, 2010

Page 2: Guidelines for Airfield Rubblization Mark Buncher, Ph.D., P.E. 2010 FAA Worldwide Airport Technology Transfer Conference Apr 20-22, 2010.

Presentation Outline

• Background on Rubblization

• Key Findings from AAPTP Project 04-01– Thickness Design Considerations– Assessing Feasibility on Weak PCC Sections – Recommendations for “Marginal” Candidates– Recommendations for Quality Assurance

Note: Many more details in conference paper and Final Report

Page 3: Guidelines for Airfield Rubblization Mark Buncher, Ph.D., P.E. 2010 FAA Worldwide Airport Technology Transfer Conference Apr 20-22, 2010.

What is Rubblization?

• Fracturing techniques that:– Rubblizes PCC into high quality agg. base – Eliminates slab action and inherent distresses– Destroys bond between concrete and any steel

• Converts failed rigid system into new flexible one– Utilizing all existing pavement layers

• Very Green Design Alternative

Page 4: Guidelines for Airfield Rubblization Mark Buncher, Ph.D., P.E. 2010 FAA Worldwide Airport Technology Transfer Conference Apr 20-22, 2010.

Rubblized PCC @ Joint

Page 5: Guidelines for Airfield Rubblization Mark Buncher, Ph.D., P.E. 2010 FAA Worldwide Airport Technology Transfer Conference Apr 20-22, 2010.

• Over 50M Sq Meters rubblized 1994-2004– Over 35 states

• Slab thicknesses generally between 8-12in

• Lots of good industry references, studies

PCC Rehab Method of Choice on Highways

Page 6: Guidelines for Airfield Rubblization Mark Buncher, Ph.D., P.E. 2010 FAA Worldwide Airport Technology Transfer Conference Apr 20-22, 2010.

• 30 airfield projects in US through 2006– Shared between MHB and RPB– PCC thicknesses from 6 to 26 inches

• Early questions about very thick slabs on airfields. Resolved in 2002…– Resonant Pavement Breaker (RPB) at Wright-

Patterson AFB, OH• Up to 26 inches

– Multi-Head Breaker (MHB) at Selfridge ANGB, MI• Up to 21 inches

Rubblization on Airfields

Page 7: Guidelines for Airfield Rubblization Mark Buncher, Ph.D., P.E. 2010 FAA Worldwide Airport Technology Transfer Conference Apr 20-22, 2010.

MHB with Guillotene Hammer at Selfridge ANGB

• Guillotene typically only needed for PCC >14in• Spacing affects max particle size at slab bottom

Page 8: Guidelines for Airfield Rubblization Mark Buncher, Ph.D., P.E. 2010 FAA Worldwide Airport Technology Transfer Conference Apr 20-22, 2010.

Selfridge Test Pit agency approval before full scale rubblization

Page 9: Guidelines for Airfield Rubblization Mark Buncher, Ph.D., P.E. 2010 FAA Worldwide Airport Technology Transfer Conference Apr 20-22, 2010.

RB-500 at WPAFBRB-500 at WPAFB

• 2000 lbf blows @ 44 cycles/second

• < 1 inch amplitude

• 9-12 inch wide passes

Page 10: Guidelines for Airfield Rubblization Mark Buncher, Ph.D., P.E. 2010 FAA Worldwide Airport Technology Transfer Conference Apr 20-22, 2010.

Test pits at WPAFB:Test pits at WPAFB:– Full depth slab destructionFull depth slab destruction– Nom. max particle size: 12 inchesNom. max particle size: 12 inches

Page 11: Guidelines for Airfield Rubblization Mark Buncher, Ph.D., P.E. 2010 FAA Worldwide Airport Technology Transfer Conference Apr 20-22, 2010.

AAPTP Project 04 – 01

• Objective– Document state-of-the-art rubblization– Develop guidance regarding project

feasibility, structural design, construction, quality control, etc

• Final Report completed 2008 and posted on www.aaptp.us – Now referenced in FAA AC 150/5320-6E,

Airport Pavement Design and Evaluation

Page 12: Guidelines for Airfield Rubblization Mark Buncher, Ph.D., P.E. 2010 FAA Worldwide Airport Technology Transfer Conference Apr 20-22, 2010.

