Guernsey Offshore wind - A Data Acquisition Strategy

53
Guernsey Offshore Wind A Data Acquisition Strategy Student: Mr Marc Staddon Supervisor: Mr Richard Cochrane

Transcript of Guernsey Offshore wind - A Data Acquisition Strategy

Page 1: Guernsey Offshore wind - A Data Acquisition Strategy

Guernsey Offshore Wind

A Data Acquisition Strategy

Student: Mr Marc Staddon

Supervisor: Mr Richard Cochrane

Page 2: Guernsey Offshore wind - A Data Acquisition Strategy

This dissertation is submitted in partial fulfilment of the requirements for the degree of

MEng Renewable Energy, University of Exeter.

© Marc Staddon 2015.

All rights reserved. No part of this publication may be reproduced

without the written permission of the copyright owner.

Page 3: Guernsey Offshore wind - A Data Acquisition Strategy

i

Contents

Table of Figures ............................................................................................................................................ iii

Table of Tables .............................................................................................................................................. iii

Acknowledgements ...................................................................................................................................... iv

Common abbreviation and notations .......................................................................................................... vi

1 Introduction .......................................................................................................................................... 1

1.1 Background ............................................................................................................................... 1

1.1.1 GRET report .......................................................................................................................... 2

1.1.2 Territorial limits .................................................................................................................... 2

1.1.3 Aquatera report .................................................................................................................... 3

2 Aims and objectives .............................................................................................................................. 3

3 Literature review and research ............................................................................................................ 4

3.1 Methodology ............................................................................................................................ 4

3.1.1 Literature review .................................................................................................................. 4

3.1.2 Online research ..................................................................................................................... 5

3.2 4C Offshore ............................................................................................................................... 5

3.3 IEC 61400-12-1 Annex L requirements ..................................................................................... 6

4 Technology ........................................................................................................................................... 7

4.1 Overview ................................................................................................................................... 7

4.2 On site assessment ................................................................................................................... 8

4.2.1 Offshore Met Mast ............................................................................................................... 8

4.2.2 FLiDAR ................................................................................................................................. 10

4.3 Remote sensing ...................................................................................................................... 12

4.3.1 Overview ............................................................................................................................. 12

4.3.2 SoDAR ................................................................................................................................. 13

4.3.3 LiDAR ................................................................................................................................... 14

4.3.4 Summary ............................................................................................................................. 15

4.4 Modelling ................................................................................................................................ 16

4.4.1 Virtual Met Mast™ .............................................................................................................. 16

4.4.2 MeteoPole - ZephyTOOLS ................................................................................................. 18

4.4.3 Summary ............................................................................................................................. 19

5 Similar projects ................................................................................................................................... 20

Page 4: Guernsey Offshore wind - A Data Acquisition Strategy

ii

5.1 Havsul II .................................................................................................................................. 20

5.2 Ulsan – South Korea ............................................................................................................... 20

5.3 Aberdeen Renewable Energy Group (AREG) .......................................................................... 21

5.3.1 AREG WRA .......................................................................................................................... 22

5.4 Summary ................................................................................................................................. 22

6 LiDAR Strategy .................................................................................................................................... 23

6.1 WRA methodology .................................................................................................................. 24

6.2 TUV NEL .................................................................................................................................. 25

6.3 Summary ................................................................................................................................. 25

7 Conclusions and Recommendations................................................................................................... 26

7.1 Conclusions ............................................................................................................................. 26

7.2 Recommendations .................................................................................................................. 26

7.3 Summary ................................................................................................................................. 27

7.4 Limitations .............................................................................................................................. 27

7.5 Further work ........................................................................................................................... 27

8 Bibliography ........................................................................................................................................ 28

9 Glossary .............................................................................................................................................. 34

Appendix A – Company information ............................................................................................................ A

Appendix B – Email communications ........................................................................................................... B

Appendix C – Phone conversations .............................................................................................................. B

Appendix D – GRET Meeting ........................................................................................................................ D

Appendix E – Aquatera ................................................................................................................................. E

Page 5: Guernsey Offshore wind - A Data Acquisition Strategy

iii

Table of Figures

Figure 4-1 Solution budgets.......................................................................................................................... 7

Figure 4-2 Horns Rev Met Mast schematic .................................................................................................. 8

Figure 4-3 Dogger Bank MET mast bucket foundation ................................................................................ 9

Figure 4-4 FLiDAR nv deployed for validation at Blyth ............................................................................... 10

Figure 4-5 Wind Profiling ............................................................................................................................ 12

Figure 4-6 Triton SoDAR ............................................................................................................................. 13

Figure 4-7 Leosphere WINDCUBE v2 .......................................................................................................... 14

Figure 4-8 Galion LiDAR .............................................................................................................................. 14

Figure 4-9 ZephIR 300 ................................................................................................................................. 14

Figure 4-10 VMM Downscaling .................................................................................................................. 17

Figure 5-1 AREG WRA data location points ................................................................................................ 21

Table of Tables

Table 1-1 Chronology of studies ................................................................................................................... 2

Table 3-1 Coopers Taxonomy results table .................................................................................................. 4

Table 5-1 Summary of LiDAR Measurements ............................................................................................. 22

Table 7-1 Methods and Costs ..................................................................................................................... 26

Table 9-1 Glossary ...................................................................................................................................... 34

Page 6: Guernsey Offshore wind - A Data Acquisition Strategy

iv

Acknowledgements

I would like to express my gratitude to Mat Desforges and Peter Barnes from Guernsey Renewable

Energy Team (GRET), for their encouragement, consideration and support.

From the University of Exeter, Penryn, my thanks to my tutor, Lecturer Dr Helen Smith, Lecturer Dr

Adam Feldman for arranging initial contact with GRET and my supervisor Mr Richard Cochrane, Director

of Education and Lecturer, for his valuable guidance and support.

I would also like to thank Mr Matt Smith (ZephIR) for his time and for sharing his knowledge, UoE alumni

Rebecca Martin (EDF) for her help and advice, and Leon Youngs and Patrick Jones (TUV NEL) for finding

the time to help in busy circumstances.

My deepest thanks to Elly Phillips BSc, whose unselfish patience, encouragement, understanding and

support over the years have made the completion of this dissertation possible.

Disclaimer

This study, produced by a student at the University of Exeter in partnership with GRET, may contain

views and conclusions that are not shared by GRET.

Page 7: Guernsey Offshore wind - A Data Acquisition Strategy

v

Abstract

Guernsey Offshore Wind – A Data Strategy Review

This research reviews wind resource assessment techniques in order to outline the best options for an

offshore wind development for The States of Guernsey.

Traditional and modern technology, methods and costs for conducting measurement campaigns are

reviewed and discussed.

Applicable strategies from other projects are assessed identifying a significant increase in the estimated

wind speeds at one offshore site from 7.23 m/s to 8.7 m/s using a short term coastal LiDAR campaign.

An optimal solution is then derived and a cost effective strategy for Guernsey is proposed.

The study concludes that modern technology and methods can reliably replace the traditional at greatly

reduced cost and thus mitigate financial barriers and increase certainty for offshore wind developments.

Page 8: Guernsey Offshore wind - A Data Acquisition Strategy

vi

Common abbreviation and notations

Abbreviation Meaning

AOWFL The Aberdeen Offshore Wind Farm Ltd

AREG Aberdeen Renewable Energy Group

Approx Approximately

asl above sea level

awl above water level

CCA Climate Change Act

CFD Computational Fluid Dynamics

EOWDC European Offshore Wind Deployment Centre

FLiDAR Floating Light Detection and Ranging Systems

GE Guernsey Electricity Limited

GRET Guernsey Renewable Energy Team

IEC International Electrotechnical Commission

LiDAR Light Detection and Ranging Systems

m/km meters/kilometres

MCP Measure Correlate Predict

Met/MET Meteorological

NM Nautical Mile

NREL National Renewable Energy Laboratory

OWA Offshore Wind Accelerator

SoDAR Sonic Detection and Ranging Systems

SoG States of Guernsey

VMM Virtual Met Mast

WRA Wind Resource assessment

WRF Wind Research and Forecasting

WTG Wind Turbine Generator

Page 9: Guernsey Offshore wind - A Data Acquisition Strategy

1

1 Introduction

1.1 Background

The States of Guernsey (SoG) energy situation differs substantially from that of the UK, France and other

nations. The existing infrastructure is wholly reliant on imported heavy fuel oil for the islands generators

and imported French tariff electricity and consequently lacks the price-security and supply autonomy that

indigenous solutions can bring1. The situation is becoming ever more pressing as part of the Guernsey

Electricity Limited (GEL) generator fleet is due to retire within the next 5-6 years 2 along with two of the

islands aging oil tankers, the latter of which is likely to require the creation of a deep water berth to serve

larger replacements and increase the choice of suppliers3.

