PAGE No.: 1 OF 11
VALDEL ENGINEERS & CONSTRUCTORS PVT LTD
MEGHDOOTH MANSION
9, CIVIL STATION HOSUR ROAD
BANGALORE-560025 (INDIA)
PROJECT : GAS COMPRESSOR SYSTEM
CLIENT/OWNER : GUJARAT STATE PETRONET LTD., GANDHINAGAR
CONTRACT No. : 9500 VE
DOCUMENT No. : GSPL-207-E-6108
DOCUMENT TITLE : SPECIFICATION FOR LT CAPACITOR CONTROL
PANEL WITH APFC
0 01.02.2012 ISSUED FOR BID MMR SLC SLC NRR
REV. DATE REVISION DESCRIPTION PREPD. CHKD. APPD. P.M.
FV5001-1/10
VALDEL ENGINEERS &
CONSTRUCTORS PVT LTD REVISION STATUS
SHEET
PAGE No. : 2 OF 11
CONTRACT No. : 9500VE
DOCUMENT No.: GSPL-207-E-6108 REV
.
0 DATE
:
01.02.2012
DOCUMENT
TITLE:
SPECIFICATION FOR LT
CAPACITOR CONTROL PANEL
WITH APFC
SIGN. :
SHEET 1
OF
PAGE
NO. REV.
ADDL.
PAGE NO. REV.
PAGE
NO. REV.
ADDL.
PAGE NO. REV.
PAGE
NO. REV.
ADDL.
PAGE NO. REV.
1 0 51 101
2 0 52 102
3 0 53 103
4 0 54 104
5 0 55 105
6 0 56 106
7 0 57 107
8 0 58 108
9 0 59 109
10 0 60 110
11 0 61 111
12 62 112
13 63 113
14 64 114
15 65 115
16 66 116
17 67 117
18 68 118
19 69 119
20 70 120
21 71 121
22 72 122
23 73 123
24 74 124
25 75 125
26 76 126
27 77 127
28 78 128
29 79 129
30 80 130
31 81 131
32 82 132
33 83 133
34 84 134
35 85 135
36 86 136
37 87 137
38 88 138
39 89 139
40 90 140
41 91 141
42 92 142
43 93 143
44 94 144
NOTE: IF REVISION REQUIRES ADDITIONAL PAGES TO BE INSERTED IN BETWEEN THE DOCUMENT, THE NUMBER OF THE PAGE AT
INSERTION SHALL BE NUMBERED WITH DECIMAL (e.g. INSERTION BETWEEN PAGE 10 AND 11 SHALL BE NUMBERED AS 10.1, 10.2
........)
FV5046-1/7
SPECIFICATION
FOR LT
CAPACITOR
CONTROL PANEL
PAGE No. : 3 OF 11
Contract No. : 9500 VE
PROJECT: Revision No. : 0
GAS COMPRESSOR SYSTEM Doc. No. : GSPL-207-E-6108
Date : 01.02.2012
FV5062/2
TABLE OF CONTENTS
1.0 SCOPE ............................................................................................................................. 4
2.0 CODES AND STANDARDS .......................................................................................... 4
3.0 GENERAL REQUIREMENTS ..................................................................................... 4
4.0 CONSTRUCTION .......................................................................................................... 5
5.0 DESIGN FEATURES ..................................................................................................... 6
6.0 OPERATIONS ................................................................................................................ 6
7.0 EARTHING ..................................................................................................................... 7
8.0 DOCUMENTATION ...................................................................................................... 7
9.0 INSPECTION, TESTING AND ACCEPTANCE ....................................................... 8
10.0 SYSTEM TESTS ............................................................................................................. 8
11.0 SPARES ........................................................................................................................... 8
12.0 PACKING FOR TRANSPORT..................................................................................... 9
13.0 ATTACHMENT .............................................................................................................. 9
SPECIFICATION
FOR LT
CAPACITOR
CONTROL PANEL
PAGE No. : 4 OF 11
Contract No. : 9500 VE
PROJECT: Revision No. : 0
GAS COMPRESSOR SYSTEM Doc. No. : GSPL-207-E-6108
Date : 01.02.2012
FV5062/2
1.0 SCOPE
The scope of this specification covers design, manufacture, assembly, shop
testing and delivery of low voltage shunt capacitors suitable for indoor locations
along with complete accessories and parts necessary for safe and efficient
operation.