Characterizing Rubblized Material - Background

• Always Assumed Rubblized Equivalent to Crushed Agg Base (CAB), P-209 – Stiffness Modulus (Erub) = 50 - 60 ksi

• Literature Suggests This is Conservative

• O4-01 Approach– Reviewed Literature for Back-calculations of

Rubblized – Performed New Back-calculations on Several

Projects

– Examine Data to Predict Erub

Page 13: Guidelines for Airfield Rubblization Mark Buncher, Ph.D., P.E. 2010 FAA Worldwide Airport Technology Transfer Conference Apr 20-22, 2010.

Conclusions on Material Characterization

• Data range of in-service Erub: 100 to 430 ksi

– Avg of 205 ksi

• Erub closer to HMA base than CAB

– For Layer-Elastic designs• PCC 6-8” thick: 100-135ksi• PCC 8-14” thick: 135-235ksi• PCC >14” thick: 235-400ksi

• Larger PCC pieces and steel produce higher Erub values

Page 14: Guidelines for Airfield Rubblization Mark Buncher, Ph.D., P.E. 2010 FAA Worldwide Airport Technology Transfer Conference Apr 20-22, 2010.

Minimum HMA Overlay ThicknessRecommendations

• If HMA Placed On Rubblized Material– 5 inches Minimum HMA

• Minimum 2 lifts, but 3 preferred (for smoothness)• 1st lift: minimum thickness of 3 inches (for density)

• If Unbound Material Placed On Rubblized– Use Existing Criteria (3 - 4 inches Min. HMA)

• Structural Design May Require Greater HMA Thickness

Page 15: Guidelines for Airfield Rubblization Mark Buncher, Ph.D., P.E. 2010 FAA Worldwide Airport Technology Transfer Conference Apr 20-22, 2010.

Assessing Suitability of Project for Rubblization

• Not All Sections May Be Strong Candidates

• Possibly Marginal Candidate If Slabs Are Thin (<8”) With Poor Underlying Support– Thin to No Subbase– Weak Subgrade (often saturated)– Typical of WWII Built (Now GA) Airfields– 13 of the 30 Known Airfield Rubblization Projects

were <8” PCC.– Was an Issue on 3 of these 13

• Pratt KA, Kegelman OK, Tullahoma TN (all RW Projects)

Page 16: Guidelines for Airfield Rubblization Mark Buncher, Ph.D., P.E. 2010 FAA Worldwide Airport Technology Transfer Conference Apr 20-22, 2010.

Pratt KAPratt KA-6” PCC, virtually no subbase, subgrade CBR of 2-46” PCC, virtually no subbase, subgrade CBR of 2-4

-Spec required RPBSpec required RPB

-Edge drains installed but no water ever drainedEdge drains installed but no water ever drained

- Rubblization started OK on edge, but problems as moved - Rubblization started OK on edge, but problems as moved toward centerlinetoward centerline

Page 17: Guidelines for Airfield Rubblization Mark Buncher, Ph.D., P.E. 2010 FAA Worldwide Airport Technology Transfer Conference Apr 20-22, 2010.
Page 18: Guidelines for Airfield Rubblization Mark Buncher, Ph.D., P.E. 2010 FAA Worldwide Airport Technology Transfer Conference Apr 20-22, 2010.
Page 19: Guidelines for Airfield Rubblization Mark Buncher, Ph.D., P.E. 2010 FAA Worldwide Airport Technology Transfer Conference Apr 20-22, 2010.

Kegelman Field, OKKegelman Field, OK- 5”-6.5” PCC, 0-4” sand subbase, clay subgrade5”-6.5” PCC, 0-4” sand subbase, clay subgrade

- RPB required RPB required

- Poor drainage and “couldn’t afford” edge drainsPoor drainage and “couldn’t afford” edge drains

- No punch-thrus but excessive rutting (>2”)No punch-thrus but excessive rutting (>2”)

- 30% of project had full depth patches30% of project had full depth patches

Page 20: Guidelines for Airfield Rubblization Mark Buncher, Ph.D., P.E. 2010 FAA Worldwide Airport Technology Transfer Conference Apr 20-22, 2010.

Shows Start-up of MHB, normal drop-height (24”) and spacing

Tullahoma TNTullahoma TN - 7.25” PCC, No Subbase- 7.25” PCC, No Subbase - Clay Subrade (CBRs: 4-12)- Clay Subrade (CBRs: 4-12)

Page 21: Guidelines for Airfield Rubblization Mark Buncher, Ph.D., P.E. 2010 FAA Worldwide Airport Technology Transfer Conference Apr 20-22, 2010.