Reducing fossil fuel reliance for commercial reasons is therefore a priority but is only a part of SoG’s

agenda. The 2011 Guernsey Energy Resource Plan reviewed targets set out in its 2008 Energy Policy Report

and adopted targets similar to the UK’s Climate Change Act (CCA) in order to demonstrate its commitment

to addressing the issues surrounding climate change. The report also highlighted the need to diversify into

low carbon and renewable energy generation to achieve this mandate4. The latest GRET report reiterates

this vision; “generating local renewable energy which is low carbon and affordable and will provide greater

energy security and independence as well as a lasting commercial, financial and environmental legacy”5.

SoG is also in the unusual and enviable position of owning its electricity utility (GEL) and could therefore be

the major partner in its own renewable energy development. Consequently SoG would also be able to

manage the project in order to maximise economic returns and control other benefits such as

employment6.

To this end the Commerce and Employment department of the SoG government delegated the task of

progressing the macro renewable energy mandate to the Guernsey Renewable Energy Team (GRET).

Offshore wind is a rapidly maturing technology and in 2011 GRET conducted a feasibility study into the

available wind resource on the island in an effort to provide an economic case for offshore wind

development7.

1 (University of Exeter, 2013)

2 (GRET, 2013)

3 (States of Guernsey, 2011)

4 (States of Guernsey, 2011)

5 (GRET, 2015)

6 (GRET, 2013)

7 (GRET, 2011)

Page 10: Guernsey Offshore wind - A Data Acquisition Strategy

2

1.1.1 GRET report

The 2011 report found favourable conditions for the development of offshore wind at two sites to the

North West. This has been reviewed and advanced in later reports and studies (Table 1-1) culminating in

the GRET 2013 ‘Wind costings’ report that confirmed the optimal site to be a 23km2 area to the North East

(the Schole bank) beyond the 3 nautical mile (NM) and slightly overlapping the 6 NM territorial water

boundaries8.

The report summarised its own recent research findings and those from previous reports and assimilated

consultation with industrial parties and predictions from the Crown Estate and the US Department of

Energy. It confirmed that Guernsey could benefit in the short term from a 30MW domestic project (Approx

30% of demand) with minimal electricity price rises and timetabled the need for more wind data (2 years)

specific to a wind project for the period 2014-2017.

Chronology of studies:

Feasibility study into Offshore Wind Energy (GRET) – Jul 2011

Renewable Energy Feasibility Report (UoE) – Jun 2012

Feasibility of Offshore Wind in Guernsey Waters (Oliver Lee) – Sep 2012

Offshore Renewable Energy for Guernsey (UoP) – Dec 2012

Guernsey Energy Analysis and Strategy Recommendations to 2050 (UoE) – May 2013

Wind costings, a review of current knowledge and it’s applicability to Guernsey (GRET) – 2013

Review of the GRET report - Costed wind model for Guernsey (Aquatera) – Jul 2014

Renewable Energy Team (RET) Strategy – 2015 and Onwards (GRET) - 2015

1.1.2 Territorial limits

Guernsey is currently in talks with the UK and France in an effort to officially extend its territorial water

limits from 3 NM to 12 NM and to exploit the higher wind resource in the North-East9. The negotiations will

redress the impact on the English Channels North-East bound shipping lane, confirm the median line with

France to avoid territorial boundary overlaps and agree free passage and pollution management

conventions to protect the Bailiwick10.

8 (GRET, 2013)

9 (BBC (a), 2013)

10 (BBC (b), 2013)

Table 1-1 Chronology of studies

Page 11: Guernsey Offshore wind - A Data Acquisition Strategy

3

1.1.3 Aquatera report

In 2014 GRET approached consultancy firm Aquatera to review the ‘Wind costings’ and analyse the newly

available wind data from 2012 and 2013 collected at the airport and the Choet anemometer mast. It drew

conclusions and proposed recommended actions for the next steps for an offshore wind project. Aquatera

described the project as being in the preliminary appraisal phase and three initial steps were identified11;

1. Analysis of imported electricity prices from France

2. Site selection process

3. Strategy for wind data gathering and resource analysis

Of the three It was felt that step 3 was the most urgent and compelling and after contacting GRET initially

through lecturer Dr Adam Feldman and latterly Mr Richard Cochrane, Director of Education and Lecturer,

work started on producing a dissertation that would fulfil this scope.

2 Aims and objectives

The Aquatera report recommended that “better wind resource data is a priority for the project (over a

more detailed financial model) and will be needed in order to attract finance” and that a “route-map

tailored for GRET” would “outline options for data gathering and data analysis” (see Appendix E). This

provided the scope for my report and the jumping off point to define the aims and objectives.

This aims of this report are:

Research Wind Resource Assessment (WRA) techniques suited to the situation

Outline the WRA options for GRET

With the optimal objective being:

Identify the most economical and effective strategy that will help reduce project risk and increase

confidence around further investment

11

(Aquatera, 2014)

Page 12: Guernsey Offshore wind - A Data Acquisition Strategy

4

3 Literature review and research

3.1 Methodology

In the first instance an article on performing literature reviews was sourced and absorbed for guidance12.

By referring to Cooper’s (1988) Taxonomy of Literature Reviews within the article the scope of the review

was defined and shown in Table 3-1 Coopers Taxonomy results table.

Characteristic Category

Focus Practises or applications

Goal Identification of central issues

Perspective Neutral representation

Coverage Exhaustive

Organisation Methodical (introduction, method, results, and discussion)

Audience Specialised scholars

3.1.1 Literature review

The literature review focussed on the latest developments in offshore WRA techniques. An advanced

search in ScienceDirect for ‘offshore wind resource assessment’ and ‘techniques’ for the period 2013-2015

and using the filters ‘wind turbine’, ‘wind farm’, ‘wind energy’, ‘wind power’, ‘renewable energy’, ‘wind

speed’ and ‘remote sensing’ produced 29 results for 2015, 50 for 2014 and 32 for 2013. Reviewing these

results proved disappointing with few articles relevant to the latest techniques with the exception of an

assessment of offshore wind energy potential using mesoscale model and geographic information systems

201413.

Another search for ‘wind resource assessment’ and ‘remote sensing techniques limited to the period 2013-

2015 and topics ‘remote sensing’, ‘wind speed’, ‘lidar datum’ and ’wind turbine’ yielded 27 results for 2015,

29 for 2014 and 21 for 2013 but no relevant articles were found on or comparing techniques. A search for

technologies mentioned in the Aquatera report such as LiDAR (Light Detection and Ranging) and FLiDAR

(Floating Light Detection and Ranging) as cheaper alternatives to traditional Met Mast methods over the

last 3 years produced a plethora of articles highlighting the rapid and extensive development of this

technology. 12

(Randolph, 2015)

13 (Yamaguchi & Ishihara, 2014)

Table 3-1 Coopers Taxonomy results table

Page 13: Guernsey Offshore wind - A Data Acquisition Strategy

5

3.1.2 Online research

A search of the Exeter University library catalogue produced no results for ‘wind resource assessment’ so

online research was conducted to identify companies and organisations involved with offshore WRA and

the development of the latest techniques. This was confined to UK and EU organizations as Guernsey lies

within these geographical limits. An online search for relevant books yielded a very detailed publication

that was ordered through the library and proved extremely useful14.

An online search for LiDAR and FLiDAR with keyword such as ‘resource assessment’ and ‘techniques’ was

performed and the plethora of results were scrutinised for relevance and the most pertinent saved for

further review and consideration.

Relevant online news feeds such as offshorewindbiz15 and windpowermonthly16 provided a jumping off

point for further investigation. Verbal or email conversations with a network of contacts spanning industry,

alumni and academic staff also provided leads to follow.

3.2 4C Offshore

4C Offshore have constructed comprehensive databases for the offshore wind and tidal markets such as

project specifications, supply chain and construction events, their interactive map is a very useful tool for

obtaining details on wind farms around the globe. 4C provides ranked 10 year mean wind speeds for each

offshore wind farm (100m hub height) derived from high resolution global satellite data from 6 NASA

satellites17.

Following leads generated from prior research on LiDAR WRA’s and using the 4C map, details on sites

similar in scale the prospective Guernsey sites were obtained. The WRA’s were then closely examined for

suitability. Unfortunately 4C charge £2300 per year for a single user subscription and so some project

details such as milestone dates were unavailable for this report.