2.0 CODES AND STANDARDS
The equipment shall comply with the requirements of latest revision of the
following standards issued by BIS (Bureau of Indian Standards) unless specified
other wise:
IS 8623 Faraday built assembly for switch gear & control gear
IS 2834 Shunt capacitor for power system
IS 4237 General requirement of switchgear & control gear for voltage not
exceeding 1000V AC & 120 volt DC.
IS 5 Colors for ready mixed paints and enamels
IS 5082 Wrought aluminium and aluminium alloy bars, rods, tubes
and sections for electrical purpose
IS 12672 Internal fuses and internal overpressure disconnectors for shunt
capacitors.
In case Indian standards are not available for any equipment, standards issued
by IEC/BS/VDE/IEEE/NEMA or equivalent agency shall be applicable.
3.0 GENERAL REQUIREMENTS
3.1 The offered equipment shall be brand new with state of the art technology and a
proven field track record. No prototype equipment shall be offered.
SPECIFICATION
FOR LT
CAPACITOR
CONTROL PANEL
PAGE No. : 5 OF 11
Contract No. : 9500 VE
PROJECT: Revision No. : 0
GAS COMPRESSOR SYSTEM Doc. No. : GSPL-207-E-6108
Date : 01.02.2012
FV5062/2
3.2 The vendor shall be responsible for design, engineering and manufacturing of
the complete capacitor bank to fully meet the intent and requirements of this
specification and attached data sheets. All equipment shall be properly
coordinated to ensure complete compatibility
4.0 CONSTRUCTION
4.1 APFCR PANEL
The housing of the capacitor banks shall be of open construction with free
ventilation for capacitor units. The connections from the capacitor units to the
control panel shall be carried in totally enclosed, dust-proof, vermin-proof bus-
ways or wire-ways. The unit shall be free standing, floor mounting & having
sheet steel thickness of 2.0mm for load bearing members 1.6mm for doors &
louvers & 3mm thick base channel. The control panel shall be fully
compartmentalized and extensible for future expansion. Bus bars and feeder
circuits shall be segregated. Single panel with all the capacitors, control &
Relay can be also considered.
4.1.1 The bus-bar sizes and clearances shall be suitable for connection of cables
through soldering sockets or crimping type cable lugs. Size of the cable will be
specified in Purchase Data Sheets. Bus-bar chamber shall be extended suitably
on one side to enable termination of cable. Undrilled removable gland plate and
access covers shall be provided for cable entry required. 5.3 The capacitor
banks shall comprise the following basic components. Other equipment, not
specifically listed below but necessary for the safe and proper functioning of the
capacitor bank shall be included:
• Capacitor units of appropriate kVAR rating
• Internal element fuses
• Bushings as per requirement
Cable end boxes for cable termination
• PVC sleeved aluminium bus bars for interconnecting the units to form
the capacitor bank
• Discharge resistors
• Incoming isolator, if specified
SPECIFICATION
FOR LT
CAPACITOR
CONTROL PANEL
PAGE No. : 6 OF 11
Contract No. : 9500 VE
PROJECT: Revision No. : 0
GAS COMPRESSOR SYSTEM Doc. No. : GSPL-207-E-6108
Date : 01.02.2012
FV5062/2
5.0 DESIGN FEATURES
5.1 Capacitor Units
5.1.1 The dielectric used in the capacitors shall be all polypropylene or mixed dielectric or
Gas filled with low watt loss. The impregnate in the capacitors shall be non-toxic, non-
PCB (Poly chlorinated bi-phenyl) based, and biodegradable.
5.1.2 The capacitor units shall be assembled such that the capacitor banks are capable of
withstanding the electro-dynamic and thermal stresses caused by transient over currents
during switching. The capacitor units shall have overload capacity as per IS 13925.
5.1.3 Protection for capacitor banks using internal element fuses shall conform to the
following requirements:
5.1.3.1 In internal element fuse design, the internal design of series and parallel
arrangement of elements shall be such that:
• In the case of one element failure, there is no harmful over voltage
across the remaining elements and no appreciable change in the
operation of the capacitor bank.
• Operation of a single fuse element does not cause cascade fuse bowling.
• Permissible over voltages and surges do not cause fuse bowling.
5.1.4 Discharge Resistors
Discharge Resistors shall be provided to reduce the capacitor bank terminal voltage to a
value equal to or less than 50V within 10 minutes after capacitor is disconnected from
the electrical system.
6.0 OPERATIONS
6.1 Power Factor Improvement Relay (PFIR) capable of automatic switching of the
capacitor units shall be provided. The relay shall have minimum 12 steps.