Shows MHB “Modified” Rubblization Process (low drop ht – 16”, large spacing – 10”) Acceptable Surface, But Didn’t Meet Criteria

Page 22: Guidelines for Airfield Rubblization Mark Buncher, Ph.D., P.E. 2010 FAA Worldwide Airport Technology Transfer Conference Apr 20-22, 2010.

Assessing risk of having inadequate structural support for effective rubblization (resulting in inconsistent breakage, large and shifting PCC particles, punch-thus or rutting from construction equipment).

0

2

4

6

8

10

12

14

16

18

20

0 1 2 3 4 5 6 7 8 9 10

Subgrade CBR

Th

ickn

ess

of

PC

C a

nd

Bas

e

High Risk

Low RiskModerate

Risk

Protocol and Criteria for Assessing Risk to Aid in Determining Project Feasibility

Page 23: Guidelines for Airfield Rubblization Mark Buncher, Ph.D., P.E. 2010 FAA Worldwide Airport Technology Transfer Conference Apr 20-22, 2010.

Recommendations on Avoiding Problems for Marginal Candidates

• Conduct assessment protocol before starting– Determine relative risk over entire project– Identify areas of high, medium and low risk

• Avoid wet season for rubblizing

• Install edge drain system before rubblization– Eases rubblization and improves long-term

performance– Exceptions:

• if one exists and is working• if subgrade is self-draining

Page 24: Guidelines for Airfield Rubblization Mark Buncher, Ph.D., P.E. 2010 FAA Worldwide Airport Technology Transfer Conference Apr 20-22, 2010.

MHB and rollers didn’t reveal this unstable areaMHB and rollers didn’t reveal this unstable area

- HMA haul trucks and paver did…bad news!- HMA haul trucks and paver did…bad news!

Proof Rolling Very Important - especially when using MHB

Page 25: Guidelines for Airfield Rubblization Mark Buncher, Ph.D., P.E. 2010 FAA Worldwide Airport Technology Transfer Conference Apr 20-22, 2010.

Other Designer Recommendations for Marginal Candidates Only

• Consider provision for “Modified” Rubblization– Waive particle criteria

• Consider other design options– Conventional Crack and Seat

• Separate bid item for full depth patching – Provides competitive price

• Keeping Perspective– Out of 30 airfield projects, 13 had PCC <8”– 10 of those 13 did not reveal instability issues

Page 26: Guidelines for Airfield Rubblization Mark Buncher, Ph.D., P.E. 2010 FAA Worldwide Airport Technology Transfer Conference Apr 20-22, 2010.

Quality Assurance

• Test Strips

• Test Pits

• Particle Size Criteria

Page 27: Guidelines for Airfield Rubblization Mark Buncher, Ph.D., P.E. 2010 FAA Worldwide Airport Technology Transfer Conference Apr 20-22, 2010.

Test Strips

• For contractor to demonstrate effective rubblization and rolling practices

• Provides area for test pit

• Minimum: 300 ft long by one slab width

• New test strip for each unique feature

Page 28: Guidelines for Airfield Rubblization Mark Buncher, Ph.D., P.E. 2010 FAA Worldwide Airport Technology Transfer Conference Apr 20-22, 2010.

Test Pits

• Excavate from test strip

• Include transverse and longitudinal joint

• Determine if spec criteria is met– Full depth fracture

• Particle size criteria (next slide)

– Steel “substantially” debonded• Dowels can be sawed

• At free edges, allow larger PCC pieces– Due to lack of support

Page 29: Guidelines for Airfield Rubblization Mark Buncher, Ph.D., P.E. 2010 FAA Worldwide Airport Technology Transfer Conference Apr 20-22, 2010.

Particle Size Acceptance Criteria

• Upper half of slab– All particles < 6”– 75% of material (by weight) < 3”

• Bottom half of slab or below steel– All particles < 2x slab thickness

Page 30: Guidelines for Airfield Rubblization Mark Buncher, Ph.D., P.E. 2010 FAA Worldwide Airport Technology Transfer Conference Apr 20-22, 2010.

Significant Non-finding from AAPTP 04-01

• No documented findings of any reflective cracking on any rubblization project – Hundreds of Highway Projects– Over 30 Airfield Projects– Dating back into the early 1990s

Page 31: Guidelines for Airfield Rubblization Mark Buncher, Ph.D., P.E. 2010 FAA Worldwide Airport Technology Transfer Conference Apr 20-22, 2010.

Questions?