14

(Bower, 2012)

15 (offshorewindbiz (b), 2015)

16 (windpowermonthly, 2015)

17 (4C (a), 2015)

Page 14: Guernsey Offshore wind - A Data Acquisition Strategy

6

3.3 IEC 61400-12-1 Annex L requirements

IEC 61400 is a set of international standards for the construction of wind turbines. These design

requirements are intended to ensure the engineering integrity of the turbine and protect against damage

from hazards within the design lifetime. They cover all aspects of the turbine from structural design to

commissioning, operation and maintenance. IEC 61400-12-1 relates specifically to ‘Power performance

measurements’ including WRA requirements and Annex L relating to the application of new remote sensing

technology18.

Under current standards for energy projection and performance monitoring a meteorological (MET) mast

must be properly sited a suitable distance from wind turbines or other obstacles. Wind data is required to

be collected at or close to the intended turbine height usually some 80-100m above water level (awl). Data

must be unaffected by wakes and with a sampling rate of 1 Hertz (Hz) or higher for wind speed and

direction19. It is generally accepted that the measurement campaign is at least a year (12 consecutive

months) in duration20.

Under the current guidelines procedures concerning remote sensing technology are restricted to the

following conditions21:

Only deployments where the remote sensing device is monitored by a cup anemometer mounted on a

mast at a height corresponding to at least the minimum of the turbine rotor lower-tip height or 40m

Only ground based remote sensing devices are used (e.g. nacelle mountings are not included)

The use of remote sensing for conducting power performance assessments is limited to flat terrain,

that is, situations where site calibration is not required in accordance with Annex B of this standard.

18

(Madsen, 2008)

19 (IEC, 2013)

20 (Bower, 2012)

21 (IEC, 2013)

Page 15: Guernsey Offshore wind - A Data Acquisition Strategy

7

4 Technology

4.1 Overview

Until recently the classic offshore WRA solution has been the installation of MET masts with cup

anemometers close to the prospective site to record wind data for a period of at least 12 months. Due to

the high cost of this method remote sensing systems utilising Sonic Detection and Ranging Systems (SoDAR)

and Light Detection and Ranging Systems (LiDAR) have been developed. Such systems provide wind

measurement profiles at multiple heights simultaneously and are rapidly being validated as reliable and

cost effective replacements. Figure 4-1 below from Leosphere22 demonstrates how the costs of a WRA vary

with the deployment of newer technology and methodology.

22

(Leosphere (b), 2015)

Figure 4-1 Solution budgets

Page 16: Guernsey Offshore wind - A Data Acquisition Strategy

8

4.2 On site assessment

The following sections details the various applicable technologies and suggests the optimal technology for

Guernsey and the stage of the islands project.

4.2.1 Offshore Met Mast

Overview

Offshore WRA utilising traditional MET masts are very expensive. Off shore MET masts are typically

installed as close as possible to prospective sites to maximise confidence levels and the bankability of the

data. The University of Exeter report for GRET suggested that “an offshore meteorological mast is deployed

to reduce investor risk”23 so this possibility was examined. Offshore MET masts are large complex

structures consisting of a foundation, platform and mast complete with a suite of sensors and cup

anemometers. The cups are set at a range of heights determined by IEC guidelines, as illustrated in Figure

4-224 below, to generate a profile of the wind at the site.

23

(University of Exeter, 2013)

24 (WindData.com, 2015)

Figure 4-2 Horns Rev Met Mast schematic

Page 17: Guernsey Offshore wind - A Data Acquisition Strategy

9

Met mast installations can require deep foundations that need to be drilled into the seabed with a jack up

barge to fix the mast base in position. Costs can be as high a £7m per mast, with one leading industry

expert suggesting ‘real world’ costs of £10-12m (Appendix C-3), a considerable investment in a project

which may prove unviable after the WRA. Figure 4-3 serves to illustrate the scale of a MET mast

deployment. This suction bucket foundation with ‘human free’ tower installation method is designed to

minimise cost and personnel risk but is still a major undertaking.

The contrast in these cost figures could be due to the extra costs involving in maximising the data gathered

by the installation. As well as the wind resource offshore permitting requires characterisation of many

other factors including the sea state, current and tidal regimes, air and sea temperature, bathymetry and

benthic, marine and other wildlife. Assessing all these parameters simultaneously would maximise the

usefulness of the mast but requires more investment and deepens the complexity of the installation, raising

costs25.

Summary

Companies such as Offshore Marine Management (OMM) are developing a reusable sectional design that

can be towed out to site as a more cost effective solution to construction and installation that is estimated

to save up to 40% of the installation, maintenance and decommissioning costs.26. However this still

represents an investment of around £4m putting it well beyond the objective of this report and it is

unsuitable for the projects current stage of development.

25

(Bower, 2012)

26 (Hopwood, 2012)

Figure 4-3 Dogger Bank MET mast bucket foundation

Page 18: Guernsey Offshore wind - A Data Acquisition Strategy

10

4.2.2 FLiDAR

Overview

FLiDAR is an acronym for the floating LiDAR being developed by the many companies listed in Appendix A.

FLiDAR nv is the name of a joint venture between 3E and OWA (DEME Group) whose aims are to build,

deploy and maintain an innovative floating wind measurement device to help reduce costs for offshore

wind resource assessments. The approach utilises a moored floating platform and LiDAR technology from

Leosphere and is intended to significantly reduce the high cost of MET masts and provide more flexibility

for wind power developers and asset managers27.

The device (shown in Figure 4-4) has successfully completed numerous validation trials culminating in the

world’s largest and most challenging validation trials of floating offshore wind measurement devices by the

Offshore Wind Accelerator (OWA) at Neart Na Gaoithe in the outer Firth of Forth, 30km north of

Torness28,29 where it was used in where a MET mast would normally be used30.

27

(FLiDAR, 2012)

28 (Carbon Trust (a), 2015)

29 (FLiDAR (c), 2015)

30 (4C (e), 2015)

Figure 4-4 FLiDAR nv deployed for validation at Blyth

Page 19: Guernsey Offshore wind - A Data Acquisition Strategy

11

Summary

The availability of commercially sensitive pricing information is extremely limited but the costs of such a

device assumed to be considerable lower than a MET mast. Matt Smith mentioned in conversation

(Appendix C-9) approximate costs of the latest FLiDAR devices as around “£2.5m for tension leg platforms,

£750,000 for spar buoys (Fugro Seawatch) and less than £1m for a hull design (Axys WindSentinel)”. This

represents a considerable cost saving over MET masts but still too large an investment for the project at

this stage but given the timeline of development for both FLiDAR and Guernsey’s project it should be

regarded solution for the onsite WRA in the future.

Page 20: Guernsey Offshore wind - A Data Acquisition Strategy

12

4.3 Remote sensing

4.3.1 Overview

Remote sensing systems include vertical profilers mounted on fixed or floating platforms and side scanning

profilers deployed on shore near prospective sights and on offshore platforms. The main advantage of

remote sensing technology is the ability to measure wind profiles at much greater heights than a wind mast

and across the rotor plane of the turbine. This helps to reduce the uncertainty in the wind characterisation

and the energy generation predictions31.

Information gathered by the devices includes horizontal wind speed and direction, vertical wind speed,

associated standard deviations, signal to noise ratio and maximum height of useable data. This information

is used to produce wind profiles and identify wind shear and the level of turbulence within the airstream to

characterise the wind at a site. Figure 4-532 illustrates the use of LiDAR and MET mast to generate a wind

profile beyond the maximum height of a MET mast to a range that includes the hub height and rotor plane

of the proposed wind turbine generator (WTG)

31

(Bower, 2012)

32 (Renewable Energy Magazine, 2013)

Figure 4-5 Wind Profiling

Page 21: Guernsey Offshore wind - A Data Acquisition Strategy

13

4.3.2 SoDAR

SoDAR systems utilise sound waves to record wind velocity. Acoustic pulses are emitted and the

backscattered echoes caused by turbulent eddies within the wind are then analysed for the Doppler Effect

frequency shift to produce a velocity measurement. They can measure wind velocities from 30m to 200m

(agl) in increments of 5-20m33. SoDAR measures wind averaged over an area and can therefore also be used

to predict the wind resource available for specific wind turbines34.

SoDAR units such as Second Wind’s Triton (Figure 4-635) tend to be larger than LiDAR’s and they are

adversely affected by acoustic interference. Although successfully deployed offshore there is a higher risk

of interference from other structural components such as the wind whistling past steel cables and wave

and wildlife noise. Air temperature and precipitation should also be measured at a SoDAR site. Air

temperature is required to accurately calculate the speed of sound and therefore the returning echo’s

altitude. Precipitation can cause noise and scatter and needs to be screened out of the collected data to

improve accuracy.