6.2 The relay shall measure KVAR of the system and shall be actuated by current signal of
1 Amp from secondary side of CT provided on incomer of Main PDB. 415 Voltage
signal shall be trapped from incomer of APFIR.
Essentially PFCR shall be able to achieve the following functions / features:
SPECIFICATION
FOR LT
CAPACITOR
CONTROL PANEL
PAGE No. : 7 OF 11
Contract No. : 9500 VE
PROJECT: Revision No. : 0
GAS COMPRESSOR SYSTEM Doc. No. : GSPL-207-E-6108
Date : 01.02.2012
FV5062/2
• Consistently high power factor under fluctuating load conditions.
• Automatically switch ON and OFF (self-adjustment) relevant capacitor
steps to ensure consistent power factor
• Ensure user interface for enabling reliable understanding of system
operation, such as display of power factor, number of switching
operations carried out, pre-set parameters, etc.
• Protect against any electrical faults (surge protection, unbalance, etc.) in
a manner that will ensure safe isolation of the power factor correction
equipment i.e., capacitors.
• No-volt release feature, to disconnect the capacitor in the event of
power supply failure.
• Digital setting of parameters like target PF, switching time, step limit,
etc.
• Visual display of target power factor.
• Indication for switching of banks per step.
• Switch ON and OFF the capacitors in rotation so that individual
capacitor bank shall not be in continuous used and unused condition for
a long time.
• Normally one capacitor unit of 5 KVAR shall be kept ON & balance
shall be variable as per requirement.
• Minimum Sensing current shall be 1%.
7.0 EARTHING
Enclosure of individual capacitors unit shall be provided with two numbers 10 mm dia.
earth terminals, each complete with two plain and one spring washers, nuts, etc. These
terminals shall be effectively bonded to the common sheet steel framework. Each bank
shall have two external earth terminals on the bus-bar chamber, complete with
hardware.
8.0 DOCUMENTATION
The vendor / manufacturer shall perform the engineering for the capacitor bank and
shall submit to Owner / RGTIL for review / reference, as per enclosed documentation
schedule.
SPECIFICATION
FOR LT
CAPACITOR
CONTROL PANEL
PAGE No. : 8 OF 11
Contract No. : 9500 VE
PROJECT: Revision No. : 0
GAS COMPRESSOR SYSTEM Doc. No. : GSPL-207-E-6108
Date : 01.02.2012
FV5062/2
9.0 INSPECTION, TESTING AND ACCEPTANCE
All necessary routine and acceptance tests as per IS 13925 shall be performed on the
capacitor bank / capacitor units in the presence of purchaser’s representative. Two
weeks’ advance notice shall be given to the purchaser to enable him or his authorized
representative to witness the tests. During the course of manufacturing, the purchaser or
his authorized representative to witness the tests. During the course of manufacturing,
the purchaser or his authorized representative shall be free to visit the works and assess
the progress of work and the manufacturer shall render him all possible assistance to do
so.
10.0 SYSTEM TESTS
Insulation resistance test. Functional test including simulation test on relay.
10.1.1 Capacitor Bank
Following routine test as per IS: 13340/13441 shall be carried out on the
Capacitor Bank:
• Visual Examination
• Test for output / Capacitance
• Voltage test between terminals
• High Voltage Test
• Voltage test between terminals & earth (for capacitor bank)
• Insulation resistance test
• Test for efficiency of discharge test
11.0 SPARES
11.1 A priced list of recommended operating spares and maintenance spares for two years
operation shall be provided with the Tender.
11.2 Spares shall be purchased at the discretion of the Purchaser.
11.3 Commissioning spares shall be provided by the Vendor.
SPECIFICATION
FOR LT
CAPACITOR
CONTROL PANEL
PAGE No. : 9 OF 11
Contract No. : 9500 VE
PROJECT: Revision No. : 0
GAS COMPRESSOR SYSTEM Doc. No. : GSPL-207-E-6108
Date : 01.02.2012
FV5062/2
12.0 PACKING FOR TRANSPORT
Capacitor banks along with the panel shall be packed and forwarded in accordance with
the Packing and Shipping Instructions.