33

(Bower, 2012)

34 (Horsfield, 2014)

35 (Windpower Egineering, 2015)

Figure 4-6 Triton SoDAR

Page 22: Guernsey Offshore wind - A Data Acquisition Strategy

14

4.3.3 LiDAR

Overview

LiDAR systems emit either a continuous or pulsed laser light to measure wind characteristics. Leosphere’s

WINDCUBE v2 (Figure 4-7) and Sgurr Energy’s Galion (Figure 4-8) use pulsed whilst ZephIR 300 (Figure 4-9)

uses continuous. The backscattered reflections caused by suspended aerosol particles and analysed again

for the Doppler Effect frequency shift that is used to infer a resultant velocity36. They are small enough to

be deployed at the foot of an offshore MET mast or mounted on the nacelle of a wind turbine.

Whilst profiling LiDAR’s are used to measure the wind in the vertical direction, side scanning LiDAR can be

used to obtain a 3D grid of wind data over a wide area from ranges of several kilometres. Side scanning

LiDAR can obtain wind data within a hemispherical volume from great range and is considered to be a

competitor to profiling LiDAR by one leading industry expert (Appendix C-15). However it is not yet as

prevalent as profiling and will therefore not be considered in this report.

36

(Bower, 2012)

Figure 4-8 Galion LiDAR Figure 4-7 Leosphere WINDCUBE v2

Figure 4-9 ZephIR 300

Page 23: Guernsey Offshore wind - A Data Acquisition Strategy

15

4.3.4 Summary

Remote sensing devices are easily moved around to gather data at multiple sites far more economically

than masts and in less time. They can also be deployed in areas where masts are impractical or unlawful37.

SoDAR systems are more prone to interference requiring more complex data quality control and are not

considered as accurate as LiDAR which also has extensive verification38.

DNV GL, international certification body and classification society considers the ZephIR 300 LiDAR as a stage

3 device (under ‘benign' conditions). This makes it an accepted device for providing bankable and finance

grade wind speed and energy assessment data. It has the added advantage of requiring limited or no on-

site MET mast comparisons39.

A WRA campaign utilising LiDAR is likely to provide the best ‘next step’ solution for Guernsey both in terms

of data requirements and investment level.

37

(Bower, 2012)

38 (Bower, 2012)

39 (offshorewindbiz (b), 2015)

Page 24: Guernsey Offshore wind - A Data Acquisition Strategy

16

4.4 Modelling

4.4.1 Virtual Met Mast™

Overview

The latest ‘Intelligent’ Virtual Met Mast™ (VMM) from the Met Office utilises site specific down scaling of

world class numerical mesoscale weather prediction models (illustrated in Figure 4-10) to produce a report

containing essential information for the prospecting, selection, and development of onshore and offshore

European wind farm projects. VMM has a resolution of 100m (model grid length) at a specified height

above sea level40 and a typical VMM report content includes41:

Site specific wind speeds

Long term mean wind speed and direction (up to 22 years at hub height)

W90 - wind speed certainty (%)

Turbulence intensity

Wind Shear

Max wind speeds (gusts, extreme winds)

Exceedance values

Air density

Turbine classification data

10 year time series data

The data is known to be accurate as it has been proven against 130 sites across UK and Europe including

offshore locations42. The standard report is available for medium wind markets. It can be generated both

with and without site data depending on the scale of the project and has become a bankable resource for

the industry43.

There are five versions of VMM covering a range of applications44:

UK and Europe – For large scale wind projects

Medium Wind – Smaller wind (down to 20m hub height)

VMM Plus – Combines with MET mast observations for higher certainty

VMM High Resolution – designed for sites with complex terrain

VMM Global – Being developed for non UK or EU countries

40

(Wong, et al., 2012)

41 (Norman, 2012)

42 (Met Office (c), 2015)

43 (Met Office (b), 2014)

44 (Met Office (a), 2014)

Page 25: Guernsey Offshore wind - A Data Acquisition Strategy

17

Figure 4-10 VMM Downscaling

Page 26: Guernsey Offshore wind - A Data Acquisition Strategy

18

4.4.2 MeteoPole - ZephyTOOLS

Overview

Zephy-Science is MeteoPole's research, development and training centre. Zephy-Science is continually

developing open source software tools with cloud based computing covering all the different phases of a

wind power project development from site selection to final micro-siting and bankable energy yield

assessment. It is specialized in developing numerical tools for designing the next generation of ‘smart wind

farms’ as well as optimizing existing wind farms. The company mainly focuses on its wind farm design

toolbox called ZephyTOOLS®45.

Among the core Zephy-Science technologies are:

Computational Wind Engineering (Mesoscale WRF and CFD OpenFOAM Wind Modelling)

Advanced Wind Resource Assessment

Energy Yield Prediction & Analysis

Power Forecasting

Condition Monitoring

Power Performance Monitoring & Optimization.

ZephyCFD is the micro-scale part of ZephyTOOLS Wind Farm Design software. It includes an automatic

wind flow model using Computational Fluid Dynamics (CFD) for the final micro-siting of turbines.

ZephyWDG is the WRA part of ZephyTOOLS that can be used for site prospecting, long-term correlation

with on-site masts and wind power forecasts on operating wind farms. It includes VMM and wind maps

that utilise a wind data generator based on mesoscale modelling.

45

(MeteoPole, 2015)

Page 27: Guernsey Offshore wind - A Data Acquisition Strategy

19

4.4.3 Summary

Inquiries with a Met Office representative confirmed that a UK/EU report would be viable and that the cost

of such a report would be £1975 (+VAT) (Appendix B-1). This presents a low investment opportunity to

validate existing WRA’s increasing certainty and encouraging further development.

The Channel Islands are part of the EU Customs Union and essentially part of the EU for trade of goods but

are outside the EU in all other aspects46, further checks should be made to ensure that Guernsey is covered

by UK/EU VMM. A sample report is available from the Met Office website47.

Similar to the Met Office, MeteoPole are a mesoscale data provider that can offer simulated historical data

or wind maps at any location. However, ZephyWDG offers much more than just a report. The software can

be used in-house and the model tuned (computation resolution, roughness length, simulation heights), to

match specific requirements. The ‘Entry’ ZephyWDG licence is advertised at €9600, this includes half a day’s

training, 6 month subscription to support and updates for 1 user. It also includes 1 ‘Machine day’ with the

cloud based virtual private server ZephyCLOUD. The complete ZephyTOOLS package including an ‘Entry’

licence ZephyCFD (€1800) would allow for a full wind farm design.

46

(Channel Islands, 2015)

47 (Met Office (d), 2015)

Page 28: Guernsey Offshore wind - A Data Acquisition Strategy

20

5 Similar projects

5.1 Havsul II

Havsul II was a proposed 800MW project in Norway. A LiDAR campaign was started in 2008 by EMD

International A/S (EMD) and Alpha Wind Energy (AWE) using a Leosphere LiDAR sited on a small lighthouse

rock near the prospective site and approximately 20km from a 60m wind mast installed on Ona island. The

LiDAR, installed and operated by AWE, was the primary data source and collected data up to 160m and

used the 60m wind mast for validation. EMD conducted the data analysis and AEP calculations for the now

failed proposal48. No information could be found on wind speed estimates prior to the FLiDAR WRA but a

figure of 10.49 m/s is recorded on the 4C offshore website and is presumed to come from the FLiDAR

campaign.

5.2 Ulsan – South Korea

Kangdong-Ulsan is a consented 196MW wind farm in the Sea of Japan (East Sea) in South Korea. The

project will consist of 28, 7MW turbines, in a 17km2 area expected to power around 140,000 homes when

completed. 4C offshore list the mean wind speed at the site as 9.29 m/s.

Galion LiDAR, a service offered by renewable energy consultants Sgurr Energy was used to conduct a 12

month wind measurement campaign for a South Korean construction company, SK Engineering &

Construction (SK E&C), as part of wind flow modelling and pre-construction development work for a

proposed offshore wind farm.

A Galion G4000 offshore LiDAR was used on the coast to measure wind conditions at a prospective wind

farm site approximately 2-4km offshore. A MET mast was installed close to the LiDAR to provide a long

term onshore reference throughout the campaign. The scope of the contract included campaign design,

device installation and training, data management and analysis, and decommissioning.

An SK E&C representative stated: “In the early stages of this project, we are interested to find out about the

wind resource at our proposed site. Deploying Galion LiDAR will provide a long term prediction based on

traceable, accurate offshore measurements. We will look forward to seeing how the results of this

campaign will inform the development of our project”49.

48

(Alpha Wind Energy, 2015)

49 (Sgurr energy, 2014)

Page 29: Guernsey Offshore wind - A Data Acquisition Strategy

21

5.3 Aberdeen Renewable Energy Group (AREG)

AREG was set up in 2004 to develop the renewables industry in Aberdeen, Scotland and the UK. AREG is

“widely recognised as an influential player and key enabler in the Scottish, UK and wider European

marketplace. Membership has grown to more than 170 businesses, with AREG actively assisting these

members to capitalise on new market opportunities”50.

Aberdeen Offshore Wind Farm Ltd (AOWFL) is a joint venture between Vattenfall and Aberdeen Renewable

Energy Group (AREG) (75% and 25% stakes respectively). Together they are developing the European

Offshore Wind Deployment Centre (EOWDC), a ground breaking 83MW facility off the coast of Aberdeen.

The centre will provide a platform for ‘first runs’ of offshore wind turbines to allow developers and supply

chain companies to test new designs, prove existing products and receive independent validation and

accreditation before commercial deployment as well as helping the industry reduce costs51.

The EOWDC represents “a huge opportunity to help the region develop its energy-based economy and

accelerate the growth of the Scottish and UK offshore wind industry, which has phenomenal potential, with

an estimated value of £100billion. Lessons learned and skills developed through the EOWDC will be

exportable, thus enabling our companies to win new business around the world”52

The grid connected wind farm (33KV) will consist of 11 turbines of between 6MW and 10MW located in a

7Km2 area approximately 13Km from the coast in Aberdeen Bay. The project is estimated to cost £230m

with a secured EU grant of £40m. It is estimated to produce enough electricity in a year to power the

equivalent of over 68,000 UK households53.

50

(AREG, 2015)

51 (4C (b), 2015)

52 (AREG, 2015)

53 (Vattenfall, 2014)

Page 30: Guernsey Offshore wind - A Data Acquisition Strategy

22

5.3.1 AREG WRA

The BERR atlas wind speed at the site was given as 7.23 m/s54. Short term wind speed data was recorded

for approximately two and half months with a Natural Power ZephIR LiDAR at a site on the coastline

approximately 7km adjacent to the EOWDC site and correlated with long-term data from Dyce

Meteorological Station (65m asl) approximately 7km further inshore as seen in Figure 5-1.

The wind data analysis showed the average wind speed to be 8.7 m/s at 90m height, with a predominant

wind direction to be from the south. A summary of the LIDAR measurements is shown in Table 5-155.

Measurement device Natural Power ZephIR

Location OS Grid Reference 395024 810254

Monitoring period 31 October 2008 to 22 January 2009

Wind speed measurement heights* 27 m, 70 m, 90 m, 125 m, 153 m

Data recorded Horizontal and vertical wind speed, wind direction, turbulence, temperature, pressure, humidity

Configuration Cloud correction turned on

54

(4C (c), 2015)

55 (Vattenfall, 2011)

Table 5-1 Summary of LiDAR Measurements

*Note: 1m added to the LIDAR measurement heights to account for height of device

Page 31: Guernsey Offshore wind - A Data Acquisition Strategy

21

Figure 5-1 AREG WRA data location points

Page 32: Guernsey Offshore wind - A Data Acquisition Strategy

221

5.4 Summary

Although no comparison can be drawn for wind speeds at the Havsul II site it serves to highlight that this

methodology has been used successfully in the past.

The Ulsan campaign followed the same methodology but no further details could be found about its

effectiveness and the site was much closer to shore than the Guernsey site.

The EOWDC methodology found the wind speed to be 8.7m/s at 90m, significantly higher than the BERR

figures of 7.23m/s. The chosen WRA was apposite for the stage of the project and would have been

much more economical than either a MET mast or FLiDAR installation. It is likely to have succeeded in

increasing confidence in the viability of the project and encouraged investment. Work is ongoing and 6

turbine manufacturers have signed a Memorandum of Understanding (MoU) with the project56.

56

(4C (b), 2015)

Page 33: Guernsey Offshore wind - A Data Acquisition Strategy

23

6 LiDAR Strategy

According to the Ecofys ‘Improved Bankability’ report57 LiDAR is now regarded as a proven mature

technology that is as accurate as conventional anemometry and recommends LiDAR for deployments

“next to a relatively short on-site MET mast. This can be a cost-effective solution to quantify the wind

shear and extrapolate wind speeds to hub height”. This is also supported by independent reviewers such

as DTU Wind Energy. Deutsche WindGuard, GL Garrad Hassan and ECN.

Leosphere state on their website that when used onshore combined with a MET mast and 12-18

months’ worth of data, a mobile LIDAR continuously collecting wind profile data can better characterize

the wind resource and reduce project risk and that it has been proven to save millions in equity

investments by providing bankable data to investors and owners58.

According to Lackner (2008), the scale and complexity of a MET mast installation means that a short

term campaign does not represent value for money and recorded data still requires extrapolation for

wind shear at turbine hub height. Lackner’s short-term shear measurement strategy seems applicable

since it considered a scenario with short-term (60 day) hub height measurements from a ground-based

device (LiDAR/SoDAR) and only a single lower measurement height reference (such as Chouet) for

estimating the shear characteristics at the site.

Lackner (2008), concluded that this method could “drastically improve the accuracy of shear predictions

on average” over a tall reference mast and that “the uncertainty of the predictions decreases as the

short-term measurement length increases”. He also concluded that “The true value in this method lies

in the substantially reduced uncertainty that it produces in shear extrapolation predictions. Utilizing this

approach allows for substantially more confidence in hub height mean wind speed predictions”.

Bower, (2012) states that “when paired with the long term data from a MET mast a LiDAR measurement

campaign period need only be enough to get a statistically representative sample of the wind

characteristics. This could be as little as a few weeks to a few months”59.

57

(Ecofys (a), 2013)

58 (Leosphere (a), 2014)

59 (Bower, 2012)

Page 34: Guernsey Offshore wind - A Data Acquisition Strategy

24

6.1 WRA methodology

Guernsey’s current measurement equipment consists of a 10m anemometer mast at the airport60,

approximately 102m asl61, and a second 10m anemometer mast installed in the north east of Guernsey

at Chouet, approximately 20m asl62. The Chouet mast has provided coastal wind data close to

prospective sites since 3/11/201163 and has confirmed the wind resource to be in line with previous

years analyses64.

A strategy similar to that of AREG strategy could be adopted with a LiDAR installed at the Choet wind

mast location providing data for extrapolation to the prospective site. The IEC guidelines reviewed in

this report are likely change to incorporate the use of LiDAR for performance prediction. Until this time

the measurements should follow accepted principles as stated in the installation manual65.

Should on site verification be required the Chouet mast can be used as the long term fixed reference

point. ZephIR can measure as low as 10m and so could periodically return to the mast height to validate,

reducing uncertainty about the site data66.

It is possible that the low height of the Chouet mast and the minimum height of the LiDAR range could

be too close for an adequate campaign. This being the case “jack-up” towers or “trailer towers” of

around 20m in height could be used. This would obviously come at extra cost but could be included

within a package WRA solution as suggested by TUV NEL67.

60

(Guernsey Met Office, 2012)

61 (Citizen Weather Observer Program, 2015)

62 (University of Exeter, 2013)

63 (Lee, 2011-2012)

64 (Aquatera, 2014)

65 (Vattenfall, 2011)

66 (ZephIR, 2012)

67 (Jones, 2015)

Page 35: Guernsey Offshore wind - A Data Acquisition Strategy

25

6.2 TUV NEL

Communications with Leon Youngs and Patrick Jones of TUV (NEL) investigated the possibility of utilising

a dormant LiDAR for future wind data acquisition on Guernsey. Guernsey’s existing equipment and data

acquisition as well as future requirements were ascertained to help develop a deployment plan and ‘ball

park’ costings. TUV NEL responded with a figure of £20,000 +VAT for a 6 month hire period including

training, calibration and service costs to prepare for deployment (Appendix B-2).

6.3 Summary

The use of a LiDAR in conjunction with the masts on Guernsey for a short term measurement campaign

would be an economical solution to better characterise the wind resource before progressing to a

campaign more acceptable for lenders and manufacturers such as MET mast and FLiDAR.

Page 36: Guernsey Offshore wind - A Data Acquisition Strategy

26

7 Conclusions and Recommendations

7.1 Conclusions

Different WRA methodologies most suited for Guernsey’s current situation have been identified and

reviewed and are listed in Table 7-1 below with approximate costs and scope;

Method Scope Approximate Cost

Virtual Met Mast Single report on prospective site £1975 +VAT

ZephyWDG or (ZephyWDG + ZephyCFD) Unlimited VMM (+ CFD for design) €9600 (€11400)

TUV NEL LiDAR campaign 6 months ‘real’ data acquisition £20,000

7.2 Recommendations

Given the findings it is obvious that more answers are needed especially official quotes from LiDAR

service providers such as Sgurr Energy and Leosphere.

In the interim it may be worthwhile obtaining a VMM from Met Office to see how this affects the WRA

for the prospective site, with the expected result being an increase in the wind speed estimation.

Similarly Aquatera could be approached for their ‘routemap’ to compare with the findings in this report.