13.0 ATTACHMENT
Data sheet for LT capacitor control panel………………….9500-75-1055
DATA SHEET FOR PAGE No. : 10 OF 11
LT CAPACITOR CONTROL PANEL CONTRACT No.: 9500 VE
SHT. 2 OF 2 REV. 0
DOC. No. : 9500-75-1055 ITEM. No.: QTY.:
PROJECT : REQN. No.: GSPL-207-E-6108
1 DESIGNATION
1.1 DESIGN AMBIENT TEMPERATURE 40º C
2 SYSTEM PARTICULARS
2.1 Voltage 415 ± 10%
2.2 Frequency 50 ± 5%
2.3 No of Phases / Wire 3 Phase, 4 Wire
2.4 System Grounding Solidly Earth
2.5 Fault Level 10kA, Symmetrical
3 Control / Auxiliary Supply
3.1 Contactor Coil 240V, 1 Ph, AC Supply
3.2 Potential Indicating Lights 240V, 1 Ph, AC Supply
3.3 Other Indicating Meters & Lights 240V, 1 Ph, AC Supply
3.4 Space Heaters 240V, 1 Ph, AC Supply
4 CONSTRUCTION
4.1 TYPE / MOUNTING Compartmentalised / Free Standing
4.2 NO. OF FRONTS Single Front
4.3 BASE FRAME Integral
4.4 DEGREE OF PROTECTION Indoor, IP 41(Min)
4.5 COLOUR *
5 CONTACTORS
5.1 TYPE Air Break
5.2 DUTY CLASS Capacitor Duty
VALDEL ENGINEERS &
CONSTRUCTORS PVT LTD
GAS COMPRESSOR PROJECT
5.2 DUTY CLASS Capacitor Duty
5.3 RATING 1.2 times Feeder Rating (Min)
5.4 AUX. CONTACTS 2 N.O and 2 N. C
6 TECHNICAL PARTICULARS OF CAPACITOR BANK
6.1 TYPE *
6.2 CONNECTION *
6.3 RATED VOLTAGE *
6.4 RATED CURRENT *
6.5 FREQUENCY *
6.60 OUTPUT KVAR *
6.7 MICROFARAD *
6.8 DUTY *
6.9 DISCHARGE RESISTOR VALUE *
6.10 NO. OF PHASES *
6.11 TOTAL HIGHT *
6.12 SUITABLE FOR PANEL MOUNTING *
6.13 MAX. TEMP. RISE PERMISSIBLE *
NOTE :
2. THE RATING OF TRANSFORMER INDICATED IS TENTATIVE.THE EXACT RATING SHALL BE WORKED OUT
0 01.02.12 SLC SLC
REV. DATE DESCRIPTION PREPD. CHKD. APPD.
FV7555-1/2
DURING DETAIL ENGINEERING.
ISSUED FOR BID MMR
1. DATA MARKED ` * ' IS TO BE FILLED UP BY VENDOR ALONG WITH BID.
DATA SHEET FOR PAGE No. :11 OF 11
LT CAPACITOR CONTROL PANEL CONTRACT No.: 9500 VE
SHT. 2 OF 2 REV. 0
DOC. No. : 9500-75-1055 ITEM. No.: QTY.:
PROJECT : REQN. No.: GSPL-207-E-6108
6.14 CONSTRUCTION
6.15 INSULATION LEVEL *
6.16 TYPE OF MOUNTING ARRANGEMENT THE PANEL *
6.17 CAPACITOR DISCHARGE TIME *
6.18
(a) 5 kVAR *
(a) 2 kVAR *
(a) 1 kVAR *
7 APFC PANEL
7.1 AUXI. SUPPLY LEVEL *
7.2 NO. OF CHANNEL *
7.3 AUTO / MANUAL SELECTION *
7.4 DISPLAY TYPE *
7.5 DEGREE PROTECTION *
7.6 TYPE *
8 SINGLE PHASE PREVENTION
8.1 SPP *
8.2 Hooter *
9 COMPONENTS
9.1 Bus Bar
9.1.1 Material Aluminium
9.1.2 Heat Shrinkable PVC Sleeve Required
9.1.3 Rating *
9.1.4 Main Bus bar Position *
9.1.5 Material of Bus bar Support *
9.2 Earth Bus
9.2.1 Material Aluminium
9.2.2 Min Size 50 * 6
9.3 Isolators
9.3.1 Make /Type *
9.3.2 Rating *
9.4 Accuracy Class of Instruments *
9.5 MCB's make
9.5.1 MCB's Rating *
9.6 ELCB's Make
9.6.1 ELCB's Rating / No of Poles *
9.7 MCCB *
9.8 Cable Entry *
9.9 Cable Glands & Lugs *
9.10 Spare Feeders *
FV7555-2/2
VALDEL ENGINEERS &
CONSTRUCTORS PVT LTD
GAS COMPRESSOR PROJECT
CAPACITOR MODULE FOR EWPL TOP-2 (50 KVAR)