It is highly recommended that the provisional quote from TUV NEL is followed up and invested in as this

will very likely represent the most economical LiDAR campaign producing ‘real’ data to accomplish the

optimal objective. Maintaining momentum on this could see a LiDAR deployed in June 2015 for 6

months covering a range of conditions that are fairly representative of a whole year, with the option to

extend the campaign.

The deployment and subsequent data analysis could be conducted by elements at UoE with GRET

support and easily meets the criteria for the 4th year MEng Renewable Energy industrial project module

running from September 2015 to January 2016, representing a fantastic mutually beneficial opportunity.

Table 7-1 Methods and Costs

Page 37: Guernsey Offshore wind - A Data Acquisition Strategy

27

7.3 Summary

An outline of the most suitable WRA options has been given and the optimal solution for Guernsey

identified and discussed. The aims and objectives of the thesis have been successfully achieved.

Modern technology and methodologies are found to be reliably replacing the traditional at greatly

reduced cost thus mitigating financial barriers and increasing certainty for wind speed estimation for

offshore wind developments.

7.4 Limitations

The author found it understandably difficult to obtain commercially sensitive information such as

costings and even to establish contact with relevant companies even when in association with GRET.

Access to essential details, knowledge and contacts was restricted by limited finances such as the

subscription to 4C and attendance at the 4th Annual WindPower Monthly Wind Resource Assessment

Forum.

7.5 Further work

There is great deal more work to be done to capitalise on a very competitively priced LiDAR campaign

and contribute to an offshore wind development in the States of Guernsey.

Page 38: Guernsey Offshore wind - A Data Acquisition Strategy

28

8 Bibliography

4C (a), 2015. Global Wind Speed Rankings. [Online]

Available at: http://www.4coffshore.com/windfarms/windspeeds.aspx

[Accessed 20 Feb 2015].

4C (b), 2015. European Offshore Wind Development Centre - EOWDC. [Online]

Available at: http://www.4coffshore.com/windfarms/european-offshore-wind-deployment-centre---

eowdc-united-kingdom-uk47.html

[Accessed 19 Feb 2015].

4C (c), 2015. Wind speed. [Online]

Available at: http://www.4coffshore.com/offshorewind/

[Accessed 20 Feb 2015].

4C (d), 2015. Global Wind Speed Rankings. [Online]

Available at: http://www.4coffshore.com/windfarms/windspeeds.aspx

[Accessed 20 Feb 2015].

4C (e), 2015. Organisations working on Neart na Gaoithe. [Online]

Available at: http://www.4coffshore.com/windfarms/contracts-on-neart-na-gaoithe-uk56.html

[Accessed 20 Feb 2015].

Alpha Wind Energy, 2015. LiDAR wind measurement campaign. [Online]

Available at: http://alphawind.dk/lidar_campaign

[Accessed 03 April 2015].

Anjum, L., 2014. Wind Resource Estimation Techniques-An Overview. International Journal of wind and

Renewable Energy, 3(2), pp. 26-38.

Aquatera, 2014. Review of the GRET report - Costed wind model for Guernsey, Stromness: Aquatera.

AREG, 2015. Welcome to AREG. [Online]

Available at: http://www.aberdeenrenewables.com/about-areg/welcome-to-areg/

[Accessed 19 Feb 2015].

BBC (a), 2013. NEWS Guernsey. [Online]

Available at: http://www.bbc.co.uk/news/world-europe-guernsey-21496754

[Accessed 18 Feb 2015].

BBC (b), 2013. NEWS Guernsey. [Online]

Available at: http://www.bbc.co.uk/news/world-europe-guernsey-21605962

[Accessed 18 Feb 2015].

Page 39: Guernsey Offshore wind - A Data Acquisition Strategy

29

Bower, M. C., 2012. Wind Resource Assessment - A Practical Guide to Developing a Wind Project. 1st ed.

Hoboken: John Wiley & Sons.

Carbon Trust (a), 2015. http://www.carbontrust.com/about-us/press/2015/02/offshore-wind-

accelerator-launches-worlds-largest-validation-trials-floating-offshore-wind-measurement-devices.

[Online]

Available at: http://www.carbontrust.com/about-us/press/2015/02/offshore-wind-accelerator-

launches-worlds-largest-validation-trials-floating-offshore-wind-measurement-devices

[Accessed 6 Feb 2015].

Carbon Trust (b), 2014. FLiDAR. [Online]

Available at: http://www.flidar.com/wp-content/uploads/2014/09/DNV-GL-FLiDAR-Stage-2-Validation-

Report-140918.pdf

[Accessed 18 April 2015].

Carbon Trust (c), 2013. FLiDAR. [Online]

Available at: http://www.flidar.com/wp-content/uploads/2014/05/OWA-FLiDAR-presentation.pdf

[Accessed 18 April 2015].

Carbon Trust (d), 2013. Reports, London: Carbon Trust.

Channel Islands, 2015. The Eu and the Channel Islands. [Online]

Available at: http://www.channelislands.eu/eu-and-the-channel-islands/

[Accessed 03 May 2015].

Citizen Weather Observer Program, 2015. METAR/Synop Information for EGJB (03894) in Guernsey

Airport, United Kingdom. [Online]

Available at: http://weather.gladstonefamily.net/site/EGJB

[Accessed 20 Feb 2015].

Collins English Dictionary, 2015. English. [Online]

Available at: http://www.collinsdictionary.com/dictionary/english/computational-fluid-dynamics

[Accessed 05 May 2015].

Ecofys (a), 2013. Publications. [Online]

Available at: http://www.ecofys.com/files/files/ecofys-2013-position-paper-on-lidar-use_02.pdf

[Accessed 02 Feb 2015].

Ecofys (b), 2013. Publications. [Online]

Available at: http://www.ecofys.com/files/files/ecofys-2013-shorter-wind-measurement-campaigns-

lidar.pdf

[Accessed 02 Feb 2015].

Page 40: Guernsey Offshore wind - A Data Acquisition Strategy

30

Emilio, M. D. P., 2013. Data Acquisition Systems. 1st ed. London: Springer.

Farmers Weekly, 2014. Accurate wind speed data crucial for best results. [Online]

Available at: http://www.fwi.co.uk/business/accurate-wind-speed-data-crucial-for-best-results.htm

[Accessed 13 Feb 2051].

FLiDAR (a), 2012. 3E and OWA Create New Company to Deliver Substantial Cost. [Online]

Available at: http://www.flidar.com/wp-

content/uploads/2012/11/FLiDARnv_OfficialLaunch_20121106_final.pdf

[Accessed 18 April 2015].

FLiDAR (b), 2014. DONG Energy installs second FLiDAR wind measurement buoy in Irish Sea. [Online]

Available at: http://www.flidar.com/dong-energy-installs-second-flidar/

[Accessed 18 April 2015].

FLiDAR (c), 2015. FLiDAR have completed the onsite wind measurements at the Neart Na Gaoithe

offshore wind farm being developed by Mainstream Renewable Power.. [Online]

Available at: http://www.flidar.com/news/

[Accessed 18 April 2015].

FLiDAR, 2012. News. [Online]

Available at:

http://www.flidar.com/?s=3E+and+OWA+Create+New+Company+to+Deliver+Substantial+Cost+Reducti

on+in+Resource+Assessments+of+Offshore+Wind+Power

[Accessed 2 April 2015].

Forewind, 2015. News. [Online]

Available at: http://www.forewind.co.uk/news/84/34/Second-meteorological-mast-installed-at-Dogger-

Bank.html

[Accessed 10 April 2015].

Google Earth, 2015. Home. [Online]

Available at: https://www.google.com/intl/en_uk/earth/

[Accessed 20 Feb 2015].

GRET, 2011. Feasibility Study into Offshore Wind Energy, St Peter Port: GRET.

GRET, 2013. Wind costings, a review of current knowledge and it’s applicability to Guernsey, St Peters

Port: GRET.

GRET, 2014. GUERNSEY ELECTRICITY SUPPLY - FUTURE STRATEGY, St Peter Port: The Policy Council.

GRET, 2015. RET Strategy – Preparation for Renewable Development – 2015 and Onwards, St Peter Port:

GRET.

Page 41: Guernsey Offshore wind - A Data Acquisition Strategy

31

Guernsey Met Office, 2012. 2012 Annual Weather Report , St Peter Port: The Guernsey Meteorological

Office.

Hopwood, D., 2012. Accurate wind resource testing. Jul-Aug, 13(4), pp. 22-23.

Horsfield, I., 2014. An Assessment of the Accuracy and Potential of LIDAR in the Wind Industry, Glasgow:

Ian Horsfield.

IEC, 2013. IEC 61400-12-1:2013, Geneva: IEC.

Jones, P., 2015. [Interview] (30 April 2015).

Lackner, M. A., 2008. THE STREAMLINED SITE ASSESSMENT METHODOLOGY: A NEW APPROACH FOR

WIND ENERGY SITE ASSESSMENT, Amherst: ProQuest LLC.

Lee, O., 2011-2012. FEASIBILITY OF OFFSHORE WIND IN GUERNSEY WATERS, Milton Keynes: Oliver Lee.

Leosphere (a), 2014. Wind Power. [Online]

Available at: http://www.leosphere.com/applications/lidar-yaw-turbine

[Accessed 22 Oct 2014].

Leosphere (b), 2015. WINDCUBEV2 OFFSHORE. [Online]

Available at: http://www.leosphere.com/products/vertical-profiling/windcube-v2-offshore-wind-

assessment

[Accessed 3 April 2015].

Madsen, P. H., 2008. Introduction to the IEC 61400-1 Standard. [Online]

Available at: http://www.windpower.org/download/461/Introduction_to_the_IEC.pdf

[Accessed 15 Feb 2015].

Met Office (a), 2014. Virtual Met Mast™ verification report: UK and Europe, Exeter: Met Office.

Met Office (b), 2014. Improved accuracy, Exeter: Met Office.

Met Office (c), 2015. Virtual Met Mast. [Online]

Available at: http://www.metoffice.gov.uk/renewables/vmm

[Accessed 03 May 2015].

Met Office (d), 2015. Virtual Met Mast™ report for Meteorological Research Unit, Cardington, Exeter:

Met Office.

MeteoPole, 2015. ZephyTOOLS. [Online]

Available at: http://www.meteopole.com/home/zephytools/

[Accessed 25 April 2015].

Page 42: Guernsey Offshore wind - A Data Acquisition Strategy

32

NOAA, 2012. An Introduction to Lidar Technology, Data, and Applications. [Online]

Available at: http://coast.noaa.gov/digitalcoast/_/pdf/lidar101.pdf

[Accessed 10 Dec 2014].

NOAA, 2012. TUTORIAL: Working with Lidar in ArcGIS 10. [Online]

Available at: http://coast.noaa.gov/digitalcoast/_/pdf/Lidar-data-handler-ArcGISv10-tutorial.pdf

[Accessed 10 Dec 2014].

Norman, S., 2012. Onshore wind 2012. [Online]

Available at:

http://www.scottishrenewables.com/media/uploads/events/presentations/onshore_wind_2012/break

out_2_stephen_norman.pdf

[Accessed 18 Feb 2015].

NREL, 1997. NREL-Wind Resource Assessment Handbook. [Online]

Available at: http://en.openei.org/wiki/NREL-Wind_Resource_Assessment_Handbook

[Accessed 2 Feb 2015].

offshorewindbiz (b), 2015. Home. [Online]

Available at: http://www.offshorewind.biz/2014/12/02/zephir-300-lidar-proves-its-bankability/

[Accessed 28 Sept 2014].

Practical Assessment Research & Evaluation, 2015. A Guide to Writing the Dissertation Literature

Review. Practical Assessment Research & Evaluation, 14(13), p. 2.

Renewable Energy Magazine, 2013. Wind. [Online]

Available at: http://www.renewableenergymagazine.com/article/rolling-hills-rocky-crags-20130617

[Accessed 30 April 2015].

Sgurr energy, 2014. Galion lidar - Overview and Experience, Glasgow: sgurr energy.

Smith, M., 2015. Head of Business Development [Interview] (Fri Feb 2015).

States of Guernsey, 2011. Energy (Resource Plan). [Online]

Available at: http://www.gov.gg/article/3261/Energy-Resource-Plan

[Accessed 12 April 2015].

U.S Department of Energy, 2012. Offshore Resource Assessment and Design Conditions. [Online]

Available at: http://www1.eere.energy.gov/wind/pdfs/offshore_data_requirements_gaps_analysis.pdf

[Accessed 16 April 2015].

University of Exeter, 2013. Guernsey Energy Analysis and Strategy Recommendations to 2050, Truro:

Students from The University of Exeter, Penryn, Cornwall.

Page 43: Guernsey Offshore wind - A Data Acquisition Strategy

33

Vattenfall, 2011. Environmental Statement - Aberdeen Offshore Wind Farm Limited. [Online]

Available at: http://corporate.vattenfall.co.uk/globalassets/uk/projects/aberdeen-bay/eowdc-consent-

vol2.pdf_18477873.pdf

[Accessed 18 April 2015].

Vattenfall, 2014. Projects. [Online]

Available at: http://corporate.vattenfall.co.uk/projects/wind-energy-projects/european-offshore-wind-

deployment-centre/

[Accessed 19 Feb 2015].

Vogiatzis, N., Kotti, K., Spanomitsios, S. & Stoukides, M., 2004. Analysis of wind potential and

characteristics in North Aegean, Greece. Renewable Energy, Volume 29, pp. 1193-1208.

WindData.com, 2015. Sites. [Online]

Available at: http://130.226.56.150/site_background_information.php?site_code=hornsrev

[Accessed 30 April 2015].

Windpower Egineering, 2015. Uploads. [Online]

Available at: http://www.windpowerengineering.com/wp-content/uploads/2014/10/Triton-sodar-with-

turbines-in-back-500p-wide.jpg

[Accessed 21 April 2015].

windpowermonthly, 2015. Home. [Online]

Available at: http://www.windpowermonthly.com/

[Accessed 05 March 2015].

Wong, R., Webster, S. & Vosper, S., 2012. High-resolution dynamical downscaling techniques for wind

resource assessment, Exeter: Met Office.

Yamaguchi, A. & Ishihara, T., 2014. Assessment of offshore wind energy potential using mesoscale

model and geographic information system. Renewable Energy, Volume 69 , pp. 506-515.

ZephIR LiDAR, 2014. ZephIR 300 – Onshore Wind Lidar. [Online]

Available at: http://www.zephirlidar.com/products/zephir-300/

[Accessed 10 Dec 2014].

ZephIR, 2012. Publications. [Online]

Available at: http://www.zephirlidar.com/support/publications/all/

[Accessed 14 FEb 2015].

ZephIR, 2014. Recent posts. [Online]

Available at: http://www.zephirlidar.com/about/news-and-events/page/2/

[Accessed 20 April 2015].

Page 44: Guernsey Offshore wind - A Data Acquisition Strategy

34

9 Glossary

Abbreviation Meaning

Computational Fluid Dynamics The prediction of the behaviour of fluids and of the effects of fluid motion past objects by numerical methods rather than model experiments68

OpenFOAM A free, open source CFD software package developed by OpenCFD Ltd

Measure Correlate Predict Established method for estimating the long term wind resource at a target site by using short term site data and long term reference data.

68

(Collins English Dictionary, 2015)

Table 9-1 Glossary

Page 45: Guernsey Offshore wind - A Data Acquisition Strategy

A1

Appendix A – Company information

Company contacts

Contact Organisation

Mat Desforges; Policy advisor, Financial Services and Renewables GRET

Peter Banes; Renewable Energy Scientist GRET

Matt Smith; Head of Business Development ZephIR Lidar

Amy Evans; Account Manager Renewables Met Office

Rebecca Martin; Offshore Wind O&M Research Engineer EDF

Leon Youngs; Team Leader, Wind Energy TUV SUD UK Ltd (NEL)

Patrick Jones; Senior Engineering Consultant TUV SUD UK Ltd (NEL)

David Quarton; Senior Technical Advisor DNV GL

Ervin Bossanyi; Senior Principle Researcher DNV GL

Will Laird; Senior Product Engineer Sgurr energy

Page 46: Guernsey Offshore wind - A Data Acquisition Strategy

A2

WRA equipment providers

FLiDAR (ZephIR)

Axys (Sentinel) http://axystechnologies.com

Babcock (Forecast) http://www.babcockinternational.com

Fugro (Seawatch) http://www.fugro.com

Eolus http://www.eolusvind.com

Fraunhoffer (IWES) http://www.iwes.fraunhofer.de

FLiDAR (WINDCUBE v2)

3E http://www.3e.eu

FLiDAR nv http://www.flidar.com

KONA http://konastructures.com

oldbaum http://www.oldbaumservices.co.uk

SoDAR

Second Wind Inc (Triton) www.secondwind.com

LiDAR

ZephIR http://www.zephirlidar.com

WINDCUBE v2 http://www.leosphere.com/en

Sgurr energy http://www.sgurrenergy.com

Meteorological masts

Sgurr energy http://www.sgurrenergy.com

Page 47: Guernsey Offshore wind - A Data Acquisition Strategy

B1

Appendix B – Email communications

Amy Evans: Account Manager - Renewables, Met Office

1. From: Evans, Amy

Sent: 16 February 2015 13:25

To: Staddon, Marc

Subject: RE: VMM costs

The cost for a VMM based on the turbines you are looking at would be £1975 + VAT.

Many thanks,

Amy Evans

Patrick Jones: Senior Engineering Consultant, TUV NEL

2. From: Jones, Patrick

Sent: Wed 06/05/2015 01:19

To: Staddon, Marc

Subject: RE: Guernsey information

As a rough cost estimate we are looking at around £20K to provide the training and hire for a 6 month

period and would include the necessary service and calibration costs for the instrument deployment.

Bullet points of service offering as follows:

Prescribe outline measurement campaign procedure in discussion with client.

Detail appropriate measurement methodology/ approach taking into account standards

and industry best practices.

Provide wind speed measuring equipment on a hired out basis including servicing and

calibration. 6 Months with pro-rata increase if extended.

Provide training on installation, commissioning, operating and data gathering from the

loaned equipment.

Data recovery and analysis services quotable as extra, as an option.

Continues…

Page 48: Guernsey Offshore wind - A Data Acquisition Strategy

B2

One option is to include deploying a taller temporary MET mast (mobile and likely not requiring the benefit

of having planning permission) and NEL are happy to quote for this. There could be economies if including

this and Leon has suggested that the additional cost could be £5K for the simplest of services.

The provision of electrical power, comms connectivity options and insurance would incur additional costs

and subject to specific location, access and available services. This may require a separate short up front

feasibility/ site survey visit as precursor which would be chargeable and could apply to any equipment NEL

propose.

Regards,

Patrick

Page 49: Guernsey Offshore wind - A Data Acquisition Strategy

C1

Appendix C – Phone conversations

Matt Smith: Head of Business Development, ZephIR

Fri 13/02/2015 12.00

After introductions I explained to Matt the aims of my project and that I would be very grateful for input to

the following questions:

What are advantages and disadvantages of LiDAR over other techniques?

What would be the best strategy for GRET?

What advantage does ZephIR have over other competitors?

What are the likely costs of a LiDAR resource assessment?

His response was very detailed and the salient points are listed below:

Advantages and Disadvantages

1) “One of the main advantages of using LiDAR for resource assessment over more traditional techniques

is the ‘future proofing’ with regard to hub height selection. LiDAR measurement campaigns typically

provide 10 sets of data from 10m to 200m above installed position (and occasionally up to 300m) and

so more easily provide equivalent wind speeds for rotor heights”

2) “Unlike Met Mast anemometry LiDAR also considers profile changes and veer”

3) “The major advantage was the considerable cost savings to be had. Met Mast went from a predicted

£6m to £10-12m”

4) “Added value to be gained by keeping FLiDAR on site during construction include:

1. Monitoring of conditions for risk assessment (health and safety etc.)

2. Site calibration of turbines for power delivery checks (not an IEC requirement but will influence

manufacturers

3. Forecasting for optimising performance and reducing fatigue

5) “Continuous Wave (CW) device takes 50 measurements at hub height and ‘screens out’ motion of

support structures where Pulsed Wave (PW) devices can’t “

Continues…

Page 50: Guernsey Offshore wind - A Data Acquisition Strategy

C2

General information

6) “A large proportion of the cost of deploying measurement devices is the support structure”

7) “Currently, fixed foundations similar to those required for a Met Mast are the industry standard and

are preferred by DNV GL”

8) “Newer, lower cost structures are in development for use with LiDAR. For example floating LiDAR or

‘FLiDAR’ has been developed through the Offshore Wind Accelerator (OWA) programme and utilise

spar buoys or tension leg platforms as low motion platforms for LiDAR”

9) £2.5m for tension leg platforms, £750,000 for spar buoy (Fugro Seawatch) and less than £1m for a

hull design (Axys WindSentinel)”

10) “The market wants 18 months’ worth of data tendered as contract”

11) “Companies using ZephIR include:

1. Babcock (Forecast)

2. Fugro (Seawatch)

3. Axis (Sentinel)

4. Eolus

5. Fraunhoffer (IWES), previously Leosphere Windcube v2”

12) “Windcube users such as:

1. 3E

2. FLiDAR nv

3. KONA

4. oldbaum

13) “essential for getting P50 and P90 figures for energy production at sites”

14) “there is an aggressive movement toward LiDAR in the UK and EU from the likes of DONG (now

using LiDAR exclusively for offshore wind), EDF, GDF (SUEZ), EDP Inovação (EDPI)”

Competition

15) “3D or hemispherical LiDAR’s are a competitor to ZephIR and although they can scan the whole site

providing greater certainty for horizontal extrapolation they have questionable financial acceptance

and the sample rate is effected by range”

16) “Optimum large site scenario would be a combination of island based Windcubes , hemispherical

LiDAR and floating LiDAR (ZephIR)”

Continues…

Page 51: Guernsey Offshore wind - A Data Acquisition Strategy

C3

Guernsey strategy

17) “two options for Guernsey would be to invest in the resource assessment and then recoup the cost

from the developer or auction the sites and assess from potential bidders”

18) “Stage 1: for 4-10 turbines in shallow water would involve modelling and/or floating LiDAR for 12

months with the added bonus of future proofing with regard to hub height data”

19) “Stage 2: floating LiDAR also used for tidal and wave data in deeper sites, particularly relevant for

floating wind sites”

20) “Met Office VMM used in initial feasibility stages but ‘real’ data required for finance and warranties”

Page 52: Guernsey Offshore wind - A Data Acquisition Strategy

D

Appendix D – GRET Meeting

Meeting with Mat Desforges and Peter Barnes of GRET, Richard Cochrane and Ilie Bivol

09/12/2015.

Salient points:

1) Discussed projects scope and deliverable/timescales

2) NDA progress discussed – Actioned, GRET to sort out with RC

3) GRET has ‘green light’ for next steps toward offshore wind

4) GRET working to releases electricity data from Guernsey Electricity Company (GEC)

5) PB working on permanent planning for Met Mast in Choet – will consult ref LiDAR

6) NDA definitely required for recent bathymetry data (30m contour)

7) Other data (geology etc.) available without NDA

8) RC to pursue LiDAR with NEL and VMM details through Met Office contact

9) Bi-weekly updates going forward

10) Dissertation to be commercial in style with NDA data in separate detailed report

11) Prioritise wind data strategy report over site selection

12) Search GIS map of island for possible LiDAR deployment sites (PB to provide)

13) Interim report scheduled for end of Feb to outline:

a. Options

b. Costs

c. Providers

d. Industry standards

e. Multiple site solutions

f. Recommendations – most ‘value for money’ option

g. Timescale for final report

Page 53: Guernsey Offshore wind - A Data Acquisition Strategy

E

Appendix E – Aquatera

Strategy for wind data gathering and resource analysis

A small change in average wind speed over 25 years can have a large impact on the projected cash flows

and is crucial in making the correct investment decision. Accurate wind data is crucial to the viability of

the project and therefore we would suggest that better wind resource data is a priority for the project

(over a more detailed financial model) and will be needed in order to attract finance. Also, a

conversation with the AREG (Aberdeen Renewable Energy Group)69 who are developing a medium scale

wind farm offshore Aberdeen City would be worthwhile. They have been trying to develop a small wind

farm with support from the Local Authority, so they understand some of the issues facing Guernsey.

An economical alternative to constructing a MET mast would be to use LIDAR equipment which

measures wind speeds from ground level (or sea level) to the proposed turbine height. There are several

providers of land-based LIDAR which can be purchased or rented70. Therefore, one approach would be

to seek advice on LIDAR type and placement onshore but as close as practicable to the selected offshore

site. An alternative, but more expensive approach would be to install a floating LIDAR set moored within

the proposed offshore site. Floating LIDAR is a relatively new advance. It is being evaluated at NAREC

and at least two developers (DONG and Mainstream) have already installed units offshore71. The FLiDAR

set consists of state-of-the art measurement equipment including a buoy adapted Leosphere LiDAR

mounted on a standard marine buoy and powered by its own renewable energy system comprising solar

photovoltaic and wind power technology.

Consultation with wind resource analysis experts (such as Sgurr Energy) could be useful in determining

the best pathway for obtaining more accurate data. They will be able to offer advice on the limitations

and advantages of different measurement options.

A ‘routemap’ report tailored to GRET would outline options for data gathering and data analysis.

69

http://www.aberdeenrenewables.com/

70 See for example: http://www.sgurrenergy.com/wp-content/uploads/2013/01/Galion-Brochure-B2.pdf

71 http://www.3e.eu/flidar-and-dong-energy-start-europes-first-commercial-floating-lidar-offshore-wind-

measurementcampaign/ and http://renews.biz/54015/north-sea-flidar-first-by-mainstream/